PPBE Quick Installation Guide - CyberPower Systems

18
Cyber Power Systems, Inc. PPBE Quick Installation Guide for Redundant Power Solutions

Transcript of PPBE Quick Installation Guide - CyberPower Systems

Cyber Power Systems, Inc.

PPBE Quick Installation Guide

for Redundant Power Solutions

Cyber Power Systems, Inc.

Index

SCENARIO-I: SERVER WITH SINGLE OR DUAL PSU – UPS X1 + RMCARD .................................................................................. 1

1-1. SCENARIO DIAGRAM ................................................................................................................................................................ 1

1-2. CONFIGURATION FOR DIFFERENT SHUTDOWN REQUIREMENTS .......................................................................................................... 2

1-2-1. To shut down server after utility grid has been lost for 10 minutes............................................................................ 2

1-2-2. To shut down server when remaining battery capacity is going to run out................................................................ 4

SCENARIO-II: SERVER WITH SINGLE OR DUAL PSU – UPS X1 + ATS ......................................................................................... 5

2-1. SCENARIO DIAGRAM ................................................................................................................................................................ 5

2-2. CONFIGURATION FOR DIFFERENT SHUTDOWN REQUIREMENTS .......................................................................................................... 6

2-2-1. To shut down server after utility grid has been lost for 10 minutes............................................................................ 6

2-2-2. To shut down server when remaining battery capacity is going to run out................................................................ 8

SCENARIO-III: SERVER WITH SINGLE OR DUAL PSU – UPS X2 + ATS ........................................................................................ 9

3-1. SCENARIO DIAGRAM ................................................................................................................................................................ 9

3-2. CONFIGURATION FOR DIFFERENT SHUTDOWN REQUIREMENTS ........................................................................................................ 10

3-2-1. To shut down server after utility grid has been lost for 10 minutes.......................................................................... 10

3-2-2. To shut down server when remaining battery capacity is going to run out.............................................................. 12

SCENARIO-IV: SERVER WITH DUAL PSU’S – UPS X2 .............................................................................................................. 13

4-1. SCENARIO DIAGRAM .............................................................................................................................................................. 13

4-2. CONFIGURATION FOR DIFFERENT SHUTDOWN REQUIREMENTS ........................................................................................................ 14

4-2-1. To shut down server after utility grid has been lost for 10 minutes.......................................................................... 14

4-2-2. To shut down server when remaining battery capacity is going to run out.............................................................. 16

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 1 -

Scenario-I: Server with Single or Dual PSU – UPS x1 + RMCARD

1-1. Scenario Diagram

(1) Connect utility power to the UPS inlet.

(2) Connect UPS outlet (critical Load) to the PSU(s) of the server.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 2 -

1-2. Configuration for different shutdown Requirements

1-2-1. To shut down server after utility grid has been lost for 10 minutes.

(1) Install PPBE Client on server. (Install PPBE Client for Virtual Machine if your server is a VMware ESXi)

(2) In ”Power >> Configuration >> Power Supply”, set “Redundant Policy” as “1” (which means server

has one power source).

(3) Assign the IP address of the UPS (e.g. the IP address of RMCard installed on the UPS) in “Device”

section.

(4) After configuration, click “Connect” to make the setting effective (when a blue “Connected” is

shown).

(5) In ”Event Action >> Settings >> Shutdown”, assign “Necessary shutdown time” to reserve enough

time for server to do graceful shutdown.

(6) Also assign the access information (login ID/PW) of host if your server is a VMware ESXi host.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 3 -

(7) In ”Event Action >> Events >> UPS”, assign a shutdown delay time (e.g. 10 mins) in the column

“Shutdown/Initiated” in the event “Utility power failure”. PPBE Client would start the countdown of

10 mins when the input power of the UPS units is down.

(8) All done.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 4 -

1-2-2. To shut down server when remaining battery capacity is going to run out.

(1) - (6) Same as 1-2-1.

