Madhya Pradesh Road Development Corporation - mprdc

18
December-2021, Page-1 Total road length constructed to date : 19143 Km Total road constructed this Month : 29 Km Monthly Status Report Ver 1.1 December-2021 Madhya Pradesh Road Development Corporation (Govt. of M.P. Undertaking) 45-A, Arera Hills, Bhopal-462011, Madhya Pradesh, India Phone: 0755-2797205, 2597254, 2597201 (PBX), Fax: 0755-2572643 Website: www.mprdc.gov.in Email: [email protected] 0 500 1000 1500 2000 Last 11 Yrs. Completed Road Length (in km) MDR NH SH MDR NH SH Physical Target 2021-22 505.195 88.7 17.46 Achievement 334.68 21.07 13.34 334.68 21.07 13.34 0 100 200 300 400 500 600 MIS, MPRDC 1/17/2022 11:19 AM

Transcript of Madhya Pradesh Road Development Corporation - mprdc

December-2021, Page-1

Total road length constructed to date : 19143 Km

Total road constructed this Month : 29 Km

Monthly Status Report Ver 1.1 December-2021

Madhya Pradesh Road Development Corporation(Govt. of M.P. Undertaking)

45-A, Arera Hills, Bhopal-462011, Madhya Pradesh, India

Phone: 0755-2797205, 2597254, 2597201 (PBX), Fax: 0755-2572643

Website: www.mprdc.gov.in Email: [email protected]

0

500

1000

1500

2000

Last 11 Yrs. Completed Road Length (in km)

MDR NH SH

MDR NH SH

Physical Target 2021-22 505.195 88.7 17.46

Achievement 334.68 21.07 13.34

334.68

21.07 13.34

0

100

200

300

400

500

600

MIS, MPRDC 1/17/2022 11:19 AM

Summary - In Progress Projects (Catagory-wise) December-2021, Page-2

Category Model Sub ModelProject

CountLength Cost

Physical

Target 2021-

22

Financial

Target 2021-

22

PA Up to

March-2021

FA Up to

March-2021

Q1_PA

2021-22

Q1_FA 2021-

22

Length covered

during Year 21-22

Expenditure

during Year 21-22 CPP CFP

RC RC 8 67 146 11.3 98.71 54.58 50.15 6.35 3.46 9.42 15.24 64 65.39

SHF SHF 5 8 43 6.16 28.61 2.2 14.22 1.3 1.82 3.92 21.398 6.12 35.618

EPC 2 137 902 23.88 151.75 112.77 432.89 4.54 23.04 10.25 48.72 123.02 481.61

NHDP III 5 333 3802 64.82 165.17 215.24 1790.003 2.45 34.037 10.82 69.707 226.06 1859.71

EPC 6 135 218 17 28 116.72 138.76 0 3.91 0 5.58 116.72 144.34

NDB NDB (61) 69 1551 3382 263.34 650 1287.58 2666.34 67.01 124.61 197.85 526.16 1485.43 3192.5

ADB-V (57) 65 1468 3075 63.122 249.238 1284.385 2768.7 46.97 97.66 136.83 437.99 1421.22 3206.69

ADB-VI 50 1523 4297 161.733 505.22 0 177.32 0 116.35 0 415.7 0 593.02

210 5222 15866 611.355 1876.698 3073.475 8038.383 128.62 404.887 369.09 1540.495 3442.57 9578.88Grand Total

SH

NHEPC

MDR

ADB

CATEGORY No. Of Projects Length Cost

OMT 13 726 35

Total FA 2020-21

Border Check Post 1 1094 85% 931 5.00 0.00

Category No. Of Projects Cost PA March-2020 FA March-2020 Fin Target 2020-21

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.

Contribution.

Summary - In Progress Projects (Model-wise) December-2021, Page-3

Model Category Sub ModelProject

CountLength Cost

PA Up to

March-2021

FA Up to

March-2021

Physical

Target 2021-

22

Financial

Target 2021-

22

Q1_PA 2021-22 Q1_FA 2021-

22

Length covered

during Year 21-22

Expenditure

during Year 21-22 CPP CFP

EPC 2 137 902 112.77 432.89 23.88 151.75 4.54 23.04 10.25 48.72 123.02 481.61

NHDP III 5 333 3802 215.24 1790.003 64.82 165.17 2.45 34.037 10.82 69.707 226.06 1859.71

EPC 6 135 218 116.72 138.76 17 28 0 3.91 0 5.58 116.72 144.34

NDB NDB 69 1551 3382 1287.58 2666.34 263.34 650 67.01 124.61 197.85 526.16 1485.43 3192.5

ADB-V 65 1468 3075 1284.385 2768.7 63.122 249.238 46.97 97.66 136.83 437.99 1421.215 3206.69

ADB-VI 50 1523 4297 0 177.32 161.733 505.22 0 116.35 0 415.7 0 593.02

RC RC 8 67 146 54.58 50.15 11.3 98.71 6.35 3.46 9.42 15.24 64 65.39

SHF SHF 5 8 43 2.2 14.22 6.16 28.61 1.3 1.82 3.92 21.398 6.12 35.618

210 5222 15866 3073.475 8038.383 611.355 1876.698 128.62 404.887 369.09 1540.495 3442.565 9578.878Grand Total

EPCNH

MDR

ADB

SH

CATEGORY No. Of Projects Length Cost

OMT 13 726 35

Total FA 2020-21

Border Check Post 1 1094 85% 931 5.00 0.00

Category No. Of Projects Cost PA March-2020 FA March-2020 Fin Target 2020-21

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.

Contribution.

Regular Contract Projects (In Progress) Page-4

SN Project Name SH Lane Concessionaire Agree't Date Anticipated Completion Date Length Cost

PA Up to

March-

2021

FA Up to

March-

2021

Physical

Target

2021-22

Financial

Target

2021-22

Length

during Year

21-22

Expen.

during Year

21-22

CPP CFP

1Dabra Bhitarwara-Harshi Road

Construction of Harshi Bypass

M/s Chambal Developers,

Gwalior10/14/2016

13-06-17 &

31-03-20213.05 9.72 0.00 2.18 3.05 7.54 1.70 1.81 1.70 3.99

2 Raisen Rahatgarh road Construction

of major bridge at Koula-Nala.

M/s Mukesh K. Verma Sehore 7/6/201605-07-17 &

31-05-190.00 4.61 0.00 0.74 0.00 4.12 0.00 0.00 0.00 0.74

3Uchehra Nagod section & Uchehra

Bypass road (4.7 Km) on Uchehra

road Reconstruction & upgradation

56 IL M/s SR. Construction Delhi 10/17/201616-10-17 &

31-03-1933.16 46.81 36.18 30.31 0.00 13.26 0.52 1.16 36.70 31.47

4Up Gradation of Chapada-

Hatpipaliya-Newari Road SH-64 (in

Principal NH) length 21.00 Km.

