POWER STRIPPING RPT - Geology Ontario

20
(705) 268-7793 41I11SEW821 63.5336 CREIGHTON 010 Mining Exploration Contractor Falconbridge Ltd Exploration P.O.BOX 40 Falconbridge Ontario PoMlSO Dear Mr Gibbins I am sending you dates and totals allocated to areas stripping and trenching was conducted. Totals are based on men and Equipment on site Less Cost Of Chain Saw and Transpertation and Accomodat ions. l Statement l (South Vermillion ClaimBlock) October 16 to 19 PO #28672,#28673,#28674,#28676 Tota^4 195 . 00 2 Statement 2 (No name Block) October 21 to 24 PO #28679#28681#28685#28686 Total^4040 . 00 3 Statement 3 (Corden Lake Claim Block) September 22to24 PO #28784, #28785,#28786 Tota^ $3180.00 4 Statement 4 (Vermilion Lake Claim Block) October 2to26 PO #28679#28660#28663#28664#28661#28662*28665 #28666,#28667,#28668,#28670,#2867 l,#28690 Total^ |14400.00 ^5 Statement'*5"( Emma Lake^Ciaitt-Block ) V October 26 1989 "^PO #28690 $60.00 6 Statement 6 Vermilion Corden Lake ClaimBlock ) /t/1 ^ October 25 to29 PO tt/8/89^2^69^28693 #28695,#28696 Thank You, * Claim Staking * Line Cutting * Power Stripping^* Trenching A Blasting Sampling * Chain Saw Work * E.M. 4 Mag Surveys ^/Exploration Access Road

Transcript of POWER STRIPPING RPT - Geology Ontario

(705) 268-7793

41I11SEW821 63.5336 CREIGHTON 010

Mining Exploration Contractor

Falconbridge Ltd ExplorationP.O.BOX 40 Falconbridge Ontario PoMlSO

Dear Mr GibbinsI am sending you dates and totals allocated to areas

stripping and trenching was conducted. Totals are based onmen and Equipment on site Less Cost Of Chain Saw andTranspertation and Accomodat ions.

l Statement l (South Vermillion ClaimBlock)

October 16 to 19 PO #28672,#28673,#28674,#28676 Tota^4 195 . 00

2 Statement 2 (No name Block)

October 21 to 24 PO #28679#28681#28685#28686 Total^4040 . 00

3 Statement 3 (Corden Lake Claim Block)

September 22to24

PO #28784, #28785,#28786 Tota^ $3180.00

4 Statement 4 (Vermilion Lake Claim Block)

October 2to26PO #28679#28660#28663#28664#28661#28662*28665

#28666,#28667,#28668,#28670,#2867 l,#28690

Total^ |14400.00

^5 Statement'*5"( Emma Lake^Ciaitt-Block ) V

October 26 1989 "^PO #28690 $60.00

6 Statement 6 Vermilion Corden Lake ClaimBlock )/t/1 ^

October 25 to29 PO tt/8/89^2^69^28693 #28695,#28696

Thank You,* Claim Staking * Line Cutting * Power Stripping^* Trenching A Blasting

Sampling * Chain Saw Work * E.M. 4 Mag Surveys ^/Exploration Access Road

C S R MAINVILLE LUMBERR.R. S2. Box 5, Site 14

CHELMSFORD, ONTARIO POM l LO

Phone 855-2577

/'D

PLEASE DETACH ANO RETURN WITH YOUR REMITTANCE

DATE- .

CHARGES AND CREDITS - :.. l-.'",* ^ t:- '

