Rate Analysis

28
RATE ANALYSIS OF CONSTRUCTION MATERIALS Batch 2012

Transcript of Rate Analysis

 

 

 

RATE ANALYSIS OF CONSTRUCTION MATERIALS  

 

Batch

2012 

 

 

2 | P a g e   

                                                     

  

 

 

Muhammad Bilal Waseem  (2012‐CV‐150) 

Tariq Ali Soomro       (2012‐CV‐131) 

Shahbaz Khan        (2012‐CV‐157) 

Syed Muhammad Atif    (2012‐CV‐169) 

Abdullah Dal         (2012‐CV‐158) 

Azhar Ali Khurshadi      (2012‐CV‐112) 

Jan Muhammad Solangi    (2012‐CV‐092) 

   

 

 

 

 

 

 

3 | P a g e   

 

 

 

 

ACKNOWLEDGEMENT 

 

   The group effort and ability of team work made it possible for us to 

complete the task which was given to us and we all thanks Almighty 

Allah for helping us through all this process. 

PROFESSOR SYED FARAZ JAFRI is teacher as well as a inspiration for all 

of the students. With his effort and encouragement we finally 

completed our work and also it proved to be informative.   

We are thankful to our sir for conveying us such a job which helped us 

in accepting all technical terms, estimating the cost of a project and 

computing the amount and rate of material used in project. It also 

boost our confidence level and motivated us towards field work 

analysis.  

 

 

4 | P a g e   

 

INDEX

S#  DESCRIPTION  PAGE 

  EXCAVATION AND FORMWORK  1‐2 

1  EXCAVATION AND FORMWORK  2 

  CEMENT,BLOCKS,SAND,CRUSH AND STEEL  3‐7 

2  CEMENT  4 

3  BLOCKS  5 

4  SAND AND CRUSH  6 

5  STEEL  7 

  SANITARY FITTINGS  8‐15 

6  SANITARY FITTING  9 

7  PIPE FITTINGS  10‐11 

8  COMMODE  12 

9  WC  13 

10  BASIN  14 

11  TILES  15 

  ELECTRICAL FITTINGS  16‐18 

12  ACCESSORIES AND FITTING  17 

13  WIRES AND CABLES  18 

  PAINTS  19‐21 

14  PAINTS  20‐21 

  DOORS, WINDOWS AND WARDROBE  22‐24 

15  DOORS ,WINDOWS AND WARDROBE  23‐24 

  STEEL WORKS  25‐26 

16  MAIN GATE  26 

  LABOUR  27‐28 

17  MASON, PAINTER, PLUMBER,ELECTRICIAN  28 

     

 

 

 

             

 

 

 

 

 

 

 

 

 

EXCAVATION AND FORMWORK 

 

6 | P a g e   

EXCAVATION AND FORMWORK 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 S #  DESCRIPTION       UNIT  COST                            DEALER 

1  EXCAVATION  Sq. Yd  60‐70 2  FORMWORK       OLD PLANKS  Sq. Ft  22   NEW PLANKS  Sq. Ft  30 

AYAZ ALI AND BROTHERS QAYUMABAD CHOWRANGI KARACHI 

0311‐8972233 

         

3  EXCAVATION  Sq. Yd  55‐70 4  FORMWORK     

  OLD PLANKS  Sq. Ft  23   NEW PLANKS  Sq. Ft  35 

ISMAIL & SONS GIZRI DHA , KARACHI 

0333‐8929992 

         

5  EXCAVATION  Sq. Yd  65‐75 6  FORMWORK       OLD PLANKS  Sq. Ft  21   NEW PLANKS  Sq. Ft  33 

BASHIR BROTHERS ORANGI TOWN , KARACHI 

0343‐2087869 

         

 

7 | P a g e   

 

 

 

 

 

 

 

 

 

 

 

   

 

 

   

 

 

 

 

 

 

CEMENT, BLOCKS, SAND,CRUSH AND STEEL 

 

8 | P a g e   

  CEMENT   

 

 

 

 

 

 

