FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA
Ministry of Urban Development, Housing & Construction
SECOND URBAN LOCAL GOVERNMENT
DEVELOPMENT PROGRAM 2014/15 to 2018/19
PROGRAM OPERATIONS MANUAL
Volume II, MUDHCo Annexes
Urban Good Governance and
Capacity Building Bureau,
P.O. Box 24134/1000 DRAFT 3
Addis Ababa MUDHCo ULGDP II POM Volume II 03.03.14
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page ii of 104
FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA
MINISTRY OF URBAN DEVELOPMENT, HOUSING AND
CONSTRUCTION
URBAN LOCAL GOVERNMENT DEVELOPMENT
PROGRAM 2014/15 to 2018/19
PROGRAM OPERATIONS MANUAL
Volume II, MUDHCo Annexes
Section CONTENTS page
ANNEX 1 TOR for ULGDP II Steering and Technical Sub-Committees .................. 6
ANNEX 2 TOR for Performance Assessment for EFY 2007 Allocation ................... 12
ANNEX 3 TOR for Annual Environmental & Social Audit ...................................... 44
ANNEX 4 TOR for ULGDP II Audit ........................................................................... 54
ANNEX 5 TOR for Annual Procurement Audit ......................................................... 56
ANNEX 6 TOR for Annual Value for Money Audit ................................................... 58
ANNEX 7 Organization & Staffing of the ULGDP II Coordination Unit ................ 60
7.1 ULGDP II Coordination Unit, UGGCBB 60
7.2 ULGDP II Coordination Unit Job Descriptions 64
7.3 TOR for the ULGDP II Program Coordinator 70
7.4 TOR for the ULGDP II Deputy Program Coordinator 72
7.5 TOR for the Project Engineer 75
7.6 TOR for the Social Management Specialist 78
7.7 TOR for the Environmental Management Specialist 81
7.8 TOR for the Procurement Specialist 84
7.9 TOR for the Monitoring & Evaluation Specialist 88
7.10 TOR for the ULG Financial Management Specialist 90
7.11 TOR for the Urban Land Administration Specialist 93
7.12 TOR for the Asset Management / O&M Specialist 95
7.13 TOR for the ULG Own Revenue / Municipal Finance Specialist 97
7.14 TOR for the Budgeting, Planning & Participation Specialist 99
7.15 TOR for the Urban Planner 102
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page iii of 104
TABLES
Table 1. Indicative ULGDP II 1st APA Work Plan......................................................................... 24
Table 2. ULGDP II Coordination Unit – Current Status ................................................................. 64
Table 3. Main Capacity Building Activities in Phases 1 and 2 ....................................................... 66
Table 4. The 44 Cities Participating in the ULGDP II .................................................................... 66
FIGURES
Figure 1. ECPI Vision, Mission and & Strategic Pillars (Dimensions) ............................................ 13
Figure 1. ECPI Vision, Mission and & Strategic Pillars (Dimensions) ............................................ 44
The ULGDP II Program Operations Manual is made up of a number of documents:
1. ULGDP II Program Operations Manual Volume I: Main Text & General Annexes
2. ULGDP II Program Operations Manual Volume II: MUDHCo Annexes
3. ULGDP II Financial Management Guidelines
4. ULGDP II Monitoring, Evaluation and Reporting System and Guidelines
a. For cities
b. For Regions
c. For MUDHCo
5. Environmental and Social Management System Guideline
6. ULGDP II Annual Performance Assessment Guideline
7. Capital Investment Plan Guide for Ethiopian Cities
8. Asset Management Plan Manual
9. Revenue Enhancement Plan Manual
Notes:
1. The Urban Local Government Development Project 2008-2014 - with 19 participating cities - is
referred to throughout this Program Operations Manual as “ULGDP”.
2. The Urban Local Government Development Program 2014/15-2018/19 – with 44 participating
cities - is referred to throughout this Program Operations Manual as “ULGDP II”
3. Regional Government Bureaus responsible for urban development are referred to as BUDs
throughout although their status and title varies from Regional State to Regional State.
Exchange rates used (as at 1 March 2014)
Ethiopian Birr 19.3149 = US Dollar $1.00
The Gregorian and Ethiopian calendars are used throughout this document. The preceding abbreviations used
are: GC = Gregorian calendar and EFY = Ethiopian Fiscal Year. The current year according to the Ethiopian
calendar is 2006, which began on September 11, 2013 of the Gregorian calendar. The Ethiopian Financial
Year commences on 1st Hamle (8
th July) and ends on 30
th Sene (7
th July) each year. In government
documents the financial year 1st Hamle EC 2006 to 30
th Sene EC 2007 is referred to as the Ethiopian Fiscal
Year (EFY) 2007 and covers the Gregorian period 8 July 2014 to 7 July 2015.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page iv of 104
ABBREVIATIONS
APA Annual Performance Assessment MUDHCo Ministry of Urban Development
Housing and Construction BUD Bureau of Urban Development (RGs)
CB Capacity Building NCB National Competitive Bidding
CBDSD Capacity Building for Decentralized
Service Delivery
NRS National Regional State
O&M Operations and Maintenance
CBP Capacity Building Plan OFAG Office of the Federal Auditor General
CIP Capital Investment Plan ORAG Office of the Regional Auditor General
DLI Disbursement Link Indicators PDO Program Development Objective
ECPI Ethiopian Cities Prosperity Initiative PforR Program for Results
EFY Ethiopian Financial Year (see below) POM Program Operations Manual
EMP Environmental Management Plan RAPs Resettlement Action Plans
ESMS Environmental and Social Management
System
REPA Regional Environmental Protection
Agency
GC Gregorian calendar RSG Resettlement Guideline
GIZ Deutsche Gesellschaft für
Internationale Zusammenarbeit GmbH
SC [ULGDP II] Steering Committee
SNNP Southern Nations Nationalities
Peoples GoE Government of Ethiopia
GTP Growth &Transformation Plan (of
GoE)
TSC [ULGDP II] Technical Sub-Committee
TOR Terms of Reference
ICB International Competitive Bidding UGGCBB Urban Good Governance and Capacity
Building Bureau KfW Kreditanstalt für Wiederaufbau
MCs Minimum Access Conditions ULG Urban local government
M&E Monitoring and Evaluation ULGDP Urban Local Government
Development Program
MoFED Ministry of Finance and Economic
Development
US$ United States Dollar
MSE Micro and small enterprise
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 6 of 104
ANNEX 1 TOR FOR ULGDP II STEERING AND TECHNICAL SUB-
COMMITTEES
FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA
Ministry of Urban Development, Housing & Construction
URBAN LOCAL GOVERNMENT DEVELOPMENT PROGRAM
2014/15 to 2018/19
ULGDP II Steering Committee (SC) and Technical
Sub-Committee (TSC)
Terms of Reference 1. INTRODUCTION
The MUDHCo has developed the Ethiopian Cities Prosperity Initiative (ECPI): Building Green
Growth, Resilient and Well Governed Cities, 2013/14-2025. The ECPI vision is to: create
economically productive and socially inclusive and environmentally sustainable cities by 2025. The
ECPI mission is to: Capacitate our Cities and Urban centers so that they can become centers of
innovation and economic production by creating the conditions necessary to support growth, to
provide services and raise the quality of life of urban residents
The first Urban Local Government Development Project (ULGDP), 2008/09 to end December 2014,
was a continuation of urban reform by the Government of Ethiopia which started in the early 2000s. It
was designed to support the government’s Plan for Accelerated and Sustained Development to End
Poverty 2005/06-2009/10 and the Ministry’s Urban Development and Urban Good Governance
Programs that were developed to support the PASDEP. The ULGDP supports 19 urban local
governments in 5 Regions, including Dire Dawa and Addis Ababa.
The ULGDP II will support the ECPI and build on the achievements and systems developed by the
ULGDP1. ULGDP II will support all three levels of the Government of Ethiopia - 44 ULGs –
excluding Addis Ababa - 9 regional governments (respective Bureaus of Urban Development) and the
federal government (specifically MUDHCo)2. The ULGDP II duration will be from 2014/15 till
December 2018/2019 (EFY 2007 – 2011). The total ULGDP II funding envelope is US 556.5 million,
comprising US 176.5 million GoE resources (contributed by ULGs and regional governments) and US
380 million International Development Association funds.
The ULGDP II expenditure framework will comprise the three following major items:
Performance based grants to 44 ULGs for urban infrastructure and services investments and
capacity building (US 499.5 million);
Regional governments capacity building and oversight/support to constituent ULGs (US30
million); and
1 The main change in approach being the use (as widely as possible) of the World Banks Program for Results (PfR)
instrument for fund delivery and systems application which replaces, to a great degree, Specific investment lending (SIL)
instrument applied in the first ULGDP. 22 Other involved GoE organs include the Federal Ethics and Anti-Corruption Commission and regional offices, the
Ethiopian Public Procurement and Property Administration Agency and regional institutions, the Regional Environmental
Protection Authorities and the Federal and Regional Offices of the Auditor General
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 7 of 104
MUDHCo to administer and coordinate the program, and strengthen its capacity to support
and guide the regions and ULGs (US27 million).
During the ULGDP constraints were identified involving coordination between federal organs
involved. This factor, together with the increased complexity of ULGDP II in terms of the number of
federal, regional and ULGs involved in program activities and in disbursement and utilization of funds
is the main justification for the establishment of the ULGDP Steering Committee (SC) and Technical
Sub-Committee (TSC) that are the subject of this TOR. To ensure smooth ULGDP II implementation
it has been agreed that a steering committee comprising, at a minimum, MoFED and MUDHCo senior
management, and a technical sub-committee made up of technical personnel from MoFED and
MUDHCo will be established. It was further agreed that the committees will be operational by July
20143 and the committee meetings will be held quarterly.
These Terms of Reference set out the responsibilities, composition and workings of the ULGDP II SC
and the ULGDP II TSC. Together, these two bodies are expected to ensure smooth ULGDP II
implementation.
2. OBJECTIVE OF THE ULGDP II STEERING COMMITTEE
The ULGDP II SC is the executive policy and decision making body responsible for providing the
direction that contributes to achievement of the ULGDP II development objective which is to enhance
institutional capacity of participating ULGs in developing and sustaining urban infrastructure and
services
The key results of the ULGDP II performance improvements will be:
enhanced participation of citizens in ULG planning and budgeting;
efficient fiduciary management;
increased amount of own source revenues at the ULG level;
improved infrastructure, service delivery and O&M systems; and
strengthened accountability and oversight systems.
3. OBJECTIVE OF THE ULGDP II TECHINCAL COMMITTEE
The ULGDP II TSC will provide administrative and technical support to the ULGDP II SC and bring
to its attention those issues arising that require executive policy and decision-making. The TSC will be
made up of technical personnel from MoFED and MUDHCo.
4. RESPONSIBILITIES OF THE ULGDP II STEERING COMMITTEE
The ULGDP II SC’s key responsibilities are:
To provide overall direction, coordination of GoE organs and decision-making authority in
general; and
To make decisions as to the annual allocation of ULGDP II Performance Grant funds each
year in advance of the Ethiopian Financial Year (EFY) for which the fund allocation applies,
based on the results of the independent annual performance assessments4.
The ULGDP II SC’s specific responsibilities are:
1 Promote the MUDHCo’s ECPI vision and mission and ULGDP II development objectives;
2 Provide overall direction to the ULGDP II and its key implementing agencies;
3 The main reason for this deadline is that, the first Performance Assessment of the 44 participating ULGs and 9
Regions is expected to be concluded by mid-May 2014, following which a decision of the ULGDP II SC, on the advice of the
TSC, will be required as to the allocation of IDA funds for EFY 2007 that commences in July 2014. 4 The World Bank will also verify the results and reserve the right to finally approve the compliance with the
Disbursement Linked Indicators.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 8 of 104
3 Receive reports from the ULGDP II TSC and determine follow-up actions and requirements
as necessary;
4 Monitor and evaluate ULGDP II performance and impacts;
5 Ensure good communication and coordination between all involved and interested
stakeholders as to ULGDP II objectives and activities;
6 Follow and enforce the laws of the Federal Democratic Republic of Ethiopia; and
7 Ensure that the ULGDP II achieves the objectives agreed and implements the agreed terms
and conditions described in the Financing Agreement in force between the Government of
Ethiopia and the World Bank.
5. RESPONSIBILITIES OF THE ULGDP II TECHNICAL SUB-COMMITTEE
The ULGDP II TSC will be responsible for:
1. Ensure that the ULGDP II is implemented in line with the ULGDP II POM;
2. Provision of administrative, logistical and secretarial support to the ULGDP II that ensures
effective and smooth operations of the SC. This responsibility includes timely dissemination
of agendas, papers, minutes, etc., as are required for effective operations;
3. Bringing to the attention of the SC of those issues that require executive direction or policy
decisions involving ULGDP II implementation. In particular, the ULGDP II TSC will note the
importance of:
a. Efficient and effective coordination and communication between the MUDHCo and
MoFED, with other Federal and Regional organs involved and with participating and
other interested ULGs; and
b. Timely submission of results and recommendations for allocation annually of
Performance Grant funds to the SC that ensures that participating ULGs, Regional
States and Federal organs are advised of the allocation of ULGDP II funds well ahead
of the start of the financial year to which they apply.
4. Periodic evaluation of ULGDP II implementation against objectives;
5. Provide technical guidance with support from the World Bank;
6. Review the results from the APA5, provide quality assurance of the results and provide advice
to the Steering/Coordinating Committee as to the achievement of DLIs and allocations to
cities; and
7. Receive and handle complaints in a streamlined manner.
6. COMPOSITION OF THE ULGDP II STEERING COMMITTEE
The Voting Members shall be:
1 To be inserted
The Non-Voting Members shall be:
1 To be inserted
7. COMPOSITION OF THE ULGDP II TECHNICAL SUB-STEERING
The ULGDP II TSC will be headed by the [to be inserted] who will be supported by:
5 Note that draft results and final results from the APA will be submitted at the same time to MuDCO and the World
Bank for verification.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 9 of 104
[to be inserted]; and
[to be inserted].
8. WORKINGS OF THE ULGDP II STEERING COMMITTEE
1. Voting members may appoint proxies as their representatives to attend ULGDP II SC
meetings. Proxy representatives shall have the power to vote either as directed by the Voting
Member concerned or in their own right if not so directed and, may, advise the meeting of
their desire to consult the Voting member before informing the ULGDP II SC of their vote.
2. The Chair of the ULGDP II SC will be appointed by H.E. the Minister, MUDHCo.
3. MUDHCo will provide the administrative support to the ULGDP II SC by means of an
ULGDP II TSC. The ULGDP II TSC will be headed by the ULGDP Program Coordinator
who may also be known as the Secretary to the ULGDP II SC. The ULGDP II TSC will be
supported by members of the ULGDP Department/Unit, UGGCBB, MUDHCo, and such
other co-opted MUDHCo officers as the Program Coordinator ULGDP may determine, in
consultation with the Director General UGGCBB. As at January 2014, Ato Bereket
Belayhun Woldemeskel, has been appointed to this post. [Contacts: Address: 3rd
floor, Room
304, MUDHCo, Ras Abebe Aregay Street, P.O. Box 3040, Addis Ababa. Tel Mobile: +251-
091-143-65 65. Tel Office: +251-011-554-06 3. Email: [email protected]]
4. Unless it agrees otherwise by majority vote, the ULGDP II SC shall meet once quarterly
until such time as the ULGDP II SC is by unanimous decision vote of its voting members
dissolved. Note: it is recommended that, because the ULGDP II reporting system is quarterly
based on the EFY, the ULGDP II SC meeting take place in the month, one month after the
end of each quarter: i.e., November, February, May and August each year.
5. Prior to each ULGDP II SC meeting, the ULGDP II PC shall prepare an Agenda for the
forthcoming meeting in consultation with the Chair and, at least seven working days prior to
the meeting, the ULGDP II PC shall circulate by hand or fax, a copy of the Agenda to all
members of the ULGDP II SC and TSC.
6. The ULGDP II SC and TSC will take particular note regarding the annual calendar of
processes and decisions required and include these in the Agenda prepared for each meeting
where decisions are required. Of particular importance are:
a. The decision regarding the annual allocation6 of Performance Grant funds to the 44
cities, 9 regions and MUDHCo. These should take place well in advance of the financial
year commencement to which the funds will apply. It is expected that:
i. The MUDHCo will contract independent performance assessors (PAs)7, who will
carry out the PA during the last 3 to 4 months of the year (September to December,
Meskel to Tahsas), with inclusion of the results of the final audit reports in January
prior to the Fiscal Year for which disbursements will be made,
ii. The results of the PA will be reviewed by the ULGDP II TSC and be put into final
recommended form by MUDHCo, prior to submission to the ULGDP II SC
(January/Tarr) each year,
iii. The ULGDP II will make the final executive decision as to the award of
Performance Grant Funds and address and resolve any issues arising as to
allocation, dissemination, communication and disbursement. (February meeting –
Note: it is expected that the first allocation. will be made in the 1st (or 2
nd) meeting
6 Note that the World Bank will have to verify the results from the APA, and provide a non-objection to the
allocations. 7 The 1st Performance Assessment (PA) will take place 1 March to 30 April EC 2006 (GC 2014) for allocation for EFY
2007 (GC 2014/15). The 2nd, 3rd and 4th Pas are expected to commence in September each year – the 2nd PA in September
2014 – and be concluded by 31 December 2014. The 3rd and 4th PAs are expected to follow this timing.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 10 of 104
of the ULGDP II SC in May or June 2014). The allocations will be made in the
year following the results of the assessments, in two tranches – July and January.
7. The Agenda of all ULGDP II SC meetings will include:
a. Review, correction and confirmation of the accuracy of the minutes of the previous
meeting;
b. Review of activities and issues relating to federal level coordination between MUDHCo
and MoFED concerning, among other things:
i. Drawdown, disbursement and fund flows,
ii. Financial reporting, and
iii. Issues involving the OFAG and EPPPAA.
8. If a ULGDP II SC Member wishes to have a matter placed on the Agenda, s/he shall notify
the ULGDP II PC of the matter in writing (by hand delivery or fax to the ULGDP II PC) at
least eight working days prior to the scheduled meeting.
9. Decisions of the ULGDP II SC8 shall be agreed, to the extent possible, by consensus of all
Voting Members. In the event of consensus not being reached, the matter shall be put to the
vote and shall be decided by simple majority. In the event of a hung vote on any matter, the
Chair’s vote shall carry. In the event that SC members are not present at a meeting at which
a decision is to be made, they may send in advance of the meeting, their views on any matter
on the agenda, and their vote should it come to a vote, to the meeting by fax or email, which
shall be received by and read out to the meeting by the ULGDP II PC.
10. The ULGDP II TSC shall be responsible for keeping the Minutes of all SC and TSC
meetings in accordance with generally accepted standard of minutes. The ULGDP II PC
shall circulate a full set of draft minutes of each meeting to all SC and TSC Members within
3 working days prior to the meeting to which they apply; and a full set of final approved
minutes of each meeting to all SC and TSC Members within 5 working days of the SC or
TSC meeting at which they were approved – usually the meeting following the meeting to
which the minutes appl.
11. In the event that a Member does not receive adequate notice of a meeting and/or Minutes of
the previous meeting, it shall be raised at the next Committee meeting so that the matter can
be rectified.
12. The ULGDP II TSC will be responsible: a) for coordination and good communication of all
relevant technical and administrative matters; b) technical review and advice to the ULGDP
II SC and c) forward planning for efficient and effective implementation of ULGDP II
proposals and activities as approved by the ULGDP II SC.
13. The ULGDP II SC shall establish such other committees, task forces and working groups as
are required for the proper implementation of specific ULGDP II activities.
14. ULGDP II SC meetings will be held alternately at a venue determined by MUDHCo or
MoFED. ULGDP II TSC meetings will be held at a venue determined by the ULGDP II PC.
8 As mentioned above, the World Bank will verify and have to agree in the compliance with the DLIs (results of the
APAs).
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 12 of 104
ANNEX 2 TOR FOR PERFORMANCE ASSESSMENT FOR EFY
2007 ALLOCATION
Note: This TOR was prepared in December 2013 and included in the Request for Proposals
issued before the end of 2013. It does not, therefore, include subsequent changes in the design
of the ULGDP II that were discussed and agreed in the final Program Appraisal Document
and Program Operations Manual agreed at ULGDP II negotiations between the World Bank
and Government of Ethiopia in early March 2014. Any necessary changes required will be
made by MUDHCo before or after award of contract which is expected before end February
2014.
Government of the Federal Democratic Republic of Ethiopia
MINISTRY OF URBAN DEVELOPMENT, HOUSING AND CONSTRUCTION
SECOND URBAN LOCAL GOVERNMENT DEVELOPMENT PROGRAM (ULGDP
II)
Terms of Reference for Undertaking Annual Performance Assessment of 44 ULGs and
Nine Regional States for allocations of ULGDP II Performance Grants in 2014/15
(EFY2007)
1. INTRODUCTION
1.1. Background
1. The Ministry of Urban Development, Housing and Construction (MUDHCo) has the Ethiopian
Cities Prosperity Initiative (ECPI) that will lead to the establishment of Green Growth, Resilient and
Well Governed Cities that support Ethiopia’s transformation from a predominantly agricultural nation
to a nation with a rapidly growing industrial sector that contributes to the economic growth necessary
to achieve middle income country status by 2020. The ECPI is the Ministry’s contribution to the
Government of Ethiopia’s Growth and Transformation Plan (GTP) 2010/11-2014/15 and 2020-23
Vision.
2. The continuous and substantial movement of people from rural villages and homesteads to
urban villages, small, medium, and large towns, and to the capital city, and the resulting rapid
urbanization, is necessary to support the development of industrial, manufacturing, and service sectors.
The societal change that will accompany the agricultural to industrial transformation can only be
accomplished successfully with careful and meticulous advance planning that addresses all aspects of
the transformation simultaneously. It is for this reason that the Ministry has developed the Ethiopian
Cities Prosperity Initiative. Its aim is to build the frameworks and provide the foundations – in our
towns and cities and in the construction industry – to achieve the country’s vision and for the
continued advancement of that vision.
3. The ECPI comprises seven pillars – or dimensions - that will contribute to the achievement of
middle income country status and bring the desired political-economic transformation. Growth is a key
objective of our initiatives and programs for urban development and construction; the main economic
objective. The main elements of the political component of the seven pillars that make up the ECPI are
good governance, democratization at local level and the satisfaction of citizens and residents with the
delivery of public services and performance of government – at local, regional and federal levels.
Together the economic and political interventions of the ECPI will produce the prosperity that
accompanies achievement of middle income country status.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 13 of 104
4. The ECPI’s seven strategic pillars will contribute to Ethiopia’s achievement of middle income
country status by producing a transformation in the economic productivity and in the good governance
of cities. Economic transformation will be achieved by increased good urban governance in general
and in the focus of the ECPI on Job Creation - Micro & Small Enterprise Development in particular.
This focus will be supported by improvements in land use planning, serviced land delivery, housing
development, construction industry development, infrastructure, services and green growth
development. Investments in all these areas and mobilization of resources to meet increasing operating
and investment costs are a main focus of the MUDHCo.
5. The attention given to economic development and governance does not neglect social and
environmental development, nor will the key GTP cross cutting issues be neglected. These include
gender and children’s affairs, youth and sports development, HIV/AIDS prevention and control, social
welfare, labor affairs, population and development, culture and tourism, science and technology,
environment and climate change.
6. The Seven strategic pillars and programs that make up the Ethiopian Cities Prosperity Initiative
are illustrated in the figure below– six of the pillars being supported at all times by the seventh -
Policy, Research and Leadership Development:
Figure 1. ECPI VISION, MISSION AND & STRATEGIC PILLARS (DIMENSIONS)
1.2. Urban Local Government Development Program
Urban Local Government Development Program 2008/09-2013/14
7. The Urban Local Government Development Program (ULGDP) was a continuation of urban
reform by the Government of Ethiopia which started in the early 2000s. ULGDP was designed to
support the government’s Plan for Accelerated and Sustained Development to End Poverty 2005/06-
2009/10 (PASDEP) and the Ministry’s Urban Development and Urban Good Governance Programs
that were developed to support the PASDEP. The specific development objective of the program is to
support improved performance in the planning, delivery and sustained provision of priority municipal
services and infrastructure by urban local governments (ULGs).
3.
Urb
an
Go
od
Go
ver
na
nce
4.
Urb
an
Pla
nn
ing
an
d
La
nd
Ma
na
gem
en
t
2.
Cit
ies
Pro
du
ctiv
ity
a
nd
Co
mp
etit
iven
ess
6.
En
vir
on
men
tal
Su
sta
ina
bil
ity
7.
Incl
usi
ve
an
d S
afe
r
Cit
ies
Dev
elo
pm
ent
5.
Infr
ast
ruct
ure
an
d
Ser
vic
es
1. Policy, Research and Leadership Development
Our Vision is to create economically productive and socially inclusive and
environmentally sustainable cities by 2025
Our Mission is to: “Capacitate our Cities and Urban centers so that they can become centers of innovation and
economic production by creating the conditions necessary to support growth, to provide services and raise the
quality of life of urban residents
Policy Review &
Implementation
Resource
Mobilization &
Management
Leadership Skill
& Change Management
ICT Infrastructure
Development &
Management
Social
Communication
& Marketing
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 14 of 104
8. The World Bank contributed to the early stages of establishing these ULGs through the
Capacity Building for Decentralized Service Delivery (CBDSD) Program. The CBDSD also provided
a range of training and other technical assistance activities to establish cities as viable entities able to
fulfill their mandates. CBDSD activities addressed 18 cities—the regional capitals and three of the
largest cities in each of the four major regions, plus Dire Dawa and Harar. Specific assistance was
also provided to Addis Ababa.
