MAYOR’S FOREWORD 2018/2019 11

MUNICIPAL MANAGER’S FOREWORD 14

CHAPTER 1: GOVERNANCE INTEGRATED DEVELOPMENT PLAN 16

Introduction and Background 16

MUNICIPAL OVERVIEW 16

ECONOMIC PROFILE 18

STRATEGIC FRAMEWORK 21

Fourth generation IDP 22

IDP Roadshows 24

CHAPTER 2: SERVICE DELIVERY PERFORMANCE 26

ORGANISATIONAL PERFORMANCE MANAGEMENT SYSTEM 26

Legislative requirements 26

Introduction 26

Organisational Performance Management Process 27

Performance Audit Committee 29

Performance Evaluation Panels 30

Auditing of Performance Information 32

Customer Satisfaction 34

Annual Organisational Performance Information 34

CHAPTER 3: ORGANISATIONAL DEVELOPMENT PERFORMANCE 51

Office of the Municipal Manager 51

Introduction 51

International Relations 52

Smart City 53

Knowledge Management 54

Integrated Development Planning 55

Performance Management 55

Internal Audit 56

Enterprise Risk Management 58

Enterprise Risk Management 58

Communications, Marketing and Outdoor Advertising 60

CORPORATE SERVICES 63

Introduction 63

3

Administration Section 63

HUMAN RESOURCES MANAGEMENT SECTION 93

INFORMATION AND COMMUNICATION TECHNOLOGY SECTION 111

COMMUNITY SERVICES 115

Introduction 115

PUBLIC HEALTH AND EMERGENCY SERVICES SECTION 117

PUBLIC SAFETY AND SECURITY 170

INFRASTRUCTURE SERVICES 194

Introduction 194

TRANSPORT, ROADS, STORM WATER AND COASTAL MANAGEMENT SERVICES 195

WATER AND SANITATION SERVICES 219

ENGINEERING SUPPORT SERVICES 239

ELECTRICAL AND ENERGY SERVICES 252

Introduction 252

CUSTOMER SERVICES, MARKETING AND RETAIL 254

OPERATIONS AND MAINTENANCE (SUBSTATION, HV & MV OPERATIONS) 258

ELECTRICITY PLANNING AND STRATEGY 267

PROCESS CONTROL & PUBLIC LIGHTING 275

FLEET MANAGEMENT AND TRANSPORTATION 283

CITY DEVELOPMENT 289

INTRODUCTION 289

URBAN AND RURAL PLANNING SECTION 290

Building Control 297

DEVELOPMENT ADMINISTRATION 299

SPATIAL AND ENVIRONMENTAL PLANNING 303

HUMAN SETTLEMENTS UNIT 317

ECONOMIC DEVELOPMENT FACILITATION SECTION 321

Community Skills Development 322

Job Creation Statistics 323

PROPERTY ADMINISTRATION SECTION 351

2.2.2.1 Regularizing of Leases Project 352

2.2.3 Property Alienation 354

2. PUBLIC TRANSPORT FACILITIES AND OPERATIONS COORDINATION 356

Financial Services 359

Introduction 359

EXPENDITURE DIVISION 359

4

FINANCIAL PERFORMANCE 2018/2019 359

REVENUE DIVISION 370

SUPPLY CHAIN MANAGEMENT 374

APPENDICES: 378

APPENDIX A: COUNCILLORS, COMMITTEE ALLOCATION AND COUNCIL ATTENDANCE 378

EXECUTIVE COMMITTEE 379

WARD COUNCILLORS: 381

PARTY REPRESENTATIONS 385

APPENDIX B: COMMITTEE ALLOCATION AND COUNCIL ATTENDANCE 389

SECTION 79 - COUNCIL AND OFFICIAL REPRESENTATION ON COMMITTEES FOR THE

2016 TO 2021 TERM OF OFFICE 389

SECTION 80 - COUNCIL AND OFFICIAL REPRESENTATION ON COMMITTEES FOR THE

2016 TO 2021 TERM OF OFFICE 391

MPAC ESTABLISHED IN TERMS OF THE MUNICIPAL STRUCTURES ACT 1998, MUNICIPAL

SYSTEMS ACT 2000 AND MUNICIPAL FINANCE MANAGEMENT ACT OF 2003 395

LOCAL LABOUR FORUM ESTABLISHED IN TERMS OF THE ORGANISATIONAL RIGHTS

AGREEMENT 396

5

FIGURE 1: FEMALE AND CHILD HEADED HOUSEHOLDS 17

FIGURE 2: % GDP CONTRIBUTION 18

FIGURE 3: HUMAN DEVELOPMENT INDEX AND GINI COEFFICIENT 19

FIGURE 4: REGIONAL UNEMPLOYMENT 19

FIGURE 5: POVERTY HEAD COUNT 20

FIGURE 6: INTENSITY OF POVERTY 21

FIGURE 7: DEVELOPMENT GOALS 22

FIGURE 8: SUMMARY OF COMMUNITY ISSUES – CORE FUNCTIONS 24

FIGURE 9: SUMMARY OF COMMUNITY ISSUES – NON-CORE FUNCTIONS 25 FIGURE 10: ORGANISATIONAL PERFORMANCE MANAGEMENT PROCESS 27

FIGURE 11: STAGES OF PERFORMANCE MANAGEMENT PROCESS : UMHLATHUZE MUNICIPALITY 28

FIGURE 12: UMHLATHUZE PERFORMANCE MANAGEMENT FRAMEWORK 29

FIGURE 13: OVERALL PERFORMANCE FROM 2014/2015 TO 2018/2019 36

FIGURE 14: MANAGEMENT OF RISK MANAGEMENT ACTIVITIES 59

FIGURE 15: ONE OF THE COUNCIL MEETINGS AT THE BAY COUNCIL CHAMBERS 68 FIGURE 16: HANDING OVER OF PHOTOCOPYING MACHINES TO SCHOOLS AT ESIKHALENI NEW HALL 72 FIGURE 17: CLEAN UP CAMPAIGN IN WARD 2, RICHARDS BAY CBD AND SURROUNDINGS 73 FIGURE 18: OFFICIAL OPENING OF MZUVEL SHOPPING CENTRE AT ENSELENI 73 FIGURE 19: TAKING COUNCIL TO THE COMMUNITY AT ESIKHALENI TVET SPORT GROUND 74 FIGURE 20: WARD 7, MKHIZE FAMILY RECEIVING BLANKETS AND FOOD PARCELS AS WELL AS PAINTING OF THE HOUSE 75 FIGURE 21: PLANT AWARENESS TRAINING CONDUCTED BY KZN WILDLIFE OFFICIALS 76 FIGURE 22: TEAM BUILDING ACTIVITIES FIGURE 23: PROSTATE CANCER SCREENING

76 FIGURE 24: COMMUNITY ENGAGEMENTS ON SERVICE DELIVERY 77 FIGURE 25: PARTICIPANTS FROM ALL SECTORS OF SOCIETY IN ENSELENI CLUSTER 77 FIGURE 26: AUDIENCE BEING ADDRESSED BY THE MAYORESS 78 FIGURE 27: CIVIL SOCIETY NGOS REPRESENTATIVES RECEIVING CAREGIVERS KITS 78 FIGURE 28: ENGAGEMENTS BETWEEN UMHLATHUZE STAKEHOLDERS GLOBAL FUND AND ZULULAND AND ABAQULUSI

REPRESENTATIVES 79 FIGURE 29: YOUTH DAY, DRUG AWARENESS CAMPAIGN 80 FIGURE 30: HANDING OVER OF CHRISTMAS FOOD PACK AT KWA-HLANGANANI HALL ON THE 19 DECEMBER 2018 81 FIGURE 31: THE HANDOVER DONE ON 18 JULY 2018, OLD STRUCTURE AND THE NEW STRUCTURE: 83 FIGURE 32: THE NEW HOME FOR THE MDLETSHE FAMILY: 84 FIGURE 33: CRAFT SAMPLES 84 FIGURE 34: HANDING OVER OF EQUIPMENT 18 JULY 2018 84 FIGURE 35: WARD 6, MAZIMAZANA HANDING OVER OF HOUSE TO MKHIZE FAMILY: 85 FIGURE 36: BELOW ARE BEFORE AND AFTER RENOVATIONS PHOTOS: 85 FIGURE 37: BELOW ARE BEFORE AND AFTER PICTURES OF THE FACILITY: 86 FIGURE 38: BELOW IS THE PICTURE OF THE SHACK THAT MAMA MAMTHIYANE STAYED IN AND ON THE RIGHT IS THE NEW HOUSE

BUILT BY LIWA TRADING IN PARTNERSHIP WITH THE ROAD ACCIDENT FUND. 87 FIGURE 39: YOUTH DAY CELEBRATIONS AT ENSELENI UMZUVUKILE SPORTS GROUND 89 FIGURE 40: DIVERSITY PROGRAMMES - HERITAGE DAY 94 FIGURE 41: WOMAN’S DAY CELEBRATION; 94 FIGURE 42: PEOPLE WITH DISABILITIES WORKSHOP 94 FIGURE 43: LONG SERVICE AWARDS 94 FIGURE 44: WELLNESS DAY EVENT HELD ON 25 OCTOBER 2018 IN ESIKHALENI 95 FIGURE 45: WELLNESS DAY EVENT HELD ON 25TH (ESIKHALENI) AND 26TH OF OCTOBER 2018 IN RICHARDS BAY 96 FIGURE 46: WELLNESS DAY EVENT HELD ON 25 (ESIKHALENI) AND 26 OCTOBER 2018 IN RICHARDS BAY 96 FIGURE 47: IN-HOUSE SAFETY INDUCTIONS, WORKSHOPS / TRAINING DURING THE 2018/2019 FINANCIAL YEAR 97 FIGURE 48: RANDOM ALCOHOL TESTING 100 FIGURE 49: OHS PRESENTATION AT HR ROAD SHOWS 100 FIGURE 50: COUNCIL BURSARY RECIEPIENTS GRADUATES 106

FIGURE 51: CONFLICT MANAGEMENT TRAINING PROGRAMME 106

6

FIGURE 52: CONFLICT MANAGEMENT TRAINING FOR SUPERVISORS 109 FIGURE 53: TOTAL NUMBER OF ICT SUPPORT REQUESTS LOGGED 113 FIGURE 54: TOTAL ICT SUPPORT REQUESTS PER DEPARTMENT (JULY 2018 TO JUNE 2019) 113

FIGURE 55: BASIC WASTE MANAGEMENT HIERARCHY 118

FIGURE 56: RECYCLING RATE ACHIEVED IN 2018/2019 FINANCIAL YEAR 119 FIGURE 57: MATERIAL RECOVERY FACILITY IN MZINGAZI (WARD 1) WHERE LOCAL WASTE-PRENEURS ARE SORTING RECYCLABLE

WASTE 121 FIGURE 58: MATERIAL RECOVERY FACILITY IN NSELENI (WARD 7) WHERE LOCAL WOMEN WASTE-PRENEURS ARE SORTING

RECYCLABLE WASTE. 121 FIGURE 59 : MATERIAL RECOVERY FACILITY IN ALTON (WARD 2) WHERE WILDLANDS TRUST IS SORTING RECYCLABLE WASTE

AND WHERE GREEN WASTE IS COLLECTED. 122 FIGURE 60: NEWLY RENOVATED MATERIAL RECOVERY FACILITY IN NTAMBANANA (WARD 33). 122 FIGURE 61 : MAP DEPICTING AREA OF WASTE REMOVAL IN THE CITY 123 FIGURE 62: FIRST PICTURE IS A ROTOPRESS REFUSE TRUCK AND SECOND PICTURE IS A COMPACTOR REFUSE TRUCK. 124 FIGURE 63: ENVIRONMENTAL AWARENESS SIGNBOARD PROMOTING A CLEAN CITY AND RECYCLING INITIA 126 FIGURE 64: ENVIRONMENTAL AWARENESS IN A SCHOOL AND CLEAN-UP CAMPAIGN WITHIN THE COMMUNITY 127 FIGURE 65: NEWLY DESIGNED “NO ILLEGAL DUMPING” SIGNBOARDS INSTALLED IN IDENTIFIED HOTSPOTS 128

FIGURE 66: AMBIENT AIR QUALITY MONITORING STATIONS 130

FIGURE 67 : SCHOOLS VISITED DURING THE SCHOOL AWARENESS PROGRAMS 132

FIGURE 68 : COMMUNITY AWARENESS PROGRAMME 133 FIGURE 69: CLINICS VISITED 134

FIGURE 70: WORLD ENVIRONMENT DAY IN NGWELEZANE 135

FIGURE 71: FIRE BRIGADE WELCOMED THE PRESIDENT AND MINISTER WITH A PARADE AND SMILES 140 FIGURE 72: CITY OF UMHLATHUZE WINNING TEAM 140 FIGURE 73: CITY OF UMHLATHUZE WINNING TEAM 141 FIGURE 74: HOSTING FIRE HOSE ACTIVITY 141 FIGURE 75: CITY OF UMHLATHUZE FIRE AND RESCUE SERVICES BANNER 141 FIGURE 76: PICTURE OF A DISASTER MANAGEMENT CENTRE 143

FIGURE 77: 2018 NATIONAL GOLDEN GAMES IN BLOEMFONTEIN FOR SENIOR CITIZENS 149

FIGURE 78: 2018 PROVINCIAL SALGA GAMES IN PIETERMARITZBURG 150

FIGURE 79: NATIONAL INDIGENOUS GAMES FESTIVAL 151 FIGURE 80 :EMPANGENI SWIMMING POOL WAS THE VENUE FOR THE ANNUAL 1000M SWIM, HOSTED BY THE LOCAL SWIMMING CLUB. 152

FIGURE 81: NEW FILTERS WERE INSTALLED AT THE UMFOLOZI SWIMMING POOL AND ARBORETUM SWIMMING POOL FOR BETTER FILTRATION

AND WATER CLARITY 153

FIGURE 82 :SECURITY PARADE AT ALKANTSTRAND BEACH DURING DECEMBER 2018 154 FIGURE 83: POLICE AND LIFEGUARDS KEEPING A WATCHFUL EYE ON ALL BEACH GOERS DURING THE FESTIVE SEASON 154 FIGURE 84: ALKANTSTRAND BEACH LIFEGUARDS RECEIVING THE 10 MALIBU BOARDS 155 FIGURE 85: WATER WHEEL CHAIR LIFEGUARD ASSISTING A PARAPLEGIC VISITOR 155 FIGURE 86: OUTBOARD CRAFT 156 FIGURE 87: OUTSOURCED AMBULANCE PERSONNEL TREATING INJURED PATIENTS. 157 FIGURE 88: PICTURES FOR GRASS CUTTING AND PRUNING TEAM IN EMPANGENI WARD 9 AND 23 158 FIGURE 89: TRACTORS PROCURED 2018/2019 BUDGET 159 FIGURE 90: CLEARING OF ALIEN INVASIVE IN ARBORETUM WARD 3 159 FIGURE 91: DECORATION / FLORAL DISPLAY: MEMORIAL SERVICE FOR STAFF MEMBER: MADLANZINI HALL WARD 4 161 FIGURE 92: DECORATION/FLORAL DISPLAY: ENVIRONMENTAL DAY NGWELEZANE HALL WARD 28 161 FIGURE 93; DECORATION AND DISPLAY: GREENEST MUNICIPAL COMPETITION CIVIC CENTRE WARD 3 162 FIGURE 94 :ARBOR DAY: MZINGAZI (SITHOLINHLAHLA. P. SCHOOL) WARD 1 162 FIGURE 95: PUBLIC OPEN SPACE CONVERTED TO COMMUNITY PARK IN ESIKHALENI WARD 21 163 FIGURE 96: DESIGNS FOR THE HEROES ACRE IN ESIKHALENI WARD 34 165 FIGURE 97: LEARNERS VISITING THE LIBRARY 167

FIGURE 98: PROVINCIAL EXHIBITION 168

FIGURE 99: OPERATION SIYAYA EMHLANGENI (PRE – REED DANCE) ON 18 AUGUST 2019 AT NGWELEZANE COMMUNITY HALL. 169 FIGURE 100: 1ST PRISE WINNERS OF THE STREET DANCE COMPETITION. 170

7

FIGURE 101: ROAD ACCIDENT STATISTICS PER QUARTER. 174 FIGURE 102: ROAD BLOCKS 175 FIGURE 103: QUARTELY ESCORT OF ABNORMAL LOADS NUMBER OF ESCOURTS 175 FIGURE 104: SPEED LAW ENFORCEMENT CAMERAS 176 FIGURE 105: QUATERLY FINES CAPTURED 177 FIGURE 106: QUARTERLY PAYMENTS RECEIVED FROM WARRANTS OF ARRESTS EXCECUTED 177 FIGURE 107: DRIVING UNDER INFLUENCE OF ALCOHOL/DRUGS 178 FIGURE 108: MEDIA COVERAGE OF ARRESTS DURING OPERATIONS 179 FIGURE 109: BUSINESS AND HAWKER INSPECTIONS 179 FIGURE 110: PUBLIC AND BY-LAW COMPLAINT INVESTIGATIONS 180 FIGURE 111: PUBLIC GATHERINGS, PROTESTS & PICKETS 183 FIGURE 112: TRUCK DRIVERS PROTEST CLOSING DOWN JOHN ROSS ALUMINA ALLEE INTERSECTION 183

FIGURE 113: ANIMALS IMPOUNDED BY MEANS OF LAW ENFORCEMENT OPERATIONS. 185

FIGURE 114: MOTOR LICENCING TRANSCATIONS 186 FIGURE 115: NUMBER OF DRIVER AND LEARNER LICENCES PROCESSED 186

FIGURE 116: NUMBER OF TRAFFIC AND LICENSING PAYMENTS AND ENQUIRIES ATTENDED TOO: 187

FIGURE 117: QUARTERLY ENQUIRIES ATTENDED TOO 188 FIGURE 118: CONSTRUCTION AT ESIKHALENI SERVICE CENTRE WHEREBY TRAFFIC LICENSING WORKSTATION WILL BE ALLOCATED188 FIGURE 119: 31 DECEMBER 2018 AT ALKANTSTRAND BEACH 191 FIGURE 120: CATTLE IMPOUDED 191 FIGURE 121: MEMBERS HAVING INSPECTION BEFORE A DEPLOYMENT. 192 FIGURE 122: RANDOM SEARCH AT LOCAL A SCHOOLS. 193 FIGURE 123: DRUGS, WEAPONS, CELL PHONES CONFISCATED FROM LEARNERS DURING RANDOM SEARCH 193 FIGURE 124: BREATHALYZER TESTS BEING CONDUCTED 193

FIGURE 125: CONSTRUCTION OF WALKWAYS IN ESIKHALENI AND MZINGAZI. 196

FIGURE 127: REPLACEMENT AND UPGRADE OF TRAFFIC SIGNAL CONTROLLERS IN EMPANGENI 197

FIGURE 128 : PAINTING OF TRAFFIC SIGNAL POLES IN RICHARDSBAY. 197

FIGURE 129: CONSTRUCTION OF PEDESTRIAN SHELTERS PORT DUNFORD AND NSELENI. 198

FIGURE 130: OESTERBANK MEERENSEE FIGURE 131 :OESTERBANK MEERENSEE 198

FIGURE 132: MANDLAZINI ROADS UPGRADE EXTENT PROJECT SITE PLAN STILL UNDER CONSTRUCTION: 200

FIGURE 133 :MIG PROJECT MANDLAZINI BUS ROAD UNDER CONSTRUCTION 200

FIGURE 134: MIG PROJECT MANDLAZINI BUS ROAD - KERB INLET UNDER CONSTRUCTION 201

FIGURE 135: ROAD REHABILITATION PROGRAM FOR THE 2018/2019 FINANCIAL YEAR; 205

FIGURE 136:RAIL MAINTENANCE OF FEEDLINE FROM BHIZOLO TO THE EXCHANGE YARD IN ALTON 206

FIGURE 137: WORK PERFORMED BY THE ROAD MARKING SECTION FOR THE 2018/2019 207

FIGURE 138: ESIKHALENI MDONI STREET FIGURE 139: EMPANGENI MAXWELL STREET 210

FIGURE 140: STORMWATER SERVITUDE MAINTENANCE AT J SECTION 214

FIGURE 141: NEW PEDESTRIAN BRIDGE IN WARD 1 FIGURE 142: NEW PEDESTRIAN BRIDGE IN WARD 24 214

FIGURE 143: THE NORTHERN CHANNEL 1 DEPICTED IN THE ABOVE LAYOUT IS CURRENTLY UNDER CONSTRUCTION. 215

FIGURE 144: TOTAL WORK THAT HAS BEEN EXECUTED IN THE 2018/2019 FINANCIAL YEAR ON RURAL ROADS 216

FIGURE 145: GRADING DONE IN ALL WARDS FOR 2018/2019 217

FIGURE 146: A TOTAL OF 63.45 KILOMETRES OF GRAVELING WAS DONE IN THE 2018/2019 FINANCIAL YEAR 217

FIGURE 147:WARD 5 KWAKHOZA GRADING FIGURE 148: WARD 5 KWAKHOZA GRAVELLING 218

FIGURE 149: WARD 27 MADLEBE 218

FIGURE 150: WATER MAINTENANCE 223 FIGURE 151: SEWER INFRASTRUCTURE MAINTENANCE FOR 2018/2019 FINANCIAL YEAR 223 FIGURE 152:SEWER INFRASTRUCTURE MAINTENANCE FOR 2018/2019 FINANCIAL YEAR 224

8

TABLE 1: POPULATION GROWTH ........................................................................................................................................................................... 16

TABLE 2: POPULATION GROWTH SCENARIOS FROM 2016 TO 2030 ............................................................................................................ 17

TABLE 3: PERFORMANCE OF BROAD ECONOMIC SECTORS .............................................................................................................................. 20

TABLE 4: 2018/2019 PERFORMANCE AUDIT COMMITTEE MEETINGS ......................................................................................................... 30

TABLE 5: PERFORMANCE ASSESSMENT PANELS FOR THE ASSESSMENT OF THE MUNICIPAL MANAGER (SECTION 54A) ................... 31

TABLE 6: PERFORMANCE ASSESSMENT PANELS FOR THE ASSESSMENT OF THE OF MANAGERS DIRECTLY ACCOUNTABLE TO THE

MUNICIPAL MANAGER ................................................................................................................................................................................... 31

TABLE 7: INTERNAL AUDIT PLAN ........................................................................................................................................................................... 33

TABLE 8: THE PERFORMANCE RESULTS FOR THE ORGANIZATIONAL PRIORITIES ........................................................................................... 35

TABLE 9: ACHIEVEMENT OF INDIVIDUAL KEY PERFORMANCE AREAS .............................................................................................................. 36

TABLE 10: ORGANISATIONAL PERFORMANCE SCORECARD 2018/2019 AND TOP LAYER SERVICE DELIVERY

TARGETS (MASTER TABLE ON DMS 1064996; 2018/2019 TAB) .............................................................................................. 44

TABLE 11: CITY TO CITY TWINNING ARRANGEMENTS ....................................................................................................................................... 53 TABLE 12: INTERNATIONAL ORGANISATIONS MEMBERSHIP AND PARTNERSHIP .......................................................................................... 53 TABLE 13: ISSUES ATTENDED BY THE CUSTOMER SERVICE DESK DURING 2018/2019: ............................................................................ 64 TABLE 14: INCIDENTS PROCESSED FOR THE REPORTING PERIOD: ..................................................................................................................... 65 TABLE 15: CALLS PROCESSED THROUGH SWITCHBOARD FOR THE REPORTING PERIOD:............................................................................... 65 TABLE 16: SCHEDULE OF MEETINGS FOR 2018/2019 ...................................................................................................................................... 67 TABLE 17: ACTIVITIES OF COUNCIL CHAMBER COMPLEX MEETING VENUES FOR 2018/2019: ................................................................ 68 TABLE 18: DRAFTED AGREEMENTS 2018/2019............................................................................................................................................... 69 TABLE 19: BUSINESS LICENCES ISSUED ................................................................................................................................................................. 70 TABLE 20: TRAINING, WORKSHOPS AND CONFERENCES ATTENDED BY COUNCILLORS ................................................................................ 71 TABLE 21: TERTIARY INSTITUTIONS REGISTRATION GRANT ............................................................................................................................ 88 TABLE 22: CANDIDATES RECRUITED AND TRAINED BY THE YOUTH OFFICE ................................................................................................... 90

TABLE 23 : THE STATISTICAL INFORMATION OF RECORDS 2018/2019 ........................................................................................................ 91

TABLE 24: REPORT IN TERMS OF SECTION 32 OF PAIA ................................................................................................................................... 91

TABLE 25: OHS COMPLIANCE TRAINING DURING THE 2018/2019 FINANCIAL YEAR ............................................................................... 98 TABLE 26: SHE COMMITTEE MEETINGS HELD DURING THE 2018/2019 FINANCIAL YEAR ...................................................................... 99 TABLE 27: OCCUPATIONAL HYGIENE SURVEYS CONDUCTED IN 2018/2019 ............................................................................................... 99 TABLE 28: 2018/2019 FINANCIAL YEAR COUNCIL EMPLOYEES TRAINING ................................................................................................ 102 TABLE 29: 2018/2019 FINANCIAL YEAR COUNCILLORS TRAINING ............................................................................................................. 104 TABLE 30: 2018/2019 DISCIPLINARY HEARINGS .......................................................................................................................................... 107 TABLE 31: 2018/2019 DISPUTE REFERRALS ................................................................................................................................................. 108 TABLE 32: THE FOLLOWING TABLE SHOWS BREAKDOWN OF WASTE RECYCLED VERSUS WASTE LANDFILLED IN THIS YEAR. ............. 119 TABLE 33: ENVIRONMENTAL AWARENESS AND CLEAN-UP CAMPAIGNS THAT WERE COVERED THIS YEAR, ............................................ 127 TABLE 34: SHOWS POLLUTANTS MEASURED IN EACH MONITORING STATION .............................................................................................. 130 TABLE 35: SHOWS METEOROLOGICAL STATION AND PARAMETERS THAT ARE MONITORED ...................................................................... 130

TABLE 36: SCHEDULED TRADE PERMITS ........................................................................................................................................................ 136

TABLE 37: NON-COMPLIANCE NOTICES ISSUED .............................................................................................................................................. 136

TABLE 38 : MAJOR STRUCTURAL FIRE ENGINE.......................................................................................................................................... 138 TABLE 39: MEDICAL SURVEILANCE PROGRAMME ............................................................................................................................................. 144 TABLE 40: SURVEILLANCE MANAGEMENT .......................................................................................................................................................... 144 TABLE 41: HEALTH AND SAFETY .......................................................................................................................................................................... 145 TABLE 42: ANIMAL BITES ...................................................................................................................................................................................... 145 TABLE 43: PRIMARY HEALTH CARE ..................................................................................................................................................................... 145 TABLE 44: CHRONIC SERVICES ............................................................................................................................................................................. 146

TABLE 45: EDUCATION PROGRAMME FOR EMPLOYEES WITH CHRONIC CONDITION ............................................................................... 146

TABLE 46: HEALTH AWARENESS PROGRAMMES................................................................................................................................................ 147

TABLE 47 : DEPOTS VISITED FOR THE HEALTHY LIFESTYLE AWARENESS CAMPAIGN ................................................................................ 147

TABLE 48: TB SCREENINGS CONDUCTED ........................................................................................................................................................... 147

TABLE 49: SPECIAL PROGRAMMES ............................................................................................................................................................. 148

9

TABLE 50: FIST AID BOX CHECKS AND REFILLING ............................................................................................................................................ 148

TABLE 51: EVENTS THAT TOOK PLACE AT SOME OF THE SWIMMING POOLS .............................................................................................. 152

TABLE 52: ALKANTSTRAND BEACH WAS THE VENUE FOR THE FOLLOWING EVENTS. ...................................................................... 156

TABLE 53: STATS FOR THE YEAR 2018/19 FESTIVE SEASON FROM 15 DECEMBER 2018 TO 5 JANUARY 2019. ................. 156

TABLE 54: TREES PLANTED IN 2018/2019 .................................................................................................................................................... 159 TABLE 55: ACCESS TO 26 HALLS FACILITIES WAS ENSURED BY THE PROVISION OF THE FOLLOWING SERVICES TO THE COMMUNITY

DURING THE PERIOD UNDER REVIEW: ....................................................................................................................................................... 168

TABLE 56: QUOTATIONS COMPLETED FOR THE PERIOD - 2018/2019 .................................................................................. 196

TABLE 57: THE TABLE BELOW INDICATES A SUMMARY OF THE WORK COMPLETED .................................................................................. 199

TABLE 58: MAINTENANCE WORKS CARRIED OUT ON THE 2018/2019 FINANCIAL YEAR ..................................................................... 202

TABLE 59: REHABILITATION ANNUAL PROGRAM FOR 2018/2019 FINANCIAL YEAR ...................................................... 203

ABBREVIATIONS

AG - Auditor-General

BEE - Black Economic Empowerment

CBD - Central Business District

CBP - Community Based Planning

CIF - Capital Investment Framework

COGTA - Cooperative Governance and Traditional Affairs

CRR - Cumulative Risk Rating

DOT - Department of Transport

EXCO - Executive Committee

GGP - Gross Geographical Product

GIS - Geographical Information System

HIV/AIDS - Human Immunodeficiency Virus/Acquired Immunodeficiency Syndrome

ICT - Information Communication Technology

IDP - Integrated Development Plan

IDP RF - Integrated Development Plan Representative Forum

IWMP - Integrated Waste Management Plan

KPI - Key Performance Indicator

KZN - KwaZulu-Natal

LED - Local Economic Development

10

LGBTIQ - Lesbian, Gay, Bisexual, Transgender, Intergender and Queer

LGTAS - Local Government Turn Around Strategies

LRAD - Land Redistribution for Agricultural Development

LUMS - Land Use Management System

MEC - Member of the Executive Council

MDB - Municipal Demarcation Board

MFMA - Municipal Finance Management Act

MIG - Municipal Infrastructure Grant

MPAC - Municipal Public Accounts Committee

MSCOA - Municipal Standard Chart of Accounts

MTCF - Medium-term Capital Framework

MTEF - Medium-Term Expenditure Framework

MTSF - Medium-Term Strategic Framework

NYDA - National Youth Development Agency

PMS - Performance Management System

PIMS - Planning, Implementation and Management System

PMU - Project Management Unit

RDP - Reconstruction and Development Programme

SADC - Southern Africa Development Community

SEA - Strategic Environmental Assessment

SDF - Spatial Development Framework

SDBIP - Service Delivery and Budget Implementation Plan

SDP - Site Development Plan

SMME - Small, Medium and Micro Enterprise

SPLUMA - Spatial Planning and Land Use Management Act

WSSA - Water and Sanitation South Africa

11

MAYOR’S FOREWORD 2018/2019

On behalf of the City of uMhlathuze Municipality, I hereby present this Annual Report for the

Financial Year 2018/2019. This report outlines our performance against the targets we set ourselves

to do over this period. The report will give our stakeholders and communities an insight into the

performance and achievements of the City. The mandate of the City of uMhlathuze Municipality is

not unique to the broader mandate given to Local Government by the South African Constitution in

terms of Chapter 7. The only uniqueness we have are the different legitimate expectations of our

citizenry. Our specific mandate is drown from the IDP Roadshows we embark upon in drafting our

Integrated Development Plan, which is our guiding document in our performance. Our resolve is

based on servicing our communities wherever they live.

The current Annual Report outlines our successes and shortcomings in relation to our political

mandate as provided in the key focus areas of Local Government, and these can be summarised as

follows:

Building a Municipality that is efficient, effective and responsive;

Strengthen Accountability and promote clean Operations;

Accelerating Service Delivery and supporting the vulnerable; and

Promoting Economic and Social development.

Fostering development partnerships, social cohesion and community looking at the above priority

areas, it is important to note that these can never be successful on their own, it becomes important

that as a collective, Councillors and Officials, work together in identifying the challenges raised in

the annual report and rectify them as soon as possible. Having said that, it is equally important to

note that there are a few specific areas, which must receive particular attention going forward:

Improved mechanisms will need to be found to strengthen the accountability and discipline of

officials in their daily work, both to each other and to political principals; The establishment of

project teams across the organisation must become central to a new way of working of officials.

This will go a long way in breaking down the silo-approach to work. This project based approach to

work must be directly linked to the performance management system for officials; Speed, timing

and excellence in the quality of daily work must become a key feature in the way in which officials

undertake their work.

The overall turn-around times of administrative and professional work will require significant

improvement. Ways will be sought to ensure that all officials, at some point, interact directly with

12

our communities. Too often the single most important objective of the public service, i.e. of serving

our people, becomes an abstract idea that is regarded as the exclusive domain of the political

principals.

Finally, the City will ensure that its most valuable resource, i.e. its staff, is highly valued and

supported. Training, personal development, career-pathing, talent management, coaching,

mentoring and Employment Assistance Programmes are some of the specific interventions that will

need to be enhanced. Equally with the politicians, it is important that we focus our energies on the

mandates we have from our respective political parties.

Our differences should only be indication of a strong democratic state, not an impediment to

deliver services to our people. It is commendable to note the improvements in relation to our

spending and expenditure patterns, but we need to do more. The ever present excuse of lack of

resource might be a legitimate one, but the key question is how effectively we use the resources at

our disposal. It is clear on this annual report that we are moving in the right direction, although not

there yet. It is of paramount importance to synchronise our programmes and plans with quarterly

targets to achieve our broader goals of effective and efficient City.

Strategic Alignment to District, Provincial, National and International Plans

I am pleased to report that the service delivery agenda of the City of uMhlathuze if fully aligned to

various strategic plans of different spheres of government as well as international strategies. At an

international level, the City draws its strategic direction from the United Nations Strategic

Development Goals (SDGs). The 17 SDGs are embedded in the world’s quest to ensure poverty

eradication, changing unsustainable and promoting sustainable patterns of consumption and

production and protecting and managing the natural resource base of economic and social

development.

At a national, the City’s plans are aligned to the National Development Plan (NDP) 2030. The NDP

offers a long-term perspective, defines a desired destination and identifies the role different sectors

of society need to play in reaching that goal. The NDP aims to eliminate poverty and reduce

inequality by 2030. According to the plan, South Africa can realise these goals by drawing on the

energies of its people, growing an inclusive economy, building capabilities, enhancing the capacity

of the state, and promoting leadership and partnerships throughout society.

At a provincial level, the City’s plans are aligned to the Provincial Growth and Development

Strategy, which provides KwaZulu-Natal with a reasoned strategic framework for accelerating and

sharing the benefits of an inclusive growth through deepened, meaningful, effective and sustainable

catalytic and developmental interventions.

At a district level, the City’s plans are aligned to King Cetshwayo District Growth and Development

Plan, which aims to translate the Provincial Growth and Development Strategy into a detailed

implementation plan at a district level, inclusive of clearly defined targets and responsibilities thus

enabling the province to measure its progress in achieving the accepted growth and development

goals.

Service Delivery Acceleration

Once again the City of uMhlathuze excelled in the implementation of Back to Basics “serving our

communities better” programme. The programme acknowledges local government as the primary

site for service delivery and the programme seeks to assist local government to enforce its mandate

for service delivery. To this end, the City remains a fully functional Municipality with an overall score

13

of 93%. Notably, access to critical services such as water (95.84), sanitation (80.94), waste removal

(69.71) and electricity in municipal licenced area (100%) remain relative high and in some instances

above the national norm. Access to basic services is improving incrementally year on year. The City

is still facing major challenges in the provision water especially in wards 31, 32 & 33 as well as

maintenance of rural roads. More resources and sustainable solutions will be prioritised in the

ensuing financial years.

During this period, the City continued to invest in infrastructure as a way of improving people’s lives

for better. Some of the key projects implemented in 2018/19 included upgrading of electricity

infrastructure, installation of high mast lights in rural wards, rural sanitation, rural and semi urban

water schemes, roads infrastructure etc. just to name a few. Details of all projects implemented are

contained in Appendix M (i) (ii) of this Annual Report.

Governance

Strategic focus on sound and good governance in our administrative and leadership processes

continue to be the main focus of the Municipality. The City received an unqualified audit opinion

and we are committed to resolving all the issues raised by the Auditor General in the final

management letter and put systems in place towards a clean audit outcome. We acknowledge the

work of Council in providing oversight to the Executive and Administration. Additionally, the

Municipal Public Accounts Committee (MPAC) and Audit Committee have played a pivotal role in

ensuring accountability and good governance. Our commitment to serve the residents of

uMhlathuze assiduously remains intact. Public participation through IDP roadshows, budget

roadshows, ward committees, taking Council to the people, etc. remains a pillar of our governance

machinery.

The Final Push

The City of uMhlathuze holds the hopes and aspirations of its residents. It is our quest and

commitment to continue investing in strategic infrastructure as part of spatial transformation,

creation of economic opportunities and improved access to municipal services thus creating

liveable and sustainable communities. The magnitude of our task is to systematically address the

triple challenges of poverty, inequality and unemployment as well as faster economic

transformation and universal access to municipal services. Through Area Based Management (ABM)

interventions service failures, grime and decay will be incrementally addressed. In the remain

months of the current political term, the City will double its efforts in ensuring that commitments

made are fulfilled and that the level of service delivery is elevated for meaningful outcomes and

impact.

COUNCILLOR MG MHLONGO CITY MAYOR

14

MUNICIPAL MANAGER’S FOREWORD

As the City of uMhlathuze, we are a Category A Municipality, a high capacity Municipality, with the

capacity to execute its mandate as envisaged in sections 155 and 156 of the Constitution of the

Republic of South Africa and Chapter 3 of the Municipal Systems Act. As a High Capacity

Municipality, we are not on shared services with other municipalities in the District, but on SPLUMA,

we opted in for the Joint Municipal Planning Tribunal, called King Cetswayo North Joint Municipal

Planning Tribunal. This tribunal includes King Cetswayo, uMfolozi Local Municipality and the City of

uMhlathuze. It seems to be working well and has cleared a number of developmental projects.

The term under review has been a very interesting and challenging one. The municipality generally

continued to do well but it became clear that the municipality is at a stage when it needs to re-

energize itself and improve on our achievements. This is particularly important in this Centenary

Celebrations of Madiba who once said, “After climbing a great Hill, one finds that there are more

Hills to climb”. Indeed, we have many more hills to climb. In the previous years we received 5

Consecutive Clean Audits but in the year under review we experienced an unfortunate regression.

We received an Unqualified Audit with One Matter of Emphasis. The City of uMhlathuze

Governance Structures continue to be very strong and highly functional. The structures include:

Council

Executive Council (EXCO)

Audit Committee

Performance Audit Committee

Municipal Public Accounts Committee (MPAC)

Enterprise Risk Management Committee

All Section 56/57 managers have been appointed

This has been a very important year in that the municipality earnestly commissioned the Enterprise

Resource Planning project with SAP as a platform. The SAP project required the integration of 49

different systems. The whole experience was an important lesson for all of us. No municipal

employee will ever be the same again after going through this experience as it has provided an

opportunity to review all business processes and customize them to suit all stakeholder’s business

needs. It is also important to note that the SAP project was commissioned at the same time when

mSCOA has been introduced, which also necessitated that the municipality reviews its culture and

15

processes of requires us to review our culture of executing projects. One can only conclude that

indeed in local government, change is a constant.

While on the subject of change, the City of uMhlathuze (with City of Polokwane) became a pilot site

for Integrated Urban Development Framework (IUDF). The biggest benefit of participating in such a

project is that it will teach us to do long-term infrastructure development planning and rollout. It’s

an exciting opportunity and we appreciate COGTA for choosing uMhlathuze for the pilot project.

We feel energized by the passion of the Deputy Minister of CoGTA. We believe that the endeavor

will put us on the right track.

There are areas which are starting to be a problem in our operations. While we maintain top spot in

the country in revenue collection, we are beginning to experience problems in the rural areas, and

we continue to engage the traditional leaders in this regard. The truth is that if people consume

services without corresponding contributions, it will collapse the municipality. We do not want to be

in that space. We continue to rely on electricity as our main revenue source, and it is against this

realization that the Mayor has given us marching orders to come up with new methods to increase

our revenue base.

In this financial year, two very important projects received a thumbs up from a feasibility study point

of view. We finalized the feasibility study for the Waste-Water Reuse Project. This project is

important because it shows how we are able to respond to climate change. As a municipality with

an appetite for growth, it means we will be able to guarantee water supply for our investors. The

feasibility study showed that this is indeed a very viable project and as well as a logical move on our

part.

We also concluded a pre-feasibility study on the Airport, which came out positive. This is also a very

important project to support the economic growth of the City. We are about to embark on a full

feasibility. There are a few other catalytic projects that will not be discussed in this report. What

remains is for us to begin to discuss earnestly our space in the 4th Industrial Revolution and how we

position ourselves to play in that space.

DR NJ SIBEKO MUNICIPAL MANAGER

16

CHAPTER 1: GOVERNANCE INTEGRATED DEVELOPMENT PLAN

Introduction and Background

MUNICIPAL OVERVIEW

The City of uMhlathuze (KZ 282) is situated on the north-east coast of the province of KwaZulu-

Natal, about 180 kilometers north-east of Durban. The uMhlathuze land area covers 79 334 Ha to

123 325 Ha and incorporates Richards Bay, Empangeni, eSikhaleni, Ngwelezane, eNseleni, Felixton

,Vulindlela, Bhuchanana and Heatonville as well as the rural areas under Traditional Councils

namely, Dube, Mkhwanazi, Khoza (Bhejane), Zungu (Madlebe), Somopho (Mthembu), Obuka (Biyela)

and Obizo (Cebekhulu). The population is estimated at 410 456 as per Community Survey 2016,

although in terms of Census 2011 the total population was estimated at 334 459. The number of

households increased from 67 127 in 2001 to 86 609 in 2011, the current number of households as

per the recent community survey is estimated at 110 503. The municipality borders a coastline that

spans approximately 45 kilometers. The N2 highway traverses the uMhlathuze Municipality in a

north-east direction towards the Swaziland border and south-west towards Durban. It effectively

forms a division between Empangeni and Richards Bay. The R34 Provincial Main Road passes

through Empangeni towards Melmoth.

The uMhlathuze Municipality was established on 5 December 2000 after the demarcation process

and the local government elections of that date. Since its establishment the municipality in 2016 has

been affected by the re-determination of municipal boundaries which changed its geographical

setting to include areas which were previously under the then Ntambanana Municipality. As such it

encompasses the towns of Empangeni, Richards Bay, eSikhaleni, Ngwelezane, eNseleni, Vulindlela,

Felixton, Heatonville and Bhuchanana as well as the Traditional Authority areas under Amakhosi

Dube, Mkhwanazi, Khoza, Mbuyazi, Zungu, Mthembu, Biyela and Cebekhulu. UMhlathuze Local

Municipality has been divided into 34 municipal wards since 2016 local government elections.

The municipality has the benefit of about 45km of coastline of which about 80% is in its natural

state. Linked to its coastal locality is the Richards Bay deep-water port that has been instrumental

in the spatial development of the area in the past and will definitely impact on the areas’ future

spatial development. There is one airport and a couple of land strips in the municipal area.

uMhlathuze is contributing 48% towards GDP within the King Centshwayo District.

Table 1: Population Growth

Year UMHLATHUZE

Census 2011 334459

Community Survey 2016 410465

% Growth 22,73%

17

Source: Stats SA, 2011; 2016

The 2016 Community Survey indicates that the population of uMhlathuze Municipality has

increased by just over 22% between 2011 and 2016. It has to be borne in mind that a portion of the

population increase is the result of an enlarged municipal area following the inclusion of three

wards from the former Ntambanana Municipality post the 2016 Local Government Elections.

Table 2: Population Growth Scenarios from 2016 to 2030

From the above, the following is highlighted:

o At a steady population increase of 1,5% per annum, the municipal population will surpass

500 000 people by 2030.

o The municipality will reach a population of 500 000 before 2021 if a population growth rate

of 5% takes place over the next few years.

o At such a 5% per annum population growth rate the number of households in the

municipality will double.

Figure 1: Female and Child Headed Households

Source: Stat SA, 2011

The number of Female headed Households has increased from 2001 from 36.29 % to 40.70% in

2011. This can be attributed by many factors including the high level of divorce cases, and the fact

2 016 2 017 2 018 2 019 2 020 2 021 2 022 2 023 2 024 2 025 2 026 2 027 2 028 2 029 2 030

1.5% Increase 410 465 416 622 422 871 429 214 435 653 442 187 448 820 455 552 462 386 469 322 476 361 483 507 490 759 498 121 505 593

Households 103 915 105 474 107 056 108 662 110 292 111 946 113 625 115 330 117 060 118 816 120 598 122 407 124 243 126 107 127 998

2% Increase 410 465 418 674 427 048 435 589 444 301 453 187 462 250 471 495 480 925 490 544 500 355 510 362 520 569 530 980 541 600

Households 103 915 105 993 108 113 110 276 112 481 114 731 117 025 119 366 121 753 124 188 126 672 129 205 131 790 134 425 137 114

3% Increase 410 465 422 779 435 462 448 526 461 982 475 841 490 117 504 820 519 965 535 564 551 631 568 180 585 225 602 782 620 865

Households 103 915 107 033 110 244 113 551 116 957 120 466 124 080 127 803 131 637 135 586 139 653 143 843 148 158 152 603 157 181

4% Increase 410 465 426 884 443 959 461 717 480 186 499 393 519 369 540 144 561 750 584 220 607 588 631 892 657 168 683 454 710 793

Households 103 915 108 072 112 395 116 890 121 566 126 429 131 486 136 745 142 215 147 904 153 820 159 973 166 372 173 026 179 947

5% Increase 410 465 430 988 452 538 475 165 498 923 523 869 550 062 577 565 606 444 636 766 668 604 702 034 737 136 773 993 812 693

Households 103 915 109 111 114 566 120 295 126 310 132 625 139 256 146 219 153 530 161 207 169 267 177 730 186 617 195 948 205 745

Female Headed Households Child Headed Households

18

that more women are becoming more independent. About 5 % of uMhlathuze Households are

Child and Adolescent Headed Households. The needs of these children are complex, many and

diverse.

ECONOMIC PROFILE

uMhlathuze has the most developed economy of all the municipalities in the district and is the

major contributor to the District GDP (it is the third largest economy in KwaZulu-Natal). It’s most

important industries are BHP Billiton Aluminum, Mondi, SAPPI, RBCT, Tata Steel and Bell Equipment.

The following chart indicates the GDP contribution by uMhlathuze Municipality comparing to other

local municipalities within King Cetshwayo District. It is evident that uMhlathuze remain the strong

contributor to the district GDP, with 48% contribution.

Figure 2: % GDP Contribution

Source: Global Insights 2015

Human Development Index and Gini Coefficient

Measuring the life expectancy, literacy rates and income levels as proxy of quality of living, it is

noted from the figures BELOW that the HDI for uMhlathuze Municipality has increased from 0.56 in

2009 to 0.64 in 2015. This is a good indicator, when translated it means the standard of living for

the citizens of uMhlathuze has improved over the period. On contrary the Gini Coefficient of

uMhlathuze Municipality has remained the same since 2009 to 2015, at 0.63.

uMfolozi 25%

City of uMhlathuze 48%

uMlalazi 18%

Mthonjaneni 6%

Nkandla 3%

19

Figure 3: Human Development Index and Gini Coefficient

Source: Global insight 2015(Provincial Treasury)

Employment and Income Levels

The City of uMhlathuze is seating at 24.6% with regards to unemployment as per the recent Global

insight statistics. The picture is better if compared with other municipalities within the region;

however, it is still relatively higher when compared with 21. 9% of the province.

Job creation is not the core competency of the municipality however City of uMhlathuze is

committed to radical economic transformation which entails making the environment conducive for

investors.

Figure 4: Regional Unemployment

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

2009 2010 2011 2012 2013 2014 2015

0.56 0.57 0.59 0.60 0.63 0.64 0.64

0.63 0.63 0.63 0.63 0.63 0.63 0.63

HDI Gini coefficient

20

Source: Global insight 2015

Table 3: Performance of Broad Economic Sectors

2005 2010 2015

Primary sector 14.4 13.3 15.4

Agriculture 3.3 3.7 3.9

Mining 11.1 9.7 11.5

Secondary sector 38.3 37.4 36.2

Manufacturing 32.5 31.3 30.5

Electricity 2.1 1.8 1.6

Construction 3.8 4.2 4

Tertiary sector 47.3 49.2 48.4

Trade 9.4 9.7 9.7

Transport 11.7 12.6 12.9

Finance 10.5 11.3 14.8

Community services 15.6 15.6 28.2

Source: Global Insight 2015

To be noted in 2010 there was a decline in the mining sector; however, we are noting an increase

within the year 2015. Manufacturing is not doing well; this is confirmed by the declining trend seen

over the years from 32.5 in 2005 and 30.5 in 2015. There is almost a double increase within the

community services sector from 15.6% in 2005 to 28.2% in 2015.

Figure 5: Poverty Head Count

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

21.9% 26.5%

31.3% 24.6% 26.7% 28.0%

32.1%

21

Source Global Insight 2015

Figure 6: Intensity of poverty

Source: Global insight 2015

There is a noticeable decrease in poverty headcount, whereas the extent of intensity of poverty

remains relatively high comparatively

STRATEGIC FRAMEWORK

The Vision:

4.1

2.3

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

2011 2016

Poverty HeadCount

42

40

39

40

41

42

43

2011 2016

Intensity of Poverty

22

“The Port City of uMhlathuze offering a better quality of life for all its citizens through sustainable

development and Inclusive Economic Growth”

Mission Statement:

The City of uMhlathuze commits itself to:

o Job creation and inclusive economic growth through accelerated economic development

and transformation;

o Enhancing industry-based skills development and strategic support to education priority

programmes;

o Community based initiatives to improve quality of citizens health and well-being;

o Creating safer city through integrated and community based public safety;

o Planned and accelerated rural development interventions;

o Promotion and maintenance of spatial equity and transformation;

o Optimal management of natural resources and ccommitment to sustainable environmental

management;

o Use of Information, Communication and Technology Systems (ICT) to improve productivity

and efficiencies in line with Smart City principles; and

o Good governance, capable and developmental municipality

Figure 7: Development Goals

Fourth generation IDP

Introduction and Background

Democratic,

Responsible,

Transparent,

Objective and

Equitable Municipal

Governance

Integrated

infrastructure

and efficient

services

Viable

Economic

Growth and

Development

Safe and

Healthy

Living

Environment

Sound

Financial and

Supply Chain

Management

Public

Safety and

Security

Immovable

Property

Management

Social

Cohesion

Integrated

Urban and

Rural

Development

A municipality that is

resourced and

committed to

attaining the vision

and mission of the

organisation

23

The IDP entails processes through which a municipality, its constituencies, various sector

departments, interested and affected parties come together to prepare clear objectives and

strategies which serve to guide allocation and management of resources within the municipal area

of jurisdiction. The Integrated Development Plan spans a five-year period which is directly linked to

the term of its Council.

UMhlathuze Municipality implement its IDP to fulfil its role of “developmental local governance”.

Central to this role are the objectives and strategies contained in the plan, which guides the

municipality in the realm of: Municipal Budgeting, Institutional re-structuring in order to fulfil the

strategic intent of the plan including integrating various sectors (housing, land use, etc.) with

economic, social and environmental dimensions.

1st Review of the 4th Generation IDP – 2018/2019

All municipalities are charged with the responsibility to develop, review and implement integrated

development planning (IDP). In this regard municipalities are guided by the Local government

system act, Chapter 4 on community participation and chapter 5 on integrated development

planning amongst the host of regulations.

The IDP Review 2018/2019 was compiled in terms of a process plan developed and adopted by

Council in 29 May 2018 to ensure compliance with certain quality standards and to ensure that

proper coordination between and within the spheres of government is established. Council

approved a process plan for the 2018/2019 IDP process on 22 August 2017, a process that which

set out the methods and approach according to which the IDP development process was to be

conducted.

The Fourth Generation IDP and subsequent reviews adopts a concept of an outcome-based

approach which emphasises the following:

That the municipality focuses on achieving the expected real improvements in the life of all

its residents;

That through the integrated development planning, municipality clarifies what the

community expect to achieve, how they expect to achieve it and how will they know whether

they are achieving it;

That the municipality improve the lives of citizens rather than just carrying out its functions.

Credibility

uMhlathuze Municipality prides itself for consistently being recognised and awarded by the Department of

Corporative Governance and Traditional Affairs for remaining amongst the top ten municipalities in the

entire province that produces credible IDPs, in the 2018/2019 IDP uMhlathuze was also awarded for the

24

producing the most credible IDP for six consecutive years, for producing the best quality in the province:

Basic Service Delivery KPA and for producing the best quality in the province: Good Governance. This

achievement is an indication of the ability and readiness of this organisation to deliver on its legislative and

Constitutional mandates.

IDP Roadshows

It is Council’s commitment to constantly engage with all the people of the city. Hence the process

plan makes provision for communities to participate throughout the development of the IDP. The

Key Strategic Outcomes to the Public participation sessions are the following:

• Identification of the real needs of all communities in the uMhlathuze

• Prioritization of such needs and development challenges

• Collective development of appropriate solutions to address such needs

• Empowerment of the local communities to take ownership for their own development

The IDP Roadshows were held as follows, Ward Committees on 31 August 2017, Amakhosi on 01

September 2017, Richards Bay Cluster on 03 September 2017, Operation Sukuma Sakhe (OSS) on

13 September 2017, Empangeni Cluster 10 September 2017, eSikhaleni Cluster on 17 September

2017 and Stakeholders on 28 September 2017. Below is graphical representation of issues raised

communities across the sessions held. It is evident from the figure below that there is an outcry on

the provision of houses and the status of roads in the City.

Figure 8: Summary of Community Issues – Core Functions

COMMUNITY ISSUES

25

Figure 9: Summary of Community Issues – Non-Core Functions

Intergovernmental Alignment

From July 2017 to May 2018, the City engaged with its District and Provincial counterparts through

district and provincial platforms established including the following:

• King Cetshwayo District IDP Planners Forum;

• COGTA KZN IDP Planners Forum; and

• SALGA Municipal IDP Support Forum.

The key strategic outcomes for these alignment sessions are the following:

• Improved co-operation and coordination between different spheres of government on IDP

matters

• Strengthened relations with government departments and other stakeholders

• Vertical and Horizontal alignment

• Improved monitoring and support by provincial department

Hospital Clinics Schools PoliceStation

Libraries ECDCentres

Old AgeHome

Jobs PublicTransport

PublicSafery

26

CHAPTER 2: SERVICE DELIVERY PERFORMANCE

ORGANISATIONAL PERFORMANCE MANAGEMENT SYSTEM

Legislative requirements

Outlined in Section 40 of the Municipal Systems Act of 2000 (MSA), Municipalities must establish

mechanisms to monitor and review its Performance Management System (PMS) so as to measure,

monitor, review, evaluate and improve performance at organisational, departmental and employee

levels. Section 34 of the MSA furthermore point out that the Integrated Development Plan (IDP)

has to be reviewed on an annual basis, and that during the IDP review process the Key Performance

Areas, Key Performance Indicators and Performance Targets be reviewed and this review will form

the basis for the review of the Organisational Performance Management and Performance

Contracts of Senior Managers.

The Municipal Planning and Performance Management Regulations (2001) stipulates that a

“municipality’s performance management system entails a framework that describes and represents

how the municipality’s cycle and processes of performance planning, monitoring, measurement,

review, reporting and improvement will be conducted, organised and managed, including

determining the roles of the different role-players” (Chapter 3, Section 7, Municipal Planning and

Performance Management Regulations, 2001).

Section 46 of the Municipal Systems Act (Act 32 of 2000), inter alia stipulates the following:-

"Annual reports

46. (1) A municipality must prepare for each financial year an annual report consisting of -

(a) a performance report reflecting;

(i) the municipality’s, and any service provider’s, performance during that

financial year, also in comparison with targets of and with performance in the

previous financial year;

(ii) the development and service delivery priorities and the performance targets

set by the municipality for the following financial year;

(iii) measures that were or are to be taken to improve performance; ”

Introduction

The first performance management framework was adopted by the uMhlathuze Municipality on 28

May 2002. The framework was reviewed and amended during 2012/2013 financial year to align

with the best practice guidelines suggested by the then Department of Provincial and Local

Government and Traditional Affairs of Kwazulu-Natal. The framework/policy was again reviewed in

June/July 2016 to address the Auditor General finding that the municipality did not have

27

documented and approved internal policies and procedures to address the process of collection,

recording, processing, monitoring and reporting of performance information.

The Reviewed Performance Management Framework and Policy has been enhanced to include the

National Treasury Communications Directive: Framework for Managing Programme Performance

Information (FMPPI). The Local Government Regulations on the appointment and conditions of

employment of Senior Managers (Reg 21 of 17 January 2014) were also included in the reviewed

framework, since it was promulgated after the adoption of the previous Performance Management

Framework and Policy.

The most recent Performance Management Framework/Policy review was on 05 December 2018 per

Council Resolution 12944, including review of the Standard Operating Procedure to clarify the

processes to collect, collate, verify and store of performance information.

The Organisational Performance Management function of uMhlathuze Municipality is delivered by

an internal Performance Management Unit within the Office of the Municipal Manager under the

authority of the Chief Operations Officer. The Performance Management unit consists of two

permanent employees, i.e. one post of Manager: Performance Management and one post of

Performance Management Specialist.

Organisational Performance Management Process

The legislative framework as set out above provides for performance management at various levels

in a municipality including organisational (sometimes also referred to as municipal, corporate or

strategic) level, operational (also referred to as services, departmental or section/team level) and

lastly, at individual level. These levels are however integrated and interdependent on each other.

Figure 10: Organisational Performance Management Process

STRATEGIC

LEVEL

OPERATIONAL

LEVEL

INDIVIDUAL

LEVEL

ORGANISATIONAL

PMS

OPERATIONAL

PMS

INDIVIDUAL

PMS

IDP

SDBIP

IDP, SDBIP,

INDIVIDUAL KPAs &

JOB DESCRIPTIONS

The process of managing performance at organisational level in the uMhlathuze Municipality

involves the stages as set out in the following diagram:

28

Figure 11: Stages of Performance Management Process : uMhlathuze Municipality

1. Performance

Planning

3. Performance

Measurement

4. Performance

Analysis

6. Performance

Review

5. Performance

Reporting

2. Performance

Monitoring

ORGANISATIONAL

PERFORMANCE

MANAGEMENT

OVERSIGHT

OVERSIGHT

O

V

E

R

S

I

G

H

T

O

V

E

R

S

I

G

H

T

Key performance indicators have been refined in support of the municipality’s development

priorities and objectives as set out in the revised IDP framework (aligned with the organizational

structure and Council’s priorities) for the five year IDP period to ensure consistency in measuring

and reporting on long terms strategies and projects. Measurable performance targets with regard

to each of these development priorities and objectives were established and are reflected in the

2018/2019 OPMS Scorecard/Top Layer of the Service Delivery Budget implementation Plan. A

process to ensure regular reporting is in place and gets reported quarterly to the Council via the

Performance Audit Committee.

Individual performance agreements and performance plans were prepared in line with provisions

prescribed in the Performance Regulations (Notice 805, published on 1 August 2006 in the official

gazette) and signed by the Municipal Manager, the Chief Operations Officer and Deputy Municipal

Managers (Heads of Department). These agreements are fully implemented and aligned with the

Service Delivery and Budget Implementation Plan as required in terms of the Municipal Finance

Management Act (No 56 of 2003)

The following diagram illustrates a summary of the reviewed performance management framework

for the City of uMhlathuze for performance measurement and reporting, adhering to the guidelines

suggested by KwaZulu-Natal Province, Department for Cooperative Governance and Traditional

Affairs:

29

Figure 12: uMhlathuze Performance Management Framework

WH

OH

OW

WH

AT

TIM

EL

INE

Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

PERFORMANCE MANAGEMENT FRAMEWORK

AUG - OCT NOV - APR MAY - JUL ON-GOING

Monthly Reports – Dept

Rep’s

Quarterly Reports –

Dept Rep’s and PMS

Unit

Annual Reports – PMS

Unit

2. Quarterly – Summarised COO & Dept. Performance – MM, Perf. Eval Panels, PAC,

EXCO & Council

3. Annual – Perf. Audit Committee, Council &

Community

1. Monthly – Departmental Performance - COO & DMM’s

ON-GOING

Benchmark

Customer / Climate Survey

Performance Assessment / Appraisal

Performance Evaluation

Actual viz Target; Self Assessment

Performance Assessment

– Perf Evaluation Panel,

COO, DMM’s, MM with PMS

unit and Dept Rep’s

Performance &

Benchmarking - Evaluation

– PMS unit

3. Individual Performance Plan – Individual Scorecard

2. COO & DMM’s Performance Plan – Dept

Perform Scorecard

1. MM Performance Plan – Org Perform Scorecard

KPA’s, KPI’s alignment

with IDP & Budget –

PMS Unit, COO, DMM’s

& Dept Rep’s

Org & Dept Scorecard –

PMS Unit

Review IDP

Determine KPA’s & KPI’s

Review Vision, Mission,

Objectives, Strategy,

Actions

Prioritise Targets

Determine Targets

Align National KPI’s

4. Budget/ Financial

Perspective

5. Stakeholder Perspective

3. Customer Perspective

2. Internal Perspective

1. Learning & Growth Perspective

KPA’s, KPI’s alignment

with IDP & Budget –

PMS Unit, COO, DMM’s

& Dept Rep’s

Org & Dept Scorecard –

PMS Unit

Vision, Mission,

Objectives - IDP Unit

KPA’s, KPI’s – IDP unit,

PMS unit & Dept Rep’s

Targets – Mayor with MM,

COO and DMM’s as

(HOD’s) and MM

Establish Balance

Scorecards

Review Performance

Plans

Measure Performance

quarterlyReport Performance

uMhlathuze Performance Management Framework diagram

Performance Audit Committee

The Performance Audit Committee has been established since 2003 in terms of of Section 14(2) (a)

of the Local Government: Municipal Planning and Performance Management Regulations of 2001

and membership changed over time. The Performance Audit Committee for the 2018/2019

financial year was re-affirmed on 7 March 2017 by Council (Resolution 11367, RPT 161834) for the

2018/2019 financial year ending the term of office on 31 January 2019 after the annual report of

2017/2018 financial year has been adopted by the Council:

Dr M J Ndlovu – Chairperson (external member)

Ms R de Waal (external member)

Mr B S Ndaba (external member)

Cllr M G Mhlongo (Mayor)

Cllr S G Mkhize (Deputy Mayor)

Following changes in the Council structure as well as vacancies resulted from the resignation of one

external member of the Performance Audit Committee membership had to be re-confirmed.

Council resolved on 19 September 2018 (Resolution 12704, RPT 165334) to appoint the following

members for the remainder of the 2018/2019 financial year up to the adoption of the 2018/2019

Annual Report in January 2020:

30

Dr M J Ndlovu – Chairperson (external member)

Dr M Masuku (external member)

Cllr K D Sibiya (Deputy Mayor) alternatively

Cllr R M Zikhali (Executive Committee members in the event of non-availability by the

Deputy Mayor)

Dr M Masuku has since resigned as a member of the performance audit committee following his re-

location to the North West Province. Following an advertisement placed in the media on

25 January 2019 to attract persons with suitable qualifications, experience and knowledge in the

public sector and in particular, Performance Management Systems to fill the vacant position in this

Committee. Mr R M J Baloyi was duly appointed by Council (Resolution 13065, RPT 165088) on

28 February 2019 to serve as an external member in the vacant position on the Performance Audit

Committee.

The Performance Audit Committee is meeting on a quarterly basis for each financial year to ensure

compliance with relevant legislation, procedures and to consider the quarterly performance

achievements reported on the OPMS Scorecard as well as the performance achievements reported

in terms of the Service Delivery Budget Implementation Plan.

The Performance Audit Committee has met quarterly during the 2018/2019 financial year as follows:

Table 4: 2018/2019 Performance Audit Committee Meetings

Period Date Reference to Agenda Reference to Minutes

Quarter 1 03 August 2018

30 August 2018

RPT 164903

RPT 165313

RPT 164904

RPT 165314

Quarter 2 29 November 2018 RPT 165923 RPT 165924

Quarter 3 14 March 2019 RPT 166423 RPT 166424

Quarter 4 28 June 2019 RPT 167089 RPT 167090

The Draft Annual Performance was submitted to the Performance Audit Committee on 28 August 2019 to

note and consider the reported annual performance achievements reported on the OPMS scorecard as well

as the Performance Achievements reported in terms of service delivery performance targets set in the Top

layer of the Service Delivery Budget Implementation Plan on the completed 2018/2019 financial year. The

minutes of meetings are available on the GroupWise electronic document management system as reflected

in the table above.

Performance Evaluation Panels

Performance Evaluation Panels have initially been established for the assessment of performance of

the Municipal Manager as well as Managers directly accountable to the Municipal Manager per

Council Resolution 4120 of 10 October 2006. The Performance Evaluation Panels were re-affirmed

over time and subsequently again on 14 September 2016, by Council Resolution 11062. It is

31

incumbent to note that Clr S G Mkhize (Former Deputy Mayor) has been replaced on 20 April 2018

by Cllr K D Sibiya.

Performance Assessment Panels for the assessment of Section 57 employees were established as

follows:

A) For purposes of evaluating the annual performance of the Municipal Manager (section 54A),

an Evaluation Panel constituting of the following persons was established -

(i) Executive Mayor or Mayor;

(ii) Chairperson of the Performance Audit Committee;

(iii) Member of the Mayoral or Executive Committee or in respect of a plenary

type Municipality, another member of Council;

(iv) Mayor and/or Municipal Manager from another Municipality; and

(v) Member of a Ward Committee as nominated by the Executive Mayor or

Mayor.”

Table 5: Performance Assessment Panels for the assessment of the Municipal Manager (section 54A)

Clr M G Mhlongo Mayor/Chairperson

Cllr K D Sibiya Member of the Executive Committee

Dr M J Ndlovu Chairperson of the Performance Audit Committee

Clr S W Mgenge Mayor from another Municipality (uMfolozi)

Mr E S Luthuli Ward Committee member

B) For purposes of evaluating the annual performance of Managers directly accountable to the

Municipal Manager, an Evaluation Panel constituted of the following persons was

established:

(i) Municipal Manager;

(ii) Chairperson of the Performance Audit Committee or the Audit Committee in

the absence of a Performance Audit Committee;

(iii) Member of the Mayoral or Executive Committee or in respect of a plenary

type Municipality, another member of Council; and

(iv) Municipal Manager from another Municipality.”

Table 6: Performance Assessment Panels for the assessment of the of Managers directly accountable to

the Municipal Manager

Dr N J Sibeko Chairperson

Cllr K D Sibiya Member of the Executive Committee

32

Dr M J Ndlovu Chairperson of the Performance Audit Committee

Mr K E Gamede Municipal Manager from another Municipality

(uMfolozi)

Performance Evaluation sessions are conducted quarterly. The first and the third quarter

assessment are informal assessments. Formal assessments are conducted for the Second and Fourth

quarter. The final (fourth) and formal performance evaluation sessions of the Municipal Manager

and Managers Directly accountable to the Municipal Manager covering the 2018/2019 financial year

will be performed once the Auditing of the Interim Annual Financial Statements and the

Predetermined Objective has been finalised by the Auditor General. The minutes of all meetings are

available on the GroupWise electronic document management system. The final performance

evaluation will commence once the Annual Report 2018/2019 has been adopted by the Council for

consideration of performance bonuses in terms of the Regulations.

Auditing of Performance Information

The MFMA and the Municipal Planning and Performance Management Regulations require that the

Municipal Council establish an audit committee consisting of a minimum of three members, where

the majority of members are not employees of the municipality. No Councillor may be a member

of an audit committee. Council shall also appoint a chairperson who is not an employee.

The Regulations give municipalities the option to establish a separate performance audit committee

whereas the MFMA provides for a single audit committee as further being recommended by

National Treasury in terms of their MFMA Circular no. 65 of November 2012. The municipal Council

has however taken a decision to continue with a separate Performance Audit Committee and Audit

Committee to allow for Councillors to serve on the Performance Audit Committee to enable

Councillors to provide input towards Performance Management related matters.

The Audit Committee relies on the work done by the Performance Audit Committee in terms of the

Audit Committee charter and receives and considers reports presented to it by the Performance

Audit Committee at its scheduled meetings.

In carrying out its mandate, the Audit Committee and Performance Audit Committee must have a

good understanding of the strategic goals of the Municipality, strategic focus areas as outlined in

the Integrated Development Plan (IDP) and the Service Delivery Budget Implementation Plan

(SDBIP) and should:

Review and comment on compliance with statutory requirements and performance

management best practices and standards.

Review and comment on the alignment of the Integrated Development Plan, the Budget,

Service Delivery and Budget Implementation Plan and performance agreements.

Review and comment on relevance of indicators to ensure they are measureable and relate

to services performed by the Municipality.

Review compliance with in-year reporting requirements.

Review the quarterly performance reports submitted by internal audit.

Review and comment on the Municipality’s annual reports within the stipulated timeframes.

Review and comment on the Municipality's performance management system and make

recommendations for its improvement at least twice a year.

33

At least twice during a financial year submit an audit report to the municipal council

concerned.

In reviewing the municipality’s performance management system the Performance Audit Committee

focus on economy, efficiency, effectiveness and impact in so far as the key performance indicators

and performance targets set by the municipality are concerned.

The Internal Audit Executive within the office of the Municipal Manager coordinates and manages

the Internal Audit function within the municipality. A Panel of service providers (SekeleZabiso,

PriceWaterHouseCoopers and Deloitte & Touche) have been appointed to deliver the Internal Audit

function.

As part of their scope, auditing of the Performance Management System and Predetermined

Objectives are performed and reported on for each quarter in terms of the following internal audit

plan:

Table 7: Internal Audit Plan

Audit Project Focus Area

Review of Performance

Information - Quarter 1

Consistency in reporting;

Measurability and reliability;

Performance reports reviews;

Performance score verification (Municipal Manager and

Deputy Municipal Managers);

Compliance with relevant laws and regulations.

Review of Performance

Information - Quarter 2

Consistency in reporting;

Measurability and reliability;

Performance reports reviews;

Compliance with relevant laws and regulations

Review of Performance

Information - Quarter 3

Consistency in reporting;

Measurability and reliability;

Performance reports reviews;

Compliance with relevant laws and regulations

Review of Performance

Information - Quarter 4

(Annual Performance

Report)

Consistency in reporting;

Measurability and reliability;

Performance reports reviews;

Compliance with relevant laws and regulations

The Auditor General will perform the auditing of information submitted in this report, together with

all achievements reported in the Organisational Performance Management System Scorecard/Top

layer of the Service Delivery Budget Implementation Plan and the findings in their management

letters will be included in the Annual Report of 2018/2019. The information reported therefore will

be validated for relevance, reliability, completeness, accuracy and correctness.

34

Customer Satisfaction

The most recent Customer Satisfaction Survey was conducted in August 2017. The comprehensive

analysis feedback report was reported to Council on 17 October 2017 and is available in the

GroupWise document management system as well as on Council’s official website.

(www.umhlathuze.gov.za under the “Performance Management” link. The next Customer

Satisfaction Survey will be conducted in the 2019/2020 financial year once resources are available.

Annual Organisational Performance Information

Performance Monitoring underpins the Municipality’s Integrated Development Plan in terms of

reviewing progress regularly in achieving the priorities and delivering value for money services.

Early investigation into variances enables remedial action taken where appropriate.

The Annual Performance Report highlights the key performance measures included in the

Integrated Development Plan (IDP) review for the 2018/2019 financial year. These priority measures

constitute the Organisational Performance Scorecard (Including the Top Layer of the SDBIP on basic

service delivery targets) for 2018/2019.

The annual performance reporting on the 2018/2019 financial year has been completed and

reflected in the Organisational Performance Scorecard / Top Layer of Service Delivery Targets set in

the Service Delivery Budget Implementation Plan in a table format (as prescribed by KwaZulu Natal

Department of Corporate Governance and Traditional Affairs). The Top Layer Service Delivery

Budget Implementation Plan (SDBIP) consolidated service delivery targets as contemplated in

National Treasury Municipal Finance Management Act (MFMA) Circular 13 guide has been included

subsequently at mid-year following the review from the Auditor General during the 2017/2018

financial year auditing process.

The Draft Organisational Performance repot was presented to the Auditor General on 30 August

2019 for auditing together with the Annual Financial Statements (based on the interim results).

This Annual Performance Report (Tables - Top Layer of Service Delivery Targets set in the Service

Delivery Budget Implementation Plan) should be read in conjunction with the uMhlathuze Annual

Report, including the Annual Financial Statements as well as Auditor General Report on the Annual

Financial Statements and Performance on Predetermined Objectives Information for the 2018/2019

financial year.

On 30 June 2019, 84.48% of organisational performance targets (Top Layer of Service Delivery

Targets set in Service Delivery Budget Implementation Plan) have been met within 95% or exceeded

the annual target. An average percentage achievement of 108,6% against the annual key

performance targets set has been recorded, reflecting an improvement when compared with

2017/2018 financial year where 78.57% targets were met with an average percentage achievement

of 113.32%. Areas for improvement are reflected in the relevant column directly in the

Organisational Performance Scorecard / Top Layer of Service Delivery Targets for 2018/2019 (OPMS

35

Scorecard, including the Top Layer of Service Delivery Targets set in the Service Delivery Budget

Implementation Plan). Accountable managers have provided comments to put performance into

context and identified actions taken to address instances where under performance are reported.

The traffic light system used to report performance is as follow:

o Blue – Performance above 2% of the target

o Green – Performance meets target

o Amber – Performance within 5% of target

o Red – performance more than 5% adverse of target

In relation to the 2018/2019 year end performance results, the final results are analysed as follows:

o 84.48% of targets have been met within 95% or exceed against the 2018/2019

annual targets set, an improvement when compared to the 2017/2018 financial

year where 78.57% of targets were met within 95%

o 15.52% of 2018/2019 annual targets were not achieved, a decrease when

compared to 2017/2018 financial year where 21.43% of targets were not met.

Organisational priorities can be summarized as follows:

Table 8: The performance results for the organizational priorities

Traffic Light Status 2018/2019 2017/2018 2016/2017 2015/2016 2014/2015

Blue – Exceeded target 40% 36% 51% 49% 36%

Green – Met target 34% 32% 11% 11% 26%

Amber – Missed target by up

to 5%

10% 11% 16% 22% 21%

Red – Missed Target by more

than 5 %

16% 21% 22% 19% 17%

It is worth noting the impact of factors such as budget and staff retention whilst continuously

increased demand for services putting pressure on achievement of challenging targets. Ultimately

the municipality has achieved savings for the financial year, maintained good levels of service

delivery (as demonstrated through comparative information) and seen increased levels of

satisfaction across a number of services.

The following chart illustrates overall performance for the 2018/2019 financial year with

performance achieved during the four previous financial years, 2017/2018, 2016/2017, 2015/2016

and 2014/2015 financial years respectively, however taken into account the increase from 37

performance indicators reported in previous years to 58 performance indicators in 2017/2018 and

in 2018/2019 financial year.

36

Figure 13: Overall performance from 2014/2015 to 2018/2019

The following high-level dashboard score for all key performance indicators on the Organisational

Performance Scorecard 2018/2019 (Top Layer of Service Delivery Targets set in the Service Delivery

Budget Implementation Plan) (has been achieved on the 58 key performance indicators (KPI’s). The

Performance Management System analysis has scored the achievement of individual key

performance areas as follows:

Table 9: Achievement of individual key performance areas

ID Key Performance Area % of Targets

achieved

Average %

against target

KPA 1 Good Governance, Community Participation and

ward Committee Systems 100 136.0

KPA 2 Basic Service Delivery and Infrastructure

Development 83.8 103.2

KPA 3 Local Economic Development & Cross Cutting 100 137.4

KPA 4 Municipal Transformation and Institutional

Development 85.7 107.1

KPA 5 Financial Viability and Financial Management 50.0 90.6

1. Good Governance, Community Participation and Ward Committee Systems

(Average of 136.0% achieved in 2018/2019 on KPI’s against 131.2% achieved in 2017/2018)

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

2018/2019 2017/2018 2016/2017 2015/2016 2014/2015

TargetExceeded>102%

Target met100% to 102%

Target missedby 5% (95% to99.9%)

Target missedby > 5% (<95%)

37

The municipality improved in the area of community liaison and public communication and

exceeding the number of planned IDP and Budget roadshow meetings. The annual target for ward

committee management meetings and community meetings were exceeded by recording three-

hundred-and-ninety (390) ward committee management meetings held against the annual target of

three-hundred-and-forty (340). The total number of public meetings held was two-hundred-and-

eighty-five (285) against the annual target of one-hundred-and-thirty-six (136) meetings for the

year, therefore exceeded the target by far.

The IDP and Budget Roadshows, Ward Committee Management, Stakeholder Liaison and Council

meetings were successfully scheduled and convened in accordance with Council’s Standing Rules of

Order to ensure ongoing community involvement in municipal decision making.

2. Basic Service Delivery and Infrastructure Development

(Average 103.2% achieved in 2018/2019 on KPI’s against 112% achieved in 2017/2018)

Access to Domestic Water supply

The basic water service infrastructure improved during the financial year with a total of 105 905

(95.84%) of households connected to the water network within the municipal area. The target of

one-thousand (1 000) water-metering connection upgrades was achieved and exceeded since one-

thousand-one-hundred-and-eighteen (1118) new water meters were installed (yard connections),

contributing to an upgrade in water supply services.

Access to Domestic Sanitation services

A total of 89 444 (80.94%) of households do have access to basic sanitation services. Two-

thousand-three-hundred-and-forty-one (2 341) additional VIP’s were constructed, not meeting the

annual target of two-thousand-five-hundred (2 500). The annual target was based on the 5 year IDP

implementation plan, however the actual achievement resulted from the balance of the VIP's

constructed in terms of the final year of a three year contract and as result of an over achievement

in the previous financial year. The three years’ contract ended in this financial year and the SCM

process initiated for a new three year contract as from 2019/2020.

Access to Domestic Electricity supply

The municipality is delivering electricity supply to thirty-five-thousand-four hundred-and-thirty-

four (35 434) households and has connected one-hundred-and-eighteen (118) additional

households against the amended annual target of one-hundred-and-twenty-seven (127) to improve

access to basic electricity services in the municipal electricity licensed area. This target remains

reliant on consumers applying for this service. The mid-year emended annual target from one

hundred (100) to one-hundred-and-twenty-seven (127) new electrical domestic connections was

not achieved due to less applications received in 2019 as expected over the first two quarters of

2018/2019. The municipality is in a position to deal with all applications received.

Access to Domestic Solid Waste removal services

A total 77 028 (67.74%) of households is receiving a weekly solid waste (refuse) removal service.

Two-thousand-one-hundred-and-seventy-two (2 172) additional households are receiving this

38

service against the annual target of two-thousand (2 000) additional households, mainly in the rural

wards, therefore exceeding the annual target.

Public transport infrastructure services

In provision of public transport facilities and infrastructure in the urban and rural areas, sixty-three-

comma-four-five (63.45) kilometers of rural gravel roads were established (gravelling) against the

amended annual target from twenty-eight (28) kilometers to fifty-nine-comma-five-

nine (59.59) kilometers, therefore exceeding the annual target. The amended annual target of

three-hundred-and-twelve (312) kilometers for the maintenance of rural gravel roads (grading) was

over-achieved, since four-hundred-and-thirty-six-comma-nine (436.9) kilometers were graded. Due

to higher demands by the community, rural gravel roads were re-prioritized and funds re-allocated

on the maintenance budget to meet the community demands.

In terms of establishing of new tarred roads, the amended annual target of one-comma-eighty-

eight (1.88) kilometers was not achieved since zero-comma-five-seven-seven (0.577) kilometers

were achieved. The appointed contractor has underperformed during the last quarter due to

financial reasons, however the situation is now stable and the contractor has brought in additional

resources to improve progress. There has been a remarkable increase in progress since July 2019.

The rehabilitation of tarred roads was prioritized and amended at mid-year from eight (8)

kilometers to eighteen (18.6) kilometers based on the budget and project plans. Eighteen-comma-

six (18.6) kilometers of tarred roads were rehabilitated at mid-year. The amended annual target of

fifteen-thousand-three-hundred (15300) m² of tarred roads to be maintained, dealing with potholes

was slightly under achieved since fourteen-thousand-three-hundred-and-thirty-seven-comma-

seventy-two (14 337.72) m² of tarred roads were repaired. The target was set based on the baseline

and is dependent on the actual occurrence of potholes. The under achievement on the target

resulted from below average rainfall therefore lesser potholes formed and patching repaired.

Additional achievements on the Top Layer Service Delivery Budget Implementation Plan

consolidate performance indicators analysed as follows:

Water and wastewater services:

The target of 100% restoration of water supply for both Planned and Unplanned reticulation within

eight (8) hours was achieved throughout the financial year with an average restoration time of five-

comma-forty-four (5.44) hours.

The amended annual target for the reduction/maintaining of water losses at twenty-two (22) %

throughout the 2018/2019 financial year was not met. Water losses was at 23% in quarter one, 26%

in quarter two, 23% in quarter 3 and ended at 25% on 30 June 2019. Additional funds are provided

for in the 2019/2020 Capital Budget for additional control valves.

The quality of drinking water to comply with the South African national standards at latest SANS

241 (between ninety-five (95)% and ninety-nine (99)% has been achieved consistently throughout

the financial year with an average reported level of 99.3% at 30 June 2019.

39

The quality of wastewater compliance of ≥90% of cumulative risk ratings based on DWA standard

was achieved, since 90% on average has been achieved with an improvement from 87%

achievement in the 2017/2018 financial year. Process Audits were conducted in plants to determine

the process anomalies. Provision is made in 2019/2020 Capital Budget to address plants which

have the highest Non - Conformances.

Electrical Infrastructure:

The annual target of ninety (90)% execution of maintenance of electrical distribution network as per

maintenance plan and approved budget was over achieved, since ninety-eight-comma-two (98.2)%

realised on average throughout the 2018/2019 financial year.

An average of four percent (4%) non-technical electricity losses was achieved against the annual

target to be kept within eight percent (8%). An average of four percent (4%) non-technical

electricity losses was recorded for the 2018/2019 financial year. The achievement improved from

six-comma-eight percent (6.8%) recorded at the end of the 2017/2018 financial year.

An average of eighty-seven percent (87%) achievement to restore general street lighting faults

within seventy-two (72) hours (excluding cable faults or stolen equipment) was achieved against the

annual target of ninety percent (90%). Recourse challenges were experienced in quarter one has

since been addressed with a contractor been appointed after not achieving the target in quarter

one to attend to backlog and maintenance of Streetlights, where-after the ninety percent (90%)

target has been achieved consistently for the last three quarters.

Public transport facilities infrastructure:

The amended annual target of one-hundred-and-thirty-eight (138) kilometres of storm water open

drains to be maintained was over achieved due to more emphasis placed on street cleaning and

storm water pipe cleaning, rather than manholes (kerb inlets). Two-hundred-and-thirty-one-

comma-fifty-eight (231.58) kilometres of storm water open drains were achieved, however

compromised the annual target of three-thousand-and-seventy-six (3076) manholes (kerb inlets) to

be maintained by achieving one-thousand-four-hundred-and-seventy-eight (1478) manholes (kerb

inlets).

100% Maintenance on municipal owned railway sidings resulting from monthly inspections has

been achieved throughout all four quarters of the financial year.

Municipal Infrastructure:

In the IDP strategy to improve the reliability and service life of Municipal Infrastructure, facilities and

assets, the annual performance target to ensure eighty percent (80%) implementation of the

Electrical, Water and Sanitation and Roads Asset Management Plan, eighty-five percent (85%)

implementation was achievement at 30 June 2019 and completion of phase two will be by

30 September 2019.

The performance target to ensure one-hundred percent (100%) planned maintenance implemented

40

on Building and Structure as per Maintenance Plan and Budget allocation was successfully achieved

with one-hundred percent (100%) reported achievement consistently throughout the 2018/2019

financial year.

On the performance target for the replacement of Vehicles and Plant, Procurement of new plant in

terms of Capital Budget, one-hundred percent (100%) achievement was recorded against the

annual target of one-hundred percent (100%). The Fleet as ordered has been delivered, thus all fleet

ordered has been received.

The amended annual target of eighty-five percent (85%) fleet availability (including minor accident

damage that can be dealt with by workshops but excludes major accident repairs) was achieved

since an average of ninety-two percent (92%) was achieved during the 2018/2019 financial year.

3. Local Economic Development and Cross Cutting

(Average 137.4% achieved in 2018/2019 on KPI’s against 116.8% achieved in 2017/2018)

There were no targets for the construction of houses during 2018/2019 financial year due to the

fact the all projects were in the Implementation of bulk services Phase which is Empangeni IRDP,

Dumisane Makhaye Village Phase- 6 and 8 and Aquadene. For the Aquadene Housing Project the

installation of bulk water and bulk sewer services were completed.

A new IDP Strategy to deal with the transfer of Post Housing stock to qualifying

occupants/residents was included since 2017/2018 financial year. The initial annual target of three-

hundred-and-eighty-nine (389) housing units to be transferred was amended at mid-year to sixty

(60) housing units to be transferred, due to challenges experienced with beneficiaries outstanding

municipal accounts before the transfers could realise. The amended annual target was achieved

and exceeded since momentum has been obtained over the last two quarters by achieving the

transfer of one-hundred-and-nine (109) housing units. The implementing agent is proceeding with

work and it is trusted that the remainder of available housing stock will be met in the 2019/2020

financial year.

In terms of Promoting economic growth by providing skills empowerment to the unemployed, four-

hundred-and-sixty-four 464 unemployed youth benefitted through training in ten (10) technical

skills programmes presented in the 2018/2019 financial year.

The annual target for creating one-thousand-two-hundred-and-twenty-eight (1228) jobs through

EPWP incentives/projects were successfully achieved since one-thousand-five-hundred-and-

ten (1 510) jobs were created, therefore exceeding the target by far.

In terms of provision of recreational facilities and environmental services to the community, the

annual target to upgrade three (3) community facilities was met since three (3) were completed. The

amended annual target of five (5) sport fields (facilities) upgraded/constructed was met since

five (5) projects were completed. New projects are well underway for the new financial year.

In terms of development of sports and recreation programmes, the amended annual target for

five (5) mass recreational programmes be implemented was over achieved since five (5) Golden

41

Games programmes were completed at mid-year and additional one (1) mass sport and

recreational program was presented in quarter four with a total of six (6) programmes presented in

the financial year.

4. Municipal Transformation and Institutional Development

(Average 107.1 % achieved in 2018/2019 on KPI’s against 109.7% achieved in 2017/2018)

Human resources was able to meet the annual targets set for the recruitment and retention of staff

from designated employment equity groups and however still experiences a high level in staff

turnover. The municipality continues with the implementation of the Employment Equity Plan

during the 2019/2020 financial year.

In terms of the target set for employing female by the Municipality, twenty-two (22) females were

appointed against the amended annual target of twenty (20). A total of seven hundred-and-sixty-

three (763) females are employed by the municipality on 30 June 2019. This target cannot be

measured accumulatively as there are factors such as resignations, retirement, dismissal, death and

or ill health which affect the total number of gender employed.

There were fifty (50) youth appointed against the annual target of thirty-eight (38). A total of six-

hundred-and-seventy-seven (527 permanent and 150 temporary) youth were employed by the

municipality on 30 June 2019. No additional employees living with disability was appointed against

the annual target of four (4). A total of twenty-one (21) people living with disability are employed

by the municipality on 30 June 2019. The organisation to identify and categorize positions on the

organogram that can be filled with people with disability and in future advertise accordingly once

those positions become vacant.

A total of two-hundred-and-twenty-four (224) Workplace Skills training programmes was

conducted during the financial year against the annual target of one-hundred-and-twenty (120),

resulting in an over achievement. The percentage of the annual budget spent on the Workplace

Skills Plan was slightly under achieved due to one training session planned for the quarter four

which was cancelled since a training provider had to resolve issues with SARS and another training

session that had to be attended by an official during the quarter will now attend in the next

financial year and this affected the budget spent. The target to spend zero-comma-eight percent

(0.80%) of the operating budget was slightly over-achieved since zero-comma-eight-zero-five

percent (0.805%) was recorded.

5. Financial Viability and Financial Management

(Average 90.6 % achieved in 2018/2019 on KPI’s against 95.5% achieved in 2017/2018)

The reported achievements on the Financial Viability and Financial Management performance

indicator ratios as prescribed in the National General Performance Indicators and reflecting in the

Organisational performance Scorecard/ Top Layer of the SDBIP is based on the interim financial

results as at 30 June 2019 and will be updated in the Annual Performance Report once the

validation process by the AG Auditing process is finalised.

The municipality has performed fairly well under the financial viability and financial management

42

indicator. Over the past financial year the municipality has seen the economy being stretched and

this was affecting every citizen of the City. Taking into account the effects of the economy the City

has remained resilient in its quest of doing better in managing the public funds. Our internal

controls and shrewd financial discipline has placed the City in a good position of delivering services

to its consumers

The financial viability of the municipality is hereby reported based on the Interim results of the year

ended in 30 June 2019. Once the final figures have been determined the correct numbers will then

be published in the financial statements and the ratios will be recalculated.

The following are the interim results:

1. Debtors Collection rate : 99.71%

2. Collection rate in days: 43.48 days

3. Debt coverage ratio: 12.06

4. Cost coverage ratio: 2.11

5. Capital expenditure: 82%

6. Overall Grants Expenditure: 101%

Taking the above ratios into account it suffices to say the municipality has performed satisfactory

on capital expenditure at 82% (interim results) which is 12% less than the target of 95%. The

municipality has spent more than 101% of Capital Grants received from National Government. This

means that some projects which are multi-year and the progress is ahead of the actual funding.

Annual Organisational Performance Scorecard/ Top Layer Service Delivery Targets set in the Service

Delivery Budget Implementation Plan

The following table reflects the organisational performance targets and achievements as reflected in

the Integrated Development Plan, as well as the performance targets and achievements as reflected

in the Top Layer Service Delivery Targets set in the Service Delivery Budget Implementation Plan

consolidate performance indicators in relation to the achievements of the previous financial year as

well as reflecting corrective measures and targets to be taken in the 2018/2019 financial year in

cases of under achievement:

Section 46(1)(a) of the Municipal Systems Act (No. 32 of 2000) require the Municipality to reflect the

municipality’s, and any service provider’s, performance during the financial year reported on. The

uMhlathuze municipality is fortunate not to be reliant on external service providers in provision of

Basic Services, i.e. water, sanitation, solid waste removal services delivered by the district

municipality like most other local municipalities do.

Water distribution to the community by uMhlathuze is delivered through water purification by

WSSA and through purified water purchased from the Mhlathuze Water Board. Electricity is

distributed to communities by uMhlathuze Municipality in the municipal licensed area, through

purchasing electricity from ESKOM. Other Basic Services delivered by uMhlathuze Municipality

include, solid waste removal (refuse collection) and sanitation. The number of households served

43

with basic services as reflected in the table below reflects the municipality’s and any service

provider’s performance on delivering basic services during the financial year, also a comparison with

performance in the previous financial year as contemplated in section 46(1)(a) of the Municipal

Systems Act (No. 32 of 2000).

The information reflected below has been subjected to validation during the Internal Auditing

process as well as the Auditor General through their annual audit process (September to

November2019) after being reported to the Executive Committee and the Council on

28 August 2019, and the Performance Audit Committee on 29 August 2019 per item on RPT167436.

Reports are available for inspection.

Resulting from the Auditor General auditing process during 2017/2018, the additional Top Layer

SDBIP consolidated service delivery targets were subsequently included as part of the

Organisational Performance Scorecard at mid-year 2018/2019 review (reflected in a different font

colour – purple) in the table below. The reported achievements on the Financial Viability and

Financial Management key performance area with performance indicator ratios will be updated

once validated by the AG together with the audited Annual Financial Statements.

NOTE: The planned annual targets for 2019/2020 financial year, relating to the total number of

households provided with basic services, reflecting in the far right-hand column in the

organisational performance scorecard are based on the total of 110 503 households aligned to the

Statistics South Africa 2016 Survey.

Draft Annual Report 2018/2019 DMS 1359442

ORGANISATIONAL PERFORMANCE SCORECARD 2018/2019 AND TOP LAYER SERVICE DELIVERY TARGETS SET IN THE SERVICE DELIVERY BUDGET IMPLEMENTATION PLAN

Table 10: ORGANISATIONAL PERFORMANCE SCORECARD 2018/2019 AND TOP LAYER SERVICE DELIVERY TARGETS (Master table on DMS 1064996; 2018/2019 tab)

IDP

2017 –

2022

Ref Ou

tco

me

9

National KPA Objective Strategies Performance Indicator

Annual

Target

2017/2018

Actual

2017/2018

Baseline

Backlog

2018/2019 2019/2020

Annual Target

2018/2019

Amended

Annual Target

2018/2019

(mid-year)

Actual

2018/2019

30 June 2019

Corrective action for Annual target not met

/ remarks

% achieved

against

annual

target

Annual

Target

1.1.4.3

Dee

pen

dem

ocra

cy th

roug

h a

refin

ed

War

d C

omm

ittee

mod

el

Good

Governance

and Public

Participation

To promote a

municipal

governance

system that

enhances and

embraces the

system of

participatory

Governance

Facilitation of Stakeholder

and Community

participation in policy

making

Number of Public Meetings

(IDP/PMS meetings in Q1 and Q2),

(budget meetings in Q3 and Q4) 10 11 N/A 10 10 12

Annual target achieved and exceeded

120.0% 10

1.1.4.1 Facilitate the Functionality

of Ward Committees

through continuous

capacitation

Number of Ward Committee

Management meetings held 374 389 N/A 374 340 416

Annual target achieved and exceeded 122.4% 374

1.1.4.1 Number of community meetings

(per ward) 136 274 N/A 136 136 274

Annual target achieved and exceeded 201.5% 136

1.1.4.2

Development of a

Credible Integrated

Development plan within

prescribed legislative

guidelines

Date of IDP approval

2018/05/31 2018/05/29 N/A 2019/05/31 2019/05/31 2019/05/29

Annual target achieved ahead of the target

date

100% 2020/05/31

2.1.1.1

Impr

ovin

g ac

cess

to b

asic

ser

vice

s

Basic Service

Delivery and

Infra-structure

Development

To expand and

maintain

infrastructure in

order to improve

access to basic

services and

promote local

economic

development

Eradicate water services

backlogs through

provision of basic water

services

% Households with access to basic

water 94.91% 94.83% 5.17% 95.73% 95.73% 95.84%

Annual targets achieved and exceeded 100.1% 96.72%

2.1.1.1 Total number of Households with

access to potable water 104880 104787 7716 105787 105787 105905 100.1% 106880

2.1.1.1 Number of Households with house

water connection 47511 47511 N/A 47511 47511 47511 100.0% 44308

2.1.1.1

Number of Households with yard

water connection 54778 55276 7716 56276 56276 56394 100.2% 43260

2.1.1.1

Number of Households within

<200m RDP water connection 6623 7716 N/A 6716 6716 6598 102% 5716

2.1.1.1

Number of Water connections

upgraded to households (upgrade

service to yard connections)

1000 907 N/A 1000 1000 1118 112.3% 1000

2.1.1.1

Number of Households with access

to free water service

10323 11644 N/A 11644 11644 11528

Target partially achieved

The target is based on the baseline, however

achievement is dependent on consumer

consumption below 6kl and consumers

qualifying for free services

99.0% 11644

2.1.1.1

Ensure 100% restoration of water

supply for both Planned and

Unplanned reticulation within 8hrs

(Average)

100% 100% 0.00% 100% 100% 100%

Target achieved

The target of 100% restoration within 8 hours

achieved with an average time of 5.44 hours 100% 100%

IDP

2017 –

2022

Ref Ou

tco

me

9 National KPA Objective Strategies Performance Indicator

Annual

Target

2017/2018

Actual

2017/2018

Baseline

Backlog

2018/2019 2019/2020

Annual Target

2018/2019

Amended

Annual Target

2018/2019

(mid-year)

Actual

2018/2019

30 June 2019

Corrective action for Annual target not met

/ remarks

% achieved

against

annual

target

Annual

Target

2.1.1.1

Impr

ovin

g ac

cess

to b

asic

ser

vice

s

Basic Service

Delivery and

Infra-structure

Development

To expand and

maintain

infrastructure in

order to improve

access to basic

services and

promote local

economic

development

Eradicate water services

backlogs through

provision of basic water

services

Ensure the reduction of water

losses (cumulative) 25% 22% N/A 20% 22% 25%

Target not achieved

Additional funds are provided for in the

2019/2020 Capital Budget for additional

control valves.

88.0% 21%

2.1.1.1

Ensure that the quality of drinking

water comply with the South African

national standards at latest SANS

241 (between 95% and 99%)

99% 99.7% N/A 99% 99% 99.3%

Target achieved

100% >95%

2.1.1.3 Eradicate Sanitation

services backlogs through

provision of basic

sanitation services

% Households with access to

sanitation 77.73% 78.82% 21.18% 81.09% 81.09% 80.94%

Target partially achieved

The annual target was based on the 5 year

IDP implementation plan, however the actual

achievement resulted from the balance of the

VIP's constructed in terms of the final year of

a three year contract and as result of an over

achievement in the previous financial year.

The three years’ contract ended in this

financial year and the SCM process initiated

for a new three year contract as from

2019/2020.

99.8% 82.25%

2.1.1.3 Number of Household with access

to Sanitation 85892 87103 23400 89603 89603 89444 99.8% 90892

2.1.1.3

Number of new VIP toilets provided

to households (rural areas)

2500 3711 N/A 2500 2500 2341 93.6% 1800

2.1.1.3

Eradicate Sanitation

services backlogs through

provision of basic

sanitation services

Number of Households with access

to free sanitation (VIP's) service &

Indigent

46889 52514 N/A 51895 61246 61116

Target partially achieved.

Target dependant on the construction of VIP's 99.8% 57514

2.1.1.3

Wastewater Quality compliance of

≥90% as per Green Drop standard 90% 87% N/A 90% 90% 90%

Target achieved 100% >90%

2.1.1.2

Eradicate electricity

supply backlogs through

provision of basic

electricity supply services

Number of Households with access

to Electricity (Municipal Licenced

Area) 35301 35316 N/A 35396 35443 35434

Target partially achieved

The achievement is dependent on consumer

applications for electrical service 99.97% 35514

2.1.1.2

Number of new households

provided with new Electricity

connections (Municipal supply)

120 135 N/A 80 127 118 92.9% 80

2.1.1.2

Ensure execution of maintenance of

electrical distribution network as per

maintenance plan and approved

budget.

100% 87.2% 12.78% 90% 90% 98.24%

Target achieved

109.2% 85%

2.1.1.2 Ensure that non-technical electricity

losses are kept within 8% (average) 8% 6.8% N/A 8% 8% 4%

Target achieved 200% 8%

2.1.1.2

Ensure that 90% of general street

lighting faults are restored within 72

hours (excluding cable faults or

stolen equipment) (average)

90% 87.5% N/A 90% 90% 87%

Annual target partially achieved

A contractor has been appointed after not

achieving the target in quarter one to attend to

backlog and maintenance of Streetlights and

the 90% target has since been achieved

96.7% 90%

IDP

2017 –

2022

Ref Ou

tco

me

9 National KPA Objective Strategies Performance Indicator

Annual

Target

2017/2018

Actual

2017/2018

Baseline

Backlog

2018/2019 2019/2020

Annual Target

2018/2019

Amended

Annual Target

2018/2019

(mid-year)

Actual

2018/2019

30 June 2019

Corrective action for Annual target not met

/ remarks

% achieved

against

annual

target

Annual

Target

consistently for the last three quarters.

2.1.1.2

Number of Households with access

to free Electricity (Municipal Area) 509 473 N/A 473 492 558

Annual target achieved and exceeded 113.4% 509

2.1.1.4

Impr

ovin

g ac

cess

to b

asic

ser

vice

s

Basic Service

Delivery and

Infra-structure

Development

To expand and

maintain

infrastructure in

order to improve

access to basic

services and

promote local

economic

development

Provide a weekly

domestic solid waste

removal service to the

community

% Households with access to waste

disposal 67.29% 67.74% 32.26% 69.55% 69.55% 69.71%

Annual target achieved and exceeded 100.2% 69.55%

2.1.1.4 Number of Households with access

to waste disposal 74356 74856 35647 76856 76856 77028 100.2% 77856

2.1.1.4 Number of new Households with

access to waste disposal 1000 1500 N/A 2000 2000 2172 108.6% 2000

2.1.1.4 Number of Households with access

to free waste removal 30891 31578 N/A 33578 33573 33772

Annual target achieved and exceeded 100.6% 33578

2.1.1.5

Provision of public

transport infrastructure

facilities

Kilometres of rural gravel roads

established (gravelling) 26 83.82 N/A 26 59.59 63.45

Annual target achieved and exceeded 106.5% 10

2.1.1.5

Kilometres of rural gravel roads

maintained (grading) 600 390.162 N/A 600 312 436.90

Annual target achieved and exceeded 140.0% 312

2.1.1.5

Kilometres of tarred roads

established

3 1.761 N/A 3 1.88 0.577

Annual target not achieved

The contractor has underperformed during the

last quarter due to financial reasons, however

the situation is now stable and the contractor

has brought in additional resources to

improve progress.

There has been a remarkable increase in

progress since July 2019.

30.7% 3

2.1.1.5

Kilometres of tarred roads

rehabilitated 8 20.91 N/A 8 18.60 18.60

Annual amended annual target achieved at

mid-year based on the budget and project

plans

100% 8

2.1.1.5

m² of repairs to potholes and

patching on urban tarred roads

10800 21992.3 N/A 10800 15300 14 337.72

Annual target not achieved

The target was set based on the baseline and

is dependent on actual occurrence of

potholes. The below target resulted from

below average rainfall therefore lesser

potholes formed and patching repaired.

92.4% 15300

2.1.1.6

Provision of public

transport infrastructure

facilities

Kilometres of storm-water open

drains maintained 92 118.052 N/A 92 138 231.58

Annual target achieved and exceeded

169.0% 46

2.1.1.6

Number of manholes maintained

(Incl kerb inlets) 3076 1915 N/A 3076 3076 1478

Annual target not achieved

The majority of manholes especially in

Richards Bay were already clean. Contractors

52.2% 1538

IDP

2017 –

2022

Ref Ou

tco

me

9 National KPA Objective Strategies Performance Indicator

Annual

Target

2017/2018

Actual

2017/2018

Baseline

Backlog

2018/2019 2019/2020

Annual Target

2018/2019

Amended

Annual Target

2018/2019

(mid-year)

Actual

2018/2019

30 June 2019

Corrective action for Annual target not met

/ remarks

% achieved

against

annual

target

Annual

Target

had challenges with lifting equipment

therefore fewer manholes were cleaned.

Going forward the target is readjusted to

accommodate the actual resources capable

on site to achieve target.

2.1.1.5

Impr

ovin

g ac

cess

to b

asic

serv

ices

Basic Service

Delivery and

Infra-

structure

Development

To expand and

maintain

infrastructure in

order to improve

access to basic

services and

promote local

economic

development

Provision of public

transport infrastructure

facilities

100% Maintenance on municipal

owned railway sidings resulting

from monthly inspections

100% 100% N/A 100% 100% 100%

Annual target achieved

100% 100%

2.1.1.7

Strive to improve

reliability and service life

of Municipal

Infrastructure, facilities

and assets

Ensure implementation of approved

Asset Management Plan

(Cumulative)

Phase 2 (Water, Roads and

Electricity)

40% 40% 60% 80% 80% 85%

Annual target achieved

ALMIP Implementation phase two currently in

progress and 100% completion 106.25% 100%

2.1.1.7

Ensure planned maintenance

implemented on Building and

Structure as per Maintenance Plan

and Budget allocation

100% 100% N/A 100% 100% 100%

Annual target achieved

100% 100%

2.1.3.1

To ensure

effective Fleet

Management

Review and implement

Fleet Management Plan

Replacement of Vehicles and Plant,

Procurement of new plant in terms

of Capital Budget

100% 82% 12% 100% 100% 100%

Annual target achieved

The Fleet as ordered has been delivered, thus

all fleet ordered has been received.