BALANCE FORWARD

BALANCE

# t/7^3-

IH JLfr

C A R MAINVILLE LUMBERPAY LAST AMOUNT

IN THIS COLUMN

EMMA LAKE CLAIM BLOCKTRENCH LOCATION

995749

50 100 m

A. TIMS

EMMA LAKE

EMMA LAKE CLAIM BLOCKTRENCH GEOLOGY

MDYK ATP8I? APH. BLK FS, HACKLY WS

MDYK ATP8aFG, LT OLIVE GRN F

LEGEND

ITUF

ILTF

NECK

LTUFFG MIX, MED GRY FS,8-10 V. LAP(WH, PNK. 8 Mbr PHYRIC)1-2 V. BLOCKS64-80 mm. GRANITOID

1*8 . 20 m- 6270*

SA 21260CREIGHTON

TOWNSHIP

SA 21261

ATP-8

ATP-IO

___ SA 21263 ITUF-ILTF

f8-10,V.LAP IWH. PNK, GRY) SIL ATP-9

21262

ILTF25-30 V. (WH, PNK, OTZITE)1-2 V. BL'OCKS-OTZITEPER. CHL ALT TH-0LOC SIL

10 ZOmA. TIMS SEPTM989

EMMA LAKE CLAIM BLOCK- TRENCH GEOLOGY

ESENDLITUF

ilTF;

NECK .^

ATP-IILTFLT GRY-GRN FSFG, MOD FOL25-30 V. PNK LAP,1-2 V. PNK BLOCKS bASUBPARAL VEIN WTH INTENSE ALT HALO

: . ' ATP-I

SA 21264CREIGHTONTOWNSHIP

SA 21267

STUFAIDWCE ?DK ORITPS. APH MTX ?MASS WTH LOC WK FOLPOSS LAP SIZ FRAG3-4 y. Po, DISS TH-0SIL

ATP-I 4

NECKZO-Z5 V, LAP LOC SER SIL TH-0

v^'HiiiiNECK

1 IGNEOUS TEX/HDMO-: ,. ; ;--:--";P 95 V.,BI

o '/GRANIOID BLOCKS. - '.. ' .;-LOC.SERICITE RICH MTX.' \ . ;

^ I'M FAULT-CONTACT WITH MASS UNIT-' : -' "

'i(A:#ff.'- ^•'•^• r̂ W^^- 'X^-i'-'-Jip - ' '-- '' '••'•

..: ' -ATP-I3

LOC 3-4 cm BANDS OF SER ALT MTX, CpRESPONDS TO STRONG FOL.SIL TH-0.

A. TIMS SEPTSI989

V -'.

BALFOUR TWI

s. ©j s. (p

635OI6347- — -4- - -

*S '55361159361'"

^363l593U|59365 S

®|s (g

59403 '55335

. TOWNSHIP' "" V

or

s^-fts"-?59.4B W10

""

CREIGHTONDISTRICT of SUDBURY

SUDBURY MINING

4IM1SEM21 63.5336 CREIGHTON 020

C&R M AINVILLE LUMBERR.R. fl2, Box 5, Site 14

CHELMSFORD, ONTARIO POM ILO

Phone 855-2577

9.6.J .M . (C J, pt M i.

PLEA St DETACH A ND RETURN WITH Y OUR REMITTANCE

DATE CHARGES AND CREDITS ' ; : :- .i'^;^ - : j

BALANCE FORWARD

BALANCE

C&R MAINVILLE LUMBERPAY LAST AMOUNT IN THIS COLUMN

MOORE LAKE CLAIM BLOCK

CREIGHTON, ' TOWNSHIP

MOORE LAKE ROAD

ATP-5

NECKBF- WH ws.BLK-GRV FS.FG-M6MTX.MASSIVE, CRYSTALLINEOT2.FP-95'/.FRACT'JRED TEXTURE TK-0SILICIFIED

ATP-7NECK . . FG-MG, MASSIVE BOUDIN VIM 1 15 cm J

NECK "VFG.SALT a PEPPER TEXTURE

LEGEND

ATP-I

l INTERMEDIATE TUFF

NECK

TRENCHXS AMPLE

o 10SCALE 6500

ZOm

A. TIMS SEPTX89

MOORE LAKE CLAIM BLOCK

CREIGHTON TOWNSHIP

ITUF

ITUFMD CRN FS,TN-BRWN WS, 02VMOD FOL WITH GENTLE FOLDINGS-FOLDED OZV

SA 31255

ITUF-ILTF- DK GRN WS. BLK-GRY FS, 15-25 y. LAP. (GRAN.SIL.ANDJ 2-tO mm

ATP-I LEGENDITUF-ILTF 20-30 y. LAP CHL

-m-

.A 31256

ATP-4

INTERMEDIATE TUFF

ATP-I TRENCHXSAMPLE *

10 -" 20*

SCALE 1800

MOORE LAKE ROAD;"