S NO             ITEM   MAKER  UNIT       COST   DEALER 

     1  OPC  LUCKY  BAG(50 KG)  525     FALCON  BAG(50 KG)  535     POWER  BAG(50 KG)  510 

     2  SULPHATE RESISTING  LUCKY  BAG(50 KG)  545     FALCON  BAG(50 KG)  560     POWER  BAG(50 KG)  490 

     3  WHITE CEMENT  KOHAT  BAG(40 KG)      850 

    MAPLE   BAG(40 KG)  790 

  

 

           

     4  OPC  LUCKY  BAG(50 KG)  530     FALCON  BAG(50 KG)  545     POWER  BAG(50 KG)  510 

     5  SULPHATE RESISTING  LUCKY  BAG(50 KG)  550     FALCON  BAG(50 KG)  540     POWER  BAG(50 KG)  550 

     6  WHITE CEMENT  KOHAT  BAG(40 KG)  860     MAPLE  BAG(40 KG)  800 

  

            

     7  OPC  LUCKY  BAG(50 KG)  525     FALCON  BAG(50 KG)  540     POWER  BAG(50 KG)  505 

     8  SULPHATE RESISTING  LUCKY  BAG(50 KG)  560     FALCON  BAG(50 KG)  550     POWER  BAG(50 KG)  545 

     9  WHITE CEMENT  KOHAT  BAG(40 KG)  850     MAPLE  BAG(40 KG)  805 

  

 

           

 

9 | P a g e   

BLOCKS 

 

 

 

 

 

 

 

 

 

 

 

    S NO  SIZE(inches)       UNIT  COST                            DEALER 

    1      3x8x12  1 PIECE  15 2  4x8x12  1 PIECE  16.5 3  5x8x12  1 PIECE  18.5 4  6x8x12  1 PIECE  20                          

5          3x8x12  1 PIECE  16 

6  4x8x12  1 PIECE  17 7  5x8x12  1 PIECE  19 8  6x8x12  1 PIECE  21 

              

        

9  3x8x12  1 PIECE  15.5 10  4x8x12  1 PIECE  16.5 11  5x8x12  1 PIECE  18 12  6x8x12  1 PIECE  23 

                         

 

10 | P a g e   

 

SAND AND CRUSH 

 

 

 

 

 

 

 

 

 

      S NO       ITEM               UNIT       COST                       DEALER 

1  COARSE  DUMPER(450 ftᶟ)  14500        2  FINE  DUMPER(450 ftᶟ)  12500                      

 

         

3  COARSE  DUMPER(450 ftᶟ)  14000        4  FINE  DUMPER(450 ftᶟ)  13000               

 

         

         

5  COARSE  DUMPER(450 ftᶟ)  14000        6  FINE  DUMPER(450 ftᶟ)  13500               

          

 

11 | P a g e   

STEEL 

 

 

 

 

 

 

 

 

 

 

                         

 

 

 

 

S NO  DIA OF BAR   TYPE        UNIT   COST  DEALER 

  TWISTED  SHIP PLATES    1  3/8    TONNES  85500 2  1/2    TONNES  86000 3  4/8    TONNES  84500   PLAIN  SHIP PLATES     4  2/8    TONNES  82000 

 

           

  TWISTED  SHIP PLATES     5  3/8    TONNES  86000 6  1/2    TONNES  83000 7  5/8    TONNES  82500   PLAIN  SHIP PLATES     8  2/8    TONNES  81000   

 

12 | P a g e   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

                            

 

 

 

 

 

 

SANITARY FITTINGS AND TILES 

 

13 | P a g e   

SANITARY FITTINGS 

 

 

 

 

 

 

 

 

S NO     ITEM          MAKER    UNIT    COST             DEALER 

 1 

 SANITARY SET  

Super asia   

Per set  3000 

    Gold star  Per set  15000     shalimar   PER SET  30000 2  SANITARY FITTNG    PER SET  5000 

       PER SET  6000 

  

           

   3 

 SANITARY SET  

 Super asia  PER SET  5200 

    Golden star 

PER SET  3500 

                 shalimar 

PER SET  7000 

  4  SANITARY FITTNG   CLIMAX  PER SET  6700      MASTER  PER SET  9000 

  

           

    5 

 SANITARY SET  

super asia  PER SET  5500 

    Golden star 

PER SET  8000 

     shalimar  PER SET  8500    6  SANITARY FITTNG   CLIMAX  PER SET  6800       MASTER  PER SET  9200 

    