9. ULGs have also received capacity building support from the urban management component of
the Public Sector Capacity Building Program Support Program 2004 to 2012 which aimed to improve
the scale, efficiency, and responsiveness of public service delivery at the federal, regional and local
level; to empower citizens to participate more effectively in shaping their own development and to
promote good governance and accountability.
10. In 2008, a credit in the amount of USD150 million equivalent was made available to the
government of Ethiopia for the ULGDP, under which 199 cities who benefitted from the CBDSD
support were able to receive grant funding for infrastructure and services based on their performance
in key areas related to city management.
11. In 2011 the World Bank approved an additional US 150 million due to the fact that the program
had performed well, and the funds had been disbursed faster than anticipated. The planned six-year
budget was disbursed in about three years. The additional bank assistance brought the revised cost of
the program to be US 416 including 20% Regional and 20% ULG contributions to the performance
grant.
12. The additional credit continued financing the costs associated with scaling up the ULGDP’s
activities to enhance the impact of this well-performing program. Specifically, the additional funds
financed investments to improve the administration of the 19 participating cities and to help address a
large infrastructure backlog. This enabled the administrations of the 19 cities benefiting from the
ULGDP to further improve their performance in participatory planning, financial management,
procurement, execution of infrastructure programs, and sustainable delivery of services. It also assists
18 additional cities10
to build capacities in good governance to prepare them to participate in the
ULGDP II anticipated to commence in 2014/15 (EFY 2007).
Second Urban Local Government Development Program 2014/15-2018/19
13. The ULGDP II is a follow-up to the successful ULGDP. In preparation for ULGDP II, 18
additional ULGs were selected in 2012 to receive capacity building support to enable them to
participate in the ULGDP II’s performance grant. The ULGDP II will scale up the ULGDP support
from 19 to 44 cities – excluding Addis Ababa and adding 26 new cities – by providing highly needed
investment funds to promote the cities as growth engines in the GoE’s urban development strategy;
build institutional capacity of all tiers of governance (federal, regional and local) in urban
development, and enhance the incentives of everyone involved. The 44 ULGs participating in the
ULGDP II are:
The 18 cities that participated in the CBDSD and (excluding Addis Ababa) in the ULGDP – as
listed on the previous page;
9 Bahir Dar, Kombolcha, Gondar and Dessie in Amhara Region; Mekelle, Adigrat, Axum and Shire Endeselassie in
Tigray Region; Adama, Bishoftu, Jimma and Shashemene in Oromia Region; and Hawassa, Arbaminch, Wolayta Sodo and
Dilla in SNNPR, Dire Dawa, Harar and Addis Ababa 10 Assela, Burayu, Sebeta, Ambo, Robe, and Batu in Oromia Region, Debre Birhan, DebreTabor, Woldya, Finoteselam,
and Mota in Amhara Region; Almata, Humera and Wukro in Tigray Region; and Mizan, Hosaena, Areka and Butajira in
SNNPR
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 15 of 104
The 18 cities that participated in the ULGDP for CB purposes only11
; i.e., did not receive
Performance Grants – as listed on the previous page; and
The 8 cities that are receiving investment funds through the KfW funded Urban Development
Fund and capacity building support from GIZ through the Urban Governance and
Decentralization Programme. These cities are: Adwa (Tigray), Debre Markos (Amhara),
Hosaina (SNNPR), Nekemte (Oromia), Gambella (Gambella), Semara (Afar), Asosa
(Benishangul Gumuz), and Jijiga (Somali). The latter four are located in the Developing
Regional States (DRS) of Ethiopia.
14. The ULGDP II will involve disbursement of funds by the World Bank and allocation of funds to
ULGs, Regional States and MUDHCo through a result orientated/performance-based capital
investment fiscal transfer system using the World Bank’s PforR methodology, clearly linked to well-
defined disbursement-linked indicators (DLIs). The PforR operation will fully utilize and enhance the
key elements of the existing GoE system.
1.3. ULGDP II Objectives
15. The ULGDP II Development Objective (PDO) is to enhance the institutional and organizational
performance of participating urban local governments in developing and sustaining urban
infrastructure and services. The key results of the performance improvements will be:
enhanced participation of citizens in ULG planning and budgeting;
efficient fiduciary management;
increased amount of own source revenues at the ULG level;
improved infrastructure, service delivery and O&M systems; and
strengthened accountability and oversight systems.
1.4 ULGDP II Description
16. The ULGDP II is expected to run for a period of five years – from EFY 2007 (2014/15) to EFY
2011 (2018/19) with the first disbursement year EFY 2007 (2014/15). ULGDP II will fund
performance- based grants for 44 cities - of the total number of larger cities (85), excluding Addis
Ababa, with a total population of 3,312,107 people (2007 figures) and 4,348,853 (2013 estimates). The
ULGDP II will cover all nine regions and Dire Dawa City Administration. The population of the 44
ULGs is about 28% of the total urban population12
.
17. The ULGDP II’s will provide funds for two main purposes:
Performance Grants (PGs) for ULGs
Performance-based fiscal transfer to 44 cities expected to total US 323 million over five years from the
World Bank supported financing and funding from the ULGs and regions in the tune of USD176.5
million. The actual grant disbursement will depend on the performance of the ULGs with a simple
average allocation per year per ULG of US 1.5 million
18. ). As per current practice, ULGDP II will determine allocations to ULGs through a simple
population formula, and disburse funds on the basis of an annual performance assessment (APA) with
clearly defined performance indicators. In doing so, ULGDP II will leverage institutional
strengthening, achievement of planned infrastructure activities, and support local capacity building.
11 TA to New and Existing ULGDP Cities in Amhara, Tigray, Oromia & SNNP Regional States
12 Based on data from WBI 2013 indicators and CSA 2013 estimates extrapolated from the 2007 census.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 16 of 104
19. Activities to be financed under the Performance Grants are core infrastructure investments in
roads, water supply, sanitation, solid waste, greenery, street lighting, etc. in a well-defined investment
menu, which targets infrastructure investments towards areas under ULG responsibility, and to
maximum gains and minimize the risks. The ULGs will prepare their Capital Investment Plans in a
participatory manner and use the planning tools developed under ULGDP: the assets inventory and
management plan system, capital investment plans, annual plans and budgets. Participatory approach
and proper planning and budgeting will be promoted through the APA. Cities and regions will
contribute to the investments through a substantial level of matching funding. New cities will be
required, at a minimum, to match 10% of the grants while cities currently part of ULGDP and all
regions will have a minimum contribution requirement of:
a. 10% for 4 cities in Afar, Benishangul Gumuz, Gambella and Somali Regional States;
b. 20% for 22 new cities in Amhara, Oromiya, SNNP and Tigray Regional States;
c. 20% for Afar, Benishangul Gumuz, Gambella and Somali Regional States; and
d. 25% for Harar city
e. 25% for Harari Region State
f. 30% for ULGDP 16 cities in Amhara, Oromiya, SNNP and Tigray Regional States;
g. 30% for Amhara, Oromiya, SNNP and Tigray Regional States.
h. 50% for Dire Dawa City Administration;
20. ULGs will be able to utilize a maximum of 5% of Performance Grants for capacity building
(CB) activities defined in a menu of eligible CB activities. These activities will build on the existing
technical assistance provided under the current government and GIZ programs. As such, the ULGDP
II will pursue a two-pronged approach in CB, focusing on the capacity building needs of:
1. The 26 cities that are did not participate in the ULGDP - which are expected to be fairly
high;
2. The 18 cities which participated in the CBDSD and the ULGDP – whose CB needs are
expected to be relatively lower, and different in nature, to the 26 new cities.
21. The main focus of CB support to cities will be on the key areas of weaknesses identified
through the APAs and Value for Money assessments (which will start from the 3rd
APA).
Regional and Federal Capacity Building and Implementation Support
22. The ULGDP II will also include a set of parallel, but related activities, expected to total US 52
million over five years. These activities will include CB activities for:
1. Those agencies in the Regional States that will: a) benefit from CB to support both their own
operational functionality and b) strengthen their ability to support ULGs in ULGDP II
implementation as per the ULGDP II Program Operations Manual (POM). These agencies
will include: Office of the Regional Auditor General (ORAG), Regional Environmental
Protection Agencies (REPA), Regional Public Procurement Agencies (RPPA) and Regional
Bureaus (or Departments13
) of Urban Development (RUDBs).
2. The federal Ministry of Urban Development, Housing and Construction.
23. The formulation of CB plans for ULGs, regions as well as the overall MUDHCo support to be
provided will be overseen by a small capacity building team at MUDHCo. The ULGDP II
13 The Regional Bureaus or Departments responsible for Urban Development are contained within differently named
Bureaus in different Regional States.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 17 of 104
Implementation Support will be provided by the MUDHCo and will include the procurement and
funding of annual performance assessments (APAs), Value for Money audits, Procurement Audits and
other program management support, including strengthening of the M&E functions. APAs, Value for
Money and procurement audits will be contracted out to private, neutral and objective companies so as
to ensure that results are willingly accepted, credible, consistent and reliable. Implementation support
will provide some support and incentives to ensure timely annual audits and strengthening of the
safeguards management by the regions.
1.5 Disbursement Linked Indicators for ULGs
24. The ULGDP II funds will be provided through disbursement linked indicators (DLIs). The first
set of three DLIs will target the program’s urban local governments and will, assuming satisfactory
performance in achievement, trigger disbursement of the US 323 million grant funds for ULGs
investments in infrastructure, services and capacity building. DLIs aim to strengthen institutions and
delivery of infrastructure and services by ULGs.
25. DLI 1 contains the Minimum Access Conditions (MACs) for ULGs comprising requirements in
planning, program financial management, safeguards and procurement must be achieved and
maintained by participating ULGs throughout the ULGDP II. MACs will be assed as part of the
Annual Performance Assessment every year, and are put in place to ensure minimum capacity of the
ULGs to handle and absorb the funds. The performance measures are further targeted towards the
institutional performance in core areas such as planning, budgeting, program financial management,
own source revenues, procurement, assets management and governance as well as infrastructure and
service plan achievement, and will (in future) be detailed in a transparent performance assessment
manual annexed to the POM. The performance results approval process will be formalized through
systems and procedures for approval, complaint handling and publication and the assessments will be
conducted in due time to fit with the ULGs budgeting and planning cycle, which will be supported
through federal incentives for timely completion. If ULGs do not comply with the minimum
conditions, they will not get access to the funds from DLIs 1, 2 and 3 – for investments in
infrastructure, services and capacity building.
26. The remaining DLIs will be linked to performance measurement of those Regional State and
Federal authorities who will use ULGDP II funds for capacity building or implementation support
activities as defined in the ULGDP II POM.
1.6 Program for Results
27. The ULGDP II will use the World Bank’s PforR lending instrument. PforR replaces the Specific
Investment Loan approach that was used to implement the ULGDP. The PforR system focuses on
results. All ULGDP II disbursements will be linked to the achievement of tangible and verifiable
results. Disbursement-Linked Indicators (DLIs) will play a critical role in ULGDP II operations—they
provide the government with incentives to achieve key program milestones and improve performance.
The key features of the PforR approach are that it: finances and supports GoE programs, disburses
upon achievement of results; focuses on strengthening institutional capacity; and provides assurance
that ULGDP II financing is used appropriately and that the environmental and social impacts of the
program are adequately addressed.
2. OBJECTIVES OF ASSIGNMENT
28. To assess the performance of:
1. The 44 cities that will participate in the Second Urban Local Government Development
Program in respect of Disbursement Linked Indicators 1, 2 and 3 and the associated
performance measures and indicators described in Annex 1 attached, so as to identify the
achievement of the cities, individually and in aggregate, so as to determine: a) whether
ULGDP II funds linked to the DLIs described can be disbursed (by the World Bank); and b)
the allocation, or non-allocation of funds, (by GoE) that may be made to each of the 44
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 18 of 104
participating cities for EFY 2007 (8 July 2014 to 7 July 2015). In addition to this, APA will
be asked to review the DLIs related with the performance at the regional level, see below.
2. The nine Regional States that will participate in the Second Urban Local Government
Development Program in respect of the extent to which:
a. The regional ORAGs have conducted timely audits of the ULGs final accounts;
b. The regional environmental protection agencies have carried out the safeguards
reviews/audits of ULGs in their jurisdictions before the start of the annual performance
assessment in each year;
c. The regions have held consultations with the ULGs on tax rates, provide a tax band in
major taxes, and have supported analysis and oversight and coding;
d. The regions have developed the capacity building plan of and TOR for regional
government teams to be in place.
3. SCOPE OF WORK
3.1. Overall Scope of Work
29. Eligibility for “downstream” ULGDP II assignments: Consultants submitting proposals to
provide consultancy services for the assignment described in this Terms of Reference will note that if
they are award a contract for the 1st Annual Performance Assessment of 44 Cities participating in the
ULGDP II, they will not be debarred or prohibited from participation in subsequent (downstream)
ULGDP II assignments including the provision of Annual Performance Assessments for ULGDP II
cities for allocation of funds in EFY 2008 and in the years that follow.
30. Disbursement Linked Indicators, Performance Measures and Indicators: Annex 1 contains
the detailed schedule of Disbursement Linked Indicators, Performance Measures and Indicators that
are to be measured by the Consultant in each of the 44 ULGDP II cities. The Consultant will note that,
because this is the first APA for ULGDP II and there are: a) performance measures and indicators that
are in some cases the same as, or similar to ULGDP PMs and indicators, and in some cases not (i.e.,
are new); and b) there are ULGs that have previously participated in ULGDP APAs and other ULGs
that are participating for the first time, the Consultant will have to determine whether the PM and
indicator to be measured will be determined on the basis of the existence of evidence:
1. At the time of the APA (March/April 2014) – i.e., in EFY 2006 – for instance the existence
of an approved CIP for the year(s) ahead;
2. At the end of the EFY 2005 (July 2012- July 2013) – for instance the ULG’s achievement in
municipal revenue collected against target;
3. From EFYs earlier than EFY 2005 (for instance in the case of evidence of prior year audits
having been concluded);
4. Whether bank reconciliations are up-to-date at the point of time for the APA or
5. A combination of the above. The final set of MCs/PMs to be completed prior to the
assessment will provide guidance to the consultants on these issues.
31. Note: The APA DLI, performance measures and indicators matrix provided in Annex 1
provides an indication of where it expected that the evidence of performance may be identified.
32. Scoring Matrix: Before the end of the contract negotiations and award of contract, the
MUDHCo will provide the Consultant with an MS Excel worksheet (or linked set of worksheets) into
which the Consultant will be expected to enter the (draft and final) data resulting from the APA. MS
Excel worksheet will calculate the allocations to be made to each of the 44 cities and the aggregated
scores for each DLI sufficient to identify whether DLI funds may be released.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 19 of 104
33. Future ULGDP II APAs according to ULGDP II POM and APAM: For future ULGDP II
APAs the assignment will be carried out by independently contracted consultants who will carry out
the assignment in strict compliance with the ULGDP Program Operations Manual (POM) and the
ULGDP II Annual Performance Assessment Manual (APAM) that is provided as an annex to the
POM. The 1st ULGDP II APA – for EFY 2007 disbursement and allocation - will be undertaken
before the APAM is completed and will form an input to the preparation of the APAM. For this reason
the 1st ULGDP II APA will be carried out in accordance with this Terms of Reference and the contract
for Consultancy Services that will be signed between the Consultant and the Urban Good Governance
Capacity Building Bureau, MUDHCo. The APAs will also review certain performance measures at the
regional level, such as timeliness of the annual audits by ORAGs and RPPAMAs, and these activities
will be somehow expanded during the 2nd
and the 3rd
assessments.
34. At the regional level the consultants will review: 1) the extent to which the regional ORAGs
have conducted timely audits of the ULGs final accounts, 2) the extent to which the regional
environmental protection agencies have carried out the safeguards reviews/audits of ULGs in their
jurisdictions before the start of the annual performance assessment in each year, and 3) the extent to
which the regions have held consultations with the ULGs on tax rates, provide a tax band in major
taxes, and have supported analysis and oversight and coding, and 4) the annual performance
assessment will finally check the extent to which the regions have developed the capacity building
plan of and TOR for regional government teams to be in place. The exact scope of assignment at the
regional level is subject to change and will be further clarified prior to signing of contract for the
consultancy
35. Provided that the continuity in the technical approach, experience acquired, and continued
professional liability is maintained and the firm proves satisfactory performance in the initial
assignment, the client may consider continuation of the assignment for further downstream APAs with
the initial consultant.
36. Objectivity & Evidence-based APA: The Annual Performance Assessment (APA) should
involve minimal “judgment” or “analysis” on the part of the consultant or city – although some is
required. It should as far as possible, be “evidence” based – i.e., performance is assessed on the basis
of identifiable (documentary) evidence. The Consultant should be able to provide evidence that
conclusively and indisputably supports the assessment.
37. ULGs Signing-off on APAs: Before completing the assignment the Consultant will be required
to present the draft assessment to executive representatives/officials of each city and region and obtain
their signed certificate of agreement to the assessment, documenting any justifications for non-
agreement.
38. Strict adherence to the work plan agreed with the Client in the Final Inception Report is
important because the APA is an input to the process of deciding on allocation of funds to cities for
EFY 2007.
3.2. Tasks
3.2.1. Task 1, Inception Period – 1 Week
39. Data Collection & Review: Thoroughly review the documents that cities must provide as part
of the performance criteria. These documents include:
a. ULGDP Operational Manual (draft only)
b. Annual Performance Assessment for EFY 2006 Allocation to ULGDP Cities. Final
Report
c. ULGDP Cities’ annual progress report for EFY 2005. As part of the preparations for the
annual assessments, each city will complete and submit to BWUD by August 15 of each
year (and BWUD to UDCBO by August 31), an annual progress report for the previous
fiscal year).
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 20 of 104
d. Cities quarterly progress reports, which must contain all the information specified in the
ULGDP Monitoring, Evaluation, and Reporting System and Guidelines. In particular,
the quarterly progress reports are expected to present information on procurement
actions, spending, revenue mobilized, physical progress of investments, consultative
meetings, and dissemination activities.
e. Cities current capital investment plans/budgets, and annual action plans.
f. Cities revenue enhancement plans.
g. Cities asset inventories and asset management plans
h. Cities external audit reports for EFY2005, if available and reports from previous EFYs
(minimum 5 years back). If not available, cities’ most recent external audit reports,
including recommendations for improved performance.
i. Evidence submitted by cities as part of their quarterly progress reports on dissemination
of information on investment plans, budgets, Procurement plans, contracts awarded and
delivered, expenditures, physical progress of investments, and improvements achieved in
terms of services delivery. This evidence is expected to be submitted to the UGGCBB
as part of the quarterly progress reports.
j. Environmental and Social Management Framework for ULGDP, November 2008.
k. Resettlement Policy Framework, for ULGDP, November 2008.
40. Work Plan: Prepare a detailed work plan for the visit by the Consultant’s teams (See Section 6)
to each city detailing: dates of visit, dates for introductory briefing and presentation of the
performance assessment to city executives, date for delivery of ULGDP II 1st Annual Performance
Assessment, complete with signed certificates of agreement from each city and documentary evidence
of performance for each city.
41. Consultant’s Team: Discuss, agree and finalize with the Client’s representative (Director,
UGGCBB, MUDHCo) the Consultant’s teams for performance of the APA for each city/region.
42. Certificate of Agreement Format: The Consultant will draft and submit, in consultation with
the Client, a form of Certificate of Agreement to the ULGDP II 1st Annual Performance Assessment
that will be signed by each City’s (and RUDBs)) nominated representative at conclusion of the APA
for each City.
43. Mobilization: The Consultant will fully mobilize their team and make all logistical preparations
for carrying out the APA in the 44 cities.
44. Inception Report: Present details of the above, plus the methodology for carrying out the
assignment in an Inception Report Not more than 15 pages.
45. ULG notification: Immediately following the submission of the Inception Report the
Consultant will contact executive officials in each city government and regional RUDBs officials to
inform them of the dates for the APA to be undertaken in each city.
46. Timing: Step 1 will be completed not more than 1 Weeks after commencement of the
assignment.
47. Approval of Inception Report: The Client will advise the Consultant that the Inception Report is
approved within 1 week of submission of the Inception Report,
3.2.2. Task 2: Annual Performance Assessment of 44 Cities
48. Presentation & Briefing: Before commencing the APA in each ULG, the Consultant will meet
with the RUDB representative, Mayor, City Manager, ULGDP Coordinator (and any other city official
nominated by the Mayor or City Manager) and:
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 21 of 104
a. Present the full Consultant’s team;
b. Brief the meeting as to the methodology to be followed;
c. Agree who will be the key informants at the city for each of the Consultant’s team/
performance criteria, what documentary evidence of performance is required and when they
will meet to agree on the assessment of performance.
d. The date, time, place and who will be present for the wrap-up meeting at which the
Consultant will present the final agreed (with the relevant City officials) preliminary APA
(not more than 4 pages) and at which, following any discussion and amendment of the
preliminary APA, the Mayor, City Manager, ULGDP Coordinator and Regional RUDB
representative will certify (attach signatures) that they have received, discussed and agreed
the preliminary APA.
e. The Consultant will take minutes of this meeting, including names of all persons present, and
will subsequently obtain the ULGDP Coordinator and RUDB representatives confirmation
as to the accuracy and completeness of these minutes
49. Annual Performance Assessment: The Consultant’s team will then carry out the APA
exercise; with team members meeting assigned city officials, securing documents as evidence of
performance achieved, carrying out inspections and investigation to verify the authenticity of the
performance as necessary; requesting and documenting reasons or justification for specific under/over
performance; meeting together to check/integrate results and coordinate activities and preparing the
preliminary APA for the city. The Consultant will, together with any other necessary actions:
a. Review quarterly progress reports and comment on their quality in relation to the ULGDP
M&E guidelines.
b. Review with the city administration evidence of public participation in the investment
planning process.
c. Review revenue mobilization achievements in relation to the targets set in the revenue
enhancement plans.
d. Visit completed and ongoing infrastructure programs that are specified in the capital
investment plans as per the demand for sampling in the APA PMs. Check the linkage of the
capital investment plans with the asset inventories and asset management plans. Record the
extent to which the condition of existing infrastructure has improved (due to effective
maintenance) and the extent to which new infrastructure has been created. Assess the extent
to which the programs are being implemented in compliance with the ULGDP’s
environmental and social safeguards.
e. In cities with recent external audit reports, assess with the city administration the extent to
which the audit recommendations have been implemented.
f. Review the internal audit and control system of the city administration
g. Review with the city administration the evidence of dissemination of information as
specified above.
h. Review with the city administration its utilization of the annual capital budget and
compliance with ULGDP II procurement procedures.
i. Review the cities institutional procurement and contracts management arrangements
adequacy; including availability of approved annual Procurement plans and its
implementation and adequacy of procurement records keeping.
j. Conduct procurement compliance review on sample of contracts procured in this FY (at least
15 to 20% sample to be taken) to verify whether the process followed is in compliance with
the legal requirements. The compliance check may include: (i) Procured Goods, works and
services contracts are in the approved PP; (ii) proper advert is made; (iii) correct Standard
Bidding Documents (SBDs) are used; (iv) bid floating periods are acceptable ; (v) Bid
Evaluation Reports (BER) are conducted consistent with requirements of the issued Bid
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 22 of 104
Documents (BDs); (vi) Bid evaluation results are announced to bidders and to the general
public; (vii) Contracts are awarded to the lowest evaluated bidder within bid validity periods
; (viii) procurement complaints, if any, are properly ; (ix) contents of contract documents are
complete; (x) timeliness of the procurement/contracting process and decisions are consistent
with the PP; (xi) Contracts implementation are cost and time effective …etc.
k. Review compliance report on Environmental and Social Management Framework for
ULGDP II, (MUDHCo Draft POM and ULGDP ESMF).
l. Review compliance report on Resettlement Policy Framework, for ULGDP, (MUDHCo
Draft POM and ULGDP RPF).
50. Wrap-Up Meeting: The APA for each city will be completed with a Wrap-Up working session.
The Consultant will take minutes of this meeting and will subsequently obtain the ULGDP
Coordinator and RUDB representative’s confirmation as to the accuracy and completeness of these
minutes. The Consultant’s team will present the Preliminary Performance Assessment for the City,
consisting of:
a. A brief written description of the Performance Assessment for each of the DLIs and
performance criteria described in Annex 1 – not more than 1 paragraph; describing: a) any
difficulties encountered in determining the assessment; and b) any reasons, explanations or
justifications provided by the City for any over or under performance;
b. The summary table described in and provided after the last paragraph in this Step;
c. The list of documents that verify the performance assessed; and
d. The Certificate of Agreement to the ULGDP II 1st APA.
51. Provision of Documents: The Consultant will provide four copies of Preliminary APA and
Certificate of Agreement, to the City representatives; 1 copy to the Regional RUDB representatives
and 2 further copies with original signatures in their full draft APA for submission to the Client with a
copy to the World Bank.
52. Client intervention: The Consultant will inform the Client, by email, when the Preliminary
APA is agreed and the signed Certificate of Agreement is secured. Should the Consultant be unable to
secure a signed Certificate of Agreement, they will inform the Client’s representative within 24 hours
and agree what follow-up action will be taken and by whom.