100.0% 100%

2.1.3.1

Ensure 85% fleet availability (This

includes minor accident damage

that can be dealt with by

Workshops, but excludes major

accident repairs)(average)

85% 93% 7% 95% 85% 92%

Annual target achieved

108.32% 85%

3.4.1.2

Act

ions

sup

port

ive

of th

e hu

man

set

tlem

ent

outc

ome

Local

Economic

Development

To promote

social cohesion

Development of

community facilities

Number of sport field (facilities)

upgraded / constructed 10 10 N/A 5 5 5

Annual target achieved

100% 5

3.4.1.2

Number of community facilities i.e.

halls/museum/library/crèche

upgraded

2 2 N/A 3 3 3

Annual target achieved

100% 9

3.4.1.1

Development of sports

and recreation

programmes

Number of mass recreational

programmes implemented 9 12 N/A 4 5 6

Annual target achieved and exceeded

A total of 6 Mass Participation (Recreational)

Programmes were presented. 120% 5

IDP

2017 –

2022

Ref Ou

tco

me

9 National KPA Objective Strategies Performance Indicator

Annual

Target

2017/2018

Actual

2017/2018

Baseline

Backlog

2018/2019 2019/2020

Annual Target

2018/2019

Amended

Annual Target

2018/2019

(mid-year)

Actual

2018/2019

30 June 2019

Corrective action for Annual target not met

/ remarks

% achieved

against

annual

target

Annual

Target

3.1.5.3

Act

ions

sup

port

ive

of th

e hu

man

set

tlem

ent o

utco

me

Local

Economic

Development

To implement

and co-ordinate

Expanded

Public Works

Programme

(EPWP) in a

manner that

enhances skills

development

and optimizes

decent

employment

and

entrepreneur-

ship

Promoting economic

growth by providing skills

empowerment to the

unemployed

Number of technical skills training

provided 400 7 N/A 389 5 10

Annual target achieved and exceeded

464 unemployed youth benefitted through

training in technical skills programmes 200% 5

3.1.5.1

Promote economic growth

by successful

implementation of EPWP

community based projects

Number of jobs created (EPWP)

through the municipality’s LED

Initiatives/Capital Projects

(Cumulative quarterly)

4 1695 N/A 4 1228 1510

Annual target achieved and exceeded

122.96% 701

6.1.1.3

Cross Cutting To plan and

manage existing

and future

development

To review and

implementation of human

settlements sector plan

Number of Post 1994 Housing

stock transferred 1110 158 389 1228 60 109

Annual target achieved and exceeded

181.67%% 182

4.1.1.2

Impl

emen

t diff

eren

tiate

d ap

proa

ch to

Mun

icip

al fi

nanc

ing,

pla

nnin

g an

d su

ppor

t

Municipal

Institutional

Development

and

Transformation

To create an

appropriate

organisational

climate that will

attract and

ensure retention

of staff

Compliance with

Employment Equity Act

Number of women employed by the

municipality

(Number of new appointments)

776 768 N/A 768 + 18 20 22

Target achieved and exceeded

The annual target of 20 additional female to

be employed in strategic positions was

exceeded since 22 female were employed in

the financial year, however it should be noted

that the target was accumulative to the

baseline. During this financial year, there

were also employees who exited the

organisation due to resignations, dismissals,

death, ill health, and retirement

110% 20

4.1.1.2

Number of Youth employed by the

municipality

(Number of new appointments)

624 552 N/A 552 + 38 38 59

Target achieved and exceeded

The annual target of 38 youth to be employed

was exceeded since 50 youth were employed

in the financial year, However it should be

noted that the target was accumulative to the

baseline. It should be noted that during this

financial year, there were also employees

who exited the organisation due to

resignations, dismissals, death, ill health, and

retirement as well as employees birthdays,

turning 36 year of age and no longer

categorised as youth

155% 40

4.1.1.2

Number of people with Disability

employed by the municipality

(Target additional to baseline) 20 21 N/A 21 + 4 4 0

Target not achieved The organisation to

identify and categorize positions on the

organogram that can be filled with people with

disability and in future advertise accordingly

once one of those positions becomes vacant.

0% 2

IDP

2017 –

2022

Ref Ou

tco

me

9 National KPA Objective Strategies Performance Indicator

Annual

Target

2017/2018

Actual

2017/2018

Baseline

Backlog

2018/2019 2019/2020

Annual Target

2018/2019

Amended

Annual Target

2018/2019

(mid-year)

Actual

2018/2019

30 June 2019

Corrective action for Annual target not met

/ remarks

% achieved

against

annual

target

Annual

Target

4.1.1.4

Impl

emen

t diff

eren

tiate

d ap

proa

ch to

Mun

icip

al fi

nanc

ing,

pla

nnin

g an

d su

ppor

t

Municipal

Institutional

Development

and

Transformation

To create an

appropriate

organisational

climate that will

attract and

ensure retention

of staff

Improve Citizens Skills

levels and education

Workplace Skills training programs

conducted 100 173 N/A 120 120 224

Target achieved and exceeded

SAP ERP training for implementation in July

2019 resulted in exceeding the annual target

by far

187% 120

4.1.1.4

% Budget Spent on Workplace

Skills Plan (cumulative)

95% 95.48% N/A 95% 95% 92.00%

Target partially achieved

One training session planned for the quarter

four was cancelled as a Training Provider had

to resolve issues with SARS and another

training session that was to have been

attended by an official during the quarter will

now attend in the next financial year and this

affected the budget spent.

97% 95%

4.1.1.4 % Operating Budget spent on

implementing Workplace Skills Plan 0.80% 0.82% N/A 0.80% 0.80% 0.805%

Target achieved 101% 0.80%

4.1.1.2

To create an

appropriate

organisational

climate that will

attract and

ensure retention

of staff

Compliancy with

Employment Equity Act

Number of S57 Performance

Agreements signed (cumulative)

8 5 2 8 8 8

Target achieved

All Senior Managers posts are filled

100% 8

5.1.1.4

Impl

emen

t diff

eren

tiate

d ap

proa

ch to

Mun

icip

al fi

nanc

ing,

Pla

nnin

g a

nd s

uppo

rt

Financial

Viability and

Financial

Management

Compliance

with financial

legislation and

policies

Debt coverage ratio

(cumulative)

(Total operating revenue received -

operating grants) / debts service

payments (interest & redemption

due for the year) (x 1000)

(cumulative)

2 569 081 /

223 897

= 11.47

2 4 59 695 /

191 763

= 12.83

N/A

2 698 236 /

224 028

= 12.04

2 635 446 /

211 058

= 12.49

2 576 917 /

198 076

= 13.01

Annual target partially achieved within 96.5%

Based on the interim results 96.5%

415 341 /

2 588 485

= 16.5%

5.1.1.4

Outstanding service

debtors to revenue

Outstanding service debtors /

revenue actually received for

services

350 101 300/

2 334 008 664

= 0.15

393 220 937 /

2279023489

= 0.17

N/A

398 452 364 /

2 468 949 600

= 0.16

415 034 400 /

2 513 909 400

= 0.17

497 820 259 /

2 478 623 535

= 0.20

Target achieved

Based on the interim results 103% 0.20

5.1.1.4

Cost coverage ratio

(cumulative)

[(Cash and Cash Equivalents -

Unspent Conditional Grants -

Overdraft) + Short Term Investment

/ Monthly fixed operating

expenditure excluding

(Depreciation, Amortisation, and

Provision for Bad Debts,

Impairment and Loss on Disposal of

Assets]

499 248 /

206 251

= 2.42

446 217 /

206 251

= 2.16

N/A

638 788 /

217 827

= 2.93

525 850 793 /

220 293 500

= 2.39

450 354 224 /

208 220 906

= 2.16

Annual target not achieved.

Although the target was placed at 2.39, the

working capital policy requires the municipality

to be at 2. The norm is to be between 1-3 and

the interim results is at 2.11. 80.8%

370 841 /

232 855

= 1.59

5.2.1.6

Sustainable

Financial and

supply chain

Management

Percentage Capital

Budget spent on Capital

project i.t.o. IDP

Capital Budget amount spent on

Capital Projects / Total Capital

Budget x 100 = Percentage spent

YTD

495 192 345 /

521 255 100

= 95 %

468 600 846 /

570 504 800

= 82.14%

N/A

498 902 760 /

525 160 800

= 95%

557 011 980 /

586 328 400

= 95%

519 036 951 /

586 328 400

= 88.52%

Annual target not achieved

Based on the interim results 82%

567 656 300 /

597 533 000

=95%

LEGEND: KEY FOR PERFORMANCE INDICATORS:

Priority (National general KPI’s)

KZN CoGTA Excellence awards criteria

Additional /Departmental criteria

Additional Top layer SDBIP consolidated service delivery targets

Comments:

Access to electricity (New connections): The Quarterly targets and achievements for this KPI are dependent on the number on consumer applications received.

Free basic Service (Households with access to free electricity): The Quarterly targets and achievements for this KPI are dependent on the number on indigent applications received.

Total number of households: The annual targets for basic services as reflected in the approved IDP have been aligned with Stats SA (2016 Survey), targets relevant for the 2018/2019 financial year have been aligned to the total

number of 110 503 households to include the additional households of the four wards included from former Ntambanana municipality.

ACHIEVEMENTS: The annual achievements as reported in the Actual (June 2019) column has been audited by the Internal Auditors (Deloitte & Touche) and presented to the Auditor General together with the audited Annual

Financial Statements and AG Report for inclusion in the uMhlathuze 2018/2019 Annual Report as validated.

Additional Top Layer Service Delivery Targets set in the Service Delivery Budget Implementation Plan has been included at mid-year in line with NT MFMA Circular 13 on recommendation by the AG during the

2017/2018 APR audit

51

CHAPTER 3: ORGANISATIONAL DEVELOPMENT PERFORMANCE

Office of the Municipal Manager

NI MTHETHWA CHIEF OPERATIONS OFFICER

Introduction

Cities drive economic productivity and prosperity. In the last few years urbanization has advanced

so have global economic outputs, noticeable poverty reduction and improved social well-being.

However, many cities still face challenges of poor infrastructure, migration of poverty, pollution,

unemployment, congestion, segregation, sprawl and other unintended consequences. The City of

uMhlathuze has significantly improved service delivery and developed strategies to drive

economic growth, human capital development and access to basic services. Against this

backdrop, The Office of the Municipal Manager (OMM) remains the epicentre of driving city

strategy, innovation and service delivery excellence. In this regard, the city continues to receive

accolades for its achievements in service delivery and good governance.

The Office of the Municipal Manager is supported by the Chief Operations Officer, as well as

specialists responsible for integrated development planning, performance management, internal

audit, communications, and enterprise risk management. The strategic role of the OMM is to

ensure a coherent and integrated approach to service delivery by all departments and alignment

of programmes and projects in order to achieve maximum impact. Access to basic services by all

residents of the city remains a priority and this can be only be achieved through good

governance and financial prudence.

To this end, the following key achievements have been recorded in terms of basic service delivery:

1. Percentage of households with access to water is at 95.84%.

2. Percentage of households with access to sanitation is at 80.94%.

3. Percentage of households with access to electricity in areas serviced by the city is at 100%

excluding infills and Eskom supplied areas backlogs.

52

4. Percentage of households with access to solid waste removal is at 69.71%.

5. Number of post 1994 Housing stock transferred to qualifying households in the 2018/2019

financial year was 109 units.

6. Number of jobs created through EPWP in the 2018/2019 financial year was 1510.

7. The city received a Back to Basics Provincial Scoring of 93% for the 2018/2019 financial

year.

8. Capital expenditure for 2018/2019 was 88.52%

9. Overall achievement of Organizational Performance Scorecard is 84.48%.

International Relations

The National Development Plan (NDP) provides a more robust argument for South Africa to

enhance its regional and international position as reflected in the Department of International

Relations and Cooperation Strategic Plan 2010 - 2013. The NDP notes that the shift of global

power towards developing countries provides South Africa with an opportunity to maximise its

regional and international influence over the next 20-30 years. In pursuit of strategically locating

the City of uMhlathuze within the global cities network, a number of partnerships with strategic

international organisations and twinning arrangements with cities have been concluded to give

effect to this aspiration. This includes finalisation of membership with world organisations

responsible for a variety of programmes and projects that will add value to the City of

uMhlathuze going forward. The City of uMhlathuze is also part of the Maputo KwaZulu Natal

(MAPKZN) Trade Initiative aimed at stimulating cross border trade solutions that will enable

regional economic growth through linking current and new players to the trade value chain.

To this end, international relations is one of the catalysts that enable the municipality to gain

exceptional competitive advantage for economic growth, sustainable development and

development of best practices in a quest to improve the quality of life of all the people of the

City.

Accordingly, the table below highlights current membership status as well as City to City Twinning

Arrangements:

53

Table 11: City to City Twinning Arrangements

City to City Twinning Arrangements

City Country Focus Area Status

City of Kigali Rwanda

4th Industrial Revolution focusing on

Technology, Innovation and Waste

Management

Active

City of Curitiba Brazil Sustainable Development and Urban Planning Active

City of Rio de

Janeiro Brazil

Technical Operations Centre, City Safety,

Community Based Planning and Economic

Cooperation

Active

City of Milwaukee USA Economic Cooperation, Skills Development

and ICT

Active

Table 12: International Organisations Membership and Partnership

Organisation Location Status

United Cities and Local

Government (UCLG)

Barcelona - Spain Active

Global on Safer Cities Network New York (United Nations) - United States of

America

Active

Sister Cities International Washington DC - United States of America Active

ICLEI - Local Government for Sustainability

Bonn - Germany Active

World Network of Port Cities Le Havre - France Active

Smart City

South Africa Connect, the national broadband policy and the associated strategy and plan, gives

expression to South Africa’s vision in the National Development (NDP) of a seamless information

infrastructure by 2030 that will underpin a dynamic and connected vibrant information society

and a knowledge economy that is more inclusive, equitable and prosperous. As envisaged in the

NDP, at the core of this will be a widespread communication system that will be universally

accessible across the country at a cost and quality that meets the communication of citizens,

business and the public sector and provides access to the creation and consumption of a wide

54

range of converged applications and services required for effective economic and social

participation. Accordingly, the City of uMhlathuze has been approved for the implementation of

Phase 2 SA Connect Project focusing on extending broadband connectivity to rural nodes. Again,

the City of uMhlathuze has approximately 90km of fibre cable and established fourteen (14) free

public Wi-Fi Zones. Part of embracing the smart city concept, the city has also introduced

Enterprise Resource Planning (ERP) and asset life cycle management system during the 2018/19

financial year.

Knowledge Management

Knowledge Management, Exchange, Learning and Innovation initiatives are intended to promote

knowledge sharing activities, effective and efficient use of resources, while laying a strong

foundation on which to build a truly cross-cutting, City-wide learning and knowledge sharing

capability. Knowledge Management focuses on how organisations create, capture, measure, share

and make use of intangible assets is increasingly important in a fast-changing knowledge

economy. Organisations have always managed knowledge, even if they did not use the term

knowledge management.

During the 2018/19 financial year, the City of uMhlathuze continued with uploading of strategic

documents on the e-platform as part of on- going research in terms of local and international

best practices, journals, academic papers, models in order to create a repository of information as

part of shared e-platform to facilitate easy access to strategic information and promote culture of

continuous learning at both strategic and operational level.

The city also initiated and organised masterclasses as a mechanism to promote learning and

growth as well as knowledge exchange for management and staff in general including

benchmarking exercises. Masterclasses included M&E, Art of Facilitating Urban Strategic Planning

etc., and enhanced strategic engagement between the City of uMhlathuze and the University of

Zululand to promote knowledge exchange and innovation. Again, the city produced a concept

document on the City of uMhlathuze’s competitive advantage and critical success factor as part of

knowledge management and preservation.

55

Enhance strategic engagement between the City of uMhlathuze and the University of Zululand to

promote knowledge exchange and innovation

Integrated Development Planning

Business Function

The IDP entails processes through which a municipality, its constituencies, various sector

departments and interested and affected parties come together to prepare clear objectives

and strategies which serve to guide allocation and management of resources within the

municipal area of jurisdiction.

Key Deliverables

Our primary functions include:

- Facilitating and coordinating the development of a credible Integrated Development

Plan

- Facilitating and coordinating the development of the Corporate Plan

- Championing the Development of Sector Plans and Ward Profiles

- Ensuring alignment between the IDP and Budget and Performance Management

Systems

- In producing a credible IDP, the unit works tirelessly to ensure proper planning and

coordination. Various structures have been established to ensure proper co-

ordination; this includes the IDP Steering Committee.

- Our role is very important towards the growth of the city. If the IDP is not credible and

poorly implemented, service delivery can be compromised.

Performance Management

Business Function

56

The unit is responsible for ensuring that the municipality inter alia complies with the

Municipal Planning and Performance Management Regulations (2001), which stipulate that:

“ a municipality's performance management system entails a framework that describes and

represents how the municipality's cycle and processes of performance planning, monitoring,

measurement, review, reporting and improvement will be conducted, organised and managed,

including determining the roles of the different role-players”.

Key Deliverables

The Performance Management Unit coordinates and ensures timeous submission of required

performance monitoring and reporting through the Performance Audit Committee to the Council

and to various organs of state. This is perfomed through quarterly Organisational Performance

Report, quarterly Non-Financial Performance Targets in terms of the Service Delivery Budget

Implementation Plan, monthly Back to Basic's reporting to National CoGTA, quarterly Back to

Basic's reporting to Provincial CoGTA and the preparation of the annual Performance Report,

reflected in Chapter 2 of this report.

The unit is continuously studying improvement opportunities, participating in workshops with

various organs of state, attending of seminars and training sessions to stay abreast of

development. It provides guidelines and information on best practices on Performance

Management and ensures implementation and management thereof at the municipality to ensure

continuous improvement on service delivery to the community.

Internal Audit

Business Function

The Internal Audit Activity (IAA) of the municipality is established and regulated by section 165 of

the Municipal Finance Management Act No. 56 of 2003 (as amended) (MFMA) read together with

the MFMA Circular no. 65 of 2012 issued by the National Treasury and by the Municipal Systems

Act, No. 32 of 2000 (MSA) which provides for the establishment of the IAA so as to regulate the

function and to provide for matters incidental thereto.

57

Internal audit exists to provide independent objective assurance and consulting insights on the

effectiveness, economy and efficiency of the City of uMhlathuze’s governance, risk and controls in

order to create and drive innovation, responsiveness and sustainability of the service delivery

value chain.

Key Deliverables

The critical success factors and deliverables for an effective Internal Audit unit include:

- Three year rolling strategic and annual operational plans that is:

- Aligned to strategic objectives of the organisation.

- Covering the strategic risk areas facing the organisation

- Risk based – addresses the key risks areas/concerns of management.

- Prepared in consultation with management, the audit committee and external auditors

and other stakeholders.

- Matching assurance needs with available resources.

- Trusted advisors to management

- Promoting the sustenance of an effective internal audit function

- Promoting accountability

- Performing consulting activities in accordance to client needs

- Assisting management with the enhancement of the overall governance, risk and

internal control environments

- Conducting performance audits to derive value for money on operations

- Maintaining a Quality Assurance and Improvement Programme:

1. That covers all aspects of the internal audit activity.

2. The programme includes an evaluation of the IAA's conformance with the

definition of Internal Auditing and the Standards, and an evaluation of whether the

internal auditors apply the Code of Ethics.

3. The programme also assesses the efficiency and effectiveness of the internal audit

activity, and identifies opportunities for improvement.

58

Enterprise Risk Management

Enterprise Risk Management

Business Function

The City of uMhlathuze defines risk management as a holistic and smart approach to managing

threats to the achievement of objectives, as well as identifying and pursuing opportunities that

may improve achievability of objectives. We understand the importance of thinking ahead so that

services are delivered to our communities, on time and according to the highest standard. We are

of the belief that this thinking ahead can only be achieved through active, entrenched Enterprise

Risk Management.

Key Deliverables

The functional key performance areas of the Enterprise Risk Management unit include:

Enterprise Risk Management;

Project Risk Management;

Fraud Risk Management;

Business Continuity Management; and

Legal Compliance Risk Management

Enterprise Risk Management Committee (ERMC)

The City’s Risk Management Committee was established in terms of the Public Sector Risk

Management Framework. Its membership comprises the Municipal Manager, his 5 Deputy

Municipal Managers, The Chief Operations Officer, specialists in the high risk business areas of

the Municipality and it is chaired by an external Chairperson.

Subject specialists and risk owners are also invited on an ad hoc basis when required to present

on matters tabled before the committee.

The Risk Committee functions under an approved Charter and meets every quarter. The primary

objective of the committee is to assist the Municipal Manager and Council in discharging his/ its

accountability for risk management by reviewing the effectiveness of the Municipality's risk

management systems, practices and procedures, and providing recommendations for

improvement.

59

One of the main focuses of the committee is the quarterly review of the Strategic Risk Register

which ensures that risk treatment plans are strategically aligned and implemented within required

timeframes in order to address the mitigation of risk to acceptable levels in line with the

organisational policy and strategy.

Risk Management Structure

The Chief Risk Officer is supported by Risk Champions in each business unit who are appointed

by the Municipal Manager; and trained and equipped to co-ordinate risk management activities

within their departments.

Risk Champions meet quarterly with the Chief Risk Officer to table activities for the quarter,

challenges in the execution of duties as well as improvement measures, as well as emerging risks

specifically those which are cross cutting and require a high level of collaboration between

departments and business units.

The following is a depiction of the structure in which risk management activities are managed:

Figure 14: Management of Risk management activities

OVERSIGHT MPAC (Municipal Public Accounts Committee)

Council

Audit Committee

Enterprise Risk Management Committee

IMPLEMENTERS

Municipal Manager

Deputy Municipal

Managers

Heads of Sections

Management

Other officials

SUPPORT

Chief Risk Officer

Risk Champions

ASSURANCE PROVIDERS

Internal Audit

External Audit (AG)

ENABLERS: Policies and Guidelines (Risk Managament Policy and

Strategy, Fraud Prevention Policy, Business Continuity

Management Policy and Strategy

60

Risk Assessment

Our risk registers are living documents in which we record the threats and opportunities which

are present or may arise in the fulfilling of our mandate.

Risk Identification, Assessment and Analysis takes place on three different levels:

Operational: Each business unit maintains a register of its risks which is used as a tool to

monitor and manage threats to the achievement of the objectives of the business unit. Such

registers are updated monthly and are used as the basis for sectional meeting discussions as well

as for tracking of mitigations.

Strategic: The municipality has in place a register which contains an assessment of the risks

related to organisational objectives as set out in the Integrated Development Plan. Risk

assessment is done annually and the document is reviewed quarterly and when necessary in order

to ensure that changes in the various environments are taken into account.

Project: All projects with a value of R10million and above are required to have in

place project risk registers, which assists management to proactively manage any risks which may

threaten the successful completion of projects.

Communications, Marketing and Outdoor Advertising

Business Function

Communication is a key strategic service to ensure that information is widely accessible

within the public space, to engage citizens in conversation around critical issues and to

empower citizens to participate in not only shaping City of uMhlathuze policies and

bylaws but also in taking up opportunities that affect their lives.

Communication plays a central role to disseminate and cascade council resolutions and

programmes to relevant internal and external audiences through proper and formal

mediums of communication timeously.

61

The vision and the mission of the City of uMhlathuze ought to be carried to greater

heights through robust marketing and promotions in order to achieve its objectives of

being a port city offering a high quality of life for all its citizens through sustainable

development and inclusive economic growth.

The Brand uMhlathuze has gradually gained a lot of traction in KwaZulu-Natal and

Nationally through good performance and clean governance and as a result, it has been

listed in the Top 5 leading municipalities with good finances in the year 2019 by the

National Treasury, thus depicting itself as a preferred investment destination of choice.

Key Deliverables

Communication and Marketing therefore plays a central role in packaging all products,

services and Council programmes then sell them to different markets and audiences to

solicit strategic partnerships for investments, encourage public participation and

empower communities with information for them to make sound decisions on their lives.

The Communication Unit is the custodian of the brand: City of uMhlathuze. The unit has a

responsibility to promote, protect and develop the brand through different creative

programmes and awareness activations. The City of uMhlathuze demographics dictates

massive effective public relations and media campaigns in order to meet expectations,

communicate services and product offering, facilitate feedback from stakeholders, sector

groups, companies and multilingual and multi-racial communities living side by side. The

accurate audience segmentation contained in the Integrated Marketing and

Communication Strategy effectively makes it easy to achieve this goal.

The City took a gigantic step to review and approve the new Outdoor advertising By-laws

provide for the effective regulation of all outdoor advertising on municipal property to

ensure the health and safety of the public and to protect the environment. The new By-

law also allows for creativity brought about by new trends in this sector and considers the

aesthetics in the City of uMhlathuze.

62

Outdoor advertising is one of the most cost- effective forms of advertising on the market.

Billboards and other signs as well as banner programs are a great way to reach the

masses where they live, commute, work and socialise, costs far less, and are more

environmentally friendly than other mediums of advertising.

Outdoor advertising offers the perfect solution to reach these busy audiences while they

are on the move. Council's Outdoor Advertising By-laws are aligned with the South

African Manual for Outdoor Advertising Control (SAMOAC). They are designed to create

opportunities for the private sector to participate in a process whereby various types of

advertising media can be applied for in order to advertise, which also affords service

providers an opportunity to benefit financially. The By-laws make provision for

organisations to advertise their activities and to make the community aware of social,

religious and sport fund raising events. This gives Council the opportunity to generate

funds, but to also allow advertising in a formal way, whereby the public can be informed

of opportunities and events.

Achievements

The key highlights of Communications initiatives for the financial year include the

following:

Growth in the use of social media platforms: Facebook: 100 000; Twitter: 7000;

Instagram: 971 and Organisational Website internet hits: *****

2019 Recipients of the SALGA Award in the category of: Social Media and

Communication.

City of uMhlathuze shared the Best Practice on Communication and Social Media in

the National Communicator’s Forum in East London.

Featured on the internationally acclaimed South African corporate magazine:

TRANSFORM.

Featured on the National Local Government Magazine The Voice of Local Government.

63

CORPORATE SERVICES

SS MASONDO DEPUTY MUNICIPAL MANAGER CORPORATE SERVICES

Introduction

The Corporate Services Department is made of 3 divisions:

- Administration

- Human Resources; and

- Information and Communication Technology

The Department of Corporate Services exists to render a comprehensive, integrated human

resource and administration function, to enhance service delivery and the welfare of all

employees. This Department is regarded as a lifeline within the Municipality as it services the

entire organisation. It provides administrative support services to eacg and every department, as

well as Council’s structures/ committees. With the overall objective being to provide good

governance and public participation, ensuring an effective and efficient administration that

complies with its legal mandates. The Department also promotes and fosters sound internal and

external communication and creates an appropriate organisational climate that will attract and

ensure retention of staff.

Administration Section

The Administration Section provides strategic administrative support to both Council and the

administration of the municipality. The Section is made of four Units:

64

- Diverse Administration;

- Legal Services;

- Public Participation and Councillor Support and;

- Records Management.

Diverse Administration

Customer Service Desk, Call Centre and Switchboard

The Customer Service Desk attends to walk-in customers, applications for water and electricity

connections; distribution of tender documents, registration of new electricity meters and directing

customers to relevant officials. The Customer Service Desk also provides information to the

community relating to any interruption of service delivery matters, for example. Power outages,

water cuts and whereabouts of Government Departments.

Customer Service Desk

Table 13: Issues attended by the Customer Service Desk during 2018/2019:

MONTHS JUL

2018

AUG

2018

SEPT

2018

OCT

2018

NOV

2018

DEC

2018

JAN

2019

FEB

2019

MARCH

2019

APR

2019

MAY

2019

JUNE

2019

YEAR

TOTAL

New water

connections 26 24 21 28 56 14 33 29 13 14 18 61 337

New

electricity

connections

6 8 14 3 8 2 7 5 5 7 5 30 100

Tender

documents

issued

362 161 96 91 142 84 201 58 27 68 116 34 1 440

Water

faults 62 58 48 70 57 54 55 56 75 47 42 14 638

Electricity

faulty 39 36 29 48 39 32 32 28 28 26 38 10 385

General

Queries

Reports

33 33 24 25 36 19 23 19 16 19 25 30 302

65

Call Centre

The Call Centre operates 24 hours through a toll-free line, 0800 222 827 and deals mainly with

service delivery enquiries.

Table 14: Incidents processed for the reporting period:

MONTHS

JUL

20

18

AU

G 2

01

8

SEP

T 2

01

8

OC

T 2

01

8

NO

V 2

01

8

DEC

20

18

JAN

20

19

FEB

20

19

MA

RC

H 2

01

9

AP

RIL

20

19

MA

Y 2

01

9

JUN

20

19

YEAR

TOTAL

Incidents

logged

through Call

Centre

93

3

1 2

13

1 0

32

87

4

1 2

55

1 2

21

92

1

36

5

11

0

1 2

53

38

3

77

5

10

33

5

Switchboard

The Switchboard screens calls and transfer them to the various Departments/Sections. The hours of

operations for Switchboard are from 07h20 to 16h00.

Table 15: Calls processed through Switchboard for the reporting period:

MONTHS

JUL

20

18

AU

G 2

01

8

SEP

T 2

01

8

OC

T 2

01

8

NO

V 2

01

8

DEC

20

18

JAN

20

19

FEB

20

19

MA

RC

H 2

01

9

AP

R 2

01

9

MA

Y 2

01

9

JUN

20

19

YEAR

TOTAL

Incoming

Calls

93

50

4

96

02

6

83

84

1

10

1 6

23

95

46

0

60

84

0

85

45

2

88

17

3

86

04

1

87

54

4

87

02

9

76

76

9

1 0

42

30

2

Outgoing

Calls

13

9 9

32

14

4 1

43

12

9 7

14

14

9 2

71

14

7 8

98

96

44

9

13

7 0

99

13

7 9

36

13

3 0

91

13

2 6

53

13

6 9

15

12

3 2

46

1 6

08

34

7

Secretariat Services

Secretariat Services ensures production and presentation of properly structured reports for

consideration by Councillors on matters of community concern.

During the period under review, Council bade farewell to Councillor T P Mfeka who was replaced by

Councillor D E Mngomezulu. Following the National Elections in May 2019, Councillor R Mohlala of

the Economic Freedom Fighters resigned from Council to take up a position in National Parliament.

66

Councillor S Mabaso was appointed as Chairperson of the Municipal Public Accounts Committee

during this period.

During this period, 345 Council, Executive Committee, Portfolio Committee, Bid Committee and

other ad hoc meetings were held with a phenomenal total of 3 252 reports being considered by

Council after having been scrutinised by the relevant portfolio and other committees resulting in

resolutions being taken by the Executive Committee and Council. The following tables refer:

67

Table 16: Schedule of meetings for 2018/2019

COUNCIL

Ordinary &

Special EXCO BID PORTFOLIOS OTHER TOTAL

QUARTER 1

Meetings held 3 5 40 16 18 82

Agenda items 207 204 137 166 162 876

QUARTER 2

Meetings held 4 6 46 11 14 81

Agenda items 266 218 206 151 105 946

QUARTER 3

Meetings held 3 3 54 13 16 89

Agenda items 134 176 174 141 116 741

QUARTER 4

Meetings held 3 1 4 52 12 21 93

Agenda items 125 1 83 175 165 140 689

Total for the year

Meetings held 14 18 192 52 69 345

Agenda items 733 681 692 623 523 3 252

To this end, 788 overtime hours were worked and 41 110 kilometres travelled during the course

of delivering agendas.

This Unit is also responsible for the control of the Council Chamber Complex meeting venues and

Auditorium and Restaurant. During 2018/2019 2 471 meetings were accommodated in these

venues.

68

Figure 15: One of the Council meetings at the Bay Council Chambers

Table 17: Activities of Council Chamber Complex meeting venues for 2018/2019:

VENUE Quarter 1 Quarter 2 Quarter 3 Quarter 4 TOTAL

Committee room 1 53 75 46 73 247

Committee room 2 65 67 38 61 231

Committee room 3 80 94 88 96 358

Executive Committee room 87 89 81 95 352

Council Chambers 87 89 73 89 338

Auditorium 98 96 98 119 411

Restaurant 45 51 45 65 206

Lounge 28 19 19 25 91

Banquet Hall 65 55 58 59 237

TOTAL OF BOOKINGS

MANAGED

608 635 546 682

2 481

Legal Services

The Legal Services unit is structured around two areas of specialisation/expertise, namely (1)

Contracts, Conveyance and Business Licensing; and (2) Legislation, Litigation and Opinion, as

follows:

69

Contracts, Conveyancing and Business Licensing

Contracts typically include a negotiation process in which various terms to which each party must

abide, are stipulated. The negotiating process may take days, weeks or even months, depending

on the contract and the contractual responsibility of each party. Contracts can also include a

process of making changes or addendums to the agreement, should the obligations of the

parties require same.

The table below illustrates the agreements that were drafted and/or vetted for the period under

review.

Table 18: Drafted Agreements 2018/2019

Quarter 1 Quarter 2 Quarter 3 Quarter 4

Total

Lease Agreements 2 2 5 6 15

Lease agreements: Public Open Spaces 0 0 0 0 0

Encroachments 0 0 2 0 2

Sale Agreements 4 3 3 4 14

Service Level Agreements 55 57 25 50 187

Sale Agreements: Public Open Spaces 0 0 0 0 0

Memorandums of Understanding, Railway Facility

Agreements, Grant Funding Agreements, Servitude

Agreements, etc.

19 12 14 19

64

EEDBS Agreements 80 21 0 0 101

TOTAL 160 95 49 79 383

The Business Licences issued for the period under review is as follows:

70

Table 19: Business Licences issued

Quarter 1 Quarter 2 Quarter 3 Quarter 4 Total

Licences issued Item 1 (Foodstuff) 25 10 14 11 60

Licences issued Item 2 (Entertainment) 2 1 0 3 6

Total New Business Licenses Issued 27 11 14 14 66

Duplicate Licenses Issued 0 1 0 0 1

Renewals 0 46 318 14 378

Councillor Support and Public Participation

This unit is charged with ensuring that there is an organised and structured manner in which the

municipality communicates and/or consults the community on their developmental needs, so

that intervention programmes can target real community needs. The municipality has 34 Wards

with 340 Ward Committee Members aimed at maximising and strengthening public participation.

The same unit ensures that ward committee vacancies are filled by means of a bi-elections.

As part of Council commitment to motivate Ward Committee members, Council has a budget of

R4 million for the ward committee out of pocket expense or stipend. Ward Committees receive a

stipend of R1 344 per month with an increase of 7% every financial year.

Councillor Support

This unit focuses on the capacitation of Councillors. Various training, seminars/ workshops have

been conducted to equip the Councillors on better service delivery. Furniture was distributed to

Councillors with offices during May 2019. Councillors who do not have office space in their

respective wards arrangements are on hand to find alternative accommodation. The installation

of the ICT network connectivity in the form of fibre cable and wireless radios to Ward Councillor

offices was also completed thereby allowing Councillors to connect to the municipal systems and

internet.

71

Table 20: Training, Workshops and Conferences attended by Councillors

Date Training/workshop/

Conference

Venue Attendee

02-05 October 2018 IRMS Master Class Johannesburg

Councillor Thusi

05 December 2018 Economic Development

and Planning working group

Durban Councillor Sookroo

07-10 October 2018 AMEU Technical

Convention 2018

Pretoria Councillor M. Lourens

13,14, October 2018

Women in Leadership

Dialog

Durban ICC All women Councillors

30 October-02

November 2018

IMPSA Conference

Cape Town Councillor Cebekhulu

05 and 06 November

2018

SALGA KZN Symposium

Umhlanga

Durban

Councillor M. Lourens

5-6 November 2018 Job Evaluation and

Remuneration Symposium

Cape Town Councillor Mbonambi

06-11 November 2018 AIVP Regional Meeting

Indian Ocean

Reunion

Island

International

Councillor S.B. Mabaso

22-23 November ILGM 2018 Conference Port Elizabeth Councillor M. Lourens

29 November 2018 MPAC and Finance

Workshop

Richards Bay

Auditorium

All MPAC and Finance Portfolio

Committee Members

29 November 2018 Secondary Cities

Symposium

Durban Councillor Sookroo

72

30 November 2018 NUMPAC Richards Bay

Auditorium

Councillor S.B. Mabaso

06-10 December 2018

SALGA Games PMB Councillor S.B. Mabaso

Councillor D.F. Ntuli

Councillor D.J. Ndimande

Councillor K. Naidoo

Councillor S.P.Mthembu

Ward Committees

There are three-hundred and fourty (340) Ward Committee members elected on the

geographical spread of the wards. Siyabonga Mdluli provide the nuber of Ward Committee

meetings held.

Office of the Speaker

Handing over of photocopying machines to schools

On 25 October 2018, The Road Accident Fund (RAF), as part of its Corporate Social Investment

(CSI) in collaboration with the Municipality donated fifteen (15) second hand photocopying and

printing machines to various schools within the municipal area of jurisdiction. The official hand

over event was attended by school principals and Governing bodies to receive the machines.

With the assistance of Ward Councillors, various schools that were in need of facilities were

identified, also prioritising Councillors within the rural areas.

Figure 16: Handing over of photocopying machines to schools at eSikhaleni New Hall

73

Clean up Campaign

The Municipal political leadership led a clean up campaign on 01 October 2018 with various

municipal Departments taking part to perfom different tasks.

Figure 17: Clean up Campaign in Ward 2, Richards Bay CBD and surroundings

Offical opening of Mzuvele Shopping Centre

The Shopping Centre was officially opened on 31 November 2018 and it is named after the late

Inkosi Mzuvele Khoza of KwaBhejane. This is an initiative to grow the economy and to contribute

to the spatial transformation of ENseleni Township.

Figure 18: Official opening of Mzuvel Shopping Centre at eNseleni

74

Taking Council to the Community

The Council meeting of 24 April 20019 held at eSikhaleni TVET Sports Grounds was aimed at

affording members of the community an opportunity to observe how Council conducts its

business.

Figure 19: Taking Council to the Community at eSikhaleni TVET Sport Ground

Traditional Leadership and Councillor Engagement

The Speaker led an engagement of Councillors from Traditional areas with Traditional Leadership

on 22 February 2019 at Richards Bay Civic Centre. The session was aimd at assisting AmaKhosi,

Izinduna and Councillors to devise better mechanisms of working together in bringing the service

delivery to the community. The session was a success the attendance was very good.

Operation Sukuma Sakhe

Operation Sukuma Sakhe is a service delivery model for government that seeks to fast track and

intervene on issues identified at war room level in all wards. These cases may be either newly

reported or those that have been reported and unattended. Cases reported range from service

delivery, HIV/Aids, Tuberculosis (TB), Sexually Transmitted Illnesses (STIs) and social ills.

uMhlathuze Municipality has 34 War Rooms that seeks to address all social discourse. This can

only be done by ensuring that Council’s war rooms are fully functional and respond to reported

cases timeously by coordinating and reporting to relevant stakeholders. Mentors have been

allocated to all War rooms to support and strengthen functionality and address service delivery

issues. The Mentors have received initial training and plan to have on-going development to

assist them in playing a correct role of supporting War Rooms in uMhlathuze Municipality.

75

The Local Task Team and Local Aids Council had a full complement of meetings for the

2018/2019, 12 Local Task Team meetings and 4 Local Aids Council meetings and the following

programmes form part of strategies and partnerships seeking to address social ills, HIV/Aids, TB,

STIs and related illnesses.

Public Service Volunteer Week

This program was held on the week of 23 to 27 July 2018 where All Provincial Departments took

part not only in evaluating war room’s functionality but also in the 67 minutes program that

celebrates Nelson Mandela’s contribution in bettering the lives of all.

The following households were visited and the municipality came bearing gifts and provided

services that would improve the families’ lives.

Figure 20: Ward 7, Mkhize family receiving blankets and food parcels as well as painting of the house

Training

Traditional Health Practitioners (THP)

On 24 August 2018, KZN Wild Life conducted awareness training on plants to to the community

on procedures to obtain permits.

On 15 March 2019, the THP forum held a planning session for the development of their own

nursery. In the spirit of sustainable development KZN wildlife has partnered with uMhlathuze and

Umfolozi Traditional Healers Practitioners in developing a nursery for critical plants used by the

THP in their healing practice. This Nursery is located within uMhlathuze Municipality in the

eNseleni Nature Reserve. The nursery will serve as the pilot garden for planting and sustain

needed plants by the practice. The nursery was later visited.

76

Figure 21: Plant Awareness Training conducted by KZN Wildlife officials

Cancer

Training was conducted by health practitioners on 17 September 2018 to create awareness of

different types of cancer, their symptoms and treatment thereof.

Financial Management

The training was conducted by Old Mutual on 26 April 2019 whereby financial Advisers trained

the community on household financial management.

Ward 34 Job Preparedness Seminar

The War Room in Ward 34 hosted a 3 days seminar targeting final year students and unemployed

graduates (youth). The campaign responded to the Public Service week which identified that the

war room is poorly functional. Stakeholders participated: Department of Labour, Department of

Health, Red Cross, Old Mutual, Lifeline and Cancer Association. The Youth was addressed by the

Mayoress.

Figure 22: Team building activities Figure 23: Prostate Cancer screening

77

Figure 24: Community engagements on service delivery

Focus on Impact

A 2-day programme was held at eNseleni Community Hall on 7 and 8 August 2019. The purpose

of the programme was to engage the affected communities in identifying the causes of high

infection rate in the cluster of eNseleni and develop local solutions that will be effective in the

reduction of new infections. This programme was conducted in partnership with OTP and GCIS.

Figure 25: Participants from all sectors of Society in eNseleni Cluster

Phila Mama Campaign

The Mayoress’s Annual Campaign usually focuses on issues of women’s health and wellbeing.

Women face a number of health issues that are known and are discussed openly in all platforms

78

such as HIV, Cancer and Abuse. However, for the year under review the focus was on those issues

not commonly discussed, which have a big impact on women’s health and life in general such as

Miscarriage, Termination of pregnancy (Abortion), Traditional sexual enhancers (Qo), the use of

Traditional medicine during pregnancy and labour (Isihlambezo and incweba). All these issues

necessitated community engagement.

Figure 26: Audience being addressed by the Mayoress

uMhlathuze Civil Society Care Givers Kits Handover

Theme:

“City of uMhlathuze working together with Civil Society to track HIV patients that were excluded

by science”.

This is an Annual programme, held on 13 December 2018 Empangeni Civil Hall, whereby the

honourable Mayor as the Chairperson of the Local Aids Council, meets with Civil Society Forums

who work with communities who are affected and infected by HIV/AIDS to discuss their working

conditions and challenges. This is done so that the Office of the Mayor can be able to devise

possible and effective interventions.

By giving uMhlathuze civic society the Care Givers Kits that would assist in approximately 5 000

treatments in their fieldwork, shows not only compassion but commitment from uMhlathuze

Municipality.

Figure 27: Civil Society NGOs representatives receiving Caregivers Kits

79

“Women in Business”

This program was held on 22 November 2018 at eSikhaleni SAGM Church aimed at empowering

young, old and disabled women. The focus was on those that are willing to start their own

business or partnerships and those that are still looking for employment.

Phelophepha Health Train

The train visited Empangeni station for two weeks (Week 1-18 to 22 March 2019, Week 2-25 to

29 March 2019). This is an annual programme of Council in collaboration with Transnet which is

aimed at assisting the poorest of the poor by providing quick and efficient specialised medical

services whilst conducting outreach programmes that are a platform for skills development and

health screening of various sectors of the community inclusive of learners in schools, the young

and senior citizens.

The train provided the following services : Health clinic, Eye clinic, Dental clinic

Male Sexual Partners - Private/Public Mix: Initiation engagements

On 21 June 2019 a sectoral session was held at Brackenham, Richards Bay Hall. This is a Global

Fund programme, which forms part of the KZN Implementation Plan on HIV (2017-2022). The

programme is specially designed for men from age 25 and upwards. Research shows that these

men have relationships with Adolescent Girls and Young Women (AGYW).

Figure 28: Engagements between uMhlathuze Stakeholders Global Fund and Zululand and Abaqulusi representatives

80

Youth Day Drug Awareness Campaign

On 28 June 2019 the Local Aids Council (LAC), Lungelo Youth Development, The Abundant Life

Church (TALC) and Dr Yangarum went to the Richards Bay Taxi Rank to create awareness. The

event targeted all the youth that are homeless due to drug addiction. The main aim of the event

was to show the youth that there is life after drugs and to remind them that despite all the

challenges faced, society still cares for them. Health care services were provided by Life Line,

SANCA and the Department of Health and Dr Yangarum provided detox medication for free.

Figure 29: Youth Day, Drug Awareness Campaign

Special Programmes

Children

School Visits and Maths and Science Promotion Programme

81

The Maths and Science Promotion packages handed over to students included two hundred

(200) Scientific Calculators, Maths Sets and Oxford English Dictionaries. A total of ten (10) schools

benefited with each receiving twenty (20) Scientific Calculators, Maths Sets and Oxford English

Dictionaries.

Senior Citizens

i) Senior Citizens Conference

A conference was held on 31 July 2018 at Richards Bay Civic Centre in the Auditorium. The main

task of the Conference was to adopt Terms of Reference, make resolutions to contribute to the

formulation of the programme of action and elect new Senior Citizens Forum.

Programme of Action of the Forum include the following:

- Leading campaigns against Abuse of Senior Citizens

- Senior Citizens Christmas Party

- Crafts Promotion Programme

- Active Living (Sports)

ii) Golden Games and other programmes

The Forum also participates in the District and Provincial programmes.

iii) Senior Citizens Christmas Party

This programme provides beneficiaries with an opportunity to sit together and reflect on their

parenting responsibilities as well as relieve them from their usual responsibilities and assist them

save any social grant money that they may be receiving for school opening period. In addition

to lunch, groceries packs are handed over to the beneficiaries.

Figure 30: Handing over of Christmas food pack at Kwa-Hlanganani Hall on the 19 December 2018

82

People with Disabilities

The municipality has a functional Disability Forum.

i) DISSA Games

The Municipality continues to successfully participate in the DISSA Games. Sports codes played

included football, chess, morabaraba, netball, athletics 100 metres, wheelchair basketball, goal

Ball (mixed team or 1 gender) and table tennis. Local Games were held on 30 August 2018 at

Velden vlei Sports Complex whilst the District Games were held on 20 September 2018 at the

Veldenvlei Sports Commplex and the Provincial Games were held on 9 to 11 November 2018 at

KwaDukuza

ii) Business Workshop for People with Disabilities

The Business Workshop for People with Disabilities was held at the New Hall, eSikhaleni on

Tuesday 16 October 2018 from 9:00 to 15:30. The motive behind this programme was to boost

the existing entrepreneurship owned and managed by the disability sector through creating

relations between the sector and business development service providers. Based on the

information presented, the Council resolved that a consideration be given to establishing cluster

based Business Workshops for People with Disabilities in all clusters in order to maximise the

number of beneficiaries.

Religious Sector and Moral Regeneration Programmes

i) Religious Sector Conference

Religious Sector Conference was convened on 24 July 2018 at Ngwelezane Community Hall with

the intention of re-launching uMhlathuze Municipality Religious Sector Forum. A forum

comprising of leaders from various religious formations was elected to guide the municipality on

matters relating to religious sector and Moral Regeneration Programmes.

ii) Matric Exam Prayer

83

As part of their programme of action, a matric examination prayer was held at Kwa-Hlanganani

Hall on 11 October 2018. The aim of the prayer was to encourage learners to perform well

during their examination and be able to obtain entry requirements for tertiary education level.

The prayer was aimed at preparing learners, spiritually, mentally and physically to help them

overcome examination fever. Schools that participated included Amabuyeni, Sikhulangemfundo,

Esikhalenisenkosi, Thambolini, Khandleleni, Tisand, Matamzana, Mjabuliseni and Nqantayi High

School.

Community Outreach Programmes

Mandela Month Celebration

The Nelson Mandela Foundation at the launch of Mandela Day 2018 at the Constitutional Hill on

23 April 2018 reinforced that in honour of the legacy of the Father of the Nation, emphasis

should be placed on the culture of volunteerism. Each citizen globally was encouraged to take

action against poverty, inspire change and make every day a Mandela Day. Thus the whole world

celebrates 2018 Nelson Mandela Centenary under the slogan #ACTIONAGAINSTPOVERTY.

It was therefore deemed fit for the City of uMhlathuze to join the whole world in the efforts to

change the lives of the disadvantaged communities and the vulnerable groups.

House Handover to Khoza Family, Ward 34

The house was built with the assistance of Conrite through lobbying done by Ward Councillor

and Department of Infrastructure. Mama Khoza, an unemployed single parent stayed with eight

(8) children in a one-room house. The family is dependent on Social Grants for survival. The

house donated has four (4) rooms (2 beds, 1 kitchen and 1 dining room).

Figure 31: The handover done on 18 July 2018, old structure and the new structure:

Old House New House Handover by the Mayor

Visit to Mdletshe Family, Ward 15

84

Destitute Mdletshe family was identified in Ward 16 but building site was only found in Ward 15.

The family is headed by an elderly male who resides with his daughter and six other young

children. No one is employed and the family was assisted through donations lobbied for by the

Ward Councillor. The family also received groceries as part of poverty relief programme.

Figure 32: The new home for the Mdletshe Family:

Masibonisane Senior Citizens Club

The club started few years back under the leadership of Gogo Langa and operates from her

premises at House No 11742, Dumisani Makhaye Village at Ward 9. The group has fifteen (15)

members and they meet on Tuesdays and Thursdays to do craftwork. Ward Councillor had

already donated a sewing machine but the club was still short of fabric, beads, crochet thread

and needles and shoe soles. The intention was to assist the group establish and sustain this

poverty alleviation initiative.

Figure 33: Craft samples Figure 34: Handing over of equipment 18 July 2018

Handover of a House to Mkhize Family, Ward 6 at Mazimazana

Children aged 17 years, 14 years and 13 years lost their parents. A donation of a fully furnished

house with 2 bedrooms, 1 kitchen and 1 dining room and a bathroom was handed over to the

85

children on the site of their original home. They also received groceries donated by the funders

and this project was handed over on 18 July 2018.

Figure 35: Ward 6, Mazimazana handing over of house to Mkhize family:

HIV/AIDS Sector- Makhumbuzi Care Centre

Makhumbuzi Care Centre located at Matshana, Ward 24 in Ngwelezane was identified. Their

services included the following:

- Providing assistance and/or advice to those infected and affected by TB and HIV/

AIDS across Ngwelezane community.

- Assisting the extremely sick out-patients with taking their medication

- Providing free screening for those staying in the same house together with the

infected person to check if they have not acquired the bacteria by taking samples of

body fluids to the clinics for TB tests.

- The Centre also provides services such as HIV Counselling and Testing (HCT) as well as

Centralised Chronic Medicines Dispensing and Distribution (CCMDD) to about

approximately 600 people.

- Lastly, they monitor their assigned group of patients to try and avoid defaulting on

medication consumption and in case there are defaults, the centre becomes

responsible for tracking and locating such and assist by ensuring that each case

accordingly takes medication to completion.

As Makhumbuzi is a Non-Government Organisation they did not have enough funding to assist

them with basic requirements and building renovations

Figure 36: Below are before and after renovations photos:

86

Visit to Phathisanani Crèche- Project assigned to the Office of the Municipal Manager

Phathisanani Crèche at Bhucanana, Ward 33, Ntambanana cluster was identified with assistance

of the Manager responsible for service delivery at Ntambanana Office and Clr Xulu. The crèche

was donated to the community by Devine Life Organisation and it services seventy six (76)

children.

Figure 37: Below are before and after pictures of the facility:

87

Handover of a house to Gogo MaMthiyane at Ward 5, KwaMampolwane

A message was given to the Office of the Speaker beginning of July 2018 regarding the appalling

situation of the old woman and means were made to get donations from Liwa Trading but

needed further financial assistance in order to ensure proper execution of this project. The Road

Accident Fund also donated funds amounting to R20 000 towards finishing the house and

getting furniture and other items for Mama MaMthiyane to have a new start and dignified

golden years.

Figure 38: Below is the picture of the shack that Mama MaMthiyane stayed in and on the right is the new house built by Liwa Trading in partnership with the Road Accident Fund.

Human Rights and Awareness Campaign on Abuse of Children and People with Disabilities

The month of March is considered as a month to commemorate and acknowledge the rights

every person is entitled to as stipulated in the Constitution. Human Rights and Awareness

Campaign on Abuse of Children and People with Disabilities was held on 28 March 2019 at

Ngwelezane New Field, the target age group being from children aged 7 years to the elderly

groups. Ngwelezane had been reported to be one of the hot spots of rape cases relating to

young children and was contributing to the high statistics of children that were reported to be

sexually abused in the municipal area of jurisdiction, thus the continuation of the theme, “Abuse

Children is Abuse of Human Rights, My Body is My Body”.

88

The programme was well received with approximately 1 500 people attending. Stakeholders that

shared the platform included War-room representatives, IEC, Department of Social Development,

Department of Health, National Prosecuting Authority and South African Police Service. The

programme was also graced by the presence of municipal leadership and the keynote address

delivered by the Deputy Mayor. Fifteen (15) beneficiaries received wheelchairs and ten (10) were

given white canes as part of acknowledging the right to mobility for People with Disabilities.

Youth Development

Youth Summit

The Annual Youth Summit was convened on 12 October 2018 at the Richards Bay Civic Centre

Auditorium. The Honourable Mayor delivered the key note address. The Chairperson of the

Youth Council highlighted in his report the achievements since the last Youth Conference held on

18 and 19 October 2016.

Youth Council Executive Committee Strategic Session

The purpose of the strategic session was for the Youth Council to understand all internal

departments core functions. All presentations from internal departments were discussed through

a questions and answer session. The Youth Council also discussed the road-map for the launch

of Ward based Youth Council structures across the Municipality that will assist in dissemination of

municipal information designated for Young people.

Tertiary Education Financial Assistance for Members of the Community

The first phase of receiving applications ended on 25 January 2019 as mentioned in the

advertisement, checking if all needed documents are attached by applicants ended on 28 January

2019.

Table 21: Tertiary Institutions Registration Grant

GRANTS IN AID TERTIARY INSTITUTION REGISTRATION GRANTS

COURSES FUNDER NUMBER OF STUDENTS 18/19 AMOUNT DURATION

89

All Municipality 30 R6 000 each Once Off

Youth in School Career Expo

The municipality hosted a Youth in School Career Expo at Kwa-Hlanganani Hall. The objective of

the career expo was to assist learners to make informed decisions about their career choice at an

intermediate phase of their schooling. The targeted group of Learners were Grade 9 studying

and residing with the City of uMhlathuze.

The total participants were 700 learners from twenty five (25) Secondary Schools within the

jurisdiction of the uMhlathuze Municipality. Presentations were done by the following

Institutions / Departments i.e. Owen Sithole College, Umfolozi TVET College, University of

Zululand and the Department of Education (King Cetshwayo District).

Youth month celebration

The Youth Month Celebration was held on 22 June 2019, Umzuvukile Sports Ground (Nseleni).

The event purpose was to celebrate the commemoration of the Youth Month. This year month

coincides with the commemoration of 25 years of Freedom and Democracy. The day also

provided the opportunity to take stock of the strides that have been made in addressing issues

facing young people.

Figure 39: Youth Day celebrations at eNseleni Umzuvukile Sports Ground

Youth Month Celebration Games

The Youth month celebration games were held on 21 June 2019 at eSikhaleni TVET Sport

Grounds, as part of commemoration of the Youth month.

The u/20 players from Clusters 5 and 6 participated in the following games:

Netball : 203 players

90

Football : 198 players

Basketball : 10 players

Ingqathu : 07 players

Youth Month Street Dancers Competition

The aim of the event was to promote competitive competition within the local street dancers’

groups and unite the Youth through street dancing art. Street dance culture permeates in the

streets of urban, township, rural or on stages. Street dancers have always displayed the kind of

skill that leaves audiences amazed.

The event was held at Empangeni Town Hall 23 June 2019 with more than 20 groups

participating.

Training

Table 22: Candidates recruited and trained by the Youth Office

COURSE FUNDER NUMBER OF

CANDIDATES

TRAINED

STIPEND TRAINING

DATE

Driving

Leaners

Discretionary Grant Funding from the Chemical

Industries Education & Training Authority (CHIETA)

102 No July -

December

2018

Driving

License

Discretionary Grant Funding from the Chemical

Industries Education & Training Authority(CHIETA)

40 No January - June

2019

TOTAL 142

Records Management

91

Records Management adheres to the requirements contained in the National Archives and

Records Service Act 1996. Mail is received through various means, i.e. daily postal collections, via

email or facsimile and hand delivered. Before any of the mail can be attended to it is circulated to

the Deputy Municipal Manager: Corporate Services for allocation to various departments and

also circulated to the Municipal Manager to note and comment on.

The statistical information is reflected below:

Table 23 : The statistical information of records 2018/2019

Record Quarter 1 Quarter 2 Quarter 3 Quarter 4

Total

Incoming mail 861 800 728 735 3 124

Cheques received 5 6 9 10 30

Outgoing mail 3 776 4 484 4 244 6 534 1 9038

Faxes 584 521 369 373 1 847

E-mail 13 683 13 539 13 142 13 437 53 801

Total items handled 18 909 19 350 18 492 21 089 77 840

Access to Information

The following is the statistical information of Access to Information applications received in terms

of the Promotion of Access to Information Act 2 of 2000 (PAIA) for the reporting period 1 April

2018 to 31 March 2019 as per legislative requirement.

Table 24: Report in terms of Section 32 of PAIA

Reporting period : 1 April 2018 to 31 March 2019 Total Number Comments

(a) number of PAIA requests received 23 Of the 23 applications received 19

were standard applications

(b) number of requests granted in full 19

19 applications granted in full.

(b) (1) number of applications not finalised 2 Applicant has not paid required copy

costs and the other

92

application still being processed

(c) number of requests granted despite there

being a ground for refusal

nil nil

(d) number of requests:

(1)refused in full

nil

nil

(2) refused partially

nil

nil

(3) number of times a provision of PAIA

was relied on to refuse a request in

full/partially

1 Section 40 was invoked

(4) number of requests not granted due

to their being no record

1 Application transferred to

Department of Transport

(e) number of instances where the 30

day period to deal with a request was

extended

nil nil

(f) number of internal appeals:

(1)lodged with the relevant authority

nil nil

(2) number of cases where the requests

were granted as a result of an internal

appeal

nil nil

(g)number of internal appeals lodged on

account of a deemed refusal

nil nil

(h)number of applications to court on

the grounds that the internal appeal

was dismissed by the relevant authority

failing to give advice of its decision

during the timeframes stated in section

77(3)

nil nil

Comments including those relating to

implementation, application, requests,

or areas of the Act for which reforms

are recommended

nil nil

93

HUMAN RESOURCES MANAGEMENT SECTION

Human Resources Administration

The main function of the Human Resources Administration Unit is to develop policies, processes

and procedure guidelines regarding the uMhlathuze’s employee benefits, recruitment and

selection functions; Employee Records Management, Leave Management and Employment Equity

and ensure the correct implementation thereof. The division ensures compliance with the

Bargaining Council directives, Conditions of Service issues and the implementation of Council

Resolutions and application of legislative imperatives. HR Administration unit is further

responsible for facilitating, directing and maintaining the organisational recruitment and

appointment of employees.

Business function

Render provision and support to departments and employees;

Implementation of legislative imperatives;

Implementation of Collective Agreements on Conditions of Service;

Implementation of legislative imperatives;

Implement an intergraded recruitment and selection process;

Development of policies, procedures and guideline;

Ensure the uMhlathuze Municipality’s compliance with Employment Equity Act (EEA)

Create an enabling environment through various sensitisation programmes (i.e. Diversity

Management programmes);

Develop a workplace strategy in order to mainstream issues relating to gender, youth and

employees living with disabilities;

Exit Management;

Diversity Management;

Statutory reporting.

Achievements

- Employment of youth; a total number of 87 youth employed for the period 1 July

2018-30 June 2019;

- 127 new appointments were made;

- 65 internal promotions were made;

- Diversity Management;

- Long Service Awards Ceremony;

- Women’s day

- Heritage Day

- Medical Aid Expo

- Conducted HR administration road shows for Council employees;

94

Awareness campaigns

Figure 40: Diversity Programmes - Heritage day

Figure 41: Woman’s day Celebration;

Figure 42: People with disabilities workshop

Figure 43: Long Service Awards

95

Employee Assistance Programme (EAP)

Business Function

The aim of EAP section is early identification and intervention to assist employees with their

personal and work related concerns

EAP Awareness Programs and Campaigns

Employee Wellness Section (EAP) organized the TB Awareness and STI/ condom week Campaigns

in all depots jointly with the Occupational clinic and Peer Educators.

Spiritual Uplifting Programme (Prayer Day)

EAP (Employee wellness) section organized a successful prayer day where different pastors and

motivational speaker (pastor Zondo) were invited to motivate and pray for our organization/

employees before Easter holidays. The main objective was to revive hope and individual’s

spiritual connection with the super power and to request God’s protection for employees and

their families.

Figure 44: Wellness Day Event held on 25 October 2018 in eSikhaleni

96

Employee Wellness Day/s Event

This event is now an organisation’s milestone; employees are always looking forward to it yearly.

Employee wellness section (EAP) has conducted two successful sessions of the Health and

Wellness day/s, the program has proven to boost employees' morale and encourage them to live

a healthy Life. These were two sessions were conducted at eSikhaleni College and at Richards Bay

Sports Field.

Figure 45: Wellness Day Event held on 25th (eSikhaleni) and 26th of October 2018 in Richards Bay

Continuous Trauma Management

The EAP section has conducted four (4) successful Continuous trauma management training

programmes (Dates: 27 September 2019, 29 November 2018, 29 April 2019 and 21 June 2019) for

all council’s firefighters and lifeguards. The training taught attendees about symptoms of stress

and its management, trauma reactions and coping skills

Financial Education and Future Planning Sessions

EAP section has together with Standard bank conducted financial literacy workshops to all depots

from 1 July to 31 of August 2018 the main aim was to equip employees on financial management

and future planning. These sessions were very informative and well received by employees.

Figure 46: Wellness Day Event held on 25 (eSikhaleni) and 26 October 2018 in Richards Bay

97

Occupational Health and Safety (OHS)

Business Function

The unit aims to assist the City of uMhlathuze employees, employee’s representatives,

supervisors and management to manage the occupational risk exposure, as effectively as possible

to prevent and control occupational health and safety related incidents.

Key deliverables

- Identification of Occupational Risk exposures.

- Develop a management system that is OHSAS18001 compliant to manage the

occupational risk.

- Communicate the system and standards to all.

- Evaluate the effectiveness of the Occupational Health and Safety management

system.

Figure 47: In-House Safety Inductions, Workshops / Training during the 2018/2019 Financial Year

In House Safety Induction Number of Sessions Number of Employees

Contractors Safety Inductions 102 728

Permanent employee/ Temporary employee

/Interns/EPWP Safety Inductions 12 114

TOTALS 114 842

98

In House Safety Workshops or Training Number of Sessions Number of Employees

Contractor Management 2 19

OHS KPA for Management 1 10

Incident Management Process flow 2 14

Random Alcohol Testing 1 7

Investigation of Public Member Threaten

employees at work 1 9

Complaint (Investigation) 1 6

Intoxication Policy workshop for Councillors 1 37

OHS Incident Management Session 1 26

Intoxication/PPE/ IOD Procedure 1 109

PPE requirement s for Parks section 1 13

PPE Meeting 1 19

Risk Assessment Workshop 1 9

HR Roadshows

Importance of wearing PPE and budget

Random Alcohol testing

Functions of SHE Reps in the workplace

4 476

TOTALS 18 754

Table 25: OHS Compliance Training during the 2018/2019 Financial Year

Safety Training Number of Sessions Number of Employees

SHE Rep Training 2 62

OHS Act Legal Liability 3 75

TOTALS 5 137

OHS Compliance Inspections during the 2018/2019 Financial Year

Total number of OHS Compliance Inspections including contractors = 79 OHS inspections

conducted.

99

Table 26: SHE Committee meetings held during the 2018/2019 Financial Year

Department Number Meetings

held Target

OHS Management Review 2 2

City Development 2 4

Corporate Services 4 4

COMS - Waste Management 3 4

COMS - Emergency Services 2 4

COMS - Public Safety and Security 0 4

COMS - Horticulture and Cemetery 4 4

COMS - Arts and Culture 3 4

COMS - Sports and Recreation 1 4

Financial Services 2 4

Electrical and Energy Services 4 4

IS - Transport, Roads and Stormwater 3 4

IS - Engineering Support Services 0 4

IS - Water and Sanitation 4 4

TOTAL 34 54

Table 27: Occupational Hygiene Surveys conducted in 2018/2019 No Document Act Ref

1. Occupational Hygiene Risk Assessments for Water and Sanitation (Plumbing

Section). Section 8 of OHS Act

2. Ergonomic (Including employees with disabilities) Survey 2018. Facilities Regulations

3. Hazardous Chemical Substances Survey 2018. Hazardous CHEMICAL SUBSTANCE

REGULATIONS

4. Indoor Air Quality and Ventilation Survey (Richards Bay Civic Centre) 2018. eNVIRONMENTAL rEGULATIONS FOR

WORKPLACES

5. Illumination (Lighting) Survey 2018. eNVIRONMENTAL rEGULATIONS FOR

WORKPLACES

6. Hazardous Biological Agents (Richards Bay Civic Centre) Survey 2018. HAZARDOUS BIOLOGICAL AGENTS

REGULATIONS

100

Figure 48: Random Alcohol Testing

Figure 49: OHS Presentation at HR Road Shows

Training and Development

Business Function

The vision of the Training and Development Unit is to ensure that Council has a skilled and

capable workforce to support inclusive growth and development of skills within the City.

This is achieved through the co-ordination and provision of quality assured skills development

interventions for Council employees to ensure that they function at an optimal level thus

contributing to effective and efficient service delivery.

Skilling of Council employees, Interns and Councillors is achieved through relevant training

interventions and sustainable development initiatives that cascade skills to all disciplines on all

levels within the organisation.

The Workplace Skills Plan (WSP) serves as the strategic document that gives direction to training

and development within the Municipality. The WSP is aligned to the National Skills Development

Strategy, the Skills Development Act No. 97 of 1998 as well as the Skills Levies Act No. 09 of 1999.

101

The WSP and Annual Training Report are submitted annually to the LGSETA. Submission of these

reports ensures that the Municipality receives its Mandatory Grant.

Council also has a Bursary Scheme which provides for bursaries for its employees and their

children.

Key deliverables

Training Committee meetings

Council has a functional Training Committee that meets at least once on a quarterly basis. The

Training Committee is a permanent sub-committee of the Local Labour Forum (LLF). The Training

Committee meetings for the 2018/2019 financial year were held on; 26 September 2018, 03

December 2018, 29 March 2019 and 26 June 2019.

Project Management Training for the Training Committee members

The Training Committee members attended Project Management training that was conducted

from 20 February 2019 to 21 February 2019.

102

Table 28: 2018/2019 financial year Council employees training

Training Interventions for Employees Number of Sessions Number of Employees

Induction for new employees 8 90

Computer Induction 11 61

Emerging Managers Training 1 1

Drivers’ License Examiners Training 1 2

Introduction to Computers 1 1

Drivers Instructors Course 1 1

Health and Safety Induction Training 4 18

Customer Services Training 4 44

OHS Legal Liability Training 5 74

Call Centre Training 3 18

Audiometry Training 1 2

MS Excel Intermediate Training 1 12

Operate a Quad Bike Training for Lifeguards 1 7

Operate a Jet Ski Training for Lifeguards 1 6

HR Roadshow 4 476

Point Duty Practical Training 1 1

Operate a 10 Ton Roller Training 2 10

Bricklaying skills Programme Training 1 20

Spirometry Training 1 2

Operate a TLB Training (Novice) 1 4

Operate a Cherry Picker (Novice) 6 37

Operate a Compactor Truck Training 1 14

Conflict Management Training (for employees

with disabilities)

1 21

War Room training for Mentors 1 38

Operate a Tree / Pole Pruner / Chainsaw 2 21

103

Training

Batho Pele Workshop 2 40

Conflict Management Training 1 26

Plumbers Trade Test Preparation Training 1 6

Plumbing Trade Test 3 10

Communication Skills Training 2 13

SAP Navigation Training 19 251

MSCOA Training 2 14

MFMP Training 7 8

Total Quality Management Training (TQM) 1 15

LLF Training for the Council Management

Component (SALGA)

1 18

Customer Care for Waste Management 5 91

HR Policies Workshop 1 10

GAPSKILL Training (CoGTA) 1 2

Operate a Lawnmower / Push mower Training 3 25

Swimming pool Award Training for Lifeguards 1 10

Beaches Lifeguard Training for Lifeguards 1 10

Municipal Leaders Liaison and Stakeholder

Management Training (SALGA)

1 1

Continuous Trauma Management Training 3 66

Business Administration Skills Training 4 39

Safety Representative Training 2 62

Combined Assurance Workshop 1 20

Policy Workshop 2 23

Project Management Skills Programme 1 10

Project Management Learnership (Funded by

LGSETA)

2 10

104

Asset Management Training 11 155

Training for Traffic Wardens 1 14

Financial Literacy Training 4 199

Supervisory Training 1 23

First Aid Training (Level 2) 2 25

SAP Training (Various Modules) 65 708

TOTAL NUMBER OF SESSIONS

TOTAL NUMBER OF EMPLOYEES TRAINED IN ALL

SESSIONS

215

2885

Table 29: 2018/2019 financial year Councillors training

Training Interventions for Councillors Number of Sessions Number of Councillors

Policy Workshop for Councillors 2 80

Certificate in Public Administration (UKZN) 5 19

War Room Mentors Training 1 8

LLF Training for Council Management

Component (SALGA)

1 2

MFMP Training 7 1

Assessor Training 1 1

Risk Management Capacity Building (CoGTA)

(MPAC Chair)

1 1

TOTAL NUMBER OF SESSIONS

TOTAL NUMBER OF COUNCILLORS TRAINED IN

ALL SESSIONS

18 112

Work Integrated Learning (WIL) (In-Service Training / Internships)

During the 2018/2019 financial year, seventy - five (75) learners were placed on the WIL

Programme at Council.

A Memorandum of Agreement (MOA) was signed between the City of uMhlathuze and the

Umfolozi TVET College wherein Umfolozi TVET College provided off-the-job training and Council

105

provided in-service training for learners to be able to graduate. Council offered in-service training

to learners from various tertiary Institutions.

Graduate Development Programme

Council hosted a Graduate Development Programme that was funded by National Treasury

through the Infrastructure and Skills Development Grant (ISDG). Graduates were placed in the

various Departments at the Municipality. These graduates were paid a salary that was funded by

National Treasury. The objective of this programme was to enable the graduates to work towards

registration with their relevant Statutory Professional bodies by providing them with the relevant

training as well as workplace experience required for registration.

Achievements

Council’s Skills Development Facilitator (SDF) is a member of the Provincial Skills Development

Forum (PSDF), a member of the Provincial Leadership of the LGSETA SDF Forum and the District

Human Resource Development Forum.

Twenty municipal officials were trained on a Bricklaying Skills Programme. The training was

funded by the Construction SETA (CETA) through Discretionary Grant Funding. The aim of this

artisan training was to enhance the bricklaying skills of Council employees to improve service

delivery for all wards within the City of uMhlathuze.

Ten municipal officials were trained on a Project Management Learnership Programme. The

training was funded by the Local Government SETA (LGSETA) through Discretionary Grant

Funding. The aim of this Programme was to enhance the project management skills of Council

employees to improve service delivery for all wards within the City of uMhlathuze.

Municipal officials were trained on a Business Administration Skills Programme. The training was

funded by the Services SETA through Discretionary Grant Funding. The aim of this training was to

enhance the administration skills of Council employees to improve service delivery for all wards

within the City of uMhlathuze.

Council was awarded Discretionary Grant (DG) Funding from the Chemical SETA (CHIETA) to train

unemployed members of the Community and Municipal officials on artisan development

programmes. The Grant shall be paid to the Municipality in tranches as per the CHIETA DG Policy.

106

Figure 50: Council Bursary Reciepients Graduates

Ms MV Mobeng Ms Mandy Govender (Jeremiah)

Above: Municipal official (Ms MV Mobeng) from the Department: City Development graduated in

June 2019 at the Durban International Convention Centre as she completed her Bachelor of

Science Honours Degree in Environmental Management from UNISA. Ms Mandy Govender

(Jeremiah) from the Office of the Municipal Manager completed a BA Degree in Communication

Science in 2018 and graduated in June 2019 at Durban International Convention Centre from

UNISA. Both Ms Mobeng & Mrs Govender are recipients of a Council Bursary.

Figure 51: Conflict Management Training Programme

Above: Twenty - one (21) Municipal officials attended a Conflict Management Training

Programme which took place on 22 May 2019. This training was specifically for employees with

disabilities, as recommended by Council’s Employment Equity Forum.

107

Labour Relations

Business Function

The core function of the section is to maintain and control the application of specific procedures

associated with sound industrial relations climate by attending to and guiding disciplinary and

grievance processes, reporting to specific Committees on the status of the function, capacitating

Management Representatives on the application and interpretation of policies and agreements,

in the long run thus ensuring proper function of Council.

All disciplinary processes and grievances are dealt with in terms of the Collective Agreement

agreed upon by SALGA and organised labour, therefore ensure that the organisation complies

with same.

Labour Relations co-ordinates frequent meetings with Organised Labour to keep abreast with

internal labour related developments within the sector and in particular the Municipality and

facilitate LLF meetings.

Key deliverables

Disciplinary matters

There were 43 disciplinary hearings that took place during this financial year. The following

schedule indicates the type of misconduct committed, incidents of such misconducts and

sanctions emitted. Cases that were postponed and or pending do not feature in the table below.

Table 30: 2018/2019 Disciplinary Hearings

Type Of misconduct No of

cases

No of

withdrawal

s

Written

warning

Final

written

warning

Dismissal

Absenteeism 15 1 3 5

Abscondment 0 0 1 2

Dishonesty/FRAUD 3 0 3 4

Insubordination 8 0 1 2

Negligence 2 0 0 2 0

Sexual Harassment 0 0 0 0 0

Intoxication On Duty 1 0

108

Driving Council’s M/V under the influence of

Alcohol

1 0

Poor Performance 2 0

Theft

1 0

Use Of Council Property Without Authorization 5

Incapacity 2 1 referred

to back to

the clinic

Assault 1 0

Damage to Property 1 0 0 0 0

Disputes referred to the SALGBC and CCMA cases

There was a total of 4 CCMA and 19 Bargaining Council disputes in the reporting period.

Table 31: 2018/2019 Dispute Referrals

NATURE OF DISPUTE NUMBERS SETTLED DISMISSED OUTCOME PENDING

REFERRED

TO

LABOUR

COURT

Interpretation and application

of a collective agreement

2 0 1 0 1 0

Unfair Labour Practice 8 3 0 0 5 0

Unfair Dismissal 9 0 0 0 7 3

Section 198B of LRA (Temp

Workers)

2 2 0 0 0 0

Section 198B of LRA (EPWP) 03 1 0 2 0

Training

Four (4) trainings were conducted this year.

- LLF members: 25 September 2018

- Training for Supervisors: 04 December 2018

- Shop Steward Training: 07 March 2019

109

- Conflict Management Training: 28 June 2019

Figure 52: Conflict Management Training for Supervisors

Organisational Development and Change Management

Business Function

This unit aims at improving the overall effectiveness of the organisation through planned,

comprehensive and systematic processes. It involves intervening in the processes, structure and

culture of the organisation. There is a strong emphasis on organisational behaviour, human

resource development and organisational change.

Organisational Development

Organisational design refers to the process of aligning the structure of the organisation with its

objectives, with the ultimate aim of improving the efficiency and effectiveness of the

organisation.

Change Management

Managing change and transition cuts across all the phases of the organisational structuring

process. It includes communication and consultation with staff and key stakeholders. How

effectively change and transition are managed has a major impact on the final outcome of the

organisational structuring processes or any other changes the organisation have to deal with.

Other functions include:

- Productivity and continuous improvement

- Efficiency studies;

110

- Utilisation studies;

- Feasibility studies.

- Business process re-engineering

- Cause and effect studies;

- Process analysis;

- Process improvement and workflow analysis.

- Job evaluation facilitation.

Key deliverables

The unit focused on maintenance of the organisational structure and providing inputs into

initiatives of departments to improve on productivity and work relations.

The Organisational Development Unit also focused on the finalisation of job descriptions of all

the posts in the Municipality, in order to be in a state of readiness for job evaluation. uMhlathuze

Municipality accepted the challenge of hosting the job evaluation of Region 4. A Job Evaluation

Committee was established with uMhlathuze Municipality representation on the Job Evaluation

Committee and the Provincial Audit Committee. Members of the Job Evaluation Committee were

trained. The Committee has commenced with job evaluation and the uMhlathuze Municipality

job descriptions have been submitted for evaluation. Job descriptions have been evaluated and

submitted for auditing.

Council has appointed a Service Provider to conduct a Work Study Investigation, targeting all

departments, with the aim of ensuring that the organisational structure is aligned with the

Integrated Development Plan and making recommendations with regard to improving

productivity. The investigation is completed and the recommendations will be studied and

implemented.

111

INFORMATION AND COMMUNICATION TECHNOLOGY SECTION

The Information and Communication Technology (ICT) is central to municipal operations as it

cuts across various functions and processes, therefore an important strategic partner in the

packaging and delivery of efficient services to the public. As a business enabler, it is paramount

that the ICT evolves with the times and industry trends to ensure continuous support of business

objectives in the new era of the Fourth Industrial Revolution (4IR) and beyond.

In line with the industry developments, the need to improve decision making process and the

legislative requirements from the upper spheres of government, the municipality is in the final

stages of implementing a SAP Enterprise Resource Planning Solution (ERP) earmarked to replace

legacy, fragmented systems.

The ICT Section of the uMhlathuze Municipality is divided into three sub-sections as follows:

- ICT Governance;

- ICT Service Delivery; and

- ICT Infrastructure

Key deliverables

ICT Governance

ICT Governance is responsible for supporting the Head of ICT in providing strategic direction to

the ICT Section, to ensure that ICT goals are aligned with business objectives, compliance with

legislation, risks are managed appropriately and the ICT resources are used appropriately. It also

ensures proper planning and management of all ICT related projects for the City of uMhlathuze.

As part of good governance, the ICT is required to develop and implement sound security

policies to ensure that municipal information assets are adequately protected, including the

systems and data.

ICT Service Delivery

The ICT Service Delivery sub-section is responsible for the establishment, management and

maintenance of a functional and efficient ICT Service Desk and desktop environment, provision of

ICT support services to the end-users. Planning, installation, upgrade and relocation of end-user

equipment including office automation fall within the scope of this sub-section. It is also

responsible for the preparation and maintenance of the ICT Asset Register

112

ICT Infrastructure

There are two focus areas of the ICT Infrastructure sub-section:

Network Connectivity Infrastructure that entails planning, installation, configuration, support,

maintenance and management of all voice and data network devices including access control

and CCTV cameras. This sub-section is also responsible for cabling including fibre and wireless

radio network infrastructure.

Server Infrastructure including planning, installation, configuration, support, maintenance and

management of all servers within the City of uMhlathuze, including backup, DRP (Disaster

Recovery Plan) and ICT Service Continuity planning, implementation, testing, and maintenance.

Achievements

ICT Section performance is continuously assessed on a monthly, quarterly and yearly basis by

various structures as follows:

ICT Steering Committee: The committee meets monthly to assess the performance of the ICT

Section and consider the submitted reports. In line with the approved committee terms of

reference and best practice, the members of the committee are the Municipal Manager, Deputy

Municipal Managers and the Head of ICT. Officials representing various departments with ICT

interests sit in the committee.

Corporate Services Portfolio: The ICT Section also submits performance and progress reports to

the Corporate Services Portfolio Committee.

Internal Audit Services: The ICT Section is audited on a regular basis, and submits performance

reports to the Internal Audit Services as and when required.

Audit Committee: On a quarterly basis, the ICT Section submits progress reports to the Audit

Committee with special focus on the progress in addressing the critical issues listed the ICT Risk

register.

Auditor General: The ICT Section is audited annually by the Auditor General to ensure compliance

with relevant legislation, frameworks, best practice and performance targets thereof.

As part of ICT performance monitoring and reporting on achievements, a comprehensive report

is tabled on a monthly basis at relevant Council Committees. The following graph shows the

number of requests logged with the ICT Service Desk for the reporting period:

113

Figure 53: Total number of ICT support requests logged

The chart below shows the number of support requests per department logged with the ICT

Service Desk for the reporting period:

Figure 54: Total ICT support requests per department (July 2018 to June 2019)

KEY

CS = Corporate Services COMMS = Community Services EES = Electrical and Energy Services

IS = Infrastructure Services FS = Financial Services CD = City Development

MM = Municipal Manager EXT = External

890

988

851

956

870

588

928 973

916

831 801

780

450

550

650

750

850

950

1050

20.00%

18.79%

9.13% 17.67%

25.17%

7.41% 1.81% 0.02%

CS COMMS EES IS FS CD MM EXT

114

Key ICT Projects completed during 2018/2019

- Installation and commissioning of Free Public Wifi Solution Phase Two (2)

- Supply and delivery of Cisco network devices;

- CAT6 Cable upgrade for Richards Bay Civic Centre and Alton Municipal Offices;

- Supply and delivery of ICT desktop equipment.

- Online Clinic System Implementation

115

COMMUNITY SERVICES

T MATHEBULA DEPUTY MUNICIPAL MANAGER COMMUNITY SERVICES

Introduction

The Department of Community Services is one of the largest and most dynamic departments in

the Municipality. It is divided into the following Sections:

Public Health and Emergency Services

- Waste Management Services

- Air Quality Services

- Occupational Clinic Services

- Fire and Rescue and Disaster Management

Recreational and Environmental Services

- Sport and Recreational

- Parks Services

- Arts and Culture

Public Safety and Security

- Traffic Services

- Security Service

This Department may be easily referred to its main responsibilities as environmental protection,

community safety, emergency services, beatification, social cohesion, promotion of learning and

sport participation.

116

Regarding activities linked to Environment Protection, waste management functions as expected.

These are handled and addressed as expected. Coupled with this service is a steadily growing

recycle programme, currently standing at 35% of total waste collected.

The cherry on top is the programme of education awareness against littering and its effect on the

environment.

Pollution Control is also functioning as expected. This service involves proactive inspection of

companies that are or have the potential to be heavy polluters. Preventive systems are put in

place or arrangements are made to manage the times and ways of releasing potential pollutants.

The Municipality’s strength lies in being able to measure a series of particular pollutants and

therefore manage the levels of pollution. Air quality stations are installed in this regard.

Parks Management is functioning. Room exists for improvement of ways of functioning. This

chain of work involves cleaning, pruning trees and cutting grass at community parks.

These activities are extended to road verges and municipal open spaces. Post attendance of the

Salzburg Global Seminar, consideration is being made to introduce programming in parks.

Linked to parks are cemeteries. These are well-kept, as expected. A process is unfolding of

exploring alternative methods of burial, while preparing the soil for extended underground burial.

With regard to Emergency Services, fire and rescue functions have gone as planned. Coupled

with this function is the programme of training learner fire fighters.

Importantly also, the Department does proactive inspection of potentially hazardous industries

and prescribe changes where required. There is still much work to be done in the area of disaster

management. In the meantime, a building has been bought to be used as a disaster

management centre. Also a service provider has been appointed to carry out assessments and

compile a Level 2 Disaster Management Plan. Once completed, the Plan will inform future

interventions.

Various mass participation and sport development programmes are being implemented. The

Department is being challenged to redefine ‘development’ and diversify sporting codes.

Processes are underway to address this.

Various arts and culture programmes are also being implemented, some in collaboration with

King Cetshwayo District Municipality and the KwaZulu-Natal Department of Arts and Culture.

There is an opportunity to expand on issues of heritage.

In terms of Community Safety, Traffic Law Enforcement got off to a slow start; low statistics, low

income. In a quest to facilitate change, the position of Manager: Traffic and Licencing Services

was filed. Concurrently, a contract was secured for camera law enforcement NB. Fourteen

Wardens were sent for formal training, certification and registration.

Another major development in Traffic Law enforcement was the implementation of the

programme for impounding of animals. Implementation is in line with the KwaZulu-Natal Pound

Act. The impounding process was preceded by seeking authorization from the Council and two

cycles of public consultation – first with the broad public then specifically with owners of animals.

117

Services under Motor-vehicle and driver licencing and testing are running as expected (learner

licence tests, renewal of driver and motor-vehicle licences, issuing of permits.

This year also came with the appointment of Manager: Security. This has been helpful in that it

has brought focused attention to matters related to Security.

The area focuses on VIP Protection and management of five external security companies. Primary

challenges have been in the areas of burglaries and theft. Systems are put in place to mitigate

these.

For all the discussions above, specific statistical information is shared below.

PUBLIC HEALTH AND EMERGENCY SERVICES SECTION

WASTE MANAGEMENT SERVICES

“PRESERVING HEALTHLY ENVIRONMENT”

The Constitution of South Africa Act No.108 of 1996 provides the foundation for

environmental regulation and policy in South Africa. The rights to environmental protection

and to live in an environment that is not harmful to health or well-being is set out in the bill

of right (Section 24 of chapter2).

The National Environment Management Waste Act, 2008 (Act No.59 of 2008) entrenches best

practices in waste management into law, replacing the out dated and unsustainable “end of

pipe” approach with a new, and more environmentally responsible and sustainable approach.

The Act deals with minimising the consumption of natural resources , waste generation,

recycling, waste disposal, prevention of pollution, promotion of waste services, remedying

land degradation, and achieving integrated waste management reporting and planning.

The Waste Management Section is divided into the following two sub-divisions:

- Waste Management: Operations

- Waste Management: Administration and Compliance

Key deliverables

The main responsibilities of Waste Management Services are as follows,

- Collection and disposal of waste within the jurisdiction of the City of uMhlathuze.

- Waste minimization re-use and recycling of waste

- Skips management and eradication of illegal dumping and,

- Community education and awareness campaigns.

118

All the above objectives conform to the legal framework, through adopted Integrated Waste

Management Plan (IWMP). The IWMP underwent a second review this year, in line with the

Integrated Development Plan (IDP). Council adoption of the second review of the IWMP was

on 29 May 2019 (RPT 166872).

Strategic goals

The eight strategic goals around which the uMhlathuze Waste Management Strategy in line

with National Waste Management Strategy (NWMS), are structured as follows:

- Goal 1: Promote waste minimisation, re-use, recycling and recovery of waste.

- Goal 2: Ensure the effective and efficient delivery of waste services.

- Goal 3: Grow the contribution of the waste sector to the green economy

- Goal 4: Ensure that people are aware of the impact of waste on their health, well-being

and the environment.

- Goal 5: Achieve integrated waste management planning.

- Goal 6: Ensure sound budgeting and financial management for waste services.

- Goal 7: Provide measures to remediate contaminated land.

- Goal 8: Establish effective compliance with and enforcement of the Waste Act.

In terms of City of uMhlathuze Waste Management the following has been achieved, in line

with its strategic goals,

GOAL 1: PROMOTE WASTE MINIMISATION, RE-USE, RECYCLING AND RECOVERY OF

WASTE

The main aim of this goal is to implement the Basic Waste Management Hierarchy as shown

below, that clearly promotes that waste must either be Reduced, Re-used, Recycled or

Recovered (in a form of energy) prior to taking the last option of disposing waste in the

landfill.

Figure 55: Basic Waste Management Hierarchy

Figure: Basic Waste Management Hierarchy

119

Recycling programs are the main programs currently promoted by the City to achieve this

goal, through separation of waste from source (Kerb Recycling), establishment of Material

Recovery Facilities (MRFs), increasing the recycling rate through individuals and buyback

centres. Table 32: The following table shows breakdown of waste recycled versus waste landfilled in this year.

Currently the City is standing at a recycling rate of 32%; which is higher than the City’s set

annual target of 22% and 25% legislative target set from the National Waste Management

Strategy (2011).

Figure 56: Recycling Rate achieved in 2018/2019 Financial Year

All this further contributes to Goal 3, which deals with contribution of waste sector to green

economy. Under this goal, several programs have been implemented in order to minimise

waste that goes to the landfill site.

The local community is benefiting in both ways, by the fact that the environmental risk has

been reduced and also by taking part in green economy.

Separation at source in our Municipality (Kerb Recycling)

5

15

25

35

Quarter 1 Quarter 2 Quarter 3 Quarter 4

Pe

rce

nta

ge (

%)

Recycling Rate per Quarter (2018/2019)

Waste Minimization %

Annual Target %

QUARTER RECYCLABLES IN TONS % WASTE MINIMIZATION

Q1 Jul – Sept 3 851 316 35.24

Q2 Oct – Dec 4 059 591 31.64

Q3 Jan – Mar 3 582 549 30.90

Q4 Apr – June 3 540 227 30.16

Total 15 033 683 31.99 % Average

120

There are a number of Kerb Recycling initiatives that are conducted within the City in order

to ensure separation of waste at source. Currently, there are five areas where kerb recycling is

taking place, which are Meerensee, Birdswood, Felixton, Brackenham and Esikhaleni J1

Section.

In these areas each household receives a yellow plastic bag, supplied by the Municipality, to

separately store recyclables and utilize trolley bin for unrecyclable domestic waste.

Recyclables from Meerensee and Birdswood are collected by a Municipal bush truck to

Material Recovery Facilities on the day of removal for further sorting.

Recyclables from Felixton, Brackenham and Esikhaleni J1 Section are collected by three

separate waste-preneurs with their own transport, on the day of removal and sort at their

recycling sites.

Establishment of Material Recovery Facilities (MRF)

This is in line with the National Waste Management Strategy, the Waste Act and the City of

uMhlathuze Waste Management Strategy. The fact that waste is a resource with an

unlimited potential for job creation cannot be over emphasised. It bears noting that a

platform for role players in recycling is not fairly levelled. Therefore, the Municipality has

constructed Material Recovery Facilities which are already operating and contributing to the

community directly. These include Mzingazi Material Recovery Facility, eNseleni Material

Recovery Facility and Alton Material Recovery Facility. In addition to these, Ntambanana

Material Recovery Facility has been recently renovated and will also be utilized as an

establishment to sort waste and promote recycling initiatives within the area.

uMzingazi Material Recovery Facility (MRF)

Local waste-preneurs that were already recycling in the area are utilizing the site. These

waste-preneurs have been on site since September 2017 and the municipality is providing

them with recyclables from the kerb recycling system in addition to their own collections.

In the new financial year there are plans to install a small shelter that will assist waste-

preneurs on site to work better in all weather conditions within the region.

121

Figure 57: Material Recovery Facility in Mzingazi (Ward 1) where local waste-preneurs are sorting recyclable waste

Enseleni Material Recovery Facility (MRF)

Local women waste-preneurs from the area are currently working on site. The municipality is

also providing them with recyclables from the kerb recycling system in addition to their own

collections.

In the new financial year there are plans to upgrade the site through the addition of a

concrete ramp and a small shelter. The ramp will allow the municipality to deliver community

skips to the site to sort and collect recyclable waste prior to waste being transported to the

landfill. This will assist the local waste-preneurs increase their tonnages and will greatly assist

the municipality in minimizing tonnages going to the landfill.

Figure 58: Material Recovery Facility in Nseleni (Ward 7) where local women waste-preneurs are sorting recyclable waste.

Alton Material Recovery Facility (MRF) and Transfer Station

This site is used for both material recovery and also as a transfer station, and this helps to

decrease the level of illegal dumping of green waste in the Richards Bay area. This transfer

station only takes green waste but from time to time some community members bring

general domestic waste, tyres and some building materials, which is prohibited.

Separation of waste recyclables at Alton MRF is on-going and this site is also attached to the

municipality kerb recycling system that contributes to job creation.

122

Figure 59 : Material Recovery Facility in Alton (Ward 2) where Wildlands Trust is sorting recyclable

waste and where Green Waste is collected.

Ntambanana Material Recovery Facility (MRF) and Transfer Station

The site was inherited from Ntambanana Municipality; however, it could not serve the

surrounding community due to structural defects. Hence, the site has been recently

renovated during this year and will be fully operational from the next year.

Figure 60: Newly renovated Material Recovery Facility in Ntambanana (Ward 33).

GOAL 2: ENSURE THE EFFECTIVE AND EFFICIENT DELIVERY OF WASTE SERVICES

123

In terms of the Constitution the responsibility for waste management functions is to be

devolved to the lowest level of government.

It is therefore clear that the City is responsible for Waste Management within its area of

jurisdiction and has to ensure proper handling of waste thus promoting a healthy

environment.

Figure : Waste removal services map showing the area of operation within the City

Figure 61 : Map Depicting area of Waste Removal in the City

Daily operations activities that are achieving this goal include the following,

- Weekly waste collection from all 34 wards, both rural and urban, and dispose

thereof at King Cetshwayo Regional Landfill site;

- Street cleaning, litter picking and public ablution facilities cleaning in public

convenience areas daily;

- Emptying and cleaning around community and business skips;

- Regular clearing of illegal dumping hotspots

The following are the means of refuse removal within the City ranging from urban areas,

sermi urban and rural areas,

- Business Skips

- Trolley Bins (households)

- Communal Skips and,

- Civil Education

124

This year all the operational services stated above were achieved, including the extension of

services to rural areas through the distribution of skips and educational awareness

campaigns. 70 % (77028) on average of the total households (110 503) had access to the

basic weekly solid waste removal service at the end of June 2019. This number is considered

very conservative considering that each household is allocated a volume of 240 L of refuse

per week, of which in rural areas community doesn’t generate a lot of waste for disposal.

The project which was initiated for conducting door to door campaigns with the rural

households continued throughout the a year without major interruptions. The objective is to

improve the hygienic conditions of rural households as well as the standard of living. This

rendered a tangible interaction between rural householders and the Municipality.

Solid waste removal services were provided on weekly basis to all serviced communities. The

scheduled routes for each community were successfully completed during this reporting

period with limited interruptions.

Figure 62: First Picture is a Rotopress Refuse Truck and second picture is a Compactor Refuse Truck.

The rural areas covered by the Rural Service Team as mentioned above comprises of the

following:

- Community road from eSikhaleni to eMpembeni

- Mkhobosa community roads including Madukwini, behind TVET College and Zimele

- Road from UVS, Mandlankala to eSikhaleni

- Gobandlovu Road to Maholoholo

- Birdswood to Mandlazini Taxi Rank including all Mandlazini internal community roads

- Mzingazi Village community streets and Taxi Rank

- Community roads in and around eNseleni

- Community roads behind University of Zululand, Vulindlela and Kwa-Dlangezwa

including Machibini.

- KwaMcebisi and Port Durnford Business Centre.

- Road from Ngwelezane to Matshana Taxi Rank including Odondolo, Ezinsimbini.

- Maguzulu to Qalakabusha including Mevamhlophe to Bingoma.

- Ntambanana areas.

125

All waste collected through litter picking is removed by refuse trucks for safe disposal at King

Cetshwayo Regional Landfill Site.

Skips were purchased and distributed in identified rural communities. EPWP employees were

also deployed to educate rural communities on proper waste management practices and

cleaning the areas, in which the target of 2000 new households was achieved.

Cleansing and Washing of Public Ablution Facilities

Public conveniences include all public ablution facilities at our bus or taxi ranks, busy streets

in eMpangeni, Ngwelezane, Felixton, Zidedele, Dumisani Makhaye Village, Vulindlela,

eSikhaleni, eNseleni and Richards Bay. These facilities had been serviced successfully

throughout the reporting financial year by the dedicated Cleansing team.

Greenest Municipality Competition

The City of uMhlathuze was pronounced as Greenest Municipality in the Province of KZN in

February 2019, won the first price and the right to represent the province of KZN at Greenest

Municipality Competition at National Evaluation. The national evaluations took place on the

03rd

and the 04th

of June 2019 results still pending.

GOAL 3: GROW THE CONTRIBUTION OF THE WASTE SECTOR TO THE GREEN

ECONOMY

Goal 1 promotes a recycling program that directly benefits a number of individuals in the

green economy, who are referred to as “Waste-preneurs”.

Continuous public awareness’s further encourages individuals within the City to consider

“Waste as a Resource out of Place” hence there is an increase in the number of Waste-

preneurs.

These recycling beneficiaries range from well-known recycling companies to small scale

individuals, formal and informal, who would not have had any form of income without this

program.

GOAL 4: ENSURE THAT PEOPLE ARE AWARE OF THE IMPACT OF WASTE ON THEIR

HEALTH, WELL-BEING AND THE ENVIRONMENT.

In order to achieve this goal waste management information detailed below was spread

among communities and learners through school awareness, door to door campaigns and

clean-up programmes:

- Develop local awareness campaigns on the social importance of waste management;

- Promote waste minimisation and recycling through education system; and

- Establish participate in Greenest Municipality Competition.

126

The annual target of 20 campaigns was met and exceeded as a total of 35 campaigns were

conducted. To further increase environmental awareness and protection, the unit has

installed educational signboards. These signboards further educate and encourage

communities on general cleanliness, recycling and reporting of illegal dumping actions.

Figure 63: Environmental Awareness Signboard promoting a Clean City and Recycling Initia

127

Table 33: Environmental awareness and clean-up campaigns that were covered this year,

Figure 64: Environmental Awareness in a school and Clean-up Campaign within the community

QUARTER 1 JUL – SEPT 2018

QUARTER 2 OCT – DEC 2018

QUARTER 3 JAN – MAR 2019

QUARTER 4 APR – JUN 2019

10 clean ups and awareness campaigns and programs were completed as follows:

Gobandlovu Primary School

Nsiwa Primary School

Phalane Primary School

Exhaphozini Primary School

Esikhawini Primary School

Sinaye Primary School

Muzuvukile Primary School

Coca Cola Beach Clean Up Campaign

Thuma Mina Clean Up Campaign

City of uMhlathuze and DEA Clean Up Campaign

5 clean ups and awareness campaigns and programs were completed as follows:

Dumisani Makhaye Village Door to Door Campaign

Mhlanga Primary School

Siyakhanyisa Primary School

Hillview Door to Door Campaign

Lot 63 Tax Rank Environmental Awareness Campaign

8 clean ups and awareness campaigns and programs were completed as follows:

Dlamvuzo High School Clean-up Campaign

Ingweni Primary School

Maqhama Primary School

Umkhoma and Ezikhaleni Door to Door Campaign

Vondlo Primary School

Umkhoma and Ezikhaleni Clean Up Campaign

Mandlankala Door to Door Campaign

Mandlankala Clean Up Campaign

12 clean ups and awareness campaigns and programs were completed as follows:

Mzingwenya Primary School

Qhakaza High School

Ethakasani Primary School

Mzingazi Clean Up Campaign

Brackenham Clean Up Campaign

Mandlazini Clean Up Campaign

Ilembe Primary School

Thembelihle Primary School

Thanduyise High School

Ingweni Primary School

Phesheya Primary School

World Environmental Day Event

128

GOAL 5: ACHIEVE INTEGRATED WASTE MANAGEMENT PLANNING

In terms of the Waste Act all spheres of government are required to develop an IWMP,

hence it is a legal requirement for the City to have one. The IWMP which was approved and

adopted in 2017 has undergone a second review, in line with the IDP. According to the Act

the IWMP must be reviewed every five (5) years, however, the City reviews annually.

Continuous review of the IWMP ensures that changes, developments and implementation of

the plan are achieved and well accounted for.

GOAL 6: ENSURE SOUND BUDGETING AND FINANCIAL MANAGEMENT FOR WASTE

SERVICES

Within the limited budget the section has managed to expand service to rural areas, where

service was never provided before. This is putting more pressure to the budget due to

limited sources of revenue.

The Section has done survey in current business so as to ensure that customers receive

service they pay for at all times. The Section has stabilized expenditure on overtime, and

currently the section only has planned and approved overtime, but still looking at other

avenues so as to ensure that more is done with limited funding.

GOAL 7: PROVIDE MEASURES TO REMEDIATE CONTAMINATED LAND

The section has developed a comprehensive eradication plan on illegal dumping which

outlines the role of each and everybody who is within the jurisdiction of the City, ranging

from business, contractors, garden services, law enforcement and even media so as to deal

with illegal dumping and land pollution.

The composition of illegally dumped waste is normally green waste, building rubble,

domestic and other forms. The quantity in terms of percentages is as follows: 70% is green

waste, 22% is building rubble, 7% is household waste and the 1% is other forms of waste

which includes tyres etc.

To combat illegal dumping within the City, the Section has purchased newly designed illegal

dumping signboards for all identified hotspots. These signboards have Council’s law-

enforcement numbers for public members to report the culprits, in trying to curb the

scourge of illegal dumping.

Figure 65: Newly designed “No Illegal Dumping” signboards installed in identified hotspots

129

GOAL 8: ESTABLISH EFFECTIVE COMPLIANCE WITH AND ENFORCEMENT OF THE

WASTE ACT

In terms of Waste Act, all handlers of waste should be registered with Waste Management

Officer. Currently there are more than 72 waste handlers who have registered with the unit,

which assists in proper profiling of waste handlers within the City.

In addition to this, all our Material Recovery Facilities have been registered in terms of

Section 4 of National Norms and Standards for Sorting, Shredding, Grinding, Crushing,

Screening or Bailing of General Waste 2017.

Air Quality Management

Business Function

The City of uMhlathuze has an obligation to ensure that Section 24 of Chapter 2 of The

Constitution of the Republic of South Africa of 1996 which states that “Everyone has the right

an environment that is not harmful to their health or well-being” is complied with.. Furthermore

the organization has a mandate to adhere to pieces of legislation such as National

Environmental Management Air Quality Act of 2004.

Therefore, role of AQMU is to ensure that the environment is protected by providing reasonable

measures for prevention and enhancement of air quality for the sake of the Citizens within the

City of uMhlathuze.

Key deliverables

Although this Unit is called Air quality, but it has other functions that are part of its

responsibility, which are,

- Ambient Air Quality Monitoring

- Schedule Trade permits

- Environmental Nuisance

- Indigent and Pauper Burial

- Ritual Slaughter

AMBIENT AIR QUALITY MONITORING

The City of uMhlathuze manages and operates three Ambient Air Monitoring Stations which

include meteorological stations. The Ambient Air Quality Monitoring Stations are located at

eSikhaleni Library, Arboretum Mzingazi Water Treatment Plant and Brackenham Cemetery.

130

Figure 66: Ambient Air Quality Monitoring Stations

The pollutants measured by these stations include sulphur dioxide (SO2), nitrogen dioxide

(NO2), particulate matter with an aerodynamic diameter less than 10 microns (PM10),

particulate matter less than 2.5 microns (PM2.5) and ozone (O3). The stations also monitor

meteorological data, including Wind direction (WD), Wind speed (WS), Temperature (T),

Relative Humidity (RH) and Rain Fall (RF).

Table 34: Shows pollutants measured in each monitoring station

Station Name SO2 NOx PM10 PM2.5 O3

Arboretum √ √ √ √ √

Brackenham √ √ √ √ √

eSikhaleni √ √ √ √ √ √ Denotes pollutants measured at each station

Table 35: Shows meteorological station and parameters that are monitored

Station Name Int Temp WD WS RH SR BP RF

Arboretum √ √ √ √ √ √ √

Brackenham √ √ √ √ √ √ √

eSikhaleni √ √ √ √ √ √ √ √ Denotes meteorological data measured at each station

Ambient Air

- It is a legal requirement in terms of National Environmental Management: Air

Quality Act No 39 of 2004 for the local authority to monitor ambient air.

- The information obtained from the monitoring stations can be used to determine

the impacts of the air pollutants on the environment, as well as health impacts on

the community.

- Analysis and verification of complaints from its sources

The stations data availability was above 90% for the period 1 July 2018 to 30 June 2019.

There were two (2) PM exceedances for 24-hour average concentration experienced at

eSikhaleni Station on 13 and 28 June 2019 respectively.

131

There were thirteen (13) exceedances for 8-hour average experienced in Brackenham Station

and fourteen (14) exceedances for 8-hour average experienced in Arboretum Station. These

exceedances were experienced throughout the last quarter of the period in review.

There were no exceedences of the National Ambient Air Quality Standards for other

pollutants namely SO2, NO2, O3, PM10, and PM2.5 recorded on the other three stations.

The 2018/19 Milestones

Inspections

There were one hundred and four (104) inspections conducted. These inspections include

various types of industries such as smelters, pulp and paper mills, chemicals, harbour, iron

steel, fertiliser, coal exporters, mineral mining, forests, blasting and sugarcane.

Complaints

There were two hundred and sixty eight (268) complaints attended. These complaints include

spillages, odour, burning, industry stack emissions etc. Out of two hundred and sixty eight

(268) complaints, two hundred and fourty four (244) were related to overgrown private

owned properties.

Awareness Programs

The awareness programs are based on bringing awareness to various stakeholders including

schools, clinics, ward meeting and informal industries. The awareness focuses on:

- Sources of air pollution

- Effects of air pollution on the environment and human health

- Strategies to embark on to minimize air pollution

- Indigent Burial Assistance Policy

School Awareness Programs

There were eight (8) schools visited. These include Thembelihle Primary School, Thanduyise

Primary School, Ingweni Primary School, Phesheya Primary School, Sinaye Primary School,

Bajabulile Primary School, Mzuvukile Primary School.

132

1. Thembelihle Primary School 2.Thanduyise High School

3. Ingweni Primary School 4.Phesheya Primary school

5. Sinaye Primary School 6.Bajabulile Primary School

7.Mzuvukile Primary School 8. Ingweni Primary School

Figure 67 : Schools Visited during the School Awareness Programs

133

Community

There were five (5) communities visited. These include; Luwamba Community ward 31,

Umhlanga reserve ward 27, Phesheya sport ground ward 27, Bingoma Community hall ward

31 and Port Dunford Community hall ward 18.

1.Phesheya Sport Ground ward 27 2. Umhlanga ward 27

3. Luwamba ward 31 4. Bingoma Hall ward 31

1. Port Dunford Hall ward 18

Figure 68 : Community awareness programme

134

Clinics

There were three (3) clinics visited. These include; Umkhontokayise clinic and Isiboniso clinic.

1.Umkhontokayise clinic 2. Isiboniso clinic

3.Umkhontokayise clinic

Figure 69: Clinics Visited

World Environment Awareness Program

On the 07 June 2019, City of uMhlathuze hosted the World Environment Day in Ngwelezane,

in which the theme for 2019 was on Air Pollution.

Schools within Ngwelezane area attended this day and these were Phesheya Primary School,

iNgweni Primary School, Thembelihle Primary School and Thanduyise High School.

135

Figure 70: World Environment Day in Ngwelezane

136

Scheduled Trade Permits

All facilities / industries conducting activities that pose a threat or are likely to cause

harm to public health and the environment are required to have a Scheduled Trade

Permit as stipulated in terms of the Council’s Environmental Health Bylaws. There were

eleven (11) Scheduled Trade Permits issued and twenty-four (24) applications received

including renewals.