A. TIMS S EPTN89

-*— -J-.,

BALFOUR TWR• .....'." T'-MfV..' - - "

S. ) S. (P

635016347-- __ _ l ^^ _

593A15W3T©H.R O

5936/US9365

593061^0758

S :

533221

5933815^35S404J59396

55038155037

s (e),282471OATJ550AS

DISTRICT of SUDBURY

41M1SETO21 63.5336 CREIGHTON 030

MAINVILLE LUMBER COMPANY LIMITEDR.R. #2. Box 5, Site 14

CHELMSFORD. ONTARIO POM ILOPhone 855-2577

SOLD BY CASH C.O.O. CHARGE ON ACCT. MOSE.RETD. PAID OUT

QTY. DESCRIPTION

RECEIVED BY

PRICE

TAX

TOTAL

AMOUNT

ri

4797 All claims and returned goods MUST be accompanied by this bill.

FORM 610-3

o

MAINVILLE LUMBER COMPANY LIMITEDR.R. #2. Box 5. Site 14

CHELMSFORD, ONTARIO POM ILOPhone 855-2577

CUSTOMER'S ORDER NO.

SOLD BY CASH C.OD. CHARGE l ON ACCT. MDSE.RETD. PAID OUT

PRICE

TAX

AMOUNT

RECEIVED BY

TOTAL

478 All claims and returned goods MUST be accompanied by this bill.

FORM 6 10-3

MAINVILLE LUMBER COMPANY LIMITEDR.R. #2. Box 5. Site 14

CHELMSFORD. ONTARIO POM l LOPhone 855-2577

CUSTOMER'S ORDER NO.

.——

SOLD BY .CASH MDSE.RETD.

RECEIVED GV

PAID OUT

PRICE

TAX

TOTAL

AMOUNT

4784 All claims and returned goods MUST be accompanied by this bill.

FORM 610-3

(TV

MAINVILLE LUMBER COMPANY LIMITEDR.R. #2. Box 5. Site 14

CHELMSFORD, ONTARIO POM l LOPhone 055-2577

SOLO BY

QTY. AMOUNT

PAID OUT

TAX

J.-..

RECEIVED BY

TOTAL

4762 All claims and returned goods MUST be accompanied by this b ill.

/ACTS/ FORM 610-3

ERRINGTON GRID CLAIM BLOCKTRENCH GEOLOGY

APT24

LEGEND

INTERMEDIATE TUFF - Black

INTER. LAPILLI TUFF - Black

ATP22 TRENCH/SAMPLE l*.

APTI6

SCALE 1:500^———*z

5 O 5 10 15 m.

A.TBAS-OCT/69

•fil/-

ERRINGTON GRID CLAIM BLOCK

TRENCH GEOLOGY

APTZI

LEGEND

INTERMEDIATE TUFF - Block

INTER. LAPILLI TUF*F - Blqck

SCALE hSOOl l l l

5 O 5 10 IS m.

A. TIMS - OCT/B3

BALFOUR TWP.

6351(6348

S. (g)| S. (P635O|6347- — -4- - -

S. ©l SJ(P634516346

s. VE/, s.6314 '6316575591575

593C6I60758 60757

59403J5S335 59 S (P) l S f?

59381 593̂ |^435S3^ '^3^x n^ ^^-hv — -L .

' I WtftfwQt l //^/*-) I7xi

TOWNSHIP

_ iM.ro. i "r\c. /r\ i -s^'hr- —**;- ^—

DISTRICT of SUDBURY

SUDBURY-MINING

' Ministry of Northern Development and Mines

Ontario

41M1SEM21 63.5336 CREIGHTON 300

Mining Act Report of WorkName and Address of Recorded Holder

/-X**

- .

*i JProspector's Licence No.

Telephone No.

