NHA Standard Housing Models - DESIGN MANUAL

88

Transcript of NHA Standard Housing Models - DESIGN MANUAL

2

3

NHA Standard Housing Models

DESIGN MANUAL

FIRST EDITION

Published By:

NATIONAL HOUSING AUTHORITY HOUSING TECHNOLOGY DEVELOPMENT OFFICE

2017

4

NHA Standard Housing Models Manual

This first edition of the NHA Standard Housing Models Manual serves the following

purposes:

An official document:

The manual serves as an official document to which NHA officials and

stakeholders can refer to for information about agency-approved standard

housing models. As such, the existence of the manual indicates that other

housing models, those which are not included in the manual, are not official

and cannot be implemented for housing projects being undertaken by the

NHA.

A planning tool in the housing production and delivery process:

The manual compiles information about all standard housing models that are

relevant in the planning stage of a housing project so that planners and

stakeholders can easily review and compare available options. Furthermore, the

manual communicates the design goals and strategies behind the housing

models, clarifying why models are designed the way they are. In effect, the

manual serves as a guide for selecting housing models that are well-suited to

project requirements.

The complete working drawings of the housing models herein included are

available upon request from the HTDO.

5

A C K N O W L E D G M E N T

The National Housing Authority (NHA) expresses its gratitude to the following

agencies and individuals who in one way or another have contributed in the

compilation and preparation of this DESIGN MANUAL:

The Bureau of Design, Department of Public Works and Highways (DPWH)

for their inputs and recommendations in the structural aspects of the

housing design to make it more resilient.

Build Change for their unselfish efforts and support in the structural

aspects especially in the details and designs which can be adopted in

the housing model.

NHA Technical Staff who are directly involved in the implementation and

who shared their invaluable views and insights in the constructability of

the housing design.

Our partners in the building industry and other individuals who have

provided support in the preparation of this Manual.

6

FOREWORD

Through the years, housing designs of the National Housing Authority

(NHA) have evolved brought about by the many changes and challenges and

effects of climate change. The improvements were made to provide better and

quality housing and to meet the demands of the end users especially the lowest

30% of the income population. Conceptualization, consultation and

development process were undertaken to come up with standard housing

designs.

It is with great pleasure that the first edition of the Design Manual has

been completed and realized during this term through the efforts exerted by the

team from the Housing Technology Development Office (HTDO). This serves as

another milestone of NHA.

The purpose of this Design Manual is to provide a reference to designers

and builders, students and professionals, and to all our partners in the housing

industry.

It covers the various NHA housing models with design parameters and

the typical construction details illustrated and simplified for better

understanding. Best practices in the implementation of the housing projects are

also considered.

7

I am confident that through our

concerted efforts, we will be able to achieve our

goals in providing safe, affordable, resilient and

decent housing especially to the marginalized

sector of our society.

It is the desire of NHA that this Manual

serve its purpose well. If there is any detail or

information which has been inadvertently

overlooked, necessary corrections shall be

made at best possible opportunity.

MARCELINO P. ESCALADA, JR.

General Manager

National Housing Authority

8

MESSAGE

I congratulate the NHA’s Housing Technology Development Office

(HTDO) under the leadership of its Department Manager, Ar. Ma. Benita O.

Regala, for the crafting and release of this NHA Design Manual.

The Manual will definitely be a useful tool among all NHA technical

practitioners to enable them to plan and develop sustainable, disaster-resilient

housing for our homeless and underprivileged citizens who are in need of much-

needed shelter and other housing-related components. This Manual is also

significant, since this could also be a source of information among other external

stakeholders, including the public in general, of the types of housing being

implemented by NHA under its various programs.

It is my sincere hope that this will be a continuing effort of NHA to strive

excellence and pursue innovation housing technologies towards a more

responsive and affordable housing for the poor.

9

Again, congratulations and thank you to

the management and staff of HTDO, and to all who

contributed for making this Manual a workable

guide in NHA and practitioners in the field of

housing.

Assistant General Manager

National Housing Authority

10

MESSAGE FROM THE AUTHOR

A design manual had been conceptualized way back in 2010 when the

First Design Conference on Gender Mainstreaming on Housing Design was held

on February 16-17,2010. Participants came from all sectors in the industry and

was spearheaded by the Housing Technology Development Office (HTDO),

under the sponsorship of the Gender and Development Committee headed at

the time by Ms. Lorna M. Seraspe. The objective of the conference was to

determine gender sensitive parameters for housing design. Three entry points

were considered, such as the following: Access to Housing, Participation and

Consultation, and Housing Design, the latter being the focus of said conference.

Today six years later, the proposed manual had evolved into a disaster

resilient design manual for the socialized sector in view of the 2013 Typhoon

Yolanda, the strongest typhoon ever to hit land which happened in the Visayan

Region. A Technical Working Group was organized by the NHA through the

HTDO’s initiative and again multi-stakeholder design consultations were held in

November and December, 2013. At the end of the conference, parameters for

disaster resilience for housing was determined and agreed on.

11

This design manual brings home the point that

housing design and construction details matter to

achieve resiliency. It is hoped that with the publication

of this document, both our technical and non-technical

employees will be able to better understand the

principles of good construction. Other end-users and the

public in general is also envisioned to benefit from these

design guidelines.

Let me thank my HTDO Team for this valuable

work that has been done as our legacy to future

generations of planners and designers, and to the

housing sector as well. Cheers and Mabuhay!

AR. MARIA BENITA O. REGALA, FUAP, ASEAN ARCHITECT

Department Manager, HTDO

12

NATIONAL HOUSING AUTHORITY

VISION

By 2019, NHA would have provided 50% of the housing needs for

homeless low-income families (based on the 2011 census) primarily those living in

waterways, danger areas, and government infrastructure project sites in Metro

Manila and all regions nationwide.

MISSION

We provide decent, adequate, and affordable housing to low-income

families, ensure the provision of community facilities, utilities, and access to social

services and economic opportunities.

13

14

15

NHA MANDATE

The National Housing Authority (NHA) is the sole national agency

mandated to engage in housing production for low income families. It traces its

roots to the People's Homesite Corporation (PHC), the first government housing

agency established on 14 October 1938 and to the National Housing

Commission (NHC) which was created seven years later, on 17 September 1945.

These two agencies, the PHC and the NHC, were eventually merged on 4

October 1947 into the People's Homesite and Housing Corporation (PHHC).

In the years that followed, six(6) more housing agencies were created to

respond to separate and distinct shelter requirements, namely: the Presidential

Assistant on Housing and Resettlement Agency (PAHRA); the Tondo Foreshore

Development Authority (TFDA); the Central Institute for the Training and

Relocation of Urban Squatters (CITRUS); the Presidential Committee for Housing

and Urban Resettlement (PRECHUR); the Sapang Palay Development

Committee (SPDC); the Inter-Agency task Force to Undertake the Relocation of

Families in Barrio Nabacaan, Villanueva, Misamis Oriental. Eventually, on 15

October 1975, the National Housing Authority was organized as a government-

owned and-controlled corporation, by virtue of Presidential Decree No. 757

dated 31 July 1975. All other housing agencies were abolished by the said

decree. The NHA took over and integrated the functions of the abolished

agencies - the PHHC and the six (6) other housing agencies. The creation of the

NHA is the second attempt of the government to integrate all housing efforts

under a single agency, twenty-eight years after the merger under the PHHC.

16

Three years later, the Ministry of Human Settlements (MHS) was created in

1978. The Ministry adopted the holistic approach to housing. The NHA was

placed as an attached agency to the MHS.

On 26 March 1986, Executive Order No. 10 was issued placing the NHA

as well as the other agencies attached to the abolished MHS, under the

administrative supervision of the office of the President. Subsequently, Executive

Order No. 90 was issued on 17 December 1986, rationalizing the housing

structure in the government along lines of specialization and concentration.

EO 90 identified the key housing agencies to implement the National

Shelter Program and defined their respective mandates. The NHA was

mandated to be the sole government agency to engage in housing

production. Under the said Executive Order, NHA was placed under the policy

and program supervision of the Housing and Urban Development Coordinating

Council (HUDCC), the umbrella agency for shelter charged with the main

function of coordinating the activities of various government housing agencies

engaged in production, finance and regulation.

Executive Order No. 20 on 28 May 2001 reaffirmed mass housing as a

centerpiece program in the poverty alleviation efforts of government. Said EO

likewise reaffirmed HUDCC's administrative supervision over the housing

agencies including the NHA.

17

BACKGROUND OF THE MANUAL

In 1998, NHA housing design prototypes were compiled as a Manual. This

is the result of a standardization effort to ensure that housing units produced by

the Agency were of good quality. Existing housing structures at the time were

reviewed and analyzed. Cost-efficiency, code compliance, functionality, and

cultural appropriateness were examined. Through the study, specific design and

construction strategies for adaptability and cost-effectiveness were formulated.

Having these strategies in hand, housing prototypes were designed, the plans

and details of which comprised the first edition of the manual.

Since the first manual, product requirements have changed significantly

so, such that the plans of the prototypes in the said manual have ceased to be

applicable to NHA housing projects. As new requirements emerged, some

aspects of the prototypes were adjusted to suit. In other cases, new building

prototypes were developed altogether. These new prototypes, or models, being

the applicable and relevant solutions at present, comprise this first edition of the

manual.

18

Memorandum Circular No. 2016 – 098

SUBJECT: NHA Standard Housing Models Design Manual

Consistent with the National Housing Authority’s continuing effort in “Providing

adequate, safe, and affordable housing and ensure the availability of basic services,

community facilities and access to social and economic opportunities to homeless

low-income families”, as stated in its commitment to national development, the

attached NHA Standard Housing Models Design Manual (Design Manual, for brevity)

is hereby adopted.

1.0 BACKGROUND AND PURPOSE

1.1 Among the mandated functions of the Housing Technology Development Office

(HTDO) is to “undertake continuous improvement of the Authority’s project

development process for infrastructure projects to ensure responsiveness to

environmental, institution and social changes” primarily through the

“development of design standards of housing and building units”1.

1.2 In 1998, the Task Force on Housing and Project Development (predecessor of

HTDO), compiled in a manual the NHA housing prototypes with detailed design

and quantity take-offs. The compilation was a result of the standardization effort to

ensure good quality in the housing units being produced by the NHA through

designs aimed to achieve adaptability and cost-effectiveness.

1.3 Typhoon Yolanda in late 2013 has prompted the review and revision of NHA

planning standards brought about by the need for more suitable sites and resilient

houses as a response to the so-called “new normal” in climate, which constitutes

stronger typhoons, severe droughts, and more and heavier rains resulting in

destructive floods and landslides.

1.4 With such new requirements, more particularly the need for disaster resilient

homes for the sector most vulnerable to the effects of disasters, there was a need

to also evolve the designs of housing models.

1As stated in NHA Office Order No. 5131 dated 08 March 2002 which reconstituted and redefined functions of

then Task Force on Housing and Project Development into what is now the Technical Services Group (TSG) with two sub-offices – HTDO and POSSO

19

1.5 Spearheaded by the HTDO, this was carried out through processes of multi-

sectoral consultation and design processes adopting upgraded structural

parameters as approved by the Department of Public Works and Highways

(DPWH) while still considering affordability.

1.6 Moreover, details specifying housing design standards from a number of NHA

memorandum circulars were incorporated into the models. The most recent

provisions are adopted in cases where specific details vary across different

programs and projects.

1.7 Hence, this edition of the NHA Design Manual is issued incorporating the new

features and presenting the new models of single story housing units to be

implemented in our resettlement projects.

1.8 The purpose of the Design Manual is to serve as reference on standard

construction details and quantity take-offs of single story house models for use by

various stakeholders, but more so for planners and implementers of NHA

resettlement projects.

2.0 SCOPE AND COVERAGE

2.1 The standards and details contained in the Design Manual shall cover all current

and future resettlement projects that will adopt single story house typologies

either without loft, loftable, or lofted.

2.2 The Design Manual consists of the legal bases, design process, house construction

details, and the description, drawings and quantity take-offs of each of these

housing models:

2.2.1 21 Square Meter Duplex

2.2.2 22 Square Meter Rowhouse (Loftable and With Loft)

2.2.3 26 Square Meter Rowhouse

2.2.4 28.4 Square Meter Rowhouse

2.2.5 33 Square Meter Rowhouse with Loft and Store Space

2.2.6 22 Square Meter Single Detached

22

RELATED DOCUMENTS

23

RELATED DOCUMENTS

24

RELATED DOCUMENTS

25

RELATED DOCUMENTS

26

27

DESIGN PHILOSOPHY

Improvement of the design of the NHA standard housing models was

guided by one overarching design philosophy, that is, Sustainable Development

(SD). As such, the design goals, objectives, and indicators were derived from this

philosophy.

SD is the national agenda for development, which was adapted in

support of the same international agenda . As the UN states,

Thus, given that housing makes for a large part of national

development, SD was identified to dictate the course of this housing design

improvement effort.

Throughout the design process, SD was observed with the understanding

that it is “development that meets the needs of the present without

compromising the ability of future generations to meet their own needs (3)”

28

DESIGN GOALS

In setting design goals, SD was considered in its three aspects — the

social, the environmental, and the economic (2). As much as possible,

“integrated” design goals were set, that is, the accomplishment of a goal should

in most cases support the accomplishment of another goal.

Social Sustainability

A housing development is socially sustainable when it empowers, includes, and

continuously provides for the needs of people, affording them a healthy and

fulfilling life.

1 Historically, a barrier-free unit (i.e., a house that fully complies with all the requirements under BP 344) costs more

than a non-barrier-free unit. Thus, designing for “accessibility” as described herein, was limited to items that would

pose insignificant increases in costs. Focus was given to adequate space allowances so that, in case the need

arises, the house could be easily converted into a barrier-free facility.