New Scheduled Trade Permits issued

Renewal Permits application New Applications in progress

11 7 17

Table 36: Scheduled Trade Permits

Notices

There were one hundred and twenty-nine (129) Non-compliance notices issued during

the period in review.

Industries Overgrown Private Property Swimming Pools

1 112 16

Table 37: Non-compliance notices issued

Indigent and indigent burial

A total number of three hundred and seventeen (317) Indigent families were assisted at a

total cost of seven hundred and eighty five thousands, nine hundred and one rands for a

period of July 2018 to June 2019.

The breakdown is as follows,

A total number of nineteen (19) Pauper burials at total cost of fifty two thousands, eight

hundred and twenty eighty rands and sixty nine cents.

Ritual Slaughter

A total number of forty three (43) applications relating to ritual slaughter were processed

and granted for the period of July 2018 to June 2019.

Overgrown privately owned properties

A total number of two hundred and forty five (245) overgrown complaints were received for

the period of July 2018 to June 2019 and they were all cleared.

Swimming Pool

A total number of eight (8) swimming pool complaints were received for the period of July

2018 to June 2019.

137

Pesticides

A total number of twenty one (21) bees’ removed, Fifteen (15) was done for the period of

July 2018 to June 2019.

Fire and Rescue Services

Business Function

The purpose of the Fire and Rescue Services is to render Community Safety against

fires and rescue in emergencies.

Fire and Rescue Services Functions are aligned to Section 84(1) (j) of the Local

Government: Municipal Structures Act, Act 117 of 1998

The Fire department operates in terms of the following Acts:

- Fire Brigade Services Act, Act 99 of 1987

- National Building Regulations + Building Standards Act (SANS 0400)

- Occupational Health and Safety Act

- South African National Standards, 10400,, 1087, 1089 and 10090

- Hazardous Substance Act

FOR DEALING WITH HARZADOUS SUBSTANCE

Mandated Acts

Ensuring compliance with the provisions of the Hazardous Substance Act,1973 ( Act

15 of 1973), the Explosive Act,1956( Act 26 of 1956,the applicable regulation made

under sections 15 and 16 of the Fire Brigade Services Act,1997 ( Act 99 of 1987),and

the Occupational Health Safety Act,1993(Act 85 of 1993)

The Fire and Rescue Services excelled once again in the effective and efficient of the

service delivery that it provides to the community. Loss of life and property has been

kept to a minimum due to effective fire fighting, rescue, hazardous material incident

handling and fire prevention activities. This is due to the dedication and loyalty of all

personnel that have gone that extra mile for the community that they serve and

protect.

FIRE BRIGADE OPERATIONS

138

OPERATIONS

For 2018/2019 Financial Year the Fire and Rescue Service personnel attended to 1

316 emergency incidents that include the following:

- 749 - Fire related incidents

- 488 - Rescues and Medical Emergencies

- 02 - Hazardous Material incidents and

- 77 - Special Services including spillages.

These responses were in terms of SANS (South African Nations Standard) 100190

that gives guidance to render Community Safety against fire. Its scope is;

- To outlines a system of determining the requirements for the operational and

fire safety functions of emergency services rendered to communities, and also

- To give recommendations for water supplies for fire-fighting.

Table 38 : MAJOR STRUCTURAL Fire Engine

For 2018/2019 City of uMhllathuze Fire and Rescue received a new MAJOR STRUCTURAL Fire Engine

FIRE PREVENTION

Mandated Acts

Ensuring compliance with the National Building Regulation and Building Standard

Act,1977 ( Act 103 of 1977), by analysing plans, attending building site meetings and

conducting building inspections to establish whether Fire Safety requirements are being met

BUILDING PLANS

This section scrutinises and clears all building plans which are referred to it (in terms of the

National Building regulations) for comment.

139

In the current period two hundred and seventy three plans were scrutinized for comments

and approval.

The Fire Safety consists of Sub-Sections:

Fire Safety

Fire safety measures are vital in preventing, eliminating, or reducing hazards that contribute

to the occurrence and spread of fire.

The City of uMhlathuze Fire & Rescue Services has a Fire Safety division to best implement

these measures, which include regularly inspecting existing/new buildings and dangerous

goods vehicles, ensuring fire breaks are in place and maintained, inspecting and removing

fire hazards, issuing relevant compliance certificates, responding to and acting on complaints

received and other related activities.

Inspectorate

The Inspectorate deals with complaints, inspections, certification, business licence

applications, special events and more.

There were two hundred and eighty four Flammable Liquids certificates issued for

compliance with SANS (South African National Standards) 10087, 10089 and Municipal

Flammable Liquid Bylaws.

FIRE PREVENTION STRATEGY

The Fire Prevention Strategy is a program about prevention and awareness in identifying

high risk locations and putting in place action plan to reduce the risk of fire from occurring.

Two thousand and sixty four Fire Prevention inspections carried out on industrial and

commercial premises, schools and medical institutions within the City of uMhlathuze area of

jurisdiction.

There were eighteen school awareness’s conducted

TRAINING

City of uMhlathuze Fire, Rescue and Disaster Management Service received full accreditation

through the following Professional Bodies:

- Southern African Emergency Services Institute

- International Fire Services Accreditation Council

- Local Government Sector Education Training

- Department of Labour

Division conducted the following training programs and generated substantial revenue:

- Fire Fighter I and II

140

- Hazmat Awareness/Operational

- First Aid Leve I, II & III

- Industrial Fire Fighting

- Basic Fire Extinguisher

FIRE AND RESCUE SERVICES

During the Thuma Mina walk the State President Hon. Cyril Ramaphosa after visiting Newly

Build Esikhaleni Fire Station applauded the City of uMhlathuze for being one of the best in

the country.

Figure 71: Fire Brigade Welcomed the President and Minister with a parade and smiles

INTERNATIONAL FIRE FIGHTERS DAY

In celebrating International Fire Fighters Day, fire fighters from uMhlathuze Fire and Rescue

Services and the Industries took part in the Fire Fighting Fitness Challenge held at eSikhaleni

Fire.

Figure 72: City of uMhlathuze winning Team

141

Figure 73: City of uMhlathuze winning Team

Figure 74: Hosting Fire hose activity

Figure 75: City of uMhlathuze Fire and Rescue Services Banner

142

Disaster Management

Business function

Disaster Management function is mandated by the Disaster Management Act 57 of 2002.

The Act requires an integrated and effective response to disasters. Disaster Management

aims at prevention, mitigation, response and recovery and finally rehabilitation and recovery.

There is also the National Disaster Management Framework which gives direction and

guidance on how the act should be implemented

Key deliverables

Awareness

Disaster Management provides a culture of risk avoidance amongst communities through

education and public awareness. Disaster Management has two components to it the

proactive component that alerts the community to the problem, highlights practices to

prevent problems and work with other departments and entities to avoid problems and to

lessen the impact of disaster, the severity of disasters, plan and prepare for emerging crisis,

events or disasters, respond rapidly and effectively to disasters and to implement post

disasters recovery and rehabilitation by monitoring, integrating, co-ordinating the disaster

risk management activities of all role-players.

Special Events

- Part of relief materials given to the community in need is cloths, during the

Mandela day Zululand observer collects clothes and give it to Disaster

Management for relief purposes.

- The International Jazz Festival that was hosted at Richards Bay Sport Complex

- The Last Dance events hosted at Richards Bay Sport Complex

- Kufeziwe Gospel Music event hosted in Richards Bay Sport Complex

Major incidents

- The horrific church wall collapse at the Pentecostal church along R34 where 14

people died, this incident was declared as the disaster

- Heavy rains that affected a number of wards

Relief Distributed

Relief was distributed in the form of 194x food parcels, 83x blankets and 55x Sponges within

the City of uMhlathuze area of jurisdiction whose residence were destroyed by fire and /or

natural disaster.

143

DISASTER MANAGEMENT CENTRE

The Municipality has procured abuilding which will be as a Municipal Disaster Management

Centre following the amendment of the Disaster Management Act which required that in

consultation with the district, local municipalities must have a Disaster Management Centre.

Figure 76: Picture of a Disaster Management centre

DISASTER MANAGEMENT PLAN

Disaster Management Plan is an integrated document that seeks to address risk reduction

programmes for the risk identified by different stakeholders. The City of uMhlathuze is in the

process of formulating a level 2 disaster management plan since the current one is due for

review.

The other important document adopted by the council that is already in place is the Disaster

Management Framework that serves as the guide in the implementation of the plan and

disaster management functions.

Occupational Health Clinic

Business function

The Occupational Health Service rendered by Council to its employees and is executed in

accordance with the provisions of the Occupational Health and Safety Act, 1993 (Act 85 of

1993) and Council Resolution 768 of 27 November 2001. The uMhlathuze Municipality has

one thousand nine hundred and thirty eight (1 938) permanent employees and three

144

hundred and twenty (320) temporary employees including the Extended Public Works

Programme workers.

Council has two Clinics, one located eMpangeni Civic and the other I Alton Service Centre

responsible for the health and safety of its employees. The clinics are operating with highly

qualified staff.

Key deliverables

The clinic is guided by the Occupational Health and Safety Act No. 85 of 1992. Therefore

annual medical surveillance are conducted which are specifically to the risk identified for the

section.

The occupational clinic is rendering the following services for the promotion of health and

prevention of diseases as well as promoting the injury free environment.

Table 39: Medical surveilance programme

DEPARTMENTS

Traffic July 2018

Licensing July 2018

Security July 2018

Museum July 2018

PMU July 2018

Cemeteries August 2018

Parks August 2018

Sports Section August 2018

Office of the Municipal Manager August 2018

Disaster September 2018

Fire September 2018

Libraries September 2018

Electrical October 2018

Clinics October 2018

Halls October 2018

Workshop October 2018

Air Quality January 2019

Laboratory January 2019

Road and Storm Water January – February 2019

Waste Management February to April 2019

Building Maintenance March 2019

Financial services March 2019

Swimming Pools May 2019

Beaches May 2019

City Development June 2019

Water and Sanitation June 2019

Corporate services June 2019

Table 40: Surveillance management

SURVEILLANCE MANAGEMENT

145

Pre-employment medicals

Periodical medical exam

Exit medical examination

Drivers medicals

Cherry Pickers

Assessment for Alternative Protection ware

Hepatitis B Given

Health Evaluation following to medicals

Health Evaluation following sick leave

Health Evaluation others

Alternative Protective wear was issued with the assistance of the Safety Section to

employees with special needs. All employees who were off sick for an extended period

are reviewed by the Occupational Health Practitioner.

Table 41: Health and safety

HEALTH AND SAFETY

IOD attended in Clinic

Seen by Doctor

Been seen by outside agents

Injury on Duty follow up

Old injury IOD

Home Injuries

Chemical injuries

Assault at work

Rehabilitation

All Injuries on Duty are monitored by the clinic. Those who were attended to by outside

agents need to be monitored to ensure the employee is fit to return for duty.

Table 42: Animal bites

ANIMAL BITES IOD

Animal bites

Bee stings

Other stings

Bites and sting occur while on duty

The clinic monitors all animal bites to ensure the employees are fit to work after the incident.

Table 43: Primary health care

PHC

Minor ailments

STI

Family Planning

Dressing done

New TB Cases

Tuberculosis visits

146

Completed Tuberculosis Treatment

Back pain

Skin conditions

Table 44: Chronic services

HCT

HIV Positive on ARV’s visiting the clinic

Hypertension Repeat visits

Epileptic visits

Diabetic New

Diabetic visits

Asthmatic visits

The Occupational Clinics works together with Primary Health Care (PHC) Clinics to test

and initiate treatment immediately if reactive for some of chronic diseases. Therefore

employees make use of this service. The Clinic is in partnership with the government

clinic to be a pickup point for employee’s chronic medicine, therefore employees with

well controlled chronic conditions collect their treatment from the Occupational Clinics.

The clinic started an education programme for employees with chronic condition. The first

three groups were started in February 2019. This was due to employees with uncontrolled

chronic conditions. The employees benefitted from the group sessions and are now able to

control their chronic condition.

Table 45: Education programme for employees with chronic condition

Clinic Topics Employees attending

Empangeni Blood pressure 8

Alton Blood pressure 8

Empangeni Diabetes 8

Alton Diabetes 8

Alton Diabetes 4

Empangeni Diet 8

Alton Diet 6

Alton Diet 4

Empangeni Exercise and stress 8

Alton Exercise and stress 7

Alton Exercise and stress 6

Empangeni Blood pressure 8

Alton Blood pressure 10

Clinic Topics Employees attending

Empangeni Diabetes 8

Alton Diabetes 10

Empangeni Diet 7

Alton Diet 10

Empangeni Exercise and stress 5

Alton Exercise and stress 8

147

Table 46: Health awareness programmes

TOPIC

Sexually Transmitted Disease

Life style

Hearing Conservation

Tuberculosis

Take care of your kidneys

Women’s Health

The Clinic participates in the Healthy Lifestyle Awareness Campaign. The following

Depots were visited:

Table 47 : Depots visited for the Healthy Lifestyle Awareness Campaign

DEPOTS VENUE

Alton Depots

Waste Management

Roads and Storm Water

Parks and Cemetery

Plumber Section

Building Structure

Fitter’s Section

Alton – Waste management depot

Laboratory and Supply Chain Management Alton

Beaches and Swimming Pool Lifeguard Tower

Richards Bay and surrounding depots Richards Bay Civic Center Auditorium

eSikhaleni Depots

Waste Management

Roads and Storm Water

Parks

Plumber Section

eSikhaleni Swimming Pools

CFO Branch

Halls and Thusong Centres

Kwa-Hlanganani Hall

Mechanical Workshop Mechanical Workshops

Empangeni Parks Empangeni Parks

In March being TB Awareness month the clinic visited three sites and a TB campaign

awareness was held. The following TB screenings were conducted:

Table 48: TB screenings conducted

Site Screening Positive

Alton 67 2

Empangeni 67 0

ESikhaleni 42 0

148

The employees who were tested positive were initiated on Anti TB Clinic by the PHC

Clinic and are being monitored by the Occupational clinic.

Table 49: SPECIAL PROGRAMMES

TOPIC

Hospital visit

Pregnancy follow up

First Aid Boxes

Employees follow up after sick leave

Employees on light duties

Employees receiving alternative PPE

The Clinic is responsible for looking after the health of pregnant employees. The

employees are visited at their place of work to identify risks which may have an impact

on the mother’s health.

Employees with health problems are followed up monthly to ensure a healthy work

force.

The checking and refilling contents of the Fist Aid Box is also continuing from the

previous quarter.

Table 50: Fist Aid Box checks and refilling

Depots

Empangeni Rail

Empangeni Library

eSikhaleni Depot

eNseleni Depot

Alton Road and Storm Water

Empangeni Rail

Electrical Depot

Swimming pools

Beaches

Main Offices

Empangeni Civic centre

eSikhaleni Depot

PEER EDUCATORS

The clinic is also involved in peer education programme. It provides relevant health

information and topics for peer educators to present to their peers at their respective

depots. They are scheduled to meet once every month to discuss topic for the month and to

give reports of previous reports.

STAFF DEVELOPMENT

Health practice is a fluid and legislated environment so clinic was able to develop two

personnel for Spirometry and Audiometry courses.

149

RECREATION AND ENVIROMENTAL SERVICES SECTION

SPORT AND RECREATION

During the 2018/2019 financial year, a number of sport and recreation programmes were

presented and various sport facilities were developed. Milestones and achievements during

the year under review include the following:

Senior Citizens Golden Games

These games which are played by senior citizens are aimed at promoting active ageing.

Senior citizens compete in games such as ball relay, jukskei, rugby ball throw, duck walk, ring

the stick, dress-up and many more. This programme starts at ward to cluster level after which

athletes selected in all clusters participate at UMhlathuze Golden Games. Athletes selected at

UMhlathuze Golden Games get to participate at District level after which they represent the

District at the Provincial Games. Those selected at Provincial Games go further and

participate at the National Golden Games. About 20 senior citizens from UMhlathuze

participated at the 2018 National Golden Games in Bloemfontein

Figure 77: 2018 National Golden Games in Bloemfontein for Senior Citizens

SALGA KZN Games

These games are played in all municipalities with an aim of unearthing and nurturing new

talent. Athletes are selected during elimination games to represent their respective wards,

clusters, local and district municipalities at provincial level. History was made when the 2018

uMhlathuze Mayoral Sport day was played at various sport facilities within eSikhaleni Suburb.

150

This proved to be a masterstroke since community members came in large numbers to

support participating athletes.

After King Cetshwayo District Game,uMhlathuze Municipality provided about 70 percent of

athletes to Team King Cetshwayo that participated at the 2018 Provincial Salga Games in

Pietermaritzburg

Figure 78: 2018 Provincial Salga Games in Pietermaritzburg

Beach Games

The 2018 Beach Games proved to be a success with many beach revellers participating in

codes such as Touch Rugby, Beach Volleyball, Beach Soccer, Indigenous Games and many

more. These Games were part of the annual UMhlathuze Beach Festival

Disability Sport

This programme is aimed at encouraging a healthy lifestyle in people living with disabilities

to encourage them to participate in various sport codes. UMhlathuze Disability Sport Day

was held where athletes competed in various activities. During these Games, some athletes

were selected to represent uMhlathuze at the King Cetshwayo District Games. At the District

Games, a team to represent King Cetshwayo District Municipality at the Provincial Games

held in KwaDukuza was formed.

Indigenous games

This is one of the mass participation programmes presented annually. Activities played in the

Indigenous Games include Khokho, Dibeke, Inchuva, Umlabalaba, Ingqathu and many more.

151

Athletes selected at Local Municipality Level get to participate at the District Level. The

District then forms a team to participate at the Provincial Level after which excelling athletes

represent the Province at the National Indigenous Games Festival.

Figure 79: National Indigenous Games Festival

Sport facilities

An outdoor gym was established with the state of the art equipment at eSikhaleni

thus enabling the community to keep fit and healthy by exercising at their convenient

time.

Some facilities such as Kick-abouts at Ndabayakhe and Bhucanana, and irrigation at

Central Sport Complex could not be finished in time due to unforeseen circumstances

AMENITIES

Swimming pools

The swimming pool opened on 1 September 2018 for the new season and closed on

30 April 2019.

The hot conditions during this season did attract large number of visitors. Lifeguards

at the swimming pools kept themselves busy by assisting schools with the Learn to

Swim Program.

Council promotes utilization of swimming pools for competitive swimming

The table below shows event that took place at some of the swimming pools.

152

Table 51: Events that took place at some of the swimming pools

SWIMMING POOLS NUMBER OF GALAS

Arboretum 20

Meerensee 4

Empangeni 3

Figure 80 :Empangeni swimming pool was the venue for the Annual 1000m swim, hosted by the local swimming club.

Councils’ swimming pools are also utilized for school excursions and baptism by various

churches.

Funds were allocated for the building of the new swimming pool in the Ward 30 area. The

design phase is completed and ready for construction. The expected date for construction

tender is 30 July 2019 and expected completion date for the construction is at the end of

2020.

Funding was made available to renovate various swimming pools.

153

Figure 81: New filters were installed at the Umfolozi swimming pool and Arboretum swimming pool for better filtration and water clarity

BEACHES

The amazing weather all year round and the well-protected beaches did attract crowds of

people throughout the year. The shark nets provided by Council, extends a few hundred

meters north and south of the main beach. The safe bathing environment and good weather

create an ideal destination for tourist from far and wide.

The Alkantsrand beach is the official bathing beach with lifeguards present 365 days a year

and the beach is open for bathing from 08h00 to 17h00.

The highly qualified lifeguards are well trained in sea rescues and certified in using the

Inshore Rescue Boat and jetski. The lifeguards respond to incident at various other beaches

such as

- Palm beach, Bayhall

- Naval Island

- Five mile.

All the lifeguards are tested annually by South African lifesaving.

Alkantstrand beach has 24 hour security based at the beach to ensure the safety of all beach

goers. South African Police Service does regular patrols and during the festive season

security is inflated.

154

Figure 82 :Security parade at Alkantstrand beach during December 2018

Figure 83: Police and lifeguards keeping a watchful eye on all beach goers during the festive season

155

Figure 84: Alkantstrand Beach Lifeguards receiving the 10 Malibu boards Alkantstrand Beach Lifeguards receiving the 10 Malibu boards purchased by Council for assisting the lifeguards in performing rescues.

Figure 85: water wheel chair lifeguard assisting a paraplegic visitor

The lifeguard assisting a paraplegic visitor to gain access into the ocean via the water wheel chair, one of the services rendered at Alkantstrand beach.

156

Figure 86: outboard craft

Lifeguards just completed the jetski training which will help to venture out to see in the harshest conditions. During 2018 several rescues were made using this outboard craft.

BEACH EVENTS

Table 52: Alkantstrand beach was the venue for the following events.

EVENTS NUMBER

Surfing competition 1

Boogie Boarding 1

Skate Boarding 1

Beach festival 1

Last Dance 1

FESTIVE SEASON 2018/19

The festive season had an average of about 15363 bathers daily and about 80 000 on

New Year’s Day. The headcount include the Bayhall area, Palm beach and Newark

recreational area.

The table below is the reported stats for the year 2018/19 Festive season from 15

December 2018 to 5 January 2019.

Table 53: stats for the year 2018/19 Festive season from 15 December 2018 to 5 January 2019.

ESTIMATE OF TOTAL VISITORS

ESTIMATE OF AVERAGE VISITORS/DAY

RESCUES HELPOUTS FIRST AID NEAR DROWNING

169000 15363 5 31 49 4

157

Figure 87: Outsourced ambulance personnel treating injured patients.

Parks services

Parks Services involves operations which include grass cutting, arboriculture, Technical

Workshop, alien invasive plants, tree planting, horticulture, development of public open

spaces and cemetery. City of uMhlathuze has developed Environmental Greening policies as

mandated by the National Environmental Management: Biodeversity Act of 2004, National

Forest Act of 1998 and Conservation of Agriculural Resources Act.

The purpose of the environmental Greening Policy is to standardise procedures regarding

the greening of the environment, especially as far as the planting of trees, the maintenance

and care thereof, the conservation and protection of existing trees within the area of

jurisdiction of the City of uMhlathuze, are concerned.

The key areas of focus for the Parks Services are as follows:

- Promote the achievement of a safe environment for the benefit of residents within

the area of jurisdiction of the municipality and to provide procedures, methods and

practices to manage the use and utilization of cemeteries in the area of a City.

- To beautify Municipal buildings using hard and soft landscaping including floral

arrangements/decorations during the municipal events.

- To develop Parks and Recreation for Citizen to connect with nature and recreate

outdoors

- To plant trees in order to improve air quality, beautify the City, reduce urban heat and

decrease the circulation of greenhouses gases like carbon dioxide and Ozone

- To cut grass and prune trees in order to keep the City looks aesthetics

Grass cutting and Arboriculture:

158

- The City of uMhlathuze is responsible for cutting grass and pruning of trees in the

entire City.

- Grass cutting cycle takes about 6-8 weeks.

- Areas of responsibility include Public Open Spaces, Streets verges, Parks, Municipal

Buildings and special requests

- The City of uMhlathuze is also responsible to provide floral arrangement /decoration

in events and function hosted by the City.

- Due to vast areas, various contractors were employed to assist with grass cutting and

functions with great success during high growing season. The contractors were

tasked to cut twice a month during the period of 1 September 2018 to February

2019. New contractors appointed and were tasked to cut once a month during the

period of 1 March 2019 to 30 June 2019.

Figure 88: Pictures for grass cutting and pruning team in Empangeni ward 9 and 23

Technical Workshop

This unit deals with procurements of new equipment’s, parts, repair and maintenance of all

the machinery and equipment’s that are used by Parks, Sport and Recreation.

For 2018-2019 Capital Projects:

- 4 tractor drawn slasher were procured

- Passenger carrier to transport employees

- 9 Tractors procured

159

Figure 89: Tractors procured 2018/2019 budget

Alien invasive plants:

- The City of uMhlathuze in partnership with Department of Economic Development,

Tourism and Environmental Affairs (DEDTEA) has embarked on alien plant control

program

- 3202.93 hectares of alien material including pine, eucalyptus has been cleared in

2018/2019 financial year.

Figure 90: Clearing of alien invasive in Arboretum ward 3

Table 54: Trees planted in 2018/2019

Quarter Area Description Name of tree planted Quantity Institutions

Donated Genus Species

1 Madlanzini area during

Arbor week

Syzgium Cordutum 100 Procured by City

of uMhlathuze

270 Widlands Trust

160

85 Richards Bay

Industrial

Development

Zone

200 Forestry and

Fisheries.

2 Mandlanzini Community

Hall, Gobandlovu

Community hall, Mandlanzini

Mian Road, Guldengrancht

Road, Kati P. School,

Aquadine S. School,

Muzuvukile P. School,

Tholokuhle P. School

,Nguluzana P. School, Vondlo

P. School, Mhlanga P.

School,, Mississippi Street

and lot 3818 Esikhaleni.

Syzygium Cordatum and

Harperphyllum Caffrum.

200 City of

uMhlathuze

3 Cent Circle, Bullion

Boulevard Dollar

Drive,Allumina Allumina

Allee, East Central Arterial,

Main Road Empangeni.

Syzygium Cordatum and

Harperphyllum Caffrum.

200 City of

uMhlathuze

4 Fourth quarter: there is no target hence it’s a very dry season due to poor survival rate of

planted trees experience over the past years.

Horticulture

It is further responsible for floral arrangements and display at events hosted by City of

uMhlathuze. Such events included inter alia the following during the 2018/2019 financial

year:

- State of the City Address

- IDP road shows, Umzuvukile Sports ground Enseleni

161

- Memorial Services for staff members

- Environmental day that was held in Ngwelezane Hall

- Arbor day that was held in Mzingazi

- Greenest Municipal Competition that was held at Civic Center

Figure 91: Decoration / floral display: Memorial Service for staff Member: Madlanzini Hall ward 4

Figure 92: Decoration/floral display: Environmental Day Ngwelezane hall ward 28

162

Figure 93; Decoration and Display: Greenest Municipal Competition Civic Centre ward 3

Figure 94 :Arbor day: Mzingazi (Sitholinhlahla. P. School) ward 1

Development of Public Open Spaces

- 2 Parks were developed which is Esikhaleni and Ngwelezane Park

- More than 100 trees have been planted in order to provide shade and keep the City

looks green and aesthetics

- Outdoor gym and free Wi-Fi installation in Esikhaleni

163

Figure 95: Public Open Space converted to Community Park in Esikhaleni Ward 21

Cemetery

The provision of interment services is the integral part of our service provision to the

community. Currently there are two fully operational cemeteries within the City of

uMhlathuze that being in Richards Bay and eSikhaleni. There also non-operational

cemeteries at Empangeni, Nseleni and Vulindlela. General maintenance was performed

during the past financial year on all of the above-mentioned cemeteries. A total number of

712 burials were accommodated at a Municipal Cemeteries during the period of 1 July 2018

to 30 June 2019

It is worth noting that Council is streamlining the service delivery to the community by

providing One Stop facility for cemetery services that includes the booking/reservation at the

following treasury offices

164

- eSikhaleni Treasury Office (Hlanganani and New Hall)

- Vulindlela Treasury Office

- eNseleni Treasury Office

- Richards Bay Treasury Office (Civic Centre)

- Ngwelezane Treasury Office

- Empangeni Treasury Office

The development of cemeteries remains an important function of the municipalities. During

the same financial year, the study of pre-feasibility study for the development of future

cemeteries and provision of alternative burials has been investigated (crematorium).

Potential land parcels were identified during the investigations, and deemed as suitable for

cemetery development purposes. The municipality will engage the landowners with the

intention of buying the identified land parcel for the aforementioned purpose.

Another investigation was launched with regards unstable soil conditions at both Richards

Bay and eSikhaleni cemeteries. The geotechnical investigation shows that both sites are

unfavourable for its intended ground burial purpose. Council has since received the report

with its recommendations, and it’s expected to be implemented in the next financial year,

and will provide certainty in terms provision of burial space for the foreseeable future.

A benchmarking exercise on the development of a Heroes Acre was also conducted during

the current financial year, with an intention of developing a Heroes Acre at eSikhaleni

cemetery. The designs for the Heroes Acre have been finalised, and plans are afoot to

commence with construction in the near future when budget processes have been finalised.

165

Figure 96: Designs for the Heroes Acre in Esikhaleni ward 34

166

Arts and Culture

BUSINESS FUNCTION

- Arts and Culture unit has the following sub-units under it:

- Halls and Thusong Centres

- Libraries

- Museum

- Performing art and cultural preservation

In line with the City’s vision and mission of improving the quality of citizen’s health and

wellbeing Arts and Culture’s mandate is to provide the following services:

- Creation of a vibrant, dynamic cultural life and artistic practice, which would serve,

respects and affirms the understanding and appreciation of Arts and Culture values and

cultural differences in the City of uMhlathuze.

- Support community and visitor access to quality visual arts, craft and design exhibitions

and programmes in the City of uMhlathuze.

- Uncover and nurture creative industry endeavours and artistic talent.

- Provision of adequate facilities within the communities.

LIBRARIES

The City of uMhlathuze has nine libraries it manages and these libraries offered to the

communities the following services:

- One hundred and sixteen thousand six hundred and thirteen (116613) books

were circulated.

- Six hundred and seventy thousand, three hundred and thirty seven (670337)

visited the library for different services including studying, internet access,

photocopying etc.

- Three thousands three hundred and seventy one (3371) took the new library

membership in different libraries.

- Number of awareness displays were displayed by different libraries to create

awareness on number of different topical issues like back to school, valentine’s

day, human rights day, Nelson Mandela month, women’s month, South African

cultures, breast cancer awareness, men’s health, disability month as well as

AIDS awareness month.

- The following outreach programmes were undertaken to popularize the library

work amongst the targeted communities in line with marketing strategy:

167

Story telling performances by schools.

Formation of chess clubs.

Reading competitions for schools.

Hosting of read aloud day.

Library orientation for different school phases.

- In order to cater for those community members who are attending tertiary

institutions, libraries have the working relationships with the following

institutions, University of Zululand, University of Johannesburg and University

of North West amongst others.

Figure 97: Learners visiting the library

MUSEUM

The museum collect objects and materials of cultural, religious and historical importance

preserve them, research into them and present them to the public for the purpose of

education and enjoyment. In line with these mandate the museum during the period under

review managed to do the following:

- 166 paintings and 16 sculptures were displayed for Grade 8 to Grade 12 learners

from local schools during the Secondary Eisteddfod competition.

- Mobile museum visited 30 schools within the Municipality.

- Crafters displayed the items which include traditional Ukhamba, writing papers,

envelopes and gift boxes made of sugar cane leaves.

- Young artists were given opportunity to display and sell their work in the gallery.

- Umhlathuze artists participated in the Provincial exhibition.

- Trainings on incubation in grass weaving, traditional bead weaving, fabric and plastic

crochet, embroidery and bead weaving.

168

- 2565 people visited the museum during the period in question.

Figure 98: Provincial exhibition

HALLS AND THUSONG CENTRES

HALLS

Table 55: Access to 26 halls facilities was ensured by the provision of the following services to the community during the period under review:

Paid Bookings Made Free Bookings Made Total Bookings Made

1934 6535 8469

Note should be taken that bookings mentioned above include bookings done in all 26 halls.

Bookings that were accommodated vary from funerals, weddings, community meetings,

governmental functions, churches, memorial services, municipal events, schools events,

private events etc.

THUSONG SERVICES CENTRES

The Municipality is operating with 2 Thusong Services Centres, which assist the community

with information, integrated services and programmes meant to share information.

Isaphendulwa 777 building Construction accredited by Construction Education and Training

Authority (CETA) to upgrade skills for fifty (50) youth aged 18-35 in Supervision of

Construction Processes SAQA NQF Level 4, Construction SAQA NQF Level 2, and Roadworks

SAQA Level 3. The programme benefitted fifty (50) learners within the community of Ward

10 and 18 through the Thusong Service Centres Programme, with a stipend of R2 500 . The

169

learnership is for 12 months, with three(3) months theory and nine (9) months Practical

experience. On completion of the Learnership, students will be able to acquire an income

throught self – employment or within the Private Sector. The learnership has officially started

from 01 February 2019.

ARTS AND CULTURE PROGRAMMES

OPERATION SIYAYA EMHLANGENI

uMhlathuze Municipality Arts and Culture hosted the operation Siyaya Emhlangeni (Pre –

Reed Dance) on 18 August 2019 at Ngwelezane Community Hall. The intention of this

event was to accommodate those maidens who won’t be able to attend the Reed Dance

Ceremony. Fifteen (15) buses were procured to transport maidens and matrons, 1300

short sleeve t-shirts were procured for maidens, 100 long sleeve t-shirts for matrons and

catering service were procured to cater for 1300 maidens and 150 VIP’s (matrons and

officials). People from other relevant Departments like Provincial Arts and Culture etc

participated on the event.

Figure 99: Operation Siyaya Emhlangeni (Pre – Reed Dance) on 18 August 2019 at

Ngwelezane Community Hall.

INGOMA COMPETITION

uMhlathuze Municipality COMMS Arts and Culture organised Ingoma Competition for all

community members of uMhlathuze Municipality. The competition was held at Vulindlela

sport ground on 24 November 2019. Different catergories of Ingoma which participated are

as follows: Amahubo, Isigekle, Isizingili girls, Isizingile boys, Isishameni, Indlamu,Umshado.

In all catergories the winners received the following prices: 1st price – R500, 2nd price –

R3000, 3RD price – R2000.

UMHLATHUZE STREET DANCE COMPETITION

170

On the Youth month we hosted the Street dance competition at Empangeni Civic Hall on 23

June 2019. Twenty four groups (24) groups from various wards of the City participated in the

competition. The prizes were as follows:

1st prize – R10 000,

2nd prize – R5000,

3rd prize – R3000,

4th prize – R2000

Figure 100: 1St Prise Winners of the Street Dance Competition.

PUBLIC SAFETY AND SECURITY

Traffic Services

TRAFFIC SERVICES AND OPERATIONS

This Sub-section is made up of five (5) units or segments namely, the Traffic Unit (TPU),

Traffic Wardens Unit (TWU), Bylaw Enforcement Unit (B-LEU), Traffic Administration section

and the Traffic Control room.

The Traffic Policing Sub-Unit (TPU)

This Unit is responsible for planning and organising for the execution of daily law

enforcement plans and traffic operations. The Unit’s functions range from law enforcement

duties, patrol function, directing and controlling traffic (point duty), setting up and conduct

of roadblocks, vehicle checkpoint inspections (VCPs) and speed detections for purposes of

road safety compliance and taking enforcement action against speeding offenders. The Unit

also attends to various calls for service received from members of the community including

responding to various emergencies, road incidents (road crashes, spillages and roadway

obstructions), escort duties, by-law violations and related complaints. The Unit also renders

assistance to mandated services of the South African Police Service relating to crime

prevention, policing of gatherings, public protests and demonstrations and management of

events.

171

The Traffic Warden Sub-Unit (TWU)

This Unit plans and executes law enforcement operations aimed at complementing the

enforcement workload of the traffic officers. The Unit focuses on the provision of road safety

education at various schools. This Unit’s function briefly entails traffic law enforcement

duties, the patrol function, directing and controlling traffic (point duty), assist with setting up

and conduct of roadblocks; regulating parking through parking control and parking

enforcements including issuing ‘fines’ or notices for parking offences.

The By-law Enforcement Sub-Unit (B-LEU)

This Unit enforces the Nuisance, Street trading and the Keeping of Animal By-laws. The

Unit’s functions range from law enforcement duties related to by-laws, the patrol function,

road safety education and assisting traffic officers with point duty (traffic control) and

roadblock activities. The Unit also attends to various calls for service including public

complaints relating to violation of bylaws and nuisances from community members. The

Bylaw Enforcement Unit also plans and executes police raids in conjunction with the South

African Police Service and other security or armed services in order to remove illegal

structures and paraphernalia used unlawfully in informal trading activities.

The Traffic Administration Sub-division (Admin Section)

The Administrative Section provides vital administrative and human resource support

function to the Traffic Section as a whole. The sub-section contributes greatly to the

efficiency of the Traffic Section. Its functions include dealing with offence data, conduct of

vehicle data searches, traffic information retrieval and recording, personnel budget, human

resource management and filing of records, control of leave and asset records, preparing the

court roll for each court day, generating court processes such as summonses and warrants of

arrests for authorisation by judicial officers.

The Control Centre/Room (Dispatch Centre)

The Traffic Communications Centre or Control Room is responsible for ensuring facilitation

of internal and external communications, information exchanges and to deal with public

queries including during and after hours. The Radio or Control Room operates a 24-hour

switchboard and is central to the departmental system of communications. The Unit has a

staff of operators (Control Room Operators) whose main function entails answering

telephone calls from the public and from traffic personnel or other external stakeholders

such as abnormal load companies, community members and construction companies. The

operations are also responsible for answering and transmitting radio messages in order to

collect information from personnel and dispatch a response to incidents and emergencies.

The Control Room also deals with emergency calls and for that purpose a 24 hour

emergency line number: 035 907 5760 / 5761 is provided for use by members of the public

to access the department in reporting any emergency at any time.

172

BY-LAW CLEAN-UP BLITZ PROGRAMME

In February 2019, the By-law Clean-Up Blitz Campaign was launched against the backdrop of

the increasing sale of vehicles displayed along the verges of various public roads (Central

Park near Five Ways Mall and Gan’s Motors in Empangeni to name but a few). The

complaints were escalated by the Khuleka sub-forum of the Empangeni CPF and culminated

in a station co-ordinated planning against crimes reported at the CPF and other forums.

Operations dealt with a variety of violations including illegal advertising and trading in

numerous gazebo’s in Commercial Road in Empangeni were scheduled.

The joint planning forum emerged with a plan for a multi-disciplinary operation involving the

SAPS, traffic officers, traffic wardens, law enforcement officers (by-law inspectors)

immigration officers, CRG Security, LED officials and Second-hand Goods Officers. The

targeted areas were Central park near the Zululand Observer, Gan’s Motors and Commercial

Road and Power Spar area in Empangeni and Midas in Richards Bay near Ritchie Ford and

Midas. The operation was a huge success and from the date of the operation, there have not

been any vehicles advertised for sale the Central park area that was cleared. All violators

found at Gan’s Motors and Central Park was served with abatement notices admonishing

them to cease their operations within 24 hours. At Power Spar and Commercial Road a

number of abatements were also issued to illegal traders. Five illegal immigrants were

detained and released upon production of their immigration documents. Numerous abortion

stickers were removed from advertising boards, power housings and street lamp poles. The

mechanics at Gan’s were issued with abatement notices and cleared the area but returned a

few days thereafter to re-establish their trade on the original spots.

However, before the traffic department could return to extend this campaign further, the

ABM (Area Based Management) programme commenced.

With the provincial Business Regulation Campaign of EDTEA (Economic Development,

Tourism, Environmental and Arts provincial department) and the ABM, numerous abatement

notices were issued to by-law violators, illegal traders in particular, all over the City including

Enseleni, Esikhaleni, Richards Bay CBD including next to Midas and the taxi rank, Empangeni,

At Home and Hyper, the door to the garage which had been open and leading to a shopping

area in the garage was closed down during the Business Regulation Campaign of the

Department (EDTEA).

PEDESTRIAN MANAGEMENT PROGRAMME

The advent of pedestrians who often use the middle of the roadway to ply their trade or beg

for donations at robotised intersection, has become commonplace. The IJS (Integrated

Justice Forum) was used to address the evident apathy in prosecution or adjudicating on the

matters involving pedestrians who beg at intersections. After the first meeting held in this

quarter, the courts began to convict these offenders accordingly. Quite a number of them

173

who now have suspended sentences as a result realized the need to stand out of the

intersection or roadway in order to beg without breaking the law.

NATIONAL ELECTIONS

From 4 May 2019, the Section was very busy engaged in security planning meetings in

preparation for and to operationalize plans from the National Joint Operations and

Intelligence Structures (Nat JOINTS) in order to assist and support the Independent Electoral

Commission (IEC) to hold peaceful and successful national elections locally.

Officers assisted in escorts of ballot boxes and other election material by police. Needless to

say the elections were a resounding success, thanks to the joint efforts of security services.

NONGOMA REED DANCE

During this prestigious cultural dance event, the Section examines numerous buses for

roadworthiness and escorts such buses conveying Zulu maidens to eNyokeni in Nongoma

for the Reed Dance ceremony. This is done to ensure safety of the maidens. The buses are

also escorted there and back as an extra measure to ensure safety. This was done in relation

to the event held from 8 – 9 September 2019.

ROAD SAFETY EDUCATION AND SERVICES

The road safety activities conducted by Traffic wardens within the City of uMHLATHUZE are

the catalyst in prevention and reduction of pedestrian related road accidents. Crime

prevention in general involves public education and articulation of public values. Allied to

serious road accidents is the heinous crime of culpable homicide. This crime may however be

prevented and crashes may be reduced when law enforcement is augmented with public

values and education and by use of the other pillars of crime prevention.

The Child-in-traffic programme serves to educate the local community and makes the public

aware of the risks and threats to their safety that may be occasioned by incautious usage of

the road network. The programme has targeted vulnerable road users, school children in

particular, and educated them on safe usage of public roads, alertness when traversing such

roadways and making oneself more visible as a pedestrian upon any section of a public road.

The programme has also organised scholars into scholar patrols in order to enable them to

become competent in conducting school-based scholar patrols. Scholar patrols enable

learners to cross busy roadways, crossings and entrances that may be potential red zones

(high accident areas) to road users school children in particular. Learners in Early Childhood

Development Centres (ECDs) and primary schools have thus benefited from the programme.

Traffic Wardens have been used as road safety officers.

Table 56: Number of schools benefited on the school safety programme

THE SAFE-TO-SCHOOL SAFE-TO-HOME (S2S-S2H) SCHOOL SAFETY PROGRAMME

Programme Details Quarter 1 Quarter 2 Quarter 3 Quarter 4

Number of Primary Schools Attended

26 17 24 0

Number of Scholars Attended 3475 2748 11229 0

174

The S2S-S2H Programme is conducted by the municipality through the medium of the traffic

section in partnership with Global Road Safety Partnership South Africa (GRSP-ZA)

The Mayor from uMfolozi municipality, Mrs Moloi from the KZN Department of Transport

and a representative of the Mayor or the Manager: Public Safety for the City of uMhlathuze

Municipality were invited to speak and attended the official launch of the programme in

Mzingazi in March 2019. The engineering assessments of the programme have confirmed

presence of safety issues around local schools namely Floraton Primary School (Aquadene),

uVondlo Primary School (eNseleni) and Mzingazi Primary School (uMfolozi municipality). The

programme is poised to commence implementation of project assessment results.

Table 57: ROAD ACCIDENT STATISTICS

Quarter 1 Quarter 2 Quarter 3 Quarter 4

Fatal 20 20 3 12

Serious Injuries 18 39 21

11

Slight/Minor Injuries 117 117 75

88

TOTAL 155 176 99 111

ROAD ACCIDENT STATISTICS

Figure 101: Road accident statistics per Quarter.

Fatal Serious injuries Slight /Minor injuries

1st Quarter 20 18 117

2nd Quarter 20 39 117

3rd Quarter 3 21 75

4th Quarter 12 11 88

20 18

117

20

39

117

3

21

75

12 11

88

0

20

40

60

80

100

120

140

Road Accident stats

1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

175

Figure 102: Road Blocks

REVENUE STATISTICS AND SERVING OF PROCESS OF NOTICES

Table 58: Notices Issued By Law Enforcement Personnel

NOTICES (“Tickets”) Quarter 1 Quarter 2 Quarter 3 Quarter 4

Sec 56 (In Hand) 800 583 606 777

Sec 341 (On Vehicle/Windscreen)

1116 522 957

1579

TOTAL 1916 1105 1563 2356

Table 59: Escort of Abnormal Loads

Quarter 1 Quarter 2 Quarter 3 Quarter 4

171 246 107 84

TOTAL FOR A YEAR 608

Figure 103: Quartely Escort of abnormal loads Number of escourts

171

246

107

84

0 50 100 150 200 250 300

1st quarter

2nd quarter

3rd quatert

4th quarter

1st quarter 2nd quarter 3rd quatert 4th quarter

Escort of abnormal loads 171 246 107 84

Escort of abnormal loads

176

CAMERA SPEED LAW ENFORCEMENT

On 3 September 2019, the Traffic Services and Operations Section implemented the

speed camera law enforcement using advanced i-Camera (i-Cam) equipment around the

City. The project cameras are used to detect and institute law enforcement procedures

against speeding offenders. The project is implemented based on a service level

agreement contained in a service delivery agreement concluded between the

municipality and a public company known as Traffic Management Technologies (TMT).

Figure 104: Speed Law enforcement Cameras

Speed law enforcement in the City is conducted on strategic sites approved by the

Director of Public Prosecutions (DPP). Manually operated speed machines are also used

to augment the speed management programme. The latter are placed in a roving

manner in various locations around the City. The impact is believed to be positive as

speed is one of the major contributing factors in road crashes. The impact is reflected in

the regular reports submitted to the DPP.

SPEED ENFORCEMENT STATISTICS

Details Quarter 1 Quarter 2 Quarter 3 Quarter 4

Infringements Captured

19 985 69 265 42 328 38139

TOTAL INFRINGEMENTS 169 717 Table 60: Quarterly Speed enforcement Statistics

177

Figure 105: Quaterly Fines Captured

Table 61: WARRANTS OF ARREST EXECUTION STATISTICS

Details Quarter 1 Quarter 2 Quarter 3 Quarter 4

Warrants Executed

17 3 31 84

TOTALS WARRANTS EXECUTED

135

Figure 106: Quarterly payments received from warrants of arrests excecuted

Table 62: ARRESTS - OTHER OFFENCES

Details of Arrest Quarter 1 Quarter 2 Quarter 3 Quarter 4

Reckless or Negligent and Other

0 0 4 0

Pedestrians – Illegal Conduct at Intersections

0 0 2 0

Other 8 6 0 2

TOTAL 8 6 4 2

1st quarter 2nd quarter 3rd quatert 4th quarter

Camera fines Captured 19985 69265 42328 38139

19985

69265

42328 38139

0

10000

20000

30000

40000

50000

60000

70000

80000

Fin

es c

aptu

red

Quarters

Camera fines Captured

2nd Quarter 3rd Quarter 4th Quarter

Warrants of arrest executed 2100 23050 66100

2100 23050

66100

-200000

20000400006000080000

pay

me

nts

re

ceiv

ed

PAYMENT RECEIVED FROM WARRANTS OF ARREST

EXECUTED

178

Two arrests were made with regard to the beggars who stand, kneel or lie upon the

surface of the public roads at intersections to ask for donations. The two were found

guilty of conduct that is likely to constitute danger to other road users and themselves.

Suspended sentences were imposed by the court.

ALCO-DETECTION PROGRAMME

In September 2019, a new programme for random detection of alcohol in drivers who

are driving motor vehicles on public roads was launched by the Traffic Services and

Operations Section. Though slow in the initial take-off the program has gradually

increased the number of drivers arrested for driving whilst under the influence of

alcohol. The programme has continued throughout the financial year.

With continued speed management operations complemented by the Alco-Detection

Programme the enforcement measures continue to positively impact the reduction of

road accidents, thus saving lives. This way the Traffic Section assists the municipality to

ensure a safe and secure environment for the members of the local community and the

City’s visitors or tourists.

Table 63: Offences of driving under influence of intoxication (liquor/narcotic effect)

Nature of Offence Quarter 1 Quarter 2 Quarter 3 Quarter 4

Driving Whilst under the Influence of intoxicating liquor/Drug having a narcotic effect

8 6 7 32

Figure 107: Driving under influence of alcohol/drugs

8

6

7 32

Driving under influence of alcohol/drugs

1st quarter

2nd quarter

3rd quarter

4th quarter

179

Figure 108: Media Coverage of arrests during operations

Table 64: COMPLIANCE INSPECTIONS

Details Quarter 1 Quarter 2 Quarter 3 Quarter 4

Business Licence Site Inspections

9 23 19 9

Informal Trade (“Hawker”) Inspections

575 315 485 573 + 25

Abatement Notices

Hawkers Trained 0 285 0 0

Figure 109: Business and Hawker inspections

1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

Business Inspections 9 23 19 9

Hawker Inspections 575 315 485 598

9 23 19 9

575

315

485

598

0

100

200

300

400

500

600

700

Nu

mb

er o

f In

spec

tio

ns

Axis Title

Business and Hawker inspections

Business Inspections Hawker Inspections

180

PUBLIC AND BY-LAW COMPLAINT INVESTIGATIONS

Various complaints were reported to the Section and law enforcement officers and traffic

officers investigated such complaints and provided feedback. Many of the complaints

relate to nuisances and informal trading against which numerous abatement notices

were issued. The service of investigating public complaints is available and continues to

be provided.

Table 65: Investigated public complaints

Nature of Complaint 1st Quarter 2018/2019

2nd Quarter 2018/2019

3rd Quarter 2018/2019

4th Quarter 2018/2019

Illegal Dumping Complaints 2 9 8 5 Complaints received and attended to aredocumentes(DMS 1276278)

53 46 50 61

Figure 110: Public and BY-Law complaint investigations

MAJOR PUBLIC EVENTS (RECREATIONAL, SIMILAR OR RELATED ACTIVITIES)

Peace officers appointed by a municipality are in terms of the law required to assist with

threats to safety and security at public events. In terms of the Safety at Sports and

Recreational Events, 2010 (Act no. 2 of 2010), this assistance includes powers for

searches and seizures, inspections, removal and impoundment of unauthorised vehicles

found parked upon designated traffic free zones. At entrances to public events, the

National Road Traffic Act, 1996 (Act no. 93 of 1996) allows traffic officers and traffic

wardens to ensure the free flow of traffic by means of traffic control and instructions that

may be given to road users in pursuance of public safety.

2 9 8 5

53 46 50

61

1st Quarter 2nd quarter 3rd quarter 4th quarter

Nu

mb

er

of

com

pla

ins

Quaters

Public and BY-Law complaint investigations

Illegal Dumping Complaints received and attended

181

Table 66: Traffic control and instructions

Recreational or Similar

Events August 2018

September

2018 December 2018 January 2019

Pre-Reed Dance Celebrations

at Ngwelezane Hall (On 18

August 2018)

1

Escort of Reed Dance Buses to

Nongoma (On 07 September

2018)

1

Reed Dance at Nongoma (08-

09 September 2018)

1

DolosFees Music Festival at

Alkantstrand Beach (22-23

September 2018)

1

Transnet Port Festival at Naval

Island (08-09 December 2018)

1

Department of Social

Development Disability

Parliament at Richards Bay

((03-05 December 2018)

1

Dr. 3 Second International

Maskandi Festival at

uMhlathuze Sports Complex

((15 – 16 December 2018)

1

uMhlathuze Mayoral Projects:

Mandlazini, Mzingazi,

eSikhaleni.(Opening of a

Hall,launch of Mzingazi road

and Siyahlola project and

bicycle project. ((14

December 2018)

1

Last Dance Music Festival at

uMhlathuze sports Complex

(31 December 2018)

1

New Year’s Day Celebrations

at Alkantstrand (01 January

2019)

1

182

Table 67: Service Delivery Protests attended to.

Nature of Assembly 1st Quarter 2018/2019

2nd Quarter 2018/2019

3rd Quarter 2018/2019

4th Quarter 2018/2019

1. ENseleni Service Delivery

March (In March 2019)

1

2. Numsa March at Foskor

(from 15 March - 30

April 2019)

1

3. Mondi (In March 2019) 1

4. March for good health by

Seventh Day Adventists

(On 26 August 2018)

1

5. March against Leomat by

Golekane Movement at

Esikhaleni (On 26 August

2018)

1

6. March against Alzeimer’s

Disease by Department of

Sports & Recreation

Richards Bay (On 11 – 13

September 2018)

1

7. March against Service

Delivery on behalf of

Esikhaleni Residents by

Golekane Movement at

Esikhaleni (On 28

September 2018)

1

Induna Strike employees

submit memorandum to

the Local Port in Richards

Bay

TOTAL 4 0 3 0

183

Figure 111: Public Gatherings, Protests & Pickets

Figure 112: Truck drivers protest closing down John Ross Alumina Allee Intersection

TRAINING

On the 1st of October 2018 fourteen (14) of these traffic wardens were enrolled at the

Traffic Training College in Pietermaritzburg in order to be formally trained as traffic

wardens. This training empowered the traffic warden as a peace officer, cultivated basic

skills required for the traffic wardens to competently perform their duties and helped the

Municipality limit its vicarious liability for the public acts of these traffic warden. The

course also entails modules/subjects such as professional conduct, procedures to

0 0

1

0 0 0

1

0 0 0

1

0

1

0 0 0

1

0 0 0

1

0 0 0

1

0 0 0

1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

Public Gatherings,Protests & Pickets

Enseleni March Numsa Foskor March

Mondi March for good health

March against Leomat March against Alzeimer's

March against service delivery Esikhaleni

184

offenders, legals (including powers and duties of a traffic warden), anti-corruption,

financial aspects and traffic control (point duty) etc.

Most of these traffic wardens completed the course on the 26th

of October 2018 and one

only completed it in May 2019. Having lost one to untimely death and with one not

completing the course, only 12 have passed and completed the course. They are now

registered and competent traffic wardens and may be fully utilized in the enforcement of

traffic laws within the scope of a traffic warden.

ANIMAL IMPOUNDMENT

KZNCOGTA has circulated the urgent requirement, to All municipalities, to establish a

Pound or conclude a shared service agreement with other Municipalities or entity to

establish a Pound, and directed to:

Adopt and implement a Pound Bylaw by way of a Council Resolution,

Promulgate the relevant bylaw in the Provincial Gazette in accordance with the

provisions of section 13 of the Systems Act,

Amend their 2018/2019 Integrated Development Plans to include Municipal Pounds

in the said Plans, in the event that the establishment of a Municipal Pound does not

currently feature in the approved Integrated Development Plan,

Allocate a budget for the establishment of a Municipal Pound or a shared service

Municipal Pond, in the Adjustment Estimate of the relevant Municipality,

Establish an operational Pound or shared service pound with another Municipality

or entity.

The establishment of an operational Municipal Pound is a priority on the Agenda of the

Justice, Crime Prevention, and Security (JCPS) Executive Council Cluster, as a result of,

amongst others, the fact that stray animals wander onto municipal roads and provincial

highways, resulting in fatal accidents.

In the meantime, City of uMhlathuze has signed an SLA with a Service Provider effective

1 December 2018, concerning the impounding of stray and abandoned animals.

Keeping in line with legislation, Eshowe animal pound was the closest pound to the

municipality with which an agreement could be considered.

In June 2019, an extensive awareness campaign was launched to augment the IDP

consultations which were conducted in May 2019 on the subject of stray and untended

animals. This campaign targeted farmers or stock owners in the main. At completion,

thereof the impoundment of animals began. Two cows and a bull were seized and

impounded when they were found stray and untended in June 2019. The animals are

currently in the pound in Eshowe.

185

Figure 113: Animals Impounded by means of Law Enforcement Operations.

MOTOR VEHICLE LICENSING

Motor Licensing and Registration under Traffic Services operates in the following areas,:

Empangeni Motor Licensing Bureau

Richards Bay Licensing Bureau

Drivers’ license Testing Centre

The Motor Vehicle Licensing Bureau (MLB) is responsible for, inter alia;

Issuing motor vehicle licence disks,

Renewal of - and registering motor vehicles,

Attending to motor vehicle enquiries.

The Driver’s License Testing Centre;

Booking and testing of learners licensing,

Processing of driver’s license renewals,

Processing of PDP applications and renewals,

Conducting learners’ classes.

Currently the performance agreement between the Municipality and Department of

Transport is being revised in terms of registration and licensing of motor vehicles and

driver’s license testing centre functions. The agreement is revised every (3) three years

between stakeholders.

Statistics

The following statistics reflect the activities for the Traffic Licensing section during third

period year.

Table 68: Motor Licensing Transactions (Administration)

Quarter 1 Quarter 2 Quarter 3 Quarter 4 Combined

Vehicle Registration 6 200 6 386 6 238 15 205 34 029

Vehicles Licenced 24 708 27 963 24 631 25 609 102 911

Other License transactions 96 552 103 679 94 188 88 844 383 263

186

Total Transactions 127 460 138 028 125 057 129 658 520 203

Figure 114: Motor Licencing Transcations

Figure 115: Number of Driver and Learner Licences Processed

Quarter 1 Quarter 2 Quarter 3 Quarter 4 Combined

Total no Applications 1 696 1 356 2112 1702 6 866

Test passed 917 796 959 927 3 599

Test Failed 722 633 754 788 2 897

Failed to attend 67 50 58 75 250

Capture test result 1 703 1 498 1 774 1 772 6 747

Drivers Licence Renewals 2 561 2 614 2 602 2 564 10 341

Dup Learners Licence 36 22 28 39 125

PRDP Applications 705 645 831 789 2 970

PRDP issue 709 584 729 775 2 797

Other DLTC functions 0 0 0 2 2

Oral Tests 0 0 0 2 2

6200 6386 6238 15205

24708 27963 24631 25609

96552 103679

94188 88844

0

20000

40000

60000

80000

100000

120000

1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

Nu

mb

er o

f tr

ansc

atio

ns

Quaters

Motor Licensing Transcations

Licensing Transcations Licensing Transcations Licensing Transcations

1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

No of applications 1696 1356 2112 1702

Test passed 917 796 959 927

Test Failed 722 633 754 788

Failed to attend 67 50 58 75

1696 1356

2112 1702

917 796 959 927 722 633 754 788 67 50 58 75

0500

1000150020002500

Number of Driver and Learner Licences processed

No of applications Test passed Test Failed Failed to attend

187

Figure 116: NUMBER OF TRAFFIC AND LICENSING PAYMENTS AND ENQUIRIES ATTENDED TOO:

Quarter 1 Quarter 2 Quarter 3 Quarter 4 Combined

Payments :

Fines 188 71 66 28 353

TOTAL : 188 71 66 28 353

Enquiries :

Incoming calls 37 732 38 861 35 193 32 034 143 820

Enquiries 49 509 48 714 45 678 43 191 187 092

TMS SCANS to PMB 1 121 855 1 073 1 322 4 371

TOTAL 88 362 88 430 81 944 83967 335 283

1703

2561

36

705

709

1498

2614

22

645

584

1774

2602

28

831

729

1772

2564

39

789

775

0 500 1000 1500 2000 2500 3000

Captured test results

Driver licence renewals

DUP Learners licence

PRDP Applications

PRDP Issued

Number of Driver and Learner Licences Processed

4th Quarter 3rd Quarter 2nd Quarter 1st Quarter

1st Quarter 2nd Quarter 3rd Quarter 4th Quarter

Incoming calls 37732 38861 35193 32034

Enquiries 49509 48714 45678 43191

TMT scans to PMB 1121 855 1073 1322

37732 38861 35193 32034

49509 48714 45678 43191

1121 855 1073 1322 0

10000

20000

30000

40000

50000

60000

ENQUIRIES ATTENDED TOO

Incoming calls Enquiries TMT scans to PMB

188

Figure 117: Quarterly ENQUIRIES ATTENDED TOO

Special Projects

The Licensing section will be establishing a work station at the eSikhaleni Service Centre. The

services offered will be limited to motor vehicle renewals and enquiries only. This will include

a licensing work station, helpdesk and supervisors office.

The community will benefits from the expansion of services which will allow them to access

to such services on their door step. The municipality on the other hand may benefit with

addressing the complaint of long queues at its current licensing offices.

The project should be finalised by the end of August 2019. Department of Transport (DOT)

has welcomed the initiative and committed their resources to the project. April 2019, DOT

inspectors visited the site for the purpose of assessing of the premises and workstations. The

approval of the workstations was subjected to whether it meets the Department of Transport

standards for the installation of licensing equipment. Should the approval be granted, it will

then be gazetted.

The assessment was successful with some minor alterations identified of which the Project

Manager was able to fix without any delays. Currently the municipality are waiting for the

equipment, from DOT to be delivered and installed.

Figure 118: Construction at Esikhaleni Service Centre whereby Traffic Licensing workstation will be allocated

SECURITY SERVICES

The Mandate of the Security Section is to protect Councils assets and Employees as well as

Office Bearers. We have a legislated mandate from PSIRA Act 56 OF 2001, MISS document of

1996 (miss) and Criminal procedure act 51 of 1977. We also deal with illegal occupation of

Municipality land issues and demolitions if there is a Court order. We also deal with

enforcement of bylaws. At times we are affected by community protests whereby protesters

end up coming to the civic and demand to see POB”S violently. We are managing those

situations by the help of CRG and the Police.

189

The security has several contracts in place with private security companies to protect Council

buildings and facilities. It is divided as follows:

- Security at Cash Offices and Electrical Substations

- Security at Council Major Buildings and Sites

- Security at Municipal Halls , Parks and Sports Facilities

- Diverse Security Services

- Security at Water Treatment works and Sewage pump stations and related amenities

More than 130 Council assets and properties are being protected. Five Contractors are

being utilized for this purpose. Each specializing in its own field, making it easier to manage

and to control . This cover all departments and in all aspects related to security.

Squatting and Vagrant Control Team

Council has a team of 15 guards doing “SQUATTING AND VAGRANT CONTROL " which is

a private security company contracted to do the work in greenbelts and open spaces around

the city .

Breakdown of General Squatter Structures and Activity:

Table 69: Alton Security Unit: 01 July 2018 to 30 June 2019

Type of Structure Number Comments and Action

Building in progress 0 0

Foundation stage 0 0

Timber 1795 Removed behind ZCBF, Blue Gum Park, Kusasa

Plastic / Cardboard 3704 Removed at Apex and Dendustry, Burundi, Essen

Wood Spar, Bundu Nursery, Taxi City

TOTAL 5499

Table 70: Other Areas: Security Unit: 01 July 2018 to 30 June 2019 (Mandlazini / Meerensee 5)

Type of Structure Number Comments and Action

Building in progress 1 Stopped and reported

Foundation stage 0 0

Timber 106

Plastic / Cardboard 864 Removed K&K Beach

TOTAL 971

190

Table 71: Ngwelezane, Empangeni Areas) 01 July 2018 to 30 June 2019

Type of Structure Number Comments and Action

Building in progress 2 Ngwelezane - stopped and reported

Foundation stage 0 Ngwelezane - stopped and reported

Timber/ plastic cardboard 494 Removed behind Moth hall and Boxer area

TOTAL 496

*This team has assisted the SAPS on numerous occasions during the night with raids in the

CBD areas with great success and with many arrests made with the assistance of the police.

This varies from the confiscation of drugs and the arrest of illegal immigrants and arrest of

wanted criminals and various other issues. This works was done at no additional cost to

Council and was done as part of their social responsibility commitments. The SAPS was

assisted 34 times with operations during this period.

Beach Protection

This team is also doing Beach protection and additional security is provided in this regard

over the Festive season. This is being done with great success. During festive seasons we

always have a lot of visitors and tourists in our beaches so SAPS cannot fight crime alone

they are assisted by CRG to fight crime. There are many successes because crime rate is

rising during festive.

191

Figure 119: 31 December 2018 at Alkantstrand beach

Cattle Control

Council contracted security guards have also now started to assist in the newly formed

system of the impounding of cattle and stray animals in the suburbs in terms of the Bylaws.

Four guards are being utilized at a time on an ad hoc basis if and when required. During the

day they patrol the suburbs in Richards Bay and other areas on bicycles to detect cattle. The

traffic Section respond to the call of stray catlle, which is then removed by the vehicles and

trailer being that is used to impound cattle.

Figure 120: Cattle impouded

Bicycle Project

The Security Section has also started up a bicycle patrolling project in the suburbs in liaison

with the Police and a private security company is managing the project on and is assisting

the bicycle patrols with back-up armed response vehicles if and when required.

192

This is very successful so far and challenges are being handled accordingly and it will be

dealt with when more finances are available .The Security company is working hand in hand

with the police and focussed on “danger “areas in certain suburbs as in Esikhaleni,

Ngwelezane, Vulindlela and Nseleni, this have great success and it has been reported that

crime reduced significantly in those areas since their introduction. The bicycle patrols are

focussing on the areas identified by the Police as “hot spot “areas and members then act in

numbers when necessary. They are supported by armed response vehicles to respond to

incidents at the time it happens. The security company have a device to locate cyclists while

on patrol their whereabouts. At the N2 nearby Esikhaleni the s a hiking spot used by

community to hike to Durban, that spot is identified as a hot spot whereby people are

robbed their belongings daily. We have deployed a static vehicle on daily basis to protect the

community, currently the crime has dropped. This company also assist y doing random

searches at school and assisting and school bullying, drug possession and use as well as

possession of weapons at schools.

Figure 121: Members having inspection before a deployment.

193

Figure 122: Random search at local a schools.

Figure 123: Drugs, weapons, cell phones confiscated from learners during random search

Random Alcohol testing at Depots, Civic Centre and other buildings.

The Security section in conjunction with the Corporate Services SHE section is randomly

doing breathalyser tests on employees at places of work in accordance with the applicable

policy.

Figure 124: Breathalyzer tests being conducted

194

INFRASTRUCTURE SERVICES

SABELO HLELA

DEPUTY MUNICIPAL MANAGER INFRASTRUCTURE SERVICES

Introduction

The Department Infrastructure Services in the Municipality is charged with the responsibility

to ensure inter alia provision, development, extension and maintenance of infrastructural

networks and bulk supplies. This is in response to the Constitutional mandate of “provision

of services to communities in a sustainable manner and promotion of safe and healthy

environment”.

Key focus areas

Ensure execution and implementation of Capital projects as indicated in the IDP and SDBIP

(component 5) and infrastructure projects

Ensure 100% restoration of water supply for both Planned and Unplanned reticulation within

8hrs

Ensure the eradication of sanitation backlogs by the provision of 2500 additional households

served with sanitation services

Ensure the reduction of water losses to 20%

Ensure that the quality of drinking water comply with the South African national standards at

latest SANS 241

Wastewater Quality compliance of >90% or <50% of cumulative risk ratings based on DWA

standard

Ensure rehabilitation of 8.0 km of tarred roads.

Maintenance of (10800 m²) of tarred roads.

Ensure that 26kms of rural gravel roads be established

Ensure that 100% of planned maintenance on Storm water Drains executed (92 km storm

water open drains, 3076 kerb inlets)

195

Key and high level achievements of the department

The overall target of 100% restoration within 8Hrs was met with no challenges

3 711 additional households served with sanitation services

The quality of drinking water comply with the South African national standards at latest

SANS 241

Rehabilitation of 20.913 km's of tarred roads

Maintenance of 21 992 m² of tarred roads

83.81 km’s of rural gravel roads established

Planned maintenance of 118.52 km's Storm water Drains

TRANSPORT, ROADS, STORM WATER AND COASTAL MANAGEMENT

SERVICES

Provision and maintenance of Roads, Storm water, Coastal management including Rail

Infrastructure.

The Section comprises of the following units:

1. TRANSPORT PLANNING AND STRATEGY

2. URBAN ROADS AND RAIL

3. STORMWATER AND COASTAL MANAGEMENT SYSTEM

4. RURAL ROADS

The Section strives to expand and maintain road infrastructure in order to improve access and

promote Local Economic Development including infrastructure in rural areas and the maintenance of

stormwater facilities.

Transportation Planning and Strategy

The section must ensure that the City of uMhlathuze remains up-to-date with development and to

provide sufficient, modern and futuristic infrastructure as required, by attending to

Signalised intersections, Roads and Stormwater related contracts and quotations, Transportation

planning and Transportation planning projects.

Service Delivery Achievements

Various quotations to improve service delivery were done during the Financial Year

2018/2019 and can be summarised as indicated in the table below:

196

Table 72: QUOTATIONS COMPLETED FOR THE PERIOD - 2018/2019

NO PROJECT DESCRIPTION

1 Quote for the installation replacement of Traffic Signal Controllers in Richards bay

2 Construction of Bus Shelters

3 Painting of Traffic Signal poles Richards bay

4 Quote for the installation replacement of Traffic Signal Controllers in Empangeni

5 Painting of Traffic Signal poles Empangeni

6 Construction and Repairs of Bus Shelters in Mkhobosa & Mandlankala

7 Construction of Bus Shelters Port Dunford

8 Construction of Speed Humps Richardsbay

9 Construction of Pedestrian Walkways Mzingazi

Figure 125: Construction of walkways in Esikhaleni and Mzingazi.

197

Figure 126: Replacement and upgrade of Traffic signal controllers in Empangeni

Figure 127 : Painting of Traffic Signal poles in Richardsbay.

198

F

Figure 128: Construction of Pedestrian Shelters Port Dunford and Nseleni.

Construction of Speedhumps

Figure 129: Oesterbank Meerensee Figure 130 :Oesterbank Meerensee

199

Transportation Planning

This Section attends to Public Transport Projects that can have an impact on the existing and

future roads network and transportation systems. The function also entails traffic model

planning to improve the transportation efficiency in and around the City. Comments are

made on all new development applications and subdivisions where a Traffic Impact

Assessment (TIA) is required and where there will be any influence on the existing and future

roads network. This section assesses Traffic Impact Assessments for existing and new

developments. Roads contribution calculations for the services agreements are done

according to the Roads Services Contribution Policy. This section must ensure effective traffic

flow and that the existing infrastructure will cater for the changing traffic conditions.

Assessments done can be summarised in the table below:

Table 73: The table below indicates a summary of the work completed

Month 2018 - 2019

Planning and Development

Act Applications

Traffic Impact

Assessment

Road Contribu-

tions

Applications

Rezone Commen

t on Plans

Sub- divisio

n

Comment on Items Consent Lease

Formal Authority

Jul-18 10 4 9 2 4 2 8 2 8 10

Aug 8 1 3 1 7 2 4 6 2 1

Sept 13 4 12 4 2 6 5 5 5 1

Oct 3 0 2 0 4 0 3 4 4 4

Nov 12 0 6 3 13 2 9 4 10 1

Dec 4 0 9 0 8 2 4 2 5 0

Jan-19 4 1 3 0 10 6 2 3 7 17

Feb 11 1 2 7 16 2 2 4 2 17

Mar 14 1 4 9 1 2 3 1 5 12

April 8 3 6 6 7 2 6 10 14 3

May 8 4 5 3 2 0 5 6 6 4

June 6 2 3 0 2 0 4 6 7 2

Transportation Planning Projects

Mzingazi Road Upgrade

UWP Consulting was appointed for the Development of a Business Plan for the upgrade of

Municipal Rural Roads. The Business Plan was approved in November 2014 by COGTA and

included in the Municipal Infrastructure Grant (MIG) projects.

After the completion of Phase 1A in Mandlazini, UWP Consulting engineers commenced with

the second phase of the project which includes the upgrade of one of the Mzigazi Village

main roads. The Contractor, Sikoti Investments cc was appointed on a 9 month project and

according to the programme; construction commenced in 9 October 2018 and is supposed

to be completed on 1 August 2019.

200

The extent of the project is as indicated on the plan below:

Figure 131: Mandlazini Roads upgrade Extent Project site plan still under construction:

Figure 132 :MIG project Mandlazini Bus Road under construction

201

Figure 133: MIG project Mandlazini Bus Road - kerb inlet under construction

URBAN ROADS & RAILWAY SIDINGS

The Urban Roads Section services the City of uMhlathuze's total urban area from three main

Depots and the main Civic Centre in Richards Bay. The City is divided into the following

three areas:

- Western Area: Empangeni, Ngwelezane and Wards 9, 23 to 29.

- Southern Area: eSikhaleni, Vulindlela and Wards 10 to 22 and 30.

- Northern Area: Richards Bay, eNseleni and Wards 1 to 8.

A total of 580.4 km of Urban roads are maintained within the City. The description of work

performed as per Works Orders are reflected in the table below:

NB: NORTH = Richards Bay, Mzingazi, Mandlazini and eNseleni

SOUTH = eSikhaleni & Vulindlela

WEST = Empangeni, Ngwelezane, Dumisane Makhaye Village and Felixton.

202

Table 74: Maintenance Works carried out on the 2018/2019 Financial Year

ROADS AND STORMWATER OPERATIONS AND

MAINTENANCE – FOURTH QUARTERLY REPORT

Year ANNUAL 2018/2019

Area North South West

Unit Total Total Total

Walkways – Cleaned (Internal Teams) m 33680 779 7247

Walkways – Cleaned (Contractors) m 43206 5976 29619

Walkways - Replaced (Internal Teams) m2 673 - 523.01

Kerbing – New (Internal Teams) m - - 202

Kerbing – Cleaned m 162 10 28

Kerbing – Repaired/Replaced (Internal Teams) m 337 98 55

Kerbing – Repaired/Replaced (Contractor) Three

Year Replacement Contract 8/2/1/UMH413-

18/19

m - - 677

Area North South West

ANNUAL 2018/2019

Unit Total Total Total

Pothole Repairs m2 900 314.91 263

Pothole Patching m2 968 1703.95 4423

Pothole Preparations m2 211 1015.18 3624

Patching Contractors 2 year Tender 8/2/UMH35-

16/17

m2 3106.36 2988.10 -

Thesen - Replaced No 383 - -

Bollards - Replaced No - - 73

Speed Humps No 3 30

Driveways Repaired m2 266 48 11

Public Parking Repaired m2 589

Paving Bricks Replaced m2 33.5

Road Shoulders Repaired m2 3843.06

203

Table 75: REHABILITATION ANNUAL PROGRAM FOR 2018/2019 FINANCIAL YEAR

RECORD OF ROAD REHABILITATION 2018/2019

ROAD NAME LENGTH(M) WIDTH(M)

LENGTH FOR

KPI

>8

width/8 x

length

DATE

STARTED

DATE

COMPLETED

1. NGWELEZANE ROAD /

EMPANGENI 674.8 15.5 674.8 11/7/2018 25/7/2018

2. BRONZE ROAD

EMPANGENI 502.1 7.2 502.1 26/7/2018 1/8/2018

3. STEELWAY ROAD

EMPANGENI 196.5 7.2 196.5 31/7/2018 1/8/2018

4.COPPER DRIVE EMPANGENI 443.4 7.3 443.4 2/8/2018 2/8/2018

5.LOOD LAAN EMPANGENI 177.3 7.3 177.3 3/8/2018 3/8/2018

6. EMANGWENI ROAD

NGWELEZANE 466.4 7.3 466.4 6/8/2018 7/8/2018

7. KHOMBINDLE ROAD

NGWELEZANE 325 5.5 325 8/8/2018 8/8/2018

8. ZIGABISE ROAD

NGWELEZANE 365 5.5 365 8/8/2018 8/8/2018

9. HLANGANANI ROAD

NGWELEZANE 312 5.5 312 13/8/2018 13/8/2018

10. SHAYAMOYA ROAD

NGWELEZANE 619 5.6 619 14/8/2018 14/8/2018

11. FUNDANI ROAD

NGWELEZANE 566 5.5 566 15/8/2018 15/8/2018

12. MAQHAMSELA

NGWELEZANE 579 5.5 579 16/8/2018 26/9/2018

13. EZINGADINI

NGWELEZANE 920 5.8 920 16/8/2018 21/8/2018

14. KHANYISE NGWELEZANE

FIRST SECTION 288 5.6 288 21/8/2018

SECOND SECTION 556 3.5 556

22/8/2018

15. MPALA NGWELEZANE 1188 5.5 1188 24/8/2018 28/8/2018

16. PHESHEYA NGWELEZANE 611 7 611 29/8/2018 30/8/2018

204

17. MPUNZI NGELEZANE 186 5.5 186 30/8/2018 30/8/2018

18. MDONI NGWELEZANE 62 5.5 62 30/8/2018 30/8/2018

19 . NYAMAZANE

NGWELEZANE 554 5.6 554 4/9/2018 5/9/2018

20. MGANKLA NGWELEZANE 278 5.7 278 5/9/2018 5/9/2018

21. NKONKONI NGWELEZANE 762 5.6 767 6/9/2018 6/9/2018

22. BHEJANE NGWELEZANE 182 5.6 182 7/9/2018 10/9/2018

23. PHESHEYA BUS LAY BYE

NGWELEZANE 70 3.55 70 7/9/2018 7/9/2018

24. IDADA NGWELEZANE 218 5.6 218 10/9/2018 10/9/2018

25. EZINTOTI NGWELEZANE 241 5.5 241 11/9/2018 11/9/2018

26. THULASIZWE

NGWELEZANE 286 5.5 286 11/9/2018 11/9/2018

27. EBOYENI NGWELEZANE 615 5.5 615 12/9/2018 13/9/2018

28. INGWE NGWELEZANE 135.6 5.5 135 13/9/2018 13/9/2018

29. MADIDA NGWELEZANE 520 7.1 520 13/9/2018 14/9/2018

30. MTHUNGWA

NGWELEZANE 341 5.5 341 17/9/2018 17/9/2018

31. WHITE CITY

NGWELEZANE 660 5.6 660 19/9/2018 21/9/2018

32. BENAMILE NGWELEZANE 469 5.7 469 21/9/2018 25/9/2018

33. ZWAKALA NGWELEZANE 164 6 164 25/9/2018 25/9/2018

34. THINASOBABILI

NGWELEZANE 88 7 88 25/9/2018 25/9/2018

Total Quarter - 1- Road

Rehabilitation (M). 14621.1

14625.5

35. KNUTZEN ROAD

EMPANGENI 663.6 9.2 763.14 15/10/2018 23/10/2018

36. FLAMBOYANT

EMPANGENI 395 6.4 395 24/10/2018 24/10/2018

37. GERMINI EMPANGENI 416 6.5 416 25/10/2018 30/10/2018

38. INTREPID EMPANGENI 664 6.5 664 30/10/2018 7/11/2018

39. CONRAD ROAD

EMPANGENI 584 6 584 7/11/2018 9/11/2018

40. FUKWE ROAD

EMPANGENI 189 9 189 12/11/2018 12/11/2018

205

41. REX HENDERSON

EMPANGENI 253 9.5 300.44 13/11/2018

42. PARKING AREA - REX

HENDERSON ROAD

1 . RIGHT HAND SIDE - BUS

LAYBY 70 3.5 70

2. LEFT HAND SIDE -

PARKING AREA 60 5.5 60

3. LEFT HAND SIDE -

PARKING AREA 37 7 37

14/11/2018

43. MACK ROAD EMPANGENI 645 6 645 15/11/2018 16/11/2018

Total Quarter - 2- Road

Rehabilitation (M) 3976.6

4123.58

Total Road Rehabilitation for

2018/2019 18749.07

Below are before and after pictures of the road Rehabilitation Program for the 2018/2019

financial year;

Figure 134: Road Rehabilitation Program for the 2018/2019 financial year;

206

Rex Henderson- Empangeni

MUINICIPAL RAILWAY SIDINGS

The Municipality owns and maintains 17 kilometres of rail sidings. A Rail Safety Permit is

annually applied for, of which one of the conditions is that Council must compile a quarterly

report which is sent to the Rail Safety Regulator, a body responsible for the safe operation of

all the Country’s rails on behalf of Transnet. The current permit which has been renewed is

valid from 28 February 2018 to 28 February 2019.

All the funds required to maintain the sidings are paid by the respective industrial and

commercial land owners whose property is adjacent to the rail tracks. These businesses are

levied once a year based on the previous year’s maintenance expenses incurred by Council

on a pro-rata basis depending on the size of their respective properties.

In order to comply with the Rail Safety Permit conditions, monthly inspections need to be

carried out on the sidings, resulting in maintenance work that has to be carried out. The

latest maintenance schedule resulting from the inspections.

Currently, the maintenance work is being carried out on Council's behalf by WES Railway

Construction appointed as from 01 June 2018 for the three-year contract overseen by R & H

Rail Consultants. The contractor is responsible for all daily inspections for the municipal rails

and also attends railway maintenance matters. Once a month the risk assessment inspections

are conducted with the representative from Transnet, R & H Rail Consultants, WES Railway

Construction and uMhlathuze Municipality. The contractor has done the maintenance of

12,873 km railway tracks and 32 sets of turnouts for this quarter.

Figure 135:Rail Maintenance of feedline from Bhizolo to the Exchange Yard in Alton

207

MAINTENANCE ACTIVITIES RELATE TO ROAD MARKINGS AND SIGNAGE.

ROAD MARKING SECTION

Figure 136: Work performed by the Road Marking Section for the 2018/2019

DESCRIPTION UNIT ANNUAL QUANTITIES

Circle Sign number 0

Drop zone number 0

Speed hump number 192

Sharp curve number 3

Stop number 165

Street name number 107

Yield number 121

Yield to the right number 2

No right turn number 9

Children cross number 0

40km/h number 5

Pedestrian cross number 13

Road narrow to left number 1

Road narrow to right number 0

No stop number 90

Stop ahead number 9

Keep left number 22

60km/h number 7

Bus stop number 3

Chevron number 58

Robot ahead number 11

208

No entry number 22

Side junction to the right number 2

Side junction to the left number 1

Children Ahead number 2

No overtaking number 0

Pedestrian priority sign number 5

No parking number 3

Beginning of dual lane number 0

No left turn number 3

20Km/h number 30

Conceal drive way number 0

10ton number 1

Wind sign number 1

Cul -de- sac number 7

Number 3 for three way stop number 7

Tow away zone number 70

One way number 5

Bus and Taxis number 4

Information sign number 10

Duty point number 0

Stop line number 0

Sharp curve number 1

White parking lots number 0

Children cross ahead number 5

camera sign number 0

209

number 4 for four way stop number 4

Danger sign number 2

No U-Turn number 5

T-junction number 1

80km/h number 0

TOTAL 1009

SUMMARY 2018/19 FY

(THERMO & REFLECTIVE PAINT) UNIT QUANTITY

100 mm wide white - retro reflective metre 211084.41

100 mm wide white- thermo plastic metre 56852.86

150mm wide white - retro reflective metre 3576.5

150mm wide white - thermo plastic metre 669.3

200mm wide white - retro reflective metre 1931.1

200mm wide white - thermo plastic metre 2490.6

100mm wide yellow - retro reflective metre 84780.8

200mm wide yellow - thermo plastic metre 2936

White hand work - retro reflective metre 7712.855

White hand work - thermo plastic metre 3774.57

Yellow hand work metre 7789.514

Road studs - Red/Red number 2886

Road studs - White/Red number 5133

Road studs - Red/Yellow number 5181

Road studs - White/White number 1711

210

Figure 137: Esikhaleni Mdoni Street Figure 138: Empangeni Maxwell Street Table 76: Erected traffic signs: all areas combined

ACTIVITIES UNIT ANNUAL TOTAL

Circle Sign number 0

Drop zone number 0

Speed hump number 192

Sharp curve number 3

Stop number 165

Street name number 107

Yield number 121

Yield to the right number 2

No right turn number 9

Children cross number 0

40km/h number 5

Pedestrian cross number 13

Road narrow to left number 1

Road narrow to right number 0

No stop number 90

Stop ahead number 9

Keep left number 22

60km/h number 7

Bus stop number 3

Chevron number 58

Robot ahead number 11

No entry number 22

Side junction to the right number 2

211

Side junction to the left number 1

Children Ahead number 2

No overtaking number 0

Pedestrian priority sign number 5

No parking number 3

Beginning of dual lane number 0

No left turn number 3

20Km/h number 30

Conceal drive way number 0

10ton number 1

Wind sign number 1

Cul -de- sac number 7

Number 3 for three way stop number 7

Tow away zone number 70

One way number 5

Bus and Taxis number 4

Information sign number 10

Duty point number 0

Stop line number 0

Sharp curve number 1

White parking lots number 0

Children cross ahead number 5

camera sign number 0

number 4 for four way stop number 4

Danger sign number 2

No U-Turn number 5

T-junction number 1

80km/h number 0

TOTAL

1009

STORMWATER SYSTEMS AND COASTAL ENGINEERING SECTION

The Stormwater System and Coastal Planning Section is responsible for the overall

Stormwater Management and Operation functions throughout the City.

It also deals with the Coastal Management functions such as Beach Rehabilitation and

Maintenance through the cooperation of various stakeholders that are involved in all

activities and functions along the City’s coastline viz.

King Cetshwayo District Municipality

Transnet National Ports Authority

KZN Wildlife Authority

212

STORMWATER SYSTEMS OPERATIONS AND MAINTENANCE

The Operations and Maintenance functions of the Stormwater Infrastructure Component is

dealt with both in-house (internally) which forms part of the un-planned maintenance and

out-sourced (externally) which forms part of the planned maintenance.

The Stormwater Maintenance (unplanned/planned) function is shared with the Urban Roads

Section and work executed during the Financial Year July 2018 to June 2019 is as follows:

Table 77:The Stormwater Maintenance (unplanned/planned)

STORMWATER OPERATIONS AND MAINTENANCE -

Year 2018 / 2019

Quarter 1 2 3 4

PLANNED/UNPLANNED

MAINTENANCE Unit

Total

Stormwater Kerb Inlet / Junction Box

/ Wingwall - New No 2 2

Stormwater Kerb Inlet / Junction Box

/ Wingwall - Repaired No 5 17 44 66

Stormwater Kerb Inlet / Junction Box

/ Wingwall - Cleaned No 446 498 539 187 1670

Stormwater Kerb Inlet / Junction Box

/ Wingwall -Cover Replaced No 17 38 76 131

PLANNED/UNPLANNED

MAINTENANCE Unit

Stormwater Pipes – Repair / replace m 10 2 18 30

Stormwater Pipes – Cleaning / High

Pressure Jetting m 955 355 809 2119

Stormwater Subsoil Drains - Cleaning m

Open Stormwater Earth/ Concrete

Drain Cleaning m 47561 93307 30 696 64359 235923

Open Stormwater Earth/ Concrete

Drain Repaired m 5 1301 1306

Street Cleaning m 341

555 375173

291

564

13943

1 1 147 723

Walkways Cleaning m 44 648 10150 34 661 19233 108 692

The section procured the service of 14 Small Emerging Contractors to undertake the Planned

Maintenance work of cleaning the Stormwater Servitudes, Streets and Walkways throughout

213

the City. Below is an extract sample of their monthly reports outlining the maintenance work

undertaken.

Table 78. Records of the progress on the work undertaken during 2018/19

The Stormwater Maintenance Contractors have performed quite well during this period, and

there are plenty of satisfactory reports from both the public as well their employers (Council).

Below are further photographs evident of the stormwater servitudes maintenance that is

being performed by the various contractors.

AREA WARD

NO. OF KERB

INLETS,

STORMWATE

R MANHOLES

AND

HEADWALLS

CLEANED

LENGTH OF

OPEN

DRAIN

CHANNEL

CLEANED

LENGTH

OF ROAD

CLEANED

LENGTH OF

WALKWAYS

CLEANED

MONTHLY

NO OF

MINIMUM

WORKERS

REQUIRED

AVERAGE NO

OF

MINIMUM

WORKERS IN

ATTENDANC

E PER

MONTH

(No.) (M) (M) (M)

A 1, 3 20 610 47 738 1 720 15 15

B 3, 4 39 847 9 325 3 841 15 13

C 2, 26 105 5 556 246 15 15

D 2 3 371 2 105 15 15

E 2 5 237 15 15

F 2 1 395 1 638 15 15

G 6, 7, 26 208 7 067 1 663 15 15

H 9, 23, 27, 28 29 1 210 847 15 15

I 9, 24 13 2 089 15 15

J 9 10 784 584 15 15

K 9 807 5 613 15 15

L 23 3 1 320 6 092 1 890 15 15

M 16, 17, 19,

20, 21, 22 20 2 148 95 15 14

N 23, 30 5 439 987 15 14

TOTAL 134 5 891 102 501 14 185 206

214

Figure 139: Stormwater servitude maintenance at J Section

A few Capital Projects have also been performed during this annual period, indicated as

below:

PEDESTRIAN BRIDGES CONSTRUTION IN WARDS 1 & 24

Figure 140: New pedestrian bridge in ward 1 Figure 141: New pedestrian bridge in Ward 24

215

CONSTRUCTION OF NEW BULK STORMWATER CHANNELS FOR THE AQUADENE HOUSING

PROJECT

Figure 142: The Northern Channel 1 depicted in the above layout is currently under construction.

RURAL ROADS OPERATIONS

The Rural Road Operations Section constructs all work for the citizens of the City living in

Rural Areas. There are 29 wards within the City of uMhlathuze that have Rural Areas. These

Rural Areas comprising of 5 different areas which are mainly under the Traditional Authority

(Amakhosi). These are the 5 areas which the City of uMhlathuze services:

KWADUBE

KWAKHOZA

KWAMADLEBE

KWAMKHWANAZI

NTAMBANANA

The Rural Roads Operations mainly include the following operation which it reports on in a

quarterly basis:-

RURAL ROADS

ACCESS ROADS

PIPE CULVERT BRIDGES

216

In the 2018/2019 Financial Year, Rural Roads Graded 436.9 km’s of roads, Gravelled 63.45

km’s and Installed 4 Pipe Culvert Bridges and Cleaning Congested Pipe Culverts on a

continuous basis thereby assisting hundreds of residents residing in the Rural Areas.

THE TABLE BELOW REPRESENTS THE TOTAL WORK THAT HAS BEEN EXECUTED IN THE

2018/2019 FINANCIAL YEAR: 1 JULY 2018 TO 30 JUNE 2019

Figure 143: TOTAL WORK THAT HAS BEEN EXECUTED IN THE 2018/2019 FINANCIAL YEAR ON

RURAL ROADS DATE Roads Graded Roads Gravelled SW Pipe Culverts

Km's

Graded

Work in Wards Km's

Gravelled

Work in Wards No Sites Work in

Wards

Jul-18 34.21 15,13,5,4,32,31,25,34,30,10,11,28 5.27 12,6,7,8,4,1 0

Aug-18 8.82 5,4,10,11,34,28,29 12.15

12,15,13,1,2,31

,25,11,30,34,28

,29

0

Sep-18 9.21 15,16,13,5,4,6,32,33,10,29,11,34 11.92 16,18,25,27,24,

33,31,10 0

Oct-18 19.91 15,13,12,6,4,32,25,24,11,34,10,30 9.97 5,8,32,31,24,34

,10,14 0

Nov-18 19.40 13,19,5,24,25,27,30,10,34,29,11,28 8.49 4,1,5,24,25,30,

13,21 2 19

Dec-18 20.44 18,12,15,6,1,5,8,4,32,31,28,11,29 3.79 27,31,24,32,29,

18 0

Jan-19 38.90 4,5,6,34,10,29,28,11,30 3.46 29,28,27 0

Feb-19 91.34 15,16,12,14,13,22,6,4,5,10,30,11,2

9,33,24 0.15 24 0

Mar-19 40.75 12,13,18,6,5,10,34,29,28,31,33,32,

25 6.78 14,6,7,28,29,11 0

Apr-19 43.64 18,22,17,13,12,16,14,6,4,1,8,5,34,1

0,11,29,33,32 0.00 0

May-19 67.99 15,14,19,18,22,13,6,5,29,11,34,10,

28,30,33,31 0.43 29 1 10

Jun-19 42.29 18,15,14,13,12,20,5,6,4,10,29,28,3

0,31,32,24,25 1.04 4,5,28 1 29

Various Earth Moving Plant are used by the Section to carry out their function and Council

has already invested in its own Plant in order to best execute its mandate.

217

GRADING PROGRAMME AND OTHER INFORMATION

A Total of 436.9 kilometres of Grading was done in all Wards for the financial year 2018/2019

and the work was carried out throughout the 12 months.

The work carried out is reflected in the graph below:

Figure 144: Grading done in all Wards for 2018/2019

GRAVELLING PROGRAMME AND OTHER INFORMATION

A Total of 63.45 kilometres of Graveling was done in the 2018/2019 financial year and the

work was carried out throughout the 12 months.

The work carried out is reflected in the graph below

Figure 145: A Total of 63.45 kilometres of Graveling was done in the 2018/2019 financial year

0

10

20

30

40

50

60

70

80

90

100

Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19

GRADING PROGRAMME

Planned Grading Actual Grading

Kilo

metr

es

0

2

4

6

8

10

12

14

Jul-18 Sep-18Nov-18Jan-19 Mar-19May-19

GRAVEL PROGRAMME

Planned Gravel Actual Gravel

Kilo

me

218

Graded and Gravelled roads: Grading Figure: Gravelling

Figure 146:Ward 5 KwaKhoza Grading Figure 147: Ward 5 KwaKhoza Gravelling

PIPE CULVERT BRIDGES

Various Pipe Culvert bridges are installed around the rural area in assisting with crossing in

high demanding areas. The section identifies areas that require the bridges urgently on an

annual bases assisted by the ward Councillors. A total of 4 Pipe Culvert Bridges were

constructed in the 2018/2019 financial year.

Picture: Before and after picture of road constructed with a Pipe Culvert Bridge

Figure 148: Ward 27 Madlebe

TOTAL WORK CARRIED OUT/EXECUTED

This is all the Grading, Graveling and Pipe Culvert that has been carried in the 2018/2019

Financial Year

219

Table 79: Grading, Graveling and Pipe Culvert 2018/2019

TOTALS KM’S GRADED KM’S GRAVELLED PIPE CULVERT

2018/2019 436.9 km 63.45 km 4 Sites

WATER AND SANITATION SERVICES

The Water and Sanitation Services Section in the City of uMhlathuze has the following sub -

sections:

- Infrastructure Maintenance

- Scientific Services

- Water Demand Management, Planning and Strategy

- Customer Services, Retail and Marketing

KEY FACTS OF WATER AND SANITATION BUSINESS

The City of uMhlathuze in its capacity as the Water Services Authority and juristic entity is

compelled by the following acts:

Water Services Act 107 of 1997

To provide for the rights of access to basic water supply and basic sanitation

RECOGNISING the rights of access to basic water supply and basic sanitation necessary to

ensure sufficient water and an environment not harmful to health or well-being,

RECOGNISING that in striving to provide water supply services and sanitation services, all

spheres of Government must observe and adhere to the principles of co-operative

government,

RECOGNISING that the provision of water supply services and sanitation services, although

an activity distinct from the overall management of water resources, must be undertaken in a

manner consistent with the broader goals of water resource management;

ENSURING that the quality of the city’s water resources, portable water and wastewater

systems are continually monitored in an endeavour to maintain quality and evaluate against

set standards/specifications/guidelines.

220

Water Services Bylaws

The Water Services Act 108 of 1997 stipulates that Water Services Authorities and local

authorities need have the necessary Water Services Policies and Water Services By-laws in

place.

Bylaws Description

Water Services

Bylaw

DMS 836540

Review in June 2014. The Water Services Act 108 of 1997 stipulates

that Water Services Authorities and local authorities need to have the

necessary bylaws implemented and review regularly.

Infrastructure Maintenance: relates to potable water distribution and sewer networks.

The infrastructure Maintenance is responsible for Operation and Maintenance of all Water

and Wastewater delivery infrastructure, including customer liaison and financial controls.

Infrastructure Maintenance also provides all in-house capital funded infrastructure

development. uMhlathuze Municipality owns and operates infrastructure that it has built,

upgraded and inherited since its establishment.

Section 57(5) of the Municipal Systems Act and the Performance Regulations gazetted in

Notice No 805 as published on 1 August 2006, provides that performance objectives must be

based on Key Performance Indicators as set out in the Municipality’s Integrated

Development Plan.

The key performance areas in terms of the Infrastructure Maintenance Section as prescribed

in the Plan are as follows:

Operations and Maintenance - Potable water Infrastructure Network.

Operations and Maintenance - Sanitation Infrastructure Network.

2.1 Operations and Maintenance – Water and Sanitation infrastructure network

2.1.1 Water reticulation network

221

Asbestos Cement (AC) pipes installed from the early 1970s at the City of uMhlathuze’s water

network are used to reticulate water to the community. AC pipes were installed mainly

because they were affordable, non-corroding alternative to metallic pipes in areas prone to

corrosion.

AC pipes deteriorate as a result of a variety of factors, including working environment,

operational conditions over the years with little or no maintenance attention and when

stresses such as pressure and soil bearing exceed their strength, consequently they fail. Due

to the variability in the deterioration rate of AC pipes, the condition of AC pipes is of utmost

importance.

AC pipes deteriorate by degradation depth (thickness) of the inner and outer walls, thus

compromising the overall strength of the pipe to an extent that the pipe size itself

contributes to breakages if differential pressures between internal pressures due to water

and soil bearing are not in equilibrium. In other words, factors such as vibrations can cause a

tilt from the equilibrium, thus posing stress to the already deteriorated pipe.

Pipe degradation depths are correlated with pipe residual strengths, microstructure

characteristics, pipe age, water quality, and flow dynamics due to unevenly eroded internal

surface of the pipe and soil properties.

Listed below is the range of internal degradation with respect to AC pipes:

- Water with low aggressiveness index.

- Soft water or water with low alkalinity

- Soil movement especially to small diameter pipes as AC pipes are extremely

brittle when considering the mechanical property.

- Furthermore, constructed structures on pipe servitudes or grounds compromise

the integrity of the AC pipe. Therefore, re-routing of pipes is required.

Sewer reticulation network

There are two causes of blockages and collapse or failure of an Asbestos Cement (AC) pipes

in a sewer system:

Introduction of foreign unsolicited objects into the sewer system, such as through open

manholes covers.

Corrosion due to hydrogen sulphide.

Open manholes have been a consequence of theft of steel covers, vandalism of concrete

covers and effects of hydrogen sulphide on the concrete covers. Also, due to open

manholes, sand is introduced into sewer systems.

222

Since most sewer manholes are constructed from concrete, bricks and mortar, hydrogen

sulphide attacks mortar thus resulting in a weakened or compromised manhole structure,

resulting in the bricks falling into the system.

Procurement of polymer plastic covers is on-going to curb factors that result in open

manholes.

The water and sanitation section: infrastructure maintenance (urban & rural) is divided into

three following area offices:

Northern (Richardsbay and surroundings)

Southern (eSikhaleni, Dlangezwa and surroundings)

Western (eMpangeni, Ngwelezane and surroundings)

Mechanical section

Infrastructure maintenance (urban and rural) – northern

Table 80: Water Infrastructure Maintenance for 2018/2019 financial year

Water Infrastructure Maintenance Annual - 2018/2019

Ward Pipe

burst

Valve

maintained

Air Valve

maintained

Meter

maintained

Meter

replaced

New Water Meter

connections

New Meter

Business /

Commercial

Fire hydrant

maintained

1 16 9 5 163 139 20 0 100

2 9 8 4 99 70 2 0 17

3 8 11 9 113 78 4 0 151

4 43 17 23 380 249 57 4 141

5 16 0 6 64 230 26 1 18

6 23 0 8 76 223 20 0 14

7 7 6 0 27 75 15 0 5

8 17 4 4 55 67 4 1 16

26 1 5 0 24 39 0 0 15

TOTAL 284 60 59 1001 1170 148 6 477

% 8.86 1.87 1.84 31.23 36.51 4.62 0.19 14.88

223

Figure 149: Water maintenance

Figure 150: Sewer Infrastructure Maintenance for 2018/2019 financial year

Sewer Infrastructure Maintenance Annual - 2018/2019

Ward

Sewer

blockages /

overflows

Sewer pipe

jetting

Manhole

repaired

Sewer

connections

repaired

New Sewer

connection

1 131 11 15 2 0

2 127 14 6 4 0

3 153 17 24 6 0

4 94 11 21 6 1

5 0 0 0 3 0

6 0 0 0 0 0

7 0 0 0 0 0

8 254 4 0 0 0

26 28 3 2 1 0

TOTAL 787 60 68 22 1

% 83.9 6.39 7.25 2.35 0.11

Pipe burst, 8.86%

Valve maintained, 1.84%

Air Valve maintained,

1.84%

Meter maintained,

31.51%Meter replaced, 36.51%

New Water Meter

connections, 4.62%

New Meter Business /

Commercial, 0.19%

Fire hydrant maintained,

14.88%

224

Figure 151:Sewer Infrastructure Maintenance for 2018/2019 financial year

INFRASTRUCTURE MAINTENANCE – SOUTHERN

Table 81: Operations and maintenance- Potable water Infrastructure Network

Ward Pipe

burst

Water leaks

/ Mainline

Maintenan

ce

Main line

maintenan

ce

Valve

Maintenanc

e

Building

Maintenance

Meter

maintained

Meter

replaced

New Water

Meter

connections

Fire hydrant

maintained

10 0 806 13 6 24 38 39 5 0

11 0 526 0 2 0 48 42 4 0

12 0 375 0 4 1 36 41 0 0

Sewer blockages / overflows, 89%

Sewer pipe jetting, 6.4%

Manhole repaired, 7.25%

Sewer connections repaired, 2.35%

New Sewer connection, 0.11%

225

13 0 233 3 1 11 48 72 5 0

14 0 320 3 9 0 52 22 0 0

15 0 453 2 43 59 58 2 0

16 2 123 0 69 3 52 11 0

0

17 0 153 0 1 0 44 30 0 0

18 0 819 8 2 33 49 54 4 0

19 0 275 14 0 36 41 59 0 0

20 0 316 5 3 2 58 64 0 0

21 0 237 11 12 18 71 46 0 0

22 3 313 2 22 18 35 63 0 0

30 0 32 3 0 0 41 2 6 0

34 0 12 0 0 0 23 5 0 0

TOTAL 3 4596 72 131 187 701 608 26 0

0.05% 72.68% 1.14% 2.07% 2.96% 11.08% 9.61% 0.41% 0%

Operations and Maintenance on potable water infrastructure as of 01 July 2018 to 30 June 2019 is

tabled at 1.2

Fig.3 Potable water Infrastructure Network Chart

226

Operations and Maintenance on potable water infrastructure as of 01 June 2018 to 30 June 2019 is

tabled at 1.2

1.3 Operations and Maintenance - Sanitation Infrastructure Network

Ward

Sewer

blockages /

overflows

Sewer

pipe

jetting

Sewer

mainline

maintenanc

e

Manhole

Inspectio

n

Manhol

e

repaired

Sewer

connecti

ons

repaired

New

Sewer

Connect

ions

Sewer

Mainlin

e

Inspecti

on

10 0 0 0 1 0 0 0 0

11 0 0 0 0 0 0 0 0

12 0 0 0 0 0 0 0 0

13 0 0 0 0 0 0 0 0

14 0 0 0 0 0 0 0 0

15 0 0 0 2 0 0 0 0

16 170 34 0 3 0 0 0 21

17 133 54 0 2 0 0 0 23

18 0 0 0 0 0 0 0 0

Infrastucture Water Network Chart

pipe burst

Water leaks

Main line manitainance

Valve Maintanance

Building Maintanance

Meter maintanance

Meter replaced

New water Meter Connections

227

19 239 97 0 13 0 0 0 37

20 247 121 0 12 0 0 0 44

21 220 91 2 12 0 0 0 51

22 204 81 0 0 0 0 0 36

30 95 23 1 0 0 0 0 13

34 0 0 0 0 0 0 0 0

TOTAL 1069 501 3 45 0 0 0 225

PERC(%) 58% 27.18% 0.16% 2.44% 0% 0% 0% 12.21%

Figure**:

INFRASTRUCTURE MAINTENANCE (URBAN AND RURAL) – WEST

Operations and maintenance- Potable water Infrastructure Network

Ward Pipe

Burst

Water

leak/install

ation of

Building

Maintenan

Valve and

air valve

maintenan

Meter

maintained

Meter

Replaced New water

meter

Fire

Hydrant

maintenan

Sanitation Infrastructure Network

sewer blockage

Sewer pipe jetting

Sewer mainline

Manhole Inspection

Sewer mainline insepction

228

pipes ce ce connection ce

9 35 386 4 21 137 98 6 29

23 19 449 1 8 216 176 25 28

24 57 624 1 5 158 249 11 20

25 6 63 1 0 7 37 1 17

27 16 113 1 1 35 158 1 0

28 18 211 1 1 31 234 1 0

29 11 215 0 0 12 109 0 0

31 1 103 0 0 6 15 2 0

32 32 224 0 0 11 5 2 0

33 19 81 0 0 5 9 0 0

Total 214 2463 9 36 618 1090 49 94

% 4.68 53.86 0.2 0.79 13.51 23.84 1.07 2.06

229

Fig.1 Potable water Infrastructure Network Chart

1.3 Operations and Maintenance - Sanitation Infrastructure Network

Ward

Sewer

blockages /

overflows

Sewer pipe

jetting

Manhole

repaired

Sewer

connections

repaired

New Sewer

connection

9 250 61 8 86 119

23 256 75 9 94 128

24 211 43 5 83 99

27 9 64 3 20 26

28 35 254 2 79 85

Total 761 497 27 362 457

% 36.17 23.62 1.28 17.21 21.72

4.68%

53.86%

0.20%

0.79%

13.51%

23.84%

1.07% 2.06%

Western Depot: 2018-2019 Portable Water Percentages

Pipe Bursts

Water Leaks

Water meter Connection

Building Maintenance

Valve and Air Valve

Maintained

Meters Maintained

meter Replaced

230

Fig **: Sanitation Infrastructure Network Chart

KEY ACHIEVEMENTS – INFRASTRUCTURE MAINTENANCE

Repairs at the Aquadene1 Sewer Pump Station

On 13 February 2019, there was a sewer overflow in Brackenham area that flooded inside the

property no. 40 Filigree Loop Street. After investigation it was found that there was a broken

gravitation sewer pipe within Aquadene 1 pump station which resulted in sewer spillages in

most of the properties along Filigree Loop, Fish Tail, Felt Fern and Frondosa streets. As part

of corrective measures two new 6m deep sewer manholes were rebuilt and the 160mm

sewer gravity pipeline was repaired.

Figure**:

36.17%

23.62%1.28%

17.21%

20%

Western Depot 2018-2019 Waste Water Percentages

Sewer Blockages/Overflows

Sewer Pipe Jetting

Manholes Repaired

Sewer connections Repaired

New Sewer Connections

231

Figure**:

Figure**: Esikhawini Pipe installation (250mm HDPE pipe) at WardS 19 and 18 areas.

