Madhya Pradesh Road Development Corporation - mprdc
-
Upload
khangminh22 -
Category
Documents
-
view
0 -
download
0
Transcript of Madhya Pradesh Road Development Corporation - mprdc
December-2021, Page-1
Total road length constructed to date : 19143 Km
Total road constructed this Month : 29 Km
Monthly Status Report Ver 1.1 December-2021
Madhya Pradesh Road Development Corporation(Govt. of M.P. Undertaking)
45-A, Arera Hills, Bhopal-462011, Madhya Pradesh, India
Phone: 0755-2797205, 2597254, 2597201 (PBX), Fax: 0755-2572643
Website: www.mprdc.gov.in Email: [email protected]
0
500
1000
1500
2000
Last 11 Yrs. Completed Road Length (in km)
MDR NH SH
MDR NH SH
Physical Target 2021-22 505.195 88.7 17.46
Achievement 334.68 21.07 13.34
334.68
21.07 13.34
0
100
200
300
400
500
600
MIS, MPRDC 1/17/2022 11:19 AM
Summary - In Progress Projects (Catagory-wise) December-2021, Page-2
Category Model Sub ModelProject
CountLength Cost
Physical
Target 2021-
22
Financial
Target 2021-
22
PA Up to
March-2021
FA Up to
March-2021
Q1_PA
2021-22
Q1_FA 2021-
22
Length covered
during Year 21-22
Expenditure
during Year 21-22 CPP CFP
RC RC 8 67 146 11.3 98.71 54.58 50.15 6.35 3.46 9.42 15.24 64 65.39
SHF SHF 5 8 43 6.16 28.61 2.2 14.22 1.3 1.82 3.92 21.398 6.12 35.618
EPC 2 137 902 23.88 151.75 112.77 432.89 4.54 23.04 10.25 48.72 123.02 481.61
NHDP III 5 333 3802 64.82 165.17 215.24 1790.003 2.45 34.037 10.82 69.707 226.06 1859.71
EPC 6 135 218 17 28 116.72 138.76 0 3.91 0 5.58 116.72 144.34
NDB NDB (61) 69 1551 3382 263.34 650 1287.58 2666.34 67.01 124.61 197.85 526.16 1485.43 3192.5
ADB-V (57) 65 1468 3075 63.122 249.238 1284.385 2768.7 46.97 97.66 136.83 437.99 1421.22 3206.69
ADB-VI 50 1523 4297 161.733 505.22 0 177.32 0 116.35 0 415.7 0 593.02
210 5222 15866 611.355 1876.698 3073.475 8038.383 128.62 404.887 369.09 1540.495 3442.57 9578.88Grand Total
SH
NHEPC
MDR
ADB
CATEGORY No. Of Projects Length Cost
OMT 13 726 35
Total FA 2020-21
Border Check Post 1 1094 85% 931 5.00 0.00
Category No. Of Projects Cost PA March-2020 FA March-2020 Fin Target 2020-21
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.
Contribution.
Summary - In Progress Projects (Model-wise) December-2021, Page-3
Model Category Sub ModelProject
CountLength Cost
PA Up to
March-2021
FA Up to
March-2021
Physical
Target 2021-
22
Financial
Target 2021-
22
Q1_PA 2021-22 Q1_FA 2021-
22
Length covered
during Year 21-22
Expenditure
during Year 21-22 CPP CFP
EPC 2 137 902 112.77 432.89 23.88 151.75 4.54 23.04 10.25 48.72 123.02 481.61
NHDP III 5 333 3802 215.24 1790.003 64.82 165.17 2.45 34.037 10.82 69.707 226.06 1859.71
EPC 6 135 218 116.72 138.76 17 28 0 3.91 0 5.58 116.72 144.34
NDB NDB 69 1551 3382 1287.58 2666.34 263.34 650 67.01 124.61 197.85 526.16 1485.43 3192.5
ADB-V 65 1468 3075 1284.385 2768.7 63.122 249.238 46.97 97.66 136.83 437.99 1421.215 3206.69
ADB-VI 50 1523 4297 0 177.32 161.733 505.22 0 116.35 0 415.7 0 593.02
RC RC 8 67 146 54.58 50.15 11.3 98.71 6.35 3.46 9.42 15.24 64 65.39
SHF SHF 5 8 43 2.2 14.22 6.16 28.61 1.3 1.82 3.92 21.398 6.12 35.618
210 5222 15866 3073.475 8038.383 611.355 1876.698 128.62 404.887 369.09 1540.495 3442.565 9578.878Grand Total
EPCNH
MDR
ADB
SH
CATEGORY No. Of Projects Length Cost
OMT 13 726 35
Total FA 2020-21
Border Check Post 1 1094 85% 931 5.00 0.00
Category No. Of Projects Cost PA March-2020 FA March-2020 Fin Target 2020-21
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.
Contribution.
Regular Contract Projects (In Progress) Page-4
SN Project Name SH Lane Concessionaire Agree't Date Anticipated Completion Date Length Cost
PA Up to
March-
2021
FA Up to
March-
2021
Physical
Target
2021-22
Financial
Target
2021-22
Length
during Year
21-22
Expen.
during Year
21-22
CPP CFP
1Dabra Bhitarwara-Harshi Road
Construction of Harshi Bypass
M/s Chambal Developers,
Gwalior10/14/2016
13-06-17 &
31-03-20213.05 9.72 0.00 2.18 3.05 7.54 1.70 1.81 1.70 3.99
2 Raisen Rahatgarh road Construction
of major bridge at Koula-Nala.
M/s Mukesh K. Verma Sehore 7/6/201605-07-17 &
31-05-190.00 4.61 0.00 0.74 0.00 4.12 0.00 0.00 0.00 0.74
3Uchehra Nagod section & Uchehra
Bypass road (4.7 Km) on Uchehra
road Reconstruction & upgradation
56 IL M/s SR. Construction Delhi 10/17/201616-10-17 &
31-03-1933.16 46.81 36.18 30.31 0.00 13.26 0.52 1.16 36.70 31.47
4Up Gradation of Chapada-
Hatpipaliya-Newari Road SH-64 (in
Principal NH) length 21.00 Km.
64M/s Rajlaxmi Devbuildcon
Bhopal7/1/2020 3/31/2021 21.00 19.72 14.15 8.32 2.75 11.40 4.05 8.17 18.20 16.49
5Widening of Chhindwara-Tamia-
Matkuli road (SH-19) in Chhindwara
city portion from km. 1 to 9/2.