29

30

Environmental Sustainability

A housing development is environmentally sustainable when it uses

natural resources to sustain human life without destroying or depleting these

resources permanently.

31

Economic Sustainability

A housing development is economically sustainable when it is cost-

efficient and self-sustaining.

32

33

DESIGN PROCESS

34

DESIGN OBJECTIVES AND INDICATORS Guided by the different ways in which the purpose of a house may be

considered, design objectives were derived. The design objectives and

Indicators were defined with the following assumptions:

35

The indicators describe provisions that increase probable success in

achieving the design objectives. These indicators were not intended to serve as

an exhaustive compilation of ALL design requirements for dwellings. All

applicable code requirements, covered by the indicators herein or otherwise,

were still observed.

In the process of designing this framework, some design objectives were

found to contribute to the achievement of some design goals while possibly

hampering the achievement of other design goals. For example, achievement

of the design objective, “materials used for the structure are inherently resistant

to the effects of earthquakes and typhoons,” may result to disaster-resilience

and low maintenance, but may not result to low initial cost. Thus, in such cases,

the NHA design team had to consider satisfying design goals in varying degrees;

that is, although a strategy may not completely satisfy a certain design goal, it

must neither completely prevent that design goal from being achieved.

DESIGN CHECKLIST This design process was enabled and applied through a design checklist.

The design checklist was created to aid NHA designers in ensuring that each

and every design objective was considered and reflected in the design of

housing models.

36

37

The Design Challenge

Shelter design greatly influences the habits and lifestyle patterns of

people and the way that they relate to the built environment and nature. The

design challenge confronting planners and builders today is how to address

climate change adaptation and gender issues, and how to find ways to

transform their inputs into concrete and viable housing solutions. Another

challenge is the problem of providing livable and sustainable housing vis-a-vis

construction costs and affordability. Production and construction costs have

been constantly going up while family incomes have not proportionately

increased over the years, making it more difficult to provide quality affordable

shelter for the low-income sector. This design manual illustrates how NHA

addresses such challenges given the technical and financial issues confronting

housing construction for the low income.

Design Standards

Batas Pambansa 220 ( BP 220) a law that was passed in 1982,

authorizing the Housing and Land Use Regulatory Board to establish and

promulgate two levels of standards and technical requirements for the

development of economic and socialized housing projects in urban and rural

areas, provided a framework for making available adequate housing for

average and low-income earners.

In 2008, revisions were made to the Implementing Rules and Regulations

(IRR) of BP 220. Such changes include the provision of the minimum lot size of 28

square meters, and the minimum floor area for a socialized housing unit at 18

square meters. Land use ratio for buildable and non-buildable areas is set at

70%-30% ratio.

NHA for its part, improved its own design standards in terms of lot and

housing unit sizes, as well as in the applicable land uses. The most recently

approved guideline for site development is now set at 60% saleable (residential,

commercial and industrial, institutional) and 40% non-saleable (open space

community facilities, easements, road networks and footpaths).

38

After Typhoon Yolanda, it has become more evident that typhoon

patterns and flooding levels have become unpredictable. Hence, the need for

disaster resilient parameters. The NHA conducted its own design conference to

arrive at these standards to address resiliency for housing. These parameters are

defined in page 134 of this manual.

In coming up with the housing models, the following principles were

considered :

1. Social and cultural: Behavioral patterns of people must be carefully

studied based on previous experience and historical data. Design should

consider acceptability and cultural adaptability of any housing

development to the specific target market.

2. Physical Aspect :

a. The exterior design of the building can never be disassociated from its

interiors. The roof, columns and beams, walls and floors, window and

door openings provide the enclosure to the structure The conscious

planning of each of the exterior parts directly affect the conditions

inside the house such as areas for sleeping, living, dining, kitchen,

laundry and toilet facilities. Further, natural light and ventilation should

be adequately provided to save on energy costs.

b. Furniture layout inside the buildings and partition walls should be

planned in same manner with thought on the layout of fixtures such as

cabinets, beds and even storage for cleaning tools and equipment.

c. Lighting and convenience outlets must also be strategically located for

easy access within the housing units, but with consideration to the

safety of the children.

d. Careful placement of spaces in relation to the solar and wind

orientation and their dimensions all relate to the indoor quality of the

house.

39

3. Maintenance and Sustainability : Project design and development must

consider the aspect of maintenance to sustain the architectural and

structural integrity of the buildings and the environmental quality of

neighborhoods.

4. The planning, architectural lay-outing and utilization of spaces within and

surrounding such buildings or structures must be well coordinated with

the design of the utilities inside and outside of the structures. As an

example, the location of electrical posts and septic tanks was

considered in the setback requirements.

5. Budget consideration : The sector being served by the NHA belongs to

the lowest 30% of the income population, so that affordability levels is of

utmost importance. The housing package which include the house and

lot models must meet the required social, cultural and physical aspects

within the financial scheme for each of the programs for

implementation.

ROWHOUSE

The one-story rowhouse model has been the most typical of all the

models constructed by the NHA in most of its resettlement projects all over the

country. At the onset of the Northrail Relocation and Resettlement Program, this

model was offered to project beneficiaries under the Community Association

Initiated Approach or CAIAP. The model is a 20 square meter shell unit on a 32-

40 square meter lot, with provision for one toilet and bath and one kitchen

counter. Beneficiaries were left to improve on their unit and on the provision of

partition walls and architectural finishes. To better serve the needs of

households, and based on a wish list submitted by community representatives

(FGD Gender and Development Technical Working Group from 2010 to 2012),

the following house models were designed by the NHA through the HTDO.

40

Page 50

Page 62

Page 72

41

Page 90

Page 100

Page 110

42

I. CONCRETE WORKS

1.1 Footing

A. Column Footing Concrete:

24 MPA @ 28 days;

17.3 MPA @ 28 days;

Reinforcing Bars

Fy = 415 MPA - 16mm Ø

Fy = 275 MPA - 12mm Ø

0.80m x 0.80m x

0.225m with 5-12mm.

RSB both ways

B. Wall Footing

1.WF 1-04.0m x 0.225

with 2-12mmØ cont.

RSB with 10mmØ RSB

lateral ties @ 300mm

2. WF 2-0.30m x 0.225m

with 2-12mmØ cont.

RSB with 10mmØ RSB

lateral ties @ 300mm

1.2 Beams and Columns

A. Loft Floor Beams Rafter -

Beam as shown on the

Structural Sheet

B. COLUMNS-0.25m x 0.175

m w/ 4-16mmØ vertical bar

with 10mmØ lateral ties, 1 @

50mm; 4 @ 100mm. Rest @

ITEM/DESCRIPTION SPECIFICATION

TECHNICAL SPECIFICATIONS FOR ONE-STOREY DWELLING UNITS (WITH LOFT

AND WITHOUT LOFT)

43

1.3 CHB Wall

A. Firewall/Party Walls Fire resistant as required by

BP 220, National Building

Code and Bureau of Fire Pro-

tection Code; 150mm. Thk

CHB with 10mm Ø horizontal

bar @ every 3rd layer and

B. Exterior Wall 100mm thk. CHB with

10mmØ vert. bar @0.60m

o.c. and 10mmØ hor. Bar @

C. Interior Wall 100mm thk. CHB with

10mmØ vert bar @ 0.60m

o.c. and 10mmØ horizontal

bar @ every 3rd layer of CHB

1.4 Flooring 100mm thk. Concrete floor

slab with 10mmØ tempera-

ture bars spaced @ 0.40m

1.5 Kitchen Countertop 100mm thk. Concrete coun-

tertop with 10mmØ bar

spaced @ 0.25m o.c.

1.6 Concrete Gutter 75mm thk. Concrete gutter

with 10mmØ cont. bar with

10mmØ lateral ties @ 0.40m

o.c.; with waterproofing

44

II. TINSMITHRY AND STEEL WORKS

2.1 Roofing 0.505mm thk. Or GA #26 corru-

gated G.I. roofing with 5mmØ

J-Bolt

2.2 Purlins 150mm x 65mm x 20mm 2.0mm

Lip channel purlins on inclined

R.C. Beam @ 0.70 m.o.c.

2.3 Sag Rods 12mmØ Sag rods @ midspan

2.4 Structural Steel and Reinforcing

Bars

Structural steel and reinforcing

bars shall be of standard quali-

ty and as specified under de-

sign criteria sheet

III. CARPENTRY (For dwelling units with loft)

3/4" thk. Ordinary plywood

flooring

3.1 Loft Flooring

3.2 Floor Joist with bridging 50mm x 150mm wooden floor

joist (tanguile, kiln dried)

spaced @ 0.40m o.c. with

50mm x 75mm bridging at mid-

3.3 Stair and Handrail A. 50 x 150 mm wooden tread

with 50 x 150mm stringer/

support on both sides

B. 50 x 75mm wooden handrail

with 50mm x 50mm vertical

and horizontal wooden sup-

port

45

3.4 Baluster 50 x 50mm vertical and hori-

zontal wooden support with

25mm x 50mm wooden bal-

usters spaced @ 0.10m o.c.

IV. PLUMBING WORKS

4.1 Water

A. Water Pipes A. Blue PVC pipes; sizes as

indicated on plans

B. As approved by MWSS

and must have passed re-

quired testing

4.2 Sewer Pipes

A. Sewer Pipes and Fittings A. Black or Orange PVC sew-

er pipes series 1000 of known

brand all pipes and fittings

materials to be used shall be

approved by MWSS and

should have passed required

listing; sizes as indicated on

plans.

4.3 Drainage Works

A. Drainage Pipes Black/Gray 10mm. Dia. PVC

pipes, series 1000

B. Downspouts Black/Gray 100mm. Dia.

PVC pipe, series 1000

C. Catch Basin CHB reinforced concrete;

sizes and details as shown/

indicated in the plans and

drawings

46

4.4 Fixtures

A. Faucet Brass Faucet

B. Water Closet Pail Flush type

C. Floor Drain 75mm x 75 mm stainless steel

D. Kitchen Sink 400mm x 600mm stainless

steel with P-trap

4.5 Septic

Tank

Purifying polyethylene septic

tank (3-chambered)

V. ELECTRICAL WORKS

5.1 Panel Box Nema 1 Enclosure

5.2 Wiring

A. Lighting A. 1.60 mmØ THHN solid wire;

color black and white in

20mmØ PVC Pipe

B. Convenience Outlet B. 3.5 mm2 THHN stranded;

color black, blue and green

(ground) in 25mmØ RSC Pipe

C. Service Entrance C. 5.5 mm2 THHN stranded;

color black, black and

green (ground) in 25mmØ

RSC Pipe

5.3 Circuit Breakers

A. Main 30 AT, 50AF, 2P, 230V, 10KAIC

Bolt-on type

B. Branch Circuit 15 AT, 50AF, 2P, 230V, 10KAIC

Bolt-on type

47

5.4 Roughing-in

A. Utility Boxes A. PVC, deep type with fixed

socket (PNS:14)

B. Junction Boxes B. PVC, deep type with fixed

socket (PNS:14

C. Electrical Pipes C. Rigid Non-Metallic

(PNS:14)

5.5 Fixtures

A. Lighting Outlet A. PVC receptacle socket

B. Convenience Outlet B. Duplex, 20A 2P with plate

cover, flush type

C. Wall Switches C. 5A, flush type with plate

cover

VI. ARCHITECTURAL WORKS

6.1 Doors and Windows

A. Main/Entrance Door A. 0.90 x 2.10 solid wood

panel type door with 50 x

100mm wooden door jamb.

B. Service Door B. 0.70 x 2.10 hollow core

flush type with 6mm thk. Ma-

rine plywood on exterior side

and 6mm thk. Ordinary ply-

wood on interior side; with 50

x 100mm thk. Wooden door

48

C. Toilet and Bath Door C.1. 0.60 x 2.10 PVC door with

PVC louvers (bottom) and PVC

door jamb and header

C.2. For units w/ PWD: 0.90 x 2.10

Hollow core flush type with 6 mm

thk marine plywood with kick

plate; 50mm x 100mm wooden

door jamb

D. Windows D. 100mm x 4.5mm thk. Clear glass

jalousie windows on aluminum

frame with wooden typhoon shut-

ters.

E. Louver Blocks E. 8" x 8" x 4" concrete louver

blocks for ventilation on the loft

area.

All doors and windows shall be in ac-

cordance with the schedule as indi-

cated in the plans and drawings in-

stalled together with accessories

6.2 Hardwares

A. Hinges 3 1/2" x 3 1/2", in full mortise loose

pin hinges for all wooden doors

B. Locksets Good quality locksets with keys

49

6.3 Finishing Works

A. Flooring

A.1 Individual Units Plain Cement Finish

A.2 Toilet and Bath 200mm x 200mm vitrified unglazed tiles.

Color shall be for the approval of NHA pri-

or to installation

B. Walls

B.1 Exterior Walls 100mm thk. CHB, plastered finish

B.2 Interior Walls 100mm thk. CHB, tool joint finish

B.3 Toilet and Bath 200mm x 200mm vitrified glazed tiles, 1 lay-

er; rest of the wall shall be smoothed finish.

VII. WATERPROOFING

7.1 Material and Application Use cementious waterproofing or its equiv-

alent for 3-chamber septic tank

Water proofing work shall be done in a

skillful manner, completely watertight and

free from loose applications.

7.2 Warranty Period Warranty periods shall be five (5) years to

prove its approvability and reliability

Water proofed area shall be given 24

hours flood test upon complete installation

of the water proofing system. Allow system

to cure 48 hours prior to flood test.