The area has been experiencing low water pressure whereas other areas of Ward 18 & 19

portions were not receiving water at all. In order to improve the situation, Water Tankers had

to be deployed. The Municipality has used this service for more than three years and has

proven to be unsustainable due to the escalation cost and due to the ever increasing

number of new houses per annum. Water Tankers Service is currently being used and cost in

a region of millions of rands per Annum. The consideration was therefore taken that a long

term solution was urgently and critically warranted.

The area consists of approximately 600 household with an estimated population of 4800

people. The pipeline consists of 250 diameter Bulk pipeline which will cater for existing

demand inclusive of growth and development of the area.

Supply and Install 250mm Sewer Line at Hillview

232

The Hillview Pumpstation collect waste water from Hillview, CBD, Qalakabusha and Tronox, it

then pumps the waste water through a 250 mm rising main which runs underneath R34 [DOT

road, below Hillview suburb} and deposit the waste water next to the bus rank in town. The

pipe failure underneath R34 was of great concern to the road users, environment and health

risk to the public and animals lives around that area.

The rising main pipe failure needed urgent attention to prevent further spillage and damages

to the environment.

SCIENTIFIC SERVICES

Scientific Services: as it relates to ensuring that the quality of potable water and raw water

and that of sewer and industrial effluent discharge is within the acceptable specifications

The City of uMhlathuze in its capacity as the Water Services Authority and juristic entity is

compelled by the Water Services act 107 of 1997 and National Water act 36 of 1998 to

ensure that the quality of the city’s water resources, portable water and wastewater systems

are continually monitored in an endeavour to maintain quality and evaluate against set

standards/specifications/guidelines. The Scientific Services section is responsible for the

effective management of this function within the Water Services Authority Division.

Various key functional areas within the Scientific Services contribute to the reliability and

credibility of an effective water quality management system. The Scientific Services include

comprises of the following:

WATER QUALITY MANAGEMENT

Key deliverables

- Water & wastewater quality monitoring as per the Water Quality Monitoring

Program (WQMP)

- Drinking Water Quality Management (including consumer complaint

management)

- Industrial Effluent Permit Management

- Industrial Pollution Management

- Industrial Inspections

- Water pollution incident investigations

233

- Storm water Inspection and Pollution Management

Key achievements

Establishment of the Trade Effluent Management System that introduced tariffs for industrial

effluent discharges in order to encourage compliance by all authorised contributors.

Effluent Management policy drafted and approved by Council.

In the process of developing an online permit application system.

LABORATORY SERVICES

Formal recognition that laboratories are competent to carry out specific tasks/tests is given

by the South African National Accreditation System (SANAS) in a form of accreditation.

Although achievable by all labs, SANAS accreditation historically believed to be a status

awarded to only large laboratories (centred on the major metropolitan areas).

Department of Water Affairs with sector partners developed the strategy to ensure

institutions use laboratories deemed competent & produce credible results to manage and

report on their drinking and wastewater quality. Strategy denotes process whereby DWA

shall approve the use of laboratories competent to analyse drinking- and wastewater

samples.

The laboratory is currently undergoing method development and validation as well as

phased implementation of ISO 17025. The laboratory is also participating in Proficiency

Testing schemes for Chemistry and Microbiology in order to continually improve accuracy

and precision when compared to other laboratories.

Key achievements

234

Procurement of various equipment for chemistry and microbiology laboratories i heating

mantles for distillation of samples, inductively coupled plasma for automated analysis of

heavy metals in various water matrices, DR6000 spectrophotometer for microbiological

analysis and automated analytical balance and auto-titrator

A new record of average z-score of 0.30 in SABS water proficiency testing and NLA round

two 100% pass.

Chemistry instrumentation laboratory.

Procurement of SANAS ISO17025:2017 lab system and internal auditing course for all staff

members in the laboratory.

Procurement and implementation of Labware Laboratory Information Management System

with sample barcode scanners for data management.

Figure**: Labware LIMS

235

Figure**: ICP-OES

Figure**: DR6000 Spectrophotometer

236

CUSTOMER SERVICES, MARKETING AND RETAIL

SECTION OVER VIEW

Customer Services, Retail and Marketing: The customer services, retail and marketing

management section covers the aspects that relate to the management of the water and

waste plants, as it talks to the effect it has on internal and external stakeholders.

The report covers the aspects that relate to the management of the plants, as it talks to the

effect it has on customer services. The following were discussed to ensure speedy repair of

leaks, pipe bursts and water loss:

All pipe servitudes cleared of any construction and vegetation.

Daily inspection of pipes.

Aggressive leaks detection is encouraged.

Regular water forums must be held.

Goedertrouw Dam level has increased in the past four quarters compare to the previous

year, the first quarter is sitting at 48% in the second quarter, 46% ,in the third quarter 50%, in

the fourth quarter 47%; Lake Mzingazi level has been sitting above 100% for the entire year,

currently operating at 50% of its capacity. Lake Cubhu is also above 100%.

Key achievements

All commissioned Pressure Valves in the City of uMhlathuze have been set to 1 bar of

pressure during the day and 0.5 bar at night.

Continuous customer relations and education.

Internal leak repair in eSikhaleni and Dumisani Makhaye Village.

Installed flow restrictor on meters.

WATER AWARENESS CAMPAIGN

237

March is declared as water month but due to the closing of schools early this year, the

awareness campaign ended up taking place in April 2019. The National Water Week

commenced on the 18 March to 4 April 2019. The City of uMhlathuze visited schools, Malls,

shopping centres and community halls, to perform Water Awareness Campaigns. The aim

was to inform the stakeholders about the water status quo, placing emphasis on keeping the

importance of water conservation, in light of the drought challenges currently facing the

region, water conservation and also encouraging the community to harvest rainwater.

The following schools, Malls, shopping centres and community halls were visited by City of

uMhlathuze officials and ward councillors during water week;

- Emondini high school

- Empangeni sanlam centre

- KaNqantayi high school

- Mevamhlophe high school

- Mzingwenya primary school

- Tholokuhle high school

- uVondlo primary school

- Nguluzane primary school

- Ngwelezane halls

- Mzuvukile primary school

- Phiwayinkosi primary school

- Vulindlela stores

Photos below indicate the highlights of the day during the visits.

238

Figure**: Emondini High School Figure**: Emangeni Sanlam centre

Figure**: Mevamhlophe High School Figure**: Mzingwenya Primary School

239

Figure**: Tholokuhle High School Figure**: uVondlo Primary School

Figure**: Ngwelezane Hall Figure**: Nguluzana Primary School

Figure**: Mzuvukile Primary School Figure**: Phiwayinkosi Primary School

ENGINEERING SUPPORT SERVICES

This section is responsible for the following sections:

- Project Management Services

240

- Building & Structures Section

- Infrastructure Asset Management

Project Management Unit

This section is responsible for the implementation of capital projects on behalf of other

departments which do not have the technical capacity to execute. The section also prepares

specifications and tender documentation. The MIG Grants funding is also implemented by

Project Management Unit (PMU) section. The section also deals with its part of contribution

into the creation of job opportunities in all its budgets which then feed into the

municipality’s Expanded Public Works Program as we deals with service delivery.

Duration of the programme

Over the past financial years it has been the 1st of April of each year indicated below in the

2010/2011 to March 2011, from the 2011/2012 financial year it was then aligned with the

Municipal financial year which is 01 July of each year to 30 June of the next year.

Evaluation As Per Practice Note

Part 1: Progress to date

Results based management principles should be used as the underlying principles to

evaluate interventions and outcomes:

ITEM NO ACTIVITY ROLE PLAYER AND ROLE PLAYED

1. Development of business plans

Consulting Engineers – Development of

Business Plans

2.

Submission of business plans to uMhlathuze

LM

Infrastructure & Technical Services Department

– Approval of Business Plans Exco Council –

Approval of Business Plans

241

3.

Submission of Business Plans to DWAF for

approval DWAF - Approval of Business Plans

4. Capturing of Business Plans into MIS

PMU/Consulting Engineers – Capturing of

business plans

5. Submission to COGTA via MIS PMU and COGTA – Approval of the BP

6.

Development of Preliminary Design and

Final Design of active BPs for the financial

year

Consulting Engineers and Water Planning &

PMU

7. Preparation of Tender Documents

Consulting Engineers, PMU and Specification

Committee

8. Tender adverts PMU & Corporate Services

9. Adjudication of Tenders

Consulting Engineers – preparation of

Adjudication Reports

10.

Submission to the municipality for

recommendation Evaluation and Adjudication Committee

11. Appointment of the contractors Municipal Manager

12. Execution of the Projects

Consulting Engineers, Contractors, ISDs, Project

Managers and PMU

13. Completion of Projects

Consulting Engineers, Contractors, Project

Managers and PMU

14. Physical Completion

Consulting Engineers, Contractors, Project

Managers and PMU

15. Final Completion (Defects Liability Period)

Consulting Engineers, Contractors, Project

Managers and PMU and Operations and

Maintenance

16. Operation and Maintenance

Water Services – Operations & Maintenance

Section

Implementation of the approved business plan –

Council registered a combined rural sanitation business plan amounting to R493 million with

MIG and this program is a continuous set up which targets the wiping off of the backlogs in

all rural areas. It be noted that before we inherited a portion of Ntamabanana wards, we

conducted a study and out of the total 46 873 backlogs were initially registered, the city has

242

covered 35 958 households and the current phase consists of 5000 households has been

underway and was completed in May 2019.

It should also be noted that the more council provides these basic level of services more

people move to these areas and we end up having to cover more infill households than

initially planned.

PART 2: Monitoring

Define the monitoring approach; map the process (on what basis is data collected; issues

around data sources and data collection methodologies). Who is responsible for each of the

tasks within the map?

How is data analysed and reported for implementation purposes –

Through the Water Planning Manager/WSA Manager and the PMU manager together with

the project leader or designer, the reports are read in conjunction with the drawings versus

the demand on that area(s) and taking into account the future demand/ growth, the Water

Planning Manager/WSA Manager or the PMU manager must call for adjustment on the

proposal or approve based on the fact that it meets the community’s needs. From there it

must be carried into the implementation stage.

Selected Major MIG Projects under PMU

Tender Nr Project Description

8/2/1/UMH101-16/17 Mkhwanazi North Phase 5 - Reticulation Zone E2

8/2/1/UMH121-16/17 Mkhwanazi North Phase 5 - Reticulation Zone K

8/2/1/891A Rural Sanitation: Factory – 17000 units

8/2/1/UMH41-16/17 Rural Sanitation: Installation of 4000 VIP's

243

Other projects executed by PMU on behalf of other Departments

Figure**: Municipal House – foundations

8/2/1/UMH121-15/16 Mzingazi Sewer Phase 2 Portion 1

8/2/1/UMH94-15/16 Mandlazini Rural Road

8/2/1/UMH87-16/17 Upgrade of Empangeni Outfall Sewer

8/2/1/UMH116-16/17 Mandlazini Sewer Phase 2A

244

Figure**: Municipal House – Completed

245

Figure**: Ntambanana - Ndondwane Creche

Figure**: Construction of SCM second floor

Building & Structures

246

Buildings and Structures forms part of the Department of Infrastructure and Technical

Services under Engineering Services. Subdivisions are as follows:

- Buildings Maintenance

- Mini Buildings Projects ( Maintenance Contractors)

- Lighting Services

- Air conditioning and Refrigeration

This unit is responsible for the maintenance / servicing of the building maintenance works.

The small works are done by this section on behalf of other Departments. The budget of the

small works is done by this section on behalf of other departments and the section works on

their demands and needs on their budget. The maintenance budget is done by sub-section.

Achievements

The refurbishment of the Richards Bay Civic Centre, various small scale repairs on behalf of

the other sections throughout the year.

Planned maintenance programs as scheduled and daily complains operation are monitored.

The maintenance part is carried out by the below sub-sections under Building & Structures:-

- Carpentry and Glazing Maintenance team

- Bricklaying & Plaster/Paving/Tiling Maintenance team

- Painting and Decoration Maintenance Team and

- lighting services maintenance team

Infrastructure Asset Management

The Infrastructure Asset Management unit is a cross cutting function that renders support to

asset custodians and support departments in line with the integrated asset management

framework.

The unit comprises of the following sub-sections:

247

- GIS civil section

- Planning and Design

- Infrastructure Asset management Unit

The sub-sections indicated above shall be elaborated in detail below:

GIS civil section

The role of GIS Civil section is to address geographical objectives associated in recording and

maintaining the organisations immovable networks in terms of Capital renewal, upgrade and

maintenance. The primary function of this section is to capture and maintain As-built

received from the implementation of Capital projects approved in terms of the MTREF and

maintain records deriving from asset maintenance.

Achievements

Implementation of a systems integration landscape to enable integration between

Infrastructure Asset Management system (IAMS) and Geographical Information Systems (GIS)

and Enterprise Revolution Plan (ERP);

GIS incumbents have been trained on applicable modules in terms of the EAMS

implementation.

Planning and Design

The role of the Planning and Design section is to render a support function to the

infrastructure planning stage of new developments, renewal and disposal of capital

infrastructure in terms of the approved MTREF and on an adhoc basis. This section contains

shared serves for costing purposes.

Achievements

248

Providing a platform for the visibility of all immovable networks through the implementation

of the EIAM solution enabling the section to make informed decisions moving forward;

Planning and Design incumbents have been trained on applicable modules in terms of the

EAMS implementation.

Infrastructure Asset Management unit

The Infrastructure asset Management unit is a cross cutting support function directing and

facilitating key performance areas of the asset management framework. In consultation with

asset custodians and key executive role players, the role of the Infrastructure Asset

Management unit is to ensure the following:

Review the Asset Management Policy and Immovable Asset Management Procedures

Manual;

Prepare annual AM Plans (AMPs) and Strategic AM Plan (SAMP) with a minimum of a 10-year

planning horizon;

Ensure EAMS is aligned to organisations Business objectives;

Review data accuracy, and the processes for updating of spatial and alpha-numeric data in

the AMIS to meet physical and financial asset management needs;

Ensure information systems’ functionality meets ongoing Asset Management needs;

Prepare infrastructure-related asset data for upload to the AMIS;;

Review and update asset and AM Framework risk exposure, in line with the Municipality’s risk

models, recommend mitigation actions, and monitor implementation;

Champion effective AM understanding, collaboration, and practice improvement across the

Municipality;

Review change needs, determine and recommend change methodologies, prepare change

plans and manage the approved AM Change Programme.

Achievements

249

Implementation of an Enterprise Infrastructure Asset Management (EIAM) solution

comprising of integrated asset related engineering and technical modules to address life

cycle management of immovable asset networks pertaining to Water & Sanitation, Electricity,

Roads, Storm water, Facilities, etc.

Implementation of Fixed Asset Management Policy as per Council Resolution 13264 dated 29

May 2019;

Development of Draft Immovable Asset Management Procedure Manual in order to

standardise Asset Management practice across technical and supporting departments;

Single data model aligned to CIDMS to facilitate Smart City principles in order to address

and direct capital renewal, upgrade and maintenance initiatives;

Development of models to predict failure and potential impact, example Water Pipe

prioritisation model, Sewer Pipe prioritisation model, electricity prioritisation model; etc.

Implementation of a systems integration landscape to enable integration between

Infrastructure Asset Management system (IAMS) and Geographical Information Systems (GIS)

and Enterprise Revolution Plan (ERP);

Development of initial sectoral Asset Management Plans (AMP) and Strategic Asset

Management Plan (SAMP);

Aligned Technical Asset Register (TAR) to Financial Asset Register (FAR) to facilitate Asset

Register outcomes;

The EIAM solution shall provide a platform to affect baseline asset management optimisation

strategies, for example formulation of Life cycle plans (operating and capital), risk based

asset management strategies, modelling of Capital renewal and maintenance budget needs,

etc.

Asset custodians and supporting roles have been trained on applicable modules in terms of

EAMS implementation.

250

Figure **: Overview of the Key Elements of Asset Lifecycle Management

251

The City’s utilisation of improved technology is in line with the digital era and will provide

benefits by laying the foundations for the development of best infrastructure management

practice. It also provides a sound platform, or hub, for future innovation, such as remote and

automated monitoring / control.

The core principles that guide and facilitate the City’s management system of immovable

assets, are as follows:

- Taking a lifecycle approach;

- Developing cost-effective management strategies that will be sustainable in the

long-term;

- Providing a defined level of service and monitoring performance;

- Understanding and meeting the impact of growth through effective demand

management and infrastructure investment;

- Managing risks associated with asset failures;

- Sustainable use of physical resources; and

- Continuous improvement in immovable asset management practices.

- Phase 2 of the ALMIP focussed on the following areas of the programme:

- Implementation of Engineering and Technical systems;

- Implementation of ERP and GIS systems landscape;

- Development of initial Asset Management Plans;

- Alignment of Technical and Financial Asset Registers;

- Establishment of the Physical Asset Management Office.

252

ELECTRICAL AND ENERGY SERVICES

NKANYISO KHUMALO

DEPUTY MUNICIPAL MANAGER- ELECTRICAL AND ENERGY SERVICES

Introduction

The City of uMhlathuze receives supply from eight (8) of Eskom‘s Point of Supply, and

distribute to about 39 198 customers active meters (of 35 204 are active). Of these 39 198

customers base, 9 are key customers, which includes Richards Bay Alloys, Mondi Group,

Transnet Freight Rail ( TFR ), Transnet National Ports Authority (TNPA) are all supplied at

132kV Voltage level. The following are other key customers which are supplied at 11kV, viz.

Richards Bay Coal Terminal (RBCT), Island View Storage, Foskor and Transnet National Ports

Authority.

City of uMhlathuze, Department of Electrical and Energy Services strive to provide a safe zero

harm, secure and reliable supply of energy in a cost-effective manner during 2018/19 fiscal

year. The city achieved this by planning its network and making investment decisions in line

with Council and GRAP17 Capital Investment Process (CIP) and Asset Management as well

executing most of the planned projects. Planning and Strategy section addresses strategic

planning relating to capital investments and renewal of electricity assets. The technical

decisions taken with regard to designs and operation of the network are in accordance with

the compliance obligations of network management legislation, regulations and related

codes of practice as per National Energy Regulator of South Africa (NERSA), and reflect

253

recognised industry best practices and standards relating to the management of electricity

infrastructure assets

The total notified maximum demand (NMD) is as follows:

Richards Bay 151MVA: Richards Bay NMD was reduced from 230 MVA to 151 MVA due to

Richards Bay Alloys plant shut down

Empangeni Main 20MVA: Maximum (11MVA)

Empangeni Western 20MVA: Maximum (20MVA)

Felixton 0.7MVA: Maximum (0.5MVA)

Vulindlela 1MVA: Maximum (0.86MVA)

Esikhaleni 16MVA: Maximum (19MVA of which 11MVA is Eskom load)

Nseleni 2.7MVA: Maximum (2.65MVA)

Ngwelezane 7MVA: Maximum (6.43MVA)

The City has total of 43 Substations, of which 12 are 132 kV and 31 are 11 kV, and we have

the following electrical infrastructure.

88.087 km of HV Over headlines.

80.644 km of MV Over headlines

142.244 km of LV Over headlines

19 152KM of HV underground cable.

360.315km of MV underground cable

789.969km of LV underground cable

940 Mini-substations.

53 Ring Main Units.

205 Pole-mounted transformers.

7280 customer distribution kiosks

17473 Streetlight Poles

254

89 Traffic Signals Intersections and

32 High Masts

Key achievements

Installation of new 132/11 Kv 30MVA transformer in Cygnus substation,

Replacement of 2km of MV cable and 7x mini-substations in Esikhaleni

CUSTOMER SERVICES, MARKETING AND RETAIL

All customers consumed a total of 978 GWhs, a decrease of 12 GWh from 2017/2018’s 990

GWhs of electricity while 1 040 GWh was purchased from Eskom (period July 2018 to June

2019) which is a decrease of 14 GWh from the 1 054 GWhs purchased from Eskom over the

same period in 2017/2018 .A total energy loss of 63 GWh which amounts to an average loss

of 6% over the financial year. This figure includes both technical and non-technical losses.

Figure 1: Graphical Network Loading Performance

0

20

40

60

80

100

120

140

160

180

Notified Maximum Demand (NMD) vs Actual Load (NDC)

Rbay NMD

Rbay NDC

Vulindlela NMD

Vulindlela NDC

Nseleni NMD

Nseleni NDC

Esikhaleni NMD

Esikhaleni NDC

Empangeni MainNMD

255

Table 1: Notified Maximum Demand (NMD) vs Actual load (NDC)

Town

Jul-

18

Aug-

18

Sep-

18

Oct-

18

Nov-

18

Dec-

18

Jan-

19

Feb-

19

Mar

-19

Apr-

19

May

-19

Jun-

19

Rbay NMD 151 151 151 151 151 151 151 151 151 151 151 151

Rbay NDC 137 132 134 143 133 143 140 143 133 153 131 131

Vulindlela NMD 1 1 1 1 1 1 1 1 1 1 1 1

Vulindlela NDC 1 1 1 1 1 1 1 1 1 1 1 1

Nseleni NMD 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7

Nseleni NDC 2 2 2 2 2 2 2 2 3 2 2 3

Esikhaleni NMD 16 16 16 16 16 16 16 16 16 16 16 16

Esikhaleni NDC 8 8 8 8 8 8 8 9 9 8 8 8

Empangeni Main

NMD 20 20 20 20 20 20 20 20 20 20 20 20

Empangeni Main

NDC 17 14 15 17 19 19 12 12 12 11 10 9

Empangeni

Western NMD 20 20 20 20 20 20 20 20 20 20 20 20

Empangeni

Western NDC 10 8 12 11 12 18 18 18 18 16 17 14

Ngwelezane

NMD 7 7 7 7 7 7 7 7 7 7 7 7

Ngwelezane NDC 11 11 10 11 10 11 11 10 11 10 11 11

Felixton NMD 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7

Felixton NDC 0.5 0.5 0.5 0.5 0.5 0.0 0.5 0.4 0.6 0.4 0.5 0.4

The consumption of Municipal installations amounted to a total value 16 608 857 kWh for

2018/2019 (until June 2019) .

256

All areas are experiencing an increase in Energy losses. The Revenue Protection section

attempts to investigate a many as possible installations for tampering it is a challenge as

there are only two teams for the entire 36 082 prepayment customer base and that team

spends 3 working days a week attending to audits for Clearance Certificate applications

(houses being sold). Monthly readings will be taking with the new tender for meter readings

and captured in SAP.

Although the national average is 10% and the overall average of the City is 8% it is a concern

that some areas are exceeding the 10% national average.

Figure 2: Energy losses for the last 5 years

0%

2%

4%

6%

8%

10%

12%

14%

16%

Richards Bay eSikhaleni eNseleni Vulindlela Empangeni Ngwelezane

Energy Losses last 5 years

2014/2015

2015/2016

2016/2017

2017/2018

2018/2019

257

Revenue Protection

Table 2 Meter audits

Prepayment Meter Audits: All Areas Annual Total

Houses Visited (general audits - EES) 1 277

Number of Customers billed for tampering 164

Number of Customers billed for faulty meters 30

Number of Customers billed for illegal connections 2

Clearance Certificate Audit requests from FS 1 182

Tampers billed from Clearance Certificate Audits 14

TOTAL 2 669

The total Revenue billed out IRO tampered / illegal connections or faulty meters during

2018/2019

0%2%4%6%8%

10%12%14%16%18%20%

Energy losses 2018/2019

Quarter 1

Quarter 2

Quarter 3

Quarter 4

258

Table 3: Revenue billed out of tampered, illegal or faulty meters

Town/Suburb Tamper Fee

Amount

consumed

Damaged

meter charge

Faulty meter

Amount

Illegal

connection

fee

kWh

consum

ed

Esikhaleni H R 96 584.40 R 135 924.71 R 4 074.78 R 4 074.78 R 0.00 99 504

Esikhaleni J R 162 777.50 R 278 203.22 R 0.00 R 0.00 R 0.00 146 384

Nseleni R 96 447.20 R 67 420.54 R 2 037.39 R 8 619.15 R 7 184.00 57 872

Vulindlela R 19 074.80 R 110 519.51 R 0.00 R 2 037.39 R 0.00 69 728

Mandlanzini R 81 384.69 R 172 881.74 R 10 423.06 R 32 461.73 R 0.00 146 087

Mzingazi R 34 240.00 R 72 479.87 R 2 046.49 R 13 864.27 R 0.00 74 013

Richards Bay R 333 888.81 R 854 754.76 R 46 830.02 R 264 343.79 R 14 768.00 782 707

Ngwelezane R 47 687.00 R 167 389.02 R 2 037.39 R 28 648.71 R 0.00 131 684

DMV R 145 911.39 R 59 071.38 R 0.00 R 378.15 R 0.00 52 864

Emp & Felixton R 94 484.43 R 344 496.58 R 12 224.34 R 199 704.51 R 0.00 361 627

Grand Total

R 1 112

480.22 R 2 263 141.33 R 79 673.47 R 554 132.48 R 21 952.00

1 922

470

OPERATIONS AND MAINTENANCE (SUBSTATION, HV & MV

OPERATIONS)

The unit is responsible for:

Improve planned maintenance in order to reduce unplanned breakdowns.

Perform infrared scans for miniature substations, all substations and cubicles.

Encourage substation maintenance on a timeous basis.

Increase the number of line inspections per division.

Do equipment (transformer & switchgear) oil sampling once a year.

259

Analyse results,

And perform purification procedures.

Attend to oil leakages and repair them.

Business unit (operations and maintenance section)

Sub-units:

- Distribution

- Protection

- West section

- North section

- South section

Key achievements

All key personnel have been re-trained on Operating Regulations for High Voltage System

(ORHVS), Cable replacement of cables which were giving problem in J2 section eSikhaleni

completed. ,A 30MVA transformer commissioned at Cygnus Substation ,Two 30MVA

transformers inherited from third party investment at Indus Substation and

Low voltage (LV) Kiosk replacement project have been started

Figure 1 depicts the percentage of inspections and maintenance that were achieved by each

sub-sections in the Operations and Maintenance section from the 1st of July 2018 – 30th of

June 2019. The maintenance target has been 85% of planned maintenance schedule. The

protection divisions could not meet some of their targets test equipment failure. A tender

process has been started to procure new test equipment.

260

Figure 4: Annual Unplanned Electrical Breakdowns for the HV Network

Failure of Hercules transformer in the month of March 2019 contributed to a high volume of

breakdowns in the HV network.

Figure 5: Annual Unplanned Electrical Breakdowns for the MV Network

97% 100% 94%

99%

76%

0%

20%

40%

60%

80%

100%

120%

WEST NORTH SOUTH DISTRIBUTION PROTECTION

PER

CEN

TAG

E A

CH

IEV

ED

SECTIONS

ANNUAL PLANNED INSPECTIONS & MAINTENANCE

1 1 1 0

1 0 0 0

4

3

0

3

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE

NU

MB

ER O

F EL

ECTR

ICA

L FA

ULT

S

MONTHS

ANNUAL UNPLANNED HV ELECTRICAL FAULTS

261

Shows that the medium voltage (MV) network was affected mostly due to on-going

construction activities, where it was found that underground cables were damaged while

digging. Other equipment on the MV network were vandalised by people who sell copper to

scrap yards.

Figure 6: Annual Unplanned Electrical Breakdowns for the LV Network

Shows a bar graph representation of electrical breakdowns that were experienced from the

1st of July 2018 to the 30th of June 2019. The graph depicts that in the low voltage (LV)

network, there was a high number of breakdowns. The breakdowns were caused mostly by

illegal connections in low income (rural) areas. Illegal connections affected electrical

equipment such as overhead lines (OHL), ring main units (RMUs) and meters.

9

24

10

6

25 27

20

14 12

9 10

14

0

5

10

15

20

25

30

JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE

NU

MB

ER O

F EL

ECTR

ICA

L FA

ULT

S

MONTHS

ANNUAL UNPLANNED MV ELECTRICAL FAULTS

262

Figure 7: Performance of the HV Network for Three Financial Years (2015/2016 – 2018/2019)

Compares the HV network performance for three financial years from 2015/2016 to

2018/2019. It shows the reduction in the number of electrical breakdowns that occurred for

each financial year. There has been an increase in number of HV faults; the biggest

contributor has been transformer faults. A strategy is being put in place to address this

problem. The transformers need to be replaced instead of being refurbished

397

447

394

456

376

454

355

296 257

409

291

332

0

50

100

150

200

250

300

350

400

450

500

JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE

NU

MB

ER O

F EL

ECTR

ICA

L FA

ULT

S

MONTHS

ANNUAL UNPLANNED LV ELECTRICAL FAULTS

263

.

Figure 8: Performance of the MV Network for Three Financial Years (2015/201 – 2018/2019)

Compares the MV network performance for the last three financial years, from 2015/2016 to

2018/2019. It shows that a high number of electrical faults were experienced in the network

in 2016 to 2017, thus a strategy was put in place to reduce the number of faults in the 2018

to 2019 financial year. As part of the strategy; cables in eSikhaleni has been replaced as

maintenance activity. An order has also been awarded for cable replacement between Polaris

and Capella Substation for faults affecting Alton area.

0

5

10

15

20

25

30

35

2015-2016 2016-2017 2017-2018 2018-2019

HV

Linear (HV)

0

50

100

150

200

250

300

2015-2016 2016-2017 2017-2018 2018-2019

MV

Linear (MV)

264

Table 4: annual planned inspections and maintenance performed

Provides information on the number of inspections and maintenance conducted by each sub-section in Operations and Maintenance section

ANNUAL PLANNED INSPECTIONS & MAINTENANCE REPORTING

MONTHS TOTAL ANNUAL TARGETS

SECTIONS JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE ACHIEVED TARGET PERCENTAGE

WEST 29 61 66 36 64 26 40 61 73 81 62 44 643 661 97%

NORTH 16 151 103 104 50 20 120 122 61 47 114 42 950 950 100%

SOUTH 93 45 82 65 96 30 106 94 63 77 71 365 1187 1258 94%

DISTRIBUTION 4 11 10 5 5 4 10 16 14 8 9 2 98 99 99%

PROTECTION 2 0 0 2 1 0 1 2 3 2 2 1 16 21 76%

Table 5: Annual unplanned breakdowns

Table provides information on the number of electrical faults or breakdowns that were attended by Operations and Maintenance section.

Detailed information is accessible from documents contained in the following RPT numbers: 165348, 165975, 166569 and 167085.

265

ANNUAL UNPLANNED ELECTRICAL FAULTS REPORTING

NETWORK MONTHS

TOTAL JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE

HV 1 1 1 0 1 0 0 0 4 3 0 3 14

MV 9 24 10 6 25 27 20 14 12 9 10 14 180

LV 397 447 394 456 376 454 355 296 257 409 291 332 4464

Table 6: A comparison study for the number electrical faults that occurred between 2015/2016 – 2018/2019

gives a summary of a comparison study that was conducted in order to analyse the performance of the network for the period of 2015/2016 to

2018/2019 financial years.

266

A COMPARISON OF THE NUMBER ELECTRICAL FAULTS THAT OCCURRED BETWEEN 2015 - 2018

NETWORK 2015-2016 2016-2017 2017-2018 2018-2019

HV 30 24 11 14

MV 175 255 197 180

267

ELECTRICITY PLANNING AND STRATEGY

Electricity Planning and Strategy section is responsibility for ensuring that there is sufficient

electricity capacity within City of uMhlathuze Municipality’s license area through planning, design

and development in order to accommodate new developments and provision of basic electricity

supply service to communities as well as improving reliability and service life of municipal electricity

infrastructure. The section ensures that planning, design and development is undertaken in

accordance with the National Regulator of South Africa Standard NRS 034-1:2007 for Sub-

transmission (132kV substations and Switching Stations as well as 132kV Feeders) and Distribution

Network (11kV, 400V and 220V networks) Planning Criteria and Guidelines and also supports climate

change as per South African’s National Climate Change Response White Paper (NCCRWP) (DEA,

2011).

Electricity Planning and Strategy develop projects under following categories in order to achieve the

smooth running and operating of the electricity network as well as provision of basic services to the

communities within City of uMhlathuze Municipality jurisdiction:

Network Refurbishment/Renewal projects

Network Strengthening projects

Network Reliability projects

Electrification projects

Private Development projects

Public Lighting projects

Energy Efficient Demand Side Management and Renewable Energy project

The section comprises of the following sub-sections namely:

Network Planning and Design

Draughting

Project Execution and

Energy Management

268

All sub-sections are involved in electricity infrastructure asset creation projects value chain and they

work in collaboration to develop an asset

Table **: Private Development Projects

Project Name Project Description Category Comment

RBIDZ (Richards Bay

Industrial

Supply IDZ 1F development with

14MVA firm capacity by

installing 2x 132kV 40MVA

transformers at Indus

Substation

New

Installation

Project completed

Table **: Network Planning Projects and their categories

Project Name Project Description Category Comment

Scorpio Substation

132/11kV 20MVA

Transformer

Refurbishment

Replacement of HV and MV

transformers windings as well

as painting of transformer tank

Renewal

Project completed

Cygnus Substation

Transformer

Installation

Installation of new 132/11kV

30MVA transformer

Strengthening

Project is completed

Ngwelezane

Waterworks 11kv

Overhead Line

Replacement

Replacement MV Overhead line

from Ubhejane Switching

Station to Ngwelezane

Waterworks Treatment Plant

Renewal

Project completed

Brackenham

Electrification Network

Refurbishment

Replacement of MV and LV

bundle as well as pole mounted

transformers with underground

cable and mini-substations

Reliability

Project completed

MV Electrical Network

Refurbishment

Replacement of MV cable

between Ubhejane – Satellite

Switching Stations

Renewal Project is in progress

and is 90% completed.

Will be completed

during 2019/20

269

Energy Master Plan

Development of a plan

containing various projects and

costing for stability of electrical

infrastructure stability and

capacity from different energy

sources

Plan

The plan is 80%

completed. Will be

completed during

2019/20

Table **: Electrification Projects

Project Name Project Description Comment

Mzingazi Electrification Replacement of MV Fox Overheadline

conductor with Mink conductor Project completed

Mandlanzini Electrification

Replacement of MV Fox Overheadline

conductor with Mink conductor and

connections of households

Project completed

IDT Ngwelezane

Electrification

Replacement of MV Fox Overheadline

conductor with Mink conductor and

connections of households

Project completed

Table **: Public Lighting Projects

Project Name Project Description Comment

High Mast Installation in

Traditional Areas

Installation of 40m high mast area lighting

in various wards within City of

uMhlathuze

4 High Masts in Ward 1; 9;

21 and 26 are in operation

Table **: Energy Management Projects

Project Name Project Description Comment

270

Replacement of Non-

energy efficient Electrical

Equipment

Replacement of 400x HPS streetlights

with LED’s at eNseleni

Project completed

The replacement of high power

consumption units within waste water

treatment plants Design, Supply and

Delivery of Aerators Motors at Empangeni

Waste Water Treatment Plant within City

of uMhlathuze

Project completed

Supply and Delivery of Energy Saving

Building Lights with Motion or Occupant

Sensors and Replacement / Retrofit High

Energy Consumption Building Lights with

LED Building Lights at eMpangeni Town

Hall and eMpangeni Civic Centre within

City of uMhlathuze

Project completed

Photos of projects and their locations:

Figure**: RBIDZ (Richards Bay Industrial): Installation of 2x 132kV 40MVA transformers at Indus

Substation: Ward 1; Co-ordinates: 28°44'25.1"S; 32°01'24.4"E

271

Figure**: Cygnus Substation Transformer Installation: Installation of new 132/11kV 30MVA

transformer: Ward 20; Co-ordinates: 28°53'09.1"S; 31°54'02.8"E

Figure**: 132kV Oil Filled Cables in South Dunes between Hydra and Capella Substations: Ward 1;

Co-ordinates: 28°49'14.4"S; 32°03'33.0"E- Replacement of 132kV Oil filled cable with 132kV XLPE

cable between Hydra and Capella substations and installation of 132kV feeder bays at Hydra

Substation.

272

Figure**: Ngwelezane Waterworks 11kV Overhead Line Replacement: Ward 27; Co-ordinates:

28°46'23.8"S; 31°51'32.0"E

Figure**: Mzingazi Electrification: Ward 1; Co-ordinates: 28°45'43.6"S; 32°07'55.9"E – Replacement

of Fox Overheadline conductor with Mink

273

Figure**: Mandlanzini Electrification: Ward 4, Co-ordinates: 28°44'35.3"S; 32°05'59.7"E

Replacement of MV Fox Overheadline conductor with Mink conductor and connections of

households

Figure**: Mzingazi, Dumisani Makhaye Village, eSikhaleni and Brackenham: Ward 1;9;21;26; Co-

ordinates: (28°45'.27"S; 31°53'01"E); (28°46'.11"S; 32°53'01"E) (28°52'.29"S; 31°54'30"E)

(28°43'.24"S; 32°02'26"E) – Installation of 40m High Masts in Traditional Areas within City of

uMhlathuze

Figure**: Replacement of 400x HPS streetlights with LED’s at eNseleni: Ward 6;7; 8; Co-ordinates:

28°39'59.3"S; 32°01'24.8"E

274

Figure**: Replacement of Aerators Motors at Empangeni Waste Water Treatment Plant: Ward 23;

Co-ordinates: 28°46'24.2"S; 31°53'49.5"E

275

PROCESS CONTROL & PUBLIC LIGHTING

The section is responsible for monitoring and control of water reservoirs, sewer and water pump

stations as well as traffic lights, street lights and fleet management systems.

The following are primary sub sections for the above mentioned divisions:

Process Control Systems

Traffic Signals

Public Lighting

The department seek to consider a traditional maintenance approach, considering the following 3

types of maintenance which are differentiated by the nature of the tasks that were performed:

Corrective maintenance: Where the set of tasks was destined to correct the defects that were to be

found in the different equipment on day to day approach.

Preventive Maintenance: Department were to maintain a level of certain service on equipment,

calibration and the interventions of their vulnerabilities in the most opportune time. It is used to be

a systematic character, that is, the equipment is inspected even if it has not given any symptoms of

having a problem.

Predictive Maintenance: It pursues constantly know and report the status and operational capacity

of the installations by knowing the values of certain variables, which represent such state and

operational ability.

Process Control Systems

Technical Operations Centre monitors all Council’s Pump stations and reservoirs’ behaviour

indicating the level of each reservoir also status of each pump station. The real time readings are

logged every single day and averaged per specific intervals. The table below indicates the event logs

for analogue signals in percentage showing the monthly average of each reservoir. This is just to

report to Council that all instruments that were installed to specific reservoirs are up and running.

The real time readings can be drawn at all times.

276

Traffic Signals

A large part of the work load is repair or replacement of traffic control equipment before it fails. The

City of uMhlathuze (CoU) conducts semi-annual inspections of controller and signal equipment,

intersection hardware, and auxiliary equipment such as traffic detection loops.

Traffic corrective maintenance is carried out after failure detection and is aimed at restoring a traffic

intersection to an appropriate condition, whilst reactive maintenance is performed after a

breakdown so a traffic intersection can perform its intended function. Rapid repair of equipment

that has broken down is critical to ensure uninterrupted operations, minimal downtime and optimal

operability. The CoU’s goal is a response to traffic signal service requests/failure within one hour of

notification.

Typical problems/requests that warrant an immediate response from signal maintenance crews

include:

All lights out due to power outage

Signals flashing red in all directions

Loose or turned signal heads

Damage caused by vehicles

Burned out lamps

Timing Problems – long red or short green

Lamp burnouts

Controller malfunctions

Detection failures

Physical damage

Traffic progression problems

Off-hour responses to safety risks at intersections

Business unit (operations and maintenance section)

277

Main Function

Process Control Systems, Traffic Lights and Public Lighting covers the maintenance of the following

assets:

89 traffic cubicles (controllers)

The following photographs show our water monitoring system for various places under the City of

uMhlathuze jurisdiction, such as Empangeni, Esikhawini and Mzingazi as seen in figures 1 – 3.

278

Figure **: Empangeni Water Distribution Network

279

Figure**: Esikhawini Water Distribution Network

280

Figure**: Mzingazi Water Distribution Network

281

Figure **: Average Annual Water Levels

76

.41

75

.06

75

.20

70

.69

68

.91

69

.73

67

.72

82

.06

69

.90

67

.94

66

.45

70

.23

J U L A U G S E P T O C T N O V D E C J A N F E B M A R A P R M A Y J U N

PER

SCEN

TAG

E %

ANNUAL REAL TIME RECORDS

2018-2019 RESERVIOR AVERAGE LEVELS

282

Public Lighting

The street lighting complaints via the call centre has processed a total of 1996 works orders which

715 were streetlight fitting failures, 146 cable failures, 75 cable thefts and 224 knocked down poles.

On routine maintenance 2475 streetlights were repaired, 207 streetlight poles replaced, 145

photocells replaced and 184 streetlight cable faults repaired. The total number of lamps replaced

amounted to 4358 while 402 fittings were replaced. The call centre is operational 24 hours a day on

0800222827, also allowing complainants to log calls either via the website at

www.umhlathuze.gov.za, or via e-mail to [email protected] .

Table **: Unplanned maintenance vs routine maintenance

Unplanned maintenance Planned Maintenance

Streetlight fitting failures 715 495

Cable faults 146 184

Pole replacement 207

(Knocked down poles)

16(Rotten/Rusted

poles)

Photocell Maintenance 184

715

45

146 207 184

16

495

145

526

0

100

200

300

400

500

600

700

800

Unplanned maintenance

Routine maintenance

283

Streetlight poles maintenance 526

Table **: Maintenance statistics

Unplanned maintenance Planned Maintenance

Streetlight fitting failures 905 676

Cable faults 147 138

Pole replacement 284 (Knocked down poles) 185 (Rotten/Rusted

poles)

Photocell Maintenance 113

Streetlight poles maintenance 410

FLEET MANAGEMENT AND TRANSPORTATION

The Fleet and Transportation Section is a support unit for the maintenance/ servicing and repair of

the entire municipal fleet. The fleet consists of vehicles and “yellow plant”

The section is responsible for submitting the Capital budget requirements for the replacement of

fleet on an annual basis.

Departments are responsible for the daily operation, management and control of all Fleet that have

been allocated to them and all Fleet requiring repairs and maintenance are booked in by the

Departments.

Departments are responsible for the, management and control of all vehicles and plant allocated to

them.

Where possible all new Vehicles and Plant are procured with a Maintenance Plan of 160 000km or 7

years.

The maintenance plans are paid to the suppliers at the time the vehicles or plant are procured, this

to ensure that they are maintained by the agents for at least a 5 or 7 year period.

284

Certain vehicle manufacturers do not offer a 160 000 km/7 years maintenance plan, in such cases

the maximum plan available for eg. 5 years/120 000 km maintenance plan will be procured.

Special controls are required to ensure that Maintenance Plans and Warranties are not forfeited and

therefore the Control of Services of Vehicles on Maintenance Plan has been monitored throughout

the year jointly with the user departments who are beneficiaries in this case.

The task of monitoring service schedules of fleet on maintenance plans are managed by the official

vehicle pool clerk, who obtains mileages on a monthly basis from the user departments in order to

book vehicles for services.

Maintenance plans do not cover any items damaged that can be attributed to abuse.

Departments are required to submit incident reports where premature failure of a component is

detected, or damages to vehicles occur.

Achievements:

Fleet tracking system:

A contract has been entered with the service provider, Fleet Horizons, for the monitoring and

tracking of Council fleet.

The installation of trackers in municipal fleet has been an outstanding item for several years, and the

lack of a tracking system has made it difficult to manage the fleet.

Since the installation of trackers , the incidents of vehicle theft has reduced drastically.

The tracking history is also being used as a investigation tool in cases where suspected vehicle abuse

has been detected.

Staff development:

Two Mechanical Assistants that were sent on training, successfully completed the course and

obtained their qualifications as Mechanics.

The two staff members were recently promoted from Mechanical Assistant to Mechanics, this

success should serve as a motivation for fellow staff members.

285

Capital Projects

The capital projects consist of the fleet replacement and additional requirements as identified to

render service delivery for the 2018/2019 financial year and onwards.

The following vehicles and plant were procured:

Graders X 2

Tractor loader backhoe X 1

Refuse compactors X 6

Water tankers X 5

Passenger carriers X 10

Double cab LDV’s X 22

Extended cab LDV’s X 3

Half ton LDV X 1

Mobile livestock trailer X1 (Animal pound trailer)

Hatch back sedan vehicles X 4

286

Figure**: 18 000L Water tankers

Figure**: Graders.and.TLB

287

Figure**: Double cab LDV’s

Figure**: Refuse compactors

288

Figure**: Passenger carriers

289

CITY DEVELOPMENT

NONTSUNDU NDONGA

DEPUTY MUNICIPAL MANAGER- CITY DEVELOPMENT

INTRODUCTION

The City Development Department directly addresses the following National Key Performance Areas (KPAs)

Basic Services and Infrastructure Provision;

Local Economic Development; and

A number of relevant cross cutting KPAs relating to urban and rural development as well

as property management

The City Development Department also commits itself to the following Municipal Missions:

Job creation and inclusive economic growth through accelerated economic development

and transformation;

Creating a safer city through integrated and community based public safety;

Planned and accelerated rural development interventions;

Promotion and maintenance of spatial equity and transformation;

Optimal management of natural resources and commitment to sustainable environmental

management; and

Good governance, capable and developmental municipality.

In context of the above KPAs, the City Development Department is divided into three Sections,

namely: Urban and Rural Planning, Economic Development Facilitation and Public Transport

Facilities and Operations Coordination. The respective Units under each of these sections are

indicated hereunder:

Urban and Rural Planning Economic Development Public Transport Facilities and

290

Facilitation Operations Coordination

Land Use Management

Development Administration

Spatial and Environmental

Planning

Human Settlement

Programmes

Business Support,

Markets and Tourism

Property

Administration

No Sub-Units

URBAN AND RURAL PLANNING SECTION

The Urban and Rural Planning Section is divided into four distinct units, namely:

- Land Use Management;

- Development Administration;

- Spatial and Environmental Planning; and

- Human Settlement Programmes.

The achievements of these units are outlined below.

Land Use Management

Relevant Council Goals, Objectives and Strategies

NATIONAL KPA 6: CROSS CUTTING

Goals Objectives Strategies

6.1 Integrated Urban

and Rural Development

6.1.1 To plan and manage

existing and future

development

6.1.1.5 Implementation of uMhlathuze

Land Use Scheme.

6.1.1.6 Compliance with National

SPLUMA, SPLUM By-law and National

Building Regulations.

6.1.1.7 Efficient processing of

development application and building

plans.

The Land Use Management Section is divided into two subsections, namely:

o Development Control; and

o Building Control.

The Land Use Management Unit daily activities involve site inspections, processing of planning

applications and scrutinising of building plans. These daily activities are undertaken in line with the

291

organisational Integrated Development Plan (IDP) Strategic Objectives, National and Provincial

Policy Framework and the City Development Department Key Performance Indicators.

1.1.1 Development Control

Responsibilities and Achievements of Development Control Sub-Unit

The main responsibility of Development Control Sub-Unit is to promote orderly development

through enforcement and management of land use within the municipal jurisdiction using the

Municipal Land Use Scheme and the Planning By-law. As such, the Sub-Unit is responsible for

processing the following planning applications:

o Consent Applications;

o Formal Authority Applications; and

o Building Line Relaxation Applications.

The relevant and applicable policy and legislative framework applicable are:

o uMhlathuze Spatial Planning and Land Use Management By-law, 2017, as amended;

o Spatial Planning and Land Use Management Act, 2013 (Act No. 16 of 2013); and

o National Building Regulations and Building Standards Act, 1977, as amended (Act No. 107 of

1977).

uMhlathuze Single Land Use Scheme

The Land Use Scheme is a development control instrument used by the Municipality to regulate

land uses and promote orderly development within its jurisdiction. In January 2014, the municipality

implemented the first Land Use Scheme, which replaced the old Town Planning Schemes of

Richards Bay and Empangeni, which were in operation before the amalgamation of Borough of

Richards Bay and Borough of Empangeni in 2001.

The old Town Planning Schemes were developed in terms of the Natal Town Planning Ordinance,

1949 (Act No. 27 of 1949) and their main focus of implementation and development control was in

the urban areas of Richards Bay and Empangeni offering very little, if any, development control in

the Former R293 Townships and Traditional Authority Areas (Rural Areas).

The current Municipal Land Use Scheme, which has been in operation since January 2014, was

developed in line with the KwaZulu-Natal Planning and Development Act, 2008 (Act No. 6 of 2008)

well known as the PDA. The main objective PDA was to assist municipalities with guidelines and

provisions for the development of Wall to Wall Scheme, which was a paradigm shift from the Town

Planning Scheme concept with a heavy urban (town) bias to a Land Use Scheme that covers the

entire municipal area. This legislative change led to the development and adoption of the current

Municipal Land Use Scheme, which has been in operation since January 2014, later amended and

effected on June 2015.

In line with the provisions of the National Development Plan, South African saw fit to introduce a

new planning act that will address Spatial Planning and Land Use Management matters for the

292

entire country. The single town planning act is called Spatial Planning and Land Use Management

Act, 2013 (Act No. 16 of 2013), well known as SPLUMA.

SPLUMA is a national planning act that was assented in August 2013 and became effect on 1 July

2015. The main focus of SPLUMA and its Regulations is to promote Spatial Justice, inter alia, to

provide for the development of single Municipal Land Use Scheme that covers the entire municipal

area and a Spatial Development Framework that is flexible and resilient. SPLUMA also expressly

provides for the incorporation of areas that were previously excluded from planning processes and

the incremental introduction of town planning principles.

In an attempt to adhere to the provisions of SPLUMA in as far as the development of a Municipal

Single Land Use Scheme is concerned Council appointed a Service Provider in September 2017 to

assist with the development of a Single Land Use Scheme for the entire municipal area in

accordance with Section 24 (1) of the SPLUMA.

The single Land Use Scheme will incorporate all 34 Municipal Wards, including Traditional Authority

Areas. This will assist greatly in incrementally introducing regulation of traditional areas, which were

previously excluded from the Scheme processes and will contribute immensely to orderly

development within the municipality.

The Municipal Single Land Use Scheme was meant to be completed during 2018/2019 financial

year. However this target could not be achieved as a result of elaborate stakeholder engagements,

which were necessary to ensure that their comments and inputs are heeded in the preparation of

the Scheme as well as the general public participation. The following Key Stakeholders were

engaged during the preparation of the draft Single Land Use Scheme:

Department of Education;

Department of Human Settlements;

Department of Agriculture, Forestry and Fisheries;

Department of Education;

Richards Bay Industrial Development Zone;

Forestry South Africa;

Department of Transport;

Ingonyama Trust Board;

Department of Economic Development, Tourism and Environmental Affairs;

Department of Cooperative Governance and Traditional Affairs;

Department of Rural Development and Land Reform;

Department of Health;

Department of Social Development;

Mondi Group;

Umhlathuze Valley Sugar;

uMfolozi and uMlalazi Local Municipalities;

King Cetshwayo District Municipality;

Transnet National Ports Authority;

KZN Wildlife;

Etc.

293

Apart from the comments from some of the above listed key departments/stakeholders, the

municipality decided to have one on one session with the Department of Agriculture Forestry and

Fisheries (DAFF) to attend directly to the requirements and provisions of the Subdivision of

Agricultural Land Act, 1970 (Act No. 70 of 1970). The session was successfully held in May 2019,

which was followed by the department’s assessment and comments received in June 2019.

However, the comments were not for the entire affected areas and the department is still busy with

the final assessment.

The Municipal Single Land Use Scheme that is under preparation addresses spatial imbalances of

the past in line with Spatial Justice, Spatial Resilience and Efficiency, being SPLUMA development

principles, by ensuring that land use controls are area based as opposed to a blanket approach and

that the Scheme is flexible and user-friendly. This has been achieved by introducing new land use

zones which includes areas within Traditional Authorities, adjusting minimum site sizes for certain

land use zones in order to accommodate citizens from the Former R293 Townships, which could not

meet the Scheme requirement due to the current Scheme requirements.

Richards Bay Central Business District Framework Plan

In March 2019 Council adopted Richards Bay Central Business District and its overall objective is to

create a more attractive urban environment with improved functionality, better urban management,

creation of new investment and economic opportunities, efficient transport system and improved

urban safety and security.

294

Figure xx: Richards Bay

CBD Framework Plan Overview

The implementation of the Richards Bay CBD Framework does not happen in isolation with the Land

Use Scheme, National Building Regulations and Building Aesthetics Bylaw to ensure that municipal

densification vision.

Building Aesthetic By-law

In May 2017 Council resolved to prepare uMhlathuze Building Aesthetics By-law, which seeks to

improve the aesthetic appeal of the built environment and the maintenance of the aesthetic quality

in all areas that fall under the jurisdiction of the Municipality. The By-law was published in the

Provincial Gazetted on 1 November 2018. It serves as a guiding tool by Council to promote and

create a built environment within uMhlathuze that is unique, creating land marks and iconic

structures that give one a sense of belonging and lasting experience.

The By-law is used in conjunction with other planning and building tools such as the National

Building Regulations and Building Standards Act, the municipal Land Use Scheme and the municipal

Spatial Development Framework to ensure that the design of buildings and their surrounding

environment are aesthetically appealing, pedestrian/people friendly; comply to the principles of

New Urbanism and the Compact City.

Since the implementation of the Building Aesthetic By-law in December 2018, the municipality has

received positive response from the public. Developers and Architects/Draughtspersons in as far the

submission to the Aesthetic Committee are concerned. The Committee has dealt with applications

from Traditional Authority Areas, Empangeni and Richards Bay CBDs and Former R293 Townships.

Land Development Applications

295

The day-to-day responsibilities carried out by Land Use Management Unit (Development Control

and Building Control Sub-Units) include site inspections, enforcement, processing of planning

application and attending to general public queries in relation to statutory planning requirements.

The table below illustrates the number of land use management applications dealt with during

2018/2019 financial year.

Application Type No. %

Building Line Relaxation 177 77

Consent 31 14

Formal Authority 21 9

Total 229 100

Table XX: Land Use Management Applications Assessed during 2018/2019 Financial Year

The planning applications outlined in the above table are assessed and evaluated in terms of the

Section 27 (1) (b) of the Municipal Spatial Planning and Land Use Management By-law, 2017, as

amended, municipal Land Use Scheme, the Standard Operating Procedures and in line with

department’s Key Performance Indicator, which requires that 95% of all applications received per

quarter must be processed and finalised.

In terms of the Standard Operating Procedure, Consent applications are supposed to be finalised

between 68 -82 days (including days public participation process); Formal Authority application

between 66-82 days, all inclusive of 30 days public participation processes and Relaxation of

Building Lines between 28-78 days.

Development control remains a challenge due to development and operations without town

planning approvals. However, enforcement actions are taken and/or advisory services are offered in

line with the uMhlathuze Land Use Scheme, and Spatial Planning and Land Use Management By-

law.

296

Figure xx: Building Line Relaxation Applications Standard Operation Procedure

Figure xx: Consent Applications Standard Operation Procedure

Figure xx: Formal Authority Applications Standard Operation Procedure

297

Figure xx:

Enforcement Standard Operation Procedure

Building Control

Building control is the backbone of the municipality in terms of promoting structural integrity of all

buildings erected within the municipal jurisdiction. Citizens, Architects/Draughtspersons and

developers are always advised to submit building plans for municipal scrutiny and approval before

commencement of alterations or additions to existing dwellings or constructing new buildings.

The submission and assessment of building plans are based on the following relevant policy and

legislation framework:

o National Building Regulations and Building Standards Act, 1997 (Act No.107 of 1997) as

amended;

o uMhlathuze Spatial Planning and Land Use Management By-law, 2017, as amended;

o Spatial Planning and Land Use Management Act, 2013 (Act No. 16 of 2013);

o uMhlathuze Land Use Scheme, as amended;

o Building Aesthetics Bylaw, 2018; and

o SANS 10400

The table below illustrates the number of building plans submitted over four subsequent financial

years and estimated building cost of proposed buildings and structures at the end of each financial

year.

Financial

Year

Total Number of Building

Plans Submitted

Total Estimated Building Cost of

Proposed Buildings and Structures (R)

298

2015/2016 536 442 960 000

2016/2017 483 144 125 000

2017/2018 433 81 306 000

2018/2019 450 123 399 000

Table xx: Building Plans Submitted in Four Different Financial Years

The table above indicates a decline in construction industry between 2015/2016 and 2017/2018

financial years and a boom in the 2018/2019 financial year.

Building Plans outlined in the above table were assessed and evaluated in terms of the National

Building Regulations and SANS 10400, the Standard Operating Procedure and in line with

department’s Key Performance Indicator, which requires that 95% of building plans applications

received per quarter must be processed and finalised.

In terms of the Standard Operating Procedure, building plans for residential development are

approved within 30 days, while building plans for commercial and industrial development are

approved within 60 days. .

Building control remains a challenge due to illegal structures being constructed and appropriate

enforcement actions are taken and/or advisory services are offered in line with the National Building

Regulations and the Building Inspectorate’s Standard Operating Procedures.

299

Figure xx: Building Plans Applications Standard Operating Procedure

DEVELOPMENT ADMINISTRATION

Relevant Council Goals, Objectives and Strategies

NATIONAL KPA 6: CROSS CUTTING

Goals Objectives Strategies

6.1 Integrated Urban and Rural

Development

6.1.3 To ensure effective Land

Use Management and Building

Management

6.1.3.2 Effective processing of

development applications

In line with the above IDP Objective, the following has been achieved as per the SDBIP for the year

under review.

Implementation of the uMhlathuze Spatial Planning and Land Use Management (SPLUM) By-law, 2017

Review of the uMhlathuze Spatial Planning and Land Use Management By-law, 2017

The Municipality adopted the uMhlathuze Spatial Planning and Land Use Management By-law,

which became effective on 21 September 2017. The aim of the By-law is to:

provide for the establishment of the Municipal Planning Approval Authority, Municipal

Planning Appeal Authority and the Municipal Planning Enforcement Authority;

provide for the adoption, repeal, review, extension and amendment of the Municipality’s

land use scheme,

regulate and manage spatial and land use planning and development,

300

provide for the categorisation of land development applications,

provide for processes and procedures for land development applications,

provide for appeals against decisions of the Municipal Planning Approval Authority;

provide for offences, penalties and enforcement matters; and

provide for compensation and matters incidental thereto.

The implementation of the By-law highlighted some shortcomings. These shortcomings could be

summarised as:

- addition and amendment of definitions to aid in interpretation of the By-law;

- addition and clarification of matters as set out in the Spatial Planning and Land Use

Management Act, such as applying for intervener status, appeals, etc.

- clarification of who is delegated to perform certain functions or actions;

- clarification or streamlining of procedures to be followed, for instance the formalisation of a

pre-application process, review of timeframes, etc; and

- minor corrections such as numbering, spelling, etc.

It was therefore proposed to review the By-law in order to ensure good governance and to aid in

interpretation of the By-law.

As required in terms of legislation and to ensure transparency, the proposed changes were

advertised for public comment, and the public participation process was successfully concluded.

No objections or comments were received, which enabled the Municipality to continue with the

formalisation of the proposed changes.

The amendments to the By-law were gazetted on 9 May 2019 (Government Gazette Notice No.

2073) and the amendments are therefore now effective.

The Municipality continues to monitor the implementation of the By-law in order to ensure a

transparent and efficient planning process that would support service delivery and investment in

the uMhlathuze Municipal area.

Planning Applications Received

Applications administered by the Development Administration Unit include rezoning, township

establishment, subdivision and consolidation of land, development of land situated outside scheme

areas, phasing or cancellation of approved layout plans for subdivision or development of land, the

alteration/suspension/deletion of restrictions relating to land and permanent closure of municipal

roads and public places.

The section attended to the following planning applications received during 2018/2019:

Period

2018/2019

Formal Applications

Received

Formal Applications Processed: (public

participation, evaluation and decision-making)

Q1 1 7

Q2 4 8

Q3 2 6

Q4 2 5

Table xx: Land Development applications processed

301

These applications could be categorised as follows:

- Applications for amendment of approved conditions (3 applications received);

- Removal of restrictive conditions as set out in a property’s title deed (2 application received);

- Applications for minor subdivision or consolidation of land (1 application received);

- Mixed use or commercial developments (4 applications received);

- Institutional or social developments such as hospitals, schools, crèches, arts and culture, etc.

(3 applications received);

- Industrial developments (1 application received); and

- Planning applications for key Municipal Projects applicable to the Steel Bridge, Carina

Substation, The Ridge and the Central Industrial Area.

Planning Applications Drafted

The relevant sections also assist in drafting and finalising planning applications on behalf of the

Municipality.

During the reporting year, the section attended to the following Council projects:

Subdivision and rezoning of the Steel Bridge and Carina Substation sites in order to create

transferable properties;

Re-layout of the Central Industrial Area in order to react to an amended environmental

approval;

Subdivision and rezoning of land to establish a commercial node in Mzingazi Village;

Correction of Cadastral Boundaries – The Empangeni Civic Centre for asset management

purposes;

Correction of Cadastral Boundaries – The Empangeni Art Centre for asset management

purposes; and

Subdivision of the Empangeni Golf Course to create an individual erf for asset management

purposes.

Decision-making Authorities

The Spatial Planning and Land Use Management Act (SPLUMA) and the uMhlathuze Spatial

Planning and Land Use Management By-law make provision for two decision-making authorities

responsible for considering and approving land development and land use applications:

a) The Municipal Planning Tribunal

The King Cetshwayo North Joint Municipal Planning Tribunal (JMPT) consists of three external

members and officials from the uMhlathuze and uMfolozi Municipalities. The names of the

members were gazetted in terms of Provincial Gazette Notice 1639 of 10 March 2016. The members

of the Tribunal are appointed for a 5 year term, effective from 10 March 2016.

The Tribunal considers applications as categorised in terms of Schedule 3 Item 7 of the uMhlathuze

Spatial Planning and Land Use Management By-law, which include higher impact activities such as

applications for township establishment, rezoning, permanent closure of public places, applications

where objections were received during the public participation process and the like.

302

The Tribunal considered 27 reports during 11 meetings held between 1 July 2018 and 30 June 2019,

compared to 26 reports during 10 meetings held between 1 July 2017 and 30 June 2018.

In terms of timeframes for decision-making, the Tribunal generally must decide on an application

within 60 days of the public participation process, or receipt of a reply to objections received. The

Tribunal performs exceptionally well in this regard, as demonstrated by the following table:

APPLICATION NUMBER DECISION DUE DATE AFTER

PUBLIC NOTICE OR COMMENT

BY APPLICANT (60 DAYS)

DECISION TAKEN

UM/22/2015(i) 10/12/2018 06/11/2018

UM/11/2018 07/03/2019 12/02/2019

UM/13/2018 10/12/2018 06/11/2018

UM/14/2018 07/03/2019 12/02/2019

UM/15/2018 18/03/2019 12/02/2019

UM/16/2018 23/03/2019 12/02/2019

UM/17/2018 01/06/2019 14/05/2019

UM/01/2019 23/07/2019 11/06/2019

Table xx: Land Development applications considered by the King Cetshwayo North JMPT

On average, the King Cetshwayo North Joint Municipal Planning Tribunal finalises a decision within

a month after the public participation process, or receipt of a reply to objections received, thereby

improving service delivery.

b) The Municipal Authorised Official

The Municipal Authorised Official appointed is the Deputy Municipal Manager: City Development.

The Municipal Authorised Official considers applications as categorised in terms of Schedule 3 Item

8 of the uMhlathuze Spatial Planning and Land Use Management Bylaw, which include lower impact

activities such as applications for minor subdivisions, consolidations, applications in traditional

settlement areas, removal of restrictions and the like.

The Authorised Official considered 4 planning application reports processed by the Development

Administration Section during the 2018/2019 financial year.

In terms of timeframes for decision-making, the Authorised Official generally must decide on an

application within 60 days of the public participation process. In some cases shown below, no public

participation process was necessary.

The Authorised Official performs exceptionally well in this regard, as demonstrated by the following

table, thereby improving service delivery:

APPLICATION

COMPLETE

DECISION DUE DATE AFTER

PUBLIC NOTICE OR COMMENT

BY APPLICANT (60 DAYS)

DECISION TAKEN

UM/12/2018 16/08/2018 N/A 24/08/2018

303

UM/08/2016(i) 28/03/2019 12/03/2019

UM/03/2019 16/04/2019 N/A 24/04/2019

UM/06/2019 09/09/2019 02/08/2019

Appeals Received

Section 51 of the Spatial Planning and Land Use Management Act and Chapter 5 of the uMhlathuze

Spatial Planning and Land Use Management By-law deal with the establishment and functioning of

a Municipal Appeals Tribunal.

The Municipality has elected its Executive Committee as its Appeals Tribunal.

Two appeals were received during the 2018/2019 financial year in response to planning decisions

made.

The appeals are received and administered by the Municipal Manager as the Appeals Authority

Registrar.

SPATIAL AND ENVIRONMENTAL PLANNING

Relevant Council Goals, Objectives and Strategies

NATIONAL KPA 6 : CROSS CUTTING

GOALS OBJECTIVES STRATEGIES

6.1 Integrated

Urban and Rural

Development

6.1.1 To plan and manage

existing and future

development

6.1.1.1 Review and Implement the Spatial

Development Framework

6.1.1.2 Develop precinct framework plans

6.1.1.4 Incremental development of a

Strategic Environmental Assessment for

the entire municipal area

In line with the above IDP Objectives, a number of targets and initiatives have been achieved for the

year under review.

Spatial Planning

This sub-unit has as its main function the review and implementation of the Municipal Spatial

Development Framework (SDF). After the review of the SDF, the implementation thereof unfolds

into an array of components, notably the development of precinct plan, framework plans for rural

and urban areas, interdepartmental coordination of development as well as catalytic project

coordination.

Spatial Development Framework (SDF) Review

304

The Spatial Development Framework (SDF) of the Municipality is a visual presentation of the

municipality’s development vision and strategies as a result it reflects the current reality, but also

the logical future development options. Amongst others, the municipal SDF provides guidance to

development/investment interventions by way of:

i. Identification of Nodes and Corridors

ii. Restructuring Zones (Human Settlement Intervention) and Priority Housing Intervention

Areas

iii. Spatial Intervention Areas

iv. Catalytic and Strategic Projects

v. Basic Services Intervention Areas

vi. Social Services Intervention Areas

Since the inclusion of four new wards into the municipal area post the Local Government Elections

of 2016, there has been steady progress toward preparing an SDF that is compliant with the

provisions of the Spatial Planning and Land Use Management Act, 2013 (SPLUMA). The second SDF

Review for 2019/2020 was adopted on 29 May 2019. As part of the second review of the Municipal

SDF, the following long term spatial vision and a Capital Expenditure Framework (CEF) have been

included into the SDF.

“An agile institution that fosters spatial sustainability, resilience, equity and compact growth,

supported by appropriate ICT solutions”

Functional Areas and Priority Development Areas have been identified as part of the CEF process.

The Functional Areas are as follow:

o Urban Core

o Rural Sustainability

o Peri-Urban

o Commercial Farming

The identified Priority Development Areas being strategic development areas, nodal areas,

corridors, precincts as well as housing restructuring zones as indicated in the following map.

305

Figure xx: Mapping of uMhlathuze Priority Development Areas

Intermediate City Municipality (ICM) Support as part of the Integrated Urban Development Framework

(IUDF)

The Municipality has been benefitting from assistance provided through the ICM (Intermediate

Cities Municipalities) Support Programme of the IUDF (Integrated Urban Development Framework)

as a Pilot Municipality. The IUDF is a policy framework guiding the reorganization of the urban

system of South Africa so that cities and towns can become inclusive, resource efficient and

adequate places to live, as per the vision outlined in the National Development Plan (NDP). This

new focus for South Africa steers urban growth towards a sustainable growth model of compact,

connected and coordinated cities and towns. The IUDF implementation plan identifies a number of

short term proposals to achieve spatial transformation.

The overall objective of the IUDF is to create efficient urban spaces by:-

o Reducing travel costs and distances

o Aligning land use, transport planning and housing

o Preventing development of housing in marginal areas

o Increasing urban densities and reducing sprawl

o Shifting jobs and investment towards dense peripheral townships

o Improving public transport and the coordination between transport modes

The IUDF has its premise on the nine levers as indicated in the figure below.

306

Figure xx: Strategic Goals and Levers of the IUDF

The above listed levers relate very specifically to the pillar of spatial transformation that is embraced

by the Municipality. The Municipality is planning and implementing for improved public transport

and investment is aimed at aiding the Township Economy and a number of processes are underway

to establish integrated human settlements in the municipal area.

The following areas of support were provided to the Municipality as part of the ICM Support

Programme:

o Financial instruments (inclusive of Long Term Financial Planning – LTFP, Infrastructure Asset

Management, Procurement and Delivery);

o Spatial Visioning; and

o Capital Expenditure Framework (CEF).

The latter two have been included into the SDF Review and more details in respect of their

formulation is provided hereunder:

1.3.1.3 Spatial Visioning

Visions are strategic planning instruments. They are “soft instruments” that act as a guideline to

establish or develop policies. The Spatial Planning and Land Use Management Act (SPLUMA)

requires of municipalities to have long term Spatial Development Frameworks (SDFs) that are

reviewed annually and for these SDFs to have long term spatial visions.

The new spatial vision for the City of uMhlathuze was prepared by way of a consultative process

that included the political leadership as well as internal and external stakeholders and the outcome

is a coherent vision (minimum 20 years) for the economic and spatial integration and

transformation of the municipal area.

307

Figure xx:the Future Vision

Figure xx: City of uMhlathuze Visionaries

The following principles for uMhlathuze were identified during the spatial visioning engagements:

o Diversity: Nurturing, encouraging and enabling diversity on all fronts, such as cultural,

traditional, religious, gender, ability, etc.

o Sustainability: Institutional, Ecological, social and financial.

o Choice: An area where people are able to exercise free will and have access to choice and

opportunity.

o Accessibility: Enabling upward mobility.

o Quality of life: Quality shared public spaces.

o Mobility: Ability to progress and an adaptable environment.

o Affordability: For all – especially public services.

o Shared societal dividends: Happiness, hope, health, safety and well being

o Equality: An administration that regards ALL residents as equal.

o Equity: An administration that seeks to improve equity. One that is fair and just.

o Inclusivity: An administration that deliberates seeks to include the marginalized (gender, age,

race, ability.

308

o Avant garde: Taking a long term view, forward thinking and thinking outside the box.

o Democratic: Meaningful consultative processes.

o Efficiency: Judicious use of public resources

The following spatial vision statement for the uMhlathuze Municipality was developed and

incorporated into the municipal Spatial Development Framework (SDF).

“An agile institution that fosters spatial sustainability, resilience, equity and compact growth,

supported by appropriate ICT solutions”

1.3.1.3 Capital Expenditure Framework

A Capital Expenditure Framework (CEF) is a core requirement for a SPLUMA (Spatial Planning and

Land Use Management Act) compliant SDF and also is a requirement for the purpose of an

Intermediate City Municipality to qualify for the Integrated Urban Development Grant (IUDG).

Amongst others, the CEF provides the Municipality with the following:

o An analysis of the socio-economic context of the Municipality.

o The uMhlathuze Development Approach.

o A summary of the Spatial Vision.

o A delineation of Functional Areas and Priority Development Areas.

o Details of growth patterns, level of services provided as well as services requirements for the

determined Functional Areas and Priority Development Areas.

o Consolidated details of the planned capital investment by the Municipality based on various

master plans and sector plans as available.

o The Long Term Financial Model and Funding Envelope available to the Municipality.

o An explanation of the Project Prioritisation methodology as well as the outcomes of the

application of the Project Prioritisation Model. The said outcomes are presented in various

ways, i.e. per programme and spatially for the 10 year period.

o Budget Scenarios.

In context of the above, a Functional Area (FA) is a delineated area characterized by common

(homogenic) geographical, spatial, developmental, service demand conditions, as well as similar

developmental challenges.

Priority Development Areas (PDAs) are specifically delineated intervention areas. Each of these areas

have a specific development intent such as strategic development areas, nodal areas, corridors,

precincts, housing restructuring etc. which are expressed, but not limited to the Spatial

Development Framework.

The mapping of the Functional Areas as applied to the uMhlathuze context is provided hereunder:

Commercial Farming

Rural Sustainability

309

Figure xx: Mapping

of uMhlathuze

Functional Areas

In addition to the

spatial depiction of

projects, details are

also provided in

respect of planned

expenditure per

Department, planned expenditure per MSCOA (Municipal Standard Chart of Accounts) Asset Type

as well as planned expenditure in renewal/upgrade/new infrastructure.

A tailored prioritization model for the uMhlathuze Municipality was also prepared to assist in

ensuring that the most important projects are implemented in line with the spatial transformation

agenda of the Municipality.

Rural Framework Plans

In order to facilitate feasible service provision, the Municipality is in the process of compiling Rural

Framework Plans for all rural areas within its jurisdiction. Amongst others, these plans can be used

as a guiding tool when land allocations are effected.

The municipality has a five stage plan for the preparation of Rural Development Framework Plans.

Phase 3 is currently underway. The following table illustrates the complete phasing approach for

the preparation of the proposed Rural Development Framework Plans.

Phase Project Name Status Financial

Year

1 Port Dunford Rural Development Framework Plan -

Mkhwanazi Traditional Authority - completed

Completed 2017/2018

2 Buchanana Rural Development Framework Plan -

Obuka Traditional Authority - completed

Completed 2018/2019

3 Hluma Rural Development Framework Plan - Underway 2019/2020

Peri Urban

Urban Core

Environmentally Sensitive

310

KwaBhejane Traditional Authority - underway

4 Matshana Rural Development Framework Plan -

Madlebe Traditional Authority

Pending 2020/2021

5 Mabuyeni Rural Development Framework Plan - Dube

Traditional Authority

Pending 2021/2022

Table x: Rural Framework Plans

Figure xx: Buchanana Framework Plan

The following priority projects have been identified for implementation to give effect to the

Buchanana Development Framework:

a) To obtain more information on the public transport associations active in the area as well as

permit arrangements.

b) To discuss the proposed de-proclamation of the P253.

c) To request prioritisation of high mast lighting in the Buchanana nodal area given the high

priority given to this intervention in the Development Framework.

d) To obtain assistance with regard to gateway signage for the Buchanana area.

1.3.1.5 Empangeni Urban Regeneration

Following the finalization of the Empangeni CBD Revitalization Plan, aesthetic guidelines for the

Refurbishment/Replacement of Pavements/Walkways in the Empangeni CBD (Central Business

311

District) were prepared to guide the ongoing maintenance of Empangeni Pavements/Walkways

takes place on an “ad hoc” basis and without consideration of a theme.

The following concept themes are subsequently being pursued:

o Geometric forms, beadwork and colour symbolism in the landscape; and

o Regeneration of the Empangeni landscape by way of ecological restoration, resource

management, reduction, reuse and rehabilitation and reducing the heat island.

This process contains various proposals as grouped hereunder:

Part 1: Non-motorized Transport (NMT) users, i.e. Pedestrians and Disabled Persons:

Proposals and guidance is provided in respect of user security, safety and traffic safety as well as

accessibility, convenience, comfort and environmental needs. Dimensions, materials etc. for

sidewalks and walkways are provided.

Part 2: NMT users: Cyclists:

Amongst others, an analysis of cyclist groups, bicycle lane requirements and a number of design

considerations are provided.

Part 3: Landscape Treatment:

Ideas for parking areas, landmarks, public squares and plazas as well as stormwater and surface

runoff management are provided.

312

Figure xx: Proposal for Secondary Pedestrian Walkway and Cycle Routes

In order to give effect to the proposals contained in the aesthetic guidelines for the

Refurbishment/Replacement of Pavements/Walkways in the Empangeni CBD (Central Business

District), an interdepartmental Task Team has been established to coordinate implementation

efforts in line with the proposals.

Environmental Planning

Environmental Planning has a strategic and monitoring responsibility in the Municipality. The unit is

at the forefront of the municipal efforts with regard to climate change mitigation and adaptation as

well as pursuing various partnerships and funding mechanisms in this regard. The responsibility to

advice and guide decision making in the municipality in respect of development (private and public

sector) also vests within the ambit of environmental planning.

Climate Action

During 2018/2019, the City of uMhlathuze built on from commitments and climate change

programs from previous years. A distinguishing achievement during the year has been the

institutional efforts in embedding a climate change effort within the organization. This was achieved

through a Climate Change Action Plan (CCAP), which Council adopted in October 2019. Council

further resolved on the role of the Green Team to co-ordinate Climate Action and report

accordingly. This is becoming increasingly important as Cities, including uMhlathuze, disclose

climate action performance for statutory reporting towards nationally determined contributions, a

voluntary public and global platforms.

Institutionalization of Climate Action

313

The Climate change action plan presents a framework for mitigation and adaptation work until

2023. The plan adopts a risk-based approach and will focus on ten priority areas where intervention

is needed:

Disaster management;

Coastal management;

Storm water management;

Water resource management;

Biodiversity and Open space management;

Air quality management;

Waste management;

Energy management;

Transport planning; and

City planning catalytic initiatives.

The appointment of a Green Team resonates with the cross cutting nature of climate action and it

requires collective action and sound co-ordination. Since the appointment of the Green team, the

City Development Department has co-ordinated six meetings for the Green Team to report on

respective Climate Action targets. This has proven to be a very useful platform in preparation of

Council’s environmental programs as well as the Greenest Municipality and Arbor City Competitions

that the Municipality had to prepare for over the year. Moreover the Green Team would be a think

tank for advancing sustainability objectives, leveraging on partnerships with various sectors as well

as dealing with compliance and enforcement issues.

Strategic Partnerships

As part of the Climate Change Action Plan, uMhlathuze has recognized that strategic partnerships

are imperative for profiling, networks and access to other programs and climate finance. As such,

the Municipality has embarked on programs with various partners in efforts to scale up responses

to climate threats. Programs associated with each partner are elaborated on below.

ICLEI

The City of uMhlathuze is a Secondary City participant in the UN funded Low Emissions

Development Strategies (Urban LEDS). ICLEI, Local Governments for Sustainability, is facilitating the

program, which now is in the second phase of implementation. Phase II, which was launched in

2018, sets the objective of fulfilling a range of cross-cutting objectives to reduce greenhouse Gas

emissions and building climate resilience. Like Phase I (which realized the installation of 11kV solar

panels at Empangeni Library, Urban LEDS II has a strong energy focus.

The City held an engagement with business and industry in November 2018 to communicate its

climate action plan with partners, ICLEI, through the URBAN LEDS 11 project. The event was

314

attended by 60 delegated. The Business Breakfast for Climate Action provided a useful platform to

address a few issues:

Mayor Mhlongo shared the vision of the City of uMhlathuze regarding climate issues.

The municipality shared work being done on climate change such as the Climate Action

Plan, the Urban Low Emissions Development Strategies II project and the uMhlathuze Water

Stewardship Partnership as examples of implementation.

Business shared what they are doing and goals for energy, water and waste.

Common areas where the municipality and business can work together on climate action

during three break away groups dealing with water, energy and waste.

A way forward that there needs to be ongoing engagement to track progress.

Figure xx: Participants at the uMhlathuze Climate Action Business Engagement

The Global Covenant of Mayors for Climate Change and Energy

The Mayor of the City of uMhlathuze is a signatory to the Global Covenant of Mayors for Climate

Change and Energy, which is the world’s largest cooperative effort among mayors and city officials

to reduce greenhouse gas emissions and climate risks in cities. The Global Covenant of Mayors for

Climate Change and Energy helps local authorities to translate their greenhouse gas emissions

315

reduction ambitions into reality, while taking into account the immense diversity on the ground. The

process provides signatories like uMhlathuze with a harmonised data compilation and reporting

framework, which assists in following a systemic climate and energy planning and monitoring

structure at a local level.

The uMhlathuze Water Stewardship Partnership (uWASP)

The uWASP was constituted by the GIZ, National Business Initiative and the World Wildlife Fund,

during the 2017 harrowing drought period where dams were sitting at 13% of their capacity. It

rallied together government departments, different water users (mainly business and industry),

water boards and municipalities within the uMhlathuze Catchment. The uMhlathuze Water

Stewardship Partnership was a platform created to collaborate with various partners to achieve

sound water resource management. The City of uMhlathuze entered into an agreement with the

uWASP in May 2019. The partnership is looking into salient catchment management objectives that

were not necessarily being prioritized. The Lake Cubhu/ Mzingwenya River Catchment management

plan is a case in point. The project has identified a range of climate interventions to ensure that

resilience of informal settlement whilst ensuring desired levels water quality is achieved.

KZN Central Climate Change Compact

The City of uMhlathuze is an active member of the KZN Central Climate Change Compact that

meets on a quarterly basis. The Compact was established as a result of the Durban Adaptation

Charter at COP 17, in Durban, with local municipalities pledging localized climate action. The KZN

Compact of Mayors was launched in November 2018 with the objective of extending the work

already done by a compact technical forum, to include the political heads of the province’s leading

towns and cities.

The Mayors, including Hon. Mayor M.G Mhlongo, signed a declaration which read: “We, the mayors

of KwaZulu-Natal municipalities do hereby commit ourselves to the undertakings of the Durban

Adaptation Charter in alignment with UNFCCC, COP 17 and the Paris Agreement. We commit to

taking local actions in each of our municipalities and implementing it through the KZN Climate

Change Compact of Mayors.”

The compact aligns the province with global structures including the ICLEI – Local Governments for

Sustainability’s Africa region and the Global Covenant of Mayors. It serves to in this regard:

improve aligning adaptation and mitigation strategies

making sure these considered the needs of vulnerable communities

ensuring sustainable development

making sure functioning ecosystems were a core part of municipal green infrastructure; and

seeking innovative funding mechanisms.

316

At the conference, uMhlathuze, along with 12 other municipalities in KwaZulu-Natal were honoured

for long service:

KwaDukuza;

iLembe;

eThekwini;

Ugu;

Ray Nkonyeni;

uMzumbe;

uMdoni;

uMgungundlovu;

uMngeni;

uMshwathi;

Mtubatuta; and

Msunduzi.

The respective partnerships serve an important resource hub to leverage climate finance

opportunities.

Climate Change Alignment with other emerging Policy Frameworks

The City of uMhlathuze’s Integrated Urban Development Framework (IUDF) is a keystone

intervention in the above regard in delivering on a spatial visioning tool to inform various facets of

planning for the future. For that matter, issues of climate change are reflected in every facet of the

IUDF, from the framework itself to issues of Capital Expenditure Framework and prioritization

models for municipal financing.

The following cross cutting themes in the IUDF address climate change:

Figure xx: Climate Change alignment with other Policy Frameworks

The IUDF from an implementation perspective seeks to transform space in order to:-

317

• Reduce travel costs and distances – mitigation

• Aligning land use, transport planning and housing – mitigation

• Preventing development of housing in marginal areas – adaptation and mitigation

• Increasing urban densities and reducing sprawl – adaptation and mitigation

• Shifting jobs and investment toward dense peripheral townships- adaptation and mitigation

• Improving public transport and the coordination between transport mode – mitigation

Catalytic projects whose implementation will have a positive impact for climate action:

• Comprehensive Integrated Transport Plan (CITP).

• Airport Relocation – increasing efficiencies in the movement of people and goods.

• Waste Water Re-use project.

• Priority Housing Development Areas have been identified to improve urban efficiencies,

reduce travel distances etc.

• uMzingwenya settlement interventions aimed at improving resilience.

• Empangeni Integrated Residential Development Project – Planning aspects include climate

proofing in terms of open spaces, energy, waste management and transport planning.

HUMAN SETTLEMENTS UNIT

Human Settlements Unit falls within the Urban and Rural Planning Section.

Relevant Council Goals, Objectives and Strategies

NATIONAL KPA 2 : BASIC SERVICES AND INFRASTRUCTURE PROVISION

Goals Objectives Strategies

2.1 Integrated infrastructure

and efficient services

2.1.2 To promote the

achievement of a non-racial,

integrated society, through

the development of

sustainable human

settlements and quality

housing

2.1.2.1 Improve community

standard of living through

accelerated development

of Integrated Human

Settlement

NATIONAL KPA 2 : BASIC SERVICES AND INFRASTRUCTURE PROVISION

Goals Objectives Strategies

6.1 Integrated Urban and

Rural Development

6.1.1 To plan and manage

existing and future development

6.1.1.3 Review of Human

Settlement Sector Plan

318

The primary objectives of the Unit in line with its strategic objective as documented in the IDP are

as follows:

Pursuing all available options for the release of suitable, well located state owned land for

sustainable human settlements;

Promoting a variety of Housing Typologies and Densities to provide for all Demand

Categories;

Improving the living environment of households in the informal settlements through

incremental access to basic services and structured in situ upgrading (where suitable);

Creating other forms of tenure through Social Housing/Rental and building new

Community Residential Units whilst upgrading the existing hostel blocks;

Enabling opportunities in the GAP market for households earning between R3501-R22 000

per month; and

Provision of security of tenure through issuing of title deeds.

Review of Integrated Human Settlements Plan

Council adopted the Reviewed Human Settlements Plan for 2019/2020 in May 2019.

Improving Community Standard of Living through Accelerated Development of Integrated

Human Settlements

The municipality managed to secure funding in the beginning of the financial year for the 3

Integrated Residential Development Programme (IRDP) Housing Projects from the Provincial

Department of Human Settlements. The funds were for the installation of internal services which

include water, sewer, stormwater and roads. The projects are currently underway.

Dumisani Makhaye Village Phase 6 & 8

The project is currently sitting at 93% complete in-terms of installation of internal bulk services such

as water, sewer, storm water and roads. Project started in June 2018 and will be completed in July

2019.

Figure xx: Dumisani Makhaye Village (DMV) Housing Project roadworks and sidewalks

319

Empangeni Mega Housing Phase 1 (Catalytic project)

The project is currently sitting at 31% complete in-terms of installation of internal reticulation

services such as water, sewer, storm water and roads. Project started in November 2018 and will be

completed in March 2020.

Figure xx: Empangeni Mega Housing Project G5 Layer completered and Water & Sewer Pipes

Reticulation

Aquadene Housing

The project is currently sitting at 43% complete in terms of installation of internal bulk services such

as water, sewer, storm water and roads. Project started in June 2018 and will be completed in March

2021.

Figure

xx:

Aquadene Housing Project sewer pipe reticulation underway and roadworks

Human Settlement Intervention on Operation Sukuma Sakhe (OSS) Programme

The OSS initiative prioritises households that need urgent interventions. The programme prioritises

the poorest of the poor, mostly falling within the definition of “vulnerable groups”, which include

the indigent, women, children and disabled persons.

The municipality together with the Provincial Department of Human Settlements has constructed

seven (7) houses for the vulnerable. The houses were constructed in Wards 10, 24, 29, 31 and 33.

320

The Provincial Department of Human Settlements has approved 41 beneficiaries under OSS

programme from ward 11, 13 and 29. The contractor has been appointed and construction of

houses will commence soon.

Figure xx: OSS house for an elderly lady in ward 33

Figure xx: OSS house built for a person living with disability in Ward 31

Housing Consumer Education

Housing Consumer Education (HCE) is a programme that educates communities on their rights and

obligations on government subsidies and provides them with information to make informed

decisions.

The municipality was able to provide 12 sessions in 12 wards reaching a total of 3549 people.

321

Figure xx: Housing Consumer Education Session with Community in Ward 28, eBomvini

Govan Mbeki Housing Awards

The municipality won the Best Accredited Level II municipality and Best Finance Linked Individual

Subsidy Programme (FLISP) in the KZN Provincial Govan Mbeki Housing Awards in September 2018.

The Municipality also won the Best Accredited Level II municipality at the National Govan Mbeki

Housing Awards in November 2018.

ECONOMIC DEVELOPMENT FACILITATION SECTION

The Economic Development Facilitation Section is divided into two distinct units, namely:

- Business Support, Markets and Tourism; and

- Property Administration.

The achievements of these units are outlined below.

Business Support, Markets and Tourism

Relevant Council Goals, Objectives and Strategies

NATIONAL KPA 3: LOCAL ECONOMIC DEVELOPMENT

Goals Objectives Strategies

3.1 Viable Economic

Growth and

Development

3.1.1 To create an environment

that will create jobs and alleviate

poverty

3.1.1.1 Develop and sustain urban and

commercial agriculture to build food

security

3.1.1.2 Facilitate and grow SMMEs

3.1.1.3 Promote local production for local

needs

3.1.1.4 Review and implement the LED

Strategy

3.1.1.5 Affirm local entrepreneurs

322

In line with the above IDP Objectives, the following are the targets that have been achieved as per

the SDBIP for the year under review.

1.1.1 Community Skills Development

The Strategic Road Map for Economic Development Transformation and Job Creation adopted by Council

highlights the main concerns raised by businesses and the youth to be lack of access to economic

infrastructure, lack of financial support, skills development, access to information and insufficient enterprise

development initiatives.

During the year under review, the unit focused largely on creating an enabling environment where effective

trade and skills development could take place, in order to address the concerns raised by the youth, small

businesses, and the informal sector.

Program Activity Beneficiaries Outcome

Upskilling of

Unemployed

Graduates

Capacitating 102

Unemployed Graduates

with Driver’s leaners.

102

All 34 Wards

Provision of Driver’s Leaners to

unemployed Graduates in order for

them to enter Labour Market.

Offering Driving Lessons

to 40 unemployed

graduates.

40

All 34 Wards

Provision of Driver’s Licenses to

Unemployed Graduates in order for

them to enter labour Market.

A Driver’s License is one of the

minimum requirements when one

applies for Job Opportunity hence the

project addressed a challenge of high

unemployment rate amongst the

youth.

Table xx: Assistance to unemployed graduates

Figure xx: Leaners that obtained Valid Driver’s Leaners Licenses

323

1.1.1.1 Job Creation Statistics

The table below shows the total number of job opportunities created by different funders per quarter for a

12 months period.

Quarter Funder Number of Job

Opportunities Created

First Private Development 120

Expanded Public Works Programme (EPWP) 175

Richards Bay Industrial Development Zone (RBIDZ) 408

Quarter Funder Number of Job

Opportunities Created

Second Private Development 65

KZN Department of Human Settlements 54

Expanded Public Works Programme (EPWP) 31

Quarter Funder Number of Job

Opportunities Created

Third

KZN Department of Human Settlements 106

Expanded Public Works Programme (EPWP) 21

Richards Bay Industrial Development Zone (RBIDZ) 228

Quarter Funder Number of Job

Opportunities Created

Fourth

KZN Department of Human Settlements 126

Richards Bay Minerals (RBM) 3

Private Development 6

Expanded Public Works Programme (EPWP) 38

First-Fourth National Department of Tourism 74

Total Number of Job Opportunities Created in the 2018/2019

Financial Year

1455

Table xx: Job Creation Statistics 2.1.2 Tourism

The following tourism projects were successfully implemented during the year under review:

2.1.2.1 Assistance to the uMhlathuze Community Tourism Organization (uCTO)

2.1.2.1.1 Successful Hosting of the Annual General Meeting (AGM) for the uCTO

The Annual General Meeting (AGM) of the uMhlathuze Community Tourism Organisation (uCTO) was held

on 23 July 2018 at Richards Bay Civic Centre. The AGM was well attended by local tourism stakeholders, City

of uMhlathuze officials as well the officials from the KZN Provincial Government.

On the day, it was stressed that the uCTO must be led by the private sector members who are fully involved

in the Tourism and Hospitality Sector. It was further highlighted that the City has finalised its Tourism

324

Marketing Strategy but is up to the role players as a cluster to get us to the next level. It was also

emphasised that it is critical that the uCTO elect right people and the organisation must be properly

registered and organised.

The AGM was also utilised to appoint a new executive committee.

Chairperson: Mr Lesley Mpanza

Deputy Chairperson: Ms Vanessa Le Roux

Treasurer: Ms Lungile Mthembu

Secretary: Ms S’phesihle Ngubane

Deputy Secretary: Mr Ken Daniel

Additional Members Mr Mandla Magagula | Ms Annelie Jordaan | Mr Bheki Nomandla | Ms

Erica Bates | Ms Lindiwe Dube | Ms Jean Van Zyl | Mr Mncedisi Hlalatu

Figure xx: Mr Sithembiso Madlala, Chairman of the Tourism KZN Board and Mr Simphiwe Morajane

from uMhlathuze Municipality at the uCTO AGM

2.1.2.1.2 uCTO Grant

uMhlathuze Municipality assisted the uCTO with a grant of R180 000.00 for the 2018/2019 financial year.

The grant was paid in part payments with the understanding that the uCTO would also embark on extensive

fund raising activities to cover other expenses that they have as an organisation.

The signed action plan was received by the Municipality and all actions for the 2018/2019 cycle emanated

from said Action Plan.

Profiling of the Destination

325

2.1.2.2.1 The King’s Experience Marketing Campaign

King Cetshwayo District Municipality’s Kings Experience Tourism Marketing Campaign was established a few

years ago with a purpose to advertise and market tourism products in the district. The Kings Experience

Campaign integrates all tourism products from the five local municipalities under the district and puts them

into one package. The marketing campaign is a formidable vehicle to take our tourism products to the

country. The idea of targeting events is well placed because a number of people travel for entertainment.

The City of uMhlathuze partnered with the district to travel to different provinces with the campaign that

encourages visitors to spend the festive season within the district and uMhlathuze region in particular.

The activation was launched on 2nd November 2018 in Mpumalanga, and then proceeded to Free State on

the 16th -17th November 2018 for the second leg of the campaign. On the 16 November 2018, the

programme began with live broadcast by our Political Office Bearers on the Free State Community Radio

Stations. It was later followed by the activations to the different places of interests where the Kings

Experience tourism information stands were manned by tourism officials from both the King Cetshwayo

District and uMhlathuze Local Municipalities.

Figure xx: Participants and officials at the King’s

Experience Campaign in Mpumalanga

Profiling uMhlathuze in Tourism Publications

The purpose of the advertorials is to market the uMhlathuze area as well as the activities taking place

around uMhlathuze. It also assists in promoting members and products of the Community Tourism

Organisation (uCTO).

326

The strategy is and has been to advertise in publications that are well received in the tourism space and

reach a wide audience as they are distributed at tourism shows, airports and tourism offices around the

country. Below are some of the adverts as they appeared in these publications:

Figure xx: Extracts from African Safari December 2018 edition and Mzansi Travel WTM & INDABA 2018

edition

Redesign of the uMhlathuze Travel Guide

The previous Tourism Guide was designed and printed in 2015. The inclusion of the Ntambanana wards

after the elections necessitated a need to include the tourism products that were not part of the previous

guide.

327

A total of 20 000 copies were printed for distribution. The PDF version of the guide is available on the

Council website, and below is a screenshot of the cover page.

Figure xx: City of uMhlathuze Visitors’ Guide

Hosting of Events

2.1.2.3.1 Successful hosting of the uMhlathuze Beach Festival 2018

The annual uMhlathuze Beach Festival was held on the 15th December 2018 at Alkantstrand Beach.

The programme included local artists who performed their latest hits to the festival goers, giving them a

platform that they do not usually get of promoting their craft to such a large audience. Identification of the

328

local artists was done by the internal Arts & culture section in partnership with the Provincial Department of

Arts and Culture. There was a kids corner with jumping castles and face painting for the young ones

The draw card artists of the day were Tipcee, DJ Merlon and our own local DJ Amenisto. Council received

sponsorship from King Cetshwayo District Municipality as well as the Department of Arts & Culture.

Figure xx: Public at uMhlathuze Beach Festival, December 2018

2.1.2.4 Attendance of Tourism Shows

2.1.2.4.1 Meetings Africa 2019

Meetings Africa 2019 took place at the Sandton Convention Centre from the 26th -28th February 2019. The

show was officially opened by Mr Siza Ntshona, CEO – South African Tourism and several stakeholders. The

highlights of the speeches were linked to South African President’s State of the National Address where the

President placed the Tourism Sector as one of the Economic Drivers of the economy.

uMhlathuze Municipality took an independent exhibition stand for the duration of Meetings Africa. Officials

representing Council took turns to meet and talk to various buyers from different countries.

329

Figure xx: Participants at the Meetings Africa Conference

2.1.2.4.2 World Travel Market (WTM) Africa

World Travel Market is a Tourism and Travel Show that delivers the leading global events for the travel

industry. One of six shows in the WTM portfolio, the Africa show was launched in 2014 to bring the benefits

and opportunities of our global industry expertise to travel professionals in this region. It took place from

the 10th -12th April 2019 in Cape Town.

uMhlathuze Municipality shared a stand with King Cetshwayo District Municipality and the uMhlathuze

Community Tourism Association (uCTO). There was a good influx of exhibitors that visited the stand who

showed great interest in the area. Good relations were built with the other districts and information was

freely shared. Tour Operators and Tour Companies were mainly interested in the City's coastline (fishing,

water sports), the Zulu Culture, Game Parks, War Histories, Birding Routes and the Dolphin Research Centre

for Humpback Dolphins.

330

Figure xx: Participants at the World Travel Market Show

2. 1.2.4.3 Africa’s Travel Indaba

Africa’s Travel Indaba is one of the largest tourism marketing events on the African calendar and one of the

top three ‘must visit’ events of its kind on the global calendar. This year the show had about 1 033

delegates and 1 502 buyers. The exhibitors and visitors arrived from about 22 countries, and the platform is

used by the tourism industry to network and build stronger relationships. The show took place from the 2nd

– 4th May 2019 in Durban.

Apart from providing tourism related information, the show also gives officials an opportunity to have

meetings and collaboration discussions with Government Departments as well as the industry as a whole.

Figure xx: Participants at the Africa Travel Indaba

2.1.2.5 Tourism Training Initiatives

2.1.2.5.1 Tourism Hospitality Programme

The KZN Hospitality Youth Training Programme was implemented in collaboration with uMhlathuze

Municipality and Tourism World Academy, as an Expanded Public Works Programme (EPWP) in the City of

uMhlathuze.

331

The objectives of the project were to provide hospitality skills to unemployed youth (18-35 years) within the

jurisdiction of the municipality, and to provide experiential training for the selected beneficiaries by placing

them at the selected Host Employers.

The primary objectives of the programme are to ensure that all the beneficiaries are provided Exit

Opportunities which may include:

Further employment by Host Employers;

Tourism Entrepreneurship (Cooperatives etc.); and

Further training.

The beneficiaries received training in one of the following SAQA registered (CATHSSETA accredited)

qualifications:

National Qualification in Food & Beverages Services NQF level: 4; and

National Qualification in Fast Food NQF level: 3

A total of 60 learners were identified for the project with 30 for Fast Food and 30 for hospitality.

2.1.2.5.2 Tourism Safety Programme

The KZN Tourism Safety Programme is a programme being implemented by the Provincial Department of

Economic Development, Tourism and Environmental Affairs (EDTEA) in collaboration with uMhlathuze and

AGB Business as Implementing Agent of the programme.

The objective of the project is to absorb unemployed tourism students / graduates around the province and

give them practical and theory training over a 12-month period.

An expression of Interest (EOI) was sent to the department and uMhlathuze was offered 14 positions for the

programme. The successful students will be place at Alkantstrand Beach, Empangeni Museum as well as

TuziGazi Waterfront.

Tourism KZN Support and Opportunities Workshop

The workshop was a partnership programme between Tourism KwaZulu Natal (TKZN) and the National

Department of Tourism (NDT). The Workshop was held at the uMfolozi Hotel Casino and Conversion Centre

on the 30th May 2019.

The following topics were under discussion during the workshop;

Tourism Transformation Fund;

332

Green Tourism Fund;

Working for Tourism Fund (EPWP); and

Tourism KZN Growth Fund.

All the tourism product owners were encouraged to make use of these funding avenues in an effort to

better their business processes.

Figure xx: Participants at the Tourism KZN Support and Opportunities Workshop

2.1.3 Small, Micro and Medium Enterprises (SMME) Support

2.1.3.1 SMME One-Stop Shop Activities

2.1.3.1.1 National Youth Development Agency (NYDA)

The Empangeni branch primarily serves three District Municipalities being King Cetshwayo, uMkhanyakude

and Zululand. The main function of the Agency is to create a platform for the youth in the North Coast of

KwaZulu-Natal to participate is socio-economic development within each district, thus alleviating poverty

and social-ills and bringing in sustainable livelihoods and an environment that brings about youth

development in all structures of society. NYDA interventions are aligned with the national strategies such as

The New Growth Path, National Development Plan, National Development Act and the Annual Programme

of Action of Government and the African Youth Charter.

The NYDA branch continues to smartly implement youth development programmes as mandated by the

National Youth Policy 2015-2020, which are:

Training and skills development; and

333

Economic participation

The NYDA, with its explicit focus on youth, remains biased to:

Unemployed youth;

Young women;

Youth in rural areas; and

Youth living with disabilities etc.

2.1.3.1.2 NYDA Strategic Partnerships

The Empangeni branch has created and signed a Memorandum of Understanding (MoU) with Transnet as

the primary objective for this financial year as well as improving accessibility and creating Jobs for young

people through fundraising. Transnet has created a good relationship with different stakeholders in the area

that we can take advantage of (e.g. SABS).

The NYDA has also created a good working relationship with Harambe as they have arranged to come to the

branch 4 days of every month-end to train young people on computer skills. This will assist in creating a very

good relationship with the Municipality.

2.1.3.1.3 NYDA Grant beneficiaries

The table below summarised the number of beneficiaries and their gender that were assisted.

NAME & SURNAME COMPANY MUNICIPALITY WARD GENDER

Thandeka Mbuyisa K2O18224913 uMhlathuze 31 Female

Nondumiso Mthembu NONDUH EVENTS uMhlathuze 31 Female

Mfihlakalo Vilakazi YUMMY PLATTERS uMhlathuze 9 Male

Sikhumbuzo CMOH CKHUH CONSULTING uMhlathuze 11 Male

334

Mngomezulu GROUP

Sipho Mdluli THULI JAMES uMhlathuze 13 Male

Sethembile Nxele GOTTA BE RICH uMhlathuze 24 Male

Ntombifuthi Ngema SONTO FOR ASANDE uMhlathuze 10 Female

Nhlanhla Myeni TOWDAH ENTERTAINMENT uMhlathuze 28 Male

Nkosinathi Khuzwayo UBUCIKO SOUL FOOD CAFÉ uMhlathuze 3 Male

Sanele Mthimkhulu CRUZZE CARWASH uMhlathuze 28 Male

Ben Thusi SOMFENE VISUALS uMhlathuze 13 Male

Total Number of Youth Assisted with Grants 11

Total Number Trained for Business Management Training (BMT) 60

Table xx: Number of Youth Funded with NYDA Grants

Below are the figures of some NYDA Grant beneficiaries, with the equipment that they were assisted with

Figure xx: Thandeka Ndlovu from Empangeni assisted with Stage, sound and tent

335

Figure xx: Emmanuel Khuzwayo from Richards Bay assisted with Mobile Kitchen

Zikulise Community Projects

Zikulise is a registered Non-Profit Company (formerly known as a Section 21 Company) and Non-Profit

Organisation. The Zikulise Community Upliftment Project NPC is facing the challenge of addressing poverty

alleviation, economic and creative growth head-on by uplifting individuals unfortunate enough to be

unskilled, unemployed and consequently disempowered.

The Project addresses the following community concerns:

Poverty, unemployment and crime;

Youth that lack skills to obtain employment / start own enterprises;

Empowering women;

Vulnerability of women and children; and

Vulnerability, loss of dignity and inability of people living with a disability to earn a living.

The community values, supports and encourages Zikulise's initiatives in addressing their needs in areas such

as economic and creative growth, poverty alleviation and capacity building particularly with regard to the

youth, women, the unemployed and self-help groups. The community members consider Zikulise as an

asset to their communities.

Furthermore, cultural crafts such as traditional bead weaving, grass and textile weaving and embroidery are

at great risk of no longer being passed down from one generation to another. The training that Zikulise

offers is therefore considered by the community as essential for black youth.

Achievements Since Opening of the SMME One-Stop Shop

The table below illustrates all the training that has been conducted by Zikulise since the opening of the

SMME One-Stop Shop.

SUMMARY BENEFICIARIES

Baking 71

Textile Development 60

Traditional Bead Weaving 16

Incubation 53

336

Table xx: Training undertaken through Zikhuli and beneficiaries

Business Management 138

TOTAL 338

AVERAGE BENEFICIARIES PER MONTH 31

337

Figure

xx:

Beneficiaries of different types of training offered through Zikulise

2.1.3.1.6 National Development Agency (NDA)

338

a) Mobilization of Cooperatives and Non-Profit Organizations (NPOs)

27 Cooperatives were mobilized with a purpose of intervening to their developmental needs.

The results were as follows:

12 Cooperatives needed formalization; and

8 not legally registered.

Mobilization of NPO

38 NPOs were mobilized;

15 were trained in compliance; and

11 were trained in Financial Management.

Formalization

46 Cooperatives; and

5 NPOs.

Plan of Action

Training of Cooperatives in June. Dates to be confirmed.

2.1.3.2 Maritime Entrepreneurship / Incubator Programme

Maritime Incubator Programme is still in progress. There are 11 participants on this programme and 9 of

them are from uMhlathuze Municipality. On a session held on 13 February 2019, trainers were coaching

participants on how to develop Business Plans, Business Management Skills including book keeping and

Financials.

2.1.3.3 Small Enterprise Development Agency (SEDA) Coaching Programme

This programme is funded by SEDA. The facilitating company is Veltra. They are coaching 33 SMMEs on

Business Management. This is a ten (10) months program that started in December 2018 and will be

concluded in September 2019.

