Agenda – 42nd SCMPSPWR 1
Agenda notes for the 42nd Meeting of Standing Committee on Power System Planning in
Western Region
1. Confirmation of the minutes of 41st meeting of the Standing Committee on Power
System Planning in Western Region (SCPSPWR) held on 21.12.2016 at NRPC,
Katwaria Sarai, New Delhi
1.1. The minutes of the 41st meeting of SCPSPWR were issued vide CEA letter No.
26/10/2017/PSP&PA-I/ 92 – 106 dated 16.02.2017.
1.2. No comments from any of the constituents have been received on the same. The Committee
may confirm the minutes of 41st meeting of SCPSPWR.
2. Reviewing the Progress of Earlier Agreed Transmission Schemes
2.1. The status of implementation of transmission projects under tariff based competitive bidding
in Western Region are enclosed at Annexure – 2.1. The status of transmission schemes under
implementation by POWERGRID in Western Region is enclosed at Annexure – 2.2.
2.2. Members may deliberate.
3. Early commissioning of TBCB schemes of M/s Adani Transmission Ltd.
3.1. Adani Transmission Ltd. vide its letter no. ATL/CEA/17-18/03062017 dated 03.06.2017
requested for advancement of transmission schemes ‘Additional System Strengthening for
Sipat STPS’, ‘Additional System Strengthening Scheme for Chhattisgarh IPPs – Part B’ and
‘System Strengthening for IPPs in Chhattisgarh & Other Generation Projects in Western
Region’ being under implementation through TBCB (Tariff Based Competitive Bidding)
process by M/s STL, M/s RRWTL and M/s CWRTL (owned by M/s Adani Transmission
Ltd.) respectively.
3.2. MoP vide their order no. 15/1/2013-Trans dated 15.07.2015 has issued the policy for
incentivizing early commissioning of transmission projects. Subsequently, MoP vide its
OM No. 15/1/2013-Trans dated 05.10.2016 constituted a committee to ensure smooth
operationalization of the Policy for early commissioning of Transmission Projects.
3.3. Accordingly, on the request of M/s STL, RRWTL and CWRTL, a meeting was held on
16.06.2017 in CEA, New Delhi, under the chairmanship of Member (PS), CEA. The request
received from M/s STL, RRWTL and CWRTL for the early commissioning did not qualify
under the MoP policy for the early commissioning, as the request was not made well in
advance (i.e. less than 24 months prior to the intended early SCOD). However, there is a
provision in the Transmission Service Agreement (TSA) between TSP and LTTCs which
provides that COD shall not be date prior to the scheduled COD mentioned in the TSA unless
mutually agreed by all parties. In view of this, the proposals received from M/s STL,
RRWTL and CWRTL were discussed scheme / element wise and the following was agreed:
Agenda – 42nd SCMPSPWR 2
i) The elementwise details of the three schemes along with their scheduled COD as per
TSA, TSP’s proposed early commissioning COD and the mutually agreed date for early
commissioning is enclosed at Annexure – 3.1.
ii) The TSP and the implementing agency of the upstream and downstream network would
make best effort to achieve the mutually agreed date of early commissioning as given
in Annexure – 3.1. The parties involved would coordinate with each other to ensure
that there is no mismatch. In case of any anticipated mismatch, the respective
transmission elements are to be completed by revised mutually agreed date or by
SCOD, whichever is earlier.
iii) There will be no financial implication either on the TSP or on the implementing
agencies of the upstream and downstream network, in case of mismatch in achieving
the early commissioning date.
3.4. Members may kindly note.
4. Provision of Bus Reactors at High Voltage Nodes in Western Region – by
POWERGRID
4.1. In 41st meeting of SCPSPWR, PGCIL had proposed 5 no. of bus reactors in Western Region
i.e. Mapusa (400 kV – 125 MVAR), Solapur (765 kV – 240 MVAR), Kolhapur GIS (400
kV – 125 MVAR), Rajgarh (400 kV – 125 MVAR) and Aurangabad (765 kV – 240 MVAR)
based on the studies carried out for 2018–19 timeframe (off peak) conditions for controlling
overvoltage. In the meeting MSETCL had informed that they had planned reactive power
compensation at various nodes in their system including Solapur. It was agreed that the
reactive power compensation proposal of PGCIL need to be reviewed considering the
reactors already proposed by MSETCL and any other utility of Western Region. CEA
requested all utilities to furnish the list of reactive compensations proposed in Western
Region.
4.2. In line with the decision of 41st meeting of Standing Committee on Power System Planning,
a meeting was held on 13.01.2017, wherein MSETCL intimated that it has planned 11 nos.
bus reactors each of 125 MVAR at following 400 kV S/s of MSETCL and these are expected
to be commissioned by 2021-22, namely, (i) Karad (ii) Kolhapur (iii) Solapur (iv) Nanded
(v) Akola-II (vi) Bhusawal – II (Deep Nagar) (vii) Koradi–II (viii) Chandrapur–II (ix)
Khaparkheda (x) Lonikhand-II (xi) Dhule. In addition, 25 MVAR bus reactor at Dhule (220
kV) in GEC-I, and 125 MVAR at Balsane (400kV) in GEC II was also proposed. MSETCL
is also providing 125 MVAR bus reactors at Kudus and Alkud 400 kV sub-stations. During
the meeting, it was decided that the revised system studies would be carried out for assessing
balance reactors requirement in WR by PGCIL, after considering reactors proposed by
MSETCL.
4.3. MSETCL has further informed that among 11 nos. shunt reactors planned, the work of
procurement, installation and commissioning of 3 nos. reactors at Kolhapur, Karad and
Solapur is under progress and remaining 08 Nos. of 1 x 125 MVAR Shunt Bus Reactors
submitted for 90% funding from PSDF are as below.
Phase –-I: 1) Nanded, 2) Akola-II, 3) Koradi-II, 4) Bhusawal-II,
Phase –II: 5) Khaparkheda, 6) Chandrapur-II, 7) Lonikand-II, 8) Dhule
Agenda – 42nd SCMPSPWR 3
4.4. MSETCL has requested approval of the SCPSPWR for the above 8 nos. bus reactors for
getting funding under PSDF.
4.5. Subsequently, a joint meeting amongst CEA, CTU and MSETCL was held on 7-8 Sep.17 at
CEA, New Delhi, wherein the reactive compensation requirement in WR was studied after
considering all the bus reactors proposed by MSETCL for 2021-22 time-frame (in off-peak
scenario). After considering MSETCL reactive compensation proposal, following is the list
of high voltage nodes in WR, where voltages remain on the higher side. Therefore, additional
reactive compensation is required at these nodes.
Sl.
No.
Name of the
Substation
Existing Bus
Reactor(s)
(MVAr)
Proposed
Bus
Reactor
(MVAr)
% times (avg)
voltage
beyond 420kV
/ 800kV as per
operational
feedback
report (Apr-
Jun’17)
Voltage in 2021-22
time frame
(Off peak)
Without
proposed
reactor
With
proposed
reactor
1
Khandwa 400
kV 2x125 125 8 418 414
2 Solapur 765 kV 240 240 20 795 787
3 Rajgarh 400 kV 125 125 27 421 416
4 Wardha 765 kV 240+330 330 3 799 791
5
Aurangabad
765 kV 2x240 240 1 803 795
4.6. Further, high voltage issues at Raipur Pool (Durg) 765kV bus were discussed in 497th OCC
meeting of WR. In July 17, maximum voltage observed at Raipur PS was 808kV and for
16.3% of time the voltage remained above 800kV. Matter was recently deliberated in the
498th OCC meeting of WR held on 22.08.2017 and it was decided to refer the matter in SCM.
In the off-peak file for 2021-22 time-frame, the voltage at Raipur PS 765kV bus is obtained
as 788kV without any proposed reactors and 785kV with reactors proposed in the table above
and without any additional reactor at Raipur PS. Since voltage obtained at Raipur Pool
(Durg) 765/400kV substation is below 790kV in the 2021-22 time frame (off-peak), no
additional reactor needs to be planned at the Pooling Station.
4.7. Further, looking into the high voltages at various nodes identified above (close to 420kV and
800kV respectively), following bus reactors are proposed at ISTS nodes in Western Region:
Agenda – 42nd SCMPSPWR 4
Sl. No. Name of the Substation Proposed Bus
Reactor (MVAr)
1 Khandwa 400kV 125
2 Solapur 765kV 240
3 Rajgarh 400kV 125
4 Wardha 765kV 330
6 Aurangabad 765kV 240
4.8. Members may deliberate.
5. Second 400 kV D/C transmission line for BALCO Complex – M/s BALCO
5.1. In the 40th meeting of SCPSPWR held on 01.06.2016, M/s BALCO had raised the issue of
single point of connectivity of BALCO with the ISTS system (through BALCO-
Dharamjaygarh 400 kV D/C dedicated line) and for redundancy had requested for second
400 kV interconnection with ISTS. M/s BALCO had also requested that the existing interim
connectivity arrangement (LILO of 2nd ckt of Korba-Birsinghpur 400kV D/c line at BALCO
switchyard), instead of dismantling, may be retained permanently for power evacuation as a
redundant transmission line, in case of any exigency condition. The issue was discussed and
committee was of the opinion that the interim LILO connectivity cannot be put in parallel to
the dedicated line, but instead of dismantling it, the LILO portion can be disconnected from
the main line and kept in charged condition with a suitable bypass arrangement, which could
be used in exigencies as per the instructions of the Grid Operator. M/s BALCO was requested
to submit the bypassing scheme so that the same could be examined by CEA, CTU and
POSOCO.
5.2. In the 41st meeting of SCPSPWR held on 21.12.2016, M/s BALCO has proposed segregation
of connectivity of 2010 MW into connectivity for IPP (600 MW) and CPP (1410 MW). It
had requested for separate connectivity for the CPP for (i) Grid security for BALCO
complex, (ii) to fulfill RPO obligation for Aluminium smelter plant, (iii) to fulfill Power Sale
commitment and (iv) import of power in case of shutdown of multiple CPP units. In the
meeting, members observed that BALCO has modified its connectivity two times and again
and it has now made a proposal for the revision of its connectivity and segregation of the
connectivity of 2010 MW into connectivity of 1410 MW for CPP and 600 MW for IPP. In
the meeting, members opined that the proposal needs a close examination. Accordingly, it
was decided that a separate meeting shall be convened by CEA with CTU, WRLDC and
BALCO to further deliberate on the issue as per the regulations of CERC.
5.3. In line with the decision of the 41st meeting of SCPSPWR, a meeting was held on 10.03.2017
in CEA, where in, the following was agreed:
(i) Existing Connectivity with ISTS through BALCO – Dharamjaygarh 400 kV D/C line,
provided for injection of power from both CPP and IPP units of BALCO, is adequate.
The existing regulations do not have provision for separate connectivity for CPP and
IPP units connected with ISTS system at a single point. Further, BALCO is not eligible
Agenda – 42nd SCMPSPWR 5
to apply for additional connectivity for the same generation capacity for which
connectivity has already been granted. In case, if BALCO still desires separate
connectivity for CPP and IPP units connected with ISTS system at a single point, M/s
BALCO may approach CERC for necessary direction in this regard.
(ii) M/s BALCO is resorting to frequent change of status of its units from IPP to CPP and /
or vice versa. M/s BALCO may therefore clearly identify the IPP units & CPP units and
submit necessary documents to CEA, CTU and POSOCO in this regard.
5.4. This is for kind information of the members.
6. LILO of SSP – Dhule 400 kV D/C at Shivaji Nagar (Balsane) 400 kV S/s – proposal by
MSETCL
6.1. MSETCL has submitted a proposal under GEC–II Part B for funding under GEC (Green
Energy Corridor - 40 % KfW loan, 40 % NCEF grant and 20 % State Govt. equity) which,
interalia, includes establishment of 400/220 kV pooling station at Balsane (Shivajinagar) by
LILO of one ckt. of Sardar Sarovar–Dhule 400 kV D/C line at Balsane. This substation has
been proposed by MSETCL for evacuation of power from large quantum of existing and
proposed RE generation projects in Sakri, Shivaji Nagar and Dondaicha area. The scope of
works of 400 kV Pooling S/s. is as follows:
a) 400/220 kV Pooling Sub-Station at Balsane (2021-22)
b) 2 x 500 MVA, 400/220 kV ICTs with GIS bays.
c) LILO of one ckt. of 400 kV Dhule–Sardar Sarovar D/C line at Balsane 400 kV Pooling
S/s.
d) 220 kV D/C line from 400 kV Pooling S/s. to 220 kV Shivajinagar S/s.
e) LILO of 220 kV Dhule – Dondaicha S/C line partially on M/C towers at 400 kV Pooling
S/s.
f) 1 x 125 MVAr Bus Reactor at 400 kV Pooling S/s.
6.2. In a joint meeting held on 7-8 Sep.17 at CEA, New Delhi amongst CEA, CTU and MSETCL
the scheme was discussed, wherein, few alternatives of the 400 kV interconnections of the
proposed 400 kV Balsane pooling station were studied. In all the alternatives, the power flow
was towards Dhule (from Balsane). The following alternatives in addition to LILO of one
circuit of Sardar Sarovar–Dhule 400 kV D/C line were studied:
Alternative 1 (i) LILO of both ckts of SSP – Dhule 400 kV D/C at Balsane
Alternative 2 (i) Balsane – Dhule 400 kV D/C line
Alternative 3 (i) Dhule – Nashik 400 kV D/C line
(ii) LILO of both ckts of Dhule – Nashik 400 kV D/C line at
Balsane.
Alternative 4 (i) LILO of one ckt of SSP – Dhule 400 kV D/C at Balsane.
(ii) Balsane – Nashik 400 kV D/C line
Agenda – 42nd SCMPSPWR 6
6.3. The proposal made by MSETCL also involves 220 kV interconnections of Balsane 400/220
kV pooling station with the existing system, therefore with the increase in injection of RE
power overloading of some of 220 kV lines were observed.
6.4. MSETCL was suggested to consider Alternative 4 so that Balsane 400/220 kV could be
directly connected to Nashik (load centre) through 400 kV D/C line. The implementation
could be taken up by MSETCL in phases with increasing RE injection in the area. Also with
this alternative, Nashik would get interconnected at 400 kV, which at present is radial. It
may be noted that for providing 400 kV interconnection to Nashik, LILO of Navsari – Navi
Mumbai 400 kV D/C at Nasik (to be implemented by MSETCL) was agreed in the 28th
meeting of SCPSPWR held on 06.12.2008, which was dropped in 41st meeting of
SCPSPWR.
6.5. MSETCL may present the final scheme and members may deliberate.
7. Additional feed to Goa: interconnection of Xeldam and Xeldam (New) S/s
7.1. The following transmission scheme for providing additional feed to Goa was discussed in
39th meeting of SCPSPWR held on 30.11.2015 and agreed in the 40th meeting of SCPSPWR
held on 01.06.2016 at NRPC, New Delhi:
i) Establishment of 2x500 MVA, 400/220 kV new substation at Xeldam. The
interconnection between the existing 220 kV Xeldam i.e. Xeldam (GED) substation
and the proposed 400/220 kV new Xeldam substation could be through bus extension
or through 220 kV interconnecting lines, as the case may be.
ii) LILO of one circuit of Narendra (existing) – Narendra (new) 400 kV D/C quad line at
Xeldam.
iii) Xeldam (New)-Mapusa S/s 400 kV D/C (Quad) line to take care of any N-1-1
contingency involving outage of any one 400 kV infeed to Goa.
7.2. The above scheme is being implemented through TBCB route. To finalize the 220 kV
interconnection arrangement between new Xeldam S/s i.e. Xeldam (TBCB) and Xeldam
(GED), a meeting was held on 25.04.2017 at Goa among representatives of GED, PFCCL,
CTU and CEA. The minutes of the meeting enclosed as Annexure – 7.1. In the meeting, the
following interconnection was agreed:
Under TBCB scope
a) Xeldem (TBCB) – Xeldem (GED) 220 kV D/C line with HTLS conductor equivalent to
twin moose conductor
(220 kV line / interconnection is under TBCB Scope, 2 nos. 220 kV line bays at Xeldem
(GED) to be constructed by GED)
Under GED scope
b) New Xeldem (400 kV) – Verna (GED) 220 kV D/c line: 220 kV line and 2 nos. 220 kV
line bays at Verna (GED)
c) LILO of 2nd circuit of Ambewadi – Ponda 220 kV D/C line at Xeldem (New) 400 kV
S/s.
Agenda – 42nd SCMPSPWR 7
7.3. Subsequently, M/s GED has requested for implementation of Xedam (New) – Mapusa 400
kV D/C line, which is under scope of TBCB, on multi-circuit towers instead of double circuit
towers, so the same could be utilized for establishment of their Xeldam – Mapusa 220 kV
D/C line (via Kadamba & Verna) and the overall RoW requirements would be reduced.
7.4. To discuss the issue raised by GED, a meeting was held in CEA on 14.06.2017, wherein it
was observed that the three alternative routes for the proposed for Xeldem (new)-Mapusa
400 kV D/C line marked in the survey report submitted by BPC were not passing through
the proposed route of 220 kV Mapusa-Kadamba-Verna-Xeldem D/C line of the GED.
Further, Xeldem (new)–Mapusa 400 kV D/C line is an ISTS line, which is to be implemented
through TBCB route and the 220 kV D/C line from Mapusa–Kadamba–Verna–Xeldem D/C
line is an intra state line of GED. Therefore, it was decided that both 400 kV and 220 kV
circuits cannot be implemented on same multi-circuit towers, and they are to be implemented
independently. The minutes of the meeting is enclosed as Annexure – 7.2.
7.5. Members may note.
8. Progress of dedicated transmission lines of IPPs which are connected through interim
arrangement – Extension of Essar Power (Mahan) interim connectivity:
8.1. The cases of connectivity on interim LILO in Western Region (including M/s EPMPL case)
were discussed in the 40th & 41st meeting of SCPSPWR held on 01.06.2016 & 21.12.2016
respectively, to finalize the replacement of interim LILOs of generation developer by their
dedicated transmission lines as per direction of the CERC. In the 41st meeting of SCPSPWR,
M/s EPTCL was requested to expedite the implementation of Mahan STPS–Bilaspur Pooling
Station 400 kV D/C line before monsoon as against their completion target of December
2017. In line with direction given by CERC vide order no. 30/MP/2014 dated 28.06.2016,
the matter was referred to WRPC forum for further deliberation.
8.2. WRPC in their 33rd meeting held on 31.01.2017 & 01.02.2017 has agreed to the TCC
recommendation that M/s EPMPL should complete the line by 30.06.2017 and CTU to
discuss such issues in WRPC forum. CTU vide their later dated 15.06.2017 has written to
WRLDC to initiate action for disconnection of interim arrangement of M/s EPMPL by
30.06.2017.
8.3. Subsequently, M/s EPMPL vide their later dated 13.06.2017 has requested CEA for
extension of LILO arrangement for evacuation of power from their generation plant up to
January 2018. A meeting was held under the Chairmanship of Member (Power System),
CEA on 28.06.2017 at CEA, New Delhi to discuss the extension of LILO arrangement for
evacuation of power of M/s EPMPL Power Project (2x600 MW) at Mahan in Madhya
Pradesh. Minutes of the meeting enclosed as Annexure – 8.1. In the meeting, following was
decided:
i) The transmission system for evacuation of power from M/s EPMPL generation plant at
Mahan is now an ISTS system being implemented by M/s EPTCL (ISTS Transmission
Licensee) and not a dedicated transmission system of generation developer. As such
LILO of Vindhyachal–Korba STPP 400 kV S/C would not be an interim arrangement.
This change would be brought to the notice of constituents in the next meeting of
SCPSPWR.
Agenda – 42nd SCMPSPWR 8
ii) The system studies indicate that the LILO of Vindhyachal–Korba STPP 400 kV S/C line
at Mahan STPS would also be essential to take care of contingency of outage of one ckt
of Mahan SPTS–Bilaspur Pooling Station 400 kV D/C line for reliable evacuation of
power from 2x600 MW units of Mahan TPS.
iii) M/s EPTCL has agreed to complete the remaining works of Mahan STPS–Bilaspur
Pooling Station 400 kV D/C line by December 2017.
8.4. Members may deliberate.
9. Connectivity of Railways’ TSS with ISTS Network
9.1. In 41st meeting of Standing Committee on Power System Planning of Western Region held
on 21.12.2016, Railways requested for availability of 220 kV bays at various substations for
its Delhi – Bharuch route. PGCIL confirmed the availability of 2 no. of 220 kV AIS bays at
Rajgarh, Dehgam, Pirana, Kota & Bassi substations and 2 no. of GIS bays at Vadodara. It
was decided in the meeting that Railways shall submit the location of TSS, maximum load,
interconnection etc., and to assess the availability of transformation capacity Railways was
requested to apply for LTA.
9.2. South East Central Railways, Bilaspur vide its letter no. ELECT/SECR/227/NTPC/1876
dated 24.05.2017 (enclosed as Annexure – 9.1) intimated that PGCIL has granted
connectivity to 220/132 kV Bhilai GSS (Grid Sub Station) of Railways (which in feeds to
various TSS – Traction Substations) through Raipur (Kumhari – PGCIL). In order to provide
an alternative source of feeding to these TSS, it has requested for another connectivity to its
Raigarh GSS through 400/220 kV Raigarh (PG) S/s.
9.3. Subsequently, South East Central Railways, Bilaspur vide its letter no.
ELECT/SECR/227/NTPC/2727 dated 26.07.2017 (enclosed as Annexure – 9.2) requested
for additional ISTS connectivity for Bhatapara GSS through 400/220 kV Bhatapara S/s for
reliability and to address voltage drop during feed extension.
9.4. Railways may furnish the information regarding the locations of its various TSS / GSS along
the Delhi–Bharuch route, maximum load at each of these, its interconnection etc., and
maximum load of Bhilai GSS.
9.5. Members may deliberate.
10. Transmission System for Solar Power Parks in Madhya Pradesh
10.1. In the 40th meeting of SCPSPWR, the following transmission system strengthening scheme
was agreed by the members:
Inter State Transmission system strengthening in Chhatarpur area in Madhya Pradesh
(i) Establishment of 2x500 MVA, 400/220 kV substation at Bijawar*
(ii) LILO of Satna – Bina 400kV (1st) D/c line at Bijawar. (There are four 400kV circuits
between Satna and Bina, out of which one is proposed to be LILOed at Sagar
(MPPTCL) Substation. This LILO is on one D/c out of the above three remaining
400kV circuits between Satna and Bina).
Agenda – 42nd SCMPSPWR 9
(iii) 1x125 MVAr, 420 kV Bus Reactor at Bijawar pooling station.
(iv) 4 nos. 220kV line bays for termination of LILO of both ckts of Tikamgarh-
Chatarpur 220 kV D/c line at Bijawar.
(v) Space for 4 nos. of 220kV line bays for solar park interconnections
*SPPD shall provide land contiguous to Chhatarpur solar park for establishment of
400/220kV Bijawar substation.
Intra State Transmission system strengthening in Chhatarpur area in Madhya
Pradesh
(i) Stringing of 2nd circuit of Tikamgarh – Chhatarpur 220kV S/c on D/c line.
(ii) LILO of both circuits of Tikamgarh-Chhatarpur 220 kV D/c line at Bijawar 400/220
kV substation (60 km)
10.2. The following transmission system was agreed by the members for solar parks in Madhya
Pradesh, which has been planned in advance in view of the short gestation periods of solar
park, based on the information made available by MNRE, MPPTCL and Govt. of Madhya
Pradesh:
S.
No.
Solar Park Capacity
(MW)
Proposed Transmission System
1 Suwasara
Distt. Mandsaur
250 Intra-State Scheme
MPPTCL scope (already under implementation by
MPPTCL under Green Energy Corridor Phase-I):
(i) 400/220kV Sitamau (Mandsaur) substation
(ii) Mandsaur-Nagda 400kV D/c line (100kM)
SPPD scope:
Interim Arrangement (Required due to mismatch in the
Implementation schedule of 400/220kV Sitamau S/s
(2018-19) and Suwasara Solar park (Mar. 2017))
(i) 220kV D/c line from Solar Park Pooling station to
crossing point of Bhanpura-Badod 220kV line – 13
km
Connectivity System
(i) Extension of 220kV D/c line from crossing point of
Bhanpura-Badod 220kV line up to Sitamau
(Mandsaur) – 37 km
(ii) Associated 220kV line bays
Agenda – 42nd SCMPSPWR 10
2 Neemuch Solar
Park
Comprises of
three solar parks:
(i) Rampura
Solar Park
(150 MW)
(ii) Singoli Solar
Park (200
MW)
(iii) Jeeran
Solar Park
(150 MW).
500 Intra-State Scheme
MPPTCL scope:
Already under implementation by MPPTCL under
Green Energy Corridor Phase-I
(i) 400/220kV Sitamau (Mandsaur) substation
(ii) Mandsaur-Nagda 400kV D/c line (100kM)
(iii) 220 kV Ratangarh Pooling station
Additional system (may be reviewed by MPPTCL)
(iv) Establishment of 1x500 MVA (3rd), 400/220 kV
transformer at Sitamau (Mandsaur)
Connectivity System - SPPD Scope
(i) Rampura SP – Sitamau (Mandsaur) 220 kV D/c line
- 60 km
(ii) Jeeran SP - Sitamau (Mandsaur) 220 kV D/C line -
60 km
(iii) Singoli SP – Ratangarh 220 kV D/C line – 30 km
3 Agar (250 MW),
Rajgarh (250
MW) and
Shajapur (Moman
Badodiya 250
MW) solar parks
Agar comprises
of two solar parks:
(i) Agar Solar Park
(125 MW)
(ii) Susner
Solar Park (125
MW)
Rajgarh comprises of two
solar parks:
(i) Jeerapur Solar
Park (125 MW)
750 Inter-state transmission system
TBCB/ POWERGRID scope:
(i) Establishment of 2x500 MVA, 400/220 kV Pooling
station at/near Jeerapur
(ii) LILO of both circuits of RAPP –Shujalpur 400 kV
D/c at Jeerapur Pooling station
(iii) 1x125 MVAr, 420 kV Bus Reactor at Jeerapur
Pooling station
(iv) 220kV line bays (10 nos) for solar park
interconnections
MPPTCL scope:
(i) Shujalpur (PG)-Shujalpur (MP) 2nd 220 kV D/C
line or another 220kV outlet from Shujalpur (PG)
towards Ashta /other load center
Connectivity System – SPPD scope
(i) Agar SP – Jeerapur Pooling station 220 kV D/c –
35 km
(ii) Susner SP – Jeerapur Pooling station 220 kV D/c –
20 km
Agenda – 42nd SCMPSPWR 11
(ii) Khilchipur
Solar Park (125
MW)
(iii) Jeerapur SP – Jeerapur Pooling station 220 kV D/c
(iv) Khilchipur SP– Jeerapur Pooling station 220 kV
D/c – 20 km
(v) Moman Badodiya SP – Jeerapur Pooling station
220 kV D/c – 45 km
4 Chattarpur Solar
park
As informed by
MoP/MNRE the
capacity of the
solar park is 250
MW.
However, as per
the information
given by Madhya
Pradesh the solar
park has potential
for 500 MW
capacity.
Therefore, for
evacuation
purpose 500 MW
capacity has been
considered.
500 Intra State Transmission system strengthening in
Chhatarpur area in Madhya Pradesh
(i) 2nd circuit stringing of 220kV Tikamgarh –
Chhatarpur line.
(ii) LILO of Tikamgarh - Chhatarpur 220 kV D/c line
(both circuits) at Bijawar PS (60 km)
Connectivity System – SPPD Scope
(i) Solar park to Bijawar 400/220 kV substation 220 kV
lines along with the 220 kV bays.
5 Morena 250 Intra-State Scheme
Connectivity System – SPPD Scope
Alternative I
(i) 220kV Morena SP - Morena S/s (MPPTCL) D/c line
– 22 km
Alternative II
(i) 220kV Morena SP – Morena 400/220 substation
(ISTS) D/c line – 35 km
(ii) Two nos. of 220 kV bays at Morena 400/220
substation (ISTS
10.3. A meeting was held in CEA on 28.08.2017 to review the status of the transmission scheme
“Connectivity System for Lanco Vidarbha Thermal Power Pvt. Ltd. (LVTPPL) and Inter
Agenda – 42nd SCMPSPWR 12
State Transmission system strengthening in Chhatarpur area in Madhya Pradesh”, which is
to be implemented through TBCB but its bidding process is yet to start. M/s Rewa Ultra
Mega Solar Ltd. (RUMSL), the Solar Power Project Developer (SPPD) for development of
solar parks in Madhya Pradesh, vide their letter dated 26.08.2017 have stated that RUMSL
is unable to develop solar park at Chhatarpur and does not require associated substation in
that area, but CEA may take decision on development of proposed ISTS substation at
Chhatarpur. In the meeting, CEA had stated that establishment of Bijawar 400/220 kV
substation has been agreed as system strengthening scheme for the purpose of evacuation of
power from Chhatarpur Solar Park and also to cater the present and future power drawl
requirements in Chhatarpur area. The 220 kV outlets for Bijawar are to be implemented by
MPPTCL as intra-state system strengthening scheme. Therefore, the scheme can still be
implemented as transmission system strengthening scheme.