           

 

14 | P a g e   

 

S NO         ITEM  MAKER   UNIT       COST  DEALER 

1  PIPES(20 Ft)       3/4” DIA (cold)  PAK ARAB  PER PIECE      400   3/4” DIA(hot)  PAK ARAB  PER PIECE      1200   3”DIA  PAK ARAB  PER PIECE      1350 2  TEE         1” DIA  PAK ARAB  PER PIECE       45   2” DIA  PAK ARAB  PER PIECE       60 

  3”DIA  PAK ARAB  PER PIECE       100 3  ELBOW         1” DIA  PAK ARAB  PER PIECE       45   2” DIA  PAK ARAB  PER PIECE       60   3”DIA  PAK ARAB  PER PIECE       90 4  UNION         1” DIA  PAK ARAB  PER PIECE       90   2” DIA  PAK ARAB  PER PIECE      290 5  VALVE         1”  PAK ARAB  PER PIECE      130   1.5”  PAK ARAB  PER PIECE      200   2”  PAK ARAB  PER PIECE      360 

       

 

           

6  PIPES(20 Ft)         

  1/2” DIA  PPR  PER PIECE  320   3/4” DIA  PPR  PER PIECE  455   1”DIA  PPR  PER PIECE  550 7  TEE         1” DIA  PPR  PER PIECE         40   2” DIA  PPR  PER PIECE  55   3”DIA  PPR  PER PIECE  90 8  ELBOW         1” DIA  PPR  PER PIECE  40   2” DIA  PPR  PER PIECE  55   3”DIA  PPR  PER PIECE  80 9  UNION         1” DIA  PPR  PER PIECE  90   2” DIA  PPR  PER PIECE  290 10  VALVE         1”  PPR  PER PIECE  120   1.5”  PPR  PER PIECE  200   2”  PPR  PER PIECE  350 

      

 

15 | P a g e   

 

 

COMMODE 

 

 

 

 

 

 

 

 

 

S NO  SHADE  MAKER       SIZE      COST                  DEALER 

1  LIGHT  LUCKY CERAMICS      LARGE  3600          2  LIGHT  DAIMOND  LARGE  4500          3  LIGHT  KARAM  LARGE  5500          

  

           

4  LIGHT  LUCKY CERMAICS  LARGE  4000          5  LIGHT  DAIMOND  LARGE  8500          6  LIGHT  KARAM  LARGE  7500          

  

           

7  LIGHT  LUCKY CERMAICS  LARGE  4200          8  LIGHT  DAIMOND  LARGE  8600          9  LIGHT  KARAM  LARGE  7300           

  

           

 

16 | P a g e   

 

 

 

WC 

 

 

 

 

 

S NO     SHADE  MAKER  SIZE       COST                  DEALER 

1  LIGHT  LUCKY CERAMIC      LARGE  1000   DARK    LARGE  1400 2  LIGHT  MASTER  LARGE  3000   DARK    LARGE  3500 3  LIGHT  AL KARAM  LARGE  2000   DARK    LARGE  2200 

  

           

4  LIGHT  LUCKY CERAMIC  LARGE  1050   DARK    LARGE  1350 5  LIGHT  MASTER  LARGE  2600   DARK    LARGE  2900 6  LIGHT  AL KARAM  LARGE  1850   DARK    LARGE  2150 

  

           

7  LIGHT  LUCKY CERAMIC  LARGE  1150   DARK    LARGE  1350 8  LIGHT  MASTER  LARGE  2700   DARK    LARGE  3100 9  LIGHT  AL KARAM  LARGE  1950   DARK    LARGE  2200 

  

           

 

17 | P a g e   

 TILES 

MARBLE 

     

S NO      ITEM  MAKER  UNIT   COST                  DEALER 

  FLOOR     1  16x16  KAMRAN  m²  550 2  16x16  SONEX  m²  750 3  16x16  ALKARAM  m²  900   WALL       4  8x12  KAMRAN  m²  550 5  8x12  SONEX  m²  600 

6  8x12  ALKARAM  m²  720 

  

           