19M/s Naveen Construction
Chhindwara6/19/2020 6/18/2021 8.10 26.90 4.10 8.54 4.00 16.67 2.35 1.86 6.45 10.40
6
Balance work of Construction of RCC
drain in Bhoma Village on Seoni-
Chiraidongari Road
M/s Dada guru Construction
Chhindwara7/1/2019 3/31/2021 0.00 0.25 0.00 0.06 0.00 0.32 0.00 0.00 0.00 0.06
7Balance work of Construction of
Motinagar Tili Pathariya Road
M/s Shukla Construction Kasara
Distt- Satna12/21/2020 9/20/2021 1.50 38.21 0.00 0.00 1.50 36.21 0.80 1.03 0.80 1.03
8
Balance work of Construction of
service road from Mahamrityunjay
to Triveni Dwar
M/s Astha Construction Ujjain 9/5/2020 12/4/2020 0.15 0.15 0.15 0.00 0.00 9.19 0.00 1.21 0.15 1.21
66.96 146.37 54.58 50.15 11.30 98.71 9.42 15.24 64.00 65.39Grand Total
NA NA
4L
- -
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress,
GC: Govt. Contribution.
State Highway Fund Projects (In Progress) Page-5
SN Project Name Lane Concessionaire Agree't DateAnticipated
Completion DateLength Cost
PA Up to
March-2021
FA Up to
March-2021
Physical
Target 2021-
22
Financial
Target
2021-22
Length
during Yr 21-
22
Expend.
during Yr
21-22
CPP CFP
1
Raisen-Rahatgarh Road Construction
of Four Lane Road in km 123 to 125 in
Begamganj Town.
8/22/2017 12/31/2021 3.47 18.37 2.20 9.54 1.27 9.28 0.65 1.51 2.85 11.05
2
Silwani-Gairatganj Road Construction
of Four lane road in km 30 and 31 SH-
44
9/11/2018 3/31/2021 2.16 15.79 0.00 4.65 2.16 10.95 0.67 1.51 0.67 6.16
3
Widening of Two lane to four lane of
Chhindwara Matkuli Road (SH-62) in
Km 30/6 to 31/6 Newton Chikhli Town
Portion.
M/s Balaji
Construction
company
Ghodadongri, Betul
8/27/2020 5/26/2021 1.10 4.37 0.00 0.00 1.10 4.37 1.10 1.63 1.10 1.63
4
Construction of shoulder & drain on
Jabalpur-Narsinghpur-Pipariya road at
Sahpura town in km. 31+200 to
31+680
-
Shri Paramhans
Construction,
Jabalpur
10/8/2020 4/7/2021 0.48 0.66 0.00 0.00 0.48 0.55 0.00 16.75 0.00 16.75
5 Balance work of Construction of
Chanderi Town Portion
4L
M/s Faix
Mohammad
Contractor
11/3/2020LOA issued on 22-02-
20211.15 3.46 0.00 0.03 1.15 3.46 1.50 0.00 1.50 0.03
8.36 42.65 2.20 14.22 6.16 28.61 3.92 21.40 6.12 35.62
4L
M/s Kapcon Projects
Ltd. Chandigarh
Grand Total
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial
Progress, GC: Govt. Contribution.
National Highway Projects NHDP-III (In Progress) Page-6
SN Project Name SH Lane ConcessionaireConsultant
(I.E)Agree't Date Appoi't Date Anticipated Completion Date Length Cost
PA Up to
March-2021
FA Up to
March-2021
Physical
Target
2021-22
Financial
Target
2021-22
Length
during Yr
21-22
Expend.
during Yr
21-22
CPP CFP
1Jabalpur to Hiran river (Km
10.400 to Km 66.00)(NH-12)
Four lane with PS - EPC
M/s Wagad Infra Projects Ltd.
& M/s Sorathia Velji Ratna
Co. (JV)
M/s ICT Ltd.
New Delhi12/19/2017 1/23/2018 14-09-2020 & 31-03-2021 55.60 628.45 55.00 364.37 0.60 27.13 0.60 14.41 55.60 378.78
2
Sindoor river to start of
Bareli bypass(Km130.00 to
193.450)(NH-12) Four lane
with PS - EPC
M/s GVR Infra Projects Pvt.
Ltd. (Sub - Contractor M/s
Bansal Construction works
pvt. Ltd.)
3/24/2016 7/5/2016 18-09-20 & 30-08-2021 63.00 809.16 55.72 381.05 7.28 96.54 6.28 46.72 62.00 427.77
3Bareli Bypass to Goharganj
(Km193.450 to 255.300)(NH-
12) Four lane with PS - EPC
M/s Ramkey Infrastructure
Ltd.-M/s Brijgopal
Construction Co. Ltd. (JV)
4/20/2016 6/10/2017 15-07-2020 & 19-08-2021 59.75 877.79 57.65 529.26 2.10 26.94 2.10 0.00 59.75 529.26
4
Goharganj to Bhopal
including link road from
Obedullaganj to NH-69
(Km255.300 to 301.800)(NH-
12) Four lane with PS - EPC
12 &
69
M/s Centrodorstory India Pvt.
Ltd. New Delhi.12/7/2017 2/7/2018 03-08-2020 & 31-03-2021 48.71 957.54 46.87 515.32 1.84 14.56 1.84 8.58 48.71 523.90
5Balance work of Sidhi to
Singrauli (NH-75E) 4L road
project on EPC Mode
75E
M/s Tirupati Buildcon Pvt.
Ltd. LOA to be issued by the
MoRTH.
- - 12:00:00 AM 12/31/2022 105.60 529.44 0.00 0.00 53.00 0.00 0.00 0.00 0.00 0.00
332.66 3,802.38 215.24 1,790.00 64.82 165.17 10.82 69.71 226.06 1,859.71
12
4L+PSM/s Theme
Engineering
Ltd. Jaipur
Grand Total
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt. Contribution.
National Highway Projects on EPC (In Progress) Page-7
SN Project Name SH Lane ConcessionaireConsultant
(I.E)
Agree't
Date
Appoi't
Date
Anticipated
Completion DateLength Cost
PA Up to
March-
2021
FA Up to
March-
2021
Physical
Target
2021-22
Financial
Target
2021-22
Length
during Yr 21-
22
Expend.
during Yr
21-22
CPP CFP
1
Barella - Mandla
Section KM 22/8
to KM 89/6 of NH
12A
12A
M/s Gammon
Dunkerley 8/10/2015 12/17/2015
09-06-2017 &
30-07-2020 & 30-06-
2021
63.55 390.51 56.72 195.99 6.83 55.65 6.43 30.98 63.15 226.97
2Umariya- Shahdol
section Km 68/4
to 142/2 (Pkg II)
78
M/s GVR infra
projects Ltd.