10.4. CEA vide its letter dated 30.08.2017 has requested MPPTCL to intimate the implementation
time frame of the intra-state strengthening scheme in Chhatarpur area (220 kV outlets from
proposed Bijawar 400/220 kV substation) also furnish the inputs regarding the tentative
location(s) of the proposed 400/220 kV substation in Chhatarpur area.
10.5. RUMS intimated that it is planning to set up 500 MW solar park in the Neemuch district
Madhya Pradesh. Considering the inputs of RUMS, in the 40th Meeting of SCPSPWR held
on 01.06.2017, the evacuation system for Neemuch Solar park i.e. three different locations
i.e. Rampura SP (150 MW), Singoli Solar Park (200 MW) and Jeeran Solar Park (150 MW)
was planned and agreed as given above. RUMS vide its letter dated 02.06.2017 has intimated
that it has identified suitable land (total of 1120 Hectares) in the vicinity of Singoli to
establish entire 500 MW at Singoli itself (instead of 150 MW at Rampura, 200 MW at Singoli
and 150 MW at Jeeran) and the solar parks at Jeeran & Rampura would not be developed.
10.6. RUMS has requested for grant of connectivity to Neemuch Solar Park in ISTS by LILO of
Chittorgarh–Nagda at Neemuch Solar Park and to establish a 400 kV or above Substation
adjacent to Neemuch solar park.
10.7. Members may deliberate.
11. Additional ISTS feed to Navi Mumbai 400/220 kV substation of POWERGRID
11.1. In the 41st meeting of Standing Committee on Power System Planning in WR held on
21.12.2017 and subsequent meeting held on 13.01.2017, following transmission system was
agreed for providing ISTS feed to Navi Mumbai 400/220 kV S/s subject to implementation
feasibility of 220 kV outlets from Navi Mumbai S/s.
i. Padghe (PG)–Kharghar 400 kV D/c quad line to be terminated into one ckt. of
Kharghar–Ghatkopar 400 kV D/c line (thus forming Padghe (PG)-Kharghar 400 kV
S/c quad line and Padghe (PG)-Ghatkopar 400 kV S/c quad line)
ii. LILO of Padghe (PG) – Ghatkopar 400 kV S/c line at Navi Mumbai (PG)
iii. LILO of Taloja–Kalwa 220 kV S/c line at Navi Mumbai (PG)
iv. LILO of Apta–Kalwa 220 kV S/c line at Navi Mumbai (PG)
11.2. In line with the decision of 41st meeting of SCPSPWR held on 21.12.2017, a joint site visit
was carried out on 07.04.2017 by CEA, CTU & MSETCL, for ascertaining the
Agenda – 42nd SCMPSPWR 13
implementation feasibility of 220 kV outlets from Navi Mumbai 400/220 kV S/s. During the
site visit, it was noted that the distance of LILO point of Taloja – Kalwa 220kV S/c section
from Navi Mumbai S/s (as mentioned at sl. no. iii) is about 7 km. The implementation of this
7 km LILO length shall not be practically possible due to severe ROW issues in this area.
Accordingly, it was decided that LILO of Apta–Taloja / Kalwa 220 kV D/c line shall be
carried out at Navi Mumbai instead of earlier mentioned LILO of Apta – Kalwa & Taloja –
Kalwa 220 kV lines.
11.3. In view of the above, the modified transmission system for providing ISTS feed to Navi
Mumbai (to be implemented through TBCB route) is as below.
Transmission System for providing ISTS feed to Navi Mumbai:
Padghe (PG)–Kharghar 400 kV D/c quad line to be terminated into one ckt. of
Kharghar–Ghatkopar 400 kV D/c line (thus forming Padghe (PG) - Kharghar 400 kV
S/c quad line, Padghe (PG) - Ghatkopar 400 kV S/c quad line)
LILO of Padghe (PG) – Ghatkopar 400kV S/c line at Navi Mumbai (PG)
LILO of Apta–Taloja and Apta-Kalwa section of the Apta-Taloja/Kalwa 220 kV D/c
line at Navi Mumbai (PG)
Figure-1: Schematic Diagram of Transmission System around Mumbai area
Agenda – 42nd SCMPSPWR 14
11.4. During the joint visit, it was also decided that to ensure that power flows are well balanced
on all the 220 kV outlets from Navi Mumbai substation, MSETCL shall carry out
reconfiguration of the Kharghar – Kandalgaon 220 kV D/c line and Apta – Taloja / Kalwa
220 kV D/c at the crossing point. One of the feasible option is shown in the figure below:
Figure-2: LILO of Apta – Kalwa 220kV D/c line at Navi Mumbai S/s of POWERGRID with Interconnection of Khargar – Khandalgaon 220kV D/c line with one circuit of Apta – Kalwa 220kV D/c line along-with bunching of the other section of Khargar – Khandalgaon 220kV D/c line near location 633
11.5. MSETCL vide their letter MSETCL/CO/STU/9849 dated 07.09.2017 requested minor
modifications in above proposed system. MSETCL proposed that Padghe(PG)–Kharghar
400 kV D/C line should be terminated at 400 kV Kharghar (MSETCL) S/s instead of
terminating it to one circuit of Kharghar–Vikhroli 400 kV D/C line, as the conductor of
Padghe(PG) – Kharghar 400 kV D/C line is quad moose while conductor of Kharghar –
Vikhroli 400 kV D/C line is twin moose.
11.6. Kharghar–Vikhroli corridor is important and main feeding source to Vikhroli S/s. This
corridor is having severe RoW issues, so CEA is in view to implement Kharghar – Vikhroli
corridor with quad moose conductor / with high ampacity conductor equivalent to quad
moose. Also by terminating the Padghe–Kharghar 400 kV D/C line to one circuit of
Kharghar-Vikhroli 400 kV D/C, Kharghar S/s and Ghatkopar S/s through Navi Mumbai S/s
would be directly connected to strong ISTS source Padghe (PG).
Agenda – 42nd SCMPSPWR 15
11.7. MSETCL vide letter dated 07.09.2017 also proposed the LILO of 400 kV Talegaon (PG) –
Kalwa line at Vikhroli S/s to have an alternate source to import power from Maharashtra
grid. The LILO of Talegaon (PG) – Kalwa 400 kV line at Vikhroli only redistribute the
power and increases the interconnections which further increases the fault level at different
sub-stations.
11.8. Members may deliberate and concur the Navi Mumbai ISTS feed proposal.
12. Interim arrangement of Koradi II–Wardha 400 kV D/C quad line and power
evacuation beyond Warora.
12.1. In the 41st meeting of SCPSPWR, following measures to control fault level at Wardha were
agreed:
(i) At present Koradi II-Wardha 400 kV D/C is terminated into one ckt of Warora–Wardha
400 kV D/C line as an interim arrangement (forming Koradi-II – Wardha 400 kV S/C
line, Koradi-II–Warora 400 kV S/C line and Warora–Wardha 400 kV S/C line). Removal
of the interim arrangement through bypassing of Koradi II-Wardha 400 kV D/C line and
Wardha (PG)–Warora 400 kV line at Wardha (forming Koradi II–Warora 400 kV D/C
line) would be done after commissioning of Koradi II–Koradi III 400 kV D/C quad line.
One ckt of Koradi II – Koradi III 400 kV D/C quad line commissioned in Dec’2016 &
another circuit commissioned in Feb, 2017.
(ii) For evacuation of power from Koradi-II / Tiroda generation projects, system
strengthening was required beyond Warora 400 (MSETCL) substation. MSETCL would
finalise the transmission system strengthening beyond Warora and the same would be
intimated in the next SCM of WR.
12.2. MSETCL may intimate the restoration status of the interim arrangement and MSETCL may
present the transmission system strengthening beyond Warora.
12.3. Members may deliberate.
13. High fault level at 400 kV Korba STPS (NTPC)
13.1. In the 40th meeting of SCPSPWR held on 01.06.2016, high fault level at 400 kV Korba STPS
(3 x 200 + 4 x 500) of NTPC was discussed and the following scheme was agreed to control
high fault current at Korba STPS:
(i) Korba STPS - Korba West 400 kV S/C line to be normally kept open.
(ii) Korba STPS- Sipat STPS 400 kV S/C line and Sipat STPS – Raipur 400 kV S/C line to
be rearranged as Korba STPS- Raipur 400 kV S/C line (bypassing Sipat STPS –
bypassing arrangement at Sipat STPS is available).
13.2. CSPTCL vide its letter no. 02 – 12 / SE (C & RA) / 1016 dated 02.09.2016 intimated that
the above arrangement (i.e. Korba STPS-Korba West 400 kV S/C line in normally open
conditions) would cause overloading of the 400 kV & 220 kV lines emanating from Korba
(West) power plant under n–1–1 contingency condition and requested to review the proposal.
In view of this, in 41st meeting of SCPSPWR, it was decided to have a joint meeting among
CEA, CTU, WRPC, WRLDC & CSPTCL.
Agenda – 42nd SCMPSPWR 16
13.3. In line with the decision of the 41st meeting of SCPSPWR, a meeting was held on 22.09.2017
at CEA, New Delhi with participation from CTU, CSPTCL, WRLDC and NTPC. Minutes
of the meeting enclosed as Annexure – 13.1. In the meeting, it was agreed to carryout studies
for 2021-22 time frame for three different alternatives as give below:
Alternative 1 (A1): Korba (NTPC) – Korba (W) 400 kV S/C open + Korba(NTPC) - Sipat
STPS 400 kV S/C line and Sipat STPS – Raipur 400 kV S/C line
bypassed at Sipat so as to form Korba STPS- Raipur 400 kV S/C line,
as proposed in 41st meeting of SCPSPWR
Alternative 2(A2): Reconfiguration of Korba (West) – Korba (NTPC) 400 kV line and
Korba (NTPC) - Sipat 400 kV S/C line as Korba (W) – Sipat 400 kV
S/C line through bypassing at Korba (NTPC).
Alternative 3(A3): Reconfiguration of Korba(W)-Korba(NTPC) 400 kV line and
Korba(NTPC)- Essar Mahan 400 kV line as Korba(W)-Essar Mahan
400 kV line through bypassing at Korba(NTPC)
13.4. As per the study results, it is seen that the fault level is in within limits for both A1 & A2. In
alternative A1, one 400 kV interconnections (Korba (NTPC) – Korba (W) 400 kV S/C line)
would not be available from both Korba(W) and Korba (NTPC) 400 kV bus. But in
alternative A2, two no. of 400 kV interconnections (Korba (NTPC) – Korba (W) 400 kV S/C
line and Korba(NTPC) - Sipat STPS 400 kV S/C line) would not be available for evacuation
of power from Korba (NTPC) 400 kV bus.
13.5. The study suggests the following alternative to control high fault current at Korba STPS
(3x200 MW + 4x500 MW) of NTPC:
i. Korba STPS - Korba West 400 kV S/C line to be normally kept open. CSPTCL to take
Korba (W) to Korba (NTPC) 400 kV S/C line into service in case of planned shutdown
of any of 400 kV lines emanating from Korba(W). This line would be normally idle
charged from one end say Korba (NTPC).
ii. Korba STPS- Sipat STPS 400 kV S/C line and Sipat STPS – Raipur 400 kV S/C line
to be rearranged as Korba STPS- Raipur 400 kV S/C line bypassing at Sipat STPS.
(bypassing arrangement at Sipat STPS already exists).
13.6. Members agreed with the above proposal. However, CSPTCL stated that they would convey
their opinion on the proposal after consultation with their SLDC. CSPTCL may
communicate their views on the proposal.
13.7. Members may deliberate.
14. Reviewing the intra state transmission system and 220 kV interconnection with Vapi –
II DNH
14.1. The following interstate transmission system, based on the joint system studies among CEA,
CTU and GETCO was proposed in the 41st meeting of SCPSPWR to cater the demand of
DNH and Daman & Diu (no space available for putting additional transformers at existing
Vapi 400/220 kV) and provide 220 feed to south Gujarat substation.
Agenda – 42nd SCMPSPWR 17
i) Establishment of 2 x 500 MVA, 400/220 kV S/s near Vapi / Ambheti (Vapi – II)
ii) LILO of KAPP – Vapi 400 kV D/c line at Vapi – II
iii) 1 x 125 MVAr bus reactor at Vapi – II Substation
220 kV connectivity from Vapi – II is given below:
(a) For Gujarat (GETCO)
Vapi-II – Atul (GETCO) 220kV D/c line
LILO of Chikhli (Ambetha) – Vapi (GETCO) 220 kV S/c line at Vapi-II
(b) For Dadra and Nagar Haveli (DNHPDCL)
Vapi-II – Sayali (DNH) 220 kV D/c line (high capacity)
Vapi-II – New Kharadpada (DNH) 220 kV D/c line (high capacity)
14.2. In the 41st meeting of SCPSPWR held on 21.12.2016, it was observed that Vapi–Khadoli
220 kV D/C line and Vapi – Kharadpapda 220 kV D/C line were lightly loaded and there is
a space constraint at Sayali and severe RoW problems in implementation of these lines.
Therefore, it was agreed to review the intrastate network of DNH & its interconnection with
Vapi II separately.
14.3. Accordingly, a meeting was held among CEA, CTU & PGCIL on 01.06.2017 and
02.06.2017 at Silavassa, DNH (Minutes of the Meeting are enclosed as Annexure – 14.1).
In the meeting, interconnection from the Vapi-II & intra state constraints in the DNH
network (based on the comprehensive system study report in the 2021-22 time frame
submitted by POWERGRID), was discussed and after the detailed deliberations, the
following system was agreed:
I. 220 kV connectivity from 400/220 kV, 2x500 MVA Vapi–II substation to DNH
(Transmission System under ISTS)
a. Vapi-II–Sayali 220kV D/C line (From Vapi-II to LILO point of one circuit of
Vapi(PG)–Khadoli 220kV D/C line at Sayali substation with ampacity equivalent
to twin zebra conductor).
b. Interconnection with LILO section (of LILO of one circuit of Vapi(PG) –Khadoli
220kV D/C line at Sayali substation) so as to form Vapi-II–Sayali 220 kV D/C line
and Vapi-Khadoli 220 kV D/C line. The LILO section is with zebra conductor.
II. Intra State system strengthening in DNH transmission network
220 kV system
a. Kala – Khadoli 220 kV (2nd) D/C line.
b. Establishment of 220 kV switching station at Bhilosa (GIS) with provision of 8 nos.
of 220 kV bays (4 nos. equipped line bays and 4 nos. future bays). (Out of the 4
equipped line bays, 2 nos. line bays are for LILO of one ckt. of Vapi- Kharadpada
220 kV D/C line at Bhilosa and 2 nos. line bays are for Bhilosa industries)
c. LILO of one ckt. of Vapi-Kharadpada 220 kV D/C line at Bhilosa.
d. Establishment of Vagchipa 220/66 kV, 2x160 MVA substation by LILO of both ckts
of Vapi – Khadoli 220 kV D/C line. (already under implementation).
Agenda – 42nd SCMPSPWR 18
e. Conversion of Sayali 220 kV switching station to 2x100 MVA, 220/66 kV
substation.
f. Conductor replacement of the LILO section (of LILO of one circuit of Vapi(PG) –
Khadoli 220kV D/C line at Sayali substation) with ampacity equivalent to twin
zebra conductor depending on the loading of the lines in future, if required.
66 kV system
g. Establishment of three 66kV circuits between Vaghchipa & Dadra
h. Establishment of three 66kV circuits between Vaghchipa & Amli
i. 66 kV Vaghchipa – Silli D/C line
j. Establishment of Sayali new 66/11 kV substation with LILO of Sayali 220/66 kV-
Rakholi 66 kV D/Cline at Sayali new and LILO of Masat – Khadoli 66kV S/C line
at Sayali New 66/11kV S/s.
k. Amli- Silvassa Town 66 kV D/C line.
l. Shifting of about 20MVA bulk load from Amli to Silli
14.4. Accordingly, the scheme for establishment of new 400/220 kV substation in Vapi/Ambethi
area and its associated transmission lines as system strengthening scheme in WR is as given
below:
Establishment of new 400/220 kV substation in Vapi/Ambethi area and its associated
transmission lines (under ISTS):
i) Establishment of 2 x 500 MVA, 400/220 kV S/s near Vapi / Ambheti (Vapi – II)
ii) LILO of both circuits of KAPP – Vapi 400 kV D/c line at Vapi – II
iii) 1 x 125 MVAr bus reactor at Vapi – II Substation
iv) Vapi-II – Sayali D/C 220kV line
From Vapi-II to LILO point of one circuit of Vapi(PG) –Khadoli 220kV D/C line
at Sayali substation with ampacity equivalent to twin zebra conductor.
Interconnection with LILO section (of LILO of one circuit of Vapi(PG) –Khadoli
220kV D/C line at Sayali substation) so as to form Vapi-II – Sayali 220 kV D/C
line and Vapi- Khadoli 220 kV D/C line. The LILO section is with zebra
conductor.
220 kV outlets to be implemented by GETCO in matching time frame of the above
scheme is given below:
a) Vapi-II–Atul (GETCO) 220kV D/c line
b) LILO of Chikhli (Ambetha)–Vapi (GETCO) 220 kV S/c line at Vapi-II
14.5. POWERGRID has suggested that DNHPDCL may implement reconductoring of the LILO
section (of LILO of one circuit of Vapi(PG)–Khadoli 220kV D/C line at Sayali substation)
with high capacity conductor with ampacity equivalent to twin zebra conductor in matching
time-frame of the ISTS line i.e., Vapi-II – Sayali D/C 220kV line
14.6. The intrastate system of DNH also includes establishment of 220 kV switching station at
Bhilosa (GIS) with LILO of one ckt. of Vapi – Kharadpada 220 kV D/C line at Bhilosa. The
scheme has already been discussed and agreed in the meeting held among CEA, CTU &
PGCIL from 01.06.2017 to 02.06.2017 at Silavassa. The scheme involves LILO of an
Agenda – 42nd SCMPSPWR 19
interstate line, therefore the scheme, as given below, has been put for approval of WR
constituents:
a. Establishment of 220 kV switching station at Bhilosa (GIS) with provision of 8 nos. of
220 kV bays (4 nos. equipped line bays and 4 nos. future bays). (Out of the 4 equipped
line bays, 2 nos. line bays are for LILO of one ckt. of Vapi- Kharadpada 220 kV D/C line
at Bhilosa and 2 nos. line bays are for Bhilosa industries)
b. LILO of one ckt. of Vapi- Kharadpada 220 kV D/C line at Bhilosa.
14.7. CEA has conveyed in principle approval of the scheme to DNH.
14.8. Member may concur the same.
15. Charging of 400 kV Solapur PG – Karad line on 220 kV level for resolving low voltage
problems in Solapur District
15.1. MSETCL vide its letter no. MSETCL/CO/STU/2818 dated 18.03.2017 has sent the proposal
of charging a part of the existing 400 kV Solapur (PG) – Karad S/C line at 220 kV level
using one circuit of under construction Solapur (PG)-Bale 220 kV D/C line as an interim
arrangement to CEA. The proposal was to resolve low voltage problems in Solapur District
during agriculture peak load. Parli–Karad 400 kV S/C line is LILOed at 400 kV Lamboti S/s
(i.e. Solapur - MSETCL). Subsequently, under WRTS–II, LILO of 400 kV Lamboti – Karad
S/C line at Solapur (PG) was implemented by M/s Reliance Power Transmission Limited
(RPTL). The schematic of the proposal is as given below:
Schematic diagram in the vicinity of Lamboti
15.2. The 220 kV substations at Pandharpur, Malinagar, Jeur, Tembhurni and Karkambh of
Solapur district are presently fed from 400/220 kV Lamboti S/s through radially connected
220 kV Lamboti–Karkambh–Jeur (189 km) line and 220 kV Lamboti–Pandarpur–Malinagar–Tembhurni–Jeur (166 km) line. However, during the peak agriculture load (6
Agenda – 42nd SCMPSPWR 20
AM to 12 Noon), power flow through these lines is beyond their SIL limit thus, the low
voltage is observed at all above substations along with 400 kV Lamboti S/s i.e. up to 370
kV. In order to address this low voltage problem, 220 kV Solapur (PG) – Bale D/C was
planned and the same is under implementation (expected to be commissioned by September
2017). Further a 400/220 kV, 2x500 MVA S/s at Tembhurni / Karjat is also planned in 2021–22 time frame to mitigate the low voltage problem.
15.3. The above interim arrangement has been discussed in 493rd OCC meeting held on 10th
March, 2017 at Vindhyachal, wherein, it was deliberated that any reconfiguration of the
network would require approval of CEA / CTU and the Reliance Power Transmission Ltd.
15.4. To discuss the proposal of MSETCL, a meeting was held on 12.04.2017 at CEA, New Delhi
among CEA, CTU, POSOCO, MSETCL and RPTL. Minutes are enclosed as Annexure –
15.1. In the meeting the following was agreed:
i) The proposal of MSETCL as shown in the block diagram above was agreed as an interim
arrangement to mitigate the low voltage problem faced in Solapur district.
ii) The interim arrangement shall be disconnected by Dec, 2017 or after the completion of
Solapur (PG) – Bale 220 kV D/C line, whichever is earlier.
iii) The above proposal is agreed in principle and the proposal would be put up in
forthcoming meeting of the Standing Committee on Power System Planning of Western
Region for ratification.
iv) All the expenditure for implementation of the interim arrangement and its restoration
shall be borne by M/s MSETCL.
v) MSETCL shall expedite the implementation of 400/220 kV Tembhurni / Karjat sub-
station along with upstream and downstream network.
vi) MSETCL shall implement Under Voltage Load Shedding (UVLS) relays at all its S/s at
the earliest and provide adequate reactive compensation at 33 kV and below voltage
level in Solapur district at the earliest.
vii) MSETCL shall explore interconnection between Solapur (PG) – Lamboti (MSETCL)
by using LILO portions of Parli - Karad 400 kV line at Solapur (PG) and Lamboti.
viii) The idle section of Solapur (PG) – Karad 400kV S/c line along with the line bays at
Solapur (PG) end shall be deemed 100% available subjected to regulatory norms.
15.5. MSETCL vide their letter dated 07.09.2017 has informed that the interim arrangement was
implemented by MSETCL on 03.05.3017. The improvement in voltage profile after
implementation of the scheme is given below:
Agenda – 42nd SCMPSPWR 22
15.6. The implementation of the interim arrangement has resulted in following benefits:
i) Voltage profile of Pandharpur, Jeur Grid increased from 7 to 14 kV
ii) Low voltage & hunting problem resolved. Now, Minimum voltage always above 198kV
iii) System Stability improved
iv) Additional Source from power grid
v) ICT loading of lamboti reduced
vi) Over Loading of Lamboti – Pandharpur & Lamboti – Karkamb/Khanapur has reduced.
Agenda – 42nd SCMPSPWR 23
vii) Utilization of ICT capacity at PGCIL
15.7. In view of above, MSETCL has requested to approve the above proposal for charging of 400
kV Solapur PG – Karad line on 220 kV Level as an interim arrangement till commissioning
of proposed 400/220 kV Karjat S/s.
15.8. MSETCL may furnish the following details:
i) Status of Solapur (PG) – Bale 220 kV D/C line.
ii) Status of the implementation of 400/220 kV Tembhurni / Karjat sub-station along with
upstream and downstream network. Details of the 400 kV interconnections and 220 kV
interconnections may be provided.
iii) Status of Under Voltage Load Shedding (UVLS) relays at all its S/s at the earliest and
provide adequate reactive compensation at 33 kV and below voltage level in Solapur
district at the earliest.
iv) Feasibility of interconnection between Solapur (PG) – Lamboti (MSETCL) by using
LILO portions of Parli-Karad 400 kV line at Solapur (PG) and Lamboti.
15.9. Members may concur the interim arrangement approved in the meeting held on 12.04.2017
at CEA, New Delhi till Dec, 2017 or after the completion of Solapur (PG) – Bale 220 kV
D/C line, whichever is earlier.
15.10. Members may deliberate on the proposal of MSETCL for charging of 400 kV Solapur PG
– Karad line on 220 kV Level as an interim arrangement till commissioning of proposed
400/220 kV Karjat S/s.
16. Progress of downstream network whose terminating bays are under construction by
POWERGRID
16.1. The 5.4. Proviso (iii) of Indian Electricity Grid Code (IEGC) (Fourth Amendment)
Regulations, 2016, of CERC dated 06.04.2016 is as follows:
“Where the transmission system executed by a transmission licensee is required to be
connected to the transmission system executed by any other transmission licensee and both
transmission systems are executed in a manner other than through tariff based competitive
bidding, the transmission licensee shall endeavor to match the commissioning of its
transmission system with the transmission system of the other licensee as far as practicable
and shall ensure the same through an appropriate Implementation Agreement.”
16.2. The purpose of the above provision of signing of Implementation Agreement (IA) between
the parties involved is that both the upstream and downstream network may be completed in
the matching timeframe to avoid any situation of transmission system remaining unutilized.
16.3. In WR there are many instances where 400/220 kV substation along with the associated 220
kV bays have already been commissioned as ISTS assets, but the 220 kV line bays are still
unutilized due to delay in completion of the associated 220 kV lines. Presently, many
400/220 kV substation are under implementation and in order optimize the asset utilization,
it is required that downstream 220 kV networks is also implemented in the matching
Agenda – 42nd SCMPSPWR 24
timeframe. In view of this, STUs are requested to furnish/ update the status of execution of
downstream network indicated in the table below:
Status of unutilised 220kV line bays at Existing Substations in WR
Sl ISTS
Substation
Voltage ratio
in use
Status of Bays
220kV Lines for
unutilized bays
Status of 220kV
lines as per 41st
meeting dated
21.12.2016
Total Unutilized
1 Raipur (PG) 3x315MVA,
400/220 kV 6
2 no bays
ready since
01.07.2011
(WRSS-6)
Raipur (PG) –
Doma 220 kV D/c
Completion by
January 2017
2 Mapusa (PG) 3x315MVA,
400/220kV 4
2 nos Bays
ready since :
01.11.2013
Mapusa – Cuncolin
220 kV D/c No participation
3 Pirana 2x315MVA,
400/220kV 4
2 nos Bays
ready since
19.03.15
(WRSS-6)
Pirana – Barjadi
220 kV D/c
Tender floated ,
completion by
June 2018
4 Boisar
2x315
+500MVA,
400/220kV
6
1 no Bay
ready since
30.05.15
Boisar – Borivali
220 kV line S/c
Completion by
June 2017
5 Magarwada 2x315MVA,
400/220kV 4
2 nos Bays
ready since
03/11/14
Magarwada –
Ringanwada 220
kV D/c
No participation
6 Wardha 2x315MVA,
400/220kV 6
2 nos Bays
ready since
01.02.2011
Wardha- Yavatmal
220 kV D/C line June 2017
2 nos Bays
ready since
01.01.2012
Wardha – Bhugaon
220 kV S/c
Commissioned in
August 2016
Wardha –
Pusad220kV S/c
Commissioned in
August 2016
7 Solapur
2x315
+1x500MVA,
400/220kV
6
2 nos Bays
ready since
01.04.2011
Solapur – Bhale
(MS) 220kV D/c September 2017
2 nos Bays
ready since
02.11.2015
Solapur –
Narangwadi 220
kV D/c line
Narangwadi 220
kV substation
planned in 2019-
20 time frame.
8 Damoh 1 x 500 MVA
400/220 kV 6
2 no. of bays
ready since
Nov – 2016
LILO of 2nd
220kV circuit of
Damoh (MPPTCL)
- Sagar 220kV line
at Damoh (PGCIL)
400kV S/s. (1Km)
Targeted to be
completed by May
2017
Agenda – 42nd SCMPSPWR 25
Status of Under Construction 220 kV line bays at New Substations / Substation
Extensions in WR
S.