50

51

52

53

54

55

56

QUANTITY TAKE-OFF : 22.00 SQM ROWHOUSE (Loftable)

ITEM DESCRIPTION QUANTITY UNIT

I. EARTHWORKS

Excavation 5.060 cu.m

Gravel Bedding 1" 2.844 cu.m

Backfill and compacted fill 4.276 cu.m

II. FORMWORKS

Marine Plywood ¼" x 4' x 8' 16.000 pc/s

Good Lumber 2" x 2" x 12' 429.521 bdft

Assorted Nails 2.750 kg/s

III. STRUCTURAL WORKS

Reinforced Concrete Footings 0.510 cu.m

Portland Cement 5.000 bag/s

Sand 0.255 cu.m

Gravel ¾" 0.510 cu.m

Deformed RSB : 12mm∅ 28.882 kg/s

G.I. Tie Wire # 16 0.750 kg/s

Reinforced Concrete Wall Footing 1.173 cu.m

Portland Cement 11.500 bag/s

Sand 0.587 cu.m

Gravel ¾" 1.173 cu.m

Deformed RSB : 12mm∅ and 10mm∅ 46.552 kg/s

G.I. Tie Wire # 16 1.000 kg/s

Reinforced Concrete Slab 2.406 cu.m

Portland Cement 23.000 bag/s

Sand 1.203 cu.m

Gravel ¾" 2.406 cu.m

Deformed RSB : 10mm∅ 103.651 kg/s

57

ITEM QUANTITY UNIT DESCRIPTION

G.I. Tie Wire # 16 2.250 kg/s

Reinforced Concrete Column 0.830 cu.m

Portland Cement 8.000 bag/s

Sand 0.415 cu.m

Gravel ¾" 0.830 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 196.050 kg/s

G.I. Tie Wire # 16 4.000 kg/s

Reinforced Concrete Beams 1.621 cu.m

Portland Cement 15.500 bag/s

Sand 0.811 cu.m

Gravel ¾" 1.621 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 359.877 kg/s

G.I. Tie Wire # 16 7.250 kg/s

IV. MASONRY WORKS

Interior and Exterior Wall

100mm CHB 449.000 pc/s

150mm CHB 489.000 pc/s

Portland Cement 66.000 bag/s

Sand 7.260 cu.m

Deformed RSB : 10mm∅ 320.923 kg/s

G.I. Tie Wire # 16 6.500 kg/s

Kitchen Counter

100mm CHB 7.000 pc/s

Portland Cement 1.000 bag/s

Sand 0.057 cu.m

Deformed RSB : 10mm∅ 2.067 kg/s

G.I. Tie Wire # 16 0.250 kg/s

V. ROOFING WORKS

Rafter and Purlins

58

Lip Channel Purlins 150 x 65 x 20 x 2.0mm 271.341 kg/s

Angle Bar 75mm x 75mm x 6mm 98.710 kg/s

100mm x 50mm x 3m Cleats 28.000 pc/s

Sagrod 12mm Ø 2.000 pc/s

Anchor Bolts 60.000 pc/s

Welding Rod 5.500 kg/s

Red Lead Primer 3.000 liter/s

Tinsmithry Work

0.5mm Rib-Type Roofing 25.350 sq.m.

Plain G.I. Sheet (Flashing) 7.600 l.m.

J-bolt 44.000 pc/s

Tek Screw 110.000 pc/s

Ridge Roll 1.000 pc/s

VI. ARCHITECTURAL WORKS

Tilling Works

Unglazed Tiles 28.000 pc/s

Glazed Tiles 35.000 pc/s

Tile Adhesive 1.000 bag/s

Doors with 2" x 4" Jambs

D-1 Solid Wood Panel Door Type (900 x 2100) 1.000 set/s

D-2 Hollow Core Flush Door Type (700 x 2100) 1.000 set/s

D-3 PVC Door Type (600 x 2100) 1.000 set/s

Door Hinges 9.000 pc/s

Door Knob and Lockset 3.000 set/s

Windows

W-2 Dual Control Aluminum Jalousie (13 blades) 2.000 set/s

W-3 Single Control Aluminum Jalousie (11 blades) 1.000 set/s

W-4 Single Control Aluminum Jalousie (4 blades) 1.000 set/s

W-6 Concrete Louver Blocks 2.000 set/s

W-7 Dual Control Aluminum Jalousie (13 blades) 1.000 set/s

Typhoon Shutters

59

Solid Wood 20mm x 20mm 2.004 bdft

Marine Plywood ¾" thk x 4' x 8' 1.000 pc/s

Angle Bar 25mm x 25mm x 3mm 4.316 kg/s

Welding Rod 0.500 kg/s

Barrel Bolt 8.000 pc/s

VII. PLUMBING WORKS

Cold Water Line

19mm∅ x 4m PPR 4.000 pc/s

19mm∅ Elbow 90' 5.000 pc/s

19mm∅ Tee 3.000 pc/s

19mm∅ Gate Valve 1.000 pc/s

19mm∅ Check Valve 1.000 pc/s

Water Meter 1.000 pc/s

Teflon Tape 5.000 roll/s

Storm and Sewer

PVC Pipe 150mm∅ x 3m 7.000 pc/s

PVC Pipe 100mm∅ x 3m 3.000 pc/s

PVC Pipe 50mm∅ x 3m 3.000 pc/s

PVC Elbow 150mm∅ 90' 1.000 pc/s

PVC Tee (100mm x 50mm) 1.000 pc/s

PVC Wye 45' (100mm x 50mm) 2.000 pc/s

PVC Wye 45' (150mm x 50mm) 1.000 pc/s

P-Trap w/ Plug 50mm∅ 3.000 pc/s

100mm∅ Clean-Out 1.000 pc/s

Teflon Tape 10.000 roll/s

PVC Gutter (150mm x 200mm) 2.000 unit/s

3 Chamber Septic Vault 1.000 unit/s

Fixtures

Faucet 4.000 pc/s

Kitchen Sink 1.000 pc/s

Water Closet 1.000 pc/s

60

ITEM QUANTITY UNIT DESCRIPTION

Lavatory 1.000 pc/s

Shower Head 1.000 pc/s

Floor Drain 1.000 pc/s

Teflon Tape 3.000 roll/s

Catch Basin

100mm CHB 12.000 pc/s

Portland Cement 1.000 bag/s

Sand 0.072 cu.m

Gravel ¾" 0.035 cu.m

Deformed RSB : 10mm∅ 8.699 kg/s

VIII. ELECTRICAL WORKS

1.6mmØ THHN Copper, Stranded 60.000 l.m.

3.5mm² THHN Copper, Stranded 50.000 l.m.

5.5mm² THHN Copper, Stranded 12.000 l.m.

20mm Ø x 3m RSC pipe 1.000 pc/s

20mm Ø x 3m Rigid PVC PNS:14 20.000 pc/s

20mm Ø PVC Locknut & Adaptor 16.000 pair/s

2" x 4" Utility Box, PVC 9.000 pc/s

4" Octagonal Junction Box, PVC 5.000 pc/s

20mm Ø Entrance Cap 1.000 pc/s

Assorted Conduit Clamp 15.000 pc/s

Assorted Common Nail 0.500 kg/s

Electrical Tape (small) 1.000 roll/s

Socket Lamp Holder 4.000 pc/s

Tumbler Switch, Single Gang Device 2.000 pc/s

Tumbler Switch, Two Gang Device 1.000 pc/s

Convenience Outlet, Duplex, 10A 2P 4.000 pc/s

PVC Solvent Cement, 100cc 1.000 can/s

Other Misc./ Consumables 1.000 LS

Panel Box, NEMA Enclosure 1.000 set/s

61

Note: 1. Concrete class mixture “AA” was used in estimating all concrete works.

2. Assumptions are based on relatively flat terrain.

QUANTITY TAKE-OFF : LOFT

ITEM DESCRIPTION QUANTITY UNIT

I. STAIRS

Reinforced Concrete Stair Base 0.212 cu.m

Earthworks

Earthfill 0.246 cu.m

Gravel Bedding 1" 0.100 cu.m

Concrete Works

100mm CHB 16.000 pc/s

Portland Cement 3.000 bag/s

Sand 0.198 cu.m

Gravel ¾" 0.212 cu.m

Deformed RSB : 16mm∅ and 12mm∅ 27.814 kg/s

G.I. Tie Wire # 16 0.750 kg/s

Wooden Staircase

Ordinary Plywood ¼" x 4' x 8' 2.000 pc/s

Solid Wood 1¼ " x 2" 83.942 bdft

Assorted Nails 1.000 kg/s

II. 11 SQM LOFT

Loft Flooring

C-Channel 100mm x 50mm x 2mm 138.914 kg/s

Ordinary Plywood ¾" x 4' x 8' 4.000 pc/s

Self Drilling Screws 120.000 pc/s

Half Wall

Ordinary Plywood ¼" x 4' x 8' 1.000 pc/s

Wood Studs 2" x 2" 21.124 bdft

Assorted Nails 1.000 kg/s

ITEM QUANTITY UNIT DESCRIPTION

Main: 30AT, 50AF, 2P, 240V, 10 KAIC

w/ 1-15AT, 50AF, 2P, 240V, 10 KAIC

3-20AT, 50AF, 2P, 240V, 10 KAIC

62

63

64

65

66

QUANTITY TAKE-OFF : 26.00 SQM ROWHOUSE

ITEM DESCRIPTION QUANTITY UNIT

I. EARTHWORKS

Excavation 6.168 cu.m

Gravel Bedding 1" 3.365 cu.m

Backfill and compacted fill 5.074 cu.m

II. FORMWORKS

Marine Plywood ¼" x 4' x 8' 10.000 pc/s

Good Lumber 2" x 2" x 12' 257.988 bdft

Assorted Nails 1.500 kg/s

III. STRUCTURAL WORKS

Reinforced Concrete Footings 0.510 cu.m

Portland Cement 5.000 bag/s

Sand 0.255 cu.m

Gravel ¾" 0.510 cu.m

Deformed RSB : 12mm∅ 28.882 kg/s

G.I. Tie Wire # 16 0.750 kg/s

Reinforced Concrete Wall Footing 1.648 cu.m

Portland Cement 16.000 bag/s

Sand 0.824 cu.m

Gravel ¾" 1.648 cu.m

Deformed RSB : 12mm∅ and 10mm∅ 60.637 kg/s

G.I. Tie Wire # 16 1.250 kg/s

Reinforced Concrete Slab 2.451 cu.m

Portland Cement 23.500 bag/s

Sand 1.226 cu.m

Gravel ¾" 2.451 cu.m

67

ITEM QUANTITY UNIT DESCRIPTION

Deformed RSB : 10mm∅ 112.980 kg/s

G.I. Tie Wire # 16 2.500 kg/s

Reinforced Concrete Column 0.541 cu.m

Portland Cement 5.500 bag/s

Sand 0.271 cu.m

Gravel ¾" 0.541 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 141.757 kg/s

G.I. Tie Wire # 16 3.000 kg/s

Reinforced Concrete Beams 0.719 cu.m

Portland Cement 7.000 bag/s

Sand 0.360 cu.m

Gravel ¾" 0.719 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 169.011 kg/s

G.I. Tie Wire # 16 3.500 kg/s

IV. MASONRY WORKS

Interior and Exterior Wall

100mm CHB 414.000 pc/s

150mm CHB 382.000 pc/s

Portland Cement 55.000 bag/s

Sand 6.045 cu.m

Deformed RSB : 10mm∅ 271.977 kg/s

G.I. Tie Wire # 16 5.500 kg/s

Kitchen Counter

100mm CHB 7.000 pc/s

Portland Cement 1.000 bag/s

Sand 0.056 cu.m

Deformed RSB : 10mm∅ 2.067 kg/s

G.I. Tie Wire # 16 0.250 kg/s

68

ITEM DESCRIPTION QUANTITY UNIT

V. ROOFING WORKS

Rafter and Purlins

Lip Channel Purlins 150 x 65 x 20 x 2.0mm 309.055 kg/s

Angle Bar 75mm x 75mm x 6mm 146.728 kg/s

100mm x 50mm x 3m Cleats 34.000 pc/s

Sagrod 12mm Ø 2.000 pc/s

Anchor Bolts 10.000 pc/s

Welding Rod 6.500 kg/s

Red Lead Primer 5.000 liter/s

Tinsmithry Work

0.5mm Rib-Type Roofing 31.000 sq.m.

Plain G.I. Sheet (Flashing) 7.700 l.m.

