Garden Reach Shipbuilders & Engineers Ltd.
-
Upload
khangminh22 -
Category
Documents
-
view
1 -
download
0
Transcript of Garden Reach Shipbuilders & Engineers Ltd.
GARDEN REACH SHIPBUILDERS amp ENGINEERS LTD
गारडन रीच शिपबिल ररसड णzwj र जीनिनररसड श शिटर
(A GOVERNMENT OF INDIA UNDERTAKING)
(भारत रसरकार का परितष ठान) 4346 Garden Reach Road Kolkata 700-024
4346 गारडन रीच रोर को काता-700 024
Phone दरभाष (033) 2469-8100 to 8114 Extn बिसतार 648749 FAX फकस (033)
2469-3932
Web site वि wwwgrsenicin E-Mail ई मल mtlsccdgmgrsecoin
CIN सी आई एन U35111WB1934GOI007891
NOTICE INVITING TENDER (NIT)
ननववदा आमतरण सचना NIT No िनविदा रसचना रसज MainContractOTWindows ampAnchor
CapstanFPV028ET-01510 Dated 09052017
Name of job कारड का नाि Biennial rate contract for Fitment of Windows Scuttles
and Installation of Anchor Capstan for FPV Project Yard 2113-17
Last date of submission of Tender
ननववदा जमा की नतथी एवम समय 02062017up to 1200 hrs
Date of opening Tender- Part I - Techno-Commercial
Bid
तकनीकी- वाणणजययक िोली भाग-I खलन की नतथी एवम समय
02062017 at 1400 hrs
Date of opening Tender - Part II ndash Price Bid
मलय िोली भाग-II खलन की नतथी - Will be intimated in due course
to the bidders qualified in Part I
Cost of tender document
ननववदा परपतर मलय
Rs 500-
Earnest Money Deposit
ियाना राशि जमा Rs 20000- (For Package A) Rs 20000- (For Package B)
List of Enclosures
सलगको की सची
ANNEXURE ndash I (अनलगनक ndashI)ndash Total 15 pages Technical specification amp
Drawing
ANNEXURE ndash II (अनलगनक ndashII) - 22 pages Standard terms amp Conditions
ANNEXURE ndash III (अनलगनक -I I I) ndash 03 pages Guidelines of Bank Guarantee amp
Format of Bank Guarantee
towards EMD
1 Bids in single stage two bid system (Part-I Techno-Commercial Bid and Part-II
Price Bid) are invited for Fitment of Windows Scuttles amp Eyebrows (Package A)
and Installation of Anchor Capstan (Package B) for FPVs Yard 2113-17 at GRSE
Main and RBD Unit as per the enclosed technical specification SOR No RN2113-
17HO207 Dated 27032017 and RN2113-17HO113 (Annexure-I) from
resourceful and financially solvent vendors having experience in execution of the
similar job for Sea going vessels
(i) Part -I Techno-Commercial bid (it must contain only technical amp commercial points
and should not contain any price If any price is indicated in Part-I the offer will be
treated as CANCELLED)
ndash ANNEXURE ndash A amp B
(ii) Part - II Price bid (containing only price to be filled in html format)
2 Being an E-tender you will have to submit your offer in E-PROCUREMENT mode
through GRSE E-portal httpwwwgrsenicinetender or
httpsepsbuyjunctioningrse where all data sheet with respect to subject tender
will be available for download need to fill up the required fields and upload the file
Price bid will also need to be filled up in html format only During filling up of price
request to insert unit price only against each item in the html format
No other attachment regarding price will be allowed and if so happen then offer will
be treated as cancelled
You should mention your offer ref no and date in ANNEXURE ndash A amp B
3 The job is to be carried out as per Technical Specification for Fitment of Windows
Scuttles amp Eyebrows and Installation of Anchor Capstan enclosed with NIT as
Annexure ndash I
4 a) Vendor should attach (Submit hard copy in case of large document) the following
details with their Techno-Commercial bid
i Documentary evidence by the Firm in terms of execution of similar order(s)
ii Details of workman staff on roll of the company
iii PAN No
iv Copy of Labor license certificate
v Copy of registration of the company
vi Solvency certificate from Banker
vii Copies of registration with PFESIService Tax authorities
viii Audited annual accounts for last three years along with annual report
b) The bidder will particularly specify in their bid documents whether they have any
arrangements for joint ventureconsortiumpartnership and the detailed documentary
proof of evidence of such joint ventureconsortiumpartnership shall accompany the bid
document for consideration thereof as a participant
5 Place of Work amp Facilities -
The work is to be carried out by the contractor at RBD Main unit of GRSE and as per
requirement of GRSE and scope of work mentioned in the SOTR
6 Quoted price should be firm and fixed till the validity of rate contract Rate contract
will be valid for two years from the date of issuing of Rate contract order
7 E-Mail Address for communication (रसजपकड हत ईि का पता) Vendor should have a
computer with suitable internet connection amp e-mail address to enable better
communication with various offices of GRSE
8 Micro amp Small Enterprise (रसकषि और छोट उदरि) -
i) For 20 value of a tender purchase preference to the tune of 15 (ie quoted price
falls within 15 of obtained L1 price) to be accorded to all participating MSEs in that
particular tender subject to acceptance of lowest quoted price (This clause is applicable
only when the job is divisible in nature and can be distributed to more than one vendor
subject to tender terms)
ii) In case of multiple bidders falling under the above category purchase preference to
be accorded in equal proportion within a limit of quantity allocated for this purpose as
above
iii) In case of such MSE is owned by SCST category entrepreneur then that
organization will be entitled for 4 out of 20 reserved for this purpose and of equal
proportion of the 16
iv) MSEs will also be entitled for following benefits -
a) Tender documents will be issued free of cost
b) Payment of Earnest Money will be exempted
However bidder has to submit Entrepreneurs Memorandum (EM-Part II) along with the
offer for such purpose to claim the benefit The service for which the exemption is
claimed should be in the listed items of EM-Part II
9 Tender Fee (िनविदा िलक) Tender Fee will be Rs 500- (Five Hundred) (non-
refundable) from NationalizedScheduled Bank other than Co-operative bank through
DDPO in favour of Garden Reach Shipbuilders amp Engineers Ltd payable at Kolkata Vendor need to submit tender fees as detailed in prescribed format in e-procurement
commercial data sheet and send the DDPO to Contract Cell GRSE MAIN Addresses to
Manager (Contract Cell) before due date of submission Please scan the Draft copy and
attach to General Documents part in e-procurement Non-submission of value of tender
documents may lead to offer rejection SSI Units registered under single point
registration with NSIC will be exempted from Tender Fee Deposit on submission of
valid NSIC single point registration certificate for particular product under tender
To claim the exemption a copy of the NSICMSME certificate with annexure is to be
scanned and enclosed with the technical bid and that the list of activities contained in
the NSIC certificateEM-Part II should cover the activity for which tender is issued and
to be confirmed in Techno-Commercial part of offer
10 EMD amount for Package A amp Package B to be submitted as follows -
i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any
one Package
EMD should be submitted in the form of DDPOBank Guarantee (as per format) in
favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II)
issued from NationalizedScheduled Bank other than Co-operative bank payable at
Kolkata through Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN and BG directly to GM(F) before due date of submission
Please scan the DDPOBG (As per format) and attach to General Documents part in e-
procurement Non-submission of EMD will lead to offer rejection SSI Units registered
under single point registration with NSIC will be exempted from Earnest Money Deposit
on submission of valid NSIC single point registration certificate for particular product
under tender EMD will be returned to the unsuccessful bidders on submission of
application with original money receipt EMD of successful bidder will be returned after
receipt of security deposit and against the purchase order
To claim the exemption a copy of the NSICMSME certificate with annexure is to be
scanned and enclosed with the technical bid and that the list of activities contained in
the NSIC certificateEM-Part II should cover the activity for which tender is issued and
to be confirmed in Techno-Commercial part of offer
11 Last date of submission of Bid Date of opening of bid is indicated in Tender
Document Tender is liable to be rejected if the requisite documents are not enclosed
with the technical offer
12 Date of opening of offer (Price Bid) will be notified in due course after conclusion of
TNCCNC meetings and acceptance of Techno-Commercial offer Price bids of the
qualified vendors could be viewed by the bidders from their own portal
13 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason
14 Acceptance Format Matrix should be filled up and attached with techno-commercial
bid as marks of acceptance of NITSOTRSTAC In case of non- receipt of filled in STACs
acceptance format matrix it would be presumed that you have accepted all our terms amp
conditions as per GRSE tender until amp unless deviation is specially mentioned in offer
15 Queries if any on SOR or other Terms may be got clarified from SM (Engg)-RBD for
technical clarifications and AGM (Contract) [Mob 8420008800] for commercial aspects
prior to submission of offer
During submission of offer through e-portal for any clarification regarding uploading of
offer in the E-PROCUREMENT system please contact DM (E-Proc)representative of
GRSE service provider [Mob 83369259448336925945]
16 L1 bidder will be decided on the basis of - Lowest obtained price per Ship for
two Package of job separately ie Fitment of Windows Scuttles amp Eyebrows
(Package A) and Installation of Anchor Capstan (Package B) GRSE at its discretion
may engage multiple vendors ship wise or in a single ship to maintain the construction
schedule For engaging multiple vendors rate established with L1 bidder will be offered to
other bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued Package wise for each ship against
established rate contract order
AGM (CONTRACT)
अपर िहापरिनधक (रसजविदा)
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 1 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 2 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 3 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 4 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 1 OF 10
DATE 270317 PREPARED BY MBISWAS
1 Scope of work ship Board scope of work is as follows - 11 Releasing of deck structure (ie seating) 3570x1400 mm overall size from
block for installation of anchor capstan
12 Installation of Anchor capstan sub assemblies on the deck structure stated above
13 Cutting of shiprsquos existing deck in way of anchor capstan matching with dimensions of deck structure if required
14 Placement of deck structure fitted with anchor capstan on board the ship and welding of same with deck structure
15 Carrying out Test amp trial of anchor capstan 2 Drawings Work is to be carried out as per following drawing document- 21 Seating for Anchor Capstan complete Drg no 2113-17110317
amp110317-1 22 Anchor amp cable arrangement plan 2113-17420101 23 General Arrangement of Anchor capstan Drg no 107112 24 Sectional Assembly of Anchor capstan Drg no 107111 25 Band Break Assembly Drg no 207073 26 Procedure for installation of Anchor capstan Annexure ndash I
All latest drawings shall be used for the job The requirement of drawings shall be forwarded to CDO through Project Leader 10 days in advance and collected from CDO 3 Installation of Anchor Capstan
31 Deck structure with upside down is to be placed on an elevated amp leveled jig 32 Under slung machineries are to be installed on deck structure as per instructions
indicated in Installation procedure 33 On completion deck structure with under slung machineries is to be inverted amp put on
jig Now above deck items are to be installed as per Installation procedure 34 Now the shiprsquos existing deck in way of anchor capstan is to be cut matching with the
dimensions of the deck structure if required 35 Deck structure fitted with anchor capstan is then to be placed in position on board the
ship and to be temporarily secured 36 Welding of deck structure with shiprsquos deck is to be done adopting controlled and
sequential welding All precautions during welding must be taken to obviate any possibility of undue deformation stresses in the structure as well as installed equipment
37 Also the under deck stiffeners of deck structure are to be joined to shiprsquos existing
stiffeners 38 On completion of all welding anchor capstan is to be manually operated to check that
equipment runs without any resistance 39 After STW (to be done by GRSE) the anchor capstan is to be operated using electrical
power and heaving and veering of chain cable is to be demonstrated
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 2 OF 10
DATE 270317 PREPARED BY MBISWAS
4 General Notes
41 Installation of anchor capstan is an intricate fabrication amp installation job requiring strict quality control and achievement of close tolerances on required dimensions Hence qualified persons having experience in fabrication of structure and installation of machinery must be employed
42 Quality and workmanship must be of highest standard suitable for naval ships and to be
to the satisfaction of inspecting authority 43 Any defects observed during inspection are to be liquidated by the sub-contractor at no
extra cost 44 Welding is to be carried out only by competent qualified and certified welders having
valid test certificate issued by ABS or IRS 45 All welding is to be done after proper edge preparation All welding are to be properly
dressed up 46 One coat of touch up paint in way of weld joint is to be done after proper cleaning 47 Local fairing of deck is to be done using strong back bar as required and the same is to
be removed after completion of work The affected areas are to be properly dressed up 48 Clean ship condition is to be maintained everyday
5 GRSE supply items
51 ABS quality plates amp sections as required
52 Anchor capstan assembly units including Stainless steel (AISI-316) holding down hex head bolts nuts and washers amp spring washers
53 Steel material for Jig
54 Primer for touch up
55 Loctite compound
56 Machining assistance if required 57 Compressed gas electrodes electricity and light 58 Scaffolding if necessary 59 Carne assistance (is necessary)
6 Sub-contractorrsquos scope of supply
61 Welding and cutting machine and accessories 62 Power drilling machine 63 Power extension board portable lamps 64 Proper safety equipment to be provided to the workmen (Helmets safety goggles mask
apron hand gloves harness working at elevation ec) 65 Supervisor The firm should provide supervisors with proper knowledge of the nature of work
should be present on board at all times
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 3 OF 10
DATE 270317 PREPARED BY MBISWAS
7 Inspection
Installation of Anchor capstan is to be inspected by GRSE (QA) CGRPT (Kol) and ABSIRS as per approved QAP Within 7 days from the date of order LOA QAP is to be submitted by the sub-contractor to GRSEQA for approval No of stage inspection will be decided by the inspecting officers GRSE Deck Machinery should depute their technical representative for assistance during installation
8 Manpower a) Sub-contractor should submit complete list of personnel as per their payroll alongwith ESI PF
reference and voter ID for Skilled labour including number of experienced marker fitter welder gas cutter etc Successful sub-contractor should undertake that these operatives would not be withdrawn jeopardizing the construction schedule
b) Similar details about engineers supervisors to be employed for the work
c) List of tools assets held with the company to be submitted
9 Hindrance Register
To be maintained by the sub-contractor and put up for approval by the Project Leader on weekly basis
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 4 OF 10
DATE 270317 PREPARED BY MBISWAS
Annexure - 1 GENERAL MOUNTING INSTRUCTIONS OF ANCHOR CAPSTAN ON DECK SEATING The Scope of this Instructions generally covers the Procedure for IN-SHOP ErectionInstallation of Anchor Capstan supplied by GRSE Deck Machinery as per GA Drg No107112 RevA on a cut-away Shiprsquos Seating Block (Ref GRSE Drg No2013-17110317 amp 110317-1) duly assembling therein all the constituent subassembliescomponents which comes in knocked down condition as dispatched from manufacturerrsquos premises 1 Scope 11 Underslung Worm Gear Box with vertical Main shaft (fitted with Clamp Key Bars and End Plate)
duly pre-assembled with Electric Motor cw Disc Brake via Worm GearWorm Shaft and Slipping Clutch cum Coupling at one end and Manually operated Bevel Gear Box with Clutch shifting lever Assembly at the other end
12 Base Plate fitted with Bush 13 Cable Lifter fitted with Bushes 14 Warping Head fitted with Hand Wheel Assembly 15 Manual operation Hand Wheel and Deck Socket Arrangement 15 Band Brake Assembly 16 Chain Reliever screwed on loose pads which are to be finally welded to the Base Plate after
aligning chain cable with naval pipe amp Anchor Hawse pipe 17 Naval Pipe Assly 18 Chain Support Assly 19 Holding Down Foundation Bolts 110 Control Panel amp Push Button Station 2 Instructions for Installation
Prior to starting on-board installation of the Anchor Capstans in Port amp Stbdsides it is to be ensured that the top deck surface in way of the capstan Base plate is duly machined and overall thickness of Deck foundation with provision of chocks in the interface of underslung units and deck does not exceed 525 mm to match with the vertical shaft length Necessary adjustments required if any are to be done only on thickness of the chocks to maintain proper assembly Hence follow the following steps
21 Examine Shiprsquos seating for Dimensions and Squareness in way of Capstan Foundation The overall thickness of the Seating (excluding Chocks) should be 512 (+-2) mm The top of Annular Bedplate (600 OD X 350 ID) should be duly machined Also check that Hand Holes are made in the 370 dia tubular shell of the ships seating to facilitate access to the vertical shaft interfaces with base plate Bottom Flange and underslung Gear Box top Flange 22 Position the Ships Seating upright and place the Base Plate on the machined annular bed plate of Ships seating as per orientation given in the GA Drawing Mark up the Bolt holes as per lsquoUpper Deck Foundation Detailsrsquo Drill amp ream the foundation Holes as required ensuring the Equipment Orientation on board Ship (Ref Fig No 1) Fit the Base Plate in position on the seating duly bolted to shiprsquos Seating (Ref Fig No 2) Repeat the same for installing the Base Plate of 2nd Capstan unit in Port Side 23 Invert the Shiprsquos Seating and place the same on an elevated level Support platform to facilitate
assembly of the underslung Machinery which will now appear on the top
24 Position the Underslung Gear Box Motor Assembly with vertical Main Shaft facing downward and insert same through the circular hole of Shiprsquos seating vis-agrave-vis through the Bush Bearing provided in the Hub of Base Plate so that the Gear Box Flange rests on the spigot of the interfacing flange of the Base Plate Rotate the Gear Box assly as per orientation of the Equipment Mark up the bolt position on Base Plate bottom flange if not already done from the Gear Box flange and bolt up the flanges of Base Plate and Gear Box ensuring orientation of the equipment properly There should be a gap between the shiprsquos seating and Gear box bottom surface in way of the holding down bolts to the tune of 13 mm which has to be compensated by chocks Measure the gap accurately in way of each bolt hole and adjust thickness accordingly with identification for each position Mark up all the Bolt Holes with Gear Box Assembly in position
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 5 OF 10
DATE 270317 PREPARED BY MBISWAS
25 Unscrew the Gear Box Assembly from the interfacing flanges of the Base Plate and remove same to complete drilling of the holding down bolt holes as per lsquoUnder Deck Foundation Detailsrsquo given in the GA drawing 26 Re-install the Gear Box Assembly on the Ships seating after inserting machined Chocks as required in respective bolt hole positions (as identified earlier) and tighten all bolts to complete the underslung holding downarrangement Foundation Bolts must now be tightened properly Repeat 24 to 26 for installing the Gear Box assly of 2nd Capstan unit in Port Side (Ref FigNo 3 amp 4) 27 Invert the Ships seating The Base Plate with Vertical Main Shaft protruding upward will now come on top as per actual arrangement in Port amp Stbd sides Unscrew the Clamps End Plate and withdraw key bars from the Main Shaft to introduce the Cable Lifter through the vertical Main Shaft Put back the Clamps on the Main Shaft and tighten the screws Ensure that the Cable lifter rotates freely on the Base Plate 28 Put back the Key Bars in position on the Main shaft and introduce the Warping Head sliding down through the Key ways Rotate same so that the driving dogs engage with those of the cable lifter below Check that when engaged the Cable Lifter rotates freely along with the Warping Head Fit the Hand Wheel at the screwed end and lower it to the level of the Warping Head so that the split retaining ring can be screwed on the top face of Warping Head Hub Screw up the end plate on the vertical shaft end 29 Rotate the Hand Wheel provided with the Warping Head counter clockwise to dis-engage from the Cable Lifter Check that there is adequate gap between the dogs of the two when the Warping Head is fully lifted up by operating the Hand Wheel Check for proper locking in both engaged and dis-engaged condition
210 Insert the Deck socket with Hand Wheel shaft through the Hole on the Deck Plate and ascertain that the Wheel shaft engages properly with the Hand operation Gear Box shaft extension protruding upward Mark up the Deck Socket Bolt Holes Remove the Hand Wheel Assembly and complete the drill Holes 211 Put back the Deck Socket and screw up to Deck Plate Dis-engage the Electro magnetic Disc Brake provided at NDE of Electric Motor Now engage the Clutch half of the Manual operation Gear Box by operating the Clutch Shifting Lever and rotate the Manual operation Hand Wheel to see that the Unit rotates freely in hoisting direction but locks in lowering direction by the pawl and ratchet provided at the output shaft of the Manual operation Gear Box 212 Put the Band Brake Assembly on The Cable Lifter and align the Brake operating Gear Box as per orientation given in the GA Drawing and check that the same rests on the shiprsquos seating provided separately Use chocks in way of the Bolt holes as necessary Fit the Keep plate on the Brake anchorage Pin Check that the Bands engage and releases properly when the Hand Wheel is rotated in the desired direction Weld the Brake Anchor Pin with Base Plate using low Hydrogen electrode Repeat 27 to 212 for 2nd Capstan unit in Port Side (Ref Fig No 5) 213 Place the Chain Reliever screwed with Pads on the outer wall of the Base Plate after scertaining its position wrt tight amp slack side of chain cable and check that there is adequate gap to permit free rotation of the Cable Lifter Weld the Pads of the Chain Reliever to the Base plate 214 Position the complete assly of Naval Pipe (GRSE Deck Machinery supply) within close proximity of cablelifter Weld the Lip plate in front of the Naval Pipe to ensure cable entry without jamming Lower portion of the Naval Pipe to be cut to shape and welded to the bellmouth (Shipyard Supply) 215 Put the Roller type Chain Support Assembly in line with the hawse pipe by adjustment of height (supplied with green material) and weld to Deck maintaining alignment of chain cable with cable lifter 216 Repeat 213 to 215 for 2nd Capstan unit in Port Side
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 6 OF 10
DATE 270317 PREPARED BY MBISWAS
217 Complete assembly of two Anchor Capstans (Port amp Stbd) wrt Anchor Hawse pipe and Naval pipe indicated in Fig No6 218 The IN-SHOP Erection Installation of both Anchor Capstans on the cut-away Shiprsquos Seating Block will thus be complete The Ships Seating Block along with Anchor Capstans (Port amp Stbd) will afterwards be taken for placement on Shiprsquos Deck for welding with Deck Structure During welding of this Block with Shiprsquos deck Structure all precautions for controlled welding should be taken to obviate any possibility of undue deformation stresses in the structure and installed equipment After completion of all welding both Anchor Capstans should be lubricated at all the Bearing points Gear Box (Oil capacity of the Gear Box is 10 Ltrs Apprx) The Anchor Capstan should be manually
operated to check that equipment runs without any resistance On completion of satisfactory Hand
operation the Control Panel and Push Button Station is to be connected to the Capstan suitably as per Interconnection diagram For detail connection and activation of circuit setting to workand to operate the Motor refer the Electrical Manual For initial startup and to run the Capstan on No-Load during STW ensure that the Electro-Magnetic Disc Brake (at the NDE of Electric Motor) is properly released activated and the Equipment runs without any resistance Equipments may be set to work on Electric Power mode followed by heavingveering of Chain Cable by the Cable Lifter for which positioning of Naval Pipe and Hawse Pipe is a pre-requisite to ensure free movement of Chain Cable during handling of Anchor 3 Salient Points 31 In order to ensure Water tightness around the interfaces of the base plate and Deck Seating Annular Bed Plate it is essential that the top of seating is machined to leave no gap when the Base plate is hard tightened on the seating by the Foundation Bolts However as an additional measure suitable Flange Sealant (LOCKTITE Product No 574 for gap fill up to 05 mm or equivalent) may be applied throughout the entire interface of Base Plate Annular Bed Plate (including fixing bolts) 2 Chocks do not get displaced after dismantling and same may be tack weldedto Deck Seating at the respective positions 3 Quality and workmanship have to be to the satisfaction of the inspecting Authority Installation defect if any is to be liquidated by the subcontractor at their cost
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
(i) Part -I Techno-Commercial bid (it must contain only technical amp commercial points
and should not contain any price If any price is indicated in Part-I the offer will be
treated as CANCELLED)
ndash ANNEXURE ndash A amp B
(ii) Part - II Price bid (containing only price to be filled in html format)
2 Being an E-tender you will have to submit your offer in E-PROCUREMENT mode
through GRSE E-portal httpwwwgrsenicinetender or
httpsepsbuyjunctioningrse where all data sheet with respect to subject tender
will be available for download need to fill up the required fields and upload the file
Price bid will also need to be filled up in html format only During filling up of price
request to insert unit price only against each item in the html format
No other attachment regarding price will be allowed and if so happen then offer will
be treated as cancelled
You should mention your offer ref no and date in ANNEXURE ndash A amp B
3 The job is to be carried out as per Technical Specification for Fitment of Windows
Scuttles amp Eyebrows and Installation of Anchor Capstan enclosed with NIT as
Annexure ndash I
4 a) Vendor should attach (Submit hard copy in case of large document) the following
details with their Techno-Commercial bid
i Documentary evidence by the Firm in terms of execution of similar order(s)
ii Details of workman staff on roll of the company
iii PAN No
iv Copy of Labor license certificate
v Copy of registration of the company
vi Solvency certificate from Banker
vii Copies of registration with PFESIService Tax authorities
viii Audited annual accounts for last three years along with annual report
b) The bidder will particularly specify in their bid documents whether they have any
arrangements for joint ventureconsortiumpartnership and the detailed documentary
proof of evidence of such joint ventureconsortiumpartnership shall accompany the bid
document for consideration thereof as a participant
5 Place of Work amp Facilities -
The work is to be carried out by the contractor at RBD Main unit of GRSE and as per
requirement of GRSE and scope of work mentioned in the SOTR
6 Quoted price should be firm and fixed till the validity of rate contract Rate contract
will be valid for two years from the date of issuing of Rate contract order
7 E-Mail Address for communication (रसजपकड हत ईि का पता) Vendor should have a
computer with suitable internet connection amp e-mail address to enable better
communication with various offices of GRSE
8 Micro amp Small Enterprise (रसकषि और छोट उदरि) -
i) For 20 value of a tender purchase preference to the tune of 15 (ie quoted price
falls within 15 of obtained L1 price) to be accorded to all participating MSEs in that
particular tender subject to acceptance of lowest quoted price (This clause is applicable
only when the job is divisible in nature and can be distributed to more than one vendor
subject to tender terms)
ii) In case of multiple bidders falling under the above category purchase preference to
be accorded in equal proportion within a limit of quantity allocated for this purpose as
above
iii) In case of such MSE is owned by SCST category entrepreneur then that
organization will be entitled for 4 out of 20 reserved for this purpose and of equal
proportion of the 16
iv) MSEs will also be entitled for following benefits -
a) Tender documents will be issued free of cost
b) Payment of Earnest Money will be exempted
However bidder has to submit Entrepreneurs Memorandum (EM-Part II) along with the
offer for such purpose to claim the benefit The service for which the exemption is
claimed should be in the listed items of EM-Part II
9 Tender Fee (िनविदा िलक) Tender Fee will be Rs 500- (Five Hundred) (non-
refundable) from NationalizedScheduled Bank other than Co-operative bank through
DDPO in favour of Garden Reach Shipbuilders amp Engineers Ltd payable at Kolkata Vendor need to submit tender fees as detailed in prescribed format in e-procurement
commercial data sheet and send the DDPO to Contract Cell GRSE MAIN Addresses to
Manager (Contract Cell) before due date of submission Please scan the Draft copy and
attach to General Documents part in e-procurement Non-submission of value of tender
documents may lead to offer rejection SSI Units registered under single point
registration with NSIC will be exempted from Tender Fee Deposit on submission of
valid NSIC single point registration certificate for particular product under tender
To claim the exemption a copy of the NSICMSME certificate with annexure is to be
scanned and enclosed with the technical bid and that the list of activities contained in
the NSIC certificateEM-Part II should cover the activity for which tender is issued and
to be confirmed in Techno-Commercial part of offer
10 EMD amount for Package A amp Package B to be submitted as follows -
i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any
one Package
EMD should be submitted in the form of DDPOBank Guarantee (as per format) in
favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II)
issued from NationalizedScheduled Bank other than Co-operative bank payable at
Kolkata through Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN and BG directly to GM(F) before due date of submission
Please scan the DDPOBG (As per format) and attach to General Documents part in e-
procurement Non-submission of EMD will lead to offer rejection SSI Units registered
under single point registration with NSIC will be exempted from Earnest Money Deposit
on submission of valid NSIC single point registration certificate for particular product
under tender EMD will be returned to the unsuccessful bidders on submission of
application with original money receipt EMD of successful bidder will be returned after
receipt of security deposit and against the purchase order
To claim the exemption a copy of the NSICMSME certificate with annexure is to be
scanned and enclosed with the technical bid and that the list of activities contained in
the NSIC certificateEM-Part II should cover the activity for which tender is issued and
to be confirmed in Techno-Commercial part of offer
11 Last date of submission of Bid Date of opening of bid is indicated in Tender
Document Tender is liable to be rejected if the requisite documents are not enclosed
with the technical offer
12 Date of opening of offer (Price Bid) will be notified in due course after conclusion of
TNCCNC meetings and acceptance of Techno-Commercial offer Price bids of the
qualified vendors could be viewed by the bidders from their own portal
13 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason
14 Acceptance Format Matrix should be filled up and attached with techno-commercial
bid as marks of acceptance of NITSOTRSTAC In case of non- receipt of filled in STACs
acceptance format matrix it would be presumed that you have accepted all our terms amp
conditions as per GRSE tender until amp unless deviation is specially mentioned in offer
15 Queries if any on SOR or other Terms may be got clarified from SM (Engg)-RBD for
technical clarifications and AGM (Contract) [Mob 8420008800] for commercial aspects
prior to submission of offer
During submission of offer through e-portal for any clarification regarding uploading of
offer in the E-PROCUREMENT system please contact DM (E-Proc)representative of
GRSE service provider [Mob 83369259448336925945]
16 L1 bidder will be decided on the basis of - Lowest obtained price per Ship for
two Package of job separately ie Fitment of Windows Scuttles amp Eyebrows
(Package A) and Installation of Anchor Capstan (Package B) GRSE at its discretion
may engage multiple vendors ship wise or in a single ship to maintain the construction
schedule For engaging multiple vendors rate established with L1 bidder will be offered to
other bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued Package wise for each ship against
established rate contract order
AGM (CONTRACT)
अपर िहापरिनधक (रसजविदा)
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 1 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 2 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 3 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 4 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 1 OF 10
DATE 270317 PREPARED BY MBISWAS
1 Scope of work ship Board scope of work is as follows - 11 Releasing of deck structure (ie seating) 3570x1400 mm overall size from
block for installation of anchor capstan
12 Installation of Anchor capstan sub assemblies on the deck structure stated above
13 Cutting of shiprsquos existing deck in way of anchor capstan matching with dimensions of deck structure if required
14 Placement of deck structure fitted with anchor capstan on board the ship and welding of same with deck structure