339

Figure xx: Beneficiaries of SEDA Coaching Programme

2.1.3.4 RBIDZ SMME Seminar

The purpose of the Richards Bay Industrial Development Zone (RBIDZ) is to develop a Special Economic Zone

(SEZ) in order to attract local and foreign investors who will beneficiate South Africa’s raw materials and

then stimulate economic growth, develop skills and transfer, as well as create job opportunities.

This was the 5th Annual Seminar that the RBIDZ had collaborated with the Local and District Municipalities

given the latter’s responsibility to ensure that local communities are well vested with the opportunities

available within the municipalities, as well as processes to be followed in doing business with them.

The RBIDZ currently has 2 investors that are already located within the Zone and further has various

investors that are signed and in the process of adhering to regulatory requirements before they can start

construction and operation of their factories.

The RBIDZ also has 2 investors that have signed investments valued at R11.5 billion, and they are at

different stages towards finalising their processes.

In light of the above, the SMMEs need to be equipped with information regarding opportunities that will be

available once construction and operations commence.

Therefore, for the SMMEs and other stakeholders to be ready of what is about to come and opportunities

that will be brought by the investors when they start construction and operation, the RBIDZ has taken a

stand to have annual SMME Engagement Seminars aimed at unpacking what the investors have in store for

the suppliers. This was done by inviting some of investors to come and present business development

opportunities as well as procurement opportunities.

340

Figure xx: Participants at the RBIDZ SMME Seminar at Ngwelezane on 13 February 2019

2.1.3.5 Skills Training conducted during 2018/2019 through the SMME One-Stop Shop by different

stakeholders

Institution Skill Number Of

Beneficiaries

National Youth Development Agency Business Management Skills 60

Life Skills 115

Zikulise Community Projects Baking 71

Textile Development 60

Traditional Bead Weaving 16

Business Management 138

National Department of Tourism Hospitality Training 60

Department of Arts and Culture Ceramic Skills Development 17

King Cetshwayo District Municipality Poultry Production 32

Sasol / Harambe Business Skills Training 100

Arambe Edu-business Business Education Skills 15

National Development Agency Conflict Management 26

Natal Sharks Boards Maritime Incubator 11

TOTAL NUMBER 721

Table xx: Skills training through the SMME One-stop shop

341

2.1.4 Informal Markets

2.1.4.1 Financial Literacy Training

The workshop was a partnership between the Municipality and ABSA Bank. The partnership came as a result

of the Municipality’s ongoing programme to educate as many informal traders as possible in financial

literacy, business management, budgeting etc.

A total of twenty five (25) Informal Traders trading in Empangeni Lot 63 attended the workshop.

Financial literacy initiatives aim to increase financial knowledge and change financial behaviour. As informal

traders receive financial education, they become more confident on financial matters and make more

informed financial decisions. In the medium to long term they will become more self‐sufficient and

financially secure. At the same time the uMhlathuze economy will benefit from a well‐educated society.

Figure xx:

Participants

at the Financial Liereracy Training held in Empangeni Library Hall in partnership with ABSA

2.1.4.2 Informal Trading By-law, Policy and Health Education

The workshop entails Health Education, which is conducted by the Department of Environmental Health of

King Cetshwayo as well as Informal Trading By-law and Policy Training.

A total of fourteen (14) Informal Traders attended the workshop.

The workshop was intended to create awareness in terms of regulations of the Environmental Health By-

Law, street trading by-law and Informal Trading Policy.

342

Figure xx: Participants at the Health Education Workshop conducted by King Cetshwayo District Municipality

Environmental Health Department

2.1.4.3 Informal Mechanics Graduation Programme

The Informal Mechanics graduation programme is a pilot project focusing on informal mechanics who are

the beneficiaries of the SMME Park mechanical workshop.

A total of twenty (20) informal mechanics attended the workshop.

The programme is conducted by FILPRO a division of GUD Filters. The purpose of the programme is to

develop Informal Mechanics into fully fledged automotive businesses.

Figure

xx: Participants at the Informal Mechanics Graduation Programme workshop conducted by FILPRO held in

Richards Bay Library Hall

343

2.1.4.4 Business Management Workshop

The Business Support unit in partnership with external stakeholder Fipro held a one day business

management workshop for the informal mechanics. The workshop included presentations from SARS, which

focused on the importance of submitting income tax returns and the different types of returns submitted by

each business. The other presentation was done by SEDA and was based on the services offered by SEDA to

small businesses. The third presentation was conducted by Standard Bank which dealt with financial

literacy.

A total number of twenty (20) informal mechanics attended the workshop.

The workshop is part of the ongoing programme aimed at graduating the informal mechanics into formal

businesses.

Figure xx: Participants at the

Business Management Workshop held at the Empangeni Council Chambers

Agriculture

Development Of The Agricultural Support Plan

Council adopted a uMhlathuze Strategic Roadmap for Economic Development, Job Creation and

Transformation, which regards agriculture as one of the sectors that can create employment. The

Municipality embarked on the development of an Agricultural Support Plan, which led to the appointment

of Kgotsofalang Farms and Projects to compile the plan.

The Agricultural Support Plan draft was presented to the Executive Management Committee (EMCO) on the

12th of March 2018 and it was supported with the condition that the service provider includes an

implementation plan for final approval.

344

A one on one consultation session with all relevant stakeholders including the private sector took place

from 07 December 2017 to 01 February 2018. The uMhlathuze Municipality Agricultural Support Plan

served at EXCO on 22 August 2018 and at Council on 19 September 2018 was approved and adopted

respectively.

Capacity building of emerging farmers

City Development Department partnered with the Department of Agriculture and CEDARA to train farmers

on agro-processing (dairy products) and chicken processing. These capacity building trainings aim to assist

farmers to tap into agro-processing opportunities and the entire value chain.

Program Activity Beneficiaries Outcome

Agro-

processing

Dairy Production - Capacitating

farmers in dairy production

29 Producing dairy products i.e.

Yoghurt and Maas

Chicken Processing -Capacitating

farmers in chicken processing

26 Producing chicken processed

products i.e. burgers, strips

Figure xx: Dairy Production and Chicken Processing in partnership with CEDARA

345

Goat Farming Agri-Business Training

Mdukatshani (GAP), King Cetshwayo District Municipality and uMhlathuze Municipality held a goat farming

training program with goat farmers at Owen Sithole Agricultural College on 05 March 2019. The training

came as a responsive approach emanating from engagements that were held with goat farmers towards the

end of October 2018. Farmers had raised various concerns and challenges that they are facing with goat

farming ranging from breeding issues, goat health, compliance, auctions and veterinary support.

This training was a first step towards socialising our farmers about value and opportunities within goat

farming. There is still more training to come e.g. Community Animal Health Workers Training, Constructing

Goat Dips, Auctioning of Goats and Breeding Goats for Commercial purposes.

Program Activity Beneficiaries Outcome

Goat Farming Agri-

Business

Goat farming training 58 Goat health and goats for

commercial purposes

Figure xx: Participants at a Goat Farm training, held at Owen Sithole College of Agriculture

2.1.5.3.1 Challenges faced by Goat Farmers:

Lack of infrastructure;

346

Water sources;

Proper fencing;

Training from accredited institutions;

Funding;

Certification of commercial farming;

Diseases;

Markets;

Cross-breeding training;

Crowd funding information;

Research;

Agro-processing knowledge; and

Land issues with Traditional Authority.

2.1.5.3.2 Way forward:

Frequent contact with the extension officers from the Department of Agriculture;

Training to be requested from the Owen Sithole College of Agriculture; and

Benchmarking with goat farmers with vast knowledge in this industry.

Information Sharing Session

The information sharing session focuses on farmers consultation and finding out challenges faced by the

livestock farmers mainly goat farmers. This session was targeted for Ntambanana community as they are

also involved in livestock farming. The session took place on 19 December 2018 at Obizo Multi-purpose

Centre where the Department of Agriculture presented to the goat farmers and were allowed to share their

challenges.

347

The session was meant to assist the Municipality with financial planning and budgeting for the subsequent

financial year (2019/2020). Livestock farmers were invited as well as Associations of Livestock Farmers.

Figure

xx: Information Sharing Session at Obizo Multi-Purpose Centre

348

Figure xx: Participants at the Information Sharing Session at Obizo Multi-Purpose Centre

Chillies Production

The Municipality partnered with King Cetshwayo District Municipality as well the Grove Farm in Dukaneni to

train farmers to produce chillies. Two co-operatives committed to contract farming of chillies production

one project from Matshana (Khanyiselwa Co-operative) and one from Mevamhlophe (Ubuhlalusebenkosi

Co-operative).

The projects have already planted chillies in December 2018. The Grove has been involved in assisting

farmers to plant. The Municipality will be responsible for monitoring and evaluation progress made. Below

is the photographic evidence.

Figure xx: Matshana Project- Khanyiselwa Coperative

Figure xx: Mevamhlophe Project- Ubuhlalusebenkosi Co-operative

349

Registration of Ten Co-operatives

To ensure successful implementation of the Agricultural Support Plan, the Department of City Development

partnered with the National Development Agency to formalise Co-operatives or people working in groups to

achieve similar goals. Ten Co-operatives from different wards were identified for formalisation and twelve

(12) Co-operatives have been registered.

Program Activity Beneficiaries Outcome

Formalisation of Co-

operatives

Registration of Co-

operatives

12 Registered business entities

Funding of Ten Co-operatives

To ensure successful implementation of the Agricultural Support Plan, the Department of City Development

has embarked on obtaining funding for co-operatives that are operational, driven and committed. A

memorandum was submitted and approved to allow for co-operatives to be funded with seedlings,

implements, gardening equipment and other related infrastructure.

The materials and inputs were delivered and invoices were paid to service providers that were appointed.

The total number of agricultural co-operatives supported for the 2018/2019 financial year is 99 from

different wards.

Program Activity Beneficiaries Outcome

Agricultural Support Funding of ten (10) Co-

operatives

99 Provision of inputs and

infrastructure

350

Figure xx: Tunnel installation and inputs at Obizo reserve

Agro-Processing Mini-Show

The Municipality partnered with the Department of Agriculture to afford agro-processors a platform to

showcase their products to relevant stakeholders and private sector and source funding and access to

markets. The Mini-Show took place on 06 February 2019 at Empangeni Town Hall where relevant

stakeholders attended.

Stakeholders that attended the show include University of Zululand, SEDA, Owen Sithole College, Kunene

Makopo Risk Solutions, National Development Agency and RBIDZ.

351

Figure xx: Participants from the Agro-Procession Mini-show held in February 2019

2.1 PROPERTY ADMINISTRATION SECTION

Relevant Council Goals, Objectives and Strategies

NATIONAL KPA 6: CROSS CUTTING

Goals Objectives Strategies

6.2 Immovable Property

Management

6.2.1 To ensure fair valuation

of properties

6.2.2 Effective Management

of Council-owned Immovable

Properties

6.2.1.1 Development and

maintenance of the valuation roll

in line with the Municipal

Property Rates Act.

6.2.2.1 Update the immovable

asset register.

6.2.2.2 Review and adopt the

Land Sale and Lease Policy.

6.2.2.3 Development of a

Standard Operating Procedure

for Land.

The City of uMhlathuze manages its fixed assets through the Property Administration Unit, which

falls under City Development Department. The Property Administration Unit, which is responsible

for the management of lease agreements and alienation of municipal land, has three divisions, i.e.

property valuation, property alienation and property leasing.

2.2.1 Property Valuation

The Municipal Valuation Division is responsible for the valuation of immovable properties for rating

purposes. The valuation of these properties is in line with the requirements as set out in the

Municipal Property Rates Act No. 6 of 2006 (MPRA), as amended.

352

The MPRA is a national law that regulates the power of a municipality to value and rate immovable

properties (that is building and land) located within the boundaries of a municipality. In a nutshell, it

standardizes the valuation of properties across the board.

General Valuation

Cycle

No. of Supplementary

Valuations Published

No. of properties in

the Roll

No. of objections

2 1 393 02

Table xx: General Valuation Roll

2.2.2 Property Leasing

Type of Lease Total number of registered leases

Public open space leases 207

Adopt-a-spot leases 6

Agricultural leases 8

Encroachments 55

Advertising leases 34

Diverse leases for commercial 40

Diverse leases for social 32

Leased hostels 214

Cell Mast 5

Total number of leased properties during the

2018/2019 financial year:

601

Table xx: Leases administered by the Municipal Leasing Division and Revenue

Regularizing of Leases Project

An advisory company was appointed to attend to the review and regularising of lease agreements,

with the aim of:

Bringing the lease agreements in line with current legislation;

Increasing revenue for Council, especially with regards to historic lease agreements that are

tied up in long term and indefinite periods; and

Freeing land parcels tied up in such agreements, where possible.

Regularization of certain clubs was successful and short-term lease agreements were concluded. An

exception was given to National Sea Rescue Institute (NSRI) who has been given an in-principle

approval for a medium-term period.

However, there were those lessees who rejected the new conditions as a result eviction summons

have been issued and litigation is in progress.

Having failed to comply with the lease conditions and renewal thereto, River Rock Investments (Pty)

Ltd defended their case at the Durban High Court. The Court ruled in favour of Council and an

application for leave to appeal lodged by River Rock Investments (Pty) Ltd was rejected by the

Durban High Court at which time the application was dismissed with costs.

353

Leases Approved for Execution

The following new leases were approved during the reporting period:

a) Request for long term lease and development proposal on Erf 1083 Nyezane eSikhawini-J;

b) Leasing of the Remainder of Erf 2305, Arboretum, Richards Bay;

c) Leasing of Public Open space for Parking purposes, a Portion of Erf 1071, iHlokohlo Street,

eSikhawini-H;

d) Request for permission to lease Erf 714 Nkonkoni Road, Ngwelezane-B;

e) Request for permission to lease a Portion of the road reserve adjacent to Portion 12 of Erf

11334, corner of Krugerrand and Lira link, Richards Bay;

f) Request for permission to lease parking bays adjacent to Haiti Hive, Kruger Rand and

Premium Promenade on Remainder of Erf 11162 Richards Bay;

g) Application to lease Municipal land for the operation of a Telecommunications Base Station

of Erf 1812, eSikhawini-J by Vodacom (Pty) Ltd.

h) Request for permission to lease a portion of Public Open Space Erf 719 Nkonkoni Road,

Ngwelezane-B; and

i) Request for permission to lease a portion of a Public Open Space on Erf 1483 iNkankane

Street, eSikhawini-H.

Development of “The Ridge” Mixed use Commercial, Residential and Hotel

Following the tender award in 2017, the following approvals have been granted:

Environmental Impact Assessment (EIA); and

Conditions of Establishment by Joint Municipal Planning Tribunal.

Development of “Greenhills Park”

This development, through Long term lease of 35 years seeks to establish an exclusive eco-housing

estate (including a high density residential component) boasting beautifully manicured and

landscaped gardens/Public Open Spaces, select medical facility, Kinder- garden, recreational

facilities and other complementary services, such as Water dependent sporting facilities,

Professional Offices.

354

Figure xx: An artistic impression showing the proposed Greenhills Park

Property Alienation

Land transfers administered by the Property Alienation Division

Although Council placed a moratorium on land sales in 2015, transfer of land that was approved

prior to the moratorium is being facilitated by the section.

2018/2019 Financial Year Transfers

ERF No. PURCHASER TRANSFER DATE

Erf 11487 Outlook church November 2018

Table xx: Land Transfers administered by Property Administration Division

Alienation of Properties for Commercial Establishment

The transfer of Erf 1563 Nseleni-A and other adjacent properties facilitated the establishment of the

eNseleni Shopping Centre, which is a long awaited commercial centre that will bring shopping

experience and job opportunities closer to the community of eNseleni.

Phase 1 of the project has been completed and the mall was launched in November 2018 with

Boxer as the anchor tenant.

The following franchises are on site: Boxer Supermarket, Boxer Liquor Store, Pep Store, Ackermans

and Rage Shoes.

355

Local shops are also available that include: Salons, Bed shops and Clothing shops.

The mall is now functional as shown in the figure below:

Figure xx: Phase 1 of eNseleni Mall showing retail outlets

Figure xx: Showing Phase 2 under construction Acquisition of Properties

From time to time, Council is required to acquire properties for Municipal Purposes and in some

instances, registration of servitudes in favour of Council over privately or state owned properties.

ERF NO STATUS

Erf 1803, Alton, Richards Bay Registered on 07 September 2018

Portion 1 of Erf 216 Vulindlela Registered on 19 November 2018

Table xx: Properties Acquired by Council

356

PUBLIC TRANSPORT FACILITIES AND OPERATIONS COORDINATION

Relevant Council Goals, Objectives and Strategies

NATIONAL KPA: BASIC SERVICES AND INFRASTRUCTURE PROVISION

Goals Objectives Strategies

2.1 Efficient and

integrated infrastructure

and services

2.1.2 To expand and maintain

road infrastructure in order to

improve access and promote

Local Economic Development

2.1.2.1 Provision of public

transport facilities and

infrastructure in the rural

areas

Roles and responsibilities

Development and review of public transport related policies;

Conclude subsidised service contracts, commercial service contracts and negotiated

contracts with operators for services within their areas;

Development and management of public transport / intermodal facilities;

Liaison with public transport stakeholders and role-players;

Operator regularisation;

Coordinate Council’s routine and periodical maintenance programmes; and

Promotion of Transportation Committees.

Public Transport Policy Development: Public Transport By-law

The By-law sets out roles and responsibilities of the municipality as the local authority, public

transport operators, activities and conduct that are prohibited in public transport vehicles and

within the facilities

Subsequent to the approval of the draft By-law by Council, the same was workshopped with

Councillors on 2 August 2018. This was to familiarise Councillors with provisions of the By-law.

Public participation on the Public Transport By-law was scheduled for the period as from 21 March

to 12 April 2019 to conduct a statutory public consultation exercise. The advertisement / notice as

pulished in four newspapers namely Zululand Observer, Mercury, Ilanga and Isolezwe.

Public Participation

Session Date and Venue Time

1 25 March 2019, Empangeni hall 10h00

2 25 March 2019, Auditorium, Richards Bay 17h00

3 26 March 2019, Hlanganani hall, eSikhaleni 10h00

Table xx: Three public participation sessions held as per the notice

The By-law was also advertised on Council’s website. Subsequent to the meetings alluded in the

table above, as an added effort, correspondence was sent to various other stakeholders, drawing

their attention to the existence of the draft By-law and accordingly encouraging them to make

inputs.

357

Intermodal Facilities / Ranks improvements

In pursuance of the quest of remedying and improving conditions characterizing almost all public

transport facilities, funding was allocated in order enable for intervention at Enseleni Intermodal

Facility. After following all the supply chain procurement processes, a service provider was

appointed to undertake the redevelopment of the rank. With the assistance of all role players,

interim operational arrangements were finalised. The site was handed over to the contractor on 5

May 2019.

The planned improvements will assist in realizing the following:

- Erection of shelters in both bus and mini bus terminals;

- Construction of new office / administration building;

- Construction of guard houses and additional ablution facilities;

- Fencing-in of the rank; and

- Installation of street lighting.

Figure xx: Conceptual design for the eNseleni Intermodal Facility upgrade showing the Admin Block and Loading Area

358

Figure xx: Conceptual design for the eNseleni Intermodal Facility upgrade showing the Bus Loading and Drop-off zone through Gate 02

4.4 Operator Regularization

During the period in question the following operating licenses related letters were issued.

Application category July-Sep. 2018

Oct-Dec. 2018

Jan-Mar. 2019

Apr-Jun. 2019

Total

New operating license 0 13 1 1 15

Phase 3 new applicants 7 16 42 2 67

Renewal of operating license 35 17 33 33 118

Late renewal of an operating license 15 5 21 6 47

Renewal and change of vehicle 1 0 4 28 33

Renewal of Bus Transport Licenses 0 81 8 0 89

Conversion of Bus Permits 0 0 0 15 15

Tourism Services license 0 0 0 0 0

Conversion of Permits to Operating licenses 0 0 0 2 2

New / renewal of Metered taxi license 0 1 1 0 2

New / renewal of staff transport 0 0 0 0 0

Change of vehicle 28 32 16 31 107

Change of vehicle and capacity 0 0 1 0 1

Transfer of an operating license 4 0 2 2 8

Deceased Transfer of an Operating License 0 1 1 1 3

Reciprocal operating agreement 1 1 0 0 2

Additional authority (Amendment) 0 3 12 0 15

Additional authority (Local ass) 2 0 3 0 5

Additional authority (External ass) 2 0 0 27 29

Duplicate operating license 2 4 5 3 14

Scholar Transport license 0 0 0 1 1

Total number of applications 97 174 150 152 573

Table xx: Operating Licenses Processed from 1 July 2018 to 30 June 2019

359

Financial Services

M KUNENE CHIEF FINANCIAL OFFICER

Introduction

EXPENDITURE DIVISION

FINANCIAL PERFORMANCE 2018/2019

EXPENDITURE DIVISION

Objectives

360

The objectives of the Expenditure Division is to provide the financial control framework of a MSCOA (Municipal Standard Chart of Accounts) budget. To provide the financial planning and control support to all Departments in the implementation of such budgets. On continuous bases, the Expenditure Division complies with all statutory financial reporting in in terms of the Municipal Financial Management Act (MFMA) and its regulations including the compilation of the Annual Financial Statements and the reporting required in terms of the Division of Revenue Act (DORA). In a manor , so as to comply with Generally Recognized Accounting Practice (GRAP), the Division strives to consistently compile unqualified Annual Financial Statements, the Financial Assets Register and a multi-peril risk mitigating Short Term Insurance Portfolio. For actual expenditure the Division managers and administers all Creditors payments including the Payroll for the Municipal Employees. During this process, the Division managers and administers all the cash and cash equivalents effectively and efficiently, so as to ensure maximum return for the Municipality. Creditors and Cash Management Section

As part of the Municipality’s developmental obligations and sound financial management, these are key activities in developing and assisting our community:

The Creditors Section facilitated the training of seven interns across all major sections of the Finance Department in the financial year. Rotations as well as Personal Development Plans were developed for interns. The progress with this program is very good, especially in the absence of other institutional platforms providing a suitable stepping-stone for aspirant local government financial managers.

Providing cash flow relief for our SMME vendors by paying invoices between 7 to 14 days;

The signing of cession agreements with primary suppliers, to assist SMME’s to receive their materials on time; Guaranteeing every single creditor who has their invoices and associated orders “GRN’d” (Goods Received Note Acknowledgement), payment

is assured from the Creditors Section within 30 Days. The Municipality prides itself for having no creditor payments outstanding more than 30

Days if invoices are relevant and endorsed by a Goods Received Note.Stricter controls are being implemented in the payment/procurement

process between Municipal user departments and suppliers in ensuring Supply Chain Management processes are followed. Occasionally, this

good governance process does unfortunately leave suppliers feeling aggrieved, only to find that they were given the unauthorized go-ahead

without proper due process being followed in the first instance.

Financial support, budget process management and budget reporting section

361

The process of planning to the approval of each MTREF (Medium Term Revenue and Expenditure Framework) is a continuous cycle, commencing immediately after the ensuing years MTREF is approved by Council. The 2018/19 MTREF was tabled before Council on 31 March 2018. Thereafter a 5-week budget participation process was undertaken with cluster meetings at various locations. Attendance by the community at these meetings is improving and the understanding of the municipal process by the community is also encouraging to note. Following the budget participation process, amendments that were identified from the communities were incorporated into the Adopted 2018/19 Budget and Medium Term Revenue and expenditure Framework (MTREF). Council adopted the 2018/2018 MTREF on 31 May 2018. National Treasury endeavours to ensure that municipalities prepare a budget document that provides concise and understandable financial and non-financial information, which will ensure that informed decisions are made to promote effective financial management and service delivery. By ensuring that the allocation of financial resources is aligned to service delivery targets it will be clear what services are being promised when budgets are approved. National Treasury created a template called “Batho Pele City” to serve as a guide to municipal officials responsible to produce their municipal budget documents. The aim of the Budget Guide is to provide more detailed guidance on the format and content of a municipal budget so as to ensure full compliance with both the letter and the spirit of Schedule A of the Municipal Budget and Reporting Regulations. In light of the above, Council has a Tabled and Adopted Budget report which has been prepared in line with the template provided by National Treasury. An exceptional exercise in the 2018/19 year was the ongoing implementation of mSCOA. Although mSCOA is a business reform that requires transformation from the whole administration, the core operational steering team originates from the Expenditure Division. This was done in addition to the continued high standard of budgeting, control, reporting and support. The mSCOA uploads of the data string has been successfully achieved in the 2018/2019 financial year. Financial support section also includes payroll administration. The payroll administration section ensures that +/- 2400 employees (including 67 councillors) are paid their monthly salaries and allowances timeously and accurately and has succeeded without failure during the whole year.

Financial Accounting, Reporting & Asset management The functions of this section include; ensuring that the Annual Financial Statements are completed and timeously submitted to the Auditor General for auditing purposes and that the Municipality complies with General Recognised Accounting Practice (GRAP) Financial Assets Register. The preparation of the 2017/2018 financial

362

statements was done using the mSCOA regulations version 6.2 accounts. The municipality managed to get two (2) clean audits during the piloting of mSCOA in 2015/2016 and 2016/2017 financial years and a unqualified report for 17/18 with one legal compliance matter . For a municipality of this size , it is worth noting that the compilation of the AFS’s are done in house. The section also manages a Financial Assets Register with the asset book of R5,4 billion and for the past 3 financial years there were no non-compliance matters reported on assets in the management report issued by the Auditor-General.

STATEMENT OF FINANCIAL PERFORMANCE

SUMMARY

The main expenditure items are EMPLOYEE COSTS AND BULK PURCHASES. Collectively these items account for R1.8 BILLION worth of expenditure which amounts to 60% of the total operating expenditure of R 3.0 BILLION. Repairs and maintenance expenditure very importantly represent 12.5% of the total expenditure which is in line with international benchmark parameters for Repairs and Maintenance on Municipal Assets represents 8% of Property Plant and Equipment.

The overall summarized operating results for the Municipality in comparison to the approved budget are shown below.

363

The statement of financial performance reflects a summary of income and expenditure

Budget vs Actuals R'000 Original Budget Adjusted Budget Audited Outcome

(Over)/Under

Original

budget

(Over)/Under

Adjusted

budget

Outcome

as %

Original

Outcome

as %

Adjusted

Operating Revenue 3 184 097 3 119 655 3 033 345 (150 752) (86 310) 95% 97%

Property rates and Service charges 2 571 823 2 513 909 2 367 570 (204 253) (146 339) 92% 94%

Government Grants 485 862 484 209 456 428 (29 434) (27 781) 94% 94%

Other 126 413 121 536 209 347 82 935 87 811 166% 172%

Operating Expenditure 3 016 497 3 049 313 3 146 732 130 235 97 418 104% 103%

Employee related costs 812 123 810 018 758 129 (53 994) (51 889) 93% 94%

Finance costs and depreciation 443 950 435 425 523 945 79 995 88 520 118% 120%

Bulk purchases 1 000 945 974 726 1 010 855 9 910 36 129 101% 104%

Other 759 478 829 146 853 803 94 325 24 658 112% 103%

Net Operating Surplus 167 601 70 341 (113 386) (280 987) (183 728) -68% -161%

2018/2019

364

OPERATING REVENUE

The major operating revenue streams that supported the Municipality’s programs and activities were:

OPERATING EXPENDITURE

Operating revenue streams

Property rates

Government operating

grants

Other

Service charges:

- Electricity

- Water

- Wastewater management(sewage

and sanitation)

365

The cash flow recovery plan which commenced with sincerity in 2010 has succeeded very well. Previous reports have highlighted the specific interventions, but in summary the success lies in: budgeting for expenditure that is funded, strict control of the budget, very good management of both debtors and creditors and ensuring both affordable and cost reflective tariffs.

366

SPENDING AGAINST CAPITAL BUDGET

Capital expenditure incurred during the year amounted to R517 million which represents 87% (2018: 82%) of the approved capital budget. Below is the funding mix of capital expenditure.

CAPITAL EXPENDITURE 2018/2019

FUNDING SOURCE R'000 ADOPTED BUDGET

ADJUSTMENT

BUDGET

ACTUAL

EXPENDITURE

PERCENTAGE

SPENT OF

ADJUSTEED

BUDGET

Borrowing 310 000 310 000 265 391 86%

Capital Replacement Reserve 85 937 152 480 146 285 96%

MIG 99 374 99 374 89 472 90%

Government Grants - National 22 000 22 000 8 696 40%

Government Grants - Provincial 7 850 7 850 6 056 77%

Public Contributions – – 1 577

TOTAL 525 161 591 703 517 477 87%

367

CAPITAL EXPENDITURE PER FUNCTION

CAPITAL EXPENDITURE 2018/2019

FUNCTION R'000 ADOPTED BUDGET

ADJUSTMENT

BUDGET

ACTUAL

EXPENDITURE

PERCENTAGE

SPENT OF

ADJUSTEED

BUDGET

Community and Social Services 55 463 62 072 44 247 71%

Energy Sources 85 472 95 773 81 616 85%

Environmental Protection 200 239 187 78%

Planning and Development 3 953 4 838 882 18%

Pubic Safety 559 499 358 72%

Sport and Recreation 24 958 26 860 15 638 58%

Waste Management 1 700 3 015 3 242 108%

Waste Water Management 48 123 54 590 79 745 146%

Water 68 773 70 710 75 224 106%

Road Transport 133 723 141 852 92 482 65%

Finance and Administration 102 236 131 256 123 855 94%

TOTAL 525 161 591 703 517 477 87%

368

FUNCTION Adjusted Budget

Actual

Expenditure (June

Interim)

Variance Variance %

Finance and Administration 140 558 900 116 460 977 24 097 923 17%

Community and Social Services 60 680 600 41 157 118 19 523 482 32%

Energy Sources 83 696 400 76 870 774 6 825 626 8%

Executive and Council 388 700 170 806 217 894 56%

Environmental Protection 230 700 221 535 9 165 4%

Housing 6 339 900 - 6 339 900 100%

Planning and Development 2 642 800 809 531 1 833 269 69%

Public Safety 449 000 358 115 90 885 20%

Road Transport 129 091 600 88 704 105 40 387 495 31%

Sport and Recreation 22 603 700 9 317 684 13 286 016 59%

Waste Management 3 420 200 3 241 963 178 237 5%

Waste Water Management 59 907 300 75 202 112 -15 294 812 -26%

Water 76 318 600 70 328 039 5 990 561 8%

Total 586 328 400 482 842 759 103 485 641 18%

2019

369

Graph - Capital Expenditure versus Budget for 2019

370

Graph - Capital Expenditure versus Budget For 2018

REVENUE DIVISION

The primary responsibility of council is to deliver services to the community within its jurisdiction.

Section 75A of the Municipal Sysstems Act permits municipalities to levy and recover fees, charges or

tariffs in respect of municipal service delivery functions and to recover collection charges and interest

on outstanding debt.

Revenue Section strives to get the basics right by implementing adequate processes to

integrate with all municipal functions along the revenue value chain. The section is committed

to ensure that council fiscal baskets is sufficient to serve the uMhlathuze community with the

social responsibilities, capital infrastructure, city development, a safe city, affordable shelter and

basic services such water, electricity and refuse removal services. This is achieved by ensuring

that all properties within the municipal cadastral are billed for property rates and all trading

services consumed are adequately measured and billed.

Albeit, uMhlathuze being ranked as one of the best performing municipalities in the province

and ultimately in the country; the current economic instability faced by South Africa has

negative drawbacks in relation to debt collection.

According to the 2018/19 published section 71 reports from National Treasury, uMhlathuze

municipality has maintained a collection rate of between 97% and 98% over the last decade

with it peak at 99%, this is a strong indicator that the municipality is doing something right

when it comes to Revenue Management. Not only do the city apply credit controls to safeguard

municipal services consumed, consumers are provided with arrangement of debt and credit

extensions to assist those with financial constraints which also enhances consumer relations

with council.

At the beginning of each financial year, medium term budgeted tariffs are determined and

reviewed dependant on the prevailing economic circumstances at the time. During the 2018/19

budget process, considerations was given on the affordability of consumers as South African

Economy slipped into recession on the last quarter of 2017.

The above affected the city in having to adjust projected revenue downwards as well as the

consequence of increased number of days in the recovery of outstanding debt from consumers

as they face hard economic down turns.

The presence of high service consumption industrial customers is an important source of

revenue for the municipality e.g. Transnet, Foskor, South 32 and the Ports, there are about 10

371

companies which the municipality places a lot of reliance on for revenue. The biggest revenue

base for the municipality is electricity.

The city is adopting the smart city concepts and a payment application is under development

phase for real time paying facilities. In addition to the payment application, the third party

payment facility will also be available effective from 2019/20. This facility will allow consumers

and business customers to pay for their accounts at clothing and grocery shops, weekdays or

weekends.

Customer relations is an integral function that is vital and critical factor of the revenue chain.

Effective from 2018, Revenue has shifted focus and invested resources to foster customer

relations with the public.

The City took an initiative to take the finance office teamed up with other service department to

the community and conducted consumer education campaigns across the city. The campaign

was based on the myriad of consumer related matters ranging from the Call Centre usage, water

saving tips and leaks reporting, billing and management of the municipal accounts, fire and

rescue services, electrical services, waste management, human settlement issue, Land Use and

many other services rendered by the City of uMhlathuze.

The team traversed different parts of the City from eSikhaleni Township where the campaign

was officially launched and moved to eMpangeni CBD where it gained more momentum.

ENseleni, Vulindlela, Ngwelezana and Richards Bay CDB were also visited.

Different presentations were made to consumers and unlimited time for questions and answers

made a huge impact on the consumers understanding of the municipality’s processes and by-

laws.

The City is now noting the drastic change of consumer and customer behaviour for the better,

benefitting both ends. Water consumption patterns especially in Nseleni has decreased which is

attributed to water conservation presentations done on the road shows.

Increased number of calls reporting water leaks is also noted especially from eNseleni residents.

Consumers are proving to be more aware of the Credit Control Action and the associated fees

and beginning to make payment arrangements.

Applications for Consumer Rebates has increased by 40% in 2019 compared to previous years.

A total number of Arrangement Of Debts has also significantly increased to 1250 arrangements

made from November 2018 to June 2019 compared to an average of 650 on an annual horizon.

Following are the pictures in eNgwelezane Community Centre:

372

Figure**:

Figure:**

373

Figure**: Enseleni Taxi Rank

Figure**:

374

Figure**:

SUPPLY CHAIN MANAGEMENT

The effective Implementation of the Supply Chain Management process is vital for the Council.

The Supply Chain Management (SCMU) has two Sub-units, i.e. Demand and Acquisition

Management and Contract and Logistics Management.

Supply Chain Management Policy

The policy was reviewed to include provisions of Preferential Procurement Regulations of 2017

and propose an addition of Military veterans as a designated group for economic

transformation. The review proposed that 40% of the municipal procurement spent be targeted

for distribution as follows; EME or QSE which is at least 51% owned by Black Youth - 30%; EME

or QSE which is at least 51% owned by Black Women – 30%; EME or QSE which is at least 51%

owned by Black People with disabilities; EME or QSE which is at least 51% owned by Black

People who are military veterans – 30%. This will be achieved through PPPFA Regulation 2017,

clause 4 and 9 provisions.

Contract Management Policy

Contract Management Policy was developed and approved in 2017, which aims to assist and

ensure efficient management of contracts. Section 116 of the Municipal Finance Management

375

Act, 2003 (Act 56 of 2003) stipulates the procedure that should be followed to manage a

contract procured through Supply Chain Management of a municipality. The were no issues or

amendments that necessitated the review.

uMhlathuze Preferential Procurement Policy

The policy was established in terms of Preferential Procurement Policy Framework Act, Section

2(1) read together with Preferential Procurement Regulations 2017, clause 2 and The

Constitution of the Republic of South African Constitution, Section 217(2) which allows an

Organ of state implement procurement policy provided for categories of preference in

allocation of contracts; and the protection and advancement of persons, or categories of

persons, disadvantaged by unfair discrimination.

Supplier training and development

As Council`s amended and approved Supply Chain Management Policy whose objective is to

spend a minimum of forty percent (40%) of its annual procurement budget with historically

disadvantaged individuals (HDIs), youth, women, People living Disabilities.

Below is the SCM spending report reflecting the performance under each category:

Total SCM Spending 2018/2019 - Quarter 1 to 4

Categories Q1 Q2 Q3 Q4 TOTAL HDI % Achieved

Total spend per quarter

113 756 385,35 231 202 535,26 197 018 256,53 133 966 001,47 675 943 178,40

State owned R9 947 955,06 14 792 723,29 27 695 466,31 169 012,66

Total spend excluding state owned

R103 808 430,29

216 409 811,97 169 322 790,22 133 796 988,81 623 338 021,29 40% 249 335 208,52

EME or QSE with at least 51% ownership by Black Women

R43 804 284,30 36 602 700,42 21 514 166,71 19 320 370,32 121 241 521,74 40% 99 734 083,41 122%

EME or QSE with at least 51% ownership by Black Youth

R30 373 103,93 35 246 361,38 27 483 417,78 46 208 363,76 139 311 246,84 40% 99 734 083,41 140%

EME or QSE with at least 51% ownership by Disabled Black People

R309 523,33 1 358 710,35 190 033,32 157 411,00 2 015 678,00 20% 49 867 041,70 4%

Total spent 74 486 911,55 73 207 772,15 49 187 617,80 65 686 145,08 262 568 446,59 42% 249 335 208,52 105%

376

through targeted groups

The targeted procurement policy of the municipality is slowly but surely meeting the

objectives set, that of improving the lives of the people. In the first year of implementation,

2016/17 financial year, 40% set aside was R348 million. Out of this amount the local black

women category achieved 175% (R244 million), youth was 94% (R131 million) and

People living with Disabilities was 0.87% (R605 Thousand).

In the second year ending 2018, there is an improvement where the youth has already

achieved 102% (R134 million), women 91% (R117 million) and the People living with

Disabilities 2% (R1.6 million).

In the third year ending June 2019, there is an improvement where the youth has already

achieved 140% (R139.3 million), women 122% (R121.2 million) and the People lwith

Disabilities 4% (R2.0 million).

These percentages grow in value in the second and third year in proportion to the first year.

Having said that, uMhlathuze is very clear with this programme of uplifting the youth in our

area. However, challenges are still encountered from these groupings more especially

around compliance perspective, their financial management skills and access to finance.

However, there has been good improvement in three year comparison.

Achievement of purchase orders allocated to Women, Youth and People Living Disabilities:

377

Targeted Groups versus Other Suppliers

Council also continued to use its objective criteria, in terms of the developmental local

government, in ensuring that more work is awarded to local suppliers, this includes the

target procurement to the marginalised youth, women and People Living Disabilities owned

companies.

The graph below illustrates positive contribution of the objective criteria:

-

50 000 000.00

100 000 000.00

150 000 000.00

200 000 000.00

250 000 000.00

300 000 000.00

350 000 000.00

400 000 000.00

450 000 000.00

Targeted Groups Others

Targeted Groups Versus Others

378

APPENDICES:

APPENDIX A: COUNCILLORS, COMMITTEE ALLOCATION AND COUNCIL

ATTENDANCE

Name: Mhlongo Mduduzi Gift

Party: ANC

MAYOR OF THE MUNICIPALITY

Name: Sibiya Duduzile

Party: ANC

DEPUTY MAYOR OF THE MUNICIPALITY

Name: Mkhize Silondile Gcinekile Party: ANC SPEAKER OF COUNCIL

Name: Lourens Manie

Party: ANC

CHIEF WHIP OF COUNCIL

379

EXECUTIVE COMMITTEE

Name: Mhlongo Mduduzi Gift

Party: ANC

EXCO

Chairperson: Finance

Name: Sibiya Duduzile

Party: ANC

EXCO

Chairperson: Corporate Services

Name: Gumede Tobias Seze

Party: IFP

EXCO

Deputy Chairperson: Finance

Name: Mthethwa Khethomusha Ngikhethi

Party: IFP

EXCO

Deputy Chairperson: Corporate Services

Name: Ndimande Dumsani Joseph Party: ANC EXCO Chairperson: Infrastructure Services

Name: Sookroo Meera

Party: ANC

EXCO

Chairperson: City Development

380

Name: Mthembu Babhekile Constance

Party: ANC

EXCO

Deputy Chairperson: Infrastructure and

Technical Services

Name: Phahla Thamsanqa M’cord

Party: ANC

EXCO

Deputy Chairperson: City Development

Name: Zikhali Raphael Mduduzi

Party: ANC

EXCO

Chairperson: Community Services

Name: Fourie Louis Christofel Mathys

Party: DA

EXCO

Deputy Chairperson: Community Services

381

WARD COUNCILLORS:

Name: Cebekhulu Langelihle

Goodman

Party: ANC

Ward No: 1

Cell phone: 0782259347

Name: Botha Christo Marius

Party: DA

Ward No: 2

Cell phone: 0828395816

Name: Henning De Vet

Party: DA

Ward No: 3

Cell phone: 0814336643

Name: Zondo Lucky Praisegod

Party: ANC

Ward No: 4

Cell phone: 0739376316

Name: Ntuli Dumisani

Fairman

Party: ANC

Ward No: 5

Cell phone: 0835737596

Name: Ndimande Dumsani Joseph

Party: ANC

Ward No: 6

Cell phone: 073 479 8776

Name: Khuzwayo Vusumuzi

Nelson

Party: ANC

Ward No: 7

Cell phone: 0837145218

Name: Wanda Thabisile

Patricia

Party: ANC

Ward No: 8

Cell phone: 0731721369

Name: Palmer Erwin Andre

Party: ANC

Ward No: 9

Cellphone: 0834096887

382

Name: Qulo Thembi Gugu

Party: ANC

Ward No: 10

Cell phone: 0829650224

Name: Zibani Ntombenhle Thembelihle Party: ANC Ward No: 11 Cell phone: 0839780478

Name: Cele John Nhlakanipho

Party: ANC

Ward No: 12

Cell phone: 0834211478

Name: Hadebe Jabu Mavis Party: ANC Ward No: 13 Cell phone: 0835221062

Name: Ntuli Sinenhlanhla Simphiwe Party: ANC Ward No: 14 Cell phone: 0730644263

Name: Zuma Sikhumbuzo Gladman Party: ANC Ward No: 15 Cell phone: 0730974630

Name: Phahla Thamsanqa M’cord Party: ANC Ward No: 16 Cell phone: 0796050900

Name: Zondi Graduate Party: ANC Ward No: 17 Cell phone: 0734240193

Name: Mjadu Khulekani Party: ANC Ward No: 18 Cell phone: 0820445405

383

Name: Zulu Sipho Mbongeleni

Party: ANC

Ward No: 19

Cellphone: 0787531095

Name: Khumalo Rhoda

Party: ANC

Ward No: 20

Cell phone: 0715986571

Name: Mthembu Samuel

Ntandane

Party: ANC

Ward No: 21

Cellphone: 0825830163

Name: Ncanana Hamilton Nkosinathi Party: ANC Ward No: 22 Cell phone: 0823430652

Name: de Lange Barend Jacobus Party: DA Ward No: 23 Cell phone: 0833217844

Name: Dlamini Siphosenkosi Gift Party: ANC Ward No: 24 Cell phone: 0834037292

Name: Mathe Thamsanqa Bongani Party: ANC Ward No: 25 Cellphone: 0838722535

Name: Joseph Leslie Samuel Party: ANC Ward No: 26 Cell phone: 0823078262

Name: Mzimela Simphiwe Party: ANC Ward No: 27 Cell phone: 0721221019

384

Name: Ntanzi Phikelakhe

Madlinyoka

Party: ANC

Ward No: 28

Cell phone: 0835243685

Name: Mathenjwa Prince

Mthuzi

Party: ANC

Ward No: 29

Cell phone: 0839565583

Name: Mpungose Muzi

Sylvester Cyril

Party: ANC

Ward No: 30

Cellphone: 0721152350

Name: Ntombela Sipho Francis

Party: ANC

Ward No: 31

Cell phone: 0824370406

Name: Ndlovu Mntozofika

Party: ANC

Ward No: 32

Cell phone: 0767814751

Name: Xulu Zakheleni Zibuse

Party: IFP

Ward No: 33

Cell phone: 0722807976

Name: Makhanya Ntuthuko

Fanelesibonge

Party: ANC

Ward No: 34

Cell phone: 0833566613

385

PARTY REPRESENTATIONS

Name: Mhlongo Mduduzi Gift Party: ANC MAYOR OF THE MUNICIPALITY

Name: Sibiya Duduzile Party: ANC DEPUTY MAYOR OF THE MUNICIPALITY

Name: Mkhize Silondile Gcinekile Party: ANC SPEAKER OF COUNCIL

Name: Lourens Manie

Party: ANC

CHIEF WHIP OF COUNCIL

Name: Mthembu Babhekile Constance Party: ANC PR – EXCO Cell phone: 0722566660

Name: Zikhali Raphael Mduduzi Party: ANC PR – EXCO Cell phone: 0730588380

Name: Sookroo Meera Party: ANC PR-EXCO Cell phone: 0765033535

Name: Cele Nonhlanhla Reginaldah Party: ANC PR Cell phone: 0788355529

386

Name: Sibiya Khonzeleni Duduzile

Party: ANC

PR-EXCO

Cell phone: 0762447526

Name: Mbonambi Khululiwe Ntombenhle Party: ANC PR Cell phone: 0827668660

Name: Mbatha Purriety Thenjiwe Party: ANC PR Cell phone: 0633802438

Name: Skumbuzo Mabaso Party: ANC PR Cell phone: 0820502481

Name: Mbokazi Musawenkosi Mazonjani Party: ANC PR Cell phone: 0721428154

Name: Gumede Tobias Seze Party: IFP PR – EXCO Cell phone: 0763566148

Name: Mthethwa Khethomusha Ngikhethi Party: IFP EXCO

Name: Mpanza Celinhlanhla Nicholas

Party: IFP

PR

Name: Ozias Zakhele Mthembu

Party: IFP

PR

Cell: 0728574290

387

Name: Sooryanarian

(Sagra)Simmadhri

Party: IFP

PR

Name: Ivan Alexander Stone

Party: IFP

PR

Cell: 0836433393

Name: Dini Emmanuel Ntuli

Party: IFP

PR

Name: Mkhulise-Khumalo

Gugulethu

Party: IFP

PR

Cell phone: 0179985159

Name: Mabuyakhulu Jeon Zakhe

Party: IFP

PR

Cell phone: 0737604696

Name: Cleopatra Nonhlanhla

Nyawo

Party: IFP

PR

Cellphone:0736967050

Name: Thandazani Thusi PARTY: IFP PR Cell phone:0731460809

Name: Mthembu Solile Phildah Party: IFP PR Cell phone: 0737715837

Name: Fourie Louis Christofel Mathys Party: DA PR - EXCO Cell phone: 0823356271

388

Name: Khonzi Edith Nkosi (Ndlovu) PARTY: DA PR Cell phone:0729894940

Name: Alen Viljoen

Party: DA PR Cell phone:0824984216

Name: Naidoo Karanagie Party: DA PR Cell phone: 0798890411

Name: Magubane Siphesihle Lwandile Party: DA PR Cell phone: 0727739183

Name: Ngubane NN Party: EFF PR Cell phone: 0730249807

Name: Hlabisa Khulezweni Simphiwe Party: EFF PR Cell phone: 0780232715

Name: Mohlala MR Party: EFF PR cell phone: 0765876251

389

APPENDIX B: COMMITTEE ALLOCATION AND COUNCIL ATTENDANCE

SECTION 79 - COUNCIL AND OFFICIAL REPRESENTATION ON COMMITTEES FOR THE 2016 TO 2021 TERM OF OFFICE

COMMITTEE CHAIR DEPUTY CHAIR ANC DA IFP EFF OBSERVERS

Bylaws

P T Mbatha (F) C G Mkhulisi-

Khumalo (F)

P M Ntanzi (M)

D E Mngomezulu (M)

N T Zibani (F)

S N Mthembu

S G Dlamini(M)

S S Ntluli (F)

S F Ntombela

A Viljoen (M) S P Mthembu (F)

I Stone (M)

S L Magubane (M)

K E Nkosi (F)

COMMITTEE CHAIR DEPUTY CHAIR ANC DA IFP EFF OBSERVERS

Standing Orders and

Disciplinary

Committee

S G Mkhize M Lourens (M) S G Zuma (M)

S B Mabaso (M)

P T Mbatha (F)

D J Ndimande (M)

R Khumalo (F)

D E Mngomezulu (M)

L C M Fourie

(M)

N T Thusi (M)

C G Mkhulise-

Khumalo (F)

K Naidoo (F)

K E Nkosi (F)

390

uMhlathuze Public

Transport Liaison

Committee (UPTLC)

&

M S C

Mpungose (M)

K N Mthethwa

(F)

L G Cebekhulu (M)

D F Ntuli (M)

V N Khuzwayo (M)

L P Zondo (M)

G Zondi (M)

K Mjadu (M)

T B Mathe (M)

S L Magubane

(M)

J Z Mabuyakhulu

(M)

C N Mpanza (F)

K S Hlabisa (M) C N Nyawo (M)

K E Nkosi (F)

N F Makhanya

(M)

Z Z Xulu (M)

S P Mthembu (F)

Public Participation

Committee under

convenorship of the

Speaker

S G Mkhize C M Botha (M) L S Joseph (M)

P M Ntanzi (M)

S Mzimela (M)

N F Makhanya (M)

T G Qulo (F)

J M Hadebe (F)

S S Ntuli (F)

K E Nkosi (F) T S Gumede (M)

N T Thusi (M)

A Viljoen (M)

L C M Fourie (M)

C N Nyawo (F)

391

SECTION 80 - COUNCIL AND OFFICIAL REPRESENTATION ON COMMITTEES FOR THE 2016 TO 2021 TERM OF OFFICE

COMMITTEE CHAIR DEPUTY CHAIR ANC DA IFP EFF OBSERVERS

Corporate Services

(CORPS)

K D Sibiya (F) K N Mthethwa (F) M Lourens (M)

K N Mbonambi (F)

J M Hadebe (F)

L S Joseph (M)

J N Cele (M)

N F Makhanya (M)

S M Mthembu (M)

S L Magubane

(M)

S Simmadhri (M)

O Z Mthembu (M)

S P Mthethwa

(M)

I Stone (M)

K Naidoo (F)

C M Botha (M)

K E Nkosi (F)

C G Mkhulise-

Khumalo (F)

D E Ntuli (M)

Community Services

(COMS)

Geographical

Naming Committee

(See reference

elsewhere in

document)

R M Zikhali (M) L C M Fourie (M) D J Ndimande (M)

D F Ntuli (M)

T G Qulo (F)

V N Khuzwayo

K Mjadu (M)

D E Mngomezulu (M)

G Zondi (M)

K Naidoo (F) N T Thusi (M)

Z Z Xulu (M)

S L Magubane (M)

S P Mthembu (F)

K E Nkosi (F)

Financial Services M G Mhlongo T S Gumede (M) P T Mbatha (F) A Viljoen (M) I Stone (M) L C M Fourie (M)

392

(FS)

(M) N R Cele (F)

H N Ncanana (M)

S Mzimela (M)

S G Zuma (M)

T B Mathe (M)

M Ndlovu (M)

S Simmadhri (M) K E Nkosi (F)

City Development

(CD)

M Sookroo (M) T Phahla (M) M M Mbokazi (M)

P M Ntanzi (M)

L P Zondo (M)

N T Zibani (F)

S S Ntuli (F)

S G Dlamini (M)

S F Ntombela (M)

C M Botha (M) O Z Mthembu (M)

J Z Mabuyakhulu

(M)

) D E Ntuli (M)

H de Wet (M)

L C M Fourie (M)

K E Nkosi (F)

C G Mkhulise-

Khumalo (F)

Z Z Xulu (M)

N N Ngubane (M)

Infrastructure

Services (INFRA)

See Council

Resolution 11689 of

20 June 2017 re

separation of

department

D J Ndimande

(M)

T S Gumede (M) E A Palmer (M)

P M Mathenjwa (M)

S M Zulu (M)

M S C Mpungose (M)

L G Cebekhulu (M)

H de Wet (M) J Z Mabuyakhulu

(M)

C N Nyawo (F)

K S Hlabisa (M) K E Nkosi (F)

O Z Mthembu (M)

Z Z Xulu (M)

393

T P Wanda (F)

R Khumalo (F)

Energy and Electrical

Services (EES)

See Council

Resolution 11689 of

20 June 2017 re

separation of

department

B C Mthembu

(F)

T M Phahla (M)

M Lourens (M)

S G Mkhize (F)

M M Mbokazi (M)

D J Ndimande (M)

N R Cele (F)

S S Ntuli (F)

K E Nkosi (F) C N Mpanza (M)

S P Mthembu (F)

S P Mthethwa

(M)

H de Wet (M)

L CM Fourie (M)

O Z Mthembu (M)

394

COMMITTEE CHAIR DEPUTY

CHAIR

ANC DA IFP EFF OBSERVERS

SPLUMA

Council Resolution 10157B

(4.3) 9 June 2015 be

amended to read as follows:

“4.3 the following seven

Councillors be nominated to

serve as a subcommittee of

the Executive Committee in

order to consider any

appeals submitted in terms

of the Spatial Planning and

Land Use Management Act,

2013, and the KZN Planning

and Development Act, 2008:

----- ----- S G Mkhize (F)

M Sookroo (F)

B C Mthembu (F)

T M Phahla (M)

L C M Fourie

(M)

K N Mthethwa (F)

T S Gumede (M)

uMHLATHUZE

MUNICIPALITY

GEOGRAPHICAL NAMING

COMMITTEE

M Lourens

(M)

S G

Mkhize

(F)

M G Mhlongo (M)

K D Sibiya (F)

R M Zikhali (M)

M M Mbokazi (M)

N T Zibani (F)

K N Mbonambi (F)

N R Cele (F)

H de Wet (M) J Z Mabuyakhulu (M)

C N Mpanza (M)

K E Nkosi (F)

A Viljoen (M)

395

MPAC ESTABLISHED IN TERMS OF THE MUNICIPAL STRUCTURES ACT 1998, MUNICIPAL SYSTEMS ACT 2000 AND MUNICIPAL

FINANCE MANAGEMENT ACT OF 2003

COMMITTEE CHAIR DEPUTY CHAIR ANC DA IFP EFF OBSERVERS

Municipal Public

Accounts Committee

(MPAC)

S B Mabaso (M)

I Stone (M) M S C Mpungose (M)

E A Palmer (M)

T P Wanda (F)

T G Qulo (F)

J M Hadebe (F)

K N Mbonambi (F)

S F Ntombela (M)

B J de Lange(M) C G Mkhulise-

Khumalo (F)

N T Thusi (M)

N N Ngubane (M) C M Botha(M)

K E Nkosi (F)

SECTION 62 ESTABLISHED IN TERMS OF THE LOCAL GOVERNMENT MUNICIPAL SYSTEMS ACT, 32 OF 2000

COMMITTEE CHAIR DEPUTY CHAIR ANC DA IFP EFF OBSERVERS

Section 62 Appeals

Committee

To be handled by the

relevant Department and

Committee Officer based

on portfolio of origin

M Lourens (M) P M Mathenjwa

P T Mbatha (F)

N R Cele (F)

S M Zulu (M)

C M Botha (M) C N Nyawo (F)

S P Mthembu (F)

** has not convened in this Term of Office – no appeals submitted

396

LOCAL LABOUR FORUM ESTABLISHED IN TERMS OF THE ORGANISATIONAL RIGHTS AGREEMENT

Local Labour Forum

CHAIRPERSON

Clr K D Sibiya (F)

DEPUTY

CHAIRPERSON

S C Dlamini

Employer

Component

K D Sibiya (Dep Ch)

S Magubane (M)

K N Mbonambi (F)

L S Joseph (M)

B Nzuza

A Lombaard

N Miya

P Dlamini

G Mthembu

N Khumalo (FS)

T Mathebula

S Simmadhri (M)

Employee

Component

12 x Organised

labour

SAMWU (8)

D P Mthiyane

(Chair)

P C Nxumalo

D M Luthuli

V M Khoza

B L Gumede

S C Dlamini

P S Ndlovu

H M Mthethwa

IMATU (4)

E Zondi

M Zungu

W Xulu

Z B Myeza

NO OBSERVERS AS PER RESOLUTION OF LLF ON 21 MAY

2007

the Local Labour Forum agendas and minutes only be made

available to the 12 employer representatives and the 12

employee representatives in future

Deals with all issues related to Labour matters in terms of the

ORA

FOR INFORMATION

Dr N J Sibeko

Mr N Mthethwa (COO)

Mr M Kunene (CFO)

Ms N Ndonga (DMM:CD)

Ms S Masondo (DMM:CS)

Mr S Hlela (DMM:INFRA)

Mr N Khumalo (DMM: EES)

397

AUDIT COMMITTEE, PERFORMANCE AUDIT, PERFORMANCE EVALUATION PANELS

Audit Committee Members

Mr S Nkonzombi (Chairperson)

Miss B Zulu

Mr A Dhuki

Mrs J Ndlovu

Office of the AG

Mr J Nkosi (Audtr General’s Office)

Mr L Lutchman (Audtr Genrl’s Office)

On Invitation

Chairperson: MPAC

Senior Management

Dr N J Sibeko (MM)

Mr N Mthethwa (COO)

Mr S Hlela (DMM:INFRASTRUCTURE)

Mr M Kunene (CFO)

Ms S Masondo (DMM:CORS)

Mrs T Mathebula (DMM:COMS)

Ms N Ndonga (DMM:CD)

Mr N Khumalo (DMM: EES)

Officials

Mr H Renald (FS)

Ms N Mthembu (OMM)

Mr D Myburgh (OMM)

Mr B Khumalo (CORS)

Miss Z Ngcobo (FS)

Mr S Khumalo (FS)

Mrs S Adonis (OMM)

Performance Audit

Committee

New members elected as per CR 10664

dated 24 February 2016

Chairperson - Dr M J Ndlovu

Mr R M J Baloyi

Deputy Mayor – Clr K D Sibiya (F)

Alternate - Clr R M Zikhali (M)

ON INVITATION

Chairperson of MPAC

Clr K E Nkosi

REVIEWED ANNUALLY

D Myburgh

Deputy Municipal Managers

Performance Evaluation

Panel – Heads Of

Departments (Section 57

Municipal Manager – uMhlathuze

Municipality

Chairman Of Performance Audit

Dr N J Sibeko

Dr M J Ndlovu

D Myburgh

B M Dladla

398

Employees)

Committee

Municipal Manager –Mfolozi

Member Of Executive Committee

K E Gamede

K D Sibiya (Deputy Mayor) (F)

Alternate - Clr R M Zikhali (M)

Performance Evaluation

Panel (Municipal Manager)

Mayor - uMhlathuze Municipality

Member Of Executive Committee

Chairman Of Performance Audit

Committee

Municipal Mayor –Mfolozi

Member Of A Ward Committee

M G Mhlongo (Mayor) (M)

K D Sibiya (Deputy Mayor) (F)

Dr M J Ndlovu

Clr S W Mgenge

E S Luthuli

Alternate - Clr R M Zikhali (M)

D Myburgh

B M Dladla

399

BOARD OF TRUSTEES

COMMITTEE EMPLOYER REPRESENTATIVES EMPLOYEE REPRESENTATIVES

Board Of Trustees

Clr A Viljoen (M) - Chairperson

Deputy Mayor, Clr K D Sibiya (F)

Clr S G Mkhize

Clr N T Thusi (M)

N Montgomery (Principal Officer)

T Moamosi

S A Pienaar

B Mathebula

N M C Zulu

Simeka

GRANTS IN AID COMMITTEE

COMMITTEE CHAIRPERSONS OF SECT 80

COMMITTEES

DMM REPRESENTATIVES

Grants in Aid

R M ZIKHALI (COMMS)

M SOOKROO (CITY DEV)

M G MHLONGO (FINANCIAL

SERVICES)

T MATHEBULA

N NDONGA

M KUNENE

400

AIRPORT WORKING COMMITTEE

COMMITTEE COUNCILLORS OFFICIALS AND CONCESSIONAIRE

Airport Working Committee

Clr M G Mhlongo (M)

Clr M Lourens (M)

T Phahla – Manager: Diverse

Administration (Chairperson)

E Raper – Deputy Manager: Financial

Services

B Mbhamali - Civil Engineer

A Vumba – Manager: Fire And Rescue

Services

N Miya: Manager Legal Services

Not more than 4 members representing

the concessionaire

Resolution 11146 of 25 October(EXCO)and 22

November 2016 (COUNCIL)

BATHO PELE COMMITTEE

401

COMMITTEE COUNCILLORS OFFICIALS

Batho Pele Committee

COUNCILLORS

Elected proportionally as follows:

ANC

Clr M G Mhlongo(M)

Clr K D Sibiya (F)

Clr S G Mkhize (F)

Clr R M Zikhali (M)

Clr M M Mbokazi (M)

Clr N R Cele (F)

Clr D J Ndimande (M)

IFP Clrs I A Stone (M)

Clr K N Mthethwa (F)

DA Clr A Viljoen (M)

T Phahla

B M Dladla

M Nzimande

N Khumalo

S Mbatha

T Mdumela

T Zondi

T Gumede

Z Masango

Z Mdluli

N Zulu

Councillors - Resolution 11187 of 25 October

2016 (Exco) and 22 November 2016 (Council)

Officials - Resolution 9624 of 28 OCTOBER 2014

Observer

Clr K E Nkosi

402

RAPID RESPONSE TEAM

COMMITTEE SPEAKER/OFFICIALS DESIGNATION

Rapid Response Team

Clr S G Mkhize

Dr N J Sibeko

Mr N Mthethwa

Mr M Kunene

Ms S Masondo

Ms N Donga

Ms T Mathebula

Mr S Hlela

Nkanyiso Khumalo

Speaker (Convenor)

Municipal Manager

Chief Operations Officer

Chief Financial Services

Deputy Municipal Manager: Corporate

Services

Deputy Municipal Manager: City

Development

Deputy Municipal Manager: Community

Services

Deputy Municipal Manager:

Infrastructure and Technical Services

Deputy Municipal Manager: Electrical

and Energy Services

1 – 7 = CR 10408 of 3 November 2015

8 = CR 11150 of 22 November 2016

403

INTERNAL COMMITTEES

SUPPLY CHAIN MANAGEMENT COMMITTEES

BID SPECIFICATION COMMITTEE BID EVALUATION COMMITTEE BID ADJUDICATION COMMITTEE

MS N NDONGA -

CHAIRPERSON

MS P GUMBI

MR Z MASANGO

MR S MORAJANE

MS Z NGCOBO

MR B V NZUZA

DEPARTMENT CITY

DEVELOPMENT

DEPARTMENT FINANCIAL

SERVICES

DEPARTMENT COMMUNITY

SERVICES

DEPARTMENT CITY

DEVELOPMENT

DEPARTMENT FINANCIAL

SERVICES

DEPARTMENT CORPORATE

SERVICES

MR S MHLONGO

MRS N DLAMINI

MS G GAZU

MR T GUMEDE

MR B KHUMALO

MR N KHUMALO

MS S MADUMA

MR R MBATHA

MS N

NDWANDWA

DEPARTMENT FINANCIAL SERVICES

DEPARTMENT FINANCIAL SERVICES

DEPARTMENT COMMUNITY

SERVICES

DEPARTMENT FINANCIAL SERVICES

DEPARTMENT CORPORATE

SERVICES

DEPARTMENT ELECTRICAL &

ENERGY SERVICES

DEPARTMENT CITY DEVELOPMENT

DEPARTMENT INFRASTRUCTURE

DEPARTMENT INFRASTRUCTURE

MR M KUNENE -

CHAIRPERSON

MR S MBATHA

MS S S MASONDO

MR S KHUMALO

MR N KHUMALO

MR S HLELA

VACANCY

DEPARTMENT: FINANCIAL

SERVICES

DEPARTMENT: CITY

DEVELOPMENT

DEPARTMENT:

CORPORATE SERVICES

DEPARTMENT: FINANCIAL

SERVICES

DEPARTMENT: FINANCIAL

SERVICES

DEPARTMENT:

INFRASTRUCTURE

INTERNAL/MANAGEMENT COMMITTEES

404

INFORMATION AND COMMUNICATION TECHNOLOGY STEERING COMMITTEE ENTERPRISE RISK MANAGEMENT COMMITTEE

COMMITTEE OFFICER

Established in terms of Resolution

6894 of 24 August 2010

COO ADDED ito RESOLUTION 10401

3 NOVEMBER 2015

MEMBERS

MUNICIPAL MANAGER

CHIEF OPERATIONS OFFICER

CHIEF FINANCIAL OFFICER

DEPUTY MUNICIPAL MANAGER:

CORPORATE SERVICES

DEPUTY MUNICIPAL MANAGER: CITY

DEVELOPMENT

DEPUTY MUNICIPAL MANAGER:

COMMUNITY SERVICES

DEPUTY MUNICIPAL MANAGER:

INFRASTRUCTURE

DEPUTY MUNICIPAL MANAGER:

ELECTRICAL & ENERGY SERVICES

HEAD OF SECTION : INFORMATION

COMMUNICATION AND TECHNOLOGY

COMMITTEE OFFICER

Administrative duties – EXTRACT

FROM CHARTER

The Chief Risk Officer, or such person

as appointed by the Committee, shall

be the secretary of the Committee.

Established in terms of Resolution

9223 OF of 25 APRIL 2014

MEMBERS

MUNICIPAL MANAGER

CHIEF FINANCIAL OFFICER

DEPUTY MUNICIPAL MANAGER:

CORPORATE SERVICES

DEPUTY MUNICIPAL MANAGER: CITY

DEVELOPMENT

DEPUTY MUNICIPAL MANAGER:

COMMUNITY SERVICES

DEPUTY MUNICIPAL MANAGER:

INFRASTRUCTURE

DEPUTY MUNICIPAL MANAGER:

ELECTRICAL & ENERGY SERVICES

HEAD OF SECTION: INFORMATION

COMMUNICATION AND TECHNOLOGY

405

STANDARDS COMMITTEE FACILITIES MANAGEMENT COMMITTEE

OWN SECRETARIAT

MEMBERS

ARNOLD ALLEN

CEDRIC KOEKEMOER

ESTELLE RAPER

NATALIE KLUCKOW

SARAH PIENAAR

SBONELO ZONDI

THEA JORDAN

THEMBA PHAHLA

OWN SECRETARIAT

MEMBERS

ALBAN MBATHA

ERNST VAN BILJON

ESTELLE RAPER

GUGU KHWELA

MTHOKOZISI MHLONGO

NTOKOZO KHUMALO

SBONELO ZONDI

SIYABONGA KHUMALO

THEMBA PHAHLA

WANDILE MBUYAZI

406

OFFICE OF THE

MUNICIPAL

MANAGER

MUNICIPAL

MANAGER

INFRASTRUCTURE

AND TECHNICAL

SERVICES

DEPUTY

MUNICIPAL

MANAGER

CITY

DEVELOPMENT

DEPUTY

MUNICIPAL

MANAGER

FINANCIAL

SERVICES

DEPUTY

MUNICIPAL

MANAGER

CORPORATE

SERVICES

DEPUTY

MUNICIPAL

MANAGER

COMMUNITY

SERVICES

DEPUTY

MUNICIPAL

MANAGER

SPECIALISED

SERVICES

CHIEF

OPERATIONS

OFFICER

INTERNAL AUDIT

INTERNAL AUDIT

EXECUTIVE

APPENDIX C: THIRD TIER ADMINISTRATIVE STRUCTURE

407

INFRASTRUCTURE

AND TECHNICAL

SERVICES

DEPUTY

MUNICIPAL

MANAGER

ELECTRICITY

SUPPLY

SERVICES

HEAD:

ELECTRICITY

SUPPLY

SERVICES

STREETLIGHTS,

OPERATIONS AND

LV NETWORKS

MANAGER

OPERATIONS AND

MAINTENANCE

MANAGER

RETAIL,

MARKETING AND

CUSTOMER

SERVICES

MANAGER

ELECTRICITY

PLANNING AND

STRATEGY

MANAGER

PROCESS

CONTROL

SYSTEMS

MANAGER

ENERGY

MANAGEMENT

DEPUTY

MANAGER

TRANSPORT,

ROADS AND

STORM WATER

HEAD:

TRANSPORT,

ROADS AND

STORM WATER

RURAL ROADS

OPERATIONS

DEPUTY

MANAGER

URBAN ROADS

AND RAIL

SERVICES

MANAGER

TRANSPORT

INFRASTRUCTURE

PLANNING

MANAGER

WATER AND

SANITATION

SERVICES

HEAD: WATER

AND SANITATION

SERVICES

INFRASTRUCTURE

MAINTENANCE

MANAGER

PLANT

PRODUCTION

AND OPERATIONS

MANAGER

SCIENTIFIC

SERVICES

DEPUTY

MANAGER

WDM PLANNING

AND STRATEGY

MANAGER

CUSTOMER

SERVICES

DEPUTY

MANAGER

ENGINEERING

SUPPORT

SERVICES

HEAD:

ENGINEERING

SUPPORT

SERVICES

PROJECT

MANAGEMENT

AND

IMPLEMENTATION

SERVICES

MANAGER

FLEET

TRANSPORT

SERVICES

MANAGER

INFRASTRUCTURE

ASSET

MANAGEMENT

MANAGER

BUILDINGS AND

STRUCTURES

DEPUTY

MANAGER

408

CITY

DEVELOPMENT

DEPUTY

MUNICIPAL

MANAGER

URBAN AND

RURAL PLANNING

HEAD: URBAN

AND RURAL

PLANNING

DEVELOPMENT

ADMINISTRATION

MANAGER

LAND USE

MANAGEMENT

MANAGER

SPATIAL AND

ENVIRONMENTAL

PLANNING,

HUMAN

SETTLEMENT

DEPUTY

MANAGER

HUMAN

SETTLEMENT

PROGRAMMES

MANAGER

ECONOMIC

DEVELOPMENT

FACILITATION

HEAD:

ECONOMIC

DEVELOPMENT

FACILITATION

PROPERTY

ADMINISTRATION

MANAGER

PROPERTY

VALUATIONS

CITY VALUER

BUSINESS

SUPPORT,

MARKETS AND

TOURISM

DEPUTY

MANAGER

PUBLIC

TRANSPORT

FACILITIES AND

OPERATIONS

COORDINATION

HEAD: PUBLIC

TRANSPORT

FACILITIES AND

OPERATIONS

COORDINATION

409

FINANCIAL

SERVICES

DEPUTY

MUNICIPAL

MANAGER

EXPENDITURE

HEAD:

EXPENDITURE

BUDGET AND

FINANCIAL

MANAGEMENT

MANAGER

EXPENDITURE

AND CASH

MANAGEMENT

MANAGER

REVENUE

HEAD:

REVENUE

REVENUE

CONTROL,

BILLING,

RATES AND

TARIFFS

MANAGER

REVENUE

ENHANCEMENT

DEPUTY

MANAGER

REVENUE

CUSTOMER

RELATIONS,

CREDIT

MANAGEMENT

AND INDIGENT

SUPPORT

MANAGER

SUPPLY CHAIN MANAGEMENT

HEAD: SUPPLY

CHAIN MANAGEMENT

SUPPLY CHAIN

MANAGEMENT

MANAGER

410

CORPORATE

SERVICES

DEPUTY

MUNICIPAL

MANAGER

ADMINISTRATION

HEAD OF

ADMINISTRATION

DIVERSE

ADMINISTRATION

MANAGER

LEGAL SERVICES

MANAGER

COUNCILLOR

SUPPORT AND

PUBLIC

PARTICIPATION

MANAGER

RECORDS

MANAGER

HUMAN

RESOURCES AND

INDUSTRIAL

RELATIONS

HEAD OF HR

HR ADMIN

SERVICES

MANAGER

HR MAINTENANCE

& DEVELOPMENT

SERVICES

MANAGER

LABOUR

RELATIONS

MANAGER

ORGANISATIONAL

DEVELOPMENT

AND CHANGE

MANAGEMENT

MANAGER

INFORMATION

COMMUNICATIONS

AND TECHNOLOGY

MANAGER

ICT GOVERNANCE

DEPUTY

MANAGER

ICT SERVICE

DELIVERY

DEPUTY

MANAGER

ICT

INFRASTRUCTURE

DEPUTY

MANAGER

411

COMMUNITY

SERVICES

DEPUTY

MUNICIPAL

MANAGER

PUBLIC HEALTH

AND

EMERGENCY

SERVICES

HEAD OF

SECTION

WASTE

MANAGEMENT

MANAGER

OCCUPATIONAL

CLINIC

MANAGER

AIR QUALITY

MANAGEMENT

MANAGER

FIRE & RESCUE

SERVICES

MANAGER

DISASTER

MANAGEMENT

MANAGER

PROTECTION

SERVICES

HEAD OF

SECTION

TRAFFIC

SERVICES

MANAGER

SECURITY

SERVICES

MANAGER

RECREATIONAL

AND

ENVIRONMENTAL

SERVICES

HEAD OF

SECTION

CONTRACTS/

PROJECTS

CHIEF OFFICER:

CONTRACTS/

PROJECTS

HORTICULTURAL

MANAGEMENT

MANAGER

SPORT AND

RECREATION

MANAGER

ARTS AND

CULTURE

MANAGER

PROJECT

MANAGEMENT

CHIEF

OFFICER:

PROJECT

MANAGEMENT

412

SPECIALISED

SERVICES

CHIEF

OPERATIONS

OFFICER

PERFORMANCE

MANAGEMENT

DEPUTY

MANAGER

INTEGRATED

DEVELOPMENT

PLANNING

DEPUTY

MANAGER

COMMUNICATION

DEPUTY

MANAGER

BUSINESS

ANALYSIS

BUSINESS

ANALYST

ENTERPRISE

RISK

MANAGEMENT

CHIEF RISK

OFFICER

SERVICE

DELIVERY

MANAGER

413

APPENDIX D: FUNCTIONS OF THE MUNICIPALITY

SERVICE DELIVERY UNIT PROGRAMME FUNCTIONS

Office of the Municipal Manager

Internal Audit Municipal Public Accounts

Risk Management Manage Risk Management framework

Integrated Development Planning

Strategic Planning, Business Planning, City Development

Strategies

Performance Management Organisational Performance

Individual Performance

Community Satisfaction

Public Communications Public Relations

Media Liaison

Website Administration

Corporate Services

Diverse Administration Services Secretariat Services

Legal Support Services Contracts, Conveyance and Business Licensing

Legislation, Litigation and Opinions

Records Management Central Registry

Facilities Management Oversee satellite office

Councillors Councillor Support and Public Participation Services Office of the Mayor

414

SERVICE DELIVERY UNIT PROGRAMME FUNCTIONS

Office of the Speaker

Special Programmes

Public Safety and Security Services

Fire & Rescue Services Fire Prevention

Fire Training

Fire and Rescue Operations

Fire and Rescue Administration

Traffic Services Crime Prevention

Licensing (Vehicles)

Traffic Operations and Administration

Traffic Control Room

Security Services

Disaster Management

Water and Sanitation

Plant Production and Operations

Plant Availability (Water and Wastewater Treatment Plants)

Plant Availability (Pumpstations)

Wastewater Final Effluent Quality Compliance (General

Authorization March 2004 and General Standard 9225 May

1984 )

415

SERVICE DELIVERY UNIT PROGRAMME FUNCTIONS

Water Treatment Final Portable Water Compliance

(SANS241-2011)

Infrastructure Maintenance

Water and Wastewater Network Reliability Program

Planned Maintenance Program for all Pumpstations

Planned Maintenance Program for all Network Pipelines

Planned Maintenance Program for all Water Meters

Scientific Services

Blue and Green Incentive Based Program

Surface Water Monitoring Program (DWA Guidelines 1996)

Wastewater Quality Monitoring Program (General

Authorization 18 March 2004 / General Standard 9225 18

may 1984)

Water Services Bylaw Compliance Program

Online Water Quality Monitoring Program

Water Demand Management and Strategy

Water Loss Management Program

Water and Wastewater Demand Management Program

Water Services Development Plan Annual review

Water Services Bylaws Annual review

416

SERVICE DELIVERY UNIT PROGRAMME FUNCTIONS

Water Safety and Risk Abatement Annual Review

Bulk Water and Wastewater Master Plan Development and

Review

Wastewater Effluent Re-Use Program

Customer Services

Electricity Supply Services

Streetlights, Operations and LV Networks

Electrical Planned Maintenance

Reticulation, Operations and Maintenance

Operations and Maintenance

Electrical Protection

Electrical Cable Faults

Electrical Network Switching

Electrical Light Current

Electricity Retail, Marketing and Customer Services

Electricity Retail and Auditing

Electricity Marketing and Customer Services

Electrical Planning and Strategy Services Electrical Planning

System Reinforcement

Electricity Contracts

Process Control Systems Planned Maintenance Program (Telemetry and Scada

Systems)

417

SERVICE DELIVERY UNIT PROGRAMME FUNCTIONS

Planned Maintenance Program (Instrumentation)

Planned Maintenance Program (Radio Engineering)

Master Plan Development and/or Review (Process Control

Systems)

Energy Management

Transport, Roads and Stormwater

Rural Roads Operations

Planned Rural Road Maintenance Program for Kwa Madlebe

Planned Rural Road Maintenance Program for Kwa Dube

Planned Rural Road Maintenance Program

for Kwa Mkhwanazi

Planned Rural Road Maintenance Program for Kwa Khoza

Planned Maintenance Program for all Pedestrian Bridges

Construction of New Culverts and Bridges

Management and Monitoring Program for all Rural Road

Mining Operations

Urban Roads and Railway Services

Planned Urban Road Maintenance Program (North)

Planned Urban Road Maintenance Program (South)

Planned Urban Road Maintenance Program (West)

Planned Rail Maintenance Program for all Urban Areas

418

SERVICE DELIVERY UNIT PROGRAMME FUNCTIONS

Planned Urban Road Maintenance Resealing Program for all

Urban Areas

Planned Urban Road Marking & Signage Program(All Areas)

Transport Infrastructure Planning and Strategy

Transport Infrastructure Plan Development and/or Annual

Review

Traffic Management Studies Program (All Areas)

Transport Master Plan (Urban, Rural and Rail)

Storm Water Systems , Catchment and Coastal

Management

Stormwater Management Bylaw Annual Review

Stormwater Drains Planned Maintenance Program

Catchment Management Program

Coastal Management Program

Public Transport Operations

Road Side Furniture Development Program

Public Transport Integration Program

Public Transport Master Plan Program

Health and Cleansing Solid Waste Management Waste Management Inland

419

SERVICE DELIVERY UNIT PROGRAMME FUNCTIONS

Waste Management Coastal

Waste Management Administration

Occupational Health Care

Pollution Control Air Pollution Control and Environmental Impact

Engineering Support Services

Engineering Projects Management and

Implementation

Electrical Projects Implementation Program

Civil Engineering Projects Implementation Program

Mechanical Projects Implementation Program

Capital Project Funding Program

Fleet Management Services

Fleet Planned Maintenance Program

Equipment and Small Plant Planned Maintenance Program

Vehicle Utilization and Optimization Program

Vehicle Replacement Program

Municipal Infrastructure Asset Management

GIS Management Program

Integrated Infrastructure Plan Program (Development &

Review)

Maintenance Plans Program Management

420

SERVICE DELIVERY UNIT PROGRAMME FUNCTIONS

Technical Operations Centre Management Program

Engineering Document Management Program

Municipal Buildings and Structures

Planned Building Maintenance Program (Civils)

Planned Building Maintenance Program (Electrical)

Planned Building Maintenance Program (Mechanical)

Building Construction and New Works Program

Planned Structures Maintenance

Recreation and Environmental

Services

Horticultural Management

Biodiversity (Cemeteries) and Conservation

Operations management

421

SERVICE DELIVERY UNIT PROGRAMME FUNCTIONS

Sport & Recreation Recreational Facilities Management

Sport and Recreation Development

Arts and Culture

Public Libraries

Museum

Community Halls and Thusong Centres

Recreational Projects Management

Horticultural Contracts Management

Local Economic Development

Community Capacity Building & Training

Business Support

Development & Support of markets

Economic Facilitation

Marketing & Tourism Development

422

SERVICE DELIVERY UNIT PROGRAMME FUNCTIONS

Urban and Rural Planning

Land Use Management (LUMS)

Building Management and Control

Planning and Development Evaluation

Development Control, Appeals and Consent use

Surveys, Analysis, Data, Research and GIS information

Spatial and Environmental Planning

Development Administration

Human Settlement Programmes

Economic Development Facilitation Property Administration

Property Evaluations

Business Support, Markets and Tourism

Tourism

Business Support and Markets

Investment Promotion

Public Transport Facilities and

Operations Coordination

Human Resource and Industrial HR Administration Services HR Administration

423

SERVICE DELIVERY UNIT PROGRAMME FUNCTIONS

Relations Services

Recruitment, Selection and Placement

Employment Equity

Personnel Maintenance and Development

SHE Risk Management

Training, Development and Education

Employee wellness

Labour Relations Management

Organisation Development and Change Management

Information, Communications and

Technology Services

ICT Governance

ICT Service Delivery

ICT Infrastructure

Expenditure

Budget and Financial Management Budget and Financial Control

Annual Financial Statements, Assets, Reporting and Loans

Expenditure and Cash Management Creditors Management

Payroll and Policy Management

Revenue Revenue Control, Billing, Rates and Tariffs Rates, Non-Metered Services, Cash Control

424

SERVICE DELIVERY UNIT PROGRAMME FUNCTIONS

Revenue Control, Tariff Design, Budget and Reporting

Billing, Metered Services, System Tariff Administration and

Reporting

Revenue Enhancement

Metered Services

Sundry Services

Revenue Customer Relations, Credit Management and

Indigent Support

Branch Management and Community Liaison

Customer Relations and Indigent Support

Supply Chain Management

Demand and Acquisitions

Stores Control

Logistics and Supply Chain Management Risk

425

APPENDIX E: WARD REPORTING AND THE FUNCTIONS OF WARD COMMITTEES

Public Participation and Councillor Support

The Constitution of the Republic of South Africa in section 152 lists the objects of local government, among

them is to provide democratic and accountable government for local communities and to encourage the

involvement of communities and community organisations in the matters of local government.

Pursuant to these noble objectives, as set out in the Constitution, Council has taken a deliberate decision to

strengthen and intensify its public participation drive. The Corporate Services Department has a unit called

Councillor Support and Public Participation. It is charged with ensuring that there is an organised and

structured manner in which the municipality communicates and/or consults the community on their

developmental needs, so that intervention programmes can target real community needs.

Ward Committees

As it is embedded in the Constitution for the democratic government, public participation is central in

deepening democracy. Public participation is described as an open, accountable process through which

individuals and groups within selected communities can exchange views and influence decision-making. It is a

process of engaging people, deciding, planning and playing an active role in the development and operation of

services that affect their lives. Public participation narrows the social gap between the communities and the

elected representative. Communities are defined as wards and each ward has to elect a Ward Committee

which is a central representative structure that links the community with Council and ensures that

communities take part in the decisions in the affairs that affect their lives. To fulfil the abovementioned

objective, Council has undergone a programme of electing Ward Committee members in all thirty four (34)

wards.

As part of Council’s commitment to motivate ward committee members, Council has a budget of R4million for

ward committee out-of-pocket expenses; ward committees received a stipend on

R1 344.00 per month with an increase of 7% every financial year.

426

APPENDIX F: WARD INFORMATION

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 1

Name Gender Portfolio /Sector Contact Number

Cllr L G Cebekhulu Male Chairman 0782259347

1 Mwandla Joyful Male Tourism 0835184913

2 Mbatha Nomusa Female Education 0721771211

3 Myeni Happines Female Community Services 0782097060

4 Mthiyane Nkosingiphile Male Youth Sector 0797799355

5 Myeni Dumsani Male Infrastructure 0795517295

6 Khoza Vincent Melusi Male Safety & Security 0723848395

7 Mthethwa Dumisani Male Financial Services 0721842893

8 Ximba Rebbecca Female Health 0788307378

9 Gerson Dennis Lionel Male Business 0832296544

10 Mthembu Sihle Jeffrey Male Corporate Services 0738550737

427

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 2

Name Gender Portfolio /Sector Contact Number

Clr C M Botha Male Chairman 0828395816

1 Ostreline Zane Carl Male Ward Secretary Meerensee( Right side of Anglers Rod) 0827329552

2 Simmadhri Shanette Somarie Female Corporate Services 0721771211

3 Pittendrigh Donald Male Technical Services / Veldenvlei 0782097060

4 Kearns Rynie Female Sports Club 0797799355

5 Ferreira John Male Meerensee (Lest side of Anglers Rod) 0795517295

6 Sedice Robin Male Finance (Businesses) 0721842893

7 Benjamin Angela Female Wildenweide 0788307378

8 Scates-Wood Bridget Anne Female Community Services ( Community Wellbeing ) 0604378980

9 De Wet Henning Male Waterfront and Beaches 0832296544

10 Le Roux Vanessa Female City Development ( Tourism ) 0738550737

428

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 3

Name Gender Portfolio /Sector Contact Number

Clr De Wet Henning Male Chairman 0832296544

1 Meiring Vincent Male Transport 0824506460

2 Samshuyzen Andre Male Education 0832771628

3 Riekert Kobus Male Community Services 0833959983

4 P.Andrew Clifford Male Youth Sector 0844900012

5 Modise Carl Male Infrastructure 0847055171

6 Pillay Saloshini Female Financial Services 0834624958

7 Thurtell Phyllis Female Health 0762218931

8 Naidu Vathanaige Female Safety and Security 0847917200

9 Vacant

10 Mathenjwa Khumbuzile

Khonziwe

Female Corporate Services 0723061372

429

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 4

Name Gender Portfolio /Sector Contact Number

Clr L P Zondo Male Chairman 0739376316

1 Mabuyakhulu Cebile Female Sports and Recreation 0630165047

2 Khumalo Khethi Female Education 0733279387

3 Cele Thembinkosi Male Transport 0733279387

4 Cele Thabile L Female Ward Secretary and Religious 0734227255

5 Mhlongo Khulekani Male Community Policing Forum 0735999605

6 Dladla Cedrick Male Agriculture & Business 0835399360

7 Hlongwane Sifiso Male Traditional 0735048307

8 Chili David Male Infrastructure 0603647228

9 Thusi Nomvula Female Rates payment 0725120574

10 Msimango Nompumelelo Female Social Development & Disability 0833664331

430

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 5

Name Gender Portfolio /Sector Contact Number

Clr D F Ntuli Male Chairperson 0835737596

1 Sokhulu Thokozane Male Sports & Recreation 0787231360

2 Mtshali Thulisile I Female NPO 0780808497

3 Cebekhulu Thabi Female Disaster 0733006919

4 Mpanza Musa Male Safety & Security 0730554468

5 Ngcobo Nkosinomusa Male Ward Secretary and Health 0733886657

6 Mtetwa Nombuso Female Projects 0838627139

7 Khoza Nombuso Female Education 0767731589

8 Makombeti Thembinkosi Male Transport 0603098514

9 Khambule Ammelia Nomusa Female Education / Agriculture 0717151428

10 Vilakazi Xolani Male Transport 0710358786

431

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 6

Name Gender Portfolio /Sector Contact Number

Clr D J Ndimande Male Chairperson 0734798776

1 Buthelezi Mathula Male Peace & Stability 0789018225

2 Mkhize Dolly Female Secretary 0734140796

3 Mthembu Nelson Thulani Male Traditional Leader 0737274342

4 Mthethwa Nomusa Female Agricultural & Rural 0726469026

5 Mthembu Zandile Female Education 0717385123

6 Mthalane Khonziwe Female Religious 0783671352

7 Nkwanyana Bongani Male Sports & Youth Development 0736927334

8 Xaba Witness Sandleni Female Health 0721490675

9 Mdluli Nkosinathi Male Economic Development 0733139618

10 Mathaba Fisokwakhe Male Transport 0728068911

11 Msane ntombizodwa Female CDW 083 201 1542

432

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 7

Name Gender Portfolio /Sector Contact Number

Clr Khuzwayo V.N Male Chairperson 0837145218

1 Linda Maria Female Traditional 0604861105

2 Zibani Ncane Female Economic Development 0718312654

3 Banda Moses Male Safety & Security 0790544088

4 Myeni Siya Male Sports 0738081964

5 Mngomezulu Dumsile Female Education 0633377897

6 Mthethwa Zodumo Female Social Development 0730007852

7 Mpanza Alson Male Senior Citizenship & Disability 073 7494 351

8 Ntombizodwa Biyela Female Infection, Prevention, Control 072 5114 457

9 Mhlongo Philisiwe Female Ward Secretary and Health 074 6080 176

10 Tembe Dumisani Isaac Male Electricity & Road 072 0457 350

433

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 8

Name Gender Portfolio /Sector Contact Number

Clr T.P Wanda Female Chairperson 0731721369

1 Madide Khanyisile C Female Religious. 0769159771

2 Msomi Mary Maureen Female Women’s. 0839683008

3 Shabalala Thembinkosi Justice Male Sports and Recreation. 0833736286

4 Mpungose N.A Male Peace and Stability 0834226295

5 Gumede V.E.B Male Secretary and Infrastructure 0634101387

6 Mthethwa Solomon Male Disability 0782187229

7 Mkhwanazi Makhosi Female Health 0639139218

8 Mhlongo Lungile Female Education 0728572973

9 Mthethwa Vusi Male Youth 0733579809

10 Mpanza Winnie Female NGO ‘s and CBO’s 0632969219

434

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 9

Name Gender Portfolio /Sector Contact Number

Clr E A Palmer Male Chairman 0834096887

1 Tholinhlanhla F Mngomezulu Female Health 0826811919

2 Jali Mable Khulile Female Social Welfare 0794555219

3 Mnguni C.Sfundo Male Sports & Recreation 0738503231

4 Sibiya Langelihle Ruth Male Agriculture 0735205744

5 Majola Bonginkosi E Male Housing 0735356858

6 Sukreben Kevin Male Safety & Security 0726862205

7 Cito Pietro Pierre Male Secretary 0722495324

8 Fourie Luan Male Housing 0795228043

9 Mchunu Seluleko Male Transport 0730983792

435

10 Ntuli Nkululeko Male Sports & Recreation 0783076872

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 10

Name Gender Portfolio /Sector Contact Number

Clr Qulo T.G Female Chairlady 0829650224

1 Shenge Samukelisiwe Gugulethu Male Sports& recreation 0731299419

2 Bila Zandile Patricia Female Roads& Transport 0780888430

3 Dlamini Mduduzi Male Secretary Youth, Education & Profession 0730873752

4 Nsele Nkosinathi Female Faith Base Seat 0836566126

5 Ndlovu Ntombikayise Female Health, Home Affairs & DSD 0720705994

6 Mbambo Phumzile Female Informal Traders 0844576643

7 Mkhwanazi Hlengiwe Female Business Sector 0768222672

436

8 Mkhwanazi Thabisile Female Senior Citizen & Security 0723405047

9 Nene Thobekile Male Women Seat 0722460596

10 Madida Sfiso Male Water & Sanitation 0822121514

11 Mnguni Wonder Male CDW 0837787883

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 11

Name Gender Portfolio /Sector Contact Number

Clr N.T Zibane Female Chairman 0839780478

1 Kubheka Patrick Male Traditional Affairs 0734744914

2 Zulu Nhlanhla Male Roads and Infrastructure 0721876833

3 Mhlongo Mduduzi Male Religious 0791758517

4 Mthembu Zwelihle Male Youth and Sports 0738725334

5 Mhlongo Sipho Male Safety and Security 0762956333

437

6 Mpanza Khululiwe Female Education 0837726087

7 Mangazi Zwethula Male Agriculture 0788492982

8 Nxumalo Samukele Female Social Development 0638553992

9 Nzuza Khetha Female Ward Secretary Health 0717836502

10 Mpunzana Jacob Male Water and Sanitation 0716334533

11 Zibani Nonhlanhla Male Community Development Worker 0832011486

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 12

Name Gender Portfolio /Sector Contact Number

Clr Cele J.N Male Chairman 0834211478

1 Dube Sonnyboy Nana Male Water and Sanitation 0710455182

2 Sibiya Siphamandla James Male Education 0786442031

3 Sibiya Mbuyiseni Thulani Male Ward Secretary Sports 0764527603

438

4 Mtshali Jabulani Male Housing 0710112845

5 Makhase Sipho Bhanda Male Infrastructure 0766476237

6 Madonsela Beatrice Phiwokuhle Female Welfare 0827014261

7 Dube Zodwa Goodness Female 0838974333

8 Gazu Hlobisile Priscilla Female Transport 0725888545

9 Shongwe Silindile Happiness Female Health and Safety 0604737127

10 Mpanza Thandazile Angelica Female Disability 0635984318

11 Zibani Nonhlanhla Female CDW 0832011486

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 13

Name Gender Portfolio /Sector Contact Number

Clr Hadebe J.M Female Chairman 0835221062

1 Ntuli Martin Thathokwakhe Male Electricity 0738442247

439

2 Mpanza Khulekani Male Ward Secretary Youth 0733988922

3 Mdlalose Phumlani Male Transport 0782531666 0717078232

4 Hlongwane Mabanga Male Water and Sanitation 0781641158

5 Mthethwa Eunice Female Health 0736463337

6 Mtshali Mirriam Female Women and Disability 0786956799

7 Mbokazi Nkosinathi Male Traditional 0825446433

8 Ngcobo Ntombemhlophe Female Safety and Security 0783446527

9 Mthiyane Zamani Male Deputy Secretary Sports and Recreation 0731909010

10 Gumede Vusimuzi Male Youth 0744655389

11 Sbonelo Ndunakazi Male CDW 0832030038

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 14

Name Gender Portfolio /Sector Contact Number

440

Clr S.S Ntuli Female Chairman 0730644263

1 Mtshali Sabelo Male Sports 0730416962

2 Mthembu Bhekizenzo Male Safety& Security 0726807217

3 Gumede Thandiwe Female Human Settlement 0781348358

4 Majola Zwelonke Male Ward Secretary Arts& Culture, Rural

Sanitation

0784017269

5 Mkhize Nonhlanhla Female Transport, Health 0733878676

6 Dube Zanele Female Social Development & Women empower 0725295517

7 Mchunu Phindeshowe Male Waste Management 0631941839

8 Phashe Zanele Female Rural Roads 0785453828

9 Nxumalo Thembisile Female Economic Development 0781903498

10 Sibiya Siphamandla Male Education 0788861344

441

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 15

Name Gender Portfolio /Sector Contact Number

Clr SG Zuma Male Chairman 0730974630

1 Mazibuko Thembisile Female Ward Secretary and Education 0744940121

2 Dube Thobile Female Religious 0825359906

3 Mthembu Judas Male Safety & Security 0724558297

4 Magagula Phillip Male Traditional Affairs 0722614642

5 Kubheka Lindiwe Female Disability 0760246896

6 Myeni Sibongakonke Male Transport 0724701758

7 Hadebe Boniwe Female Youth Development 0726388228

8 Ndlovu Sani Male Sports & Recreation 0720518763

9 Mthiyane Nana S Female Social Development 0782511315

10 Zulu Goodman K Male Business Sector 0738291462

442

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 16

Name Gender Portfolio /Sector Contact Number

Clr Phahla Male Chairman 0796050900

1 Zulu Sfiso Sibonelo Male Sports and Recreation 0783258563

2 Mkhwanazi Nokulunga Bridgett Female Education and Youth Development 0760222772

3 Zungu Sibahle Sanelisiwe Female Woman elderly and Orphaned 0765380875

4 Wynne Rita Pinky Female Ward Secretary Electricity & Roads

Infrastructure

0737270869

5 Madonsela Nkosinathi Emmanuel Male Human Settlement & Sanitation 0839456936

6 Gumede Nonhlanhla Female Environmental Services 0721742010

7 Mncube Vuyisile Cycology Male Social Development, Health & Home

Affairs

0814080064- 0737206161

8 Cele Philapedia Lungile Female Disability & Religious Forum 0832041512/ 0761491302

9 Mncwango Gugu Female Water 0839233321

10 Khuzwayo Zamani Male Safety & Security 0732127181

443

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 17

Name Gender Portfolio /Sector Contact Number

Clr Zondi G Male Chairman 0734240193

1 Sbonelo Mhlongo Male Youth 0781204857

2 Dlamini Phakade Male 0795597430

3 Dinga Zikhali Male Disability 0826280666

4 Visagie Gerlie Female 0732065234

5 Nkosingiphile Ngema Female Religious 0724582875

6 Manase Mpanza Male Social & Welfare 0832087891

7 Bright Gumede Male Transport & Sport 0829302129 0781297627

8 Ntombifuthi Madide Female Ward Secretary and Health 0836616437

9 Nombuso Thetiso Female Woman & Child 0768974781

10 R.B Yimba Male Safety & Security 0786677240

444

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 18

Name Gender Portfolio /Sector Contact Number

Clr Mjadu Khulekani Male Chairman 0820445405

1 Ncanana Nontobeko Female Business Forum 0720447166

2 Dumisa Siphesihle Hloniphile P Female Education 0799451401

3 Mhlongo Nozipho Smangele Female Transport 0731822333

4 Ntshangase Makhosi Female Agriculture 0839759154

5 Sikhakhane Londiwe Portia Female Health 0818391613

6 Sithole Thokozani Male Traditional Affairs 0606365050

7 Mnguni Siphiwe Male Safe and Security 0832532348

8 Buthelezi Muziwakhe Male Human Settlement 0721163029

9 Mkhwanazi Elvis Thabani Male Sports 0747631707

10 Mthethwa Sbonelo P Male Infrastructure 0633745843

445

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 19

Name Gender Portfolio /Sector Contact Number

Clr Zulu S.M Male Chairman 0787531095

1 Phiwa Buthelezi Male Secretary and Traditional 0729527184

2 Mtshali Bonisiwe Virginia Male Disability 0732256180

3 Jabu P Fihlela Female Women & Children 0630843943

4 Ngema Prudence Female Education 0647349176

5 Thusi Lwazilwemkosi B Female Welfare 0633601681

6 Mthembeni Mpanza Male Infrastructure 0728689360

7 Khulekani Mtshali Male Peace & Stability 0785441612

8 Smangele Ntenga Female Religious 0731883356

9 Thandi C Ntsele Female Health 0733355490

10 Mahlangu Thembinkosi P Male Sports 0631739520

446

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 20

Name Gender Portfolio /Sector Contact Number

Clr Khumalo Rhoda Female Chairperson 0715986571

1 Mthethwa Sabathile Female Disability 0710080866

2 Ngobese Zibuyisile Frieda Female Health and Traditional 0791512595

3 Dube Bongiwe Female Women and Children 0739094515

4 Calane Thamsanqa Male Education 0723621889

5 Myeni Thembinkosi Sakhile Male Infrastructure 0606414145

6 Ndlovu Vela Male Senior Citizens and Agriculture 0790866779

7 Zikhali Bonakele Female Transport and Ward Secretary 0736329269

8 Mabanga Andries Mdu Male Youth / Recr & Safety 0790454849

9 Mbuyisa Walter Male Welfare and Media 0769759050

10 Sithole Nelisiwe Female Education and Religious 0824206219

447

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 21

Name Gender Portfolio /Sector Contact Number

Clr Mthembu S.N Male Chairman 0825830163

1 Nkosi Alfred Thengamehlo Male Safety & Security 0710786227

2 Mngomezulu Senzo Wiseman Male Health 0814367966

3 Mchunu Siyabonga Male Sports & Recreation 0738448568 0608847714

4 Dludla Mafika Sibusiso Male Agriculture 0723822743

5 Mfusi Zanele Lerato Female Ward Secretary and Education 0710845348

6 Mncube Sthembiso Male Transport 0730509189

7 Zulu Phumulani Sibusiso Male Disability 0726895514 0818554351

8 Xulu Siyabonga Hopewell Male Traditional Healers 0835146866

9 Mzila Nomvula Siphumelele Female Youth 0738434927

10 Sabelisiwe Phiri Female Religious 0791111151

448

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 22

Name Gender Portfolio /Sector Contact Number

Clr Ncanana H.N Male Chairman 0823430652

1 Khoza Hlengiwe Voice Female Traditional Affairs 0820816219

2 Mthembu Rejoice Dududzile Female Secretary Roads and Transport 0738933010

3 Mthethwa Peter Michael Male Agriculture & Informal Trading 0797167521

4 Mthiyane Nokuthula Ntombenhle Female Senior Citizen & Disability 0712279729

5 Mbuyazi Sandile Goodenough Male Housing 0656569376

6 Hlubi Sonto Female Sport & Recreation 0725303043

7 Sikhakhane Sandile Male Youth & Education 0834864252

8 Dube Thokozani Bhongoza Male Water & Sanitation 0739565420

9 Mhlongo Sibusiso Male Business Sector 0712114600

449

10 Makhathini Phumlani Male Health 0832438111

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 23

Name Gender Portfolio /Sector Contact Number

Clr B J de Lange Male Chairperson 0833217844

1 Mbuyazi Phakamani Male Zidedele Village 0767915326

2 Masondo Kwandile Praisewell Male Zidedele Village 0621880460

3 Hlabisa Lindokuhle Siboniso Male Central Business Area 0768203628

4 Mdletshe Nompilo Thuli Female Youth and Farms 0734567274

5 Mnguni Sindi Sibongile Female Heuwelland School 0722543398

6 Msezane Musawenkosi Johannes Male eMpangeni Prep School 0734253821

7 Mkhwanazi Senzo Male eMpangeni Prep School 0833779374

450

8 Tlou Sipho Dan Male Nyala Park Area 0728085854

9 Zondi Ngcebo Male Heuwelland School 0714853383

10 Mngomezulu Mandla Male Noordgesig Area 0835240233

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 24

Name Gender Portfolio /Sector Contact Number

Clr Dlamini S.G Male Chairman 0718312206

1 Msweli Ayanda Zethu Female Youth Development 0787597269

2 Mbatha Zithulele James Male Peace & Stability 0834899276

3 Nyawo Nkosini Male Infrastructure 0767015273

4 Zulu Thokozani Mandlenkosi Male Senior Citizens 0782036580

5 Gwala Sikhumbuzo Aubrey Male Ward Secretary and Businesses 0604802093

451

6 Lawana Mxolisi Micheal Male Education 0824132167 0814013361

7 Khumalo Vusimuzi Male Disability 0720173310

8 Buthelezi Ntombikhona Female Agriculture and Forestry 0734869827

9 Zungu Bhekizenzo Male Social Development 0769828696

10 Khumalo Dolly Bianca Female Health 0717054760

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 25

Name Gender Portfolio /Sector Contact Number

Clr Mathe T.B Male Chairman 0838722535

1 Zwane David Male SPORTS & RECREATION 0832406909

2 Makhathini Thembinkosi Male TRADITIONAL & INFRASTRUCTURE 0833429694

3 Ntuli Siphamandla Male YOUTH 0737962447

452

4 Xulu Nonhlanhla Female SOCIAL DEVELOPMENT 0766649931

5 Khumalo Siphamandla Male RELIGIOUS 0794288566

6 Mbili Sindisiwe Female WOMAN & CHILDREN 0733665439

7 Shange Xolani Male HEALTH & EDUCATION 0785573993

8 Mkhwanazi Senzo Male SAFETY & SECURITY 0736239923

9 Sithole Sibusiso Male ROAD & TRANSPORT 0849491163

10 Manqele Mbongeni Male AGRICULTURE 0794519963

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 26

Name Gender Portfolio /Sector Contact Number

Clr L.S Joseph Male Chairman 0823078262

1 Stainbank Phillip Male Housing & Development 0790442533

453

2 Mkhwanazi Siyabonga Male All 0725069866

3 Nzuza Sibusiso Male Sports & Recreation 0837315430

4 Ngcobo Phumelele P Female Social Welfare 0733076561

5 Vilakazi Zonke P Female Safety & Security 0737294587/0629837649

6 Ntuli Thenjiwe Female Water & Sanitation 0793689886

7 Christian Yenkiah Male Social Welfare 0824668567

8 Pillay Krish Male Water & Sanitation 0840908433

9 Vacant

10 Ashraff Shaik Male Safety & Security 0626529529

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 27

Name Gender Portfolio /Sector Contact Number

Clr Mzimela Simphiwe Male Chairman 0721221019

1 Dhlodhlo Celumusa Bayede Male Sports & Recreation 0737821537

454

2 Gumede Nomthandazo Promise Female Water & Sanitation 0723539091

3 Mthiyane Sithembiso Male Home Affairs 0839822383

4 Mtshali Mthobisi Senzosenkosi Male Education 0710825186

5 Mofokeng Zandile Kotsho Female Transport 0835714106

6 Madela Zinhle Snenhlanhla Female Secretary and Health 0737231524

7 Mtshali Thulani Arthur Male Safety & Security 0735143699

8 Mhlongo Dumisani Nhlanhla Male Agriculture 0833557622

9 Mnyandu Thulani Male Social Development 0658718159

10 Mbatha Sakhile Cyril Male Infrastructure 0782423932

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 28

Name Gender Portfolio /Sector Contact Number

Clr P M Ntanzi Male Chairperson 0835243685

1 Majola Zanele Zithobile Female Health 0717056398

455

2 Kumalo Muziwakhe Zamokwakhe Male Sports 0828181368

3 Zulu Michael Mandla Male Education 0732319953

4 Mtembu December Getson Male Agriculture 0822174009

5 Mafuleka Dominic David Male Coordinator of all portfolios 0795958979

6 Myeni Doreen Female Social Development & Housing 0734683962

7 Madida Henry Mandla Male Safety Liaison committee 0603390976

8 Zondi Nozipho Female Women Development 0735847296

9 Khoza Goodman Sibusiso Male Transport 0829778856

10 Zikhali Nhlonipho Nelisa Male Youth Development 0781506504

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 29

Name Gender Portfolio /Sector Contact Number

Clr Prince Mthunzi Mathenjwa Male Chairman 073 264 8101

1 Mbokaz I Muzikayise Abednigo Male Youth Sports 0769275628

456

2 Vacant

3 Mngomezulu Nkosinathi Simiso Male Infrastructure 0733316111

4 Dube Zakhona Female Health 0713515949

5 Sibiya Sidudla Thandazile Female Agriculture 0796254965

6 Zuilu Mandlenkosi Vincent Male Safety & Security 0839859860

7 Mkhonza Bonginhlahla Male Social Development 0724479902

8 Gumede N Busisiwe Female Secretary 0828430237

9 Mhlongo Belina Cingeni Female Senior Citizen, Woman and children 0721436367

10 Gumede LS Male Transport 0739563836

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 30

Name Gender Portfolio /Sector Contact Number

Clr Mpungose M S C Male Chairman 0721152350

1 Mkhwanazi Prudence Ntombi Female Agriculture 0710536646

457

2 Gumede Thandeka 0716631701 0716631701

3 Nsele Ntombikayise Thulisiwe Female Traditional Affairs 0712230949

4 Ngwenya Simangele Nombuso Female Sports & Recreation 0822144805

5 Ndlamlenze Nondumiso Sindisiwe Female Ward Secretary and Safety & Security 0731398316

6 Ndlovu Xolani Male Rural Development 0765786758

7 Nene Richard Phakamani Male Transport 0731622809

8 Mdletshe Sbongile Female Health 0730530264

9 Zungu Lindani Male Secretary/Housing 0634997116

10 Ngcamu Nonkululeko Female 0760848698

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTERS WARD 31

Name Gender Portfolio /Sector Contact Number

Clr SF Ntombela Male Chairman 072 524 5575

1 Manqele Bongani Nomduya Male Safety and Security 079 039 7432

458

2 Ntshangase Bhekisisa Sbongiseni Male Sports, Youth 072 978 7272

3 Ngobese Simangaliso Male Water 060 954 3885

4 Dlamini Vumile Maureen Female Ward Secretary and Health 076 425 8819

5 Zungu Thandazile Female Deputy Secretary Home Affairs 079 591 7795

6 Mthembu Ncamsile Hlengiwe Female Electricity 079 925 0602

7 Mdlalose Wonderboy Male Agriculture 072 779 5300

8 Mthembu Themba Derrick Male Traditional Affairs , Roads & Transport 079 663 9037

9 Manqele Vusumuzi Male Education 073 636 6818

10 Magwaza Thembinkosi Male Housing 073 392 5510

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 32

Name Gender Portfolio /Sector Contact Number

Clr M Ndlovu Male Chairman 0767814751

1 Mtshali Sthabiso Male Infrastructure 0711944589

459

2 Mchunu H.B Male Safety and Security 0799482206

3 Mthembu Funukwazi Male Ward Secretary and Roads 0734368772

4 Xulu Nomfundo Female Health 0832380308

5 Nxumalo Mphiliseni Male Education 0712762047

6 Cebekhulu P.N.T Male Sports and Recreation 0781303406

7 Sthole Bongani Male Agriculture 0736739337

8 Ngwane Cebile Marcia Female Disability 0768033594

9 Mthembui Sipho Male Traditional Affairs 0767769164

10 Zungu Sinenhlanhla Female Youth 0604787122

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 33

Name Gender Portfolio /Sector Contact Number

Cllr Xulu Z.Z Male Chairman 0722807976

1 Makhaza Bheki Sibusiso Male Tourism 0738802302

460

2 Biyela Mhlonipheni Emmanuel Male Transport 0720317891

3 Ntombela Zandile Nobuhle Female Secretary and Education 0715292591

4 Msimango Goodwill Male Education 0731298273

5 Mbuyazi Bonginhlanhla Male Traditional 0712470435

6 Biyela Mphiweni Vusi Male Sports & Recreation 0790189990

7 Zungu Mbali Nokuthula Female Community Services 0792669561 0717844504

8 Ziqubu Norman Thulubheke Male Water & Sanitation 0796808866

9 Mtshali Vela Male Business Economics 0767937953

10 Zungu Ernest Male Religious 0724556663

CITY OF UMHLATHUZE WARD COMMITTEE MEMBERS ATTENDANCE REGISTER WARD 34

Name Gender Portfolio /Sector Contact Number

Clr Makhanya Male Chairperson 0833566613

1 Nxumalo Lungile Female Health 0725967850

461

2 Mdletshe Lethukuthula Female Youth 0785523055

3 Khumalo Phiwayinkosi Mboneni Male Sports and Recreation 0844276163

4 Mkhwanazi Simphiwe Female Welfare 0727163572

5 Manqele Mimy Theresa Female Housing 0713753998

6 Ebbie Siphiwe Mthembu Female Traditional Affairs 0826226636

7 Sphiwe Manqele Female Senior Citizen Disability 0736374756

8 Brenda S Mthembu Female Ward Secretary and Safety and

Security

0719258029

9 Ramsamy Appah Male Agriculture 0837911687

10 Zikhali Angel Female Education 0793470365

462

APPENDIX G: RECOMMENDATIONS OF THE MUNICIPAL AUDIT COMMITTEE

The Honourable Speaker

Council of the City of uMhlathuze

Civic Centre

Mark Strasse

Richards Bay

3901

REPORT OF THE AUDIT COMMITTEE TO COUNCIL

Dear Sir

INTRODUCTION

The Audit and Performance Committee (Audit Committee) is pleased to present its Report for the

financial year ending 30 June 2019. This report covers work done during the third and fourth quarters

of this financial year.