64M/s Rajlaxmi Devbuildcon

Bhopal7/1/2020 3/31/2021 21.00 19.72 14.15 8.32 2.75 11.40 4.05 8.17 18.20 16.49

5Widening of Chhindwara-Tamia-

Matkuli road (SH-19) in Chhindwara

city portion from km. 1 to 9/2.

19M/s Naveen Construction

Chhindwara6/19/2020 6/18/2021 8.10 26.90 4.10 8.54 4.00 16.67 2.35 1.86 6.45 10.40

6

Balance work of Construction of RCC

drain in Bhoma Village on Seoni-

Chiraidongari Road

M/s Dada guru Construction

Chhindwara7/1/2019 3/31/2021 0.00 0.25 0.00 0.06 0.00 0.32 0.00 0.00 0.00 0.06

7Balance work of Construction of

Motinagar Tili Pathariya Road

M/s Shukla Construction Kasara

Distt- Satna12/21/2020 9/20/2021 1.50 38.21 0.00 0.00 1.50 36.21 0.80 1.03 0.80 1.03

8

Balance work of Construction of

service road from Mahamrityunjay

to Triveni Dwar

M/s Astha Construction Ujjain 9/5/2020 12/4/2020 0.15 0.15 0.15 0.00 0.00 9.19 0.00 1.21 0.15 1.21

66.96 146.37 54.58 50.15 11.30 98.71 9.42 15.24 64.00 65.39Grand Total

NA NA

4L

- -

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress,

GC: Govt. Contribution.

State Highway Fund Projects (In Progress) Page-5

SN Project Name Lane Concessionaire Agree't DateAnticipated

Completion DateLength Cost

PA Up to

March-2021

FA Up to

March-2021

Physical

Target 2021-

22

Financial

Target

2021-22

Length

during Yr 21-

22

Expend.

during Yr

21-22

CPP CFP

1

Raisen-Rahatgarh Road Construction

of Four Lane Road in km 123 to 125 in

Begamganj Town.

8/22/2017 12/31/2021 3.47 18.37 2.20 9.54 1.27 9.28 0.65 1.51 2.85 11.05

2

Silwani-Gairatganj Road Construction

of Four lane road in km 30 and 31 SH-

44

9/11/2018 3/31/2021 2.16 15.79 0.00 4.65 2.16 10.95 0.67 1.51 0.67 6.16

3

Widening of Two lane to four lane of

Chhindwara Matkuli Road (SH-62) in

Km 30/6 to 31/6 Newton Chikhli Town

Portion.

M/s Balaji

Construction

company

Ghodadongri, Betul

8/27/2020 5/26/2021 1.10 4.37 0.00 0.00 1.10 4.37 1.10 1.63 1.10 1.63

4

Construction of shoulder & drain on

Jabalpur-Narsinghpur-Pipariya road at

Sahpura town in km. 31+200 to

31+680

-

Shri Paramhans

Construction,

Jabalpur

10/8/2020 4/7/2021 0.48 0.66 0.00 0.00 0.48 0.55 0.00 16.75 0.00 16.75

5 Balance work of Construction of

Chanderi Town Portion

4L

M/s Faix

Mohammad

Contractor

11/3/2020LOA issued on 22-02-

20211.15 3.46 0.00 0.03 1.15 3.46 1.50 0.00 1.50 0.03

8.36 42.65 2.20 14.22 6.16 28.61 3.92 21.40 6.12 35.62

4L

M/s Kapcon Projects

Ltd. Chandigarh

Grand Total

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial

Progress, GC: Govt. Contribution.

National Highway Projects NHDP-III (In Progress) Page-6

SN Project Name SH Lane ConcessionaireConsultant

(I.E)Agree't Date Appoi't Date Anticipated Completion Date Length Cost

PA Up to

March-2021

FA Up to

March-2021

Physical

Target

2021-22

Financial

Target

2021-22

Length

during Yr

21-22

Expend.

during Yr

21-22

CPP CFP

1Jabalpur to Hiran river (Km

10.400 to Km 66.00)(NH-12)

Four lane with PS - EPC

M/s Wagad Infra Projects Ltd.

& M/s Sorathia Velji Ratna

Co. (JV)

M/s ICT Ltd.

New Delhi12/19/2017 1/23/2018 14-09-2020 & 31-03-2021 55.60 628.45 55.00 364.37 0.60 27.13 0.60 14.41 55.60 378.78

2

Sindoor river to start of

Bareli bypass(Km130.00 to

193.450)(NH-12) Four lane

with PS - EPC

M/s GVR Infra Projects Pvt.

Ltd. (Sub - Contractor M/s

Bansal Construction works

pvt. Ltd.)

3/24/2016 7/5/2016 18-09-20 & 30-08-2021 63.00 809.16 55.72 381.05 7.28 96.54 6.28 46.72 62.00 427.77

3Bareli Bypass to Goharganj

(Km193.450 to 255.300)(NH-

12) Four lane with PS - EPC

M/s Ramkey Infrastructure

Ltd.-M/s Brijgopal

Construction Co. Ltd. (JV)

4/20/2016 6/10/2017 15-07-2020 & 19-08-2021 59.75 877.79 57.65 529.26 2.10 26.94 2.10 0.00 59.75 529.26

4

Goharganj to Bhopal

including link road from

Obedullaganj to NH-69

(Km255.300 to 301.800)(NH-

12) Four lane with PS - EPC

12 &

69

M/s Centrodorstory India Pvt.

Ltd. New Delhi.12/7/2017 2/7/2018 03-08-2020 & 31-03-2021 48.71 957.54 46.87 515.32 1.84 14.56 1.84 8.58 48.71 523.90

5Balance work of Sidhi to

Singrauli (NH-75E) 4L road

project on EPC Mode

75E

M/s Tirupati Buildcon Pvt.

Ltd. LOA to be issued by the

MoRTH.

- - 12:00:00 AM 12/31/2022 105.60 529.44 0.00 0.00 53.00 0.00 0.00 0.00 0.00 0.00

332.66 3,802.38 215.24 1,790.00 64.82 165.17 10.82 69.71 226.06 1,859.71

12

4L+PSM/s Theme

Engineering

Ltd. Jaipur

Grand Total

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt. Contribution.