15 Carrying out Test amp trial of anchor capstan 2 Drawings Work is to be carried out as per following drawing document- 21 Seating for Anchor Capstan complete Drg no 2113-17110317
amp110317-1 22 Anchor amp cable arrangement plan 2113-17420101 23 General Arrangement of Anchor capstan Drg no 107112 24 Sectional Assembly of Anchor capstan Drg no 107111 25 Band Break Assembly Drg no 207073 26 Procedure for installation of Anchor capstan Annexure ndash I
All latest drawings shall be used for the job The requirement of drawings shall be forwarded to CDO through Project Leader 10 days in advance and collected from CDO 3 Installation of Anchor Capstan
31 Deck structure with upside down is to be placed on an elevated amp leveled jig 32 Under slung machineries are to be installed on deck structure as per instructions
indicated in Installation procedure 33 On completion deck structure with under slung machineries is to be inverted amp put on
jig Now above deck items are to be installed as per Installation procedure 34 Now the shiprsquos existing deck in way of anchor capstan is to be cut matching with the
dimensions of the deck structure if required 35 Deck structure fitted with anchor capstan is then to be placed in position on board the
ship and to be temporarily secured 36 Welding of deck structure with shiprsquos deck is to be done adopting controlled and
sequential welding All precautions during welding must be taken to obviate any possibility of undue deformation stresses in the structure as well as installed equipment
37 Also the under deck stiffeners of deck structure are to be joined to shiprsquos existing
stiffeners 38 On completion of all welding anchor capstan is to be manually operated to check that
equipment runs without any resistance 39 After STW (to be done by GRSE) the anchor capstan is to be operated using electrical
power and heaving and veering of chain cable is to be demonstrated
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 2 OF 10
DATE 270317 PREPARED BY MBISWAS
4 General Notes
41 Installation of anchor capstan is an intricate fabrication amp installation job requiring strict quality control and achievement of close tolerances on required dimensions Hence qualified persons having experience in fabrication of structure and installation of machinery must be employed
42 Quality and workmanship must be of highest standard suitable for naval ships and to be
to the satisfaction of inspecting authority 43 Any defects observed during inspection are to be liquidated by the sub-contractor at no
extra cost 44 Welding is to be carried out only by competent qualified and certified welders having
valid test certificate issued by ABS or IRS 45 All welding is to be done after proper edge preparation All welding are to be properly
dressed up 46 One coat of touch up paint in way of weld joint is to be done after proper cleaning 47 Local fairing of deck is to be done using strong back bar as required and the same is to
be removed after completion of work The affected areas are to be properly dressed up 48 Clean ship condition is to be maintained everyday
5 GRSE supply items
51 ABS quality plates amp sections as required
52 Anchor capstan assembly units including Stainless steel (AISI-316) holding down hex head bolts nuts and washers amp spring washers
53 Steel material for Jig
54 Primer for touch up
55 Loctite compound
56 Machining assistance if required 57 Compressed gas electrodes electricity and light 58 Scaffolding if necessary 59 Carne assistance (is necessary)
6 Sub-contractorrsquos scope of supply
61 Welding and cutting machine and accessories 62 Power drilling machine 63 Power extension board portable lamps 64 Proper safety equipment to be provided to the workmen (Helmets safety goggles mask
apron hand gloves harness working at elevation ec) 65 Supervisor The firm should provide supervisors with proper knowledge of the nature of work
should be present on board at all times
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 3 OF 10
DATE 270317 PREPARED BY MBISWAS
7 Inspection
Installation of Anchor capstan is to be inspected by GRSE (QA) CGRPT (Kol) and ABSIRS as per approved QAP Within 7 days from the date of order LOA QAP is to be submitted by the sub-contractor to GRSEQA for approval No of stage inspection will be decided by the inspecting officers GRSE Deck Machinery should depute their technical representative for assistance during installation
8 Manpower a) Sub-contractor should submit complete list of personnel as per their payroll alongwith ESI PF
reference and voter ID for Skilled labour including number of experienced marker fitter welder gas cutter etc Successful sub-contractor should undertake that these operatives would not be withdrawn jeopardizing the construction schedule
b) Similar details about engineers supervisors to be employed for the work
c) List of tools assets held with the company to be submitted
9 Hindrance Register
To be maintained by the sub-contractor and put up for approval by the Project Leader on weekly basis
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 4 OF 10
DATE 270317 PREPARED BY MBISWAS
Annexure - 1 GENERAL MOUNTING INSTRUCTIONS OF ANCHOR CAPSTAN ON DECK SEATING The Scope of this Instructions generally covers the Procedure for IN-SHOP ErectionInstallation of Anchor Capstan supplied by GRSE Deck Machinery as per GA Drg No107112 RevA on a cut-away Shiprsquos Seating Block (Ref GRSE Drg No2013-17110317 amp 110317-1) duly assembling therein all the constituent subassembliescomponents which comes in knocked down condition as dispatched from manufacturerrsquos premises 1 Scope 11 Underslung Worm Gear Box with vertical Main shaft (fitted with Clamp Key Bars and End Plate)
duly pre-assembled with Electric Motor cw Disc Brake via Worm GearWorm Shaft and Slipping Clutch cum Coupling at one end and Manually operated Bevel Gear Box with Clutch shifting lever Assembly at the other end
12 Base Plate fitted with Bush 13 Cable Lifter fitted with Bushes 14 Warping Head fitted with Hand Wheel Assembly 15 Manual operation Hand Wheel and Deck Socket Arrangement 15 Band Brake Assembly 16 Chain Reliever screwed on loose pads which are to be finally welded to the Base Plate after
aligning chain cable with naval pipe amp Anchor Hawse pipe 17 Naval Pipe Assly 18 Chain Support Assly 19 Holding Down Foundation Bolts 110 Control Panel amp Push Button Station 2 Instructions for Installation
Prior to starting on-board installation of the Anchor Capstans in Port amp Stbdsides it is to be ensured that the top deck surface in way of the capstan Base plate is duly machined and overall thickness of Deck foundation with provision of chocks in the interface of underslung units and deck does not exceed 525 mm to match with the vertical shaft length Necessary adjustments required if any are to be done only on thickness of the chocks to maintain proper assembly Hence follow the following steps
21 Examine Shiprsquos seating for Dimensions and Squareness in way of Capstan Foundation The overall thickness of the Seating (excluding Chocks) should be 512 (+-2) mm The top of Annular Bedplate (600 OD X 350 ID) should be duly machined Also check that Hand Holes are made in the 370 dia tubular shell of the ships seating to facilitate access to the vertical shaft interfaces with base plate Bottom Flange and underslung Gear Box top Flange 22 Position the Ships Seating upright and place the Base Plate on the machined annular bed plate of Ships seating as per orientation given in the GA Drawing Mark up the Bolt holes as per lsquoUpper Deck Foundation Detailsrsquo Drill amp ream the foundation Holes as required ensuring the Equipment Orientation on board Ship (Ref Fig No 1) Fit the Base Plate in position on the seating duly bolted to shiprsquos Seating (Ref Fig No 2) Repeat the same for installing the Base Plate of 2nd Capstan unit in Port Side 23 Invert the Shiprsquos Seating and place the same on an elevated level Support platform to facilitate
assembly of the underslung Machinery which will now appear on the top
24 Position the Underslung Gear Box Motor Assembly with vertical Main Shaft facing downward and insert same through the circular hole of Shiprsquos seating vis-agrave-vis through the Bush Bearing provided in the Hub of Base Plate so that the Gear Box Flange rests on the spigot of the interfacing flange of the Base Plate Rotate the Gear Box assly as per orientation of the Equipment Mark up the bolt position on Base Plate bottom flange if not already done from the Gear Box flange and bolt up the flanges of Base Plate and Gear Box ensuring orientation of the equipment properly There should be a gap between the shiprsquos seating and Gear box bottom surface in way of the holding down bolts to the tune of 13 mm which has to be compensated by chocks Measure the gap accurately in way of each bolt hole and adjust thickness accordingly with identification for each position Mark up all the Bolt Holes with Gear Box Assembly in position
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 5 OF 10
DATE 270317 PREPARED BY MBISWAS
25 Unscrew the Gear Box Assembly from the interfacing flanges of the Base Plate and remove same to complete drilling of the holding down bolt holes as per lsquoUnder Deck Foundation Detailsrsquo given in the GA drawing 26 Re-install the Gear Box Assembly on the Ships seating after inserting machined Chocks as required in respective bolt hole positions (as identified earlier) and tighten all bolts to complete the underslung holding downarrangement Foundation Bolts must now be tightened properly Repeat 24 to 26 for installing the Gear Box assly of 2nd Capstan unit in Port Side (Ref FigNo 3 amp 4) 27 Invert the Ships seating The Base Plate with Vertical Main Shaft protruding upward will now come on top as per actual arrangement in Port amp Stbd sides Unscrew the Clamps End Plate and withdraw key bars from the Main Shaft to introduce the Cable Lifter through the vertical Main Shaft Put back the Clamps on the Main Shaft and tighten the screws Ensure that the Cable lifter rotates freely on the Base Plate 28 Put back the Key Bars in position on the Main shaft and introduce the Warping Head sliding down through the Key ways Rotate same so that the driving dogs engage with those of the cable lifter below Check that when engaged the Cable Lifter rotates freely along with the Warping Head Fit the Hand Wheel at the screwed end and lower it to the level of the Warping Head so that the split retaining ring can be screwed on the top face of Warping Head Hub Screw up the end plate on the vertical shaft end 29 Rotate the Hand Wheel provided with the Warping Head counter clockwise to dis-engage from the Cable Lifter Check that there is adequate gap between the dogs of the two when the Warping Head is fully lifted up by operating the Hand Wheel Check for proper locking in both engaged and dis-engaged condition
210 Insert the Deck socket with Hand Wheel shaft through the Hole on the Deck Plate and ascertain that the Wheel shaft engages properly with the Hand operation Gear Box shaft extension protruding upward Mark up the Deck Socket Bolt Holes Remove the Hand Wheel Assembly and complete the drill Holes 211 Put back the Deck Socket and screw up to Deck Plate Dis-engage the Electro magnetic Disc Brake provided at NDE of Electric Motor Now engage the Clutch half of the Manual operation Gear Box by operating the Clutch Shifting Lever and rotate the Manual operation Hand Wheel to see that the Unit rotates freely in hoisting direction but locks in lowering direction by the pawl and ratchet provided at the output shaft of the Manual operation Gear Box 212 Put the Band Brake Assembly on The Cable Lifter and align the Brake operating Gear Box as per orientation given in the GA Drawing and check that the same rests on the shiprsquos seating provided separately Use chocks in way of the Bolt holes as necessary Fit the Keep plate on the Brake anchorage Pin Check that the Bands engage and releases properly when the Hand Wheel is rotated in the desired direction Weld the Brake Anchor Pin with Base Plate using low Hydrogen electrode Repeat 27 to 212 for 2nd Capstan unit in Port Side (Ref Fig No 5) 213 Place the Chain Reliever screwed with Pads on the outer wall of the Base Plate after scertaining its position wrt tight amp slack side of chain cable and check that there is adequate gap to permit free rotation of the Cable Lifter Weld the Pads of the Chain Reliever to the Base plate 214 Position the complete assly of Naval Pipe (GRSE Deck Machinery supply) within close proximity of cablelifter Weld the Lip plate in front of the Naval Pipe to ensure cable entry without jamming Lower portion of the Naval Pipe to be cut to shape and welded to the bellmouth (Shipyard Supply) 215 Put the Roller type Chain Support Assembly in line with the hawse pipe by adjustment of height (supplied with green material) and weld to Deck maintaining alignment of chain cable with cable lifter 216 Repeat 213 to 215 for 2nd Capstan unit in Port Side
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 6 OF 10
DATE 270317 PREPARED BY MBISWAS
217 Complete assembly of two Anchor Capstans (Port amp Stbd) wrt Anchor Hawse pipe and Naval pipe indicated in Fig No6 218 The IN-SHOP Erection Installation of both Anchor Capstans on the cut-away Shiprsquos Seating Block will thus be complete The Ships Seating Block along with Anchor Capstans (Port amp Stbd) will afterwards be taken for placement on Shiprsquos Deck for welding with Deck Structure During welding of this Block with Shiprsquos deck Structure all precautions for controlled welding should be taken to obviate any possibility of undue deformation stresses in the structure and installed equipment After completion of all welding both Anchor Capstans should be lubricated at all the Bearing points Gear Box (Oil capacity of the Gear Box is 10 Ltrs Apprx) The Anchor Capstan should be manually
operated to check that equipment runs without any resistance On completion of satisfactory Hand
operation the Control Panel and Push Button Station is to be connected to the Capstan suitably as per Interconnection diagram For detail connection and activation of circuit setting to workand to operate the Motor refer the Electrical Manual For initial startup and to run the Capstan on No-Load during STW ensure that the Electro-Magnetic Disc Brake (at the NDE of Electric Motor) is properly released activated and the Equipment runs without any resistance Equipments may be set to work on Electric Power mode followed by heavingveering of Chain Cable by the Cable Lifter for which positioning of Naval Pipe and Hawse Pipe is a pre-requisite to ensure free movement of Chain Cable during handling of Anchor 3 Salient Points 31 In order to ensure Water tightness around the interfaces of the base plate and Deck Seating Annular Bed Plate it is essential that the top of seating is machined to leave no gap when the Base plate is hard tightened on the seating by the Foundation Bolts However as an additional measure suitable Flange Sealant (LOCKTITE Product No 574 for gap fill up to 05 mm or equivalent) may be applied throughout the entire interface of Base Plate Annular Bed Plate (including fixing bolts) 2 Chocks do not get displaced after dismantling and same may be tack weldedto Deck Seating at the respective positions 3 Quality and workmanship have to be to the satisfaction of the inspecting Authority Installation defect if any is to be liquidated by the subcontractor at their cost
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
8 Micro amp Small Enterprise (रसकषि और छोट उदरि) -
i) For 20 value of a tender purchase preference to the tune of 15 (ie quoted price
falls within 15 of obtained L1 price) to be accorded to all participating MSEs in that
particular tender subject to acceptance of lowest quoted price (This clause is applicable
only when the job is divisible in nature and can be distributed to more than one vendor
subject to tender terms)
ii) In case of multiple bidders falling under the above category purchase preference to
be accorded in equal proportion within a limit of quantity allocated for this purpose as
above
iii) In case of such MSE is owned by SCST category entrepreneur then that
organization will be entitled for 4 out of 20 reserved for this purpose and of equal
proportion of the 16
iv) MSEs will also be entitled for following benefits -
a) Tender documents will be issued free of cost
b) Payment of Earnest Money will be exempted
However bidder has to submit Entrepreneurs Memorandum (EM-Part II) along with the
offer for such purpose to claim the benefit The service for which the exemption is
claimed should be in the listed items of EM-Part II
9 Tender Fee (िनविदा िलक) Tender Fee will be Rs 500- (Five Hundred) (non-
refundable) from NationalizedScheduled Bank other than Co-operative bank through
DDPO in favour of Garden Reach Shipbuilders amp Engineers Ltd payable at Kolkata Vendor need to submit tender fees as detailed in prescribed format in e-procurement
commercial data sheet and send the DDPO to Contract Cell GRSE MAIN Addresses to
Manager (Contract Cell) before due date of submission Please scan the Draft copy and
attach to General Documents part in e-procurement Non-submission of value of tender
documents may lead to offer rejection SSI Units registered under single point
registration with NSIC will be exempted from Tender Fee Deposit on submission of
valid NSIC single point registration certificate for particular product under tender
To claim the exemption a copy of the NSICMSME certificate with annexure is to be
scanned and enclosed with the technical bid and that the list of activities contained in
the NSIC certificateEM-Part II should cover the activity for which tender is issued and
to be confirmed in Techno-Commercial part of offer
10 EMD amount for Package A amp Package B to be submitted as follows -
i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any
one Package
EMD should be submitted in the form of DDPOBank Guarantee (as per format) in
favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II)
issued from NationalizedScheduled Bank other than Co-operative bank payable at
Kolkata through Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN and BG directly to GM(F) before due date of submission
Please scan the DDPOBG (As per format) and attach to General Documents part in e-
procurement Non-submission of EMD will lead to offer rejection SSI Units registered
under single point registration with NSIC will be exempted from Earnest Money Deposit
on submission of valid NSIC single point registration certificate for particular product
under tender EMD will be returned to the unsuccessful bidders on submission of
application with original money receipt EMD of successful bidder will be returned after
receipt of security deposit and against the purchase order
To claim the exemption a copy of the NSICMSME certificate with annexure is to be
scanned and enclosed with the technical bid and that the list of activities contained in
the NSIC certificateEM-Part II should cover the activity for which tender is issued and
to be confirmed in Techno-Commercial part of offer
11 Last date of submission of Bid Date of opening of bid is indicated in Tender
Document Tender is liable to be rejected if the requisite documents are not enclosed
with the technical offer
12 Date of opening of offer (Price Bid) will be notified in due course after conclusion of
TNCCNC meetings and acceptance of Techno-Commercial offer Price bids of the
qualified vendors could be viewed by the bidders from their own portal
13 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason
14 Acceptance Format Matrix should be filled up and attached with techno-commercial
bid as marks of acceptance of NITSOTRSTAC In case of non- receipt of filled in STACs
acceptance format matrix it would be presumed that you have accepted all our terms amp
conditions as per GRSE tender until amp unless deviation is specially mentioned in offer
15 Queries if any on SOR or other Terms may be got clarified from SM (Engg)-RBD for
technical clarifications and AGM (Contract) [Mob 8420008800] for commercial aspects
prior to submission of offer
During submission of offer through e-portal for any clarification regarding uploading of
offer in the E-PROCUREMENT system please contact DM (E-Proc)representative of
GRSE service provider [Mob 83369259448336925945]
16 L1 bidder will be decided on the basis of - Lowest obtained price per Ship for
two Package of job separately ie Fitment of Windows Scuttles amp Eyebrows
(Package A) and Installation of Anchor Capstan (Package B) GRSE at its discretion
may engage multiple vendors ship wise or in a single ship to maintain the construction
schedule For engaging multiple vendors rate established with L1 bidder will be offered to
other bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued Package wise for each ship against
established rate contract order
AGM (CONTRACT)
अपर िहापरिनधक (रसजविदा)
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 1 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 2 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 3 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 4 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 1 OF 10
DATE 270317 PREPARED BY MBISWAS
1 Scope of work ship Board scope of work is as follows - 11 Releasing of deck structure (ie seating) 3570x1400 mm overall size from
block for installation of anchor capstan
12 Installation of Anchor capstan sub assemblies on the deck structure stated above
13 Cutting of shiprsquos existing deck in way of anchor capstan matching with dimensions of deck structure if required
14 Placement of deck structure fitted with anchor capstan on board the ship and welding of same with deck structure
15 Carrying out Test amp trial of anchor capstan 2 Drawings Work is to be carried out as per following drawing document- 21 Seating for Anchor Capstan complete Drg no 2113-17110317
amp110317-1 22 Anchor amp cable arrangement plan 2113-17420101 23 General Arrangement of Anchor capstan Drg no 107112 24 Sectional Assembly of Anchor capstan Drg no 107111 25 Band Break Assembly Drg no 207073 26 Procedure for installation of Anchor capstan Annexure ndash I
All latest drawings shall be used for the job The requirement of drawings shall be forwarded to CDO through Project Leader 10 days in advance and collected from CDO 3 Installation of Anchor Capstan
31 Deck structure with upside down is to be placed on an elevated amp leveled jig 32 Under slung machineries are to be installed on deck structure as per instructions
indicated in Installation procedure 33 On completion deck structure with under slung machineries is to be inverted amp put on
jig Now above deck items are to be installed as per Installation procedure 34 Now the shiprsquos existing deck in way of anchor capstan is to be cut matching with the
dimensions of the deck structure if required 35 Deck structure fitted with anchor capstan is then to be placed in position on board the
ship and to be temporarily secured 36 Welding of deck structure with shiprsquos deck is to be done adopting controlled and
sequential welding All precautions during welding must be taken to obviate any possibility of undue deformation stresses in the structure as well as installed equipment
37 Also the under deck stiffeners of deck structure are to be joined to shiprsquos existing
stiffeners 38 On completion of all welding anchor capstan is to be manually operated to check that
equipment runs without any resistance 39 After STW (to be done by GRSE) the anchor capstan is to be operated using electrical
power and heaving and veering of chain cable is to be demonstrated
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 2 OF 10
DATE 270317 PREPARED BY MBISWAS
4 General Notes
41 Installation of anchor capstan is an intricate fabrication amp installation job requiring strict quality control and achievement of close tolerances on required dimensions Hence qualified persons having experience in fabrication of structure and installation of machinery must be employed
42 Quality and workmanship must be of highest standard suitable for naval ships and to be
to the satisfaction of inspecting authority 43 Any defects observed during inspection are to be liquidated by the sub-contractor at no
extra cost 44 Welding is to be carried out only by competent qualified and certified welders having
valid test certificate issued by ABS or IRS 45 All welding is to be done after proper edge preparation All welding are to be properly
dressed up 46 One coat of touch up paint in way of weld joint is to be done after proper cleaning 47 Local fairing of deck is to be done using strong back bar as required and the same is to
be removed after completion of work The affected areas are to be properly dressed up 48 Clean ship condition is to be maintained everyday
5 GRSE supply items
51 ABS quality plates amp sections as required
52 Anchor capstan assembly units including Stainless steel (AISI-316) holding down hex head bolts nuts and washers amp spring washers
53 Steel material for Jig
54 Primer for touch up
55 Loctite compound
56 Machining assistance if required 57 Compressed gas electrodes electricity and light 58 Scaffolding if necessary 59 Carne assistance (is necessary)
6 Sub-contractorrsquos scope of supply
61 Welding and cutting machine and accessories 62 Power drilling machine 63 Power extension board portable lamps 64 Proper safety equipment to be provided to the workmen (Helmets safety goggles mask
apron hand gloves harness working at elevation ec) 65 Supervisor The firm should provide supervisors with proper knowledge of the nature of work
should be present on board at all times
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 3 OF 10
DATE 270317 PREPARED BY MBISWAS
7 Inspection
Installation of Anchor capstan is to be inspected by GRSE (QA) CGRPT (Kol) and ABSIRS as per approved QAP Within 7 days from the date of order LOA QAP is to be submitted by the sub-contractor to GRSEQA for approval No of stage inspection will be decided by the inspecting officers GRSE Deck Machinery should depute their technical representative for assistance during installation
8 Manpower a) Sub-contractor should submit complete list of personnel as per their payroll alongwith ESI PF
reference and voter ID for Skilled labour including number of experienced marker fitter welder gas cutter etc Successful sub-contractor should undertake that these operatives would not be withdrawn jeopardizing the construction schedule
b) Similar details about engineers supervisors to be employed for the work
c) List of tools assets held with the company to be submitted
9 Hindrance Register
To be maintained by the sub-contractor and put up for approval by the Project Leader on weekly basis
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 4 OF 10
DATE 270317 PREPARED BY MBISWAS
Annexure - 1 GENERAL MOUNTING INSTRUCTIONS OF ANCHOR CAPSTAN ON DECK SEATING The Scope of this Instructions generally covers the Procedure for IN-SHOP ErectionInstallation of Anchor Capstan supplied by GRSE Deck Machinery as per GA Drg No107112 RevA on a cut-away Shiprsquos Seating Block (Ref GRSE Drg No2013-17110317 amp 110317-1) duly assembling therein all the constituent subassembliescomponents which comes in knocked down condition as dispatched from manufacturerrsquos premises 1 Scope 11 Underslung Worm Gear Box with vertical Main shaft (fitted with Clamp Key Bars and End Plate)
duly pre-assembled with Electric Motor cw Disc Brake via Worm GearWorm Shaft and Slipping Clutch cum Coupling at one end and Manually operated Bevel Gear Box with Clutch shifting lever Assembly at the other end
12 Base Plate fitted with Bush 13 Cable Lifter fitted with Bushes 14 Warping Head fitted with Hand Wheel Assembly 15 Manual operation Hand Wheel and Deck Socket Arrangement 15 Band Brake Assembly 16 Chain Reliever screwed on loose pads which are to be finally welded to the Base Plate after
aligning chain cable with naval pipe amp Anchor Hawse pipe 17 Naval Pipe Assly 18 Chain Support Assly 19 Holding Down Foundation Bolts 110 Control Panel amp Push Button Station 2 Instructions for Installation
Prior to starting on-board installation of the Anchor Capstans in Port amp Stbdsides it is to be ensured that the top deck surface in way of the capstan Base plate is duly machined and overall thickness of Deck foundation with provision of chocks in the interface of underslung units and deck does not exceed 525 mm to match with the vertical shaft length Necessary adjustments required if any are to be done only on thickness of the chocks to maintain proper assembly Hence follow the following steps
21 Examine Shiprsquos seating for Dimensions and Squareness in way of Capstan Foundation The overall thickness of the Seating (excluding Chocks) should be 512 (+-2) mm The top of Annular Bedplate (600 OD X 350 ID) should be duly machined Also check that Hand Holes are made in the 370 dia tubular shell of the ships seating to facilitate access to the vertical shaft interfaces with base plate Bottom Flange and underslung Gear Box top Flange 22 Position the Ships Seating upright and place the Base Plate on the machined annular bed plate of Ships seating as per orientation given in the GA Drawing Mark up the Bolt holes as per lsquoUpper Deck Foundation Detailsrsquo Drill amp ream the foundation Holes as required ensuring the Equipment Orientation on board Ship (Ref Fig No 1) Fit the Base Plate in position on the seating duly bolted to shiprsquos Seating (Ref Fig No 2) Repeat the same for installing the Base Plate of 2nd Capstan unit in Port Side 23 Invert the Shiprsquos Seating and place the same on an elevated level Support platform to facilitate
assembly of the underslung Machinery which will now appear on the top
24 Position the Underslung Gear Box Motor Assembly with vertical Main Shaft facing downward and insert same through the circular hole of Shiprsquos seating vis-agrave-vis through the Bush Bearing provided in the Hub of Base Plate so that the Gear Box Flange rests on the spigot of the interfacing flange of the Base Plate Rotate the Gear Box assly as per orientation of the Equipment Mark up the bolt position on Base Plate bottom flange if not already done from the Gear Box flange and bolt up the flanges of Base Plate and Gear Box ensuring orientation of the equipment properly There should be a gap between the shiprsquos seating and Gear box bottom surface in way of the holding down bolts to the tune of 13 mm which has to be compensated by chocks Measure the gap accurately in way of each bolt hole and adjust thickness accordingly with identification for each position Mark up all the Bolt Holes with Gear Box Assembly in position
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 5 OF 10
DATE 270317 PREPARED BY MBISWAS
25 Unscrew the Gear Box Assembly from the interfacing flanges of the Base Plate and remove same to complete drilling of the holding down bolt holes as per lsquoUnder Deck Foundation Detailsrsquo given in the GA drawing 26 Re-install the Gear Box Assembly on the Ships seating after inserting machined Chocks as required in respective bolt hole positions (as identified earlier) and tighten all bolts to complete the underslung holding downarrangement Foundation Bolts must now be tightened properly Repeat 24 to 26 for installing the Gear Box assly of 2nd Capstan unit in Port Side (Ref FigNo 3 amp 4) 27 Invert the Ships seating The Base Plate with Vertical Main Shaft protruding upward will now come on top as per actual arrangement in Port amp Stbd sides Unscrew the Clamps End Plate and withdraw key bars from the Main Shaft to introduce the Cable Lifter through the vertical Main Shaft Put back the Clamps on the Main Shaft and tighten the screws Ensure that the Cable lifter rotates freely on the Base Plate 28 Put back the Key Bars in position on the Main shaft and introduce the Warping Head sliding down through the Key ways Rotate same so that the driving dogs engage with those of the cable lifter below Check that when engaged the Cable Lifter rotates freely along with the Warping Head Fit the Hand Wheel at the screwed end and lower it to the level of the Warping Head so that the split retaining ring can be screwed on the top face of Warping Head Hub Screw up the end plate on the vertical shaft end 29 Rotate the Hand Wheel provided with the Warping Head counter clockwise to dis-engage from the Cable Lifter Check that there is adequate gap between the dogs of the two when the Warping Head is fully lifted up by operating the Hand Wheel Check for proper locking in both engaged and dis-engaged condition
210 Insert the Deck socket with Hand Wheel shaft through the Hole on the Deck Plate and ascertain that the Wheel shaft engages properly with the Hand operation Gear Box shaft extension protruding upward Mark up the Deck Socket Bolt Holes Remove the Hand Wheel Assembly and complete the drill Holes 211 Put back the Deck Socket and screw up to Deck Plate Dis-engage the Electro magnetic Disc Brake provided at NDE of Electric Motor Now engage the Clutch half of the Manual operation Gear Box by operating the Clutch Shifting Lever and rotate the Manual operation Hand Wheel to see that the Unit rotates freely in hoisting direction but locks in lowering direction by the pawl and ratchet provided at the output shaft of the Manual operation Gear Box 212 Put the Band Brake Assembly on The Cable Lifter and align the Brake operating Gear Box as per orientation given in the GA Drawing and check that the same rests on the shiprsquos seating provided separately Use chocks in way of the Bolt holes as necessary Fit the Keep plate on the Brake anchorage Pin Check that the Bands engage and releases properly when the Hand Wheel is rotated in the desired direction Weld the Brake Anchor Pin with Base Plate using low Hydrogen electrode Repeat 27 to 212 for 2nd Capstan unit in Port Side (Ref Fig No 5) 213 Place the Chain Reliever screwed with Pads on the outer wall of the Base Plate after scertaining its position wrt tight amp slack side of chain cable and check that there is adequate gap to permit free rotation of the Cable Lifter Weld the Pads of the Chain Reliever to the Base plate 214 Position the complete assly of Naval Pipe (GRSE Deck Machinery supply) within close proximity of cablelifter Weld the Lip plate in front of the Naval Pipe to ensure cable entry without jamming Lower portion of the Naval Pipe to be cut to shape and welded to the bellmouth (Shipyard Supply) 215 Put the Roller type Chain Support Assembly in line with the hawse pipe by adjustment of height (supplied with green material) and weld to Deck maintaining alignment of chain cable with cable lifter 216 Repeat 213 to 215 for 2nd Capstan unit in Port Side
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 6 OF 10
DATE 270317 PREPARED BY MBISWAS