Chennai
4/9/2015 8/1/2015 6/30/2021 73.10 511.83 56.05 236.90 17.05 96.10 3.82 17.74 59.87 254.64
136.65 902.34 112.77 432.89 23.88 151.75 10.25 48.72 123.02 481.61
2L + PS -
Grand Total
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial
Progress, GC: Govt. Contribution.
MDR Projects on EPC (In Progress) Page-8
SN Project Name Lane ConcessionaireAuthority
EngineerAgree't Date Appoi't Date
Anticipated
Completion DateLength
Contract
Price (in
Cr.)
PA Up to
March-2021
FA Up to
March-2021
Physical
Target 2021-
22
Financial
Target 2021-
22
Length
during Yr 21-
22
Expend.
during Yr
21-22
CPP CFP
1 Ambha Pinhat 14-10-15 7/31/2018 23.12 54.11 23.06 45.47 1.00 9.00 0.00 0.49 23.06 45.96
2Jawasa-
Sunarpura Road10/14/2015 1/28/2018 22.63 48.81 22.63 27.91 1.00 19.00 0.00 3.24 22.63 31.15
3Nadigaon -
Seondha10/28/2015 11/4/2015 5/13/2018 22.14 72.11 22.14 65.38 1.00 0.00 0.00 1.85 22.14 67.23
4
Pawai -
Prithvipura
Road
9/24/2015 10/14/2015 1/28/2018 22.34 0.00 6.98 0.00 1.00 0.00 0.00 0.00 6.98 0.00
5Satanbada-
Narwar10/28/2015 11/4/2015 5/13/2018 25.54 43.22 23.69 0.00 1.00 0.00 0.00 0.00 23.69 0.00
6
Tekna-Manpur-
Rameshwar
Road
9/24/2015 10/14/2015 7/31/2018 19.41 0.00 18.22 0.00 1.00 0.00 0.00 0.00 18.22 0.00
135.18 218.25 116.72 138.76 6.00 28.00 0.00 5.58 116.72 144.34Grand Total
IL
M/S CMM infra
project ltd.-
M/S Keti
construction
ltd. Indore (J.V.)
M/s LN Malviya,
Infra Project
Private Limited.
9/24/2015
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial
Progress, GC: Govt. Contribution.
NDB Projects (In Progress) Page-9
SN PKG Project Name Concessionaire Agree't DateAnticipated Completion
DateLength Cost
PA Up to March-
2021
FA Up to March-
2021
Physical Target 2021-
22
Financial Target 2021-
22
Length during Yr 21-
22
Expend. during Yr 21-
22 CPP CFP
1 Badagaon-Baldeogarh Road 6/13/2019 31.0 0.0 119.3 241.7 0.0 0.0 0.0 9.7 119.3 251.3
2 Majna -Palera Road 6/13/2019 55.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3 Badagaon-Kakarwaha Road 6/13/2019 13.7 241.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4 Digoda Mohangarh Road 6/13/2019 19.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5 Lodi -Mahoba Road 3/14/2019 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6 Baxwaha -Dalpatpur Road 3/14/2019 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7 Ganj -Rajnagar Road 3/14/2019 0.0 175.5 4.5 30.8 0.0 0.0 0.0 0.1 4.5 30.9
8 Nawgong-ShrinagarRoad 3/14/2019 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9 Tetra Vijaypur Iklodh road 7/31/2021 6.0 105.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10 Goras aawada ajapura road 7/31/2021 34.2 0.0 44.0 110.9 0.5 15.0 0.5 4.2 44.5 115.1
11Iklod Tiraha to Gandhi Chouk-City Portion
Vijayour7/31/2021 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12 Karera Bhitarvaar Road 12/1/2022 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
13 Singhnivaas Khurai Raod 12/1/2022 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
14 Padora Gora Pichhore Road 12/1/2022 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
15 Pichhore Basayi Road 12/1/2022 0.0 0.0 0.0 18.6 0.0 0.0 0.0 0.3 0.0 18.9
16 Singhpur - Gijorra Road 4/30/2021 6.3 0.0 22.5 29.8 0.3 8.9 0.0 2.0 22.5 31.8
17 Rangava – Deogarh Road 4/30/2021 16.5 38.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
18 Aron - Ashoknagar Road 9/25/2019 11.7 90.3 47.9 84.4 0.0 0.0 0.0 2.1 47.9 86.5
19 Bharoli - Ajleshwar Road 9/25/2019 19.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
20 Hapakhedi – Panwadi hat Road 9/25/2019 16.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
21 Anooppur Chechai Amlai Road 4/30/2021 22.0 152.5 76.6 132.6 0.0 19.9 0.0 10.4 76.6 143.0
22 Anooppur darri kherwa road 4/30/2021 10.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
23 Nonghati damedi devri leelatola road 4/30/2021 44.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
24 Panagar Belkhadu Road 6/14/2019 14.1 68.0 31.6 65.3 0.0 0.0 0.0 0.0 31.6 65.3
25 Sihora Majauli Katav Road 6/14/2019 17.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
26 Dhooma Gotegaon Road 12/27/2018 28.4 0.0 47.6 103.1 0.0 0.0 0.0 4.1 47.6 107.2
27Ganeshganj Sunwara Kewlari Pindrai
Road 12/27/2018 9.7 103.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
28 Kewlari Bheemgarh Chhapara Road 12/27/2018 9.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
29 Damoh-Jamuniya-Balakot Road 8/30/2021 17.4 125.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
30 Abhana-Tendukheda 8/30/2021 35.2 0.0 41.3 100.5 11.2 25.2 11.2 40.4 52.6 140.9
31 Pali-Peerghat-Khimlasa -Kanjiya Road 7/31/2020 36.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
32 Bhapel -Jaisinagar Road 7/31/2020 24.8 193.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
33 Devri-Sehejpur Road 7/31/2020 21.3 0.0 82.9 182.6 0.0 11.0 0.0 13.8 82.9 196.3
P-01M/s Gawar Construction Ltd.