National Highway Projects on EPC (In Progress) Page-7

SN Project Name SH Lane ConcessionaireConsultant

(I.E)

Agree't

Date

Appoi't

Date

Anticipated

Completion DateLength Cost

PA Up to

March-

2021

FA Up to

March-

2021

Physical

Target

2021-22

Financial

Target

2021-22

Length

during Yr 21-

22

Expend.

during Yr

21-22

CPP CFP

1

Barella - Mandla

Section KM 22/8

to KM 89/6 of NH

12A

12A

M/s Gammon

Dunkerley 8/10/2015 12/17/2015

09-06-2017 &

30-07-2020 & 30-06-

2021

63.55 390.51 56.72 195.99 6.83 55.65 6.43 30.98 63.15 226.97

2Umariya- Shahdol

section Km 68/4

to 142/2 (Pkg II)

78

M/s GVR infra

projects Ltd.

Chennai

4/9/2015 8/1/2015 6/30/2021 73.10 511.83 56.05 236.90 17.05 96.10 3.82 17.74 59.87 254.64

136.65 902.34 112.77 432.89 23.88 151.75 10.25 48.72 123.02 481.61

2L + PS -

Grand Total

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial

Progress, GC: Govt. Contribution.

MDR Projects on EPC (In Progress) Page-8

SN Project Name Lane ConcessionaireAuthority

EngineerAgree't Date Appoi't Date

Anticipated

Completion DateLength

Contract

Price (in

Cr.)

PA Up to

March-2021

FA Up to

March-2021

Physical

Target 2021-

22

Financial

Target 2021-

22

Length

during Yr 21-

22

Expend.

during Yr

21-22

CPP CFP

1 Ambha Pinhat 14-10-15 7/31/2018 23.12 54.11 23.06 45.47 1.00 9.00 0.00 0.49 23.06 45.96

2Jawasa-

Sunarpura Road10/14/2015 1/28/2018 22.63 48.81 22.63 27.91 1.00 19.00 0.00 3.24 22.63 31.15

3Nadigaon -

Seondha10/28/2015 11/4/2015 5/13/2018 22.14 72.11 22.14 65.38 1.00 0.00 0.00 1.85 22.14 67.23

4

Pawai -

Prithvipura

Road

9/24/2015 10/14/2015 1/28/2018 22.34 0.00 6.98 0.00 1.00 0.00 0.00 0.00 6.98 0.00

5Satanbada-

Narwar10/28/2015 11/4/2015 5/13/2018 25.54 43.22 23.69 0.00 1.00 0.00 0.00 0.00 23.69 0.00

6

Tekna-Manpur-

Rameshwar

Road

9/24/2015 10/14/2015 7/31/2018 19.41 0.00 18.22 0.00 1.00 0.00 0.00 0.00 18.22 0.00

135.18 218.25 116.72 138.76 6.00 28.00 0.00 5.58 116.72 144.34Grand Total

IL

M/S CMM infra

project ltd.-

M/S Keti

construction

ltd. Indore (J.V.)

M/s LN Malviya,

Infra Project

Private Limited.

9/24/2015

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial

Progress, GC: Govt. Contribution.

NDB Projects (In Progress) Page-9

SN PKG Project Name Concessionaire Agree't DateAnticipated Completion

DateLength Cost

PA Up to March-

2021

FA Up to March-

2021

Physical Target 2021-

22

Financial Target 2021-

22

Length during Yr 21-

22

Expend. during Yr 21-

22 CPP CFP

1 Badagaon-Baldeogarh Road 6/13/2019 31.0 0.0 119.3 241.7 0.0 0.0 0.0 9.7 119.3 251.3

2 Majna -Palera Road 6/13/2019 55.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

3 Badagaon-Kakarwaha Road 6/13/2019 13.7 241.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

4 Digoda Mohangarh Road 6/13/2019 19.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

5 Lodi -Mahoba Road 3/14/2019 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

6 Baxwaha -Dalpatpur Road 3/14/2019 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

7 Ganj -Rajnagar Road 3/14/2019 0.0 175.5 4.5 30.8 0.0 0.0 0.0 0.1 4.5 30.9

8 Nawgong-ShrinagarRoad 3/14/2019 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

9 Tetra Vijaypur Iklodh road 7/31/2021 6.0 105.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

10 Goras aawada ajapura road 7/31/2021 34.2 0.0 44.0 110.9 0.5 15.0 0.5 4.2 44.5 115.1

11Iklod Tiraha to Gandhi Chouk-City Portion

Vijayour7/31/2021 4.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

12 Karera Bhitarvaar Road 12/1/2022 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

13 Singhnivaas Khurai Raod 12/1/2022 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

14 Padora Gora Pichhore Road 12/1/2022 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

15 Pichhore Basayi Road 12/1/2022 0.0 0.0 0.0 18.6 0.0 0.0 0.0 0.3 0.0 18.9

16 Singhpur - Gijorra Road 4/30/2021 6.3 0.0 22.5 29.8 0.3 8.9 0.0 2.0 22.5 31.8

17 Rangava – Deogarh Road 4/30/2021 16.5 38.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

18 Aron - Ashoknagar Road 9/25/2019 11.7 90.3 47.9 84.4 0.0 0.0 0.0 2.1 47.9 86.5

19 Bharoli - Ajleshwar Road 9/25/2019 19.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

20 Hapakhedi – Panwadi hat Road 9/25/2019 16.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

21 Anooppur Chechai Amlai Road 4/30/2021 22.0 152.5 76.6 132.6 0.0 19.9 0.0 10.4 76.6 143.0

22 Anooppur darri kherwa road 4/30/2021 10.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

23 Nonghati damedi devri leelatola road 4/30/2021 44.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

24 Panagar Belkhadu Road 6/14/2019 14.1 68.0 31.6 65.3 0.0 0.0 0.0 0.0 31.6 65.3

25 Sihora Majauli Katav Road 6/14/2019 17.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

26 Dhooma Gotegaon Road 12/27/2018 28.4 0.0 47.6 103.1 0.0 0.0 0.0 4.1 47.6 107.2

27Ganeshganj Sunwara Kewlari Pindrai

Road 12/27/2018 9.7 103.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

28 Kewlari Bheemgarh Chhapara Road 12/27/2018 9.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

29 Damoh-Jamuniya-Balakot Road 8/30/2021 17.4 125.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

30 Abhana-Tendukheda 8/30/2021 35.2 0.0 41.3 100.5 11.2 25.2 11.2 40.4 52.6 140.9

31 Pali-Peerghat-Khimlasa -Kanjiya Road 7/31/2020 36.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

32 Bhapel -Jaisinagar Road 7/31/2020 24.8 193.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

33 Devri-Sehejpur Road 7/31/2020 21.3 0.0 82.9 182.6 0.0 11.0 0.0 13.8 82.9 196.3

P-01M/s Gawar Construction Ltd.