217 Complete assembly of two Anchor Capstans (Port amp Stbd) wrt Anchor Hawse pipe and Naval pipe indicated in Fig No6 218 The IN-SHOP Erection Installation of both Anchor Capstans on the cut-away Shiprsquos Seating Block will thus be complete The Ships Seating Block along with Anchor Capstans (Port amp Stbd) will afterwards be taken for placement on Shiprsquos Deck for welding with Deck Structure During welding of this Block with Shiprsquos deck Structure all precautions for controlled welding should be taken to obviate any possibility of undue deformation stresses in the structure and installed equipment After completion of all welding both Anchor Capstans should be lubricated at all the Bearing points Gear Box (Oil capacity of the Gear Box is 10 Ltrs Apprx) The Anchor Capstan should be manually
operated to check that equipment runs without any resistance On completion of satisfactory Hand
operation the Control Panel and Push Button Station is to be connected to the Capstan suitably as per Interconnection diagram For detail connection and activation of circuit setting to workand to operate the Motor refer the Electrical Manual For initial startup and to run the Capstan on No-Load during STW ensure that the Electro-Magnetic Disc Brake (at the NDE of Electric Motor) is properly released activated and the Equipment runs without any resistance Equipments may be set to work on Electric Power mode followed by heavingveering of Chain Cable by the Cable Lifter for which positioning of Naval Pipe and Hawse Pipe is a pre-requisite to ensure free movement of Chain Cable during handling of Anchor 3 Salient Points 31 In order to ensure Water tightness around the interfaces of the base plate and Deck Seating Annular Bed Plate it is essential that the top of seating is machined to leave no gap when the Base plate is hard tightened on the seating by the Foundation Bolts However as an additional measure suitable Flange Sealant (LOCKTITE Product No 574 for gap fill up to 05 mm or equivalent) may be applied throughout the entire interface of Base Plate Annular Bed Plate (including fixing bolts) 2 Chocks do not get displaced after dismantling and same may be tack weldedto Deck Seating at the respective positions 3 Quality and workmanship have to be to the satisfaction of the inspecting Authority Installation defect if any is to be liquidated by the subcontractor at their cost
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
under single point registration with NSIC will be exempted from Earnest Money Deposit
on submission of valid NSIC single point registration certificate for particular product
under tender EMD will be returned to the unsuccessful bidders on submission of
application with original money receipt EMD of successful bidder will be returned after
receipt of security deposit and against the purchase order
To claim the exemption a copy of the NSICMSME certificate with annexure is to be
scanned and enclosed with the technical bid and that the list of activities contained in
the NSIC certificateEM-Part II should cover the activity for which tender is issued and
to be confirmed in Techno-Commercial part of offer
11 Last date of submission of Bid Date of opening of bid is indicated in Tender
Document Tender is liable to be rejected if the requisite documents are not enclosed
with the technical offer
12 Date of opening of offer (Price Bid) will be notified in due course after conclusion of
TNCCNC meetings and acceptance of Techno-Commercial offer Price bids of the
qualified vendors could be viewed by the bidders from their own portal
13 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason
14 Acceptance Format Matrix should be filled up and attached with techno-commercial
bid as marks of acceptance of NITSOTRSTAC In case of non- receipt of filled in STACs
acceptance format matrix it would be presumed that you have accepted all our terms amp
conditions as per GRSE tender until amp unless deviation is specially mentioned in offer
15 Queries if any on SOR or other Terms may be got clarified from SM (Engg)-RBD for
technical clarifications and AGM (Contract) [Mob 8420008800] for commercial aspects
prior to submission of offer
During submission of offer through e-portal for any clarification regarding uploading of
offer in the E-PROCUREMENT system please contact DM (E-Proc)representative of
GRSE service provider [Mob 83369259448336925945]
16 L1 bidder will be decided on the basis of - Lowest obtained price per Ship for
two Package of job separately ie Fitment of Windows Scuttles amp Eyebrows
(Package A) and Installation of Anchor Capstan (Package B) GRSE at its discretion
may engage multiple vendors ship wise or in a single ship to maintain the construction
schedule For engaging multiple vendors rate established with L1 bidder will be offered to
other bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued Package wise for each ship against
established rate contract order
AGM (CONTRACT)
अपर िहापरिनधक (रसजविदा)
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 1 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 2 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 3 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 4 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 1 OF 10
DATE 270317 PREPARED BY MBISWAS
1 Scope of work ship Board scope of work is as follows - 11 Releasing of deck structure (ie seating) 3570x1400 mm overall size from
block for installation of anchor capstan
12 Installation of Anchor capstan sub assemblies on the deck structure stated above
13 Cutting of shiprsquos existing deck in way of anchor capstan matching with dimensions of deck structure if required
14 Placement of deck structure fitted with anchor capstan on board the ship and welding of same with deck structure
15 Carrying out Test amp trial of anchor capstan 2 Drawings Work is to be carried out as per following drawing document- 21 Seating for Anchor Capstan complete Drg no 2113-17110317
amp110317-1 22 Anchor amp cable arrangement plan 2113-17420101 23 General Arrangement of Anchor capstan Drg no 107112 24 Sectional Assembly of Anchor capstan Drg no 107111 25 Band Break Assembly Drg no 207073 26 Procedure for installation of Anchor capstan Annexure ndash I
All latest drawings shall be used for the job The requirement of drawings shall be forwarded to CDO through Project Leader 10 days in advance and collected from CDO 3 Installation of Anchor Capstan
31 Deck structure with upside down is to be placed on an elevated amp leveled jig 32 Under slung machineries are to be installed on deck structure as per instructions
indicated in Installation procedure 33 On completion deck structure with under slung machineries is to be inverted amp put on
jig Now above deck items are to be installed as per Installation procedure 34 Now the shiprsquos existing deck in way of anchor capstan is to be cut matching with the
dimensions of the deck structure if required 35 Deck structure fitted with anchor capstan is then to be placed in position on board the
ship and to be temporarily secured 36 Welding of deck structure with shiprsquos deck is to be done adopting controlled and
sequential welding All precautions during welding must be taken to obviate any possibility of undue deformation stresses in the structure as well as installed equipment
37 Also the under deck stiffeners of deck structure are to be joined to shiprsquos existing
stiffeners 38 On completion of all welding anchor capstan is to be manually operated to check that
equipment runs without any resistance 39 After STW (to be done by GRSE) the anchor capstan is to be operated using electrical
power and heaving and veering of chain cable is to be demonstrated
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 2 OF 10
DATE 270317 PREPARED BY MBISWAS
4 General Notes
41 Installation of anchor capstan is an intricate fabrication amp installation job requiring strict quality control and achievement of close tolerances on required dimensions Hence qualified persons having experience in fabrication of structure and installation of machinery must be employed
42 Quality and workmanship must be of highest standard suitable for naval ships and to be
to the satisfaction of inspecting authority 43 Any defects observed during inspection are to be liquidated by the sub-contractor at no
extra cost 44 Welding is to be carried out only by competent qualified and certified welders having
valid test certificate issued by ABS or IRS 45 All welding is to be done after proper edge preparation All welding are to be properly
dressed up 46 One coat of touch up paint in way of weld joint is to be done after proper cleaning 47 Local fairing of deck is to be done using strong back bar as required and the same is to
be removed after completion of work The affected areas are to be properly dressed up 48 Clean ship condition is to be maintained everyday
5 GRSE supply items
51 ABS quality plates amp sections as required
52 Anchor capstan assembly units including Stainless steel (AISI-316) holding down hex head bolts nuts and washers amp spring washers
53 Steel material for Jig
54 Primer for touch up
55 Loctite compound
56 Machining assistance if required 57 Compressed gas electrodes electricity and light 58 Scaffolding if necessary 59 Carne assistance (is necessary)
6 Sub-contractorrsquos scope of supply
61 Welding and cutting machine and accessories 62 Power drilling machine 63 Power extension board portable lamps 64 Proper safety equipment to be provided to the workmen (Helmets safety goggles mask
apron hand gloves harness working at elevation ec) 65 Supervisor The firm should provide supervisors with proper knowledge of the nature of work
should be present on board at all times
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 3 OF 10
DATE 270317 PREPARED BY MBISWAS
7 Inspection
Installation of Anchor capstan is to be inspected by GRSE (QA) CGRPT (Kol) and ABSIRS as per approved QAP Within 7 days from the date of order LOA QAP is to be submitted by the sub-contractor to GRSEQA for approval No of stage inspection will be decided by the inspecting officers GRSE Deck Machinery should depute their technical representative for assistance during installation
8 Manpower a) Sub-contractor should submit complete list of personnel as per their payroll alongwith ESI PF
reference and voter ID for Skilled labour including number of experienced marker fitter welder gas cutter etc Successful sub-contractor should undertake that these operatives would not be withdrawn jeopardizing the construction schedule
b) Similar details about engineers supervisors to be employed for the work
c) List of tools assets held with the company to be submitted
9 Hindrance Register
To be maintained by the sub-contractor and put up for approval by the Project Leader on weekly basis
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 4 OF 10
DATE 270317 PREPARED BY MBISWAS
Annexure - 1 GENERAL MOUNTING INSTRUCTIONS OF ANCHOR CAPSTAN ON DECK SEATING The Scope of this Instructions generally covers the Procedure for IN-SHOP ErectionInstallation of Anchor Capstan supplied by GRSE Deck Machinery as per GA Drg No107112 RevA on a cut-away Shiprsquos Seating Block (Ref GRSE Drg No2013-17110317 amp 110317-1) duly assembling therein all the constituent subassembliescomponents which comes in knocked down condition as dispatched from manufacturerrsquos premises 1 Scope 11 Underslung Worm Gear Box with vertical Main shaft (fitted with Clamp Key Bars and End Plate)
duly pre-assembled with Electric Motor cw Disc Brake via Worm GearWorm Shaft and Slipping Clutch cum Coupling at one end and Manually operated Bevel Gear Box with Clutch shifting lever Assembly at the other end
12 Base Plate fitted with Bush 13 Cable Lifter fitted with Bushes 14 Warping Head fitted with Hand Wheel Assembly 15 Manual operation Hand Wheel and Deck Socket Arrangement 15 Band Brake Assembly 16 Chain Reliever screwed on loose pads which are to be finally welded to the Base Plate after
aligning chain cable with naval pipe amp Anchor Hawse pipe 17 Naval Pipe Assly 18 Chain Support Assly 19 Holding Down Foundation Bolts 110 Control Panel amp Push Button Station 2 Instructions for Installation
Prior to starting on-board installation of the Anchor Capstans in Port amp Stbdsides it is to be ensured that the top deck surface in way of the capstan Base plate is duly machined and overall thickness of Deck foundation with provision of chocks in the interface of underslung units and deck does not exceed 525 mm to match with the vertical shaft length Necessary adjustments required if any are to be done only on thickness of the chocks to maintain proper assembly Hence follow the following steps
21 Examine Shiprsquos seating for Dimensions and Squareness in way of Capstan Foundation The overall thickness of the Seating (excluding Chocks) should be 512 (+-2) mm The top of Annular Bedplate (600 OD X 350 ID) should be duly machined Also check that Hand Holes are made in the 370 dia tubular shell of the ships seating to facilitate access to the vertical shaft interfaces with base plate Bottom Flange and underslung Gear Box top Flange 22 Position the Ships Seating upright and place the Base Plate on the machined annular bed plate of Ships seating as per orientation given in the GA Drawing Mark up the Bolt holes as per lsquoUpper Deck Foundation Detailsrsquo Drill amp ream the foundation Holes as required ensuring the Equipment Orientation on board Ship (Ref Fig No 1) Fit the Base Plate in position on the seating duly bolted to shiprsquos Seating (Ref Fig No 2) Repeat the same for installing the Base Plate of 2nd Capstan unit in Port Side 23 Invert the Shiprsquos Seating and place the same on an elevated level Support platform to facilitate
assembly of the underslung Machinery which will now appear on the top
24 Position the Underslung Gear Box Motor Assembly with vertical Main Shaft facing downward and insert same through the circular hole of Shiprsquos seating vis-agrave-vis through the Bush Bearing provided in the Hub of Base Plate so that the Gear Box Flange rests on the spigot of the interfacing flange of the Base Plate Rotate the Gear Box assly as per orientation of the Equipment Mark up the bolt position on Base Plate bottom flange if not already done from the Gear Box flange and bolt up the flanges of Base Plate and Gear Box ensuring orientation of the equipment properly There should be a gap between the shiprsquos seating and Gear box bottom surface in way of the holding down bolts to the tune of 13 mm which has to be compensated by chocks Measure the gap accurately in way of each bolt hole and adjust thickness accordingly with identification for each position Mark up all the Bolt Holes with Gear Box Assembly in position
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 5 OF 10
DATE 270317 PREPARED BY MBISWAS
25 Unscrew the Gear Box Assembly from the interfacing flanges of the Base Plate and remove same to complete drilling of the holding down bolt holes as per lsquoUnder Deck Foundation Detailsrsquo given in the GA drawing 26 Re-install the Gear Box Assembly on the Ships seating after inserting machined Chocks as required in respective bolt hole positions (as identified earlier) and tighten all bolts to complete the underslung holding downarrangement Foundation Bolts must now be tightened properly Repeat 24 to 26 for installing the Gear Box assly of 2nd Capstan unit in Port Side (Ref FigNo 3 amp 4) 27 Invert the Ships seating The Base Plate with Vertical Main Shaft protruding upward will now come on top as per actual arrangement in Port amp Stbd sides Unscrew the Clamps End Plate and withdraw key bars from the Main Shaft to introduce the Cable Lifter through the vertical Main Shaft Put back the Clamps on the Main Shaft and tighten the screws Ensure that the Cable lifter rotates freely on the Base Plate 28 Put back the Key Bars in position on the Main shaft and introduce the Warping Head sliding down through the Key ways Rotate same so that the driving dogs engage with those of the cable lifter below Check that when engaged the Cable Lifter rotates freely along with the Warping Head Fit the Hand Wheel at the screwed end and lower it to the level of the Warping Head so that the split retaining ring can be screwed on the top face of Warping Head Hub Screw up the end plate on the vertical shaft end 29 Rotate the Hand Wheel provided with the Warping Head counter clockwise to dis-engage from the Cable Lifter Check that there is adequate gap between the dogs of the two when the Warping Head is fully lifted up by operating the Hand Wheel Check for proper locking in both engaged and dis-engaged condition
210 Insert the Deck socket with Hand Wheel shaft through the Hole on the Deck Plate and ascertain that the Wheel shaft engages properly with the Hand operation Gear Box shaft extension protruding upward Mark up the Deck Socket Bolt Holes Remove the Hand Wheel Assembly and complete the drill Holes 211 Put back the Deck Socket and screw up to Deck Plate Dis-engage the Electro magnetic Disc Brake provided at NDE of Electric Motor Now engage the Clutch half of the Manual operation Gear Box by operating the Clutch Shifting Lever and rotate the Manual operation Hand Wheel to see that the Unit rotates freely in hoisting direction but locks in lowering direction by the pawl and ratchet provided at the output shaft of the Manual operation Gear Box 212 Put the Band Brake Assembly on The Cable Lifter and align the Brake operating Gear Box as per orientation given in the GA Drawing and check that the same rests on the shiprsquos seating provided separately Use chocks in way of the Bolt holes as necessary Fit the Keep plate on the Brake anchorage Pin Check that the Bands engage and releases properly when the Hand Wheel is rotated in the desired direction Weld the Brake Anchor Pin with Base Plate using low Hydrogen electrode Repeat 27 to 212 for 2nd Capstan unit in Port Side (Ref Fig No 5) 213 Place the Chain Reliever screwed with Pads on the outer wall of the Base Plate after scertaining its position wrt tight amp slack side of chain cable and check that there is adequate gap to permit free rotation of the Cable Lifter Weld the Pads of the Chain Reliever to the Base plate 214 Position the complete assly of Naval Pipe (GRSE Deck Machinery supply) within close proximity of cablelifter Weld the Lip plate in front of the Naval Pipe to ensure cable entry without jamming Lower portion of the Naval Pipe to be cut to shape and welded to the bellmouth (Shipyard Supply) 215 Put the Roller type Chain Support Assembly in line with the hawse pipe by adjustment of height (supplied with green material) and weld to Deck maintaining alignment of chain cable with cable lifter 216 Repeat 213 to 215 for 2nd Capstan unit in Port Side
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 6 OF 10
DATE 270317 PREPARED BY MBISWAS
217 Complete assembly of two Anchor Capstans (Port amp Stbd) wrt Anchor Hawse pipe and Naval pipe indicated in Fig No6 218 The IN-SHOP Erection Installation of both Anchor Capstans on the cut-away Shiprsquos Seating Block will thus be complete The Ships Seating Block along with Anchor Capstans (Port amp Stbd) will afterwards be taken for placement on Shiprsquos Deck for welding with Deck Structure During welding of this Block with Shiprsquos deck Structure all precautions for controlled welding should be taken to obviate any possibility of undue deformation stresses in the structure and installed equipment After completion of all welding both Anchor Capstans should be lubricated at all the Bearing points Gear Box (Oil capacity of the Gear Box is 10 Ltrs Apprx) The Anchor Capstan should be manually
operated to check that equipment runs without any resistance On completion of satisfactory Hand
operation the Control Panel and Push Button Station is to be connected to the Capstan suitably as per Interconnection diagram For detail connection and activation of circuit setting to workand to operate the Motor refer the Electrical Manual For initial startup and to run the Capstan on No-Load during STW ensure that the Electro-Magnetic Disc Brake (at the NDE of Electric Motor) is properly released activated and the Equipment runs without any resistance Equipments may be set to work on Electric Power mode followed by heavingveering of Chain Cable by the Cable Lifter for which positioning of Naval Pipe and Hawse Pipe is a pre-requisite to ensure free movement of Chain Cable during handling of Anchor 3 Salient Points 31 In order to ensure Water tightness around the interfaces of the base plate and Deck Seating Annular Bed Plate it is essential that the top of seating is machined to leave no gap when the Base plate is hard tightened on the seating by the Foundation Bolts However as an additional measure suitable Flange Sealant (LOCKTITE Product No 574 for gap fill up to 05 mm or equivalent) may be applied throughout the entire interface of Base Plate Annular Bed Plate (including fixing bolts) 2 Chocks do not get displaced after dismantling and same may be tack weldedto Deck Seating at the respective positions 3 Quality and workmanship have to be to the satisfaction of the inspecting Authority Installation defect if any is to be liquidated by the subcontractor at their cost
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 1 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 2 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 3 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 4 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 1 OF 10
DATE 270317 PREPARED BY MBISWAS
1 Scope of work ship Board scope of work is as follows - 11 Releasing of deck structure (ie seating) 3570x1400 mm overall size from
block for installation of anchor capstan
12 Installation of Anchor capstan sub assemblies on the deck structure stated above
13 Cutting of shiprsquos existing deck in way of anchor capstan matching with dimensions of deck structure if required
14 Placement of deck structure fitted with anchor capstan on board the ship and welding of same with deck structure
15 Carrying out Test amp trial of anchor capstan 2 Drawings Work is to be carried out as per following drawing document- 21 Seating for Anchor Capstan complete Drg no 2113-17110317
amp110317-1 22 Anchor amp cable arrangement plan 2113-17420101 23 General Arrangement of Anchor capstan Drg no 107112 24 Sectional Assembly of Anchor capstan Drg no 107111 25 Band Break Assembly Drg no 207073 26 Procedure for installation of Anchor capstan Annexure ndash I
All latest drawings shall be used for the job The requirement of drawings shall be forwarded to CDO through Project Leader 10 days in advance and collected from CDO 3 Installation of Anchor Capstan
31 Deck structure with upside down is to be placed on an elevated amp leveled jig 32 Under slung machineries are to be installed on deck structure as per instructions
indicated in Installation procedure 33 On completion deck structure with under slung machineries is to be inverted amp put on
jig Now above deck items are to be installed as per Installation procedure 34 Now the shiprsquos existing deck in way of anchor capstan is to be cut matching with the
dimensions of the deck structure if required 35 Deck structure fitted with anchor capstan is then to be placed in position on board the
ship and to be temporarily secured 36 Welding of deck structure with shiprsquos deck is to be done adopting controlled and
sequential welding All precautions during welding must be taken to obviate any possibility of undue deformation stresses in the structure as well as installed equipment
37 Also the under deck stiffeners of deck structure are to be joined to shiprsquos existing
stiffeners 38 On completion of all welding anchor capstan is to be manually operated to check that
equipment runs without any resistance 39 After STW (to be done by GRSE) the anchor capstan is to be operated using electrical
power and heaving and veering of chain cable is to be demonstrated
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 2 OF 10
DATE 270317 PREPARED BY MBISWAS
4 General Notes
41 Installation of anchor capstan is an intricate fabrication amp installation job requiring strict quality control and achievement of close tolerances on required dimensions Hence qualified persons having experience in fabrication of structure and installation of machinery must be employed
42 Quality and workmanship must be of highest standard suitable for naval ships and to be
to the satisfaction of inspecting authority 43 Any defects observed during inspection are to be liquidated by the sub-contractor at no
extra cost 44 Welding is to be carried out only by competent qualified and certified welders having
valid test certificate issued by ABS or IRS 45 All welding is to be done after proper edge preparation All welding are to be properly
dressed up 46 One coat of touch up paint in way of weld joint is to be done after proper cleaning 47 Local fairing of deck is to be done using strong back bar as required and the same is to
be removed after completion of work The affected areas are to be properly dressed up 48 Clean ship condition is to be maintained everyday
5 GRSE supply items
51 ABS quality plates amp sections as required
52 Anchor capstan assembly units including Stainless steel (AISI-316) holding down hex head bolts nuts and washers amp spring washers
53 Steel material for Jig
54 Primer for touch up
55 Loctite compound
56 Machining assistance if required 57 Compressed gas electrodes electricity and light 58 Scaffolding if necessary 59 Carne assistance (is necessary)
6 Sub-contractorrsquos scope of supply
61 Welding and cutting machine and accessories 62 Power drilling machine 63 Power extension board portable lamps 64 Proper safety equipment to be provided to the workmen (Helmets safety goggles mask
apron hand gloves harness working at elevation ec) 65 Supervisor The firm should provide supervisors with proper knowledge of the nature of work
should be present on board at all times
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 3 OF 10
DATE 270317 PREPARED BY MBISWAS
7 Inspection
Installation of Anchor capstan is to be inspected by GRSE (QA) CGRPT (Kol) and ABSIRS as per approved QAP Within 7 days from the date of order LOA QAP is to be submitted by the sub-contractor to GRSEQA for approval No of stage inspection will be decided by the inspecting officers GRSE Deck Machinery should depute their technical representative for assistance during installation
8 Manpower a) Sub-contractor should submit complete list of personnel as per their payroll alongwith ESI PF
reference and voter ID for Skilled labour including number of experienced marker fitter welder gas cutter etc Successful sub-contractor should undertake that these operatives would not be withdrawn jeopardizing the construction schedule
b) Similar details about engineers supervisors to be employed for the work
c) List of tools assets held with the company to be submitted
9 Hindrance Register
To be maintained by the sub-contractor and put up for approval by the Project Leader on weekly basis
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 4 OF 10
DATE 270317 PREPARED BY MBISWAS
Annexure - 1 GENERAL MOUNTING INSTRUCTIONS OF ANCHOR CAPSTAN ON DECK SEATING The Scope of this Instructions generally covers the Procedure for IN-SHOP ErectionInstallation of Anchor Capstan supplied by GRSE Deck Machinery as per GA Drg No107112 RevA on a cut-away Shiprsquos Seating Block (Ref GRSE Drg No2013-17110317 amp 110317-1) duly assembling therein all the constituent subassembliescomponents which comes in knocked down condition as dispatched from manufacturerrsquos premises 1 Scope 11 Underslung Worm Gear Box with vertical Main shaft (fitted with Clamp Key Bars and End Plate)
duly pre-assembled with Electric Motor cw Disc Brake via Worm GearWorm Shaft and Slipping Clutch cum Coupling at one end and Manually operated Bevel Gear Box with Clutch shifting lever Assembly at the other end
12 Base Plate fitted with Bush 13 Cable Lifter fitted with Bushes 14 Warping Head fitted with Hand Wheel Assembly 15 Manual operation Hand Wheel and Deck Socket Arrangement 15 Band Brake Assembly 16 Chain Reliever screwed on loose pads which are to be finally welded to the Base Plate after
aligning chain cable with naval pipe amp Anchor Hawse pipe 17 Naval Pipe Assly 18 Chain Support Assly 19 Holding Down Foundation Bolts 110 Control Panel amp Push Button Station 2 Instructions for Installation
Prior to starting on-board installation of the Anchor Capstans in Port amp Stbdsides it is to be ensured that the top deck surface in way of the capstan Base plate is duly machined and overall thickness of Deck foundation with provision of chocks in the interface of underslung units and deck does not exceed 525 mm to match with the vertical shaft length Necessary adjustments required if any are to be done only on thickness of the chocks to maintain proper assembly Hence follow the following steps
21 Examine Shiprsquos seating for Dimensions and Squareness in way of Capstan Foundation The overall thickness of the Seating (excluding Chocks) should be 512 (+-2) mm The top of Annular Bedplate (600 OD X 350 ID) should be duly machined Also check that Hand Holes are made in the 370 dia tubular shell of the ships seating to facilitate access to the vertical shaft interfaces with base plate Bottom Flange and underslung Gear Box top Flange 22 Position the Ships Seating upright and place the Base Plate on the machined annular bed plate of Ships seating as per orientation given in the GA Drawing Mark up the Bolt holes as per lsquoUpper Deck Foundation Detailsrsquo Drill amp ream the foundation Holes as required ensuring the Equipment Orientation on board Ship (Ref Fig No 1) Fit the Base Plate in position on the seating duly bolted to shiprsquos Seating (Ref Fig No 2) Repeat the same for installing the Base Plate of 2nd Capstan unit in Port Side 23 Invert the Shiprsquos Seating and place the same on an elevated level Support platform to facilitate
assembly of the underslung Machinery which will now appear on the top
24 Position the Underslung Gear Box Motor Assembly with vertical Main Shaft facing downward and insert same through the circular hole of Shiprsquos seating vis-agrave-vis through the Bush Bearing provided in the Hub of Base Plate so that the Gear Box Flange rests on the spigot of the interfacing flange of the Base Plate Rotate the Gear Box assly as per orientation of the Equipment Mark up the bolt position on Base Plate bottom flange if not already done from the Gear Box flange and bolt up the flanges of Base Plate and Gear Box ensuring orientation of the equipment properly There should be a gap between the shiprsquos seating and Gear box bottom surface in way of the holding down bolts to the tune of 13 mm which has to be compensated by chocks Measure the gap accurately in way of each bolt hole and adjust thickness accordingly with identification for each position Mark up all the Bolt Holes with Gear Box Assembly in position
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 5 OF 10
DATE 270317 PREPARED BY MBISWAS
25 Unscrew the Gear Box Assembly from the interfacing flanges of the Base Plate and remove same to complete drilling of the holding down bolt holes as per lsquoUnder Deck Foundation Detailsrsquo given in the GA drawing 26 Re-install the Gear Box Assembly on the Ships seating after inserting machined Chocks as required in respective bolt hole positions (as identified earlier) and tighten all bolts to complete the underslung holding downarrangement Foundation Bolts must now be tightened properly Repeat 24 to 26 for installing the Gear Box assly of 2nd Capstan unit in Port Side (Ref FigNo 3 amp 4) 27 Invert the Ships seating The Base Plate with Vertical Main Shaft protruding upward will now come on top as per actual arrangement in Port amp Stbd sides Unscrew the Clamps End Plate and withdraw key bars from the Main Shaft to introduce the Cable Lifter through the vertical Main Shaft Put back the Clamps on the Main Shaft and tighten the screws Ensure that the Cable lifter rotates freely on the Base Plate 28 Put back the Key Bars in position on the Main shaft and introduce the Warping Head sliding down through the Key ways Rotate same so that the driving dogs engage with those of the cable lifter below Check that when engaged the Cable Lifter rotates freely along with the Warping Head Fit the Hand Wheel at the screwed end and lower it to the level of the Warping Head so that the split retaining ring can be screwed on the top face of Warping Head Hub Screw up the end plate on the vertical shaft end 29 Rotate the Hand Wheel provided with the Warping Head counter clockwise to dis-engage from the Cable Lifter Check that there is adequate gap between the dogs of the two when the Warping Head is fully lifted up by operating the Hand Wheel Check for proper locking in both engaged and dis-engaged condition
210 Insert the Deck socket with Hand Wheel shaft through the Hole on the Deck Plate and ascertain that the Wheel shaft engages properly with the Hand operation Gear Box shaft extension protruding upward Mark up the Deck Socket Bolt Holes Remove the Hand Wheel Assembly and complete the drill Holes 211 Put back the Deck Socket and screw up to Deck Plate Dis-engage the Electro magnetic Disc Brake provided at NDE of Electric Motor Now engage the Clutch half of the Manual operation Gear Box by operating the Clutch Shifting Lever and rotate the Manual operation Hand Wheel to see that the Unit rotates freely in hoisting direction but locks in lowering direction by the pawl and ratchet provided at the output shaft of the Manual operation Gear Box 212 Put the Band Brake Assembly on The Cable Lifter and align the Brake operating Gear Box as per orientation given in the GA Drawing and check that the same rests on the shiprsquos seating provided separately Use chocks in way of the Bolt holes as necessary Fit the Keep plate on the Brake anchorage Pin Check that the Bands engage and releases properly when the Hand Wheel is rotated in the desired direction Weld the Brake Anchor Pin with Base Plate using low Hydrogen electrode Repeat 27 to 212 for 2nd Capstan unit in Port Side (Ref Fig No 5) 213 Place the Chain Reliever screwed with Pads on the outer wall of the Base Plate after scertaining its position wrt tight amp slack side of chain cable and check that there is adequate gap to permit free rotation of the Cable Lifter Weld the Pads of the Chain Reliever to the Base plate 214 Position the complete assly of Naval Pipe (GRSE Deck Machinery supply) within close proximity of cablelifter Weld the Lip plate in front of the Naval Pipe to ensure cable entry without jamming Lower portion of the Naval Pipe to be cut to shape and welded to the bellmouth (Shipyard Supply) 215 Put the Roller type Chain Support Assembly in line with the hawse pipe by adjustment of height (supplied with green material) and weld to Deck maintaining alignment of chain cable with cable lifter 216 Repeat 213 to 215 for 2nd Capstan unit in Port Side
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 6 OF 10
DATE 270317 PREPARED BY MBISWAS
