Harmony PlaygroundAdult FitnessLocated off Prospect Park West between 9th and 11th Street, West of the Bandshell in Prospect Park, Borough of Brooklyn
Landmarks Preservation Commission ReviewDocket # LPC-19-38010
Participatory Budgeting 2018 ProjectCity Council District 39, Brad Lander
2Harmony Playground Adult Fitness
2 | Community & Neighborhood Context
Bandshell & Harmony Playground Site
Prospect Park
Prospect Park West
11th St Entrance
9th St EntranceAdult Fitness
at Harmony Playground
NTS
NTS
NTS
Bandshell
3Harmony Playground Adult Fitness
3
N
| Historic Maps
1901 MAP 1940 WATER MAIN MAP
The site of the current Bandshell and Playground was originally an open archery field. The entire area was defined by an oval path with an immediate connection to the Ninth Street Entrance.
The Bandshell structure and the original Playground were constructed in 1941 the year after this map (showing an approximate building footprint) was made.
11th St 11th St 9th St 9th St
Approximate Location of
Fitness Area
4Harmony Playground Adult Fitness
4
N
| Historic Maps
1980 SURVEY 2015 SURVEY
The Bandshell and Playground shown in this survey as they were installed in 1941.As you can see the playground extended into the northern oval where there is currently more lawn.
The Bandshell structure and the adjacent playground, now called Harmony Playground, were reconstructed in 2001. The Bandshell was enlarged, but the playground was decreased in size on the north side.
11th St 11th St
9th St 9th St
5Harmony Playground Adult Fitness
50’ 20’ 40’
N
| Existing Conditions
Prospect Park West11th St
Prospect Park Bandshell
Sand Pit
Water Feature
Water Feature
Swings
Play Structure
Play Structure
Adult Fitness
9th St
Play Equipmentor Structures
Safety Surface
Concrete Pavement
Woodchips
Legend
Park Entrance
Project Limit
6Harmony Playground Adult Fitness
6 | Existing Conditions
1
2
2 - North Side1 - Existing Adult Fitness West Side
Pull-up Bars
Parallel Bars Sit-up Bench 4ft Ht Steel Fence
7Harmony Playground Adult Fitness
7 | Existing Site Plan
1. Refurbish Sit Up Bench
2. Refurbish Pull Up Bars
3. Parallel Bars being replaced to be ADA
X
XX
X
0’ 5’ 10’
N
Remove Steel Fence
Replace Parallel Bars with ADA Parallel Bars
Harmony Playground
Remove woodchipsto make ADA
to 9th St Entrance
to Bandshell & Park interior
to 11th St Entrance
2
31
30ft
30ft
8Harmony Playground Adult Fitness
8 | Proposed Site Plan
3. ADA Parallel Bars
7. Balance Beam
4. Cycle
8. Step Ups
0’ 5’ 10’
N
5. ADA Press Squat
6. ADA Chest Press & Hand Cycle (to share post)
Harmony Playground
Shrub Buffer Planting
Refurbished Bench
Central Park Settees
Refurbished Pull Up Bars
Install Safety Surface 750sf with concrete perimeter curb
Existing Tree in planting bed
Install permeable Bonded Woodchip Surface 950sf with Steel Edging
Install Asphalt Path 125ft length
to 9th St Entrance
to Bandshell & Park interior
to 11th St Entrance
4
5
7
6
8
3
33ft
25ft
25ft32
ft
9Harmony Playground Adult Fitness
9 | View Looking West
Safety Surface with Concrete Curb
Bonded Woodchip Surface with Steel Edging
Asphalt Path
10Harmony Playground Adult Fitness
10 | Materials
Full Depth Asphalt
Aronia melanocarpa ‘Low Scape’
Calycanthus floridus
Cephalanthus occidentalis ‘Sugar Shack’
Cornus amomum Hydrangea quercifolia
Ilex glabra ‘Compacta’
Ilex opaca Itea virginica ‘Merlot’
Rhododendron viscosum
Bonded Wood Fiber w/ Steel EdgingCentral Park Settee w/ Armrests Brown Safety Surface Tiles w/ Concrete Curb