No. ISTS Substation
Proposed
Bays
Comm.
Schedule
220kV Lines emanating
from Substation
Status of
220kV lines
as per 41st
WR SCM
dtd
21.12.2016
Remarks
1 Betul GIS 2x315
MVA, 400/220 kV 4
Commissio
ned
(i) Betul (PG) - Betul D/C
220 kV line (3 Km)
targeted to
complete by
March 2017
ii) LILO of Sarni -
Pandhurna 220kV line at
Betul GIS(PGCIL) 400
kV S/s (41 Km).
targeted to
complete by
Jan 2018
2 Morena (TBCB) 2
x 315, 400/220 kV 4
May’18
(Chhattisgar
h & WR
SS)
i) LILO of one circuit of
Malanpur – Mehgaon
220kV line at Morena
(TBCB) 400kV S/s (8Km
from Loc. No.12).
ii) Morena(TBCB)400 -
Sabalgarh 220kV DCDS
line (92Km) with LILO of
one circuit of
Morena(TBCB)400 -
Sabalgarh 220kV line at
Morena 220kV S/s of
MPPTCL (0.5Km)
targeted to
complete by
March 2018
3 Navi Mumbai 2 x
315, 400/220 kV 4
Bays ready
since
Mar’14
(WRSS-V)
STU line Planned
Severe
RoW
issues are
involved
4
Indore (PG) 2x500
MVA,
400/220 kV
6
Jul’18
(WRSS-14)
LILO of both circuit of
Indore-II (Jaitpura) -
Ujjain 220 kV line at
Indore (PGCIL) 765 kV
S/s. (2X4Km)
Targeted to
complete by
March 2018
(ii) Remaining 2 Nos.
feeders from
Indore(PGCIL) 765kV S/s
shall be intimated at later
stage
5
Itarsi (PG) 1x500
MVA,
400/220 kV
2 Jul’18
(WRSS-14)
LILO of 2nd 220kV circuit
of Itarsi (MPPTCL) -
Hoshangabad 220 kV line
In line with
scheduled
Agenda – 42nd SCMPSPWR 26
at Itarsi (PGCIL) 400kV
S/s (Existing)
date of ICT
i.e. July 2018
6 Parli (PG) 2x500
MVA, 400/220 kV 4
Jun/Jul’18
(WRSS-16)
LILO of Parli - Harngul
220 kV S/c Dec, 2018
LILO of Osmanabad (MS)
- Parli 220 kV S/c Dec, 2018
7
Mapusa (PG)
3X315 MVA,
400/220
2 Jun/Jul’18
(WRSS-16)
Mapusa - Tuem 220 kV
D/c UC
8 Satna (PG) 1x500
MVA, 400/220 kV 2
Jun/Jul’18
(WRSS-16)
LILO of one circuit of
Satna (MPPTCL) -
Chhatarpur 220 kV line at
Satna (PGCIL) 400 kV S/s
(3Km)
Targeted to
complete by
March- 2018
9
Vadodara GIS 2 x
500 MVA,
400/220 kV
4 March –
2017
220 kV Venkatpura-
Vadodara D/C Line
220 KV Jambua –
Vadodara D/C Line
Dec, 2017
Dec, 2018
10
Bijawar (TBCB) 2
x 500 MVA,
400/220 kV
4 RfQ stage
LILO of Tikamgarh –
Chhattarpur 220kV D/c
line at Bijawar
To be
awarded
11
Navsari
2x315MVA +
1x500MVA,
400/220kV
2 May’18 Navsari – Bhestan 220kV
D/c line
Scheduled
COD :
May’18
DGENTPL
has
confirmed
that they
are not
taking up
implementa
tion of the
scheme
12 Rewa PS 3x500
MVA, 400/220kV 6 Oct’17
Rewa UMSPP – Rewa PS
220kV 3xD/c line
UC by Rewa
UMSPP
Matching
with
Generation
Project
13 Khandwa 1x500
MVA, 400/220kV 2 Sep’19
Khandwa – Chamera
220kV D/c line UC
STU to make all effort to maintain the time schedule indicated.
16.4. Members may deliberate this.
Agenda – 42nd SCMPSPWR 27
17. Requirement of Transformer Augmentation in Western Region – Agenda by
POWERGRID
17.1. Several 400/220 kV ICTs in WR are getting critically loaded in current time frame. In case
of tripping of one ICT in that S/s, the situation becomes critical as the parallel ICT gets
overloaded. Studies have been carried out and the list of transformers with high anticipated
loadings in 2021-22 time frame (peak file) and which violate N-1 criteria is given below:
17.2. In view of the above, following is proposed:
Augmentation of 400/220 kV transformation capacity at Jabalpur(PG) S/s by 500 MVA
Replacement of 315 MVA, 400/220kV transformer at Itarsi (PG) S/s by 500 MVA ICT
and shifting the 315 MVA ICT thus freed to Gwalior as 4th 400/220 kV ICT
Augmentation of 400/220 kV transformation capacity at Magarwada (PG) S/s by 500
MVA
17.3. Subsequently, MPPTCL vide its letter no. 04 – 02 /n – 171 / 2601 dated 16.10.2017 intimated
that the existing 2 x 315 MVA ICTs at Jabalpur (PG) are feeding Jabalpur, Panagar and
Narsinghpur 220 kV S/s. The max loading on these ICTs observed in April – 2017 as 287.16
MW and generally the loading on these ICTs is around 200 MVA on each throughout the
year. It is also mentioned that under n – 1 contingency of above transformers, it is very
difficult to manage the loads of Jabalpur & Narsinghpur. Therefore, it is proposed to install
additional 1 x 500 MVA or 1 x 315 MVA ICT at Jabalpur (PG) S/s.
17.4. Members may deliberate.
18. Provision of Bus Reactor at Champa Pool 400 kV Split bus Section – A – Agenda by
POWERGRID
REGION / TRANSFORMER
EXISTING
/PLANNED
TRANSFORME
RS (MVA)
CURRENT TIME FRAME 2021-22 TIME FRAME
PEAK
LOADING
(MW)
AVERAGE
LOADING
(MW)
PEAK
LOADING
(MW)
N-1 Outage loading
(MW)
WR-II JABALPUR 400/220kV 2x315 2x285 2x169 2x284 1x399 (315MVA
outage)
WR-II ITARSI 400/220kV 1x315 + 1x500* 1x274 1x217 1x224+1x3
55
1x306 (500 MVA
outage)
WR-II GWALIOR 400/220kV 3x315 3x257 3x187 3x228 2x294 (315 MVA
outage)
WR-II MAGARWADA 400/220kV 2x315 2x139 2x88 2x201
1x358 (315MVA
outage) with
Magarwada 220kV
(D&D) bus split &
1x317 (315MVA
outage) without the split
arrangement
*Additional 500MVA ICT under implementation (under WRSS-14 scheme by POWERGRID)
Agenda – 42nd SCMPSPWR 28
18.1. During the 39th meeting of SCPSPWR held on 30.11.2015, the following split bus
arrangement was agreed at Champa P.S.
i. Champa Pooling Station after BUS Splitting:
Champa Pool Voltage
Level(in kV)
Description BUS Section A BUS Section B
400
Generation (in MW) Available 4920 4520
BUS Reactor (in MVAR)
Available 2x80 1x80
765/400 kV ICT(in
MVA)
Available 3x1500 3x1500
765 BUS Reactor (in MVAR)
Available - 240
Proposed 240 -
18.2. Under the proposed splitting arrangement, 2x80MVAr bus reactor under Section A of
Champa 400 kV bus was inadvertently mentioned as “available” whereas only space for
2x80 MVAr Bus Reactors is available at Section A of Champa 400 kV bus. With the above
agreed splitting arrangement, the existing one 80 MVAr Bus Reactor at Champa Pooling
Station would be on Section B of 400 kV bus (mentioned under Bus Section B in the table
above). Hence, no bus reactor would be available at split section A of Champa 400kV bus
post the under-implementation splitting arrangement.
18.3. Accordingly, it is proposed to install a 420 kV, 1x125 MVAr bus reactor at Champa Split
section A for voltage control purpose as the Split Section A shall be operating as an
independent substation after splitting.
18.4. Members may deliberate.
Agenda – 42nd SCMPSPWR 29
19. Transmission System associated with DGEN TPS (4x300MW) under implementation
by DGEN Transmission Co. Ltd.
19.1. DGEN-Vadodara 400 kV D/C line and Navsari – Bhestan 220 kV D/C line has been awarded
to DGEN Transmission Company Ltd (DGENTCL) through tariff based competitive bidding
route for evacuation of power from DGEN TPS (3x400 MW) with commissioning schedule
of May 2018. The zero date of the project is 17.03.2015 and M/S DGENTCL has not yet
taken up the implementation of the scheme as per the execution plan submitted by them.
19.2. In a meeting held at CEA on 26.04.2017, it was decided that Torrent Energy Ltd shall initiate
action as per relevant clause of TSA as M/s DGENTCL has confirmed that they are not
taking up the implementation of the project. Further, CEA shall inform the status of project
to CERC in due course. In the same meeting, representative from Torrent Energy Ltd.
informed that all three units of 1200 MW DGEN gas based power project at Dahej near
Bharuch in South Gujarat have been commissioned along with dedicated connectivity line
(DGEN- Navsari 400 kV D/C line. They are not able to run the power plant at full load due
to unavailability of gas. In case of gas availability and absence of DGEN-Vadodara 400 kV
D/C line, there may be constraint in evacuation of power from DGEN plant.
19.3. In view of the above, future course of action regarding transmission system associated with
DGEN TPS (4x300MW) may be deliberated upon by the constituents.
20. Charging of 2x330 MVAR Line Reactors of Dharamjaygarh – Jharsuguda 765kV 2nd
D/c line as Bus Reactor at 765/400 kV Dharamjaygarh Substation
20.1. 765 kV Bus voltage of Dharamjaygarh Substation remains high for most of the time and to
control overvoltage problem in spite of all the reactors remaining in service either as Bus
reactor or line reactor, opening of 765 kV lines is required. During the months of May’17 to
Jul’17, the maximum & minimum voltages observed at Dharamjaygarh 765kV bus were
802kV and 765kV respectively and voltages remained in the range of 781kV to 800kV for
more than 70% of the time. The voltage profile at Dharamjaygarh substation is as given
below:
0.0
29.5
61.6
8.8 0.1
Percentage Voltage Distribution - D'jaygarh
765kV Bus Voltage
Below 765KV
765 - 780
781-790
791-800
Above 800
Agenda – 42nd SCMPSPWR 30
20.2. The bays associated with 765kV Jharsuguda-Dharamjaygarh Ckt 3 & 4 along with 2x330
MVAR line reactors are ready for charging at Dharamjaygarh substation, whereas the
construction of the line is in progress and is expected to be completed by March 18.
20.3. In view of above, POWERGRID has proposed to charge the 2x330 MVAR Line Reactors
as bus reactors (utilizing Jharsuguda Ckt # 3 & 4 bays) till such time the 765 kV Jharsuguda-
Dharamjaygarh Ckt 3 & 4 is completed. System studies indicate a voltage sensitivity of about
2.5kV per 330MVAr reactor switching. Accordingly, the reactors may be utilized based on
requirement of system condition to control High Voltage encountered at Dharamjaygarh
substation.
20.4. Members may deliberate.
21. Interconnection of MSETCL lines with PGCIL lines or S/s
21.1. MSETCL vide its letter no. MSETCL/CO/STU/5607 dated 29.05.2017 (copy enclosed as
annexure – 21.1) intimated that in its five year plan (from 2017–18 to 2021–22), it has
proposed to interconnect some of its existing or upcoming new lines / substations with
PGCIL network and requested to take up the same in the meeting of SCPSPWR.
21.2. The list of elements of MSETCL are as follows:
S.
No.
Transmission Elements PGCIL S/s Target
Year
1 LILO of 400 kV Talegaon (PG) – Kalwa at Vikhroli Talegaon 2021 – 22
2 Wardha (PG) – Yavatmal 220 kV D/C Wardha 2017 - 18
3 Solapur (PG) – Bale 220 kV D/C Solapur 2016 – 17
4 Conversion of existing 220 kV S/C Urse – Chinchwad line to M/C for
portion between Chinchwad S/s to prop 220 kV Talegaon PGCIL line LILO
point (Loc no. 50)
Talegaon 2016 – 17
5 LILO of one Ckt. of 400 kV Tarapur – Padghe D/C at Kudus (Padghe II) Padghe /
Kudus
2017 – 18
6 LILO of one Ckt. of Aurangabad (PG ) – Shendra D/C at Phulambri Aurangabad 2019 – 20
7 LILO of 220 kV Parli – Harangul S/C at Parli (PG) Parli 2018 – 19
8 LILO of Parli – Osmanabad S/C at Parli (PG) Parli 2018 – 19
9 LILO of 2nd Ckt of South Solapur – Kolhapur D/C at Alkud 400 kV S/s Solapur 2016 – 17
10 LILO of both ckts of Parli (PG) – Pune (PG) 400 kV D/C at Lonikhand II Pune 2017 – 18
11 LILO of one ckt. Of 220 kV Borivali – Boisar (M) M/C line at Boisar (PG)
and 220 kV Nalasopara at Boisar PG Idle line
Boisar 2016 – 17
12 LILO of both ckts of Dhule – SSP 400 kV D/C at Balsane PS Dhule / SSP 2019 – 20
Agenda – 42nd SCMPSPWR 31
21.3. Members may deliberate.
22. Declaration of 132 kV Nepanagar (Madhya Pradesh) – Dharni (Maharashtra) line as
ISTS line – proposal by MSETCL
22.1. MSETCL vide its letter no. MSETCL/CO/STU/9849 dated 07.09.2017 intimated that 132
kV Nepanagar (Madhya Pradesh)–Dharni (Maharashtra) line (approx. 60 km) has been
charged on 09.02.2017 in radial mode and power was flowing towards Maharashtra
successfully through this line since 16.02.2017. As it is interconnected between two states,
it is requested to declare this line as an ISTS line (Inter State Transmission System).
22.2. Members may deliberate.
23. Advancement in schedule of 2 no. of 220 kV line bays at Khandwa (PG) 400/220 kV S/s
associated with 1 x 500 MVA, 400/220 kV, 3rd ICT
23.1. MPPTCL vide its letter no. 04-02/N-171/2223 dated 29.08.2017 intimated that 1 x 500
MVA, 400/220 kV 3rd ICT at Khandwa was agreed in 39th meeting of SCPSPWR held on
30.11.2015 and 2 no. of 220 kV line bays were agreed the 41st meeting of SCPSPWR held
on 21.12.2016.
23.2. In this regards, MPPTCL intimated that the downstream network associated with above ICT
is 220 kV Chhenera – Khandwa (PG) D/C line and the same has been already awarded and
expected to get completed by Dec, 2018. However, the target for completion of 500 MVA,
400/220 kV 3rd ICT at Khandwa along with 2 no. of 220 kV bays is September, 2019. In
view of this, it is requested to implement the ICT in matching time frame of its downstream
i.e. Dec, 2018.
23.3. Members may deliberate.
24. Provision of 400/220 kV, 2x500 MVA ICT at Kakrapar Nuclear Power Station –
proposal by GETCO
24.1. GETCO vide its letter no. STU/511/13 dated 04.09.2017 has intimated that installed capacity
of KAPP is 2x220 MW (Unit–1 & 2) and work is under progress for Units 3 & 4 (2 x 700
MW). The Associated Transmission System (ATS) for KAPP is as follows:
(i) KAPP – Navsari 400 kV D/C
(ii) KAPP – Vapi (PG) 400 kV D/C
(iii) KAPP – Vav 220 kV D/C
(iv) KAPP – Vapi 220 kV D/C
(v) KAPP – Haldarwa 220 kV D/C
24.2. Presently, the 400 kV switchyard and 220 kV switchyard at KAPP are operating in isolated
mode. GETCO has informed that during low / no generation at KAPP, the power is flowing
from Haldarwa to Vav & Vapi through 220 kV Haldarwa–KAPP D/C and KAPP–Vav 220
kV D/C & KAPP–Vapi 220 kV D/C, thus some of the 220 kV lines in this area getting over
loaded.
Agenda – 42nd SCMPSPWR 32
24.3. In view of this, GETCO has proposed for 2 x 500 MVA, 400/220 kV ICT at KAPP.
24.4. Members may deliberate.
25. Installation of 2 x 50MVA, 220/33kV transformer with 10 Nos. 33kV feeder bays at
220kV Jabalpur substation
25.1. Jabalpur 400/220 kV sub-station of POWERGRID presently has 2x315 MVA, 400/220 kV
ICTs and the 220kV & 132kV works including 220kV bus and 220kV side ICT bays located
in the same premises are owned by MPPTCL. NTPC (then owner of Jabalpur 400kV sub-
station) vide letter dated 22-05-1987 had allowed MPPTCL (then MPEB) to carry out
220/132kV extension works at its Jabalpur sub-station subject to inter-alia the following
conditions:
MPEB will not provide any 132/33 kV extension at Jabalpur 400kV sub-station
MPEB shall not construct any staff quarter in the space given by NTPC
The ownership of the land allotted to MPEB for 220/132kV extension rests with NTPC
25.2. Now, MPPTCL vide letter dated 10.04.2017 has requested POWERGRID to provide consent
towards the installation of 2x50MVA, 220/33kV transformer along with 10 nos. 33 kV
outgoing feeders (to be implemented by MPPTCL) to cater to future load growth of Jabalpur
& surrounding area. The existing 33kV auxiliary supply to Jabalpur substation is from a
16km long 33kV line from 220/132/33kV MPPTCL substation, which is not reliable. Hence,
the proposed 220/33kV ICTs shall also help to provide reliable auxiliary supply to Jabalpur
(PG) substation.
25.3. Considering the planned augmentations, a further increase in the loading of Jabalpur ICTs is
expected in future. Therefore, to feed the additional load requirement of MPPTCL with
reliability and n-1 security may require augmentation of transformation capacity at
400/220kV Jabalpur substation.
25.4. Members may deliberate.
26. Retention of LILO of 400kV Khandwa- Rajgarh at Khangone – Agenda by NTPC
26.1. NTPC has intimated that one double circuit line has been approved for many of recently
approved NTPC projects namely Darlipalli, Khargone, Rihand III. Under planned shutdown
of any one line, as per operational practice Auto reclose of second line is blocked. This has
resulted in station blackout and damage to LP turbine diaphragm due to loss of cooling water
(Mouda). It takes minimum 6-8 hours to replace the diaphragm, subject to availability of
spares if required to be replaced for multiple units. Even if Single Phase Auto Reclose is
kept enabled, during dead time, generators will be subjected to very high Negative sequence
current (Rotor heating) and torsional stress.
26.2. The approved transmission system meets transmission planning criteria, above facts may
also be taken into consideration at planning stage. NTPC has proposed the following:
a) Provision of at least two D/C lines preferably to two different substation may be
considered for new projects as immediate transmission system.
Agenda – 42nd SCMPSPWR 33
b) For Khargone TPS, the LILO of 400kV Khandwa-Rajgarh at Khangone may be
allowed to be retained.
26.3. The following transmission system associated with Khargone TPP has been agreed and the
same is under implementation through tariff based competitive bidding route:
1. Connectivity system for Khargone STPP
(i) LILO of one ckt of Rajgarh-Khandwa 400kV D/C line at Khargone TPP (The LILO
shall be used for startup power and commissioning activities requirement. After
commissioning of balance transmission system, the LILO would be bypassed at
Khargone generation switchyard and may be utilized only under contingency
condition)
(ii) Khargone TPP Switchyard – Khandwa pool 400 kV D/C (Quad) line
2. System strengthening in WR in time frame of Khargone TPP
(i) Khandwa Pool – Indore 765kV D/C line
(ii) Khandwa Pool – Dhule 765 kV D/C line
(iii) Establishment of 765/400kV, 2x1500MVA pooling station at Khandwa pool
26.4. As per the approved scheme the LILO shall be used for startup power and commissioning
activities requirement. After commissioning of balance transmission system, the LILO
would be bypassed at Khargone generation switchyard and may be utilized only under
contingency condition. Now NTPC has requested to retain the LILO on continuous basis for
evacuation of power.
26.5. Members may deliberate.
1
Annexure - 2.1 Status of TBCB Transmission Projects - Western Region
S.N. Name of the Project BPC / Implementing Agency / Milestones
Scope of works Current Status
1 System Strengthening in NR for import of power from North Karanpura and other projects outside NR and System Strengthening in WR for import of power from North Karanpura and other projects outside Western Region and also for projects within Western Region. Estimated Cost Rs. 2700 Cr
REC NKTCL (Reliance Power Transmission Company Ltd) Milestones:
(i) SPV acquired by Reliance on 20-05-2010 (ii) Approval u/s 164 received on 12.08.2013.
(i) Sipat/Korba (Pooling) - Seoni 400 kV D/C line (ii) Lucknow - Bareilly 765 kV D/C line (iii) Bareilly - Meerut 765 kV D/C line (iv) Agra - Gurgaon(ITP) 400 kV D/C line (v) Gurgaon (ITP) - Gurgaon (PG) 400 kV D/C line (vi) Gurgaon (ITP) 400/220 kV GIS Substation
Matter was in CERC for revision of tariff and extension of date of commissioning. NKTCL filed an appeal in appellate tribunal challenging CERC order of 9.5.2013. Appellate Tribunal has given final judgment on 2.12.13 setting aside CERC order and allowing the appeal. NKTCL is initiating steps for implementing of order. The judgment of Appellate Tribunal accepts delay in clearance under section-164 as force majeure. According NKTCL have requested MoP to extend the validity of section 68 clearance vide their letter dated 14.1.2014. Beneficiaries have appealed SC. SC on 12th August has disposed of the appeal and directed ATE to decide on the appeal. Work Yet to start.
2 Transmission System Associated with Krishnapattnam UMPP- Synchronous interconnection between SR and WR (Part-B) Estimated Cost Rs. 440 Cr
REC RSTCL (Consortium of Patel-Simplex- BS Transcomm) Milestones: (i) LoI placed on 16.12.2010 (ii) SPV acquired on 07.01.2011 (iii) Trans. license received on 24.08.2011 (iv) Approval u/s 164 received on 29.08.2011
Tariff adoption on 12.8.2011
(i) Raichur - Sholapur 765 kV S/C line-1 (208 ckm)
Commissioned in 06/2014
3 System strengthening common for WR and NR Estimated Cost Rs. 1720 Cr
PFC Jabalpur Transmission Company Limited (Sterlite Grid) Milestones: (i) LOI placed on 31.01.2011 (ii) Special Purpose Vehicle acquired on 31.03.2011 (iii) Scheduled Completion Date is 31.03.2014. (iv) Transmission License granted on 12.10.2011. (v) Tariff adoption approval on 28.10.2011
(i) Dhramjaygarh - Jabalpur 765 kV D/C
(ii) Jabalpur - Bina 765 kV S/C line
Line commissioned in 09/2015 Line commissioned in 06/2015
2
S.N. Name of the Project BPC / Implementing Agency / Milestones
Scope of works Current Status
(vi) Clearance under Section 164 : received on 12.07.13
4 System strengthening for WR Estimated Cost Rs. 2900 Cr
PFC BDTCL(Sterlite Grid) Milestones: (i) LoI placed on 19.1.2011 (ii) SPV acquired on 31.3.2011 (iii) Trans. license received on 12.10.2011 (iv) Approval u/s 164 received on 29.01.2013 (v) Tariff adoption on 28.10.2011 (vi) Original COD : Mar2014
(i) Jabalpur-Bhopal 765 kV S/C line (ii) Bhopal-Indore 765 kV S/C line (iii) 2x1500 MVA 765/400 kV substation at Bhopal (iv) Bhopal-Bhopal (MPPTCL) 400 kV D/c quad line. (v) Aurangabad-Dhule 765 kV S/C line (vi) Dhule-Vadodara 765 kV S/C line (vii) 2x1500 MVA, 765/400 kV substation at Dhule (viii) Dhule - Dhule(Msetcl)400 kV D/C Line
Line commissioned in 06/2015 Line commissioned in 10/2014 Commissioned in 07/2014 Line Commissioned in 07/2014 Line commissioned in 10/2014 Line commissioned in 10/2015 Commissioned in 11/2014 Line Commissioned in 11/2014
5 Transmission System associated with DGEN TPS (1200 MW) of Torrent Power Ltd. Estimated Cost Rs. 275 Cr
PFC M/s Instalaciones Inabensa, S.A. Spain Milestones: (i) LoI issued on 19.05.2014 (ii) Approval under section 68 on 30.01.2014. (iii) Approval under Sec 164 of EA,2003 on 24.04.2016
(i) DGEN TPS – Vadodara 400 kV D/C, Twin Moose line. (ii) Navsari – Bhestan 220 kV D/C line
Project authority had not started construction activity as per execution plan. Matter was taken up with the project authority and notice served in August/Sept 2016 but project authority did not respond. Member(PS), CEA took a meeting on 26.04.2017 to review the progress of Tr. project wherein project authority informed to close the project due to financial constraints in parent company. CEA vide letter dated 14.06.2017 informed CERC to take appropriate action. Completion Target : May 2018
6 Transmission System associated with Gadarwara STPS (2x800 MW) of NTPC (Part-A)
REC Powergrid Warora Transmisson Limited (A subsidiary of PGCIL) Milestones: (i) LoI issued on 11.03.2015 (ii) Approval under section 68 on 26.11.2014 (iii) Approval under Sec 164 of EA,2003 on 24.04.2017
(i) Gadarwara STPS - Jabalpur Pool 765kV D/C line (ii) Gadarwara STPS - Warora P.S. (New) 765 kV D/C line (iii) LILO of both Ckts. Of Wardha-Parli 400 kV D/C at
Warora P.S. (2xD/C) (iv) Warora 765/400 kV Pooling Station (2x1500 MVA).