217 Complete assembly of two Anchor Capstans (Port amp Stbd) wrt Anchor Hawse pipe and Naval pipe indicated in Fig No6 218 The IN-SHOP Erection Installation of both Anchor Capstans on the cut-away Shiprsquos Seating Block will thus be complete The Ships Seating Block along with Anchor Capstans (Port amp Stbd) will afterwards be taken for placement on Shiprsquos Deck for welding with Deck Structure During welding of this Block with Shiprsquos deck Structure all precautions for controlled welding should be taken to obviate any possibility of undue deformation stresses in the structure and installed equipment After completion of all welding both Anchor Capstans should be lubricated at all the Bearing points Gear Box (Oil capacity of the Gear Box is 10 Ltrs Apprx) The Anchor Capstan should be manually
operated to check that equipment runs without any resistance On completion of satisfactory Hand
operation the Control Panel and Push Button Station is to be connected to the Capstan suitably as per Interconnection diagram For detail connection and activation of circuit setting to workand to operate the Motor refer the Electrical Manual For initial startup and to run the Capstan on No-Load during STW ensure that the Electro-Magnetic Disc Brake (at the NDE of Electric Motor) is properly released activated and the Equipment runs without any resistance Equipments may be set to work on Electric Power mode followed by heavingveering of Chain Cable by the Cable Lifter for which positioning of Naval Pipe and Hawse Pipe is a pre-requisite to ensure free movement of Chain Cable during handling of Anchor 3 Salient Points 31 In order to ensure Water tightness around the interfaces of the base plate and Deck Seating Annular Bed Plate it is essential that the top of seating is machined to leave no gap when the Base plate is hard tightened on the seating by the Foundation Bolts However as an additional measure suitable Flange Sealant (LOCKTITE Product No 574 for gap fill up to 05 mm or equivalent) may be applied throughout the entire interface of Base Plate Annular Bed Plate (including fixing bolts) 2 Chocks do not get displaced after dismantling and same may be tack weldedto Deck Seating at the respective positions 3 Quality and workmanship have to be to the satisfaction of the inspecting Authority Installation defect if any is to be liquidated by the subcontractor at their cost
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 2 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 3 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 4 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 1 OF 10
DATE 270317 PREPARED BY MBISWAS
1 Scope of work ship Board scope of work is as follows - 11 Releasing of deck structure (ie seating) 3570x1400 mm overall size from
block for installation of anchor capstan
12 Installation of Anchor capstan sub assemblies on the deck structure stated above
13 Cutting of shiprsquos existing deck in way of anchor capstan matching with dimensions of deck structure if required
14 Placement of deck structure fitted with anchor capstan on board the ship and welding of same with deck structure
15 Carrying out Test amp trial of anchor capstan 2 Drawings Work is to be carried out as per following drawing document- 21 Seating for Anchor Capstan complete Drg no 2113-17110317
amp110317-1 22 Anchor amp cable arrangement plan 2113-17420101 23 General Arrangement of Anchor capstan Drg no 107112 24 Sectional Assembly of Anchor capstan Drg no 107111 25 Band Break Assembly Drg no 207073 26 Procedure for installation of Anchor capstan Annexure ndash I
All latest drawings shall be used for the job The requirement of drawings shall be forwarded to CDO through Project Leader 10 days in advance and collected from CDO 3 Installation of Anchor Capstan
31 Deck structure with upside down is to be placed on an elevated amp leveled jig 32 Under slung machineries are to be installed on deck structure as per instructions
indicated in Installation procedure 33 On completion deck structure with under slung machineries is to be inverted amp put on
jig Now above deck items are to be installed as per Installation procedure 34 Now the shiprsquos existing deck in way of anchor capstan is to be cut matching with the
dimensions of the deck structure if required 35 Deck structure fitted with anchor capstan is then to be placed in position on board the
ship and to be temporarily secured 36 Welding of deck structure with shiprsquos deck is to be done adopting controlled and
sequential welding All precautions during welding must be taken to obviate any possibility of undue deformation stresses in the structure as well as installed equipment
37 Also the under deck stiffeners of deck structure are to be joined to shiprsquos existing
stiffeners 38 On completion of all welding anchor capstan is to be manually operated to check that
equipment runs without any resistance 39 After STW (to be done by GRSE) the anchor capstan is to be operated using electrical
power and heaving and veering of chain cable is to be demonstrated
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 2 OF 10
DATE 270317 PREPARED BY MBISWAS
4 General Notes
41 Installation of anchor capstan is an intricate fabrication amp installation job requiring strict quality control and achievement of close tolerances on required dimensions Hence qualified persons having experience in fabrication of structure and installation of machinery must be employed
42 Quality and workmanship must be of highest standard suitable for naval ships and to be
to the satisfaction of inspecting authority 43 Any defects observed during inspection are to be liquidated by the sub-contractor at no
extra cost 44 Welding is to be carried out only by competent qualified and certified welders having
valid test certificate issued by ABS or IRS 45 All welding is to be done after proper edge preparation All welding are to be properly
dressed up 46 One coat of touch up paint in way of weld joint is to be done after proper cleaning 47 Local fairing of deck is to be done using strong back bar as required and the same is to
be removed after completion of work The affected areas are to be properly dressed up 48 Clean ship condition is to be maintained everyday
5 GRSE supply items
51 ABS quality plates amp sections as required
52 Anchor capstan assembly units including Stainless steel (AISI-316) holding down hex head bolts nuts and washers amp spring washers
53 Steel material for Jig
54 Primer for touch up
55 Loctite compound
56 Machining assistance if required 57 Compressed gas electrodes electricity and light 58 Scaffolding if necessary 59 Carne assistance (is necessary)
6 Sub-contractorrsquos scope of supply
61 Welding and cutting machine and accessories 62 Power drilling machine 63 Power extension board portable lamps 64 Proper safety equipment to be provided to the workmen (Helmets safety goggles mask
apron hand gloves harness working at elevation ec) 65 Supervisor The firm should provide supervisors with proper knowledge of the nature of work
should be present on board at all times
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 3 OF 10
DATE 270317 PREPARED BY MBISWAS
7 Inspection
Installation of Anchor capstan is to be inspected by GRSE (QA) CGRPT (Kol) and ABSIRS as per approved QAP Within 7 days from the date of order LOA QAP is to be submitted by the sub-contractor to GRSEQA for approval No of stage inspection will be decided by the inspecting officers GRSE Deck Machinery should depute their technical representative for assistance during installation
8 Manpower a) Sub-contractor should submit complete list of personnel as per their payroll alongwith ESI PF
reference and voter ID for Skilled labour including number of experienced marker fitter welder gas cutter etc Successful sub-contractor should undertake that these operatives would not be withdrawn jeopardizing the construction schedule
b) Similar details about engineers supervisors to be employed for the work
c) List of tools assets held with the company to be submitted
9 Hindrance Register
To be maintained by the sub-contractor and put up for approval by the Project Leader on weekly basis
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 4 OF 10
DATE 270317 PREPARED BY MBISWAS
Annexure - 1 GENERAL MOUNTING INSTRUCTIONS OF ANCHOR CAPSTAN ON DECK SEATING The Scope of this Instructions generally covers the Procedure for IN-SHOP ErectionInstallation of Anchor Capstan supplied by GRSE Deck Machinery as per GA Drg No107112 RevA on a cut-away Shiprsquos Seating Block (Ref GRSE Drg No2013-17110317 amp 110317-1) duly assembling therein all the constituent subassembliescomponents which comes in knocked down condition as dispatched from manufacturerrsquos premises 1 Scope 11 Underslung Worm Gear Box with vertical Main shaft (fitted with Clamp Key Bars and End Plate)
duly pre-assembled with Electric Motor cw Disc Brake via Worm GearWorm Shaft and Slipping Clutch cum Coupling at one end and Manually operated Bevel Gear Box with Clutch shifting lever Assembly at the other end
12 Base Plate fitted with Bush 13 Cable Lifter fitted with Bushes 14 Warping Head fitted with Hand Wheel Assembly 15 Manual operation Hand Wheel and Deck Socket Arrangement 15 Band Brake Assembly 16 Chain Reliever screwed on loose pads which are to be finally welded to the Base Plate after
aligning chain cable with naval pipe amp Anchor Hawse pipe 17 Naval Pipe Assly 18 Chain Support Assly 19 Holding Down Foundation Bolts 110 Control Panel amp Push Button Station 2 Instructions for Installation
Prior to starting on-board installation of the Anchor Capstans in Port amp Stbdsides it is to be ensured that the top deck surface in way of the capstan Base plate is duly machined and overall thickness of Deck foundation with provision of chocks in the interface of underslung units and deck does not exceed 525 mm to match with the vertical shaft length Necessary adjustments required if any are to be done only on thickness of the chocks to maintain proper assembly Hence follow the following steps
21 Examine Shiprsquos seating for Dimensions and Squareness in way of Capstan Foundation The overall thickness of the Seating (excluding Chocks) should be 512 (+-2) mm The top of Annular Bedplate (600 OD X 350 ID) should be duly machined Also check that Hand Holes are made in the 370 dia tubular shell of the ships seating to facilitate access to the vertical shaft interfaces with base plate Bottom Flange and underslung Gear Box top Flange 22 Position the Ships Seating upright and place the Base Plate on the machined annular bed plate of Ships seating as per orientation given in the GA Drawing Mark up the Bolt holes as per lsquoUpper Deck Foundation Detailsrsquo Drill amp ream the foundation Holes as required ensuring the Equipment Orientation on board Ship (Ref Fig No 1) Fit the Base Plate in position on the seating duly bolted to shiprsquos Seating (Ref Fig No 2) Repeat the same for installing the Base Plate of 2nd Capstan unit in Port Side 23 Invert the Shiprsquos Seating and place the same on an elevated level Support platform to facilitate
assembly of the underslung Machinery which will now appear on the top
24 Position the Underslung Gear Box Motor Assembly with vertical Main Shaft facing downward and insert same through the circular hole of Shiprsquos seating vis-agrave-vis through the Bush Bearing provided in the Hub of Base Plate so that the Gear Box Flange rests on the spigot of the interfacing flange of the Base Plate Rotate the Gear Box assly as per orientation of the Equipment Mark up the bolt position on Base Plate bottom flange if not already done from the Gear Box flange and bolt up the flanges of Base Plate and Gear Box ensuring orientation of the equipment properly There should be a gap between the shiprsquos seating and Gear box bottom surface in way of the holding down bolts to the tune of 13 mm which has to be compensated by chocks Measure the gap accurately in way of each bolt hole and adjust thickness accordingly with identification for each position Mark up all the Bolt Holes with Gear Box Assembly in position
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 5 OF 10
DATE 270317 PREPARED BY MBISWAS
25 Unscrew the Gear Box Assembly from the interfacing flanges of the Base Plate and remove same to complete drilling of the holding down bolt holes as per lsquoUnder Deck Foundation Detailsrsquo given in the GA drawing 26 Re-install the Gear Box Assembly on the Ships seating after inserting machined Chocks as required in respective bolt hole positions (as identified earlier) and tighten all bolts to complete the underslung holding downarrangement Foundation Bolts must now be tightened properly Repeat 24 to 26 for installing the Gear Box assly of 2nd Capstan unit in Port Side (Ref FigNo 3 amp 4) 27 Invert the Ships seating The Base Plate with Vertical Main Shaft protruding upward will now come on top as per actual arrangement in Port amp Stbd sides Unscrew the Clamps End Plate and withdraw key bars from the Main Shaft to introduce the Cable Lifter through the vertical Main Shaft Put back the Clamps on the Main Shaft and tighten the screws Ensure that the Cable lifter rotates freely on the Base Plate 28 Put back the Key Bars in position on the Main shaft and introduce the Warping Head sliding down through the Key ways Rotate same so that the driving dogs engage with those of the cable lifter below Check that when engaged the Cable Lifter rotates freely along with the Warping Head Fit the Hand Wheel at the screwed end and lower it to the level of the Warping Head so that the split retaining ring can be screwed on the top face of Warping Head Hub Screw up the end plate on the vertical shaft end 29 Rotate the Hand Wheel provided with the Warping Head counter clockwise to dis-engage from the Cable Lifter Check that there is adequate gap between the dogs of the two when the Warping Head is fully lifted up by operating the Hand Wheel Check for proper locking in both engaged and dis-engaged condition
210 Insert the Deck socket with Hand Wheel shaft through the Hole on the Deck Plate and ascertain that the Wheel shaft engages properly with the Hand operation Gear Box shaft extension protruding upward Mark up the Deck Socket Bolt Holes Remove the Hand Wheel Assembly and complete the drill Holes 211 Put back the Deck Socket and screw up to Deck Plate Dis-engage the Electro magnetic Disc Brake provided at NDE of Electric Motor Now engage the Clutch half of the Manual operation Gear Box by operating the Clutch Shifting Lever and rotate the Manual operation Hand Wheel to see that the Unit rotates freely in hoisting direction but locks in lowering direction by the pawl and ratchet provided at the output shaft of the Manual operation Gear Box 212 Put the Band Brake Assembly on The Cable Lifter and align the Brake operating Gear Box as per orientation given in the GA Drawing and check that the same rests on the shiprsquos seating provided separately Use chocks in way of the Bolt holes as necessary Fit the Keep plate on the Brake anchorage Pin Check that the Bands engage and releases properly when the Hand Wheel is rotated in the desired direction Weld the Brake Anchor Pin with Base Plate using low Hydrogen electrode Repeat 27 to 212 for 2nd Capstan unit in Port Side (Ref Fig No 5) 213 Place the Chain Reliever screwed with Pads on the outer wall of the Base Plate after scertaining its position wrt tight amp slack side of chain cable and check that there is adequate gap to permit free rotation of the Cable Lifter Weld the Pads of the Chain Reliever to the Base plate 214 Position the complete assly of Naval Pipe (GRSE Deck Machinery supply) within close proximity of cablelifter Weld the Lip plate in front of the Naval Pipe to ensure cable entry without jamming Lower portion of the Naval Pipe to be cut to shape and welded to the bellmouth (Shipyard Supply) 215 Put the Roller type Chain Support Assembly in line with the hawse pipe by adjustment of height (supplied with green material) and weld to Deck maintaining alignment of chain cable with cable lifter 216 Repeat 213 to 215 for 2nd Capstan unit in Port Side
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 6 OF 10
DATE 270317 PREPARED BY MBISWAS
217 Complete assembly of two Anchor Capstans (Port amp Stbd) wrt Anchor Hawse pipe and Naval pipe indicated in Fig No6 218 The IN-SHOP Erection Installation of both Anchor Capstans on the cut-away Shiprsquos Seating Block will thus be complete The Ships Seating Block along with Anchor Capstans (Port amp Stbd) will afterwards be taken for placement on Shiprsquos Deck for welding with Deck Structure During welding of this Block with Shiprsquos deck Structure all precautions for controlled welding should be taken to obviate any possibility of undue deformation stresses in the structure and installed equipment After completion of all welding both Anchor Capstans should be lubricated at all the Bearing points Gear Box (Oil capacity of the Gear Box is 10 Ltrs Apprx) The Anchor Capstan should be manually
operated to check that equipment runs without any resistance On completion of satisfactory Hand
operation the Control Panel and Push Button Station is to be connected to the Capstan suitably as per Interconnection diagram For detail connection and activation of circuit setting to workand to operate the Motor refer the Electrical Manual For initial startup and to run the Capstan on No-Load during STW ensure that the Electro-Magnetic Disc Brake (at the NDE of Electric Motor) is properly released activated and the Equipment runs without any resistance Equipments may be set to work on Electric Power mode followed by heavingveering of Chain Cable by the Cable Lifter for which positioning of Naval Pipe and Hawse Pipe is a pre-requisite to ensure free movement of Chain Cable during handling of Anchor 3 Salient Points 31 In order to ensure Water tightness around the interfaces of the base plate and Deck Seating Annular Bed Plate it is essential that the top of seating is machined to leave no gap when the Base plate is hard tightened on the seating by the Foundation Bolts However as an additional measure suitable Flange Sealant (LOCKTITE Product No 574 for gap fill up to 05 mm or equivalent) may be applied throughout the entire interface of Base Plate Annular Bed Plate (including fixing bolts) 2 Chocks do not get displaced after dismantling and same may be tack weldedto Deck Seating at the respective positions 3 Quality and workmanship have to be to the satisfaction of the inspecting Authority Installation defect if any is to be liquidated by the subcontractor at their cost
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 3 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 4 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 1 OF 10
DATE 270317 PREPARED BY MBISWAS
1 Scope of work ship Board scope of work is as follows - 11 Releasing of deck structure (ie seating) 3570x1400 mm overall size from
block for installation of anchor capstan
12 Installation of Anchor capstan sub assemblies on the deck structure stated above
13 Cutting of shiprsquos existing deck in way of anchor capstan matching with dimensions of deck structure if required
14 Placement of deck structure fitted with anchor capstan on board the ship and welding of same with deck structure
15 Carrying out Test amp trial of anchor capstan 2 Drawings Work is to be carried out as per following drawing document- 21 Seating for Anchor Capstan complete Drg no 2113-17110317
amp110317-1 22 Anchor amp cable arrangement plan 2113-17420101 23 General Arrangement of Anchor capstan Drg no 107112 24 Sectional Assembly of Anchor capstan Drg no 107111 25 Band Break Assembly Drg no 207073 26 Procedure for installation of Anchor capstan Annexure ndash I
All latest drawings shall be used for the job The requirement of drawings shall be forwarded to CDO through Project Leader 10 days in advance and collected from CDO 3 Installation of Anchor Capstan
31 Deck structure with upside down is to be placed on an elevated amp leveled jig 32 Under slung machineries are to be installed on deck structure as per instructions
indicated in Installation procedure 33 On completion deck structure with under slung machineries is to be inverted amp put on
jig Now above deck items are to be installed as per Installation procedure 34 Now the shiprsquos existing deck in way of anchor capstan is to be cut matching with the
dimensions of the deck structure if required 35 Deck structure fitted with anchor capstan is then to be placed in position on board the
ship and to be temporarily secured 36 Welding of deck structure with shiprsquos deck is to be done adopting controlled and
sequential welding All precautions during welding must be taken to obviate any possibility of undue deformation stresses in the structure as well as installed equipment
37 Also the under deck stiffeners of deck structure are to be joined to shiprsquos existing
stiffeners 38 On completion of all welding anchor capstan is to be manually operated to check that
equipment runs without any resistance 39 After STW (to be done by GRSE) the anchor capstan is to be operated using electrical
power and heaving and veering of chain cable is to be demonstrated
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 2 OF 10
DATE 270317 PREPARED BY MBISWAS
4 General Notes
41 Installation of anchor capstan is an intricate fabrication amp installation job requiring strict quality control and achievement of close tolerances on required dimensions Hence qualified persons having experience in fabrication of structure and installation of machinery must be employed
42 Quality and workmanship must be of highest standard suitable for naval ships and to be
to the satisfaction of inspecting authority 43 Any defects observed during inspection are to be liquidated by the sub-contractor at no
extra cost 44 Welding is to be carried out only by competent qualified and certified welders having
valid test certificate issued by ABS or IRS 45 All welding is to be done after proper edge preparation All welding are to be properly
dressed up 46 One coat of touch up paint in way of weld joint is to be done after proper cleaning 47 Local fairing of deck is to be done using strong back bar as required and the same is to
be removed after completion of work The affected areas are to be properly dressed up 48 Clean ship condition is to be maintained everyday
5 GRSE supply items
51 ABS quality plates amp sections as required
52 Anchor capstan assembly units including Stainless steel (AISI-316) holding down hex head bolts nuts and washers amp spring washers
53 Steel material for Jig
54 Primer for touch up
55 Loctite compound
56 Machining assistance if required 57 Compressed gas electrodes electricity and light 58 Scaffolding if necessary 59 Carne assistance (is necessary)
6 Sub-contractorrsquos scope of supply
61 Welding and cutting machine and accessories 62 Power drilling machine 63 Power extension board portable lamps 64 Proper safety equipment to be provided to the workmen (Helmets safety goggles mask
apron hand gloves harness working at elevation ec) 65 Supervisor The firm should provide supervisors with proper knowledge of the nature of work
should be present on board at all times
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 3 OF 10
DATE 270317 PREPARED BY MBISWAS
7 Inspection
Installation of Anchor capstan is to be inspected by GRSE (QA) CGRPT (Kol) and ABSIRS as per approved QAP Within 7 days from the date of order LOA QAP is to be submitted by the sub-contractor to GRSEQA for approval No of stage inspection will be decided by the inspecting officers GRSE Deck Machinery should depute their technical representative for assistance during installation
8 Manpower a) Sub-contractor should submit complete list of personnel as per their payroll alongwith ESI PF
reference and voter ID for Skilled labour including number of experienced marker fitter welder gas cutter etc Successful sub-contractor should undertake that these operatives would not be withdrawn jeopardizing the construction schedule
b) Similar details about engineers supervisors to be employed for the work
c) List of tools assets held with the company to be submitted
9 Hindrance Register
To be maintained by the sub-contractor and put up for approval by the Project Leader on weekly basis
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 4 OF 10
DATE 270317 PREPARED BY MBISWAS
Annexure - 1 GENERAL MOUNTING INSTRUCTIONS OF ANCHOR CAPSTAN ON DECK SEATING The Scope of this Instructions generally covers the Procedure for IN-SHOP ErectionInstallation of Anchor Capstan supplied by GRSE Deck Machinery as per GA Drg No107112 RevA on a cut-away Shiprsquos Seating Block (Ref GRSE Drg No2013-17110317 amp 110317-1) duly assembling therein all the constituent subassembliescomponents which comes in knocked down condition as dispatched from manufacturerrsquos premises 1 Scope 11 Underslung Worm Gear Box with vertical Main shaft (fitted with Clamp Key Bars and End Plate)
duly pre-assembled with Electric Motor cw Disc Brake via Worm GearWorm Shaft and Slipping Clutch cum Coupling at one end and Manually operated Bevel Gear Box with Clutch shifting lever Assembly at the other end
12 Base Plate fitted with Bush 13 Cable Lifter fitted with Bushes 14 Warping Head fitted with Hand Wheel Assembly 15 Manual operation Hand Wheel and Deck Socket Arrangement 15 Band Brake Assembly 16 Chain Reliever screwed on loose pads which are to be finally welded to the Base Plate after
aligning chain cable with naval pipe amp Anchor Hawse pipe 17 Naval Pipe Assly 18 Chain Support Assly 19 Holding Down Foundation Bolts 110 Control Panel amp Push Button Station 2 Instructions for Installation
Prior to starting on-board installation of the Anchor Capstans in Port amp Stbdsides it is to be ensured that the top deck surface in way of the capstan Base plate is duly machined and overall thickness of Deck foundation with provision of chocks in the interface of underslung units and deck does not exceed 525 mm to match with the vertical shaft length Necessary adjustments required if any are to be done only on thickness of the chocks to maintain proper assembly Hence follow the following steps
21 Examine Shiprsquos seating for Dimensions and Squareness in way of Capstan Foundation The overall thickness of the Seating (excluding Chocks) should be 512 (+-2) mm The top of Annular Bedplate (600 OD X 350 ID) should be duly machined Also check that Hand Holes are made in the 370 dia tubular shell of the ships seating to facilitate access to the vertical shaft interfaces with base plate Bottom Flange and underslung Gear Box top Flange 22 Position the Ships Seating upright and place the Base Plate on the machined annular bed plate of Ships seating as per orientation given in the GA Drawing Mark up the Bolt holes as per lsquoUpper Deck Foundation Detailsrsquo Drill amp ream the foundation Holes as required ensuring the Equipment Orientation on board Ship (Ref Fig No 1) Fit the Base Plate in position on the seating duly bolted to shiprsquos Seating (Ref Fig No 2) Repeat the same for installing the Base Plate of 2nd Capstan unit in Port Side 23 Invert the Shiprsquos Seating and place the same on an elevated level Support platform to facilitate
assembly of the underslung Machinery which will now appear on the top
24 Position the Underslung Gear Box Motor Assembly with vertical Main Shaft facing downward and insert same through the circular hole of Shiprsquos seating vis-agrave-vis through the Bush Bearing provided in the Hub of Base Plate so that the Gear Box Flange rests on the spigot of the interfacing flange of the Base Plate Rotate the Gear Box assly as per orientation of the Equipment Mark up the bolt position on Base Plate bottom flange if not already done from the Gear Box flange and bolt up the flanges of Base Plate and Gear Box ensuring orientation of the equipment properly There should be a gap between the shiprsquos seating and Gear box bottom surface in way of the holding down bolts to the tune of 13 mm which has to be compensated by chocks Measure the gap accurately in way of each bolt hole and adjust thickness accordingly with identification for each position Mark up all the Bolt Holes with Gear Box Assembly in position
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 5 OF 10
DATE 270317 PREPARED BY MBISWAS
25 Unscrew the Gear Box Assembly from the interfacing flanges of the Base Plate and remove same to complete drilling of the holding down bolt holes as per lsquoUnder Deck Foundation Detailsrsquo given in the GA drawing 26 Re-install the Gear Box Assembly on the Ships seating after inserting machined Chocks as required in respective bolt hole positions (as identified earlier) and tighten all bolts to complete the underslung holding downarrangement Foundation Bolts must now be tightened properly Repeat 24 to 26 for installing the Gear Box assly of 2nd Capstan unit in Port Side (Ref FigNo 3 amp 4) 27 Invert the Ships seating The Base Plate with Vertical Main Shaft protruding upward will now come on top as per actual arrangement in Port amp Stbd sides Unscrew the Clamps End Plate and withdraw key bars from the Main Shaft to introduce the Cable Lifter through the vertical Main Shaft Put back the Clamps on the Main Shaft and tighten the screws Ensure that the Cable lifter rotates freely on the Base Plate 28 Put back the Key Bars in position on the Main shaft and introduce the Warping Head sliding down through the Key ways Rotate same so that the driving dogs engage with those of the cable lifter below Check that when engaged the Cable Lifter rotates freely along with the Warping Head Fit the Hand Wheel at the screwed end and lower it to the level of the Warping Head so that the split retaining ring can be screwed on the top face of Warping Head Hub Screw up the end plate on the vertical shaft end 29 Rotate the Hand Wheel provided with the Warping Head counter clockwise to dis-engage from the Cable Lifter Check that there is adequate gap between the dogs of the two when the Warping Head is fully lifted up by operating the Hand Wheel Check for proper locking in both engaged and dis-engaged condition
210 Insert the Deck socket with Hand Wheel shaft through the Hole on the Deck Plate and ascertain that the Wheel shaft engages properly with the Hand operation Gear Box shaft extension protruding upward Mark up the Deck Socket Bolt Holes Remove the Hand Wheel Assembly and complete the drill Holes 211 Put back the Deck Socket and screw up to Deck Plate Dis-engage the Electro magnetic Disc Brake provided at NDE of Electric Motor Now engage the Clutch half of the Manual operation Gear Box by operating the Clutch Shifting Lever and rotate the Manual operation Hand Wheel to see that the Unit rotates freely in hoisting direction but locks in lowering direction by the pawl and ratchet provided at the output shaft of the Manual operation Gear Box 212 Put the Band Brake Assembly on The Cable Lifter and align the Brake operating Gear Box as per orientation given in the GA Drawing and check that the same rests on the shiprsquos seating provided separately Use chocks in way of the Bolt holes as necessary Fit the Keep plate on the Brake anchorage Pin Check that the Bands engage and releases properly when the Hand Wheel is rotated in the desired direction Weld the Brake Anchor Pin with Base Plate using low Hydrogen electrode Repeat 27 to 212 for 2nd Capstan unit in Port Side (Ref Fig No 5) 213 Place the Chain Reliever screwed with Pads on the outer wall of the Base Plate after scertaining its position wrt tight amp slack side of chain cable and check that there is adequate gap to permit free rotation of the Cable Lifter Weld the Pads of the Chain Reliever to the Base plate 214 Position the complete assly of Naval Pipe (GRSE Deck Machinery supply) within close proximity of cablelifter Weld the Lip plate in front of the Naval Pipe to ensure cable entry without jamming Lower portion of the Naval Pipe to be cut to shape and welded to the bellmouth (Shipyard Supply) 215 Put the Roller type Chain Support Assembly in line with the hawse pipe by adjustment of height (supplied with green material) and weld to Deck maintaining alignment of chain cable with cable lifter 216 Repeat 213 to 215 for 2nd Capstan unit in Port Side
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 6 OF 10
DATE 270317 PREPARED BY MBISWAS
217 Complete assembly of two Anchor Capstans (Port amp Stbd) wrt Anchor Hawse pipe and Naval pipe indicated in Fig No6 218 The IN-SHOP Erection Installation of both Anchor Capstans on the cut-away Shiprsquos Seating Block will thus be complete The Ships Seating Block along with Anchor Capstans (Port amp Stbd) will afterwards be taken for placement on Shiprsquos Deck for welding with Deck Structure During welding of this Block with Shiprsquos deck Structure all precautions for controlled welding should be taken to obviate any possibility of undue deformation stresses in the structure and installed equipment After completion of all welding both Anchor Capstans should be lubricated at all the Bearing points Gear Box (Oil capacity of the Gear Box is 10 Ltrs Apprx) The Anchor Capstan should be manually
operated to check that equipment runs without any resistance On completion of satisfactory Hand
operation the Control Panel and Push Button Station is to be connected to the Capstan suitably as per Interconnection diagram For detail connection and activation of circuit setting to workand to operate the Motor refer the Electrical Manual For initial startup and to run the Capstan on No-Load during STW ensure that the Electro-Magnetic Disc Brake (at the NDE of Electric Motor) is properly released activated and the Equipment runs without any resistance Equipments may be set to work on Electric Power mode followed by heavingveering of Chain Cable by the Cable Lifter for which positioning of Naval Pipe and Hawse Pipe is a pre-requisite to ensure free movement of Chain Cable during handling of Anchor 3 Salient Points 31 In order to ensure Water tightness around the interfaces of the base plate and Deck Seating Annular Bed Plate it is essential that the top of seating is machined to leave no gap when the Base plate is hard tightened on the seating by the Foundation Bolts However as an additional measure suitable Flange Sealant (LOCKTITE Product No 574 for gap fill up to 05 mm or equivalent) may be applied throughout the entire interface of Base Plate Annular Bed Plate (including fixing bolts) 2 Chocks do not get displaced after dismantling and same may be tack weldedto Deck Seating at the respective positions 3 Quality and workmanship have to be to the satisfaction of the inspecting Authority Installation defect if any is to be liquidated by the subcontractor at their cost
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
GRSE LTD TECHNICAL
SPECIFICATION FOR
FITMENT OF WINDOWS
SCUTTLES amp EYEBROWS
REQUISITION NO
RN2113-17HO207
YARD NOS 2113-17 SHEET 4 OF 4
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 1 OF 10
DATE 270317 PREPARED BY MBISWAS
1 Scope of work ship Board scope of work is as follows - 11 Releasing of deck structure (ie seating) 3570x1400 mm overall size from
block for installation of anchor capstan
12 Installation of Anchor capstan sub assemblies on the deck structure stated above
13 Cutting of shiprsquos existing deck in way of anchor capstan matching with dimensions of deck structure if required