Gurgone25-04-17

P-02

M/s IL & FS Transportation

Networks Ltd. & M/s Il & FS

Engineering and construction

comp. Ltd. (JV) Mumbai

16-06-17

P-03M/s Tomar Builders &

Contractors Pvt. Ltd., Gwalior.26-09-18

P-04M/s Ganon Dunkerley & Co.

Ltd. Mumbai19-04-17

P-05M/s B. Patel Infrastructure Pvt.

Ltd. JV27-09-18

P-06

M/s Gawar Construction Ltd.

Gurgone

27-02-18

P-07 09-10-17

P-08M/s Gaur Road Tar Coat

Jabalpur02-02-18

P-09M/s Ganon Dunkerley & Co.

Ltd. Mumbai24-06-17

P-10M/s Prakash Asphalting & Toll

Highways (India) Ltd.29-06-18

P-11M/s KCC Buildcon Pvt. Ltd.

Gurgaon24-05-17

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.

Contribution.

NDB Projects (In Progress) Page-10

SN PKG Project Name Concessionaire Agree't DateAnticipated Completion

DateLength Cost

PA Up to March-

2021

FA Up to March-

2021

Physical Target 2021-

22

Financial Target 2021-

22

Length during Yr 21-

22

Expend. during Yr 21-

22 CPP CFP

34 Shahgarh Baraytha Road 1/2/2020 25.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

35 Banda Shahpur Parsoriya Road 1/2/2020 32.4 120.7 57.4 120.6 0.0 0.0 0.0 0.4 57.4 121.0

36 Bhainsdehi nanda bhimpur road 12/31/2020 46.8 0.0 78.8 155.0 0.1 31.6 0.1 24.9 78.9 179.9

37 Bhoura Phophalya road 12/31/2020 32.1 186.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

38 P-14 Basoda Sironj Road

M/s Bansal construction Works

Pvt. Ltd. & Prakash Asphalting

& Toll Highways (India) Ltd (JV)

Bhopal.

19-05-17 9/23/2018 42.0 79.4 42.0 81.9 0.0 0.0 0.0 8.2 42.0 90.0

39 Chhindgaon temagaon Road 5/17/2019 11.6 63.4 28.7 61.9 0.0 0.0 0.0 1.3 28.7 63.3

40 Sinrali charua road 5/17/2019 17.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

41 Berasia Narsinghgarh Road 1/15/2019 10.2 0.0 56.5 117.8 0.0 0.0 0.0 4.8 56.5 122.6

42 Narsingarh Berasia Road 1/15/2019 7.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

43 Doraha - Ahmadpur 1/15/2019 16.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

44 Bhojapura Ahmedpura Road Part - I 1/15/2019 11.1 120.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

45 Bhojapura Ahmedpura Road Part - II 1/15/2019 11.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

46 Rangwasa - Agra - Girota Road 8/30/2021 52.4 188.2 93.4 150.4 11.0 37.9 11.0 50.6 104.4 201.0

47 Depalpur - Kaisur Road 8/30/2021 17.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

48 Sanwer - Ajnor - Depalpur Road 8/30/2021 34.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

49 P-18 Khandwa to Dedatalayi Road

M/s Madhav Infra Projects

Limited, M/s M.S. Khurana

Engineering Ltd. (JV), Vadodara

4/24/2017 9/21/2018 41.5 86.3 41.5 88.1 0.0 0.0 0.0 3.6 41.5 91.7

50 Maalpoor Varchar Mandur Road 5/30/2021 12.5 70.0 41.9 69.4 1.2 5.0 0.8 16.8 42.7 86.2

51 Sonda Sakdi Umraeth Bakhatgarh Road 5/30/2021 30.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

52Balsamundh Ochar nangalwadi Bistaan

Road12/31/2019 13.2 0.0 16.9 70.5 27.8 89.3 8.8 44.8 25.7 115.2

53 Pati Bokarta Khetiya Road 12/31/2019 31.5 128.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

54 Katargaon-Karhi-Pandlya 2/20/2019 30.3 0.0 76.4 148.3 13.9 34.3 13.0 17.7 89.3 166.0

55Sanawad-Dhalgaon- Hirapur-

Bheekangaon Road 2/22/2019 41.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

56Bheekangaon-Kendwa-Shankargaon-

Khudgaon-Angad Road 2/22/2019 18.8 182.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

57 Avalda Bag Jobat Borjhar Road 4/10/2019 38.5 0.0 61.8 152.3 0.0 0.0 0.0 6.1 61.8 158.3

P-12

M/s Diamond Construction

Company – M/s Gawar

Construction Limited

20-09-18

P-13M/s KCC Buildcon Pvt. Ltd.

Gurgaon28-06-17

P-15M/s Gawar Construction Ltd.

Gurgone22-01-18

P-16M/s Madhav Infra Projects

Limited, M/s Eagle Infra JV24-06-17

P-17M/s Ganon Dunkerley & Co.

Ltd. Mumbai26-09-17

P-19M/s Madhav Infra Projects

Limited, Vadodara22-09-18

P-20M/s Sorathia Velji Ratna & Co.

& Ketan Construction26-09-18

P-21M/s GHV (India) Pvt Ltd

Mumbai 12-05-17

P-22 M/s Shriji-Ketan JV 30-06-17

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.

Contribution.

NDB Projects (In Progress) Page-11

SN PKG Project Name Concessionaire Agree't DateAnticipated Completion

DateLength Cost

PA Up to March-

2021

FA Up to March-

2021

Physical Target 2021-

22

Financial Target 2021-

22

Length during Yr 21-

22

Expend. during Yr 21-

22 CPP CFP

58 Dhrampur Tarapur Mandav Road 4/10/2019 23.4 151.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

59 Shahpur Nachankheda Road 5/30/2021 10.8 0.0 46.3 109.0 3.1 5.0 3.1 4.4 49.4 113.4

60Burhanpur Bori Borsal Ratangarh

saikheda Nepanagar Road 5/30/2021 38.6 101.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

61 Goi kavri Dhulkot Road 5/30/2021 76.4 0.0 84.3 157.0 10.3 41.4 10.3 30.5 94.6 187.4

62 Rajpur Vipri Khajuri Badsalay road 5/30/2021 18.2 198.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lodi -Mahoba Road 5/28/2022 15.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Baxwaha -Dalpatpur Road 5/28/2022 23.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ganj -Rajnagar Road 5/28/2022 17.5 170.6 43.6 84.1 42.1 86.5 42.1 96.1 85.7 180.2