53. Format for APA Summary Sheet for each City: The Consultant will use the format provided
in Annex A that defines the DLIs and performance measures/requirements (collectively referred to as
“performance criteria. As indicated earlier in this TOR, before the end of the contract negotiations and
award of contract, the MUDHCo will provide the Consultant with an MS Excel worksheet (or linked
set of worksheets) into which the Consultant will be expected to enter the (draft and final) data
resulting from the APA
54. Consultant’s output/deliverable: The Consultant’s Task 2 output/deliverable is a draft
ULGDP II 1st APA of 44 participating ULGs for allocation of Performance Grants for utilization by
the ULGs in EFY 2007. An indicative format for the draft document is provided in Section 4 below.
3.2.3. Task 3: Workshop
55. In the week following submission of the draft ULGDP II 1st APA the UGGCBB will arrange a 2
day (TBD) workshop, in a venue to be determined, for the presentation of the draft ULGDP II 1st APA
and consideration of the findings. The Consultant will make the main presentation of their results
which should take no more than 3 hours. The format for the workshop will be advised to the
Consultant in due course. The Consultant will not include the workshop costs in their financial
proposal. The workshop participants are not yet identified but are likely to be approximately 100+,
with representatives from each ULGDP II participating ULG, Regional States, MUDHCo, MoFED
and other federal agencies, as well as the World Bank, other development partners, the press, etc.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 23 of 104
56. The workshop objectives are:
1. Communication and Mobilization: To communicate with and mobilize all stakeholders,
ULGDP II implementing agencies and interested parties in support of and in identify further
actions required to successfully implement the ULGDP II; and
2. ULGDP II Disbursements and Allocations: To support the process and ensure clarity,
accuracy and robustness of decisions to be made immediately following the workshop by the
ULGDP II Executive Committee as to:
Whether the APA results support the disbursement of funds as per the Disbursement
Linked Indicators assessed by the Consultant; and
Whether allocations may be made or not, and where made the extent of the allocations,
to each of the 444 participating ULGs.
57. The workshop outputs are:
A memorandum prepared by the Technical Subcommittee (UGGCBB) of the ULGDP II
Steering Committee with recommendations, justifications and explanatory notes regarding
the workshop objectives described above that relate to ULGDP II Disbursements and
Allocations. The memorandum will be presented to the members of the ULGDP II
Coordination Committee, in formal meeting, within 5 days of the workshop.
A brief workshop report, prepared by the Consultant, containing: any presentations
made at the workshop, a list of workshop participants (name, position, telephone, email),
identification of any issues arising at the workshop that require follow-up or that either
affect decision as to EFY 2007 ULGDP II disbursements and allocations, or the conduct
of future ULGDP II APAs.
3.2.4. Task 4: Final Report
58. The Consultant will produce a final APA report, in the same format as for the draft report,
within 2 weeks of the workshop, containing any amendments, additions or omissions required by and
notified to the Consultant in writing.
4. REPORTS AND DELIVERABLES
59. Inception Report: Not more than 15 pages. Containing: methodology for carrying out the
assignment (where this is different from or additional to the Consultant’s Technical Proposal); detailed
work plan for the visit by the Consultant’s teams to each city; date for delivery of ULGDP II 1st
Annual Performance Assessment; consultants’ team; Certificate of Agreement with APA by ULG
format:
60. Draft and Final ULGDP II 1st Annual Performance Assessment: The contents and structure
of the Draft and Final ULGDPs 1st APA reports, to be submitted to MUDHCo and the World Bank,
will be as follows:
a) Cover, contents and abbreviations.
b) Section 1, Introduction: very brief description of who has done the assessment, when,
where and for whom. Not more than 2 pages.
c) Section 2, Approach and methodology: Full details of the approach and methodology
followed – as presented in the Inception Report. Note more than 5 to 8 pages. Any detailed
lists, schedule of city visits, Consultant’s staff, etc., to be put in Annexes.
d) Sections 3 to 46, Performance Assessment for Cities: a separate chapter for each city (if
necessary each city can be given its own Performance Assessment document); describing:
The results of the APA for the city; and
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 24 of 104
Copies of the Certificate of Agreement (or in its absence reasons for its absence).
e) Section 47, ULG APA summary: A summary of the findings in a simplified matrix
showing comparative results for each city against others.
f) Section 48, DLI APA summary: A summary of the findings in a simple matrix or table in
respect of each DLI assessed.
g) Section 23, Observations: Overall observations, lessons learned and recommendations for
future conduct of Annual Performance Assessments and improvement of the ULGDP II
APA system.
h) Annexes:
Lists of all documents secured for each city providing evidence of the assessed
performance;
Details of dates of presentation/briefing and wrap-up meetings, persons present and brief
minutes documenting key aspects of any queries, issues raised or agreements made.
5. INDICATIVE SCHEDULE OF ACTIVITIES & TIMINGS
Table 1. INDICATIVE ULGDP II 1ST APA WORK PLAN
No
Activity
Note: Consultant’s responsibilities are
indicated in red – in some cases (Nos. 7
to 10 inclusive and No. 12) in jointly
with UGGCBB, MUDHCo
2013 2014 2014
Week starting Monday
23 30 6 13 20 27 3 10 17 24 3 10 21 28 5 12 19
Dec. January February March April May
1 Request for Proposals issued to
consultants
3 Consultant submit Tec/Fin proposals
4 Evaluation of Proposals (MUDHCo)
5 ULGDP II appraisal (MUDHCo)
6 Contract negotiations concluded
7 Contract signed
8 Contract start
9a 1st APA Inception Period
9b 1st APA completed for 44 ULGs Six weeks
9c Draft APA delivered
10 ULGDP II 1st APA workshop
11 APA Results agreed & notified
12 ULGDP II launch workshop/ceremony
61. Notes:
1. The work plan provided above is indicative. The Consultant should provide its own work plan
in their Technical Proposal. However, the Consultant will note the Clients strong
recommendation that the Draft 1st ULGDP II Annual Performance Assessment is delivered –
on or before 30 April 2014
2. 30 days have been provided between issuance of the Request for Proposals to consultants and
the submission of technical and financial proposals by shortlisted consultants.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 25 of 104
3. 2 months – 1st March to 30
th April 2014 - have been provided for the completion of the
assignment to the point the Draft 1st ULGDP II Annual Performance Assessment is delivered
– on or before 30 April 2014.
4. It is expected that the Consultant will present the methodology and results of the 1st ULGDP II
APA at a workshop arranged by UGGCBB, MUDHCo during the week 5 to 9 May, probably
on 7 or 8 May, in Addis Ababa.
5. Following the 1st ULGDP II APA workshop it is expected that the Consultant will provide a
final APA document together with hard and soft copies of all evidence of performance
collected from cities.
6…TEAM COMPOSITION AND QUALIFICATIONS
62. The description of the Consultant’s team provided below is indicative. The firms invited to
submit proposals should propose their own team structure, composition and staffing levels, based on
their own evaluation of the TOR’s requirements and the resources available to the consultant.
63. It is expected that the Consultant will provide:
A team leader and deputy team leader who will be responsible for overall management
of the four APA teams and logistical arrangements; communication with the Client and
key stakeholders; quality control of team members work; coordination and integration of
Consultant’s inputs and outputs; and production of the reports and deliverables that are
consistent, reliable, concise, readable (in English) and clear in their findings and
presentation of APA results.
Four APA teams. It is calculated that the APA for each city will require approximately 3
to four day’s work for 1 team, depending on the size of the ULG and other factors
affecting work rates. On this basis and assuming a 6 day working week, with travel
occasionally on Sundays, it is expected that, during the 6 week (36 working days)
assessment period, each team can carry out the assessment of about 10 to 12 ULGs.
Approximately 4 x 11 cities for each team. The arrangements proposed in detail will be
included in the Consultant’s Technical Proposal. Clearly the size and complexity of
different ULGs; whether they participated in the ULGDP, Urban Development Fund or
not; regional language usages and familiarity with different regions; as well as the
logistical arrangements are among the factors the Consultant will need to take into account
in selecting and directing their APA teams.
64. It is expected that the Consultant’s APA teams may include expertise in the following areas:
municipal infrastructure, asset management, local government, financial management, procurement,
environmental and social management, municipal revenues, ethics and anti-corruption, budgeting,
planning and participation, urban land management, urban spatial planning. It is understood that the
Consultant may be able to provide to experts who can provide adequate expertise in 2 or more of the
areas identified above. All experts provide should have the ability to communicate clearly, verbally
and in writing.
65. The consultant’s key team members undertaking this assignment shall have a minimum of
Master’s degree and a minimum of 10 years work experience. All team members provided should
have a solid professional background in the areas to be addressed, which apart from the specific
expertise described in the previous paragraph, would include performance assessment and evaluation,
and program/program management
66. The team leader and deputy team leader shall have very strong interpersonal, analytic, writing
and communication skills. In addition, the team leader or deputy team leader should have substantial
expertise in data collection, manipulation and presentation. It is advisable that the team should have
members or counterpart team members who are conversant with the local official language, Amharic,
since most of the work involves interacting with regional and city officials.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 26 of 104
67. On an indicative basis it is estimated that the following level of input is necessary:
Team Leader and Deputy Team Leader – say 2 months full time each = 4 months.
Each APA team, approximately 6-7 members each having say 1.75 months input = 13.2
months. For 4 teams = 52.8 months.
Allow 2.2 months for administrative and logistical support.
Total is estimated at 59 months TA input.
68. There should not be former MUDHCo, UGGCBB, RUDBD or ULG staff involved in the APA
as part of the Consultant’s team (within the last three years). Personnel involved should be at “arm’s
length from any previous involvement with related ULGDP or city activities.
7…FACILITIES TO BE PROVIDED BY MUDHCo
69. The Ministry of Urban Development, Housing and Construction is the client for this work. In
terms of performance and deliverables, the Consultant will carry out the assignment under the
direction of and report to the Director General, Urban Good Governance Capacity Building Bureau,
MUDHCo. As the agency responsible for the overall coordination of ULGDP II, the Director General,
UGGCBB will sign the contract with the consultants on behalf of MUDHCo and UGGCBB will be
responsible for all payments to the Consultant.
70. Inputs provided By the Client: The client will provide to the Consultant at the commencement
of the assignment with any key documents deemed relevant to the Consultant’s scope of work. Other
relevant documents will be made available as necessary.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 29 of 104
8….ANNEX 1: DLI 1, 2 AND 3, MINIMUM ACCESS CONDITIONS & ULG PERFORMANCE MEASURES
Note: The Minimum Conditions and Performances described below are as at December 2013. They have been amended during final appraisal 3-14
March 2014 and may be further amended during final negotiations 10-14 March 2014.
Entry-level condition – Prior to Release:
Participatory performance agreement signed with
MUDHCo
Show commitment by all parties and defines the
rules of the system
Update the PPAs. Should be included in the ULGDP II
Operational Manual.
8.1 DLI: Minimum Conditions (MCs)
No. Minimum Condition Reason Comments – phasing in etc.
1. ULG has produced and the council approved
a:
Rolling three year capital investment plan
(CIP) with
Annual action plan;
Annual budget
Annual procurement plan
The planned use of the performance-based
grants from ULGDP II is in compliance
with investment menu (only from
assessment in 2015 of the performance in
FY 2014/15).
Document minimum capacity in planning and project
handling.
Implementation readiness.
The subject for review is the plans developed in the previous year
for the year where assessments are conducted, e.g. if assessment
is conducted in August 2014, it is the plans for FY 2014/15 /EFY
2007), which are typically developed from March – June 2014.
In the assessment for FY 2014/15 (EFY 2007) budget allocations,
which is expected conducted in March 2014, it is the plans for FY
2013/14 (EFY 2006), which are reviewed, hence the exact plan
will depend on timing of the APA.
To make this effective it is important that the APAs are conducted
timely in the future, see Section on APA procedures.
Transitional arrangements. For new ULGs, procurement plans
will only a minimum condition for the second year, see also
below.
The investment menu will only be assessed from the second
assessment where there has been the first planning/budgeting on
the use of the performance-based grants. From the third
assessment, the actual utilization of grants in the previous year
will also be assessed.
2. Submission of financial statements for the last
FY (closure of the FY on time).
Show evidence on minimum capacity in PFM In order for the external audits to start as early as possible cities
should close their accounts by end of September/ each year.
Phasing in the first year: The new ULGs participating in the
Program should have completed the financial statements before
the start of the assessment.
3. Audit report from previous FY should not be
adverse or with a disclaimer opinion.
To reduce fiduciary risks It should be ensured that audit quality continues, and there is need
to combine with other minimum conditions to ensure sufficient
safeguards on PFM. Compared to previous system, this is a
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 30 of 104
No. Minimum Condition Reason Comments – phasing in etc.
strengthening of the requirements, as it is reviewing the audit
report from previous FY.
If the ORAG cannot conduct the audit in time, external audit
firms will have to be contracted, and their results applied. (ORAG
should clear the TOR and makes QA/endorsement of the results).
Transitional arrangements:
A waiver is provided in the first FY for the new ULGDP ULGs
providing them with sufficient time to improve, but as a minimum
they should have completed the financial statements from
previous FY. For the first year for the “current ULGDP” ULGs,
the deadline is prior to the effectiveness.
Second year: All should be on time, i.e. January 7.
The audit report is the last “trigger” in the assessment process,
and will be checked after the field-work, but prior to the
consolidation of the results.
4. Co-funding requirements (defined with
various rates of co-funding depending on the
type of ULG). The co-funding requirements
are the following:
10 % for the new ULGs in the DRS
20 % for the new ULGs in the non-DRS
regions.
30 % for the “old” ULGs.
50 % for Dire Dawa and Harar.
A higher level of co-funding is promoted in
the performance measures.
Reflect sustainability of the program and ensure that
the rule on counterpart funding is adhered with. The
co-funding is set at a realistic level and further
contributions are promoted through the performance
measures.
Promote improved revenue mobilization and incentives
to focus on longer-term sustainable urban finance.
Is combined with performance measures so that contribution
above the minimum level is rewarded.
Co-funding should be budgeted for prior to the start of the FY,
and by the end of a FY ULGs should have contributed with the
specific %, measured by actual use of funding on capital
investments on areas defined in the investment menu and source
of funding (IBEX coding).
Transitional arrangements/Phasing in: ULGs can only budget for
this in the second assessment, as they do not know the level for
this coming FY. The assessment of actual utilization of funds can
only be done in the assessment following a year of actual
disbursements of ULGDP funds, i.e. from the September 2015
assessment.
5. Key positions in place/coordination team with
the following positions under the coordination
of the city manager: focal persons for revenue,
procurement, environmental and social
sustainability, M&E, PFM, and civil
engineering, plus a functioning internal audit
unit.
To ensure that there is minimum capacity to handle the
entire program implementation process at the ULG
level.
The positions should be in place at point of time for the
assessments.
6. Safeguards: ULGs have demonstrated that
they have established a functional system for
environmental and social management as a
minimum condition to access the
To ensure that there is a mechanism and capacity to
screen environmental and social risks of the CIP prior
to implementation.
Defined by:
Initiation of recruitment of environmental and social safeguards
focal person at the city level;
Endorsement of city level ESMS document that includes
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 31 of 104
No. Minimum Condition Reason Comments – phasing in etc.
performance-based grant, including an
environmental and social safeguards focal
person.
procedures for due diligence; institutional procedures for
grievance management (see below under No. 8) and
environmental, managing resettlement/land take processes and
environmental social mitigation and monitoring plan.
Only from second APA (September 2014)
7. Functional institutional set-up for procurement
system in place according to public
procurement proclamation including:
1. Procurement function and minimum core
staff in place – at least two procurement
specialists;
2. Functional tender committee/tender
award committee in place;
3. Participating cities have the copies of
their respective region’s procurement law,
directives, manuals and standard
procurement documents and staffs are
familiar with these legal documents
Procurement is a high-risk area, hence need to ensure
that basic systems, and functioning of this is in place
prior to transfer of PB grant installments.
The existence and functionality of the procurement
system is basic to make sure that Program systems
coupled with the mitigation measures provide
reasonable assurance that the financing proceeds will
be used for intended purposes with due consideration
of economy, efficiency, transparency and fairness.
8. Complaints handling system in place,
including system for reporting of complaints,
system for receiving and addressing
complaints and reporting on corrupt practices
and complaints, through the ethics unit.
Receiving, reviewing and addressing complaints
within core areas such as areas related to
environmental degradation of the surrounding:
Environmental health impacts on people; loss of
livelihood, income or assets is an important aspect of
any GRM. The system will encompass a system for
complaints received, registration of these, description
of where to send the various types of complaints, to
whom, and how?; and description of the procedures.
The information about these procedures should be
published.
Only from the second APA (September 2014).
The POM will further define the requirements within this area.
8.2 DLI 2: Institutional Performance
Below is a presentation of the institutional performance measures.
Main changes compared to existing ULGDP I performance assessment system are:
Division of institutional and service delivery targets in two sets of indicators under each DLI 2 and 3.
Movement of CIP utilization rate to separate DLI (DLI 3), performance linked allocation; Similar for the utilization of maintenance budget.
Improvement and sharpening of indicators in most areas.
New indicators more focusing on the ULGs gaps and areas of importance for activities linked with achievement of targets of the program.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 32 of 104
Reorganization of some of the performance areas, and regrouping.
Links to the government policy on Ethiopian Cities Prosperity Initiative are included.
Ser. No. Performance Areas Performance measure/Indicator/score Objective
Links to
Ethiopian
Cities
Prosperity
Initiative
Existing or new
indicator
1 Planning and Budgeting (maximum 10 points)
1.1 Rolling three year CIP, with linkages
between the annual budget, annual action
plan, and annual procurement plan
(Maximum 3 points)
Consistency of figures and alignment with revenue
enhancement plan and asset management plan: 2
points.
Capturing of operational and recurrent costs of
investments in the plans: 1 point.
Promote efficient
planning, budgeting
and procurement for
efficient
infrastructure
development
Pillars 2, 3
and 4
Pillar 3
Existing
Existing
1.2 Participation of citizens in the planning
process to meet service delivery priorities
identified by citizens
(Maximum 4 points)
Evidence of participatory planning process with
involvement of citizens
Measured by:
Number of public consultations (minimum two per
year: 1 point)
Increase or stable level of number of people involved
in planning discussions and the % of women
involvement is more than 40 %: 1 point.
Existence of a meeting agenda and other information
has been shared in advance and evidence that issues
discussed have included the prioritization of projects in
the up-date of the CIP/annual plan: 1 point.
Good governance procedures on planning reflected by
minutes from the consultation meetings: 1 point.
Citizens involvement
and good governance
Pillars 3 and
7
Yes, but
strengthened
1.3 Budget appropriation
(Maximum 2 points)
Budget approved by Council and proclaimed in the
budget proclamation following the standard charts of
accounts: 2 points. Note that both conditions have to be
Promote political
leadership and
governance
Pillar 1 New
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 33 of 104
Ser. No. Performance Areas Performance measure/Indicator/score Objective
Links to
Ethiopian
Cities
Prosperity
Initiative
Existing or new
indicator
complied with to achieve the points.
1.4 Budget reliability
(Maximum 1 points)
Variance in % between total budget and actual for the
previous FY (related with total budget expenditures on
municipal services) is less than 10 %: 1 point.
Promote proper
budgeting and
implementation
Pillars 3 and
5
Existing (but
only partial)
2 Assets Management (10 points)
2.1 Assets management plan prepared and
updated
(Maximum 10 points)
Asset inventory updated, featuring a tabular and spatial
database of all infrastructure, with specification and
characteristics, at least for the five categories of
municipal assets (Road &Drainage, Solid and Liquid
waste, Socioeconomic infrastructure &greeneries,
Utilities, Public buildings including abattoirs (2
points)
Conditions of assets reflected in asset inventories
correctly (professional input) (2 points)
Asset inventory show an asset value and deficit, which
calculates the remaining asset value, maintenance and
rehabilitation deficit based on annual depreciation
rates. (2 points)
City updated the AMP according to the AMP 10 steps
(as per the guideline for asset management preparation
if exists) elaborating its implementation strategy,
which details individual activities and their respective
budgets over the course of the year (2 points)
AMP clearly show related budget for asset
maintenance, rehabilitation and new assets, which lists
all necessary costs (2 points)
Strengthen
management of
infrastructure and
assets.
Pillar 5 Existing
3 Public Financial Management (Maximum 15 points)
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 34 of 104
Ser. No. Performance Areas Performance measure/Indicator/score Objective
Links to
Ethiopian
Cities
Prosperity
Initiative
Existing or new
indicator
3.1 Accounting and timely reporting
(Maximum 4 points)
Use of integrated IBEX for all operations including
ULGDP grants and reporting on these: 1 point
Charts of accounts adhered with, including: On site
analyses of correctness of coding – in particular of
municipal revenues: 1 point.
Timely financial reporting: 1 point
Monthly cash count report and Bank reconciliation
submitted to region on time (within 15 days after the
end of the month): 1 point
Strengthen
accountability
Pillars 1 and
3
New
New
Existing
New
3.2 External audit backlogs cleared
(3 points)
All audit backlogs cleared for previous years
(minimum 5 years back): 3 points. Strengthen
accountability
Pillars 1 and
3
Existing
3.3 Audit Opinion for the previous audit
(3 points)
The audit report from the previous audit has a clean
audit opinion: 3 points. Strengthen
accountability
Pillars 1 and
3
New
3.4 Compliance with audit recommendations
(2 points)
Evidence that audit queries raised in the external audit
report have been acted upon by the city: Minimum 80
percent of the queries have to be cleared: 2 points.
Strengthen
accountability
Pillars 1 and
3
New (was
monitored only)
3.5 Internal audit (3 points) Internal audit procedures adherence with good
practices reflected in: (a) quarterly reports, (b)
reporting to mayor, (c), and evidence of follow up on
audit findings). (3 points, one point for compliance
with each of a, b, c).
Strengthen
accountability
Pillars 1 and
3
New
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 35 of 104
Ser. No. Performance Areas Performance measure/Indicator/score Objective
Links to
Ethiopian
Cities
Prosperity
Initiative
Existing or new
indicator
4 Procurement 14
(Maximum 15 points)
4.1 Annual procurement plans for ULGDP II
prepared and its implementation is
monitored and updated as required.
(Maximum 3 points)
The procurement plan implementation is monitored
and procurement process milestones are achieved: 1
point.
Procurement plan is up-dated, as required at the point
of time for assessment: 2 points.
Strengthen efficiency
and competition in
implementation of
infrastructure (urban
productivity and
competiveness)
Pillar 2 Existing
(modified)
4.2 Adherence to procurement procedures and
effectiveness of contracts
(Maximum 12 points)
Based on the review of a sample of procured contracts, the
following are assessed as procurement performance
indicators (the contract sampling size for review should not
be less than 20 percent in each city):
Availability of adequate relevant auditable records on
the procurement process; (1 point)
All ICB and NCB contracts award published as
necessary and compliance with procurement process
and decisions made in accordance with the legal
requirements: (11 points) divided on: (a) Procured
Goods, works and services contracts are in the
approved PP (1 point); (b) proper advert is made (1
point); (c) correct SBDs are used (1 point); (d) bid
floating periods are acceptable (1 point); (e) BER are
conducted consistent with requirements of the issued
BD (1 point); (f) Evaluation results are announced to
bidders and to the general public (1 point) (g)
Strengthen efficiency
and competition in
implementation of
infrastructure (urban
productivity and
competiveness) (the
first two years, the
APA will conduct
this assessment, and
in the following year
(3) and onwards, the
procurement audit
will fit into the
results of the APA,
using the regional
Participatory
Performance
Agreement.
Pillar 2 Existing
(modified)
Existing
Existing (partly
and modified)
14 Annual Independent procurement audit (IPA), including contracts effectiveness is to be conducted and reported along with management response of issues raised. The IPA will have an agreed terms of reference and conducted
by regional public procurement agencies or an independent consultant. At the moment, since the RPPAs do not have the capacity, the first two years independent procurement audit will be conducted together with APA and the
terms of reference of the APA will be modified to address the IPA need. The RPPAs capacity will be enhanced during the first two years and the RPPAs will take over the IPA responsibility from the APA consultant (Procurement
audit is their legal mandate). The adequacy of the regional public procurement and asset management agencies to carry out IPA will be assessed and confirmed by joint review of Federal Public Procurement and Asset
Management Agency and the World Bank.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 36 of 104
Ser. No. Performance Areas Performance measure/Indicator/score Objective
Links to
Ethiopian
Cities
Prosperity
Initiative
Existing or new
indicator
Contracts are awarded to the lowest evaluated bidder
within bid validity periods (1 point); (h) procurement
complaints, if any, are properly addressed (1 point);
(i)contract documents contents are complete (1 point);
(j) timeliness of the procurement/contracting process
and decisions are consistent with the procurement plan
(1 point); (k) Contracts implemented are according to
planned timing and budgets. (1 point).
5. Own source revenue enhancement (Maximum 10 points) Note as 5.4 is only relevant from year 2 and 3, other
indicators are increased in the first APA proportionally.
5.1 Revenue enhancement plan updated for the
most recent year
(Maximum points: 2)
(Maximum 3 points in the first APA)
The up-dated revenue enhancement plan will
include: (a) city analysis of previous year’s
revenue performance with detailed analyses of
each main source of revenue including discussion
of its revenue potential: 1 point. (2 points in the
first APA)
And (b) city strategies for revenue enhancement: 1
point.