Gurgone25-04-17
P-02
M/s IL & FS Transportation
Networks Ltd. & M/s Il & FS
Engineering and construction
comp. Ltd. (JV) Mumbai
16-06-17
P-03M/s Tomar Builders &
Contractors Pvt. Ltd., Gwalior.26-09-18
P-04M/s Ganon Dunkerley & Co.
Ltd. Mumbai19-04-17
P-05M/s B. Patel Infrastructure Pvt.
Ltd. JV27-09-18
P-06
M/s Gawar Construction Ltd.
Gurgone
27-02-18
P-07 09-10-17
P-08M/s Gaur Road Tar Coat
Jabalpur02-02-18
P-09M/s Ganon Dunkerley & Co.
Ltd. Mumbai24-06-17
P-10M/s Prakash Asphalting & Toll
Highways (India) Ltd.29-06-18
P-11M/s KCC Buildcon Pvt. Ltd.
Gurgaon24-05-17
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.
Contribution.
NDB Projects (In Progress) Page-10
SN PKG Project Name Concessionaire Agree't DateAnticipated Completion
DateLength Cost
PA Up to March-
2021
FA Up to March-
2021
Physical Target 2021-
22
Financial Target 2021-
22
Length during Yr 21-
22
Expend. during Yr 21-
22 CPP CFP
34 Shahgarh Baraytha Road 1/2/2020 25.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
35 Banda Shahpur Parsoriya Road 1/2/2020 32.4 120.7 57.4 120.6 0.0 0.0 0.0 0.4 57.4 121.0
36 Bhainsdehi nanda bhimpur road 12/31/2020 46.8 0.0 78.8 155.0 0.1 31.6 0.1 24.9 78.9 179.9
37 Bhoura Phophalya road 12/31/2020 32.1 186.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
38 P-14 Basoda Sironj Road
M/s Bansal construction Works
Pvt. Ltd. & Prakash Asphalting
& Toll Highways (India) Ltd (JV)
Bhopal.
19-05-17 9/23/2018 42.0 79.4 42.0 81.9 0.0 0.0 0.0 8.2 42.0 90.0
39 Chhindgaon temagaon Road 5/17/2019 11.6 63.4 28.7 61.9 0.0 0.0 0.0 1.3 28.7 63.3
40 Sinrali charua road 5/17/2019 17.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
41 Berasia Narsinghgarh Road 1/15/2019 10.2 0.0 56.5 117.8 0.0 0.0 0.0 4.8 56.5 122.6
42 Narsingarh Berasia Road 1/15/2019 7.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
43 Doraha - Ahmadpur 1/15/2019 16.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
44 Bhojapura Ahmedpura Road Part - I 1/15/2019 11.1 120.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
45 Bhojapura Ahmedpura Road Part - II 1/15/2019 11.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
46 Rangwasa - Agra - Girota Road 8/30/2021 52.4 188.2 93.4 150.4 11.0 37.9 11.0 50.6 104.4 201.0
47 Depalpur - Kaisur Road 8/30/2021 17.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
48 Sanwer - Ajnor - Depalpur Road 8/30/2021 34.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
49 P-18 Khandwa to Dedatalayi Road
M/s Madhav Infra Projects
Limited, M/s M.S. Khurana
Engineering Ltd. (JV), Vadodara
4/24/2017 9/21/2018 41.5 86.3 41.5 88.1 0.0 0.0 0.0 3.6 41.5 91.7
50 Maalpoor Varchar Mandur Road 5/30/2021 12.5 70.0 41.9 69.4 1.2 5.0 0.8 16.8 42.7 86.2
51 Sonda Sakdi Umraeth Bakhatgarh Road 5/30/2021 30.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
52Balsamundh Ochar nangalwadi Bistaan
Road12/31/2019 13.2 0.0 16.9 70.5 27.8 89.3 8.8 44.8 25.7 115.2
53 Pati Bokarta Khetiya Road 12/31/2019 31.5 128.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
54 Katargaon-Karhi-Pandlya 2/20/2019 30.3 0.0 76.4 148.3 13.9 34.3 13.0 17.7 89.3 166.0
55Sanawad-Dhalgaon- Hirapur-
Bheekangaon Road 2/22/2019 41.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
56Bheekangaon-Kendwa-Shankargaon-
Khudgaon-Angad Road 2/22/2019 18.8 182.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
57 Avalda Bag Jobat Borjhar Road 4/10/2019 38.5 0.0 61.8 152.3 0.0 0.0 0.0 6.1 61.8 158.3
P-12
M/s Diamond Construction
Company – M/s Gawar
Construction Limited
20-09-18
P-13M/s KCC Buildcon Pvt. Ltd.
Gurgaon28-06-17
P-15M/s Gawar Construction Ltd.
Gurgone22-01-18
P-16M/s Madhav Infra Projects
Limited, M/s Eagle Infra JV24-06-17
P-17M/s Ganon Dunkerley & Co.
Ltd. Mumbai26-09-17
P-19M/s Madhav Infra Projects
Limited, Vadodara22-09-18
P-20M/s Sorathia Velji Ratna & Co.
& Ketan Construction26-09-18
P-21M/s GHV (India) Pvt Ltd
Mumbai 12-05-17
P-22 M/s Shriji-Ketan JV 30-06-17
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.
Contribution.
NDB Projects (In Progress) Page-11
SN PKG Project Name Concessionaire Agree't DateAnticipated Completion
DateLength Cost
PA Up to March-
2021
FA Up to March-
2021
Physical Target 2021-
22
Financial Target 2021-
22
Length during Yr 21-
22
Expend. during Yr 21-
22 CPP CFP
58 Dhrampur Tarapur Mandav Road 4/10/2019 23.4 151.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
59 Shahpur Nachankheda Road 5/30/2021 10.8 0.0 46.3 109.0 3.1 5.0 3.1 4.4 49.4 113.4
60Burhanpur Bori Borsal Ratangarh
saikheda Nepanagar Road 5/30/2021 38.6 101.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
61 Goi kavri Dhulkot Road 5/30/2021 76.4 0.0 84.3 157.0 10.3 41.4 10.3 30.5 94.6 187.4
62 Rajpur Vipri Khajuri Badsalay road 5/30/2021 18.2 198.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Lodi -Mahoba Road 5/28/2022 15.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Baxwaha -Dalpatpur Road 5/28/2022 23.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ganj -Rajnagar Road 5/28/2022 17.5 170.6 43.6 84.1 42.1 86.5 42.1 96.1 85.7 180.2
Nawgong-ShrinagarRoad 5/28/2022 33.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P-04APichhore Basayi Road- 7.98 Km, Padora
Gora Pichhore Road - 65.61 Km.M/s DCC, Haryana 21.01.2021 16.02.2021 73.6 125.2 0.0 0.0 39.5 125.2 47.4 66.5 47.4 66.5
P-04B Singhnivaas Khurai Raod M/s Tomar Builders, Gwalior. 12.03.2021 22.03.2021 36.8 48.1 0.0 0.0 36.8 48.1 24.7 26.7 24.7 26.7
P-04C Karera Bhitarvaar Road M/s Gawar Const Ltd. Gurgaon 21.01.2021 16.02.2021 31.5 65.7 0.0 0.0 65.6 65.7 25.0 35.7 25.0 35.7
1550.9 3382.2 1287.6 2666.3 263.3 650.0 197.9 526.2 1485.4 3192.5
P-22 M/s Shriji-Ketan JV 30-06-17
P-23 M/s Kiledar-Barbric JV 22-07-17
Grand Total
P-24M/s GHV (India) Pvt Ltd
Mumbai 23-06-17
P-02AM/s Madhav Infra Projects,
Vadodara6/1/2020
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.