(7) In ”Event Action >> Events >> UPS”, assign a shutdown delay time (ex. 10 mins) in the column

“Shutdown/Initiated” in the event “Remaining runtime will be exhausted”. PPBE would reserve a

buffer time of 2 mins (default and not adjustable).

(8) Given “Necessary shutdown time” is 2 mins, it would trigger the PPBE power event when UPS

remaining runtime is 14 mins: 10 (shutdown delay time) + 2 (necessary shutdown time) + 2 (buffer

time) = 14 mins.

And 10 mins (delay time) after PPBE power event is triggered, server would start to shut down itself.

Same as 1-2-1 above, PPBE would start the shutdown procedure when the remaining runtime of the

UPS unit is going to drain.

(9) All done.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 5 -

Scenario-II: Server with Single or Dual PSU – UPS x1 + ATS

2-1. Scenario Diagram

(1) Connect utility power to the UPS inlet and the UPS outlet to the input A of ATS.

(2) Connect utility power to the input B of ATS.

(3) The PSU(s) of the server will be connected to the outlet(s) of ATS.

(4) Set input A (from UPS) as the primary power source of ATS.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 6 -

2-2. Configuration for different shutdown Requirements

2-2-1. To shut down server after utility grid has been lost for 10 minutes.

(1) Install PPBE Client on server. (Install PPBE Client for Virtual Machine if your server is a VMware ESXi)

(2) In ”Power >> Configuration >> Power Supply”, set “Redundant Policy” as “1” (which means server

has one power source).

(3) Assign the IP address of ATS and the UPS (e.g. the IP address of RMCard installed on the UPS) in

“Device” section. Leave the second UPS address blank.

(4) After configuration, click “Connect” to make the setting effective (when a blue “Connected” is

shown).

(5) In ”Event Action >> Settings >> Shutdown”, assign “Necessary shutdown time” to reserve enough

time for server to do graceful shutdown.

(6) Also assign the access information (login ID/PW) of ESXi host if your server is a VMware ESXi.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 7 -

(7) In ”Event Action >> Events >> UPS”, assign a shutdown delay time (e.g. 10 mins) in the column

“Shutdown/Initiated” in the event “Utility power failure”. PPBE Client would start the countdown of

10 mins when the input power of the UPS units is down.

(8) All done.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 8 -

2-2-2. To shut down server when remaining battery capacity is going to run out.

(1) - (6) Same as 1-2-1.

(7) In ”Event Action >> Events >> UPS”, assign a shutdown delay time (ex. 10 mins) in the column

“Shutdown/Initiated” in the event “Remaining runtime will be exhausted”. PPBE would reserve a

buffer time of 2 mins (default and not adjustable).

(8) Given “Necessary shutdown time” is 2 mins, it would trigger the PPBE power event when UPS

remaining runtime is 14 mins: 10 (shutdown delay time) + 2 (necessary shutdown time) + 2 (buffer

time) = 14 mins.

And 10 mins (delay time) after PPBE power event is triggered, server would start to shut down itself.

Same as 1-2-1 above, PPBE would start the shutdown procedure when the remaining runtime of the

UPS unit is going to drain.

(9) All done.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 9 -

Scenario-III: Server with Single or Dual PSU – UPS x2 + ATS

3-1. Scenario Diagram

(1) Connect utility power to UPS#1 inlet and the UPS#1 outlet to the input A of ATS.

(2) Connect utility power to UPS#2 inlet and the UPS#2 outlet to the input B of ATS.

(3) The PSU(s) of the server will be connected to the outlet(s) of ATS.

(4) Set input A (from UPS#1) as the primary power source of ATS.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 10 -

3-2. Configuration for different shutdown Requirements

3-2-1. To shut down server after utility grid has been lost for 10 minutes.

(1) Install PPBE Client on server. (Install PPBE Client for Virtual Machine if your server is a VMware ESXi)

(2) In ”Power >> Configuration >> Power Supply”, set “Redundant Policy” as “1” (which means server

has one power source).

(3) Assign the IP address of ATS and both UPS (e.g. the IP address of RMCard installed on each UPS) in

“Device” section.