Completion Target: November, 2017
7 Transmission System associated with Gadarwara STPS (2x800 MW) of NTPC (Part-B).
REC Powergrid Parli Transmisson Limited (A subsidiary of PGCIL) Milestones:
(i) Warora P.S.- Parli (New) 765 kV D/C line (ii) Parli (New) - Solapur 765 kV D/c line (iii) Parli (New) - Parli (PG) 400 kV D/C (Quad) line (iv) 765/400 kV Parli (New) Sub-station (2x1500 MVA)
Completion Target: January, 2018
3
S.N. Name of the Project BPC / Implementing Agency / Milestones
Scope of works Current Status
(i) LoI issued on 11.03.2015 (ii) Approval under section 68 on 10.12.2014 (iii) Approval under Sec 164 of EA,2003 on 28.06.2017
8 Transmission System Strengthening associated with Vindhyachal- V
REC Powergrid Jabalpur Transmisson Limited (A subsidiary of PGCIL) Milestones: (i) LoI issued on 10.02.2015 (ii) SPV has been acquired by the successful bidder on
26.02.2015 (iii) Approval u/s 164 of EA,2003 on 19.09.2016
(i) Vindhyachal P. S- Jabalpur P. S. 765 kV D/C line. Completion Target: June, 2018
9 System strengthening for IPPs in Chhattisgarh and other generation projects in Western Region
PFC Chhattisgarh - WR Transmission Ltd. (A subsidiary of Adani Power Limited) Milestones: (i) LoI issued on 28.07.2015 (ii) SPV acquisition on 23.11.2015 (iii) Approval u/s 68 of EA,2003 on 24.04.2015 (iv) Approval u/s 164 of EA,2003 on 20.10.2016
(i) Gwalior 765/400 kV – Morena 400 kV D/C line 400 kV D/C Length- 50 km
(ii) Establishment of 400/220 kV S/s at Morena, 2X315 MVA (iii) Vindhyachal-IV & V– Vindhyachal Pool 400 kV D/C
(Quad) line Length-15 km
(iv) Sasan UMPP – Vindhyachal Pooling station 765 kV S/C (Q) line 7 Length-8 km
(v) LILO of one circuit of Aurangabad – Padghe 765 kV D/C line at Pune Length-50 km
(vi) Raigarh (Kotra) – Champa (Pool) 765kV S/C (Q) line (vii) Champa (Pool) – Dharamjaygarh 765kV S/C (Q) line
Scheduled Date of Completion: March, 2019 Anticipated Date of Completion: May, 2018
10 Additional System Strengthening for Sipat STPS
PFC Sipat Transmission Ltd (A subsidiary of Adani Power Limited) Milestones: (i) SPV acquisition on 23.11.2015 (ii) LoI issued on 28.07.2015 (iii) Approval u/s 164 of EA,2003 on 05.08.2016
(i) Sipat – Bilaspur Pooling Station765 kV S/C line Length-25 km
(ii) Bilaspur PS – Rajnandgaon 765 kV D/C line Length-180 km
Scheduled Date of Completion: March, 2019 Anticipated Date of Completion: July, 2018
11 Additional System Strengthening Scheme for Chhattisgarh IPPs – Part B
PFC Raipur - Rajnandgaon - Warora Transmission Ltd (A subsidiary of Adani Power Limited)
(i) Raipur (Pool) – Rajnandgaon 765 kV D/C line Length - 60 KM
(ii) Rajnandgaon – New Pooling station near Warora 765 kV D/C line Length - 270 KM
(iii) Establishment of new 765/400 kV substation near
Scheduled Date of Completion: Nov, 2018 Anticipated Date of Completion: March, 2018
4
S.N. Name of the Project BPC / Implementing Agency / Milestones
Scope of works Current Status
Milestones: (i) SPV acquisition on 23.11.2015 (ii) LoI issued on 28.07.2015 (iii) Approval u/s 164 of EA,2003 on 15.06.2016
Rajnandgaon 2x1500 MVA
12 Additional inter-Regional AC link for import into Southern Region i.e. Warora – Warangal and Chilakaluripeta - Hyderabad - Kurnool 765 kV link
PFC Warora Kurnool Transmission Ltd (A subsidiary of Essel Infraprojects Limited) Milestones: (i) LoI issued on 29.02.2016 (ii) SPV acquisition on 06.07.2016 (iii) Approval u/s 164 of EA,2003 on 27.06.2017
(i) Establishment of 765/400 kV S/s at Warangal (New) with 2x1500 MVA ICTs and 2x240 MVAR bus reactors
(ii) Warora Pool – Warangal (New) 765kV D/c line with 240 MVAR switchable line reactor at both ends Length - 350 KM
(iii) Warangal (New) – Hyderabad 765 kV D/c line with 330 MVAR switchable line reactor at Warangal end Length- 160 KM
(iv) Warangal (New) – Warangal (existing) 400 kV (quad) D/c line Length-10 KM
(v) Hyderabad – Kurnool 765 kV D/c line with 240 MVAR switchable line reactor at Kurnool end Length- 170 KM
(vi) Warangal (New) – Chilakaluripeta 765kV D/c line with 240 MVAR switchable line reactor at both ends Length – 250 KM
(vii) Cuddapah – Hoodi 400kV (quad) D/c line with 63 MVAR switchable line reactor at both ends Length-200 KM
Scheduled Date of Completion : Nov, 2019
13 Common Transmission System for Phase-II Generation Projects in Odisha and Immediate Evacuation System for OPGC (1320 MW) Project in Odisha
PFC Orissa Generation Phase-II Transmission Limited (A subsidiary of Sterlite Grid Limited) Milestones: (i) LoI issued on 06.01.2016 (ii) SPV acquisition on 08.04.2016 (iii) Approval u/s 164 of EA,2003 on 07.03.2017
(i) OPGC (IB TPS) – Jharsuguda (Sundargarh) 400 kV D/C line with Triple Snowbird Conductor Length - 50 KM
(ii) Jharsuguda (Sundargarh) – Raipur Pool 765 kV D/C line Length - 350 KM
Scheduled Date of Completion: August, 2019
14. Transmission System Strengthening in WR associated with Khargone TPP (1320 MW)
REC Khargone Transmission Limited (Sterlite Grid Ltd.) Milestones: (i) LoI issued on 26.05.2016 (ii) SPV acquisition on 22.08.2016 (iii) Approval u/s 164 of EA,2003 on 05.07.2017
A. Connectivity system for Khargone TPP (i) LILO of one ckt of Rajgarh - Khandwa 400 kV D/C line
at Khargone TPP (ii) Khargone TPP Switchyard – Khandwa pool 400 kV D/C
(Quad) line B. System strengthening in WR in time frame of
Khargone TPP (i) Khandwa Pool – Indore 765 kV D/C line.
Scheduled Date of Completion: July, 2019 Anticipated Date of Completion: Feb, 2018
5
S.N. Name of the Project BPC / Implementing Agency / Milestones
Scope of works Current Status
(ii) Khandwa Pool – Dhule 765 kV D/C line. (iii) Establishment of 765/400 kV, 2x1500 MVA pooling
station at Khandwa pool
15. New WR- NR 765 kV Inter-regional corridor
REC Milestones: (i) MoP vide Gazette Notification dated 28.10.2016
appointed RECTPCL as BPC (ii) Request for Qualification : 28.12.2016 (iii) Request for Proposal : 28.03.2017
(i) Vindhyanchal Pooling Station- Varanasi 765 kV D/C line Yet to get Awarded
16. A. Additional 400kV feed to Goa B. Additional System for Power
Evacuation from Generation projects pooled at Raigarh (Tamnar) Pool
PFC Milestones: (i) MoP vide Gazette Notification dated 28.10.2016
appointed PFCCL as BPC (ii) Request for Qualification : 01.02.2017 (iii) Request for Proposal : 01.05.2017
A. Additional 400kV feed to Goa (i) LILO of one ckt. of Narendra (existing) – Narendra
(New) 400 kV D/c quad line at Xeldem (ii) Xeldem – Mapusa 400 kV D/c (Q) line (iii) Establishment of 2x500MVA, 400/220kV substation at
Xeldem B. Additional System for Power Evacuation from
Generation Projects pooled at Raigarh (Tamnar) Pool
(i) Dharamjaygarh Pool section B - Raigarh (Tamnar) Pool 765 kV D/c line
Yet to get Awarded
17. A. Connectivity System for Lanco Vidarbha Thermal Power Ltd. (LVTPL)
B. Inter State Transmission system
strengthening in Chhatarpur area in Madhya Pradesh
PFC Milestones: (i) MoP vide Gazette Notification dated 28.10.2016
appointed PFCCL as BPC
A. Connectivity System for Lanco Vidarbha Thermal Power Ltd. (LVTPL)
(i) LVTPL TPS switchyard – Warora Pool 765kV D/c line B. Inter State Transmission system strengthening in
Chhatarpur area in Madhya Pradesh (i) LILO of both circuits of Satna – Bina 400kV (1st) D/c line
at Bijawar. (ii) Establishment of 2x500MVA, 400/220kV substation at
Bijawar
Bidding process is kept in abeyance
Annexure 2.2
Sl.
No.Description of Scheme
Estimated
Cost (Rs.
Cr)
Date of
firming up in
WR standing
committee
Date of
investment
approval
Target date as of now Remarks
1Western Region System Strengthening Scheme -
II5222
20th
(23.01.04)July’06
Set-A: For absorbing import in eastern and central
part of WR Grid (POWERGRID)1700 Commissioned
Set-B: For regional strengthening in Southern
Maharashtra (100 % private)1050 Commissioned
Set-C: For regional strengthening in Gujarat (100 %
private)600 --- Implementation by Reliance
a) Rajgarh – Karamsad 400kV D/c commissioned
b) Limdi(Chorania) – Ranchodpura 400kV D/c commissioned
c) Ranchodpura – Zerda(Kansari) 400kV D/c commissioned
Set-D: For regional Strengthening in Northern
Madhya Pradesh (POWERGRID)1050 commissioned
2 Western Region System Strengthening -V 72225
th
(30.09.06)Dec’07 Under implementation
a) 400 kV Vapi- Kala - Kudus D/c Dec'17
Vapi-Kala portion
commissioned in Mar'14.
Kudus S/s being implemente by
MSETCL.
b) LILO of 400 kV Lonikhand - Kalwa line at Navi
MumbaiDec'17
Cable work in progress (2km.)
Critical ROW issues
c) Establishment of 400/220 kV, 2 x 315 MVA
new S/s (GIS) at Navi Mumbai
Substation is ready and
shall be commissioned
matching with line
d) 220 kV Vapi- Khadoli D/c. Commissioned
3Tr. System of Mundra Ultra Mega Power Project
(4000 MW) 4824
26th
(23.02.07)Oct’08 Under implementation
a) Mundra – Bachchau -Ranchodpura 400 kV
(Triple) D/cCommissioned
b) Mundra – Jetpur 400 kV (Triple) D/c Commissioned
c) Mundra – Limbdi 400 kV (Triple) D/c Commissioned
d) Gandhar-Navsari 400 kV D/c Commissioned
e) Navsari - Boisar 400 kV D/c Commissioned Severe ROW & Forest issue.
f) LILO of both circuits of Kawas-Navsari 220 kV
D/c at Navsari (PG)Commissioned
g) Wardha-Aurangabad 400 kV(Quad) D/c (with
provision to upgrade at 1200 kV at later date)Feb'18
Both Contracts terminated due
to unsatisfactory performance.
Tender awarded for both the
packages.
g) Aurangabad (PG) -Aurangabad I (Waluj) 400
kV(Quad) Commissioned
Substations
a) 40% Fixed Series Compensation each on
Wardha - Aurangabad 400 kV D/c at Wardha endFeb'18
Commissioning matching with
the line
b) Establishment of new 400/220 kV, 2x315
MVA substation at Navsari & BachchauCommissioned
c) Establishment of new 765/400 kV, 3x1500
MVA, substation at Wardha for charging of Seoni -
Wardha 2xS/c lines at 765 kV level
Commissioned
4
Transmission system associated with
Krishnapatnam (5x800 MW) (WR Portion)- now
delinked from Krishnapatnam UMPP
192827
th
(30.07.07)Under implementation
a) Raichur – Solapur (PG) 765 kV S/c Commissioned
b) Solapur(PG) – Pune 765 kV S/c Commissioned
c) LILO of 400kV Aurangabad I (Waluj) - Pune (PG)
D/c & Parli (PG) - Pune (PG) D/c lines at Pune(GIS) Commissioned
d) Establishment of new 765/400 kV substations at
Pune (GIS) with 2x1500 MVA transformation
capacity
Commissioned
5Associated transmission system of VSTPP-IV and
Rihand-III4673
29th
(10.09.09)Mar’10 Under implementation
a) Rihand III- Vindhyachal Pool 765 kV D/c (initially
to be op. at 400kV)Commissioned
b) Vindhyachal IV - Vindhyachal Pool 400kV
D/c(Quad)Commissioned
c) Vindhyachal Pool - Satna 765 kV 2xS/c Commissioned
d) Satna -Gwalior 765 kV 2xS/c Commissioned
e) Gwalior – Jaipur(South) 765 kV S/c Commissioned
f) Vindhyachal Pool-Sasan 765 kV S/c Commissioned
STATUS OF TRANSMISSION SCHEMES UNDER IMPLEMENTATION BY POWERGRID IN WESTERN REGION (as on 31.08.2017)
Sl.
No.Description of Scheme
Estimated
Cost (Rs.
Cr)
Date of
firming up in
WR standing
committee
Date of
investment
approval
Target date as of now Remarks
STATUS OF TRANSMISSION SCHEMES UNDER IMPLEMENTATION BY POWERGRID IN WESTERN REGION (as on 31.08.2017)
g) Vindhyachal Pool-Sasan 400 kV D/c Commissioned
h) Establishment of 765/400kV, 2x1500 MVA
substation at Vindhyachal PoolCommissioned
6 Solapur STPP(2x660MW) transmission system 63.3230th
(08.07.10)Oct'13 Under implementation
a) Solapur STPP – Solapur (PG) 400kV D/c (Quad) Commissioned Line completed in Apr'15
b) Augmentation of 400/220kV ICT by 1x500MVA
transformer (3rd
) at Solapur (PG)Commissioned
7Solapur STPP (2x660MW) transmission system
(Part-A)50.52
36th
(29.08.13)Mar'15 Award placed in May'15
a) Solapur STPP – Solapur (PG) 400kV 2nd D/c
(Quad)Sep'17 Expected by end of Sep'17
8Transmission system for evacuation of Kakrapar
Atomic Power Project unit 3 &4 (2x700 MW)378.71
31st
(27.12.10)Feb'14 Under Implementation
a) Kakrapar NPP – Navsari 400kV D/c – 38 km CommissionedStringing commenced from
Mar'16
b) Kakrapar NPP – Vapi 400kV D/c - 104 km Commissioned
9Transmission System associated with Mauda
Stage-II (2x660 MW)1575.3
32nd
(13.05.11) Sep'13 Under Implementation
a) Mauda II – Betul 400KV D/c (Quad)-210 km Commissioned
b) Betul– Khandwa 400KV D/c (Quad)-180 km Commissioned
c) Khandwa – Indore(PG) 400kV D/c -215 km Commissioned
d) Establishment of 400/220kV 2x315MVA
substation at Betul Commissioned
10
Provision of 1x315MVA ICT & Spare Converter Trf
for reliable auxlliary power supply at HVDC back
to back station at Bhadravati
14333
rd
(21.10.11) - Commissioned
ICT commissioned in Mar'15.
Balance work under progress.
11
Establishment of Pooling Station at Champa and
Raigarh (Near Tamnar) for IPP Generation
Projects in Chhattisagrh
2066.8529th
(10.09.09) May'11 Under Implementation
a) Champa Pooling Station - Raipur Pooling Station
765kV D/cCommissioned
b) Raigarh Pooling Staiton (near Kotra) - Raigarh
pooling (near Tamnar) 765kV D/cCommissioned
c) Champa Pooling Station - Dharamjaygarh
Pooling Station 765kv S/cCommissioned
d)Raigarh Pooling Staiton (near Kotra) - Champa
pooling 765kV S/cCommissioned
e) Establishment of 765/400kV 6x1500MVA
Champa Pooling StationCommissioned
f)Establishment of 765/400kV 3x1500MVA Raigarh
Pooling Station (near Tamnar)Commissioned
12
Transmission system strengthening in Western
Part of WR for IPP generation proejcts in
Chhattisgarh
2127.5129th
(10.09.09) Nov'11 Under Implemetation
a) Aurangabad(PG) – Boisar 400kV D/c (Quad) Sep'17 Expected by end of Sep'17
b) Wardha - Aurangabad (PG) 765kV D/c Commissioned
c) Establishement of 765/400kv 2x1500MVA
auraganbad (PG) S/sCommissioned
d) Augmentation of transformation capacity at
Boisar by 400/220kV, 1x500MVACommissioned
13System strengthening in North/West part of WR
for IPP Projects in Chhattisgarh2073.26
29th
(10.09.09) Dec'11 Under Implementation
a) Aurangabad (PG) – Padghe(PG) 765kV D/c Dec'17
b) Vadodara – Asoj 400kV D/c(Quad) Commisisoned
c) Padghe – Kudus 400kV D/c (Quad) Dec'17
14System Strengthening in Raipur-Wardha Corridor
for IPP projects in Chhattisgarh (DPR-6)1422.85
29th
(10.09.09) Jan'12 Under Implementation
a) Raipur Pooling station - Wardha 765kV 2nd D/c Commisisoned
15WR-NR HVDC interconnector for IPP Projects in
Chhattisgarh9569.76
29th
(10.09.09)/30
th (08.07.10)
Mar'12 Under Implementation
a) A + 800kV, 3000Mw HVDC bipole between
Champa Pooling Station-Kurukshetra (NR)
(provision to upgrade to 6000MW at a latter date)
Commissioned
b) Kurukshetra(NR) - Jallandhar 400kV D/c(Quad)
one ckt. via 400/220kV Nakodar Commissioned
c) LILO of Abdullapur – Sonepat 400kV D/c(triple)
at KurukshetraCommissioned
Sl.
No.Description of Scheme
Estimated
Cost (Rs.
Cr)
Date of
firming up in
WR standing
committee
Date of
investment
approval
Target date as of now Remarks
STATUS OF TRANSMISSION SCHEMES UNDER IMPLEMENTATION BY POWERGRID IN WESTERN REGION (as on 31.08.2017)
d) Establishment of 3000MW 800KV HVDC bipole
terminal each at Champa Pooling station and
Kurukshetra(NR) respectively: to be upgraded to
6000MW.
Commissioned
e) Establishment of 400/220kV 2x500 MVA S/s at
Kurukshetra (GIS) 2x500MVACommissioned
400kV bays ready for
commissioning in Dec'15. ICT-II
16Inter-regional system strengthening scheme for
WR and NR-Part A1315.9
36th
(29.08.13) Oct'13 Completed
a) Solapur - Aurangabad 765kV D/c Commissioned
17Transmission System Associated with Lara STPS-I
(2x800MW)400.47
17th
LTA
(03.01.13) Jun'14 Under Implementation
a) Lara STPS-I – Raigarh (Kotra) Pooling Station 400
kV D/c line – 18kmCommissioned
b) Lara STPS-I – Champa Pooling Station 400 kV
D/c (quad) line.-112kmCommissioned
Tower erection commenced in
Oct'15
18Transmission System Strengthening in WR-NR
Transmission Corridor for IPPs in Chattisgarh5151.37
35th
(03.01.13) Jun'14 Under Implementation
a) Up-gradation of + 800kV, 3000MW HVDC bipole
between Champa Pooling Station – Kurukshetra
(NR) to 6000MW
Pole-III: Jun'18; Pole-IV:
Dec'18Tentative
b) Kurukshetra (NR) – Jind 400kV D/c (Quad) Oct'17
19Inter-regional system strengthening scheme for
WR and NR-Part B6517.36 Dec'14 Under Implementation
(a) 765KV D/C Jabalpur Pooling Station - Orai line Mar'18
(b) 765KV D/C Orai - Aligarh line Mar'18
(c) 400KV D/C Orai - Orai line (Q) Mar'18
(d) LILO of one ckt of Satna-Gwalior 765KV 2x S/C
line at OraiMar'18
(e) LILO of Agra - Meerut 765KV S/C at Aligarh Mar'18
(f) LILO of Kanpur - Jhatikara 765KV S/C at Aligarh Mar'18
20 Wardha - Hyderabad 765kV Links 3662.02 Jan'15
(a) 765KV D/C Wardha - Hyderabad line Commissioned
(b) 400KV D/C Nizamabad - Dichpali line Commissioned
21 GREEN ENERGY CORRIDORS:- Inter State
Transmission Scheme (ISTS) - Part B
3705.61
36 / 37th
(29.08.13/05.
09.14)
Apr'15 Under Implementation
(a) 765KV D/C Banaskanta - Chittorgarh (New) line Apr'18
(b) 765KV D/C Chittorgarh (New) - Ajmer (New)
line Apr'18
(c) 400KV D/C Banaskanta - Sankhari line Apr'18
(d) Establishment of 765/400/220kV (765/400kV -
2x1500 MVA & 400/220kV - 2x500MVA)
substation at Banaskanta
Apr'18
22 GREEN ENERGY CORRIDORS:- Inter State
Transmission Scheme (ISTS) - Part C
2247.37
36 / 37th
(29.08.13/05.
09.14)
July'15 Under Implementation
(a) 765KV D/C Bhuj Pool - Banaskanta line July'18
(d) Establishment of 765/400/220kV (765/400kV -
2x1500 MVA & 400/220kV - 2x500MVA) pooling
station at Bhuj
July'18
23Transmission System Strengthening Associated
with Vindhyachal V - Part A
34th
(09.05.12)Feb'15
(a) 1x1500MVA, 765/400kV ICT at Vindhyachal
Pooling StationCommissioned
24Transmission System Strengthening Associated
with Vindhyachal V - Part B
34th
(09.05.12)Under Implementation
(a) 2 nos of 765kV Line bays alongwith 2x330MVAR
Line Reactor at Vindhyachal Pooling Station
Jun'18
(a) 2 nos of 765kV Line bays alongwith 2x330MVAR
Line Reactor at Jabalpur Pooling Station
Jun'18
25 STATCOMs in Western Region36th
(29.08.13)Mar'15
(a) Aurangabad Sep'17
(b) Gwalior Apr'18
(c) Solapur Sep'17
(d) Satna Sep'17
26Western Region System Strengthening Scheme
XIV93.96
37th
(05.09.14)Jan'16
Efforts being made to
commission earlier
Sl.
No.Description of Scheme
Estimated
Cost (Rs.
Cr)
Date of
firming up in
WR standing
committee
Date of
investment
approval
Target date as of now Remarks
STATUS OF TRANSMISSION SCHEMES UNDER IMPLEMENTATION BY POWERGRID IN WESTERN REGION (as on 31.08.2017)
(a)2x500MVA, 400/220kV transformer alongwith
six nos of 220kV bays at Indore (PG) 765/400kV
Substation
July'18
(b)1x500MVA, 400/220kV transformer alongwith
two nos of 220kV bays at Itarsi (PG) 400/220kV S/sCommissioned
27
Powergrid works associated with Part-A of
Transmission system for Gadarwara STPS of
NTPC
36/37th
(29.08.13 /
05.09.14)
Apr'16
(a) 2 nos. 765 kV line bays at 765/400kV Jabalpur
Pooling Station of POWERGRID for Gadarwara
STPS (NTPC) - Jabalpur PS 765 kV D/c
Commissioned in
May'17
28
Powergrid works associated with Part-B of
Transmission system for Gadarwara STPS of
NTPC i.e. WRSS XV
36/37th
(29.08.13 /
05.09.14)
Apr'16Matching with TBCB
schedule
(a) 2 nos. 765 kV line bays at 765/400kV Solapur
sub-station of POWERGRID for Parli New (TBCB) -
Solapur (PG) 765 kV D/c
Jan'18
(b) 2 nos 400kV line bays at existing 400kV Parli
(PG) Switching Station of POWERGRID for Parli
New (TBCB) - Parli (PG) 400kV D/c (quad)
Feb'18
29
Powergrid works associated with System
Strengthening for IPPs in Chhattisgarh and other
generation projects in Western Region
36th
(29.08.13) Jul'16
Matching with TBCB
schedule
(a) 1 no. 765 kV line bay at 765/400kV Vindhyachal
Pooling Station of POWERGRID for Sasan UMPP -
Vindhyachal PS (PG) 765 kV 2nd S/c
Nov'18
(b) 2 no. 400 kV line bays at 765/400kV
Vindhyachal Pooling Station of POWERGRID for
Vindhaychal (IV/V) STPP switchyard (NTPC) -
Vindhyachal PS (PG) 400 kV 2nd D/c (quad)
Jan'19
(c) 2 no. 400 kV line bays at Gwalior Substation
for Gwalior - Morena 400 kV D/c (quad)May'18
(d) 2 nos. 765 kV line bays at 765/400kV Pune (GIS)
sub-station of POWERGRID for LILO of one circuit
of Aurangabad(PG) – Padghe(PG)765 kV D/c at
Pune (GIS) (PG)
Mar'19
(e) 2 nos. 765 kV line bays at 765/400kV Champa
Pooling Station of POWERGRID 1for Champa
PS(PG) - Raigarh (Kotra) PS(PG) 765 kV 2nd S/c, 1
for Champa PS(PG) – Dharamjaigarh(PG) 765 kV
2nd S/c
Nov'18
(f) 1 no. 765 kV line bay at 765/400kV Raigarh
(Kotra) Pooling Station of POWERGRID for
Champa PS(PG) - Raigarh (Kotra) PS(PG) 765 kV
2nd S/c
Nov'18
(g) 1 no. 765 kV line bay at 765/400kV
Dharamjaigarh Pooling Station of POWERGRID for
Champa PS(PG) – Dharamjaigarh(PG)765 kV 2nd
S/c
Nov'18
30
Powergrid works associated with Additional
System Strengthening Scheme Chhattisagrh IPPs
Part-B
36/37th
(29.08.13 /
05.09.14)
Jul'16Matching with TBCB
schedule
(a) 2 nos. 765 kV line bay at 765/400kV Raipur
Pooling Station of POWERGRID for Raipur PS(PG)
– Rajnandgaon (TBCB) 765 kV D/c
Nov'18
30 Powergrid workds associated with Additional
System Strengthening for Sipat STPS
36/37th
(29.08.13 /
05.09.14)
Jul'16Matching with TBCB
schedule
(a) 3 nos. 765 kV line bays at 765/400kV Bilaspur
Pooling Station of POWERGRID (1 no. for Sipat
STPS(NTPC) - Bilapur PS(PG) 3rd 765kV S/c, 2 nos.
for Bilaspur PS(PG)-Rajnandgaon(TBCB) 765 kV
D/c)
Nov'18-Mar'19
(b) 2 nos. 240 MVAR, 765 kV switchable line
reactors at 765/400kV Bilaspur PS end for
Bilaspur PS(PG) - Rajnandgaon(TBCB) 765 kV D/c
Mar'19
31Transmission System Strengthening associated
with Mundra UMPP- Part A266.19
36th
(29.08.13)Jul'16
(a) LILO of both circuits of Mundra UMPP-Limbdi
400kV D/c (triple snowbird) line at Bachau
Dec'17
Sl.
No.Description of Scheme
Estimated
Cost (Rs.
Cr)
Date of
firming up in
WR standing
committee
Date of
investment
approval
Target date as of now Remarks
STATUS OF TRANSMISSION SCHEMES UNDER IMPLEMENTATION BY POWERGRID IN WESTERN REGION (as on 31.08.2017)
32 Transmission System Strengthening associated
with Mundra UMPP- Part B
36/38th
(29.08.13/17.
07.2015)
Dec'18
(a) Mundra UMPP - Bhuj Pool 400kV D/c line
(triple snowbird)
33 Bays for Transmission System Associated with
DGEN Torrent Energy Ltd (1200MW)
13/14th LTA
(27.12.10/13.
05.2011)
Jul'16Execution of TBCB scheme
critical
(a) 2nos 400kV Bays at Vadodara (GIS) May'18
(b) 2nos 220kV Bays at Navsari (GIS) May'18
34Western Region System Strengthening -16
38th
(17.07.15)Jul'16 July'18
(a) Installation of 2x500MVA, 400/220kV ICTs with
associated bays at Parli (PG) switching station
along with provision of six nos. of 220 kV bays
(b) Provision of two nos. of 220kV bays at Mapusa
(Colvale) 400/220 kV substation
(c) Installation of 500MVA, 400/220kV (3rd) ICT
with associated bays at Satna (PG) S/s with
provision of two nos. 220kV line bays
(d) Provision of two nos. of 400 kV bays at
765/400kV Indore(PG) substation
35Western Region System Strengthening -17
39th
(30.11.15)Feb'17 Sep'19
1. Provision of 1x240 MVAR switchable line reactor
at Pune GIS S/s end for Aurangabad (PG) – Pune
GIS 765kV S/C line, formed after LILO of one ckt of
Aurangabad (PG) – Padghe (PG) 765kV D/C line at
Pune GIS.
2. Conversion of followings Fixed Line Reactor into
Switchable Line Reactors / BUS Reactor. a. Itarsi – Indore (MPPTCL) 400kV 2xS/C lines:
420kV 50 MVAR fixed line reactors at both ends of
each line are to be converted into switchable line
reactors.
b. Bina (PG) – Shujalpur 400kV D/C line: 420kV 50
MVAR fixed line reactor at Shujalpur end is to be
converted into switchable line reactor. The 420kV
63 MVAR line reactor installed at Bina (PG) end is
already switchable.
c. 1x63 MVAR BUS Reactor at Bhadravati S/s:
420kV
3. Installation of ICTs along with associated bays at
following substations of POWERGRID:
a. Khandwa 400/220kV Substation: 1x500 MVA,
400/220kV 3rd ICT.
b. Boisar 400/220kV Substation: 1x500 MVA,
400/220kV 4th ICT.
c. Kala 400/220kV Substation: 1x500 MVA,
400/220kV 3rd ICT.
d. Dehgam 400/220kV Substation: 1x500 MVA,
400/220kV 3rd ICT.
36Western Region System Strengthening -18
39th
(30.11.15)Feb'17 Feb'20
1. Splitting of following substation along with
necessary switching arrangement.
a. Dharamjaygarh Pool 765kV BUS
b. Raigarh Pool (Kotra) 400kV & 765kV BUS
c. Champa Pool 400 kV & 765kV BUS
2. Installation of Reactors:
a. 1X125 MVAR BUS Reactor at 400kV BUS Section
A of Dharamjaygarh Pool.
b. 1X125 MVAR BUS Reactor at 400kV BUS Section
A of Raigarh Pool (Kotra).
c. 1X240 MVAR BUS Reactor at 765kV BUS Section
A of Raigarh Pool (Kotra).
d. 1X240 MVAR BUS Reactor at 765kV BUS Section
A of Champa Pool.
e. 1X330 MVAR BUS Reactor at 765kV BUS Section
B of Dharamjaygarh Pool.
37 PG Works associated with Transmission System
for Khargone TPP
38th & 39th
(17.07.15 &
30.11.15)
Feb'17
Sl.