1. Legislative requirements

The purpose of this report is to communicate to the Council the audit committee’s progress to date in

carrying out its oversight responsibilities in terms of section 166 of the Municipal Finance

Management Act, 2003 (Act No. 56 of 2003, as amended) (MFMA), read with circular 65 published by

the National Treasury for the year ended 30 June 2019.

The MFMA obliges every municipality to establish an independent audit committee, which must

advise the municipal Council, political office-bearers, accounting officer and management staff of the

municipality as well as the accounting officer and the management staff of the municipal entity, on

matters relating to internal financial controls and internal audits, risk management, accounting

policies, the adequacy, reliability and accuracy of financial reporting and information, performance

management, effective governance, compliance with the MFMA, the annual Division of Revenue Act

(DoRA) and any other applicable legislation, and any other issues referred to it by the municipality.

The audit committee is governed by formal terms of reference, which are regularly reviewed and

approved by the Council. The committee is pleased to present its report for the financial year ended

30 June 2019.

2. Audit committee members and attendance

The audit committee was established in accordance with section 166 of the MFMA read with MFMA

Circular 65 issued by the National Treasury. The audit committee charter requires that the audit

committee comprises a maximum of four (4) members, of whom the majority must not be in the

employ of the municipality or municipal entity. The audit committee comprises four (4) members,

including the chairperson. In terms of section 166(4)(b) of the MFMA, the audit committee must meet

463

at least four (4) times a year. During the financial year ended 30 June 2019, the audit committee met

on five (5) occasions.

The new Audit Committee was appointed in February 2019 as the term of office for the previous

Committee expired in January 2019.

The members of the audit committee held meetings with the municipal manager as the accounting

officer, the board of directors of the municipal entity, senior management of the municipality, the

internal audit function and the external auditors, collectively and individually, on matters related to

governance, internal control and risk in the municipality, throughout the reporting period. The

committee also held a meeting with the honourable mayor and the executive committee of the

Council to report on governance, internal control, risk, performance and financial information and

other relevant matters concerning the municipality.

The table below sets forth the particulars of the current Audit Committee members and their dates of

appointment:

Name

Date appointed

Meetings held

Meetings

attended

Mr H Mpungose

(Chairperson)

01 February 2019 2 1

Ms K Sewnarain 01 February 2019 2

2

Dr N.J Ndlovu

01 February 2019

2

2

Ms N.H Thungo

01 February 2019

2

2

3. Audit committee’s responsibility

The audit committee has complied with its responsibilities arising from section 166 of the MFMA read

with MFMA Circular 65, and reports that it operated in terms of the audit committee charter read in

conjunction with the internal audit charter.

4. Effectiveness of internal control

464

The audit committee acknowledges management’s efforts to strengthen internal controls within the

municipality. Due to the strategic importance of, and investment in, the modernisation of information

and communication technology (ICT) in the municipality, the audit committee has considered internal

audit reports on the ICT controls during the year under review. The audit committee remains

concerned that not all ICT risks have been addressed in implementing the new systems.

5. The quality of monthly and quarterly reports submitted in terms of the MFMA and DORA

The audit committee is satisfied with the content and quality of monthly and quarterly reports

prepared and issued during the year under review in compliance with the statutory framework. The

finance committee of the municipality reviews these reports on quarterly basis and engage with

management to remedy shortcomings, especially on reports relating to performance against

predetermined objectives. Furthermore these reports are submitted to the audit committee for noting.

The audit committee reviewed the municipality’s annual financial statements and report on

performance information prior to submission to the external auditors by 31 August 2019.

The audit committee has reviewed the reports issued to National Treasury and the Transferring Officer

in terms of the Division of Revenue Act and is comfortable that the Municipality is meeting its

obligation in terms of DORA and has recognised revenue to the extent that conditions have been met.

6. Internal audit function

The accounting officer is obliged, in terms of section 165 of the MFMA, to ensure that the entity has a

system of internal audit under the control and direction of the audit committee. The audit committee

is satisfied that the internal audit function has properly discharged its functions and responsibilities

during the year under review.

The internal audit capacity has been enhanced through co-sourcing parts of the internal audit

function to independent external service providers. The audit committee supports the direction that

the internal audit function is adopting in providing the necessary skills and agility required for the

function to respond quickly and effectively to the demands for internal audit across the municipality.

The recent appointment of specialist ICT auditors is a welcome development in light of the need for

expertise in the auditing of automated systems and the development and maintenance of a system of

continuous auditing.

In terms of the risk-based audit plan approved by the audit committee, the internal audit function

performed twenty eight (28) of the thirty two (32) planned engagements, with the other four (4) being

postponed due to capacity constraints within the internal audit function during the year under review.

The internal audit function found that the control environment as a whole was effective, however,

some control weaknesses were identified in certain areas and recommendations were made for

improvement.

465

The audit committee is satisfied that the internal audit function maintains an effective internal quality

assurance and programme that covers all aspects of the internal audit activity.

7. Risk management function

The audit committee is responsible for the oversight of the risk management function To ensure that

the risk management committee understands the requirements of the audit committee, a member of

the audit committee serves as a member of the risk management committee. The committee has

reviewed the risk register and the reports from the risk committee and is satisfied with the maturity of

the risk management process.

8. Evaluation of the finance function

The audit committee is satisfied with the municipality’s finance function during the year under review.

9. Performance management

Part of the responsibilities of the audit committee includes the review of performance management.

The audit committee has in terms of the performance of the municipality performed the following

functions:

Review and comment on compliance with statutory requirements and performance

management best practices and standards.

Review and comment on the alignment of the integrated development plan, budget,

service delivery and budget implementation plan and

performance agreements.

Review and comment on the relevance of indicators to ensure that they are

measurable and relate to services performed by the municipality and

its entities.

Review of compliance with in-year reporting requirements.

Review of the quarterly performance reports submitted by the internal audit function.

Review and comment on the municipality’s performance management system and

making recommendations for its improvement.

The audit committee is satisfied that the performance report has been prepared in terms of the

MFMA, MSA and the related Regulations.

10. Fraud and irregular activities

During the period under review, no forensic investigations were performed internally and no other

reports were submitted to the audit committee for consideration, however the work of the internal

audit is planned in such a manner that fruitless and wasteful expenditure, irregular expenditure is

identified.

466

The Audit Committee has noted the findings and the conclusion of the Auditor General on the

irregular expenditure as a result of non-compliance with SCM regulations. The committee is confident

that given the effectiveness of the controls in place the recurrence of this exception will be prevented.

11. Evaluation of the annual financial statements

The audit committee has reviewed the annual financial statements, which focused on the

following: • Significant financial reporting judgements and estimates contained in the

annual financial statements.

Clarity and completeness of disclosures and whether disclosures made have been set

properly in context.

Quality and acceptability of, and any changes in, accounting policies and practices.

Compliance with accounting standards and legal requirements.

Significant adjustments and/or unadjusted differences resulting from the audit.

Reflection of unusual circumstances or events and management’s explanation for the

accounting treatment adopted.

Reasons for major year-on-year fluctuations.

Asset valuations and revaluations.

Calculation and levels of general and specific provisions.

Write-offs and reserve transfers.

The basis for the going concern assumption, including any financial sustainability risks and

issues.

Except for the matters identified by the external auditors in the auditor’s report, the audit committee

is comfortable that the annual financial statements were prepared in terms of GRAP and the MFMA.

12. External auditor’s report

The external audit function performed by the Auditor General South Africa is independent of the

entity.

The audit committee accepts the conclusion and audit opinion of the external auditors on the annual

financial statements. The committee is of the view that the audited financial statements be accepted

and read together with the report of the external auditors. The audit committee confirms that it has

been adequately appraised of the issues giving rise to the audit opinion.

The audit committee also concurs with the conclusion on the reported performance information and

compliance with legislation. The committee is comfortable that given the implementation of effective

and efficient controls, these matters should be adequately dealt with in future periods.

On behalf of the Audit Committee

467

Mr. Hopewell Mpungose

Chairperson

31 January 2020

468

APPENDIX H:LONG TERM CONTRACTS AND PUBLIC PRIVATE PARTNERSHIP

APPENDIX I : MUNICIPAL ENTITY/SERVICE PROVIDER PERFORMANCE

SCHEDULE

The City does not have a Municipal owned entity at this stage

APPENDIX J :RECOMMENDATION OF THE MUNICIPAL AUDIT COMMITTEE

NO NAME POSITION STATUS OF

DISCLOSURE

2018/2019

1 Dr NJ Sibeko Municipal Manager Yes

2 Mr N Mthethwa Chief Operations Officer Yes

3 Mr S Hlela Deputy Municipal Manager

Infrastructure Services

Yes

4 Ms N Ndonga Deputy Municipal Manager

City Development

Yes

5 Ms T Mathabula Deputy Municipal Manager

Community Services

Yes

6 Mr M Kunene Deputy Municipal Manager Yes

469

Financial Services

7 Mr N Khumalo Deputy Municipal Manager

Electricity and Energy Services

Yes

8 Ms S Masondo Deputy Municipal Manager

Corporate Services

Yes

ANNEXURE K

ASSESSMENT BY THE MUNICIPALITY’S ACCOUNTING OFFICER OF THE

MUNICIPALITY’S PERFORMANCE FOR REVENUE COLLECTION FROM EACH

REVENUE SOURCE AND FOR EACH VOTE OF THE MUNICIPALITY

The Rates income of the City has increased by R 34.4 million which is 7.7 percent year on year comparison. Electricity continues to be our biggest contributor in terms of revenue with R1,3 billion from Energy Sources vote. The total grants and public contributions revenue of R458 million only represents only 15.1 percent of the Municipality’s total revenue.

ANNEXURE K (I)

Revenue performance by source

Source Actual

2018/2019

Adjusted Budget

2018/2019

Actual / Budget

R’000 R’000 %

Property rates 480 418 495 732 97

Service Charges 1 894 505 2 018 177 94

Rental of facilities and equipment 10 276 8 599 120

Interest earned – external investments 27 999 55 000 51

Interest earned – outstanding debtors 130 86 151

Fines 76 479 7 698 993

Licences and Permits 3 899 3 308 117

Income for agency fees 6 407 5 797 111

Government grants and subsidies 456 428 484 209 94

470

Public contributions 2 103 - -

Operational income 54 989 40 290 136

Actuarial gain 19 712 - -

Gains on disposal of assets - 759

TOTAL REVENUE 3 033 345 3 119 655 97

APPENDIX K (II) : REVENUE COLLECTION PERFORMANCE BY SOURCE

Revenue performance by vote

Vote Actual

2018/2019

Adjusted Budget

2018/2019

Actual / Budget

R’000 R’000 %

Community and Social Services 18 051 19 378 93

Energy Sources 1 330 754 1 461 431 91

Environmental Protection 73 1 009 7

Executive and Council 961 191 503

Finance and Administration 545 452 571 031 96

Housing 5 433 3 858 141

Internal Audit 29 - -

Other 614 740 83

Planning and Development 14 800 16 047 92

Public Safety 80 039 9 903 808

Road Transport 17 826 20 434 87

Sport and Recreation 12 500 21 565 58

Waste Management 153 185 149 652 102

Waste Water Management 287 723 298 226 96

Water Management 565 905 546 190 104

TOTAL REVENUE 3 033 345 3 119 655 97

471

APPENDIX K (III) : ASSESSMENT BY THE MUNICIPALITY’S ACCOUNTING

OFFICER OF ANY ARREARS ON MUNICIPAL TAXES AND SERVICE CHARGE

Outstanding gross consumer debtors as at 30 June 2019 were R544 million (2018: R 533 million). The amounts included in the consumer debtor balances considered to be doubtful are covered by a provision for impairment of R141 million, which represents 26% of the total outstanding consumer debtors.

The overall payment rate for the past nine years is illustrated below:

Year Payment Rate

2011/2012 99.49%

2012/2013 99.17%

2013/2014 100.93%

2014/2015 99.08%

2015/2016 96.86%

2016/2017 100.88%

2017/2018 94.34%

2018/2019 99.71%

Collection Ratio / Debtors Turnover Ratio / Payment Ratio – For Consumer Debtors

Suburb Debt Collection Ratio – In Days

Debtors Turnover Rate - %

Rolling 12-Month

Payment Rate - %

Richards Bay 34.26 days 9.39 % 100.12 %

472

Vulindlela 100.39 days 30.06 % 94.38 %

eNseleni 150.04 days 45..26 % 96.36 %

eSikhaleni 158.92 days 45.32 % 98.75 %

Sundry Debtors 309.70 days 94.00 % 87.75 %

Empangeni 46.43 days 9.39 % 98.72 %

Ngwelezane 211.03 days 60.91 % 111.85 %

Combined 58.14 days 17.36 % 99.71

The debt collection ratio is for the 12-month period preceding 30 June 2019. The debtor’s turnover rate represents the outstanding debtors’ amount expressed as a percentage of the last 12 months billed revenue.

The payment rate is the rolling average of the 12 months preceding 30 June 2019.

473

APPENDIX K (III) : ASSESSMENT BY THE MUNICIPALITY’S ACCOUNTING OFFICER OF ANY ARREARS ON MUNICIPAL

TAXES AND SERVICE CHARGE CONTINUED….

Summary of debtors by customer classification

Residential Industry/ commercial

Municipal/ State

Total

R R R R

30 June 2019

Current (0 - 30) days 88 251 101 217 025 765 20 532 903 325 809 769

31 - 60 days 6 368 339 6 297 966 502 131 13 168 436

61 - 90 days 5 013 163 6 422 000 377 953 11 813 115

91 - 120 days 6 169 779 5 900 786 100 401 12 170 967

121+ days 105 227 828 64 312 474 11 516 890 181 057 193

sub-total 211 030 210 299 958 991 33 030 278 544 019 479

Less: Provision for bad debt (54 792 844) (78 002 643) (8 576 132) (141 371 619)

Total debtors by customer classification 156 237 366 221 956 347 24 454 146 402 647 860

474

APPENDIX L : CONDITIONAL GRANTS RECEIVED: EXCLUDING MIG

VARIANCE MAJOR CONDITIONS APPLIED BY DONOR

DETAIL OF GRANT BUDGET ADJUSTMENT

BUDGET

ACTUAL BUDGET ADJUSTMENT

BUDGET

Finance Management 2 650 000 2 650 000 2 650

000

- - This grant is used to promote and support reforms in financial

management by building capacity in municipalities to implement the

Municipal Finance Management Act (MFMA).

Infrastructure Skills

Development

5 000 000 (2 700 000) 2 300

000

-0,54 -1,85 This grant is used to strengthen capacity of local government to

effectively and efficiently deliver quality infrastructure by increasing

the pool of skills available, to facilitate lifelong learning and the

transfer of knowledge and skills to municipalities.

Municipal Systems

Improvement Grant

1 055 000 1 055 000 255

000

-0,76 -0,76 This grant is for the dis-establishment of Ntambanana Municipality.

Municipalities who were affected by the re-demarcations of the

municipal boundaries for a review of their Business Plans.

Expanded Public Works

Programme Integrated

5 189 000 5 189 000 5 189

000

- - This grant is used to incentivise municipalities to expand work

creation efforts through the use of labour intensive delivery methods

in compliance with EPWP Guidelines.

Energy Efficiency and

Demand Side management

Grant

6 000 000 6 000 000 6 000

000

- - To provide subsidies to municipalities to implement energy

efficiency and demand side management initiatives within municipal

infrastructure in order to reduce electricity consumption and improve

energy efficiency

Library Subsidy - Public

Internet Access

1 576 000 1 576 000 1 576

000

- - This grant is used to appoint library computer assistants at various

libraries.

Library Subsidy 8 275 000 8 275 000 8 275

000

- This subsidy is used towards the current staffing and operational

costs of the libraries.

475

Museum Subsidy 192 000 192 000 192

000

- - This subsidy is used in the daily running of the Empangeni museum.

476

APPENDIX M (I) : CAPITAL EXPENDITURE – NEW ASSETS PROGRAMME Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

Community and

Social Services

AIR CONDITIONER - HR OFFICE 8300

AIR CONDITIONER 674630.9

NTAMBANANA PROJECTS - BUILDING

STRUCTURES

54062.6

CONSTRUCTION OF NDONDWANE CRECHE 2270210.45

CONSTRUCTION OF BAMBANANI CRECHE 2312821.71

CONSTRUCTION OF MANCENCE COMMUNITY

HALL

3382436.82

ESIKHALENI BUSINESS CENTRE 165987.45

UPGRADING OF FINANCE OFFICE ESIKHALENI

H2

706652

NETWORK POINTS AND CABLING FOR

HLANGANANI FINANCE OFFICE

64655

UPGRADING OF HLANGANANI FINANCE OFFICE 804250

CONSTRUCTION OF STANDBY QUARTERS FOR

ELECTRICAL SECTION

19795.61

CONSTRUCTION OF FOUNDATION CONCRETE

SLABS

25538

REFURBISHMENT OF STEEL CONTAINERS 53650

STONE CONCRETE 194800

RURAL ROADS 720390

REFURBISHMENT OF NORTHERN AND SERVICE

CENTRES

51022.78

RENOVATION AND UPGRADE OF OFFICES ALL

DEPOTS

106340

UPGRADE OF OFFICES IN THE NORTHERN 125504.26

477

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

SERVICES DEPOT

CARPOTS FOR SCIENTIFIC SERVICES BUILDING 161000

EXENTION AND DESIGN OF SCIENTIFIC

SERVICES BUILDING

400148

AIR CONDITIONER FOR CREDITORS OFFICE 35737.61

REFURBISHMENT OF SCM OFFICES 386726.32

AIR CONNDITIONER 36000BTU 22834

INSTALATION OF AIRCONDITIONERS( FITTERS

NORTHERN DEPOT)

47368.42

AIR CONDITIONER FOR ARTS AND CULTURE

OFFICES (RICHARDS BAY CIVIC

70360

REFURBISHMENT OF SMME ONE STOP SHOP

TILING

120000

RENOVATION TO PARK HOME (ARTS AND

CULTURE OFFICES)

168942.91

CONTINGENCIES AFTER INSTALLATION OF

WATER TANKS IN RURAL AREAS

14200

AIR CONDITIONER FOR NSELENI HALL 162812.5

AIR CONDITIONER FOR MACENCE HALL 170412.5

AIRCONDITONER FOR EMPANGENI MAIN HALL 171510

AIRCONDITONER FOR EMPANGENI SUPPER

HALL

171510

REPLACEMENT OF ROOF AT NSELENI HALL 296221

REFURBISHMENT OF HLANGANANI

COMMUNITY HALL

495000

REPLACEMENT OF ENSELENI HALL ROOF 772607.33

CONSTRUCTION OF MUNICIPAL BUILDING 414390.35

478

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

EXTENTION OF ROAD MARKING STOREROOM 1166984.8

AIRCONDITIONER AT NORTHERN SERVICES

DEPOT FOR URBAN ROADS

26075

AIRCONDITIONER AT NORTHERN SERVICES

DEPOT FOR RURAL ROADS

67184

AIR CONDITIONER FOR ICT SECTION 89472.51

AIRCONDITIONER FOR MECHANICAL

WORKSHOP

8496

AIR CONDITIONER - CEMETERY 13043.48

GEYSER 4417.77

VACUUM CLEANER 17198

DESK SHELL 1350

WALL SAFE 1717.31

TELEVISION SET 2700

SLIDING DOOR CREDENZA 3900

3 SHELF CABINET 5981.5

CLOCK CARD MACHINE 6317

WATER COOLER 7600

DESK 10791.24

300L FRIDGE 12000

HIGH BACK CHAIRS 69903

CASH REGISTER 8600

RFID FOR RICHARDS BAY LIBRARY 195999

OFFICE CHAIR 19200

HIGHBACK CHAIRS LEATHER 30000

479

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

CHAIRS 201734

AUDIO VISUAL DISPLAY SHELF 16500

TUB CHAIRS 16880

CYBER WORKSTATIONS 27954

BLACK LEATHER CHAIR 27996.99

BOOK SHELF WITH REVOLVING BASE 28497

OTTOMAN 28809

TABLE DOUBLE SIDED READING SHELF 29527

STUDY CARREL 29651

REVOLVING PAPERBACK BOOK SHELF 29980

STUDY DESK 30000

CLUSTER WORK STATION 33120

INDUSTRIAL GARDEN BLOWER 3507.5

AIR CONDITIONER - EMPANGENI OFFICE 17984

PARTITIONING AT EMPANGENI FINANCE

OFFICE

150250

TEE SOLID HDPE 200MM 15584.5

TRENCH 100m OF 95mm2 4 CORE AL CABLE 20000

INSTALL 3 PHASE BREAKER OF 100A AND

PROVIDE 60A 1 PHASE

20876.63

MUNICIPAL HOUSING 4383347.75

AIR CONDITIONER - CASHIERS RICHARDS BAY 8300

AIR CONDITIONER - REVENUE 49128

INSTALLATION OF NETWORK POINTS AT

SECURITY DESK RICHARDS BAY CIVIC

10475

480

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

AIR CONDITIONER FOR HR OFFICE 19875.86

REFURBISHMENT OF NTAMBANA OFFICE

TOILETS

28500

UPGRADE OF CIVIC CENTRE LIFT 31266.68

H2 FINANCE OFFICE UPGRADE - SAFETY 35680

PROCUREMENT OF TOP COVER AT CSD 50100

AIR CONDITIONER FOR VARIOUS OFFICES 56603.58

AIR CONDITIONER -COPORATE SERVICES

OFFICES

76103.02

REFURBISHMENT OF COUNCILLOR OFFICES,

MZINGAZI AND MADLANZINI

79000

REFURBISHMENT OF COUNCILLOR OFFICE -

VELDENVLEI HALL

90613

MUNICIPAL BUILDINGS 111900

SUPPLY AND INSTALLATION OF AIRCONS 112850.04

REFURBISHMENT OF THR FOYER AND COUNCIL

CHAMBERS

147500

REFURBISHMENT OF TOILETS AT CIVIC CENTRE 154420

REFURBISHMENT OF COUNCILLOR OFFICE 166970

UPGRADING OF FINANCE OFFICE ESIKHALENI 229559.83

REDESIGN OF RICHARDS BAY CIVIC CENRE 4239650.43

AIR CONDITIONER - SCM 39472

REFURBISHMENT AT SCM OFFICES IN ALTON 278709.89

AIR CONDITIONER FOR WATER AND

SANITATION SERVICES

11341

AIR CONDITIONER - SCIENTIFIC SERVICES 14950

481

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

AIR CONDITIONER FOR LABORATORY AT

SCIENTIFIC SERVICES

18500

GATE MOTOR 26900

ROUND TABLE 1332.94

MICROWAVE 1450

SIGNING DESK 2163.2

FRIDGE 3099

SCREENS 3800

SERVER 5000

MOBILE PEDESTAL 6450

BOARDROOM TABLE 8000

CASHIER TROLLEY 8000

VISITOR CHAIR 9540

SIDE CHAIR 10000

PEDESTAL 10800

DESK TITAN COMBINATION AND WALL UNIT 12000

WOODEN BENCHES 24000

CABINET 29305.4

CLUSTER DESK 30000

28957267.37

Energy Sources AIR CONDITIONER 8773.93

INTERROGATOR KIT 11638.21

CHAIR 3507

482

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

BAR FRIDGE 4200

EXECUTIVE OFFICE CHAIR 6200

HIGH BACK SWIVEL CHAIR 12800

ELECTRIFICATION OF EMPANGENI MEGA

HOUSE PROJECT PHASE 1

702195.64

REPLACEMENT OF 11KV SWITCHBOARD 762232

ELECTRICAL MATERIAL 1025

REPLACEMENTOF LV SUPPLY AT THE ALTON

LANDFILL

4122.81

STATS METER INSTALLATION 144000

ELECTRICAL MASTER PLAN 159195

ENERGY DEMAND SUPPLY MANAGEMENT 460680

CONSULTANTS SERVICES FOR ELECTRICAL

PROJECTS

704474.52

ENERGY SAVING INITIATIVE - ENERGY DEMAND

SUPPLY MANAGEMENT

852312.4

ELECTRICAL PROJECTS 1026800

AERATORS MOTORS AT EMPANGENI WASTE

WATER TREATMENT PLANT

1103419.11

12 CORE FIBRE OPTIC AND 132 KV OVERHEAD

LINE POWER SYSTEM PROTECTION

1576813.16

PROFESSIONAL SERVICE ON VARIOUS

ELECTRICAL PROJECTS

2556225

INSTALLATION OF HIGH MAST STRUCTURES 454483.32

HIGH MAST LIGHTING 537613.55

ENERGY DEMAND SUPPLT MANAGEMENT 554030.55

483

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

HIGH MAST INSTALLATION 856428

PROJECT MANAGEMENT 550149.09

ELECTRICAL TESTING EQUIPMENT 2168703.15

POLE RELOCATION ERF 13461 MANDLANZINI 1568

MATERIAL FOR GOLDFERN AND GIBBUM

GROVE

1555.2

RELOCATION OF KIOSK AND LV CABLE AT 16

KITEFISH MEREENSEE

2050

CIRCUIT BREAKER 400A 7300

MATERIAL FOR BRACKENHAM STREET LIGHTS 8060

RE-INSTATEMENT OF 40 DRIVEWAYS 24750

MATERIAL FOR BRACKENHAM

ELECTRIFICATION

28359.9

16mm2 4 4 CORE CU CABLE FOR SOPRANOS 49800

MATERIAL FOR NGWELEZANE COMMUNITY

HALL A1256

57254.79

MATERIAL FOR MANDLANZINI 67467.99

400A CIRCUIT BREAKERS FOR BRACKENHAM

PROJECT

73700

MATERIAL FOR BRACKENHAM 184968.32

REPLACEMENT OF OVERHEAD BUNDLE

CONDUCTOR IN BRACKENHAM

269533

ELECTRIFICATION OF BRACKENHAM 286400

MATERIAL FOR BOULDER BEND BRACKENHAM 453701.16

BRACKENHAM ELECTRIFICATION 1436633.22

NGWELEZANE WATERWORKS O/H MV LINE 1299.6

484

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

MATERIAL FOR A1275 2175

NSELENI MALL PROJECT 24mm2 4 CORE CABLE 2178

MATERIAL FOR A1275 REMEDIAL WORK 3700

EZINGADINI CRESCENT FROM A1275 RMU TO

OVERHEAD LINE

22700

MEDIUM VOLTAGE CABLES AT EMPANGENI IN

WEST SECTION

28906

NEW CONNECTION 300A 6-8 UBHEJANE ROAD

NSELENI

32350

EXTENSION OF MV NETWORK AND

INSTALLATION OF A 200KVA TFR - MZINGAZI

HIGH SCHOOL

35080

MATERIAL FOR MANDLANZINI, NGWELEZANE

AND MZINGAZI

56643.6

ELECTRICAL MATERIAL 79054.15

INSTALL 800M OF 11KV 3 CORE 240MM

UNDERGROUND CABLE

90452

240mm 2 4 CORE CABLE FROM GIBBUM GROVE 91770

MATERIAL FOR NGWELEZANE WATERWORKS

O/H MV LINE

93369.7

NGWELEZANE WATERWORKS MV

STRENGTHENING

144407.3

MV ELECTRICAL NETWORK REFURBISHMENT 148573.75

MATERIAL FOR GYGNUS/DENEB PROJECT 205705.2

ELECTRICAL PROJECTS 370547.19

ESIKHALENI PROJECTS ms11&ms12 AND ms12A 457973.36

ELECTRICAL MATERIAL FOR MANDLANZINI,

NGWELEZANE AND MZINGAZI

585664.55

485

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

MATERIAL FOR CABLE REPLACEMENT AT

ESIKHALENI

1556836.2

MANDLAZINI ELECTRIFICATION 52000

MANDLANZINI 30 NEW CONNECTIONS 53616

NGWELEZANE WATERWORKS MV OVERHEAD 102213.3

ELECTRIFICATION OF THE NGWELEZANE IDT

FOR 350 HOUSEHOLDS

265450

ELECTRIFICATION OF 74 HOUSEHOLDS IN THE

MZINGAZI AREA

427824

MANDLANZINI ELECTRIFICATION 480364

ELECTRICAL RETICULATION FOR EMPANGENI

MEGA HOUSING PROJECT - WATERSTONE

504703.13

132KV ELECTRICAL CABLES BETWEEN

CAPELLA SWITCHING STATION AND HYDRA

SUBSTATION

911083.45

READY BOARDS 939327.2

LED LIGHTS ON THE JOHN ROSS HIGHWAY 1204442.79

HIGH MAST DESIGN PROJECT 1741041.45

CONDONATION FOR UTILISING THE

ELECTRICAL CONSULTANT FOR EMPANGENI

MEGA HOUSING

1490047.04

315 MVA RING MAIN UNIT 276353

315MVA RING MAIN UNIT 276353

MV CABLE ESIKHALENI MS 37 TO CYGNUS

SUBSTATION

547876.95

MINI SUBSTATION 736000

315 KVA SUBSTATION 3680000

486

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

CONDONATION FOR UTILISING THE

ELECTRICAL CONSULTANT FOR EMPANGENI

MEGA HOUSING

2715299.71

UMHLATHUZE ELECTRICAL MASTER PLAN 1107165.16

UBHEJANE SATELITE 11KV UNDERGROUND

CABLE AND OPTIC FIBRE INSTALLATION

1809764

132KV OIL FILLED CABLES 3392406.61

11KV SWITCHBOARD REPLACEMENT 4031915.5

MATERIAL FOR CYGNUS/DENEB MV 1812.9

600A ADJUSTABLE CIRCUIT BREAKER 5000

PROJECT MATERIAL 19185.05

ELECTRIFICATION OF BRACKENHAM 116964.97

CABLE FOR NGWELEZANE SPORTFIELD 7458

HIGH MAST LIGHTING 924876

SUPPLY AND INSTALLATION OF HIGH MAST

STRUCTURES

1875532.06

INSTALLATION OF HIGH MAST LIGHTING 2068524.88

HIGH MAST STRUCTURES 3304002.46

INSTALLATION OF HIGH MAST STRUCTURES 5750762.76

JOSS ROSS STREET LIGHT MATERIAL

INSTALLATION

1075.5

LED LIGHTS IN MANDLANZINI 50750

JOHN ROSS EAST ARTERIAL (RIGHT SIDE) LED

STREET LIGHTS

65332

MANDLANZINI LED STREET LIGHTS 84175

INSTALLATION OF STREET LIGHTS 125000

487

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

GALVANISED STREET LIGHT POLES 282556.75

SUPPLY AND INSTALLATION LED FITTINGS 510393

ELECTRICITY AND GAS DISTRIBUTION AND

PLANNING

850898

ELECTRICITY AND GAS DISTRIBUTION AND

PLANNING

1683196.04

ELECTRICITY AND GAS DISTRIBUTION AND

PLANNING

116075

16mm2 AIRDAC MANDLANZINI HOUSE

CONNECTIONS

66899.97

AERATORS MOTORS AT EMPANGENI WASTE

WATER TREATMENT PLANT

275730.89

MZINGAZI ELECTRIFICATION 427436

INSTALL, COMMISSION AND TEST 132KV

ELECTRICAL CABLES BETWEEN CAPELLA AND

HYDRA

463592.03

EMPANGENI WASTE WATER TREATMENT

PLANT ENERGY EFFECIENY PROJECT

915400

ENERGY DEMAND SUPPLY MANAGEMENT 3850941.11

72773325.28

Environmental

Protection

AIR CONDITIONER 8597

HIGHBACK CHAIR 7497

Nox ANALYSER 173855

VISITOR CHAIR 5697

195646

Executive and

Council

90 DEGREE LINK 7214.24

488

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

CREDENZA 30401.28

CUPBOARD 41093.76

DESK SHELL 24128

MID CHAIR SWIVEL AND TILT 16286.4

PEDESTAL 28953.6

SIDE CHAIR 22728.64

170805.92

Finance and

Administration

AIR CONDITIONER - CLINIC 64222

SUPPLY AND DELIVER MATERIAL EMPANGENI

CLINIC

123150

CCTV CAMERAS 80000

SOW FIBRE WORK 173479.96

INSTALLATION OF POINTS AND FIBRE OPTIC AT

NGWELEZANE COMMUNITY HALL

26509.05

INSTALLATION OF NETWORK POINTS AND

FIBRE OPTIC AT EMPANGENI SMME ONE STOP

SHOP

88839.21

WALL MOUNTED TOUCHSCREEN PC 39990

TROLLEY JACK 74015.92

WIRELESS HEADSET 46583.29

VOICE DIGITAL RECORDER 48505.38

DOCKING STATION 197078.49

BUILDING FIBRE ROUTE BETWEEN

EMPANGENI, VULINDLELA AND ESIKHALENI

MUNICIPAL OFFICES

30250

489

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

LED SCREENS 16049.97

TV 22454.47

METAL DETECTORS 172965

WIRELESS RADIO NETWORK INFRASTRUCTURE

INSTALLATION

129327.6

REMOTE POWER MANAGEMENT AND

CONTROL SYSTEM

247500

SHREDDER 18675

CONNECTOR RECEIVERS 42682.32

UPS 295841.61

DIGITAL PROJECTOR 9402.63

SPEAKER SYSTEM 3607

PA SYSTEM 5115.42

PULL DOWN SCREEN 5324

PORTABLE PROJECTOR 7686.4

PROJECTOR 14132.8

CHAIR 4500

PRESIDENT HIGH BACK CHAIR 4950

HIGH BACK CHAIR 6600

CHAIR HEAVY DUTY 4X4 BURGUNDY FABRIC 33132

FOUR SEATER CHAIR 12180

NISSAN NP 200 173185.22

TRIPO PROJECTOR SCREEN 1685

EPSON SLIP PRINTERS 9568

490

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

PC 50622.44

WEIGHT SCALE 13000

SUPPLY & DELIVER OF AUDIO VISUAL 22385.27

LED MONITOR 26174.4

LINE MATRIC IMPACT PRINTER 93995

MONITOR 217223.56

WASTE BIN 500

LETTER TRAY 750

CUPBOARD 3950

ATHENA SERVER 5587

COFFEE TABLE 11360

HIGHBACK CHAIR 14495

MONTEGO FULL SETUP 42700

VISITOR CHAIR 47600

REGENCY OFFICE FURNITURE 62225

WORKSTATION 107000

CHAIR 153611.98

AIRCONDITIONER FOR TLB V1625 49795.8

WATER TRAILER WITH PUMP 97431

NETWORK POINTS, CABLING AND CABINETS:

NTAMBANANA

162775

CISCO SWITCHES FOR WARD COUNCILLORS

NTAMBANANA

92225

FITMENT OF CRANE TO SKIP LOADER 338390

491

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

CAT 6 UTP CABLE INSTALLATION UPGRADE

RICHARDS BAY CIVIC CENTRE AND ALTON

OFFICES

376456.35

LAPTOPS 15INCH 493188.48

PC i7 563690.8

POLO VIVO 638086.61

BMW 1 SERIES 673044.5

UPS BATTERY REPLACEMENT- EMPANGENI

CIVIC

699758

CAT 6 UTP CABLE INSTALLATION 765212.95

LAPTOPS 874844.31

SUPPLY AND DELIVER OF CISCO NETWORK

DEVICES

1038498.33

TLB 1165244.24

OCCUPATIONAL CLINIC EXTENSION 1197833.1

INSTALLATION OF PUBLIC WIFI 1925290.52

FORD RANGER 4X4 LDV 2166819.69

PCi5 2815960.32

FORD RANGER D/CAB 4X4 3818989.98

FORD RANGER D/CAB 4X2 4780601.04

MAJOR STRUCTURAL FIRE ENGEN 4893560

GRADER 6588709.36

PERSONNEL CARRIER 7905988.4

ASSET MAINTANANCE MANAGEMENT SYSTEM 8120600

FINANCIAL ERP SYSTEM 20638417.43

492

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

ASSET MANAGEMENT SOFTWARE 24229284.21

100213062.8

Planning and

Development Total

BURNT OAK BINS 16200

CHAIRS 29200

CONSTRUCTION OF CONCRETE TABLES FOR

MARKET STALLS AT THE RICHARDS BAY TAXI

RANK

146000

CONSTRUCTION OF MARKET STALLS 132316.24

CONSTRUCTION OF MARKET STALLS AT

NGWELEZANE HOSPITAL

69800

CUPBOARD 11098

DIGITAL CAMERA 1704

ERECT GROUND SIGNS, ALUMINIUM ROUND

BAR AND CHROMODEK

10290

HIGH BACK CHAIR AND TILT 35420

HIGH BACK CHAIR BONDED 4280

HIGHBACK CHAIR 5652.18

NEW BILLBOARD AT JOHN ROSS PARKWAY AND

MONDI INTERSECTION

147350

POLE TOP BOX AT NGWELEZANE HOSPITAL

MARKET STALLS

2150

RENOVATION AT EMPANGENI SMME ONE STOP

SHOP

34950

ROLLER DOOR CUPBOARD 19587

STEEL BILLBOARD 168960

TRESSLE TABLE 28320

493

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

TV SET 10836

VISITOR ARM CHAIRS 7920

882033.42

Public Safety Total DIGITAL RADIO 32370

DIGITAL TWI WAY RADIO 101905

FIRE PUMP 117500

INFRA-RED CAMERA 50445.11

SINGLE BEDS 28000

TWO WAY RADIO 129800

460020.11

Road Transport

Total

BAR FRIDGE 3118.5

FRIDGE 150L 4500

MICROWAVE 4600

LETTER TRAY 5200

FRIDGE 300L 5499

DOUBLE DOOR FRIDGE 5499.99

TRESTLE TABLE 9700

VISITOR CHAIR 10000

CHAIR 19050

HIGHBACK CHAIR 19500

ROLLER DOOR CUPBOARD 20000

300 LITRE FRIDGE 21996

494

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

CLOCKING MACHINE 23552

4 DRAWER CABINET 24974

DESK 25920

RETENTION - CERT 2 UMH147 - 17/18 PMT755 26464

VISITOR CHAIR 27515.16

WATER COOLER DISPENSER 28700.1

PROFESSIONAL STAFF - UWP CONSULTING

ACCOUNT 9

31479.2

RETENTION - CERT 5 - UMH324-17/18 PMT 798 38405.12

HIGHBACK CHAIRS 42700.8

ROLLER SHUTTER CABINET 54600

CONSTRUCTION OF WALKWAYS ESIKHALENI 71600

CONSTRUCTION OF SPEED HUMPS EMP,NGW,

ESK

99000

UMHLATHUZE RURAL ROAD UPGRADE 103669.88

HOT MIX ASPHALT FOR ESIKHALENI AREA 109656.48

AQUADENE BULK STORM WATER 116499.42

UPGRADE OF ESIKHALENI INTERSECTION-

UPGRADE OF MTHOMBOTHI/MDLEBE

MTSHONA ONTERSECTION

149568.25

CONSTRUCTION OF BUS SHELTERS AT PORT

DUNFORD

161220

GABION STONES 180950

UPGRADE OF RURAL ROADS 189124.85

READY BOARDS 190000

TRAFFIC CALMING 193705

495

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

BULK STORM WATER FOR NORTHERN OUTFALL

DRAINAGE CHANNEL

197653.29

CONSTRUCTION OF BUS SHELTERS AT

MKHOBOSA AND MANDLANKALA

198170

PROFESSIONAL STAFF - UWP CONSULTING

ACCOUNT 7

198240.99

MZINGAZI ROAD UPGRADE 237554.62

UPDATING AND IMPLEMENTATION OF

PAVEMENT MANAGEMENT SYSTEM

286920.73

KERB INLET CONCRETE 305250

CONSTRUCTION OF TRAFFIC CALMING 318140

SPEED HUMPS AND RAISED PEDESTRIAN

CROSSING

333617

CONSTRUCTION OF PEDESTRIAN WALKWAYS 336037.1

KERB REPLACEMENT 342165

UPGRADE OF RURAL ROADS - 8/2/1/UMH324-

17/18

439373.73

DEVELOPMENT AND UPGRADE OF RURAL ROAD

INFRASTRUCTURE PHASE 3

501491.72

UPGRADE OF RURAL ROADS - MZINGAZI PHASE

3

505897.21

CONSTRUCTION OF BUS SHELTERS 641323.2

CONSTRUCTION OF PEDESTRIAN BRIDGE 805440

AQUADENE INTERNAL BULK SERVICES 824099.62

CONSTRUCTION OF PEDESTRIAN WALKWAYS 925285

ROAD MARKING 1496013.08

UPGRADE OF ESIKHALENI INTERSECTION 3166941.98

496

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

ESIKHALENI INTERSECTION 3737517.85

RETRO-REFLECTIVE ROAD MARKING 4952292.85

ROADS SEALING 6824862.59

AQUADENE BULK STORMWATER NORTHERN

DRAINAGE CHANNEL

7822362

ASPHALT BASE ABD SURFACING 25630465.19

63045082.5

Sport and

Recreation Total

FRIDGE 3995

HIGHBACK CHAIR 6000

BAR CHAIRS 7650

RENOVATION OF COLLEGE SWIMMING POOL 18294

RENOVATION OF ENSELENI SWIMMING POOL 19460

RENOVATION OF AQUADENE SWIMMING POOL 25575

BRIGHTLINER MARKING MACHINES 26000

SWIMMING POOL PUMP 37000

RENOVATION OF NGWELEZANE SWIMMING

POOL

43300

TOP SOIL 45000

CONSTRUCTION OF SPORTS COMPLEX 51740

SOCCER GOAL POSTS 54000

ALLUMINIUM CARPOT 62530.5

SLATTED BENCH 75360.01

TRACTOR DRAWN SLASHERS 95000

497

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

RENOVATION OF ARBORETUM SWIMMING

POOL

97436.6

1.5M H/O TRACTOR DAWN SLASHERS 99999

INSTALLATION OF SWIMMING POOL FILTERS 113520

CONSTRUCTION OF NTAMBANANA KICK-ABOUT 125650

SEATER PLAYERS DUGOUT 138400

LAWNMOWER 141800

INDUSTRIAL LAWN MOWER 142000

TURF MARKING MACHINE 150100.64

PORTABLE SWIMMING POOL FILTER 155000

PAVING ESIKHALENI PARK 262915

INSTALLATION OF IRRIGATION SYSTEM AT THE

SPORT COMPLEX

303542.1

DESIGN FOR BRACKENHAM SPORTFIELD

UPGRADE

330499

SUPPLY AND ERECT STEEL PALISADE AT

NGWELEZANE

614300

PAVING OF NGWELEZANE PARK 819635

PUBLIC SWIMMING POOL AND FACILITY AT

VULINDLELA

946277.26

CONSTRUCTION OF ESIKHALENI FITNESS

CENTRE

5871069.94

10883049.05

Waste

Management Total

INSTALLATION OF PERIMETER AT ALTON

DUMPING SITE

149000

149000

498

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

Waste Water

Management Total

DRAWER FILLING SYSTEM 1000

HEAVY DUTY YELLOW HELIFLEX SUCTION

HOSE

9300

STAINLESS STEEL BRACKET FOR MEERENSEE

PUMPSTATIONS

16050

HTP PIPE FOR ARBORETUM MACERATOR 29040

ESIKHALENI WATER IMPROVEMENTS 50588.88

METER X 300 184500

REFURBISH NGWELEZANE WATER

TREATMENT WORKS

328823

SEWER UPGRADE MS 2 346500

TELEMETRY SPARES EQUIPMENT 362490.55

REFURBISH HIGH LIFT PUMP AT MZINGAZI 544434

REFURBISH ESIKHAWINI WATER TREATMENT

WORKS

686686

EMPANGENI OUTFALL SEWER RISING MAIN 937922.72

CONSTRUCTION OF 4000 VIP TOILETS -

8/2/1/UMH41-15/16

941177.2

RURAL SANITATION PHASE IV 1262969.45

250MM SEWER LINEAND DRILLING AT

HILLVIEW

1372782.85

RURAL SANITATION 1859220.17

PROVISION OF FIRE ENGINEERING SERVICES

FOR WASTE WATER TREATMENT WORKS AND

MACERATORS

1932094

RURAL SANITATION PHASE 5:8/2/1/UMH41- 2893402.6

499

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

15/16

RURAL SANITATION PHASE 4 3410376.97

UPGRADE OF EMPANGENI OUTFALL SEWER 3804601.52

MZINGAZI VILLAGE SEWER RETICULATION

PHASE 2

4461163.73

LAND AND BUILDINGS - RURAL SANITATION 4784578.92

PRECAST CONCRETE TOP-STRUCTURE

FACTORY - 17000 UNITS

4805919.09

RURAL SANITATION PRECAST TOP STRUCTURE 5757835.41

THE UPGRADE EMPANGENI OUTFALL SEWER 6972388.5

DUMIANI MAKHAYE VILLAGE BULK

SANITATION

7286984.51

MANDLANZINI AGRI VILLAGE SEWER

NETWORK INSTALLATION

23108966.69

78151796.76

Water

Management Total

REPLACE AND UPGRADE OF ONLINE

ANALYTICAL INSTRUMENTS FOR WATER

QUALITY MANAGEMENT

1288220.5

WATER QUALITY SOFTWARE ENHANCEMENT 469276.35

250MM HDPE TEE PIECE 192000

MOTOR FOR LCH2 PUMP STATION 24174.48

STAINLESS STEEL CHAIN 5084

SUBMERSIBLE BOREHOLE PUMPS FOR

NTAMBANANA

66548.62

VALVE FOR AQUADENE 1 PUMPSTATION 28800

SUBMERSIBLE BOREHOLE PUMPS FOR 33637.5

500

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

NTAMBANANA

GENERATOR 15KVA FOR NTAMBANANA

BOREHOLE PUMPS

78176

METER REPLACEMENT 89082

STATIC TANKS 105000

PILOT VALVES FOR ARBORETUM NORTH

ARTERIAL FLATS PRV

173175.42

WATER DEMAND MANAGEMENT 170173.91

ESIKHALENI WATER IMPROVEMENT 666828.91

ESIKHAWINI WATER IMPROVEMENTS 0

MKHWANAZI NORTH PHASE 5 ZONE K 132280.24

MKHWANAZI NORTH PHASE 5 5097131.02

MKHWANAZI NORTH PHASE 5 RETENTION-

ZONE E2-8/2/1/UMH101-16/17

33856.28

MKHWANAZI NORTH PHASE 5 RETICULARION

ZONE E2 RETENTION - 8/2/1/UMH101-16/17

207294.11

MKHWANAZI NORTH PHASE 5 RETICULATION

ZONE E

14780

MKHWANAZI NORTH PHASE 5 RETICULATION

ZONE E2

74240

MKHWANAZI NORTH PHASE 5 RETICULATION

ZONE K

59460

MKHWANAZI NORTH PHASE 5 RETICULATION

ZONE U

33150

MKHWANAZI NORTH PHASE 5- ZONE K-

8/2/1/UMH121-16/17

153919.59

MKHWANAZI NORTH PHASE 5-ZONE K -

8/2/1/UMH121-16/17

174629.08

501

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

MKHWANAZI NORTH PHASE V 187342.98

MKHWANAZI NORTH RETICULATION - ZONE U 1734786.87

WATER DISTRIBUTION - RURAL WATER 1608750.87

WATER SUPPLY IN DUBE TRIBAL AREA 322665

WATER SUPPLY RURAL/SEMI URBAN AREAS 1593882.32

BULK GRAVITY MAN 1670258.77

EMPANGENI BULK SERVICES 345540.73

EMPANGENI BULK WATER 40289.7

WATER SUPPLY - MEGA HOUSING 153186

WATERSTONE MEGA HOUSING PROJECT 409380.15

METER REPLACEMENT 797564.65

METER REPLACEMNT 293092.04

CONSTRUCTION OF 3MI RESERVIOR 356146.7

AIR CONDITIONER 8200

AUTOMATIC DILUTER 101040

BENCH TOP VACUUM TOP 19846

BOTTLE TOP DISPENSER 12824.46

BREATHING APPARATUS 17970

CHEMICAL DUTY VACCUM PRESSURE PUMP 11670

FRIDGE FREEZE 31240

LUMIN ULTRA PHOTON MASTER ANALYSER 139278

PIPETTE STAND 1520

QUANTI TRAY 65000

SAMPLE CELL 1 INCH SQUARE 10ML 31200

502

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

105 REPLACEMENT METERS 296940

5000 LITRE MASTER STANDS 216260.85

5000L STD PLASTIC PVE JOJO TANKS 55800

JOJO TANKS 210050

METER REPLACEMENT 1941186.98

POLYETHYLENE WATER TANK AND

CONSTRUCTION OF WATER TANK STANDS

386022

CONSTRUCTION OF WATER SUPPLY STANDS 425614

METER REPLACEMENT 623138.66

METER REPLACEMENT 843524.78

REPLACEMENT OF METERS 248439.4

JOJO TANK STANDS 165100

STATIC STANDS 29900.01

STATIC TANKS 155499.9

TELEMETRY SPARES EQUIPMENT 132459.8

WATER LOSS AND DROUGHT RELIEF PROJECT 2156.4

INSTALLATION OF ANALYTICAL INSTRUMENTS,

FLOWMETER

235773.2

JOJO TANKS AND CONSTRUCTION OF STANDS 772044

METER REPLACEMENT 6737985.37

STATIC STANDS 27999.99

TELEMETRY SPARES EQUIPMENT 260845.22

UPGRADE OF NTAMBANANA WATER SUPPLY:

CONSTRUCTION OF 3ML RESERVOIR

948252.8

WATER METER REPLACEMENTS 2508362.01

503

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

WATER METERS 0

METER REPLACEMENT 273457.15

DESIGN AND MANAGEMENT OF KWADUBE

WATER SUPPLY

419000

WATER METER REPLACEMENT 376124

LAKE CHUBHU AUTOMATION 978044.5

LAKE CHUBHU MOTOR PROTECT 686360.23

MKHWANAZI NORTH PHASE 05 212308.63

MKHWANAZI NORTH PHASE 05 RETICULATION 2180418.85

MKHWANAZI NORTH PHASE 5 4245728.96

MKHWANAZI NORTH PHASE 5 : RETICULATION 1663340.97

MKHWANAZI NORTH PHASE 5 : RETICULATION

ZONE E

941610.14

MKHWANAZI NORTH PHASE 5 : RETICULATION

ZONE K

2467451.46

MKHWANAZI NORTH PHASE 5 RETENTION-

ZONE E2-8/2/1/UMH101-16/17

304706.47

MKHWANAZI NORTH PHASE 5 RETICULARION

ZONE E2 - 8/2/1/UMN101-16/17

907788.69

MKHWANAZI NORTH PHASE 5 RETICULATION 3299479.65

MKHWANAZI NORTH PHASE 5 RETICULATION

ZONE K

450253.53

MKHWANAZI NORTH PHASE 5 RETICULATION

ZONE U

3803810.43

MKHWANAZI NORTH PHASE 5 ZONE K 1190522.29

MKHWANAZI NORTH RETICULATION 753727.46

504

Appendix M(i)Capital Expenditure: New Assets Program

FUNCTION DESCRIPTION AMOUNT

MKHWANAZI NORTH RETICULATION - ZONE U 1498905.76

MKHWANAZI NORTH WATER SUPPLY 329611.96

WATER SUPPLY RURAL/SEMI URBAN AREAS 0

63529599.75

TOTAL 419410689

APPENDIX M(II) : CAPITAL EXPENDITURE – UPGRADE/RENEWAL PROGRAMME

Appendix M(ii): Capital Expenditure - Upgrade/Renewal/Replacement

FUNCTION DESCRIPTION AMOUNT

Community and

Social Services

MANDLANZINI HALL 117187

UPGRADING AND RENOVATIONS OF VARIOUS

LIBRARIES

391998

REFURBISHMENT OF BRACKENHAM COMMUNITY

HALL

297190.67

REFURBISHMENT OF AQUADENE COMMUNITY

HALL

304065.89

REPLACING COPPER PIPING FOR AIR

CONDITIONER AT RICHARDS BAY LIBRARY

16210

AIR CONDITIONER H2 FINANCE OFFICE 202415.06

REFURBISHMENT OF ESIKHALENI FINANCE H2

OFFICE

2985604.34

REFURBISHMENT OF STORMWATER SECTION AT

ESIKHALENI DEPOT

190931.09

MUNICIPAL BUILDINGS 55280

505

Appendix M(ii): Capital Expenditure - Upgrade/Renewal/Replacement

FUNCTION DESCRIPTION AMOUNT

FINANCE OFFICE VULINDLELA WALL 99820

H2 FINANCE OFFICE UPGRADE 243771.87

RENOVATIONS FOR NGWELEZANE STANDBY

QUARTERS

199880

REFURBISHMENT FOR STORMWATER SECTION -

ESIKHALENI DEPOT

186375

EMPANGENI SMME ONE STOP SHOP 22076

MUNICIPAL BUILDINGS 10697

CONSTRUCTION OF SCM BUILDING 10040638.36

15364140.28

Energy Sources CYGNUS SUBSTATION POWER TRANSFORMER 466873.5

132KV OIL FILL CABLES 474002.32

BRACKENHAM MV AND LV BUNDLE

REPLACEMENT

193688.75

SATELITE/UBHEJANE 11KV UNDERGROUND

CABLES PROJECT

5958.2

ELECTRIFICATION OF NGWELEZANE IDT FOR 350

HOUSEHOLDS

46150

NGWELEZANE IDT MATERIAL 117033.76

COMMISSIONING OF POWER TRANSFORMER 278250

NGWELEZANE POLE REPLACEMENT 76124.6

MINK CONDUCTOR 116640

NGWELEZANE WATERWORKS MV OVERHEAD LINE

REFURBISHMENT

1342110.47

LED LIGHTS ON THE JOHN ROSS HIGHWAY 1708680

506

Appendix M(ii): Capital Expenditure - Upgrade/Renewal/Replacement

FUNCTION DESCRIPTION AMOUNT

INSTALLATION OF THREE CURRENT

TRANSFORMERS

281827.44

132KV ELECTRICAL CABLES BETWEEN CAPPELA

SWITCHING STATION AND HYDRA SUBSTATION

412277.14

132/11KV SCORPO TRANSFORMER RECONDITION 1837700

REFURBISHMENT OF VULINDLELA OVERHEAD

LINE

85868

A1278 AND A1277 ELECTRIFICATION 211415.03

132/11KV SCORPO TRANSFORMER RECONDITION 400050

8054649.21

Finance and

Administration

LED SCREENS 31567.45

DESKTOP COMPUTER 78449.9

TRAILER 163285

LAPTOPS 14INCH 682129.8

PAYLOAD REFUSE TRUCK 4482179.16

WATER TANKER 6650842.6

REFUSE TRUCK 8744271.04

UPS UPGRADES -

NGWELEZANE,NSELENI,ESIKHAWINI H,J

579014.06

21411739.01

Environmental

Protection

INDIGENT OFFICE RENOVATIONS 25889

25889

Other Total AIR CONDITIONER 184493.93

507

Appendix M(ii): Capital Expenditure - Upgrade/Renewal/Replacement

FUNCTION DESCRIPTION AMOUNT

184493.93

Road Transport FENCING AT ESIKHALENI YMCA J1 84170

FENCING IMPROVEMENTS AT YMCA ESIKHAWINI

J1

189700

RETENTION CERT 3 UMH12 - 15/16 4523.73

UPGRADING OF RURAL ROAD INFRASTRUCTURE 30956.93

CONSTRUCTION OF TAXI RANK LOT 63 57330

ROADS- URBAN ROADS 72665.57

UPGRADING OF ENSELENI TAXI RANK 75613.63

ROADS - URBAN ROADS 148376.48

DRAWINGS FOR WIDENING OF ANGLERS ROD AT

MEERENSEE

161250

CONCRETE STONES FOR EMPANGENI A RANK

UPGRADE

189000

ASBESTOS APPROVAL INSPECTION AUTHORITY 189500

ESIKHALENI YMCA RENOVATIONS 200290

DESIGN AND DRAWINGS FOR STEEL SHED AND

BUS BAY TAXI RANK

219800

DEVELOP AND UPGRADE OF RURAL ROAD

INFRASTRUCTURE

227760.86

DEVELOPMENT AND UPGRADE OF RURAL ROAD

INFRASTRUCTURE PHASE 3

251677.33

UPGRADE OF RURAL ROADS FOR THE CITY OF

UMHLATHUZE

320708.26

UPGRADING OF ENSELENI TAXI RANK 329652

CONSTRUCTION OF KERBS 391129.8

508

Appendix M(ii): Capital Expenditure - Upgrade/Renewal/Replacement

FUNCTION DESCRIPTION AMOUNT

ROADS PROJECTS 418004.17

EMPANGENI TAXI RANK 431150

UPGRADING OF RICHARDS BAY RANK PHASE 1 475368

UPGRADE OF RURAL ROAD FOR CITY OF

UMHLATHUZE

541842.98

UPGRADE OF RURAL ROAD INFRASTRUCTURE 1375719.49

UPGRADING OF RICHARDS BAY TAXI RANK 4176293.56

UPGRADING OF ENSELENI TAXI RANK 5030765.87

ESIKHALENI MALL ROAD SAFETY IMPROVEMENTS 5201166.38

UPGRADE OF INTERSECTION 8540927.62

29335342.66

Sport and

Recreation

RESCUE MALIBU BOARDS 146800

BRUSH CUTTERS 185026.72

UPGRADE OF MAPHENDULA SPORTFIELD IN

NDABAYAKHE

32000

INTERIOR AND EXTERIOR RENOVATIONS AT

ALKANSTRAND LIFEGUARDS BUILDING

169985

IMPROVEMENTS AT RICHARDS BAY SPORTS

COMPLEX ATHLETHIC STADIUM

4221555.08

4755366.8

Waste Management

Total

RENOVATIONS OF NTAMBANANA TRANSFER

STATION

1405162.7

SKIP 1687800

3092962.7

509

Appendix M(ii): Capital Expenditure - Upgrade/Renewal/Replacement

FUNCTION DESCRIPTION AMOUNT

Waste Water

Management

GORMAN RUPP PUMP 211199.85

PIPE EXTENSION AT KHOZA RURAL AREA 160000

DESIGN AND CONSTRUCTION MANAGEMENT FOR

THE WASTE WATER TREATMENT WORKS AND

MACERATORS Total

181320

SEWER UPGRADE MS 9 241200

SEWER UPGRADE BIRDSWOOD 252000

NKONINGA PUMPSTATION 547019.98

1592739.83

WATER METERS - NGWELEZANE 375284.6

WATER METERS - RICHARDS BAY 717571.26

BIRDSWOOD PROJECT (FIXING OF ALLUMINA

ALLEY IN BIRDWOOD)

26000

UPGRADING OF EMERGENCY LINE TO SUPPLY

WATER FOR WARD 18 AND 19 AROUND PORT

DUNFORD

6988393

WATER METERS - KWA DLANGEZWA 246753.3

EMPANGENI WATER IMPROVEMENTS 1050468.46

RETENTION - CERT 7 - UMH34-PMT669 187331.77

APPENDIX N : CAPITAL PROGRAMME BY PROJECT CURRENT YEAR

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

Community

and Social

AIR CONDITIONER - HR OFFICE 8300

510

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

Services

AIR CONDITIONER 674630.9

NTAMBANANA PROJECTS - BUILDING

STRUCTURES

54062.6

CONSTRUCTION OF NDONDWANE CRECHE 2270210.45

CONSTRUCTION OF BAMBANANI CRECHE 2312821.71

CONSTRUCTION OF MANCENCE COMMUNITY

HALL

3382436.82

ESIKHALENI BUSINESS CENTRE 165987.45

UPGRADING OF FINANCE OFFICE ESIKHALENI

H2

706652

NETWORK POINTS AND CABLING FOR

HLANGANANI FINANCE OFFICE

64655

UPGRADING OF HLANGANANI FINANCE OFFICE 804250

CONSTRUCTION OF STANDBY QUARTERS FOR

ELECTRICAL SECTION

19795.61

CONSTRUCTION OF FOUNDATION CONCRETE

SLABS

25538

REFURBISHMENT OF STEEL CONTAINERS 53650

STONE CONCRETE 194800

RURAL ROADS 720390

REFURBISHMENT OF NORTHERN AND SERVICE

CENTRES

51022.78

RENOVATION AND UPGRADE OF OFFICES ALL

DEPOTS

106340

UPGRADE OF OFFICES IN THE NORTHERN

SERVICES DEPOT

125504.26

511

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

CARPOTS FOR SCIENTIFIC SERVICES BUILDING 161000

EXENTION AND DESIGN OF SCIENTIFIC

SERVICES BUILDING

400148

AIR CONDITIONER FOR CREDITORS OFFICE 35737.61

REFURBISHMENT OF SCM OFFICES 386726.32

AIR CONNDITIONER 36000BTU 22834

INSTALATION OF AIRCONDITIONERS( FITTERS

NORTHERN DEPOT)

47368.42

AIR CONDITIONER FOR ARTS AND CULTURE

OFFICES (RICHARDS BAY CIVIC

70360

REFURBISHMENT OF SMME ONE STOP SHOP

TILING

120000

RENOVATION TO PARK HOME (ARTS AND

CULTURE OFFICES)

168942.91

CONTINGENCIES AFTER INSTALLATION OF

WATER TANKS IN RURAL AREAS

14200

AIR CONDITIONER FOR NSELENI HALL 162812.5

AIR CONDITIONER FOR MACENCE HALL 170412.5

AIRCONDITONER FOR EMPANGENI MAIN HALL 171510

AIRCONDITONER FOR EMPANGENI SUPPER

HALL

171510

REPLACEMENT OF ROOF AT NSELENI HALL 296221

REFURBISHMENT OF HLANGANANI

COMMUNITY HALL

495000

REPLACEMENT OF ENSELENI HALL ROOF 772607.33

CONSTRUCTION OF MUNICIPAL BUILDING 414390.35

EXTENTION OF ROAD MARKING STOREROOM 1166984.8

512

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

AIRCONDITIONER AT NORTHERN SERVICES

DEPOT FOR URBAN ROADS

26075

AIRCONDITIONER AT NORTHERN SERVICES

DEPOT FOR RURAL ROADS

67184

AIR CONDITIONER FOR ICT SECTION 89472.51

AIRCONDITIONER FOR MECHANICAL

WORKSHOP

8496

AIR CONDITIONER - CEMETERY 13043.48

GEYSER 4417.77

VACUUM CLEANER 17198

DESK SHELL 1350

WALL SAFE 1717.31

TELEVISION SET 2700

SLIDING DOOR CREDENZA 3900

3 SHELF CABINET 5981.5

CLOCK CARD MACHINE 6317

WATER COOLER 7600

DESK 10791.24

300L FRIDGE 12000

HIGH BACK CHAIRS 69903

CASH REGISTER 8600

RFID FOR RICHARDS BAY LIBRARY 195999

OFFICE CHAIR 19200

HIGHBACK CHAIRS LEATHER 30000

CHAIRS 201734

513

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

AUDIO VISUAL DISPLAY SHELF 16500

TUB CHAIRS 16880

CYBER WORKSTATIONS 27954

BLACK LEATHER CHAIR 27996.99

BOOK SHELF WITH REVOLVING BASE 28497

OTTOMAN 28809

TABLE DOUBLE SIDED READING SHELF 29527

STUDY CARREL 29651

REVOLVING PAPERBACK BOOK SHELF 29980

STUDY DESK 30000

CLUSTER WORK STATION 33120

INDUSTRIAL GARDEN BLOWER 3507.5

AIR CONDITIONER - EMPANGENI OFFICE 17984

PARTITIONING AT EMPANGENI FINANCE

OFFICE

150250

TEE SOLID HDPE 200MM 15584.5

TRENCH 100m OF 95mm2 4 CORE AL CABLE 20000

INSTALL 3 PHASE BREAKER OF 100A AND

PROVIDE 60A 1 PHASE

20876.63

MUNICIPAL HOUSING 4383347.75

AIR CONDITIONER - CASHIERS RICHARDS BAY 8300

AIR CONDITIONER - REVENUE 49128

INSTALLATION OF NETWORK POINTS AT

SECURITY DESK RICHARDS BAY CIVIC

10475

AIR CONDITIONER FOR HR OFFICE 19875.86

514

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

REFURBISHMENT OF NTAMBANA OFFICE

TOILETS

28500

UPGRADE OF CIVIC CENTRE LIFT 31266.68

H2 FINANCE OFFICE UPGRADE - SAFETY 35680

PROCUREMENT OF TOP COVER AT CSD 50100

AIR CONDITIONER FOR VARIOUS OFFICES 56603.58

AIR CONDITIONER -COPORATE SERVICES

OFFICES

76103.02

REFURBISHMENT OF COUNCILLOR OFFICES,

MZINGAZI AND MADLANZINI

79000

REFURBISHMENT OF COUNCILLOR OFFICE -

VELDENVLEI HALL

90613

MUNICIPAL BUILDINGS 111900

SUPPLY AND INSTALLATION OF AIRCONS 112850.04

REFURBISHMENT OF THR FOYER AND COUNCIL

CHAMBERS

147500

REFURBISHMENT OF TOILETS AT CIVIC CENTRE 154420

REFURBISHMENT OF COUNCILLOR OFFICE 166970

UPGRADING OF FINANCE OFFICE ESIKHALENI 229559.83

REDESIGN OF RICHARDS BAY CIVIC CENRE 4239650.43

AIR CONDITIONER - SCM 39472

REFURBISHMENT AT SCM OFFICES IN ALTON 278709.89

AIR CONDITIONER FOR WATER AND

SANITATION SERVICES

11341

AIR CONDITIONER - SCIENTIFIC SERVICES 14950

AIR CONDITIONER FOR LABORATORY AT 18500

515

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

SCIENTIFIC SERVICES

GATE MOTOR 26900

ROUND TABLE 1332.94

MICROWAVE 1450

SIGNING DESK 2163.2

FRIDGE 3099

SCREENS 3800

SERVER 5000

MOBILE PEDESTAL 6450

BOARDROOM TABLE 8000

CASHIER TROLLEY 8000

VISITOR CHAIR 9540

SIDE CHAIR 10000

PEDESTAL 10800

DESK TITAN COMBINATION AND WALL UNIT 12000

WOODEN BENCHES 24000

CABINET 29305.4

CLUSTER DESK 30000

MANDLANZINI HALL 117187

UPGRADING AND RENOVATIONS OF VARIOUS

LIBRARIES

391998

REFURBISHMENT OF BRACKENHAM

COMMUNITY HALL

297190.67

REFURBISHMENT OF AQUADENE COMMUNITY

HALL

304065.89

516

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

REPLACING COPPER PIPING FOR AIR

CONDITIONER AT RICHARDS BAY LIBRARY

16210

AIR CONDITIONER H2 FINANCE OFFICE 202415.06

REFURBISHMENT OF ESIKHALENI FINANCE H2

OFFICE

2985604.34

REFURBISHMENT OF STORMWATER SECTION

AT ESIKHALENI DEPOT

190931.09

MUNICIPAL BUILDINGS 55280

FINANCE OFFICE VULINDLELA WALL 99820

H2 FINANCE OFFICE UPGRADE 243771.87

RENOVATIONS FOR NGWELEZANE STANDBY

QUARTERS

199880

REFURBISHMENT FOR STORMWATER SECTION -

ESIKHALENI DEPOT

186375

EMPANGENI SMME ONE STOP SHOP 22076

MUNICIPAL BUILDINGS 10697

CONSTRUCTION OF SCM BUILDING 10040638.36

TOTAL 44321407.65

Energy Sources AIR CONDITIONER 8773.93

INTERROGATOR KIT 11638.21

CHAIR 3507

BAR FRIDGE 4200

EXECUTIVE OFFICE CHAIR 6200

HIGH BACK SWIVEL CHAIR 12800

ELECTRIFICATION OF EMPANGENI MEGA 702195.64

517

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

HOUSE PROJECT PHASE 1

REPLACEMENT OF 11KV SWITCHBOARD 762232

ELECTRICAL MATERIAL 1025

REPLACEMENTOF LV SUPPLY AT THE ALTON

LANDFILL

4122.81

STATS METER INSTALLATION 144000

ELECTRICAL MASTER PLAN 159195

ENERGY DEMAND SUPPLY MANAGEMENT 460680

CONSULTANTS SERVICES FOR ELECTRICAL

PROJECTS

704474.52

ENERGY SAVING INITIATIVE - ENERGY DEMAND

SUPPLY MANAGEMENT

852312.4

ELECTRICAL PROJECTS 1026800

AERATORS MOTORS AT EMPANGENI WASTE

WATER TREATMENT PLANT

1103419.11

12 CORE FIBRE OPTIC AND 132 KV OVERHEAD

LINE POWER SYSTEM PROTECTION

1576813.16

PROFESSIONAL SERVICE ON VARIOUS

ELECTRICAL PROJECTS

2556225

INSTALLATION OF HIGH MAST STRUCTURES 454483.32

HIGH MAST LIGHTING 537613.55

ENERGY DEMAND SUPPLT MANAGEMENT 554030.55

HIGH MAST INSTALLATION 856428

PROJECT MANAGEMENT 550149.09

ELECTRICAL TESTING EQUIPMENT 2168703.15

POLE RELOCATION ERF 13461 MANDLANZINI 1568

518

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

MATERIAL FOR GOLDFERN AND GIBBUM GROVE 1555.2

RELOCATION OF KIOSK AND LV CABLE AT 16

KITEFISH MEREENSEE

2050

CIRCUIT BREAKER 400A 7300

MATERIAL FOR BRACKENHAM STREET LIGHTS 8060

RE-INSTATEMENT OF 40 DRIVEWAYS 24750

MATERIAL FOR BRACKENHAM

ELECTRIFICATION

28359.9

16mm2 4 4 CORE CU CABLE FOR SOPRANOS 49800

MATERIAL FOR NGWELEZANE COMMUNITY

HALL A1256

57254.79

MATERIAL FOR MANDLANZINI 67467.99

400A CIRCUIT BREAKERS FOR BRACKENHAM

PROJECT

73700

MATERIAL FOR BRACKENHAM 184968.32

REPLACEMENT OF OVERHEAD BUNDLE

CONDUCTOR IN BRACKENHAM

269533

ELECTRIFICATION OF BRACKENHAM 286400

MATERIAL FOR BOULDER BEND BRACKENHAM 453701.16

BRACKENHAM ELECTRIFICATION 1436633.22

NGWELEZANE WATERWORKS O/H MV LINE 1299.6

MATERIAL FOR A1275 2175

NSELENI MALL PROJECT 24mm2 4 CORE CABLE 2178

MATERIAL FOR A1275 REMEDIAL WORK 3700

EZINGADINI CRESCENT FROM A1275 RMU TO

OVERHEAD LINE

22700

519

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

MEDIUM VOLTAGE CABLES AT EMPANGENI IN

WEST SECTION

28906

NEW CONNECTION 300A 6-8 UBHEJANE ROAD

NSELENI

32350

EXTENSION OF MV NETWORK AND

INSTALLATION OF A 200KVA TFR - MZINGAZI

HIGH SCHOOL

35080

MATERIAL FOR MANDLANZINI, NGWELEZANE

AND MZINGAZI

56643.6

ELECTRICAL MATERIAL 79054.15

INSTALL 800M OF 11KV 3 CORE 240MM

UNDERGROUND CABLE

90452

240mm 2 4 CORE CABLE FROM GIBBUM GROVE 91770

MATERIAL FOR NGWELEZANE WATERWORKS

O/H MV LINE

93369.7

NGWELEZANE WATERWORKS MV

STRENGTHENING

144407.3

MV ELECTRICAL NETWORK REFURBISHMENT 148573.75

MATERIAL FOR GYGNUS/DENEB PROJECT 205705.2

ELECTRICAL PROJECTS 370547.19

ESIKHALENI PROJECTS ms11&ms12 AND ms12A 457973.36

ELECTRICAL MATERIAL FOR MANDLANZINI,

NGWELEZANE AND MZINGAZI

585664.55

MATERIAL FOR CABLE REPLACEMENT AT

ESIKHALENI

1556836.2

MANDLAZINI ELECTRIFICATION 52000

MANDLANZINI 30 NEW CONNECTIONS 53616

NGWELEZANE WATERWORKS MV OVERHEAD 102213.3

520

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

ELECTRIFICATION OF THE NGWELEZANE IDT

FOR 350 HOUSEHOLDS

265450

ELECTRIFICATION OF 74 HOUSEHOLDS IN THE

MZINGAZI AREA

427824

MANDLANZINI ELECTRIFICATION 480364

ELECTRICAL RETICULATION FOR EMPANGENI

MEGA HOUSING PROJECT - WATERSTONE

504703.13

132KV ELECTRICAL CABLES BETWEEN CAPELLA

SWITCHING STATION AND HYDRA SUBSTATION

911083.45

READY BOARDS 939327.2

LED LIGHTS ON THE JOHN ROSS HIGHWAY 1204442.79

HIGH MAST DESIGN PROJECT 1741041.45

CONDONATION FOR UTILISING THE

ELECTRICAL CONSULTANT FOR EMPANGENI

MEGA HOUSING

1490047.04

315 MVA RING MAIN UNIT 276353

315MVA RING MAIN UNIT 276353

MV CABLE ESIKHALENI MS 37 TO CYGNUS

SUBSTATION

547876.95

MINI SUBSTATION 736000

315 KVA SUBSTATION 3680000

CONDONATION FOR UTILISING THE

ELECTRICAL CONSULTANT FOR EMPANGENI

MEGA HOUSING

2715299.71

UMHLATHUZE ELECTRICAL MASTER PLAN 1107165.16

UBHEJANE SATELITE 11KV UNDERGROUND

CABLE AND OPTIC FIBRE INSTALLATION

1809764

132KV OIL FILLED CABLES 3392406.61

521

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

11KV SWITCHBOARD REPLACEMENT 4031915.5

MATERIAL FOR CYGNUS/DENEB MV 1812.9

600A ADJUSTABLE CIRCUIT BREAKER 5000

PROJECT MATERIAL 19185.05

ELECTRIFICATION OF BRACKENHAM 116964.97

CABLE FOR NGWELEZANE SPORTFIELD 7458

HIGH MAST LIGHTING 924876

SUPPLY AND INSTALLATION OF HIGH MAST

STRUCTURES

1875532.06

INSTALLATION OF HIGH MAST LIGHTING 2068524.88

HIGH MAST STRUCTURES 3304002.46

INSTALLATION OF HIGH MAST STRUCTURES 5750762.76

JOSS ROSS STREET LIGHT MATERIAL

INSTALLATION

1075.5

LED LIGHTS IN MANDLANZINI 50750

JOHN ROSS EAST ARTERIAL (RIGHT SIDE) LED

STREET LIGHTS

65332

MANDLANZINI LED STREET LIGHTS 84175

INSTALLATION OF STREET LIGHTS 125000

GALVANISED STREET LIGHT POLES 282556.75

SUPPLY AND INSTALLATION LED FITTINGS 510393

ELECTRICITY AND GAS DISTRIBUTION AND

PLANNING

850898

ELECTRICITY AND GAS DISTRIBUTION AND

PLANNING

1683196.04

ELECTRICITY AND GAS DISTRIBUTION AND 116075

522

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

PLANNING

16mm2 AIRDAC MANDLANZINI HOUSE

CONNECTIONS

66899.97

AERATORS MOTORS AT EMPANGENI WASTE

WATER TREATMENT PLANT

275730.89

MZINGAZI ELECTRIFICATION 427436

INSTALL, COMMISSION AND TEST 132KV

ELECTRICAL CABLES BETWEEN CAPELLA AND

HYDRA

463592.03

EMPANGENI WASTE WATER TREATMENT

PLANT ENERGY EFFECIENY PROJECT

915400

ENERGY DEMAND SUPPLY MANAGEMENT 3850941.11

CYGNUS SUBSTATION POWER TRANSFORMER 466873.5

132KV OIL FILL CABLES 474002.32

BRACKENHAM MV AND LV BUNDLE

REPLACEMENT

193688.75

SATELITE/UBHEJANE 11KV UNDERGROUND

CABLES PROJECT

5958.2

ELECTRIFICATION OF NGWELEZANE IDT FOR

350 HOUSEHOLDS

46150

NGWELEZANE IDT MATERIAL 117033.76

COMMISSIONING OF POWER TRANSFORMER 278250

NGWELEZANE POLE REPLACEMENT 76124.6

MINK CONDUCTOR 116640

NGWELEZANE WATERWORKS MV OVERHEAD

LINE REFURBISHMENT

1342110.47

LED LIGHTS ON THE JOHN ROSS HIGHWAY 1708680

523

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

INSTALLATION OF THREE CURRENT

TRANSFORMERS

281827.44

132KV ELECTRICAL CABLES BETWEEN

CAPPELA SWITCHING STATION AND HYDRA

SUBSTATION

412277.14

132/11KV SCORPO TRANSFORMER

RECONDITION

1837700

REFURBISHMENT OF VULINDLELA OVERHEAD

LINE

85868

A1278 AND A1277 ELECTRIFICATION 211415.03

132/11KV SCORPO TRANSFORMER

RECONDITION

400050

TOTAL 80827974.49

Environmental

Protection

AIR CONDITIONER 8597

HIGHBACK CHAIR 7497

Nox ANALYSER 173855

VISITOR CHAIR 5697

INDIGENT OFFICE RENOVATIONS 25889

TOTAL 221535

Executive and

Council

90 DEGREE LINK 7214.24

CREDENZA 30401.28

CUPBOARD 41093.76

DESK SHELL 24128

MID CHAIR SWIVEL AND TILT 16286.4

524

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

PEDESTAL 28953.6

SIDE CHAIR 22728.64

TOTAL 170805.92

Finance and

Administration

AIR CONDITIONER - CLINIC 64222

SUPPLY AND DELIVER MATERIAL EMPANGENI

CLINIC

123150

CCTV CAMERAS 80000

SOW FIBRE WORK 173479.96

INSTALLATION OF POINTS AND FIBRE OPTIC AT

NGWELEZANE COMMUNITY HALL

26509.05

INSTALLATION OF NETWORK POINTS AND

FIBRE OPTIC AT EMPANGENI SMME ONE STOP

SHOP

88839.21

WALL MOUNTED TOUCHSCREEN PC 39990

TROLLEY JACK 74015.92

WIRELESS HEADSET 46583.29

VOICE DIGITAL RECORDER 48505.38

DOCKING STATION 197078.49

BUILDING FIBRE ROUTE BETWEEN EMPANGENI,

VULINDLELA AND ESIKHALENI MUNICIPAL

OFFICES

30250

LED SCREENS 16049.97

TV 22454.47

METAL DETECTORS 172965

WIRELESS RADIO NETWORK INFRASTRUCTURE 129327.6

525

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

INSTALLATION

REMOTE POWER MANAGEMENT AND CONTROL

SYSTEM

247500

SHREDDER 18675

CONNECTOR RECEIVERS 42682.32

UPS 295841.61

DIGITAL PROJECTOR 9402.63

SPEAKER SYSTEM 3607

PA SYSTEM 5115.42

PULL DOWN SCREEN 5324

PORTABLE PROJECTOR 7686.4

PROJECTOR 14132.8

CHAIR 4500

PRESIDENT HIGH BACK CHAIR 4950

HIGH BACK CHAIR 6600

CHAIR HEAVY DUTY 4X4 BURGUNDY FABRIC 33132

FOUR SEATER CHAIR 12180

NISSAN NP 200 173185.22

TRIPO PROJECTOR SCREEN 1685

EPSON SLIP PRINTERS 9568

PC 50622.44

WEIGHT SCALE 13000

SUPPLY & DELIVER OF AUDIO VISUAL 22385.27

LED MONITOR 26174.4

526

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

LINE MATRIC IMPACT PRINTER 93995

MONITOR 217223.56

WASTE BIN 500

LETTER TRAY 750

CUPBOARD 3950

ATHENA SERVER 5587

COFFEE TABLE 11360

HIGHBACK CHAIR 14495

MONTEGO FULL SETUP 42700

VISITOR CHAIR 47600

REGENCY OFFICE FURNITURE 62225

WORKSTATION 107000

CHAIR 153611.98

AIRCONDITIONER FOR TLB V1625 49795.8

WATER TRAILER WITH PUMP 97431

NETWORK POINTS, CABLING AND CABINETS:

NTAMBANANA

162775

CISCO SWITCHES FOR WARD COUNCILLORS

NTAMBANANA

92225

FITMENT OF CRANE TO SKIP LOADER 338390

CAT 6 UTP CABLE INSTALLATION UPGRADE

RICHARDS BAY CIVIC CENTRE AND ALTON

OFFICES

376456.35

LAPTOPS 15INCH 493188.48

PC i7 563690.8

527

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

POLO VIVO 638086.61

BMW 1 SERIES 673044.5

UPS BATTERY REPLACEMENT- EMPANGENI

CIVIC

699758

CAT 6 UTP CABLE INSTALLATION 765212.95

LAPTOPS 874844.31

SUPPLY AND DELIVER OF CISCO NETWORK

DEVICES

1038498.33

TLB 1165244.24

OCCUPATIONAL CLINIC EXTENSION 1197833.1

INSTALLATION OF PUBLIC WIFI 1925290.52

FORD RANGER 4X4 LDV 2166819.69

PCi5 2815960.32

FORD RANGER D/CAB 4X4 3818989.98

FORD RANGER D/CAB 4X2 4780601.04

MAJOR STRUCTURAL FIRE ENGEN 4893560

GRADER 6588709.36

PERSONNEL CARRIER 7905988.4

ASSET MAINTANANCE MANAGEMENT SYSTEM 8120600

FINANCIAL ERP SYSTEM 20638417.43

ASSET MANAGEMENT SOFTWARE 24229284.21

LED SCREENS 31567.45

DESKTOP COMPUTER 78449.9

TRAILER 163285

528

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

LAPTOPS 14INCH 682129.8

PAYLOAD REFUSE TRUCK 4482179.16

WATER TANKER 6650842.6

REFUSE TRUCK 8744271.04

UPS UPGRADES -

NGWELEZANE,NSELENI,ESIKHAWINI H,J

579014.06

TOTAL 121624801.8

Other AIR CONDITIONER 184493.93

184493.93

Planning and

Development

BURNT OAK BINS 16200

CHAIRS 29200

CONSTRUCTION OF CONCRETE TABLES FOR

MARKET STALLS AT THE RICHARDS BAY TAXI

RANK

146000

CONSTRUCTION OF MARKET STALLS 132316.24

CONSTRUCTION OF MARKET STALLS AT

NGWELEZANE HOSPITAL

69800

CUPBOARD 11098

DIGITAL CAMERA 1704

ERECT GROUND SIGNS, ALUMINIUM ROUND BAR

AND CHROMODEK

10290

HIGH BACK CHAIR AND TILT 35420

HIGH BACK CHAIR BONDED 4280

HIGHBACK CHAIR 5652.18

529

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

NEW BILLBOARD AT JOHN ROSS PARKWAY AND

MONDI INTERSECTION

147350

POLE TOP BOX AT NGWELEZANE HOSPITAL

MARKET STALLS

2150

RENOVATION AT EMPANGENI SMME ONE STOP

SHOP

34950

ROLLER DOOR CUPBOARD 19587

STEEL BILLBOARD 168960

TRESSLE TABLE 28320

TV SET 10836

VISITOR ARM CHAIRS 7920

TOTAL 882033.42

Public Safety DIGITAL RADIO 32370

DIGITAL TWI WAY RADIO 101905

FIRE PUMP 117500

INFRA-RED CAMERA 50445.11

SINGLE BEDS 28000

TWO WAY RADIO 129800

TOTAL 460020.11

Road

Transport

BAR FRIDGE 3118.5

FRIDGE 150L 4500

MICROWAVE 4600

LETTER TRAY 5200

530

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

FRIDGE 300L 5499

DOUBLE DOOR FRIDGE 5499.99

TRESTLE TABLE 9700

VISITOR CHAIR 10000

CHAIR 19050

HIGHBACK CHAIR 19500

ROLLER DOOR CUPBOARD 20000

300 LITRE FRIDGE 21996

CLOCKING MACHINE 23552

4 DRAWER CABINET 24974

DESK 25920

RETENTION - CERT 2 UMH147 - 17/18 PMT755 26464

VISITOR CHAIR 27515.16

WATER COOLER DISPENSER 28700.1

PROFESSIONAL STAFF - UWP CONSULTING

ACCOUNT 9

31479.2

RETENTION - CERT 5 - UMH324-17/18 PMT 798 38405.12

HIGHBACK CHAIRS 42700.8

ROLLER SHUTTER CABINET 54600

CONSTRUCTION OF WALKWAYS ESIKHALENI 71600

CONSTRUCTION OF SPEED HUMPS EMP,NGW,

ESK

99000

UMHLATHUZE RURAL ROAD UPGRADE 103669.88

HOT MIX ASPHALT FOR ESIKHALENI AREA 109656.48

531

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

AQUADENE BULK STORM WATER 116499.42

UPGRADE OF ESIKHALENI INTERSECTION-

UPGRADE OF MTHOMBOTHI/MDLEBE

MTSHONA ONTERSECTION

149568.25

CONSTRUCTION OF BUS SHELTERS AT PORT

DUNFORD

161220

GABION STONES 180950

UPGRADE OF RURAL ROADS 189124.85

READY BOARDS 190000

TRAFFIC CALMING 193705

BULK STORM WATER FOR NORTHERN OUTFALL

DRAINAGE CHANNEL

197653.29

CONSTRUCTION OF BUS SHELTERS AT

MKHOBOSA AND MANDLANKALA

198170

PROFESSIONAL STAFF - UWP CONSULTING

ACCOUNT 7

198240.99

MZINGAZI ROAD UPGRADE 237554.62

UPDATING AND IMPLEMENTATION OF

PAVEMENT MANAGEMENT SYSTEM

286920.73

KERB INLET CONCRETE 305250

CONSTRUCTION OF TRAFFIC CALMING 318140

SPEED HUMPS AND RAISED PEDESTRIAN

CROSSING

333617

CONSTRUCTION OF PEDESTRIAN WALKWAYS 336037.1

KERB REPLACEMENT 342165

UPGRADE OF RURAL ROADS - 8/2/1/UMH324-

17/18

439373.73

532

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

DEVELOPMENT AND UPGRADE OF RURAL ROAD

INFRASTRUCTURE PHASE 3

501491.72

UPGRADE OF RURAL ROADS - MZINGAZI PHASE

3

505897.21

CONSTRUCTION OF BUS SHELTERS 641323.2

CONSTRUCTION OF PEDESTRIAN BRIDGE 805440

AQUADENE INTERNAL BULK SERVICES 824099.62

CONSTRUCTION OF PEDESTRIAN WALKWAYS 925285

ROAD MARKING 1496013.08

UPGRADE OF ESIKHALENI INTERSECTION 3166941.98

ESIKHALENI INTERSECTION 3737517.85

RETRO-REFLECTIVE ROAD MARKING 4952292.85

ROADS SEALING 6824862.59

AQUADENE BULK STORMWATER NORTHERN

DRAINAGE CHANNEL

7822362

ASPHALT BASE ABD SURFACING 25630465.19

FENCING AT ESIKHALENI YMCA J1 84170

FENCING IMPROVEMENTS AT YMCA

ESIKHAWINI J1

189700

RETENTION CERT 3 UMH12 - 15/16 4523.73

UPGRADING OF RURAL ROAD INFRASTRUCTURE 30956.93

CONSTRUCTION OF TAXI RANK LOT 63 57330

ROADS- URBAN ROADS 72665.57

UPGRADING OF ENSELENI TAXI RANK 75613.63

ROADS - URBAN ROADS 148376.48

533

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

DRAWINGS FOR WIDENING OF ANGLERS ROD

AT MEERENSEE

161250

CONCRETE STONES FOR EMPANGENI A RANK

UPGRADE

189000

ASBESTOS APPROVAL INSPECTION AUTHORITY 189500

ESIKHALENI YMCA RENOVATIONS 200290

DESIGN AND DRAWINGS FOR STEEL SHED AND

BUS BAY TAXI RANK

219800

DEVELOP AND UPGRADE OF RURAL ROAD

INFRASTRUCTURE

227760.86

DEVELOPMENT AND UPGRADE OF RURAL ROAD

INFRASTRUCTURE PHASE 3

251677.33

UPGRADE OF RURAL ROADS FOR THE CITY OF

UMHLATHUZE

320708.26

UPGRADING OF ENSELENI TAXI RANK 329652

CONSTRUCTION OF KERBS 391129.8

ROADS PROJECTS 418004.17

EMPANGENI TAXI RANK 431150

UPGRADING OF RICHARDS BAY RANK PHASE 1 475368

UPGRADE OF RURAL ROAD FOR CITY OF

UMHLATHUZE

541842.98

UPGRADE OF RURAL ROAD INFRASTRUCTURE 1375719.49

UPGRADING OF RICHARDS BAY TAXI RANK 4176293.56

UPGRADING OF ENSELENI TAXI RANK 5030765.87

ESIKHALENI MALL ROAD SAFETY

IMPROVEMENTS

5201166.38

UPGRADE OF INTERSECTION 8540927.62

534

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

TOTAL 92380425.16

Sport and

Recreation

FRIDGE 3995

HIGHBACK CHAIR 6000

BAR CHAIRS 7650

RENOVATION OF COLLEGE SWIMMING POOL 18294

RENOVATION OF ENSELENI SWIMMING POOL 19460

RENOVATION OF AQUADENE SWIMMING POOL 25575

BRIGHTLINER MARKING MACHINES 26000

SWIMMING POOL PUMP 37000

RENOVATION OF NGWELEZANE SWIMMING

POOL

43300

TOP SOIL 45000

CONSTRUCTION OF SPORTS COMPLEX 51740

SOCCER GOAL POSTS 54000

ALLUMINIUM CARPOT 62530.5

SLATTED BENCH 75360.01

TRACTOR DRAWN SLASHERS 95000

RENOVATION OF ARBORETUM SWIMMING POOL 97436.6

1.5M H/O TRACTOR DAWN SLASHERS 99999

INSTALLATION OF SWIMMING POOL FILTERS 113520

CONSTRUCTION OF NTAMBANANA KICK-ABOUT 125650

SEATER PLAYERS DUGOUT 138400

LAWNMOWER 141800

535

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

INDUSTRIAL LAWN MOWER 142000

TURF MARKING MACHINE 150100.64

PORTABLE SWIMMING POOL FILTER 155000

PAVING ESIKHALENI PARK 262915

INSTALLATION OF IRRIGATION SYSTEM AT THE

SPORT COMPLEX

303542.1

DESIGN FOR BRACKENHAM SPORTFIELD

UPGRADE

330499

SUPPLY AND ERECT STEEL PALISADE AT

NGWELEZANE

614300

PAVING OF NGWELEZANE PARK 819635

PUBLIC SWIMMING POOL AND FACILITY AT

VULINDLELA

946277.26

CONSTRUCTION OF ESIKHALENI FITNESS

CENTRE

5871069.94

RESCUE MALIBU BOARDS 146800

BRUSH CUTTERS 185026.72

UPGRADE OF MAPHENDULA SPORTFIELD IN

NDABAYAKHE

32000

INTERIOR AND EXTERIOR RENOVATIONS AT

ALKANSTRAND LIFEGUARDS BUILDING

169985

IMPROVEMENTS AT RICHARDS BAY SPORTS

COMPLEX ATHLETHIC STADIUM

4221555.08

TOTAL 15638415.85

Waste

Management

INSTALLATION OF PERIMETER AT ALTON

DUMPING SITE

149000

RENOVATIONS OF NTAMBANANA TRANSFER 1405162.7

536

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

STATION

SKIP 1687800

TOTAL 3241962.7

Waste Water

Management

DRAWER FILLING SYSTEM 1000

HEAVY DUTY YELLOW HELIFLEX SUCTION HOSE 9300

STAINLESS STEEL BRACKET FOR MEERENSEE

PUMPSTATIONS

16050

HTP PIPE FOR ARBORETUM MACERATOR 29040

ESIKHALENI WATER IMPROVEMENTS 50588.88

METER X 300 184500

REFURBISH NGWELEZANE WATER TREATMENT

WORKS

328823

SEWER UPGRADE MS 2 346500

TELEMETRY SPARES EQUIPMENT 362490.55

REFURBISH HIGH LIFT PUMP AT MZINGAZI 544434

REFURBISH ESIKHAWINI WATER TREATMENT

WORKS

686686

EMPANGENI OUTFALL SEWER RISING MAIN 937922.72

CONSTRUCTION OF 4000 VIP TOILETS -

8/2/1/UMH41-15/16

941177.2

RURAL SANITATION PHASE IV 1262969.45

250MM SEWER LINEAND DRILLING AT

HILLVIEW

1372782.85

RURAL SANITATION 1859220.17

537

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

PROVISION OF FIRE ENGINEERING SERVICES

FOR WASTE WATER TREATMENT WORKS AND

MACERATORS

1932094

RURAL SANITATION PHASE 5:8/2/1/UMH41-

15/16

2893402.6

RURAL SANITATION PHASE 4 3410376.97

UPGRADE OF EMPANGENI OUTFALL SEWER 3804601.52

MZINGAZI VILLAGE SEWER RETICULATION

PHASE 2

4461163.73

LAND AND BUILDINGS - RURAL SANITATION 4784578.92

PRECAST CONCRETE TOP-STRUCTURE FACTORY

- 17000 UNITS

4805919.09

RURAL SANITATION PRECAST TOP STRUCTURE 5757835.41

THE UPGRADE EMPANGENI OUTFALL SEWER 6972388.5

DUMIANI MAKHAYE VILLAGE BULK

SANITATION

7286984.51

MANDLANZINI AGRI VILLAGE SEWER NETWORK

INSTALLATION

23108966.69

GORMAN RUPP PUMP 211199.85

PIPE EXTENSION AT KHOZA RURAL AREA 160000

DESIGN AND CONSTRUCTION MANAGEMENT

FOR THE WASTE WATER TREATMENT WORKS

AND MACERATORS Total

181320

SEWER UPGRADE MS 9 241200

SEWER UPGRADE BIRDSWOOD 252000

NKONINGA PUMPSTATION 547019.98

TOTAL 79744536.59

538

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

Water

Management

REPLACE AND UPGRADE OF ONLINE

ANALYTICAL INSTRUMENTS FOR WATER

QUALITY MANAGEMENT

1288220.5

WATER QUALITY SOFTWARE ENHANCEMENT 469276.35

250MM HDPE TEE PIECE 192000

MOTOR FOR LCH2 PUMP STATION 24174.48

STAINLESS STEEL CHAIN 5084

SUBMERSIBLE BOREHOLE PUMPS FOR

NTAMBANANA

66548.62

VALVE FOR AQUADENE 1 PUMPSTATION 28800

SUBMERSIBLE BOREHOLE PUMPS FOR

NTAMBANANA

33637.5

GENERATOR 15KVA FOR NTAMBANANA

BOREHOLE PUMPS

78176

METER REPLACEMENT 89082

STATIC TANKS 105000

PILOT VALVES FOR ARBORETUM NORTH

ARTERIAL FLATS PRV

173175.42

WATER DEMAND MANAGEMENT 170173.91

ESIKHALENI WATER IMPROVEMENT 666828.91

ESIKHAWINI WATER IMPROVEMENTS 0

MKHWANAZI NORTH PHASE 5 ZONE K 132280.24

MKHWANAZI NORTH PHASE 5 5097131.02

MKHWANAZI NORTH PHASE 5 RETENTION-

ZONE E2-8/2/1/UMH101-16/17

33856.28

MKHWANAZI NORTH PHASE 5 RETICULARION

ZONE E2 RETENTION - 8/2/1/UMH101-16/17

207294.11

539

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

MKHWANAZI NORTH PHASE 5 RETICULATION

ZONE E

14780

MKHWANAZI NORTH PHASE 5 RETICULATION

ZONE E2

74240

MKHWANAZI NORTH PHASE 5 RETICULATION

ZONE K

59460

MKHWANAZI NORTH PHASE 5 RETICULATION

ZONE U

33150

MKHWANAZI NORTH PHASE 5- ZONE K-

8/2/1/UMH121-16/17

153919.59

MKHWANAZI NORTH PHASE 5-ZONE K -

8/2/1/UMH121-16/17

174629.08

MKHWANAZI NORTH PHASE V 187342.98

MKHWANAZI NORTH RETICULATION - ZONE U 1734786.87

WATER DISTRIBUTION - RURAL WATER 1608750.87

WATER SUPPLY IN DUBE TRIBAL AREA 322665

WATER SUPPLY RURAL/SEMI URBAN AREAS 1593882.32

BULK GRAVITY MAN 1670258.77

EMPANGENI BULK SERVICES 345540.73

EMPANGENI BULK WATER 40289.7

WATER SUPPLY - MEGA HOUSING 153186

WATERSTONE ESTATE BULK WATER SERVICE 0

WATERSTONE MEGA HOUSING PROJECT 409380.15

METER REPLACEMENT 797564.65

METER REPLACEMNT 293092.04

CONSTRUCTION OF 3MI RESERVIOR 356146.7

540

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

AIR CONDITIONER 8200

AUTOMATIC DILUTER 101040

BENCH TOP VACUUM TOP 19846

BOTTLE TOP DISPENSER 12824.46

BREATHING APPARATUS 17970

CHEMICAL DUTY VACCUM PRESSURE PUMP 11670

FRIDGE FREEZE 31240

LUMIN ULTRA PHOTON MASTER ANALYSER 139278

PIPETTE STAND 1520

QUANTI TRAY 65000

SAMPLE CELL 1 INCH SQUARE 10ML 31200

105 REPLACEMENT METERS 296940

5000 LITRE MASTER STANDS 216260.85

5000L STD PLASTIC PVE JOJO TANKS 55800

JOJO TANKS 210050

METER REPLACEMENT 0

METER REPLACEMENT 1941186.98

POLYETHYLENE WATER TANK AND

CONSTRUCTION OF WATER TANK STANDS

386022

CONSTRUCTION OF WATER SUPPLY STANDS 425614

METER REPLACEMENT 623138.66

METER REPLACEMENT 843524.78

REPLACEMENT OF METERS 248439.4

JOJO TANK STANDS 165100

541

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

STATIC STANDS 29900.01

STATIC TANKS 155499.9

TELEMETRY SPARES EQUIPMENT 132459.8

WATER LOSS AND DROUGHT RELIEF PROJECT 2156.4

INSTALLATION OF ANALYTICAL INSTRUMENTS,

FLOWMETER

235773.2

JOJO TANKS AND CONSTRUCTION OF STANDS 772044

METER REPLACEMENT 6737985.37

STATIC STANDS 27999.99

TELEMETRY SPARES EQUIPMENT 260845.22

UPGRADE OF NTAMBANANA WATER SUPPLY:

CONSTRUCTION OF 3ML RESERVOIR

948252.8

WATER METER REPLACEMENTS 2508362.01

WATER METERS 0

METER REPLACEMENT 273457.15

DESIGN AND MANAGEMENT OF KWADUBE

WATER SUPPLY

419000

WATER METER REPLACEMENT 376124

LAKE CHUBHU AUTOMATION 978044.5

LAKE CHUBHU MOTOR PROTECT 686360.23

MKHWANAZI NORTH PHASE 05 212308.63

MKHWANAZI NORTH PHASE 05 RETICULATION 2180418.85

MKHWANAZI NORTH PHASE 5 4245728.96

MKHWANAZI NORTH PHASE 5 : RETICULATION 1663340.97

MKHWANAZI NORTH PHASE 5 : RETICULATION 941610.14

542

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

ZONE E

MKHWANAZI NORTH PHASE 5 : RETICULATION

ZONE K

2467451.46

MKHWANAZI NORTH PHASE 5 RETENTION-

ZONE E2-8/2/1/UMH101-16/17

304706.47

MKHWANAZI NORTH PHASE 5 RETICULARION

ZONE E2 - 8/2/1/UMN101-16/17

907788.69

MKHWANAZI NORTH PHASE 5 RETICULATION 3299479.65

MKHWANAZI NORTH PHASE 5 RETICULATION

ZONE K

450253.53

MKHWANAZI NORTH PHASE 5 RETICULATION

ZONE U

3803810.43

MKHWANAZI NORTH PHASE 5 ZONE K 1190522.29

MKHWANAZI NORTH RETICULATION 753727.46

MKHWANAZI NORTH RETICULATION - ZONE U 1498905.76

MKHWANAZI NORTH WATER SUPPLY 329611.96

WATER SUPPLY RURAL/SEMI URBAN AREAS 0

WATER METERS - NGWELEZANE 375284.6

WATER METERS - RICHARDS BAY 717571.26

BIRDSWOOD PROJECT (FIXING OF ALLUMINA

ALLEY IN BIRDWOOD)