Contribution.
ADB-V Projects (In Progress) Page-12
SN PKG Project Name Concessionaire Agree't DateAnticipated
Completion DateLength Cost
PA Up to
March-
2021
FA Up to
March-
2021
Physical
Target
2021-22
Financial
Target
2021-22
Length
during Yr
21-22
Expend
during Yr
21-22
CPP CFP
1 P-01
Khatakia to Suthaliya via NH-3, Kumbhraj,
Barod, Mragwas, Batawda, Chanchoda,
Binaganj, Teligaon M/s Bansal-Path(JV) 5/19/2017 9/15/2018 70.8 145.4 68.1 165.3 1.8 0.0 2.7 15.4 70.8 180.7
2 Sirsod-Pichhore road 8/23/2018 31.2 123.7 57.6 146.2 0.2 0.0 0.0 5.7 57.6 151.93 Narwar-Chitori to Amola road 8/23/2018 26.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.04 Mungawali-Malahargarh road 11/3/2019 16.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.05 Piprod-Thubon road 11/3/2019 7.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.06 Belai-Kareela Mata Mandir road - 11/3/2019 17.7 113.1 62.1 124.7 0.0 0.0 0.2 2.8 62.3 127.57 Bhounrasa-Malhargarh road 4/7/2018 11/3/2019 20.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8 P-04 Sanwer, Chandravatiganj, Gautampura
road
M/s Dineshchandra R. Agrawal
Infracon Pvt. Ltd. LOA issued on
26.02.2018
4/9/2018 8/14/2019 33.9 96.2 33.9 130.4 0.0 0.0 0.0 5.2 33.9 135.5
9 P-05Bijwar Kataphod Satwaas Khategaon road
M/s Dineshchandra R. Agarwal
Infracon Pvt. Ltd.2/23/2017 4/18/2018 55.2 103.9 55.2 121.2 0.0 0.0 0.0 5.2 55.2 126.4
10 Gadarwara-Gotetoria road 10/23/2018 13.6 0.0 68.2 120.7 0.7 18.6 1.9 10.3 70.1 131.011 Podar-Salichok-Babai-Sukhakhairi road 10/23/2018 23.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.012 Kareli-Singhpur-Dangidhana road 10/23/2018 32.9 137.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.013 Maharajpur Sahajpur road 12/25/2018 24.4 0.0 84.9 176.0 0.0 0.0 0.0 6.9 84.9 182.9
14Samnapur-Bilehra-Nanhi-Deori-Narayanpur
road 12/25/2018 45.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
15 Kesali Sahapur road 12/25/2018 15.1 145.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.016 Barodiya Dhamoni road 12/25/2018 19.8 146.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.017 Nauniya Madanpura road 12/25/2018 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.018 Khurai Rajwans road 12/25/2018 31.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.019 Garpehera Dhamoni road 12/25/2018 35.3 0.0 89.0 158.6 0.0 0.0 0.0 9.0 89.0 167.620 Rajnagar Bachhon road 4/25/2019 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.021 Khaparia Banspahari road 4/25/2019 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.022 Chhatarpur-Vikrampur-Rajnagar road 4/25/2019 0.0 213.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.023 Bamitha to Dumra 4/25/2019 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
24Baraiya Choki Lugasi Garhi Malhara road
4/25/2019 0.0 0.0 21.1 53.9 0.0 0.0 0.0 0.0 21.1 53.9
25 Barghat Kanhiwada road 10/25/2018 0.0 0.0 14.3 44.3 0.0 0.0 0.0 45.3 14.3 89.626 Dharna Aata Dondiwada Dharmakua 10/25/2018 0.0 40.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.027 Waraseoni Katangi road 10/25/2018 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P-02 M/s KCC Buildcon Pvt. Ltd. Gurgaon 5/3/2017
P-03M/s Gawar construction Ltd. - Atcon
India Ltd. LOA issued on 26.02.2018
4/7/2018
P-06 M/s Gannon & Dunkerly 5/12/2017
P-07
M/s KCC Buildcon Pvt. Ltd. Gurgaon 2/16/2017
P-08
P-10M/s IL&FS Transportation Networks
Limited-M/s IL&FS Engineering and
Construction Company Ltd. (JV)
3/2/2017
P-11
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.
Contribution.
ADB-V Projects (In Progress) Page-13
SN PKG Project Name Concessionaire Agree't DateAnticipated
Completion DateLength Cost
PA Up to
March-
2021
FA Up to
March-
2021
Physical
Target
2021-22
Financial
Target
2021-22
Length
during Yr
21-22
Expend
during Yr
21-22
CPP CFP
28 Rampayali-Garra Chouki road 1/14/2019 27.2 0.0 88.0 211.8 0.0 0.0 0.0 11.5 88.0 223.329 Khairlanji-Agasi road 1/14/2019 29.0 173.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.030 Laalbarra-Samnapur road 1/14/2019 8.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.031 Sitapathar-Mahkepaar-Goreghat road 1/14/2019 23.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.032 Chand-Bichhua-Khamarpani road 11/26/2018 59.3 125.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.033 Chourai-Panjara-Chand road 11/26/2018 17.2 0.0 88.2 219.1 0.0 0.0 0.0 8.5 88.2 227.734 Rayamond Chowk- Sai Kheda (blank) - - 11.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
35Harfari Khaira-Misirgawan via Shivpurva
road 1/14/2019 26.0 97.3 48.7 121.5 0.0 0.0 0.0 4.4 48.7 125.9
36 Chitrangi-Garhwa road 1/14/2019 22.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
37 P-19Sohagpur Manpur road
M/s Shreeji Infrastructure India Pvt.