No.Description of Scheme
Estimated
Cost (Rs.
Cr)
Date of
firming up in
WR standing
committee
Date of
investment
approval
Target date as of now Remarks
STATUS OF TRANSMISSION SCHEMES UNDER IMPLEMENTATION BY POWERGRID IN WESTERN REGION (as on 31.08.2017)
1. 63 MVAr switchable line reactor along with
500Ω NGR at Rajgarh(PG) end of Khargone TPS –
Rajgarh (PG) 400kV line formed after LILO of one
circuit of Khandwa - Rajgarh 400 kV D/C line at
Khargone TPS, being implemented under TBCB
Feb'18
2. 2 nos. of 765 kV line bays at 765/400kV
Indore Substation of POWERGRID for termination
of Khandwa PS – Indore 765 kV D/C line, being
implemented under TBCB
July'19
3. 240 MVAr Switchable Line Reactors along
with 700Ω NGR at Indore (765/400kV S/s) end of
each circuit of Khandwa Pool – Indore 765kV D/c
line (Line being implemented under TBCB)
July'19
38POWERGRID Works associated with New WR -
NR 765kV Inter-regional corridor
40th
(01.06.2016)
Matching with TBCB
Line
a. 2 nos. of 765kV Line Bays at Vindhyachal
765/400 kV Pooling Station;
b. 2 nos. of 765kV Line Bays along with 765kV,
1x330 MVAr line reactor in each bay at Varanasi
765/400 kV GIS sub-station
39POWERGRID Works associated with Additional
400kV feed to Goa
40th
(01.06.2016)
41st
(21.12.2016)
Matching with TBCB
works
2 nos of 400kV line bays at Mapusa s/s for
termination of Xeldem – Mapusa 400kV D/c (quad)
line & 1x80MVAr LR at Narendra (New) S/s for
Narendra(New) - Xeldam 400kV line
40POWERGRID Works associated with Additional
System for Power Evacuation from Generation
Projects pooled at Raigarh (Tamnar) Pool
40th
(01.06.2016)
Matching with TBCB
works
2 nos. of 765kV Line Bays each at Dharamjaygarh
Pool and Raigarh (Tamnar) Pool
41 Transmission system for Ultra Mega Solar Power
Park (700MW) at Banaskantha (Radhanesda),
Gujarat
118
40th
(01.06.2016)
May'17
Matching with
Banaskantha
(Radhanesda) Solar Park
(expected by Jun'19)
400KV D/C Banaskantha PS - Banaskantha (PG) line
765/400kV Banasktantha (PG) 2 nos line bays
42Supplementary Transmission system for Ultra
Mega Solar Power Park (700MW) at Banaskantha
(Radhanesda), Gujarat
41st
(21.12.2016)
Matching with
Transmission system for
Ultra Mega Solar Power
Park (700MW) at
Banaskantha
(Radhanesda) GujaratEstablishment of 2x500MVA, 400/220kV pooling
station at Banaskantha (Radhanesda) [GIS] along
with 1x125MVAr bus reactor
4 nos. 220kV line bays at 400/220kV at
Banaskantha (Radhanesda) pooling station for
Solar Park Interconnection.
43 Transmission System for Ultra mega Solar Park in
Rewa District, Madhya Pradesh .
38th
(17.07.2015)
Jan'16 /
Mar'17
Matching with Rewa
UMSPP (expected by
Oct'17)
Establishment of 3x500MVA, 400/220kV
substation at Rewa Pooling Station
LILO of Vindhyachal - Jabalpur 40kV D/c (both
circuits) at Rewa Pooling Station
6 nos. 220kV line bays at Rewa Pooling Station
Annexure - 3.1
S. No. Elements Developer SCOD as
per TSA
Indicated Early date of commissioning
Mutually agreed date of
Early Commissioning
Remarks
1 Sipat Transmission Ltd. (STL) - Additional System Strengthening for Sipat STPS
a765 kV S/C Sipat -Bilaspur Pooling Station
STL Nov’ 18 Dec’17
June’ 18
Early commissioning of this transmission line would improve the reliability of evacuation system of Sipat STPS.
i1 no. 765 kV line bay at Sipat STPP of NTPC
STL Nov’18 May’17
ii 1no. of 765 kV line bay at Bilaspur PS PGCIL Nov’18* June’18
b765 kV D/C Bilaspur Pooling Station -Rajnandgaon
STL Mar’ 19 July 18Nov’18
The system beyond Rajnandgaon (i.e, Rajnandgaon-Warora-Parli) is under implementation by different TSPs (RRWTL, PWTL, and PPTL).
i 2 no. of Bays at Bilaspur PS PGCIL Mar’19* Nov’18
ii2 no. of 765 kV bay at Rajnandgaon SS(Switching)
RRWTL Nov’ 18 Nov’17 Nov’18(SCOD)
2 Raipur - Rajnandgaon Warora Transmission Ltd. (RRWTL) - Additional System Strengthening Scheme for Chhattisgarh IPPs – Part B
a 765 kV D/C Raipur Pool - Rajnandgaon RRWTL Nov’18 May’17
Nov’18 (SCOD)
System Strengthening Scheme for Chhattisgarh IPPs, no requirement of early commissioning. This scheme is interlinked with transmission system being implemented by M/s PWTL (Nov’17) & PPTL (January 18). The line reactors of the Rajnandgaon- Warora 765 kV D/C line at Warora substation are in the scope of M/s WKPL (Nov’19 with SCOD of reactors as Nov 18).
i 2 no. of 765 kV Baysat Raipur PS PGCIL Nov’18* -
ii2 no. of 765 kV bays at Rajnandgaon SS(Switching)
RRWTL Nov’18 Nov’17
b
765 kV D/C Rajnandgaon - New Pooling Station near Warora
RRWTL Nov’18 June’18Nov’18 (SCOD)
i2 no. of 765 kV bays at Rajnandgaon SS(Switching)
RRWTL Nov’18 Nov’17
ii2 no. of 765 kV bays at New Warora Pooling Station
Powergrid Warora
Transmission Ltd
Nov’17 Nov’17 Nov’17 (SCOD)
iii2X240 MVAR line reactors at Warora end
WKTL Nov’18 - Nov’18 ( SCOD)
c
Establishment of new 765kV switching station near Rajnandgaon
RRWTL Nov’18 Nov’17 Nov’18 (SCOD)
3 Chhattisgarh WR Transmission Limited (CWRTL) - System Strengthening for IPPs in Chhattisgarh & Other Generation Projects in Western Region
a400 kV D/C Gwalior -Morena CWRTL May’18 Jan’18
Jan’18
This line is planned to establish an interconnection between Gwalior (PG) & Morena (MPPTCL). MPPTCL agreed to implement their 220 kV outlets from Morena 400/220 kV SS by January 2018
i 2 no. of 400 kV bays at Gwalior (PG) PGCIL May’18* Jan’18
ii 2 no. of 400 kV bays at Morena (TBCB) CWRTL May’18 Jan’18
iii 4 no. of 220 kV outlets from Morena (TBCB) MPPTCL May’18 Jan’18
b
400 kV D/C Vindhyachal IV & V STPP - Vindhyachal Pool
CWRTL Jan’19 Jan’18
Jan’18
To improve reliability of power evacuation of Vindhyachal stage IV & V.
i2 no. of 400 kV Baysat Vindhyachal STPP of NTPC
CWRTL Jan’19 Jan’18
ii 2 no. of Bays at Vindhyachal Pool PGCIL Jan’19* Jan’18
c765 kV S/C Sasan UMPP - Vindhyachal Pooling Station
CWRTL Nov’18 Dec’17
Jun’18To improve the reliability of power evacuation of Sasan UMPP
i1 no. of 765 kV Bay at Sasan UMPP of M/s. SPL, Reliance
CWRTL Nov’18 Dec’17
ii 1 no. of 765 kV Bay at Vindhyachal Pool PGCIL Nov’18* Jun’18
d
LILO of one circuit of Aurangabad - Padghe 765 kV D/C line at Pune
CWRTL Mar’19 Jul’18Jul’18 System strengthening line
i 2 no. of 765 kV bays at Pune PGCIL Mar’19* Jul’18
e765 kV S/C Raigarh (Kotra) - Champa (Pool)
CWRTL Nov’18 Mar’18
Jun’18
To improve reliability in Chattishgarh generation complex( Raigarh kotra, Raigarh Tamna, Champa)
i 1 no. of 765 kV bay at Raigarh (Kotra) PGCIL Nov’18* Jun’18
ii 1 no. of 765 kV bay at Champa (Pool) PGCIL Nov’18* June’18
f765 kV S/C Champa (Pool) -Dharamjaigarh
CWRTL Nov’18 Apr’18
Jun’18
To improve reliability in Chattishgarh generation complex( Raigarh kotra, Raigarh Tamna, Champa)
i 1 no. of 765 kV bay at Champa PS PGCIL Nov’18* Jun’18
ii 1 no. of 765 kV bay at Dharamjaygarh PGCIL Nov’18* Jun’18
*Bays in matching time frame of the associated line.
Gist of the discussions of the meeting held on 25-04-2017 at Xeldem 220 kV sub-station of Goa Electricity Department (GED) to finalize interconnection of proposed New Xeldem 400/220 kV sub-station at 220 kV level
1.0 List of participants is enclosed at Annexure-I.
2.0 A meeting was held under the chairmanship of Chief Engineer (PSPA-I), CEA on 25-
04-2017 at Xeldem 220 kV sub-station of GED to discuss location of New Xeldem
400/220kV sub-station being implemented through tariff based competitive
bidding (TBCB) and modalities of its interconnection with existing Xeldem 220 kV
sub-station of GED.
3.0 It was informed that at the proposed New Xeldem 2x500 MVA 400/220 kV sub-
station is an AIS sub-station. Keeping in view the provision for expansion by 2x500
MVA transformer, the land required for the new sub-station would be about 40
acre. Further, the switching scheme at 220 kV level at new sub-station would be
double main and transfer bus scheme with bus bar rating of 3000A.
4.0 GED informed that the switching scheme at existing Xeldem sub-station is double
main bus scheme and the bus bar rating is of 2000A.
5.0 As adequate land contiguous to the existing Xeldem sub-station was not available
and also keeping in view the different 220 kV switching scheme at proposed New
Xeldem S/S and existing Xeldem sub-station, it was decided that interconnection
between the two sub-stations would be through 220 kV HTLS D/C line. The
interconnection line has already been covered under the scope of TBCB. The two
no. of 220 kV line bays of adequate rating required for the interconnection at
Xeldem existing sub-station would be provided by GED.
6.0 The surveyor appointed by Bid Process Coordinator (BPC) i.e. PFCCL informed that
they have identified 3 locations for establishment of New Xeldem sub-station,
which are in the vicinity of existing 220 kV Xeldem sub-station of GED. It was
decided that the surveyor would collect landowner ship details at these locations
and furnish the same to GED, PFCCL, CTU and CEA. After interaction with local
administration and landowners, GED will inform CEA, CTU and BPC the location,
which is more suitable for establishment of the new sub-station from land
acquisition and line termination point of view.
7.0 After further discussions, it was decided that following 220kV interconnections
would be established for drawl of power from New Xeldem 400/220 kV sub-
station:
New Xeldem (400 kV) - Xeldem (GED) 220kV D/c line with HTLS conductorequivalent to twin moose conductor: (220 kV line under TBCB Scope, 2 nos.220kV line bays at Xeldem (GED) to be constructed by GED)
New Xeldem (400 kV)-Verna (GED) 220kV D/c line : 220 kV line and 2 nos.220kV line bays at Verna (GED) to be constructed by GED
LILO of 2nd circuit of Ambewadi-Ponda 220 kV D/C line at New Xeldem (400kV)
Annexure-I
List of the participants of the meeting chaired by Chief Engineer (PSPA-I), CEA held on 25-
04-2017 at Xeldem 220 kV sub-station of Goa Electricity Department (GED) to finalize
interconnection of proposed New Xeldem 400/220 kV sub-station at 220 kV level
S.
No.
Name Designation & organization
1. Sh. Ravinder Gupta CE (PSPA-I), CEA, New Delhi
2. Sh. Subir Mulchandani CEO, PFCCL, New Delhi
3. Sh. Yogesh Juneja GM, PFCCL, New Delhi
4. Sh. Ramchandra DGM, CTU-Planning, POWERGRID, Gurgaon.
9910378128
5 Sh. Laxmikant Kolveker CEE Goa
6. Ms. Reshma Mathew Suptd. Engineer Elect. Dept., Panji, Goa
7 Sh. Devadasan A Executive Engineer Div.XII Xeldem
8 Sh. Jose E. De Melo Executive Engineer, EHV
Minutes of the meeting held on 28.06.2017 at CEA, New Delhi to discuss the extension of LILO arrangement for evacuation of power of M/s EPMPL (ESSAR Power MP Ltd.) Power Project (2x600 MW) at Mahan in Madhya
Pradesh
1. A meeting was held under the Chairmanship of Member (Power System), CEA on 28.06.2017 at CEA, New Delhi to discuss the extension of LILO arrangement for evacuation of power of M/s EPMPL Power Project (2x600 MW) at Mahan in Madhya Pradesh. List of participants is enclosed at Annexure-I.
2. CEA stated that M/s EPMPL is establishing 1200 (2x600) MW TPS in Madhya Pradesh. First unit of 600 MW is under operation and the second unit is expected to be commissioned by July, 2017. The following transmission system for Mahan TPS was agreed in the 27th meeting of Standing Committee on Power System Planning of Western Region (SCPSPWR) / 9th meeting of WR constituents on LTOA held on 30.07.2007 to be implemented by generation developer:
i. Mahan STPS-Sipat (Bilaspur Pooling Station) 400 kV D/C (triple moose conductor) line
ii. Loop In Loop Out (LILO) of one circuit of existing 400 kV Vindhyachal-Korba S/C lines at Mahan STPS (This was short term arrangement meant for providing connectivity to the regional grid. The LILO to be removed and line shall be restored to the original configuration by M/s EPMPL at their cost after commissioning of item (i) and other grid elements identified for providing long term access.)
iii. Gandhar NTPC – Hazira 400 kV D/C (twin moose) line
iv. Hazira 400/220 kV S/s
MoP vide its letter no. 11/4/07-PG dated 26.05.2008 granted prior approval of Government under section 68(1) of the Electricity Act, 2003 to M/s EPTCL for the transmission system mentioned at (2) above.
3. M/s ESSAR representative stated that CERC vide Licence no. 4/Transmission/CERC dated 08-04-2008 and order dated 15-09-2009 granted transmission license to M/s ESSAR Power Transmission Company Ltd. (EPTCL) on Build Own Operate Maintain (BOOM) basis for the following transmission works:
i) Mahan STPS-Sipat (Bilaspur Pooling Station) 400 kV D/C (Quad moose conductor) line
ii) LILO of existing 400 kV Vindhyachal-Korba S/C lines at Mahan STPS
iii) Gandhar NTPC – Hazira 400 kV D/C (twin moose) line
iv) 3x500 MVA 400/220 kV S/s at Hazira
v) 2x50 MVAR line reactors at Sipat (Bilaspur) Pooling station.
vi) 2x50 MVAR line reactors at Mahan STPS
vii) 1x80 MVAR 420 kV bus reactor at Mahan TPS along with associated 400 kV bay
viii) 2 no. 400 kV line bays at Sipat (Bilaspur) Pooling station
ix) 2 no. 400 kV line bays at Gandhar NTPC
x) 4 no. 400 kV line bays at Mahan generation switchyard
4. CEA further stated that the all cases of connectivity on interim LILO in Western Region (including M/s EPMPL case) were discussed in the 40th & 41st meeting of SCPSPWR held on 01.06.2016 & 21.12.2016 respectively, to finalize the replacement of interim LILOs of generation developer by their dedicated transmission lines as per direction of the CERC. In the 41st meeting of SCPSPWR, M/s EPTCL was requested to expedite the implementation of Mahan STPS–Bilaspur Pooling Station 400 kV D/C line before monsoon as against their completion target of December 2017. In line with direction given by CERC vide order no. 30/MP/2014 dated 28.06.2016, the matter was referred to WRPC forum for further deliberation. WRPC in their 33rd meeting held on 31.01.2017 & 01.02.2017 has agreed to the TCC recommendation that M/s EPMPL should complete the line by 30.06.2017 and CTU to discuss such issues in WRPC forum. CTU vide their later dated 15.06.2017 has written to WRLDC to initiate action for disconnection of interim arrangement of M/s EPMPL by 30.06.2017. Subsequently, M/s EPMPL vide their later dated 13.06.2017 has requested CEA for extension of LILO arrangement for evacuation of power from their generation plant up to January 2018.
5. M/s ESSAR representative stated that all elements of transmission system associated with evacuation of power from Mahan STPS has been commissioned except Mahan STPS–Bilaspur Pooling Station 400 kV D/C line. He informed that the delay in completion of the line is due to delay in getting forest clearance from MoEF, severe RoW issues and issues related to project financing. As on date all the issues have been resolved and the work would be started after the Monsoon. He also informed that lenders have already sanctioned funding to the tune of Rs. 175 Crores, which includes promoters’ equity of Rs. 75 Crores. As on date, the equity of Rs. 75 crores has already been deposited in Trust Retention Account (TRA).
6. With regard to progress of the line, M/s ESSAR representative informed that as on date out of 942 foundations, 938 has been completed and 909 towers has been erected and out of 337 km stringing 197 km has been completed. With all inputs required for construction of the line been tied up, the line would be completed by December 2017.
7. M/s ESSAR representative also stated that with existing LILO of Vindhyachal–Korba STPP 400 kV S/C line at Mahan STPS, no overloading or grid security issue has been observed. The LILO would also help in charging of Mahan STPS–
Bilaspur Pooling Station 400 kV D/C line. Without the LILO arrangement, Mahan generating station would be connected radially to the grid through 337 KM long line. Without LILO, outage of one circuit of Mahan STPS–Bilaspur Pooling Station 400 kV D/C line would result in massive voltage & power swings and angular instability at Mahan TPS. Therefore, it is desirable to retain the LILO arrangement even after completion of Mahan STPS–Bilaspur Pooling Station 400 kV D/C line from security and stability of Mahan TPS machines and grid as whole.
8. M/s EPMPL further informed that they have filed a petition in CERC on 14.06.2017 to allow EPMPL to use the LILO connectivity till January, 2018 and the hearing for the same was held on 20.06.2017. The RoP / order of the CERC is awaited.
9. CTU informed that system studies carried out by them also indicate the requirement of another anchoring of Mahan TPS apart from Mahan-Sipat Pooling point 400 kV D/C line. The summary of the studies carried out by CTU is given below:
a) Case-1 : Without Mahan STPS-Sipat pooling station 400 kV D/C line
i) With one unit of 600 MW in service at Mahan STPS – No instability/oscillations observed in power evacuation under n-1 condition.
ii) With both units of 600 MW in service - Rotor angle instability of Mahan STPS units as well as sustained grid oscillations are observed under outage of Mahan STPS -Vindhyachal 400 kV S/C line. With tripping of one unit through SPS (within 450 ms), the system remains stable.
b) Case-2 : With only Mahan STPS–Bilaspur Pooling Station 400 kV D/C line
i) With one unit of 600 MW in service at Mahan STPS – No instability / oscillations observed in power evacuation under n-1 condition.
ii) With both 600 MW units in service at Mahan STPS - Grid instability issues (oscillations) are observed under N-1 conditions of the line. With tripping of one unit through SPS (within 300 ms), the system remains stable.
c) Case-3 : With both lines i.e. LILO of Vindhyachal – Korba STPP 400 kV S/C line at Mahan STPS and Mahan STPS–Bilaspur Pooling Station 400 kV D/C line)
i) With one unit of 600 MW in service at Mahan STPS – No instability / oscillations observed in power evacuation under n-1 condition.
ii) With both 600 MW units in service at Mahan STPS - Power can be reliably evacuated from both units of Mahan TPS. Issue of increase in short circuit level at Vindhyachal due to both the lines needs to be studied in detail.
Thus from the above it is seen that there is requirement of LILO of Vindhyachal – Korba STPP 400 kV S/C line at Mahan STPS in addition to Mahan STPS–Bilaspur Pooling Station 400 kV D/C line for safe and reliable evacuation of power from Mahan STPS.
Similar case of instability / oscillations being observed in the case of Lalitpur Generating station in Northern Region, under the contingency of one ckt of the only 765 kV D/C line was pointed out during the deliberations.
10. CEA stated that the transmission licence given by CERC, inter alia, includes elements, which are part of generation switchyard and with the grant of transmission license to M/s EPTCL, the status of the entire evacuation system from Mahan STPS has been changed from dedicated system (to be built by generation developer) to ISTS (being implemented by TSP M/s EPTCL). Further, system studies carried out by POWERGRID also indicate there is a technical requirement of additional anchoring of Mahan TPS with grid apart from Mahan TPS-Sipat Pooling station 400 kV D/C line.
11. WRPC stated that the decision regarding the opening of the LILO of Vindhyachal–Korba STPP 400 kV S/C line at Mahan TPS has to be taken at WRPC forum and require further deliberations. The WRPC meeting is scheduled in the last week of July 2017. To the query of WRPC whether the LILO section would be a part of final EPMPL – Bilaspur Pooling Station 400 kV D/C line, it was clarified that the LILO and the D/C line are in different direction and now both are ISTS assets. LILO of Vindhyachal–Korba STPP 400 kV S/C line at Mahan TPS is already commissioned and its tariff is being paid from PoC pool.
12. After further discussion, following was decided:
i) The transmission system for evacuation of power from M/s EPMPL generation plant at Mahan is now an ISTS system being implemented by M/s EPTCL (ISTS Transmission Licensee) and not a dedicated transmission system of generation developer. As such LILO of Vindhyachal–Korba STPP 400 kV S/C would not be an interim arrangement. This change would be brought to the notice of constituents in the next meeting of SCPSPWR.
ii) The system studies indicate that the LILO of Vindhyachal–Korba STPP 400 kV S/C line at Mahan STPS would also be essential to take care of contingency of outage of one ckt of Mahan SPTS–Bilaspur Pooling Station 400 kV D/C line for reliable evacuation of power from 2x600 MW units of Mahan TPS.
iii) M/s EPTCL has agreed to complete the remaining works of Mahan STPS–Bilaspur Pooling Station 400 kV D/C line by December 2017.
The meeting ended with thanks to the chair.
Annexure – I
List of Participants of a meeting held on 28.06.2017 regarding extension of interim connectivity of ESSAR Mahan MP Ltd.
S. No.
Name S/Shri/ Ku./Smt.
Designation Mobile E-mail
CENTRAL ELECTRICITY AUTHORITY
1 Prakash Mhaske Member
2 Ravinder Gupta CE(PSPA-I) 9968286184 [email protected]
3 Awdhesh Kumar Yadav
Director 9868664087 [email protected]
4 Shiva Suman Dy. Director 9013929260 [email protected]
5 Vikas Sachan
Assistant Director
7838263699 [email protected]
6 Nitin Deswal Assistant Director
9717818349 [email protected]
POWER GRID/ CTU
7 Ashok Pal GM 9910378105 ashok@ powergridindia.com
8 Pratyush Singh Sr. Engineer 8826094863 pratyush.singh@ powergridindia.com
EPMPL/ EPTCL
9 Madam G. Gupta M.D. 9819731319 [email protected]
10 S.J. Bhujade V.P. 9909993545 [email protected]
11 Shruti Verma 7291887303 [email protected]
WRPC
12 L.K.S. Rathore AS/Ex 9833371844 [email protected]
Minutes of a meeting held on 22.09.l2017 to discuss measures to control high
fault level at Korba (NTPC)
The list of participants is enclosed as Annexure – I.
1. CE (PSPA-1), CEA welcomed the participants and stated that in the 40th
meeting of Standing
Committee on Power System Planning of Western Region (SCPSPWR) held on 01.06.2016,
the following scheme was agreed to control high fault current at Korba STPS (3x200 MW +
4x500 MW) of NTPC:
(i) Korba STPS - Korba West 400 kV S/C line to be normally kept open.
(ii) Korba STPS- Sipat STPS 400 kV S/C line and Sipat STPS – Raipur 400 kV S/C line
to be reconfigured as Korba STPS- Raipur 400 kV S/C line bypassing at Sipat STPS.
(bypassing arrangement at Sipat STPS already exists).
Subsequently in the 41st meeting of SCPSPWR held on 21.12.2016, CSPTCL has raised
concern over above proposal i.e. keeping the Korba STPS - Korba West 400 kV S/C line in
normally open condition, as it would cause overloading of the 400 kV and 220 kV lines
emanating from Korba (West) power plant under n–1–1 contingency conditions. In the
meeting, it was decided that SLDC (Chhattisgarh) concerns / suggestion would be deliberated
in joint meeting of CEA, CTU, WRPC, CSPTCL and WRLDC. Therefore, in line with the
decision of the 41st meeting of SCPSPWR, this meeting has been convened to further deliberate
on measures to control high fault level at 400 kV Korba (NTPC) S/s.
2. Director (PSP-1), CEA stated that an alternative proposal (say A2), in addition to proposal
made in the 41st meeting of SCPSPWR (say A1), has also been studied in consultation with
CTU and the same was circulated. The alternative proposal was reconfiguration of Korba
(West) – Korba (NTPC) 400 kV line and Korba (NTPC) - Sipat 400 kV S/C line as Korba (W)
– Sipat 400 kV S/C line through bypassing at Korba (NTPC)).
3. NTPC representative stated that in the alternative circulated two nos. of 400kV outlets from
Korba (NTPC), one to Korba (W) and another to Sipat would not be available for evacuation
of power. There may be constraints in power evacuation from Korba (NTPC) in case of n-1
contingency conditions of lines emanating from Korba (NTPC).
4. Endorsing the views of NTPC, WRLDC representative stated that sometimes high loading on
the Korba(NTPC)- Sipat 400 kV S/C line is observed due to its short length. Therefore,
bypassing of Korba(NTPC)-Sipat-Raipur 400 kV S/C line at Sipat (so as to form Korba
(NTPC)-Raipur 400 kV line) is required as already proposed in alternative A1. It is seen that
power normally flows from Korba(NTPC) to Korba(W) on Korba(W)- Korba (NTPC)
interconnection, therefore opening of this line would help in reducing the loadings on
transmission system connected with Korba(W) and underlying network of Chhattisgarh.
5. CSPTCL representative stated that they would prefer alternative A2. As far as the alternative
A1 is concerned, overloading of 220 kV network may take place in case of N-1-1 contingency
of 400 kV outlets from Korba(W). To reduce the short circuit level at Korba(NTPC), bus
splitting could also be explored.
6. NTPC stated that bus splitting at Korba(NTPC) is not a feasible solution as auxiliary supply
system is common for whole plant.
7. Director, CEA stated that another alternative, say A3, which involves bypassing of Korba(W)-
Korba(NTPC) 400 kV line and Korba(NTPC)- Essar Mahan 400 kV line at Korba(NTPC) so
as to form Korba(W)-Essar Mahan 400 kV line could also be explored. He added that there
is substantial short circuit current contribution at Korba (NTPC) from Korba (West) and Sipat
and to control the short circuit level at Korba (NTPC) opening of Korba (W) – Korba (NTPC)
400 kV line and bypassing of Korba (NTPC) - Sipat 400 kV S/C line & Sipat-Raipur 400 kV
S/C line at Sipat are required.
8. In the meeting, it was agreed to carryout studies for 2021-22 time frame for three different
alternatives as give below:
Alternative 1 (A1): Korba (NTPC) – Korba (W) 400 kV S/C open + Korba(NTPC) - Sipat
STPS 400 kV S/C line and Sipat STPS – Raipur 400 kV S/C line to be
bypassed at Sipat so as to form Korba STPS- Raipur 400 kV S/C line, as
proposed in 41st meeting of SCPSPWR
Alternative 2(A3): Reconfiguration of Korba (West) – Korba (NTPC) 400 kV line and Korba
(NTPC) - Sipat 400 kV S/C line as Korba (W) – Sipat 400 kV S/C line
through bypassing at Korba (NTPC).
Alternative 3(A3): Reconfiguration of Korba(W)-Korba(NTPC) 400 kV line and
Korba(NTPC)- Essar Mahan 400 kV line as Korba(W)-Essar Mahan 400
kV line through bypassing at Korba(NTPC)
Assumptions made in the Base Case are given below:
a) Studies have been carried out for 2021–22 time-frame the load of WR and Chhattisgarh
is considered as 72 GW & 6000 MW respectively as per 19th
EPS
b) All generators near to the Korba (NTPC) were kept on
c) 90% dispatch has been considered for generating stations in and around Korba (NTPC)
i.e. Korba (NTPC), Sipat, Korba (West), Korba (East), Korba (Extension), Essar
Mahan etc.