14 Placement of deck structure fitted with anchor capstan on board the ship and welding of same with deck structure
15 Carrying out Test amp trial of anchor capstan 2 Drawings Work is to be carried out as per following drawing document- 21 Seating for Anchor Capstan complete Drg no 2113-17110317
amp110317-1 22 Anchor amp cable arrangement plan 2113-17420101 23 General Arrangement of Anchor capstan Drg no 107112 24 Sectional Assembly of Anchor capstan Drg no 107111 25 Band Break Assembly Drg no 207073 26 Procedure for installation of Anchor capstan Annexure ndash I
All latest drawings shall be used for the job The requirement of drawings shall be forwarded to CDO through Project Leader 10 days in advance and collected from CDO 3 Installation of Anchor Capstan
31 Deck structure with upside down is to be placed on an elevated amp leveled jig 32 Under slung machineries are to be installed on deck structure as per instructions
indicated in Installation procedure 33 On completion deck structure with under slung machineries is to be inverted amp put on
jig Now above deck items are to be installed as per Installation procedure 34 Now the shiprsquos existing deck in way of anchor capstan is to be cut matching with the
dimensions of the deck structure if required 35 Deck structure fitted with anchor capstan is then to be placed in position on board the
ship and to be temporarily secured 36 Welding of deck structure with shiprsquos deck is to be done adopting controlled and
sequential welding All precautions during welding must be taken to obviate any possibility of undue deformation stresses in the structure as well as installed equipment
37 Also the under deck stiffeners of deck structure are to be joined to shiprsquos existing
stiffeners 38 On completion of all welding anchor capstan is to be manually operated to check that
equipment runs without any resistance 39 After STW (to be done by GRSE) the anchor capstan is to be operated using electrical
power and heaving and veering of chain cable is to be demonstrated
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 2 OF 10
DATE 270317 PREPARED BY MBISWAS
4 General Notes
41 Installation of anchor capstan is an intricate fabrication amp installation job requiring strict quality control and achievement of close tolerances on required dimensions Hence qualified persons having experience in fabrication of structure and installation of machinery must be employed
42 Quality and workmanship must be of highest standard suitable for naval ships and to be
to the satisfaction of inspecting authority 43 Any defects observed during inspection are to be liquidated by the sub-contractor at no
extra cost 44 Welding is to be carried out only by competent qualified and certified welders having
valid test certificate issued by ABS or IRS 45 All welding is to be done after proper edge preparation All welding are to be properly
dressed up 46 One coat of touch up paint in way of weld joint is to be done after proper cleaning 47 Local fairing of deck is to be done using strong back bar as required and the same is to
be removed after completion of work The affected areas are to be properly dressed up 48 Clean ship condition is to be maintained everyday
5 GRSE supply items
51 ABS quality plates amp sections as required
52 Anchor capstan assembly units including Stainless steel (AISI-316) holding down hex head bolts nuts and washers amp spring washers
53 Steel material for Jig
54 Primer for touch up
55 Loctite compound
56 Machining assistance if required 57 Compressed gas electrodes electricity and light 58 Scaffolding if necessary 59 Carne assistance (is necessary)
6 Sub-contractorrsquos scope of supply
61 Welding and cutting machine and accessories 62 Power drilling machine 63 Power extension board portable lamps 64 Proper safety equipment to be provided to the workmen (Helmets safety goggles mask
apron hand gloves harness working at elevation ec) 65 Supervisor The firm should provide supervisors with proper knowledge of the nature of work
should be present on board at all times
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 3 OF 10
DATE 270317 PREPARED BY MBISWAS
7 Inspection
Installation of Anchor capstan is to be inspected by GRSE (QA) CGRPT (Kol) and ABSIRS as per approved QAP Within 7 days from the date of order LOA QAP is to be submitted by the sub-contractor to GRSEQA for approval No of stage inspection will be decided by the inspecting officers GRSE Deck Machinery should depute their technical representative for assistance during installation
8 Manpower a) Sub-contractor should submit complete list of personnel as per their payroll alongwith ESI PF
reference and voter ID for Skilled labour including number of experienced marker fitter welder gas cutter etc Successful sub-contractor should undertake that these operatives would not be withdrawn jeopardizing the construction schedule
b) Similar details about engineers supervisors to be employed for the work
c) List of tools assets held with the company to be submitted
9 Hindrance Register
To be maintained by the sub-contractor and put up for approval by the Project Leader on weekly basis
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 4 OF 10
DATE 270317 PREPARED BY MBISWAS
Annexure - 1 GENERAL MOUNTING INSTRUCTIONS OF ANCHOR CAPSTAN ON DECK SEATING The Scope of this Instructions generally covers the Procedure for IN-SHOP ErectionInstallation of Anchor Capstan supplied by GRSE Deck Machinery as per GA Drg No107112 RevA on a cut-away Shiprsquos Seating Block (Ref GRSE Drg No2013-17110317 amp 110317-1) duly assembling therein all the constituent subassembliescomponents which comes in knocked down condition as dispatched from manufacturerrsquos premises 1 Scope 11 Underslung Worm Gear Box with vertical Main shaft (fitted with Clamp Key Bars and End Plate)
duly pre-assembled with Electric Motor cw Disc Brake via Worm GearWorm Shaft and Slipping Clutch cum Coupling at one end and Manually operated Bevel Gear Box with Clutch shifting lever Assembly at the other end
12 Base Plate fitted with Bush 13 Cable Lifter fitted with Bushes 14 Warping Head fitted with Hand Wheel Assembly 15 Manual operation Hand Wheel and Deck Socket Arrangement 15 Band Brake Assembly 16 Chain Reliever screwed on loose pads which are to be finally welded to the Base Plate after
aligning chain cable with naval pipe amp Anchor Hawse pipe 17 Naval Pipe Assly 18 Chain Support Assly 19 Holding Down Foundation Bolts 110 Control Panel amp Push Button Station 2 Instructions for Installation
Prior to starting on-board installation of the Anchor Capstans in Port amp Stbdsides it is to be ensured that the top deck surface in way of the capstan Base plate is duly machined and overall thickness of Deck foundation with provision of chocks in the interface of underslung units and deck does not exceed 525 mm to match with the vertical shaft length Necessary adjustments required if any are to be done only on thickness of the chocks to maintain proper assembly Hence follow the following steps
21 Examine Shiprsquos seating for Dimensions and Squareness in way of Capstan Foundation The overall thickness of the Seating (excluding Chocks) should be 512 (+-2) mm The top of Annular Bedplate (600 OD X 350 ID) should be duly machined Also check that Hand Holes are made in the 370 dia tubular shell of the ships seating to facilitate access to the vertical shaft interfaces with base plate Bottom Flange and underslung Gear Box top Flange 22 Position the Ships Seating upright and place the Base Plate on the machined annular bed plate of Ships seating as per orientation given in the GA Drawing Mark up the Bolt holes as per lsquoUpper Deck Foundation Detailsrsquo Drill amp ream the foundation Holes as required ensuring the Equipment Orientation on board Ship (Ref Fig No 1) Fit the Base Plate in position on the seating duly bolted to shiprsquos Seating (Ref Fig No 2) Repeat the same for installing the Base Plate of 2nd Capstan unit in Port Side 23 Invert the Shiprsquos Seating and place the same on an elevated level Support platform to facilitate
assembly of the underslung Machinery which will now appear on the top
24 Position the Underslung Gear Box Motor Assembly with vertical Main Shaft facing downward and insert same through the circular hole of Shiprsquos seating vis-agrave-vis through the Bush Bearing provided in the Hub of Base Plate so that the Gear Box Flange rests on the spigot of the interfacing flange of the Base Plate Rotate the Gear Box assly as per orientation of the Equipment Mark up the bolt position on Base Plate bottom flange if not already done from the Gear Box flange and bolt up the flanges of Base Plate and Gear Box ensuring orientation of the equipment properly There should be a gap between the shiprsquos seating and Gear box bottom surface in way of the holding down bolts to the tune of 13 mm which has to be compensated by chocks Measure the gap accurately in way of each bolt hole and adjust thickness accordingly with identification for each position Mark up all the Bolt Holes with Gear Box Assembly in position
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 5 OF 10
DATE 270317 PREPARED BY MBISWAS
25 Unscrew the Gear Box Assembly from the interfacing flanges of the Base Plate and remove same to complete drilling of the holding down bolt holes as per lsquoUnder Deck Foundation Detailsrsquo given in the GA drawing 26 Re-install the Gear Box Assembly on the Ships seating after inserting machined Chocks as required in respective bolt hole positions (as identified earlier) and tighten all bolts to complete the underslung holding downarrangement Foundation Bolts must now be tightened properly Repeat 24 to 26 for installing the Gear Box assly of 2nd Capstan unit in Port Side (Ref FigNo 3 amp 4) 27 Invert the Ships seating The Base Plate with Vertical Main Shaft protruding upward will now come on top as per actual arrangement in Port amp Stbd sides Unscrew the Clamps End Plate and withdraw key bars from the Main Shaft to introduce the Cable Lifter through the vertical Main Shaft Put back the Clamps on the Main Shaft and tighten the screws Ensure that the Cable lifter rotates freely on the Base Plate 28 Put back the Key Bars in position on the Main shaft and introduce the Warping Head sliding down through the Key ways Rotate same so that the driving dogs engage with those of the cable lifter below Check that when engaged the Cable Lifter rotates freely along with the Warping Head Fit the Hand Wheel at the screwed end and lower it to the level of the Warping Head so that the split retaining ring can be screwed on the top face of Warping Head Hub Screw up the end plate on the vertical shaft end 29 Rotate the Hand Wheel provided with the Warping Head counter clockwise to dis-engage from the Cable Lifter Check that there is adequate gap between the dogs of the two when the Warping Head is fully lifted up by operating the Hand Wheel Check for proper locking in both engaged and dis-engaged condition
210 Insert the Deck socket with Hand Wheel shaft through the Hole on the Deck Plate and ascertain that the Wheel shaft engages properly with the Hand operation Gear Box shaft extension protruding upward Mark up the Deck Socket Bolt Holes Remove the Hand Wheel Assembly and complete the drill Holes 211 Put back the Deck Socket and screw up to Deck Plate Dis-engage the Electro magnetic Disc Brake provided at NDE of Electric Motor Now engage the Clutch half of the Manual operation Gear Box by operating the Clutch Shifting Lever and rotate the Manual operation Hand Wheel to see that the Unit rotates freely in hoisting direction but locks in lowering direction by the pawl and ratchet provided at the output shaft of the Manual operation Gear Box 212 Put the Band Brake Assembly on The Cable Lifter and align the Brake operating Gear Box as per orientation given in the GA Drawing and check that the same rests on the shiprsquos seating provided separately Use chocks in way of the Bolt holes as necessary Fit the Keep plate on the Brake anchorage Pin Check that the Bands engage and releases properly when the Hand Wheel is rotated in the desired direction Weld the Brake Anchor Pin with Base Plate using low Hydrogen electrode Repeat 27 to 212 for 2nd Capstan unit in Port Side (Ref Fig No 5) 213 Place the Chain Reliever screwed with Pads on the outer wall of the Base Plate after scertaining its position wrt tight amp slack side of chain cable and check that there is adequate gap to permit free rotation of the Cable Lifter Weld the Pads of the Chain Reliever to the Base plate 214 Position the complete assly of Naval Pipe (GRSE Deck Machinery supply) within close proximity of cablelifter Weld the Lip plate in front of the Naval Pipe to ensure cable entry without jamming Lower portion of the Naval Pipe to be cut to shape and welded to the bellmouth (Shipyard Supply) 215 Put the Roller type Chain Support Assembly in line with the hawse pipe by adjustment of height (supplied with green material) and weld to Deck maintaining alignment of chain cable with cable lifter 216 Repeat 213 to 215 for 2nd Capstan unit in Port Side
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 6 OF 10
DATE 270317 PREPARED BY MBISWAS
217 Complete assembly of two Anchor Capstans (Port amp Stbd) wrt Anchor Hawse pipe and Naval pipe indicated in Fig No6 218 The IN-SHOP Erection Installation of both Anchor Capstans on the cut-away Shiprsquos Seating Block will thus be complete The Ships Seating Block along with Anchor Capstans (Port amp Stbd) will afterwards be taken for placement on Shiprsquos Deck for welding with Deck Structure During welding of this Block with Shiprsquos deck Structure all precautions for controlled welding should be taken to obviate any possibility of undue deformation stresses in the structure and installed equipment After completion of all welding both Anchor Capstans should be lubricated at all the Bearing points Gear Box (Oil capacity of the Gear Box is 10 Ltrs Apprx) The Anchor Capstan should be manually
operated to check that equipment runs without any resistance On completion of satisfactory Hand
operation the Control Panel and Push Button Station is to be connected to the Capstan suitably as per Interconnection diagram For detail connection and activation of circuit setting to workand to operate the Motor refer the Electrical Manual For initial startup and to run the Capstan on No-Load during STW ensure that the Electro-Magnetic Disc Brake (at the NDE of Electric Motor) is properly released activated and the Equipment runs without any resistance Equipments may be set to work on Electric Power mode followed by heavingveering of Chain Cable by the Cable Lifter for which positioning of Naval Pipe and Hawse Pipe is a pre-requisite to ensure free movement of Chain Cable during handling of Anchor 3 Salient Points 31 In order to ensure Water tightness around the interfaces of the base plate and Deck Seating Annular Bed Plate it is essential that the top of seating is machined to leave no gap when the Base plate is hard tightened on the seating by the Foundation Bolts However as an additional measure suitable Flange Sealant (LOCKTITE Product No 574 for gap fill up to 05 mm or equivalent) may be applied throughout the entire interface of Base Plate Annular Bed Plate (including fixing bolts) 2 Chocks do not get displaced after dismantling and same may be tack weldedto Deck Seating at the respective positions 3 Quality and workmanship have to be to the satisfaction of the inspecting Authority Installation defect if any is to be liquidated by the subcontractor at their cost
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 1 OF 10
DATE 270317 PREPARED BY MBISWAS
1 Scope of work ship Board scope of work is as follows - 11 Releasing of deck structure (ie seating) 3570x1400 mm overall size from
block for installation of anchor capstan
12 Installation of Anchor capstan sub assemblies on the deck structure stated above
13 Cutting of shiprsquos existing deck in way of anchor capstan matching with dimensions of deck structure if required
14 Placement of deck structure fitted with anchor capstan on board the ship and welding of same with deck structure
15 Carrying out Test amp trial of anchor capstan 2 Drawings Work is to be carried out as per following drawing document- 21 Seating for Anchor Capstan complete Drg no 2113-17110317
amp110317-1 22 Anchor amp cable arrangement plan 2113-17420101 23 General Arrangement of Anchor capstan Drg no 107112 24 Sectional Assembly of Anchor capstan Drg no 107111 25 Band Break Assembly Drg no 207073 26 Procedure for installation of Anchor capstan Annexure ndash I
All latest drawings shall be used for the job The requirement of drawings shall be forwarded to CDO through Project Leader 10 days in advance and collected from CDO 3 Installation of Anchor Capstan
31 Deck structure with upside down is to be placed on an elevated amp leveled jig 32 Under slung machineries are to be installed on deck structure as per instructions
indicated in Installation procedure 33 On completion deck structure with under slung machineries is to be inverted amp put on
jig Now above deck items are to be installed as per Installation procedure 34 Now the shiprsquos existing deck in way of anchor capstan is to be cut matching with the
dimensions of the deck structure if required 35 Deck structure fitted with anchor capstan is then to be placed in position on board the
ship and to be temporarily secured 36 Welding of deck structure with shiprsquos deck is to be done adopting controlled and
sequential welding All precautions during welding must be taken to obviate any possibility of undue deformation stresses in the structure as well as installed equipment
37 Also the under deck stiffeners of deck structure are to be joined to shiprsquos existing
stiffeners 38 On completion of all welding anchor capstan is to be manually operated to check that
equipment runs without any resistance 39 After STW (to be done by GRSE) the anchor capstan is to be operated using electrical
power and heaving and veering of chain cable is to be demonstrated
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 2 OF 10
DATE 270317 PREPARED BY MBISWAS
4 General Notes
41 Installation of anchor capstan is an intricate fabrication amp installation job requiring strict quality control and achievement of close tolerances on required dimensions Hence qualified persons having experience in fabrication of structure and installation of machinery must be employed
42 Quality and workmanship must be of highest standard suitable for naval ships and to be
to the satisfaction of inspecting authority 43 Any defects observed during inspection are to be liquidated by the sub-contractor at no
extra cost 44 Welding is to be carried out only by competent qualified and certified welders having
valid test certificate issued by ABS or IRS 45 All welding is to be done after proper edge preparation All welding are to be properly
dressed up 46 One coat of touch up paint in way of weld joint is to be done after proper cleaning 47 Local fairing of deck is to be done using strong back bar as required and the same is to
be removed after completion of work The affected areas are to be properly dressed up 48 Clean ship condition is to be maintained everyday
5 GRSE supply items
51 ABS quality plates amp sections as required
52 Anchor capstan assembly units including Stainless steel (AISI-316) holding down hex head bolts nuts and washers amp spring washers
53 Steel material for Jig
54 Primer for touch up
55 Loctite compound
56 Machining assistance if required 57 Compressed gas electrodes electricity and light 58 Scaffolding if necessary 59 Carne assistance (is necessary)
6 Sub-contractorrsquos scope of supply
61 Welding and cutting machine and accessories 62 Power drilling machine 63 Power extension board portable lamps 64 Proper safety equipment to be provided to the workmen (Helmets safety goggles mask
apron hand gloves harness working at elevation ec) 65 Supervisor The firm should provide supervisors with proper knowledge of the nature of work
should be present on board at all times
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 3 OF 10
DATE 270317 PREPARED BY MBISWAS
7 Inspection
Installation of Anchor capstan is to be inspected by GRSE (QA) CGRPT (Kol) and ABSIRS as per approved QAP Within 7 days from the date of order LOA QAP is to be submitted by the sub-contractor to GRSEQA for approval No of stage inspection will be decided by the inspecting officers GRSE Deck Machinery should depute their technical representative for assistance during installation
8 Manpower a) Sub-contractor should submit complete list of personnel as per their payroll alongwith ESI PF
reference and voter ID for Skilled labour including number of experienced marker fitter welder gas cutter etc Successful sub-contractor should undertake that these operatives would not be withdrawn jeopardizing the construction schedule
b) Similar details about engineers supervisors to be employed for the work
c) List of tools assets held with the company to be submitted
9 Hindrance Register
To be maintained by the sub-contractor and put up for approval by the Project Leader on weekly basis
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 4 OF 10
DATE 270317 PREPARED BY MBISWAS
Annexure - 1 GENERAL MOUNTING INSTRUCTIONS OF ANCHOR CAPSTAN ON DECK SEATING The Scope of this Instructions generally covers the Procedure for IN-SHOP ErectionInstallation of Anchor Capstan supplied by GRSE Deck Machinery as per GA Drg No107112 RevA on a cut-away Shiprsquos Seating Block (Ref GRSE Drg No2013-17110317 amp 110317-1) duly assembling therein all the constituent subassembliescomponents which comes in knocked down condition as dispatched from manufacturerrsquos premises 1 Scope 11 Underslung Worm Gear Box with vertical Main shaft (fitted with Clamp Key Bars and End Plate)
duly pre-assembled with Electric Motor cw Disc Brake via Worm GearWorm Shaft and Slipping Clutch cum Coupling at one end and Manually operated Bevel Gear Box with Clutch shifting lever Assembly at the other end
12 Base Plate fitted with Bush 13 Cable Lifter fitted with Bushes 14 Warping Head fitted with Hand Wheel Assembly 15 Manual operation Hand Wheel and Deck Socket Arrangement 15 Band Brake Assembly 16 Chain Reliever screwed on loose pads which are to be finally welded to the Base Plate after
aligning chain cable with naval pipe amp Anchor Hawse pipe 17 Naval Pipe Assly 18 Chain Support Assly 19 Holding Down Foundation Bolts 110 Control Panel amp Push Button Station 2 Instructions for Installation
Prior to starting on-board installation of the Anchor Capstans in Port amp Stbdsides it is to be ensured that the top deck surface in way of the capstan Base plate is duly machined and overall thickness of Deck foundation with provision of chocks in the interface of underslung units and deck does not exceed 525 mm to match with the vertical shaft length Necessary adjustments required if any are to be done only on thickness of the chocks to maintain proper assembly Hence follow the following steps
21 Examine Shiprsquos seating for Dimensions and Squareness in way of Capstan Foundation The overall thickness of the Seating (excluding Chocks) should be 512 (+-2) mm The top of Annular Bedplate (600 OD X 350 ID) should be duly machined Also check that Hand Holes are made in the 370 dia tubular shell of the ships seating to facilitate access to the vertical shaft interfaces with base plate Bottom Flange and underslung Gear Box top Flange 22 Position the Ships Seating upright and place the Base Plate on the machined annular bed plate of Ships seating as per orientation given in the GA Drawing Mark up the Bolt holes as per lsquoUpper Deck Foundation Detailsrsquo Drill amp ream the foundation Holes as required ensuring the Equipment Orientation on board Ship (Ref Fig No 1) Fit the Base Plate in position on the seating duly bolted to shiprsquos Seating (Ref Fig No 2) Repeat the same for installing the Base Plate of 2nd Capstan unit in Port Side 23 Invert the Shiprsquos Seating and place the same on an elevated level Support platform to facilitate
assembly of the underslung Machinery which will now appear on the top
24 Position the Underslung Gear Box Motor Assembly with vertical Main Shaft facing downward and insert same through the circular hole of Shiprsquos seating vis-agrave-vis through the Bush Bearing provided in the Hub of Base Plate so that the Gear Box Flange rests on the spigot of the interfacing flange of the Base Plate Rotate the Gear Box assly as per orientation of the Equipment Mark up the bolt position on Base Plate bottom flange if not already done from the Gear Box flange and bolt up the flanges of Base Plate and Gear Box ensuring orientation of the equipment properly There should be a gap between the shiprsquos seating and Gear box bottom surface in way of the holding down bolts to the tune of 13 mm which has to be compensated by chocks Measure the gap accurately in way of each bolt hole and adjust thickness accordingly with identification for each position Mark up all the Bolt Holes with Gear Box Assembly in position
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 5 OF 10
DATE 270317 PREPARED BY MBISWAS
25 Unscrew the Gear Box Assembly from the interfacing flanges of the Base Plate and remove same to complete drilling of the holding down bolt holes as per lsquoUnder Deck Foundation Detailsrsquo given in the GA drawing 26 Re-install the Gear Box Assembly on the Ships seating after inserting machined Chocks as required in respective bolt hole positions (as identified earlier) and tighten all bolts to complete the underslung holding downarrangement Foundation Bolts must now be tightened properly Repeat 24 to 26 for installing the Gear Box assly of 2nd Capstan unit in Port Side (Ref FigNo 3 amp 4) 27 Invert the Ships seating The Base Plate with Vertical Main Shaft protruding upward will now come on top as per actual arrangement in Port amp Stbd sides Unscrew the Clamps End Plate and withdraw key bars from the Main Shaft to introduce the Cable Lifter through the vertical Main Shaft Put back the Clamps on the Main Shaft and tighten the screws Ensure that the Cable lifter rotates freely on the Base Plate 28 Put back the Key Bars in position on the Main shaft and introduce the Warping Head sliding down through the Key ways Rotate same so that the driving dogs engage with those of the cable lifter below Check that when engaged the Cable Lifter rotates freely along with the Warping Head Fit the Hand Wheel at the screwed end and lower it to the level of the Warping Head so that the split retaining ring can be screwed on the top face of Warping Head Hub Screw up the end plate on the vertical shaft end 29 Rotate the Hand Wheel provided with the Warping Head counter clockwise to dis-engage from the Cable Lifter Check that there is adequate gap between the dogs of the two when the Warping Head is fully lifted up by operating the Hand Wheel Check for proper locking in both engaged and dis-engaged condition
210 Insert the Deck socket with Hand Wheel shaft through the Hole on the Deck Plate and ascertain that the Wheel shaft engages properly with the Hand operation Gear Box shaft extension protruding upward Mark up the Deck Socket Bolt Holes Remove the Hand Wheel Assembly and complete the drill Holes 211 Put back the Deck Socket and screw up to Deck Plate Dis-engage the Electro magnetic Disc Brake provided at NDE of Electric Motor Now engage the Clutch half of the Manual operation Gear Box by operating the Clutch Shifting Lever and rotate the Manual operation Hand Wheel to see that the Unit rotates freely in hoisting direction but locks in lowering direction by the pawl and ratchet provided at the output shaft of the Manual operation Gear Box 212 Put the Band Brake Assembly on The Cable Lifter and align the Brake operating Gear Box as per orientation given in the GA Drawing and check that the same rests on the shiprsquos seating provided separately Use chocks in way of the Bolt holes as necessary Fit the Keep plate on the Brake anchorage Pin Check that the Bands engage and releases properly when the Hand Wheel is rotated in the desired direction Weld the Brake Anchor Pin with Base Plate using low Hydrogen electrode Repeat 27 to 212 for 2nd Capstan unit in Port Side (Ref Fig No 5) 213 Place the Chain Reliever screwed with Pads on the outer wall of the Base Plate after scertaining its position wrt tight amp slack side of chain cable and check that there is adequate gap to permit free rotation of the Cable Lifter Weld the Pads of the Chain Reliever to the Base plate 214 Position the complete assly of Naval Pipe (GRSE Deck Machinery supply) within close proximity of cablelifter Weld the Lip plate in front of the Naval Pipe to ensure cable entry without jamming Lower portion of the Naval Pipe to be cut to shape and welded to the bellmouth (Shipyard Supply) 215 Put the Roller type Chain Support Assembly in line with the hawse pipe by adjustment of height (supplied with green material) and weld to Deck maintaining alignment of chain cable with cable lifter 216 Repeat 213 to 215 for 2nd Capstan unit in Port Side
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 6 OF 10
DATE 270317 PREPARED BY MBISWAS
217 Complete assembly of two Anchor Capstans (Port amp Stbd) wrt Anchor Hawse pipe and Naval pipe indicated in Fig No6 218 The IN-SHOP Erection Installation of both Anchor Capstans on the cut-away Shiprsquos Seating Block will thus be complete The Ships Seating Block along with Anchor Capstans (Port amp Stbd) will afterwards be taken for placement on Shiprsquos Deck for welding with Deck Structure During welding of this Block with Shiprsquos deck Structure all precautions for controlled welding should be taken to obviate any possibility of undue deformation stresses in the structure and installed equipment After completion of all welding both Anchor Capstans should be lubricated at all the Bearing points Gear Box (Oil capacity of the Gear Box is 10 Ltrs Apprx) The Anchor Capstan should be manually
operated to check that equipment runs without any resistance On completion of satisfactory Hand
operation the Control Panel and Push Button Station is to be connected to the Capstan suitably as per Interconnection diagram For detail connection and activation of circuit setting to workand to operate the Motor refer the Electrical Manual For initial startup and to run the Capstan on No-Load during STW ensure that the Electro-Magnetic Disc Brake (at the NDE of Electric Motor) is properly released activated and the Equipment runs without any resistance Equipments may be set to work on Electric Power mode followed by heavingveering of Chain Cable by the Cable Lifter for which positioning of Naval Pipe and Hawse Pipe is a pre-requisite to ensure free movement of Chain Cable during handling of Anchor 3 Salient Points 31 In order to ensure Water tightness around the interfaces of the base plate and Deck Seating Annular Bed Plate it is essential that the top of seating is machined to leave no gap when the Base plate is hard tightened on the seating by the Foundation Bolts However as an additional measure suitable Flange Sealant (LOCKTITE Product No 574 for gap fill up to 05 mm or equivalent) may be applied throughout the entire interface of Base Plate Annular Bed Plate (including fixing bolts) 2 Chocks do not get displaced after dismantling and same may be tack weldedto Deck Seating at the respective positions 3 Quality and workmanship have to be to the satisfaction of the inspecting Authority Installation defect if any is to be liquidated by the subcontractor at their cost
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 2 OF 10
DATE 270317 PREPARED BY MBISWAS
4 General Notes
41 Installation of anchor capstan is an intricate fabrication amp installation job requiring strict quality control and achievement of close tolerances on required dimensions Hence qualified persons having experience in fabrication of structure and installation of machinery must be employed
42 Quality and workmanship must be of highest standard suitable for naval ships and to be
to the satisfaction of inspecting authority 43 Any defects observed during inspection are to be liquidated by the sub-contractor at no
extra cost 44 Welding is to be carried out only by competent qualified and certified welders having
valid test certificate issued by ABS or IRS 45 All welding is to be done after proper edge preparation All welding are to be properly
dressed up 46 One coat of touch up paint in way of weld joint is to be done after proper cleaning 47 Local fairing of deck is to be done using strong back bar as required and the same is to
be removed after completion of work The affected areas are to be properly dressed up 48 Clean ship condition is to be maintained everyday
5 GRSE supply items
51 ABS quality plates amp sections as required
52 Anchor capstan assembly units including Stainless steel (AISI-316) holding down hex head bolts nuts and washers amp spring washers
53 Steel material for Jig
54 Primer for touch up
55 Loctite compound
56 Machining assistance if required 57 Compressed gas electrodes electricity and light 58 Scaffolding if necessary 59 Carne assistance (is necessary)
6 Sub-contractorrsquos scope of supply
61 Welding and cutting machine and accessories 62 Power drilling machine 63 Power extension board portable lamps 64 Proper safety equipment to be provided to the workmen (Helmets safety goggles mask
apron hand gloves harness working at elevation ec) 65 Supervisor The firm should provide supervisors with proper knowledge of the nature of work
should be present on board at all times
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 3 OF 10
DATE 270317 PREPARED BY MBISWAS
7 Inspection
Installation of Anchor capstan is to be inspected by GRSE (QA) CGRPT (Kol) and ABSIRS as per approved QAP Within 7 days from the date of order LOA QAP is to be submitted by the sub-contractor to GRSEQA for approval No of stage inspection will be decided by the inspecting officers GRSE Deck Machinery should depute their technical representative for assistance during installation
8 Manpower a) Sub-contractor should submit complete list of personnel as per their payroll alongwith ESI PF
reference and voter ID for Skilled labour including number of experienced marker fitter welder gas cutter etc Successful sub-contractor should undertake that these operatives would not be withdrawn jeopardizing the construction schedule
b) Similar details about engineers supervisors to be employed for the work
c) List of tools assets held with the company to be submitted
9 Hindrance Register
To be maintained by the sub-contractor and put up for approval by the Project Leader on weekly basis
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 4 OF 10
DATE 270317 PREPARED BY MBISWAS