  FLOOR       7  16x16  KAMRAN  m²  620 8  16x16  SONEX  m²  780 9  16x16  ALKARAM  m²  610   WALL       10  8x12  KAMRAN  m²  560 11  8x12  SONIX  m²  620 12  8x12  ALKARAM  m²  610 

  

           

  FLOOR     7  16x16  KAMRAN  m²  550 8  16x16  SONEX  m²  820 9  16x16  ALKARAM  m²  550   WALL       10  8x12  KAMRAN  m²  580 11  8x12  SONIX  m²  630 12  8x12  ALKARAM  m²  620 

  

           

S NO      ITEM  MAKER  UNIT   COST                  DEALER 

  FLOOR     1  MARBLE  SUNY GREEN  Sq.ft  160 2  MARBLE  CHECKU  Sq.ft  130 3  MARBLE  CANA BROWN  Sq.ft  250 

  

4  MARBLE  GRANITE  Sq.ft  1200   

 

18 | P a g e   

 

 

 

 

 

 

 

 

 

     

 

 

 

 

ELECTRICAL  FITTINGS 

 

19 | P a g e   

 

S NO  ITEM  MAKER  UNIT  COST   DEALER 

1  MAIN SWITCH  MILLAT  PER PIECE  260 2  DOUBLE BREAKER  MILLAT  PER PIECE  200 3  DB(12X15)  MILLAT  PER PIECE  950 4  BREAKER  MILLAT  PER PIECE  280 5  SWITCH SHEET  MILLAT  PER PIECE  90 6  MULTIPOWER 

SWITCH MILLAT  PER PIECE  90 

7  POWER BOARD  MILLAT  PER PIECE  180 

8  SWITCH SHEET  MILLAT  PER PIECE  30 9  DIMMER  MILLAT  PER PIECE  80 10  SWITCH  MILLAT  PER PIECE  15 11  SOCKET  MILLAT  PER PIECE  20 12  CHANNEL FITTING  MILLAT  PER Ft  5.5 

     

           

13  MAIN SWITCH  MILLAT  PER PIECE  280 14  DOUBLE BREAKER  MILLAT  PER PIECE  240 15  DB(12X15)  MILLAT  PER PIECE  980 16  BREAKER  MILLAT  PER PIECE  250 17  SWITCH SHEET  MILLAT  PER PIECE  120 18  MULTIPOWER SWITCH  MILLAT  PER PIECE  100 19  POWER BOARD  MILLAT  PER PIECE  190 20  SWITCH SHEET  MILLAT  PER PIECE  40 21  DIMMER  MILLAT  PER PIECE  80 22  SWITCH  MILLAT  PER PIECE  15 23  SOCKET  MILLAT  PER PIECE  20    24  CHANNEL FITTING  MILLAT  PER Ft  6 

    

           

25  MAIN SWITCH  MILLAT  PER PIECE  285 26  DOUBLE BREAKER  MILLAT  PER PIECE  240 27  DB(12X15)  MILLAT  PER PIECE  980 28  BREAKER  MILLAT  PER PIECE  270 29  SWITCH SHEET  MILLAT  PER PIECE  120 30  MULTIPOWER 

SWITCH MILLAT  PER PIECE  100 

31  POWER BOARD  MILLAT  PER PIECE  200 32  SWITCH SHEET  MILLAT  PER PIECE  45 33  DIMMER  MILLAT  PER PIECE  80 34  SWITCH  MILLAT  PER PIECE  15 35  SOCKET  MILLAT  PER PIECE  15 36  CHANNEL FITTING  MILLAT  PER Ft  6 

   

 

           

 

20 | P a g e   

 

 

S NO   ITEM  MAKER            UNIT      COST             DEALER 

1  3‐29  PAKISTAN CABLES  PER COIL  1700     ASHFAQ CABLES  PER COIL  880     FAYAZ CABLES  PER COIL  1060 2  7‐29  PAKISTAN CABLES  PER COIL  3630     ASHFAQ CABLES  PER COIL  1880     FAYAZ CABLES  PER COIL  2400 3  7‐36  PAKISTAN CABLES  PER COIL  4570 

    ASHFAQ CABLES  PER COIL  2750     FAYAZ CABLES  PER COIL  3680 4  7‐44  PAKISTAN CABLES  PER COIL  6990     ASHFAQ CABLES  PER COIL  4300     FAYAZ CABLES  PER COIL  5425 