Study Cases:
CASE-1: Base Case + A1, CASE-2: Base Case +A2, CASE-3: Base Case + A3
The fault levels at various 400 kV buses near to the Korba (NTPC) in 2021 – 22 timeframe for
above alternatives is as tabulated below:
S.
No.
Bus Base case (kA) Case I (kA) Case II (kA) Case III (kA)
1 Korba (NTPC) 51 37 35 40
2 Korba (West) 38 18 25 20
3 Sipat STPS 39 28 34 38
4 Raipur I 26 26 26 26
5 Raipur II 38 38 38 38
6 Vindhyachal (I,II,III) 41 41 41 41
In case-3, as the fault level at Korba (NTPC) of 40 kA is observed, therefore the case was not
studied further.
The power flows through various lines in base case and under contingencies as follows:
a) Base Case Power flows
S. No. Transmission Element MW
1 Korba (N) – Bhilai - I 287
2 Korba (N) – Bhilai - II 279
3 Korba (N) - Bhatapara 401
4 Korba (N) – Korba (W) 115
5 Korba (N) - Vindhyachal -46
6 Korba – Birsinghpur D/C 2 x 283
7 Korba (N) - Sipat 444
8 Korba (N) – Essar Mahan - 180
9 Korba (N) – Raipur D/C 2 x 123
10 Korba (W) – Raita 349
11 Korba (W) – Bhilai 243
12 Korba (W) - Marwa 160
13 400/220 kV ICT at Korba (W) -175 (Injection at 400 kV level
b) Power flows through various lines interconnected with Korba (NTPC) in above alternatives
including under n-1-1 contingencies
S.
No.
Transmission
Element
Case I Case I under
n-1-1
Case II Case II under
n-1-1
1 Korba (N) – Bhilai I 319 Out 365 Out
2 Korba (N) – Bhilai II 311 Out 375 Out
3 Korba (N) - Bhatapara 436 580 495 700
4 Korba (N) – Korba (W) Open Open Bypass Bypass
5 Korba (N) - Vindhyachal -26 22 -4 71
6 Korba – Birsinghpur D/C 2 x 395 2 x 450 2 x 425 2 x 499
7 Korba (N) - Sipat NA NA Bypass Bypass
8 Korba (N) – Raipur 326 464 NA NA
9 Korba (N) – Essar Mahan -154 -95 -127 -35
10 Korba (N) – Raipur D/C 2 x 147 2 x 220 2 x 180 2 x 290
c) Power flows in above alternatives and under n-1-1 contingencies in CSPTCL network
S.
No.
Transmission
Element
Case I Case I
n-1-1
Case II Case II
n-1-1
1 Korba (W) – Raita 317 485 277 Out
2 Korba (W) - Bhilai 218 out 187 Out
3 Korba (W) - Marwa 118 Out 54 242
4 ICT 500 MVA, 400/220 kV 151 325 106 186
)
The results of studies on above options like power flows in base case, power flows during
contingencies, short circuits levels etc.., are enclosed as Annexure II.
9. As per the study results, it is seen that the fault level is in within limits for both A1 & A2. In
alternative A1, one 400 kV interconnections (Korba (NTPC) – Korba (W) 400 kV S/C line)
would not be available from both Korba(W) and Korba (NTPC) 400 kV bus. But in alternative
A2, two no. of 400 kV interconnections (Korba (NTPC) – Korba (W) 400 kV S/C line and
Korba(NTPC) - Sipat STPS 400 kV S/C line) would not be available for evacuation of power
from Korba (NTPC) 400 kV bus.
10. The study suggests the following alternative to control high fault current at Korba STPS (3x200
MW + 4x500 MW) of NTPC:
i. Korba STPS - Korba West 400 kV S/C line to be normally kept open. CSPTCL to take
Korba (W) to Korba (NTPC) 400 kV S/C line into service in case of planned shutdown of
any of 400 kV lines emanating from Korba(W). This line would be normally idle charged
from one end say Korba (NTPC).
ii. Korba STPS- Sipat STPS 400 kV S/C line and Sipat STPS – Raipur 400 kV S/C line to
be rearranged as Korba STPS- Raipur 400 kV S/C line bypassing at Sipat STPS.
(bypassing arrangement at Sipat STPS already exists).
11. Members agreed with the above proposal. However, CSPTCL stated that they would convey
their opinion on the proposal after consultation with their SLDC.
Meeting ended with thanks to the chair.
*****
Annexure - I
S.NO. NAME ORGANIZATION DESIGNATION MOBILE E-MAIL
1 Ravinder Gupta CEA CE
2 Awdhesh Kumar Yadav CEA Director
3 Shiva Suman CEA DD
4 Vikas Sachan CEA AD
5 Nitin Deswal CEA AD
6 Pratyush Singh POWERGRID Sr. Engr. 8826094863 [email protected]
7 P.S. Das POWERGRID Asst. GM 9433041837 [email protected]
8 Pushpa Seshadri WRLDC POSOCO Asst. GM 9869404482 [email protected]
9 Rahul Chakrabarti NLDC POSOCO Sr. Engr. 9599449975 [email protected]
10 Subhash Thakur NTPC AGM 9650991067 [email protected]
11 Vivek Chauhan NTPC Mgr 9650999980 [email protected]
12 D.K. Chawda CSPTCL Raipur SE (PL) O/o ED (C&D) 9425202572 [email protected]
List of Participants of a Meeting held on 22.09.2017 to discuss measures to limit High Fault level at NTPC Korba
KORBA FAULT LEVEL STUDY
BASE CASE
314001
KNTPC4
400.3
2314.4
-650.0
314002
RAIPUR
314003
KORBW4
314004
BHI4
403.8
314005
BHATP4
398.9
314008
SIPAT4
403.2
314010
PATH4
403.2
314019
BALCO
400.0
314030
RAIPUR_POOL
408.7
364008
VINDH_W4
400.0
364017
BRSGPR4
408.9
364027
MAHAN
401.7
122.9
-83.7
-122.3
-28.1
122.9
-83.7
-122.3
-28.1
116.0
11.9
-115.9
-19.3
279.4
-85.0
-276.6
53.0
286.7
-84.4
-283.8
56.0
401.0
-35.5
-397.3
8.2
443.8
-109.8
-442.5
98.7
-45.6
-28.9
45.7
-39.6
383.0
-75.8
-377.0
94.2
383.0
-75.8
-377.0
94.2
0.6
180.2
-62.0
20.0
115.3
242.6
-89.9
-240.1
-6.1
3182.8
-48.7R
4-48.8R
5444.9
-118.5R
-51.4
43.1
51.5
-48.5
1-75.0L
2243.7
-75.0L
1131.8
-19.1R
2131.8
-19.1R
3131.8
-19.1R
4131.8
-19.1R
1
-633.7
57.7
636.7
-1.1
1525.7
-150.0L
2525.7
-150.0L
1
243.7
2650.0
-664.5
314049
RAIPUR SPLT
403.8
400.0
401.5
247.1
-65.3-8.7
247.1
-65.3
-245.4
-8.7
229.1
-59.4
-227.7
37.5
-214.4
45.811
-214.4
45.811
74.1
-0.1
-73.7
3.1
74.1
-0.1
-73.7
3.1
-61.0
1.7
61.0
-8.8
10.0
73.9
10.0
186.4
-245.4
1
KORBABYP
400.0
403.3
2
SIPATBYP
400.0
374007
BHADR4
417.4
314015
RAIPUR-FSC1
407.0
314025
RAIPUR-FSC2
407.0
-109.4
-303.9
25.9
240.8
-103.0
-237.1
44.0
240.8
-237.1
44.0
325.5
-58.5
-325.5
41.6
325.5
-58.5
-325.5
41.6
314.0
-107.7
-311.0
33.41
F0.0
-490.3
314028
BIL-POOL
404.2
364025
VIN-POOL
414.7
-116.4
-78.4
117.2
-118.4
-116.4
-78.4
117.2
-118.4
243.7
-75.0
-243.5
54.9
243.7
-75.0
-243.5
54.9
474046
RANCHI
183.3
314021
RAITA
403.4
314022
MARWA
400.0
348.5
-81.3
-345.2
37.5
160.4
-29.4-160.1
-0.7
-60.6
-2.5
60.6
-31.4
-60.6
-2.5
60.6
-31.4
-60.6
-2.5
60.6
-31.4
-254.5
13.6
256.6
-85.2
-307.9
30.9
310.4
-89.6
-307.9310.4
-89.6
1444.9
-122.0R
2444.9
-122.0R 30.9
306.8
-103.0
-178.9
318007
SIPAT7
767.0
1582.3
-165.0L
2582.3
-165.0L
3582.3
-165.0L
4444.1
-125.0L5
444.1
-125.0L
10.0
241.3
312002
RAIPUR2
218.4
-173.4
-36.3
1
1
-173.4
-36.3
1
1
-173.4
-36.3
1
1
-175.4
3.8 11
183.3
-29.3R
2183.3
-29.3R
220.0
1
312003
KORBW2
1
0.9
191.1
312099
VISHRAMPUR
1150.0
45.0
CHHATTISGARH 220kV NETWORK
314003
KORBW4
1.0
400.0
314004
BHI4
1.0
403.8
314021
RAITA
1.0
403.4
314022
MARWA
1.0
400.0
1
KORBABYP
1.0
400.0
314001
KNTPC4
1.0
400.3
242.6
-89.9
-240.1
-6.1
348.5
-81.3
-345.2
37.5
160.4
-29.4
-160.1
-0.7
116.0
11.9
-115.9
-19.3
3182.8
-48.7R
4183.3
-48.8R
5444.9
-118.5R
-60.6
-2.5
60.6
-31.4
-60.6
60.6
-31.4
-60.6
-2.5
60.6
-31.4
-254.5
13.6
256.6
-85.2
279.4
-85.0
-276.6
53.0
286.7
-84.4
-283.8
56.0
-307.9
30.9 -89.6
-307.9
30.9
310.4
-89.6
1444.9
-122.0R
2444.9
-122.0R
310.4
-2.5
2314.4
-650.0
312003
KORBW2
1.0
220.0
-175.4
3.811
183.3
-29.3R
2183.3
-29.3R
312014
KORBAEXT
1.0
220.0
312017
KOTMIKL
1.0
219.1
312023
MOPKA
1.0
215.8
312001
KORBE2
1.0
220.0
40.8
-7.6
-40.8
6.788.1
-14.4
-86.9
6.7
88.1
-14.4
-86.9
6.7
164.0
2.8
-160.7
4.1
-80.5
13.8
80.5
-14.4
-80.5
13.8
80.5
-14.4
-275.6
48.5
-47.9
11
222.6
-28.8R
2222.9
-28.8R
156.8
3.4
-153.8
2.0
385.7
110.9
312008
RAIGR2
1.0
219.1
312032
BALCO
1.0
220.0
422015
BUDHIPADAR
1.0
220.7
65.9
-12.6
-65.2
1.1
60.1
-22.4
-59.2
3.0
60.1
-22.4
-59.2
3.0
30.3
-20.9
-30.1
7.11
1
275.7
312015
SUHELA2
1.0
217.7
312024
BANARI
1.0
218.2
109.3
-12.9
-106.9
7.0
101.3
-3.4
-100.3
-0.1
-111.3
14.9
112.8
-17.4
312037
MARWA
1.0
218.7
-172.5
-9.011-86.1
-5.6
86.2
4.5
-86.1
-5.6
86.2
4.5
1
157.9
68.7
-150.0
-45.0
1.0
132.0
-160.6
10.111
-160.6
10.111
172.9
10.4
311002
KORE1
1
KORBA FAULT LEVEL STUDY
BASE CASE
314001
KNTPC4
0.0, 0.0
50382.4, -87.2
13543.5
-628.1
314002
RAIPUR
314003
KORBW4
314004
BHI4
0.0, 0.0
38630.6, -85.7
314005
BHATP4
0.0, 0.0
13536.7, -85.3
314008
SIPAT4
0.0, 0.0
38680.2, -87.5
314010
PATH4
314019
BALCO
314030
RAIPUR_POOL
364008
VINDH_W4
0.0, 0.0
40826.6, -87.2
364017
BRSGPR4
364027
MAHAN
0.0, 0.0
25085.9, -86.8
2105.5
-85.1
2670.1
-85.4
2105.5
-85.1
2670.1
-85.4
10278.8
-87.2
20886.4
-86.3
1754.2
-85.5
2166.7
-86.2
1799.9
-85.5
2223.1
-86.2
1983.7
-85.3
4628.8
-85.3
8442.4
-87.3
9983.7
-86.8
2093.6
-85.4
2151.2
-85.3
1853.1
-85.7
1853.1
-85.7
-85.5
2888.2
-85.2
2
1799.8
-85.4
1732.1
-86.4
3951.5
-90.0
4-90.0
52325.2
-90.0
2256.9
-85.6
5630.0
-85.1
1
2
1
2
3
4
1
7527.2
-86.5
11192.0
-85.8
13575.5
-90.0
23575.5
-90.0
1
16333.1
-897.5
314049
RAIPUR SPLT
0.0, 0.0
37862.3, -85.5
2942.1
-84.9-86.2
2942.1
-84.9
2988.6
-86.2
2727.6
-85.1
2770.7
-86.4
8388.9
-89.6
8388.9
-89.6
1665.6
-84.9
1665.6
-84.9
13871.1
-85.0
14672.0
-85.7
1
1
2988.6
1
KORBABYP
0.0, 0.0
36755.5, -86.8
0.0, 0.0
25943.3, -85.1
2
SIPATBYP
374007
BHADR4
314015
RAIPUR-FSC1
314025
RAIPUR-FSC2
-87.0
1528.4
-85.0
1528.4
3286.8
-83.2
3286.8
-83.2
2072.4
-87.01
F
314028
BIL-POOL
364025
VIN-POOL
1935.1
-85.2
1935.1
-85.2
474046
RANCHI
951.5
314021
RAITA
0.0, 0.0
26577.3, -85.5
314022
MARWA
2370.6
-85.4
3047.8
-86.0
4002.0
-85.7
1771.0
-85.6
5382.5
-85.3
1771.0
-85.6
5382.5
-85.3
1771.0
-85.6
5382.5
-85.3
1425.0
-86.5
2113.3
-86.0
2113.3
1
2-86.0
1933.0
-85.0
2591.6
318007
SIPAT7
0.0, 0.0
39979.7, -88.2
11758.7
-89.8
21758.7
-89.8
31758.7
-89.8
41399.9
-89.75
1399.9
-89.7
1
312002
RAIPUR2
2
1
312003
KORBW2
1
KORBA FAULT LEVEL STUDY
CASE 1: AS AGREED IN 41st WR SCM
314001
KNTPC4
400.3
2314.4
-650.0
314002
RAIPUR
314003
KORBW4
314004
BHI4
404.2
314005
BHATP4
398.9
314008
SIPAT4
404.0
314010
PATH4
403.4
314019
BALCO
400.0
314030
RAIPUR_POOL
408.8
364008
VINDH_W4
400.0
364017
BRSGPR4
408.5
364027
MAHAN
401.7
146.8
-84.5
-145.9
-24.5
146.8
-84.5
-145.9
-24.5
311.4
-86.3
-307.8
62.0
319.5
-85.7
-315.8
65.3
436.3
-35.3
-431.9
15.5
-26.3
-31.0
26.4
-38.3
402.0
-72.0
-395.3
96.7
402.0
-72.0
-395.3
96.7
-3.6
155.6
-61.6
20.0
115.3
220.5
-92.4
-218.5
-8.3
3182.8
-46.1R
4-46.2R
5444.9
-112.2R
-70.9
49.6
71.1
-54.4
1-75.0L
2243.7
-75.0L
1131.8
-19.5R
2131.8
-19.5R
3131.8
-19.5R
4131.8
-19.5R
1
-640.4
57.4
643.6
-0.1
1525.7
-150.0L
2525.7
-150.0L
1
243.7
2650.0
-659.0
314049
RAIPUR SPLT
404.4
400.0
401.6
207.0
-62.4-17.2
207.0
-62.4
-205.9
-17.2
-270.5
59.411
-270.5
59.411
63.5
3.0
-63.2
-1.0
63.5
3.0
-63.2
-1.0
-67.0
-20.5
67.0
13.3
10.0
74.2
10.0
186.5
-205.9
1
KORBABYP
400.0
403.3
2
SIPATBYP
402.7
374007
BHADR4
417.5
314015
RAIPUR-FSC1
407.8
314025
RAIPUR-FSC2
407.8
329.8
-75.4
-326.9
15.1
-107.0
-306.6
23.8
243.0
-101.1
-239.2
42.4
243.0
-239.2
42.4
322.8
-61.7
-322.8
45.0
322.8
-61.7
-322.8
45.0
-329.8
330.6
-95.0
316.4
-106.2
-313.4
32.31
F0.0
-490.5
75.4
314028
BIL-POOL
404.4
364025
VIN-POOL
414.7
-125.1
-76.4
126.1
-119.2
-125.1
-76.4
126.1
-119.2
243.7
-75.0
-243.5
54.9
243.7
-75.0
-243.5
54.9
474046
RANCHI
183.3
314021
RAITA
403.8
314022
MARWA
400.2
320.1
-84.9
-317.3
35.4
118.8
-30.2
-118.6
-1.4
-45.8
-3.9
45.8
-30.2
-45.8
-3.9
45.8
-30.2
-45.8
-3.9
45.8
-30.2
-241.1
12.7
243.0
-86.7
-296.2
30.7
298.5
-91.4
-296.2298.5
-91.4
1444.9
-125.0L
2444.9
-125.0L 30.7
309.5
-101.1
-154.6
318007
SIPAT7
767.5
1582.3
-165.0L
2582.3
-165.0L
3582.3
-165.0L
4444.1
-125.0L5
444.1
-125.0L
10.0
241.6
312002
RAIPUR2
218.6
-173.9
-37.6
1
1
-173.9
-37.6
1
1
-173.9
-37.6
1
1
312003
KORBW2
-151.5
2.9 11
183.3
-28.6R
2183.3
-28.6R
220.0
1
1
0.9
191.1
312099
VISHRAMPUR
1150.0
45.0
CHHATTISGARH 220kV NETWORK
314003
KORBW4
1.0
400.0
314004
BHI4
1.0
404.2
314021
RAITA
1.0
403.8
314022
MARWA
1.0
400.2
1
KORBABYP
1.0
400.0
314001
KNTPC4
1.0
400.3
220.5
-92.4
-218.5
-8.3
320.1
-84.9
-317.3
35.4
118.8
-30.2
-118.6
-1.4
3182.8
-46.1R
4183.3
-46.2R
5444.9
-112.2R
-45.8
-3.9
45.8
-30.2
-45.8
45.8
-30.2
-45.8
-3.9
45.8
-30.2
-241.1
12.7
243.0
-86.7
311.4
-86.3
-307.8
62.0
319.5
-85.7
-315.8
65.3
-296.2
30.7 -91.4
-296.2
30.7
298.5
-91.4
1444.9
-125.0L
2444.9
-125.0L
298.5
-3.9
2314.4
-650.0
312003
KORBW2
1.0
220.0
-151.5
2.911
183.3
-28.6R
2183.3
-28.6R
312014
KORBAEXT
1.0
220.0
312017
KOTMIKL
1.0
219.1
312023
MOPKA
1.0
215.9
312001
KORBE2
1.0
220.0
35.4
-6.7
-35.4
5.785.2
-14.2
-84.2
6.1
85.2
-14.2
-84.2
6.1
160.6
2.2
-157.5
4.0
-75.7
12.9
75.8
-13.6
-75.7
12.9
75.8
-13.6
-275.3
48.5
-47.8
11
222.6
-29.7R
2222.9
-29.8R
153.9
2.7
-151.0
2.0
385.7
108.0
312008
RAIGR2
1.0
219.1
312032
BALCO
1.0
220.0
422015
BUDHIPADAR
1.0
220.7
63.5
-12.7
-62.9
0.9
59.3
-22.4
-58.4
2.8
59.3
-22.4
-58.4
2.8
31.4
-20.7
-31.2
7.01
1
275.4
312015
SUHELA2
1.0
217.8
312024
BANARI
1.0
218.3
105.8
-13.3
-103.5
6.6
99.6
-4.1
-98.7
0.4
-106.7
14.1
108.0
-17.3
312037
MARWA
1.0
218.8
-168.4
-9.411-84.0
-5.8
84.2
4.7
-84.0
-5.8
84.2
4.7
1
157.9
68.7
-150.0
-45.0
1.0
132.0
-159.3
10.011
-159.3
10.011
172.9
10.4
311002
KORE1
1
KORBA FAULT LEVEL STUDY
CASE 1: AS AGREED IN 41st WR SCM
314001
KNTPC4
0.0, 0.0
36430.9, -86.9
13543.5
-628.1
314002
RAIPUR
314003
KORBW4
314004
BHI4
0.0, 0.0
37426.9, -85.8
314005
BHATP4
0.0, 0.0
13376.9, -85.3
314008
SIPAT4
0.0, 0.0
27692.8, -87.7
314010
PATH4
314019
BALCO
314030
RAIPUR_POOL
364008
VINDH_W4
0.0, 0.0
40711.4, -87.2
364017
BRSGPR4
364027
MAHAN
0.0, 0.0
24996.1, -86.8
2247.4
-85.0
2548.0
-85.5
2247.4
-85.0
2548.0
-85.5
2313.3
-85.2
2281.2
-85.8
2373.6
-85.2
2340.6
-85.8
2597.4
-85.2
4497.9
-85.3
2114.7
-85.3
2081.4
-85.3
1885.5
-85.6
1885.5
-85.6
-85.4
2808.2
-85.2
2
2245.2
-85.1
1259.2
-87.7
3951.5
-90.0
4-90.0
52325.2
-90.0
2298.6
-85.4
5608.6
-85.1
1
2
1
2
3
4
1
7485.4
-86.5
11170.8
-85.8
13575.5
-90.0
23575.5
-90.0
1
16333.1
-897.5
314049
RAIPUR SPLT
0.0, 0.0
37484.0, -85.5
3706.5
-84.8-86.2
3706.5
-84.8
3248.2
-86.2
8478.9
-89.6
8478.9
-89.6
1672.3
-84.8
1672.3
-84.8
14119.5
-84.9
14061.0
-85.8
1
1
3248.2
1
KORBABYP
0.0, 0.0
17878.4, -87.1
0.0, 0.0
25723.1, -85.1
2
SIPATBYP
374007
BHADR4
314015
RAIPUR-FSC1
314025
RAIPUR-FSC2
2579.0
-86.0
-87.1
1527.0
-85.0
1527.0
3287.3
-83.1
3287.3
-83.1
2611.2
-85.3
2077.9
-87.01
F
314028
BIL-POOL
364025
VIN-POOL
1940.8
-85.2
1940.8
-85.2
474046
RANCHI
951.5
314021
RAITA
0.0, 0.0
25006.8, -85.6
314022
MARWA
2931.6
-85.1
2185.2
-87.2
4775.1
-85.4
1451.0
-86.3
5397.9
-85.2
1451.0
-86.3
5397.9
-85.2
1451.0
-86.3
5397.9
-85.2
1145.8
-87.5
1735.2
-86.7
1735.2
1
2-86.7
1931.3
-85.0
2637.1
318007
SIPAT7
0.0, 0.0
38167.7, -88.0
11758.7
-89.8
21758.7
-89.8
31758.7
-89.8
41399.9
-89.75
1399.9
-89.7
1
312002
RAIPUR2
2
1
312003
KORBW2
1
KORBA FAULT LEVEL STUDY
41st WR SCM CASE: N-1-1_KORBA(NTPC)-BHILAI D/c OUT
314001
KNTPC4
400.0
2314.4
-444.8
314002
RAIPUR
314003
KORBW4
314004
BHI4
404.2
314005
BHATP4
397.8
314008
SIPAT4
403.7
314010
PATH4
403.1
314019
BALCO
400.0
314030
RAIPUR_POOL
408.7
364008
VINDH_W4
400.0
364017
BRSGPR4
407.2
364027
MAHAN
401.6
220.5
-82.5
-218.6
-14.2
220.5
-82.5
-218.6
-14.2
580.1
-21.9
-572.4
40.0
22.3
-36.7
-22.2
-32.7
450.7
-61.7
-442.3
104.4
450.7
-61.7
-442.3
104.4
-13.5
95.4
-58.4
20.0
114.9
230.5
-92.4
-228.3
-6.3
3182.8
-46.3R
4-46.4R
5444.9
-112.7R
-178.4
76.2
179.1
-75.3
1-75.0L
2243.7
-75.0L
1131.8
-19.1R
2131.8
-19.1R
3131.8
-19.1R
4131.8
-19.1R
1
1525.7
-150.0L
2525.7
-150.0L
1
243.7
2650.0
-629.7
314049
RAIPUR SPLT
403.8
400.0
401.6
239.7
-61.3
-238.2
-13.9
222.3
-55.8
-220.9
32.8
-290.3
56.611
-290.3
56.611
59.3
1.9
-59.1
-0.4
59.3
1.9
-59.1
-0.4
-351.8
66.5
352.1
-70.4
10.0
73.9
10.0
186.5
1
KORBABYP
402.6
2
SIPATBYP
401.9
374007
BHADR4
417.6
314015
RAIPUR-FSC1
407.7
314025
RAIPUR-FSC2
407.7
463.2
-74.7
-457.5
44.9
-110.9
-293.6
24.2
232.5
-103.9
-229.0
42.3
232.5
-229.0
42.3
357.9
-72.2
-357.9
51.6
357.9
-72.2
-357.9
51.6
-463.2
464.6
-84.2
287.7
-108.8
-285.2
26.51
F0.0
-490.6
74.7
314028
BIL-POOL
404.1
364025
VIN-POOL
414.5
-141.8
-73.8
143.1
-118.7
-141.8
-73.8
143.1
-118.7
243.7
-75.0
-243.5
54.9
243.7
-75.0
-243.5
54.9
474046
RANCHI
183.3
314021
RAITA
403.8
314022
MARWA
400.2
329.4
-84.6
-326.4
36.9
127.7
-30.3-127.5
-1.0
-62.6
-1.1
62.6
-32.8
-62.6
-1.1
62.6
-32.8
-62.6
-1.1
62.6
-32.8
-250.7
14.8
252.8
-87.1
-302.1
31.8
304.5
-91.5
-302.1304.5
-91.5
1444.9
-125.0L
2444.9
-125.0L 31.8
296.4
-103.9
-95.0
364022
VINDH-IV,V
413.2
-666.4
64.5
669.8
-4.3
284.5
-93.8
-284.2
73.4
284.5
-93.8
-284.2
73.4
284.5
-93.8
-284.2
73.4
284.5
-93.8
-284.2
73.4
1365.7
-125.0L
2406.4
-125.0L
3365.7
-125.0L
400.0
318007
SIPAT7
767.1
1582.3
-165.0L
2582.3
-165.0L
3582.3
-165.0L
4444.1
-125.0L5
444.1
-125.0L
10.0
241.3
312002
RAIPUR2
218.3
-173.0
-36.8
1
1
-173.0
-36.8
1
1
-173.0
-36.8
1
1
-123.4
1.911
183.3
-27.0R
2183.3
-27.0R
220.0
1
312003
KORBW2
1
KORBA FAULT LEVEL STUDY
41st WR SCM CASE: N-1-1 - KORBA(W) BHILAI & KORBA(W) RAITA OUT
314001
KNTPC4
400.0
2314.4
-642.9
314002
RAIPUR
314003
KORBW4
314004
BHI4
403.4
314005
BHATP4
398.3
314008
SIPAT4
403.8
314010
PATH4
403.3
314019
BALCO
400.0
314030
RAIPUR_POOL
408.8
364008
VINDH_W4
400.0
364017
BRSGPR4
408.4
364027
MAHAN
401.7
145.1
-84.5
-144.2
-24.6
145.1
-84.5
-144.2
-24.6
320.5
-82.9
-316.7
61.0
328.9
-82.2
-325.0
64.3
432.0
-32.6
-427.7
12.1
-29.2
-32.0
29.3
-37.2
396.9
-73.6
-390.4
96.7
396.9
-73.6
-390.4
96.7
-4.5
158.6
-60.2
20.0
115.1
3182.8
-7.3R
4-7.3R
5444.9
-17.7R
-96.0
49.6
96.3
-53.6
1-75.0L
2243.7
-75.0L
1131.8
-19.3R
2131.8
-19.3R
3131.8
-19.3R
4131.8
-19.3R
1
-636.6
58.7
639.7
-1.8
1525.7
-150.0L
2525.7
-150.0L
1
243.7
2650.0
-655.5
314049
RAIPUR SPLT
403.8
400.0
401.6
215.5
-59.2-19.1
215.5
-59.2
-214.3
-19.1
-276.4
56.911
-276.4
56.911
60.9
2.3
-60.6
-0.7
60.9
2.3
-60.6
-0.7
-135.6
-29.9
135.6
23.2
10.0
73.9
10.0
186.5
-214.3
1
KORBABYP
400.0
403.1
2
SIPATBYP
402.3
374007
BHADR4
417.4
314015
RAIPUR-FSC1
407.2
314025
RAIPUR-FSC2
407.2
335.0
-73.4
-332.0
14.3
-109.5
-302.8
25.7
239.9
-103.0
-236.2
43.7
239.9
-236.2
43.7
335.5
-62.3
-335.5
44.3
335.5
-62.3
-335.5
44.3
-335.0
335.7
-92.6
308.6
-109.9
-305.7
34.31
F0.0
-490.2
73.4
314028
BIL-POOL
404.3
364025
VIN-POOL
414.6
-125.5
-76.4
126.5
-119.0
-125.5
-76.4
126.5
-119.0
243.7
-75.0
-243.5
54.9
243.7
-75.0
-243.5
54.9
474046
RANCHI
183.3
314021
RAITA
402.9
314022
MARWA
400.0
486.6
-45.4-483.9
41.7
-32.9
-3.5
32.9
-30.6
-32.9
-3.5
32.9
-30.6
-32.9
-3.5
32.9
-30.6
-333.8
26.5
337.5
-81.1
-422.1
48.9
426.7
-84.4
-422.1426.7
-84.4
1444.9
-92.3R
2444.9
-92.3R 48.9
305.7
-103.0
-157.6
318007
SIPAT7
767.3
1582.3
-165.0L
2582.3
-165.0L
3582.3
-165.0L
4444.1
-125.0L5
444.1
-125.0L
10.0
241.5
312002
RAIPUR2
218.1
-170.1
-39.0
1
1
-170.1
-39.0
1
1
-170.1
-39.0
1
1
-324.4
13.211
183.3
-33.3R
2183.3
-33.3R
220.0
1
312003
KORBW2
1
0.9
191.1
312099
VISHRAMPUR
1150.0
45.0
CHHATTISGARH 220kV NETWORK
314003
KORBW4
1.0
400.0
314004
BHI4
1.0
403.4
314021
RAITA
1.0
402.9
314022
MARWA
1.0
400.0
1
KORBABYP
1.0
400.0
314001
KNTPC4
1.0
400.0
486.6
-45.4
-483.9
41.7
3182.8
-7.3R
4183.3
-7.3R
5444.9
-17.7R
-32.9
-3.5