Annexure - 1 GENERAL MOUNTING INSTRUCTIONS OF ANCHOR CAPSTAN ON DECK SEATING The Scope of this Instructions generally covers the Procedure for IN-SHOP ErectionInstallation of Anchor Capstan supplied by GRSE Deck Machinery as per GA Drg No107112 RevA on a cut-away Shiprsquos Seating Block (Ref GRSE Drg No2013-17110317 amp 110317-1) duly assembling therein all the constituent subassembliescomponents which comes in knocked down condition as dispatched from manufacturerrsquos premises 1 Scope 11 Underslung Worm Gear Box with vertical Main shaft (fitted with Clamp Key Bars and End Plate)
duly pre-assembled with Electric Motor cw Disc Brake via Worm GearWorm Shaft and Slipping Clutch cum Coupling at one end and Manually operated Bevel Gear Box with Clutch shifting lever Assembly at the other end
12 Base Plate fitted with Bush 13 Cable Lifter fitted with Bushes 14 Warping Head fitted with Hand Wheel Assembly 15 Manual operation Hand Wheel and Deck Socket Arrangement 15 Band Brake Assembly 16 Chain Reliever screwed on loose pads which are to be finally welded to the Base Plate after
aligning chain cable with naval pipe amp Anchor Hawse pipe 17 Naval Pipe Assly 18 Chain Support Assly 19 Holding Down Foundation Bolts 110 Control Panel amp Push Button Station 2 Instructions for Installation
Prior to starting on-board installation of the Anchor Capstans in Port amp Stbdsides it is to be ensured that the top deck surface in way of the capstan Base plate is duly machined and overall thickness of Deck foundation with provision of chocks in the interface of underslung units and deck does not exceed 525 mm to match with the vertical shaft length Necessary adjustments required if any are to be done only on thickness of the chocks to maintain proper assembly Hence follow the following steps
21 Examine Shiprsquos seating for Dimensions and Squareness in way of Capstan Foundation The overall thickness of the Seating (excluding Chocks) should be 512 (+-2) mm The top of Annular Bedplate (600 OD X 350 ID) should be duly machined Also check that Hand Holes are made in the 370 dia tubular shell of the ships seating to facilitate access to the vertical shaft interfaces with base plate Bottom Flange and underslung Gear Box top Flange 22 Position the Ships Seating upright and place the Base Plate on the machined annular bed plate of Ships seating as per orientation given in the GA Drawing Mark up the Bolt holes as per lsquoUpper Deck Foundation Detailsrsquo Drill amp ream the foundation Holes as required ensuring the Equipment Orientation on board Ship (Ref Fig No 1) Fit the Base Plate in position on the seating duly bolted to shiprsquos Seating (Ref Fig No 2) Repeat the same for installing the Base Plate of 2nd Capstan unit in Port Side 23 Invert the Shiprsquos Seating and place the same on an elevated level Support platform to facilitate
assembly of the underslung Machinery which will now appear on the top
24 Position the Underslung Gear Box Motor Assembly with vertical Main Shaft facing downward and insert same through the circular hole of Shiprsquos seating vis-agrave-vis through the Bush Bearing provided in the Hub of Base Plate so that the Gear Box Flange rests on the spigot of the interfacing flange of the Base Plate Rotate the Gear Box assly as per orientation of the Equipment Mark up the bolt position on Base Plate bottom flange if not already done from the Gear Box flange and bolt up the flanges of Base Plate and Gear Box ensuring orientation of the equipment properly There should be a gap between the shiprsquos seating and Gear box bottom surface in way of the holding down bolts to the tune of 13 mm which has to be compensated by chocks Measure the gap accurately in way of each bolt hole and adjust thickness accordingly with identification for each position Mark up all the Bolt Holes with Gear Box Assembly in position
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 5 OF 10
DATE 270317 PREPARED BY MBISWAS
25 Unscrew the Gear Box Assembly from the interfacing flanges of the Base Plate and remove same to complete drilling of the holding down bolt holes as per lsquoUnder Deck Foundation Detailsrsquo given in the GA drawing 26 Re-install the Gear Box Assembly on the Ships seating after inserting machined Chocks as required in respective bolt hole positions (as identified earlier) and tighten all bolts to complete the underslung holding downarrangement Foundation Bolts must now be tightened properly Repeat 24 to 26 for installing the Gear Box assly of 2nd Capstan unit in Port Side (Ref FigNo 3 amp 4) 27 Invert the Ships seating The Base Plate with Vertical Main Shaft protruding upward will now come on top as per actual arrangement in Port amp Stbd sides Unscrew the Clamps End Plate and withdraw key bars from the Main Shaft to introduce the Cable Lifter through the vertical Main Shaft Put back the Clamps on the Main Shaft and tighten the screws Ensure that the Cable lifter rotates freely on the Base Plate 28 Put back the Key Bars in position on the Main shaft and introduce the Warping Head sliding down through the Key ways Rotate same so that the driving dogs engage with those of the cable lifter below Check that when engaged the Cable Lifter rotates freely along with the Warping Head Fit the Hand Wheel at the screwed end and lower it to the level of the Warping Head so that the split retaining ring can be screwed on the top face of Warping Head Hub Screw up the end plate on the vertical shaft end 29 Rotate the Hand Wheel provided with the Warping Head counter clockwise to dis-engage from the Cable Lifter Check that there is adequate gap between the dogs of the two when the Warping Head is fully lifted up by operating the Hand Wheel Check for proper locking in both engaged and dis-engaged condition
210 Insert the Deck socket with Hand Wheel shaft through the Hole on the Deck Plate and ascertain that the Wheel shaft engages properly with the Hand operation Gear Box shaft extension protruding upward Mark up the Deck Socket Bolt Holes Remove the Hand Wheel Assembly and complete the drill Holes 211 Put back the Deck Socket and screw up to Deck Plate Dis-engage the Electro magnetic Disc Brake provided at NDE of Electric Motor Now engage the Clutch half of the Manual operation Gear Box by operating the Clutch Shifting Lever and rotate the Manual operation Hand Wheel to see that the Unit rotates freely in hoisting direction but locks in lowering direction by the pawl and ratchet provided at the output shaft of the Manual operation Gear Box 212 Put the Band Brake Assembly on The Cable Lifter and align the Brake operating Gear Box as per orientation given in the GA Drawing and check that the same rests on the shiprsquos seating provided separately Use chocks in way of the Bolt holes as necessary Fit the Keep plate on the Brake anchorage Pin Check that the Bands engage and releases properly when the Hand Wheel is rotated in the desired direction Weld the Brake Anchor Pin with Base Plate using low Hydrogen electrode Repeat 27 to 212 for 2nd Capstan unit in Port Side (Ref Fig No 5) 213 Place the Chain Reliever screwed with Pads on the outer wall of the Base Plate after scertaining its position wrt tight amp slack side of chain cable and check that there is adequate gap to permit free rotation of the Cable Lifter Weld the Pads of the Chain Reliever to the Base plate 214 Position the complete assly of Naval Pipe (GRSE Deck Machinery supply) within close proximity of cablelifter Weld the Lip plate in front of the Naval Pipe to ensure cable entry without jamming Lower portion of the Naval Pipe to be cut to shape and welded to the bellmouth (Shipyard Supply) 215 Put the Roller type Chain Support Assembly in line with the hawse pipe by adjustment of height (supplied with green material) and weld to Deck maintaining alignment of chain cable with cable lifter 216 Repeat 213 to 215 for 2nd Capstan unit in Port Side
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 6 OF 10
DATE 270317 PREPARED BY MBISWAS
217 Complete assembly of two Anchor Capstans (Port amp Stbd) wrt Anchor Hawse pipe and Naval pipe indicated in Fig No6 218 The IN-SHOP Erection Installation of both Anchor Capstans on the cut-away Shiprsquos Seating Block will thus be complete The Ships Seating Block along with Anchor Capstans (Port amp Stbd) will afterwards be taken for placement on Shiprsquos Deck for welding with Deck Structure During welding of this Block with Shiprsquos deck Structure all precautions for controlled welding should be taken to obviate any possibility of undue deformation stresses in the structure and installed equipment After completion of all welding both Anchor Capstans should be lubricated at all the Bearing points Gear Box (Oil capacity of the Gear Box is 10 Ltrs Apprx) The Anchor Capstan should be manually
operated to check that equipment runs without any resistance On completion of satisfactory Hand
operation the Control Panel and Push Button Station is to be connected to the Capstan suitably as per Interconnection diagram For detail connection and activation of circuit setting to workand to operate the Motor refer the Electrical Manual For initial startup and to run the Capstan on No-Load during STW ensure that the Electro-Magnetic Disc Brake (at the NDE of Electric Motor) is properly released activated and the Equipment runs without any resistance Equipments may be set to work on Electric Power mode followed by heavingveering of Chain Cable by the Cable Lifter for which positioning of Naval Pipe and Hawse Pipe is a pre-requisite to ensure free movement of Chain Cable during handling of Anchor 3 Salient Points 31 In order to ensure Water tightness around the interfaces of the base plate and Deck Seating Annular Bed Plate it is essential that the top of seating is machined to leave no gap when the Base plate is hard tightened on the seating by the Foundation Bolts However as an additional measure suitable Flange Sealant (LOCKTITE Product No 574 for gap fill up to 05 mm or equivalent) may be applied throughout the entire interface of Base Plate Annular Bed Plate (including fixing bolts) 2 Chocks do not get displaced after dismantling and same may be tack weldedto Deck Seating at the respective positions 3 Quality and workmanship have to be to the satisfaction of the inspecting Authority Installation defect if any is to be liquidated by the subcontractor at their cost
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 3 OF 10
DATE 270317 PREPARED BY MBISWAS
7 Inspection
Installation of Anchor capstan is to be inspected by GRSE (QA) CGRPT (Kol) and ABSIRS as per approved QAP Within 7 days from the date of order LOA QAP is to be submitted by the sub-contractor to GRSEQA for approval No of stage inspection will be decided by the inspecting officers GRSE Deck Machinery should depute their technical representative for assistance during installation
8 Manpower a) Sub-contractor should submit complete list of personnel as per their payroll alongwith ESI PF
reference and voter ID for Skilled labour including number of experienced marker fitter welder gas cutter etc Successful sub-contractor should undertake that these operatives would not be withdrawn jeopardizing the construction schedule
b) Similar details about engineers supervisors to be employed for the work
c) List of tools assets held with the company to be submitted
9 Hindrance Register
To be maintained by the sub-contractor and put up for approval by the Project Leader on weekly basis
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 4 OF 10
DATE 270317 PREPARED BY MBISWAS
Annexure - 1 GENERAL MOUNTING INSTRUCTIONS OF ANCHOR CAPSTAN ON DECK SEATING The Scope of this Instructions generally covers the Procedure for IN-SHOP ErectionInstallation of Anchor Capstan supplied by GRSE Deck Machinery as per GA Drg No107112 RevA on a cut-away Shiprsquos Seating Block (Ref GRSE Drg No2013-17110317 amp 110317-1) duly assembling therein all the constituent subassembliescomponents which comes in knocked down condition as dispatched from manufacturerrsquos premises 1 Scope 11 Underslung Worm Gear Box with vertical Main shaft (fitted with Clamp Key Bars and End Plate)
duly pre-assembled with Electric Motor cw Disc Brake via Worm GearWorm Shaft and Slipping Clutch cum Coupling at one end and Manually operated Bevel Gear Box with Clutch shifting lever Assembly at the other end
12 Base Plate fitted with Bush 13 Cable Lifter fitted with Bushes 14 Warping Head fitted with Hand Wheel Assembly 15 Manual operation Hand Wheel and Deck Socket Arrangement 15 Band Brake Assembly 16 Chain Reliever screwed on loose pads which are to be finally welded to the Base Plate after
aligning chain cable with naval pipe amp Anchor Hawse pipe 17 Naval Pipe Assly 18 Chain Support Assly 19 Holding Down Foundation Bolts 110 Control Panel amp Push Button Station 2 Instructions for Installation
Prior to starting on-board installation of the Anchor Capstans in Port amp Stbdsides it is to be ensured that the top deck surface in way of the capstan Base plate is duly machined and overall thickness of Deck foundation with provision of chocks in the interface of underslung units and deck does not exceed 525 mm to match with the vertical shaft length Necessary adjustments required if any are to be done only on thickness of the chocks to maintain proper assembly Hence follow the following steps
21 Examine Shiprsquos seating for Dimensions and Squareness in way of Capstan Foundation The overall thickness of the Seating (excluding Chocks) should be 512 (+-2) mm The top of Annular Bedplate (600 OD X 350 ID) should be duly machined Also check that Hand Holes are made in the 370 dia tubular shell of the ships seating to facilitate access to the vertical shaft interfaces with base plate Bottom Flange and underslung Gear Box top Flange 22 Position the Ships Seating upright and place the Base Plate on the machined annular bed plate of Ships seating as per orientation given in the GA Drawing Mark up the Bolt holes as per lsquoUpper Deck Foundation Detailsrsquo Drill amp ream the foundation Holes as required ensuring the Equipment Orientation on board Ship (Ref Fig No 1) Fit the Base Plate in position on the seating duly bolted to shiprsquos Seating (Ref Fig No 2) Repeat the same for installing the Base Plate of 2nd Capstan unit in Port Side 23 Invert the Shiprsquos Seating and place the same on an elevated level Support platform to facilitate
assembly of the underslung Machinery which will now appear on the top
24 Position the Underslung Gear Box Motor Assembly with vertical Main Shaft facing downward and insert same through the circular hole of Shiprsquos seating vis-agrave-vis through the Bush Bearing provided in the Hub of Base Plate so that the Gear Box Flange rests on the spigot of the interfacing flange of the Base Plate Rotate the Gear Box assly as per orientation of the Equipment Mark up the bolt position on Base Plate bottom flange if not already done from the Gear Box flange and bolt up the flanges of Base Plate and Gear Box ensuring orientation of the equipment properly There should be a gap between the shiprsquos seating and Gear box bottom surface in way of the holding down bolts to the tune of 13 mm which has to be compensated by chocks Measure the gap accurately in way of each bolt hole and adjust thickness accordingly with identification for each position Mark up all the Bolt Holes with Gear Box Assembly in position
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 5 OF 10
DATE 270317 PREPARED BY MBISWAS
25 Unscrew the Gear Box Assembly from the interfacing flanges of the Base Plate and remove same to complete drilling of the holding down bolt holes as per lsquoUnder Deck Foundation Detailsrsquo given in the GA drawing 26 Re-install the Gear Box Assembly on the Ships seating after inserting machined Chocks as required in respective bolt hole positions (as identified earlier) and tighten all bolts to complete the underslung holding downarrangement Foundation Bolts must now be tightened properly Repeat 24 to 26 for installing the Gear Box assly of 2nd Capstan unit in Port Side (Ref FigNo 3 amp 4) 27 Invert the Ships seating The Base Plate with Vertical Main Shaft protruding upward will now come on top as per actual arrangement in Port amp Stbd sides Unscrew the Clamps End Plate and withdraw key bars from the Main Shaft to introduce the Cable Lifter through the vertical Main Shaft Put back the Clamps on the Main Shaft and tighten the screws Ensure that the Cable lifter rotates freely on the Base Plate 28 Put back the Key Bars in position on the Main shaft and introduce the Warping Head sliding down through the Key ways Rotate same so that the driving dogs engage with those of the cable lifter below Check that when engaged the Cable Lifter rotates freely along with the Warping Head Fit the Hand Wheel at the screwed end and lower it to the level of the Warping Head so that the split retaining ring can be screwed on the top face of Warping Head Hub Screw up the end plate on the vertical shaft end 29 Rotate the Hand Wheel provided with the Warping Head counter clockwise to dis-engage from the Cable Lifter Check that there is adequate gap between the dogs of the two when the Warping Head is fully lifted up by operating the Hand Wheel Check for proper locking in both engaged and dis-engaged condition
210 Insert the Deck socket with Hand Wheel shaft through the Hole on the Deck Plate and ascertain that the Wheel shaft engages properly with the Hand operation Gear Box shaft extension protruding upward Mark up the Deck Socket Bolt Holes Remove the Hand Wheel Assembly and complete the drill Holes 211 Put back the Deck Socket and screw up to Deck Plate Dis-engage the Electro magnetic Disc Brake provided at NDE of Electric Motor Now engage the Clutch half of the Manual operation Gear Box by operating the Clutch Shifting Lever and rotate the Manual operation Hand Wheel to see that the Unit rotates freely in hoisting direction but locks in lowering direction by the pawl and ratchet provided at the output shaft of the Manual operation Gear Box 212 Put the Band Brake Assembly on The Cable Lifter and align the Brake operating Gear Box as per orientation given in the GA Drawing and check that the same rests on the shiprsquos seating provided separately Use chocks in way of the Bolt holes as necessary Fit the Keep plate on the Brake anchorage Pin Check that the Bands engage and releases properly when the Hand Wheel is rotated in the desired direction Weld the Brake Anchor Pin with Base Plate using low Hydrogen electrode Repeat 27 to 212 for 2nd Capstan unit in Port Side (Ref Fig No 5) 213 Place the Chain Reliever screwed with Pads on the outer wall of the Base Plate after scertaining its position wrt tight amp slack side of chain cable and check that there is adequate gap to permit free rotation of the Cable Lifter Weld the Pads of the Chain Reliever to the Base plate 214 Position the complete assly of Naval Pipe (GRSE Deck Machinery supply) within close proximity of cablelifter Weld the Lip plate in front of the Naval Pipe to ensure cable entry without jamming Lower portion of the Naval Pipe to be cut to shape and welded to the bellmouth (Shipyard Supply) 215 Put the Roller type Chain Support Assembly in line with the hawse pipe by adjustment of height (supplied with green material) and weld to Deck maintaining alignment of chain cable with cable lifter 216 Repeat 213 to 215 for 2nd Capstan unit in Port Side
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 6 OF 10
DATE 270317 PREPARED BY MBISWAS
217 Complete assembly of two Anchor Capstans (Port amp Stbd) wrt Anchor Hawse pipe and Naval pipe indicated in Fig No6 218 The IN-SHOP Erection Installation of both Anchor Capstans on the cut-away Shiprsquos Seating Block will thus be complete The Ships Seating Block along with Anchor Capstans (Port amp Stbd) will afterwards be taken for placement on Shiprsquos Deck for welding with Deck Structure During welding of this Block with Shiprsquos deck Structure all precautions for controlled welding should be taken to obviate any possibility of undue deformation stresses in the structure and installed equipment After completion of all welding both Anchor Capstans should be lubricated at all the Bearing points Gear Box (Oil capacity of the Gear Box is 10 Ltrs Apprx) The Anchor Capstan should be manually
operated to check that equipment runs without any resistance On completion of satisfactory Hand
operation the Control Panel and Push Button Station is to be connected to the Capstan suitably as per Interconnection diagram For detail connection and activation of circuit setting to workand to operate the Motor refer the Electrical Manual For initial startup and to run the Capstan on No-Load during STW ensure that the Electro-Magnetic Disc Brake (at the NDE of Electric Motor) is properly released activated and the Equipment runs without any resistance Equipments may be set to work on Electric Power mode followed by heavingveering of Chain Cable by the Cable Lifter for which positioning of Naval Pipe and Hawse Pipe is a pre-requisite to ensure free movement of Chain Cable during handling of Anchor 3 Salient Points 31 In order to ensure Water tightness around the interfaces of the base plate and Deck Seating Annular Bed Plate it is essential that the top of seating is machined to leave no gap when the Base plate is hard tightened on the seating by the Foundation Bolts However as an additional measure suitable Flange Sealant (LOCKTITE Product No 574 for gap fill up to 05 mm or equivalent) may be applied throughout the entire interface of Base Plate Annular Bed Plate (including fixing bolts) 2 Chocks do not get displaced after dismantling and same may be tack weldedto Deck Seating at the respective positions 3 Quality and workmanship have to be to the satisfaction of the inspecting Authority Installation defect if any is to be liquidated by the subcontractor at their cost
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 4 OF 10
DATE 270317 PREPARED BY MBISWAS
Annexure - 1 GENERAL MOUNTING INSTRUCTIONS OF ANCHOR CAPSTAN ON DECK SEATING The Scope of this Instructions generally covers the Procedure for IN-SHOP ErectionInstallation of Anchor Capstan supplied by GRSE Deck Machinery as per GA Drg No107112 RevA on a cut-away Shiprsquos Seating Block (Ref GRSE Drg No2013-17110317 amp 110317-1) duly assembling therein all the constituent subassembliescomponents which comes in knocked down condition as dispatched from manufacturerrsquos premises 1 Scope 11 Underslung Worm Gear Box with vertical Main shaft (fitted with Clamp Key Bars and End Plate)
duly pre-assembled with Electric Motor cw Disc Brake via Worm GearWorm Shaft and Slipping Clutch cum Coupling at one end and Manually operated Bevel Gear Box with Clutch shifting lever Assembly at the other end
12 Base Plate fitted with Bush 13 Cable Lifter fitted with Bushes 14 Warping Head fitted with Hand Wheel Assembly 15 Manual operation Hand Wheel and Deck Socket Arrangement 15 Band Brake Assembly 16 Chain Reliever screwed on loose pads which are to be finally welded to the Base Plate after
aligning chain cable with naval pipe amp Anchor Hawse pipe 17 Naval Pipe Assly 18 Chain Support Assly 19 Holding Down Foundation Bolts 110 Control Panel amp Push Button Station 2 Instructions for Installation
Prior to starting on-board installation of the Anchor Capstans in Port amp Stbdsides it is to be ensured that the top deck surface in way of the capstan Base plate is duly machined and overall thickness of Deck foundation with provision of chocks in the interface of underslung units and deck does not exceed 525 mm to match with the vertical shaft length Necessary adjustments required if any are to be done only on thickness of the chocks to maintain proper assembly Hence follow the following steps
21 Examine Shiprsquos seating for Dimensions and Squareness in way of Capstan Foundation The overall thickness of the Seating (excluding Chocks) should be 512 (+-2) mm The top of Annular Bedplate (600 OD X 350 ID) should be duly machined Also check that Hand Holes are made in the 370 dia tubular shell of the ships seating to facilitate access to the vertical shaft interfaces with base plate Bottom Flange and underslung Gear Box top Flange 22 Position the Ships Seating upright and place the Base Plate on the machined annular bed plate of Ships seating as per orientation given in the GA Drawing Mark up the Bolt holes as per lsquoUpper Deck Foundation Detailsrsquo Drill amp ream the foundation Holes as required ensuring the Equipment Orientation on board Ship (Ref Fig No 1) Fit the Base Plate in position on the seating duly bolted to shiprsquos Seating (Ref Fig No 2) Repeat the same for installing the Base Plate of 2nd Capstan unit in Port Side 23 Invert the Shiprsquos Seating and place the same on an elevated level Support platform to facilitate
assembly of the underslung Machinery which will now appear on the top
24 Position the Underslung Gear Box Motor Assembly with vertical Main Shaft facing downward and insert same through the circular hole of Shiprsquos seating vis-agrave-vis through the Bush Bearing provided in the Hub of Base Plate so that the Gear Box Flange rests on the spigot of the interfacing flange of the Base Plate Rotate the Gear Box assly as per orientation of the Equipment Mark up the bolt position on Base Plate bottom flange if not already done from the Gear Box flange and bolt up the flanges of Base Plate and Gear Box ensuring orientation of the equipment properly There should be a gap between the shiprsquos seating and Gear box bottom surface in way of the holding down bolts to the tune of 13 mm which has to be compensated by chocks Measure the gap accurately in way of each bolt hole and adjust thickness accordingly with identification for each position Mark up all the Bolt Holes with Gear Box Assembly in position
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 5 OF 10
DATE 270317 PREPARED BY MBISWAS
25 Unscrew the Gear Box Assembly from the interfacing flanges of the Base Plate and remove same to complete drilling of the holding down bolt holes as per lsquoUnder Deck Foundation Detailsrsquo given in the GA drawing 26 Re-install the Gear Box Assembly on the Ships seating after inserting machined Chocks as required in respective bolt hole positions (as identified earlier) and tighten all bolts to complete the underslung holding downarrangement Foundation Bolts must now be tightened properly Repeat 24 to 26 for installing the Gear Box assly of 2nd Capstan unit in Port Side (Ref FigNo 3 amp 4) 27 Invert the Ships seating The Base Plate with Vertical Main Shaft protruding upward will now come on top as per actual arrangement in Port amp Stbd sides Unscrew the Clamps End Plate and withdraw key bars from the Main Shaft to introduce the Cable Lifter through the vertical Main Shaft Put back the Clamps on the Main Shaft and tighten the screws Ensure that the Cable lifter rotates freely on the Base Plate 28 Put back the Key Bars in position on the Main shaft and introduce the Warping Head sliding down through the Key ways Rotate same so that the driving dogs engage with those of the cable lifter below Check that when engaged the Cable Lifter rotates freely along with the Warping Head Fit the Hand Wheel at the screwed end and lower it to the level of the Warping Head so that the split retaining ring can be screwed on the top face of Warping Head Hub Screw up the end plate on the vertical shaft end 29 Rotate the Hand Wheel provided with the Warping Head counter clockwise to dis-engage from the Cable Lifter Check that there is adequate gap between the dogs of the two when the Warping Head is fully lifted up by operating the Hand Wheel Check for proper locking in both engaged and dis-engaged condition
210 Insert the Deck socket with Hand Wheel shaft through the Hole on the Deck Plate and ascertain that the Wheel shaft engages properly with the Hand operation Gear Box shaft extension protruding upward Mark up the Deck Socket Bolt Holes Remove the Hand Wheel Assembly and complete the drill Holes 211 Put back the Deck Socket and screw up to Deck Plate Dis-engage the Electro magnetic Disc Brake provided at NDE of Electric Motor Now engage the Clutch half of the Manual operation Gear Box by operating the Clutch Shifting Lever and rotate the Manual operation Hand Wheel to see that the Unit rotates freely in hoisting direction but locks in lowering direction by the pawl and ratchet provided at the output shaft of the Manual operation Gear Box 212 Put the Band Brake Assembly on The Cable Lifter and align the Brake operating Gear Box as per orientation given in the GA Drawing and check that the same rests on the shiprsquos seating provided separately Use chocks in way of the Bolt holes as necessary Fit the Keep plate on the Brake anchorage Pin Check that the Bands engage and releases properly when the Hand Wheel is rotated in the desired direction Weld the Brake Anchor Pin with Base Plate using low Hydrogen electrode Repeat 27 to 212 for 2nd Capstan unit in Port Side (Ref Fig No 5) 213 Place the Chain Reliever screwed with Pads on the outer wall of the Base Plate after scertaining its position wrt tight amp slack side of chain cable and check that there is adequate gap to permit free rotation of the Cable Lifter Weld the Pads of the Chain Reliever to the Base plate 214 Position the complete assly of Naval Pipe (GRSE Deck Machinery supply) within close proximity of cablelifter Weld the Lip plate in front of the Naval Pipe to ensure cable entry without jamming Lower portion of the Naval Pipe to be cut to shape and welded to the bellmouth (Shipyard Supply) 215 Put the Roller type Chain Support Assembly in line with the hawse pipe by adjustment of height (supplied with green material) and weld to Deck maintaining alignment of chain cable with cable lifter 216 Repeat 213 to 215 for 2nd Capstan unit in Port Side
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 6 OF 10
DATE 270317 PREPARED BY MBISWAS
217 Complete assembly of two Anchor Capstans (Port amp Stbd) wrt Anchor Hawse pipe and Naval pipe indicated in Fig No6 218 The IN-SHOP Erection Installation of both Anchor Capstans on the cut-away Shiprsquos Seating Block will thus be complete The Ships Seating Block along with Anchor Capstans (Port amp Stbd) will afterwards be taken for placement on Shiprsquos Deck for welding with Deck Structure During welding of this Block with Shiprsquos deck Structure all precautions for controlled welding should be taken to obviate any possibility of undue deformation stresses in the structure and installed equipment After completion of all welding both Anchor Capstans should be lubricated at all the Bearing points Gear Box (Oil capacity of the Gear Box is 10 Ltrs Apprx) The Anchor Capstan should be manually
operated to check that equipment runs without any resistance On completion of satisfactory Hand
operation the Control Panel and Push Button Station is to be connected to the Capstan suitably as per Interconnection diagram For detail connection and activation of circuit setting to workand to operate the Motor refer the Electrical Manual For initial startup and to run the Capstan on No-Load during STW ensure that the Electro-Magnetic Disc Brake (at the NDE of Electric Motor) is properly released activated and the Equipment runs without any resistance Equipments may be set to work on Electric Power mode followed by heavingveering of Chain Cable by the Cable Lifter for which positioning of Naval Pipe and Hawse Pipe is a pre-requisite to ensure free movement of Chain Cable during handling of Anchor 3 Salient Points 31 In order to ensure Water tightness around the interfaces of the base plate and Deck Seating Annular Bed Plate it is essential that the top of seating is machined to leave no gap when the Base plate is hard tightened on the seating by the Foundation Bolts However as an additional measure suitable Flange Sealant (LOCKTITE Product No 574 for gap fill up to 05 mm or equivalent) may be applied throughout the entire interface of Base Plate Annular Bed Plate (including fixing bolts) 2 Chocks do not get displaced after dismantling and same may be tack weldedto Deck Seating at the respective positions 3 Quality and workmanship have to be to the satisfaction of the inspecting Authority Installation defect if any is to be liquidated by the subcontractor at their cost
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 5 OF 10
DATE 270317 PREPARED BY MBISWAS
25 Unscrew the Gear Box Assembly from the interfacing flanges of the Base Plate and remove same to complete drilling of the holding down bolt holes as per lsquoUnder Deck Foundation Detailsrsquo given in the GA drawing 26 Re-install the Gear Box Assembly on the Ships seating after inserting machined Chocks as required in respective bolt hole positions (as identified earlier) and tighten all bolts to complete the underslung holding downarrangement Foundation Bolts must now be tightened properly Repeat 24 to 26 for installing the Gear Box assly of 2nd Capstan unit in Port Side (Ref FigNo 3 amp 4) 27 Invert the Ships seating The Base Plate with Vertical Main Shaft protruding upward will now come on top as per actual arrangement in Port amp Stbd sides Unscrew the Clamps End Plate and withdraw key bars from the Main Shaft to introduce the Cable Lifter through the vertical Main Shaft Put back the Clamps on the Main Shaft and tighten the screws Ensure that the Cable lifter rotates freely on the Base Plate 28 Put back the Key Bars in position on the Main shaft and introduce the Warping Head sliding down through the Key ways Rotate same so that the driving dogs engage with those of the cable lifter below Check that when engaged the Cable Lifter rotates freely along with the Warping Head Fit the Hand Wheel at the screwed end and lower it to the level of the Warping Head so that the split retaining ring can be screwed on the top face of Warping Head Hub Screw up the end plate on the vertical shaft end 29 Rotate the Hand Wheel provided with the Warping Head counter clockwise to dis-engage from the Cable Lifter Check that there is adequate gap between the dogs of the two when the Warping Head is fully lifted up by operating the Hand Wheel Check for proper locking in both engaged and dis-engaged condition
210 Insert the Deck socket with Hand Wheel shaft through the Hole on the Deck Plate and ascertain that the Wheel shaft engages properly with the Hand operation Gear Box shaft extension protruding upward Mark up the Deck Socket Bolt Holes Remove the Hand Wheel Assembly and complete the drill Holes 211 Put back the Deck Socket and screw up to Deck Plate Dis-engage the Electro magnetic Disc Brake provided at NDE of Electric Motor Now engage the Clutch half of the Manual operation Gear Box by operating the Clutch Shifting Lever and rotate the Manual operation Hand Wheel to see that the Unit rotates freely in hoisting direction but locks in lowering direction by the pawl and ratchet provided at the output shaft of the Manual operation Gear Box 212 Put the Band Brake Assembly on The Cable Lifter and align the Brake operating Gear Box as per orientation given in the GA Drawing and check that the same rests on the shiprsquos seating provided separately Use chocks in way of the Bolt holes as necessary Fit the Keep plate on the Brake anchorage Pin Check that the Bands engage and releases properly when the Hand Wheel is rotated in the desired direction Weld the Brake Anchor Pin with Base Plate using low Hydrogen electrode Repeat 27 to 212 for 2nd Capstan unit in Port Side (Ref Fig No 5) 213 Place the Chain Reliever screwed with Pads on the outer wall of the Base Plate after scertaining its position wrt tight amp slack side of chain cable and check that there is adequate gap to permit free rotation of the Cable Lifter Weld the Pads of the Chain Reliever to the Base plate 214 Position the complete assly of Naval Pipe (GRSE Deck Machinery supply) within close proximity of cablelifter Weld the Lip plate in front of the Naval Pipe to ensure cable entry without jamming Lower portion of the Naval Pipe to be cut to shape and welded to the bellmouth (Shipyard Supply) 215 Put the Roller type Chain Support Assembly in line with the hawse pipe by adjustment of height (supplied with green material) and weld to Deck maintaining alignment of chain cable with cable lifter 216 Repeat 213 to 215 for 2nd Capstan unit in Port Side