Nawgong-ShrinagarRoad 5/28/2022 33.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

P-04APichhore Basayi Road- 7.98 Km, Padora

Gora Pichhore Road - 65.61 Km.M/s DCC, Haryana 21.01.2021 16.02.2021 73.6 125.2 0.0 0.0 39.5 125.2 47.4 66.5 47.4 66.5

P-04B Singhnivaas Khurai Raod M/s Tomar Builders, Gwalior. 12.03.2021 22.03.2021 36.8 48.1 0.0 0.0 36.8 48.1 24.7 26.7 24.7 26.7

P-04C Karera Bhitarvaar Road M/s Gawar Const Ltd. Gurgaon 21.01.2021 16.02.2021 31.5 65.7 0.0 0.0 65.6 65.7 25.0 35.7 25.0 35.7

1550.9 3382.2 1287.6 2666.3 263.3 650.0 197.9 526.2 1485.4 3192.5

P-22 M/s Shriji-Ketan JV 30-06-17

P-23 M/s Kiledar-Barbric JV 22-07-17

Grand Total

P-24M/s GHV (India) Pvt Ltd

Mumbai 23-06-17

P-02AM/s Madhav Infra Projects,

Vadodara6/1/2020

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.

Contribution.

ADB-V Projects (In Progress) Page-12

SN PKG Project Name Concessionaire Agree't DateAnticipated

Completion DateLength Cost

PA Up to

March-

2021

FA Up to

March-

2021

Physical

Target

2021-22

Financial

Target

2021-22

Length

during Yr

21-22

Expend

during Yr

21-22

CPP CFP

1 P-01

Khatakia to Suthaliya via NH-3, Kumbhraj,

Barod, Mragwas, Batawda, Chanchoda,

Binaganj, Teligaon M/s Bansal-Path(JV) 5/19/2017 9/15/2018 70.8 145.4 68.1 165.3 1.8 0.0 2.7 15.4 70.8 180.7

2 Sirsod-Pichhore road 8/23/2018 31.2 123.7 57.6 146.2 0.2 0.0 0.0 5.7 57.6 151.93 Narwar-Chitori to Amola road 8/23/2018 26.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.04 Mungawali-Malahargarh road 11/3/2019 16.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.05 Piprod-Thubon road 11/3/2019 7.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.06 Belai-Kareela Mata Mandir road - 11/3/2019 17.7 113.1 62.1 124.7 0.0 0.0 0.2 2.8 62.3 127.57 Bhounrasa-Malhargarh road 4/7/2018 11/3/2019 20.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

8 P-04 Sanwer, Chandravatiganj, Gautampura

road

M/s Dineshchandra R. Agrawal

Infracon Pvt. Ltd. LOA issued on

26.02.2018

4/9/2018 8/14/2019 33.9 96.2 33.9 130.4 0.0 0.0 0.0 5.2 33.9 135.5

9 P-05Bijwar Kataphod Satwaas Khategaon road

M/s Dineshchandra R. Agarwal

Infracon Pvt. Ltd.2/23/2017 4/18/2018 55.2 103.9 55.2 121.2 0.0 0.0 0.0 5.2 55.2 126.4

10 Gadarwara-Gotetoria road 10/23/2018 13.6 0.0 68.2 120.7 0.7 18.6 1.9 10.3 70.1 131.011 Podar-Salichok-Babai-Sukhakhairi road 10/23/2018 23.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.012 Kareli-Singhpur-Dangidhana road 10/23/2018 32.9 137.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.013 Maharajpur Sahajpur road 12/25/2018 24.4 0.0 84.9 176.0 0.0 0.0 0.0 6.9 84.9 182.9

14Samnapur-Bilehra-Nanhi-Deori-Narayanpur

road 12/25/2018 45.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

15 Kesali Sahapur road 12/25/2018 15.1 145.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.016 Barodiya Dhamoni road 12/25/2018 19.8 146.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.017 Nauniya Madanpura road 12/25/2018 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.018 Khurai Rajwans road 12/25/2018 31.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.019 Garpehera Dhamoni road 12/25/2018 35.3 0.0 89.0 158.6 0.0 0.0 0.0 9.0 89.0 167.620 Rajnagar Bachhon road 4/25/2019 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.021 Khaparia Banspahari road 4/25/2019 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.022 Chhatarpur-Vikrampur-Rajnagar road 4/25/2019 0.0 213.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.023 Bamitha to Dumra 4/25/2019 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

24Baraiya Choki Lugasi Garhi Malhara road

4/25/2019 0.0 0.0 21.1 53.9 0.0 0.0 0.0 0.0 21.1 53.9

25 Barghat Kanhiwada road 10/25/2018 0.0 0.0 14.3 44.3 0.0 0.0 0.0 45.3 14.3 89.626 Dharna Aata Dondiwada Dharmakua 10/25/2018 0.0 40.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.027 Waraseoni Katangi road 10/25/2018 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

P-02 M/s KCC Buildcon Pvt. Ltd. Gurgaon 5/3/2017

P-03M/s Gawar construction Ltd. - Atcon

India Ltd. LOA issued on 26.02.2018

4/7/2018

P-06 M/s Gannon & Dunkerly 5/12/2017

P-07

M/s KCC Buildcon Pvt. Ltd. Gurgaon 2/16/2017

P-08

P-10M/s IL&FS Transportation Networks

Limited-M/s IL&FS Engineering and

Construction Company Ltd. (JV)

3/2/2017

P-11

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.

Contribution.

ADB-V Projects (In Progress) Page-13

SN PKG Project Name Concessionaire Agree't DateAnticipated

Completion DateLength Cost

PA Up to

March-

2021

FA Up to

March-

2021

Physical

Target

2021-22

Financial

Target

2021-22

Length

during Yr

21-22

Expend

during Yr

21-22

CPP CFP

28 Rampayali-Garra Chouki road 1/14/2019 27.2 0.0 88.0 211.8 0.0 0.0 0.0 11.5 88.0 223.329 Khairlanji-Agasi road 1/14/2019 29.0 173.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.030 Laalbarra-Samnapur road 1/14/2019 8.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.031 Sitapathar-Mahkepaar-Goreghat road 1/14/2019 23.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.032 Chand-Bichhua-Khamarpani road 11/26/2018 59.3 125.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.033 Chourai-Panjara-Chand road 11/26/2018 17.2 0.0 88.2 219.1 0.0 0.0 0.0 8.5 88.2 227.734 Rayamond Chowk- Sai Kheda (blank) - - 11.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

35Harfari Khaira-Misirgawan via Shivpurva

road 1/14/2019 26.0 97.3 48.7 121.5 0.0 0.0 0.0 4.4 48.7 125.9

36 Chitrangi-Garhwa road 1/14/2019 22.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

37 P-19Sohagpur Manpur road

M/s Shreeji Infrastructure India Pvt.