J-bolt 44.000 pc/s

Tek Screw 132.000 pc/s

Ridge Roll 1.000 pc/s

VI. ARCHITECTURAL WORKS

Tilling Works

Unglazed Tiles 28.000 pc/s

Glazed Tiles 32.000 pc/s

Tile Adhesive 1.000 bag/s

Doors with 2" x 4" Jambs

D-1 Solid Wood Panel Door Type (900 x 2100) 1.000 set/s

D-2 Hollow Core Flush Door Type (700 x 2100) 1.000 set/s

D-3 PVC Door Type (600 x 2100) 1.000 set/s

D-4 Hollow Core Flush Door Type (800 x 2100) 1.000 set/s

Door Hinges 12.000 pc/s

Door Knob and Lockset 4.000 set/s

Windows

W-1 Dual Ctrl Aluminum Jalousie (13 blades) 1.000 set/s

W-3 Single Ctrl Aluminum Jalousie (11 blades) 1.000 set/s

69

ITEM QUANTITY UNIT DESCRIPTION

W-4 Single Control Aluminum Jalousie (4 blades) 1.000 set/s

W-5 Dual Control Aluminum Jalousie (16 blades) 1.000 set/s

Typhoon Shutters

Solid Wood 20mm x 20mm 3.006 bdft

Marine Plywood ¾" thk x 4' x 8' 1.000 pc/s

Angle Bar 25mm x 25mm x 3mm 5.644 kg/s

Welding Rod 0.500 kg/s

Barrel Bolt 12.000 pc/s

VII. PLUMBING WORKS

Cold Water Line

19mm∅ x 5m PPR 3.000 pc/s

19mm∅ Elbow 90' 11.000 pc/s

19mm∅ Tee 4.000 pc/s

19mm∅ Gate Valve 1.000 pc/s

19mm∅ Check Valve 1.000 pc/s

Water Meter 1.000 pc/s

Storm and Sewer

PVC Pipe 100mm∅ x 4m 5.000 pc/s

PVC Pipe 75mm∅ x 4m 2.000 pc/s

PVC Pipe 50mm∅ x 4m 2.000 pc/s

PVC Elbow 50mm∅ 90' 5.000 pc/s

PVC Elbow 75mm∅ 90' 4.000 pc/s

PVC Elbow 100mm∅ 90' 1.000 pc/s

PVC Elbow 100mm∅ 95' 1.000 pc/s

PVC Tee 50mm∅ 2.000 pc/s

PVC Tee Reducer (100mm x 50mm) 1.000 pc/s

PVC Wye 45' (100mm x 50mm) 3.000 pc/s

PVC Wye 45' (100mm x 100mm) 1.000 pc/s

P-Trap w/ Plug 50mm∅ 3.000 pc/s

100mm∅ Clean-Out 1.000 pc/s

70

ITEM QUANTITY UNIT DESCRIPTION

Teflon Tape 10.000 roll/s

PVC Solvent 1.000 can/s

PVC Gutter (150mm x 200mm) 2.000 unit/s

3 Chamber Septic Vault 1.000 unit/s

Fixtures

Faucet 4.000 pc/s

Kitchen Sink 1.000 pc/s

Water Closet 1.000 pc/s

Lavatory 1.000 pc/s

Shower Head 1.000 pc/s

Floor Drain 1.000 pc/s

Catch Basin

100mm CHB 12.000 pc/s

Portland Cement 1.000 bag/s

Sand 0.072 cu.m

Gravel ¾" 0.035 cu.m

Deformed RSB : 10mm∅ 8.699 kg/s

VIII. ELECTRICAL WORKS

2.0mm² THHN Copper, Solid 68.000 l.m.

3.5mm² THHN Copper, Stranded 50.000 l.m.

5.5mm² THHN Copper, Stranded 12.000 l.m.

20mm Ø x 3m Rigid PVC PNS:14 20.000 pc/s

20mm Ø PVC Locknut & Adaptor 30.000 pc/s

2" x 4" Utility Box, PVC 9.000 pair/s

4" Octagonal Junction Box, PVC 5.000 pc/s

20mm Ø Entrance Cap 1.000 pc/s

Screw pin Type Insulator (Small) 1.000 pc/s

Assorted Conduit Clamp 15.000 pc/s

Assorted Common Nail 0.500 kg/s

Electrical Tape (small) 1.000 roll/s

71

ITEM QUANTITY UNIT DESCRIPTION

Socket Lamp Holder 5.000 pc/s

Tumbler Switch, Single Gang Device 2.000 pc/s

Tumbler Switch, Two Gang Device 1.000 pc/s

Convenience Outlet, Duplex, 10A 2P 4.000 pc/s

PVC Solvent Cement, 100cc 1.000 can/s

Other Misc./ Consumables 1.000 LS

Panel Box, NEMA Enclosure 1.000 set/s

Main: 30AT, 50AF, 2P, 240V, 10 KAIC

w/ 4-15AT, 50AF, 2P, 240V, 10 KAIC

3-20AT, 50AF, 2P, 240V, 10 KAIC

Note: 1. Concrete class mixture “AA” was used in estimating all concrete works.

2. Assumptions are based on relatively flat terrain.

72

73

74

(OP

T. 1

)

75

(OP

T. 1

)

76

(OP

T. 1

)

QUANTITY TAKE-OFF : 28.40 SQM ROWHOUSE (Option 1)

ITEM DESCRIPTION QUANTITY UNIT

I. EARTHWORKS

Excavation 5.361 cu.m

Gravel Bedding 1" 3.620 cu.m

Backfill and compacted fill 4.792 cu.m

II. FORMWORKS

Marine Plywood ¼" x 4' x 8' 10.000 pc/s

Good Lumber 2" x 2" x 12' 252.137 bdft

Assorted Nails 1.500 kg/s

III. STRUCTURAL WORKS

Reinforced Concrete Footings 0.510 cu.m

Portland Cement 5.000 bag/s

Sand 0.255 cu.m

Gravel ¾" 0.510 cu.m

Deformed RSB : 12mm∅ 28.882 kg/s

G.I. Tie Wire # 16 0.750 kg/s

Reinforced Concrete Wall Footing 1.586 cu.m

Portland Cement 15.500 bag/s

Sand 0.793 cu.m

Gravel ¾" 1.586 cu.m

Deformed RSB : 12mm∅ and 10mm∅ 52.956 kg/s

G.I. Tie Wire # 16 1.250 kg/s

Reinforced Concrete Slab 2.857 cu.m

Portland Cement 27.500 bag/s

Sand 1.429 cu.m

Gravel ¾" 2.857 cu.m

77

(OP

T. 1

)

ITEM QUANTITY UNIT DESCRIPTION

Deformed RSB : 10mm∅ 141.523 kg/s

G.I. Tie Wire # 16 3.000 kg/s

Reinforced Concrete Column 0.578 cu.m

Portland Cement 5.500 bag/s

Sand 0.289 cu.m

Gravel ¾" 0.578 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 135.650 kg/s

G.I. Tie Wire # 16 2.750 kg/s

Reinforced Concrete Beams 0.807 cu.m

Portland Cement 8.000 bag/s

Sand 0.404 cu.m

Gravel ¾" 0.807 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 172.023 kg/s

G.I. Tie Wire # 16 3.500 kg/s

IV. MASONRY WORKS

Interior and Exterior Wall

100mm CHB 256.000 pc/s

150mm CHB 439.000 pc/s

Portland Cement 51.000 bag/s

Sand 5.632 cu.m

Deformed RSB : 10mm∅ 237.878 kg/s

G.I. Tie Wire # 16 5.000 kg/s

Kitchen Counter

100mm CHB 9.000 pc/s

Portland Cement 1.500 bag/s

Sand 0.089 cu.m

Deformed RSB : 10mm∅ 3.082 kg/s

G.I. Tie Wire # 16 0.250 kg/s

78

(OP

T. 1

)

ITEM DESCRIPTION QUANTITY UNIT

V. ROOFING WORKS

Rafter and Purlins

Lip Channel Purlins 150 x 65 x 20 x 2.0mm 309.055 kg/s

Angle Bar 75mm x 75mm x 6mm 146.728 kg/s

100mm x 50mm x 3m Cleats 34.000 pc/s

Sagrod 12mm Ø 2.000 pc/s

Anchor Bolts 10.000 pc/s

Welding Rod 6.500 kg/s

Red Lead Primer 5.000 liter/s

Tinsmithry Work

0.5mm Rib-Type Roofing 31.000 sq.m.

Plain G.I. Sheet (Flashing) 7.700 l.m.

J-bolt 44.000 pc/s

Tek Screw 132.000 pc/s

Ridge Roll 1.000 pc/s

VI. ARCHITECTURAL WORKS

Tilling Works

Unglazed Tiles 37.000 pc/s

Glazed Tiles 27.000 pc/s

Tile Adhesive 1.000 bag/s

Doors with 2" x 4" Jambs

D-1 Solid Wood Panel Door Type (900 x 2100) 1.000 set/s

D-2 Hollow Core Flush Door Type (700 x 2100) 1.000 set/s

D-3 PVC Door Type (600 x 2100) 1.000 set/s

Door Hinges 9.000 pc/s

Door Knob and Lockset 3.000 set/s

Windows

W-1 Dual Ctrl Aluminum Jalousie (13 blades) 2.000 set/s

W-2 Dual Ctrl Aluminum Jalousie (13 blades) 1.000 set/s

W-4 Single Ctrl Aluminum Jalousie (4 blades) 1.000 set/s

79

(OP

T. 1

)

ITEM QUANTITY UNIT DESCRIPTION

Typhoon Shutters

Solid Wood 20mm x 20mm 3.006 bdft

Marine Plywood ¾" thk x 4' x 8' 1.000 pc/s

Angle Bar 25mm x 25mm x 3mm 5.644 kg/s

Welding Rod 0.500 kg/s

Barrel Bolt 12.000 pc/s

VII. PLUMBING WORKS

Cold Water Line

19mm∅ x 5m PPR 3.000 pc/s

19mm∅ Elbow 90' 11.000 pc/s

19mm∅ Tee 4.000 pc/s

19mm∅ Gate Valve 1.000 pc/s

19mm∅ Check Valve 1.000 pc/s

Water Meter 1.000 pc/s

Storm and Sewer

PVC Pipe 100mm∅ x 4m 5.000 pc/s

PVC Pipe 75mm∅ x 4m 2.000 pc/s

PVC Pipe 50mm∅ x 4m 2.000 pc/s

PVC Elbow 50mm∅ 90' 5.000 pc/s

PVC Elbow 75mm∅ 90' 4.000 pc/s

PVC Elbow 100mm∅ 90' 1.000 pc/s

PVC Elbow 100mm∅ 95' 1.000 pc/s

PVC Tee 50mm∅ 2.000 pc/s

PVC Tee Reducer (100mm x 50mm) 1.000 pc/s

PVC Wye 45' (100mm x 50mm) 3.000 pc/s

PVC Wye 45' (100mm x 100mm) 1.000 pc/s

P-Trap w/ Plug 50mm∅ 3.000 pc/s

100mm∅ Clean-Out 1.000 pc/s

Teflon Tape 10.000 roll/s

PVC Solvent 1.000 can/s

80

(OP

T. 1

)

ITEM QUANTITY UNIT DESCRIPTION

PVC Gutter (150mm x 200mm) 2.000 unit/s

3 Chamber Septic Vault 1.000 unit/s

Fixtures

Faucet 4.000 pc/s

Kitchen Sink 1.000 pc/s

Water Closet 1.000 pc/s

Lavatory 1.000 pc/s

Shower Head 1.000 pc/s

Floor Drain 1.000 pc/s

Catch Basin

100mm CHB 12.000 pc/s

Portland Cement 1.000 bag/s

Sand 0.072 cu.m

Gravel ¾" 0.035 cu.m

Deformed RSB : 10mm∅ 8.699 kg/s

VIII. ELECTRICAL WORKS

2.0mm² THHN Copper, Solid 68.000 l.m.

3.5mm² THHN Copper, Stranded 50.000 l.m.

5.5mm² THHN Copper, Stranded 12.000 l.m.

20mm Ø x 3m Rigid PVC PNS:14 20.000 pc/s

20mm Ø PVC Locknut & Adaptor 30.000 pc/s

2" x 4" Utility Box, PVC 9.000 pair/s

4" Octagonal Junction Box, PVC 5.000 pc/s

20mm Ø Entrance Cap 1.000 pc/s

Screw pin Type Insulator (Small) 1.000 pc/s

Assorted Conduit Clamp 15.000 pc/s

Assorted Common Nail 0.500 kg/s

Electrical Tape (small) 1.000 roll/s

Socket Lamp Holder 5.000 pc/s

Tumbler Switch, Single Gang Device 2.000 pc/s

81

(OP

T. 1

)

ITEM QUANTITY UNIT DESCRIPTION

Tumbler Switch, Two Gang Device 1.000 pc/s

Convenience Outlet, Duplex, 10A 2P 4.000 pc/s

PVC Solvent Cement, 100cc 1.000 can/s

Other Misc./ Consumables 1.000 LS

Panel Box, NEMA Enclosure 1.000 set/s

Main: 30AT, 50AF, 2P, 240V, 10 KAIC

w/ 4-15AT, 50AF, 2P, 240V, 10 KAIC

3-20AT, 50AF, 2P, 240V, 10 KAIC

Note: 1. Concrete class mixture “AA” was used in estimating all concrete works.