     

      PER COIL     

5  3‐29  PAKISTAN CABLES  PER COIL  1850     ASHFAQ CABLES  PER COIL  940     FAYAZ CABLES  PER COIL  1200 6  7‐29  PAKISTAN CABLES  PER COIL  3700     ASHFAQ CABLES  PER COIL  1900     FAYAZ CABLES  PER COIL  2500 7  7‐36  PAKISTAN CABLES  PER COIL  4600     ASHFAQ CABLES  PER COIL  2800     FAYAZ CABLES  PER COIL  3750 8  7‐44  PAKISTAN CABLES  PER COIL  7000     ASHFAQ CABLES  PER COIL  4400 

    FAYAZ CABLES  PER COIL  5500 

    

           

9  3‐29  PAKISTAN CABLES  PER COIL  1750     ASHFAQ CABLES  PER COIL  890     FAYAZ CABLES  PER COIL  1120 10  7‐29  PAKISTAN CABLES  PER COIL  3680     ASHFAQ CABLES  PER COIL  1900     FAYAZ CABLES  PER COIL  2450 11  7‐36  PAKISTAN CABLES  PER COIL  4600     ASHFAQ CABLES  PER COIL  2770     FAYAZ CABLES  PER COIL  3700 12  7‐44  PAKISTAN CABLES  PER COIL  7000     ASHFAQ CABLES  PER COIL  4500     FAYAZ CABLES  PER COIL  5500 

   

  

 

21 | P a g e   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                   

 

 

 

 

 

 

PAINTS 

 

22 | P a g e   

PAINTS  

 

 

 

 

S NO  ITEM         MAKER  UNIT      COST  DEALER 

1  OIL PAINT  BERGER  1 GALLON  1300     BELTA  1 GALLON  1050     ICI  1 GALLON  1700 2  MATT FINISH  BERGER  1 GALLON  1950     BELTA  1 GALLON  2000     ICI  1 GALLON  1950 3  WEATHER SHIELD  BERGER  1 GALLON  1930     BELTA  1 GALLON  1750     ICI  1 GALLON  1950 4  DISTEMPER  BERGER  1 GALLON  720     BELTA  1 GALLON  1100     ICI  1 GALLON  1980 5  PUTTY  BERGER  BAG(20 KG)  1900 

    BELTA  BAG(20 KG)  1900     ICI  BAG(20 KG)  1500 

       

           

6  OIL PAINT  BERGER  1 GALLON  1800     BELTA  1 GALLON  1900     ICI  1 GALLON  1700 7  MATT FINISH  BERGER  1 GALLON  1900     BELTA  1 GALLON  1950     ICI  1 GALLON  1800 8  WEATHERSHIELD  BERGER  1 GALLON  2200     BELTA  1 GALLON  2100     ICI  1 GALLON  1800 9  DISTEMPER  BERGER  1 GALLON  1000     BELTA  1 GALLON  1050     ICI  1 GALLON  800 10  PUTTY  BERGER  BAG(20 KG)  2400 

    BELTA  BAG(20 KG)  2600       ICI  BAG(20 KG)  1400 

      

           

 

23 | P a g e   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

S NO  ITEM        MAKER           UNIT   COST  DEALER 

11  OIL PAINT  NELSON  1 GALLON  1750     GOBI  1 GALLON  1950     ICI  1 GALLON  1750 12  MATT FINISH  NELSON  1 GALLON  1900     GOBI  1 GALLON  1980     ICI  1 GALLON  1850 13  WEATHER SHIELD  NELSON  1 GALLON  2200 

    GOBI  1 GALLON  1980     ICI  1 GALLON  1850 14  DISTEMPER  NELSON  1 GALLON  1100     GOBI  1 GALLON  1070     ICI  1 GALLON  830 15  PUTTY  NELSON  BAG(20 KG)  2600     GOBI  BAG(20 KG)  2720 

    ICI  BAG(20 KG)  1500 

      

           

 

24 | P a g e   

 

 

 

             

 

 

 

 

 

 

                   

 

 

 

 

 

 

 

 

DOORS, WINDOWS AND WARDROBE 

 

25 | P a g e   

 