Ltd.-PRL projects & Infrastructure

Ltd. (SIIPL-PRL) (JV)

2/27/2017 10/14/2018 59.4 85.8 59.4 79.5 0.0 6.4 0.0 3.2 59.4 82.7

38 Anooppur Jaitpur road 3/23/2019 36.7 0.0 100.1 159.5 0.0 11.4 0.0 6.4 100.1 165.939 Gohparu Rasmohni Budhar road 3/23/2019 39.9 170.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.040 Pasgarhi Deori Janakpur road 3/23/2019 23.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.041 Govindgarh Tikar Laxmanpur Road - 17.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.042 Jigna New Ramnagar to Gorsari Road - 24.2 120.4 58.7 116.6 0.0 0.0 0.0 6.4 58.7 123.043 Byohari Manpur Road - 16.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

44 P-23Kotma Jaithari Rajendragram Road

M/S Shreeji Infra Pvt. Ltd. M/s Gour

Road Tar Coat Pvt. (JV)1/4/2018 1/3/2019 52.2 101.9 52.2 125.0 0.0 0.0 0.0 0.2 52.2 125.2

45 Teonthar-Shankargarh - 14.6 26.6 13.9 23.9 14.4 28.1 2.0 5.5 15.9 29.446 Naigarhi-Garh road - 14.1 23.0 14.1 25.7 0.0 0.0 0.0 1.9 14.1 27.5

47 P-15BBaheradabar-Piparahi-Jadkud road

M/s Udit Infraworld Pvt. Ltd. LOA

issued on 26.02.20184/9/2018 8/2/2019 19.7 47.3 19.7 54.0 0.0 0.0 0.0 0.8 19.7 54.8

48 Bhatura Bhadpur Barakhurd road - 20.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

49Kharamseda-Kirhai-Ramgarh-Mukundpur

Road - 34.4 122.0 35.6 80.3 12.5 39.5 18.8 49.4 54.4 129.7

50 P-16B Jharkua-Raigaon-Karsara

M/s ABS Associaes JV Bhati

Associates Pvt. Ltd. LOA issued on

26.02.2018

4/11/2018 8/2/2019 24.0 45.0 24.0 41.1 0.0 3.9 0.0 3.4 24.0 44.6

51 Parsona-Mada road Barbarik Project Ltd. LoA on 12.03.18 8/4/2019 12.6 63.3 32.5 62.0 0.0 0.0 0.1 0.1 32.6 62.1

52 Mada Ramgarh road

Barbarik Project Ltd

A-24 Ashoka Millennium, Ring Road

No.1 Near Rajendra Nagar Raipur

492001(CG)

8/4/2019 19.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

P-12 M/s SVR-Ketan (JV) 4/19/2017

P-14M/s GHV INDIA 5/1/2017

P-17 M/s Path India Ltd., Indore 9/22/2017

P-20 M/s GHV (India) Pvt Ltd 2/22/2017

P-21M/s P.D. Agrawal, Infrastructure Pvt.

Ltd. -

P-15AM/s Ramraja Construction Company,

Niwari6/4/2020

P-16AM/s P.D. Agrawal, Infrastructure Pvt.

Ltd. Indore11/4/2019

P-18A 4/7/2018

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.

Contribution.

ADB-V Projects (In Progress) Page-14

SN PKG Project Name Concessionaire Agree't DateAnticipated

Completion DateLength Cost

PA Up to

March-

2021

FA Up to

March-

2021

Physical

Target

2021-22

Financial

Target

2021-22

Length

during Yr

21-22

Expend

during Yr

21-22

CPP CFP

53 P-18B Jhurai Sarai road

M/s Shreeji Infraspace Pvt.

Ltd.,Ahemdabad

LOA issued on 26.02.2018

4/12/2018 8/2/2019 31.4 50.3 31.4 51.7 0.0 0.0 0.0 2.4 31.4 54.1

54 Deotalab Garh Road - 14.8 97.7 28.7 62.3 9.1 40.3 12.1 26.1 40.8 88.455 Latiyar Hanumana Road - 26.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.056 Chakghat -Sonari Road - 27.8 92.7 30.0 66.1 4.4 31.2 7.3 20.2 37.3 86.357 Sohagi-Teothar-Panwar-Daboura Road - 9.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Barghat Kanhiwada road 10/31/2022 21.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Dharna Aata Dondiwada Dharmakua 10/31/2022 26.2 140.1 4.8 27.1 20.0 40.0 60.1 114.2 64.9 141.4Waraseoni Katangi road 10/31/2022 30.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Rajnagar Bachhon road - 23.9 54.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Khaparia Banspahari road - 24.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Chhatarpur-Vikrampur-Rajnagar road - 10.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Bamitha to Dumra - 28.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Baraiya Choki Lugasi Garhi Malhara road - 15.5 172.1 0.0 0.0 0.0 30.0 31.7 67.7 31.7 67.7

1468.2 3075.4 1284.4 2768.7 63.1 249.2 136.8 438.0 1421.2 3206.7

P-22AM/s Bansal construction Works Pvt.

Ltd. -

P-22B

Grand Total

P-11A Re-tendering in process 2/2/2021

P-10A

M/s PRL Projects & Infrastructure

Ltd. - M/s Udit Infraworld Pvt. Ltd.

(JV), New Delhi

3/3/2021

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt.

Contribution.