2. Assumptions are based on relatively flat terrain.

82

(OP

T. 2

)

83

(OP

T. 2

)

84

(OP

T. 2

)

QUANTITY TAKE-OFF : 28.40 SQM ROWHOUSE (Option 2)

ITEM DESCRIPTION QUANTITY UNIT

I. EARTHWORKS

Excavation 5.616 cu.m

Gravel Bedding 1" 3.663 cu.m

Backfill and compacted fill 4.919 cu.m

II. FORMWORKS

Marine Plywood ¼" x 4' x 8' 10.000 pc/s

Good Lumber 2" x 2" x 12' 252.137 bdft

Assorted Nails 1.500 kg/s

III. STRUCTURAL WORKS

Reinforced Concrete Footings 0.510 cu.m

Portland Cement 5.000 bag/s

Sand 0.255 cu.m

Gravel ¾" 0.510 cu.m

Deformed RSB : 12mm∅ 28.882 kg/s

G.I. Tie Wire # 16 0.750 kg/s

Reinforced Concrete Wall Footing 1.668 cu.m

Portland Cement 16.000 bag/s

Sand 0.834 cu.m

Gravel ¾" 1.668 cu.m

Deformed RSB : 12mm∅ and 10mm∅ 56.648 kg/s

G.I. Tie Wire # 16 1.250 kg/s

Reinforced Concrete Slab 2.857 cu.m

Portland Cement 27.500 bag/s

Sand 1.429 cu.m

Gravel ¾" 2.857 cu.m

85

(OP

T. 2

)

ITEM QUANTITY UNIT DESCRIPTION

Deformed RSB : 10mm∅ 141.523 kg/s

G.I. Tie Wire # 16 3.000 kg/s

Reinforced Concrete Column 0.608 cu.m

Portland Cement 6.000 bag/s

Sand 0.304 cu.m

Gravel ¾" 0.608 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 159.777 kg/s

G.I. Tie Wire # 16 3.250 kg/s

Reinforced Concrete Beams 0.840 cu.m

Portland Cement 8.000 bag/s

Sand 0.420 cu.m

Gravel ¾" 0.840 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 184.781 kg/s

G.I. Tie Wire # 16 3.750 kg/s

IV. MASONRY WORKS

Interior and Exterior Wall

100mm CHB 287.000 pc/s

150mm CHB 439.000 pc/s

Portland Cement 53.000 bag/s

Sand 5.816 cu.m

Deformed RSB : 10mm∅ 248.326 kg/s

G.I. Tie Wire # 16 5.000 kg/s

Kitchen Counter

100mm CHB 9.000 pc/s

Portland Cement 1.500 bag/s

Sand 0.089 cu.m

Deformed RSB : 10mm∅ 3.082 kg/s

G.I. Tie Wire # 16 0.250 kg/s

86

(OP

T. 2

)

ITEM DESCRIPTION QUANTITY UNIT

V. ROOFING WORKS

Rafter and Purlins

Lip Channel Purlins 150 x 65 x 20 x 2.0mm 309.055 kg/s

Angle Bar 75mm x 75mm x 6mm 146.728 kg/s

100mm x 50mm x 3m Cleats 34.000 pc/s

Sagrod 12mm Ø 2.000 pc/s

Anchor Bolts 10.000 pc/s

Welding Rod 6.500 kg/s

Red Lead Primer 5.000 liter/s

Tinsmithry Work

0.5mm Rib-Type Roofing 31.000 sq.m.

Plain G.I. Sheet (Flashing) 7.700 l.m.

J-bolt 44.000 pc/s

Tek Screw 132.000 pc/s

Ridge Roll 1.000 pc/s

VI. ARCHITECTURAL WORKS

Tilling Works

Unglazed Tiles 37.000 pc/s

Glazed Tiles 27.000 pc/s

Tile Adhesive 1.000 bag/s

Doors with 2" x 4" Jambs

D-1 Solid Wood Panel Door Type (900 x 2100) 1.000 set/s

D-2 Hollow Core Flush Door Type (700 x 2100) 1.000 set/s

D-3 PVC Door Type (600 x 2100) 1.000 set/s

Door Hinges 9.000 pc/s

Door Knob and Lockset 3.000 set/s

Windows

W-1 Dual Ctrl Aluminum Jalousie (13 blades) 3.000 set/s

W-4 Single Ctrl Aluminum Jalousie (4 blades) 1.000 set/s

Ceiling Works

87

(OP

T. 2

)

ITEM QUANTITY UNIT DESCRIPTION

Marine Plywood ¾" thk x 4' x 8' 1.000 pc/s

Good Lumber 2" x 2" x 12' 10.199 bdft

Assorted Nails 0.500 kg/s

Typhoon Shutters

Solid Wood 20mm x 20mm 4.009 bdft

Marine Plywood ¾" thk x 4' x 8' 1.000 pc/s

Angle Bar 25mm x 25mm x 3mm 6.972 kg/s

Welding Rod 0.500 kg/s

Barrel Bolt 16.000 pc/s

VII. PLUMBING WORKS

Cold Water Line

19mm∅ x 5m PPR 3.000 pc/s

19mm∅ Elbow 90' 11.000 pc/s

19mm∅ Tee 4.000 pc/s

19mm∅ Gate Valve 1.000 pc/s

19mm∅ Check Valve 1.000 pc/s

Water Meter 1.000 pc/s

Storm and Sewer

PVC Pipe 100mm∅ x 4m 5.000 pc/s

PVC Pipe 75mm∅ x 4m 2.000 pc/s

PVC Pipe 50mm∅ x 4m 2.000 pc/s

PVC Elbow 50mm∅ 90' 5.000 pc/s

PVC Elbow 75mm∅ 90' 4.000 pc/s

PVC Elbow 100mm∅ 90' 1.000 pc/s

PVC Elbow 100mm∅ 95' 1.000 pc/s

PVC Tee 50mm∅ 2.000 pc/s

PVC Tee Reducer (100mm x 50mm) 1.000 pc/s

PVC Wye 45' (100mm x 50mm) 3.000 pc/s

PVC Wye 45' (100mm x 100mm) 1.000 pc/s

P-Trap w/ Plug 50mm∅ 3.000 pc/s

88

(OP

T. 2

)

ITEM QUANTITY UNIT DESCRIPTION

100mm∅ Clean-Out 1.000 pc/s

Teflon Tape 10.000 roll/s

PVC Solvent 1.000 can/s

PVC Gutter (150mm x 200mm) 2.000 unit/s

3 Chamber Septic Vault 1.000 unit/s

Fixtures

Faucet 4.000 pc/s

Kitchen Sink 1.000 pc/s

Water Closet 1.000 pc/s

Lavatory 1.000 pc/s

Shower Head 1.000 pc/s

Floor Drain 1.000 pc/s

Catch Basin

100mm CHB 12.000 pc/s

Portland Cement 1.000 bag/s

Sand 0.072 cu.m

Gravel ¾" 0.035 cu.m

Deformed RSB : 10mm∅ 8.699 kg/s

VIII. ELECTRICAL WORKS

2.0mm² THHN Copper, Solid 68.000 l.m.

3.5mm² THHN Copper, Stranded 50.000 l.m.

5.5mm² THHN Copper, Stranded 12.000 l.m.

20mm Ø x 3m Rigid PVC PNS:14 20.000 pc/s

20mm Ø PVC Locknut & Adaptor 30.000 pc/s

2" x 4" Utility Box, PVC 9.000 pair/s

4" Octagonal Junction Box, PVC 5.000 pc/s

20mm Ø Entrance Cap 1.000 pc/s

Screw pin Type Insulator (Small) 1.000 pc/s

Assorted Conduit Clamp 15.000 pc/s

Assorted Common Nail 0.500 kg/s

89

(OP

T. 2

)

ITEM QUANTITY UNIT DESCRIPTION

Electrical Tape (small) 1.000 roll/s

Socket Lamp Holder 5.000 pc/s

Tumbler Switch, Single Gang Device 2.000 pc/s

Tumbler Switch, Two Gang Device 1.000 pc/s

Convenience Outlet, Duplex, 10A 2P 4.000 pc/s

PVC Solvent Cement, 100cc 1.000 can/s

Other Misc./ Consumables 1.000 LS

Panel Box, NEMA Enclosure 1.000 set/s

Main: 30AT, 50AF, 2P, 240V, 10 KAIC

w/ 4-15AT, 50AF, 2P, 240V, 10 KAIC

3-20AT, 50AF, 2P, 240V, 10 KAIC

Note: 1. Concrete class mixture “AA” was used in estimating all concrete works.

2. Assumptions are based on relatively flat terrain.

90

91

92

93

94

QUANTITY TAKE-OFF : 33 SQM ROWHOUSE WITH STORE SPACE

ITEM DESCRIPTION QTY. UNIT

I. EARTHWORKS

Excavation 5.549 cu.m

Gravel Bedding 1" 2.889 cu.m

Backfilling 2.434 cu.m

II. FORMWORKS

Marine Plywood ¼" x 4' x 8' 15 pc/s

Good Lumber 2" x 2" x 12' 408.17 bdft

Assorted Nails 3.085 kg/s

III. STRUCTURAL WORKS

Reinforced Concrete Footings 0.676

Portland Cement 6.422 bag/s

Sand 0.338 cu.m

Gravel ¾" 0.676 cu.m

Deformed RSB : 12mm∅ 29.16 kg/s

G.I. Tie Wire # 16 3.821 kg/s

Reinforced Concrete Wall Footing 1.504

Portland Cement 14.288 bag/s

Sand 0.752 cu.m

Gravel ¾" 1.504 cu.m

Deformed RSB : 12mm∅ and 10mm∅ 53.133 kg/s

G.I. Tie Wire # 16 1.063 kg/s

Reinforced Concrete Slab 2.2

Portland Cement 20.9 bag/s

Sand 1.1 cu.m

Gravel ¾" 2.2 cu.m

Deformed RSB : 10mm∅ 94.063 kg/s

G.I. Tie Wire # 16 1.881 kg/s

95

ITEM QUANTITY UNIT DESCRIPTION

Reinforced Concrete Column 0.886

Portland Cement 8.415 bag/s

Sand 0.443 cu.m

Gravel ¾" 0.886 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 281.897 kg/s

G.I. Tie Wire # 16 5.638 kg/s

Reinforced Concrete Beams 1.952

Portland Cement 18.544 bag/s

Sand 0.976 cu.m

Gravel ¾" 1.952 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 307.718 kg/s

G.I. Tie Wire # 16 6.154 kg/s

Reinforced Concrete Ledge 0.143

Portland Cement 1.359 bag/s

Sand 0.0715 cu.m

Gravel ¾" 0.143 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 27.885 kg/s

G.I. Tie Wire # 16 0.558 kg/s

IV. MASONRY WORKS

Interior and Exterior Wall

100mm CHB 412 pc/s

150mm CHB 437 pc/s

Portland Cement 39.183 bag/s

Sand 5.218 cu.m

Deformed RSB : 10mm∅ 168.482 kg/s

G.I. Tie Wire # 16 2.045 kg/s

Kitchen Counter

100mm CHB 6.000 pc/s

Portland Cement 0.512 bag/s

Sand 0.044 cu.m

96

ITEM QUANTITY UNIT DESCRIPTION

Deformed RSB : 10mm∅ 5.482 kg/s

G.I. Tie Wire # 16 0.091 kg/s

V. ROOFING WORKS

Rafter and Purlins

Lip Channel Purlins 150 x 65 x 20 x 2.0mm 53.9 l.m

Angle Bar 75mm x 75mm x 6mm x 6m 2 pc/s

100mm x 50mm x 3m Cleats 24 pc/s

Sagrod 10mm Ø 3 pc/s

Anchor Bolts 16 pc/s

Welding Rod 1 kg/s

Red Lead Primer 3 liter/s

Tinsmithry Work

0.5mm Rib-Type Roofing 25.824 sq.m.

Plain G.I. Sheet (Flashing) 7.594 l.m

J-bolt 18 pc/s

Tek Screw 81 pc/s

Ridge Roll 2 pc/s

VI. ARCHITECTURAL WORKS

Tilling Works

Unglazed Tiles 28 pc/s

Glazed Tiles 34 pc/s

ABC Grout 2.79 kg/s

Doors with 2" x 4" Jambs

D-1 Panel Door Type (900 x 2100) 1 set/s

D-2 Flush Door Type (700 x 2100) 1 set/s

D-3 PVC Door Type (600 x 2100) 1 set/s

Door Hinges 9 pc/s

Door Knob and Lockset 3 set/s

Windows

W-2 Aluminum Jalousie (13 blades) 2 set/s

97

ITEM QUANTITY UNIT DESCRIPTION

W-3 Aluminum Jalousie (11 blades) 1 set/s

W-4 Aluminum Jalousie (4 blades) 1 set/s

W-6 Concrete Louver Blocks 2 set/s

W-7 Aluminum Jalousie (6 blades) 1 set/s

Loft Flooring

C-Joist 100mm x 50mm x 2.0mm 39.5 l.m

Ordinary Plywood ¾" x 4' x 2' 4 pc/s

Assorted Nails 3 kg/s

Tek Screw 112 pc/s

Loft Wall

Ordinary Plywood ¼" thk x 4' x 8' 2 pc/s

Good Lumber 2" x 2" x 12' 11.8 bdft

Assorted Nails 1 kg/s

Typhoon Shutters

Marine Plywood ¾" thk x 4' x 8' 1 pc/s

Angle Bar 25mm x 25mm x 3mm 3 m

Welding Rod 1 kg/s

Barrel Bolt 8 pc/s

Stairs

Solid Wood Stringer 1' x 2" 31.759 bdft

Solid Wood Tread 8¼" x 2" 32.48 bdft

Good Lumber 1¼" x 2" 8.607 bdft

Ordinary Plywood ¼" thk x 4' x 8' 2 pc/s

Concrete Works 0.158 cu.m

Earthfill 0.239 cu.m

Assorted Nails 5 kg/s

VII. PLUMBING WORKS

Cold Water Line

19mm∅ x 4m PPR 4 pc/s

19mm∅ Elbow 90' 5 pc/s

98

ITEM QUANTITY UNIT DESCRIPTION

19mm∅ Tee 3 pc/s

19mm∅ Gate Valve 1 pc/s

19mm∅ Check Valve 1 pc/s

Water Meter 1 pc/s

Teflon Tape 5 roll/s

Storm and Sewer

PVC Pipe 150mm∅ x 3m 7 pc/s

PVC Pipe 100mm∅ x 3m 3 pc/s

PVC Pipe 50mm∅ x 3m 3 pc/s

PVC Elbow 150mm∅ 90' 1 pc/s

PVC Tee 50mm∅ (100mm x 50mm) 1 pc/s

PVC Wye 45' (150mm x 50mm) 1 pc/s

PVC Wye 45' (100mm x 50mm) 2 pc/s

P-Trap w/ Plug 50mm∅ 3 pc/s

100mm∅ Clean-Out 1 pc/s

Teflon Tape 10 roll/s

3 Chamber Septic Vault 1 unit/s

Fixtures

Faucet 4 pc/s

Kitchen Sink 1 pc/s

Water Closet 1 pc/s

Lavatory 1 pc/s

Shower Head 1 pc/s

Floor Drain 1 pc/s

Teflon Tape 3 roll/s

Catch Basin

100mm CHB 15 pc/s

Portland Cement 0.66 bag/s

Sand 0.05 cu.m

Gravel ¾" 0.04 cu.m

99

ITEM QUANTITY UNIT DESCRIPTION

Deformed RSB : 10mm∅ 2.22 kg/s

PVC 100mmØ 3 pc/s

VIII. ELECTRICAL WORKS

1.6mmØ THHN Copper, Stranded 60 l.m.