DOORS AND WINDOWS 

 

 

S NO             ITEM    SIZE   UNIT      COST          DEALER 

1  DOORS         SKIN DOOR  3’x7’  Sq.Ft  2520   SKIN DOOR(CAL)  3’x7’  Sq.Ft  3150   SKIN DOOR(GLASS)  3’x7’  Sq.Ft  7350 2  WINDOWS         SIMPLE    RUNNING Ft  110   FANCY    RUNNING Ft  130 

3  PANEL         CAL    RUNNING Ft  185   GOLDEN TEAK    RUNNING Ft  250 4  CABINET         LASANI    Sq.Ft  380   LASANI(GLASS)    Sq.Ft  750 5  WARDROBE         CHIPBOARD    Sq.Ft  550   LASANI    Sq.Ft  700 

      

 

           

6  DOORS         SKIN DOOR  3’x7’  Sq.Ft  2300   SKIN DOOR(CAL)  3’x7’  Sq.Ft  1995   SKIN DOOR(GLASS)  3’x7’  Sq.Ft  18900 7  WINDOWS         SIMPLE    RUNNING Ft  95   FANCY    RUNNING Ft  110 8  PANEL         CAL    RUNNING Ft  175   GOLDEN TEAK    RUNNING Ft  250 9  CABINET         LASANI    Sq.Ft  360   LASANI(GLASS)    Sq.Ft  750 10  WARDROBE       

  CHIPBOARD    Sq.Ft  520   LASANI    Sq.Ft  675 

       

       

           

 

26 | P a g e   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

S NO             ITEM  SIZE    UNIT   COST   DEALER 

11  DOORS         SKIN DOOR  3’x7’  Sq.Ft  2200   SKIN DOOR(CAL)  3’x7’  Sq.Ft  3900   SKIN DOOR(GLASS)  3’x7’  Sq.Ft  8400 12  WINDOWS         SIMPLE    RUNNING Ft  92   FANCY    RUNNING Ft  92> 

13  PANEL         CAL    RUNNING Ft  180   GOLDEN TEAK    RUNNING Ft  240 14  CABINET         LASANI    Sq.Ft  380   LASANI(GLASS)    Sq.Ft  730 15  WARDROBE         CHIPBOARD    Sq.Ft  540   LASANI    Sq.Ft  680 

      

           

 

27 | P a g e   

          

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

           

LABOUR 

 

28 | P a g e   

LABOUR  

S NO        ITEM  UNIT          COST  CONTACT 

1  MASON       SKILLED  PER DAY  1200   UNSKILLED  PER DAY  600 

SHAFIQ AHMAD, SOHRAB GOTH, 

  0332‐2584475 

           

2  MASON       SKILLED  PER DAY  1100   UNSKILLED  PER DAY  600 

WALI KHAN, WATERPUMP 0300‐2545232 

           

3  MASON       SKILLED  PER DAY  1300   

  UNSKILLED  PER DAY  700   

MOLA BUKSH, SAFURA GOTH 

0343‐2985521 

           

4  ELECTRICIAN         

    Sq Ft  14        

MAQSUD, HYDERI 0345‐2316903 

    Sq Ft  11        

SHAKEEL, LIAQATABAD 0306‐2010420 

    Sq Ft  13        

REHAN, NAZIMABAD 0300‐9214169 

5  PLUMBER         

  FOR 120 Sq Yds  LUMP SUM  17000        

QASIM, GOLIMAAR 0345‐2760866 

  FOR 120 Sq Yds  LUMP SUM  20000        

ALI RAZA, WATERPUMP 0300‐2554100 

  FOR 120 Sq Yds  LUMP SUM  19000        

NOOR MUHAMMAD, SAFURA 

0342‐2705358 

6  PAINTER         

  FOR 120 Sq Yds  LUMP SUM  22000        

YAMIN KHAN, SAFURA 0346‐2773248 

  FOR 120 Sq Yds  LUMP SUM  25000        

SULEMAN , LIAQATABAD 0313‐2757653 

  FOR 120 Sq Yds  LUMP SUM  18500      

ABDULLAH, WATERPUMP 0312‐ 2130742 

1  CARPENTER       SKILLED  PER Sq.ft  250 