Summary of Distribution of Credits and Work PerformanceMining Divisio Mining Claim

Prefix NumberWork

Days Cr.Mining Claim

Prefix NumberWork

Days Cr.Mining Claim

Prefix NumberWork

Days Cr.Township or Area XI J j

Total Assessment Credits Claimed ^5745" 20

Type of Work Performed (Check one only)

D Manual Work.—.Shaft Sinking Drifting or other LJ Lateral Work

j — | Mechanical equipment

rr-yPower Stripping other than Manual Lv (maximum credit allowed - 100 days

per claim) O Diamond or other Core drilling

QCore Specimens

IH 9957HS Z.&

995-719 •2.0

995116

6 19

j 11575-^j 915755j 99575^ 2*9

•2.0

Dates when work was performed

From: 3*?pf ^ k\ l To: Oci. 76 /^

Total No. of Days Performed

M&HTotal No. of Days Claimedsoq Total No. of Days to be Claimed at a

Future Date

All the work was performed on Mining Claim(s): Indicate no. of days performed on each claim. * (See note No. 1 on reverse side)

Mining Claim No. of Days Mining Claim No. of Days

Mining Claim

9*157 MSMining Claim

No. of Days

SoNo. of Days

Mining Claim No. of Days

6wnzJ35MMining Claim No. of Days

Mining Claim

Mining Claim

No. of Days

No. of Days

Mining Claim

Mining Claim

No. of Days

No. of Days

Required Information eg. type of equipment, Names, Addresses, etc. (See Table on reverse side) If space below is insufficient, attach schedules with required Information and location sketches

of W.r-k: ?ovoc. S*TJA usMic, ^klcJAw W^W W

.* Box 5"L*rcWe.

PoM ILO MftJiwI

simvevASSESSMENT FILES

MAY 16 1990

R E C E l ViED**4—AMI——*V*oK

12Ml \

APR l 4 1990

Certification of Beneficial Interest * (See Note No. 2 on reverse side)l hereby certify that, at the time the work was performed, the claims covered In this report of work were recorded in (tie current recorded holder's name or held under a beneficial interest by the current recorded holder.

t (Signature)

Certification Verifying Report of Workl hereby certify that l have a personal and intimate knowledge of the facts set forth In the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.Name and Address of Pereon Certifying

For Office Use OnlyWork Assignments ReceivAcLSta

^ MINING DIV.RECEIVED

APR 2 4 1990A. M. P.M.

Ministry ofNorthern Developmentand Mines

Ontario

Instructions- Please type or print.- For each type ol work performed, a separate Report of Work should

be completed.- For Gee-technical work, use form no. 1362 "Report of Work

(Geological, Geophysical, Geochemical") and form no. B7B for Expenditures.

- Refer to Sections 76 and 77, the Mining Act for assessment work requirements and the reverse side of this form for table of information.

Mining Act Report of WorkName and Address of Recorded Holder Prospector's Licence No.

Telephone No.

Summary of Distribution of Credits and Work PerformanceMining Division

tftSDBuAYTownship or Area j

Cret4h.TcrtTotal Assea^rnent Credits Claimed

2.1ZType of Work Performed (Check one only)

Q Manual Work. — . Shaft Sinking Drifting or other LJ Lateral Work

l | Mechanical equipment

VfPower Stripping other than Manual Idnmaximum credit allowed - 100 days

per claim)l | Diamond or other Core drilling

Q Core Specimens

Mining ClaimPrefix

551531S5

Number

^57^3nw/9137 ttft si rt7757*7f9S7ft11573*9115790

Work Days Cr.

JlbSu.fMJ?UfM.fftfUfttf

Mining ClaimPrefix Number

Work Days Cr.

Mining ClaimPrefix Number

Work Days Cr.

Dates when work was performed From: 5#oV. *Z 7 39 l To:

.

J | 7 f?