32.9
-30.6
-32.9
32.9
-30.6
-32.9
-3.5
32.9
-30.6
-333.8
26.5
337.5
-81.1
320.5
-82.9
-316.7
61.0
328.9
-82.2
-325.0
64.3
-422.1
48.9 -84.4
-422.1
48.9
426.7
-84.4
1444.9
-92.3R
2444.9
-92.3R
426.7
-3.5
2314.4
-642.9
312003
KORBW2
1.0
220.0
-324.4
13.211
183.3
-33.3R
2183.3
-33.3R
312014
KORBAEXT
1.0
220.0
312017
KOTMIKL
1.0
219.0
312023
MOPKA
1.0
215.4
312001
KORBE2
1.0
220.0
77.7
-13.9
-77.6
13.3101.0
-15.0
-99.5
9.3
101.0
-15.0
-99.5
9.3
182.4
4.4
-178.4
6.9
-114.3
19.9
114.5
-20.2
-114.3
19.9
114.5
-20.2
-285.8
50.4
-49.7
11
222.6
-25.7R
2222.9
-25.7R
172.0
5.0
-168.4
3.8
385.7
125.3
312008
RAIGR2
1.0
219.0
312032
BALCO
1.0
220.0
422015
BUDHIPADAR
1.0
220.6
86.1
-14.1
-84.9
5.4
74.2
-23.1
-72.8
6.5
74.2
-23.1
-72.8
6.5
32.3
-21.2
-32.1
7.51
1
286.0
312015
SUHELA2
1.0
217.3
312024
BANARI
1.0
218.0
124.2
-11.9
-121.1
10.1
112.9
-3.1
-111.8
0.9
-127.8
17.9
129.8
-17.6
312037
MARWA
1.0
218.5
-182.8
-10.111-91.2
-6.0
91.4
5.0
-91.2
-6.0
91.4
5.0
1
157.9
68.7
-150.0
-45.0
1.0
132.0
-167.9
11.311
-167.9
11.311
172.9
10.4
311002
KORE1
1
KORBA FAULT LEVEL STUDY
KORBA(W) TO SIPAT BYPASSING KORBA (NTPC)
314001
KNTPC4
400.0
2314.4
-555.2
314002
RAIPUR
314003
KORBW4
314004
BHI4
404.3
314005
BHATP4
398.5
314008
SIPAT4
404.2
314010
PATH4
403.4
314019
BALCO
400.0
314030
RAIPUR_POOL
408.8
364008
VINDH_W4
400.0
364017
BRSGPR4
407.9
364027
MAHAN
401.7
180.0
-85.2
-178.7
-18.8
180.0
-85.2
-178.7
-18.8
365.5
-86.2
-360.5
77.1
375.0
-85.7
-369.9
80.7
494.9
-33.0
-489.2
27.4
-3.7
-34.5
3.7
-35.2
424.8
-68.0
-417.3
100.9
424.8
-68.0
-417.3
100.9
-9.4
127.4
-59.3
20.0
115.1
187.2
-84.3
-185.8
-23.6
3182.8
-52.5L
4-52.5L
5444.9
-125.0L
-105.4
59.8
105.7
-63.2
1-75.0L
2243.7
-75.0L
1131.8
-19.5R
2131.8
-19.5R
3131.8
-19.5R
4131.8
-19.5R
1
-652.4
60.7
655.6
-2.0
1525.7
-150.0L
2525.7
-150.0L
1
243.7
2650.0
-645.2
314049
RAIPUR SPLT
404.3
402.4
401.6
217.5
-60.8-17.6
217.5
-60.8
-216.2
-17.6
201.7
-55.4
-200.6
29.5
-286.7
62.811
-286.7
62.811
184.9
-71.7
-184.7
44.3
60.7
3.5
-60.4
-1.9
60.7
3.5
-60.4
-1.9
-19.0
-4.8
19.0
-2.5
10.0
74.1
71.7
185.0
-78.4
10.0
186.5
-216.2
-184.9
1
KORBABYP
401.8
403.1
2
SIPATBYP
400.0
374007
BHADR4
417.6
314015
RAIPUR-FSC1
408.0
314025
RAIPUR-FSC2
408.0
-108.2
-299.6
22.9
237.4
-101.9
-233.8
41.5
237.4
-233.8
41.5
337.8
-67.2
-337.8
48.9
337.8
-67.2
-337.8
48.9
311.8
-106.3
-308.8
30.91
F0.0
-490.6
314028
BIL-POOL
404.4
364025
VIN-POOL
414.6
-133.1
-74.9
134.2
-119.3
-133.1
-74.9
134.2
-119.3
243.7
-75.0
-243.5
54.9
243.7
-75.0
-243.5
54.9
474046
RANCHI
183.3
314021
RAITA
404.3
314022
MARWA
401.3
277.4
-74.9
-275.3
16.9
54.6
-11.5-54.6
-21.6
-24.0
-14.7
24.0
-19.7
-24.0
-14.7
24.0
-19.7
-24.0
-14.7
24.0
-19.7
-220.9
2.2
222.5
-80.2
-278.7
22.0
280.7
-86.1
-278.7280.7
-86.1
1444.9
-125.0L
2444.9
-125.0L 22.0
302.5
-101.9
-126.8
318007
SIPAT7
767.6
1582.3
-165.0L
2582.3
-165.0L
3582.3
-165.0L
4444.1
-125.0L5
444.1
-125.0L
10.0
241.6
312002
RAIPUR2
218.6
-170.8
-37.1
1
1
-170.8
-37.1
1
1
-170.8
-37.1
1
1
-106.8
-16.3 11
183.3
-35.5R
2183.3
-35.5R
220.0
1
312003
KORBW2
1
0.9
191.1
312099
VISHRAMPUR
1150.0
45.0
CHHATTISGARH 220kV NETWORK
314003
KORBW4
1.0
401.8
314004
BHI4
1.0
404.3
314021
RAITA
1.0
404.3
314022
MARWA
1.0
401.3
1
KORBABYP
1.0
402.4
314001
KNTPC4
1.0
400.0
187.2
-84.3
-185.8
-23.6
277.4
-74.9
-275.3
16.9
54.6
-11.5
-54.6
-21.6
-184.9
71.7
185.0
-78.4
3182.8
-52.5L
4183.3
-52.5L
5444.9
-125.0L
-24.0
-14.7
24.0
-19.7
-24.0
24.0
-19.7
-24.0
-14.7
24.0
-19.7
-220.9
2.2
222.5
-80.2
365.5
-86.2
-360.5
77.1
375.0
-85.7
-369.9
80.7
-278.7
22.0 -86.1
-278.7
22.0
280.7
-86.1
1444.9
-125.0L
2444.9
-125.0L
280.7
-14.7
2314.4
-555.2
312003
KORBW2
1.0
220.0
-106.8
-16.311
183.3
-35.5R
2183.3
-35.5R
312014
KORBAEXT
1.0
220.0
312017
KOTMIKL
1.0
219.2
312023
MOPKA
1.0
215.9
312001
KORBE2
1.0
220.0
25.9
-5.0
-25.9
4.178.8
-13.8
-77.9
4.8
78.8
-13.8
-77.9
4.8
156.3
2.1
-153.3
3.1
-66.7
11.3
66.8
-12.1
-66.7
11.3
66.8
-12.1
-271.2
47.8
-47.1
11
222.6
-31.1R
2222.9
-31.2R
150.4
2.6
-147.7
1.4
385.7
104.9
312008
RAIGR2
1.0
219.1
312032
BALCO
1.0
220.0
422015
BUDHIPADAR
1.0
220.8
57.7
-11.9
-57.2
-0.5
55.0
-22.1
-54.2
1.8
55.0
-22.1
-54.2
1.8
30.4
-20.8
-30.3
7.01
1
271.4
312015
SUHELA2
1.0
217.8
312024
BANARI
1.0
218.5
101.3
-13.2
-99.2
5.4
98.7
-6.0
-97.8
2.2
-99.9
11.0
101.1
-15.2
312037
MARWA
1.0
219.1
-160.3
-13.711-80.0
-8.1
80.2
6.9
-80.0
-8.1
80.2
6.9
1
157.9
68.7
-150.0
-45.0
1.0
132.0
-157.2
9.711
-157.2
9.711
172.9
10.4
311002
KORE1
1
KORBA FAULT LEVEL STUDY
KORBA(W) TO SIPAT BYPASSING KORBA (NTPC)
314001
KNTPC4
0.0, 0.0
34552.8, -87.0
13543.5
-628.1
314002
RAIPUR
314003
KORBW4
314004
BHI4
0.0, 0.0
38150.2, -85.8
314005
BHATP4
0.0, 0.0
13480.9, -85.3
314008
SIPAT4
0.0, 0.0
34717.6, -87.5
314010
PATH4
314019
BALCO
314030
RAIPUR_POOL
364008
VINDH_W4
0.0, 0.0
40685.9, -87.3
364017
BRSGPR4
364027
MAHAN
0.0, 0.0
24976.7, -86.8
2300.9
-85.0
2547.1
-85.5
2300.9
-85.0
2547.1
-85.5
2517.5
-85.2
2414.2
-85.8
2583.1
-85.2
2477.1
-85.8
2797.4
-85.2
4507.0
-85.4
2116.3
-85.3
2066.4
-85.4
1889.9
-85.6
1889.9
-85.6
-85.4
2789.4
-85.3
2
2080.0
-85.2
1500.4
-87.0
3951.5
-90.0
4-90.0
52325.2
-90.0
2411.1
-85.4
5669.2
-85.1
1
2
1
2
3
4
1
7475.8
-86.5
11165.8
-85.8
13575.5
-90.0
23575.5
-90.0
1
16333.1
-897.5
314049
RAIPUR SPLT
0.0, 0.0
37232.8, -85.5
2954.3
-84.9-86.5
2954.3
-84.9
2808.4
-86.5
2738.9
-85.1
2603.7
-86.7
8421.0
-89.6
8421.0
-89.6
5918.5
-86.9
1666.8
-84.8
1666.8
-84.8
13583.9
-85.0
14559.0
-85.7
1
7545.0
-86.7
1
2808.4
1
KORBABYP
0.0, 0.0
24712.4, -87.1
0.0, 0.0
25776.7, -85.1
2
SIPATBYP
374007
BHADR4
314015
RAIPUR-FSC1
314025
RAIPUR-FSC2
-87.0
1528.0
-85.0
1528.0
3300.9
-83.1
3300.9
-83.1
2069.4
-87.01
F
314028
BIL-POOL
364025
VIN-POOL
1942.9
-85.2
1942.9
-85.2
474046
RANCHI
951.5
314021
RAITA
0.0, 0.0
25849.5, -85.5
314022
MARWA
2724.3
-85.2
2630.5
-86.5
4497.4
-85.5
1615.9
-86.0
5397.8
-85.3
1615.9
-86.0
5397.8
-85.3
1615.9
-86.0
5397.8
-85.3
1289.4
-87.0
1932.3
-86.4
1932.3
1
2-86.4
1932.6
-85.0
2638.7
318007
SIPAT7
0.0, 0.0
39439.9, -88.1
11758.7
-89.8
21758.7
-89.8
31758.7
-89.8
41399.9
-89.75
1399.9
-89.7
1
312002
RAIPUR2
2
1
312003
KORBW2
1
KORBA FAULT LEVEL STUDY
KORBA(W)-SIPAT BYPASSING KORBA(NTPC): N-1-1 KORBA-BHATAPARA & KORBA BHILAI OUT
314001
KNTPC4
400.0
2314.4
-359.2
314002
RAIPUR
314003
KORBW4
314004
BHI4
403.8
314005
BHATP4
397.9
314008
SIPAT4
403.8
314010
PATH4
403.0
314019
BALCO
400.0
314030
RAIPUR_POOL
408.7
364008
VINDH_W4
400.0
364017
BRSGPR4
405.5
364027
MAHAN
401.5
312.1
-74.8
-308.3
-0.4
312.1
-74.8
-308.3
-0.4
597.5
-57.9
-584.4
139.7
84.8
-40.3
-84.4
-25.1
513.0
-44.9
-502.2
113.5
513.0
-44.9
-502.2
113.5
-21.6
18.1
-54.1
20.0
114.3
202.6
-83.8
-200.9
-21.0
3182.8
-52.5L
4-52.5L
5444.9
-125.0L
203.2
36.3
-202.4
-34.7
1-75.0L
2243.7
-75.0L
1131.8
-19.0R
2131.8
-19.0R
3131.8
-19.0R
4131.8
-19.0R
1
1525.7
-150.0L
2525.7
-150.0L
1
243.7
2650.0
-593.5
314049
RAIPUR SPLT
403.7
402.0
401.6
248.2
-59.4-14.7
248.2
-59.4
-246.6
-14.7
230.1
-54.0
-228.7
31.9
-350.6
63.311
-350.6
63.311
121.4
-69.4
-121.3
40.2
48.0
3.0
-47.8
-2.4
48.0
3.0
-47.8
-2.4
-251.9
26.3
252.0
-31.8
10.0
73.9
69.4
121.5
-76.6
10.0
186.5
-246.6
-121.4
1
KORBABYP
401.7
2
SIPATBYP
400.0
374007
BHADR4
417.6
314015
RAIPUR-FSC1
408.4
314025
RAIPUR-FSC2
408.4
-113.0
-278.3
21.8
220.2
-105.0
-217.0
40.0
220.2
-217.0
40.0
391.3
-87.1
-391.3
62.3
391.3
-87.1
-391.3
62.3
276.8
-111.8
-274.5
26.71
F0.0
-490.7
314028
BIL-POOL
404.0
364025
VIN-POOL
414.3
-164.2
-69.5
165.9
-118.3
-164.2
-69.5
165.9
-118.3
243.7
-75.0
-243.5
54.9
243.7
-75.0
-243.5
54.9
474046
RANCHI
183.3
314021
RAITA
403.7
314022
MARWA
400.6
296.2
-73.5
-293.8
19.0
84.9
-10.5-84.8
-22.0
-36.8
-11.3
36.9
-22.9
-36.8
-11.3
36.9
-22.9
-36.8
-11.3
36.9
-22.9
-229.8
4.6
231.5
-80.8
-285.2
23.4
287.3
-86.1
-285.2287.3
-86.1
1444.9
-125.0L
2444.9
-125.0L 23.4
280.8
-105.0
-18.0
364022
VINDH-IV,V
413.1
-697.8
73.2
701.4
-9.3
284.5
-93.8
-284.2
73.5
284.5
-93.8
-284.2
73.5
284.5
-93.8
-284.2
73.5
284.5
-93.8
-284.2
73.5
1365.7
-125.0L
2406.4
-125.0L
3365.7
-125.0L
401.3
318007
SIPAT7
767.0
1582.3
-165.0L
2582.3
-165.0L
3582.3
-165.0L
4444.1
-125.0L5
444.1
-125.0L
10.0
241.3
312002
RAIPUR2
218.1
-177.1
-38.0
1
1
-177.1
-38.0
1
1
-177.1
-38.0
1
1
-105.8
-11.611
183.3
-32.2R
2183.3
-32.2R
220.0
1
312003
KORBW2
1
KORBA FAULT LEVEL STUDY
KORBA(W)-SIPAT BYPASSING KORBA(NTPC): N-1-1 KORBA-BHILAI D/c OUT
314001
KNTPC4
400.0
2314.4
-325.1
314002
RAIPUR
314003
KORBW4
314004
BHI4
405.3
314005
BHATP4
397.5
314008
SIPAT4
404.4
314010
PATH4
403.2
314019
BALCO
400.0
314030
RAIPUR_POOL
408.8
364008
VINDH_W4
400.0
364017
BRSGPR4
405.9
364027
MAHAN
401.6
290.4
-78.9
-287.1
-2.2
290.4
-78.9
-287.1
-2.2
700.7
-9.1
-689.4
67.1
70.8
-39.7
-70.5
-27.0
498.6
-49.1
-488.4
111.3
498.6
-49.1
-488.4
111.3
-20.3
35.1
-55.1
20.0
114.7
209.2
-87.2
-207.4
-17.2
3182.8
-52.5L
4-52.5L
5444.9
-125.0L
-257.0
105.7
258.4
-97.2
1-75.0L
2243.7
-75.0L
1131.8
-19.4R
2131.8
-19.4R
3131.8
-19.4R
4131.8
-19.4R
1
1525.7
-150.0L
2525.7
-150.0L
1
243.7
2650.0
-604.2
314049
RAIPUR SPLT
404.9
402.9
401.6
248.0
-64.2-10.3
248.0
-64.2
-246.4
-10.3
230.0
-58.4
-228.6
36.3
-343.0
70.711
-343.0
70.711
139.1
-64.6
-139.0
35.7
49.5
4.8
-49.3
-4.1
49.5
4.8
-49.3
-4.1
-278.2
59.8
278.4
-65.0
10.0
74.3
64.6
139.2
-71.8
10.0
186.5
-246.4
-139.1
1
KORBABYP
402.2
2
SIPATBYP
400.0
374007
BHADR4
417.9
314015
RAIPUR-FSC1
409.9
314025
RAIPUR-FSC2
409.9
-109.1
-280.9
17.7
222.3
-102.1
-219.1
36.8
222.3
-219.1
36.8
389.3
-92.6
-389.3
68.1
389.3
-92.6
-389.3
68.1
278.2
-106.4
-275.9
20.61
F0.0
-491.3
314028
BIL-POOL
404.2
364025
VIN-POOL
414.4
-159.9
-69.9
161.5
-119.0
-159.9
-69.9
161.5
-119.0
243.7
-75.0
-243.5
54.9
243.7
-75.0
-243.5
54.9
474046
RANCHI
183.3
314021
RAITA
405.1
314022
MARWA
401.9
301.0
-77.8
-298.6
23.6
83.0
-16.5-82.9
-16.3
-51.4
-8.2
51.5
-26.1
-51.4
-8.2
51.5
-26.1
-51.4
-8.2
51.5
-26.1
-239.1
7.8
240.9
-83.1
-291.5
25.9
293.7
-88.3
-291.5293.7
-88.3
1444.9
-125.0L
2444.9
-125.0L 25.9
283.4
-102.1
-35.1
364022
VINDH-IV,V
413.1
-689.7
69.8
693.3
-6.9
284.5
-93.8
-284.2
73.5
284.5
-93.8
-284.2
73.5
284.5
-93.8
-284.2
73.5
284.5
-93.8
-284.2
73.5
1365.7
-125.0L
2406.4
-125.0L
3365.7
-125.0L
402.2
318007
SIPAT7
767.5
1582.3
-165.0L
2582.3
-165.0L
3582.3
-165.0L
4444.1
-125.0L5
444.1
-125.0L
10.0
241.6
312002
RAIPUR2
218.8
-164.5
-39.2
1
1
-164.5
-39.2
1
1
-164.5
-39.2
1
1
-78.6
-21.511
183.3
-36.5R
2183.3
-36.5R
220.0
1
312003
KORBW2
1
KORBA FAULT LEVEL STUDY
Bypass Korba NTPC: N-1-1_KORBA(W)-BHILAI & Korba (W)- Raita OUT
314001
KNTPC4
400.0
2314.4
-526.2
314002
RAIPUR
314003
KORBW4
314004
BHI4
403.0
314005
BHATP4
397.7
314008
SIPAT4
403.2
314010
PATH4
403.1
314019
BALCO
400.0
314030
RAIPUR_POOL
408.7
364008
VINDH_W4
400.0
364017
BRSGPR4
407.9
364027
MAHAN
401.6
177.4
-83.2
-176.1
-21.2
177.4
-83.2
-176.1
-21.2
377.1
-77.8
-371.8
72.0
386.9
-77.0
-381.5
75.5
499.5
-25.0
-493.8
20.8
-8.9
-34.0
8.9
-35.6
419.3
-68.9
-412.1
99.9
419.3
-68.9
-412.1
99.9
-8.1
134.3
-59.8
20.0
114.9
3182.8
-29.3R
4-29.4R
5444.9
-71.4R
-124.1
55.7
124.4
-58.4
1-75.0L
2243.7
-75.0L
1131.8
-18.9R
2131.8
-18.9R
3131.8
-18.9R
4131.8
-18.9R
1
1525.7
-150.0L
2525.7
-150.0L
1
243.7
2650.0
-643.5
314049
RAIPUR SPLT
403.2
400.7
401.5
255.3
-60.7-12.0
255.3
-60.7
-253.6
-12.0
236.7
-55.1
-235.2
34.3
-250.1
48.011
-250.1
48.011
381.7
-96.5
-380.8
80.3
66.8
0.1
-66.5
2.1
66.8
0.1
-66.5
2.1
-159.8
-5.7
159.9
-0.9
10.0
73.7
96.5
382.1
-99.7
10.0
186.4
-253.6
-381.7
1
KORBABYP
402.7
402.3
374007
BHADR4
417.4
314015
RAIPUR-FSC1
406.7
314025
RAIPUR-FSC2
406.7
-112.6
-294.6
26.6
233.3
-105.2
-229.7
44.2
233.3
-229.7
44.2
350.0
-64.9
-350.0
45.2
350.0
-64.9
-350.0
45.2
298.8
-112.2
-296.1
33.91
F0.0
-490.2
314028
BIL-POOL
404.1
364025
VIN-POOL
414.5
-130.1
-76.2
131.2
-118.3
-130.1
-76.2
131.2
-118.3
243.7
-75.0
-243.5
54.9
243.7
-75.0
-243.5
54.9
474046
RANCHI
183.3
314021
RAITA
402.9
314022
MARWA
400.0
242.4
-34.7-241.8
8.7
10.9
-13.6
-10.9
-20.6
10.9
-13.6
-10.9
-20.6
10.9
-13.6
-10.9
-20.6
-263.6
10.2
265.9
-79.9
-347.8
33.2
351.0
-84.6
-347.8351.0
-84.6
1444.9
-109.3R
2444.9
-109.3R 33.2
297.4
-105.2
-133.6
364022
VINDH-IV,V
413.3
-651.5
62.1
654.7
-3.5
284.5
-93.8
-284.2
73.4
284.5
-93.8
-284.2
73.4
284.5
-93.8
-284.2
73.4
284.5
-93.8
-284.2
73.4
1365.7
-125.0L
2406.4
-125.0L
3365.7
-125.0L
400.0
2
SIPATBYP
318007
SIPAT7
766.9
1582.3
-165.0L
2582.3
-165.0L
3582.3
-165.0L
4444.1
-125.0L5
444.1
-125.0L
10.0
241.2
312002
RAIPUR2
218.0
-172.9
-37.1
1
1
-172.9
-37.1
1
1
-172.9
-37.1
1
1
-186.4
4.311
183.3
-29.2R
2183.3
-29.2R
220.0
1
312003
KORBW2
1
KORBA FAULT LEVEL STUDY
KORBA(W) to Essar By passing Korba (N)
314001
KNTPC4
400.6
2314.4
-650.0
314002
RAIPUR
314003
KORBW4
314004
BHI4
403.9
314005
BHATP4
399.0
314008
SIPAT4
403.3
314010
PATH4
403.2
314019
BALCO
400.0
314030
RAIPUR_POOL
408.7
364008
VINDH_W4
400.0
364017
BRSGPR4
409.1
364027
MAHAN
401.7
118.4
-82.6
-117.9
-29.9
118.4
-82.6
-117.9
-29.9
272.0
-83.9
-269.3
50.0
279.1
-83.2
-276.3
53.0
392.6
-34.5
-389.1
5.4
424.5
-105.1
-423.3
92.3
-50.3
-27.1
50.4
-41.1
379.8
-75.5
-373.8
92.6
379.8
-75.5
-373.8
92.6
20.0
115.3
252.2
-90.1
-249.5
-3.8
3182.8
-46.6R
4-46.7R
5444.9
-113.3R
-47.1
41.2
47.2
-46.8
1-75.0L
2243.7
-75.0L
1131.8
-19.1R
2131.8
-19.1R
3131.8
-19.1R
4131.8
-19.1R
1
1525.7
-150.0L
2525.7
-150.0L
1
243.7
2650.0
-664.7
314049
RAIPUR SPLT
403.9
400.2
401.5
243.8
-64.8-9.7
243.8
-64.8
-242.2
-9.7
226.1
-59.0
-224.7
36.6
-218.5
47.811
-218.5
47.811
73.4
0.3
-73.0
2.6
73.4
0.3
-73.0
2.6
-50.0
-0.3
50.0
-6.8
10.0
74.0
1.8
-166.9
-8.8
10.0
186.4
-242.2
167.0
403.4
2
SIPATBYP
402.3
374007
BHADR4
417.5
314015
RAIPUR-FSC1
407.0
314025
RAIPUR-FSC2
407.0
-109.2
-304.3
25.8
241.1
-102.8
-237.4
43.8
241.1
-237.4
43.8
324.5
-58.5
-324.5
41.7
324.5
-58.5
-324.5
41.7
315.0
-107.4
-312.0
33.41
F0.0
-490.4
314028
BIL-POOL
404.2
364025
VIN-POOL
414.7
-118.1
-78.0
119.0
-118.6
-118.1
-78.0
119.0
-118.6
243.7
-75.0
-243.5
54.9
243.7
-75.0
-243.5
54.9
474046
RANCHI
183.3
314021
RAITA
403.4
314022
MARWA
400.0
360.8
-81.4
-357.3
40.2
178.5
-30.7-178.1
1.3
-66.9
-0.9
67.0
-33.0
-66.9
-0.9
67.0
-33.0
-66.9
-0.9
67.0
-33.0
-260.3
15.3
262.5
-85.7
-313.0
32.1
315.5
-89.9
-313.0315.5
-89.9
1444.9
-121.6R
2444.9
-121.6R 32.1
307.2
-102.8
-167.0
-1.8
168.2
-61.5 364022
VINDH-IV,V
413.4
-642.2
58.9
645.3
-1.3
284.5
-93.8
-284.2
73.4
284.5
-93.8
-284.2
73.4
284.5
-93.8
-284.2
73.4
284.5
-93.8
-284.2
73.4
1365.7
-125.0L
2406.4
-125.0L
3365.7
-125.0L
400.0
1
KORBABYP
318007
SIPAT7
767.1
1582.3
-165.0L
2582.3
-165.0L
3582.3
-165.0L
4444.1
-125.0L5
444.1
-125.0L
10.0
241.3
312002
RAIPUR2
218.4
-172.9
-36.5
1
1
-172.9
-36.5
1
1
-172.9
-36.5
1
1
-186.5
4.311
-29.8R
2183.3
-29.8R
220.0
1
312003
KORBW2
183.3
1
KORBA FAULT LEVEL STUDY
Korba W to Essar
314001
KNTPC4
0.0, 0.0
40114.0, -87.2
13543.5
-628.1
314002
RAIPUR
314003
KORBW4
314004
BHI4
314005
BHATP4
314008
SIPAT4
0.0, 0.0
38175.2, -87.5
314010
PATH4
314019
BALCO
314030
RAIPUR_POOL
364008
VINDH_W4
0.0, 0.0
40801.5, -87.2
364017
BRSGPR4
364027
MAHAN
2226.7
-85.0
2597.9
-85.5
2226.7
-85.0
2597.9
-85.5
2281.7
-85.2
2341.2
-85.2
2569.3
-85.3
8998.0
-87.1
9291.2
-86.8
2182.2
-85.2
2178.4
-85.2
1884.0
-85.6
1884.0
-85.6
2
2239.6
-85.1
3951.5
-90.0
4-90.0
52325.2
-90.0
1
2
1
2
3
4
1
1
2
1
16333.1
-897.5
314049
RAIPUR SPLT
0.0, 0.0
37761.6, -85.5
2998.9
-84.9-86.2
2998.9
-84.9
3023.3
-86.2
2780.2
-85.1
2802.9
-86.4
8399.2
-89.6
8399.2
-89.6
1666.0
-84.9
1666.0
-84.9
14490.3
-85.7
1
2601.5
-85.2
1
3023.3
0.0, 0.0
25840.5, -85.1
2
SIPATBYP
374007
BHADR4
314015
RAIPUR-FSC1
314025
RAIPUR-FSC2
-87.0
1527.9
-85.0
1527.9
3290.6
-83.1
3290.6
-83.1
1
F
314028
BIL-POOL
364025
VIN-POOL
474046
RANCHI
951.5
314021
RAITA
314022
MARWA
2924.5
-85.2
4765.5
-85.4
1
2
1932.4
-85.0
364022
VINDH-IV,V
7471.8
-86.6
1
2
3
0.0, 0.0
20450.8, -86.9
1
KORBABYP
318007
SIPAT7
1
2
3
4 5
1
312002
RAIPUR2
2
1
312003
KORBW2
1
KORBA FAULT LEVEL STUDY
KORBA(W) to Essar By passing Korba (N)
Korba (W) - Bhilai 400 kV D/C out
314001
KNTPC4
400.0
2314.4
-485.0
314002
RAIPUR
314003
KORBW4
314004
BHI4
404.2
314005
BHATP4
398.4
314008
SIPAT4
402.8
314010
PATH4
403.1
314019
BALCO
400.0
314030
RAIPUR_POOL
408.7
364008
VINDH_W4
400.0
364017
BRSGPR4
408.1
364027
MAHAN
401.6
171.0
-84.2
-169.8
-21.2
171.0
-84.2
-169.8
-21.2
500.2
-31.1
-494.4
26.9
654.4
-111.2
-651.7
122.4
-10.7
-33.8
10.7
-35.8
414.2
-70.2
-407.1
99.4
414.2
-70.2
-407.1
99.4
20.0
115.0
265.3
-91.4
-262.4
0.5
3182.8
-46.5R
4-46.6R
5444.9
-113.1R
-129.8
62.8
130.2
-65.1
1-75.0L
2243.7
-75.0L
1131.8
-18.8R
2131.8
-18.8R
3131.8
-18.8R
4131.8
-18.8R
1
1525.7
-150.0L
2525.7
-150.0L
1
243.7
2650.0
-655.1
314049
RAIPUR SPLT
403.8
400.2
401.5
298.9
-69.53.6
298.9
-69.5
-296.5
3.6
277.2
-63.1
-275.0
48.8
-189.9
41.111
-189.9
41.111
78.3
-1.3
-77.9
4.8
78.3
-1.3
-77.9
4.8
-298.9
55.1
299.1
-60.0
10.0
74.0
-2.7
-192.2
-4.0
10.0
186.4
-296.5
192.3
402.9
2
SIPATBYP
402.3
374007
BHADR4
417.6
314015
RAIPUR-FSC1
407.7
314025
RAIPUR-FSC2
407.7
-110.9
-293.2
24.1
232.1
-103.9
-228.7
42.2
232.1
-228.7
42.2
354.7
-70.6
-354.7
50.4
354.7
-70.6
-354.7
50.4
290.1
-108.9
-287.5
27.21
F0.0
-490.6
314028
BIL-POOL
404.1
364025
VIN-POOL
414.6
-117.4
-78.5
118.3
-118.1
-117.4
-78.5
118.3
-118.1
243.7
-75.0
-243.5
54.9
243.7
-75.0
-243.5
54.9
474046
RANCHI
183.3
314021
RAITA
403.6
314022
MARWA
400.0
374.7
-82.6
-370.9
44.5
195.0
-31.7-194.5
3.2
-84.1
3.6
84.2
-37.2
-84.1
3.6
84.2
-37.2
-84.1
3.6
84.2
-37.2
-271.2
19.4
273.7
-87.8
-320.4
35.2
323.1
-91.7
-320.4323.1
-91.7
1444.9
-123.5R
2444.9
-123.5R 35.2
295.9
-103.9
-192.3
2.7
193.8
-61.8 364022
VINDH-IV,V
413.3
-618.1
56.9
621.0
-1.9
284.5
-93.8
-284.2
73.4
284.5
-93.8
-284.2
73.4
284.5
-93.8
-284.2
73.4
284.5
-93.8
-284.2
73.4
1365.7
-125.0L
2406.4
-125.0L
3365.7
-125.0L
400.0
1
KORBABYP
318007
SIPAT7
766.7
1582.3
-165.0L
2582.3
-165.0L
3582.3
-165.0L
4444.1
-125.0L5
444.1
-125.0L
10.0
241.1
312002
RAIPUR2
218.4
-172.7
-36.7
1
1
-172.7
-36.7
1
1
-172.7
-36.7
1
1
-168.1
3.511
-29.0R
2183.3
-29.0R
220.0
1
312003
KORBW2
183.3
1
1 | P a g e
Minutes of the Meeting among CEA, CTU & DNH held on 01.06.2017 &
02.06.2017 at Silvassa, DNH to discuss and review the 220 kV outlets from Vapi
Il to DNH and intra state transmission system strengthening of DNH
In line with the decision of 41st meeting of Standing Committee on Power System
Planning of Western Region (SCPSPWR) held on 21.12.2016, a meeting was held on
01.06.2017 & 02.06.2017 at Silvassa, DNH amongst CEA, CTU and DNH to discuss
and review the 220 kV outlets from the 400/220kV Vapi Il substation to DNH and intra
state transmission system strengthening of DNH. The list of participants are enclosed
at Annexure-I.