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 6 OF 10
DATE 270317 PREPARED BY MBISWAS
217 Complete assembly of two Anchor Capstans (Port amp Stbd) wrt Anchor Hawse pipe and Naval pipe indicated in Fig No6 218 The IN-SHOP Erection Installation of both Anchor Capstans on the cut-away Shiprsquos Seating Block will thus be complete The Ships Seating Block along with Anchor Capstans (Port amp Stbd) will afterwards be taken for placement on Shiprsquos Deck for welding with Deck Structure During welding of this Block with Shiprsquos deck Structure all precautions for controlled welding should be taken to obviate any possibility of undue deformation stresses in the structure and installed equipment After completion of all welding both Anchor Capstans should be lubricated at all the Bearing points Gear Box (Oil capacity of the Gear Box is 10 Ltrs Apprx) The Anchor Capstan should be manually
operated to check that equipment runs without any resistance On completion of satisfactory Hand
operation the Control Panel and Push Button Station is to be connected to the Capstan suitably as per Interconnection diagram For detail connection and activation of circuit setting to workand to operate the Motor refer the Electrical Manual For initial startup and to run the Capstan on No-Load during STW ensure that the Electro-Magnetic Disc Brake (at the NDE of Electric Motor) is properly released activated and the Equipment runs without any resistance Equipments may be set to work on Electric Power mode followed by heavingveering of Chain Cable by the Cable Lifter for which positioning of Naval Pipe and Hawse Pipe is a pre-requisite to ensure free movement of Chain Cable during handling of Anchor 3 Salient Points 31 In order to ensure Water tightness around the interfaces of the base plate and Deck Seating Annular Bed Plate it is essential that the top of seating is machined to leave no gap when the Base plate is hard tightened on the seating by the Foundation Bolts However as an additional measure suitable Flange Sealant (LOCKTITE Product No 574 for gap fill up to 05 mm or equivalent) may be applied throughout the entire interface of Base Plate Annular Bed Plate (including fixing bolts) 2 Chocks do not get displaced after dismantling and same may be tack weldedto Deck Seating at the respective positions 3 Quality and workmanship have to be to the satisfaction of the inspecting Authority Installation defect if any is to be liquidated by the subcontractor at their cost
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 6 OF 10
DATE 270317 PREPARED BY MBISWAS
217 Complete assembly of two Anchor Capstans (Port amp Stbd) wrt Anchor Hawse pipe and Naval pipe indicated in Fig No6 218 The IN-SHOP Erection Installation of both Anchor Capstans on the cut-away Shiprsquos Seating Block will thus be complete The Ships Seating Block along with Anchor Capstans (Port amp Stbd) will afterwards be taken for placement on Shiprsquos Deck for welding with Deck Structure During welding of this Block with Shiprsquos deck Structure all precautions for controlled welding should be taken to obviate any possibility of undue deformation stresses in the structure and installed equipment After completion of all welding both Anchor Capstans should be lubricated at all the Bearing points Gear Box (Oil capacity of the Gear Box is 10 Ltrs Apprx) The Anchor Capstan should be manually
operated to check that equipment runs without any resistance On completion of satisfactory Hand
operation the Control Panel and Push Button Station is to be connected to the Capstan suitably as per Interconnection diagram For detail connection and activation of circuit setting to workand to operate the Motor refer the Electrical Manual For initial startup and to run the Capstan on No-Load during STW ensure that the Electro-Magnetic Disc Brake (at the NDE of Electric Motor) is properly released activated and the Equipment runs without any resistance Equipments may be set to work on Electric Power mode followed by heavingveering of Chain Cable by the Cable Lifter for which positioning of Naval Pipe and Hawse Pipe is a pre-requisite to ensure free movement of Chain Cable during handling of Anchor 3 Salient Points 31 In order to ensure Water tightness around the interfaces of the base plate and Deck Seating Annular Bed Plate it is essential that the top of seating is machined to leave no gap when the Base plate is hard tightened on the seating by the Foundation Bolts However as an additional measure suitable Flange Sealant (LOCKTITE Product No 574 for gap fill up to 05 mm or equivalent) may be applied throughout the entire interface of Base Plate Annular Bed Plate (including fixing bolts) 2 Chocks do not get displaced after dismantling and same may be tack weldedto Deck Seating at the respective positions 3 Quality and workmanship have to be to the satisfaction of the inspecting Authority Installation defect if any is to be liquidated by the subcontractor at their cost
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 7 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 8 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 9 OF 10
DATE 270317 PREPARED BY MBISWAS
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
GRSE LTD TECHNICAL SPECIFICATION
FOR INSTALLATION OF ANCHOR CAPSTAN
REQUISITION NO RN2113-17HO113
YARD NOS 2113-17 SHEET 10 OF 10
DATE 270317 PREPARED BY MBISWAS
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
ANNEXURE-II
STANDARD TERMS amp CONDITIONS (STAC)
मानक ननबधन और शरत (एसटीएसी)
1 PAYMENT TERMS (भगरतान की शरत) i) 100 payment with full service tax will be released with full service tax on
monthly progressive bill basis within 30 days of receipt of bill duly certified by PL
Nominated GRSE Rep amp supported with satisfactory Work Done Certificate duly
certified by Site Engineer PL and on clearance of ESI amp FP liabilities from the
concerned department Number of progressive bill should not be more than two
nos per month
ii) 10 bill value will be retained from each bill as performance guarantee and the
same will be released after expiry of guarantee period duly certified by
PLNominated rep or on submission of performance Bank Guarantee of equivalent
amount valid till expiry of Guarantee period
Bills are to be raised ship wise Payment will be made on actual certification basis
Bills are to be submitted in the Bill Drop Box maintained at Finance Department
along with filled up checklist as per Appendix-F attached with Tender Enquiry
NIT In case of outstation vendors bills are to be sent to DGM (Finance-SLP)
2 COMPLIANCE OF ESI amp PF (ईएसआई और पीएफ़ का अनपालन)
If ESI amp PF of the engaged laboures are not deposited to respective authorities in
due time GRSE will deduct the same amount from bills of the vendor and will
deposit with the authorities In such cases GRSE has the right to charge 10
interest for delayed compliance of statutory provisions
3 WORK DONE CERTIFICATE(WDC) कारय पनरत य परमाण-पतर (डबलरडीसी) Firm will put up work done for certification to site EngineerPL along with clear
inspection report signed by Quality Assurance Authority WDC is to include
whether work has been completed as per delivery schedule or the delay in
daysweeks occurred in completion of work
4 LIQUIDATED DAMAGES (पररननधायरररत नकसान) The vendor will be liable to pay the minimum Liquidated Damages frac12 per
week or part thereof on the undelivered work subject to a maximum of 5 of the
value of the order for delayed part
5 GUARANTEE PERIOD ( गारटी अवधध) Workmanship will be guaranteed for satisfactory performance for a period of 12
months from the date of final inspection Any faulty work carried out by the sub-
contractor is to be rectified by them within the time stipulated by the GRSE In case
of failure of sub- contractor to meet the ship s programme outstanding deficiencies shall be rectified by GRSE and all costs of such work shall have to be
borne by the sub-contractor
ContdP2
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
2
6 RISK PURCHASE (जोखिम िरीद) In case the progress of work is not satisfactory and the contractor fails to maintain
the schedule GRSE reserves the right to get the work done by alternative source at
the risk and cost of sub-contractor
GRSE shall be at liberty to purchaseobtain the service from the alternative source
as it deems fit to make good such default and or in the event of the contract being
terminated the balance of the remaining service to be delivered there under Any
excess over the job price service rates paid and incurred by GRSE as the case
may be over the contract price shall be recoverable from the firm To make good
the recoverable excess amount paid GRSE shall be at liberty to invoke Bank
Guarantee andor with other available dues of the firm
7 RATE CONTRACT TENURE amp VALIDITY OF RATE-
This is a rate contract and your quoted rate should valid for 2 (two) years from the
date of Rate contract order The contract period may be extended reduced as per
requirement of GRSE production schedule
However if any work order is required to be issued beyond the tenure of contract
escalation to the established rate may be applicable which will be settled at that
time through mutual negotiation
8 QUANTITY VARIATION
Quantity mentioned in the tender may increasedecrease during execution of the
job as per requirement of berth Purchase order will be amended as per actual
requirement of the job during executionafter completion of the job
9 JOB STARTING amp COMPLETION PERIOD (कारय परारमभ नरतधि) Job to be started within 07 days from the date of Purchase order subject to
availability of site and materials and to be completed by ndash
a) Windows Scuttles amp Eyebrows-
Yard 2113 ndash 31012018
Yard 2114 - 31012018
Yard 2115 ndash 31072018
Yard 2116 ndash 31012019
Yard 2117 - 31072019
b) Installation of Anchor Capstan -
Yard 2113 ndash 15112017
Yard 2114 - 15112017
Yard 2115 ndash 15052018
Yard 2116 ndash 15112018
Yard 2117 - 15052019
10 MOBILISATION TIME (एकतरतररत करन का समर) 07 days notice will be given for commencement of job of individual ship
11 PRICE (मलर) a) Price bid need to be filled up in html format only through e-portal No other
attachment regarding price will be allowed if so then offer will be treated as
cancelled
ContdP3
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
3
b) L1 bidder will be decided on the basis of Lowest obtained price per Ship
Package wise separately ie Fitment of Windows Scuttles amp Eyebrows amp
Installation (Package A) of Anchor Capstan (Package B) GRSE may engage
multiple vendor ship wise based on production requirement performance of the
vendor Initially a rate contract will be established with the lowest bidder To
engage multiple bidder rate established with L1 bidder will be offered to other
bidders in chronological ranking L2 L3 L4 ---- for establishment of parallel rate
contract Individual purchase order will be issued for individual ship and Package
against established rate contract order
c) Service Tax will be paid extra as per ruling rate for the service of Installation of
equipment
d) As a general rule Price Negotiation with L1 vendor (s) will not be entered into as
far as possible unless warranted by unreasonable price quoted in the opinion of
GRSE
The quoted price should be inclusive of all statutory TaxesLevies and other
charges as applicable The price should remain firm amp fixed till satisfactory
execution of the entire contract with no escalation applicable whatsoever Service
tax will be paid extra as per the ruling rate Service tax registration certificate for
the service being tendered is to be enclosed with the techno-commercial bid If the
certificate is not obtained so far copy of the application for registration for the
service under consideration is to be enclosed Service tax registration number is to
be quoted in all bills
12 VALIDITY OF OFFER (परसरताव की वधरता) Your offer should remain valid for a period of 120 days from the due date of the
tender
13 JOINT VENTURE OR CONSORTIUM (सघठन) The bids submitted by a joint-
venture or Consortium of two or more firms as partners shall comply with the
following requirements
i) One of the partners responsible for performing a key component of the contract
shall be designated as a leader this authorization shall be evidenced by submitting
with the bid a Power of Attorney signed by legally authorized signatories of all the
partners
ii) The leader shall be authorized to incur liabilities and receive instruction for
and on behalf of any and all partners of the joint-venture or consortium and the
entire execution of the contract shall be done with the leader
iii) All partners of the joint venture or consortium shall be liable jointly and
severally for the execution of the project or contract
iv) A copy of the contractagreement entered into by the joint venture or
consortium partners shall be submitted with the bid
ContdP4
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
4
v) The responsibility of all members of the JV or Consortium should be clearly
indicated and these shall not be varied or modified without the prior approval of
the employer and the joint venture agreement consortium should be registered
vi) In order for a joint venture or consortium to qualify each of its partners or
combination of partners must meet the minimum criteria set for the individual
bidder Failure to comply with this requirement will result in rejection of the joint venture or consortium s bid The figures for each of the partners of a joint venture comprising of two or more persons shall be added together in proportion to their participation in the JV or consortium to determine the bidder s compliance with the minimum criteria say( work to be executed per year not less than Rs 3 crore if
such criteria is set in RFP) The lead partner should hold at least 51 of those
minimum criteria failure to comply with which the bid shall stand rejected
vii) The percentage of partnership of the lead partner shall be highest among all
the joint ventures partners The lead partner shall be such a company only who
has purchased the bid document
viii) Bid securityEMD can be submitted either by the lead partner or
proportionately by the joint venture Consortium partners However performance
security BG shall have to be submitted by all the partners of joint
ventureconsortium on a basis proportionate to their participation
xi) The contract agreement shall be signed jointly by each joint
ventureconsortium partners
14 YOUR OFFER SHOULD COME IN TWO PART (आपका परसरताव दो भागो म आना चाहिए)-
You will have to submit bid in two part (Techno-Commercial amp price Bid) in e-
procurement mode where all data sheet will be available for download need to fill
up the required field and upload the file Price bid need to be filled up in html
format only No other attachment regarding price will be allowed if so then offer
will be treated as cancelled
15 GRSE reserves the right to accept reject any Tender in full or in part without
assigning any reason GRSE also reserves the right to enter into the contract with
one or more contractors for their requirement of whole or part job
16 No Conditional offer will be accepted
17 SUB-CONTRACTING OF SUB-CONTRACTED JOB (उप सववदा कारय का उप सववदा)-
When an order is issued to a Vendor Contractor for execution of a particular job
the Contractor shall not sub-contract the job a part of the job without approval
from the employer and without intimation of the name and credentials of the said
sub-contractor
ContdP5
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
5
18 EXCESSWASTEREJECTED MATERIALS (अनरतररकरतबकार असवीकरत सामगरी)-
Removal of excesswasterejected materials etc generated during execution of
work should be arranged at your cost immediately after completion of work each
day and for non-removal of same by you the expenditure incurred by GRSE in
removing these materials will be to your account
19 FIRE amp SAFETY PRECUATIONS अगनन एव सरकषा सावधाननराा - The VendorContractor
shall abide by the Safety regulations of the GRSE as detailed in ANNEXURE ndashE You
should take all safety precautions and provide adequate supervision amp control for
your workmen in order to carry out the job safely In case of any violation of safety
precaution and none using of safety equipments Contractor shall be liable for a
penalty which is detailed in ANNEXURE ndashE Penalty amount depends on the type
and frequency of violation mentioned in the safety guideline and the same will be deducted from the defaulter s bill 20 ENVIRONMENT MANAGEMENT AND OCCUPATIONAL HEALTH amp
SAFETY(परायवरण परबधन एव वरावसानरक सवासर सरकषा) - The vendor shall
ensure compliance of Environment Management System (ISO140012004)
Occupational Health amp Safety (OHSAS 180012007) amp Energy Management System
(ISO 500012011) while carrying out their activity in the yard
21 ENERGY CONSERVATION (ऊजाय सरकषण) -
GRSE will provide power supply at free of cost for execution of job You should
ensure that the power during execution of job shall be used in a very economic
way to save energy as per Energy Management System of ISO 50001 2011
22 EARNEST MONEY DEPOSIT (INTEREST FREE) बराना जमा (बराज रहिरत) a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package
B
b) Rs 20000- (Twenty Thousand only (interest free) for the participation in
any one of the above Package
(i) EMD should be submitted in the form of DDPOBank Guarantee (as per
format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in
ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative
bank payable at Kolkata and should valid till minimum six months from tender
due date Vendor need to submit EMD as detailed in prescribed format in e-
procurement commercial data sheet and send the DDPO to Manager (Contract)
Contract Cell GRSE MAIN before due date of submission Please scan the copy of
DDPOBG and attach to General Documents part in e-procurement Non-
submission of EMD will lead to offer rejection SSI Units registered under single
point registration with NSIC will be exempted from Earnest Money Deposit on
submission of valid NSIC single point registration certificate for particular product
under tender
(ii) If EMD is submitted in the form of BG then the same is to be forwarded
directly to GM (Finance) GRSE in Banker s sealed envelope failing which same
will not be accepted Details of BG are to be confirmed in Techno-Commercial part
of offer
ContdP6
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
6
(iii) SSI units registered under single point NSIC may be exempted from the
earnest money deposit However this will be as per guidelines circulated by DPE
from time to time A copy of the NSIC certificate with annexure is to be scanned
and enclosed with the technical bid and that the list of activities contained in the
NSIC certificate should cover the activity for which tender is issued and to be
confirmed in Techno-Commercial part of offer
(iv) EMD of unsuccessful bidders will be refunded returned within 30 days of
finalisation of order on surrendering the original copy of money receipt with an
application by bidder to AGM (Contract) GRSE upon the intimation from the
purchaser EMD of disqualified bidders in TNCCNC will be returned within 30
days from the date of submission of original copy of money receipt with an
application by the bidder EMD if not claimed within 1 year from the date of
notification will be forfeited
EMD of successful bidder will be returned after receipt security deposit against
purchase order as per contractual terms
23 FORFEITURE OF EMD (बराना जमा की जबरती) The EMD may be forfeited if
a) The bidder withdraws the bid after opening of Price Bid during the period of
validity of offer
b) The bidder does not accept the correction of error in bid price as indicated in
Clause 37 hereinafter
c) The successful bidder fails within the specifies time limit to
i) Acknowledge the LOAOrder
ii) Furnish the required Security Deposit
iii) Non-performance of the contract by the Contractor
24 SECURITY DEPOSIT (INTEREST FREE) परनरतभनरत (बराज रहिरत) (a) Successful bidder will deposit an amount equivalent to 5 of the total
contract value as interest free SD in the form of Pay OrderDDBank Guarantee
(as per GRSE format) on any schedule bank other than Co-operative bank payable
at Kolkata duly crossed favouring Garden Reach Shipbuilders amp Engineers
Limited within 15 days from the date of issue of individual Purchase order and
valid for sixty days beyond the tenure of the contract (in case of BG) In case of
non-submission of SD as per schedule penal interest will be changed for delayed
period of submission of SD beyond 15 days at the prevailing cash credit rate on
the amount of SD to be submitted
(b) If SD is submitted in the form of BG then same is to be forwarded directly to our Gen Mgr Finance in Banker s sealed envelope failing which same will not be accepted Details of B G should also be confirmed to Sub ndash Contract Cell
ContdP7
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
7
(c) SD amount would be returned after successful execution of job and on
submission of SD release application by the vendor duly certified by PLBerth
officerhis nominated rep of GRSE through Contract Cell GRSE In the event of
failure to execute the order satisfactorily or default by the contractor sub-
contractor the security deposit will be forfeited
(d) SSI units registered under single point NSIC may be exempted from the
security deposit However this will be as per guidelines circulated by DPE from
time to time
25 FREAK LOW QUOTES
In case after opening of price bid of techno-commercially cleared firms it is
noted that the L-1 firm has quoted very low rates and indicates to withdraw from
the tender then EMD shall be forfeited and the firm may be given tender holiday
including intimation to other PSUs
However in case the vendor agrees to take-up the job with such low quote and if
the rates quoted are found less than GRSE Estimate by 30 and also if the
difference in rate between L1 amp L2 is 30 or more then the firm will have to give
additional Security Deposit of 20 of Order value
There shall not be any exemption applicable against this additional Security
Deposit
26 Work on board should be carried out under guidance of PLSPMPMPCO or his
deputed engineer on board
27 SITE-INCHARGE LOG BOOK HINDRANCE amp OTHER RECORDS साइट परभारीलॉग बक अवरोध एव अनर ररकॉडय
a) One fully responsible and Qualified Site-in-charge has to be posted at the site
during progress of work
b) Attendance Register Wage Register etc are to be maintained daily for the
particular job on board and to be shown as and when required
c) Details of technical personnel deployed for the job
d) Monthly progress report
e) Log book for re-work modification
f) Details of materials brought by vendor along with copies of challan
g) Proper record of hindrances is to be maintained by the sub-contractor for the
purpose of timely removal of the hindrance and is to be put up for approval by
Project LeaderSite Engineer on weekly basis A copy of the same would have to
be enclosed while submitting any request for waiver of liquidity damages
28 WORKING HOURS कारय समर The Contractor s normal working hours shall be in between AM-5PM Work may also be required to be carried out in day or night shift as per GRSE s requirement Also work may be required to be carried out on SundayHoliday or
beyond schedule working hours as per requirement of GRSE and the Contractor
will have to arrange for same at no extra cost
ContdP8
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
8
29 INDIVIDUALITY OF THE CONTRACT सववदा की ववशषरता This Contract should be treated as an individual contract and should not be
related with other orders with GRSE in respect of progress of work or payment
30 Quotation received after due date and time will not be considered
31 Sufficient Supervisory Staff should be provided by you during execution of work
and in case of any accident damage to GRSE properties full responsibility will
be attributed to you
32 SECRECY OF INFORMATION (सचना की गोपनीररता)-
All documents and drawings of this project are of confidential in nature and
should be used explicitly for the purpose for which they are provided Drawings
should not be copied and should be returned to GRSE on completion of work
No information in respect of contractsorders shall be released to the national or
international media or any one not directly involved its execution without the
express written approval of the integrated Headquarters MOD (NAVY) In the
event of any breach of above provisions the vendor would have to make good of any
loss cost damage any other claim whatsoever preferred by anybody to GRSE in this
respect
33 REGISTRATION OF APPROVED VENDOR अनमोहदरत ववकररता का पजीकरण
The contractor is to confirm whether they are registered with GRSE as approved Vendor and Indicate Supplier s Code digits and product Code group If not an approved vendor provisional vendor registration code is to be taken from GRSE
Vendor Registration Cell prior to placement of order
34 CONTRACT WORKMAN WAGE PAYMENT - Payment of wages to the contractor s employeeworkmen should be made through individual bank account on
monthly basis instead of cash payment PF-UAN activation of all the contractor s employeeworkmen is mandatory
35 QUALITY ASSURANCE AUTHORITY गणरता आशवासन पराधधकारी GRSE (QA)CGRPTIRSABS
36 CORRECTION OF ERRORS तरहटरो म सधार
Bids determined to be responsive will be checked by the Employer for any
arithmetic error Errors will be corrected by Employer as follows
a) Where there is a discrepancy between the rates in figures and in words the
rates in words will govern
b) Where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity the unit rate as
quoted will govern
ContdP9
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
9
37 FORCE MAJEURE अपरतराशशरत घटना In the event of contractor being unable to fulfil the obligation under the
agreement owing to force majeure such as War Fire Earthquake Flood Strike
Lockout at GRSE premises where the contractor is working the party affected
shall not be held responsible for any failure or non-performance of the duties
and obligations under the agreement provided that all responsible efforts have
been made to overcome the consequences of such failure or non-performance
The time for performances of the contractual obligation shall then be extended
by period not more than the duration of such events In the event of Force Majeure condition existing at contractor s site in GRSE Premises or CPT areas for GRSE work GRSE is to be intimated with details of
such happenings and cessations thereof within 3 days Force Majeure is to be limited to contractor s site in GRSECPT premises for GRSE s work only Lock out Closure of contractor s factory premises or office or any other place outside GRSECPTGRSE nominated place as indicated above can not be considered as a
Force Majeure condition under this contract
38 TERMINATION OF CONTRACT सववदा समापरत In the event of non-performance
or non-engagement of manpower for the execution of the job within the notice
period GRSE reserves the right to cancel the order in part or in full and no
compensation whatsoever will be entertained
39 DAMAGE OF MATERIALS EQUIPMENTS (सामगरीउपकरण की कषनरत) The
contractor will ensure that no damage is caused to the materials equipment or
any other property of GRSE due to negligence and or any reason whatsoever by
the contractors man The cost of damage will be suitably recovered from vendor s bills
40 OFFICE amp STORAGE SPACE कारायलर एव भडारण सिान The contractor will have to
arrange their office amp storage required for execution of job for cumulative order
value of Rs75 lakhs and above of their own However space for placing up to one
container will be provided free of cost by GRSE Container will have to be
removed by the contractor within 03 months from the date of final settlement
with GRSE In case of non removal of container within specified period penalty as
deemed fit will be imposed for the occupied area of GRSE
41 ARBITRATION (मधरसिरता)-
i) If at any time before during or after the contract period any unsettled
claim question dispute or difference arises between the parties upon or in
relation to or in connection with or in any way touching or concerning this order the same shall be referred to the Chairman amp Managing Director CMD in short of Garden Reach Shipbuilders amp Engineers Limited GRSE Ltd in short for appointment of a sole arbitrator for adjudication of the said disputes or
differences in accordance with the provisions of the Arbitration and
Conciliation Act 1996
ii) The CMD GRSE Ltd shall appoint a person whom he thinks fit and
competent for adjudication of the disputes or differences as the Sole Arbitrator
ContdP10
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
10
iii) Such arbitration shall in all respects be conducted in accordance with the
provisions of the Arbitration and Conciliation Act 1996 and the rules framed
there under or any statutory modification or re-enactment thereof for the time
being in force
iv) The Award of the Sole Arbitrator shall be final conclusive and binding upon
the parties
v) In the event of the death or resignation for any reason whatsoever of the said
Sole Arbitrator appointed by the said CMD of GRSE Ltd the CMD of GRSE Ltd
on an application from either of the parties in this behalf shall appoint in place of
the outgoing Arbitrator another person whom he thinks fit and competent to
adjudicate the said disputes and differences in accordance with law
vi) Also in the event an Arbitration award is set aside by a competent court on
an application from either party and unless otherwise ordered by the said court
the CMD of GRSE Ltd on an application from either party shall appoint a person
whom he thinks fit and competent to adjudicate the disputes and differences in
accordance with law
vii) The cost of the arbitration fees of the arbitrator remuneration of the
stenographer and clerk stamp paper etc as shall be decided by the Sole
Arbitrator shall be shared equally by the parties The venue of arbitration shall
be at Kolkata and unless otherwise decided by the parties or by the Sole
Arbitrator himself the venue shall be the premises of Garden Reach Shipbuilders
amp Engineers Ltd located at 4346 Garden Reach Road Kolkata 700 024
viii) The language of the proceeding shall be in English
42 JURISDICTION अधधकार कषतर Litigation if any pertaining to this contract will
come under the jurisdiction of High Court at Kolkata
i) All contracts shall be deemed to have been wholly made in Kolkata and all
claims there under are payable in Kolkata City and it is the distinct
condition of the order that no suit or action for the purpose of enforcing
any claim in respect of the order shall be instituted in any Court other
than that situated in Kolkata City West Bengal State India
ii) The Firm is warranted that all service rendered by them shall conform to
applicable city states amp central laws ordinances and regulations and the
said Firm shall indemnify defend relieve GRSE harmless from of
against loss cost of damage by reason or any actual or alleged violation
thereof
iii) GSRE shall not be liable under the workmen s compensation Act of in case any employee or workmen receives injury while actually serving his employer in connection with the latter s work inside the compound of GRSE Ltd
iv) All existing applicable Laws such as ESI PF SERVICE CONTRACT
LABOUR CHILD LABOUR etc as applicable shall be binding for the
contract
v) The Firm engaged in work are required to have registration under the
Service Tax
ContdP11
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
11
43 Declaration form as per Appendix A regarding LicencePFESI is to be filled up and submitted along with the techno-commercial bid
44 CONTRACT LABOUR ACT REQUIREMENTS (सववदा शरम अधधननरम आवशरकरताएा -
as per Appendix B amp C enclosed
45 GENERAL REQUIREMENTS सामानर आवशरकरताएा ndash as per Appendix- D enclosed
46 FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा ndashas per Appendix E
enclosed
47 CHECK LIST FOR BILL SUBMISSION तरबल जमा िरत जाच सची ndash as per Appendix
F Note-
1 In case of non- receipt of filled in NITSOTRSTAC acceptance format matrix it would
be presumed that you have accepted all our terms amp conditions as per GRSE tender
until amp unless deviation is specially mentioned in offer
2 For any discrepancy between NIT (Notice Inviting Tender) and STAC NIT statement
may be taken as final
3 Clarification required if any regarding Tender Document should be got resolved by
contacting competent authority of GRSE prior to submission of bid
----------------------------------
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
APPENDIX-A
पररशशषट lsquoएrsquo
DECLARATION FORM घोषणा परपतर
1 I We hereby declare that our Firm Mshelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Address helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip is having not having own PF and ESI Codes
a) Firms having PF amp ESI Codes Numbers
(i) PF Code No
(ii) ESI Code No
b) Firms not having their own PF amp ESI Codes
(i) I We hereby declare that I We will deduct PF amp ESI
contributions of our labourers from wages who are deployed on contractual
engagement every month and deposit the PF contribution Employer s amp Employees under Code No WB Un ndash exempted) of GRSE and ESI contributions Employer s amp Employees under ESI Code No ndash 3771 of
GRSE in each month and produce duly acknowledged copies of challans by
the authorities concerned to the Retainer of GRSE for verification of
compliance
(ii) We also authorize GRSE Ltd To retain the bills payable to us till we furnish the challan depositing PF amp ESI dues GRSE is also authorised to
deduct all such statutory dues from our bills in case of our continued default
in depositing PF amp ESI dues and deposit the same with the respective statutory authorities
2 Our Labour Licence number Date ishelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip Labour Licence is valid upto Date helliphelliphelliphelliphelliphelliphelliphelliphellip
3 I We shall follow the Company s regulations on deployment of Contract Labour and shall comply with the statutory provisions as envisaged under the CL(R