26000

UPGRADING OF EMERGENCY LINE TO SUPPLY

WATER FOR WARD 18 AND 19 AROUND PORT

DUNFORD

6988393

WATER METERS - KWA DLANGEZWA 246753.3

EMPANGENI WATER IMPROVEMENTS 1050468.46

RETENTION - CERT 7 - UMH34-PMT669 187331.77

543

Appendix N: Capital Program by Project - Current year

FUNCTION DESCRIPTION AMOUNT

RETENTION - CERT 8 - UMH34-PMT719 370363.12

RICHARDS BAY WATER IMPROVEMENTS 25820.96

UPGRADING OF EMPANGENI WATER

DISTRIBUTION NETWORK

3464404.4

TOTAL 76981990.62

GRAND TOTAL 516680406.3

544

APPENDIX O : CAPITAL PROGRAMME BY PROJECT FOR ALL WARDS CURRENT YEAR Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

4 SEWER UPGRADE BIRDSWOOD 252000

4 BIRDSWOOD PROJECT (FIXING OF ALLUMINA ALLEY IN BIRDWOOD) 26000

TOTAL 278000

19 AIR CONDITIONER - EMPANGENI OFFICE 17984

19 PARTITIONING AT EMPANGENI FINANCE OFFICE 150250

19 AIR CONDITIONER H2 FINANCE OFFICE 202415.06

19 REFURBISHMENT OF ESIKHALENI FINANCE H2 OFFICE 2985604.34

19 WASTE BIN 500

19 LETTER TRAY 750

19 CUPBOARD 3950

19 ATHENA SERVER 5587

19 COFFEE TABLE 11360

545

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

19 HIGHBACK CHAIR 14495

19 MONTEGO FULL SETUP 42700

19 VISITOR CHAIR 47600

19 REGENCY OFFICE FURNITURE 62225

19 WORKSTATION 107000

19 CHAIR 153611.98

TOTAL 3806032.38

26 REFURBISHMENT OF AQUADENE COMMUNITY HALL 304065.89

26 315 MVA RING MAIN UNIT 276353

26 315MVA RING MAIN UNIT 276353

26 MV CABLE ESIKHALENI MS 37 TO CYGNUS SUBSTATION 547876.95

26 MINI SUBSTATION 736000

26 315 KVA SUBSTATION 3680000

546

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

TOTAL 5820648.84

28 INSTALLATION OF THREE CURRENT TRANSFORMERS 281827.44

28 132KV ELECTRICAL CABLES BETWEEN CAPPELA SWITCHING STATION

AND HYDRA SUBSTATION

412277.14

28 A1278 AND A1277 ELECTRIFICATION 211415.03

TOTAL 905519.61

1, 2, 3, 4 SEWER UPGRADE MS 9 241200

1,2,3,4 DESIGN AND CONSTRUCTION MANAGEMENT FOR THE WASTE WATER

TREATMENT WORKS AND MACERATORS Total

181320

1,2,3,4 NKONINGA PUMPSTATION 547019.98

TOTAL 969539.98

10,11,16,17,19,20,21 MKHWANAZI NORTH PHASE 05 212308.63

547

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

10,11,16,17,19,20,21 MKHWANAZI NORTH PHASE 05 RETICULATION 2180418.85

10,11,16,17,19,20,21 MKHWANAZI NORTH PHASE 5 4245728.96

10,11,16,17,19,20,21 MKHWANAZI NORTH PHASE 5 : RETICULATION 1663340.97

10,11,16,17,19,20,21 MKHWANAZI NORTH PHASE 5 : RETICULATION ZONE E 941610.14

10,11,16,17,19,20,21 MKHWANAZI NORTH PHASE 5 : RETICULATION ZONE K 2467451.46

10,11,16,17,19,20,21 MKHWANAZI NORTH PHASE 5 RETENTION- ZONE E2-8/2/1/UMH101-

16/17

304706.47

10,11,16,17,19,20,21 MKHWANAZI NORTH PHASE 5 RETICULARION ZONE E2 -

8/2/1/UMN101-16/17

907788.69

10,11,16,17,19,20,21 MKHWANAZI NORTH PHASE 5 RETICULATION 3299479.65

10,11,16,17,19,20,21 MKHWANAZI NORTH PHASE 5 RETICULATION ZONE K 450253.53

10,11,16,17,19,20,21 MKHWANAZI NORTH PHASE 5 RETICULATION ZONE U 3803810.43

10,11,16,17,19,20,21 MKHWANAZI NORTH PHASE 5 ZONE K 1190522.29

10,11,16,17,19,20,21 MKHWANAZI NORTH RETICULATION 753727.46

10,11,16,17,19,20,21 MKHWANAZI NORTH RETICULATION - ZONE U 1498905.76

548

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

10,11,16,17,19,20,21 MKHWANAZI NORTH WATER SUPPLY 329611.96

10,11,16,17,19,20,21 WATER SUPPLY RURAL/SEMI URBAN AREAS 0

TOTAL 24249665.25

10,11,30,34 MUNICIPAL BUILDINGS 10697

TOTAL 10697

13, 14, 15 DESIGN AND MANAGEMENT OF KWADUBE WATER SUPPLY 419000

13, 14, 15 WATER METER REPLACEMENT 376124

TOTAL 795124

14,15,16 METER REPLACEMENT 797564.65

14,15,16 METER REPLACEMNT 293092.04

TOTAL 1090656.69

549

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

14.16.21 UPGRADE OF ESIKHALENI INTERSECTION-UPGRADE OF

MTHOMBOTHI/MDLEBE MTSHONA ONTERSECTION

149568.25

14.16.21 GABION STONES 180950

14.16.21 READY BOARDS 190000

14.16.21 UPGRADE OF ESIKHALENI INTERSECTION 3166941.98

14.16.21 ESIKHALENI INTERSECTION 3737517.85

14.16.21 RETENTION CERT 3 UMH12 - 15/16 4523.73

14.16.21 ROADS- URBAN ROADS 72665.57

14.16.21 ROADS - URBAN ROADS 148376.48

14.16.21 DRAWINGS FOR WIDENING OF ANGLERS ROD AT MEERENSEE 161250

14.16.21 CONCRETE STONES FOR EMPANGENI A RANK UPGRADE 189000

14.16.21 ASBESTOS APPROVAL INSPECTION AUTHORITY 189500

14.16.21 CONSTRUCTION OF KERBS 391129.8

14.16.21 ESIKHALENI MALL ROAD SAFETY IMPROVEMENTS 5201166.38

550

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

14.16.21 UPGRADE OF INTERSECTION 8540927.62

TOTAL 22323517.66

15, 16, 17, 18, 19, 20, 21, 22 METER REPLACEMENT 273457.15

TOTAL 273457.15

15-19,30 INSTALLATION OF HIGH MAST STRUCTURES 454483.32

15-19,30 HIGH MAST LIGHTING 537613.55

15-19,30 ENERGY DEMAND SUPPLT MANAGEMENT 554030.55

15-19,30 HIGH MAST INSTALLATION 856428

15-19,30 CABLE FOR NGWELEZANE SPORTFIELD 7458

15-19,30 HIGH MAST LIGHTING 924876

15-19,30 SUPPLY AND INSTALLATION OF HIGH MAST STRUCTURES 1875532.06

15-19,30 INSTALLATION OF HIGH MAST LIGHTING 2068524.88

15-19,30 HIGH MAST STRUCTURES 3304002.46

551

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

15-19,30 INSTALLATION OF HIGH MAST STRUCTURES 5750762.76

TOTAL 16333711.58

18 & 19 UPGRADING OF EMERGENCY LINE TO SUPPLY WATER FOR WARD 18

AND 19 AROUND PORT DUNFORD

6988393

TOTAL 6988393

2 & 3 HEAVY DUTY YELLOW HELIFLEX SUCTION HOSE 9300

2 & 3 STAINLESS STEEL BRACKET FOR MEERENSEE PUMPSTATIONS 16050

2 & 3 HTP PIPE FOR ARBORETUM MACERATOR 29040

2 & 3 SEWER UPGRADE MS 2 346500

TOTAL 400890

23 & 26 AQUADENE INTERNAL BULK SERVICES 824099.62

TOTAL 824099.62

552

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

23 & 5 CONSTRUCTION OF CONCRETE TABLES FOR MARKET STALLS AT THE

RICHARDS BAY TAXI RANK

146000

23 & 5 CONSTRUCTION OF MARKET STALLS 132316.24

23 & 5 CONSTRUCTION OF MARKET STALLS AT NGWELEZANE HOSPITAL 69800

23 & 5 POLE TOP BOX AT NGWELEZANE HOSPITAL MARKET STALLS 2150

23 & 5 RENOVATION AT EMPANGENI SMME ONE STOP SHOP 34950

TOTAL 385216.24

24, 25 ESIKHALENI WATER IMPROVEMENTS 50588.88

24, 25 METER X 300 184500

24, 25 250MM SEWER LINEAND DRILLING AT HILLVIEW 1372782.85

TOTAL 1607871.73

553

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

26,3 REFURBISHMENT OF BRACKENHAM COMMUNITY HALL 297190.67

TOTAL 297190.67

3,7,16,19,23,26,27,28 CONSTRUCTION OF SPEED HUMPS EMP,NGW, ESK 99000

3,7,16,19,23,26,27,28 TRAFFIC CALMING 193705

3,7,16,19,23,26,27,28 CONSTRUCTION OF TRAFFIC CALMING 318140

3,7,16,19,23,26,27,28 SPEED HUMPS AND RAISED PEDESTRIAN CROSSING 333617

TOTAL 944462

31, 32, 33, 34 INSTALLATION OF ANALYTICAL INSTRUMENTS, FLOWMETER 235773.2

31, 32, 33, 34 JOJO TANKS AND CONSTRUCTION OF STANDS 772044

31, 32, 33, 34 METER REPLACEMENT 6737985.37

31, 32, 33, 34 STATIC STANDS 27999.99

31, 32, 33, 34 TELEMETRY SPARES EQUIPMENT 260845.22

31, 32, 33, 34 UPGRADE OF NTAMBANANA WATER SUPPLY: CONSTRUCTION OF 3ML 948252.8

554

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

RESERVOIR

31, 32, 33, 34 WATER METER REPLACEMENTS 2508362.01

TOTAL 11491262.59

31,32,33 RENOVATIONS OF NTAMBANANA TRANSFER STATION 1405162.7

TOTAL 1405162.7

4,5,7,8,18,23,27 CONSTRUCTION OF BUS SHELTERS AT MKHOBOSA AND

MANDLANKALA

198170

4,5,7,8,18,23,27 CONSTRUCTION OF BUS SHELTERS 641323.2

TOTAL 839493.2

5,12,13,14,15,22,16,18,19,20,22 RURAL SANITATION PHASE 5:8/2/1/UMH41-15/16 2893402.6

5,12,13,14,15,22,16,18,19,20,22 RURAL SANITATION PHASE 4 3410376.97

5,12,13,14,15,22,16,18,19,20,22 MZINGAZI VILLAGE SEWER RETICULATION PHASE 2 4461163.73

555

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

5,12,13,14,15,22,16,18,19,20,22 LAND AND BUILDINGS - RURAL SANITATION 4784578.92

5,12,13,14,15,22,16,18,19,20,22 PRECAST CONCRETE TOP-STRUCTURE FACTORY - 17000 UNITS 4805919.09

5,12,13,14,15,22,16,18,19,20,22 RURAL SANITATION PRECAST TOP STRUCTURE 5757835.41

5,12,13,14,15,22,16,18,19,20,22 THE UPGRADE EMPANGENI OUTFALL SEWER 6972388.5

5,12,13,14,15,22,16,18,19,20,22 MANDLANZINI AGRI VILLAGE SEWER NETWORK INSTALLATION 23108966.69

TOTAL 56194631.91

5,7,8,9,20,23,24,26,27,29,30 EMPANGENI TAXI RANK 431150

TOTAL 431150

9,24,23 DUMIANI MAKHAYE VILLAGE BULK SANITATION 7286984.51

TOTAL 7286984.51

WHOLE OF MUNICIPALITY NTAMBANANA PROJECTS - BUILDING STRUCTURES 54062.6

WHOLE OF MUNICIPALITY CONSTRUCTION OF NDONDWANE CRECHE 2270210.45

556

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY CONSTRUCTION OF BAMBANANI CRECHE 2312821.71

WHOLE OF MUNICIPALITY CONSTRUCTION OF MANCENCE COMMUNITY HALL 3382436.82

WHOLE OF MUNICIPALITY INSTALATION OF AIRCONDITIONERS( FITTERS NORTHERN DEPOT) 47368.42

WHOLE OF MUNICIPALITY GEYSER 4417.77

WHOLE OF MUNICIPALITY VACUUM CLEANER 17198

WHOLE OF MUNICIPALITY CHAIRS 201734

WHOLE OF MUNICIPALITY AIR CONDITIONER - CASHIERS RICHARDS BAY 8300

WHOLE OF MUNICIPALITY AIR CONDITIONER - REVENUE 49128

WHOLE OF MUNICIPALITY GATE MOTOR 26900

WHOLE OF MUNICIPALITY ROUND TABLE 1332.94

WHOLE OF MUNICIPALITY MICROWAVE 1450

WHOLE OF MUNICIPALITY SIGNING DESK 2163.2

WHOLE OF MUNICIPALITY FRIDGE 3099

WHOLE OF MUNICIPALITY SCREENS 3800

557

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY SERVER 5000

WHOLE OF MUNICIPALITY MOBILE PEDESTAL 6450

WHOLE OF MUNICIPALITY BOARDROOM TABLE 8000

WHOLE OF MUNICIPALITY CASHIER TROLLEY 8000

WHOLE OF MUNICIPALITY VISITOR CHAIR 9540

WHOLE OF MUNICIPALITY SIDE CHAIR 10000

WHOLE OF MUNICIPALITY PEDESTAL 10800

WHOLE OF MUNICIPALITY DESK TITAN COMBINATION AND WALL UNIT 12000

WHOLE OF MUNICIPALITY WOODEN BENCHES 24000

WHOLE OF MUNICIPALITY CABINET 29305.4

WHOLE OF MUNICIPALITY CLUSTER DESK 30000

WHOLE OF MUNICIPALITY REFURBISHMENT OF STORMWATER SECTION AT ESIKHALENI DEPOT 190931.09

WHOLE OF MUNICIPALITY REFURBISHMENT FOR STORMWATER SECTION - ESIKHALENI DEPOT 186375

WHOLE OF MUNICIPALITY AIR CONDITIONER 8773.93

558

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY BAR FRIDGE 4200

WHOLE OF MUNICIPALITY EXECUTIVE OFFICE CHAIR 6200

WHOLE OF MUNICIPALITY HIGH BACK SWIVEL CHAIR 12800

WHOLE OF MUNICIPALITY ELECTRICITY AND GAS DISTRIBUTION AND PLANNING 850898

WHOLE OF MUNICIPALITY ELECTRICITY AND GAS DISTRIBUTION AND PLANNING 1683196.04

WHOLE OF MUNICIPALITY ELECTRICITY AND GAS DISTRIBUTION AND PLANNING 116075

WHOLE OF MUNICIPALITY AIR CONDITIONER 8597

WHOLE OF MUNICIPALITY HIGHBACK CHAIR 7497

WHOLE OF MUNICIPALITY VISITOR CHAIR 5697

WHOLE OF MUNICIPALITY INDIGENT OFFICE RENOVATIONS 25889

WHOLE OF MUNICIPALITY SOW FIBRE WORK 173479.96

WHOLE OF MUNICIPALITY INSTALLATION OF POINTS AND FIBRE OPTIC AT NGWELEZANE

COMMUNITY HALL

26509.05

WHOLE OF MUNICIPALITY NETWORK POINTS, CABLING AND CABINETS: NTAMBANANA 162775

559

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY CISCO SWITCHES FOR WARD COUNCILLORS NTAMBANANA 92225

WHOLE OF MUNICIPALITY FORD RANGER 4X4 LDV 2166819.69

WHOLE OF MUNICIPALITY MAJOR STRUCTURAL FIRE ENGEN 4893560

WHOLE OF MUNICIPALITY GRADER 6588709.36

WHOLE OF MUNICIPALITY PAYLOAD REFUSE TRUCK 4482179.16

WHOLE OF MUNICIPALITY REFUSE TRUCK 8744271.04

WHOLE OF MUNICIPALITY UPS UPGRADES - NGWELEZANE,NSELENI,ESIKHAWINI H,J 579014.06

WHOLE OF MUNICIPALITY AIR CONDITIONER 184493.93

WHOLE OF MUNICIPALITY DIGITAL CAMERA 1704

WHOLE OF MUNICIPALITY SINGLE BEDS 28000

WHOLE OF MUNICIPALITY PROFESSIONAL STAFF - UWP CONSULTING ACCOUNT 9 31479.2

WHOLE OF MUNICIPALITY RETENTION - CERT 5 - UMH324-17/18 PMT 798 38405.12

WHOLE OF MUNICIPALITY UMHLATHUZE RURAL ROAD UPGRADE 103669.88

WHOLE OF MUNICIPALITY UPGRADE OF RURAL ROADS 189124.85

560

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY PROFESSIONAL STAFF - UWP CONSULTING ACCOUNT 7 198240.99

WHOLE OF MUNICIPALITY MZINGAZI ROAD UPGRADE 237554.62

WHOLE OF MUNICIPALITY UPGRADE OF RURAL ROADS - 8/2/1/UMH324-17/18 439373.73

WHOLE OF MUNICIPALITY DEVELOPMENT AND UPGRADE OF RURAL ROAD INFRASTRUCTURE

PHASE 3

501491.72

WHOLE OF MUNICIPALITY UPGRADE OF RURAL ROADS - MZINGAZI PHASE 3 505897.21

WHOLE OF MUNICIPALITY FENCING IMPROVEMENTS AT YMCA ESIKHAWINI J1 189700

WHOLE OF MUNICIPALITY ESIKHALENI YMCA RENOVATIONS 200290

WHOLE OF MUNICIPALITY HIGHBACK CHAIR 6000

WHOLE OF MUNICIPALITY BAR CHAIRS 7650

WHOLE OF MUNICIPALITY SLATTED BENCH 75360.01

WHOLE OF MUNICIPALITY IMPROVEMENTS AT RICHARDS BAY SPORTS COMPLEX ATHLETHIC

STADIUM

4221555.08

WHOLE OF MUNICIPALITY DRAWER FILLING SYSTEM 1000

WHOLE OF MUNICIPALITY PIPE EXTENSION AT KHOZA RURAL AREA 160000

561

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY SUBMERSIBLE BOREHOLE PUMPS FOR NTAMBANANA 33637.5

WHOLE OF MUNICIPALITY GENERATOR 15KVA FOR NTAMBANANA BOREHOLE PUMPS 78176

WHOLE OF MUNICIPALITY CONSTRUCTION OF 3MI RESERVIOR 356146.7

WHOLE OF MUNICIPALITY LAKE CHUBHU AUTOMATION 978044.5

WHOLE OF MUNICIPALITY LAKE CHUBHU MOTOR PROTECT 686360.23

WHOLE OF MUNICIPALITY WATER METERS - KWA DLANGEZWA 246753.3

WHOLE OF MUNICIPALITY EMPANGENI WATER IMPROVEMENTS 1050468.46

WHOLE OF MUNICIPALITY RETENTION - CERT 7 - UMH34-PMT669 187331.77

WHOLE OF MUNICIPALITY RETENTION - CERT 8 - UMH34-PMT719 370363.12

WHOLE OF MUNICIPALITY RICHARDS BAY WATER IMPROVEMENTS 25820.96

WHOLE OF MUNICIPALITY UPGRADING OF EMPANGENI WATER DISTRIBUTION NETWORK 3464404.4

WHOLE OF MUNICIPALITY AIR CONDITIONER - HR OFFICE 8300

WHOLE OF MUNICIPALITY AIR CONDITIONER 674630.9

WHOLE OF MUNICIPALITY ESIKHALENI BUSINESS CENTRE 165987.45

562

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY UPGRADING OF FINANCE OFFICE ESIKHALENI H2 706652

WHOLE OF MUNICIPALITY NETWORK POINTS AND CABLING FOR HLANGANANI FINANCE OFFICE 64655

WHOLE OF MUNICIPALITY UPGRADING OF HLANGANANI FINANCE OFFICE 804250

WHOLE OF MUNICIPALITY CONSTRUCTION OF STANDBY QUARTERS FOR ELECTRICAL SECTION 19795.61

WHOLE OF MUNICIPALITY CONSTRUCTION OF FOUNDATION CONCRETE SLABS 25538

WHOLE OF MUNICIPALITY REFURBISHMENT OF STEEL CONTAINERS 53650

WHOLE OF MUNICIPALITY STONE CONCRETE 194800

WHOLE OF MUNICIPALITY RURAL ROADS 720390

WHOLE OF MUNICIPALITY REFURBISHMENT OF NORTHERN AND SERVICE CENTRES 51022.78

WHOLE OF MUNICIPALITY RENOVATION AND UPGRADE OF OFFICES ALL DEPOTS 106340

WHOLE OF MUNICIPALITY UPGRADE OF OFFICES IN THE NORTHERN SERVICES DEPOT 125504.26

WHOLE OF MUNICIPALITY CARPOTS FOR SCIENTIFIC SERVICES BUILDING 161000

WHOLE OF MUNICIPALITY EXENTION AND DESIGN OF SCIENTIFIC SERVICES BUILDING 400148

WHOLE OF MUNICIPALITY AIR CONDITIONER FOR CREDITORS OFFICE 35737.61

563

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY REFURBISHMENT OF SCM OFFICES 386726.32

WHOLE OF MUNICIPALITY AIR CONNDITIONER 36000BTU 22834

WHOLE OF MUNICIPALITY AIR CONDITIONER FOR ARTS AND CULTURE OFFICES (RICHARDS BAY

CIVIC

70360

WHOLE OF MUNICIPALITY REFURBISHMENT OF SMME ONE STOP SHOP TILING 120000

WHOLE OF MUNICIPALITY RENOVATION TO PARK HOME (ARTS AND CULTURE OFFICES) 168942.91

WHOLE OF MUNICIPALITY CONTINGENCIES AFTER INSTALLATION OF WATER TANKS IN RURAL

AREAS

14200

WHOLE OF MUNICIPALITY AIR CONDITIONER FOR NSELENI HALL 162812.5

WHOLE OF MUNICIPALITY AIR CONDITIONER FOR MACENCE HALL 170412.5

WHOLE OF MUNICIPALITY AIRCONDITONER FOR EMPANGENI MAIN HALL 171510

WHOLE OF MUNICIPALITY AIRCONDITONER FOR EMPANGENI SUPPER HALL 171510

WHOLE OF MUNICIPALITY REPLACEMENT OF ROOF AT NSELENI HALL 296221

WHOLE OF MUNICIPALITY REFURBISHMENT OF HLANGANANI COMMUNITY HALL 495000

WHOLE OF MUNICIPALITY REPLACEMENT OF ENSELENI HALL ROOF 772607.33

564

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY CONSTRUCTION OF MUNICIPAL BUILDING 414390.35

WHOLE OF MUNICIPALITY EXTENTION OF ROAD MARKING STOREROOM 1166984.8

WHOLE OF MUNICIPALITY AIRCONDITIONER AT NORTHERN SERVICES DEPOT FOR URBAN ROADS 26075

WHOLE OF MUNICIPALITY AIRCONDITIONER AT NORTHERN SERVICES DEPOT FOR RURAL ROADS 67184

WHOLE OF MUNICIPALITY AIR CONDITIONER FOR ICT SECTION 89472.51

WHOLE OF MUNICIPALITY AIRCONDITIONER FOR MECHANICAL WORKSHOP 8496

WHOLE OF MUNICIPALITY AIR CONDITIONER - CEMETERY 13043.48

WHOLE OF MUNICIPALITY DESK SHELL 1350

WHOLE OF MUNICIPALITY WALL SAFE 1717.31

WHOLE OF MUNICIPALITY TELEVISION SET 2700

WHOLE OF MUNICIPALITY SLIDING DOOR CREDENZA 3900

WHOLE OF MUNICIPALITY 3 SHELF CABINET 5981.5

WHOLE OF MUNICIPALITY CLOCK CARD MACHINE 6317

WHOLE OF MUNICIPALITY WATER COOLER 7600

565

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY DESK 10791.24

WHOLE OF MUNICIPALITY 300L FRIDGE 12000

WHOLE OF MUNICIPALITY HIGH BACK CHAIRS 69903

WHOLE OF MUNICIPALITY CASH REGISTER 8600

WHOLE OF MUNICIPALITY RFID FOR RICHARDS BAY LIBRARY 195999

WHOLE OF MUNICIPALITY OFFICE CHAIR 19200

WHOLE OF MUNICIPALITY HIGHBACK CHAIRS LEATHER 30000

WHOLE OF MUNICIPALITY AUDIO VISUAL DISPLAY SHELF 16500

WHOLE OF MUNICIPALITY TUB CHAIRS 16880

WHOLE OF MUNICIPALITY CYBER WORKSTATIONS 27954

WHOLE OF MUNICIPALITY BLACK LEATHER CHAIR 27996.99

WHOLE OF MUNICIPALITY BOOK SHELF WITH REVOLVING BASE 28497

WHOLE OF MUNICIPALITY OTTOMAN 28809

WHOLE OF MUNICIPALITY TABLE DOUBLE SIDED READING SHELF 29527

566

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY STUDY CARREL 29651

WHOLE OF MUNICIPALITY REVOLVING PAPERBACK BOOK SHELF 29980

WHOLE OF MUNICIPALITY STUDY DESK 30000

WHOLE OF MUNICIPALITY CLUSTER WORK STATION 33120

WHOLE OF MUNICIPALITY TEE SOLID HDPE 200MM 15584.5

WHOLE OF MUNICIPALITY TRENCH 100m OF 95mm2 4 CORE AL CABLE 20000

WHOLE OF MUNICIPALITY INSTALL 3 PHASE BREAKER OF 100A AND PROVIDE 60A 1 PHASE 20876.63

WHOLE OF MUNICIPALITY MUNICIPAL HOUSING 4383347.75

WHOLE OF MUNICIPALITY INSTALLATION OF NETWORK POINTS AT SECURITY DESK RICHARDS

BAY CIVIC

10475

WHOLE OF MUNICIPALITY AIR CONDITIONER FOR HR OFFICE 19875.86

WHOLE OF MUNICIPALITY REFURBISHMENT OF NTAMBANA OFFICE TOILETS 28500

WHOLE OF MUNICIPALITY UPGRADE OF CIVIC CENTRE LIFT 31266.68

WHOLE OF MUNICIPALITY H2 FINANCE OFFICE UPGRADE - SAFETY 35680

567

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY PROCUREMENT OF TOP COVER AT CSD 50100

WHOLE OF MUNICIPALITY AIR CONDITIONER FOR VARIOUS OFFICES 56603.58

WHOLE OF MUNICIPALITY AIR CONDITIONER -COPORATE SERVICES OFFICES 76103.02

WHOLE OF MUNICIPALITY REFURBISHMENT OF COUNCILLOR OFFICES, MZINGAZI AND

MADLANZINI

79000

WHOLE OF MUNICIPALITY REFURBISHMENT OF COUNCILLOR OFFICE - VELDENVLEI HALL 90613

WHOLE OF MUNICIPALITY MUNICIPAL BUILDINGS 111900

WHOLE OF MUNICIPALITY SUPPLY AND INSTALLATION OF AIRCONS 112850.04

WHOLE OF MUNICIPALITY REFURBISHMENT OF THR FOYER AND COUNCIL CHAMBERS 147500

WHOLE OF MUNICIPALITY REFURBISHMENT OF TOILETS AT CIVIC CENTRE 154420

WHOLE OF MUNICIPALITY REFURBISHMENT OF COUNCILLOR OFFICE 166970

WHOLE OF MUNICIPALITY UPGRADING OF FINANCE OFFICE ESIKHALENI 229559.83

WHOLE OF MUNICIPALITY REDESIGN OF RICHARDS BAY CIVIC CENRE 4239650.43

WHOLE OF MUNICIPALITY AIR CONDITIONER - SCM 39472

568

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY REFURBISHMENT AT SCM OFFICES IN ALTON 278709.89

WHOLE OF MUNICIPALITY AIR CONDITIONER FOR WATER AND SANITATION SERVICES 11341

WHOLE OF MUNICIPALITY AIR CONDITIONER - SCIENTIFIC SERVICES 14950

WHOLE OF MUNICIPALITY AIR CONDITIONER FOR LABORATORY AT SCIENTIFIC SERVICES 18500

WHOLE OF MUNICIPALITY MANDLANZINI HALL 117187

WHOLE OF MUNICIPALITY UPGRADING AND RENOVATIONS OF VARIOUS LIBRARIES 391998

WHOLE OF MUNICIPALITY REPLACING COPPER PIPING FOR AIR CONDITIONER AT RICHARDS BAY

LIBRARY

16210

WHOLE OF MUNICIPALITY MUNICIPAL BUILDINGS 55280

WHOLE OF MUNICIPALITY FINANCE OFFICE VULINDLELA WALL 99820

WHOLE OF MUNICIPALITY H2 FINANCE OFFICE UPGRADE 243771.87

WHOLE OF MUNICIPALITY RENOVATIONS FOR NGWELEZANE STANDBY QUARTERS 199880

WHOLE OF MUNICIPALITY EMPANGENI SMME ONE STOP SHOP 22076

WHOLE OF MUNICIPALITY CONSTRUCTION OF SCM BUILDING 10040638.36

569

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY INTERROGATOR KIT 11638.21

WHOLE OF MUNICIPALITY CHAIR 3507

WHOLE OF MUNICIPALITY ELECTRIFICATION OF EMPANGENI MEGA HOUSE PROJECT PHASE 1 702195.64

WHOLE OF MUNICIPALITY REPLACEMENT OF 11KV SWITCHBOARD 762232

WHOLE OF MUNICIPALITY ELECTRICAL MATERIAL 1025

WHOLE OF MUNICIPALITY REPLACEMENTOF LV SUPPLY AT THE ALTON LANDFILL 4122.81

WHOLE OF MUNICIPALITY STATS METER INSTALLATION 144000

WHOLE OF MUNICIPALITY ELECTRICAL MASTER PLAN 159195

WHOLE OF MUNICIPALITY ENERGY DEMAND SUPPLY MANAGEMENT 460680

WHOLE OF MUNICIPALITY CONSULTANTS SERVICES FOR ELECTRICAL PROJECTS 704474.52

WHOLE OF MUNICIPALITY ENERGY SAVING INITIATIVE - ENERGY DEMAND SUPPLY

MANAGEMENT

852312.4

WHOLE OF MUNICIPALITY ELECTRICAL PROJECTS 1026800

WHOLE OF MUNICIPALITY AERATORS MOTORS AT EMPANGENI WASTE WATER TREATMENT

PLANT

1103419.11

570

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY 12 CORE FIBRE OPTIC AND 132 KV OVERHEAD LINE POWER SYSTEM

PROTECTION

1576813.16

WHOLE OF MUNICIPALITY PROFESSIONAL SERVICE ON VARIOUS ELECTRICAL PROJECTS 2556225

WHOLE OF MUNICIPALITY PROJECT MANAGEMENT 550149.09

WHOLE OF MUNICIPALITY ELECTRICAL TESTING EQUIPMENT 2168703.15

WHOLE OF MUNICIPALITY POLE RELOCATION ERF 13461 MANDLANZINI 1568

WHOLE OF MUNICIPALITY MATERIAL FOR GOLDFERN AND GIBBUM GROVE 1555.2

WHOLE OF MUNICIPALITY RELOCATION OF KIOSK AND LV CABLE AT 16 KITEFISH MEREENSEE 2050

WHOLE OF MUNICIPALITY CIRCUIT BREAKER 400A 7300

WHOLE OF MUNICIPALITY MATERIAL FOR BRACKENHAM STREET LIGHTS 8060

WHOLE OF MUNICIPALITY RE-INSTATEMENT OF 40 DRIVEWAYS 24750

WHOLE OF MUNICIPALITY MATERIAL FOR BRACKENHAM ELECTRIFICATION 28359.9

WHOLE OF MUNICIPALITY 16mm2 4 4 CORE CU CABLE FOR SOPRANOS 49800

WHOLE OF MUNICIPALITY MATERIAL FOR NGWELEZANE COMMUNITY HALL A1256 57254.79

571

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY MATERIAL FOR MANDLANZINI 67467.99

WHOLE OF MUNICIPALITY 400A CIRCUIT BREAKERS FOR BRACKENHAM PROJECT 73700

WHOLE OF MUNICIPALITY MATERIAL FOR BRACKENHAM 184968.32

WHOLE OF MUNICIPALITY REPLACEMENT OF OVERHEAD BUNDLE CONDUCTOR IN BRACKENHAM 269533

WHOLE OF MUNICIPALITY ELECTRIFICATION OF BRACKENHAM 286400

WHOLE OF MUNICIPALITY MATERIAL FOR BOULDER BEND BRACKENHAM 453701.16

WHOLE OF MUNICIPALITY BRACKENHAM ELECTRIFICATION 1436633.22

WHOLE OF MUNICIPALITY NGWELEZANE WATERWORKS O/H MV LINE 1299.6

WHOLE OF MUNICIPALITY MATERIAL FOR A1275 2175

WHOLE OF MUNICIPALITY NSELENI MALL PROJECT 24mm2 4 CORE CABLE 2178

WHOLE OF MUNICIPALITY MATERIAL FOR A1275 REMEDIAL WORK 3700

WHOLE OF MUNICIPALITY EZINGADINI CRESCENT FROM A1275 RMU TO OVERHEAD LINE 22700

WHOLE OF MUNICIPALITY MEDIUM VOLTAGE CABLES AT EMPANGENI IN WEST SECTION 28906

WHOLE OF MUNICIPALITY NEW CONNECTION 300A 6-8 UBHEJANE ROAD NSELENI 32350

572

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY EXTENSION OF MV NETWORK AND INSTALLATION OF A 200KVA TFR -

MZINGAZI HIGH SCHOOL

35080

WHOLE OF MUNICIPALITY MATERIAL FOR MANDLANZINI, NGWELEZANE AND MZINGAZI 56643.6

WHOLE OF MUNICIPALITY ELECTRICAL MATERIAL 79054.15

WHOLE OF MUNICIPALITY INSTALL 800M OF 11KV 3 CORE 240MM UNDERGROUND CABLE 90452

WHOLE OF MUNICIPALITY 240mm 2 4 CORE CABLE FROM GIBBUM GROVE 91770

WHOLE OF MUNICIPALITY MATERIAL FOR NGWELEZANE WATERWORKS O/H MV LINE 93369.7

WHOLE OF MUNICIPALITY NGWELEZANE WATERWORKS MV STRENGTHENING 144407.3

WHOLE OF MUNICIPALITY MV ELECTRICAL NETWORK REFURBISHMENT 148573.75

WHOLE OF MUNICIPALITY MATERIAL FOR GYGNUS/DENEB PROJECT 205705.2

WHOLE OF MUNICIPALITY ELECTRICAL PROJECTS 370547.19

WHOLE OF MUNICIPALITY ESIKHALENI PROJECTS ms11&ms12 AND ms12A 457973.36

WHOLE OF MUNICIPALITY ELECTRICAL MATERIAL FOR MANDLANZINI, NGWELEZANE AND

MZINGAZI

585664.55

WHOLE OF MUNICIPALITY MATERIAL FOR CABLE REPLACEMENT AT ESIKHALENI 1556836.2

573

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY MANDLAZINI ELECTRIFICATION 52000

WHOLE OF MUNICIPALITY MANDLANZINI 30 NEW CONNECTIONS 53616

WHOLE OF MUNICIPALITY NGWELEZANE WATERWORKS MV OVERHEAD 102213.3

WHOLE OF MUNICIPALITY ELECTRIFICATION OF THE NGWELEZANE IDT FOR 350 HOUSEHOLDS 265450

WHOLE OF MUNICIPALITY ELECTRIFICATION OF 74 HOUSEHOLDS IN THE MZINGAZI AREA 427824

WHOLE OF MUNICIPALITY MANDLANZINI ELECTRIFICATION 480364

WHOLE OF MUNICIPALITY ELECTRICAL RETICULATION FOR EMPANGENI MEGA HOUSING

PROJECT - WATERSTONE

504703.13

WHOLE OF MUNICIPALITY 132KV ELECTRICAL CABLES BETWEEN CAPELLA SWITCHING STATION

AND HYDRA SUBSTATION

911083.45

WHOLE OF MUNICIPALITY READY BOARDS 939327.2

WHOLE OF MUNICIPALITY LED LIGHTS ON THE JOHN ROSS HIGHWAY 1204442.79

WHOLE OF MUNICIPALITY HIGH MAST DESIGN PROJECT 1741041.45

WHOLE OF MUNICIPALITY CONDONATION FOR UTILISING THE ELECTRICAL CONSULTANT FOR

EMPANGENI MEGA HOUSING

1490047.04

574

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY CONDONATION FOR UTILISING THE ELECTRICAL CONSULTANT FOR

EMPANGENI MEGA HOUSING

2715299.71

WHOLE OF MUNICIPALITY UMHLATHUZE ELECTRICAL MASTER PLAN 1107165.16

WHOLE OF MUNICIPALITY UBHEJANE SATELITE 11KV UNDERGROUND CABLE AND OPTIC FIBRE

INSTALLATION

1809764

WHOLE OF MUNICIPALITY 132KV OIL FILLED CABLES 3392406.61

WHOLE OF MUNICIPALITY 11KV SWITCHBOARD REPLACEMENT 4031915.5

WHOLE OF MUNICIPALITY MATERIAL FOR CYGNUS/DENEB MV 1812.9

WHOLE OF MUNICIPALITY 600A ADJUSTABLE CIRCUIT BREAKER 5000

WHOLE OF MUNICIPALITY PROJECT MATERIAL 19185.05

WHOLE OF MUNICIPALITY ELECTRIFICATION OF BRACKENHAM 116964.97

WHOLE OF MUNICIPALITY JOSS ROSS STREET LIGHT MATERIAL INSTALLATION 1075.5

WHOLE OF MUNICIPALITY LED LIGHTS IN MANDLANZINI 50750

WHOLE OF MUNICIPALITY JOHN ROSS EAST ARTERIAL (RIGHT SIDE) LED STREET LIGHTS 65332

WHOLE OF MUNICIPALITY MANDLANZINI LED STREET LIGHTS 84175

575

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY INSTALLATION OF STREET LIGHTS 125000

WHOLE OF MUNICIPALITY GALVANISED STREET LIGHT POLES 282556.75

WHOLE OF MUNICIPALITY SUPPLY AND INSTALLATION LED FITTINGS 510393

WHOLE OF MUNICIPALITY 16mm2 AIRDAC MANDLANZINI HOUSE CONNECTIONS 66899.97

WHOLE OF MUNICIPALITY AERATORS MOTORS AT EMPANGENI WASTE WATER TREATMENT

PLANT

275730.89

WHOLE OF MUNICIPALITY MZINGAZI ELECTRIFICATION 427436

WHOLE OF MUNICIPALITY INSTALL, COMMISSION AND TEST 132KV ELECTRICAL CABLES

BETWEEN CAPELLA AND HYDRA

463592.03

WHOLE OF MUNICIPALITY EMPANGENI WASTE WATER TREATMENT PLANT ENERGY EFFECIENY

PROJECT

915400

WHOLE OF MUNICIPALITY ENERGY DEMAND SUPPLY MANAGEMENT 3850941.11

WHOLE OF MUNICIPALITY CYGNUS SUBSTATION POWER TRANSFORMER 466873.5

WHOLE OF MUNICIPALITY 132KV OIL FILL CABLES 474002.32

WHOLE OF MUNICIPALITY BRACKENHAM MV AND LV BUNDLE REPLACEMENT 193688.75

576

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY SATELITE/UBHEJANE 11KV UNDERGROUND CABLES PROJECT 5958.2

WHOLE OF MUNICIPALITY ELECTRIFICATION OF NGWELEZANE IDT FOR 350 HOUSEHOLDS 46150

WHOLE OF MUNICIPALITY NGWELEZANE IDT MATERIAL 117033.76

WHOLE OF MUNICIPALITY COMMISSIONING OF POWER TRANSFORMER 278250

WHOLE OF MUNICIPALITY NGWELEZANE POLE REPLACEMENT 76124.6

WHOLE OF MUNICIPALITY MINK CONDUCTOR 116640

WHOLE OF MUNICIPALITY NGWELEZANE WATERWORKS MV OVERHEAD LINE REFURBISHMENT 1342110.47

WHOLE OF MUNICIPALITY LED LIGHTS ON THE JOHN ROSS HIGHWAY 1708680

WHOLE OF MUNICIPALITY 132/11KV SCORPO TRANSFORMER RECONDITION 1837700

WHOLE OF MUNICIPALITY REFURBISHMENT OF VULINDLELA OVERHEAD LINE 85868

WHOLE OF MUNICIPALITY 132/11KV SCORPO TRANSFORMER RECONDITION 400050

WHOLE OF MUNICIPALITY Nox ANALYSER 173855

WHOLE OF MUNICIPALITY 90 DEGREE LINK 7214.24

WHOLE OF MUNICIPALITY CREDENZA 30401.28

577

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY CUPBOARD 41093.76

WHOLE OF MUNICIPALITY DESK SHELL 24128

WHOLE OF MUNICIPALITY MID CHAIR SWIVEL AND TILT 16286.4

WHOLE OF MUNICIPALITY PEDESTAL 28953.6

WHOLE OF MUNICIPALITY SIDE CHAIR 22728.64

WHOLE OF MUNICIPALITY AIR CONDITIONER - CLINIC 64222

WHOLE OF MUNICIPALITY SUPPLY AND DELIVER MATERIAL EMPANGENI CLINIC 123150

WHOLE OF MUNICIPALITY CCTV CAMERAS 80000

WHOLE OF MUNICIPALITY INSTALLATION OF NETWORK POINTS AND FIBRE OPTIC AT

EMPANGENI SMME ONE STOP SHOP

88839.21

WHOLE OF MUNICIPALITY WALL MOUNTED TOUCHSCREEN PC 39990

WHOLE OF MUNICIPALITY TROLLEY JACK 74015.92

WHOLE OF MUNICIPALITY WIRELESS HEADSET 46583.29

WHOLE OF MUNICIPALITY VOICE DIGITAL RECORDER 48505.38

578

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY DOCKING STATION 197078.49

WHOLE OF MUNICIPALITY BUILDING FIBRE ROUTE BETWEEN EMPANGENI, VULINDLELA AND

ESIKHALENI MUNICIPAL OFFICES

30250

WHOLE OF MUNICIPALITY LED SCREENS 16049.97

WHOLE OF MUNICIPALITY TV 22454.47

WHOLE OF MUNICIPALITY METAL DETECTORS 172965

WHOLE OF MUNICIPALITY WIRELESS RADIO NETWORK INFRASTRUCTURE INSTALLATION 129327.6

WHOLE OF MUNICIPALITY REMOTE POWER MANAGEMENT AND CONTROL SYSTEM 247500

WHOLE OF MUNICIPALITY SHREDDER 18675

WHOLE OF MUNICIPALITY CONNECTOR RECEIVERS 42682.32

WHOLE OF MUNICIPALITY UPS 295841.61

WHOLE OF MUNICIPALITY DIGITAL PROJECTOR 9402.63

WHOLE OF MUNICIPALITY SPEAKER SYSTEM 3607

WHOLE OF MUNICIPALITY PA SYSTEM 5115.42

579

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY PULL DOWN SCREEN 5324

WHOLE OF MUNICIPALITY PORTABLE PROJECTOR 7686.4

WHOLE OF MUNICIPALITY PROJECTOR 14132.8

WHOLE OF MUNICIPALITY CHAIR 4500

WHOLE OF MUNICIPALITY PRESIDENT HIGH BACK CHAIR 4950

WHOLE OF MUNICIPALITY HIGH BACK CHAIR 6600

WHOLE OF MUNICIPALITY CHAIR HEAVY DUTY 4X4 BURGUNDY FABRIC 33132

WHOLE OF MUNICIPALITY FOUR SEATER CHAIR 12180

WHOLE OF MUNICIPALITY NISSAN NP 200 173185.22

WHOLE OF MUNICIPALITY TRIPO PROJECTOR SCREEN 1685

WHOLE OF MUNICIPALITY EPSON SLIP PRINTERS 9568

WHOLE OF MUNICIPALITY PC 50622.44

WHOLE OF MUNICIPALITY SUPPLY & DELIVER OF AUDIO VISUAL 22385.27

WHOLE OF MUNICIPALITY LED MONITOR 26174.4

580

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY LINE MATRIC IMPACT PRINTER 93995

WHOLE OF MUNICIPALITY MONITOR 217223.56

WHOLE OF MUNICIPALITY AIRCONDITIONER FOR TLB V1625 49795.8

WHOLE OF MUNICIPALITY WATER TRAILER WITH PUMP 97431

WHOLE OF MUNICIPALITY FITMENT OF CRANE TO SKIP LOADER 338390

WHOLE OF MUNICIPALITY CAT 6 UTP CABLE INSTALLATION UPGRADE RICHARDS BAY CIVIC

CENTRE AND ALTON OFFICES

376456.35

WHOLE OF MUNICIPALITY LAPTOPS 15INCH 493188.48

WHOLE OF MUNICIPALITY PC i7 563690.8

WHOLE OF MUNICIPALITY POLO VIVO 638086.61

WHOLE OF MUNICIPALITY BMW 1 SERIES 673044.5

WHOLE OF MUNICIPALITY UPS BATTERY REPLACEMENT- EMPANGENI CIVIC 699758

WHOLE OF MUNICIPALITY CAT 6 UTP CABLE INSTALLATION 765212.95

WHOLE OF MUNICIPALITY LAPTOPS 874844.31

581

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY SUPPLY AND DELIVER OF CISCO NETWORK DEVICES 1038498.33

WHOLE OF MUNICIPALITY TLB 1165244.24

WHOLE OF MUNICIPALITY OCCUPATIONAL CLINIC EXTENSION 1197833.1

WHOLE OF MUNICIPALITY INSTALLATION OF PUBLIC WIFI 1925290.52

WHOLE OF MUNICIPALITY PCi5 2815960.32

WHOLE OF MUNICIPALITY FORD RANGER D/CAB 4X4 3818989.98

WHOLE OF MUNICIPALITY FORD RANGER D/CAB 4X2 4780601.04

WHOLE OF MUNICIPALITY PERSONNEL CARRIER 7905988.4

WHOLE OF MUNICIPALITY ASSET MAINTANANCE MANAGEMENT SYSTEM 8120600

WHOLE OF MUNICIPALITY FINANCIAL ERP SYSTEM 20638417.43

WHOLE OF MUNICIPALITY ASSET MANAGEMENT SOFTWARE 24229284.21

WHOLE OF MUNICIPALITY LED SCREENS 31567.45

WHOLE OF MUNICIPALITY DESKTOP COMPUTER 78449.9

WHOLE OF MUNICIPALITY TRAILER 163285

582

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY LAPTOPS 14INCH 682129.8

WHOLE OF MUNICIPALITY WATER TANKER 6650842.6

WHOLE OF MUNICIPALITY BURNT OAK BINS 16200

WHOLE OF MUNICIPALITY CHAIRS 29200

WHOLE OF MUNICIPALITY CUPBOARD 11098

WHOLE OF MUNICIPALITY ERECT GROUND SIGNS, ALUMINIUM ROUND BAR AND CHROMODEK 10290

WHOLE OF MUNICIPALITY HIGH BACK CHAIR AND TILT 35420

WHOLE OF MUNICIPALITY HIGH BACK CHAIR BONDED 4280

WHOLE OF MUNICIPALITY HIGHBACK CHAIR 5652.18

WHOLE OF MUNICIPALITY NEW BILLBOARD AT JOHN ROSS PARKWAY AND MONDI

INTERSECTION

147350

WHOLE OF MUNICIPALITY ROLLER DOOR CUPBOARD 19587

WHOLE OF MUNICIPALITY STEEL BILLBOARD 168960

WHOLE OF MUNICIPALITY TRESSLE TABLE 28320

583

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY TV SET 10836

WHOLE OF MUNICIPALITY VISITOR ARM CHAIRS 7920

WHOLE OF MUNICIPALITY DIGITAL RADIO 32370

WHOLE OF MUNICIPALITY DIGITAL TWI WAY RADIO 101905

WHOLE OF MUNICIPALITY FIRE PUMP 117500

WHOLE OF MUNICIPALITY INFRA-RED CAMERA 50445.11

WHOLE OF MUNICIPALITY TWO WAY RADIO 129800

WHOLE OF MUNICIPALITY BAR FRIDGE 3118.5

WHOLE OF MUNICIPALITY FRIDGE 150L 4500

WHOLE OF MUNICIPALITY MICROWAVE 4600

WHOLE OF MUNICIPALITY LETTER TRAY 5200

WHOLE OF MUNICIPALITY FRIDGE 300L 5499

WHOLE OF MUNICIPALITY DOUBLE DOOR FRIDGE 5499.99

WHOLE OF MUNICIPALITY TRESTLE TABLE 9700

584

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY VISITOR CHAIR 10000

WHOLE OF MUNICIPALITY CHAIR 19050

WHOLE OF MUNICIPALITY HIGHBACK CHAIR 19500

WHOLE OF MUNICIPALITY ROLLER DOOR CUPBOARD 20000

WHOLE OF MUNICIPALITY 300 LITRE FRIDGE 21996

WHOLE OF MUNICIPALITY CLOCKING MACHINE 23552

WHOLE OF MUNICIPALITY 4 DRAWER CABINET 24974

WHOLE OF MUNICIPALITY DESK 25920

WHOLE OF MUNICIPALITY RETENTION - CERT 2 UMH147 - 17/18 PMT755 26464

WHOLE OF MUNICIPALITY VISITOR CHAIR 27515.16

WHOLE OF MUNICIPALITY WATER COOLER DISPENSER 28700.1

WHOLE OF MUNICIPALITY HIGHBACK CHAIRS 42700.8

WHOLE OF MUNICIPALITY ROLLER SHUTTER CABINET 54600

WHOLE OF MUNICIPALITY CONSTRUCTION OF WALKWAYS ESIKHALENI 71600

585

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY HOT MIX ASPHALT FOR ESIKHALENI AREA 109656.48

WHOLE OF MUNICIPALITY AQUADENE BULK STORM WATER 116499.42

WHOLE OF MUNICIPALITY CONSTRUCTION OF BUS SHELTERS AT PORT DUNFORD 161220

WHOLE OF MUNICIPALITY BULK STORM WATER FOR NORTHERN OUTFALL DRAINAGE CHANNEL 197653.29

WHOLE OF MUNICIPALITY UPDATING AND IMPLEMENTATION OF PAVEMENT MANAGEMENT

SYSTEM

286920.73

WHOLE OF MUNICIPALITY KERB INLET CONCRETE 305250

WHOLE OF MUNICIPALITY CONSTRUCTION OF PEDESTRIAN WALKWAYS 336037.1

WHOLE OF MUNICIPALITY KERB REPLACEMENT 342165

WHOLE OF MUNICIPALITY CONSTRUCTION OF PEDESTRIAN BRIDGE 805440

WHOLE OF MUNICIPALITY CONSTRUCTION OF PEDESTRIAN WALKWAYS 925285

WHOLE OF MUNICIPALITY ROAD MARKING 1496013.08

WHOLE OF MUNICIPALITY RETRO-REFLECTIVE ROAD MARKING 4952292.85

WHOLE OF MUNICIPALITY ROADS SEALING 6824862.59

586

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY AQUADENE BULK STORMWATER NORTHERN DRAINAGE CHANNEL 7822362

WHOLE OF MUNICIPALITY ASPHALT BASE ABD SURFACING 25630465.19

WHOLE OF MUNICIPALITY UPGRADING OF RURAL ROAD INFRASTRUCTURE 30956.93

WHOLE OF MUNICIPALITY CONSTRUCTION OF TAXI RANK LOT 63 57330

WHOLE OF MUNICIPALITY UPGRADING OF ENSELENI TAXI RANK 75613.63

WHOLE OF MUNICIPALITY DESIGN AND DRAWINGS FOR STEEL SHED AND BUS BAY TAXI RANK 219800

WHOLE OF MUNICIPALITY DEVELOP AND UPGRADE OF RURAL ROAD INFRASTRUCTURE 227760.86

WHOLE OF MUNICIPALITY DEVELOPMENT AND UPGRADE OF RURAL ROAD INFRASTRUCTURE

PHASE 3

251677.33

WHOLE OF MUNICIPALITY UPGRADE OF RURAL ROADS FOR THE CITY OF UMHLATHUZE 320708.26

WHOLE OF MUNICIPALITY UPGRADING OF ENSELENI TAXI RANK 329652

WHOLE OF MUNICIPALITY ROADS PROJECTS 418004.17

WHOLE OF MUNICIPALITY UPGRADING OF RICHARDS BAY RANK PHASE 1 475368

WHOLE OF MUNICIPALITY UPGRADE OF RURAL ROAD FOR CITY OF UMHLATHUZE 541842.98

587

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY UPGRADE OF RURAL ROAD INFRASTRUCTURE 1375719.49

WHOLE OF MUNICIPALITY UPGRADING OF RICHARDS BAY TAXI RANK 4176293.56

WHOLE OF MUNICIPALITY UPGRADING OF ENSELENI TAXI RANK 5030765.87

WHOLE OF MUNICIPALITY FRIDGE 3995

WHOLE OF MUNICIPALITY RENOVATION OF COLLEGE SWIMMING POOL 18294

WHOLE OF MUNICIPALITY RENOVATION OF ENSELENI SWIMMING POOL 19460

WHOLE OF MUNICIPALITY RENOVATION OF AQUADENE SWIMMING POOL 25575

WHOLE OF MUNICIPALITY BRIGHTLINER MARKING MACHINES 26000

WHOLE OF MUNICIPALITY SWIMMING POOL PUMP 37000

WHOLE OF MUNICIPALITY RENOVATION OF NGWELEZANE SWIMMING POOL 43300

WHOLE OF MUNICIPALITY TOP SOIL 45000

WHOLE OF MUNICIPALITY CONSTRUCTION OF SPORTS COMPLEX 51740

WHOLE OF MUNICIPALITY SOCCER GOAL POSTS 54000

WHOLE OF MUNICIPALITY ALLUMINIUM CARPOT 62530.5

588

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY TRACTOR DRAWN SLASHERS 95000

WHOLE OF MUNICIPALITY RENOVATION OF ARBORETUM SWIMMING POOL 97436.6

WHOLE OF MUNICIPALITY 1.5M H/O TRACTOR DAWN SLASHERS 99999

WHOLE OF MUNICIPALITY INSTALLATION OF SWIMMING POOL FILTERS 113520

WHOLE OF MUNICIPALITY CONSTRUCTION OF NTAMBANANA KICK-ABOUT 125650

WHOLE OF MUNICIPALITY SEATER PLAYERS DUGOUT 138400

WHOLE OF MUNICIPALITY LAWNMOWER 141800

WHOLE OF MUNICIPALITY INDUSTRIAL LAWN MOWER 142000

WHOLE OF MUNICIPALITY TURF MARKING MACHINE 150100.64

WHOLE OF MUNICIPALITY PORTABLE SWIMMING POOL FILTER 155000

WHOLE OF MUNICIPALITY PAVING ESIKHALENI PARK 262915

WHOLE OF MUNICIPALITY INSTALLATION OF IRRIGATION SYSTEM AT THE SPORT COMPLEX 303542.1

WHOLE OF MUNICIPALITY DESIGN FOR BRACKENHAM SPORTFIELD UPGRADE 330499

WHOLE OF MUNICIPALITY SUPPLY AND ERECT STEEL PALISADE AT NGWELEZANE 614300

589

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY PAVING OF NGWELEZANE PARK 819635

WHOLE OF MUNICIPALITY PUBLIC SWIMMING POOL AND FACILITY AT VULINDLELA 946277.26

WHOLE OF MUNICIPALITY CONSTRUCTION OF ESIKHALENI FITNESS CENTRE 5871069.94

WHOLE OF MUNICIPALITY RESCUE MALIBU BOARDS 146800

WHOLE OF MUNICIPALITY BRUSH CUTTERS 185026.72

WHOLE OF MUNICIPALITY UPGRADE OF MAPHENDULA SPORTFIELD IN NDABAYAKHE 32000

WHOLE OF MUNICIPALITY INTERIOR AND EXTERIOR RENOVATIONS AT ALKANSTRAND

LIFEGUARDS BUILDING

169985

WHOLE OF MUNICIPALITY INSTALLATION OF PERIMETER AT ALTON DUMPING SITE 149000

WHOLE OF MUNICIPALITY SKIP 1687800

WHOLE OF MUNICIPALITY REFURBISH NGWELEZANE WATER TREATMENT WORKS 328823

WHOLE OF MUNICIPALITY TELEMETRY SPARES EQUIPMENT 362490.55

WHOLE OF MUNICIPALITY REFURBISH HIGH LIFT PUMP AT MZINGAZI 544434

WHOLE OF MUNICIPALITY REFURBISH ESIKHAWINI WATER TREATMENT WORKS 686686

590

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY EMPANGENI OUTFALL SEWER RISING MAIN 937922.72

WHOLE OF MUNICIPALITY CONSTRUCTION OF 4000 VIP TOILETS - 8/2/1/UMH41-15/16 941177.2

WHOLE OF MUNICIPALITY RURAL SANITATION PHASE IV 1262969.45

WHOLE OF MUNICIPALITY RURAL SANITATION 1859220.17

WHOLE OF MUNICIPALITY PROVISION OF FIRE ENGINEERING SERVICES FOR WASTE WATER

TREATMENT WORKS AND MACERATORS

1932094

WHOLE OF MUNICIPALITY UPGRADE OF EMPANGENI OUTFALL SEWER 3804601.52

WHOLE OF MUNICIPALITY GORMAN RUPP PUMP 211199.85

WHOLE OF MUNICIPALITY 250MM HDPE TEE PIECE 192000

WHOLE OF MUNICIPALITY MOTOR FOR LCH2 PUMP STATION 24174.48

WHOLE OF MUNICIPALITY STAINLESS STEEL CHAIN 5084

WHOLE OF MUNICIPALITY SUBMERSIBLE BOREHOLE PUMPS FOR NTAMBANANA 66548.62

WHOLE OF MUNICIPALITY VALVE FOR AQUADENE 1 PUMPSTATION 28800

WHOLE OF MUNICIPALITY METER REPLACEMENT 89082

591

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY STATIC TANKS 105000

WHOLE OF MUNICIPALITY PILOT VALVES FOR ARBORETUM NORTH ARTERIAL FLATS PRV 173175.42

WHOLE OF MUNICIPALITY WATER DEMAND MANAGEMENT 170173.91

WHOLE OF MUNICIPALITY ESIKHALENI WATER IMPROVEMENT 666828.91

WHOLE OF MUNICIPALITY ESIKHAWINI WATER IMPROVEMENTS 0

WHOLE OF MUNICIPALITY MKHWANAZI NORTH PHASE 5 ZONE K 132280.24

WHOLE OF MUNICIPALITY MKHWANAZI NORTH PHASE 5 5097131.02

WHOLE OF MUNICIPALITY MKHWANAZI NORTH PHASE 5 RETENTION- ZONE E2-8/2/1/UMH101-

16/17

33856.28

WHOLE OF MUNICIPALITY MKHWANAZI NORTH PHASE 5 RETICULARION ZONE E2 RETENTION -

8/2/1/UMH101-16/17

207294.11

WHOLE OF MUNICIPALITY MKHWANAZI NORTH PHASE 5 RETICULATION ZONE E 14780

WHOLE OF MUNICIPALITY MKHWANAZI NORTH PHASE 5 RETICULATION ZONE E2 74240

WHOLE OF MUNICIPALITY MKHWANAZI NORTH PHASE 5 RETICULATION ZONE K 59460

WHOLE OF MUNICIPALITY MKHWANAZI NORTH PHASE 5 RETICULATION ZONE U 33150

592

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY MKHWANAZI NORTH PHASE 5- ZONE K-8/2/1/UMH121-16/17 153919.59

WHOLE OF MUNICIPALITY MKHWANAZI NORTH PHASE 5-ZONE K - 8/2/1/UMH121-16/17 174629.08

WHOLE OF MUNICIPALITY MKHWANAZI NORTH PHASE V 187342.98

WHOLE OF MUNICIPALITY MKHWANAZI NORTH RETICULATION - ZONE U 1734786.87

WHOLE OF MUNICIPALITY WATER DISTRIBUTION - RURAL WATER 1608750.87

WHOLE OF MUNICIPALITY WATER SUPPLY IN DUBE TRIBAL AREA 322665

WHOLE OF MUNICIPALITY WATER SUPPLY RURAL/SEMI URBAN AREAS 1593882.32

WHOLE OF MUNICIPALITY BULK GRAVITY MAN 1670258.77

WHOLE OF MUNICIPALITY EMPANGENI BULK SERVICES 345540.73

WHOLE OF MUNICIPALITY EMPANGENI BULK WATER 40289.7

WHOLE OF MUNICIPALITY WATER SUPPLY - MEGA HOUSING 153186

WHOLE OF MUNICIPALITY WATERSTONE ESTATE BULK WATER SERVICE 0

WHOLE OF MUNICIPALITY WATERSTONE MEGA HOUSING PROJECT 409380.15

WHOLE OF MUNICIPALITY AIR CONDITIONER 8200

593

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY AUTOMATIC DILUTER 101040

WHOLE OF MUNICIPALITY BENCH TOP VACUUM TOP 19846

WHOLE OF MUNICIPALITY BOTTLE TOP DISPENSER 12824.46

WHOLE OF MUNICIPALITY BREATHING APPARATUS 17970

WHOLE OF MUNICIPALITY CHEMICAL DUTY VACCUM PRESSURE PUMP 11670

WHOLE OF MUNICIPALITY FRIDGE FREEZE 31240

WHOLE OF MUNICIPALITY LUMIN ULTRA PHOTON MASTER ANALYSER 139278

WHOLE OF MUNICIPALITY PIPETTE STAND 1520

WHOLE OF MUNICIPALITY QUANTI TRAY 65000

WHOLE OF MUNICIPALITY SAMPLE CELL 1 INCH SQUARE 10ML 31200

WHOLE OF MUNICIPALITY 105 REPLACEMENT METERS 296940

WHOLE OF MUNICIPALITY 5000 LITRE MASTER STANDS 216260.85

WHOLE OF MUNICIPALITY 5000L STD PLASTIC PVE JOJO TANKS 55800

WHOLE OF MUNICIPALITY JOJO TANKS 210050

594

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY METER REPLACEMENT 0

WHOLE OF MUNICIPALITY METER REPLACEMENT 1941186.98

WHOLE OF MUNICIPALITY POLYETHYLENE WATER TANK AND CONSTRUCTION OF WATER TANK

STANDS

386022

WHOLE OF MUNICIPALITY CONSTRUCTION OF WATER SUPPLY STANDS 425614

WHOLE OF MUNICIPALITY METER REPLACEMENT 623138.66

WHOLE OF MUNICIPALITY METER REPLACEMENT 843524.78

WHOLE OF MUNICIPALITY REPLACEMENT OF METERS 248439.4

WHOLE OF MUNICIPALITY JOJO TANK STANDS 165100

WHOLE OF MUNICIPALITY STATIC STANDS 29900.01

WHOLE OF MUNICIPALITY STATIC TANKS 155499.9

WHOLE OF MUNICIPALITY TELEMETRY SPARES EQUIPMENT 132459.8

WHOLE OF MUNICIPALITY WATER LOSS AND DROUGHT RELIEF PROJECT 2156.4

WHOLE OF MUNICIPALITY WATER METERS - NGWELEZANE 375284.6

595

Appendix O: Capital Program by Project by Ward- Current year

WARD BENEFITTING DESCRIPTION AMOUNT

WHOLE OF MUNICIPALITY WATER METERS - RICHARDS BAY 717571.26

WHOLE OF MUNICIPALITY INDUSTRIAL GARDEN BLOWER 3507.5

WHOLE OF MUNICIPALITY WEIGHT SCALE 13000

WHOLE OF MUNICIPALITY FENCING AT ESIKHALENI YMCA J1 84170

WHOLE OF MUNICIPALITY REPLACE AND UPGRADE OF ONLINE ANALYTICAL INSTRUMENTS FOR

WATER QUALITY MANAGEMENT

1288220.5

WHOLE OF MUNICIPALITY WATER QUALITY SOFTWARE ENHANCEMENT 469276.35

TOTAL 350727025

516680403.3

596

APPENDIX P : SERVICE CONNECTION BACKLOGS AT SCHOOLS AND CLINICS.

None

597

APPENDIX Q: SERVICE BACKLOGS EXPERIENCED BY THE COMMUNITY WHERE

ANOTHER SPHERE OF GOVERNMENT IS RESPONSIBLE FOR SERVICE PROVISION

Non-Core Function 2018/2019

Request Ward Responsible Department

Clinic 32 Department of Health

Clinic 31 Department of Health

Clinic 33 Department of Health

Clinic 19 Department of Health

Clinic 9 Department of Health

Clinic 15 Department of Health

Clinic 1 Department of Health

Clinic 26 Department of Health

Clinic 5 Department of Health

Clinic 15 Department of Health

Clinic 12 Department of Health

Clinic 22 Department of Health

Clinic 24 Department of Health

Clinic 25 Department of Health

Clinic 23 Department of Health

Crèche 33 Department of Social Development

Crèche 22 Department of Social Development

Crèche 7 Department of Social Development

Crèche 34 Department of Social Development

Crèche 21 Department of Social Development

Crèche 34 Department of Social Development

Crèche 15 Department of Social Development

Crèche 13 Department of Social Development

598

Non-Core Function 2018/2019

Request Ward Responsible Department

Crèche 10 Department of Social Development

Crèche 9 Department of Social Development

Crèche 27 Department of Social Development

Crèche 31 Department of Social Development

Crèche 11 Department of Social Development

High School 34 Department of Education

High School 33 Department of Education

High School 9 Department of Education

Mobile Clinic 22 Department of Health

Mobile Clinic 30 Department of Health

Mobile Clinic 11 Department of Health

Mobile Clinic 16 Department of Health

Orphanage Home 5 Department of Social Development

Safety 13 Department of Community Safety and Security

Safety 31 Department of Community Safety and Security

Safety 33 Department of Community Safety and Security

Safety 19 Department of Community Safety and Security

Safety 15 Department of Community Safety and Security

Safety 27 Department of Community Safety and Security

Safety 16 Department of Community Safety and Security

Safety 21 Department of Community Safety and Security

Safety 14 Department of Community Safety and Security

Safety 6 Department of Community Safety and Security

Safety 26 Department of Community Safety and Security

Safety 5 Department of Community Safety and Security

599

Non-Core Function 2018/2019

Request Ward Responsible Department

Safety 1 Department of Community Safety and Security

Safety 2 Department of Community Safety and Security

Safety 15 Department of Community Safety and Security

Safety 17 Department of Community Safety and Security

Safety 21 Department of Community Safety and Security

Safety 13 Department of Community Safety and Security

Safety 11 Department of Community Safety and Security

Safety 14 Department of Community Safety and Security

Safety 19 Department of Community Safety and Security

Safety 21 Department of Community Safety and Security

Safety 34 Department of Community Safety and Security

Safety 30 Department of Community Safety and Security

Safety 22 Department of Community Safety and Security

Safety 9 Department of Community Safety and Security

Safety 24 Department of Community Safety and Security

Safety 8 Department of Community Safety and Security

School 7 Department of Education

School 16 Department of Education

School 25 Department of Education

600

APPENDIX R : DECLARATION OF LOANS AND GRANTS MADE BY THE MUNICIPALITY

Declaration of Loans and Grants made by the Municipality

All organisations or Persons in receipt of Grants provided by the Municipality Nature of Project Conditions attached to funding Value

Women's Summit Grant- in - aid None 66 484

uMhlathuze Athletics Associations Grant- in - aid None 100 000

Aerobics Womens' Day Grant- in - aid None 100 000

Disability Sector Grant- in - aid None 117 641

University Registrations Grant- in - aid None 177 850

Reed Dance Grant- in - aid None 197 677

Dolos Festival Grant- in - aid None 200 000

Disaster Management Grant- in - aid None 296 874

4th Annual Spring Tour Festival Grant- in - aid None 300 000

Community Mayor Outreach Grant- in - aid None 356 289

SPCA Grant- in - aid None 420 000

Agricultural Cooperatives Grant- in - aid None 499 044

Sisters Help Desk Corner Grant- in - aid None 500 000

Senior Citizens Summit Grant- in - aid None 536 391

Youth Forum Grant- in - aid None 542 085

Lance Dance Festival Grant- in - aid None 1 000 000

Jazz Festival Grant- in - aid None 1 555 000

SEDA Construction Incubator Trust Grant- in - aid None 2 233 000

Richards Bay Football Club Grant- in - aid None 2 500 000

Various grants in aid Grant- in - aid None 4 083 355

15 781 690

601

APPENDIX S : DECLARATION OF RETURNS NOT MADE IN DUE TIME UNDER

MFMA S71

All returns submitted on time as required in terms of MFMA section 71

APPENDIX T : NATIONAL AND PROVINCIAL OUTCOME FOR LOCAL

GOVERNMENT The National Government adopted 12 strategic outcomes for 2014 to 2019 term of office. Out of 12

outcomes, only 6 outcomes directly affect local government. The progress made in respect of the City

of uMhlathuze is outlines below and can be used by the National and Provincial spheres to monitor

and evaluate service delivery performance.

OUTCOME PROGRESS TO DATE

Outcome 4: Decent employment through

inclusive economic growth

Current unemployment rate: 24.6% (Global

insight 2015)

Other initiatives by the City include:

Establishment of SMME one Stop Shop

Establishment of Construction incubation

Supply Chain Management set asides and

sub-contracting

Internship and industry-based skills

development

Catalytic projects for economic growth

Establishment of business support centre

Richards Bay Industrial Development Zone

Free Public Wi-Fi to promote easy

broadband connectivity

Outcome 5: A skilled and capable workforce

to support an inclusive growth path

Completed skills audit to determine skills

level and industry requirements for the

City of uMhlathuze.

District Skills Audit for King Cetshwayo

conducted by Richards Bay Industrial

Development Zone (RBIDZ)

Richards Bay chapter of KZN growth

coalition

Mayoral Bursary Scheme

Outcome 6: An efficient , competitive and

responsive economic infrastructure network

On average the City invests more than

R500 million on capital projects

Current access to basic services is as

602

OUTCOME PROGRESS TO DATE

follows: water-94.83%, sanitation- 78.82%,

electricity-100% within the Municipal

licenced area

Outcome 7: Vibrant, equitable and

sustainable rural communities with food

security for all

The City has approved an Agricultural

Support Plan to be implemented in 2019-

2020 focusing on development of

agricultural products, support to emerge

farmers and investment in agricultural

infrastructure to ensure food security.

Outcome 8: Sustainable human settlements

and improved quality of household life

The current backlog in housing in 24 442

The City is currently implementing the

following projects:

Empangeni Mega Housing: 10 000 units

Aquadene Housing : 2416 units

Dumisani Makhaya Village Phase 6 &8 :

1212 units

Outcome 9: A responsive , accountable,

effective and efficient local government

system

The City has maintained good governance

and effective and efficient Municipal

systems in line with the back to basics

approach

For 2017/2018 the City received a back to

basics Provincial scoring off 88% depicting

a fully functional Municipality

603

APPENDIX U : TOP RATED RISKS 2018/2019

RISK

RANK RISK REF RISK NAME

RESIDUAL

RISK

RATING

(RRR)

RISK TREATMENT PLANS

COU#01 CD17 Climate Change: Inadequate adaptation

ability 25

FAP1. Review / update Climate Change Strategy/ Low Emissions Development

Strategy

FAP2. Appoint a Green Team to address climate change actions, together with a

Terms of Reference (TOR) for the team

FAP3. Develop a climate change action plan

FAP4. Monitor and evaluate the climate change plan (through quarterly reporting)-

linked to Integrated Development Plan (IDP) yearly review

FAP5. Affiliation with additional strategic partners

COU#02 CD18 Climate Change: Greenhouse gas

contributions 25

COU#03 EES02 Decreasing reliance on electricity as a

source of energy 25

FAP1. Consultant appointed to develop the energy sector plan.

FAP2. Revising of applicable Bylaws

COU#04 EES01 Inadequate reliability of electricity supply 25 FAP1. Reviewing electrical asset management plan.

FAP2. Budget for electronic surveillance and security searching detectors

COU#05 CD02 Poor standard of living in rural and urban

areas for vulnerable groups 25

FAP1.Annual review and update of strategic planning documents; ie

a. Spatial Development Framework (SDF) ; b. Human Settlement Plan

FAP2. Fund and develop the Rural Framework Plans- 5 Phases- Phase 3 in current fin

year

FAP3. Pursue implementation of NUSP proposals- multi-year- Phase 1 in current fin

year: Feasibility studies for Nseleni and Umzingwenya

FAP4. Implementation of Level 2 Accreditation mandate

FAP5. Motivate for and Secure funding/resources to implement Municipal Human

Settlement Plan

COU#06 CD26

Unplanned settlements on Council owned

land (including environmentally sensitive

areas); land invasions of non-Council

owned land (including environmentally

25

FAP1. Annual review and update of strategic planning documents.

FAP2. Continuous engagement with ITB and relevant stakeholders to resolve issues

in Traditional Areas

604

RISK

RANK RISK REF RISK NAME

RESIDUAL

RISK

RATING

(RRR)

RISK TREATMENT PLANS

sensitive areas)

COU#07 EES03 Inability to supply unplanned future

demand of electricity 25

FAP1. Monitoring of contractor performance

COU#08 EES07 Settlement under electrical servitude 25 FAP1. Moving of the power lines when the budget is available.

FAP2. Designs for new powerlines route will be developed in 2019/2020.

COU#09 EES08 Ineffective Fleet Management 25

FAP1. Action plan on implementation of Audit findings

FAP2. Vehicle tracking system Installation

FAP3. Provision of access to all Supervisors to ensure monitoring of vehicle usage and

driver behaviour

COU#10 FS16 Inadequate mSCOA Business Reform 25

FAP1. Support plan in Enterprise Resource Planning (ERP) Service Level Agreement

(SLA)on GoLive to ensure that MSCOA amendments are effected

FAP2. Business Process Re-engineering

FAP3. MSCOA Training for Non-financial managers

FAP4. Change Management Programme for MSCOA (to be discussed with DMM CS)

COU#11 IS07 Failure to successfully execute capital

projects 25

FAP1.Relook at section to Increase capacity in Project Management Unit (PMU)- to be

submitted to Council

FAP2. Separate planning and execution of projects- for all departments

FAP3. Approval of TOR- Project Steering Committee (psc)

FAP4. Monthly monitoring of Capex by department

COU#12 IS09 Coastal Erosion 25

FAP1. Extension of Geobag Revetment Wall northwards

FAP2. Completion and finalising of Memorandum of Understanding (MOU) between

COU and Transnet

FAP3. Increased and continuous sand pumping from sandtrap onto beach from

Transnet as per MOU between COU and Transnet

FAP4. Further Coastal Erosion Study to be conducted to assist in request from

Transnet for increased sand volumes, and construction of alternative erosion control

605

RISK

RANK RISK REF RISK NAME

RESIDUAL

RISK

RATING

(RRR)

RISK TREATMENT PLANS

measures

FAP5. Implementation of beach erosion maintenance along the coastline

COU#13 COUOHS01 Non-compliance of municipal facilities

with the OHS Act requirements 25

FAP1. Updating of all relevant compliance certificates to obtain occupation certificates

(all Council buildings)

FAP2. Emergency Planning and Response 3 year program for all Council Buildings

FAP3. Occupational Hygiene surveys for all Council Workplaces

FAP4. Update and replenishment of all compliance signage

COU#14 FS08 Deterioration of debt collection 20 FAP1. Alignment of processes between FS, IS and EES- workflow

FAP2. Consumer training program in consultation with the Office of the Speaker

COU#15 CD10 Increased unemployment 20

FAP1. Construction of a Business Centre: Esikhaleni

FAP2. Establishment of a Construction Incubator

FAP3. Review the Skills Audit and Budget for Skills Development.

COU#16 COUOSH03

Inadequate or insufficient Engineering

and/or Administrative Controls to mitigate

any potential hazards in the working

environment

20

FAP1. AIA study on all machinery and equipment to ascertain current state of

engineering controls and gap analysis

FAP2. From the AIA study, the creation of an action plan for maintenance and

replacement of all tools, equipment and machinery, including fire equipment and the

lifts

FAP3. Implementation of UMSAP to address the document control gap.

COU#17 COUOHS05

Failure to identify, assess and manage

Occupational Health and Safety risk to

acceptable levels

20 FAP1. Formulation of OHS Baseline Risk Assessment Implementation Programme-

Deputy Municipal Manager's

COU#18 COMS01 Inadequate public safety and security 20

FAP1. Management of Internal CCTV Programme post installation by ICT

FAP2. Implementation of Integrated Public Safety Strategy

FAP3. Approval and implementation of Bylaw on Alcohol Consumption in Public

FAP4. Conducting of multi-disciplinary public safety operations

FAP5. Sustaining of the Bicycle project

606

RISK

RANK RISK REF RISK NAME

RESIDUAL

RISK

RATING

(RRR)

RISK TREATMENT PLANS

COU#19 COMS09 Occurrence of disasters 20

FAP1. Appointment of consultant to develop a Disaster Risk Assessment and Disaster

Management Plan : City Wide

FAP2. Documented Community Education and Awareness Programme to be compiled

COU#20 FS17 Reduced financial resources due to the

adverse economic climate 20

FAP1. Prioritizing expenditure for economic infrastructure aimed at improving

investment, revenue and job creation

FAP2. Finalize projects prioritization model (discuss with DMM CD)

FAP3. Advocate for Management Accounting in the institution

COU#21 EES04 Inadequate Asset Management 20

FAP1. Implementation of recommendations from ERP system requirements study

FAP2. Revision of maintenance and refurbishment plans

FAP3. Top 5 assets per section in terms of risk (water, electrical, roads, fleet, facilities)

FAP4. Report top 5 per quarter

FAP5. Asset Management System implementation

COU#22 EES06 Failure of and shortened economic

lifespan of infrastructure and facilities 20

FAP1. Asset Management System Project Phase 1 implementation

FAP2. Decentralizing of budgeting to departments for assets

COU#23 FS13

Compromised service delivery/

Non-adherence to legislative

requirements

20

FAP1. Capitation of SCMU with allocated budget for 19/20

FAP2. Implement audit action plan

FAP3. Develop procedures and process plans for new circulars in relation to SCM

COU#24 COUOHS02

Unsafe conditions as a result of

inadequate or poorly maintained tools,

equipment and machinery

20

FAP1. Re-launching of the importance of on-the-job orientation by Supervisors

FAP2. Creation of a central database for all plant, tools and equipment which require

specialized training to prioritize all compliance training in the annual budget

FAP3. The implementation of UMSAP will assist with record keeping for all

maintenance

FAP4. Improvement of access control including installation of cameras at all

workplaces

FAP5. Implementation of Planned Task Observations (PTO's for all operational tasks

involving tools, equipment and machinery)

607

RISK

RANK RISK REF RISK NAME

RESIDUAL

RISK

RATING

(RRR)

RISK TREATMENT PLANS

COU#25 COUOHS04 Inadequate provision and management of

Personal Protective Equipment 20

FAP1. Verification of central PPE needs register

FAP2. Input of verified needs into new PPE Tender

FAP3. Centralization of PPE Budget to OHS Unit

COU#26 COUOHS07

Failure to ensure adherence to controls /

mitigations related to OHS, as

documented in the OHS Risk Assessment

(cross ref to COUOHS09)

20

FAP1. Regular reporting to Top Management Structure- which must take steps to

ensure consequence management and enforcement of discipline for OHS non-

compliance

COU#27 COUOHS09

Failure of management to enforcement

consequences for non-adherence to OHS

requirements as contained in the Act and

Regulations (cross ref to COUOHS07)

20

FAP1. Regular reporting to Top Management Structure- which must take steps to

ensure consequence management and enforcement of discipline for OHS non-

compliance

COU#28 COUOHS11 Inadequate contractor management 20 FAP1. Further engagements with departments on issues with quotations.

COU#29 CD01 Inadequate or insufficient or irrelevant

public transport facilities 16

FAP1. Rank Management Strategy

FAP2. Adoption of the Public Transport Bylaw

FAP3. Adoption of Comprehensive Integrated Transport Plan (CITP).

COU#30 COMS08 Inadequate Heritage, Arts and Culture

Programmes 16

FAP1. Incremental Implementation of Integrated Heritage, Arts and Culture

Programmes

FAP2. Alignment of funding to Grants in Aid Policy (as determined by the GIA

Committee)

COU#31 CS07 Inability of ICT system to support effective

decision making in the organisation 16

FAP1. Implementation of ERP System

FAP2. Testing of Disaster Recovery Plan (DRP)

COU#32 IS01 Unreliable supply of water 16

FAP1. PPP Projects (desalination; waste water re-use)- plant completion

FAP2. Tugela transfer scheme upgrade (various stakeholders involved in this project,

run by DWS)

FAP3. Storm water Drainage Master Plan (harvesting of run off before reaching water

sources)

608

RISK

RANK RISK REF RISK NAME

RESIDUAL

RISK

RATING

(RRR)

RISK TREATMENT PLANS

FAP4. Bulk Water Master Plan- tender to revise

FAP5. Pipe replacement program to address water losses- various phases

FAP6. Meeting with Councillors on Drought issues

FAP7. Meeting with industries

FAP8. Investigation on increasing Lake Cubhu storage capacity and extraction of

water from there- SP to be appointed to conduct feasibility study to build dam wall

FAP10. Bulk pipeline from Nsezi to eSikhaleni Reservoirs- business plan submitted to

DOWA

COU#33 IS08

Continued or increasing losses resulting

from water services provision (current:

24%, target: 22%; int std: 15%; nat std:

20%)

16

FAP1. Water- Audits on industrial, commercial, municipal, government installations

FAP2. Revision of Water Services Bylaw to impose stricter consequences for water

related transgressions

FAP3. Installation of water reticulation in rural areas- Phase 5 (Mkhwanazi North,

Wards 10, 11 and 34)

COU#34 COUICT13 Failure of ERP and Assetman System Go

Live 16

FAP1. No additional large system implementations over and above ERP and Asset

Management competing for same resources.

FAP2. Continuous monitoring of the project implementation and change

management.

COU#35 COUICT16 Inadequate Human Capital Capacitation in

the ICT Section 16

FAP1. Approval and funding for the revised ICT structure

FAP2. Annual budget submission

COU#36 CS08

Lack of co-ordination, centralization and

standardization of records management

across the organization

15

FAP1. Relocation of Registry to a suitable and compliant facility (follow up on clinic

relocation)

FAP2. Approval of electronic records management system- post SAP implementation

FAP4. Correction of fire equipment in Registry

COU#37 CS09

Outdated Policies that do not talk to the

latest legislative provisions which may

lead to dissatisfaction from employees

15 FAP1. Report on updating of policies- quarterly

609

RISK

RANK RISK REF RISK NAME

RESIDUAL

RISK

RATING

(RRR)

RISK TREATMENT PLANS

and the community

COU#38 COMS02 Inadequate fire prevention in the City 15

FAP1. Incremental filling of approved structure

FAP2. Continued inspection of high risk business

FAP3. Continued response to fire incidents

FAP4. Continued replacement of fire equipment as and when required

FAP5. Specific community awareness on the safety of using alternative energy

sources, ie gas

COU#39 FR02 Abuse of overtime or working hours by

municipal officials 16

FAP1. Biometric system to be installed and workshopped to all municipal officials

COU#40 FR03

Abuse of working hours by municipal

officials by not being present during

working hours or performing work for

personal interests

16

FAP1. Biometric system to be installed at the Municipality and workshopped to all

municipal officials

FAP2. Installation of CCTV cameras

COU#41 FR11 Leaking of confidential information 16

FAP1. Review of Minimum Information Security Standards (MISS) application to

Council processes and assessment of compliance thereto.

City of uMhlathuzeAnnual Financial Statements

for the year ended 30 June 2019

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

General Information

Nature of business and principal activities Local government

Executive Committee

Executive Committe and MPAC Cllr MG Mhlongo ( Mayor )

Cllr KD Sibiya ( Deputy Mayor )

Cllr SG Mkhize ( Speaker )

Cllr M Lourens ( Chief Whip )

Cllr LCM Fourie ( Exco )

Cllr TS Gumede ( Exco )

Cllr BC Mthembu ( Exco )

Cllr K Mthethwa ( Exco )

Cllr DJ Ndimande ( Exco )

Cllr TM Phahla ( Exco )

Cllr M Sookroo ( Exco )

Cllr RM Zikhali ( Exco )

Cllr SB Mabaso ( Chairperson of section 79 MPAC )

Chief Finance Officer Mr M Kunene

Accounting Officer Dr NJ Sibeko

Registered Office 5 Mark Strasse

Central Business District

Richards Bay

3900

Business Address 5 Mark Strasse

Central Business District

Richards Bay

3900

Postal Address Private Bag X1004

Richards Bay

3900

Bankers ABSA

Auditors Auditor-General South Africa

Registered Auditors

1

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Index

The reports and statements set out below comprise the Annual Financial Statements presented to the Municipal Council:

Page

Accounting Officer's Responsibilities and Approval 3

Statement of Financial Position 4

Statement of Financial Performance for the year ended 30 June 2019 5

Statement of Changes in Net Assets for the year ended 30 June 2019 6

Cash Flow Statement for the year ended 30 June 2019 7

Statement of Budget Comparison and Actual Amounts for the year ended 30 June 2019 8 - 13

Accounting Policies for the year ended 30 June 2019 14 - 27

Notes to the Annual Financial Statements for the year ended 30 June 2019 28 - 62

Appendixes (not subject to audit):

Appendix A: Schedule of External loans as at 30 June 2018 63

Appendix B: Analysis of Property, Plant and Equipment as at 30 June 2018 64

Appendix F: Disclosure of Grants and Subsidies in terms of Section 123 , MFMA , 56 of 2003 67

COID Compensation for Occupational Injuries and Diseases

DBSA Development Bank of South Africa

GRAP Generally Recognised Accounting Practice

HDF Housing Development Fund

CIGFARO Chartered Institute of Government Finance Audit and Risk Officer

MFMA Municipal Finance Management Act

MIG Municipal Infrastructure Grant (Previously CMIP)

MSCOA Municipal Standard Chart Of Accounts

SALGA South African Local Government Association

2

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Statement of Financial Position as at 30 June 20192019 2018

Restated*Note(s) R R

Assets

Current Assets

Inventories 2 69 380 506 64 791 919

Current portion of long-term receivables 3 - 45 848

Receivables from non-exchange transactions 4 103 046 769 112 170 005

Receivables from exchange transactions 5 361 728 005 412 170 563

Cash and cash equivalents 6 461 154 733 460 422 240

995 310 013 1 049 600 575

Non-Current Assets

Investment property 7 86 798 936 87 333 174

Property, plant and equipment 8 6 205 475 195 6 225 646 400

Intangible assets 9 116 081 094 63 504 225

Heritage assets 10 2 464 611 2 766 994

6 410 819 836 6 379 250 793

Total Assets 7 406 129 849 7 428 851 368

Liabilities

Current Liabilities

Other financial liabilities 11 87 792 565 145 258 677

Payables from exchange transactions 12 405 127 696 485 748 893

VAT payable 48 14 327 754 10 601 503

Consumer deposits 13 65 555 956 61 828 894

Unspent conditional grants and receipts 14 10 800 509 15 676 399

Provisions 15 16 518 380 15 176 264

600 122 860 734 290 630

Non-Current Liabilities

Other financial liabilities 11 614 841 385 394 165 665

Employee benefit obligation 16 224 236 000 220 079 000

839 077 385 614 244 665

Total Liabilities 1 439 200 245 1 348 535 295

Net Assets 5 966 929 604 6 080 316 073

Accumulated surplus 17 5 966 929 604 6 080 316 073

* See Note 39

4

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Statement of Financial Performance for the year ended 30 June 20192019 2018

Restated*Note(s) R R

Revenue

Revenue from exchange transactions

Service charges 18 1 890 432 000 1 823 519 981

Rental of facilities and equipment 10 275 798 8 722 479

Interest earned - outstanding debtors 129 852 102 819

Agency services 6 406 951 6 356 294

Licences and permits 3 899 939 3 876 502

Operational revenue 19 54 989 088 57 711 624

Interest received - investment 20 27 999 016 76 055 871

Actuarial gains 16 19 712 000 157 558 526

Gain on disposal of land 33 - 652 684

Total revenue from exchange transactions 2 013 844 644 2 134 556 780

Revenue from non-exchange transactions

Taxation revenue

Property rates 21 477 137 969 442 660 780

Property rates - penalties imposed 21 3 280 389 2 013 216

Surcharges and Taxes 46 4 072 533 4 492 333

Transfer revenue

Transfers and subsidies 22 456 427 945 463 327 707

Public contributions and donations 23 2 102 809 3 972 232

Fines, Penalties and Forfeits 76 478 848 7 848 582

Total revenue from non-exchange transactions 1 019 500 493 924 314 850

Total revenue 3 033 345 137 3 058 871 630

Expenditure

Employee related costs 24 758 128 805 700 888 831

Remuneration of councillors 25 30 394 989 29 341 691

Post-employment benefit expenses 16 23 869 000 45 105 789

Depreciation and amortisation 26 464 233 772 348 560 825

Impairment loss 8 424 712 -

Finance costs 27 51 286 016 67 690 845

Debt Impairment 28 163 733 092 27 153 878

Collection costs 1 998 049 2 142 943

Bulk purchases 29 1 010 855 149 962 387 727

Contracted services 30 312 392 114 288 507 777

Transfers and subsidies 31 15 781 690 11 517 223

Loss on disposal of assets and liabilities 11 689 152 1 449 010

Operating expenses 32 293 945 065 283 871 173

Total expenditure 3 146 731 605 2 768 617 712

(Deficit) / Surplus for the year (113 386 468) 290 253 918

* See Note 39

5

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Statement of Changes in Net Assets for the year ended 30 June 2019Accumulated

surplusTotal net assets

R R

Restated* Balance at 01 July 2017 5 790 062 155 5 790 062 155Changes in net assetsSurplus for the year 290 253 918 290 253 918

Total changes 290 253 918 290 253 918

Restated* Balance at 01 July 2018 6 080 316 072 6 080 316 072Changes in net assetsSurplus for the year (113 386 468) (113 386 468)

Total changes (113 386 468) (113 386 468)

Balance at 30 June 2019 5 966 929 604 5 966 929 604

* See Note 39

6

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Cash Flow Statement for the year ended 30 June 20192019 2018

Restated*Note(s) R R

Cash flows from operating activities

Receipts

Sale of goods and services 1 861 590 684 1 836 734 793

Grants 464 924 947 467 299 940

Interest income 27 999 016 76 055 871

Other receipts 544 237 004 520 466 999

2 898 751 651 2 900 557 603

Payments

Employee costs (754 289 172) (700 888 831)

Suppliers (1 739 766 453) (1 731 951 591)

Finance costs (51 286 016) (67 690 845)

(2 545 341 641) (2 500 531 267)

Net cash flows from operating activities 35 353 410 010 400 026 336

Cash flows from investing activities

Purchase of property, plant and equipment 8 (461 900 627) (463 625 608)

Proceeds from sale of property, plant and equipment 8 759 300 -

Purchase of investment property 7 - (113 500)

Purchase of other intangible assets 9 (54 745 798) (35 508 954)

Non-current receivables - 32 736

Proceed from sale of land - 680 000

Net cash flows from investing activities (515 887 125) (498 535 326)

Cash flows from financing activities

Proceeds from other financial liabilities 310 000 000 -

Repayment of long-term liabilities (146 790 392) (156 184 529)

Net cash flows from financing activities 163 209 608 (156 184 529)

Net increase/(decrease) in cash and cash equivalents 732 493 (254 693 519)

Cash and cash equivalents at the beginning of the year 460 422 240 715 115 759

Cash and cash equivalents at the end of the year 6 461 154 733 460 422 240

* See Note 39

7

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Statement of Budget Comparison and Actual Amounts for the year ended 30 June 2019Budget on Accrual Basis

Approvedbudget

Adjustments Final Budget Actual amountson comparable

basis

Differencebetween final

budget andactual

Reference

R R R R R

Statement of Financial Performance

Revenue

Revenue from exchangetransactions

Service charges 2 097 369 100 (79 192 100) 2 018 177 000 1 890 432 000 (127 745 000) %93.67

Rental of facilities and equipment 8 448 800 149 800 8 598 600 10 275 798 1 677 198 %119.51

Interest earned - outstandingdebtors

3 397 900 (3 312 200) 85 700 129 852 44 152 %151.52

Agency services 7 796 500 (2 000 000) 5 796 500 6 406 951 610 451 %110.53

Licences and permits 3 807 500 (500 000) 3 307 500 3 899 939 592 439 %117.91

Operational income 43 874 700 (3 584 300) 40 290 400 54 989 088 14 698 688 %136.48

Interest received - investment 55 000 000 - 55 000 000 27 999 016 (27 000 984) %50.91

Gains on disposal of assets - 759 300 759 300 - (759 300) %-

Total revenue from exchangetransactions

2 219 694 500 (87 679 500) 2 132 015 000 1 994 132 644 (137 882 356) 94

Revenue from non-exchangetransactions

Taxation revenue

Property rates 474 453 400 21 279 000 495 732 400 477 137 969 (18 594 431) %96.25

Property rates - penalties imposed - - - 3 280 389 3 280 389 %-

Surcharges and Taxes - - - 4 072 533 4 072 533 %-

Transfer revenue

Government grants & subsidies 485 862 100 (1 653 000) 484 209 100 456 427 945 (27 781 155) %94.26

Public contributions and donations - - - 2 102 809 2 102 809 %-

Fines, Penalties and Forfeits 4 087 300 3 610 900 7 698 200 76 478 848 68 780 648 %993.46

Total revenue from non-exchangetransactions

964 402 800 23 236 900 987 639 700 1 019 500 493 31 860 793 104%

Total revenue 3 184 097 300 (64 442 600) 3 119 654 700 3 013 633 137 (106 021 563) 97%

Expenditure

Remuneration of employees (812 123 200) 2 105 700 (810 017 500) (758 128 805) 51 888 695 %93.59

Remuneration of councillors (31 880 800) 393 100 (31 487 700) (30 394 989) 1 092 711 %96.53

Post employment benefits - - - (23 869 000) (23 869 000) %-

Depreciation and amortisation (376 066 000) - (376 066 000) (464 233 772) (88 167 772) %123.44

Impairment loss/ Reversal ofimpairments

- - - 8 424 712 8 424 712 %-

Finance costs (67 884 000) 8 525 500 (59 358 500) (51 286 016) 8 072 484 %86.40

Debt Impairment (26 512 500) (3 217 000) (29 729 500) (163 733 092) (134 003 592) %550.74

Collection costs - - - (1 998 049) (1 998 049) %-

Repairs and maintenance (426 963 700) (66 528 600) (493 492 300) (396 124 692) 97 367 608 %80.27

Bulk purchases (1 000 945 200) 26 219 500 (974 725 700) (1 010 855 149) (36 129 449) %103.71

Transfers and Subsidies (12 533 600) (2 645 500) (15 179 100) (15 781 690) (602 590) %103.97

Operating expenses (261 587 500) 2 330 500 (259 257 000) (227 061 911) 32 195 089 %87.58

Total expenditure (3 016 496 500) (32 816 800) (3 049 313 300) (3 135 042 453) (85 729 153) 103.00

8

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Statement of Budget Comparison and Actual Amounts for the year ended 30 June 2019Budget on Accrual Basis

Approvedbudget

Adjustments Final Budget Actual amountson comparable

basis

Differencebetween final

budget andactual

Reference

R R R R R

Operating deficit 167 600 800 (97 259 400) 70 341 400 (121 409 316) (191 750 716)

Loss on disposal - - - (11 689 152) (11 689 152) %-

Actuarial gains/losses - - - 19 712 000 19 712 000 %-

- - - 8 022 848 8 022 848 -

Deficit before taxation 167 600 800 (97 259 400) 70 341 400 (113 386 468) (183 727 868) -

Actual Amount on ComparableBasis as Presented in the Budgetand Actual Comparative Statement

167 600 800 (97 259 400) 70 341 400 (113 386 468) (183 727 868) -

9

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Statement of Budget Comparison and Actual Amounts for the year ended 30 June 2019Budget on Accrual Basis

Approvedbudget

Adjustments Final Budget Actual amountson comparable

basis

Differencebetween final

budget andactual

Reference

R R R R R

Statement of Financial Position

Assets

Current Assets

Inventories 80 641 542 (3 773 276) 76 868 266 69 380 506 (7 487 760) %90.26

Long-term Receivables 34 071 - 34 071 - (34 071) %-

Receivables from non-exchangetransactions

33 479 018 - 33 479 018 103 046 769 69 567 751 %307.80

Receivables from exchangetransactions

456 032 762 (21 922 094) 434 110 668 361 728 005 (72 382 663) %83.33

Cash and cash equivalents 638 748 217 (112 897 424) 525 850 793 461 154 733 (64 696 060) %87.70

1 208 935 610 (138 592 794) 1 070 342 816 995 310 013 (75 032 803) %93.19

Non-Current Assets

Investment property 124 144 438 (780 832) 123 363 606 86 798 936 (36 564 670) %70.36

Property, plant and equipment 5 515 085 754 43 006 533 5 558 092 287 6 205 475 195 647 382 908 %111.65

Intangible assets 89 675 774 35 989 271 125 665 045 116 081 094 (9 583 951) %92.37

Heritage assets 3 011 994 - 3 011 994 2 464 611 (547 383) %81.83

Long-term Receivables 23 513 - 23 513 - (23 513) %-

5 731 941 473 78 214 972 5 810 156 445 6 410 819 836 600 663 391 %114.75

Total Assets 6 940 877 083 (60 377 822) 6 880 499 261 7 406 129 849 525 630 588 %111.40

Liabilities

Current Liabilities

Other financial liabilities 84 326 087 - 84 326 087 87 792 565 3 466 478 %104.11

Payables from exchangetransactions

482 468 000 122 546 365 605 014 365 405 127 697 (199 886 668) %66.96

VAT payable - - - 14 327 754 14 327 754 %-

Consumer deposits 52 876 045 2 961 058 55 837 103 65 555 956 9 718 853 %117.41

Unspent conditional grants andreceipts

11 629 158 - 11 629 158 10 800 509 (828 649) %92.87

Provisions 25 877 822 (10 701 558) 15 176 264 16 518 380 1 342 116 %108.84

657 177 112 114 805 865 771 982 977 600 122 861 (171 860 116) %77.74

Non-Current Liabilities

Other financial liabilities 608 786 998 - 608 786 998 614 841 385 6 054 387 %101.0

Employee benefit obligation 337 416 981 (93 946 981) 243 470 000 224 236 000 (19 234 000) %92.1

946 203 979 (93 946 981) 852 256 998 839 077 385 (13 179 613.0) %98.5

Total Liabilities 1 603 381 091 20 858 884 1 624 239 975 1 439 200 246 (185 039 729) %88.61

Net Assets 5 337 495 992 (81 236 706) 5 256 259 286 5 966 929 603 710 670 317 %113.52

10

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Statement of Budget Comparison and Actual Amounts for the year ended 30 June 2019Budget on Accrual Basis

Approvedbudget

Adjustments Final Budget Actual amountson comparable

basis

Differencebetween final

budget andactual

Reference

R R R R R

Net Assets

Reserves

Capital replacement reserve 369 182 715 - 369 182 715 366 496 778 (2 685 937) %99.27

Accumulated surplus 4 968 313 277 (81 236 706) 4 887 076 571 5 600 432 825 713 356 254 %114.60

Total Net Assets 5 337 495 992 (81 236 706) 5 256 259 286 5 966 929 603 710 670 317 %113.52

11

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Statement of Budget Comparison and Actual Amounts for the year ended 30 June 2019Budget on Accrual Basis

Approvedbudget

Adjustments Final Budget Actual amountson comparable

basis

Differencebetween final

budget andactual

Reference

R R R R R

Cash Flow Statement

Cash flows from operating activities

Receipts

Property rates 464 964 332 20 853 420 485 817 752 460 913 399 (24 904 353) %94.87

Service charges 1 957 075 975 (65 547 889) 1 891 528 086 1 861 590 684 (29 937 402) %98.42

Grants 485 862 100 (1 653 000) 484 209 100 464 924 947 (19 284 153) %96.02

Interest income 58 397 900 (3 312 200) 55 085 700 27 999 016 (27 086 684) %50.83

Other receipts 64 867 524 823 676 65 691 200 83 323 605 17 632 405 %126.84

3 031 167 831 (48 835 993) 2 982 331 838 2 898 751 651 (83 580 187) %97.20

Payments

Employee costs (825 304 360) - (825 304 360) (754 289 172) 71 015 188 %91.40

Suppliers (1 703 744 876) (67 840 568) (1 771 585 444) (1 739 766 453) 31 818 991 %98.20

Finance costs (67 884 000) 8 525 500 (59 358 500) (51 286 016) 8 072 484 %86.40

(2 596 933 236) (59 315 068) (2 656 248 304) (2 545 341 641) 110 906 663 %95.82

Net cash flows from operatingactivities

434 234 595 (108 151 061) 326 083 534 353 410 010 27 326 476

Cash flows from investing activities

Purchase of property, plant andequipment

(525 178 722) (17 731 663) (542 910 385) (461 900 627) 81 009 758 %85.08

Proceeds from sale of property,plant and equipment

- - - 759 300 759 300 %-

Purchase of other intangible assets - - - (54 745 798) (54 745 798) %-

Net cash flows from investingactivities

(525 178 722) (17 731 663) (542 910 385) (515 887 125) 27 023 260 %95.02

Cash flows from financing activities

Proceeds from financial liabilities 310 000 000 - 310 000 000 310 000 000 -

Repayment of other financialliabilities

(156 184 530) 4 485 930 (151 698 600) (146 790 392) 4 908 208

Movement in consumer deposits - 8 500 000 8 500 000 - (8 500 000)

Net cash flows from financingactivities

153 815 470 12 985 930 166 801 400 163 209 608 (3 591 792)

Net increase/(decrease) in cash andcash equivalents

62 871 343 (112 896 794) (50 025 451) 732 493 50 757 944 %(1.46)

Cash and cash equivalents at thebeginning of the year

466 876 244 - 466 876 244 460 422 240 (6 454 004) %98.62

Cash and cash equivalents at theend of the year

529 747 587 (112 896 794) 416 850 793 461 154 733 44 303 940 %110.63

12

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Statement of Budget Comparison and Actual Amounts for the year ended 30 June 2019Budget on Accrual Basis

Approvedbudget

Adjustments Final Budget Actual amountson comparable

basis

Differencebetween final

budget andactual

Reference

R R R R R

Capital expenditure

Community and Social Services 55 463 300 6 608 300 62 071 600 44 247 392 (17 824 208) %71.28

Electricity 85 472 000 10 300 500 95 772 500 81 615 831 (14 156 669) %85.22

Environmental protection 200 000 38 500 238 500 187 049 (51 451) %78.43

Planning and Development 3 952 500 885 500 4 838 000 882 033 (3 955 967) %18.23

Public Safety 559 000 (60 000) 499 000 358 115 (140 885) %71.77

Sport and Recreation 24 958 400 1 901 700 26 860 100 15 638 412 (11 221 688) %58.22

Waste Management 1 700 000 1 315 200 3 015 200 3 241 963 226 763 %107.52

Waste Water Management 48 123 200 1 092 000 49 215 200 79 744 537 30 529 337 %162.03

Water 68 773 200 1 936 800 70 710 000 75 224 494 4 514 494 %106.38

Road Transport 133 723 200 8 129 200 141 852 400 92 482 331 (49 370 069) %65.20

Finance and administration 102 236 000 29 019 900 131 255 900 125 414 794 (5 841 106) %95.55

Total expenditure 525 160 800 61 167 600 586 328 400 519 036 951 (67 291 449) 88.52%

13

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Accounting Policies for the year ended 30 June 2019

1. Presentation of Annual Financial Statements

The annual financial statements have been prepared in accordance with the Standards of Generally Recognised Accounting Practice (GRAP),issued by the Accounting Standards Board in accordance with Section 122(3) of the Municipal Finance Management Act (Act 56 of 2003).

These annual financial statements have been prepared on an accrual basis of accounting and are in accordance with historical costconvention as the basis of measurement, unless specified otherwise. They are presented in South African Rand.

A summary of the significant accounting policies, which have been consistently applied in the preparation of these annual financialstatements, are disclosed below.

These annual financial statements have been prepared in accordance with Generally Recognised Accounting Practice (GRAP), issued by theAccounting Standards Board (ASB) in accordance with Section 122(3) of the Municipal Finance Management Act, (Act No 56 of 2003) withthe exception of certain accounting policies adopted in accordance with International Accounting Standards (IAS).