(4) After configuration, click “Connect” to make the setting effective (when a blue “Connected” is

shown).

(5) In ”Event Action >> Settings >> Shutdown”, assign “Necessary shutdown time” to reserve enough

time for server to do graceful shutdown.

(6) Also assign the access information (login ID/PW) of ESXi host if your server is a VMware ESXi.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 11 -

(7) In ”Event Action >> Events >> UPS”, assign a shutdown delay time (e.g. 10 mins) in the column

“Shutdown/Initiated” in the event “Utility power failure”. Please be noted that since two UPS units

are connected to the ATS, PPBE Client would start the countdown of 10 mins only when the input

power of both UPS units is down.

(8) All done.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 12 -

3-2-2. To shut down server when remaining battery capacity is going to run out.

(1) - (6) Same as 2-2-1.

(7) In ”Event Action >> Events >> UPS”, assign a shutdown delay time (ex. 10 mins) in the column

“Shutdown/Initiated” in the event “Remaining runtime will be exhausted”. PPBE would reserve a

buffer time of 2 mins (default and not adjustable).

(8) Given “Necessary shutdown time” is 2 mins, it would trigger the PPBE power event when UPS

remaining runtime is 14 mins: 10 (shutdown delay time) + 2 (necessary shutdown time) + 2 (buffer

time) = 14 mins.

And 10 mins (delay time) after PPBE power event is triggered, server would start to shut down itself.

Same as 2-2-1 above, PPBE would start the shutdown procedure only when the remaining runtime

of both UPS units is going to drain.

(9) All done.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 13 -

Scenario-IV: Server with Dual PSU’s – UPS x2

4-1. Scenario Diagram

(1) Connect utility power to UPS#1 inlet and the UPS#1 outlet to the PSU#1 of server.

(2) Connect utility power to UPS#2 inlet and the UPS#2 outlet to the PSU#2 of server.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 14 -

4-2. Configuration for different shutdown Requirements

4-2-1. To shut down server after utility grid has been lost for 10 minutes.

(1) Install PPBE Client on server. (Install PPBE Client for Virtual Machine if your server is a VMware ESXi)

(2) In ”Power >> Configuration >> Power Supply”, set “Redundant Policy” as “2 (1+1)” (which means

server has two power sources).

(3) Assign the IP address of ATS and both UPS (e.g. the IP address of RMCard installed on each UPS) in

“Device” section.

(4) After configuration, click “Connect” to make the setting effective (when a blue “Connected” is

shown).

(5) In ”Event Action >> Settings >> Shutdown”, assign “Necessary shutdown time” to reserve enough

time for server to do graceful shutdown.

(6) Also assign the access information (login ID/PW) of ESXi host if your server is a VMware ESXi.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 15 -

(7) In ”Event Action >> Events >> UPS”, assign a shutdown delay time (e.g. 10 mins) in the column

“Shutdown/Initiated” in the event “Utility power failure”. Please be noted that since two UPS units

are connected to two different PSU of the server, PPBE Client would start the countdown of 10 mins

only when the input power of both UPS units is down.

(8) All done.

PPBE Quick Installation Guide for Redundant Power Solutions

Cyber Power Systems, Inc. - 16 -

4-2-2. To shut down server when remaining battery capacity is going to run out.

(1) - (6) Same as 3-2-1.

(7) In ”Event Action >> Events >> UPS”, assign a shutdown delay time (ex. 10 mins) in the column

“Shutdown/Initiated” in the event “Remaining runtime will be exhausted”. PPBE would reserve a

buffer time of 2 mins (default and not adjustable).

(8) Given “Necessary shutdown time” is 2 mins, it would trigger the PPBE power event when UPS

remaining runtime is 14 mins: 10 (shutdown delay time) + 2 (necessary shutdown time) + 2 (buffer

time) = 14 mins.

And 10 mins (delay time) after PPBE power event is triggered, server would start to shut down itself.

Same as 3-2-1 above, PPBE would start the shutdown procedure only when the remaining runtime

of both UPS units is going to drain.

(9) All done.