ampA) Act 1970 read with Central Rules Jharkhand (Bihar) Rules The Factories Act
1948 West Bengal Factories Rules 1958 Bihar Factory Rules 1950 EPF (MP) Act
1952 ESI Act 1948 and Minimum Wages Act and the Rules there under as applicable
including payment of contributions (Employer amp Employees) in respect of each of
our workmen
Place helliphelliphelliphelliphelliphelliphellip Signature of the Proprietor___________________________
Date helliphelliphelliphelliphelliphelliphellip Name of the Proprietor _____________________________
Stamp Seal of the Firm ______________________________
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
APPENDIX- B
पररशशषट lsquoबीrsquo
SPECIAL CONDITIONS OF CONTRACT सववदा की ववशष शरत
(Relating to Labour Laws) शरम कानन स सबनधित
1 It is expressed terms of this tendercontract that this tendercontract shall be
governed strictly in accordance with all the terms and conditions as embodied in all
other documents forming part of this tendercontract The Contractor shall be
responsible to produce to and or complete the under the contract exclusively with hisit s duly employed workmen solely at hisit s own risk and responsibility The definition of workmen Contractor principal Employer Wages or any other statutory terms used elsewhere in this tender contract shall have the same
meaning as are assigned to them by the Contract Labour (Regulation amp Abolition)
act1970or any other applicable appropriate enactment
3 While performing the contractual work the contractor must ensure compliance with
all the existing statutory labour enactment regulations including the following-
a) Contractor Labour (R amp A) Act 1970 and Central amp State Rules as applicable
b) Minimum Wages Act 1948
c) ESI Act1948
d) EPF amp MP Act 1952
e) The Building amp other Construction Works (RE ampCS) Act 1996 amp Rules
4 Contract Labour (R amp A) Act 1970 amp rules framed thereunder The Contractor is to
comply wit all the provisions of the Act including the following important requirements
under the Act
a) To obtain a labour Licence issued by the Competent Authority (ie Licencing Officer)
where the execution of works are to be carried out The contractor on whom the
contractor is awarded by the Principal Employer GRSE is require to obtain Licence for
all the Contractor Labours working under ithim including the Contractor Labour of his it s sub-agency s piece rated workers or any other labour engaged by it him in any manner for the execution of the contract at the principal Employer GRSE premises as
applicable under the relevant provision of the Act The Contractor is to contact the
Office of the Asst Labour Commissioner 6 Church Lane Kolkata-700 001 or any other
appropriate office Authority for obtaining renewal of the Labour Licence etc in
respect of contractual work executed by him it for the principal EmployerGRSE
b The Contractor shall maintain a muster Roll Register Register of Wages Deduction Overtime Fines and Advance strictly as per the provisions of the Act
The Contractor shall issue Wage Slips to the workman at least a day prior to
disbursement of wages The Registers maintained by the Contractor shall be placed for
inspection and scrutiny by the concerned officer of the Principal EmployerGRSE at
regular intervals and also as and when required
ContdP2
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
2
c) the Contractor shall be responsible for payment of wages to each workman
employed by it him in accordance with law and the disbursement of wages shall be
made in presence of authorised representative of the Principal Employer GRSE No
wage period shall exceed one month and wages of every workman shall be paid within
thee days from the end of the wage period in case the wage period is one week or a
fortnight and in all other cases before the expiry of the 7th day from the end of wage
period
d) Contractor is required to cover all the workmen under them including those
workmen of the Sub-agencies piece rated workers or any other workers engaged by
himit in any manner under ESI amp EPF ampMP Acts All these workmen are to be covered under separate Code Nos of the Contractor Contractor should also ensure it s own PF amp ESI Code while entering into the contract
e) Notice showing the rates of wages hours of work wage period date of payment of
wagesunpaid wages name address and designation of Inspector having jurisdiction
shall have to be displayed in conspicuous places and at the work site as per Rule
81(1)(i) of the Contract labour (R amp A) Act and the Rules framed there under A Notice
board shall have to exclusively earmarked for above purpose
f) A copy the notice as per Rule 81 (2) of the at shall be required to be sent to the
inspector and wherever any change occurs the same shall be required to be
communicated to him forthwith
g) As per Rule 81 (30 of the Act information of commencement completion of work of
the Contractor shall have to be communicated to the Inspector within 15 days from such
commencementcompletion
5 Photocopies of Registration Certificates of Code Nos along with current documents
challans etc in support of deposit of contribution as applicable under above ActRules
are to be submitted with Techno-commercial part of tender
6 Compliance of EPF ampMP Act ईपीएफ़ एव एमपी अधधननरम का अनपालन
a) The Contractor shall have own P F Code no against his Firm and submit the same to
GRSE while entering into finalising tender
b) PF shall have to be deposited against own code of the Contractor and PF Challan
along with Annexure for PF deposition against Contract Labour name wise shall have
to submitted to the Principal Employer by the 20th of every month Besides all other
statutory returns pertaining to PF are to be submitted by the Contractor in time
ContdP3
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
3
c) In the event of failure to show proof of PF Deposit for all the workman working under the Contractor including workers of it s Subcontractor paymentclearance of the right to pay the bill after suitable deduction on account of PF Bills of such defaulted
Contractor shall be settled only on satisfactory production of PF deposit challan in
respect of Contractor Labour duly certified by the HR Dept of the respective UnitMain
Yard of Principal EmployerGRSE
7 Compliance of ESI Act ईएसआई अधधननरम का अनपालन
The Contractor shall have own ESI Code No as against his Firm and submit the same to
GRSE while entering into contract finalising tenders The Contractor shall cover all the
workman employees engaged by him under ESI ActScheme and pay the monthly
contribution (both employer and employee) and shall furnish all necessary particulars
to ESI Corporation as required by the said Act under their own ESI Code and also to the
Principal EmployerGRSE
The Contractor expressly undertake that nobody will be engaged by ithim without
coverage under the Act In case ESI Code No of the contractor is inoperative for
whatever reasons the Principal EmployerGRSE will be at liberty to deduct ESI
Contributions at appropriate rates from the Contractor s Bill and deposit the same to the ESI Authority
8Contractors having ESI Code ईएसआई कोड वाल ठकदार
The Contractor will furnish a list containing details of workmenemployees to be
engaged for work to the concerned Department before taking up the assigned job Any
subsequent change will have to be intimated forthwith to the concerned Department of
the Principal Employer GRSE for proper control In addition they will also submit
documentary evidence showing all compliance with ESI formalities in respect of
employees engaged in the job of the Principal Employer GRSE Such documents will be
monthly challan for ESI deposit and certified copy of all half-yearly returns submit to
ESIC etc subject to satisfactory compliance of all formalities
9 All Contractors shall ensure that detailed responsibility be strictly complied with as
envisaged in the enclosed list of Contractors responsibilities along with other provisions as applicable to them as per Appendix B
10 The Contractor engaged in Shipbuilding works is require t obtain registration under
the Building amp Other Construction Work Act 1996 and Rules framed there under and is
also required to maintain Registers and Records and submit returns strictly in line with
the stipulated provisions of the said Act amp Rules so framed
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
APPENDIX- C
पररशशषट lsquoसीrsquo
CONTRACTORS RESPONSIBILITIES ठकदारो की गजममदाररराा
1 Obtain Labour Licence from Licensing Authority and to submit a copy of Licence to the Retainer and concerned Unit HR Department 2 Licence to be renewed by applying in Form-VII to Licensing Authority at
least 30 days before expiry and copy to be furnished to the Retainer and HR
Department
3 The contractor shall be responsible for payment of wages to each workmen
employed by him The wages of every workman shall be paid within three day s from the end of the wage period in case the wage period is one week or a fortnight and in all other cases within before the expiry of the seventh day
from the end of the wage period Date Time Place of payment wage unpaid
wages minimum rate of wages hours of work wage period name address
and designation of Inspector having jurisdiction etc are to displayed in a
Notice Board at conspicuous place and copy to submitted to Retainer and HR
Department All other statutory payments are to be made within the due date
as per statute
4 It shall be the duty of the Contractor to ensure that timely disbursement of
wages is made in the presence of the authorised representative of the
principal Employer ndash ie representative of the HR DEPT Retainer
Certification of the Register Wages by the representative of the RetainerHR
Dept would be made with the following endorsement- Certified that the amount shown in Column No helliphelliphelliphelliphelliphellip has been paid to the workmen concerned in my our presence on helliphelliphelliphelliphelliphelliphelliphellip at helliphelliphelliphelliphellip
5 Register of Workmen employed by the Contractors shall be maintained in
Form XIII and produced before the Retainer and HR Dept
6 Muster Roll Register ( Form-XVI) Register of Wages ( Form- XVII) Register of
Deduction of Damages or Loss ( Form-XX) Register of Fines ( Form-XXI)
Register of Advance ( Form-XXII) Register of Overtime ( Form-XXIII) are to
be maintained and produced before Retainer HR Dept
7 Returns in Form-XXIV (in duplicate) to be sent by the Contractor to the
Licensing Officer for the Half ndashyear ending 30th June and 31st December each
year endorsing copy to HR Dept Retainer
8 Ensure issuance of Wage Slip to each labour at least a day prior to
disbursement of wages and copy be submitted to Retainer HR Dept
9 Copy of Nomination and Declaration Form -2 ( REVISED) under EPF (MP) Act
1952 in respect of all labourers to be submitted to Retainer HR Dept
10 Monthly Return ( Statement of contribution ) in Form -12A ( Revised duly
filled in along with challans for deposit of PF contribution is to be submitted
to the Retainer by 20th days happens to be SundayHoliday the same is to be
submitted on 21st next working day
11 Consolidated Annual Contribution Statement Returns in Form 6A and
contribution card for current period in Form- 3A ( Revised ) to be submitted
to RPFC with a copy to Retainer HR Dept within 30th April each year
ContdP2
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
2
12 Status on Employees Provident Fund Scheme in Form -19 and status on
Form-10-C (EPS) for workmen ceasing employment and claiming withdrawal
benefit to be furnished forth with to Retainer HR Dept
13 Every contractor shall send to the Commissioner EPF within 15 (fifteen)
days of close of each month a Return in Form-5 under paragraph 36 (2)b of
EPF Scheme 1952 amp EPS 95 [ Para 20(4)]
14 ESI amp PF Registration Certificate in original to be produced before the
Retainer HR Dept and copy submitted before at the time of
commencement of work
15 ESI Challans against deposit of monthly contributions of workmen be
submitted every month by 10th day of the subsequent months to ESI
Authorities and copies be made available to HR Dept Retainer along with
ESI empanelment of all employees engaged by them latest by 20th day of
each month
16 Ensure Half- Yearly Returns is submitted to ESI Authorities endorsing copy to
Retainer HR Dept at the earliest
17 Date of commencement completion of work with the Company is to be
intimated to the HR Dept through respective PLsHODsDGM (Repair) as
applicable
18 The contractor engaged in Shipbuilding work with the Company is required
to obtain registration under the Building amp Other Construction Work Act
1966 amp Rules there under All statutory obligations as per this Act Rules are
to be strictly complied with Contractor is to maintain Register and Records
and also submit the requisite Returns accordingly
19 Any other statutory provisions as may be applicable are required to be
complied with by the Contractor
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
APPENDIX- D
पररशशषट lsquoडीrsquo
GENERAL REQUIREMENTS सामानर आवशरकरताएा (a) All your personnel will be subject to routine physical search and checking of
Identity Cards at any time during the deployment
(b) During the engagement of Contractors if anybody gets involved in any police
case or gets himself involved with quarrel with GRSE employees or other contractor s workmen engaged in GRSE his entry permit will be withheld forthwith
(c) A certificate from the contractor s labour clearly endorsing that characters of all his labourers have been duly verified and found to be satisfactory be submitted to
GRSE at the time of making gate Pass
(d) Photo Identity Card Gate Pass as required by GRSE will be arranged by the
contractor for his employees at his own cost
(e) No workman of the contractor will be allowed to join or participate in any Gate
Meeting Demonstration inside or at GRSE Gate
(f) During the course of engagement with GRSE if any individual s character is found to be not satisfactory on verification of specific complaint received entry
permit will be withdrawn forthwith Entry Exit will be allowed only in presence of
proper Supervisory staff of the contractor No workman of the contractor will be
allowed to loiter around in the yard leaving the specified space of work
(g) Police Verification Report of character antecedents duly verified by DIB in
respect of all employees of contractorsSub-contractors for operating in GRSE Ltd
are required to be submitted to Security DeptGRSE Ltd before processing of Gate
Passes
This requirement is as per Official Secretariat Act 1923 of Ministry of Home
Affairs Govt of India
(h) One fully responsible and qualified Site In-Charge has to be posted at the site
during progress of work
(i) The contractor will ensure that no damage is caused to the materials equipment
or any other property of GRSE due to negligence and or any reason whatsoever by the Contractor s men (j) The contractor will work when the ship will be at FOJMain YardCPT Dry Dock
any other placeDock near GRSE in the event of work being carried out outside GRSE
premises
(k) The contractor shall have to follow all the rules and regulations of other
Docksplaces in the event of work being carried out outside GRSE premises
(l) For any exigencies and for stock taking or for any other reason deemed valid by
GRSE GRSE reserves the right to suspend the work as required without any
compensation to the contractor
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
APPENDIX E
Safety guidelines to be followed by the contractorsrsquo at GRSE
FIRE ampSAFETY PRECAUTIONS अगनन एव सरकषा सावधाननराा 1 General The contractor will ensure fulfillment of conditions laid down by Safety Department
of GRSE The contractor will be governed by all the statutory requirements The contractor will provide proper Personal Protective Equipments (PPEs) and tools amp tackles to their workmen GRSE reserves the right to impose penalty for any of the following reasons
(a) Unsafe practices being adopted by the party (b) Serious accidents due to the fault of the party (c) Non-compliance to safety norms and contract terms
2 Safety Rules (i) The Contractor shall abide by the safety regulations of the GRSE He shall take all safety precautions and provide adequate supervision amp control for his workmen in order to carry out the job safely The Contractor shall report to the concerned Officer of executing Department as well as the Chief Safety Officer of Safety Department immediately on award of contract along with contract documents amp job instructions from the contract awarding Department and shall obtain brief for the job and the safety rules amp procedures to be followed The Contractor shall obtain clearance from Safety Department before starting the job The contractor shall engage workers or do the contract job only when he is satisfied that the unsafe conditions if any of gaselectricitymoving machinery etc are removed from the area of work The Contractor shall supply required PPEs like safety shoes helmets hand gloves safety goggles etc and as promulgated by the Safety Department from time to time depending upon working condition (ii) The use of proper tools and tackles kits by contractorrsquos men is mandatory and the necessary safety precautions proper tools and equipments including personal protective
equipment for contractorsrsquo men are to be arranged by the contractors for safety of the personnel employed by them Site In-charge of the firm shall be accountable to the
respective Officer of the executing Department in all matters related to safety of their
personnel at work including all activities carried out by them
(iii) The Contractor shall take all reasonable precautions to prevent fire of any nature in the
vicinity of his operations and shall be held accountable for all damages from fire resulting
due to adopting unsafe practices by any one on behalf of the contractorrsquos firm
(iv) The Contractor shall follow the standard safety precautions as enumerated below
a) Personal Protective Equipments (PPEs)
The contractor shall provide amp ensure use of ISI marked Industrial Safety Shoes Safety
Helmets including other necessary Personal Protective Equipments (PPEs) and Boiler
Suits while at work
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
b) Hot Work Safety (Gas Cutting Welding etc)
i Prior to commencement of hot work surrounding areas (including other side of the
bulkhead amp deck) shall be inspected for the presence of any inflammable materials
and no Hot Work shall be carried out without obtaining Hot Work Permit from GRSE
ii Adequate ventilation must be arranged while working in confined spaces throughout
the period of carrying hot work
iii Damaged gas hoses amp welding cables should not be used for gas cutting amp welding
job Gas cutting hoses amp copper welding cables must be ISI marked of reputed make
Use of Aluminium Welding Cable is prohibited during construction activities
from fire safety point of view
iv The gas cutting hose should be separated from welding cables amp electrical cables
v The welding holders if energized should not be left unattended
vi All gas cutting torches shall be ISI marked of reputed make and must be fitted with
standardized FLASH BACK ARRESTOR
vii Full insulated welding holders (ISI marked) shall be used in construction jobs
viii During recess period (Lunch time and at the end of dayrsquos work) or when work is suspended for more than half an hour the gas hoses shall be disconnected from the
cylinder valves
ix All gas equipment shall be subjected to ldquoWater Diprdquo test daily before taking those on
board A record of the testing to be maintained by the person carrying out such test
x Electric power shall be cut off from welding transformer end during recess period at
the end of dayrsquos work and whenever the work is stopped for at least half an hour
c) House Keeping
i All inflammable wastes like cotton waste plastic broken wooden planks parts jutes
cloths paperselectrodes packets etc should be removed by the contractors from the
ship every day
ii Gas cutting hose amp welding cables shall not be used laid on board in a haphazard
manner and to be hanged properly on suitable hook support towards avoiding fire amp
electrocution hazard
d) Electrical Safety
i Portable Safety Hand Lamp (maximum of 110 Volts) should be used on board
vessel
ii All electrical connections should be of permanent type as far as possible
iii Industrial type Plug amp Sockets shall be used for electrical connections
iv Use of any electrical extension board without having top part of the KITKAT FUSE
and plug amp socket connection is prohibited
v The 440 220 V supply lines should be provided with distinguishing mark amp identified
with red stickers at every metre distance 440 Volt should be covered by MS Angle
e) Safety during Painting
i Painting work should not be undertaken while hot work is in progress either in the
compartments or in the adjacent areas
ii A board indicating ldquoPainting in Progressrdquo in Hindi Bengali amp English be displayed
near entrance of the compartment
iii While painting a safety hand lamp fitted with insulated handle wire case and glass
cover over the lamp shall only be used
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
iv While painting in confined space closed compartments one person must be posted
near the entry point for constant coordination with the person working inside the
confined space
f) Safety during Grinding
i All grinding machines shall be provided with standardized amp non-expired grinding
wheels of reputed make and shall be fitted with protective metal guards during
grinding job
ii Use of oversize grinding wheel and chiseling hammering of oversize grinding
wheel is prohibited
iii All grinding wheels shall be of reputed brand amp make and shall be stored handled
carefully prior to taking into use
iv Damaged grinding wheel shall be replaced forthwith for avoiding likely hood bursting
of the wheel
g) Safety while working at height
i Damaged defective wooden planks shall not be used for staging purposes
ii Wooden planks are to be secured at both ends for preventing over turning of the
planks
iii Use of oil drums for staging purpose is strictly prohibited The Steel Stools staging
materials are to be used for staging purpose and to be used in safe manner
iv While working on shiprsquos mast or fragile roof or from where a person is likely to fall and injured Full Body Harness with double lanyard shall be used with proper
anchorage
h) Safety during erection of scaffolding structure
i The scaffold platform shall be provided with suitable railing toe guard amp waist guard
on each open side and shall be secured at both ends for preventing over turning of
the planks
ii All personnel engaged for erection of scaffolding structure must wear safety belt
3 Contractorrsquos liability for non-compliance of Safety Rules amp Regulations A The executing department or the Head of Safety Dept upon his satisfaction that the Contractor is not conforming to the safety requirement(s) may direct stoppage of work and require the Contractor to remedy the defects or supply the Omissions as the case may be The Contractor shall not proceed with the work until his compliance with such directions to the satisfaction of the executing department or the Head of Safety Department B The Contractor shall be fully responsible for the accident caused due to his or his Agents or Workmenrsquos negligence or carelessness in regard to the observance of the safety requirements and be liable to pay compensation for injuries C Without prejudice to the right conferred by the clause (A) above for stoppage of work for violating safety requirements the Contractor shall be liable for a penalty as below
SlNo Type of violation Penalty (in Rupees)
1st instance
2nd instance
3rd instance
1 Any worker not having not using PPEs properly
500- 750- 1000-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
2 Use of defective non IS PPEs 2000- 3000- 5000-
3
Violation of safety guidelines of the Tender terms and or safety guidelines issued by Safety Dept from time to time
2000- 2500- 3000-
4 Creation of unsafe condition
10000- 20000- 30000-
5 Found adopting unsafe practice
2500- 5000- 7500-
Note
a) In case the safety rules are found to be violated more than 3 (three) times during the tenure of the contract GRSE shall have the discretion to terminate the contract forthwith without assigning any reason and without any further intimation Moreover the defaulter contractor may be debarred from participating in future tenders for the next 1 (one) or more years depending upon the management discretion
b) In case of permanent disability fatal accident during the execution of the contract a penalty will be imposed on the contractor on the basis of recommendation of a committee constituted by competent authority of GRSE on case to case basis In such case the penalty may be banning of business dealing with GRSE or deduction of upto 10 of contract value to a minimum of Rs 50000- (fifty thousand) or both
c) The penalty amount shall be recoverable from any Bill Security Deposit Earnest Money Deposit or from other dues of the contractor
d) The above rules amp procedures are only illustrative and not exhaustive
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
CHECK LIST FOR BILL SUBMISSION ndash CONTRACTORS तरबल जमा िरत जाच सची ndash ठकदारAPPENDIX F
CONTRACTOR PARTY CODE
BILL NO DATE
ORDER NO DATE
1 BILL IN ORIGINAL PLUS THREE COPIES DULY CERTIFIED WITH JOB
NO BY THE DESIGNATED PERSON OF THE PRODUCTION
ORDERING DEPARTMENT ndash SUBMITTED
2 JOB COMPLETION CERTIFICATE OF DESIGNATED AUTHORITY ndash
ENCLOSED
3 BANK GUARANTEE AS REQUIRED BY THE TERMS OF THE ORDER HAS BEEN SENT TO FINANCE IN BANK S SEALED ENVELOPE
4 SECURITY DEPOSIT AS PER ORDER SUBMITTED
5 FORM 8384 FOR WORKS CONTRACT SUBMITTED
6 MATERIAL RECONCILIATION STATEMENT AS PER THE TERMS OF
THE ORDER ndash ENCLOSED
7 INSURANCE POLICY AS PER TERMS OF THE ORDER ndash ENCLOSED
8 SERVICE TAX REGISTRATION NO WHEREVER APPLICABLE IS
MENTIONED IN THE INVOICE
9 ANY OTHER SPECIFIC DOCUMENTS AS PER ORDER
I
II
III
10 DEDUCTION RECOVERY TO BE MADE
[FOR USE OF BILL CERTIFICATION DEPARTMENT]
I
II
III
NOTE TRANSACTION FEE OF RS 50000 FOR FIRST RETURN amp RS
100000 FOR SUBSEQUENT RETURN OF BILL WITH
INAPPROPRIATE DOCUMENTS WILL BE CHARGED
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
ANNEXURE-III
FORMAT NO
OS030085
GARDEN REACH SHIPBUILDERS amp ENGINEERS LIMITED
4346 Garden Reach Road Kolkata 700 024
(GUIDELINES OF BANK GUARANTEE) बक गारटी क हदशा ननदश
1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to
obtained in the name of the banker for execution of the Bank Guarantee If a single
Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations may
be used but the serial nos or purpose of each Stamp Paper be of consecutive nos and
purchased on the same day Such Stamp Paper should not be older than one year or the
date of purchase Order Contract whichever is applicable Stamp Papers obtained in
the name of the supplier will not be accepted
2 Address of the Supplier Contractor and the executing Bank should be
incorporated in full in the Bank Guarantee
3 Bank Guarantee should be executed by scheduled Banks preferably by Nationalised Banks and should be sent in Banker s sealed envelope directly to General Manager Finance Corporate Finance MS Garden Reach Shipbuilders amp Engineers Limited 43 46 Garden Reach
Road Kolkata ndash 700 024 superscribing the word BANK GUARANTEE
4 No confirmation of B G is required to be obtained from issuing Bank if the B G executed by Scheduled Nationalised Banks is received in Banker s sealed envelop
5 Banker s confirmation is required in case of Bank Guarantee executed by Non-
Scheduled Banks Co-operative Bank Regional Private Bank etc and for those Guarantee
which were not received in the terms of (3) above
6 The Bank Guarantee should conform strictly in conformity with the terms and
Conditions of the order and in GRSE s standard format prescribed against each of the above cases
7 Expiry date should be in accordance with the requirement of contractual terms and the
claim period for preferring the claim should not be less than six months from the date of expiry
of any case
8 Bank Guarantee shall be free from all infirmities and typographical errors deletions inclusions riders etc requires to be authenticated by Bank s signatory with official seal
9 Issuing Bank should furnish confirmation towards execution of Guarantee immediately on receipt of GRSE s formal letter for same Confirmation letter should contain GRSE s letter reference requested for and must be in Bank s sealed cover addressed to GRSE
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
FORMAT OF BANK GUARNTEE TOWARDS EARNEST MONEY
बराना क शलए बक गारटी का परपतर
GUARANTEE BOND
(To be used by all scheduled Banks)
1 In consideration of Ms Garden Reach Shipbuilders amp Engineers Limited 4346
Garden Reach Road Kolkata - hereinafter called the Buyer having agreed to exempt Ms having its registered office at helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip hereinafter called the party from the demand under the terms and conditions contained in the Tender No dated hereinafter called the Said Tender of Security Deposit for the due fulfillment by the said party s of the terms and conditions contained in the said Tender on production of a Bank Guarantee for Rs Rupeeshelliphelliphelliphelliphelliphelliponly weBank Limited ( hereinafter referred to as the Bank do hereby undertake to pay to the Buyer an amount not exceeding Rs Rupeeshelliphelliphelliphelliphelliphelliponly against any loss of any breach by the said Party of any of the terms amp conditions
contained in the said Tender
2 We Bank do hereby undertake to pay the
amounts due and payable under this Guarantee without any demur merely on a
demand from the Buyer stating that the amount claimed is due by way if loss or
damage caused to or would be caused to or suffered by the Buyer by reason of any
breach by the said Party of any of the terms and conditions contained in the said Tender or by reason of Party s failure to perform the said Tender Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the
Bank under this Guarantee
3 We Bank Limited further agree to the Guarantee herein
contained shall remain in full force and effect during the period that would be taken
for the performance of said Tender Order and that it shall continue to be
enforceable till all the dues of the Buyer under or by virtue of the said Tender
Order have been fully paid and its claims satisfied or discharged or till the Managing
Director Garden Reach Shipbuilders amp Engineers Limited certifies that the terms
and conditions of the said Tender Order have been fully amp properly carried out by
the said party and accordingly discharges the Guarantee Unless a demand or claim
under this Guarantee is made on us in writing on or before the
We shall be discharged from all liability under this Guarantee thereafter
4 We Bank Limited further agree with the
Buyer that the Buyer shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Tender Order or to extend time of performance by the said
Party from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Buyer against the said Party and to forbear or enforce any
of the terms and conditions relating to the said Tender Order and we shall not be
relieved from our liability by reason of any such variation or extensions being
granted to the said Party or for any forbearance act or omission on the part of the
Buyer or any indulgence by the Buyer to the said Party or by any such matter of
thing whatsoever which under the law relating to sureties would but for this
provision have effect of so relieving us
Cont Page ndash 2
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
== 2 ==
5 We Bank Limited lastly undertake not to revoke this
Guarantee during its currency except with the previous consent of the Buyer in
writing
6 Notwithstanding anything contained herein above the liability of the Guarantor
under this Guarantee is restricted to Rs (
Rupeesonly) and that this Guarantee shall remain in force until its
expiry on the (date) unless a suit or action to enforce a claim under this
Guarantee is made against the Guarantor within six months from the aforesaid date
of expiry all the rights of beneficiary under the said Guarantee shall be forfeited
and the Guarantee shall be released and discharged from all liabilities thereof
For Bank Limited
Dated the day of 20
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-
Sl No Item Description QTY UOMTECHNICAL
REMARKSAccepted (YesNo)
AFitment of Windows Scuttles amp Eyebrows
(PACKAGE A)
10 Fitment of Windows -PACKAGE -A 1400 Set
20 Fitment of Scuttles - PACKAGE - A 1000 Set
30 Fitment of Eyebrows -PACKAGE - A 1000 Set
B Installation of Anchor Capstan (PACKAGE B)
40 Installation of Anchor Capstan- PACKAGE-B 200 No
50Fitment of Roller Chain support assembly -
PACKAGE-B400 No
60 Fitment of manual operation Assembly-Package -B 200 No
70 Fitment of Band Break Assymbly-Package-B 200 No
80 Fitment of Chain Releivers - Package-B 200 No
90 Fitment of Naval Pipe Assembly -Package-B 200 No
100 Fitment of Control Panel-Package-B 200 No
110 Fitment of Push Button Station - Package -B 200 No
120 Fitment of Anchor Strop-Package-B 200 No
-Mandatory Field
NOTE (i) Qty mentioned above is for 01 Ship but Total requirement is for Five ships
(ii) UOM - Unit of measurement (iii) NO - Number
Rate not to be quoted at this page
BIDDERS REFERENCE NODATE
CONTACT NO FAX NO e-mail OF THE BIDDER
NAME amp ADDRESS OF THE BIDDER
गारडन रीच शिपबिलरडरस एणरड इजिननयरस शिशिटरडGarden Reach Shipbuilders amp Engineers Limited
(भारत ररकार का उपकरि) (A Govt of India Undertaking)
(रकषा ितरािय) (Ministry of Defence)
4346 गारडन रीच रोरड कोिकाता - 700 024 4346 Garden Reach Road Kolkata ndash 700 024
ANNEXURE-A (TECHNICAL OFFER)
ITEMS Biennial rate contract for Fitment of Windows Scuttles and Installation of Anchor Capstan for FPV Project Yard 2113-
17
E- TENDER NO MainContractOTWindows ampAnchor CapstanFPV028ET-01510 Dated 09052017
- NOTICE INVITING TENDER (NIT)
- 10 EMD amount for Package A amp Package B to be submitted as follows -
- i) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- ii) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one Package
- EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkata th
- STANDARD TERMS amp CONDITIONS (STAC)
- a) Rs 40000- (Forty thousand only) (interest free) for Package A + Package B
- b) Rs 20000- (Twenty Thousand only (interest free) for the participation in any one of the above Package
- (i) EMD should be submitted in the form of DDPOBank Guarantee (as per format) in favour of Garden Reach Shipbuilders amp Engineers Limited (Detailed in ANNEXURE-II) issued from NationalizedScheduled Bank other than Co-operative bank payable at Kolkat
-
- Kolkata 700 024
-
- (GUIDELINES OF BANK GUARANTEE) बक गारटी क दिशा निरदश
- 1 Non- Judicial Stamp Paper ndash N J S Paper of Rs 50- (Rupees Fifty Only) is to obtained in the name of the banker for execution of the Bank Guarantee If a single Stamp Paper of Rs 50- is not available Stamp Papers of multiple denominations
-