Ltd.-PRL projects & Infrastructure
Ltd. (SIIPL-PRL) (JV)
2/27/2017 10/14/2018 59.4 85.8 59.4 79.5 0.0 6.4 0.0 3.2 59.4 82.7
38 Anooppur Jaitpur road 3/23/2019 36.7 0.0 100.1 159.5 0.0 11.4 0.0 6.4 100.1 165.939 Gohparu Rasmohni Budhar road 3/23/2019 39.9 170.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.040 Pasgarhi Deori Janakpur road 3/23/2019 23.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.041 Govindgarh Tikar Laxmanpur Road - 17.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.042 Jigna New Ramnagar to Gorsari Road - 24.2 120.4 58.7 116.6 0.0 0.0 0.0 6.4 58.7 123.043 Byohari Manpur Road - 16.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
44 P-23Kotma Jaithari Rajendragram Road
M/S Shreeji Infra Pvt. Ltd. M/s Gour
Road Tar Coat Pvt. (JV)1/4/2018 1/3/2019 52.2 101.9 52.2 125.0 0.0 0.0 0.0 0.2 52.2 125.2
45 Teonthar-Shankargarh - 14.6 26.6 13.9 23.9 14.4 28.1 2.0 5.5 15.9 29.446 Naigarhi-Garh road - 14.1 23.0 14.1 25.7 0.0 0.0 0.0 1.9 14.1 27.5
47 P-15BBaheradabar-Piparahi-Jadkud road
M/s Udit Infraworld Pvt. Ltd. LOA
issued on 26.02.20184/9/2018 8/2/2019 19.7 47.3 19.7 54.0 0.0 0.0 0.0 0.8 19.7 54.8
48 Bhatura Bhadpur Barakhurd road - 20.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
49Kharamseda-Kirhai-Ramgarh-Mukundpur
Road - 34.4 122.0 35.6 80.3 12.5 39.5 18.8 49.4 54.4 129.7
50 P-16B Jharkua-Raigaon-Karsara
M/s ABS Associaes JV Bhati
Associates Pvt. Ltd. LOA issued on
26.02.2018
4/11/2018 8/2/2019 24.0 45.0 24.0 41.1 0.0 3.9 0.0 3.4 24.0 44.6
51 Parsona-Mada road Barbarik Project Ltd. LoA on 12.03.18 8/4/2019 12.6 63.3 32.5 62.0 0.0 0.0 0.1 0.1 32.6 62.1
52 Mada Ramgarh road
Barbarik Project Ltd
A-24 Ashoka Millennium, Ring Road
No.1 Near Rajendra Nagar Raipur
492001(CG)
8/4/2019 19.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P-12 M/s SVR-Ketan (JV) 4/19/2017
P-14M/s GHV INDIA 5/1/2017
P-17 M/s Path India Ltd., Indore 9/22/2017
P-20 M/s GHV (India) Pvt Ltd 2/22/2017
P-21M/s P.D. Agrawal, Infrastructure Pvt.
Ltd. -
P-15AM/s Ramraja Construction Company,
Niwari6/4/2020
P-16AM/s P.D. Agrawal, Infrastructure Pvt.
Ltd. Indore11/4/2019
P-18A 4/7/2018
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.
Contribution.
ADB-V Projects (In Progress) Page-14
SN PKG Project Name Concessionaire Agree't DateAnticipated
Completion DateLength Cost
PA Up to
March-
2021
FA Up to
March-
2021
Physical
Target
2021-22
Financial
Target
2021-22
Length
during Yr
21-22
Expend
during Yr
21-22
CPP CFP
53 P-18B Jhurai Sarai road
M/s Shreeji Infraspace Pvt.
Ltd.,Ahemdabad
LOA issued on 26.02.2018
4/12/2018 8/2/2019 31.4 50.3 31.4 51.7 0.0 0.0 0.0 2.4 31.4 54.1
54 Deotalab Garh Road - 14.8 97.7 28.7 62.3 9.1 40.3 12.1 26.1 40.8 88.455 Latiyar Hanumana Road - 26.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.056 Chakghat -Sonari Road - 27.8 92.7 30.0 66.1 4.4 31.2 7.3 20.2 37.3 86.357 Sohagi-Teothar-Panwar-Daboura Road - 9.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Barghat Kanhiwada road 10/31/2022 21.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Dharna Aata Dondiwada Dharmakua 10/31/2022 26.2 140.1 4.8 27.1 20.0 40.0 60.1 114.2 64.9 141.4Waraseoni Katangi road 10/31/2022 30.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Rajnagar Bachhon road - 23.9 54.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Khaparia Banspahari road - 24.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Chhatarpur-Vikrampur-Rajnagar road - 10.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Bamitha to Dumra - 28.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Baraiya Choki Lugasi Garhi Malhara road - 15.5 172.1 0.0 0.0 0.0 30.0 31.7 67.7 31.7 67.7
1468.2 3075.4 1284.4 2768.7 63.1 249.2 136.8 438.0 1421.2 3206.7
P-22AM/s Bansal construction Works Pvt.
Ltd. -
P-22B
Grand Total
P-11A Re-tendering in process 2/2/2021
P-10A
M/s PRL Projects & Infrastructure
Ltd. - M/s Udit Infraworld Pvt. Ltd.
(JV), New Delhi
3/3/2021
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.
Contribution.