1. In the 41st meeting of SCPSPWR held on 21.12.2016, the following 220kV feeds from
the 2x500MVA, 400/220kV Vapi-II substation and intra state system strengthening at
220 kV in DNH were proposed:
I. 220kV feeds from the 2x500MVA, 400/220kV Vapi-II substation (under ISTS)
a. Vapi-II – New Kharadpada 220kV D/c line (high capacity)
b. Vapi-II – Sayali 220kV D/c line (high capacity)
II. Intra-state Transmission System Strengthening in DNH network at 220 kV level
a. LILO of 2nd ckt. of Vagchipa – Khadoli 220 kV DC line at Sayali Substation b. Kala (PG) – Khadoli 220kV 2nd D/c line (New) c. Kharadpada – New Kharadpada 220kV 2nd D/c line (New) d. Conversion of New Kharadpada 220kV switching station into 2x160MVA,
220/66 kV substation e. Augmentation of Transformation capacity at 220/66kV Vagchipa substation
by 160 MVA (3rd ICT)
2. POWERGRID in their comprehensive system study of transmission network of DNH
for 2021-22 time frame (considering the 400/220 kV,500 MVA ICT at Kala, Vagchipa
and Sayali 2200/ 66 kV substations as additional augmentation in transmission
system) has highlighted the following constraints, without the 220 kV feed to DNH from
proposed 400/220 kV substation at Vapi-II:
a. 3x315MVA, 400/220kV ICTs at Vapi (PG) and 2x315+1x500MVA,
400/220kV ICTs at Kala (PG) substations violate N-1 criteria
b. With the commissioning of Kala – Kudus (MSETCL) 400kV D/c line
overloading on Kala – Khadoli 220kV D/c line is observed. Further, Khadoli
– Sayali 220kV line gets overloaded under outage of Vaghchipa – Sayali
220kV line. Kala (PG) – New Kharadpada 220kV D/c line does not satisfy
n-1 contingency criteria.
2 | P a g e
c. Sayali – Rakholi 66kV D/c and Rakholi – Khadoli 66kV D/c lines are heavily
loaded even under normal conditions and loading becomes worse under
various outage conditions.
d. Kharadpada – Amli as well as Kharadpada – Piparia – Amli 66kV lines are
very heavily loaded both under normal and outage conditions.
e. Vaghchipa 2x160MVA ICTs & Sayali 2x100MVA ICTs do not satisfy n-1
outage criteria.
For mitigation of the above constraints, the following augmentations has been
proposed in the study report:
a. Vapi-II – New Kharadpada 220kV D/c line (high capacity)
b. Vapi-II – Sayali 220kV D/c line (high capacity)
c. LILO of 2nd ckt. of Vagchipa – Khadoli 220 kV DC line at Sayali Substation
d. Kala (PG) – Khadoli 220kV 2nd D/c line. e. Kharadpada – New Kharadpada 220kV 2nd D/c line. f. Conversion of New Kharadpada 220kV switching station into 2x160MVA,
220/66 kV substation g. Augmentation of Transformation capacity at 220/66kV Vagchipa
substationby 160 MVA (3rd ICT) h. Vaghchipa – Dadra 66kV line, which is under construction, may be
constructed with high capacity/HTLS conductor. i. Khadoli (220/66kV) – Khadoli (66/11kV) 66kV D/c line shall have to be
strengthened through another 66kV D/c line or re-conductoring with high capacity/HTLS conductor
3. Site visit of all the existing 220kV level substations of DNH viz. Kharadpada, New
Kharadpada, Sayali and Khadoli substations was carried out on 01.06.2017 to assess
the availability of space at these substations. It was found that space for additional
220kV bays is available at New Kharadpada (1 no.) and Khadoli (2 nos.) existing
substations. There was space for creation of three no. of 220 kV GIS bay at Sayali out
of which two nos. of bays has already been proposed by DNH for installation of 2X100
MVA ICTs at Sayali and one no. GIS bay could be utilised as line bay. DNH has also
proposed establishment of Bhilosa 220 kV switching station by LILO of one ckt. of
Vapi-Kharadpada 220 kV D/C line for giving supply to Bhilosa industries at 220 kV
level.
In view of the space constraint, it was observed that the implementation of following
augmentations proposed in DNH system would not be possible:
• Conversion of New Kharadpada 220kV switching station into 2x160MVA,
220/66 kV substation
• Vapi-II – Sayali 220kV D/c line (high capacity)
• Vapi-II – New Kharadpada 220kV D/c line (high capacity)
• Kharadpada – New Kharadpada 220kV 2nd D/c line
3 | P a g e
4. Joint studies were carried out on 02.06.2017, wherein several alternatives of 220kV
feed to DNH from the proposed 400/220 kV Vapi-II were studied. The augmentations
to overcome the constraints listed under item 2 considering the space constraints at
existing 220 kV substations were also studied (Study results enclosed at Annexure-
II).
5. After detailed deliberations and power flow studies, the following transmission system
was agreed:
I. 220 kV connectivity from 400/220 kV, 2X500 MVA Vapi – II substation to
DNH ( Transmission System under ISTS )
a. Vapi-II – Sayali D/C 220kV line (From Vapi-II upto LILO point of one
circuit of Vapi(PG) –Khadoli 220kV D/C line at Sayali substation with
ampacity equivalent to twin zebra conductor).
b. Interconnection with LILO section (of LILO of one circuit of Vapi(PG) –
Khadoli 220kV D/C line at Sayali substation) so as to form Vapi-II –
Sayali 220 kV D/C line and Vapi- Khadoli 220 kV D/C line. The LILO
section is with zebra conductor.
II. Intra State system strengthening in DNH transmission network
220 kV system
a. Kala – Khadoli 220 kV (2nd) D/C line.
b. Establishment of 220 kV switching station at Bhilosa (GIS) with provision
of 8 nos. of 220 kV bays (4 nos. equipped line bays and 4 nos. future
bays). (Out of the 4 equipped line bays, 2 nos. line bays are for LILO of
one ckt. of Vapi- Kharadpada 220 kV D/C line at Bhilosa and 2 nos. line
bays are for Bhilosa industries)
c. LILO of one ckt. of Vapi- Kharadpada 220 kV D/C line at Bhilosa.
d. Establishment of Vagchipa 220/66, 2X160 MVA substation by LILO of
both ckts of Vapi-Khadoli 220 kV D/C line. (already under
implementation).
e. Conversion of Sayali 220 kV switching station to 2X100 MVA, 220/66 kV
substation.
f. Conductor replacement of the LILO section (of LILO of one circuit of
Vapi(PG) –Khadoli 220kV D/C line at Sayali substation) with ampacity
equivalent to twin zebra conductor depending on the loading of the lines
in future, if required.
66 kV system
g. Establishment of three 66kV circuits between Vaghchipa & Dadra
h. Establishment of three 66kV circuits between Vaghchipa & Amli
i. 66 kV Vaghchipa – Silli D/C line
4 | P a g e
j. Establishment of Sayali new 66/11 kV substation with LILO of Sayali
220/66 kV- Rakholi 66 kV D/Cline at Sayali new and LILO of Masat –
Khadoli 66kV S/C line at Sayali New 66/11kV S/s.
k. Amli- Silvassa Town 66 kV D/C line.
l. Shifting of about 20MVA bulk load from Amli to Silli
5 | P a g e
Annexure I
List of the participants of the meeting held on 1st to 2nd June 2017 at Silvasa,
Dadra and Nagar Haveli to review transmission system of DNH.
S.No Name & Designation Organisation E-mail & contact number
1 Awdhesh Kumar Yadav, Director
CEA
2 Vikas Sachan, Asst. Director
CEA
3 Ramchandra DGM
POWERGRID [email protected] Mob. 9910378128
4 Pratyush Singh Sr. Engineer
POWERGRID [email protected] Mob. 8826094863
5 H. M. Patel Executive Engineer
6 H.C. Surma Asst. Engineer
37.8
2.5
45.8
8.0
17.0
3.4TR
34.0
6.8
DNH Power Scenario Zone 33 Summary: Net Interchange : -1297.94 MW, -227.11 MVAR Zone loads : 1297.54 MW, 286.04 MVAR Zone generation : 10.37 MW, 6.50 MVAR Zone losses : 10.77 MW, 196.34 MVAR
63.4
46.0
7.0
46.2
7.4
46.0
7.0
46.2
7.4
5.8
14.6
3.6
14.53.8
5.8
14.8
14.9
332011BHILOSA220
212.7
30.2
30.25.1
87.8 15.8
88.114.3
157.6
10.7
DNH POWER FLOW STUDY
5.8
2021-22
336008SAYALINEW66
332001KARARPD2
212.5
332004NEW KHARDPDA
212.6
4.1
87.2
4.1
77.1
14.4
87.2
213.4
48.2
11.3 48.2
11.3
213.7
73.5
2.6
332006ALOK IND
215.2
120.7
17.21
120.7
17.2
214.1
116.3
11.2
116.3
208.2
19.3
1 1
208.2
19.3
1 1
332005RIL
212.6
52.8
52.8
7.5
CS105.5
15.0
7.5
140.6
12.3
140.
6 12.3
215.4
208.2
27.3
1 1
208.2
27.3
1 1
208.2
27.3
1 1
330.5
30.6
1 1 330.5
332002KHADOLI
352010VAPI_PG2
332007VAGHCHIPA
332008SAYALI
332003KALA
215.7
73.5
2.6
73.4
1.5
144
.6
23.5
144.7
7.5
23.5
144.
7
7.5
116.3
11.2
116.4
11.1
11.2
116.4
11.1
352170VAPI II
214.0
116.3
11.2
59.7
144.6
336001KARARPD6
63.5
5.51186.7
8.711
54.2
5.511
86.7
8.711
CS89.3
12.8
60.9
20.1
336004AMLI
63.6
336009ATHAL
63.3
336015RAKHOLI1
62.8
336019DADRA1
63.3
336021PIPARIA
63.4
336022WAGHDARA
63.1 8.0
3.3
36.1
4.5
20.0
4.2
10.2
2.4
19.6
19.6
13.5
8.4
TR31.4
12.9
128.4
4.1
CS122.0
17.4TR
13.2
9.7
CS26.0
3.7
TR98.7
20.1
123.7
6.0
125.5
5.1
63.47.5
9.3
19.4
2.7
TR64.8
21.3
336002KHADOLI6
63.5
336005SILLI
63.1
13.7
2.0
45.0
4.6
45.0
4.6
CS25.5
TR8.7
43.10.9
336007VAGHCHIPA
63.8
27.5
3.8
27.5
3.8
30.9
1.9
30.9
1.9
336024AMLI66CONSUM
63.6
121.5
9.811
11
23.6
6.3CS
23.6
6.3
106.0
16.7
1
1
106.0
16.711
336012KHANVEL
63.2
336013KALA
63.2
336014KHADOLI3
62.7 336023VELUGAM
63.0
5.9
2.8
5.9
2.8
6.8
2.7
6.8
2.7
39.4
4.6
39.4
4.6
15.1
2.415.1
2.4
111.7
5.6
113.6
5.4
81.2
11.6
TR75.2
38.5
CS25.7
3.7
TR6.5
2.2
TR
336025SAYALI
63.7
11
84.2
5.4
9.8
27.4
37.8
2.5
45.8
8.0
336026SILVASA TOWN
63.6
17.0
3.4
12.1
1.5H
18.3
5.0H
121.5
54.2
106.0
11
7.1
10.0
46.5
2.9
31.7
2.6
31.5
2.9
31.7
2.6
10.0
46.0
1.9
30.6
2.6
1
25.8
2.6
16.7
31.5
2.9
31.7
2.6
31.5
336010MASAT1
1.9
1.9
CS
1.8
26.1
39.4
4.6
39.4
4.6
30.9
11 14.9
84.2
CS
106.0
83.4
393.8
1
395.0
396.3
75.8
53.6
75.8
53.6
449.2
13.9
449.2
13.9
354010VAPI4
334003KALA DNH
374052KUDUS-MSETCL
1
Page 1 of 4
Minutes of Meeting held on 12.04.2017 to discuss the issues related to Low
Voltage problem in Solapur area
The list of participants is enclosed as Annexure–I.
1.0 CE, PSP&A–I, CEA welcomed the participants for the meeting. He stated that this meeting
has been called to discuss the interim arrangement proposed by MSETCL. The proposal
involves charging a part of the existing 400 kV Solapur (PG)–Karad S/C line at 220 kV
level using one circuit of under construction Solapur (PG)-Bale 220 kV D/C line as an
interim arrangement. MSETCL has intimated that the proposal was to resolve low voltage
problems in Solapur District during agriculture peak load. This interim arrangement has
been discussed in 493rd OCC meeting held on 10th March, 2017 at Vindhyachal, wherein,
it was deliberated that any reconfiguration of the network would require approval of CEA
/ CTU and the Reliance Power Transmission Ltd.
2.0 Director, PSP&A–I, CEA informed that MSETCL vide its letter no.
MSETCL/CO/STU/2818 dated 18.03.2017 sent the proposal (copy enclosed as Annexure-
II). He said that Parli–Karad 400 kV S/C line was LILO at 400 kV Lamboti S/s (i.e. Solapur
- MSETCL). Subsequently, under WRTS–II, LILO of 400 kV Lamboti-Karad S/C line at
Solapur (PG) was implemented by M/s Reliance Power Transmission Limited (RPTL).
3.0 MSETCL representative intimated that 220 kV substations at Pandharpur, Malinagar, Jeur,
Tembhurni and Karkambh of Solapur district are fed from 400/220 kV Lamboti S/s through
radially connected 220 kV Lamboti – Karkambh – Jeur (189 km) line and 220 kV Lamboti
– Pandarpur – Malinagar – Tembhurni – Jeur (166 km) line. During the peak agriculture
load (6 AM to 12 Noon), these lines are loaded beyond SIL limit thus the low voltage
observed at all above substations and the voltage at Lamboti S/s at 400 kV level is also low
i.e. ranging from 370 kV to 400 kV. He informed that to address the low voltage problem,
220 kV Solapur (PG) – Bale D/C was planned and the same is under implementation
(expected to be commissioned by September 2017). Further a 400/220 kV 2x500 MVA S/s
at Tembhurni / Karjat is also planned in 2021–22 time frame to mitigate the low voltage
problem.
4.0 MSETCL representative added that existing Solapur (PG)–Karad 400 kV S/C line is
crossing 220 kV Solapur (PG)–Bale D/C line, Karkambh–Jeur S/C line and Tembhurni –
Jeur S/C line. The present proposal is to charge a section of Solapur (PG) – Karad 400 kV
S/C line at 220 kV by interconnecting it with part of 220 kV Solapur (PG)-Bale (one circuit)
line and Tembhurni–Jeur 220 kV S/C line so as to form Solapur (PG)–Jeur 220 kV S/C
line.
5.0 CE, PSP&A–I, CEA stated that from the proposal submitted by MSETCL, it is observed
that some portion of 400 kV Solapur-Karad S/c line at Solapur (PG) and Karad end would
remain unutilized. The proposal also involves tapping (formation T) at 220 kV level at
some points. He added that section 44 (6) of CEA Regulations, 2010 (Measures relating
Page 2 of 4
Safety and Electric Supply), states, “There shall not be tapping of another transmission
line from main line for 66 kV and above class of lines”.
6.0 MSETCL representative agreed to modify the scheme so as to remove all tappings at 220
kV voltage level. In the revised schematic Solapur (PG) would be connected to Jeur and
Jeur - Karkambh line would be opened at suitable location and Jeur would be connected to
Tembhurni at that location. The idle section of Jeur - Karkambh line from Karkambh end
may be charged for anti-theft purpose. Similarly, idle sections of Solapur (PG) - Karad line
from Solapur (PG) and from Karad ends may also be charged to avoid theft. The schematic
of the above proposal is given below:
Block diagram – interconnection of various S/s of Solapur area
7.0 Director, PSP&A–I stated that the study results submitted by MSETCL indicate 257 MW
of power flowing through 220 kV Solapur (PG) – Jeur line. This means that 220 section of
Solapur (PG) - Bale line is over loaded. He suggested that MSETCL must explore the
possibility of charging idle section of Solapur (PG) - Karad line from Karad end at 220 kV
and connect it to Tembhurni or Karkhamb S/s so as to provide additional feed to area
around Jeur.
8.0 MSECTCL representative stated that Solapur (PG) - Bale 220 kV D/C line has been
designed for maximum operating temperature of 85oC. As per CEA planning criterion, the
220 kV S/c line with ACSR Zebra conductor can carry 769A (264 MW at 0.9 power factor)
with ambient temperature of 40oC. The loading of 257 MW is for peak agriculture load
during morning hours, when the ambient temperature is also low. The charging of idle
Page 3 of 4
section of Solapur – Karad line from Karad end at 220 kV would require one no. 220 kV
bay at Karad and shifting of line from 400 kV portion of the switchyard to 220 kV
switchyard. MSETCL agreed to explore the possibility.
9.0 CTU representative stated that 400 kV Lamboti is a weak source and studies indicate a
voltage difference of 10 kV between Solapur (PG) and Lamboti at 400 kV. He suggested
that a 400 kV D/C interconnection may be planned between Solapur (PG) and Lamboti.
MSETCL was requested to examine the proposal of bypassing the LILO of Karad – Parli
at both Solapur (PG) and Lamboti S/s and interconnect LILO portions to form Solapur
(PG) – Lamboti 400 D/C line. MSETCL agreed to explore this option.
10.0 NLDC representative stated that M/s MSETCL should implement Under Voltage Load
Shedding (UVLS) relays at all its S/s at the earliest, in order to improve grid safety and
security. It was also suggested that in order to improve the voltage profile, adequate
reactive compensation at 33 kV and below voltage level may be implemented by MSETCL
at the earliest. MSETCL agreed for the same.
11.0 Representative of M/s Reliance Power Transmission Limited expressed concern about the
recovery of tariff and availability of the LILO portion i.e. LILO of Lamboti - Karad 400
kV S/C line at Solapur (PG) implemented by M/s RPTL after implementation of this
interim arrangement. He informed that the transmission asset of RPTL has been mortgaged
and consent from lenders would be required. He added that change of ownership of the
transmission asset is under process and prior consent of new owner would be required.
12.0 CE (PSPA-I), CEA stated that there will be no impact on transmission tariff and availability
after the implementation of the interim arrangement. This being an ISTS asset, the manner
of usage of this asset would be decided by CEA, CTU and the constituents of Western
Region. Therefore, no permission from lenders / prospective owner is required. CTU
representative stated that their 1 no. of 400 kV bay at Solapur (PG) should also be deemed
100% available, as per regulatory norms.
13.0 After further deliberations, following was agreed.
i) The proposal of MSETCL as shown in the block diagram above was agreed as an
interim arrangement to mitigate the low voltage problem faced in Solapur district.
ii) The interim arrangement shall be disconnected by Dec, 2017 or after the completion
of Solapur (PG) – Bale 220 kV D/C line, whichever is earlier.
iii) The above proposal is agreed in principle and the proposal would be put up in
forthcoming meeting of the Standing Committee on Power System Planning of
Western Region for ratification.
iv) All the expenditure for implementation of the interim arrangement and its
restoration shall be borne by M/s MSETCL.
Page 4 of 4
v) MSETCL shall expedite the implementation of 400/220 kV Tembhurni / Karjat
sub-station along with upstream and downstream network.
vi) MSETCL shall implement Under Voltage Load Shedding (UVLS) relays at all its
S/s at the earliest and provide adequate reactive compensation at 33 kV and below
voltage level in Solapur district at the earliest.
vii) MSETCL shall explore interconnection between Solapur (PG) – Lamboti
(MSETCL) by using LILO portions of Parli - Karad 400 kV line at Solapur (PG)
and Lamboti.
viii) The idle section of Solapur (PG) – Karad 400kV S/c line along with the line bays
at Solapur (PG) end shall be deemed 100% available subjected to regulatory norms.
The meeting ended with thanks to the chair.
*******
Annexure - I
List of participants of the meeting held on 12.04.2017 at CEA, New Delhi to discuss the issues
related to low voltage problem in the areas of Solapur District, Maharashtra.
S. No. Name Designation
&
Organization
Contact No. e - mail ID
1 Shri. Ravindra Gupta Chief Engineer, CEA 9968286184 [email protected]
2 Shri. Awdhesh Kumar Yadav Director, CEA 9868664087 [email protected]
3 Shri. Shiva Suman Dy. Director, CEA 9013929260 [email protected]
4 Shri. Vikas Sachan Assistant Director, CEA 7838263649 [email protected]
5 Shri. Nitin Deswal Assistant Director, CEA 9717818349 [email protected]
6 Shri. Ashok Pal GM (CTU-Plg) 9910378105 [email protected]
7 Shri. Pratyush Singh Engineer (CTU-Plg) 8826094863 [email protected]
8 Shri. N. Nallarasan DGM (POSOCO) 8527077022 [email protected]
9 Shri. R. H. Satpute SE (MSETCL) 9930128535 [email protected]
10 Shri. Vinay G. Khedekar Add. EE (MSETCL) 9619850189 [email protected]
11 Shri. Naveen Nagpal DGM (RPTL) 9350718386 [email protected]