Proper planning and
analysis is a condition
for effective targeting
of initiatives
Pillars 1 and
3
Existing (partly)
Existing (partly
5.2 Municipal Revenues increase
(Maximum 3 points) (Maximum 4 points in
the first APA)
Percentage increase of in total municipal revenues from
business taxes, municipal rent and charges and fees over
previous year: 5-10 percent increase: 1 point; 11-20
percent: 2 points; above 20 percent: 3 points (4 points in the
first APA). (nominal increase)
Promote
sustainability,
ownership and
accountability
Pillars 1 and
3
New
5.3 Revenue planning capacity
(Maximum 2 points) (Maximum 3 points in
the first APA)
Percentage of municipal revenue on business taxes,
municipal rent and charges and fees collected against
planned target for the previous EFY. (variation less than 5
percent: 2 points (3 points in the first APA), less than 10
percent: 1 point.
Promote realism in
revenue planning and
efficiency in
collection
Pillars 1 and
3
Existing (but
now focus on
municipal
revenues)
5.4 Funding from ULGs ULG contribution level for capital investments above a
Promote
sustainability,
Pillars 1 and New
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 37 of 104
Ser. No. Performance Areas Performance measure/Indicator/score Objective
Links to
Ethiopian
Cities
Prosperity
Initiative
Existing or new
indicator
(Maximum 3 points)
certain level
o More than 10 % for new ULGDP cities in new
(DRS) regions, calibrated with 11-20 %: 2 points
and above 20%: 3 points;
o More than 20 % for new ULGs in non-DRS
regions calibrated with 21-30 %: 2 points, and
above 30 % 3 points.
o More than 30 % for old ULGDP cities calibrated
with 30-40 %: 2 points and above 40%: 3 points.
o More than 50 % for Dire Dawa and Harar
calibrated with 51-60 %: 2 points and above 60
% 3 points.
Transitional arrangement: Only from second assessment
(September 2014) (budget allocated), and from the third
Assessment in September 2015 (both budget and account
figures are checked).
In the first assessment, the other indicators (5.1-5.3) will be
increased to 5.1: 3 points, 5.2: 4 points and 5.3: 3 points)
ownership and
accountability
3
6 Accountability and transparency (Maximum 15 points)
6.1 Accountability and transparency in city’
operations and service delivery
(Maximum points: 15)
City has identified the top three basic municipal
services, and prepared a standard for delivery along
with citizen charter and published this ( Yes/NO ==6
points) This indicator will be used only for the first
year of the program.
Is municipal service delivery as per the standard and
citizen charter? ( Yes/No 6= points). This will be as of
the 2nd
year of the program.
Dissemination of summary of annual budgets,
Strengthen
accountability and
good governance
Pillar 3 Existing (but
strengthen
availability of
information on
service
information)
Existing
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 38 of 104
Ser. No. Performance Areas Performance measure/Indicator/score Objective
Links to
Ethiopian
Cities
Prosperity
Initiative
Existing or new
indicator
approved projects, expenditures, audited accounts and
results of the procurement decisions in city offices and
other public places, or web-pages, newspapers etc.: 6
points.
Timely submission of quarterly physical progress
reports: 3 points.
7 Environment and social Safeguards (Maximum 10 points)
7.1 Eligible investments for potential
environmental and social safeguard
impacts screened
(Maximum points: 6 points)
All capital projects in the previous FY screened against
the set of environment and social criteria in the
planning stage: 3 points.
Environmental and social impact assessments,
Environmental Management Plans (EMP) and
Resettlement Action Plans (RAP) prepared and
approved by the Regional Environmental Protection
Agency as required (based on a sample review of
projects): 3 points.
Avoid adverse
environmental and
social impact
Promote
environmental and
social sustainability
Pillar 6 Existing
Existing
7.2 ESMPs and Resettlement Action Plans
implemented timely
(Maximum points: 4 points)
ESMPs and Resettlement action plans implemented
prior to commencement of civil works: 4 points. Avoid adverse
environmental and
social impact
Promote
environmental and
social sustainability
Pillar 6 Existing
8 Land management and urban planning (Maximum 15 points)
8.1 Statutory structure plan
(Maximum 5 points)
Existence of up-to-date approved statutory city-wide
(structure) plans (yes/no): If Yes =3 points.
CIP is in accordance with the statutory plan (structure
plan) (sample 5-6 investments): Yes/No. If Yes= 2
Promote efficient
urban planning
Pillar 4 New
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 39 of 104
Ser. No. Performance Areas Performance measure/Indicator/score Objective
Links to
Ethiopian
Cities
Prosperity
Initiative
Existing or new
indicator
points.
8.2 Land management
(Maximum 10 points)
Land released is serviced as per standards and city plan
(sample 3-4 projects) Yes/No. If Yes: 5 points (all have
to be fulfilled)
City has an up to date inventory of land use (Yes/No):
Yes= 5 points.
Promote efficient
land management
Pillar 4 New
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 40 of 104
8.3 DLI 3: Achievements of Infrastructure and Maintenance Targets and Value for Money in Investments
Note as some of the indicators will only kick in from the second and the third assessment, the scores of the other indicators will be adjusted pro-rate to ensure that the scoring is always
between 0-100 points
Ser. No. Performance Areas Performance measure/Indicator Objective
Links to
Ethiopian
Cities
Prosperity
Initiative
Existing
indicator
1 Job creation (35 % weight (maximum 35 points) on this in the first two assessments and from the 3rd
assessment: 30 % weight (maximum 30 points) for this theme)
Promote growth and
development
Pillar 7 New
1.1 Job creation
(Maximum 35 points in first assessments)
Cities’ achievement of jobs created (disaggregated by gender)
under the CIP against their targets (% of achievement). Note: a
condition for this, and for provision of points on this, is that cities
have registered/planned targets and started implementation.
Score: achievement rate @ weight, e.g. 100 % achieved = 35
points, 60 percent = 21 points. As of second year, the job created
will be measured (possibly person days of employment) based on
standard to be developed by MUDHCo.
New
2 Achievement of Urban infrastructure targets Maximum 35 points (35 % weight) on this in the first two
assessments, and from the third assessment: Max 30 point) or 30 % weight on this DLI. Pillar 5 Existing
2.1 Urban infrastructure targets achieved
(Maximum 35 points in the first
assessments)
Physical targets as included in the Capital Investment Plan
and annual work plan implemented.
o The % of implementation against plans will be reflected
directly in the score multiplied by 35 % (weight of this
indicator), i.e. 100 % implemented = 35 points, 60 % =
21 points.
The score on this indicator will be between 0-35.15
Achievement under this indicator will be measured on the basis of
actual delivery of infrastructure against targets laid out in the CIP
and annual work plan for the previous year. The means for
verification are:
Review all planned projects and the degree to which they
have been implemented by the end of the FY.
Ensure effective
implementation of
infrastructure and
service delivery
Pillar 5 Yes
(modified)
15 See means of verification below in the notes.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 41 of 104
Ser. No. Performance Areas Performance measure/Indicator Objective
Links to
Ethiopian
Cities
Prosperity
Initiative
Existing
indicator
Review annual and quarterly work plans and reports
Check minimum sample of 5 projects from the field-work
(on-the-spot of implementation rates)
Check the contract implementation progress and contract
completions through the review of bills of quantities, see the
description below.
Implementation rate of each project will be assessed and there
will a weighting of these to get a total score. The weight of each
project will depend on the budgeted size of the projects (see the
table below the APA table).
Assessed by the performance assessment teams.
No transitional arrangements. However, DLI 2 will only kick in
for the new ULGDP ULGs from the second assessment.
3. Maintenance Performance 30% weight of this in the first assessment (maximum 30 points) and 20 % of the
weight (maximum 20 points) on this DLI from the 3rd
assessment when value for money kicks in). Pillar 5 Existing but
adjusted.
3.1 Maintenance budget and implementation
rate (Maximum points: 15 points in first
assessments)
(10 points in the 3rd
and following
assessments)
Maintenance plan derived from the assets management plan
ULGs have developed a clear maintenance budget and
actual implementation rate is minimum 80% of the planned.
Note: both conditions have to be complied with to get the 15
points.
Review Overall budget and utilization rate in final accounts.
Sample of projects to review actual maintenance.
Ensure sustainability
in the investments
through up-keep of
infrastructure
Pillar 5 Existing, but
adjusted
3.2 Actual maintenance (Maximum points 15
in first assessments)
(10 points in the 3rd
and the following
assessments)
Maintenance is catered for (reward if all projects, which
need maintenance, have actually been catered for). This will
be based on a sample of 3-5 projects from the Assets
management plan.
Note: All projects have to be catered for to achieve the points.
Ensure sustainability
in the investments
through up-keep of
infrastructure
Pillar 5 New
4 Quality of infrastructure (20 % weight from the 3rd
assessment)
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 42 of 104
Ser. No. Performance Areas Performance measure/Indicator Objective
Links to
Ethiopian
Cities
Prosperity
Initiative
Existing
indicator
4.1 Value for the money in the infrastructure
investments funded by the Program16
.
(Maximum points 20 from 3rd
. assessment
and onwards)
Percentage of projects implemented with a satisfactory level of
value for the money, calibrated in the value for the money
assessment tool.
The % of projects with a satisfactory level of value for the money
will be reflected in the score multiplied by 0.20 (20 % which is
the weight of this indicator), i.e. 80 % satisfactory projects=16
points, 60 % = 12 points.
The score on this indicator will be rated between 0-20 points.
The value for the money of each project (level of satisfactory
value for the money) will be assessed and there will a weighting
of these to get a total score. The weight of each project will
depend on the budgeted size of the projects.
The input from this will be provided by the value for the money
audits to the assessment teams to be included in the calibration
and in the final calculation of the size of the allocations.
Transitional arrangement:
The results of the value for money will be assessed first time at
the APA in September 2015 of the performance in FY 2014/15.
Ensure efficient and
high quality
infrastructure and
service delivery
Pillars 2
and 5
New
Maximum points 1, 2,3,4 = 100
16 The value for money will be conducted from the 3rd assessment starting in September 2015. In case they are not completed by the time needed to be incorporated in the regular assessment, the firm,
which will carry out the assessment will revise the assessment results by taking the VFM audit results into account in due course.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 44 of 104
ANNEX 3 TOR FOR ANNUAL ENVIRONMENTAL & SOCIAL
AUDIT
FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA
Ministry of Urban Development, Housing & Construction
URBAN LOCAL GOVERNMENT DEVELOPMENT PROJECT II
2014/15 to 2018/19
Terms of Reference for Consultancy Service to Provide the ULGDP II
Annual Environmental and Social Management System Performance Audit
for EFY [to be inserted]
1….INTRODUCTION
1.1…Ethiopian Cities Prosperity Initiative
Figure 1. ECPI VISION, MISSION AND & STRATEGIC PILLARS (DIMENSIONS)
The Ministry of Urban Development, Housing and Construction (MUDHCo) has produced the
Ethiopian Cities Prosperity Initiative (ECPI). The ECPI will lead to the establishment of
Green Growth, Resilient and Well Governed Cities that support Ethiopia’s transformation from
a predominantly agricultural nation to a nation with a rapidly growing industrial sector that
7.
En
vir
on
men
tal
Su
sta
ina
bil
ity
6 H
ou
sin
g a
nd
Co
nst
ruct
ion
In
du
stry
Dev
elo
pm
ent
Ma
nag
emen
t
5.
Infr
ast
ruct
ure
an
d
Ser
vic
es
4.
Urb
an
Pla
nn
ing
an
d L
an
d
Ma
nag
emen
t
3.
Urb
an
Goo
d
Go
ver
na
nce
2
MS
E
Dev
elo
pm
ent
an
d
.Pro
du
ctiv
ity
8.
Incl
usi
ve
an
d S
afe
r
Cit
ies
Dev
elo
pm
ent
Our Vision is ‘to create economically productive, socially inclusive, and
environmentally sustainable cities by 2025’
Our Mission is to: “Capacitate our Cities and Urban centers so that they can become centers of innovation,
economic production, by creating the necessary growth supporting conditions, and to provide standardized services
and raise the quality of life of urban residents..
Policy Implementation,
Monitoring and Impact
Analysis
Leadership Skill
& Change
Management
ICT Infrastructure
Development &
Management
Social
Communication&
Marketing
Program Development
Project Design and
Resource Mobilization
1. Policy, Research and Leadership Development
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 45 of 104
contributes to the economic growth necessary to achieve middle income country status by
2025. The ECPI is the Ministry’s contribution to the Government of Ethiopia’s Growth and
Transformation Plan (GTP) 2010/11-2014/15 and national Vision.
The ECPI comprises eight pillars – or dimensions - that will contribute to the achievement of
middle income country status and bring the desired political-economic transformation. Growth
is a key objective of our initiatives and programs for urban development and construction; the
main economic objective. The main elements of the political component of the seven pillars
that make up the ECPI are good governance, democratization at local level and the satisfaction
of citizens and residents with the delivery of public services and performance of government –
at local, regional and federal levels. Together the economic and political interventions of the
ECPI will produce the prosperity that accompanies achievement of middle income country
status.
The eight strategic pillars and the programs that make up each pillar of the ECPI are illustrated
in the figure below– seven of the pillars being supported at all times by the first - Policy,
Research and Leadership Development:
1.2….Urban Local Government Development Program
1.2.1…Urban Local Government Development Program 2008/09-2013/14
The Urban Local Government Development Program (ULGDP) is a continuation of urban
reform by the Government of Ethiopia which started in the early 2000s. ULGDP was designed
to support the government’s Plan for Accelerated and Sustained Development to End Poverty
2005/06-2009/10 (PASDEP) and the Ministry’s Urban Development and Urban Good
Governance Programs that were developed to support the PASDEP. The specific development
objective of the program is to support improved performance in the planning, delivery and
sustained provision of priority municipal services and infrastructure by urban local
governments (ULGs).
1.2.2….Second Urban Local Government Development Program 2014/15-2018/19
The ULGDP II is a follow-up to the successful ULGDP. In preparation for ULGDP II, 18
additional ULGs were selected in 2012 to receive capacity building support to enable them to
participate in the ULGDP II’s performance grant. The ULGDP II will scale up the ULGDP
support from 19 to 44 cities – excluding Addis Ababa and adding 26 new cities – by providing
investment funds to promote the cities as growth engines in the GoE’s urban development
strategy; build institutional capacity of all tiers of governance (federal, regional and local) in
urban development, and enhance the incentives of everyone involved. The 44 ULGs
participating in the ULGDP II are:
The 18 cities17
that participated in the CBDSD and (excluding Addis Ababa) in the
ULGDP – as listed in footnote 1 below;
The 18 cities18
that participated in the ULGDP for capacity building (CB) purposes only
– as listed in footnote 2 below; and
17 Bahir Dar, Kombolcha, Gondar and Dessie in Amhara Region; Mekelle, Adigrat, Axum and Shire Endeselassie in Tigray
Region; Adama, Bishoftu, Jimma and Shashemene in Oromia Region; and Hawassa, Arbaminch, Wolayta Sodo and Dilla
in SNNPR, Dire Dawa and Harar
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 46 of 104
The 8 cities19
that are receiving investment funds through the KfW funded Urban
Development Fund and capacity building support from GIZ through the Urban
Governance and Decentralization Programme.
The ULGDP II will involve disbursement of Performance Grant funds by the Government of
Ethiopia (provided by a World Bank credit) and allocation of funds to ULGs, Regional States
and MUDHCo through a result orientated/performance-based capital investment fiscal transfer
system using the World Bank’s PforR methodology, clearly linked to well-defined
disbursement-linked indicators (DLIs) – see the ULGDP II POM. The PforR operation will
fully utilize and enhance the key elements of the existing GoE systems – financial
management, procurement, environmental & social safeguards.
1.2.3…ULGDP II Objectives
The ULGDP II Development Objective (PDO) is to enhance the institutional and
organizational performance of participating ULGs in developing and sustaining urban
infrastructure and services.
1.2.4….ULGDP II Description
The ULGDP II will support the ECPI and build on the achievements and systems developed by
the ULGDP20
. ULGDP II will support all three levels of the Government of Ethiopia - 44
ULGs – excluding Addis Ababa - 9 regional governments (respective Bureaus of Urban
Development and other regional agencies involved) and the federal government (specifically
MUDHCo)21. The Program duration will be from 2014/15 till 7 July 2018/2019 (EFY 2007 –
2011). The total Program funding envelope is US$ 518 million, comprising US$ 168 million
GoE resources (contributed by ULGs and regional governments) and US$ 350 million World
Bank funds.
The ULGDP II expenditure framework will comprise the three following major items:
1. Performance based grants to 44 ULGs for urban infrastructure and services investments
and capacity building (US$ 476 million);
2. Regional governments capacity building and oversight/support to constituent ULGs
(US$20 million); and
3. MUDHCo to administer and coordinate the program, and strengthen its capacity to
support and guide the regions and ULGs (US$22 million).
Activities to be financed by the Performance Grants are:
18 Assela, Burayu, Sebeta, Ambo, Robi, and Batu in Oromia, Debre Birhan, Debre Tabor, Woldya, Finote Selam, and Mota
in Amhara; Almata, Humera and Wukro in Tigray; and Mizan, Hosaena, Areka and Butajira in SNNPR 19 Adwa (Tigray), Debre Markos (Amhara), Hosaina (SNNPR), Nekemte (Oromia), Gambella (Gambella), Semara (Afar),
Asosa (Benishangul Gumuz), and Jijiga (Somali). 20 The main change in approach being the use (as widely as possible) of the World Banks Program for Results (PfR)
instrument for fund delivery and systems application which replaces, to a great degree, Specific investment lending (SIL)
instrument applied in the first ULGDP. 21 Other involved GoE organs include the Federal Ethics and Anti-Corruption Commission and regional offices, the
Ethiopian Public Procurement and Property Administration Agency and regional institutions, the Regional Environmental
Protection Authorities and the Federal and Offices of the Regional Auditor General
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 47 of 104
1. Core infrastructure investments in roads, water supply, sanitation, solid waste, greenery,
street lighting, etc. in a well-defined investment menu, which targets infrastructure
investments towards areas under ULG responsibility, and to maximum gains and
minimize the risks. The ULGs will prepare their Capital Investment Plans in a
participatory manner and use the planning tools developed under ULGDP: the assets
inventory and management plan system, capital investment plans, annual plans and
budgets. Participatory approach and proper planning and budgeting will be promoted
through the Annual Performance Assessments (APA). Cities and regions will contribute
to the investments through a substantial level of matching funding.
2. ULGs will be able to utilize a maximum of 5% of Performance Grants for CB activities
defined in a menu of eligible CB activities. These activities will build on the existing
technical assistance provided under the current government and GIZ programs. As
such, the ULGDP II will pursue a two-pronged approach focusing on the CB needs of:
The 26 cities that are did not participate in the ULGDP - which are expected to be
fairly high;
The 18 cities which participated in the CBDSD and the ULGDP – whose CB needs
are expected to be relatively lower, and different in nature, to the 26 new cities.
The Environmental and Social Management System Manual (including the Resettlement
System Guidelines) for Urban Local Governments (ULGs) is produced (February 2014) by the
Ministry of Urban Development, Housing and Construction for the use of all designated cities
and towns. The Environmental and Social Management System (ESMS) Manual is based on
the Environmental and Social Management Framework and the Resettlement Policy
Framework that were introduced in EFY 2001 (GC 2008/09) and successfully adopted and
used by the 19 ULGs that participated in the Urban Local Government Development Project
EFY 2001 to 2006 (GC 2008/09 to 2013/14). Annex 1 details those considerations which
should be taken into account, in addition to the procedures and guidelines provided in the
ESMS, by those ULGs that fund construction works using performance grant funds provided
by the second Urban Local Government Development Project (ULGDP II) which will be
implemented from EFY 2007 to 2011 (GC 2014/15 to 2018/19).
This ESMS document is to be used by all ULGs in order to ensure that all environmental and
social safeguards are adequately addressed and that the relevant capacity and training needs are
established in order for the recommended measures to be implemented effectively. The main
purpose of the ESMS is to:
Establish clear procedures and methodologies for the environmental and social
assessment, review, approval and implementation of construction works to be
financed by ULGs;
Specify appropriate roles and responsibilities, and outline the necessary reporting
procedures, for managing and monitoring environmental and social concerns related
to ULG construction works;
Provide practical information resources for implementing the ESMS.
Resettlement system guidelines (RSG) have also been developed and are presented in this
manual. Short simpler descriptions of the ESMS and RSG and checklists for use by ULGs in
identifying and implementing construction works will be prepared separately.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 48 of 104
2….OBJECTIVES OF THE TOR
The objective of assignment described in this is to carry out an Annual Environmental and
Social Management System Performance Audit for EFY [to be inserted] for the 44 cities
participating in the ULGDP II. These cities are in:
Amhara National Regional State: Bahir Dar, Kombolcha, Gondar, Dessie, Debre
Birhan, DebreTabor, Woldya, Finoteselam, Mota and Debre Markos;
Tigray National Regional State: Mekelle, Adigrat, Axum, Shire Endeselassie, Almata,
Humera, Wukro and Adwa;
Oromia National Regional State: Adama, Bishoftu, Jimma, Shashemene, Assela,
Burayu, Sebeta, Ambo, Robe, Batu and Nekemte;
SNNP National Regional State: Hawassa, Arbaminch, Wolayta Sodo, Dilla, Mizan,
Hosaena, Areka, Butajira and Hosaina;
Harari National Regional State: Harar;
Somali National Regional State: Jijiga;
Afar National Regional State: Semara;
Gambella National Regional State: Gambella;
Benishangul Gumuz National Regional State: Asosa; and
Dire Dawa City Administration.
3….SCOPE OF WORK
3.1….Overall Scope of Work
The Consultant will carrying out an Environmental & Social Management System Performance
Audit to assess the extent to which the ULGDP II funded investment projects (construction
works projects) of the 44 ULGDP II participating cities are being implemented in full
accordance with the MUDHCo’s Environmental and Social Management System Manual
(including the Resettlement System Guidelines) for Urban Local Governments (ULGs);
including Annex 1 of the ESMS and RSG which applies specifically to ULGs using ULGDP II
funds for investment projects/construction works. The Consultant will use generally acceptable
and recognized assessment techniques and evaluation methods, standards and practices. In
addition to the overall scope of work the Consultant will specifically assess performance of
ULGs in those areas pertaining to the ESMS that are also measured in the ULGDP II Annual
Performance Assessment.
3.2…Specific Tasks
The specific tasks carried out by the Consultant, include, but are not limited to:
1. Preparation of an Inception Report.
2. Review of the cities consultation processes to determine their effectiveness.
3. Review and assessment of cities’ ULGDP II funded projects’ ESMS screening
reports as prepared by the respective cities and their subsequent approval by
Regional Environmental Protection Agencies (REPAs). The assessment will include
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 49 of 104
evaluation of the time taken to complete the screening and approval process and the
consistency achieved in applying ESMS procedures.
4. Assess the status of ULGDP II funded projects that are categorized as Schedule 1
and 2 projects by REPAs in all cities and compare the categorizations of the REPAs
with the GoE procedures for categorization and checking compatibilities.
5. Review Environmental and Social Impact Assessment documents of ULGDP II
funded projects in terms of ESMS compliance requirements with the minimum legal
requirements for Schedule 1 and 2 REPA categorized projects in all cities and also
checks to ensure that due legal process has been followed.
6. Assess the Environmental Management Plan of ULGDP II funded projects
categorized as Schedule 1 and 2 by REPAs in all cities to check and evaluate the
effectiveness of Environmental Management Systems on site or in operation as
regards application of procedures, work instructions, guidelines, specification,
training program and monitoring systems being implemented by the employees of
the firm or organization operating on the site.
7. Review environmental compliance of ULGDP II funded projects categorized as
Schedule 1 and 2 by REPAs in all cities specifically to test the environmental
policies, objectives, laws, by-laws, ordinances, regulations and standards; testing and
specific checks on, compliance with requirements in water quality.
8. Assess wastes released by ULGDP II funded projects categorized as schedule 1 and
2 by REPAs in all cities; specifically focusing at the waste management component
of an operation or site and identify the consequences of waste on environment. The
methods, procedures and systems of waste management would be reviewed, checked
and verified.
9. Review contract clauses of ULGDP II funded projects categorized as schedule 1, 2
and 3 by REPAs in all cities to test the environmental compliance of a contractor or
supplier.
10. Assess the application of the RSGs of ULGDP II funded projects that displaced
people due to acquisition of land and other assets, or caused loss of access to
services and businesses and other sources of livelihood.
11. Identify the number of cases where a Resettlement Action Plan (RAP) prepared and
implemented; assess the effectiveness and thoroughness of RAP implementation.
12. Review the procedure being followed to produce RAPs and compare the procedure
with the RSG procedures.
13. Assess the livelihood condition of displaced persons (PAPs) after resettlement is
taking place (physical, social and economic) as compared to before resettlement.
14. Assess the implementation and effectiveness institutional arrangements (roles and
responsibilities) outlined in ESMS Guidelines.
15. Assess adequacy of the technical support being given to cities by REPA and
Regional BUDHCos (or their Regional equivalent).
16. Assess the capacity of ULGs ESMS Focal persons and the REPAs to implement and
monitor the ESMS.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 50 of 104
17. Develop an ESMS reporting mechanism that will enable UGGCBB to follow the
performance of the ULGs adherence to the project’s ESMS and RGS.
18. Review and assess the application of the environmental and social screening process
outlined in the ESMS and identify areas requiring improvements or changes.
19. Review and assess the effectiveness of the environmental monitoring systems for
ULGDP II funded projects and indicate how these systems have been useful/not
useful for speedy ULGDP II funded projects’ implementation.
20. Review and assess the environmental and social management capacity at the ULGs
participating in the project and make appropriate recommendations for future
implementation.