3.5mm² THHN Copper, Stranded 50 l.m.

5.5mm² THHN Copper, Stranded 12 l.m.

20mm Ø x 3m RSC pipe 1 pc/s

20mm Ø x 3m Rigid PVC PNS:14 20 pc/s

20mm Ø PVC Locknut & Adaptor 16 pair/s

2" x 4" Utility Box, PVC 9 pc/s

4" Octagonal Junction Box, PVC 5 pc/s

20mm Ø Entrance Cap 1 pc/s

Assorted Conduit Clamp 15 pc/s

Assorted Common Nail 0.5 kg/s

Electrical Tape (small) 1 roll/s

Socket Lamp Holder 4 pc/s

Tumbler Switch, Single Gang Device 2 pc/s

Tumbler Switch, Two Gang Device 1 pc/s

Convenience Outlet, Duplex, 10A 2P 4 pc/s

PVC Solvent Cement, 100cc 1 can/s

Other Misc./ Consumables 1 LS

Panel Box, NEMA Enclosure 1 set/s

Main: 30AT, 50AF, 2P, 240V, 10 KAIC

w/ 1-15AT, 50AF, 2P, 240V, 10 KAIC

3-20AT, 50AF, 2P, 240V, 10 KAIC

Note: 1. Concrete class mixture “AA” was used in estimating all concrete works.

2. Assumptions are based on relatively flat terrain.

100

101

102

10.00

6.0

0

3.50 3.50

103

104

QUANTITY TAKE-OFF : 21 SQM DUPLEX

ITEM DESCRIPTION QUANTITY UNIT

I. EARTHWORKS

Excavation 5.260 cu.m

Gravel Bedding 1" 2.678 cu.m

Backfilling 2.746 cu.m

II. FORMWORKS

Marine Plywood ¼" x 4' x 8' 11.000 pc/s

Good Lumber 2" x 2" x 12' 300.210 bdft

Assorted Nails 3.000 kg/s

III. STRUCTURAL WORKS

Reinforced Concrete Footings 0.648

Portland Cement 6.156 bag/s

Sand 0.324 cu.m

Gravel ¾" 0.648 cu.m

Deformed RSB : 12mm∅ 35.964 kg/s

G.I. Tie Wire # 16 0.719 kg/s

Reinforced Concrete Wall Footing 0.806

Portland Cement 7.652 bag/s

Sand 0.403 cu.m

Gravel ¾" 0.806 cu.m

Deformed RSB : 12mm∅ and 10mm∅ 47.113 kg/s

G.I. Tie Wire # 16 0.942 kg/s

Reinforced Concrete Slab 2.100

Portland Cement 19.950 bag/s

Sand 1.050 cu.m

Gravel ¾" 2.100 cu.m

Deformed RSB : 10mm∅ 50.820 kg/s

G.I. Tie Wire # 16 1.016 kg/s

105

ITEM QUANTITY UNIT DESCRIPTION

Reinforced Concrete Column 0.696

Portland Cement 6.607 bag/s

Sand 0.348 cu.m

Gravel ¾" 0.696 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 172.981 kg/s

G.I. Tie Wire # 16 3.460 kg/s

Reinforced Concrete Beams 0.888

Portland Cement 8.439 bag/s

Sand 0.444 cu.m

Gravel ¾" 0.888 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 195.903 kg/s

G.I. Tie Wire # 16 3.918 kg/s

IV. MASONRY WORKS

Interior and Exterior Wall

100mm CHB 399.000 pc/s

150mm CHB 236.000 pc/s

Portland Cement 32.000 bag/s

Sand 4.200 cu.m

Deformed RSB : 10mm∅ 106.590 kg/s

G.I. Tie Wire # 16 1.625 kg/s

Kitchen Counter

100mm CHB 6.000 pc/s

Portland Cement 0.512 bag/s

Sand 0.044 cu.m

Deformed RSB : 10mm∅ 3.696 kg/s

G.I. Tie Wire # 16 0.091 kg/s

V. ROOFING WORKS

Rafter and Purlins

Lip Channel Purlins 150 x 65 x 20 x 2.0mm 21.000 l.m

Angle Bar 75mm x 75mm x 6mm x 6m 2.000 pc/s

106

ITEM QUANTITY UNIT DESCRIPTION

100mm x 50mm x 3m Cleats 18.000 pc/s

Sagrod 10mm Ø 3.000 pc/s

Anchor Bolts 12.000 pc/s

Welding Rod 1.000 kg/s

Red Lead Primer 3.000 liter/s

Tinsmithry Work

0.5mm Rib-Type Roofing 27.500 sq.m.

Plain G.I. Sheet (Flashing) 16.400 l.m

J-bolt 30.000 pc/s

Tek Screw 90.000 pc/s

Ridge Roll 2.000 pc/s

VI. ARCHITECTURAL WORKS

Tilling Works

Unglazed Tiles 27.000 pc/s

Glazed Tiles 32.000 pc/s

ABC Grout 2.655 kg/s

Doors with 2" x 4" Jambs

D-1 Solid Wood Panel Door Type (900 x 2100) 1.000 set/s

D-2 Hollow Core Flush Door Type (700 x 2100) 1.000 set/s

D-3 PVC Door Type (600 x 2100) 1.000 set/s

D-4 Hollow Core Flush Door Type (800 x 2100) 1.000 set/s

Door Hinges 12.000 pc/s

Door Knob and Lockset 4.000 set/s

Windows

W-1 Dual Control Aluminum Jalousie 1.000 set/s

W-3 Aluminum Jalousie (11 blades) 1.000 set/s

W-4 Aluminum Jalousie (4 blades) 1.000 set/s

W-5 Dual Control Aluminum Jalousie 2.000 set/s

Typhoon Shutters

Marine Plywood ¾" thk x 4' x 8' 1.000 pc/s

107

ITEM QUANTITY UNIT DESCRIPTION

Angle Bar 25mm x 25mm x 3mm 3.000 m

Welding Rod 1.000 kg/s

Barrel Bolt 8.000 pc/s

VII. PLUMBING WORKS

Cold Water Line

19mm∅ x 5m PPR 3.000 pc/s

19mm∅ Elbow 90' 11.000 pc/s

19mm∅ Tee 3.000 pc/s

19mm∅ Gate Valve 1.000 pc/s

19mm∅ Check Valve 1.000 pc/s

Water Meter 1.000 pc/s

Teflon Tape 5.000 roll/s

Storm and Sewer

PVC Pipe 100mm∅ x 4m 4.000 pc/s

PVC Pipe 75mm∅ x 4m 2.000 pc/s

PVC Pipe 50mm∅ x 4m 2.000 pc/s

PVC Elbow 50mm∅ 90' 6.000 pc/s

PVC Elbow 75mm∅ 90' 4.000 pc/s

PVC Elbow 100mm∅ 90' 1.000 pc/s

PVC Tee 50mm∅ 4.000 pc/s

PVC Wye 45' (100mm x 50mm) 4.000 pc/s

P-Trap w/ Plug 50mm∅ 3.000 pc/s

100mm∅ Clean-Out 1.000 pc/s

Teflon Tape 10.000 roll/s

PVC Solvent 1.000 can/s

3 Chamber Septic Vault 1.000 unit/s

Fixtures

Faucet 4.000 pc/s

Kitchen Sink 1.000 pc/s

Water Closet 1.000 pc/s

108

ITEM QUANTITY UNIT DESCRIPTION

Lavatory 1.000 pc/s

Shower Head 1.000 pc/s

Floor Drain 1.000 pc/s

Teflon Tape 3.000 roll/s

Catch Basin

100mm CHB 15.000 pc/s

Portland Cement 0.660 bag/s

Sand 0.050 cu.m

Gravel ¾" 0.040 cu.m

Deformed RSB : 10mm∅ 2.220 kg/s

PVC 100mmØ 3.000 pc/s

VIII. ELECTRICAL WORKS

1.6mmØ THHN Copper, Stranded 60 l.m.

3.5mm² THHN Copper, Stranded 50 l.m.

5.5mm² THHN Copper, Stranded 12 l.m.

20mm Ø x 3m RSC pipe 1 pc/s

20mm Ø x 3m Rigid PVC PNS:14 20 pc/s

20mm Ø PVC Locknut & Adaptor 16 pair/s

2" x 4" Utility Box, PVC 9 pc/s

4" Octagonal Junction Box, PVC 5 pc/s

20mm Ø Entrance Cap 1 pc/s

Assorted Conduit Clamp 15 pc/s

Assorted Common Nail 0.5 kg/s

Electrical Tape (small) 1 roll/s

Socket Lamp Holder 4 pc/s

Tumbler Switch, Single Gang Device 2 pc/s

Tumbler Switch, Two Gang Device 1 pc/s

Convenience Outlet, Duplex, 10A 2P 4 pc/s

PVC Solvent Cement, 100cc 1 can/s

Other Misc./ Consumables 1 LS

109

ITEM QUANTITY UNIT DESCRIPTION

Panel Box, NEMA Enclosure 1 set/s

Main: 30AT, 50AF, 2P, 240V, 10 KAIC

w/ 1-15AT, 50AF, 2P, 240V, 10 KAIC

3-20AT, 50AF, 2P, 240V, 10 KAIC

Note: 1. Concrete class mixture “AA” was used in estimating all concrete works.

2. Assumptions are based on relatively flat terrain.

110

111

112

(OP

T. 1

)

113

(OP

T. 1

)

114

(OP

T. 1

)

ITEM DESCRIPTION QUANTITY UNIT

I. EARTHWORKS

Excavation 3.484 cu.m

Gravel Bedding 1" 0.429 cu.m

Backfill and compacted fill 2.343 cu.m

II. FORMWORKS

Marine Plywood ¼" x 4' x 8' 10.000 pc/s

Good Lumber 2" x 2" x 12' 129.408 bdft

Assorted Nails 3.000 kg/s

III. STRUCTURAL WORKS

Reinforced Concrete Footings 0.966 cu.m

Portland Cement 9.500 bag/s

Sand 0.483 cu.m

Gravel ¾" 0.966 cu.m

Deformed RSB : 12mm∅ 56.061 kg/s

G.I. Tie Wire # 16 1.250 kg/s

Reinforced Concrete Slab 0.554 cu.m

Portland Cement 5.500 bag/s

Sand 0.277 cu.m

Gravel ¾" 0.554 cu.m

Deformed RSB : 10mm∅ 39.972 kg/s

G.I. Tie Wire # 16 1.000 kg/s

QUANTITY TAKE-OFF : 22 SQM SINGLE DETACHED (OPT. 1)

115

(OP

T. 1

)

ITEM QUANTITY UNIT DESCRIPTION

Reinforced Concrete Column 1.162 cu.m

Portland Cement 11.500 bag/s

Sand 0.581 cu.m

Gravel ¾" 1.162 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 312.780 kg/s

G.I. Tie Wire # 16 6.500 kg/s

Reinforced Concrete Beams 1.711 cu.m

Portland Cement 16.500 bag/s

Sand 0.856 cu.m

Gravel ¾" 1.711 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 440.927 kg/s

G.I. Tie Wire # 16 9.000 kg/s

IV. MASONRY WORKS

Interior and Exterior Wall

100mm CHB 392.000 pc/s

Portland Cement 21.500 bag/s

Sand 2.367 cu.m

Deformed RSB : 10mm∅ 134.169 kg/s

G.I. Tie Wire # 16 2.750 kg/s

Kitchen Counter

Portland Cement 0.500 bag/s

Sand 0.017 cu.m

Deformed RSB : 10mm∅ 3.929 kg/s

G.I. Tie Wire # 16 0.250 kg/s

V. CARPENTRY WORKS

Exterior Wall

Sawali 10.951 sq.m.

2" x 3" Good Lumber 68.649 bdft

Assorted Nails 0.750 kg/s

116

(OP

T. 1

)

ITEM QUANTITY UNIT DESCRIPTION

Ceiling

Plywood ¾" x 4' x 8' 1.000 pc/s

2" x 3" Good Lumber 68.649 bdft

Assorted Nails 0.250 kg/s

Flooring

Plywood ¾" x 4' x 8' 5.500 pc/s

2" x 5" Good Lumber 288.862 bdft

Assorted Nails 2.000 kg/s

Stairs

2" x 6" Solid Wood Stringer 14.510 bdft

2" x 10" Solid Wood Tread 18.835 bdft

Assorted Nails 1.250 kg/s

Railing

1" x 2" Good Lumber 17.923 bdft

2" x 2" Good Lumber 11.200 bdft

Assorted Nails 0.750 kg/s

V. ROOFING WORKS

Rafter and Purlins

2" x 5" Good Lumber 81.856 bdft

3" x 3" Good Lumber 142.122 bdft

Bamboo slats 5.273 sq.m.

Assorted Nails 7.000 kg/s

Tinsmithry Work

0.5mm Rib-Type Roofing 31.200 sq.m.