ADB-VI Projects (In Progress) Page-15

SN PKG Project Name ConcessionaireAgree't

Date

Anticipated

Completion

Date

Length Cost

PA Up to

March-

2021

FA Up to

March-

2021

Physical

Target

2021-22

Financial

Target

2021-22

Length

during Yr

21-22

Expend.

during Year

21-22

CPP CFP

1 Pkg-1+B4:B48 Bhabra-Kattiwada-Kheda road - 35.9 115.1 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.02 Pkg-1+B4:B49 Bhabra-Udaigarh road - 24.9 66.4 0.0 22.8 1.0 66.4 0.0 0.0 0.0 22.83 Udaigarh-Bori road 23.01.20 - 15.5 46.2 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.04 Tanda-Bori road 23.01.21 - 17.6 62.6 0.0 20.9 1.0 62.6 0.0 44.0 0.0 64.95 Tanda-Balwadi road 23.01.22 - 20.1 61.4 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

6 Pkg-3 Jobat-Nanpur roadM/s NPM Jobat Nanpur

Pathways Pvt. Ltd.21.01.20 - 21.9 63.2 0.0 17.0 1.0 63.2 0.0 26.8 0.0 43.8

7 Pkg-4 Alirajpur-Mathwad road

M/s Alirajput- Mathwad

Highways Pvt. Ltd. - 56.2 182.9 0.0 23.6 1.0 182.9 0.0 74.4 0.0 97.9

8Badwani-Badhan-Ambapani-Sindhi-Khodar-Silawad

road - 17.9 84.2 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

9 Dhavabawdi-Balkua-Lonsara-Borlay road - 11.0 39.5 0.0 16.1 1.0 39.5 0.0 67.6 0.0 83.7

10

Pipaliya Kevat - Ghatgheri (Raisen) - Ghatkheri

(Raisen) to Sahajpur - Salabaru-Ghatkheri (Sagar) &

Pratapgarh-Salabarru

- 35.6 110.6 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

11

Salabarru-Gutauri - Gutauri-Deori - Gorakhpur-

Ghahlavan - Ghahlavan-Sadrai - Sadrai-Heerapur -

Heerapur-Kaakraghat (Narmada Bridge)

- 36.5 126.2 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

12 Pkg-19 Maharastra Border-Kukru-Khamla-BhaisdehiM/s Udit Khamla Highways Pvt.

Ltd.31.12.19 - 30.2 90.5 0.0 22.7 1.0 90.5 0.0 23.7 0.0 46.4

13 Sultaniya-Pipalkheda-Salaiya Road - 12.8 38.4 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

14 Basoda-Gurod-Somvara-Enchda-Imaliya-Sironj road - 35.0 105.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

15 Amravad-Bharkachh road - 17.3 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

16 Obedullaganj-Magarpunch-Ashapuri-Bhojpur road - 14.7 168.6 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

17 Chikhlod-Raisen road - 24.8 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.018 Vidisha-Ahmadpur-Gadi-Gairatganj - 18.9 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

19 Pkg-42Shipra Budhi Barlai-Solsinda-Khandakhedi-Jamodi-

Maharajganj Biloda Nayda-Panod Sanver road

Feasibility under preparation by

M/s AICONS - 28.9 86.7 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

20 Siddikganj-Hatpipaliya Road - 21.2 48.9 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.021 Bhaukhedi-Amlaha-Dhamanda Road - 17.9 49.7 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

22Toomda-Patania-Barkheda Saalam road Length

12.80 Km - 9.7 23.2 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

M/s Shreeji Infraspace Highway

Pvt. Ltd07.07.20

Pkg-2M/s Shreeji Udaigarh Balwadi

Highway Pvt. Ltd.

23.01.20

Pkg-5M/s Badwani-Badhan Highways

Pvt. Ltd

Pkg-18 Under Review -

Pkg-25Feasibility under preparation by

M/s AICONS

- Pkg-35 (blank)

Pkg-52M/s Brijgopal construction

company Pvt. Ltd.10.07.20

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt. Contribution.

ADB-VI Projects (In Progress) Page-16

SN PKG Project Name ConcessionaireAgree't

Date

Anticipated

Completion

Date

Length Cost

PA Up to

March-

2021

FA Up to

March-

2021

Physical

Target

2021-22

Financial

Target

2021-22

Length

during Yr

21-22

Expend.

during Year

21-22

CPP CFP

23 Pkg-10 Pawai-Mohindra-Semaria road Bid Evaluation I/P - - 37.5 99.5 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

24 Aaron Via Vidoriya-Raghogarh M/s Madhav Infra Projects Ltd 01.07.20 - 32.7 72.1 0.0 15.4 1.0 0.0 0.0 20.1 0.0 35.5

25 Ashoknagar-Aaron Road (Upto Sindh River) - 30.0 74.8 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.026 Mohna-Patai Road - 17.4 46.9 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

27 Chitauli-Ranighati Road Financial Bids under Evalution - 11.4 35.3 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

28 Bhitarwar-Karera Road (blank) - 10.8 28.2 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

29 Pkg-16 Aavan Road Maksudangadh to JanjaliM/s VVC MKS PROJECTS

PRIVATE LTD.01.06.20 - 37.5 94.7 0.0 4.9 1.0 0.0 0.0 25.2 0.0 30.1

30 Porsa-Mehgaon-Mau-Sevda Road - 76.9 207.8 0.0 34.0 1.0 0.0 0.0 73.3 0.0 107.231 Jamna-Bilav Road - 18.0 45.5 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

32Pahadgad-Sahasram Via Maran -Kanhar (Upto

Khurjan Road) - 24.9 62.4 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

33 Noorabad-Padhavali Road to Sanichra Road - 17.7 50.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.034 Nepri to Brijgadi via Kishangad-Kukroli Road - 15.2 46.3 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

35 Pkg-27BKailaras to Jaura via Pahadgad-Manpur-Nirar-

Pagara Road - 62.9 162.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

36 Vijaypur-Mohna Road to Sahasram Road - 23.5 95.1 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.037 Baroda to Maswani Road - 19.5 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.038 Pkg-34 Premsar-Hirnikheda-Mundla road - 30.8 92.4 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.039 Sahajpur-Tendukheda road - 14.7 44.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.040 Orchha - Mandore - 19.0 57.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.041 Pkg-56 Chinor-Karhaiya-Bhitarwar road Under Review - 30.1 69.7 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

42 Pkg-9Langhatola-Patna-Karpa-Sarai-Ahirgaon-Kelamania

roadFinancial Bids under Evalution - 52.6 170.9 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

43 Pkg-13 Beohari-Bansukli-Sidhi RoadM/s Beohari-Bansukli Pathways

Private Ltd.04.06.20 - 46.4 106.6 0.0 0.0 1.0 0.0 0.0 28.9 0.0 28.9

44 Pkg-17ANeemdana-Hirdagarh-Navegaon-Nidrai-Bordehi

Road

M/s Arcons Infrastructure &

contructions Pvt Ltd23.06.20 - 41.4 145.7 0.0 0.0 1.0 0.0 0.0 16.9 0.0 16.9

45 Pkg-17B Tamiya-Junnardeo Road Feasibility study in progress - - 27.0 120.8 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

46 Pkg-23 Baihar-Lamta RoadM/s Udit Baihar Lamta Private

Ltd.04.06.20 - 52.2 54.7 0.0 0.0 1.0 0.0 0.0 14.8 0.0 14.8

47 Pkg-45Anjaniya-Ramnagar-Raigaon-Chubhaval-Chakdehi

Khinha road - 73.8 221.4 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

48 Pkg-46 Harrai-Batkakhapa-Bijori road - 73.0 219.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.049 Pkg-47 Bandol Jod-Kunda-Thavri-Chourai road - 50.4 151.2 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.050 Pkg-53 Padmi-Ramnagar-Ghunghri-Salwah road - 51.1 153.3 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0

1522.7 4296.6 0.0 177.3 50.0 505.2 0.0 415.7 0.0 593.0

Pkg-14

(blank)

- Pkg-15

Feasibility study in progress -

Grand Total

Pkg-26M/s RCL Porsa Highways Pvt

Ltd.13.01.20

Pkg-27A

Financial Bids under Evalution

- Pkg-28

Feasibility study in progressPkg-38

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt. Contribution.

