BIOGAS-CAPTURE ANAEROBIC DIGESTER

Layout of Biogas plant

Gas

POME

Automatic pressure protection device and pressure relief deviceBiogas desulfurization device

Second Deposit Pond

Overflowwater

Sludge Pond

System device

Acidification Tank

USR_Up-Flow Solid Reactor • COD loading factor 6~8 kg COD/m3d• HRT = 9 days < SRT & MRT• COD, BOD removal rate 90 ~ 95%• High system efficiency• Energy saving and clean water • Life span > 30 years• Low O & M cost, easy to manage • Device with double system security

System Comparison

31kW/hour

90% ~ 95%

Flexible feeding

The life span is 15 years and above The storage tank is hemispherical Ease of maintenance The membrane is fire rated to European

standard B level

Double Membrane Gas Storage

Enamel Service life : >30 yearsBuild time : 160 daysMaintenance: Don't need cleaning, maintenance.Appearance: beautiful & modern

Safety device

Foundation Desulfurizing Enamel board

Physical Characteristic of Enameled Steel

Coating thickness: 0.25~0.45mm, both sides coating ; Acid-proof alkalinity:

a) The standard coating is suitable to the pH value: 3~11; b) The special coating is suitable to the pH value : 1~14;

Adhesive power: 3,450 N/cm; Elasticity: the same to the steel plate Service life : ≥ 30years; Volume scope: 100-10000m3

Upon completion, operation and management procedures will be provided for easy operation and management system

Project site

No. Project Reference Mill/Plant Customer Complete Estimated power generate Status

1 Palm Oil Mill Effluent Biogas Engineering System (45T/h, POME 400m3) Tee Teh Palm Oil Mil l, Keratong Tee Teh Nov 2007 22,400 kW/day Genset 500kW - 1 unit

Genset 200kW - 1 unit

2 Swine Farm Effluent Biogas Engineering System Teratai Agriculture Farm, Muar Leong Hup Jan 2011 2,000 kW/day Genset 260kW-1 unit

3 Palm Oil Mill Effluent Biogas Engineering System (60T/h, POME 750m3)

MSSP Palm Oil Mill, Dumai Indonesia

PT .CILIANDA PERKASA Aug 2012 33,500 kW/day Not using the power

generated - flare all

4 Palm Oil Mill Effluent Biogas Engineering System (90T/h, POME 1170m3) Adong Palm Oil Mill, Miri Woodman Group Jan 2014 57,500 kW/day Power generation

5 Palm Oil Mill Effluent Biogas Engineering System (90T/h, POME 1065m3)

Ladang Sabah Palm Oil Mill, Sandakan IOI Group Dec 2013 57,000 kW/day

Waiting for flare and genset to be installed

by owner.

6 Palm Oil Mill Effluent Biogas Engineering System (60T/h, POME 750m3)

PT. PALMINA UTAMA, Banjarmasin JULONG GROUP estimated Dec

2014 43,000 kW/day On-going project

7 Palm Oil Mill Effluent Biogas Engineering System (30T/h, POME 390m3) PT --- PTP III Group Jul-14 20,000 kW/day

Awaiting power supply from miller to begin commissioning.

Project reference

FFB 45T/h, POME400m3/dGas: 28.89m3/ m3POMEOutlet:COD 1500~2900PPMBOD 200~1000PPM

Palm Oil Mill(RC), at Tee Teh Palm Oil Mill located at Block10, Mukim Keratong, Rompin, Pahang-in Malaysia

Trouble-free operation since 2007, 24 hour power generation

MPOB tested 42 timesCOD, BOD all

removal 90 ~ 95%

Palm Oil Mill(Enamel) in Dumai of Indonesia

FFB 60T/h, POME780m3/dOutlet:COD 1500~2900PPMBOD 1000~1500PPMCOD, BOD removal 90 ~ 95%

Woodman - MiriFFB 90T/h, POME1,170m3/dInput:COD 55,000 ppm BOD 26,000ppm

Enamel Digester

Double-membrane Gas storage

Biogas Project in Sandakan :IOI Group FFB 90T/h, POME1,065m3/dInput:COD 60,000 ppmBOD 26,000ppm

Biogas Project in PTPN3 :FFB 30T/h, POME 390m3/dInput:COD 45,000 ppmBOD 23,000 ppm

Shendong gas engine