21. Review and assess ULGDP II funded projects proposed, ongoing and completed
with specific reference to the additional guidelines applicable to the ULGDP II
funded projects that are described in Annex 1 of the ESMS Guidelines.
22. Assess the implementation of recommendations made in the last ESMS Performance
Audit (this task is excluded for the 1st ULGDP II Annual ESMS Performance Audit).
23. Prepare a draft report.
24. On receipt of comments indicating amendments, additions or omissions required by
the MUDHCo, prepare final report incorporating comments and suggestions to be
made on the draft report.
4….DURATION AND TIMETABLE
It is expected that the consultancy assignment will start in the first week of the month of
August each year and will take approximately 10 weeks by deploying at least 19
environmental, urban infrastructure and social management specialists to the 44 ULGs, nine
Regions and Dire Dawa City Administration.
5….OUTPUTS AND DELIVERABLES
All reports and deliverables are to be provided, in English, ten (10) hardbound copies and four
(4) soft copies on compact disk (Word and Excel).
5.1…Inception Report
1. A half-day session will be held between the UGGCBB/MUDHCo and the Consultants
at the start of the assignment to discuss and agree the Consultant’s plan to accomplish
the task will be held prior to submitting an Inception Report
2. An Inception Report shall be submitted within 1 week of the commencement of the
assignment, reflecting the agreed methodology (including schedule of visits to cities),
auditing techniques, and an outline of the proposed contents of the ULGDP II ESMS
Performance Audit (Draft) Report.
5.2….Draft Final Environmental Performance Audit Report
1. Draft Final ULGDP II ESMS Performance Audit Report, with an Executive Summary,
a consolidated section for all 44 ULGs and separate distinct sections for each region
and ULG which incorporates recommendations and the way forward to effective
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 51 of 104
environmental and social management of the ULGDP II. The report will be submitted
within eight weeks of the commencement of the assignment.
5.3….Final Environmental Performance Audit Report
1. Final ULGDP II ESMS Performance Audit Report, with an Executive Summary, a
consolidated section for all 44 ULGs and separate distinct sections for each region and
ULG which, with relevant recommendations and the way forward to effective
environmental and social management of the ULGDP II by incorporating comments
and suggestions to be made on the Draft Final ULGDP II ESMS Performance Audit
Report.
6….TEAM COMPOSITION, STRUCTURE, AND STAFF MONTHS
It is envisaged that: the Consultant’s team will include: 1 x Team Leader, 6 x Environmental
specialists, 6 x Urban Infrastructure specialists and 6 x Sociologists/Community Development
specialists.
The Consultant’s team members undertaking this assignment shall have a minimum of
Master’s Degree or equivalent in Environmental Studies, Environmental/Municipal/Civil
Engineering and/or Social Sciences and solid professional background in the areas of
environmental resources management and/or community resettlement and familiarity
Government of Ethiopia safeguards policies, laws, regulations and procedures. The team leader
shall have adequate experiences at least 10 years of relevance that include practical experience
on methodologies and techniques of environmental or social auditing and basic skills on
project coordination and management. The Consultant’s team members shall have at least 10
years of relevance that include practical experience on methodologies and techniques of
environmental or social auditing and basic skills on project coordination and management very
strong interpersonal, analytic, writing and communication skills and able to work
independently. On an indicative basis it is estimated that the following level of input is
necessary:-
No
Position
Number Estimated person
months
1 Team Leader/ESM Specialist 1x2.5m 2
2 Environmental Specialists 6x1.5m 9
3 Urban Infrastructure Specialists 6x1.5m 9
4 Sociologist 6x1.5m 9
Total 19 29.5
The above information is indicative only. The firm invited to submit proposals should propose
their own team structure, composition and staffing levels, based on their own evaluation of the
TOR’s requirements and the resources available to the Consultant.
7….MANAGEMENT AND ACCOUNTABILITY RELATIONSHIPS
The Ministry of Urban Development, Housing and Construction (MUDHCo) has overall
responsibility for implementation of the ULGDP II and for the compliance of implementing
agencies with the Environmental and Social Management System Guidelines and Resettlement
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 52 of 104
System Guidelines. The Ministry of Urban Development, Housing and Construction is the
client for the Consultant’s assignment:
In terms of performance and deliverables, the Consultant will carry out the assignment
under the direction of and report to the [insert name, position, phone number & email of
individual responsible], Director General, Urban Good Governance Capacity Building
Bureau, MUDHCo.
As the agency responsible for the overall coordination of ULGDP II, the [insert name,
position, phone number & email of individual responsible], Ministry of Urban
Development, Housing and Construction will sign the contract with the consultants on
behalf of Ministry of Urban Development, Housing and Construction will be
responsible for all payments to the Consultant.
Inputs provided By the Client: The Ministry of Urban Development, Housing and
Construction will provide to the Consultant at the commencement of the assignment with any
key documents deemed relevant to the Consultant’s scope of work. Other relevant documents
will be made available as required by the implementing entities. Documents that are required
for the Consultant’s information and guidance include:
1. ULGDP II POM Volume I: Main Text & General Annexes
2. ULGDP II Guidelines and Associated documents
a. ULGDP II Monitoring, Evaluation and Reporting System and Guidelines – for Cities
b. Environmental and Social Management System Guidelines (with ULGDP II Annex)
c. Capital Investment Plan Guide for Ethiopian Cities (MWUD/GIZ July 2011)
d. Asset Management, Manual Series on Infrastructure. GTZ-IS 2006 (10 step process)
Inputs provided by the Consultant: The consultant will provide for their own transport, as
well as offices sufficiently equipped and furnished for purposes of producing the required
outputs.
The Consultant firm will protect the confidentiality of those participating in the auditing
processes. All data is confidential and is the property of the Ministry of Urban Development,
Housing and Construction. No data or other information from this auditing will be released to
third parties without written approval of the Ministry of Urban Development, Housing and
Construction. The Consultant firm will deliver all data and relevant information to the
UGGCBB/ Ministry of Urban Development, Housing and Construction.
The Consultant firm shall provide detailed estimates of the budget including staff charges,
travel, equipment, hardware, software, technical meetings, report preparation and other related
activities.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 54 of 104
ANNEX 4 TOR FOR ULGDP II AUDIT
To be developed by end first half EFY 2007 – end December 2014 – during MoFED, World
Bank, Office of the Federal Auditor General and MUDHCo consultations.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 56 of 104
ANNEX 5 TOR FOR ANNUAL PROCUREMENT AUDIT
To be developed by end first half EFY 2007 – end December 2014 – during MoFED, World
Bank, OFAG and MUDHCo consultations.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 58 of 104
ANNEX 6 TOR FOR ANNUAL VALUE FOR MONEY AUDIT
To be developed by end first half EFY 2007 – end December 2014 – during MoFED, World
Bank, OFAG and MUDHCo consultations.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 60 of 104
ANNEX 7 ORGANIZATION & STAFFING OF THE ULGDP II
COORDINATION UNIT
7.1 ULGDP II COORDINATION UNIT, UGGCBB
7.1.1 Objective
The ULGDP II Coordination Unit of the Ministry is responsible for the overall management of
the ULGDP II to a standard that ensures that the program performs satisfactorily in:
The achievement of all disbursement linked indicators and performance measures that are
agreed for the 44 participating cities, 9 participating regions and for the Ministry itself;
Compliance with the principles and procedures described in the Program Operations Manual
for program management, financial management, procurement, monitoring and evaluation and
environmental and social safeguards.
Note: The objective of the ULGDP II Coordination Unit of the Ministry will contribute to the overall
objective of the ULGDP II which is to: to enhance the institutional and organizational performance of
participating urban local governments in developing and sustaining urban infrastructure and services.
The key results of the performance improvements will be: enhanced participation of citizens in ULG
planning and budgeting; efficient fiduciary management; increased amount of own source revenues at
the ULG level; improved infrastructure, service delivery and O&M systems; and strengthened
accountability and oversight systems.
7.1.2 ULGDP II Coordination Unit Organization
The ULGDP II Coordination Unit will be headed by a Program Coordinator, supported by a Deputy
Program Coordinator and contain 32 other staff covering eleven urban local government subject areas:
Position No.
ULGDP II Program Coordinator 1
Deputy Program Coordinator 1
Project Engineer 7
Procurement Specialist 5
Environmental Specialist 3
Social Management Specialist 3
Monitoring and Evaluation Specialist 2
Asset Management / O&M Specialist 2
ULG Financial Management Specialist 2
ULG Own Revenue /Finance Specialist 2
Urban Planner 2
Urban Land Administration Specialist 2
ULG Budgeting, Planning & Participation Specialist 2
Total 34
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 61 of 104
7.1.3 Reporting Responsibilities
The ULGDP II Program Coordinator will determine which staff of the Coordination Unit will report to
him/her and which will report to the Deputy Program Coordinator.
The ULGDP II Program Coordinator will report to and act under the direction of the Director General
of the Urban Good Governance Capacity Building Office, MUDHCo, who is responsible to H.E., the
Minister.
Other ULGDP II Coordination Unit staff will report to the Program Coordinator or the Deputy Program
Coordinator as determined by the Program Coordinator in consultation with the Director General
UGGCBB.
7.1.4 General Division of Responsibilities of the ULGDP II Coordination Unit
The ULGDP II Coordination Unit is responsible for the overall management of the ULGDP II.
Responsibilities are in the first instance divided into overall management and subject area management
as indicated in the table in the previous section. The main responsibilities of the Coordination Unit are:
1. General overall program management and coordination.
2. Capacity building support, mentoring, supervision & monitoring to Somali, Afar, Gambella and
Benishangul Gumuz National Regional States and the 4 cities (Jijiga, Samera, Gambella and
Assosa) within those NRSs;
a. GIZ will continue to provide capacity building support to the four cities, and in addition
Adwa, Debre Markos, Hoseana and Nekemte.
3. Monitoring, supervision and limited capacity building support to the Amhara, Oromia, SNNP
and Tigray Regional States and the 38 participating cities within these regions. Support is
limited because:
a. ULGDP is currently funding consultancy services to provide technical assistance to
new and existing ULGDP cities in Amhara, Tigray, Oromia & SNNP Regional States
up to end 2014; and
b. ULGDP II will fund consultancy services comprising teams of 10 experts each,
contracted by each of the Amhara, Oromia, SNNP and Tigray Regional States to
provide support for ULGDP II implementation and build capacity in the regional
bureaus of urban development, participating cities and regional ORAGs, REACIs, PPA
offices;
Nonetheless, the ULGDP II Coordination Unit will need to monitor operations these
Regions and be prepared to provide increased support where need is identified or
requested.
4. Capacity building support, supervision & monitoring to Dire Dawa City Administration, Harar
City and Harari Regional State.
7.1.5 Suggested Allocation of Staff Responsibilities Geographically
It is suggested that responsibilities of ULGDP II Coordination Unit staff can be divided as illustrated in
the following table:
ULGDP II Coordination Unit Staff
Overall
program
management
Oromia/
SNNP
Amhara/
Tigray
Harar,
Jijiga,
Samera
Dire Dawa,
Gambella/
Asosa
ULGDP II Program Coordinator Principle responsibility – all implementing agencies
Deputy Program Coordinator Principle responsibility to support Program Coordinator, as directed
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 62 of 104
ULGDP II Coordination Unit Staff
Overall
program
management
Oromia/
SNNP
Amhara/
Tigray
Harar,
Jijiga,
Samera
Dire Dawa,
Gambella/
Asosa
in the coordination and management of the Coordination Units team
activities, including logistical arrangements – all implementing
agencies
Project Engineer 2 2 2 1
Procurement Specialist 1 1 2 1
Environmental Specialist 1 1 1
Social Management Specialist 1 1 1
Monitoring and Evaluation Specialist 1 1
Asset Management / O&M Specialist 1 1
ULG Financial Management Specialist 1 1
ULG Own Revenue /Finance Specialist 1 1
Urban Planner 1 1
Urban Land Administration Specialist 1 1
ULG Budgeting, Planning & Participation
Specialist
1 1
Note: It is expected that all staff, with the exception of the Program Coordinator and Deputy Program
Coordinator will spend, on average, 3 to 3.5 weeks per months in the Regional States, with
implementing agencies, or travelling. The exceptions will arise as a result of assignment of
responsibilities that involve Addis Ababa based work, for instance involving MUDHCo’s ULGDP II
capacity building tasks – however, Addis Ababa based assignments should in no case constrain
responsibilities to support cities and regional states.
7.1.6 ULGDP II Coordination Unit Functions
General overall program management and coordination including:
a) Management of the ULGDP II Coordination Unit: briefing the Director General UGGCBB and
resolution of issues that require higher level decision.
b) Overall program management (liaison, coordination, briefing, forward planning) with: 9
regional urban development bureaus; 9 regional Offices of the Regional Auditor General,
Ethics and Anti-Corruption institutions, Public Procurement offices, Environmental Protection
Authorities and Bureaus of Finance and Economic Development; 44 participating cities in 9
regions; the Federal Ethics and Anti-Corruption Agency, Ethiopia Public Procurement and
Property Administration, Office of the Federal Auditor General, Ethiopian Environmental
Protection Agency; internally with the various interested/involved Bureaus of the Ministry,
directly and through the Director General of the UGGCBB for regular Ministry management
meetings.
c) Communication with the public, press, media, etc.
d) Establishment of, administrative, logistical & secretarial services support to and effective
operations of the ULGDP II Steering Committee Technical Sub-Committee.
e) Ensure cities & regions make funding contributions as described in the POM.
f) Ensure effective operations of the ULGDP II Steering Committee.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 63 of 104
g) Timely recruitment of the Annual Performance Assessment Consultant, processing of results
and allocation of funds. (DLI 6). Assist the Ministry in preparation of the ULGDP II annual
budget for adoption at federal/regional levels.
h) Initiate Annual Value for Money Audits of the 44 participating cities by ULGDP II year 3 (end
EFY 2009/ 2016/2017). (DLI 6)
i) Develop systems and procedures where required and provide guidance to cities & regions on
procurement, ethics and anti-corruption, environmental and social management system,
financial management and reporting and monitoring, evaluation and reporting systems.
j) Develop and ensure implementation of a two week urban management course provided by
ECSU at the start of the ULGDP II for the 26 new cities.
k) Ensure proper development and implementation of city, regional and MUDHCo Capacity
Building Plans.
l) Development, publication, dissemination, training, updating of the Program Operations
Manual; monitoring and reporting on implementing agencies compliance with the POM.
m) Securing and disseminating the World Bank Listing of Ineligible Firms & Individuals to all
implementing agencies undertaking procurement with ULGDP II funds every six months (in
June and December).
n) Draft and secure Performance and Participation Agreements with all implementing agencies
and Memorandum of Understanding with all federal agencies who have responsibilities for
ULGDP II implementation activities.
o) Support for and participation in World Bank six monthly supervision missions.
p) Consolidation of quarterly progress and financial reports.
q) Monitoring progress in and subsequently supporting implementation by the Regional Public
Procurement offices, supported by the Ethiopian PPPAA of Annual Procurement Audits of the
44 participating cities by ULGDP II year 3 (end EFY 2009/ 2016/2017).
r) Put in place and ensure effective implementation of quality assurance mechanisms that will be
applied to ensure or verify that procurement by the 44 cities that will participate in ULGDP II,
of consultancy services utilizing the capacity building element.
Capacity building support to:
.. Somali, Afar, Gambella and Benishangul Gumuz National Regional States and the 4 cities, and Dire
Dawa City Administration, Harar City and Harari Regional State (DLI 7)
a) Monitoring compliance with ULGDP II POM.
b) Capacity building support to cities and regional agencies for ULGDP II implementation and
achievement of DLI 1 (Minimum Conditions), DLI 2 and DLI 3 for cities and DLI 4 and 5 for
Regional agencies.
Note: GIZ will continue to provide capacity building support to the four cities, and in addition Adwa,
Debre Markos, Hoseana and Nekemte.
Monitoring, supervision and limited support to
….the Amhara, Oromia, SNNP and Tigray Regional States and the 38 participating cities
a) Monitoring compliance with ULGDP II POM.
b) Capacity building support when identified as needed or requested.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 64 of 104
Notes: a)ULGDP is currently funding consultancy services to provide technical assistance to new and
existing ULGDP cities in Amhara, Tigray, Oromia & SNNP Regional States up to end 2014; and b)
ULGDP II will fund consultancy services comprising teams of 10 experts each, contracted by each of
the Amhara, Oromia, SNNP and Tigray Regional States to provide support for ULGDP II
implementation and build capacity in the regional bureaus of urban development, participating cities
and regional ORAGs, REACIs, PPA offices;
Nonetheless, the ULGDP II Coordination Unit will need to monitor operations these Regions and be
prepared to provide increased support where need is identified or requested.
Detail and implement MUDHCo ULGDP II Capacity Building component.
Draft annually and implement (monitor & report) a MUDHCo ULGDP II Capacity Building Plan,
covering the following areas:
MUDHCo internal capacity building to support ULGDP2 & ECPI.
Centre of Excellence in Good Governance, Capacity Building and Leadership Development, for
Urban Development.
Land Administration: Establish competency certification and TOT system to be embedded in
TVET colleges.
Service Standardization, Benchmarking and Performance Measurement.
International TA.
Table 2. ULGDP II COORDINATION UNIT – CURRENT STATUS
Position No. Status Req. Type
ULGDP II Program Coordinator 1 Placed Individual Consultant
Deputy Program Coordinator 1 Vacant Individual Consultant
Project Engineer 7 5 placed, 2 vacant #4Individual Consultant/ #3Channel 1
Procurement Specialist 5 3 placed #4Individual Consultant/#1Channel 1
Environmental Specialist 3 1 placed, 2 vacant Individual Consultant
Social Management Specialist 3 3 vacant Individual Consultant
Monitoring and Evaluation Specialist 2 1 placed, 1 vacant #1Individual Consultant/#1Channel 1
Asset Management / O&M Specialist 2 Vacant Individual Consultant or / Channel 1
ULG Financial Management Specialist 2 Vacant Individual Consultant or Channel 1
ULG Own Revenue /Finance Specialist 2 Vacant Individual Consultant or Channel 1
Urban Planner 2 Vacant Individual Consultant or Channel 1
Urban Land Administration Specialist 2 Vacant Individual Consultant or Channel 1
Budgeting, Planning & Participation
Specialist
2 Vacant #1Individual Consultant/ #1Channel 1
Total 34
7.2 ULGDP II COORDINATION UNIT JOB DESCRIPTIONS
7.2.1 Introduction
On the following pages Terms of Reference for the ULGDP II Program Coordinator, Deputy
Coordinator and 11 subject area professionals are presented. Some parts of the Terms of Reference are
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 65 of 104
generic and these are described below. In each TOR it is stated where the generic section is to be
inserted.
7.2.2 TOR Generic Section – Title
FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA
Ministry of Urban Development, Housing & Construction
URBAN LOCAL GOVERNMENT DEVELOPMENT PROGRAMME
2014/15 to 2018/19
TERMS OF REFERENCE FOR
A [insert as applicable] (An Individual Consultant)
TO SUPPORT IMPLEMENTATION AND COORDINATIONOF URBAN
INFRASTRUCTURE PROJECTS AND CAPACITY BUILDING UNDER URBAN
LOCAL GOVERNMENT DEVELOPMENT PROGRAM (ULGDP II) EFY 2007-2011
(2014/15-2018/19)
7.2.3 TOR Generic Section 1. Background
1…Background
The ULGDP II will support the ECPI and build on the achievements and systems developed by the
ULGDP22
. ULGDP II will support all three levels of the Government of Ethiopia - 44 ULGs –
excluding Addis Ababa - 9 regional governments (respective Bureaus of Urban Development and other
regional agencies involved) and the federal government (specifically MUDHCo)23
. The Program
duration will be from 2014/15 till 7 July 2018/2019 (EFY 2007 – 2011). The total Program funding
envelope is US$ 556.5 million, comprising US$ 176.3 million GoE resources (contributed by ULGs and
regional governments) and US$ 380 million World Bank funds.
The ULGDP II expenditure framework will comprise the three following major items:
1. Performance based grants to 44 ULGs for urban infrastructure and services investments and
capacity building (US$ 499.5 million);
2. Regional governments capacity building and oversight/support to constituent ULGs (US$ 30
million); and
3. MUDHCo to administer and coordinate the program, and strengthen its capacity to support and
guide the regions and ULGs (US$27 million).
Activities to be financed by the Performance Grants are:
22 The main change in approach being the use (as widely as possible) of the World Banks Program for Results (PfR)
instrument for fund delivery and systems application which replaces, to a great degree, Specific investment lending (SIL)
instrument applied in the first ULGDP. 23 Other involved GoE organs include the Federal Ethics and Anti-Corruption Commission and regional offices, the
Ethiopian Public Procurement and Property Administration Agency and regional institutions, the Regional Environmental
Protection Authorities and the Federal and Offices of the Regional Auditor General
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 66 of 104
3. Core infrastructure investments in roads, water supply, sanitation, solid waste, greenery, street
lighting, etc. in a well-defined investment menu, which targets infrastructure investments
towards areas under ULG responsibility, and to maximum gains and minimize the risks. The
ULGs will prepare their Capital Investment Plans in a participatory manner and use the
planning tools developed under ULGDP: the assets inventory and management plan system,
capital investment plans, annual plans and budgets. Participatory approach and proper planning
and budgeting will be promoted through the Annual Performance Assessments (APA). Cities
and regions will contribute to the investments through a substantial level of matching funding.
4. ULGs will be able to utilize a maximum of 5% of Performance Grants for CB activities defined
in a menu of eligible CB activities. These activities will build on the existing technical
assistance provided under the current government and GIZ programs. As such, the ULGDP II
will pursue a two-pronged approach focusing on the CB needs of:
The 26 cities that are did not participate in the ULGDP - which are expected to be fairly
high;
The 18 cities which participated in the CBDSD and the ULGDP – whose CB needs are
expected to be relatively lower, and different in nature, to the 26 new cities.
Table 3. MAIN CAPACITY BUILDING ACTIVITIES IN PHASES 1 AND 2
Phase 1 (November 2013 to
December 2014)
Phase 2 (August 2014 to December 2019)
1. Federal (ULGDP I) mobile team
2. Two technical consultant teams
with capacity building support for
ULGs (phased out by end of
period)
3. GIZ financed support for capacity
building of regional governments
and eight cities (phased out by end
of period)
1. Expanded federal mobile team and functions – main focus is Afar,
Benishangul Gumuz, Gambella, Somali and Harari Regions/cities
+ Dire Dawa City Administration.
2. Four new regional mobile teams for Amhara, Oromia, SNNP and
Tigray Regions.
3. New urban management course for ULGs (mandatory for 26 new
cities, voluntary for ULGDP I 18).
4. Demand-driven capacity building for ULGs and Regions (5% of
ULGs ULGDP II allocation – 25 mln and USD 20 mln for 9
Regions. Based on Capacity Building Plans -
Table 4. THE 44 CITIES PARTICIPATING IN THE ULGDP II
1 Afar National Regional State: Samera/Logiya;
2 Amhara National Regional State: Bahir Dar, Kombolcha, Gondar, Dessie, Debre Birhan, Debre
Tabor, Woldya, Finoteselam, Mota and Debre Markos;
3 Benishangul Gumuz National
Regional State:
Asosa
4 Dire Dawa City Administration.
5 Harari National Regional State: Harar;
6 Gambella National Regional State: Gambella;
7 Oromia National Regional State: Adama, Bishoftu, Jimma, Shashemene, Assela, Burayu,
Sebeta, Ambo, Robe, Batu and Nekemte;
8 SNNP National Regional State: Hawassa, Arbaminch, Wolayta Sodo, Dilla, Mizan, Hosaena,
Areka, Butajira and Hosaina;
9 Somali National Regional State: Jijiga;
10 Tigray National Regional State: Mekelle, Adigrat, Axum, Shire Endeselassie, Almata, Humera,
Wukro and Adwa;
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 67 of 104
1.2…ULGDP II Objectives
The ULGDP II Development Objective is to enhance the institutional and organizational performance
of participating ULGs in developing and sustaining urban infrastructure and services.
1.3…..ULGDP II Description
The ULGDP II will support the ECPI and build on the achievements and systems developed by the
ULGDP24
. ULGDP II will support all three levels of the Government of Ethiopia - 44 ULGs –
excluding Addis Ababa - 9 regional governments (respective Bureaus of Urban Development and other
regional agencies involved) and the federal government (specifically MUDHCo)25
. The ULGDP II
duration will be from 2014/15 till 7 July 2018/2019 (EFY 2007 – 2011). The total ULGDP II funding
envelope is US$ 556.5 million, comprising US$ 176.5 million GoE resources (contributed by ULGs and
regional governments) and US$ 380 million World Bank funds.
The ULGDP II expenditure framework will comprise the three following major items:
4. Performance grants to 44 ULGs for urban infrastructure and services investments and capacity
building (US$ 499.5 million) of which US$ 323 comes from the IDA funding, and US$176.5
derives from contribution from the ULGs and the regions;
5. Nine Regional governments will provide capacity building and oversight/support to
participating ULGs in their region (US$30 million); and
6. MUDHCo to administer and coordinate the program, and strengthen its capacity to support and
guide the regions and ULGs (US$27 million).
Activities to be financed by the Performance Grants are:
1. Core infrastructure investments in roads, water supply, sanitation, solid waste, greenery, street
lighting, etc. in a well-defined investment menu, which targets infrastructure investments
towards areas under ULG responsibility, and to maximum gains and minimize the risks. The
ULGs will prepare their Capital Investment Plans in a participatory manner and use the
planning tools developed under ULGDP: the assets inventory and management plan system,
capital investment plans, annual plans and budgets. Participatory approach and proper planning
and budgeting will be promoted through the Annual Performance Assessments (APA). Cities
and regions will contribute to the investments through a substantial level of matching funding
(see the following Section 2.5).