Physical, Financial Targets and Achievements for 2019-20 of 24 Border Check Post Barrier's Page-17

S.

No. Name of Road

Physical

Progress Districts

Project

Cost

Concession

Period

Concessi

onaire Agr Dt. App Dt. Com Dt.

PA

March

2021

FA

March

2021

Financial

Target

Physical

Target

Expen.

during Yr

2021-22 CFP

1 Agra- Mumbai Road(NH-3)136.47

137.22 Completed Badwani

2 Morena-Dholpur Road (NH-3) 63.65 64.4 Court Case Morena

3 Mhow-Neemuch Road (SH-31) 250.55 251.8 Completed Neemuch

4 Indore- Ichhapur Road (SH-27) 199.60 200.35 Completed Burhanpur

1 Indore-Ahemdabad Road (NH-59) 170.10 170.25 Completed Jhabua

2 Rewa-Mirzapur Road (NH-7) 141.95 142.6 Completed Rewa

3 Rewa- Allahabad Road (NH-27) 46.93 47.58 In Progress Rewa

4 Ujjain-Jhalawad-Jaipur Road ( SH-27) 188.08 188.73 Completed Shajapur

5 Seoni-Nagpur Road (NH-7) 646.50 647.15 Completed Seoni

6 Betul-Nagpur Road (NH-69) 172.60 173.25 Completed Betul

1 Shivpuri-Jhansi Road (NH-25) 75.95 76.5 Court CaseDatiya &

Shivpuri

2 Bhind-Ettawah Road (NH-92)104.70

105.25 Court Case Bhind

3 Naugaon-Jhansi Road (NH-75) 95.4 95.95 Completed Chattarpur

4 Chhindwara-Nagpur Road (NH-12) 72.93 73.48 Completed Chhindwara

5 Jabalpur-Jaipur Road (NH-12) 486.85 487.4 Completed Rajragh

6 Sendhwa-Khetia Road (MDR) 46.03 46.58 Completed Badwani

7 Shivpuri-Kota Road (NH-76) 563.05 563.6 Completed Shivpuri

8 Warud-Multai Road 18.95 19.5 Completed Betul

9 Sagar-Kanpur Road (NH-86) 186.4 186.95 Completed Chatarpur

10 Jabalpur-Mandla Road (NH-12A) 172.375 172.925 In Progress Mandla

11 Sagar-Lalitpur Road (NH-26) 133.5 134.05 Completed Sagar

1 Balaghat-Gondia (SH-11) 262.1 262.55 Completed Balaghat

2 Venket Nagar Road 23.5 23.95 Completed Anuppur

3 Kabir Chabutara Road 205 205.45 Completed Dindori

Total 4221.995 4477.465 1094 85% 930.93 0 0.00% 0 930.9

1 Indore Completed

2 Gwalior Completed

LocationLARGE- CHECK POST

1094.00

Cr.

Concession

Period 12.5

Year

M/s MP

Border

Check

post

Develop

ment

Company

Ltd.

CCF Building

05.05.11

2CCF &

19 check

post

complete

d

85% 930.93 0.0 0%10.11.10 0 930.9

MEDIUM- CHECK POST

SMALL- CHECK POST

SINGLE-CHECK POST

Length in KM Cost in Cr., PA-Physical Achievment, FA-Financial Achievment, Com Dt.-Completion Date, Agr Dt.-Agreement Date, App Dt.-Appointment Date, CFP-Cumlative Financial Progress, GC: Govt. Contribution.

OMT Projects (In Progress) Page-18

SN Name SHConcession

Period

Date of

Agreement

Insurance

Validity Upto

Accounts &

Audit report

dated

Length Cost to be borne by

conssionaire (in Cr.)

Monthly Premium

(in Rs.) Premium Due

1 Agar sarangpur 25 10 Yrs 20-09-16 - - 51.00 1.40 30855.00 0.00

2 Deshgaon - Khargone (SH-26) NH-347B 10 Yrs 6/21/2016 - - 63.60 1.40 57788.00 89839.00

3Badi - Baktara - Dobi - Shahganj - Budhni Road (SH -

15) 29C 10 Yrs 27-06-16 - - 58.80 1.40 19965.00 12870.00

4 Bargawan - Waidhan Road (MDR) MDR 12-T 01 10 Yrs 21-06-16 - - 27.28 1.40 33275.00 0.00

5 Bela - Govindgarh - Churhat 15 9 Yrs 27-10-14 - 6/14/2019 56.74 12.20 215223.00 0.00

6 Betul - Paratwada (SH-43) NH-548C 10 Yrs 21-06-16 - - 68.70 2.30 72096.00 0.00

7 Datia - Dinara Road (SH-19) 1 10 Yrs 21-06-16 43921 - 27.00 1.40 33275.00 0.00

8 Ghansore - Mandla 33 7 Yrs 2/4/2015 5/1/2020 9/24/2019 50.80 4.47 658845.00 0.00

9 Khalghat - Manawar Road (SH-38) 36 10 Yrs 27-06-16 5/1/2020 9/24/2019 42.70 1.96 69878.00 0.00

10 Khargon - Barwani road (SH-26) 37-A, NH-347B 10 Yrs 22-06-16 - - 84.60 2.30 61004.00 84848.00

11 Satna - Maihar - Umariya 6 5 Yrs 8/11/2017 - - 133.21 2.00 8708333.00 40665320.00

12 Udayapura - Silwani (SH-44) 20 10 Yrs 22-06-16 - - 28.60 1.40 39930.00 0.00

13 Udaypura - Gardarwara (SH-44) 20 10 Yrs 23-06-17 - - 32.70 1.40 16638.00 0.00

Grand Total 725.73 35.03 10017105.00 40852877.00

Length in KM

Cost in Cr., GC: Govt. Contribution