ADB-VI Projects (In Progress) Page-15
SN PKG Project Name ConcessionaireAgree't
Date
Anticipated
Completion
Date
Length Cost
PA Up to
March-
2021
FA Up to
March-
2021
Physical
Target
2021-22
Financial
Target
2021-22
Length
during Yr
21-22
Expend.
during Year
21-22
CPP CFP
1 Pkg-1+B4:B48 Bhabra-Kattiwada-Kheda road - 35.9 115.1 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.02 Pkg-1+B4:B49 Bhabra-Udaigarh road - 24.9 66.4 0.0 22.8 1.0 66.4 0.0 0.0 0.0 22.83 Udaigarh-Bori road 23.01.20 - 15.5 46.2 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.04 Tanda-Bori road 23.01.21 - 17.6 62.6 0.0 20.9 1.0 62.6 0.0 44.0 0.0 64.95 Tanda-Balwadi road 23.01.22 - 20.1 61.4 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
6 Pkg-3 Jobat-Nanpur roadM/s NPM Jobat Nanpur
Pathways Pvt. Ltd.21.01.20 - 21.9 63.2 0.0 17.0 1.0 63.2 0.0 26.8 0.0 43.8
7 Pkg-4 Alirajpur-Mathwad road
M/s Alirajput- Mathwad
Highways Pvt. Ltd. - 56.2 182.9 0.0 23.6 1.0 182.9 0.0 74.4 0.0 97.9
8Badwani-Badhan-Ambapani-Sindhi-Khodar-Silawad
road - 17.9 84.2 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
9 Dhavabawdi-Balkua-Lonsara-Borlay road - 11.0 39.5 0.0 16.1 1.0 39.5 0.0 67.6 0.0 83.7
10
Pipaliya Kevat - Ghatgheri (Raisen) - Ghatkheri
(Raisen) to Sahajpur - Salabaru-Ghatkheri (Sagar) &
Pratapgarh-Salabarru
- 35.6 110.6 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
11
Salabarru-Gutauri - Gutauri-Deori - Gorakhpur-
Ghahlavan - Ghahlavan-Sadrai - Sadrai-Heerapur -
Heerapur-Kaakraghat (Narmada Bridge)
- 36.5 126.2 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
12 Pkg-19 Maharastra Border-Kukru-Khamla-BhaisdehiM/s Udit Khamla Highways Pvt.
Ltd.31.12.19 - 30.2 90.5 0.0 22.7 1.0 90.5 0.0 23.7 0.0 46.4
13 Sultaniya-Pipalkheda-Salaiya Road - 12.8 38.4 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
14 Basoda-Gurod-Somvara-Enchda-Imaliya-Sironj road - 35.0 105.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
15 Amravad-Bharkachh road - 17.3 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
16 Obedullaganj-Magarpunch-Ashapuri-Bhojpur road - 14.7 168.6 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
17 Chikhlod-Raisen road - 24.8 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.018 Vidisha-Ahmadpur-Gadi-Gairatganj - 18.9 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
19 Pkg-42Shipra Budhi Barlai-Solsinda-Khandakhedi-Jamodi-
Maharajganj Biloda Nayda-Panod Sanver road
Feasibility under preparation by
M/s AICONS - 28.9 86.7 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
20 Siddikganj-Hatpipaliya Road - 21.2 48.9 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.021 Bhaukhedi-Amlaha-Dhamanda Road - 17.9 49.7 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
22Toomda-Patania-Barkheda Saalam road Length
12.80 Km - 9.7 23.2 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
M/s Shreeji Infraspace Highway
Pvt. Ltd07.07.20
Pkg-2M/s Shreeji Udaigarh Balwadi
Highway Pvt. Ltd.
23.01.20
Pkg-5M/s Badwani-Badhan Highways
Pvt. Ltd
Pkg-18 Under Review -
Pkg-25Feasibility under preparation by
M/s AICONS
- Pkg-35 (blank)
Pkg-52M/s Brijgopal construction
company Pvt. Ltd.10.07.20
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt. Contribution.
ADB-VI Projects (In Progress) Page-16
SN PKG Project Name ConcessionaireAgree't
Date
Anticipated
Completion
Date
Length Cost
PA Up to
March-
2021
FA Up to
March-
2021
Physical
Target
2021-22
Financial
Target
2021-22
Length
during Yr
21-22
Expend.
during Year
21-22
CPP CFP
23 Pkg-10 Pawai-Mohindra-Semaria road Bid Evaluation I/P - - 37.5 99.5 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
24 Aaron Via Vidoriya-Raghogarh M/s Madhav Infra Projects Ltd 01.07.20 - 32.7 72.1 0.0 15.4 1.0 0.0 0.0 20.1 0.0 35.5
25 Ashoknagar-Aaron Road (Upto Sindh River) - 30.0 74.8 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.026 Mohna-Patai Road - 17.4 46.9 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
27 Chitauli-Ranighati Road Financial Bids under Evalution - 11.4 35.3 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
28 Bhitarwar-Karera Road (blank) - 10.8 28.2 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
29 Pkg-16 Aavan Road Maksudangadh to JanjaliM/s VVC MKS PROJECTS
PRIVATE LTD.01.06.20 - 37.5 94.7 0.0 4.9 1.0 0.0 0.0 25.2 0.0 30.1
30 Porsa-Mehgaon-Mau-Sevda Road - 76.9 207.8 0.0 34.0 1.0 0.0 0.0 73.3 0.0 107.231 Jamna-Bilav Road - 18.0 45.5 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
32Pahadgad-Sahasram Via Maran -Kanhar (Upto
Khurjan Road) - 24.9 62.4 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
33 Noorabad-Padhavali Road to Sanichra Road - 17.7 50.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.034 Nepri to Brijgadi via Kishangad-Kukroli Road - 15.2 46.3 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
35 Pkg-27BKailaras to Jaura via Pahadgad-Manpur-Nirar-
Pagara Road - 62.9 162.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
36 Vijaypur-Mohna Road to Sahasram Road - 23.5 95.1 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.037 Baroda to Maswani Road - 19.5 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.038 Pkg-34 Premsar-Hirnikheda-Mundla road - 30.8 92.4 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.039 Sahajpur-Tendukheda road - 14.7 44.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.040 Orchha - Mandore - 19.0 57.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.041 Pkg-56 Chinor-Karhaiya-Bhitarwar road Under Review - 30.1 69.7 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
42 Pkg-9Langhatola-Patna-Karpa-Sarai-Ahirgaon-Kelamania
roadFinancial Bids under Evalution - 52.6 170.9 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
43 Pkg-13 Beohari-Bansukli-Sidhi RoadM/s Beohari-Bansukli Pathways
Private Ltd.04.06.20 - 46.4 106.6 0.0 0.0 1.0 0.0 0.0 28.9 0.0 28.9
44 Pkg-17ANeemdana-Hirdagarh-Navegaon-Nidrai-Bordehi
Road
M/s Arcons Infrastructure &
contructions Pvt Ltd23.06.20 - 41.4 145.7 0.0 0.0 1.0 0.0 0.0 16.9 0.0 16.9
45 Pkg-17B Tamiya-Junnardeo Road Feasibility study in progress - - 27.0 120.8 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
46 Pkg-23 Baihar-Lamta RoadM/s Udit Baihar Lamta Private
Ltd.04.06.20 - 52.2 54.7 0.0 0.0 1.0 0.0 0.0 14.8 0.0 14.8
47 Pkg-45Anjaniya-Ramnagar-Raigaon-Chubhaval-Chakdehi
Khinha road - 73.8 221.4 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
48 Pkg-46 Harrai-Batkakhapa-Bijori road - 73.0 219.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.049 Pkg-47 Bandol Jod-Kunda-Thavri-Chourai road - 50.4 151.2 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.050 Pkg-53 Padmi-Ramnagar-Ghunghri-Salwah road - 51.1 153.3 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
1522.7 4296.6 0.0 177.3 50.0 505.2 0.0 415.7 0.0 593.0
Pkg-14
(blank)
- Pkg-15
Feasibility study in progress -
Grand Total
Pkg-26M/s RCL Porsa Highways Pvt
Ltd.13.01.20
Pkg-27A
Financial Bids under Evalution
- Pkg-28
Feasibility study in progressPkg-38
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt. Contribution.