2. ULGs will be able to utilize a maximum of 5% of Performance Grants for CB activities defined
in a menu of eligible CB activities (see the following Section 2.6). These activities will build on
the existing technical assistance provided under the current government and GIZ programs. As
such, the ULGDP II will pursue a two-pronged approach focusing on the CB needs of:
The 26 cities that are did not participate in the ULGDP - which are expected to be fairly
high;
The 18 cities which participated in the CBDSD and the ULGDP – whose CB needs are
expected to be relatively lower, and different in nature, to the 26 new cities.
24 The main change in approach being the use (as widely as possible) of the World Banks Program for Results (PfR)
instrument for fund delivery and systems application which replaces, to a great degree, Specific investment lending (SIL)
instrument applied in the first ULGDP. 25 Other involved GoE organs include the Federal Ethics and Anti-Corruption Commission and regional offices, the
Ethiopian Public Procurement and Property Administration Agency and regional institutions, the Regional Environmental
Protection Authorities and the Federal and Offices of the Regional Auditor General
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 68 of 104
7.2.4 ULGDP II Coordination Unit Functions
General overall program management and coordination including:
a. Management of the ULGDP II Coordination Unit: briefing the Director General UGGCBB and
resolution of issues that require higher level decision.
b. Overall program management (liaison, coordination, briefing, forward planning) with: 9
regional urban development bureaus; 9 regional Offices of the Regional Auditor General,
Ethics and Anti-Corruption institutions, Public Procurement offices, Environmental Protection
Authorities and Bureaus of Finance and Economic Development; 44 participating cities in 9
regions; the Federal Ethics and Anti-Corruption Agency, Ethiopia Public Procurement and
Property Administration, Office of the Federal Auditor General, Ethiopian Environmental
Protection Agency; internally with the various interested/involved Bureaus of the Ministry,
directly and through the Director General of the UGGCBB for regular Ministry management
meetings.
c. Communication with the public, press, media, etc.
d. Establishment of, administrative, logistical & secretarial services support to and effective
operations of the ULGDP II Steering Committee Technical Sub-Committee.
e. Ensure cities & regions make funding contributions as described in the POM.
f. Ensure effective operations of the ULGDP II Steering Committee.
g. Timely recruitment of the Annual Performance Assessment Consultant, processing of results
and allocation of funds. (DLI 6). Assist the Ministry in preparation of the ULGDP II annual
budget for adoption at federal/regional levels.
h. Initiate Annual Value for Money Audits of the 44 participating cities by ULGDP II year 3 (end
EFY 2009/ 2016/2017). (DLI 6)
i. Develop systems and procedures where required and provide guidance to cities & regions on
procurement, ethics and anti-corruption, environmental and social management system,
financial management and reporting and monitoring, evaluation and reporting systems.
j. Develop and ensure implementation of a two week urban management course provided by
ECSU at the start of the ULGDP II for the 26 new cities.
k. Ensure proper development and implementation of city, regional and MUDHCo Capacity
Building Plans.
l. Development, publication, dissemination, training, updating of the Program Operations
Manual; monitoring and reporting on implementing agencies compliance with the POM.
m. Securing and disseminating the World Bank Listing of Ineligible Firms & Individuals to all
implementing agencies undertaking procurement with ULGDP II funds every six months (in
June and December).
n. Draft and secure Performance and Participation Agreements with all implementing agencies
and Memorandum of Understanding with all federal agencies who have responsibilities for
ULGDP II implementation activities.
o. Support for and participation in World Bank six monthly supervision missions.
p. Consolidation of quarterly progress and financial reports.
q. Monitoring progress in and subsequently supporting implementation by the Regional Public
Procurement offices, supported by the Ethiopian PPPAA of Annual Procurement Audits of the
44 participating cities by ULGDP II year 3 (end EFY 2009/ 2016/2017).
r. Put in place and ensure effective implementation of quality assurance mechanisms that will be
applied to ensure or verify that procurement by the 44 cities that will participate in ULGDP II,
of consultancy services utilizing the capacity building element.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 69 of 104
7.2.5 TOR Generic Section 5….Level of effort and Timetable
It is expected that the assignment will start in July 2014 depending on availability. The [insert as
applicable] will be based at MUHDCo with frequent travel to cities and regions and other destinations
as necessary. Contract: one year contract, with possible extension upon satisfactory performance of the
[insert as applicable]. Remunerations: Negotiable / dependent on qualifications and experience.
7.2.6 TOR Generic Section 6….Inputs provided by the Client
UGCBB will provide reasonable and standard office space and office furniture and equipment required
for the duration of the assignment, at its premises for successful discharging of his assignment. The
[insert as applicable] will be provided, for official business, with internet access, telephone and fax
facilities. Moreover, UGCBB will arrange a vehicle for the [insert as applicable] as a means of local
transportation.
7.2.7 TOR Generic Section 7…..Management procedures
Contractually, the [insert as applicable] will be accountable to the [insert as applicable] to whom all
reports and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation ULGDP, the Urban Governance and Capacity Building Office
(UGCBB) will sign the contract with the [insert as applicable] on behalf of Ministry of Urban
Development and Construction. The UGCBB will also be responsible for all payments to the [insert as
applicable] once the work has been accepted and cleared for payment.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 70 of 104
7.3 TOR FOR THE ULGDP II PROGRAM COORDINATOR
Title: Insert generic Title
Section 1. Insert generic Section 1.
7.3.1 Objective of the Assignment
The objective of the assignment is to support the UGGCBB and MUDCo to effectively and efficiently
manage the ULGDP II as described in the Program Operations Manual and associated documents so as
to ensure: a that the ULGDP II achieves its development objectives in general and; b) that the 44
ULGs, 9 Regional States and the Ministry itself achieve satisfactory performance or better in the annual
performance assessment of disbursement linked indicators and performance measures that is required to
ensue ULGDP II investments in infrastructure and services and in capacity building.
7.3.2 Scope of Work
The Program Coordinator/ the consultant will have the following duties and responsibilities:
a) Management of the ULGDP II Coordination Unit: briefing the Director General UGGCBB and
resolution of issues that require higher level decision.
b) Overall program management (liaison, coordination, briefing, forward planning) with: 9
regional urban development bureaus; 9 regional Offices of the Regional Auditor General, Ethics
and Anti-Corruption institutions, Public Procurement offices, Environmental Protection
Authorities and Bureaus of Finance and Economic Development; 44 participating cities in 9
regions; the Federal Ethics and Anti-Corruption Agency, Ethiopia Public Procurement and
Property Administration, Office of the Federal Auditor General, Ethiopian Environmental
Protection Agency; internally with the various interested/involved Bureaus of the Ministry,
directly and through the Director General of the UGGCBB for regular Ministry management
meetings.
c) Communication with the public, press, media, etc.
d) Establishment of, administrative, logistical & secretarial services support to and effective
operations of the ULGDP II Steering Committee Technical Sub-Committee.
e) Ensure cities & regions make funding contributions as described in the POM.
f) Ensure effective operations of the ULGDP II Steering Committee.
g) Timely recruitment of the Annual Performance Assessment Consultant, processing of results
and allocation of funds. (DLI 6). Assist the Ministry in preparation of the ULGDP II annual
budget for adoption at federal/regional levels.
h) Initiate Annual Value for Money Audits of the 44 participating cities by ULGDP II year 3 (end
EFY 2009/ 2016/2017). (DLI 6)
i) Develop systems and procedures where required and provide guidance to cities & regions on
procurement, ethics and anti-corruption, environmental and social management system,
financial management and reporting and monitoring, evaluation and reporting systems.
j) Develop and ensure implementation of a two week urban management course provided by
ECSU at the start of the ULGDP II for the 26 new cities.
k) Ensure proper development and implementation of city, regional and MUDHCo Capacity
Building Plans.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 71 of 104
l) Development, publication, dissemination, training, updating of the Program Operations Manual;
monitoring and reporting on implementing agencies compliance with the POM.
m) Securing and disseminating the World Bank Listing of Ineligible Firms & Individuals to all
implementing agencies undertaking procurement with ULGDP II funds every six months (in
June and December).
n) Draft and secure Performance and Participation Agreements with all implementing agencies and
Memorandum of Understanding with all federal agencies who have responsibilities for ULGDP
II implementation activities.
o) Support for and participation in World Bank six monthly supervision missions.
p) Consolidation of quarterly progress and financial reports.
q) Monitoring progress in and subsequently supporting implementation by the Regional Public
Procurement offices, supported by the Ethiopian PPPAA of Annual Procurement Audits of the
44 participating cities by ULGDP II year 3 (end EFY 2009/ 2016/2017).
r) Put in place and ensure effective implementation of quality assurance mechanisms that will be
applied to ensure or verify that procurement by the 44 cities that will participate in ULGDP II,
of consultancy services utilizing the capacity building element.
7.3.3 Qualifications and Skills Required
The Program Coordinator shall be a highly qualified project/program manager with MSc and BSc
degree or higher in Civil Engineering, Municipal Engineering or Sanitary Engineering or related field of
studies with a track record of achievements in project planning, implementation and management of
infrastructure projects. He/She shall have a minimum of 10 and 15 years’ experience for MSc and BSc
respectively in implementation of projects, design and supervision, contract management as well as
appraisal of projects with an excellent change management skills and strong commitment to sharing
expertise and experience in order to develop others (helping others to achieve goals, resolving conflict
successfully). He/she shall also have excellent writing and communication skills and knowledge of the
urban sector in Ethiopia and GoE procurement and safeguard policies and procedures.
The program coordinator should therefore possess the following qualifications/competencies:
MSc and BSc degree or higher in Civil Engineering, Municipal Engineering or Sanitary
Engineering or related field of studies with a track record of achievements in project planning,
implementation and management of infrastructure projects.
A minimum of 10 and 15 years’ experience for MSc and BSc respectively in implementation of
projects, design and supervision, contract management as well as appraisal of projects.
Excellent change management skills and strong commitment to sharing expertise and
experience in order to develop others (helping others to achieve goals, resolving conflict
successfully).
Excellent writing and communication skills.
Knowledge of the urban sector in Ethiopia and World Bank procurement and safeguard policies
and procedures is an advantage.
Section 5. Insert generic Section 5.
Section 6. Insert generic Section 6.
Section 7. Insert generic Section 7.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 72 of 104
7.4 TOR FOR THE ULGDP II DEPUTY PROGRAM COORDINATOR
Title: Insert generic Title
Section 1. Insert generic Section 1.
7.4.1 Objective of the Assignment
The objective of the assignment is to support the ULGDP II Program Coordinator to effectively and
efficiently manage the ULGDP II as described in the Program Operations Manual and associated
documents so as to ensure: a that the ULGDP II achieves its development objectives in general and; b)
that the 44 ULGs, 9 Regional States and the Ministry itself achieve satisfactory performance or better in
the annual performance assessment of disbursement linked indicators and performance measures that is
required to ensue ULGDP II investments in infrastructure and services and in capacity building.
7.4.2 Scope of Work
The deputy program coordinator will assist program coordinator in the overall planning, managing,
coordinating and reporting of the ULGDP in the provision of capacity building and mentoring services
and assistance to 9 Regional States and 44 ULGs (city administrations) in the managing the ULGDP II
in accordance with Government of Ethiopia policies, laws and regulations.
The Deputy Program Coordinator/ the consultant will have the following duties and responsibilities:
a. Deputize in program management (liaison, coordination, briefing, forward planning) with: 9
regional urban development bureaus; 9 regional Offices of the Regional Auditor General,
Ethics and Anti-Corruption institutions, Public Procurement offices, Environmental Protection
Authorities and Bureaus of Finance and Economic Development; 44 participating cities in 9
regions; the Federal Ethics and Anti-Corruption Agency, Ethiopia Public Procurement and
Property Administration, Office of the Federal Auditor General, Ethiopian Environmental
Protection Agency; internally with the various interested/involved Bureaus of the Ministry.
b. Draft annually and implement (monitor & report) a MUDHCo ULGDP II Capacity Building
Plan.
c. Ascertains the assistance in preparation of draft bidding documents and review the draft
bidding documents prepared by design consultants or cities as per the Government of Ethiopia
Standard Bidding Document (ICB) and National Competitive Bidding (NCB) to be given to
regions/ULGs.
d. Ascertains the accuracy of reports and other documentation produced by staffs.
e. Coordinate closely with the concerned bodies and assist them in fulfilling their responsibilities
in terms of contract management for smooth and successful completion of projects.
f. Assist cities in the construction supervision consultants and making periodic monthly progress
reports of sites to the Program Coordinator.
g. Ascertains support cities in the application of ESMS and RSG and consideration of the
environment and social issues in the contract documents in cooperation with EMS
Management specialists.
h. Ascertains the accuracy of proper documentation of all the infrastructure projects being
implemented by the regions/ULGs under the ULGDP and review action plans/schedules and
resources required as well as assist towns in maintaining the project management, monitoring
and reporting systems for ULGDP and others.
i. Assist cities in the preparations and consolidating the Capital Investment Plans for the Urban
Local Government Development Project (ULGDP) and participate in any other works or
meetings related to ULGDP and assist them in reviewing and appraising project proposals.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 73 of 104
j. Assist cities, design and construction supervision consultants and contractors to obtain the
necessary documents and information required for the timely completion of the projects.
k. Assist in project management and implementation of ULGDP and other programs related to
project management and capacity building. This includes working with the cities technical
team as and when required.
l. Monitor and examine alternative design proposals/variations submitted by the design and
construction supervision consultants and contractor/client for execution and recommend
appropriate solution to UGCBB and cities to respond to technical and financial queries.
m. Assist in settling any minor disputes (not litigation and arbitration) between contractor and
municipality, inform relevant authorities at the earliest opportunity of any problem(s) or
potential problem(s) which may arise from construction of the project and recommend
possible solutions.
n. Examine with design and construction supervision consultants and recommend on settlement
of the contractor's claims for extensions of time, payment for extra work etc.
o. Organize meetings and/or consultative forums as required with the cities and other partners
for the successful completion of the projects.
p. Prepare consolidated physical progress reports and submit to ULGDP Coordinator
q. Preparation of training manuals, guidelines, seminars and workshops on infrastructure and
related subjects.
r. Support Federal ULGDP staff, regional and cities to plan for the future in developing and
planning for operations, maintenance and an environmental mitigation of infrastructure
financed under the ULGDP such as roads, drainage and management of markets,
slaughterhouses, solid and liquid waste disposals for sustainability of the infrastructure
projects.
s. Render technical assistance for technical staff of MUHDCo, regions and the cities to enhance
capacity in the preparation of project proposals, construction and supervision procedures and
current standards as well as in other key project management systems and areas of expertise as
and when required.
t. Perform additional responsibilities as delegated/assigned by the Program Coordinator.
7.4.3 Qualifications and Skills Required
The Program Coordinator shall be a qualified project/program manager with MSc and BSc degree or
higher in Civil Engineering, Municipal Engineering or Sanitary Engineering or related field of studies
with a track record of achievements in project planning, implementation and management of
infrastructure projects. He/She shall have a minimum of 10 years’ experience for MSc respectively in
implementation of projects, design and supervision, contract management as well as appraisal of
projects with an excellent change management skills and strong commitment to sharing expertise and
experience in order to develop others (helping others to achieve goals, resolving conflict successfully).
He/she shall also have excellent writing and communication skills and knowledge of the urban sector in
Ethiopia and GoE procurement and safeguard policies and procedures.
The deputy project coordinator should therefore possess the following qualifications/competencies:
MSc and BSc degree or higher in Civil Engineering, Municipal Engineering or Sanitary
Engineering or related field of studies with a track record of achievements in project planning,
implementation and management of infrastructure projects.
A minimum of 8 and 10 years’ experience for MSc and BSc respectively in implementation of
projects, design and supervision, contract management as well as appraisal of projects.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 74 of 104
Excellent change management skills and strong commitment to sharing expertise and
experience in order to develop others (helping others to achieve goals, resolving conflict
successfully).
Excellent writing and communication skills.
Knowledge of the urban sector in Ethiopia and World Bank procurement and safeguard policies
and procedures is an advantage.
Section 5. Insert generic Section 5.
Section 6. Insert generic Section 6.
Section 7. Insert generic Section 7.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 75 of 104
7.5 TOR FOR THE PROJECT ENGINEER
Title: Insert generic Title
Section 1. Insert generic Section 1.
7.5.1 Objective of the TOR
The objective of the TOR is to obtain the services of qualified and experienced Project Engineer with
specific contract management experience, experience on design of civil engineering works and
knowledge of environmental and sociological matters related to infrastructure and who will assist
UGCBB in providing support and assistance to regions and ULGs in the implementation of
infrastructure projects and achievement of disbursement linked indicators and performance measures:
FOR ULGS:
Disbursement Linked Indicator 1 (DLI 1): Minimum Conditions (MCs)26
The ULG will produce and its council approve key documents including: A rolling three year
Capital Investment Plan (CIP), with Annual Action Plan (AAP),
That the ULG’s planned use of the ULGDP II performance grants is in compliance with
investment menu;
That key staff positions are in place for management of ULGDP II implementation under the
coordination of the City Manager: key staff positions are ULGDP II focal persons for: civil
engineer;
Disbursement Linked Indicator 2 (DLI 2): Institutional Performance
Planning and Budgeting
That a rolling three year CIP, with linkages between the annual budget, annual action plan,
and annual procurement plan is prepared and approved and that it is consistent in data and
alignment with an Asset Management Plan; and captures operational and recurrent costs of
investments in the plans;
That there is participation of citizens in the planning process that helps to meet service
delivery priorities identified by citizens;
Assets Management: That the Assets Management Plan is prepared and updated;
Accountability and transparency: That the ULG achieves accountability and transparency in
its operations and service delivery;
Disbursement Linked Indicator 3 (DLI 3): Achievements of Infrastructure and Maintenance
Targets and Value for Money in Investments27
Achievement of Urban infrastructure targets: That urban infrastructure targets are achieved;
Maintenance Performance: That the ULG’s Maintenance Plan is based on the Assets
Management Plan; the ULG has developed a maintenance budget and actual implementation
rate is not less than 80% of that planned; and that maintenance is carried out; and
26 Note: Full details of DLIs, performance areas, performance measures, indicators, the weightings allocated and points
applied for each measure/indicator are described in the POM. 27 For the first assessment in 2014: reviewing all investments implemented in FY 2012/13 (EFY 2005). Note that this
DLI is only applied for the first ULGDP (2008-2014) ULGs in the first assessment.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 76 of 104
Quality of infrastructure: That value for the money (VFM) is achieved in the infrastructure
investments funded by the ULGDP II. Note. The VFM assessment tool is yet to be developed
and the VFM will be assessed for the first time in EFY 2008 based on performance in EFY
2007 (2014/15).
FOR REGIONAL STATES:
Disbursement Linked Indicator 4 (DLI 4): Regional Capacity Building and Service Delivery
Standards: That the NRS ensures, with capacity building support of the MUDHCo that it develops
its own capacity and the capacity of the participating ULG(s) in the NRS to ensure efficient and
effective the institutional and organizational performance of urban local government(s) in
developing and sustaining urban infrastructure and services in the area of civil engineering, project
preparation, preparation of procurement documentation and operation & maintenance
7.5.2 Scope of Work
The Municipal /Civil Engineer will be responsible for: monitoring and supervising ULGDP II
participating cities and capacity building for regional urban development bureaus and cities in areas
involving investment construction project preparation (including design and supervision consultancy),
contract management, and development of capital investment plans, operations and maintenance, and
participation of citizens in city development. Specific duties and responsibilities are:
a. Assist in the preparation of draft bidding documents and review the draft bidding documents
prepared by design consultants or cities as per the Government of Ethiopia Standard Bidding
Document (ICB) and National Competitive Bidding (NCB) to be given to regions/ULGs.
b. Monitor, inspect and coordinate the design works being done by engineering consultants
during the design and supervision during the implementation of the projects. Review the
reports and other documentation produced by the Consultants.
c. Check the designs, bills of quantities and other documents that are submitted by design and
construction supervision consultants and the regions/ULGs in respect of the infrastructure
rehabilitation projects and for conformity GoE requirements.
d. Follow-up that proper hand over of sites and mobilization formalities are fulfilled and assist in
the layout of construction sites.
e. Coordinate closely with the concerned bodies and assist them in fulfilling their responsibilities
in terms of contract management for smooth and successful completion of projects.
f. Assist cities in the construction supervision consultants and making periodic monthly progress
reports of sites.
g. Support cities in the application of ESMS and RSG and consideration of the environment and
social issues in the contract documents in cooperation with EMS Management specialists.
h. To keep proper documentation of all the infrastructure projects being implemented by the
regions/ULGs under the ULGDP and review action plans/schedules and resources required as
well as assist towns in maintaining the project management, monitoring and reporting systems
for ULGDP and others.
i. Assist cities in the preparations and consolidating the Capital Investment Plans for the
ULGDP and participate in any other works or meetings related to ULGDP and assist them in
reviewing and appraising project proposals.
j. Assist cities, design and construction supervision consultants and contractors to obtain the
necessary documents and information required for the timely completion of the projects.
k. Assist in project management and implementation of ULGDP and other programs related to
project management and capacity building. This includes working with the cities technical
team as and when required.
l. Support Resident Engineer in checking works, materials and workmanship to ensure
compliance with the approved designs, drawings and specifications and provide feedback on
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 77 of 104
the technical performance of the contractor and his staff to the contracting authority and
UGCBB.
m. Examine alternative design proposals/variations submitted by the design and construction
supervision consultants and contractor/client for execution and recommend appropriate
solution to UGCBB and cities to respond to technical and financial queries.
n. Assist in settling any minor disputes (not litigation and arbitration) between contractor and
municipality, inform relevant authorities at the earliest opportunity of any problem(s) or
potential problem(s) which may arise from construction of the project and recommend
possible solutions.
o. Examine with design and construction supervision consultants and recommend on settlement
of the contractor's claims for extensions of time, payment for extra work etc.
p. Organize meetings and/or consultative forums as required with the cities and other partners
for the successful completion of the projects.
q. Prepare simplified workbook, guidelines, checklist for supervision works for a project
engineer
r. Prepare physical progress report and submit to ULGDP Coordinator
s. Participate in, and support the preparation of training manuals, guidelines, seminars and
workshops on infrastructure and related subjects.
t. Support regional cities to plan for the future in developing and planning for operations,
maintenance and an environmental mitigation of infrastructure financed under the ULGDP
such as roads, drainage and management of markets, slaughterhouses, solid and liquid waste
disposals for sustainability of the infrastructure projects.
u. Render technical assistance for technical staff of the cities to enhance capacity in the
preparation of project proposals, construction and supervision procedures and current
standards as well as in other key project management systems and areas of expertise as and
when required.
v. Perform any other duties assigned by the Program Coordinator.
7.5.3 Staffing and Skills Required
The assignment will require a high level of technical competence in engineering especially in
municipal/civil engineering works. The Consultant should therefore possess the following
qualifications:
B.Sc. degree or higher in Civil Engineering, Municipal Engineering or Sanitary Engineering or
related field of studies with a track record of achievements in implementation of infrastructure
projects.
A minimum of 8 years’ experience in implementation and support of projects, design and
supervision, contract management as well as appraisal of projects.
Strong commitment to sharing expertise and experience in order to develop others.
Excellent writing and communication skills in both Amharic and English (all reports,
documents and correspondences shall be in English and/or Amharic).
Knowledge of the urban sector in Ethiopia is an advantage.
Section 5. Insert generic Section 5.
Section 6. Insert generic Section 6.
Section 7. Insert generic Section 7.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 78 of 104
7.6 TOR FOR THE SOCIAL MANAGEMENT SPECIALIST
Title: Insert generic Title
Section 1. Insert generic Section 1.
7.6.1 Objective of the TOR
The objective of the TOR is to obtain the services of a qualified and experienced Social Management
Consultant who will assist in providing capacity building and mentoring services to regions and urban
local governments (city administrations) in implementation of the MUDHCo Environmental and Social
Management System and achievement of disbursement linked indicators and performance measures:
FOR ULGS:
Disbursement Linked Indicator 1 (DLI 1): Minimum Conditions (MCs)28
That key staff positions are in place for management of ULGDP II implementation under the
coordination of the City Manager: key staff positions are ULGDP II focal persons for: social
sustainability;
That the ULG has established a functional system for social management;
That a complaints handling system is in place, including procedures for reporting of complaints,
receiving and addressing complaints and reporting on corrupt practices and complaints, through
the ULG’s Ethics Unit;
Disbursement Linked Indicator 2 (DLI 2): Institutional Performance
Planning and Budgeting
That there is participation of citizens in the planning process that helps to meet service
delivery priorities identified by citizens;
Environment and Social Safeguards
That eligible investments for potential environmental and social safeguard impacts are
screened against the set of environment and social criteria in the planning stage and
Environmental and Social Impact Assessments (ESIAs), and Resettlement Action Plans
(RAPs) are prepared and approved by the Regional Environmental Protection Agency as
required;
That RAPs are implemented in a timely manner - prior to commencement of civil works);
Accountability and transparency in city’ operations and service delivery: City has identified the
top three basic municipal services, and prepared a standard for delivery along with citizen
charter and published this. This indicator will be used only for the first year of the ULGDP II.
Is municipal service delivery as per the standard and citizen charter? Used in following years.
