Transcript of MUAR BAN LEE GROUP BHD.
Gas
POME
Automatic pressure protection device and pressure relief deviceBiogas desulfurization device
Second Deposit Pond
Overflowwater
Sludge Pond
System device
Acidification Tank
USR_Up-Flow Solid Reactor • COD loading factor 6~8 kg COD/m3d• HRT = 9 days < SRT & MRT• COD, BOD removal rate 90 ~ 95%• High system efficiency• Energy saving and clean water • Life span > 30 years• Low O & M cost, easy to manage • Device with double system security
The life span is 15 years and above The storage tank is hemispherical Ease of maintenance The membrane is fire rated to European
standard B level
Double Membrane Gas Storage
Enamel Service life : >30 yearsBuild time : 160 daysMaintenance: Don't need cleaning, maintenance.Appearance: beautiful & modern
Safety device
Foundation Desulfurizing Enamel board
Physical Characteristic of Enameled Steel
Coating thickness: 0.25~0.45mm, both sides coating ; Acid-proof alkalinity:
a) The standard coating is suitable to the pH value: 3~11; b) The special coating is suitable to the pH value : 1~14;
Adhesive power: 3,450 N/cm; Elasticity: the same to the steel plate Service life : ≥ 30years; Volume scope: 100-10000m3
Upon completion, operation and management procedures will be provided for easy operation and management system
No. Project Reference Mill/Plant Customer Complete Estimated power generate Status
1 Palm Oil Mill Effluent Biogas Engineering System (45T/h, POME 400m3) Tee Teh Palm Oil Mil l, Keratong Tee Teh Nov 2007 22,400 kW/day Genset 500kW - 1 unit
Genset 200kW - 1 unit
2 Swine Farm Effluent Biogas Engineering System Teratai Agriculture Farm, Muar Leong Hup Jan 2011 2,000 kW/day Genset 260kW-1 unit
3 Palm Oil Mill Effluent Biogas Engineering System (60T/h, POME 750m3)
MSSP Palm Oil Mill, Dumai Indonesia
PT .CILIANDA PERKASA Aug 2012 33,500 kW/day Not using the power
generated - flare all
4 Palm Oil Mill Effluent Biogas Engineering System (90T/h, POME 1170m3) Adong Palm Oil Mill, Miri Woodman Group Jan 2014 57,500 kW/day Power generation
5 Palm Oil Mill Effluent Biogas Engineering System (90T/h, POME 1065m3)
Ladang Sabah Palm Oil Mill, Sandakan IOI Group Dec 2013 57,000 kW/day
Waiting for flare and genset to be installed
by owner.
6 Palm Oil Mill Effluent Biogas Engineering System (60T/h, POME 750m3)
PT. PALMINA UTAMA, Banjarmasin JULONG GROUP estimated Dec
2014 43,000 kW/day On-going project
7 Palm Oil Mill Effluent Biogas Engineering System (30T/h, POME 390m3) PT --- PTP III Group Jul-14 20,000 kW/day
Awaiting power supply from miller to begin commissioning.
Project reference
FFB 45T/h, POME400m3/dGas: 28.89m3/ m3POMEOutlet:COD 1500~2900PPMBOD 200~1000PPM
Palm Oil Mill(RC), at Tee Teh Palm Oil Mill located at Block10, Mukim Keratong, Rompin, Pahang-in Malaysia
Trouble-free operation since 2007, 24 hour power generation
MPOB tested 42 timesCOD, BOD all
removal 90 ~ 95%
Palm Oil Mill(Enamel) in Dumai of Indonesia
FFB 60T/h, POME780m3/dOutlet:COD 1500~2900PPMBOD 1000~1500PPMCOD, BOD removal 90 ~ 95%
Woodman - MiriFFB 90T/h, POME1,170m3/dInput:COD 55,000 ppm BOD 26,000ppm
Enamel Digester
Double-membrane Gas storage