Physical, Financial Targets and Achievements for 2019-20 of 24 Border Check Post Barrier's Page-17
S.
No. Name of Road
Physical
Progress Districts
Project
Cost
Concession
Period
Concessi
onaire Agr Dt. App Dt. Com Dt.
PA
March
2021
FA
March
2021
Financial
Target
Physical
Target
Expen.
during Yr
2021-22 CFP
1 Agra- Mumbai Road(NH-3)136.47
137.22 Completed Badwani
2 Morena-Dholpur Road (NH-3) 63.65 64.4 Court Case Morena
3 Mhow-Neemuch Road (SH-31) 250.55 251.8 Completed Neemuch
4 Indore- Ichhapur Road (SH-27) 199.60 200.35 Completed Burhanpur
1 Indore-Ahemdabad Road (NH-59) 170.10 170.25 Completed Jhabua
2 Rewa-Mirzapur Road (NH-7) 141.95 142.6 Completed Rewa
3 Rewa- Allahabad Road (NH-27) 46.93 47.58 In Progress Rewa
4 Ujjain-Jhalawad-Jaipur Road ( SH-27) 188.08 188.73 Completed Shajapur
5 Seoni-Nagpur Road (NH-7) 646.50 647.15 Completed Seoni
6 Betul-Nagpur Road (NH-69) 172.60 173.25 Completed Betul
1 Shivpuri-Jhansi Road (NH-25) 75.95 76.5 Court CaseDatiya &
Shivpuri
2 Bhind-Ettawah Road (NH-92)104.70
105.25 Court Case Bhind
3 Naugaon-Jhansi Road (NH-75) 95.4 95.95 Completed Chattarpur
4 Chhindwara-Nagpur Road (NH-12) 72.93 73.48 Completed Chhindwara
5 Jabalpur-Jaipur Road (NH-12) 486.85 487.4 Completed Rajragh
6 Sendhwa-Khetia Road (MDR) 46.03 46.58 Completed Badwani
7 Shivpuri-Kota Road (NH-76) 563.05 563.6 Completed Shivpuri
8 Warud-Multai Road 18.95 19.5 Completed Betul
9 Sagar-Kanpur Road (NH-86) 186.4 186.95 Completed Chatarpur
10 Jabalpur-Mandla Road (NH-12A) 172.375 172.925 In Progress Mandla
11 Sagar-Lalitpur Road (NH-26) 133.5 134.05 Completed Sagar
1 Balaghat-Gondia (SH-11) 262.1 262.55 Completed Balaghat
2 Venket Nagar Road 23.5 23.95 Completed Anuppur
3 Kabir Chabutara Road 205 205.45 Completed Dindori
Total 4221.995 4477.465 1094 85% 930.93 0 0.00% 0 930.9
1 Indore Completed
2 Gwalior Completed
LocationLARGE- CHECK POST
1094.00
Cr.
Concession
Period 12.5
Year
M/s MP
Border
Check
post
Develop
ment
Company
Ltd.
CCF Building
05.05.11
2CCF &
19 check
post
complete
d
85% 930.93 0.0 0%10.11.10 0 930.9
MEDIUM- CHECK POST
SMALL- CHECK POST
SINGLE-CHECK POST
Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt. Contribution.
OMT Projects (In Progress) Page-18
SN Name SHConcession
Period
Date of
Agreement
Insurance
Validity Upto
Accounts &
Audit report
dated
Length Cost to be borne by
conssionaire (in Cr.)
Monthly Premium
(in Rs.) Premium Due
1 Agar sarangpur 25 10 Yrs 20-09-16 - - 51.00 1.40 30855.00 0.00
2 Deshgaon - Khargone (SH-26) NH-347B 10 Yrs 6/21/2016 - - 63.60 1.40 57788.00 89839.00
3Badi - Baktara - Dobi - Shahganj - Budhni Road (SH -
15) 29C 10 Yrs 27-06-16 - - 58.80 1.40 19965.00 12870.00
4 Bargawan - Waidhan Road (MDR) MDR 12-T 01 10 Yrs 21-06-16 - - 27.28 1.40 33275.00 0.00
5 Bela - Govindgarh - Churhat 15 9 Yrs 27-10-14 - 6/14/2019 56.74 12.20 215223.00 0.00
6 Betul - Paratwada (SH-43) NH-548C 10 Yrs 21-06-16 - - 68.70 2.30 72096.00 0.00
7 Datia - Dinara Road (SH-19) 1 10 Yrs 21-06-16 43921 - 27.00 1.40 33275.00 0.00
8 Ghansore - Mandla 33 7 Yrs 2/4/2015 5/1/2020 9/24/2019 50.80 4.47 658845.00 0.00
9 Khalghat - Manawar Road (SH-38) 36 10 Yrs 27-06-16 5/1/2020 9/24/2019 42.70 1.96 69878.00 0.00
10 Khargon - Barwani road (SH-26) 37-A, NH-347B 10 Yrs 22-06-16 - - 84.60 2.30 61004.00 84848.00
11 Satna - Maihar - Umariya 6 5 Yrs 8/11/2017 - - 133.21 2.00 8708333.00 40665320.00
12 Udayapura - Silwani (SH-44) 20 10 Yrs 22-06-16 - - 28.60 1.40 39930.00 0.00
13 Udaypura - Gardarwara (SH-44) 20 10 Yrs 23-06-17 - - 32.70 1.40 16638.00 0.00
Grand Total 725.73 35.03 10017105.00 40852877.00
Length in KM
Cost in Cr., GC: Govt. Contribution