Disbursement Linked Indicator 3 (DLI 3): Achievements of Infrastructure and Maintenance
Targets and Value for Money in Investments29
Job creation
28 Note: Full details of DLIs, performance areas, performance measures, indicators, the weightings allocated and points
applied for each measure/indicator are described in the POM. 29 For the first assessment in 2014: reviewing all investments implemented in FY 2012/13 (EFY 2005). Note that this
DLI is only applied for the first ULGDP (2008-2014) ULGs in the first assessment.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 79 of 104
That the ULG’s achievement of its job creation targets (disaggregated by gender) is
satisfactory;
FOR REGIONAL STATES:
Disbursement Linked Indicator 4 (DLI 4): Regional Capacity Building and Service Delivery
Standards: That the NRS ensures, with capacity building support of the MUDHCo that it develops
its own capacity and the capacity of the participating ULG(s) in the NRS to ensure efficient and
effective the institutional and organizational performance of urban local government(s) in
developing and sustaining urban infrastructure and services in the area of social development.
Disbursement Linked Indicator 6 (DLI 6): Timely review of ULG safeguards compliance: That
the NRS ensures that there is timely review by the Regional Environmental Protection Agency
(REPA) of the Environmental Screening reports produced by ULG(s) and submitted to the REPA for
review.
7.6.2 Scope of Work
The Social Management Specialist will have the following duties and responsibilities:
a. Provide overall coordination and assistance in the implementation of the ESMS and RSG for
the ULGDP.
b. Establish the system of screening forms, RAP set out in the ESMS and RSG, and oversee their
smooth operation including advice to ULGs on the procurement of consultants for any required
CRMP or RAP studies;
c. Site visits during ULG investment project execution and operation to assess how social aspects
are succeeding or have succeeded in minimizing impacts.
d. Provide specific technical advice on mitigation measures for labor intensive projects;
e. Raise awareness and proactively create demand for this technical advice among ULG officers;
f. Liaise with the MUHDCo, BUDs and ULGs to ensure the project’s compliance with the ESMS,
RSG and all resettlement aspects of the project;
g. Be responsible for collating information related to the ESMS, RSG and resettlement;
h. Be involved in preparing a country specific entitlement matrix under the ULGDP;
i. Undertake review of RAPs to ensure compliance with the ESMS and RSG;
j. Establish a monitoring and evaluation system for the implementation of the ESMS and RSG;
and
k. Lead the delivery of capacity building programs for ULG officers on the ESMS and RSG and
produce a training plan.
l. Review the procedure being followed to produce Resettlement Action Plan (RAP) to ensure
compliance with the RSG
m. Review the Resettlement Action plans and monitor the implementation of Resettlement action
plans.
n. Ensure that key staff positions are in place for management of ULGDP II implementation;
o. Ensure that the ULG has established a functional system for social management;
p. Ensure that there is participation of citizens in the planning process that helps to meet service
delivery priorities identified by citizens;
q. Ensure that eligible investments for potential environmental and social safeguard impacts are
screened against the set of environment and social criteria in the planning stage and
Environmental and Social Impact Assessments (ESIAs), and Resettlement Action Plans (RAPs)
are prepared and approved by the Regional Environmental Protection Agency as required;
r. Ensure that RAPs are implemented in a timely manner - prior to commencement of civil works;
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 80 of 104
s. Perform other duties assigned by the Program Coordinator.
7.6.3 Staffing and Skills Required
The assignment will require a good understanding and knowledge of social and environmental
safeguards that are associated with projects such as the ULGDP and a high level of technical
competence in the implementation of ESMSs and RSGs.
The Consultant should therefore possess the following qualifications:
BSc degree or higher in Sociology, Economics, Urban Management, community development
or other related degree;
A minimum of 8 years relevant experience in social welfare and community development,
including experience in similar projects and geographic areas, with 5 years of experience in
aspects of social welfare involving community development and urban development in general
and social safeguard screening against resettlement and compensation criteria in the planning
stage and resettlement action plans (RAPs) in the implementation stage of projects.
Experience in working with local governments and/or knowledge of the urban sector in
Ethiopia will be an added advantage.
Excellent writing and communication skills in both Amharic and English.
Section 5. Insert generic Section 5.
Section 6. Insert generic Section 6.
Section 7. Insert generic Section 7.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 81 of 104
7.7 TOR FOR THE ENVIRONMENTAL MANAGEMENT SPECIALIST
Title: Insert generic Title
Section 1. Insert generic Section 1.
7.7.1 Objective of the TOR
The objective of the TOR is to obtain the services of a qualified and experienced Environmental
Management Specialist who will assist in providing capacity building and mentoring services to regions
and urban local governments (city administrations) in implementation of the MUDHCo Environmental
and Social Management System and achievement of disbursement linked indicators and performance
measures:
FOR ULGS:
Disbursement Linked Indicator 1 (DLI 1): Minimum Conditions (MCs)30
That key staff positions are in place for management of ULGDP II implementation under the
coordination of the City Manager: key staff positions are ULGDP II focal persons for:
environmental sustainability;
That the ULG has established a functional system for environmental management;
That a complaints handling system is in place, including procedures for reporting of complaints,
receiving and addressing complaints and reporting on corrupt practices and complaints, through
the ULG’s Ethics Unit;
Disbursement Linked Indicator 2 (DLI 2): Institutional Performance
Planning and Budgeting
That there is participation of citizens in the planning process that helps to meet service
delivery priorities identified by citizens;
That the ULG has a budget approved by Council, as proclaimed in the budget proclamation,
and that follows the standard charts of accounts;
That the variance in % between total budget and actual for the previous FY (related with
total budget expenditures on municipal services) is less than 10 %);
Accountability and transparency
That the ULG achieves accountability and transparency in its operations and service
delivery;
Environment and social Safeguards
That eligible investments for potential environmental safeguard impacts are screened
against the set of environment criteria in the planning stage and Environmental and Social
Impact Assessments (ESIAs), Environmental Management Plans (EMPs) are prepared and
approved by the Regional Environmental Protection Agency as required;
That EMPs are implemented in a timely manner - prior to commencement of civil works);
FOR REGIONAL STATES:
30 Note: Full details of DLIs, performance areas, performance measures, indicators, and the weightings allocated and
points applied for each measure/indicator are described in the POM.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 82 of 104
Disbursement Linked Indicator 4 (DLI 4): Regional Capacity Building and Service Delivery
Standards: That the NRS ensures, with capacity building support of the MUDHCo that it develops
its own capacity and the capacity of the participating ULG(s) in the NRS to ensure efficient and
effective the institutional and organizational performance of urban local government(s) in
developing and sustaining urban infrastructure and services in the area of environmental
management.
Disbursement Linked Indicator 6 (DLI 6): Timely review of ULG safeguards compliance: That
the NRS ensures that there is timely review by the Regional Environmental Protection Agency
(REPA) of the Environmental Screening reports produced by ULG(s) and submitted to the REPA for
review.
7.7.2 Scope of Work
The Environmental Management Specialist will have the following duties and responsibilities:
a. Provide overall coordination and assistance in the implementation of the ESMS for the
ULGDP II.
b. Establish the system of screening forms and EIA set out in this ESMS, and oversee their
smooth operation including advice to ULGs on the procurement of consultants for any
required EIA studies;
c. Review and assess project screening reports prepared by the respective cities which the
categorized as schedule 1, 2 and 3and follow the approval of the reports by regional
environmental protection institutions.
d. Review the Environmental and Social Impact Assessment (ESIA) of the sub projects and
monitor the implementations of the Environmental Management Plans of the sub-projects
e. Liaise with the Ethiopia EPA on a regular basis;
f. Site visits during ULG investment project execution and operation to assess how
environmental screening and mitigation measures are succeeding or have succeeded in
minimizing impacts.
g. Commission an independent consulting firm to carry out an environmental performance audit
of ULGDP, on an annual basis;
h. Provide specific technical advice on mitigation measures for labor intensive projects;
i. Provide technical advice to ULGs on all technical issues related to natural resources and
environmental management. These issues will relate to impacts on surface water,
groundwater, agricultural resources and vegetation, sourcing of materials used in construction,
human health, ecology and protected areas, land and soil degradation;
j. Raise awareness and proactively create demand for this technical advice among ULG officers;
k. Liaise with the MUDHCos, BWUDs and ULGs to ensure the project’s compliance with the
ESMS with all aspects of the project;
l. Liaise with the BWUDs and ULGs to ensure the project’s compliance with the EMSF, RSG
and all resettlement aspects of the project;
m. Be responsible for collating information related to the ESMS;
n. Be involved in preparing a country specific entitlement matrix under the ULGDP;
o. Undertake review of EMPs to ensure compliance with the ESMS;
p. Establish a monitoring and evaluation system for the implementation of the ESMS;
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 83 of 104
q. Lead the delivery of capacity building programs for ULG officers on the ESMS and produce a
training plan.
r. Check and support all cities’ projects that, their CIPs are all screened and approved by the
Regions’ Environmental Protection Authorities.
s. Assist that eligible investments for potential environmental safeguard impacts are screened
against the set of environment criteria in the planning stage and Environmental and Social
Impact Assessments (ESIAs), Environmental Management Plans (EMPs) are prepared and
approved by the Regional Environmental Protection Agency as required;
t. Ensure that EMPs are implemented in a timely manner - prior to commencement of civil
works;
u. Ensure that the ULG has established a functional system for environmental management;
v. That eligible investments for potential environmental safeguard impacts are screened against
the set of environment criteria in the planning stage and Environmental and Social Impact
Assessments (ESIAs), Environmental Management Plans (EMPs) are prepared and approved
by the Regional Environmental Protection Agency as required;
w. That EMPs are implemented in a timely manner - prior to commencement of civil works;
x. Perform other duties assigned by the Program Coordinator.
7.7.3 Staffing and Skills Required
The assignment will require a good understanding and knowledge of social and environmental
safeguards that are associated with projects such as the ULGDP and a high level of technical
competence in the implementation of ESMS.
The Consultant should therefore possess the following qualifications:
BSc degree or higher in Environmental Science, Environmental engineering or other related
degree;
A minimum of 8 years relevant experience in environmental, health, safety and social issues,
including experience in similar projects and geographic areas, with 5 years of experience in all
aspects of urban infrastructure development and environmental safeguard impacts screening
against environment criteria in the planning stage and environmental and social impact
assessments (ESIAs), environmental management plans (EMPs).
Experience in working with local governments and/or knowledge of the urban sector in
Ethiopia will be an added advantage.
Excellent writing and communication skills in both Amharic and English.
Section 5. Insert generic Section 5.
Section 6. Insert generic Section 6.
Section 7. Insert generic Section 7.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 84 of 104
7.8 TOR FOR THE PROCUREMENT SPECIALIST
Title: Insert generic Title
Section 1. Insert generic Section 1.
7.8.1 Objectives of the TOR
The objective of the TOR is to obtain the services of a qualified procurement specialist who will assist
UGCBB in providing support to regions and ULGs (Cities) in the preparation of procurement plans,
ULGs and Regions in capacity building and achievement of disbursement linked indicators and
performance measures:
FOR ULGS:
Disbursement Linked Indicator 1 (DLI 1): Minimum Conditions (MCs)31
That the ULG will produce and its council approve key documents including: An Annual
Procurement Plan (APP);
That key staff positions are in place for management of ULGDP II implementation under the
coordination of the City Manager: key staff positions are ULGDP II focal persons for:
procurement;
That there is a functional organizational capacity for effective implementation of the
procurement system according to the relevant Regional/Federal public procurement
proclamation including:
That procurement function and minimum core staff are place – at least two procurement
specialists;
That there is a functional tender committee/tender award committee (TAC) in place; and
That the ULG has copies of their Region’s procurement law, directives, manuals and
standard procurement documents and staffs are familiar with these legal documents;
That a complaints handling system is in place, including procedures for reporting of complaints,
receiving and addressing complaints and reporting on corrupt practices and complaints, through
the ULG’s Ethics Unit;
Disbursement Linked Indicator 2 (DLI 2): Institutional Performance
Planning and Budgeting
That a rolling three year CIP, with linkages with thee and annual procurement;
Procurement
That Annual Procurement Plans for ULGDP II are prepared and their implementation is
monitored and updated as required;
That the ULG adheres to procurement procedures and ensures effectiveness of contracts by:
maintaining adequate relevant auditable records on the procurement process; publishing all
ICB and NCB contracts awarded and complying with procurement procedures as per the
legal requirements;
31 Note: Full details of DLIs, performance areas, performance measures, indicators, and the weightings allocated and
points applied for each measure/indicator are described in the POM.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 85 of 104
Accountability and transparency
That the ULG achieves accountability and transparency in its operations and service
delivery;
FOR REGIONAL STATES:
Disbursement Linked Indicator 4 (DLI 4): Regional Capacity Building and Service Delivery
Standards: That the NRS ensures, with capacity building support of the MUDHCo that it develops
its own capacity and the capacity of the participating ULG(s) in the NRS to ensure efficient and
effective the institutional and organizational performance of urban local government(s) in
developing and sustaining urban infrastructure and services in the area of procurement.
7.8.2 Scope of work
The Procurement Specialist(s) will assist MUHDCo in the overall planning, managing, coordinating
and reporting of the ULGDP in the provision of support services and assistance to regions and ULGs
(city administrations) in the managing the procurement program of the project for goods, works and
services in accordance with Government of Ethiopia policies, laws and regulations in the participating
ULGs, Regions and UGGCBB. The Procurement specialist will have the following duties and
responsibilities
a. Managing the procurement program of the project for goods, works and services in
accordance with Government of Ethiopia regulations.
b. Providing technical support and guidance to beneficiaries in all aspects of procurement of
works, goods and services.
c. Initiating and coordinating training for beneficiaries in procurement with particular focus
GOE procedures.
d. Monitoring procurement in implementing beneficiaries/towns to ascertain compliance with
GoE procurement regulations.
e. Ensuring that the Procurement Agent and other consultants execute their actions in
accordance with the contracts.
f. Updating as appropriate the ULGDP II Procurement Plan.
g. Coordinating/conducting the preparation of Terms of Reference, Request for Expression of
Interest, Shortlisting, Invitation of Bid, Procurement Specifications, and Bid documents for
Works, Goods, and related supplies and consultant services.
h. Coordinating/conducting the bid/proposal evaluation process and thereafter preparing the
bid/proposal evaluation report for submission to the relevant authorities for approval.
i. Managing contracts after signature and assisting beneficiaries to manage their own contracts.
j. Visiting construction sites, attending site meetings with all parties concerned, and assessing
progress by reviewing performance certificates for completed works/tasks so as to recommend
appropriateness for settlement of due payments.
k. Attending to all audit queries on procurement.
l. Developing a procurement processing, monitoring and reporting system and taking a lead
in the preparation of quarterly reports on the status of procurement activities in the project.
m. Initiating the settlement of disputes with contractors/suppliers and follow upon shortages and
defective supplies/services/works that are in breach of contract provisions.
n. Attending to procurement enquiries and complaints by prospective bidders and/or bidders.
o. Liaising with supervising consultants to prepare progress reports on Civil Works.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 86 of 104
p. Coordinate and disseminate GOE’s guidelines/ standards of bidding documents for
procurements of works, goods and consultancy services. Support regions and ULGs in
producing draft bidding documents and evaluation formats as per the GoE Standard Bidding
Document (ICB) and National Competitive Bidding (NCB)
q. Carry out a review to identify constraints and opportunities to the effective and efficient
procurement and administration of works, goods and consultancies in the ULGs and an
implementation capacity assessment to identify gaps.
r. Carry out effective coordination and timely delivery of and put in place systems to guide
procurement management and monitoring the performance of procurement activities across
regional, local agencies and ULGs.
s. Producing compiled reports in accordance with reporting requirements to be forwarded to the
concerned stakeholders.
t. Check the Bidding Documents and other related documents that are produced by design and
construction supervision consultants’ suppliers and by regions/ ULGs for conformity with
GOE ICB or NCB procurement requirements.
u. Coordinate closely with the concerned bodies and assist ULGs in fulfilling their
responsibilities for smooth and successful completion of procurement activities and making
periodic monthly progress reports of deliverables.
v. Ensure MUHDCo, Regions as well as ULGs are keeping proper documentation of all the
procurements being implemented under the ULGDP and review action plans/schedules and
resources required as well as assist cities in maintaining the procurement administration,
monitoring and reporting systems.
w. Render technical assistance for technical staff of the cities to enhance capacity in the
preparation of project proposals, procurement and supervision procedures and current
standards as well as in other key procurement management systems and areas of expertise as
and when required.
x. Establish and implement program for procurement monitoring and supervision system at
MUHDCo to regulate the overall project management and implementation of ULGDP and
other programs related to capacity building. This includes working with the cities' technical
team as and when required.
y. Assist in settling any minor contractual disputes between contractor and municipality, inform
relevant authorities at the earliest opportunity of any problem(s) or potential problem(s) which
may arise from procurements of consultants, goods and works and recommend possible
solutions.
z. Organize meetings and/or consultative forums as required with the cities and other partners
for the successful completion of the projects.
aa. Participate and assist in the procurement & management, particularly from a technical
perspective, of some international staff and a large team of national staff on stipulating,
gathering information requirements, collecting & processing, comparing target and actual
performance of planned procurement activities, inputs of resources, assumptions, and
assessing deviations of outputs from the objectives of the program/project and give remedial
actions
bb. Present monthly technical reports and perform any other duties assigned by the Program
Coordinator.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 87 of 104
7.8.3 Required qualifications and Experience
It is envisaged that the technical assistance will require an experienced and high level of
technical competence in procurement of services, goods and works and administrations on
World Bank financed projects. The procurement specialist, therefore, should be required to
fulfill the following qualifications.
At least a Degree from a reputable and recognized university in Commerce, Business
Administration, Economics, Engineering, Law or any other related discipline. Possession of
post graduate degree or an advanced degree will be an advantage.
Postgraduate training in procurement or a professional qualification in procurement.
At least 8 years’ experience in procurement in a large private/ public sector organization or
projects.
At least 5 years procurement experience in GOE/IDA funded projects thorough understanding
of Federal and local government procurement procedures.
Computer literacy in the use of word processor, spreadsheets and any other
Application relevant to procurement.
Excellent change management skills and strong commitment to sharing expertise and
experience in order to develop others.
Excellent writing and communication skills in both Amharic and English (all reports,
documents and correspondences shall be in English).
Knowledge of the urban sector in Ethiopia is an advantage
Section 5. Insert generic Section 5.
Section 6. Insert generic Section 6.
Section 7. Insert generic Section 7.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 88 of 104
7.9 TOR FOR THE MONITORING & EVALUATION SPECIALIST
Title: Insert generic Title
Section 1. Insert generic Section 1.
7.9.1 Objective of the assignment
The objective of the assignment is to lead the ULGDP’s monitoring and evaluation work, including
supporting the regional and city M&E offices that are responsible for M&E of the ULGDP-financed
activities and achievement of disbursement linked indicators and performance measures:
FOR ULGS:
Disbursement Linked Indicator 1 (DLI 1): Minimum Conditions (MCs)32
That key staff positions are in place for management of ULGDP II implementation under the
coordination of the City Manager: key staff positions are ULGDP II focal persons for: M&E;
FOR REGIONAL STATES:
Disbursement Linked Indicator 4 (DLI 4): Regional Capacity Building and Service Delivery
Standards: That the NRS ensures, with capacity building support of the MUDHCo that it develops its
own capacity and the capacity of the participating ULG(s) in the NRS to ensure efficient and effective
the institutional and organizational performance of urban local government(s) in developing and
sustaining urban infrastructure and services – in the area of M&E.
7.9.2 Scope of Work
The ULGDP Monitoring and Evaluation Specialist at Federal level based at MUHDCo will plan,
coordinates and facilitates all M&E related activities of the ULGDP. He/she will be responsible for:
establishing, implementing ULGDP II M&E and reporting systems in ULGDP II participating regions,
cities and MUDHCo; monitoring and supervising ULGDP II participating cities during implementation
of M&E and reporting systems; and capacity building for regional urban development bureaus and
cities in areas involving ULGDP II monitoring, evaluation and reporting and participation of citizens in
city development. Specific duties and responsibilities are:
a. Coordinate with the ULGDP M&E Officers at Regional and ULG levels in maintaining a
monitoring and evaluation system for the cities to ensure that verifiable data is supplied,
analyzed, and reported as required.
b. Review existing M&E guidelines and design formats for monitoring.
c. Prepare results based Monthly, Quarterly Progress Report, Semi-Annual Report, Annual
Report and other relevant reports (e.g. Annual Performance Report) for ULGDP according to
the M&E reporting criteria.
d. Regularly follow-up on project implementation progress as per the key performance
indicators.
e. Identify training needs for monitoring and evaluation and arrange and conduct training
programs for relevant project staff at regional and city levels.
f. Advise the Program Coordinator on all aspects relating to provision of up to date project
management information;
32 Note: Full details of DLIs, performance areas, performance measures, indicators, and the weightings allocated and
points applied for each measure/indicator are described in the POM.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 89 of 104
g. Assist cities and regions in the preparation of M&E reports , consolidate and submit quarterly
monitoring and evaluation reports to the Program Coordinator;
h. Prepare and submit Monthly, Quarterly Progress Reports for ULGDP for period to October,
January, April and July not later than 10 days of the end of each quarter.
i. Consolidate and submit Semi-Annual Reports for ULGDP for period July to January not later
than the 1st week of February each year.
j. Prepare and submit to ULGDP, Annual Performance Report for ULGDP for period July to
July not later than August 7 each year.
k. Review and comment on M&E reports of cities and regions and assist cities and regions as
necessary to ensure the quality of the reports.
l. Work with ULGDP team members and other project implementing partners to familiarize
them with key performance indicators of the ULGDP.
m. Participate in M&E and other training courses as appropriate.
n. Familiarize self with the ULGDP Manuals and Guidelines.
o. Monitoring compliance with ULGDP II POM.
p. Perform other duties assigned by the Program Coordinator.
7.9.3 Qualifications Required
The ULGDP Monitoring and Evaluation Specialist should have experience in monitoring and
evaluation of projects. He or she should have adequate knowledge and understanding of project
implementation, and experience with monitoring and evaluation. The assignment also requires excellent
report writing skills in both Amharic and English.
The Monitoring and Evaluation Specialist should possess the following qualifications/ competencies:
B.Sc. degree in social sciences, economics or a related field; Master’s Degree that include
project management and monitoring and evaluation preferred.
A minimum of 8 years’ experience in implementation of projects and M&E, preferably of
infrastructure projects project/program management, including experience in similar projects
and geographic areas, with 5 years of experience in aspects of project management involving
monitoring and evaluation systems and capacity building for M&E in an urban development
setting.
Excellent writing and communication skills in English, excellent report writing skills.
Excellent command of computer programs and applications with significant capabilities in
computerized database, spreadsheet constructions.
Excellent change management skills and strong commitment to sharing expertise and
experience in order to develop others (helping others to achieve goals), resolving conflict
successfully.
Knowledge of the urban sector issues in Ethiopia is an advantage.
Section 5. Insert generic Section 5.
Section 6. Insert generic Section 6.
Section 7. Insert generic Section 7.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 90 of 104
7.10 TOR FOR THE ULG FINANCIAL MANAGEMENT SPECIALIST
Title: Insert generic Title
Section 1. Insert generic Section 1.
7.10.1 Objective of the assignment
The objective of the assignment is to lead the ULGDP’s financial transaction work, including
supporting the regional and city finance officers that are responsible for financial issues of the ULGDP-
financed activities through planning, budgeting and coordinating disbursement of funds of the City and
its accountability, according to finance and accounting regulations and achievement of disbursement
linked indicators and performance measures:
FOR ULGS:
Disbursement Linked Indicator 1 (DLI 1): Minimum Conditions (MCs)33
That the ULG will produce and its council approve key documents including: An Annual
Budget, and an
That the ULG will submit its financial statements for the prior FY on time;
That the ULG’s audit report for the previous FY shall not be adverse or have a disclaimer
opinion;
That the ULG’s counterpart funding requirements are fulfilled;
That key staff positions are in place for management of ULGDP II implementation under the
coordination of the City Manager: key staff positions are ULGDP II focal persons for: financial
management and that there is a functioning Internal Audit (IA) unit;
Disbursement Linked Indicator 2 (DLI 2): Institutional Performance
Financial Management
That the ULG maintains required accounting systems and timely reporting;
That external audit backlogs are cleared - minimum 5 years back;
That the audit opinion for the previous audit is clean;
That the ULG is in compliance with audit recommendations;
That internal audit procedures are adhered to with good practices reflected in quarterly
reports, reporting to mayor, and evidence of follow-up on audit findings;
Accountability and transparency
That the ULG achieves accountability and transparency in its operations and service
delivery;
FOR REGIONAL STATES:
Disbursement Linked Indicator 4 (DLI 4): Regional Capacity Building and Service Delivery
Standards: That the NRS ensures, with capacity building support of the MUDHCo that it develops
its own capacity and the capacity of the participating ULG(s) in the NRS to ensure efficient and
33 Note: Full details of DLIs, performance areas, performance measures, indicators, and the weightings allocated and
points applied for each measure/indicator are described in the POM.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 91 of 104
effective the institutional and organizational performance of urban local government(s) in
developing and sustaining urban infrastructure and services – in the area of financial management.
Disbursement Linked Indicator 5 (DLI 5): Timely execution of ULG annual external and
procurement audits: That the NRS ensures that there is timely execution of annual external audit of
the books of account of the participating ULG(s) in the NRS starting in Year 1 (EFY 2007 / GC
2014/15).