Fascia Board 4.000 pc/s

Tek Screw 150.000 pc/s

Ridge Roll 1.000 pc/s

117

(OP

T. 1

)

ITEM DESCRIPTION QUANTITY UNIT

VI. ARCHITECTURAL WORKS

Tilling Works

300 x 300 Unglazed Tiles 14.000 pc/s

300 x 300 Glazed Tiles 11.000 pc/s

Tile Adhesive 0.500 bag/s

Doors with 2" x 4" Jambs

D-1 Solid Wood Panel Door Type (900 x 2100) 1.000 set/s

D-2 Hollow Core Flush Door Type (700 x 2100) 1.000 set/s

D-3 PVC Door Type (600 x 2100) 1.000 set/s

Door Hinges 9.000 pc/s

Door Knob and Lockset 3.000 set/s

Windows

W-1 Dual Control Aluminum Jalousie (13

blades) 3.000 set/s

W-2 Dual Control Aluminum Jalousie (13

blades) 2.000 set/s

W-4 Single Control Aluminum Jalousie (4

blades) 2.000 set/s

VII. PLUMBING WORKS

Cold Water Line

19mm∅ x 5m PPR 3.000 pc/s

19mm∅ Elbow 90' 9.000 pc/s

19mm∅ Tee 3.000 pc/s

19mm∅ Gate Valve 1.000 pc/s

19mm∅ Check Valve 1.000 pc/s

Water Meter 1.000 pc/s

Teflon Tape 5.000 roll/s

118

(OP

T. 1

)

ITEM QUANTITY UNIT DESCRIPTION

Storm and Sewer

PVC Pipe 100mm∅ x 4m 5.000 pc/s

PVC Pipe 75mm∅ x 4m 3.000 pc/s

PVC Pipe 50mm∅ x 4m 2.000 pc/s

PVC Elbow 100mm∅ 90' 2.000 pc/s

PVC Elbow 75mm∅ 90' 6.000 pc/s

PVC Elbow 50mm∅ 90' 4.000 pc/s

PVC Tee (50mm) 4.000 pc/s

PVC Tee (100mm x 50mm) 1.000 pc/s

PVC Wye 45' (100mm x 50mm) 4.000 pc/s

P-Trap w/ Plug 50mm∅ 3.000 pc/s

100mm∅ Clean-Out 1.000 pc/s

Teflon Tape 10.000 roll/s

PVC Gutter (150mm x 200mm) 2.000 unit/s

3 Chamber Septic Vault 1.000 unit/s

Fixtures

Faucet 3.000 pc/s

Kitchen Sink 1.000 pc/s

Water Closet 1.000 pc/s

Lavatory 1.000 pc/s

Shower Head 1.000 pc/s

Floor Drain 1.000 pc/s

Teflon Tape 3.000 roll/s

Catch Basin

100mm CHB 12.000 pc/s

Portland Cement 1.000 bag/s

Sand 0.072 cu.m

Gravel ¾" 0.035 cu.m

Deformed RSB : 10mm∅ 8.699 kg/s

119

(OP

T. 1

)

ITEM DESCRIPTION QUANTITY UNIT

VIII. ELECTRICAL WORKS

5/8"Ø x 6" Oval Eye Bolt 1.000 pc/s

15mmØ Entrance Cap 1.000 pc/s

15mmØ x 3m IMC Pipe 1.000 pc/s

20mmØ x 3m PVC Pipe 35.000 pc/s

15mmØ IMC Locknut & Adaptor 1.000 pair/s

20mmØ PVC Locknut & Adaptor 15.000 pc/s

2"x4" PVC Utility Box w/ moulded fixed socket & cover 10.000 pc/s

4"x4" PVC Junction Box w/ moulded fixed socket &

cover 7.000 pc/s

5.5mm² THHN Wire, Stranded 20.000 l.m.

3.5mm² THHN Wire, Stranded 81.000 l.m.

2.0mm² THHN Wire, Stranded 10.000 l.m.

1.6mm² THHN Wire, Solid 87.000 l.m.

Receptacle socket holder w/ 1 15W CFL 7.000 pc/s

Switch, Single Pole, w/ Plate & Cover 3.000 pc/s

Switch, Two Pole, w/ Plate & Cover 2.000 pc/s

Convenience Outlet, Duplex, w/ ground, universal type,

16A 5.000 pc/s

LP in Nema 1 Enclosure 1.000 assy

Main: 30AT 2P Bolt-on

Branches: 1-15AT 2P Bolt-on, 3-20AT 2P Bolt-on

400cc PVC Solvent Cement 1.000 can/s

Hacksaw Blade 3.000 pc/s

Electrical Tape 5.000 roll/s

Rubber Tape 1.000 roll/s

G.I. Tie Wire 1.000 kg/s

Assorted Concrete Nail 1.000 kg/s

Assorted Common Nail 1.000 kg/s

1.000 kg/s Assorted Conduit Clamp

Note: 1. Concrete class mixture “AA” was used in estimating all concrete works.

2. Assumptions are based on relatively flat terrain.

120

(OP

T. 2

)

121

(OP

T. 2

)

122

(OP

T. 2

)

ITEM DESCRIPTION QUANTITY UNIT

I. EARTHWORKS

Excavation 3.484 cu.m

Gravel Bedding 1" 0.429 cu.m

Backfill and compacted fill 2.343 cu.m

II. FORMWORKS

Marine Plywood ¼" x 4' x 8' 10.000 pc/s

Good Lumber 2" x 2" x 12' 129.408 bdft

Assorted Nails 3.000 kg/s

III. STRUCTURAL WORKS

0.966 cu.m Reinforced Concrete Footings

Portland

Cement 9.500 bag/s

Sand 0.483 cu.m

Gravel ¾" 0.966 cu.m

Deformed RSB : 12mm∅ 56.061 kg/s

G.I. Tie Wire # 16 1.250 kg/s

Reinforced Concrete Slab 0.554 cu.m

Portland

Cement 5.500 bag/s

Sand 0.277 cu.m

Gravel ¾" 0.554 cu.m

Deformed RSB : 10mm∅ 39.972 kg/s

G.I. Tie Wire # 16 1.000 kg/s

QUANTITY TAKE-OFF : 22 SQM SINGLE DETACHED (OPT. 2)

123

(OP

T. 2

)

ITEM QUANTITY UNIT DESCRIPTION

Reinforced Concrete Column 1.162 cu.m

Portland Cement 11.500 bag/s

Sand 0.581 cu.m

Gravel ¾" 1.162 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 312.780 kg/s

G.I. Tie Wire # 16 6.500 kg/s

Reinforced Concrete Beams 1.711 cu.m

Portland Cement 16.500 bag/s

Sand 0.856 cu.m

Gravel ¾" 1.711 cu.m

Deformed RSB : 16mm∅ and 10mm∅ 440.927 kg/s

G.I. Tie Wire # 16 9.000 kg/s

IV. MASONRY WORKS

Interior and Exterior Wall

100mm CHB 392.000 pc/s

Portland Cement 21.500 bag/s

Sand 2.367 cu.m

Deformed RSB : 10mm∅ 134.169 kg/s

G.I. Tie Wire # 16 2.750 kg/s

Kitchen Counter

Portland Cement 0.500 bag/s

Sand 0.017 cu.m

Deformed RSB : 10mm∅ 3.929 kg/s

G.I. Tie Wire # 16 0.250 kg/s

124

(OP

T. 2

)

ITEM DESCRIPTION QUANTITY UNIT

V. CARPENTRY WORKS

Exterior Wall

Sawali 10.951 sq.m.

2" x 3" Good Lumber 68.649 bdft

Assorted Nails 0.750 kg/s

Ceiling

Plywood ¾" x 4' x 8' 1.000 pc/s

2" x 3" Good Lumber 68.649 bdft

Assorted Nails 0.250 kg/s

Flooring

Plywood ¾" x 4' x 8' 5.500 pc/s

2" x 5" Good Lumber 304.009 bdft

Assorted Nails 2.000 kg/s

Overhang seat

Bamboo seating 2.276 sq.m.

2" x 2" Solid Wood 29.796 bdft

Assorted Nails 1.250 kg/s

Stairs

2" x 6" Solid Wood Stringer 14.510 bdft

2" x 10" Solid Wood Tread 21.185 bdft

Assorted Nails 1.250 kg/s

Railing

1" x 2" Good Lumber 13.207 bdft

2" x 2" Good Lumber 6.341 bdft

Assorted Nails 0.500 kg/s

V. ROOFING WORKS

Rafter and Purlins

2" x 5" Good Lumber 81.856 bdft

3" x 3" Good Lumber 142.122 bdft

Bamboo slats 5.273 sq.m.

125

(OP

T. 2

)

ITEM QUANTITY UNIT DESCRIPTION

Assorted Nails 7.000 kg/s

Tinsmithry Work

0.5mm Rib-Type Roofing 31.200 sq.m.

Fascia Board 4.000 pc/s

Tek Screw 150.000 pc/s

Ridge Roll 1.000 pc/s

VI. ARCHITECTURAL WORKS

Tilling Works

300 x 300 Unglazed Tiles 14.000 pc/s

300 x 300 Glazed Tiles 11.000 pc/s

Tile Adhesive 0.500 bag/s

Doors with 2" x 4" Jambs

D-1 Solid Wood Panel Door Type (900 x 2100) 1.000 set/s

D-2 Hollow Core Flush Door Type (700 x 2100) 1.000 set/s

D-3 PVC Door Type (600 x 2100) 1.000 set/s

Door Hinges 9.000 pc/s

Door Knob and Lockset 3.000 set/s

Windows

W-1 Dual Control Aluminum Jalousie (13 blades) 3.000 set/s

W-2 Dual Control Aluminum Jalousie (13 blades) 2.000 set/s

W-4 Single Control Aluminum Jalousie (4 blades) 2.000 set/s

VII. PLUMBING WORKS

Cold Water Line

19mm∅ x 5m PPR 3.000 pc/s

19mm∅ Elbow 90' 9.000 pc/s

19mm∅ Tee 3.000 pc/s

19mm∅ Gate Valve 1.000 pc/s

19mm∅ Check Valve 1.000 pc/s

Water Meter 1.000 pc/s

Teflon Tape 5.000 roll/s

126

(OP

T. 2

)

ITEM QUANTITY UNIT DESCRIPTION

Storm and Sewer

PVC Pipe 100mm∅ x 4m 5.000 pc/s

PVC Pipe 75mm∅ x 4m 3.000 pc/s

PVC Pipe 50mm∅ x 4m 2.000 pc/s

PVC Elbow 100mm∅ 90' 2.000 pc/s

PVC Elbow 75mm∅ 90' 6.000 pc/s

PVC Elbow 50mm∅ 90' 4.000 pc/s

PVC Tee (50mm) 4.000 pc/s

PVC Tee (100mm x 50mm) 1.000 pc/s

PVC Wye 45' (100mm x 50mm) 4.000 pc/s

P-Trap w/ Plug 50mm∅ 3.000 pc/s

100mm∅ Clean-Out 1.000 pc/s

Teflon Tape 10.000 roll/s

PVC Gutter (150mm x 200mm) 2.000 unit/s

3 Chamber Septic Vault 1.000 unit/s

Fixtures

Faucet 3.000 pc/s

Kitchen Sink 1.000 pc/s

Water Closet 1.000 pc/s

Lavatory 1.000 pc/s

Shower Head 1.000 pc/s

Floor Drain 1.000 pc/s

Teflon Tape 3.000 roll/s

Catch Basin

100mm CHB 12.000 pc/s

Portland Cement 1.000 bag/s

Sand 0.072 cu.m

Gravel ¾" 0.035 cu.m

Deformed RSB : 10mm∅ 8.699 kg/s

127

ITEM DESCRIPTION QTY UNIT

VIII. ELECTRICAL WORKS

5/8"Ø x 6" Oval Eye Bolt 1.000 pc/s

15mmØ Entrance Cap 1.000 pc/s

15mmØ x 3m IMC Pipe 1.000 pc/s

20mmØ x 3m PVC Pipe 35.000 pc/s

15mmØ IMC Locknut & Adaptor 1.000 pair/s

20mmØ PVC Locknut & Adaptor 15.000 pc/s

2"x4" PVC Utility Box w/ moulded fixed socket & cover 10.000 pc/s

4"x4" PVC Junction Box w/ moulded fixed socket & cover 7.000 pc/s

5.5mm² THHN Wire, Stranded 20.000 l.m.

3.5mm² THHN Wire, Stranded 81.000 l.m.

2.0mm² THHN Wire, Stranded 10.000 l.m.

1.6mm² THHN Wire, Solid 87.000 l.m.

Receptacle socket holder w/ 1 15W CFL 7.000 pc/s

Switch, Single Pole, w/ Plate & Cover 3.000 pc/s

Switch, Two Pole, w/ Plate & Cover 2.000 pc/s

Convenience Outlet, Duplex, w/ ground, universal type,

16A 5.000 pc/s

LP in Nema 1 Enclosure 1.000 assy

Main: 30AT 2P Bolt-on

Branches: 1-15AT 2P Bolt-on, 3-20AT 2P Bolt-on

400cc PVC Solvent Cement 1.000 can/s

Hacksaw Blade 3.000 pc/s

Electrical Tape 5.000 roll/s

Rubber Tape 1.000 roll/s

G.I. Tie Wire 1.000 kg/s

Assorted Concrete Nail 1.000 kg/s

Assorted Common Nail 1.000 kg/s

1.000 kg/s Assorted Conduit Clamp

(OP

T. 2

)

Note: 1. Concrete class mixture “AA” was used in estimating all concrete works.

2. Assumptions are based on relatively flat terrain.

128

129

SUPER TYPHOON YOLANDA CASUALTIES (Leyte, November 2013)

Defining Resilience

“The ability of a system,

community or society

exposed to hazards to resist,

absorb, accommodate to

and recover from the

effects of a hazard in a

timely and efficient

manner”

-United Nations International Strategy for

Disaster Reduction (UNISDR)

130

131

132

133

134

135

136

137

138

139

140

141

142

143

144

145

“Preparedness is the only way we

can combat natural disaster.”