Total No. of Days Performed Total No. of Days Claimed•Z l

Total No. of Days to be Claimed at a Future Date

All the work was performed on Mining Claim(s): Indicate no. of days performed on each claim. * (See note No. 1 on reverse side)

Mining Claim No. of Days Mining Claim No. of Days

Mining Claim No. of Days

59S57S3|^2-Mining Claim No. of Days

Mining Claim

Mining Claim

No. of Days

No. of Days

Mining Claim

Mining Claim

No. of Days

No. of Days

Mining Claim

Mining Claim

No. of Days

No. of Days

Required Information eg. type of equipment, Names If space below is insufficient, attach schedules with requir

R^^SL, Box 5") 3HeCWlms^ord J OflrVxvto

Pott \uo

CW**\*A"V

3(xtr*

Certification of Beneficial Interest * (See Note No. 2

,, Addresses, etc. (See Table on reverse side) ed information and location sketches

l . -v*JLYVi^Otvs./ UtYViki*^

flNTMHO OBOUOOlCAt SUKVEY f, p p ^' Q ^ASSESSfVENT FILES RECOHUC"

OFPICP

WAY 16 1990 m 2 41990

'RECEIVED ^ ,,1\*\ n o v l\^e BaoiptA-^2^ —— - — ~-

-\^. OkWfXf&^S Q^ sx'&ftvl^.

on reverse side) f/ //j1 hereby certify that, at the time the work was performed, the claims covered in this report Date * t , Recorded Holder of/ Ajrfnt (Signature) of work were recorded in the current recorded holder's name or held under a beneficial interest i fl f 1 1/ /sj,~. ^OK—d^n by the current recorded holder. /^Idfe-h ' 7 f 7 U Jf^^Y*^'

Certification Verifying Report of Work1 hereby certify that 1 have a personal and intimate knowledge of the facts set forth In the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.Name and Address of Person Certifying

T

C

?*x to./Z/eat&Ue AI&JO fb/t/fe ,,elephone No. Date^ , Caitlflajd^Mi (Slgnt^M^r

For Office Use OnlyWork Assignments

5".Received Stamp

7BH ISfl/MI

Ministry ofNorthern Developmentand Mines

Ontario

9007.

Instructions- Please type or print.- For each type of work performed, a separate Report of Work should

be completed.- For Geo-technical work, use form no. 1362 "Report of Work

(Geological. Geophysical, Geochemical") and form no. 878 for Expenditures.

- Refer to Sections 76 and 77, the Mining Act for assessment work requirements and the reverse side of this form for table of Information.

Mining Act Report of WorkName and Address of Recorded Holder Prospector's Licence No.

Telephone No.

Summary of Distribution of Credits and Work PerformanceMining Division

^udiiuu^/Township or Area '

GEiaWerkTotal Assessment Credits Claimed

^bc da^Type of Work Performed ( (Check one only)

Q Manual Work. — . Shaft Sinking Drifting or other D Lateral Work

Q Mechanical equipment

k-vPower Stripping other than Manual uQ (maximum credit allowed - 100 days ' per claim) l l Diamond or other Core drilling

Q Core Specimens

Mining ClaimPrefix

55

Number

IQS/^q^7T

Work Days Cr.

looleo

Mining ClaimPrefix Number

Work Days Cr.

Mining ClaimPrefix Number

Work Days Cr.

Dates when work was performed

From: O To:I?/'Total No. of Days Performed Total No. of Days Claimed Total No. of Days to be Claimed at a

Future Date /7/1

All the work was performed on Mining Claim(s): Indicate no. of days performed on each claim. * (See note No. 1 on reverse side)

Mining Claim No. of Days Mining Claim No. of Days

Mining Claim

5W^Mining Claim

No. of Days

No. of Days

Mining Claim

Mining Claim

No. of Days

No. of Days

Mining Claim

Mining Claim

No. of Days

No. of Days

Mining Claim

Mining Claim

No. of Days

No. of Days

Required Information eg. type of equipment, Names, Addresses, etc. (See Table on reve If space below is insufficient, attach schedules with required information and location sketches

o, *S Wdcwjr l D O

uw'He LIM^WC\H

aunvevASSESSMENT FILES

MAY 161990

R E

APR l * 1990

Certification of Beneficial Interest * (See Note No. 2 on reverse side) IL—/Ll hereby certify that, at the time the work was performed, the claims covered in this report of work were recorded in the current recorded holder's name or held under a beneficial interest by the current recorded holder.

nt (Signature)

Certification Verifying Report of Workl hereby certify that l have a personal and Intimate knowledge of the facts set forth In the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.Name and Address of Person Certifying