7.10.2 Scope of Work
The ULGDP Financial Management Specialist at Federal level based at MUHDCo will be responsible
for: monitoring and supervising ULGDP II participating cities and capacity building for regional urban
development bureaus and cities in areas involving of local government finance, accounting and audit,
and participation of citizens in city development. Specific duties and responsibilities are:
a. Review and gets acquainted with the ULGD Program implementation documents: The PIP,
manuals, region and city specific implementation plans.
b. Review the financial management manual, prepare training materials and provide training to
the ULGDP accountants at the Regional Bureaus of Finance and Economic Development and
ULGs.
c. Facilities and ensure timely release and flow of resources to ULGD program implementing
agencies.
d. Ensure timely submission of expenditure documents from ULGDP implementing Agencies
and from BoFED to MoFED; for replenishment;
e. Prepare request for replenishment with relevant and necessary documentation and reports
/Interim Financial Reports (IFR)
f. Prepare periodic Financial report and additional statement as per the ULGDP Financial
reporting (as stated in the ULGDP Financial Management Manual)
g. Collect, consolidate and regularly updated ULGDP expenditure data and information;
h. Ensure that the program budget and disbursement schedules are regularly updated and
maintained.
i. Ensure that proper financial records are maintained at ULGDP implementing Agencies;
j. Ensure the quality and consistency of all financial data reported from ULGDP Agencies;
k. Reconcile monthly ULGDP bank accounts at MoFED with the bank statements.
l. Strengthen the capacity of ULGDP accounts;
m. Serve as a focal person for ULGDP implementation at MoFED;
n. Prepare annual consolidated financial statements within three months after the end of the
financial year and ensure that these are submitted for audit to the external auditors;
o. Facilitate the external auditor with all the necessary financial documents in order to conduct
the audit in time and ensure the audit report is submitted to the bank within six months after
the end of the financial year of the project;
p. Copy financial reports to MUHDCo for proper follow-up of the implementation and the
project fund utilization;
q. Assist that the ULG will produce and its council approve key documents including: An
Annual Budget, and an
r. Assist that the ULG will submit its financial statements for the prior FY on time;
s. Assist that the ULG’s audit report for the previous FY shall not be adverse or have a
disclaimer opinion;
t. Assist that the ULG’s counterpart funding requirements are fulfilled;
u. Monitoring compliance with ULGDP II POM;
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 92 of 104
v. Providing technical support and guidance to ULGs management on financial matters;
w. Perform other duties assigned by the Program Coordinator.
7.10.3 Qualifications Required
The ULGDP Financial Management Specialist should have experience in financial management of
projects. He or she should have adequate knowledge and understanding of project implementation, and
experience with financial management.
The Financial Management Specialist should possess the following qualifications/competencies:
B.Sc. degree in accounting; plus a minimum of a Post graduate diploma in Financial
Management or Business Administration preferred.
A minimum of 8 years’ experience public sector finance and financial audit, including
experience in similar projects and geographic areas, with 5 years of experience in aspects of
local government finance, accounting, internal and external audit.
Excellent report writing skills in both Amharic and English.
Excellent command of computer programs and applications with significant capabilities in
computerized database, spreadsheet constructions and preferably knowledge of IBEX system.
Excellent change management skills and strong commitment to sharing expertise and
experience in order to develop others (helping others to achieve goals), resolving conflict
successfully.
Knowledge of the urban sector issues in Ethiopia is an advantage.
Section 5. Insert generic Section 5.
Section 6. Insert generic Section 6.
Section 7. Insert generic Section 7.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 93 of 104
7.11 TOR FOR THE URBAN LAND ADMINISTRATION SPECIALIST
Title: Insert generic Title
Section 1. Insert generic Section 1.
7.11.1 Objective of the assignment
The objective of the assignment is to lead the Urban Land Administration activities at Federal level
based at MUHDCo will enforcing compliance with national policies, strategies, programs and
guidelines on land, housing and urban development within the ULGs and achievement of
disbursement linked indicators and performance measures:
FOR ULGS:
Disbursement Linked Indicator 2 (DLI 2): Institutional Performance
Land management and urban planning
That the ULG demonstrates effective land management practices and policies;
FOR REGIONAL STATES:
Disbursement Linked Indicator 4 (DLI 4): Regional Capacity Building and Service Delivery
Standards: That the NRS ensures, with capacity building support of the MUDHCo that it develops
its own capacity and the capacity of the participating ULG(s) in the NRS to ensure efficient and
effective the institutional and organizational performance of urban local government(s) in
developing and sustaining urban infrastructure and services – in the area of land management
7.11.2 Scope of Work
The Urban Land Administration Specialist at Federal level based at MUHDCo will enforcing
compliance with national policies, strategies, programs and guidelines on land, housing and urban
development within the ULGs; and related activities of the ULGDP. Specific duties and responsibilities
are:
a. Compliance with national Policies, strategies, programs and guidelines on lands, housing and
urban development enforced within the ULGs;
b. Development and enforcement of ULGs ordinances on sustainable use and development of
land, and safe, planned housing/ human settlement in line with national standards
coordinated;
c. Implementation of national lands, housing and urban development initiatives and policies in
local governments coordinated, monitored and evaluated;
d. Support supervision and technical back-up support on matters of lands, urban development
and housing in the urban local governments provided;
e. Periodic reports on the performance of the Land Management sub-sector of the ULGs
prepared and submitted relevant authorities and stakeholders;
f. Work plans and budgets for land management programs and activities prepared and
submitted;
g. Coordinating the development and enforcement of Federal, Regional and ULGs ordinances on
sustainable use and development of land; safe, planned housing and human settlement;
h. Coordinating and monitoring the implementation of ULGDP projects in accordance
with national lands, housing and urban development initiatives and policies in the ULGs;
i. Providing support supervision and technical back-up support to ULGs on matters of
lands, urban development and housing;
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 94 of 104
j. Preparing and submitting reports on the performance of the Land Management sub-sector of
the relevant authorities and stakeholders;
k. Preparing and submitting work plans and budgets for land management programs and
activities;
l. Assist in developing and maintaining a ULGs land registration register;
m. Providing technical guidance to the ULGs in regard to matters of land registration;
n. Advice in planning towns and trading centers in the ULGs;
o. Inspecting structures in the ULGs to ensure compliance with the land use plan;
p. Maintaining the ULGs planning information, equipment and records;
q. Guiding ULGs authorities on balanced development;
r. Coordinate that the ULG demonstrates effective land management practices and policies;
s. Monitoring compliance with ULGDP II POM;
t. Perform other duties assigned by the Program Coordinator.
7.11.3 Qualifications Required
The Urban Land Administration Specialist should have experience in Urban Land Administration. He
or she should have adequate knowledge and understanding and experience with land management. The
Urban Land Administration Specialist should possess the following qualifications/competencies:
B.Sc. degree in Land Administration, Urban Planning, Regional Planning; or similar
discipline.
A minimum of 8 years’ experience in urban land management, development and
administration, including experience in similar projects and geographic areas, with 5 years of
experiences in local government.
Excellent writing and communication skills in English, excellent report writing skills.
Excellent change management skills and strong commitment to sharing expertise and
experience in order to develop others (helping others to achieve goals), resolving conflict
successfully.
Knowledge of the urban sector issues in Ethiopia is an advantage.
Planning, organizing and coordinating;
Records and information management;
Knowledge of the provisions of the Land Act;
Problem solving and decision making.
Section 5. Insert generic Section 5.
Section 6. Insert generic Section 6.
Section 7. Insert generic Section 7.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 95 of 104
7.12 TOR FOR THE ASSET MANAGEMENT / O&M SPECIALIST
Title: Insert generic Title
Section 1. Insert generic Section 1.
7.12.1 Objective of the assignment
The objective of the assignment is to lead the ULGDP’s that the ULG’s Maintenance Plan is based on
the Assets Management Plan; the ULG has developed a maintenance budget and actual implementation
rate is not less than 80% of that planned and achievement of disbursement linked indicators and
performance measures:
FOR ULGS:
Disbursement Linked Indicator 1 (DLI 1): Minimum Conditions (MCs)34
Disbursement Linked Indicator 2 (DLI 2): Institutional Performance
Planning and Budgeting: That a rolling three year CIP, the annual budget, annual action
plan, and annual procurement plan are in alignment with an Asset Management Plan; and
capture operational and recurrent costs of investments in the plans;
Assets Management: That the Assets Management Plan is prepared and updated;
Disbursement Linked Indicator 3 (DLI 3): Achievements of Infrastructure and Maintenance
Targets and Value for Money in Investments35
Maintenance Performance: That the ULG’s Maintenance Plan is based on the Assets
Management Plan; the ULG has developed a maintenance budget and actual implementation
rate is not less than 80% of that planned; and That maintenance is carried out; and
Quality of infrastructure: That value for the money (VFM) is achieved in the infrastructure
investments funded by the ULGDP II. Note. The VFM assessment tool is yet to be developed
and the VFM will be assessed for the first time in EFY 2008 based on performance in EFY
2007 (2014/15).
FOR REGIONAL STATES:
Disbursement Linked Indicator 4 (DLI 4): Regional Capacity Building and Service Delivery
Standards: That the NRS ensures, with capacity building support of the MUDHCo that it develops
its own capacity and the capacity of the participating ULG(s) in the NRS to ensure efficient and
effective the institutional and organizational performance of urban local government(s) in
developing and sustaining urban infrastructure and services in the area of asset management &
O&M.
7.12.2 Scope of Work
The Asset Management / O&M Specialist at Federal level based at MUHDCo will assist regions and
ULGs in developing and improving asset management policies, strategies and plans through the assets’
‘whole life cycle’; and related activities of the ULGDP. Specific duties and responsibilities are:
34 Note: Full details of DLIs, performance areas, performance measures, indicators, and the weightings allocated and
points applied for each measure/indicator are described in the POM. 35 For the first assessment in 2014: reviewing all investments implemented in FY 2012/13 (EFY 2005). Note that this
DLI is only applied for the first ULGDP (2008-2014) ULGs in the first assessment.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 96 of 104
a. Work with planning and participation specialist to ensure linkages between the AMP and CIP
preparation
b. Ensure cities and bureaus understand the need for regular inventory of infrastructural assets
and asset management plan (AMP) preparation;
c. Train cities and bureaus on Infrastructural Asset Management Planning Framework with
special emphasis on the ten steps of AMP Preparation;
d. Update the asset management planning framework manual;
e. Support cities in implementing infrastructural asset management planning including inventory
and updating of the AMP;
f. Urban infrastructures technology design (e.g. for durability, maintainability) ;
g. condition assessments and understanding of deterioration factors;
h. Life cycle cost and trade off analysis (typically MS Excel based modeling) ;
i. Investment appraisal techniques (NPV, IRR, ROI) ;
j. Appraisal of maintenance practices (reactive, condition and risk based) ;
k. Gap analysis of compliance with regulatory and industry standards;
l. Process design and driving efficiency improvements;
m. Functional requirements definition of asset information systems;
n. Cross industry benchmarking of leading practices;
o. Analyze risk management and mitigation measures;
p. Assist that the ULG’s Maintenance Plan;
q. Assist ULGs that maintenance is carried out; and that value for the money (VFM) is achieved
in the infrastructure investments funded by the ULGDP II;
r. Monitoring compliance with ULGDP II POM;
s. Perform other duties assigned by the Program Coordinator.
7.12.3 Qualifications Required
The Asset Management / O&M Specialist should have experience in asset management/O&M of
projects. He or she should have adequate experience in transport or other asset intensive industry. The
Asset Management / O&M Specialist should possess the following qualifications/competencies:
First degree (civil, municipal engineering / asset management / business management)
A minimum of 8 years of experience in urban infrastructure development and operations,
including experience in similar projects and geographic areas, with 5 years of experience in
aspects of municipal infrastructure asset management and maintenance of urban
infrastructure.
Enthusiasm and energy, working individually and as part of a team.
Good understanding of asset management processes and competency frameworks, and the
associated maturity development techniques.
Proven analytical, organizational and communication skills
Section 5. Insert generic Section 5.
Section 6. Insert generic Section 6.
Section 7. Insert generic Section 7.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 97 of 104
7.13 TOR FOR THE ULG OWN REVENUE / MUNICIPAL FINANCE SPECIALIST
Title: Insert generic Title
Section 1. Insert generic Section 1.
7.13.1 Objective of the assignment
The objective of the assignment is to lead the ULGDP’s own revenue generation activities, including
supporting the regional and city financial officers that are responsible for revenue generation of the City
and its accountability and achievement of disbursement linked indicators and performance measures:
FOR ULGS:
Disbursement Linked Indicator 1 (DLI 1): Minimum Conditions (MCs)36
1. That key staff positions are in place for management of ULGDP II implementation under
the coordination of the City Manager: key staff positions are ULGDP II focal persons for:
revenue;
2. That a complaints handling system is in place, including procedures for reporting of
complaints, receiving and addressing complaints and reporting on corrupt practices and
complaints, through the ULG’s Ethics Unit;
Disbursement Linked Indicator 2 (DLI 2): Institutional Performance
Own source revenue enhancement
That the ULG’s Revenue Enhancement Plan is updated for the most recent year;
That municipal revenues increase;
That revenue collection capacity is demonstrated;
That the ULG provides counterpart funding as described in the POM and this PPA;
Accountability and transparency
That the ULG achieves accountability and transparency in its operations and service
delivery;
FOR REGIONAL STATES:
Disbursement Linked Indicator 4 (DLI 4): Regional Capacity Building and Service Delivery
Standards: That the NRS ensures, with capacity building support of the MUDHCo that it develops
its own capacity and the capacity of the participating ULG(s) in the NRS to ensure efficient and
effective the institutional and organizational performance of urban local government(s) in
developing and sustaining urban infrastructure and services in the area of cities’ own source
revenues.
Disbursement Linked Indicator 7 (DLI 7): Support to ULG municipal revenue enhancement:
That the NRS ensures that there is effective support to participating ULG(s) achievement of DLI 2
that requires that the ULG’s Revenue Enhancement Plan is updated for the most recent year; its
municipal revenues increase; its revenue collection capacity is demonstrated; and that the ULG
provides counterpart funding as described in the POM and the PPA signed by the ULG and the
NRS.;
36 Note: Full details of DLIs, performance areas, performance measures, indicators, and the weightings allocated and
points applied for each measure/indicator are described in the POM.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 98 of 104
7.13.2 Scope of Work
The ULG Own Revenue /Municipal Finance Specialist at Federal level based at MUHDCo will be
responsible for monitoring and supervising ULGDP II participating cities and capacity building for
regional urban development bureaus and cities in areas involving of local government revenue
enhancement and planning, and participation of citizens in city development. Specific duties and
responsibilities are:
a. Preparing and consolidating budgets and work plans;
b. Preparing guidelines and plans for revenue collections;
c. Planning and monitoring revenue collection in the ULGs;
d. Preparing supplementary estimates;
e. Enforcing adherence procedures for procurement of goods and services for the ULGs;
f. Preparing and reconciling periodical financial statements and reports;
g. Providing technical support to the ULGs on alternative resources of funds;
h. Introducing and maintaining Integrated Financial Management Systems;
i. Assist that the ULG’s Revenue Enhancement Plan is updated for the most recent year;
j. Assist that municipal revenues of ULGs increase;
k. Assist that revenue collection capacity of ULGs is demonstrated;
l. Assist that the ULG provides counterpart funding as described in the POM and this PPA;
m. Monitoring compliance with ULGDP II POM;
n. Perform other duties assigned by the Program Coordinator.
7.13.3 Qualifications Required
The ULGDP Own Revenue/Financial Specialist should have experience in financial management of
projects. He or she should have adequate knowledge and understanding of project implementation, and
experience with revenue generation. The assignment also requires excellent report writing skills in both
Amharic and English. The Own Revenue/Financial Specialist should possess the following
qualifications/competencies:
B.Sc. degree in accounting; plus a minimum of a Post graduate diploma in Financial
Management or Business Administration.
A minimum of 8 years’ experience in public sector finance, including experience in similar
projects and geographic areas, with 5 years of experience in aspects of local government
finance and revenues (taxes, charges, levies, fees) and revenue enhancement planning.
Excellent command of computer programs and applications with significant capabilities in
computerized database, spreadsheet constructions.
Excellent change management skills and strong commitment to sharing expertise and
experience in order to develop others (helping others to achieve goals), resolving conflict
successfully.
Knowledge of the urban sector issues in Ethiopia is an advantage.
Section 5. Insert generic Section 5.
Section 6. Insert generic Section 6.
Section 7. Insert generic Section 7.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 99 of 104
7.14 TOR FOR THE BUDGETING, PLANNING & PARTICIPATION SPECIALIST
Title: Insert generic Title
Section 1. Insert generic Section 1.
7.14.1 Objective of the assignment
The Budgeting, Planning & Participation Specialist will play an important role in working with regional
and urban local governments in formulating ways to incorporate citizen feedback into all aspect of
urban management, most importantly budgeting and selection of investments and achievement of
disbursement linked indicators and performance measures:
FOR ULGS:
Disbursement Linked Indicator 1 (DLI 1): Minimum Conditions (MCs)37
That the ULG will produce and its council approve key documents including: An Annual
Budget
Disbursement Linked Indicator 2 (DLI 2): Institutional Performance
Planning and Budgeting
That a rolling three year CIP integrated into the annual budget, annual action plan, and
annual procurement plan is prepared and approved and is consistent in data and alignment
with a Revenue Enhancement Plan and an Asset Management Plan; and captures
operational and recurrent costs of investments in the plans;
That there is participation of citizens in the planning process that helps to meet service
delivery priorities identified by citizens;
That the ULG has a budget approved by Council, as proclaimed in the budget proclamation,
and that follows the standard charts of accounts;
That the variance in % between total budget and actual for the previous FY (related with
total budget expenditures on municipal services) is less than 10 %);
FOR REGIONAL STATES:
Disbursement Linked Indicator 4 (DLI 4): Regional Capacity Building and Service Delivery
Standards: That the NRS ensures, with capacity building support of the MUDHCo that it develops
its own capacity and the capacity of the participating ULG(s) in the NRS to ensure efficient and
effective the institutional and organizational performance of urban local government(s) in
developing and sustaining urban infrastructure and services – in the area of budgeting planning and
participation.
7.14.2 Scope of Work
The ULG Budgeting, Planning & Participation Specialist at Federal level based at MUHDCo will
perform budgeting, planning and participation activities of the ULGDP. Specific duties and
responsibilities are:
a. Formulating and developing ULGs development strategies, plans and budgets;
b. Preparing and disseminating performance standards and indicators for the ULGs to users;
37 Note: Full details of DLIs, performance areas, performance measures, indicators, and the weightings allocated and
points applied for each measure/indicator are described in the POM.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 100 of 104
c. Providing technical support in preparation and production of ULGs Development
Plans;
d. Determining ULGs investment priorities;
e. Monitoring and evaluating performance of ULGs Development Plans
programs and projects;
f. Collecting, analyzing and storing data into useful information for end users;
g. Developing and maintaining a data bank for planning and decision making purposes;
h. Providing technical advice on matters related to planning;
i. Preparing and coordinating work plans and budgets;
j. Developing and constantly reviewing ULGs plans, projects and local government policies;
k. Monitoring and evaluating implementation of Local Government plans, programs and
projects.
l. Prepares and submits short, medium and long range projections based on the National Plan
and other pertinent plans.
m. Evaluates continuously implemented proposals and decisions both technically and
economically with a view of setbacks and subsequent corrections.
n. Ensures the collection, compilation and analysis of data and information necessary for the
establishment of future growth based on demand.
o. Compiles, analyzes and issues statistical and other reports accomplished.
p. Ensures that applicable records, economic, statistical bulletins and miscellaneous data are
maintained and updated from time to time.
q. Devices a system of control on the inflow and outflow of projects and correspondences
through a centralized channel;
r. Monitors and adjusts activities, resources and plans by monitoring, evaluation and review of
projects and meeting with clients, project management groups, key workers and stakeholders;
s. Develops solutions to project problems through desk research, meeting with clients, project
management groups, key workers and stakeholders;
t. Evaluates the effectiveness of project planning and implementation through monitoring,
evaluation and review of projects, post implementation review and dissemination of project
results;
u. Initiates actions to prevent the occurrence of any non-conformity; ensures timely completion
of corrective actions and verifies their effectiveness;
v. Initiates corrective and preventive actions on the identified actual and potential nonconformity
to strategic objectives;
w. Consolidates reports submitted to the program coordinator on strategy execution and submits
with suggestions;
x. Designs and submits proposals to the program coordinator setting key success indicators for
ULGDP staff for implementing the performance management scheme;
y. Follows up the handling of the assignments and instructions; reports on the outcome.
z. Monitoring compliance with ULGDP II POM.
aa. Coordinate that the ULG will produce and its council approve key documents including: An
Annual Budget.
bb. Perform other duties assigned by the Program Coordinator.
7.14.3 Qualifications Required
The ULG Budgeting, Planning & Participation Specialist should possess the following
qualifications/competencies:
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 101 of 104
B.Sc. degree in B.A. Degree in Economics or Management
A minimum of 8 years of experience in public finance including budgeting and experience in
similar projects and geographic areas, with 5 years of experience in local government
budgeting planning and participation.
Excellent writing and communication skills in English, excellent report writing skills.
Excellent command of computer programs and applications with significant capabilities in
computerized database, spreadsheet constructions.
Excellent change management skills and strong commitment to sharing expertise and
experience in order to develop others (helping others to achieve goals), resolving conflict
successfully.
Knowledge of the urban sector issues in Ethiopia is an advantage.
Section 5. Insert generic Section 5.
Section 6. Insert generic Section 6.
Section 7. Insert generic Section 7.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 102 of 104
7.15 TOR FOR THE URBAN PLANNER
Title: Insert generic Title
Section 1. Insert generic Section 1.
7.15.1 Objective of the assignment
The objective of the TOR is to obtain the services of a qualified urban planner who will assist in
providing support to regions and ULGs (Cities) in the use of computerized geographic information
systems (GIS) to map land areas, to overlay maps with geographic variables such as population density,
and to combine or manipulate geographic information to produce alternative plans for land use or
development and achievement of disbursement linked indicators and performance measures:
FOR ULGS: Disbursement Linked Indicator 2 (DLI 2): Institutional Performance. Land
management and urban planning: That the ULG has a valid and approved statutory structure plan and
that CIP investments are in accordance with the statutory plans (Structure and Local Plans);
FOR REGIONAL STATES:
Disbursement Linked Indicator 4 (DLI 4): Regional Capacity Building and Service Delivery
Standards: That the NRS ensures, with capacity building support of the MUDHCo that it develops
its own capacity and the capacity of the participating ULG(s) in the NRS to ensure efficient and
effective the institutional and organizational performance of urban local government(s) in
developing and sustaining urban infrastructure and services – in the area of urban planning.
7.15.2 Scope of Work
The Urban planner at Federal level based at UGCBB will plan, coordinates and facilitates ULGs urban
planning, and related activities of the ULGDP. Specific duties and responsibilities are:
a. Design, promote and administer government plans and policies affecting land use, zoning,
public utilities, community facilities, housing, and transportation.
b. Recommend approval, denial or conditional approval of proposals.
c. Determine the effects of regulatory limitations on projects.
d. Assess the feasibility of proposals and identify necessary changes.
e. Create, prepare, or requisition graphic and narrative reports on land use data, including land
area maps overlaid with geographic variables such as population density.
f. Advise planning officials on project feasibility, cost-effectiveness, regulatory conformance,
and possible alternatives.
g. Conduct field investigations, surveys and impact studies in order to compile and analyze data
on economic, social, regulatory and physical factors affecting land use.
h. Discuss with planning officials the purpose of land use projects such as transportation,
conservation, residential, commercial, industrial, and community use.
i. Keep informed about economic and legal issues involved in zoning codes, building codes, and
environmental regulations.
j. Mediate community disputes and assist in developing alternative plans and recommendations
for programs or projects.
k. Coordinate work with economic consultants and architects during the formulation of plans
and the design of large pieces of infrastructure.
l. Review and evaluate environmental impact reports pertaining to private and public planning
projects and programs.
m. Supervise and coordinate the work of urban planning technicians and technologists.
Mudhco ULGDP II POM V3 Vol II Annex 030314 Page 103 of 104
n. Investigate property availability.
o. Monitoring compliance with ULGDP II POM.
p. Coordinate that the ULG has a valid and approved statutory structure plan and that CIP
investments are in accordance with the statutory plans (Structure and Local Plans).
q. Perform other duties assigned by the Program Coordinator.
7.15.3 Qualifications Required
The Urban planner should possess the following qualifications/competencies:
The Urban planning specialist should have BSc degree or higher in Urban Planning,
Architecture town planning or Civil Engineering, Municipal Engineering, Sanitary
Engineering or related field of studies with extensive experience in designing and
implementing regulations and systems in urban development involving development at a
national level of policies and strategies for urban development and management with
particular focus on the development of urban local governments.
A minimum of 8 years’ experience in urban planning, including experience in similar projects
and geographic areas, with 5 years of experience in local government planning.
A working knowledge of GIS and CAD systems and an ability to transmit that knowledge to
others will be an advantage.
Excellent writing and communication skills in English, excellent report writing skills.
Excellent change management skills and strong commitment to sharing expertise and
experience in order to develop others (helping others to achieve goals), resolving conflict
successfully.
Knowledge of the urban sector issues in Ethiopia is an advantage.
Master's degree from an accredited planning program in urban or regional planning or a
related field, such as urban design, environmental planning, or geography is an advantage.
Section 5. Insert generic Section 5.
Section 6. Insert generic Section 6.
Section 7. Insert generic Section 7.