-John Quinlan

146

147

148

149

150

151

152

153

154

155

156

157

158

159

160

161

ALLEY Any building space or thoroughfare which has been dedicated

or deeded to the public or for public use as a passageway with

a width of not more than three meters.

ALTER OR ALTERATION Any change, addition, or modification in construction of

occupancy.

BANGUERAHAN An elevated kitchen counter usually made of bamboo strips,

projecting beyond the kitchen wall which is used to store food

and kitchen utensils

A storage shelf and drainer before the dish rack was introduced

BATALAN Washing area

"Wet area" - usually jutting out somewhat from one of the walls.

Sometimes at the same level as the living area and sometimes

at ground level, the Batalan can contain any combination of

cooking and dishwashing area, bathing area, and in some

cases, a lavatory.

BLOCK A parcel of land bounded on the sides by streets or alleys or

pathways or other natural or manmade features, and occupied

by or intended for buildings.

Maximum block length is 400 meters. However, block length

exceeding 250 meters shall already be provided with a 2-meter

alley approximately at midlength.

BUILDABLE AREA The remaining space in a lot after deducting the required

minimum open spaces.

BUILDING Any structure built for the support, shelter, or enclosure of

persons, animals, chattels, or property of any kind.

GLOSSARY

162

BUILDING HEIGHT The vertical distance from the established grade elevation to

the highest point of the coping of a flat roof, to the average

height of the highest gable or a pitch or hip roof, or to the top

of the parapet if the roof is provided with a parapet. In case of

sloping ground, the average ground level of the buildable area

shall be considered the established grade elevation.

BUILDING LENGTH Its general lineal dimensions usually measured in the direction of

the bearing wall for girders.

BUILDING WIDTH Its shortest linear dimensions usually measured in the direction of

the floor, beams, or joints.

CONCRETE BLOCK A hollow or solid concrete masonry unit made from portland

cement and suitable aggregates such as sand, gravel, crushed

stone, bituminous or anthracite cinders, burned clay, pumice,

volcanic scoria, cooled or expanded blast furnace slags.

COURSE A continuous horizontal layer of masonry units.

COURT An occupied space between building lines and lot lines other

than a yard; free, open, and unobstructed by appendages

from the ground upward.

DWELLING Any building or any portion thereof which is not an "apartment

house", "lodging house", or a "hotel" as defined in this Code

which contained one or two "dwelling units" or "guest rooms",

used, intended or designed to be built, used, rented, leased, let

or hired out to be occupied, or which are occupied for living

purposes.

DWELLING UNIT One or more habitable rooms which are occupied or which are

intended or designated to be occupied by one family with

facilities for living, sleeping, cooking, and eating.

163

DWELLING,

INDIGENOUS FAMILY

A dwelling intended for the use and occupancy by the family

of the owner only. It is one constructed of native materials such

as bamboo, nipa, logs, or lumber, the total cost of which does

not exceed fifteen thousand pesos.

EXIT A continuous and unobstructed means of egress to a public

way, and shall include intervening doors, doorways, corridors,

exterior exit balconies, ramps, stairways, smokeproof,

enclosures, horizontal exits, exit passageways, exit courts, and

yards. An exit shall be deemed to be that point which open

directly into a safe dispersal area or public way. All

measurement are to be made to that point when determining

the permissible distance of the travel.

FIREWALL A fireblock with extends vertically from the lowest portion of the

wall which adjoins the 2 living units up to a minimum height of

0.30 meter above the highest portion of the roof attached to it;

the fire wall shall also extend horizontally up to a minimum

distance of 0.30 meter beyond the outermost edge of the

abutting units.

FLOOR AREA The area included within the surrounding exterior walls of a

building or portion thereof, exclusive of vent shafts and courts.

The floor area of a building or portion thereof not provided with

surrounding exterior walls shall be the usable area under the

horizontal projection of the roof or floor above.

FOOTING That portion of the foundation of a structure which spreads and

transmits loads directly to the soil or the pile.

FOUNDATION All the portions of the building or structure below the footing,

the earth upon which the structure rests.

164

FRONTAGE That part or end of a lot which abuts a street.

GROUND FLOOR The storey at or near the level of the grade, the other storeys,

beginning with second for the first next above, shall be

designated by the successive floor numbers counting upward.

LINE, BUILDING The line formed by the intersection of the outer surface of the

enclosing wall of the building and the surface of the ground.

LINTEL The beam or girder placed over an opening in a wall, which

supports the wall construction above.

LOAD, DEAD The weight of the permanent portions of a building or structure;

it includes the weight of the walls permanent partitions, framing

floors, roofs, and all other permanent and stationary fixtures

mechanism, and other construction entering into and

becoming a part of a building or structure.

LOAD, LATERAL That load cased by winds, earthquakes, or other dynamic

forces.

LOAD, LIVE The weight of the contents of a building or structure; it includes

all loads except dead and lateral, and weight of temporary

partitions, cases, counters, and similar equipment, and all loads

imposed due to the occupancy of the building or structure.

LOFT A room or space directly below the roof; attic

LOT LINE The line of demarcation between either public and private

property.

LOT/PLOT A portion of a subdivision or any parcel of land intended as a

unit for transfer of ownership or for building development.

A parcel of land on which a principal building and its

accessories are placed or may be placed together with the

required open spaces. A lot may or may not be the land

designated as lot or recorded plot.

165

MASONRY A form of construction composed of stone, brick, concrete,

gypsum, hollow clay tile, concrete block or tile, or other similar

building units of material or combination of these material laid

up unit and set in mortar.

MASONRY SOLID Masonry of solid units built without hollow spaces.

MASONRY UNIT Brick, block, tile, stone or other similar building unit or

combination thereof, made to be bounded together by a

cementation agent.

M E Z Z A N I N E O R

MEZZANINE FLOOR

A partial intermediate floor in any storey or room of a building

having an area not more than one-half of the area of the room

or space in which it is constructed.

OCCUPANCY The purpose for which a building is used or intended to be used.

The term shall also include the building or room housing such

use. Change of occupancy is not intended to include change

of tenants or proprietors.

PARTITION An interior subdividing walls.

PASAMANO Window sill; handrail

A piece of wood or masonry placed horizontally at the bottom

of a window; a narrow horizontal wooden rail on top of a

balustrade which serves as a handhold.

PATHWALK/ FOOTPATH A public way intended for pedestrian and which cuts across a

block to provide access to adjacent streets or property with

maximum length of 100 meters if connecting to roads and 50

meters if terminating in a dead end.

PLASTER A portion of the wall which projects on one or both sides and

acts as a vertical beam, a column, or both.

PLASTER, PORTLAND,

CEMENT

A mixture of portland cement, or portland cement and lime,

and aggregate and other approved material as specified in this

Code.

166

ROWHOUSE One of a series of houses, often of similar or identical design,

situated side by side and joined by common walls.

A single-family attached dwelling containing three or more

separate living units designed in such a way that they abut

each other at the sides, as in a row, and are separated from

each other by party walls: provided with independent access,

services, and use of land.

A house of not more than two storeys, composed of a row or

dwelling units entirely separated from one another by partly

wall or walls and with an independent entrance for each

dwelling units.

SAWALI Refers to woven split bamboo mats used in the Philippines to

construct walls.

It is a commonly used material in the construction of the

ubiquitous nipa hut.

Sawali is associated with lower income rural housing because it

is inexpensive and because its raw materials are found in rural

areas where lower income households abound. It is not

uncommon for sawali to also be used as a design element in

higher class leisure centers and other structures to portray a

rustic cultural architectural style.

SILONG Underneath the house; enclosed/ open space under the house

which are used as storage for harvested crops and farming

tools and where livestock (chicken, pigs, goats) are tended.

Raised up on hardwood stilts which serve as the main posts of

the house under the living space for a number of reasons, the

most important of which are to create a buffer area for rising

waters during floods, and to prevent pests such as rats from

getting up to the living area.[2] This section of the house is often

used for storage, and sometimes for raising farm animals,[4] and

thus may or may not be fenced off.

167

SOCIALIZED HOUSING refers to housing programs and projects covering houses and

lots or homelots only undertaken by the Government or the

private sector for the underprivileged and homeless citizens

which shall include sites and services development, long-term

financing, liberalized terms on interest payments, and such

other benefits in accordance with the provisions of this act (RA

7279)

SOFFIT The underside of a beam. lintel, or revear.

STAIRWAY Two or more risers shall constitute a stairway.

STOREY That portion of a building included between the upper surface

of any floor and the upper surface of the floor next above,

except that the topmost storey shall be that portion of a

building included between the upper surface of the topmost

floor and the ceiling or roof above. If the finished floor level

directly above a basement, cellar or unused underfloor space is

more than 3.60 meters above grade as defined herein at any

point. Such basement, cellar or unused underfloor space shall

be considered as a storey.

STRUCTURAL FRAME The framing system including the columns and the girders,

beams, trusses, and spandrels having direct connections to the

columns and all other members which are essential to the

stability of the building as a whole. The members of floor or roof

which have no connection to the column shall be considered

secondary and not a part of the structural frame.

STRUCTURE That which is built or constructed, an edifice or building of any

kind or any piece of work artificially built up or composed of

parts joined together in some definite manner.

168

VERANDAH An open space in front of the house building usually covered

and provided with perimeter grilles or railing

an outdoor porch with a roof. Most verandahs extend along the

sides and front of a house or building.

WALL BEARING A wall which supports any load other than its own weight.

WALL, CROSS A term which may be used synonymously with a partition.

WALL, EXTERIOR Any wall or element of a wall or any number or group of

members, which defines the exterior boundary or courts of a

building.

WALL, THICKNESS OF The minimum thickness measured on the bed or base of the

WINDOW An opening through a wall of a building to the outsider for the

purpose of admitting natural light and air.

YARD OR PATIO /

SETBACK

The vacant space left in a lot between the building and the

property line.

The minimum setback of dwelling unit both for economic and

socialized

housing project shall be as follows:

a. Front Setback 1.5 m.

b. Side yard 1.5 m (from the building line)

c. Rear yard 2.0 m.

d. Abutments May be allowed per requirements of the National

Building Code of the Philippines

YARD, REAR The yard lying between the side lot lines and the nearest lot line

and the nearest building line.

169

BIBLIOGRAPHY

Build Change. Residential Design and Construction Guidelines. Cebu City:

Build Change, 2016.

Department for International Development. Defining Disaster Resilience: A

DFID Approach Paper. London: Department for International

Development, 2011.

Fernandez, Rino. Diksyonaryong Biswal ng Arkitekturang Filipino. Manila:

University of Santo Tomas Publishing House, 2015.

Handbook on R.A. 9266 (The Architecture Act of 2004) and P.D. 1096

(National Building Code of the Philippines). Quezon City: United Architects of

the Philippines, 2013.

Housing and Land Use Regulatory Board. Revised implementing rules and

regulation for BP 220. Quezon City: s.n., 2008

International Association of Plumbing and Mechanical Officials. 2012 Uniform

Plumbing Code of the Philippines. s.l.: 2014

National Council on Disability Affairs. Batas Pambansa bilang 344

(Accessibility law) and its implementing rules and regulations. Quezon

City: s.n., 2010.

National Economic and Development Authority. Featured news: National

Economic and Development Authority. Republic of the Philippines

Government Web site. [Online] [Cited: February 9, 2016.] http://

www.neda.gov.ph/2015/11/03/ph-pledges-support-for-sdgs-pushes-

for-urgent-action-to-combat-climate-change-at-un-summit/.

170

Philippine Council for Sustainable Development. Enhanced Philippine

Agenda - 21. Pasig City : s.n., 2010.

US Department of Health and Human Services. Healthy housing reference

manual. Atlanta : s.n., 2006.

United Nations. Transforming Our World: The 2030 Agenda for Sustainable

Development. New York : s.n., 2015.

Photo Credits

Page 129

GMA News

Abs-Cbn News

Philippine Star

Page 131

NHA Information Division

171

NOTES

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

172

NOTES

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

173

Housing Technology Development Office Brief History and Function

The Housing Technology Development Office (HTDO) is one of the two sub-

offices under Technical Services Group (TSG) pursuant to NHA Office Order No. 5131

dated 08 March 2002 (copy attached as Annex 1) which was a reconstitution and

redefinition of functions of the Task Force on Housing Technology and Project

Development created under Office Order No. 9738 of December 1993.

The functions as stated in said Office Order No. 5131, and which are still being

undertaken by HTDO, are:

1. Undertake continuous improvement of the Authority’s project development process for

infrastructure projects to ensure responsiveness to environmental, institution and social

changes primarily through the following:

A. Development of design standards of housing and building units

B. Development of standard site development schemes and design of utilities and

infrastructures

C. Development of alternative building and site configuration plan

2. Research and develop low cost housing technology and alternative housing materials,

including prototype design of housing units and engineering components.

3. Act as the Technical Secretariat for AITECH accreditation of housing technology

schemes.

4. Provide technical and research assistance to management and operating units in

developing housing programs and approaches.

5. Provide the technical planning and support services to operating units, during the pre

design phases.

6. Establish and manage the authority’s technical databases to include, among others,

an updateable information resource on construction materials and price indices.

The HTDO is also in charge of the development of the master plan and the

supervision of construction of new structures in the NHA Main Compound per Office

Order No. 9545 dated June 10, 2010. It coordinates with other government agencies and

other organizations on matters pertinent to housing and planning (e.g., disaster risk

reduction, climate change adaptation, green building, gender sensitivity) to enhance

the NHA’s capacity in carrying out its mandate. Moreover, HTDO aims to encourage the

use of innovative housing technologies, materials and building systems as an alternative

to the traditional housing construction system.