The principal accounting policies adopted in the preparation of these annual financial statements are set out below: GRAP 1 Presentation of Financial Statement GRAP 2 Cash Flow Statements GRAP 3 Accounting Policies, Changes in Accounting Estimates and Error GRAP 5 Borrowing Costs GRAP 6 Consolidated and Separate Financial Statements GRAP 9 Revenue from Exchange Transactions GRAP 12 Inventories GRAP 13 Leases GRAP 14 Events after the Reporting Date GRAP 16 Investment property GRAP 17 Property, Plant and Equipment GRAP 19 Provisions, Contingent Liabilities and Contingent Asset GRAP 21 Impairment of non-cash generating asset GRAP 23 Revenue from Non-exchange transactions GRAP 24 Presentation of budget information GRAP 25 Employee benefits GRAP 26 Impairment of cash generating assets GRAP 31 Intangible Assets GRAP 100 Non-Current Assets Held for Sale and Discontinued Operations GRAP 103 Heritage Assets GRAP 104 Financial Instruments GRAP 106 Transfer of Functions between entities not under common Control

The following GRAP standards have been issued but are not yet effective and have not been adopted early by the Municipality: GRAP 18 Segment Reporting ( Effective 1 April 2019 ) GRAP 20 Related Party Disclosures ( Effective 1 April 2019 ) GRAP 32 Standard of GRAP on Service Concession Arrangements: Grantor ( Effective 1 April 2019 ) GRAP 108 Statutory Receivables ( Effective 1 April 2019 ) GRAP 109 Accounting by Principals and Agents ( Effective 1 April 2019 )

The following GRAP standards have been issued and effective but are not applicable to the Municipality. GRAP 4 The effects of changes in foreign exchange rates GRAP 6 Consolidated and separate financial statements GRAP 7 Investments in associate GRAP 8 Interest in joint ventures GRAP 10 Financial reporting in hyperinfationary economics GRAP 27 Agriculture

1.1 Presentation currency

These annual financial statements are presented in South African Rand. The figures are rounded off to the nearest rand.

14

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Accounting Policies for the year ended 30 June 2019

1.2 Going concern assumption

These annual financial statements have been prepared based on the expectation that the Municipality will continue to operate as agoing concern for at least the next 12 months.

1.3 Offsetting

Assets, liabilities, revenue and expenses have not been offset except when offsetting is required or permitted by a Standard of GRAP.

1.4 Significant judgements and sources of estimation uncertainty

The preparation of the Municipality’s financial statements requires management to make judgements, estimates and assumptions thataffect the reported amounts of revenues, expenses, assets and liabilities, at the reporting date. However, uncertainty about theseassumptions and estimates could result in outcomes that require a material adjustment to the carrying amount of the asset or liabilityaffected in future periods.

Judgements

In the process of applying the Municipality’s accounting policies, management has made the following judgements, which have the mostsignificant effect on the amounts recognised in the financial statements.

Operating lease – Municipality as lessor

The Municipality has entered into commercial property leases on its investment property portfolio. The Municipality has determined, basedon an evaluation of the terms and conditions of the arrangements, that it retains all the significant risks and rewards of ownership of theseproperties and accounts for the contracts as operating leases.

Estimates and assumptions

The key assumptions concerning the future and other key sources of estimation uncertainty at the reporting date, that have a significantrisk of causing a material adjustment to the carrying amounts of assets and liabilities within the next financial year, are as follows:

Depreciation and impairment

The Municipality depreciates its assets over their estimated useful lives taking into account residual values, where appropriate. Theappropriateness of its assets’ estimated useful lives, residual values and their depreciation methods are re-assessed on an annual basis. Theactual lives of these assets and their respective residual values may vary depending on a variety of factors. In re-assessing asset lives,factors such as technological innovation, product life cycles and maintenance programmes are taken into account.

Management used their judgement in applying the internal and external impairment indicators to its assets. No impairment indicators wereidentified and as such the recoverable amounts of the aforementioned assets was not calculated.

Customer receivables

At year-end management makes an estimate of the amount of total outstanding customer debt that it expects to hand over to externaldebt collectors and the total subsequent receipts it expects to receive after year end. In addition, management estimates the amounts thatit expects to recover from outstanding balances handed over based upon the age profile of debts handed over and based on priorexperience and trends. A provision for impairment is raised based on these estimates. A detailed breakdown of the student fee receivable isprovided in note 3.

Provisions

Provisions were raised and management determined an estimate based on the information available. Additional disclosure of theseestimates of provisions are included in note 15 - Provisions.

15

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Accounting Policies for the year ended 30 June 2019

1.4 Significant judgements and sources of estimation uncertainty (continued)

Post retirement benefits

The present value of the post retirement obligation depends on a number of factors that are determined on an actuarial basis using anumber of assumptions. The assumptions used in determining the net cost (income) include the discount rate. Any changes in theseassumptions will impact on the carrying amount of post retirement obligations.

The Municipality determines the appropriate discount rate every two years. This is the interest rate that should be used to determine thepresent value of estimated future cash outflows expected to be required to settle the pension obligations. In determining the appropriatediscount rate, the Municipality considers the interest rates of high-quality corporate bonds that are denominated in the currency in whichthe benefits will be paid, and that have terms to maturity approximating the terms of the related pension liability.

Other key assumptions for pension obligations are based on current market conditions. Additional information is disclosed in Note 16.

1.5 Comparative figures

Prior year Comparative

Where necessary, comparative figures have been reclassified to conform to changes in presentation in the current year.

When the presentation or classification of items in the Annual Financial Statements is amended, prior period comparative amounts arerestated. The nature and reason for the reclassification is disclosed. Where accounting errors have been identified in the current year, thecorrection is made retrospectively as far as is practicable, and the prior year comparatives are restated accordingly. Where there has been achange in accounting policy in the current year, the adjustment is made retrospectively as far as is practicable, and the prior yearcomparatives are restated accordingly.

Current year Comparative

Budgeted amounts have been included in the annual financial statements for the current financial year only.

1.6 Property, plant and equipment

Initially recognition

Property, plant and equipment are tangible non-current assets (including infrastructure assets) that are held for use in the production orsupply of goods or services, rental to others, or for administrative purposes, and are expected to be used during more than one year.

Infrastructure assets in particular are those that are part of a system or network, specialized in nature and do not have alternative uses,immovable and maybe subject to constraints on disposal.

The cost of an item of property, plant and equipment is recognised as an asset if, and only if it is probable that future economic benefits orservice potential associated with the item will flow to the municipality, and if the cost or fair value of the item can be measured reliably.

Property, plant and equipment are initially recognised at cost on its acquisition date or in the case of assets acquired by grant or donation,deemed cost, being the fair value of the asset on initial recognition. The cost of an item of property, plant and equipment is the purchaseprice and other costs attributable to bring the asset to the location and condition necessary for it to be capable of operating in the mannerintended by the municipality.

Trade discounts and rebates are deducted in arriving at the cost. The cost also includes the necessary costs of dismantling and removing theasset and restoring the site on which it is located.

When significant components of an item of property, plant and equipment have different useful lives, they are accounted for as separateitems (major components) of property, plant and equipment.

The cost of an item of property, plant and equipment acquired in exchange for a non-monetary asset is measured at its fair value. If theacquired item could not be measured at its fair value, its cost was measured at the carrying amount of the asset given up.

Subsequent measurement

16

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Accounting Policies for the year ended 30 June 2019

1.6 Property, plant and equipment (continued)

Subsequent expenditure relating to property, plant and equipment is capitalised if it is probable that future economic benefits or potentialservice delivery associated with the subsequent expenditure will flow to the entity and the cost or fair value of the subsequent expenditurecan be reliably measured.

Subsequent expenditure incurred on an asset is only capitalised when it increases the capacity or future economic benefits associated withthe asset. Where the municipality replaces parts of an asset, it de-recognises the part of the asset being replaced and capitalises the newcomponent.

Subsequently all property plant and equipment, are measured at cost (or deemed cost), less accumulated depreciation and accumulatedimpairment losses. Compensation from third parties for items of property, plant and equipment that were impaired, lost or given up isincluded in surplus or deficit when the compensation becomes receivable.

Depreciation

Land is not depreciated as it is regarded as having an indefinite life. Depreciation on assets other than land is calculated on cost, using thestraight-line method, to allocate their cost to their residual values over the estimated useful lives of the assets. The depreciation methodused reflects the pattern in which the asset’s future economic benefits or service potential are expected to be consumed by themunicipality on each asset.

Components of assets that are significant in relation to the whole asset and that have different useful lives are depreciated separately. Thedepreciation rates are based on the following estimated useful lives.

The Municipality assesses at each reporting date whether there is any indication that the entity's expectations about the residual value anduseful life of an asset have changed since the preceding reporting date. If any such indication exists, the municipality revises the expecteduseful life and/or residual value. The change(s) are accounted for in accordance with the Standard of GRAP on Accounting Policies, Changesin Accounting Estimates and Errors.

Depreciation only commences when the asset is available for use.

The depreciable amount of an asset is allocated on a systematic basis over its useful life.

Each part of an item of property, plant and equipment with a cost that is significant in relation to the total cost of the item is depreciatedseparately.

The depreciation method used reflects the pattern in which the asset’s future economic benefits or service potential are expected to beconsumed by the Municipality. The depreciation method applied to an asset is reviewed at least at each reporting date and, if there hasbeen a significant change in the expected pattern of consumption of the future economic benefits or service potential embodied in theasset, the method is changed to reflect the changed pattern. Such a change is accounted for as a change in an accounting estimate.

The Municipality assesses at each reporting date whether there is any indication that the Municipality expectations about the residual valueand the useful life of an asset have changed since the preceding reporting date. If any such indication exists, the Municipality revises theexpected useful life and/or residual value accordingly. The change is accounted for as a change in an accounting estimate.

The depreciation charge for each period is recognised in surplus or deficit unless it is included in the carrying amount of another asset.

Items of property, plant and equipment are derecognised when the asset is disposed of or when there are no further economic benefits orservice potential expected from the use of the asset.

The gain or loss arising from the derecognition of an item of property, plant and equipment is included in surplus or deficit when the item isderecognised. The gain or loss arising from the derecognition of an item of property, plant and equipment is determined as the differencebetween the net disposal proceeds, if any, and the carrying amount of the item.

Assets which the Municipality holds for rentals to others and subsequently routinely sell as part of the ordinary course of activities, aretransferred to inventories when the rentals end and the assets are available-for-sale. Proceeds from sales of these assets are recognised asrevenue. All cash flows on these assets are included in cash flows from operating activities in the cash flow statement.

The Municipality separately discloses expenditure to repair and maintain property, plant and equipment in the notes to the financialstatements (see note 8).

17

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Accounting Policies for the year ended 30 June 2019

1.6 Property, plant and equipment (continued)

The Municipality discloses relevant information relating to assets that are work in progress, in the notes to the financial statements (seenote 8).

The table below shows the depreciation methods and average useful lives.Buildings Straight line 30 yearsRoads and paving Straight line 15-65 yearsWatercraft Straight line 15 yearFurniture and fixtures Straight line 7 yearsMotor vehicles Straight line 3-7 yearsOffice equipment Straight line 3-5 yearsPedestrian bridges Straight line 30 yearsElectricity infrastructure Straight line 20-30 yearsCommunity Straight line 5-30 yearsWater infrastructure Straight line 15-65 yearsSewerage infrastructure Straight line 15-30 yearsHousing Straight line 30 yearsSpecialised plant and equipment Straight line 10-15 yearsBins and containers Straight line 5-10 yearsOther property, plant and equipment Straight line 2-5 yearsSpecialised vehicles Straight line 10 years

Derecognition

Items of property, plant and equipment are derecognised when the asset is disposed of or when there are no further economic benefits orservice potential expected from the use of the asset. The gain or loss arising on the disposal or retirement of an item of property, plant andequipment is determined as the difference between the sales proceeds and the carrying value and is recognised in the Statement ofFinancial Performance.

1.7 Leases

A lease is classified as a finance lease if it transfers substantially all the risks and rewards incidental to ownership. A lease is classified as anoperating lease if it does not transfer substantially all the risks and rewards incidental to ownership.

When a lease includes both land and buildings elements, the entity assesses the classification of each element separately.

Operating leases - lessor

Rental income from operating leases is recognised on a straight-line basis over the term of the relevant lease.

Leased assets are classified as investment property measured at cost model and depreciation on leased assets has been calculated inaccordance with GRAP 17 Property, plant and equipment.

Operating leases - lessee

Operating leases are those leases that do not fall within the scope of the above definition. Operating lease expenses are recognised on astraight-line basis over the lease term.

1.8 Impairment of cash-generating assets

Cash-generating assets are assets used with the objective of generating a commercial return. Commercial return means that positive cashflows are expected to be significantly higher than the cost of the asset.

Impairment is a loss in the future economic benefits or service potential of an asset, over and above the systematic recognition of the lossof the asset’s future economic benefits or service potential through depreciation (amortisation).

Carrying amount is the amount at which an asset is recognised in the statement of financial position after deducting any accumulateddepreciation and accumulated impairment losses thereon.

18

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Accounting Policies for the year ended 30 June 2019

1.8 Impairment of cash-generating assets (continued)

A cash-generating unit is the smallest identifiable group of assets used with the objective of generating a commercial return that generatescash inflows from continuing use that are largely independent of the cash inflows from other assets or groups of assets.

Costs of disposal are incremental costs directly attributable to the disposal of an asset, excluding finance costs and income tax expense.

Depreciation (Amortisation) is the systematic allocation of the depreciable amount of an asset over its useful life.

Fair value less costs to sell is the amount obtainable from the sale of an asset in an arm’s length transaction between knowledgeable,willing parties, less the costs of disposal.

Recoverable amount of an asset or a cash-generating unit is the higher its fair value less costs to sell and its value in use.

Useful life is either: the period of time over which an asset is expected to be used by the Municipality; or the number of production or similar units expected to be obtained from the asset by the Municipality.

In assessing whether there is any indication that an asset may be impaired, the following have been considered:

External sources of information Cessation or near cessation, of the demand or need for services provided by the asset; Significant long-term changes with an adverse effect on the entity that have taken place during the period or will take place in

the near future, in the technological, legal or government policy environment in which the municipality operates.

Internal sources of information Evidence of physical damage of an asset; Increased expenditure on repairs and maintenance on the asset.

Assets that are subject to depreciation or amortisation are reviewed for impairment whenever events or circumstances indicate that thecarrying amount may not be recoverable.

An impairment loss is recognised for the amount by which the carrying amount exceeds the recoverable amount. The recoverable amountis the higher of the assets Fair Value less cost to sell, or its value in use.

1.9 Impairment of non-cash-generating assets

Cash-generating assets are assets used with the objective of generating a commercial return. Commercial return means that positive cashflows are expected to be significantly higher than the cost of the asset.

Non-cash-generating assets are assets other than cash-generating assets.

Impairment is a loss in the future economic benefits or service potential of an asset, over and above the systematic recognition of the lossof the asset’s future economic benefits or service potential through depreciation (amortisation).

Carrying amount is the amount at which an asset is recognised in the statement of financial position after deducting any accumulateddepreciation and accumulated impairment losses thereon.

A cash-generating unit is the smallest identifiable group of assets managed with the objective of generating a commercial return thatgenerates cash inflows from continuing use that are largely independent of the cash inflows from other assets or groups of assets.

Costs of disposal are incremental costs directly attributable to the disposal of an asset, excluding finance costs and income tax expense.

Depreciation (Amortisation) is the systematic allocation of the depreciable amount of an asset over its useful life.

Fair value less costs to sell is the amount obtainable from the sale of an asset in an arm’s length transaction between knowledgeable,willing parties, less the costs of disposal.

Recoverable service amount is the higher of a non-cash-generating asset’s fair value less costs to sell and its value in use.

19

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Accounting Policies for the year ended 30 June 2019

1.9 Impairment of non-cash-generating assets (continued)

Useful life is either: the period of time over which an asset is expected to be used by the Municipality; or the number of production or similar units expected to be obtained from the asset by the Municipality.

In assessing whether there is any indication that an asset may be impaired, the following have been considered:

External sources of information Cessation or near cessation, of the demand or need for services provided by the asset; Significant long-term changes with an adverse effect on the entity that have taken place during the period or will take place in

the near future, in the technological, legal or government policy environment in which the municipality operates.

Internal sources of information Evidence of physical damage of an asset; Increased expenditure on repairs and maintenance on the asset.

Assets that are subject to depreciation or amortisation are reviewed for impairment whenever events or circumstances indicate that theserviceable amount may not be recoverable.

An impairment loss is recognised for the amount by which the carrying amount exceeds the recoverable service amount.

The recoverable service amount is the higher of the assets fair value less cost to sell, or its value in use.

The value in use is the present value of the estimated future cash flows expected to be derived from the continuing use of an asset andfrom its disposal at the end of its useful life.

1.10 Intangible assets

The Municipality discloses relevant information relating to assets under construction or development, in the notes to the financialstatements (see note 9).

An intangible asset is an identifiable non-monetary asset without physical substance. Examples include computer software, licenses anddevelopment costs.

An asset is identifiable when it: is capable of being separated or divided from an entity and sold, transferred, licensed, rented or exchanged, either individually

or together with a related contract, assets or liability, or arises from contractual rights or other legal rights, regardless whether those rights are transferable or separate from the

Municipality or from other rights and obligations.

Initial recognition

The municipality recognises an intangible asset in its Statement of Financial Position only when it is probable that the expected futureeconomic benefits or the service potential that are attributable to the asset will flow to the municipality and the cost or fair value of theasset can be measured reliably.

Internally generated intangible assets are subject to strict recognition criteria before they are capitalised. Research expenditure is nevercapitalised, while development expenditure is only capitalised to the extent that:

the Municipality intends to complete the intangible asset for use or sale the Municipality has the ability to use or sell the asste the Municipality can reliably measure expenditure during development it is technically feasible to complete the intangible asset the Municipality has the resources to complete the project, and it is probable that the Municipality will receive future economic benefits or service potential

Acquired computer software licenses are capitalised on the basis of the costs incurred to acquire and bring to use the specific software.Internally generated intangible assets are subject to strict recognition criteria before they are capitalised.

20

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Accounting Policies for the year ended 30 June 2019

1.10 Intangible assets (continued)

Intangible assets are initially recognised at cost. Where an intangible asset is acquired by the municipality for no or nominal consideration(i.e. a non-exchange transaction), the cost is deemed to be equal to the fair value of that asset on the date acquired.

Amortisation and impairment

The cost of an intangible asset is amortised over the useful life of 3 - 7 years.

The amortisation period and the amortisation method for an intangible asset with a finite useful life are reviewed at each reporting dateand any changes are recognised as a change in accounting estimate in the Statement of Financial Performance.

Subsequent measurement

Intangible assets are carried at its cost less any accumulated amortisation and any accumulated impairment losses.

Derecognition

An intangible asset is derecognised when it is permanently withdrawn from use and no future economic benefit or service potential isderived from it. The gain or loss arising from the disposal of an intangible asset is determined as the difference between the net disposalproceeds, if any, and the carrying amount of the asset. It is recognised in surplus or deficit when the intangible asset is derecognised.

1.11 Investment property

Investment property is property (land or a building - or part of a building - or both) held to earn rentals or for capital appreciation or both,rather than for:

use in the production or supply of goods or services or for administrative purposes, or sale in the ordinary course of operations.

Investment property is recognised as an asset when, it is probable that the future economic benefits or service potential that are associatedwith the investment property will flow to the Municipality, and the cost or fair value of the investment property can be measured reliably.

Investment property is initially recognised at cost. Transaction costs are included in the initial measurement.

Where investment property is acquired through a non-exchange transaction, its cost is its fair value as at the date of acquisition.

Costs include costs incurred initially and costs incurred subsequently to add to, or to replace a part of, or service a property. If areplacement part is recognised in the carrying amount of the investment property, the carrying amount of the replaced part isderecognised.

Compensation from third parties for investment property that was impaired, lost or given up is recognised in surplus or deficit when thecompensation becomes receivable.

Property held under operating leases are classified and accounted for as investment property in the following circumstances:

When classification is difficult, the criteria used to distinguish investment property from owner-occupied property and from property heldfor sale in the ordinary course of operations, including the nature or type of properties classified as held for strategic purposes, are asfollows:

The nature OR type of properties classified as held for strategic purposes are as follows:

The Municipality separately discloses expenditure to repair and maintain investment property in the notes to the annual financialstatements (see note 7).

The Municipality discloses relevant information relating to assets under construction or development, in the notes to the annual financialstatements (see note 7).

Initial recognition

21

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Accounting Policies for the year ended 30 June 2019

1.11 Investment property (continued)

Investment property is recognised as an asset, only where: It is probable that the future economic benefits or service potential that are associated with the investment property will flow

to the entity; and The cost or fair value of the investment property can be measured reliably.

Investment properties have been initially measured at cost (Transaction costs shall be included in this initial measurement).Transactioncosts are costs which are directly attributable to the expenditure, for example professional fees for legal services, conveyancing fees,property transfer taxes and other transaction costs shall be included in this initial measurement.

If payment for investment property is deferred, its cost is the cash price equivalent.

The difference between this amount and the total payments is recognised as interest expense over the period of credit.

Subsequent measures

Subsequently investment properties are stated at cost less accumulated depreciation and accumulated impairment losses.

Depreciation is calculated on cost, using the straight-line method over the useful life of the property. Buildings held under Investmentproperty are depreciated on an average useful life of 30 years. Vacant land held under investment properties is not depreciated.

Derecognition

An investment property is derecognised upon disposal, or when it is permanently withdrawn from use and no future economic benefits orservice potential are expected from its disposal. Any gain or loss arising from the retirement or disposal of investment property is includedin surplus or deficit in the period of the retirement or disposal.

1.12 Inventories

Consumable stores, unsold water, and land held for sale are valued at the lower of cost and net realisable value.

In general, the basis of determining cost is the first-in, first-out method.

For the land component recognised in terms of GRAP 12 land is recognised at cost with the cost based on fair value at date of recognition.

Redundant and slow-moving inventories are identified and written down to current replacement cost.

1.13 Revenue from exchange transactions

Revenue is the gross inflow of economic benefits or service potential during the reporting period when those inflows result in an increase innet assets, other than increases relating to contributions from owners.

An exchange transaction is one in which the municipality receives assets or services, or has liabilities extinguished, and directly givesapproximately equal value (primarily in the form of goods, services or use of assets) to the other party in exchange.

Fair value is the amount for which an asset could be exchanged, or a liability settled, between knowledgeable, willing parties in an arm’slength transaction.

Revenue from exchange transactions refers to revenue that accrued to the Municipality directly in return for services rendered/goods sold,the value of which approximates the consideration received or receivable.

Service charges relating to electricity and water are based on consumption. Meters are read on a monthly basis and are recognised asrevenue in the period of consumption. Where meters cannot be read during a particular month, they are provisionally billed with thenecessary adjustments made in the month in which they were read. Revenue from the sale of electricity prepaid meter cards is deferredand recognised as revenue on the consumption basis, commencing on date of purchase.

Service charges relating to refuse removal are recognised on a monthly basis in arrears by applying the approved tariff to each propertythat has improvements. Tariffs are determined per category of property usage, and are levied monthly based on the number of refusecontainers on each property, regardless of whether or not all containers are emptied.

22

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Accounting Policies for the year ended 30 June 2019

1.13 Revenue from exchange transactions (continued)

Service charges from sewerage are based on the water consumption on each developed property using the tariffs approved from Counciland are levied monthly.

Interest and rentals are recognised on a time apportionment basis. Revenue arising from the application of the approved tariff of charges isrecognised when the relevant service is rendered by applying the relevant gazetted tariffs. This includes the issuing of licences and permits.

Income for agency services is recognised on a monthly basis once the income collected on behalf of agents has been quantified. The incomerecognised is in terms of the agency agreement.

Revenue from the sale of goods is recognised when the risks and rewards of ownership of the goods is passed to the consumer.

Revenue from exchange transactions is measured at the fair value of the consideration received or receivable taking into account theamount of any trade discounts allowed by the Municipality.

1.14 Revenue from non-exchange transactions

Revenue from non-exchange transactions refers to transactions where the Municipality received revenue from another entity withoutdirectly giving approximately equal value in exchange. Revenue from non-exchange transactions is generally recognised to the extent thatthe related receipt or receivable qualifies for recognition as an asset and there is no liability to repay the amount.

Revenue from property rates is recognised when the legal entitlement to this revenue arises. Collection charges are recognised when suchamounts are legally enforceable. Penalty interest on unpaid rates is recognised on a time proportion basis.

Fines constitute both spot fines and summonses. Revenue from spot fines and summonses is recognised when it is accrued. Spot fines areusually not given directly to the offender. Further legal processes have to be undertaken before the spot fine is enforceable. In respect tosummon, the Public Prosecutor can decide whether to waive the fine, reduce it or prosecute for non-payment by the offender.

Donations are recognised on a cash receipt basis or where the donation is in the form of property, plant and equipment, when such itemsof property, plant and equipment are brought into use furthermore Revenue from public contributions and donations is recognised whenall conditions associated with the contribution have been met or where the contribution is to finance property, plant and equipment, whensuch items of property, plant and equipment qualifies for recognition and first becomes available for use by the Municipality.

Where public contributions have been received but the Municipality has not met the related conditions, a deferred income (liability) isrecognised.

Revenue from the recovery of unauthorised, irregular, fruitless and wasteful expenditure is based on legislated procedures, including thoseset out in the Municipal Finance Management Act (Act No. 56 of 2003) and is recognised when the recovery thereof from the responsibleCouncillors or officials is virtually certain.

The liability is transferred to revenue as and when the conditions attached to the grant are met. Grants without any conditions attached arerecognised as revenue when the asset is recognised.

1.15 Provisions and contingencies

Provisions are recognised when the Municipality has a present or constructive obligation as a result of past events, it is probable that anoutflow of resources embodying economic benefits will be required to settle the obligation and a reliable estimate of the provision can bemade. Provisions are reviewed at reporting sheet date and adjusted to reflect the current best estimate. Contingent Liabilities and Assetsare not recognized but disclosed.

The Municipality does not recognise a contingent liability or contingent asset. A contingent liability is disclosed unless the possibility of anoutflow of resources embodying economic benefits is remote. A contingent asset is disclosed where an inflow of economic benefits isprobable.

Future events that may affect the amount required to settle an obligation are reflected in the amount of a provision where there issufficient objective evidence that they will occur. Gains from the expected disposal of assets are not taken into account in measuring aprovision. Provisions are not recognised for future operating losses. The present obligation under an onerous contract is recognised andmeasured as a provision.

23

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Accounting Policies for the year ended 30 June 2019

1.16 Housing development fund

Housing selling schemes both complete and in progress at 1 April 1998, were also transferred to the Housing Development Fund. Allproceeds from housing developments, which include rental income and sales of houses, is paid into the Housing Development Fund.Monies standing to the credit of the Housing Development Fund are used to finance housing developments within the municipal area. Anytransfers to and from the fund are recognized in the statement of changes in net assets.

1.17 Retirement benefits

The Municipality provides post-retirement medical aid benefits to retired employees. The entitlement to these benefits is usuallyconditional on the employee remaining in employment up to retirement age.

An actuarial valuation involves making various assumptions. These include the determination of the discount rate, future salary increases,mortality rates and future pension increases. Due to the complexity of the valuation, the underlying assumptions and its long-term nature,a defined benefit obligation is highly sensitive to changes in these assumptions.

The Expected costs of these benefits are accrued of the period of employment. Actuarial gains and losses arising from experienceadjustments and changes in actuarial assumptions are recognized immediately in the statement of financial performance for the reportingperiod. The Defined benefit obligations are valued once in two years by independent qualified actuaries.

1.18 Borrowing costs

Borrowing costs incurred are recognised as an expense in the Statement of Financial Performance in the period in which they are incurredin accordance with GRAP 5.

1.19 Financial instruments

Classification

The Municipality has types of financial instruments and these can be broadly categorised as either Financial Assets or Financial Liabilities.

Subsequent measurement of financial assets and financial liabilities

Financial assets are categorised according to their nature as financial assets at amortised costs and financial liabilities are categorized asfinancial liabilities carried at amortised cost in accordance with GRAP 104.

Financial assets

The classification of financial assets depends on their nature and purpose, and is determined at the time of initial recognition.

Trade and other receivables

Trade and other receivables are categorised as financial assets: loans and receivables including statutory receivables and are initiallyrecognised at fair value and subsequently carried at amortised cost. Amortised cost refers to the initial carrying amount, plus interest, lessrepayments and impairments. An estimate is made for doubtful receivables based on a review of all outstanding amounts at year end. Thefair value of Debtors is estimated as the present value of future cash flows, discounted at the market rate of interest at the reporting date.

Significant financial difficulties of the debtor, probability that the debtor will enter bankruptcy or financial reorganisation, and default ordelinquency in payments (more than 30 days overdue) are considered indicators that the trade receivable is impaired. Impairments aredetermined by discounting expected future cash flows to their present value. Amounts that are receivable within 12 months from thereporting date are classified as current.

An impairment of trade receivables is accounted for by reducing the carrying amount of trade receivables through the use of an allowanceaccount, and the amount of the loss is recognised in the Statement of Financial Performance within operating expenses. When a tradereceivable is uncollectible, it is written off.

Subsequent recoveries of amounts previously written off are credited against operating expenses in the Statement of FinancialPerformance.

Cash and cash equivalents

24

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Accounting Policies for the year ended 30 June 2019

1.19 Financial instruments (continued)

Cash includes cash on hand (including petty cash) and cash with banks (including call deposits). Cash equivalents are short-term highly liquidinvestments, readily convertible into known amounts of cash that are held with registered banking institutions with maturities of threemonths or less and are subject to an insignificant risk of change in value.

For the purposes of the Cash Flow Statement, cash and cash equivalents comprise cash on hand, deposits held on call with banks, net ofbank overdrafts. The Municipality categorises cash and cash equivalents as Financial assets: loans and receivables. The closing balance onthe bank account is representative of its fair value of the monies held.

Bank overdrafts are recorded based on the facility utilised. Finance charges on bank overdrafts are expensed as incurred. Amounts owing inrespect of bank overdrafts are categorised as Financial liabilities: other financial liabilities carried at amortised cost.

Financial liabilities

Trade and other payables from exchange transactions

Financial liabilities consist of trade payables and borrowings. They are categorised as financial liabilities held at amortised cost, are initiallyrecognised at fair value and subsequently measured at amortised cost which is the initial carrying amount, less repayments, plus interest.The fair value of creditors is estimated as the present value of future cash flows, discounted at the market rate of interest at the reportingdate.

Borrowings and other financial liabilities

Borrowings are recognised initially at fair value, net transaction costs incurred. Borrowings are subsequently stated at amortised cost. Long-term borrowings are non-derivative financial loans and the Municipality does not hold financial loans for trading purposes. Long-termborrowings are utilised. Other financial liabilities are carried at amortised cost.

The interbank rate or prime lending rate is not the risk-free interest rate, however it has been used as a benchmark for determining themarket related rate of interest which is not significantly different to the current rates on long-term loans, hence the fair value of these loansequates their amortised cost.

1.20 Heritage assets

A heritage asset is defined as an asset that has a cultural, environmental, historical, natural, scientific, technological or artistic significanceand is held and preserved indefinitely for the benefit of present and future generations. A heritage asset shall be recognised as an asset if,and only if,

(a) It is probable that the economic benefit or service potential will flow to the Municipality,

(b) The cost or the fair value will be measured reliably.

The Municipality separately discloses expenditure to repair and maintain heritage assets in the notes to the financial statements (see note11).

The Municipality discloses relevant information relating to assets under construction or development, in the notes to the financialstatements (see note 11).

Initial measurement

A heritage asset that qualifies for recognition as an asset shall be measured at its cost (Cash price equivalent at the recognition date).Where a heritage asset is acquired through a non-exchange transaction, its cost is deemed to be its fair value as at the date of acquisition.

25

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Accounting Policies for the year ended 30 June 2019

1.20 Heritage assets (continued)

Subsequent measurement

Heritage assets are not depreciated, since their long economic life and high residual value mean that any depreciation would be immaterial.

After recognition as an asset, heritage assets shall be carried at its cost less any accumulated impairment losses. The Municipality assessesat each reporting date whether there are any indicators of impairment of Heritage assets.

Where there is an indication of impairment the assets are recorded at their recoverable amount or their recoverable service amount.

Derecognition

A Heritage asset is de-recognised when it is disposed or where there is no future economic benefits or service potential are expected fromits use or disposal. The gain or loss arising from de-recognition, is determined as the difference between the net disposal proceeds, if any,and the carrying amount of the heritage asset. Such difference is recognised in surplus or deficit when the heritage asset is derecognized.

1.21 Short term benefits

The cost of short-term employee benefits, (those payable within 12 months after the service is rendered, such as paid vacation leave andsick leave, bonuses, and non-monetary benefits such as medical care), are recognised in the period in which the service is rendered and arenot discounted.

The expected cost of compensated absences is recognised as an expense as the employees render services that increase their entitlementor, in the case of non-accumulating absences, when the absence occurs. The expected cost of bonus payments is recognised as an expensewhen there is a legal or constructive obligation to make such payments as a result of past performance.

1.22 Grants in aid

The Municipality donates money, goods or services to individuals, organisations and other sectors of government from time to time. Whenmaking these donations, the Municipality does not:Receive any goods or services directly in return as would be expected in a purchase or sale transaction;Expect to be repaid in future; orExpect a financial return, as would be expected from an investment.

These transfers are recognized in the statement of financial performance as expenses in the period during which events giving rise to thetransfer occurred.

1.23 Budget information

The budget is prepared on an accrual basis. The budget amounts are scheduled as a separate additional financial statement called thestatement of comparison of budget and actual amounts.

Explanatory comments are provided in the notes to the annual financial statements, first stating reasons for changes from approved to finalbudget and secondly reasons for overspending or underspending on line items.

1.24 Unauthorised expenditure

Unauthorized expenditure is expenditure that has not been budgeted, expenditure that is not in terms of the conditions of an allocationreceived from another sphere of government, municipality or organ of state and expenditure in the form of a grant that is not permitted interms of the Municipal Finance Management Act (Act No.56 of 2003).

1.25 Irregular expenditure

Irregular expenditure is expenditure that is contrary to the Municipal Finance Management Act (Act No.56 of 2003), the Municipal SystemsAct (Act No.32 of 2000), the Public Office Bearers Act (Act No. 20 of 1998) or is in contravention of the Municipality’s supply chainmanagement policy. Irregular expenditure excludes unauthorised expenditure.

Irregular expenditure excludes unauthorised expenditure. Irregular expenditure is accounted for as expenditure in the Statement ofFinancial Performance and where recovered, it is subsequently accounted for as revenue in the Statement of Financial Performance.

26

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Accounting Policies for the year ended 30 June 2019

1.26 Fruitless and wasteful expenditure

Fruitless and wasteful expenditure is expenditure that was made in vain and would have been avoided had reasonable care been exercised.Fruitless and wasteful expenditure is accounted for as expenditure in the Statement of Financial Performance and where recovered, it issubsequently accounted for as revenue in the Statement of Financial Performance.

1.27 Value-added Tax

VAT

The Municipality accounts for Value Added Tax on payments basis. This means that VAT is declared to the South African Revenue Servicesas input VAT or output VAT only when payments are made to suppliers or payments are received for goods or services. The net output VATon debtors where money has not been received or creditors where payment has not been made is disclosed separately in the Statement ofFinancial Position in terms of GRAP 1.

1.28 Internal reserves

Capital replacement reserve (CRR)

In order to finance the provision of infrastructure and other items of property, plant and equipment from internal sources, amounts aretransferred from the accumulated surplus/(deficit) to the CRR. A corresponding amount is transferred to a designated CRR bank orinvestment account. The cash in the designated CRR bank account can only be utilised to finance items of property, plant and equipment.The CRR is reduced and the accumulated surplus/(deficit) is credited by a corresponding amount when the amounts in the CRR are utilised.

The following guidelines are set for the creation and utilisation of the CRR:

1) The cash funds that back up the CRR are invested until utilised.2) The CRR may only be utilised for purchasing items of property, plant and equipment, and not their maintenance, unless otherwisedirected by Council.3) Whenever an asset is purchased out of the CRR, an amount equal to the cost price of the asset is transferred from CRR and accumulatedsurplus is credited by a corresponding amount.

1.29 Events after reporting date

Events after reporting date are those events, both favourable and unfavourable, that occur between the reporting date and the date whenthe financial statements are authorised for issue. Two types of events can be identified:

those that provide evidence of conditions that existed at the reporting date (adjusting events after the reporting date); and those that are indicative of conditions that arose after the reporting date (non-adjusting events after the reporting date).

The Municipality will adjust the amount recognised in the financial statements to reflect adjusting events after the reporting date once theevent occurred.

The Municipality will disclose the nature of the event and an estimate of its financial effect or a statement that such estimate cannot bemade in respect of all material non-adjusting events, where non-disclosure could influence the economic decisions of users taken on thebasis of the financial statements.

27

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

2. Inventories

Consumable stores 19 581 006 15 115 767Water 1 744 500 1 621 152Land 48 055 000 48 055 000

69 380 506 64 791 919

3. Long-term Receivables

At amortised costStudy loans - 45 848

Current assetsAt amortised cost - 45 848

4. Receivables from non-exchange transactions

Fines 101 235 490 29 121 218Rates 77 419 856 62 126 128Amounts paid in advance 8 595 497 7 983 950Other receivables from non-exchange revenue 44 213 273 55 356 456Impairment - Rates (36 500 000) (21 637 738)Impairment - Fines (91 917 347) (20 780 009)

103 046 769 112 170 005

RatesCurrent 0 - 30 days 40 868 272 31 636 33731-60 days 3 691 358 3 683 88561-90 days 1 981 689 1 807 30691-120 days 1 411 438 1 642 059121-360 days 13 694 353 12 017 053361 + days 15 772 746 11 339 488

77 419 856 62 126 128

FinesCurrent 0 - 30 days 5 084 650 628 40031-60 days 7 700 400 568 62561-90 days 3 863 600 583 37591-120 days 6 979 500 560 950121-360 days 53 914 250 5 357 178361 + days 23 693 090 21 422 690

101 235 490 29 121 218

Reconciliation of provision for impairment of receivables from non-exchangetransactionsOpening Balance (43 116 953) (44 980 003)Contibution (86 231 236) (9 057 997)Write Off 930 842 10 921 047

(128 417 347) (43 116 953)

28

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

5. Receivables from exchange transactions

Gross balancesElectricity 180 666 305 169 964 930Water 207 992 818 227 295 801Sewerage 18 569 118 17 472 821Refuse 13 172 162 11 426 612Sundry debtors 34 704 545 34 739 414Housing rental 11 494 676 10 870 985

466 599 624 471 770 563

Less: Allowance for impairmentElectricity (25 700 000) (15 700 000)Water (70 871 619) (38 200 000)Sewerage (4 700 000) (3 400 000)Refuse (3 600 000) (2 300 000)

(104 871 619) (59 600 000)

Net balanceElectricity 154 966 305 154 264 930Water 137 121 199 189 095 801Sewerage 13 869 118 14 072 821Refuse 9 572 162 9 126 612Sundry debtors 34 704 545 34 739 414Housing rental 11 494 676 10 870 985

361 728 005 412 170 563

ElectricityCurrent (0 -30 days) 154 963 581 149 767 52731 - 60 days 12 328 643 10 135 29061 - 90 days 1 442 635 1 267 53891 - 120 days 1 045 810 877 511121 - 365 days 5 328 615 5 346 369> 365 days 5 557 021 2 570 695

180 666 305 169 964 930

WaterCurrent (0 -30 days) 84 033 675 75 955 48631 - 60 days 14 809 088 16 709 82961 - 90 days 7 627 122 14 866 33491 - 120 days 7 741 392 17 562 029121 - 365 days 30 722 432 30 139 398> 365 days 63 059 109 72 062 725

207 992 818 227 295 801

29

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

5. Receivables from exchange transactions (continued)

SewerageCurrent (0 -30 days) 10 099 639 8 354 00331 - 60 days 1 195 403 1 360 59861 - 90 days 771 610 607 48791 - 120 days 533 703 539 088121 - 365 days 2 542 717 3 280 608> 365 days 3 426 046 3 331 037

18 569 118 17 472 821

RefuseCurrent (0 -30 days) 7 557 225 6 028 22531 - 60 days 800 889 740 40061 - 90 days 508 715 437 38291 - 120 days 404 228 372 173121 - 365 days 1 990 882 2 089 599> 365 days 1 910 223 1 758 833

13 172 162 11 426 612

Sundry debtorsCurrent (0 -30 days) 9 490 974 222 86531 - 60 days 1 400 751 (1 753 650)61 - 90 days 666 334 966 83991 - 120 days 511 572 1 368 084121 - 365 days 7 254 784 3 007 884> 365 days 15 380 130 30 927 392

34 704 545 34 739 414

RentalCurrent (0 -30 days) 1 398 483 1 077 48531 - 60 days 226 579 162 60261 - 90 days 170 330 159 89091 - 120 days 164 973 165 703121 - 365 days 1 339 323 2 043 715> 365 days 8 194 988 7 261 590

11 494 676 10 870 985

30

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

5. Receivables from exchange transactions (continued)

Summary of debtors by customer classification

ConsumersCurrent (0 -30 days) 76 999 499 185 546 78731 - 60 days 4 992 277 13 857 81861 - 90 days 4 304 970 16 589 00291 - 120 days 5 674 393 1 611 351121 - 365 days 26 227 298 11 939 768> 365 days 68 572 618 39 300 439

186 771 055 268 845 165Less: Allowance for impairment (45 754 763) (31 322 464)

141 016 292 237 522 701

Industrial/ commercialCurrent (0 -30 days) 182 046 987 38 929 25731 - 60 days 4 526 114 5 719 74761 - 90 days 5 470 789 5 120 20691 - 120 days 5 223 296 5 309 131121 - 365 days 7 533 804 32 872 902> 365 days 59 123 755 82 568 872

263 924 745 170 520 115Less: Allowance for impairment (62 456 774) (22 580 202)

201 467 971 147 939 913

National and provincial governmentCurrent (0 -30 days) 11 386 603 14 004 75631 - 60 days 438 563 535 21161 - 90 days 55 667 817 43991 - 120 days 45 326 571 985121 - 365 days 3 063 194 5 619 490> 365 days 3 375 225 10 856 402

18 364 578 32 405 283Less: Allowance for impairment (6 988 463) (5 697 334)

11 376 115 26 707 949

TotalCurrent (0 -30 days) 259 046 486 241 405 59231 - 60 days 9 956 954 27 355 06961 - 90 days 9 831 426 18 305 47091 - 120 days 10 943 015 20 884 589121 - 365 days 36 824 296 45 907 572> 365 days 139 997 447 117 912 271

466 599 624 471 770 563Less: Allowance for impairment (104 871 619) (59 600 000)

361 728 005 412 170 563

Less: Allowance for impairment> 365 days (104 871 619) (59 600 000)

31

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

5. Receivables from exchange transactions (continued)

Reconciliation of allowance for impairmentBalance at beginning of the year (59 600 000) (51 800 000)Contributions to allowance (78 938 639) (18 596 427)Debt impairment written off against allowance 33 667 020 10 796 427

(104 871 619) (59 600 000)

6. Cash and cash equivalents

Cash and cash equivalents consist of:

Cash on hand 49 499 48 848Cash book balances 71 105 234 45 373 392Short-term deposits 390 000 000 415 000 000

461 154 733 460 422 240

The municipality had the following bank accounts

`

Account number / description Bank statement balances Cash book balances30 June 2019 30 June 2018 30 June 2019 30 June 2018

Absa Bank - Cheque - 2150000028 47 997 652 4 087 070 47 402 750 11 629 814Absa Bank - Deposit - 2150000095 4 519 550 15 240 235 5 702 684 16 567 644Absa Bank - Deposit - 9123615121 443 415 420 363 443 415 420 363Absa Bank - Cheque - 9171373496 2 787 421 2 618 476 2 791 204 2 647 594Absa Bank - Deposit - 9092247889 6 304 325 5 977 996 6 317 504 5 989 919Absa Bank - Deposit - 9171373917 5 194 634 5 041 209 5 304 434 5 041 209Absa Bank - Deposit - 9233674990 4 149 3 934 4 347 4 130Absa Bank - Deposit - 9272068005 1 579 471 1 497 399 1 580 617 1 498 455Absa Bank - Deposit - 4079286548 444 029 8 737 3 710 3 710Absa Bank - Deposit - 9283221999 2 023 279 1 854 861 1 285 388 1 569 282Absa Bank - Deposit - 9082916767 268 989 1 088 269 173 1 272

Total 71 566 914 36 751 368 71 105 226 45 373 392

32

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

7. Investment property

2019 2018

Cost / Valuation ccumulateddepreciation and

accumulatedimpairment

Carrying value Cost / Valuation Accumulateddepreciation and

accumulatedimpairment

Carrying value

Investment property 93 230 238 (6 431 302) 86 798 936 97 509 268 (10 176 094) 87 333 174

Reconciliation of investment property - 2019

Opening balance Depreciation TotalInvestment property 87 333 174 (534 238) 86 798 936

Reconciliation of investment property - 2018

Opening balance Additions Reclassification Restatement Depreciation TotalInvestment property 124 004 990 113 500 (31 477 679) (4 561 851) (745 786) 87 333 174

A register containing the information required by section 63 of the Municipal Finance Management Act is available for inspection at theregistered office of the municipality.

8. Property, plant and equipment

2019 2018

Cost / Valuation Accumulateddepreciation and

accumulatedimpairment

Carrying value Cost / Valuation Accumulateddepreciation and

accumulatedimpairment

Carrying value

Land 1 267 581 533 - 1 267 581 533 1 267 582 533 - 1 267 582 533Infrastructure 11 252 290 895 (7 220 621 104) 4 031 669 791 11 182 960 304 (7 099 356 262) 4 083 604 042Community 502 803 273 (177 551 693) 325 251 580 489 615 918 (170 271 708) 319 344 210Other property, plant and equipment 1 585 270 795 (1 160 479 882) 424 790 913 815 762 844 (423 072 324) 392 690 520Housing 166 864 904 (10 683 526) 156 181 378 174 093 324 (11 668 229) 162 425 095

Total 14 774 811 400 (8 569 336 205) 6 205 475 195 13 930 014 923 (7 704 368 523) 6 225 646 400

33

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 2019Figures in Rand

8. Property, plant and equipment (continued)

Reconciliation of property, plant and equipment - 2019

Opening balance Additions Work in Progress Disposals Transfers Other changes,movements

Depreciation Impairment loss Total

Land 1 267 582 533 - - - (1 000) - - - 1 267 581 533Infrastructure 4 083 604 042 32 777 932 292 039 134 - - (5 070 588) (363 256 017) (8 424 712) 4 031 669 791Community 319 344 210 6 884 592 28 385 196 - - (2 087 501) (27 274 917) - 325 251 580Other property, plant and equipment 392 690 520 68 037 145 29 336 819 (4 390 705) - (627 826) (60 255 040) - 424 790 913Housing 162 425 095 - 4 439 809 - - - (10 683 526) - 156 181 378

6 225 646 400 107 699 669 354 200 958 (4 390 705) (1 000) (7 785 915) (461 469 500) (8 424 712) 6 205 475 195

Reconciliation of property, plant and equipment - 2018

Opening balance Additions Work in Progress Disposals Reclassification Transfers Restatement Depreciation TotalLand 525 026 950 - - - 15 054 400 (1 000) 727 502 183 - 1 267 582 533Infrastructure 3 916 719 771 60 578 120 258 231 316 - 19 534 900 - 96 168 010 (267 628 075) 4 083 604 042Community 306 147 206 31 922 735 12 206 196 - (11 507 442) - (1 308 095) (18 116 390) 319 344 210Other property, plant and equipment 367 064 132 82 041 831 19 918 310 (1 449 011) 12 091 644 - (29 413 173) (57 563 213) 392 690 520Housing development fund 173 909 541 - - - (3 695 824) - (5 616 522) (2 172 100) 162 425 095

5 288 867 600 174 542 686 290 355 822 (1 449 011) 31 477 678 (1 000) 787 332 403 (345 479 778) 6 225 646 400

34

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

8. Property, plant and equipment (continued)

Property, plant and equipment in the process of being constructed or developed

Carrying value of property, plant and equipment that is taking a significantly longerperiod of time to complete than expectedRoads 10 028 945 -The delays are due to encroachments and land issues.Community 2 782 363 -The delays are due to community challenges.Other assets 439 157 -The delays are due to scope amendments due to on site challenges.Water and sanitation 21 873 637 -The delays are due community challenges.

35 124 102 -

35

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

8. Property, plant and equipment (continued)

Reconciliation of Work-in-Progress 2019

Included withinInfrastructure

Included withinCommunity

Included withinOther PPE

Total

Opening balance 249 679 862 5 834 002 10 574 057 266 087 921Additions/capital expenditure 296 478 943 28 385 199 29 336 819 354 200 961Transferred to completed items (7 995 168) - - (7 995 168)

538 163 637 34 219 201 39 910 876 612 293 714

Reconciliation of Work-in-Progress 2018

Included withinInfrastructure

Included withinCommunity

Included withinOther PPE

Total

Opening balance 571 457 511 21 737 260 10 569 359 603 764 130Additions/capital expenditure 258 231 316 12 206 196 19 918 311 290 355 823Transferred to completed items (580 008 965) (28 109 454) (19 913 613) (628 032 032)

249 679 862 5 834 002 10 574 057 266 087 921

Expenditure incurred to repair and maintain property, plant and equipment

Expenditure incurred to repair and maintain property, plant and equipment includedin Statement of Financial PerformanceEmployee related costs 217 249 768 200 795 103Contracted services 136 433 709 134 906 406Material 73 890 889 73 139 406Transport 14 330 867 8 291 926

441 905 233 417 132 841

A register containing the information required by section 63 of the Municipal Finance Management Act is available for inspection at theregistered office of the municipality.

9. Intangible assets

2019 2018

Cost / Valuation Accumulatedamortisation and

accumulatedimpairment

Carrying value Cost / Valuation Accumulatedamortisation and

accumulatedimpairment

Carrying value

Computer software, other 122 844 473 (6 763 379) 116 081 094 68 098 675 (4 594 450) 63 504 225

Reconciliation of intangible assets - 2019

Opening balance Additions Amortisation TotalComputer software, other 63 504 225 54 745 798 (2 168 929) 116 081 094

Reconciliation of intangible assets - 2018

Opening balance Additions Restatement Amortisation TotalComputer software, other 33 724 253 35 508 953 (3 393 719) (2 335 262) 63 504 225

36

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

9. Intangible assets (continued)

Intangible assets in the process of being constructed or developed

Cumulative expenditure recognised in the carrying value of Intangible assetsComputer software, other 52 988 302 31 891 598

A register containing the information required by section 63 of the Municipal Finance Management Act is available for inspection at theregistered office of the municipality

10. Heritage assets

2019 2018

Cost / Valuation Accumulatedimpairment

losses

Carrying value Cost / Valuation Accumulatedimpairment

losses

Carrying value

Art Collections, antiquities and exhibits 524 313 - 524 313 524 313 - 524 313Historical buildings 1 940 298 - 1 940 298 2 242 681 - 2 242 681

Total 2 464 611 - 2 464 611 2 766 994 - 2 766 994

Reconciliation of heritage assets 2019

Opening balance Disposals TotalArt Collections, antiquities and exhibits 524 313 - 524 313Historical buildings 2 242 681 (302 383) 1 940 298

2 766 994 (302 383) 2 464 611

Reconciliation of heritage assets 2018

Opening balance Transfers TotalArt Collections, antiquities and exhibits 245 913 278 400 524 313Historical buildings 2 521 081 (278 400) 2 242 681

2 766 994 - 2 766 994

11. Financial liabilities

At amortised costDBSA 310 478 504 40 305 272Nedbank 96 634 691 143 309 348Rand merchant bank - 1 212 227Standard bank 295 520 755 323 205 121INCA - 31 392 374

702 633 950 539 424 342

Total other financial liabilities 702 633 950 539 424 342

Non-current liabilitiesAt amortised cost 614 841 385 394 165 665

37

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

11. Financial liabilities (continued)

Current liabilitiesAt amortised cost 87 792 565 145 258 677

12. Payables from exchange transactions

Trade payables 256 164 120 331 360 150Amounts received in advance 27 391 917 30 211 778Retentions 52 468 869 46 355 780Other payables 54 822 881 66 038 793Accrued leave pay 14 279 909 11 782 392

405 127 696 485 748 893

13. Consumer deposits

Electricity and Water 61 937 464 58 210 402Other deposits 3 618 492 3 618 492

65 555 956 61 828 894

Bank Gaurantees in favour of the municipality for consumer deposits amounts to R 46 525 803.37 (2019 ) and R 57 128 413.37 (2018).

14. Unspent conditional grants and receipts

Unspent conditional grants and receipts comprises of:

Unspent conditional grants and receiptsMunicipal Systems Improvement Grant 800 000 -Provincial Housing Grant 2 315 351 2 167 379Provincial Local Government Grants 6 252 720 5 062 274Provincial Libraries Grant 1 263 066 837 605Integrated Electrification Program - 2 650 169uThungulu District 169 372 39 372Energy efficiency and demand side management grant - 4 919 600

10 800 509 15 676 399

The nature and extent of government grants recognised in the annual financial statements and an indication of other forms of governmentassistance from which the municipality has directly benefited; and

Unfulfilled conditions and other contingencies attaching to government assistance that has been recognised.

See note for reconciliation of grants from National/Provincial Government.

These amounts are invested in a ring-fenced investment until utilised.

38

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

15. Provisions

Reconciliation of provisions - 2019

Opening Balance Additions TotalPro rata Bonus 15 176 264 1 342 116 16 518 380

Reconciliation of provisions - 2018

Opening Balance Additions TotalPro rata Bonus 13 899 657 1 276 607 15 176 264

Pro rata Bonus

The bonus accrues to staff on an annual basis based on their anniversary month. The provision is an estimate of the amount payable to stafffor the following year on a pro-rata basis. The timing of the amount is uncertain with regards to payment of pro-rata bonus when staffmembers resign.

16. Employee benefit obligations

The amounts recognised in the statement of financial position are as follows:

Carrying valuePresent value of the defined benefit obligation-wholly unfunded (220 079 000) (332 531 737)Current service cost (8 328 000) (18 623 617)Interest cost (21 929 000) (32 265 172)Actuarial gain 19 712 000 157 558 526Benefits paid 6 388 000 5 783 000

(224 236 000) (220 079 000)

Changes in the present value of the defined benefit obligation are as follows:

Opening balance 220 079 000 332 531 737Net amount recognised in the statement of financial performance 4 157 000 (112 452 737)

224 236 000 220 079 000

Net amount recognised in the statement of financial performance

Current service cost 8 328 000 18 623 617Interest cost 21 929 000 32 265 172Actuarial (gains) (19 712 000) (157 558 526)Settlement (6 388 000) (5 783 000)

4 157 000 (112 452 737)

Key assumptions used

The Municipality operates on 5 accredited medical aid schemes, namely: Bonitas, Hosmed, Keyhealth, LA Health and Samwumed. Pensionerscontinue on the option they belonged to on the day of their retirement. The independent valuers, ZAQ Consultants and Actuaries, carried outa statutory valuation for the year ended 30 June 2019 with projected liabilities for year ending 2020 and 2021. There a no planned assets.

Discount rates used Yield curveAverage retirement age 60 yearsMedical cost trend rates CPI + 1%

39

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

17. Accumulated surplus

Ring-fenced internal funds and reserves within accumulated surplus - 2019

Capitalreplacement

reserve

Housingdevelopment

fund

Accumulatedsurplus

Total

Opening balance 190 324 256 3 061 960 5 886 929 855 6 080 316 071Transfer to capital replacement reserve 176 172 522 - (176 172 522) -Deficit for the year - - (113 386 468) (113 386 468)

366 496 778 3 061 960 5 597 370 865 5 966 929 603

18. Service charges

Sale of electricity 1 298 484 098 1 281 889 919Sale of water 414 491 081 373 831 155Sewerage and sanitation charges 92 760 434 70 033 876Refuse removal 84 696 387 97 765 031

1 890 432 000 1 823 519 981

An amount of R10 902 624.06 (2018: R10 595 197.12) received in respect of prepaid electricity sales has been deferred and transferred toamounts received in advance.

19. Operational Revenue

Building plans 1 456 345 874 442Extension fees 19 528 333 12 370 172Connection fees 11 056 146 10 513 223Skills levy fees 1 936 965 472 795Insurance claims refund 3 074 092 86 171Sundries 14 292 187 23 488 092Advertisement 2 537 450 2 564 618Transaction handling fees 694 221 2 145 041Discount received 327 458 3 375 110Inventory gains - 1 752 690Meter Replacement 85 891 69 270

54 989 088 57 711 624

20. Interest received - investment

Interest revenueBank 27 999 016 76 055 871

40

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

21. Property rates

Rates received

Residential 175 259 106 164 874 263Commercial 120 618 436 109 155 177State 32 533 342 31 927 261Vacant land 55 661 905 45 841 174Public benefit organisations 238 982 203 038Agriculture 2 071 154 1 912 838Industrial 150 758 277 140 584 983Mining 801 507 751 188Public service infrastructure 84 978 77 897Less: Income forgone (60 889 718) (52 667 039)

477 137 969 442 660 780Property rates - penalties imposed 3 280 389 2 013 216

480 418 358 444 673 996

Valuations

Residential 18 425 838 010 18 340 258 410Commercial 5 899 456 092 5 633 152 692State 3 185 926 600 3 215 746 600Vacant land 2 602 678 977 2 507 864 252Public benefit organisations 95 200 000 73 500 000Agriculture 747 064 308 729 528 308Industrial 7 072 372 000 7 077 372 000Mining 35 942 000 35 942 000Public service infrastructure 130 685 150 128 382 150Multiple use 404 504 000 504 055 000

38 599 667 137 38 245 801 412

The first valuation in terms of the Property Rates Act No.6 of 2004 came into effect on 01 July 2008. Valuations were performed on land andbuildings together. Valuations on land and buildings are performed every four years. The last valuation came into effect on 1 July 2013. Onesupplementary valuation roll and objection roll in terms of the new Act were processed during the financial year. The following rate randageand ratio to residential tariff were applied:

41

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

21. Property rates (continued)New category of properties Rates Randage Ratio to

ResidentialTariff

Residential 0.0097 1:1,00Business/Commercial 0.0204 1:2,10Industrial 0.0213 1:2,20Agricultural 0.0024 1:0,25Public service purpose ( State owned ) 0.0107 1:1,10Public service infrastructure 0.0021 1:0,25PBO's 0.0024 1:0,25Mining 0.0223 1:2,30Vacant land 0.0194 1:2,00

Subject to the provisions contained in the Rates Policy and upon application, the following rebates were applied:

Agricultural Properties - 5%

Non-profit Organisations - 20%

Pensioners - R15 000 Valuation Reduction on primary developed property

In addition to the statutory R15 000 reduction in the valuation on residential properties, a further reduction of R105 000 of the valuation onall developed residential properties with >R40 000 was made.

Rates are levied on a monthly basis but upon request can be levied annually. The final date for payment of rates that are levied on an annualbasis is 30 September of each year, and 30 June for monthly ratepayers. Interest of prime plus 1% is levied on outstanding rates.

42

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

22. Transfers and subsidies

Operating grants

Equitable Share 326 255 000 292 009 000Municipal Demarcation Grant - 6 209 000Financial Management Grant 2 603 947 2 342 985Expanded Public Works Program 5 189 000 4 143 000Infrastructure Skills development Grant 2 300 000 5 533 232Provincial Libraries Grant 9 617 539 9 416 189Other Government Grants - 2 990Provincial Local government 753 490 19 610Municipal Infrastructure grant 2 014 031 -

348 733 007 319 676 006

Capital grantsMunicipal Infrastructure Grant 89 217 078 95 678 607Integrated National Electrification Program 2 650 169 7 349 831Water Services Infrastructure Grant - 34 000 000Provincial Housing Grant 3 471 074 2 101 872Provincial Local Government Grant 6 055 564 4 033 976Financial Management Grant 46 053 307 015King Cetshwayo Grant - 100 000Municipal Systems Improvement Grant 255 000 -Energy Efficiency and Demand Side Management Grant 6 000 000 80 400

107 694 938 143 651 701

456 427 945 463 327 707

Equitable Share

In terms of the Constitution, this grant is used to subsidise the provision of basic services to indigent community members.

Municipal Systems Improvement Grant

Current-year receipts 1 055 000 -Conditions met - transferred to revenue (255 000) -

Conditions still to be met - remain liabilities (see note 15) 800 000 -

National Conditional Grants are allocated in terms of the Division of Revenue Act. The Municipal Systems Improvement Grant is used to assistmunicipalities to perform their functions and stabilse institutional and governance systems as required in the Municipal systems act andrelated legislation.

Water Services Infrastructure Grant

Current-year receipts - 34 000 000- (34 000 000)

Conditions still to be met - remain liabilities (see note 15) - -

National Conditional Grant are allocated in terms of the Division of Revenue Act. This grant is used to construct water and sewerageinfrastructure as part of the upgrading of informal settlement areas. No funds have been withheld.

43

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

22. Transfers and subsidies (continued)

Municipal Infrastructure Grant

Current-year receipts 104 604 000 108 742 000Conditions met - transferred to revenue (91 231 109) (95 678 607)Other (13 372 891) (13 063 393)

Conditions still to be met - remain liabilities (see note 15) - -

National Conditional Grant are allocated in terms of the Division of Revenue Act. This grant is used to construct water and sewerageinfrastructure as part of the upgrading of informal settlement arrears. No funds have been withheld.

Provincial Housing Grant

Balance unspent at beginning of year 2 167 379 2 784 831Current-year receipts 3 494 158 1 316 040Conditions met - transferred to revenue (3 471 074) (2 101 872)Interest 124 888 168 380

Conditions still to be met - remain liabilities (see note 15) 2 315 351 2 167 379

Provincial Housing Grant was allocated to assist in the refurbishment of various hostels. The grant are spent in accordance with a businessplan approved by the Provincial government. Fund were provided for the housing operating account. Funds were also provided for theMunicipality to implement the enhanced extended discount benefit scheme. No funds were withheld. An amount of R 5 598 678 wastransferred to the Brackenham Housing reserve ( Municipal housing operating account ) in terms of an agreement between Council and theDepartment of Human Settlement . A tri-party agreement between Waterstone country estate, the City of Umhlathuze and the Departmentof Human Settlement was signed to procure the property for affordable housing development.

Infrastructure skills development grant

Balance unspent at beginning of year - 1 654 232Current-year receipts 2 300 000 6 500 000Grant withheld - (2 621 000)Conditions met - transferred to revenue (2 300 000) (5 533 232)

Conditions still to be met - remain liabilities (see note 15) - -

National Conditional Grant are allocated in terms of the Division of Revenue Act. The infrastructure and skills development grant is used tostrengthen capacity of local government, to effectively and efficiently deliver quality infrastructure by increasing the pool of skills available, tofacilitate lifelong learning and the transfer of knowledge and skills to municipalities and to sustain infrastructure related management capacityin local government.

Finance Management Grant

Current-year receipts 2 650 000 2 650 000Conditions met - transferred to revenue (2 650 000) (2 650 000)

Conditions still to be met - remain liabilities (see note 15) - -

National Conditional Grant are allocated in terms of the Division of Revenue Act. The financial management grant is used to promote andsupport reforms in financial management by building capacity in municipalities to implement the Municipal Finance Management Act (MFMA).

44

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

22. Transfers and subsidies (continued)

Restructuring Grant

Balance unspent at beginning of year - 9 385Conditions met - transferred to revenue - (9 385)

Conditions still to be met - remain liabilities (see note 15) - -

National Conditional Grant are allocated in terms of the Division of Revenue Act. The Restructuring grant received in 2002, 2003 and 2004from National treasury has been earmarked for certain projects that will improve the local economy.

Provincial Local Government Grant

Balance unspent at beginning of year 5 062 274 5 408 820Current-year receipts 7 999 500 3 687 025Conditions met - transferred to revenue (6 809 054) (4 033 571)

Conditions still to be met - remain liabilities (see note 15) 6 252 720 5 062 274

Provincial local government grants are used to implement administrative and financial framework and to provide a municipal infrastructureframework. The grants are spent in accordance with a business plan approved by the Provincial government.

Provincial Libraries

Balance unspent at beginning of year 837 605 685 793Current-year receipts 10 043 000 9 385 000Conditions met - transferred to revenue (9 617 539) (9 233 188)

Conditions still to be met - remain liabilities (see note 15) 1 263 066 837 605

Provincial library grants were allocated to subsidise the purchase of equipment for various libraries. A subsidy was also received to assist inthe construction of the Empangeni library study hall. Funds were also provided to refurbish the old community hall at Felixton into a libraryFurther funding was also received for the installation of computer hardware and software for public internet access, the cost of the internetconnectivity, furniture to house these computers and salaries for the employment of "cyber-cadets". The subsidies are spent in accordancewith a business plan approved by the Provincial government. No funds have been withheld.

Water Services Operating Subsidy Grant

Department of water affairs refurbishment grant and subsidy for water services works. The grant is spent in accordance with an approvedbusiness plan.

Expanded public works program

Current-year receipts 5 189 000 4 143 000Conditions met - transferred to revenue (5 189 000) (4 143 000)

Conditions still to be met - remain liabilities (see note 15) - -

National Conditional Grant are allocated in terms of the Division of Revenue Act. The grant is to incentivise municipalities to expand workcreation efforts through the use of labour intensive delivery methods in compliance with EPWP guidelines.

45

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

22. Transfers and subsidies (continued)

Integrated National Electrification Programme

Balance unspent at beginning of year 2 650 169 -Current-year receipts - 10 000 000Conditions met - transferred to revenue (2 650 169) (7 349 831)

Conditions still to be met - remain liabilities (see note 15) - 2 650 169

Department of Minerals and Energy provided a grant in support of electrification projects. The grants are spent in accordance with anapproved business plan.

uThungulu District Municipality/ King Cetshwayo District Municipality

Balance unspent at beginning of year 39 372 52 992Current-year receipts 130 000 100 000Conditions met - transferred to revenue - (113 620)

Conditions still to be met - remain liabilities (see note 15) 169 372 39 372

uThungulu district allocated funds for the capacity building grant, for the beach protection project at Alkantstrand beach Richards Bay andalso provided a subsidy to assist in the daily running of the Empangeni museum. No funds have been withheld.

Municipal Demarcation Grant

Current-year receipts - 6 209 000Conditions met - transferred to revenue - (6 209 000)

Conditions still to be met - remain liabilities (see note 15) - -

National Conditional Grant are allocated in terms of the Division of Revenue Act. The purpose of the grant is to subsidise the additionalinstitutional and administrative costs arising from major boundary changes due to come into effect at the time of the 2016 local governmentelections.

Energy effeciency and demand side management grant

Balance unspent at beginning of year 4 919 600 -Current-year receipts 6 000 000 5 000 000Grant withheld (4 919 600) -Conditions met - transferred to revenue (6 000 000) (80 400)

- 4 919 600

National Conditional Grants are allocated in term of the Division of Revenue Act. The purpose of the grant is to provide subsidies tomunicipalities to implement energy efficiency and demand side management ( EEDSM ) initiatives within municipal infrastructure in order toreduce electricity consumption and improve energy efficiency.

23. Public contributions and donations

Lotto Funding 1 565 668 2 434 332Other Public contributions and donations 537 141 1 537 900

2 102 809 3 972 232

46

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

24. Employee related costs

Basic 449 378 946 420 996 083Bonus 37 258 917 34 635 088Medical aid - company contributions 38 460 617 36 322 229UIF 3 836 347 3 667 110Leave pay provision charge 18 166 908 16 232 038Other allowances 12 577 851 7 141 947Defined contribution plans 6 156 919 5 720 621Travel, motor car, accommodation, subsistence and other allowances 47 538 273 44 064 027Overtime payments 50 331 332 44 522 830Housing benefits and allowances 4 239 143 4 316 393Cellphone allowances 3 864 790 3 600 141Contributions to pensions and group life 86 138 762 79 506 991Protective Clothing 180 000 163 333

758 128 805 700 888 831

2019 : Remuneration to senior managers &managers

MunicipalManager

COO DMM:Infrastructure &Technical Service

DMM:Electricityand Energy

ServicesAnnual Remuneration 1 365 800 1 543 672 1 128 664 1 239 014Annual Bonus 113 817 - 90 412 101 477Contribution to UIF, Medical & Pension Fund 388 285 83 311 316 026 345 486Travel Allowance 240 000 156 202 244 440 95 433

2 107 902 1 783 185 1 779 542 1 781 410

2018 : Remuneration to senior managers & managers MunicipalManager

COO DMM:Infrastructure &Technical Service

DMM:Electricityand Energy

ServicesAnnual Remuneration 1 290 531 1 461 515 757 794 391 791Annual Bonus 107 544 - - -Performance Bonus 218 417 158 574 - -Contribution to UIF, Medical & Pension Fund 304 498 78 730 207 493 117 769Travel Allowance 240 000 156 202 164 086 32 000

2 160 990 1 855 021 1 129 373 541 560

2019 : Remuneration to seniormanagers & managers

DMM: CityDevelopment

DMM:Community

Services

DMM: FinancialServices (CFO)

DMM: CorporateServices

Head:Engineering

ServicesAnnual Remuneration 1 391 439 1 343 319 1 426 468 1 478 348 728 164Annual Bonus 109 606 107 589 113 429 - 60 680Contribution to UIF, Medical &Pension Fund

193 085 68 366 59 425 105 024 288 873

Travel Allowance 154 622 259 556 204 600 183 223 304 000

1 848 752 1 778 830 1 803 922 1 766 595 1 381 717

47

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

24. Employee related costs (continued)

2018 : Remuneration to seniormanagers & managers

DMM: CityDevelopment

DMM:Community

Services

DMM: FinancialServices (CFO)

DMM: CorporateServices

Head:Engineering

ServicesAnnual Remuneration 1 315 277 904 284 1 348 084 1 396 033 680 527Annual Bonus 104 174 - 107 258 - 56 711Performance Bonus 142 716 - 158 574 158 574 -Travel Allowance 156 724 176 383 204 300 201 012 285 744Contribution to UIF, Medical &Pension Fund

114 838 49 720 31 422 99 401 259 554

1 833 729 1 130 387 1 849 638 1 855 020 1 282 536

2019 : Remuneration to seniormanagers & managers

Head: FinancialService Exp

Head: FinancialService Revenue

Head: TransportRoads

Head: Water andSanitation

Head: HumanResources

Annual Remuneration 728 164 728 164 962 361 728 164 728 164Annual Bonus 60 680 60 680 - 60 680 60 680Housing Subsidy 10 228 - - - -Travel Allowance 304 000 304 000 343 204 304 000 304 000Contribution to UIF, Medical &Pension Fund

284 017 215 028 272 782 225 351 218 854

1 387 089 1 307 872 1 578 347 1 318 195 1 311 698

2018 : Remuneration to seniormanagers & managers

Head: FinancialService Exp

Head: FinancialService Revenue

Head: TransportRoads

Head: Water andSanitation

Head: HumanResources

Annual Remuneration 680 527 680 527 909 318 680 527 680 527Annual Bonus 56 711 56 711 - 56 711 56 711Housing Subsidy 9 559 - - - -Travel Allowance 285 744 285 744 320 754 285 744 285 744Contribution to UIF, Medical &Pension Fund

280 455 199 168 276 323 210 565 218 650

1 312 996 1 222 150 1 506 395 1 233 547 1 241 632

48

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

24. Employee related costs (continued)

2019 : Remuneration to seniormanagers & managers

Head: Health &Safety

Head: ElectricalServices

Head: TransportFacilities andOperations

Head: Park,Sport &

Recreation

Head: SCM

Annual Remuneration 728 164 54 256 728 164 - 728 164Annual Bonus 60 680 - 60 680 - 60 680Housing Subsidy 9 376 - - - 10 228Travel Allowance 304 000 21 950 304 000 - 304 000Contribution to UIF, Medical &Pension Fund

252 219 - 261 376 - 283 079

1 354 439 76 206 1 354 220 - 1 386 151

2018 : Remuneration to seniormanagers & managers

Head: Health &Safety

Head: ElectricalServices

Head: TransportFacilities andOperations

Head: Park,Sport &

Recreation

Head: SCM

Annual Remuneration 405 761 493 685 680 527 57 295 293 776Annual Bonus - 42 416 56 711 - -Housing Subsidy - - - - 3 186Travel Allowance 167 017 191 100 285 744 73 636 120 480Contribution to UIF, Medical &Pension Fund

125 909 255 203 172 938 - 131 727

698 687 982 404 1 195 920 130 931 549 169

25. Remuneration of councillors

Mayor 847 064 816 875Deputy Mayor 735 406 683 120Mayoral Committee Members 5 465 745 5 304 867Speaker 695 365 543 506Councillors 19 875 133 19 252 186Councillors’ pension contribution 2 776 276 2 741 137

30 394 989 29 341 691

In-kind benefits

The Mayor, Deputy Mayor, Speaker, Chief Whip and Executive Committee Members are full-time. They are provided with an office andsecretarial support at the cost of Council.

The Mayor, Speaker and the Deputy Mayor and Chief Whip each have the use of separate Council owned vehicles for official duties.

26. Depreciation and amortisation

Property, plant and equipment 461 530 604 345 479 777Investment property 534 238 745 786Intangible assets 2 168 930 2 335 262

464 233 772 348 560 825

27. Finance costs

Non-current borrowings 51 286 016 67 690 845

49

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

28. Debt impairment

Debt impairment 163 733 092 27 153 878

29. Bulk purchases

Electricity 865 607 570 840 992 491Water 145 247 579 121 395 236

1 010 855 149 962 387 727

30. Contracted services

Outsourced ServicesOther Contractors 29 422 888 30 183 313Cleaning Services 3 701 334 3 582 269Meter Management 7 323 470 6 324 923Security Services 60 558 273 55 535 426Sewerage Services 74 560 440 57 975 440Animal Care 392 000 -Maintenance Contracters 136 433 709 134 906 406

312 392 114 288 507 777

31. Transfers and subsidies

Other subsidiesSubsidies 15 781 690 11 517 223

50

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

31. Transfers and subsidies (continued)

Municipal Grants and Subsidies Paid

16 Days of Activism - 205 425SPCA 420 000 398 800Hippo Rally - 50 000Death of a public member - 33 783Sundries 594 465 396 085Bursaries employee children 519 417 631 698Dolos festival 200 000 200 000Reed dance - 351 144Womens summit 66 484 95 367Senior Citizen 536 391 401 177Operation sukuma sakhe 213 044 201 473Community Mayor outreach 356 289 342 041University registrations 177 850 336 000uMhlathuze athletics associations 100 000 -Last dance festival 1 000 000 1 000 000Aerobics ( Women day ) 100 000 -Nkosi Mthiyane schools tournament 100 000 -Disaster management 296 874 527 741Diwali festival - 50 000Music festival - 200 000Soccer madness tournament - 450 000Richards bay football club 2 500 000 2 500 000Freedon day and Human rights day 50 426 118 216Civic funeral - Cllr Mthenjana - 842 349Mayoral school uniform campaigh - 150 531uMhlathuze tourism organisation 171 761 150 000Tournament - 50 000Phakama music festival - 150 000God's power trading - 50 000State of the city entertainment - 75 000Zwide 247 events and tournament - 250 000Profiling people with disability/ Disability sector 117 641 132 540uMhlathuze local football association 170 000 -Annual aerobics marathon 123 996 -Youth forum 542 085 -Federations - Rugby 53 050 -Downstream alluminium centre for technology 188 000 150 000Children 167 693 -Religious sector 74 244 -Isithembiso music production 84 000 -Hire of bus to Enyokeni - 55 000uMhlathuze operationn siyaya emhlangeni - 70 500Pentecostal holiness church 172 500 -uMhlathuze maskandi festival - 500 000Funeral former councillor 84 161 -Black cuban consulting 260 870 -Agricultural co-operatives 499 044 -SEDA construction incubator trust 2 233 000 -Soul and Jazz experience 1 555 000 -Madiba Jive 250 000 -Kufeziwe gospel celebration 150 000 150 000Catering for 1300 maidens 203 050 -Operation siyaya eMhlangeni 197 677 -

51

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

31. Transfers and subsidies (continued)PPE alien vegetation programme - 52 3534th Annual spring tour music festival 300 000 -Second annual spring music tour festival - 200 000uMhlathuze music festival 100 000 -Sisters help desk corner 500 000 -Mavuso RG - reimbursement of home contents 134 158 -Ngwelezane beneficiary subsidy 218 520 -

15 781 690 11 517 223

32. Operating expenses

Advertising 4 922 349 5 717 814Auditors remuneration 5 291 892 5 078 771Bank charges 9 512 127 7 007 967Cleaning 23 621 10 568Commission paid 6 549 460 6 182 132Consulting and professional fees 33 885 840 30 190 997Consumables 2 275 645 2 505 832Legal expenses 13 501 079 8 384 173Entertainment 200 132 406 457Insurance 7 315 762 4 651 102Community development and training 6 492 321 6 122 682Conferences and seminars 624 794 808 026Employee Awards 693 396 377 273Examination of samples 4 000 540 7 476 270Levies 6 386 653 5 892 371Packaging 152 815 155 645Pest control 78 355 72 885Fuel and oil 23 744 572 19 404 725Resettlement Cost 116 416 80 754Postage and courier 2 224 502 2 190 331Printing and publications 376 952 332 843Workmen's Compensation Fund 3 325 340 4 174 561External Computer Service 12 030 661 10 040 035Subscriptions and membership fees 8 342 934 7 544 513Telephone and fax 6 826 938 2 952 003Refuse Site Fees 9 130 048 9 213 672Uniforms 5 792 705 5 552 295Bursaries 642 375 667 343Indigent support - 201 534Licences 2 895 444 2 652 038Materials and Supplies 83 732 578 83 137 498Travel and Subsistence 5 804 634 4 636 520Rental of property, plant and equipment 22 492 586 37 262 483Venue expenses 3 361 695 2 787 060Inventory loss 1 197 904 -

293 945 065 283 871 173

33. Gains on disposal of land

Gains on disposal of land - 652 684

52

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

34. Auditors' remuneration

Fees 5 291 892 5 078 771

35. Cash generated from operations

(Deficit) surplus (113 386 468) 290 253 918Adjustments for:Depreciation and amortisation 464 233 772 348 560 825Loss on sale of assets and liabilities 11 689 152 1 449 010Impairment deficit 8 424 712 -Debt impairment 163 733 092 27 153 878Movements in retirement benefit assets and liabilities 4 157 000 (112 452 737)Movements in provisions 1 342 116 1 276 607Gain on sale of land - (653 684)Other non-cash items - inventory loss - (1 298 224)Changes in working capital:Inventories (4 588 587) 1 975 982Consumer debtors (28 841 316) (88 343 234)Other receivables from non-exchange transactions (77 807 206) 28 909 660Payables from exchange transactions (78 123 680) (160 792 354)VAT 3 726 251 44 812 818Unspent conditional grants and receipts (4 875 890) 5 080 346Consumer deposits 3 727 062 14 093 525

353 410 010 400 026 336

36. Commitments

Authorised capital expenditure

Approved and contracted for Property, plant and equipment 263 133 454 217 311 231

Total capital commitmentsApproved and contracted for 263 133 454 217 311 231

This committed expenditure relates to property, plant and equipment and will be financed by available bank facilities, government grants,funds internally generated, etc.

53

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

37. Contingencies

Guy Morton Shaw Smith N.O. and 2 others referred to as Indlovu Development Trust ( Mzingazi Golf Estate developers) launched anapplication against council for an amount of R1 142 748.90 in respect of bulk services contribution. They claim that Council unlawfullyappropriated this amount from the proceeds of the sale while council was only supposed to levy R 121 355.45. They seek an order forpayment of the sum of R 1 142 748.90, interest at the rate of 9% per annum from the date of demand costs of suit and further and / oralternative relief. The matter was defended and is ongoing. The court date has not been set.

Council procured services from Kulu Civils in respect of Tenders 8/2/1/UMH22-15/16 and 8/2/1/UMH23-15/16. The contractor subsequentlydid not comply with the conditions in the letter of intention to award. The intention to award was subsequently cancelled. Kulu Civils hasrefered the matter to the Adjudicator who found in favour of the contractor that they were entitled to general costs, loss of profit. Thedecision of the Adjudicator has been challenged and a review application has been lodged in the High Court. The possible outfflow ofeconomic benefits is R500 000. The matter is ongoing.

Labour dispute by claimant Wiseman Sinothi Mkhonza. The municipality is awaiting deposit requirements from the client so that council cantranscribe the record. The possible outflow of economic benefits is R 1 881 546.66.

Labout dispute by claimant Mthethwa. This matter is ready to be set down and is awaiting set down date. The possible outflow of economicbenefits is R 113 408.44.

Labour dispute by claimant M Nhleko. The municipality is awaiting transcripts. The possible outflow of economic benefits is R 1 075 169.52

Richards bay ski-boat club filed a case against the municipality called for not restoring electicity supply. The municipality received draft bill ofcosts after court hearing on 14/03/2019. The possible outflow of economic benefits is R 91 098.93.

Zululand yacht club legal case for rental charged by the municipality. The possible outflow of economic benefits is R 73 540.60

Contingent assets

Council instituted a claim of R 2 339 614 against Thinasobabile Trading for defective performance. The matter is awaiting a court date.

54

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 2019Figures in Rand

38. Related parties

There were no related party transactions that occurred during the year.

Remuneration of management

Executive committee members

2019

Basic salary Cellphone/Data Travel Allowance Medical Aid Pension TotalNameMhlongo MG - Mayor 802 664 44 400 - 83 664 120 400 1 051 128Sibiya KD - Deputy Mayor 489 661 44 400 201 345 40 926 73 449 849 781Mkhize G - Speaker 650 965 44 400 - 56 772 97 645 849 782Lourens M - Chief Whip 656 561 44 400 - - 98 484 799 445Fourie LCM - Executive Committee 492 420 44 400 188 761 - 73 863 799 444Gumede TS - Executive Committee 633 777 44 400 - 26 202 95 067 799 446Mthembu BC - Executive Committee 437 763 44 400 188 761 62 856 65 665 799 445Mthethwa KN - Executive Committee 454 902 44 400 188 761 43 146 68 235 799 444Ndimande DJ - Executive Committee 447 050 44 400 188 761 52 176 67 058 799 445Phahla TM - Executive Committee 437 763 44 400 188 761 62 856 65 665 799 445Sookroo M - Executive Committee 428 706 44 400 188 761 73 272 64 306 799 445Zikhali RM - Executive Committee 456 833 44 400 188 761 40 926 68 525 799 445

6 389 065 532 800 1 522 672 542 796 958 362 9 945 695

2018

Basic salary Cellphone/Data Travel Allowance Medical Aid Pension TotalNameMhlongo MG - Mayor 772 475 44 400 - 79 662 115 871 1 012 408Sibiya KD - Deputy Mayor 97 861 8 757 36 364 6 530 11 975 161 487Mkhize G - Deputy Mayor 500 177 35 643 - 42 922 78 576 657 318Mkhize G - Speaker 128 041 8 757 - 9 032 15 657 161 487Mthenjana MW - Speaker 403 184 28 543 - 31 586 63 062 526 375

55

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 2019Figures in Rand

38. Related parties (continued)Lourens M - Chief Whip 631 309 44 400 - - 94 696 770 405Fourie LCM - Executive Committee 473 482 44 400 181 501 - 71 022 770 405Mthembu BC - Executive Committee 421 438 44 400 181 501 59 850 63 216 770 405Mthethwa KN - Executive Committee 437 758 44 400 181 501 41 082 65 664 770 405Sookroo M - Executive Committee 415 944 44 400 181 501 66 168 62 392 770 405Zikhali RM - Executive Committee 440 805 44 400 181 501 37 578 66 121 770 405Phahla TM - Executive Committee 421 438 44 400 181 501 59 850 63 216 770 405Gumede TS - Executive Committee 614 929 44 400 - 18 837 92 239 770 405Ndimande DJ - Executive Committee 84 692 8 757 35 796 9 992 12 704 151 941Sibiya KD - Executive Committee 483 148 35 643 24 704 - 74 958 618 453

6 326 681 525 700 1 185 870 463 089 951 369 9 452 709

Councillors/Mayoral committee members

2019

Basic salary Cellphone/Data Travel Allowance Medical Aid Pension TotalNameExecutive committee members 6 389 065 532 800 1 522 672 542 796 958 362 9 945 695Other Councillors 11 226 787 2 239 773 2 092 874 1 116 862 1 635 215 18 311 511Section 79 full/part time 1 218 009 177 600 388 358 171 114 182 702 2 137 783

18 833 861 2 950 173 4 003 904 1 830 772 2 776 279 30 394 989

2018

Basic salary Cellphone/Data Travel Allowance Medical Aid Pension TotalNameExecutive committee members 6 326 681 525 700 1 185 870 463 089 951 369 9 452 709Other Councillors 10 863 626 2 278 245 2 039 146 1 187 397 1 624 236 17 992 650Section 79 full/part time 1 092 841 162 159 338 027 138 208 165 097 1 896 332

18 283 148 2 966 104 3 563 043 1 788 694 2 740 702 29 341 691

56

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

39. Prior-year adjustments

During the year the municipality reclassified different classes of property, plant and equipment as well as investment property andintangible assets. The municipality undertook a detailed verification of infrastructure assets as a result there were assets that were broughtin which were not previously recognised, this change was done as a prior error in accordance with GRAP 3. There were also assets thatwere brought in which were not previously recognised, these have been classified under correction of error. Other payables were alsocorrected due to interest accrual that was not reversed in the prior year. Presented below are those items contained in the statement offinancial position that have been affected by prior-year adjustments:

Statement of Financial Position

2018

Note As previouslyreported

Correction oferror

Reclassification Restated

Property, plant and equipment 8 5 406 836 319 787 332 403 31 477 678 6 225 646 400Intangibles 9 66 897 945 (3 393 720) - 63 504 226Investment property 7 123 372 704 (4 561 851) (31 477 678) 87 333 175Receivables from non exchange transactions 4 97 606 357 1 800 000 12 763 648 112 170 005Accumulated surplus 17 5 313 301 186 763 952 927 3 061 960 6 080 316 073Materials and supplies 32 94 679 797 - (11 551 309) 83 128 488Maintenance contracters 30 123 364 107 - 11 551 309 134 915 416Payables from exchange transactions 12 443 549 901 9 188 929 33 010 064 485 748 893Inventory Land 2 56 055 000 (8 000 000) - 48 055 000Consumer deposits 13 82 040 332 - (20 211 438) 61 828 894Housing development fund 17 3 061 960 - (3 061 960) -

11 810 765 608 1 546 318 688 25 562 274 13 382 646 570

2019

Reclassifications

40. Financial risk management

Financial risk management

The municipality’s activities expose it to a variety of financial risks: liquidity risk, credit risk and interest rate risk.

The municipality’s overall risk management program focuses on the unpredictability of financial markets and seeks to minimise potentialadverse effects on the municipality’s financial performance. The municipality uses derivative financial instruments to hedge certain riskexposures. Risk management is carried out by financial services department under policies approved by the accounting officer. Municipality'sfinancial services department identifies, evaluates and hedges financial risks in close co-operation with the municipality’s operating units. Theaccounting officer provides written principles for overall risk management, as well as written policies covering specific areas, such as foreignexchange risk, interest rate risk, credit risk, use of derivative financial instruments and non-derivative financial instruments, and investment ofexcess liquidity.

57

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

40. Financial risk management (continued)

Liquidity risk

Liquidity risk is the risk that the municipality will not be able to meet its obligations as they fall due. The municipality's approach is to ensurethat sufficient liquidity is available to meet its liabilities when due. The municipality uses cash flow forecasts to ensure that sufficient cash isavailable to meet expected operating expenses. This is guided by working capital and revenue enhancement policy.

The municipality’s risk to liquidity is a result of the funds available to cover future commitments. The municipality manages liquidity riskthrough an ongoing review of future commitments and credit facilities.

The credit profile of the City of uMhlathuze issued by Moody's Investor Service for the 2018/19 financial year, reflects its prudent financialpolicies, solid operating performance and a strong liquidity position, with a rating of (Ba2).

Cash flow forecasts are prepared and adequate utilised borrowing facilities are monitored.

The table below analyses the municipality’s financial liabilities and net-settled derivative financial liabilities into relevant maturity groupingsbased on the remaining period at the statement of financial position to the contractual maturity date. The amounts disclosed in the table arethe contractual undiscounted cash flows. Balances due within 12 months equal their carrying balances as the impact of discounting is notsignificant.

Credit risk

Credit risk consists mainly of cash deposits, cash equivalents, derivative financial instruments and trade debtors. The municipality onlydeposits cash with major banks with high quality credit standing and limits exposure to any one counter-party.

Trade receivables comprise a widespread customer base. Management evaluated credit risk relating to customers on an ongoing basis. Ifcustomers are independently rated, these ratings are used. Otherwise, if there is no independent rating, risk control assesses the credit qualityof the customer, taking into account its financial position, past experience and other factors. Individual risk limits are set based on internal orexternal ratings in accordance with limits set by Council. The utilisation of credit limits is regularly monitored. Sales to retail customers aresettled in cash or using major credit cards. Credit guarantee insurance is purchased when deemed appropriate.

Financial assets exposed to credit risk at year end were as follows:

`

Financial instrument 2019 2018Investments 390 000 000 415 000 000Cash and cash equivalents 71 337 933 45 422 240Long-term receivables - -Consumer debtors 361 728 008 412 170 563Receivables from non exchange transactions 105 106 988 97 606 357

Market risk

Interest rate risk

As the municipality has no significant interest-bearing assets, the municipality’s income and operating cash flows are substantiallyindependent of changes in market interest rates.

The municipality’s interest rate risk arises from long-term borrowings. Borrowings issued at variable rates expose the municipality to cashflow interest rate risk. Borrowings issued at fixed rates expose the municipality to fair value interest rate risk. Municipality policy is tomaintain its borrowings in fixed rate instruments.

41. Events after the reporting date

No material facts and circumstances have occurred between the accounting date and the date of this report that would have an impact onthe financial statements.

58

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

42. Unforseen and unavoidable expenditure

Incurred expenditure 82 726 341 -

The unforseen and unavoidable expenditure is mainly due an increase on expenditure of non-cash items namely depreciation andimpairment. Ex pos facto condonation by Council in September 2019.

43. Irregular expenditure

Opening balance 77 628 008 -Irregular Expenditure - current year 47 533 346 -Irregular expenditure identified in the current year for prior year - 77 628 008

125 161 354 77 628 008

The irregular expenditure disclosed by the Municipality relates to Supply Chain Management Regulation 36 approvals by the AccountingOfficer, Supply Chain Management Regulation 22 clause 2 (shortening of tender advertisement period ) and the appointment of the ERPservice provider. At the date of the audit report the irregular expenditure was not resolved, hence management disclosed the irregularexpenditure which will later be reviewed.

44. Additional disclosure in terms of Municipal Finance Management Act

Contributions to organised local government

Current year subscription / fee 8 342 934 7 544 513

Audit fees

Current year subscription / fee 5 291 892 5 078 771

PAYE and UIF

Current year subscription / fee 121 677 106 108 114 011Amount paid - current year (121 677 106) (108 114 011)

- -

Pension and Medical Aid Deductions

Opening balance (1 953) (1 953)Current year subscription / fee 178 997 847 167 172 217Amount paid - current year (179 026 229) (167 172 217)Amount paid - previous years 30 335 1 953

- -

VAT

VAT payable 14 327 754 10 601 503

All VAT returns have been submitted by the due date throughout the year.

59

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

44. Additional disclosure in terms of Municipal Finance Management Act (continued)

Councillors' arrear consumer accounts

The following Councillors had arrear accounts outstanding for more than 90 days at :

30 June 2019 Outstanding lessthan 90 days

R

Outstandingmore than 90

daysR

TotalR

Mthembu SN ( Samuel ) 43 3 898 3 941Mthethwa KN ( Khethomusa ) 1 512 84 763 86 275Ntuli DE ( Dini ) 8 451 146 472 154 923

10 006 235 133 245 139

30 June 2018 Outstanding lessthan 90 days

R

Outstandingmore than 90

daysR

TotalR

Mthembu SP ( Solile P ) - 1 527 1 527Wanda TP ( Thabisile ) - 78 78Xulu ZZ ( Zakheleni ) 913 13 195 14 108

913 14 800 15 713

Supply chain management regulations

In terms of section 36 of the Municipal Supply Chain Management Regulations any deviation from the Supply Chain Management Policy needsto be approved/condoned by the City Manager and noted by Council. The expenses incurred as listed hereunder have been condoned.

IncidentEmergency 3 044 330 12 047 878Sole provider 4 520 602 8 176 224Exceptional case where it is impossible to follow the official procument process 22 293 541 77 854 969Ratify minor breaches of the procument process - 42 988

29 858 473 98 122 059

45. Budget differences

Explananation of variances between approved and final budget amounts

The reason for the variance between approved and final budget is mainly due to the adjustments budget that was approved by Council on 28February 2019 under resolution 13061.

Explanation of variances greater than 20% between final budget and actual amounts

Statement of Financial Performance

Revenue

Other Income: The variance is the result of mainly a decreased in revenue received on extension fees for engineering contribution .

Interest Received- Investment: The variance is the result of decrease in surplus funds available for investments during the year.

Fines, penalties and forfeits: The variance is due to thecommencement of the new tender for the issuing ans collection of fines.

60

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 20192019 2018

R R

45. Budget differences (continued)

Interest Earned - Outstanding debtors: The variance is due to interest levied on outstanding study loan fees.

Expenditure

Depreciation: The variance is mainly due to work in progress that was completed and unbundling of Infrastructure assets.

Debt impairment: The variance is mainly due to the write off of rural water accounts and increase in the provision for debt impairment.

Contracted Services: The variance is mainly due to reduced expenditure on sewerage and waste disposal

General Expenses: The variance is due to reduced expenditure on material and supply, legal fees and uniforms

46. Surcharges and Taxes

Water surcharges 4 072 533 4 492 333

47. Gaurantees

Guarantee by uMhlathuze Municipality in respect of Postal Services is R 200 000.

48. VAT payable

VAT 14 327 754 10 601 503

49. Operating lease

The municipality as a lessee

At the reporting date, the municipality has an outstanding commitments under operating leases which fall due as follows:

IT equipment 2019 2018Within one year 3 249 736 2 306 547In the second to the fifth year inclusive - 7 026 041

3 249 736 9 332 588

Operating lease payment represents rentals payments by the municipality for certain of its offices. The municipality also has current leasearrangements for three years for printers. No contingent rent is payable.

50. Change in estimate

Property, plant and equipment

The municipality in the current financial year changed the estimated useful lives of certain property, plant and equipment, intangible assetsand investment properties that were reaching their initial estimated useful lives. The effect of this revision has reduced the depreciationcharges for the current and future periods by R6 389 551.61

61

City of uMhlathuzeAnnual Financial Statements for the year ended 30 June 2019

Notes to the Annual Financial Statements for the year ended 30 June 2019Figures in Rand

51. Water Losses

Water losses for uMhlathuze Municipality calculated at a variable cost per klTotal produces and purchased ( KL ) amounts to: 39 355 555 35 765 914Total sold ( KL ) 30 236 353 28 103 435Water loss 9 119 202 7 662 480% Loss 23 21Variable cost ( KL ) 6 5

Loss in rand value 60 733 885 35 312 400

Water Losses are attributed to the following reasons:

Non-technical reasons: Included in these losses is measured water through bulk meters supplying the Traditional Areas of Mkhwanazi South,North and Dube. However individuals are not metered yet hence not billed and therefore recorded as lost at this stage.

Technical reasons: Aged reticulation without sufficient replacement, refurbishment and maintenance.

52. Electricity Losses

Electricity losses for uMhlathuze Municipality calculated at a unit cost per kilowattTotal purchases ( KW ) 1 040 169 844 1 053 954 829Total sold ( KW ) 977 742 107 990 116 354Electricity loss ( KW ) 62 427 737 63 838 475% Loss ( KW ) 6 6Unit Cost / KW 0.89 1.25

Loss in rand value 55 268 073 79 798 093

Electricity losses are attributable to the following reasons:

Non-technical reasons : Theft, unmetered supply and error in metering.

Technical reasons : Electrical resistivity in the network. Ageing of network without sufficient replacement, refurbishment and maintenance.Incorrect meter calibration and monitoring.

62

Appendix AJune 2019

Schedule of external loans as at 30 June 2019

LoanNumber

Redeemable Balance at30 June

2018

Receivedduring the

period

Redeemedwritten offduring the

period /Interestaccrued

Balance at30 June

2019

CarryingValue ofProperty,Plant &Equip

Other Costsin

accordancewith theMFMA

Rand Rand Rand Rand Rand Rand

Development Bank of SouthAfrica

Development Bank of South Africa 103170 2018/12/31 19 916 599 - 19 916 599 - - -Development Bank of South Africa 103494 2019/06/30 4 634 316 - 4 634 316 - - -Development Bank of South Africa 103494 2019/06/30 15 754 356 - 15 754 356 - - -Development Bank of South Africa - 310 000 000 (478 504) 310 478 504 - -

40 305 271 310 000 000 39 826 767 310 478 504 - -

Other loans

Rand Merchant Bank UMHL 2019/06/30 1 212 227 - 1 212 227 - - -INCA 2019/06/28 31 392 374 - 31 392 374 - - -Nedbank 05/7831/2 2019/12/31 42 887 594 - 27 802 203 15 085 391 - -Nedbank 1003878/3 2022/06/17 40 421 754 - 8 900 208 31 521 546 - -Nedbank 1003878/4 2024/06/28 60 000 000 - 9 972 247 50 027 753 - -Standard Bank 407554 2026/06/30 323 205 121 - 27 684 366 295 520 755 - -

499 119 070 - 106 963 625 392 155 445 - -

Total external loans

Development Bank of South Africa 40 305 271 310 000 000 39 826 767 310 478 504 - -Other loans 499 119 070 - 106 963 625 392 155 445 - -

539 424 341 310 000 000 146 790 392 702 633 949 - -

Page 63

Appendix BJune 2019

Analysis of property, plant and equipment as at 30 June 2019Cost/Revaluation Accumulated depreciation

OpeningBalance

Acc Depr Acquisitions Transfers

Revaluations

Other changes,movements

ClosingBalance

OpeningBalance

Acquisitions disposal Depreciation Impairment loss ClosingBalance

Carrying value

Rand Rand Rand Rand

Rand

Rand Rand Rand Rand Rand Rand Rand Rand Rand

Land and buildings

Land (Separate for AFS purposes) 1 267 582 533 - - - - - 1 267 582 533 - - - - - - 1 267 582 533Landfill Sites (Separate for AFSpursoses)

- - - - - - - - - - - - - -

Quarries (Separate for AFS purposes) - - - - - - - - - - - - - -Buildings (Separate for AFS purposes) - - - - - - - - - - - - - -

1 267 582 533 - - - - - 1 267 582 533 - - - - - - 1 267 582 533

Infrastructure

Electrical Infrastucture 876 066 719 (332 375 005) 80 980 735 - - (5 062 145) 619 610 304 - - - (23 885 309) (418 723) (24 304 032) 595 306 272Storm water - - - - - - - - - - - - - -Coastal Infrastructure 36 758 777 (17 540 074) - - - - 19 218 703 - - - (808 759) - (808 759) 18 409 944Information and communication 81 190 420 (4 313 823) 6 673 660 - - - 83 550 257 - - - (2 316 870) - (2 316 870) 81 233 387Street lighting - - - - - - - - - - - - - -Dams & Reservoirs - - - - - - - - - - - - - -Rail Infrastructure 6 106 569 (4 328 343) - - - - 1 778 226 - - - (108 849) - (108 849) 1 669 377Reticulation - - - - - - - - - - - - - -Reticulation - - - - - - - - - - - - - -Road Infrastructure 2 363 726 162 (1 520 856 037) 72 943 752 - - - 915 813 877 - - - (88 721 304) (5 613 181) (94 334 485) 821 479 392Solid waste infrastructure 11 392 392 (4 636 550) 1 554 163 - - - 8 310 005 - - - (513 304) - (513 304) 7 796 701Housing - - - - - - - - - - - - - -Sanitation Infrastructure 1 741 997 363 (955 567 262) 78 584 358 - - - 865 014 459 - - - (111 742 557) (1 020 369) (112 762 926) 752 251 533Storm water Infrastructure 1 140 324 688 (823 553 845) 8 136 515 - - - 324 907 358 - - - (20 408 717) - (20 408 717) 304 498 641Water Supply infrastructure 4 925 382 800 (3 436 172 698) 75 943 884 - - (8 447) 1 565 145 539 - - - (114 750 344) (1 372 439) (116 122 783) 1 449 022 756Security Measures - - - - - - - - - - - - - -

11 182 945 890 (7 099 343 637) 324 817 067 - - (5 070 592) 4 403 348 728 - - - (363 256 013) (8 424 712) (371 680 725) 4 031 668 003

Community Assets

Communitu facilities 260 661 737 (82 232 269) 25 185 058 - - (2 087 501) 201 527 025 - - - (14 293 816) - (14 293 816) 187 233 209Clinics/Care Centres - - - - - - - - - - - - - -Creches - - - - - - - - - - - - - -Fire/Ambulance Stations - - - - - - - - - - - - - -Halls - - - - - - - - - - - - - -Libraries - - - - - - - - - - - - - -Markets - - - - - - - - - - - - - -Museums & art galleries - - - - - - - - - - - - - -Parks - - - - - - - - - - - - - -Public Ablution Facilities - - - - - - - - - - - - - -Taxi Ranks/Bus Terminals - - - - - - - - - - - - - -Sport & Recreation Facilities 228 910 680 (87 995 940) 10 084 732 - - - 150 999 472 - - - (12 981 101) - (12 981 101) 138 018 371Security and policing - - - - - - - - - - - - - -

- - - - - - - - - - - - - -

489 572 417 (170 228 209) 35 269 790 - - (2 087 501) 352 526 497 - - - (27 274 917) - (27 274 917) 325 251 580

Page 64

Appendix BJune 2019

Analysis of property, plant and equipment as at 30 June 2019Cost/Revaluation Accumulated depreciation

OpeningBalance

Acc Depr Acquisitions Transfers

Revaluations

Other changes,movements

ClosingBalance

OpeningBalance

Acquisitions disposal Depreciation Impairment loss ClosingBalance

Carrying value

Rand Rand Rand Rand

Rand

Rand Rand Rand Rand Rand Rand Rand Rand Rand

Heritage assets

Buildings 2 242 681 - - - - - 2 242 681 - - (302 383) - - (302 383) 1 940 298Painting and art galleries 524 313 - - - - - 524 313 - - - - - - 524 313

2 766 994 - - - - - 2 766 994 - - (302 383) - - (302 383) 2 464 611

Specialised vehicles

Refuse - - - - - - - - - - - - - -Fire - - - - - - - - - - - - - -Conservancy - - - - - - - - - - - - - -Ambulances - - - - - - - - - - - - - -Buses - - - - - - - - - - - - - -

- - - - - - - - - - - - - -

Other assets

Computer Equipment 39 625 313 (26 032 943) 6 163 360 - - - 19 755 730 - - (291 797) (4 138 046) - (4 429 843) 15 325 887Furniture and Office Equipment 25 721 119 (15 995 292) 2 307 912 - - - 12 033 739 - - (4 214) (2 620 231) - (2 624 445) 9 409 294Computer Equipment - - - - - - - - - - - - - -Computer Software (part of computerequipment)

- - - - - - - - - - - - - -

Machinery and Equipment 286 170 734 (125 188 731) 45 695 691 - - - 206 677 694 - - (1 468 236) (27 167 163) - (28 635 399) 178 042 295Operational Buildings - - - - - - - - - - - - - -Transport Assets 116 829 914 (58 608 454) 12 250 727 - - - 70 472 187 - - (2 626 458) (12 690 975) - (15 317 433) 55 154 754Abattoirs - - - - - - - - - - - - - -Markets - - - - - - - - - - - - - -Airports - - - - - - - - - - - - - -Security measures - - - - - - - - - - - - - -Civic land and buildings - - - - - - - - - - - - - -Other buildings 281 434 453 (131 269 020) 30 990 252 - - - 181 155 685 - - (597 275) (13 699 482) - (14 296 757) 166 858 928Land main investments - - - - - - - - - - - - - -Bins and Containers - - - - - - - - - - - - - -Work in progress - - - - - - - - - - - - - -Water craft - - - - - - - - - - - - - -Other Assets - Leased - - - - - - - - - - - - - -Surplus Assets - (Investment orInventory)

- - - - - - - - - - - - - -

Housing 177 781 911 (15 356 816) 4 439 809 - - - 166 864 904 - - - (10 683 526) - (10 683 526) 156 181 378Other - - - - - - - - - - - - - -

927 563 444 (372 451 256) 101 847 751 - - - 656 959 939 - - (4 987 980) (70 999 423) - (75 987 403) 580 972 536

Page 65

Appendix BJune 2019

Analysis of property, plant and equipment as at 30 June 2019Cost/Revaluation Accumulated depreciation

OpeningBalance

Acc Depr Acquisitions Transfers

Revaluations

Other changes,movements

ClosingBalance

OpeningBalance

Acquisitions disposal Depreciation Impairment loss ClosingBalance

Carrying value

Rand Rand Rand Rand

Rand

Rand Rand Rand Rand Rand Rand Rand Rand Rand

Total property plant and equipment

Land and buildings 1 267 582 533 - - - - - 1 267 582 533 - - - - - - 1 267 582 533Infrastructure 11 182 945 890 (7 099 343 637) 324 817 067 - - (5 070 592) 4 403 348 728 - - - (363 256 013) (8 424 712) (371 680 725) 4 031 668 003Community Assets 489 572 417 (170 228 209) 35 269 790 - - (2 087 501) 352 526 497 - - - (27 274 917) - (27 274 917) 325 251 580Heritage assets 2 766 994 - - - - - 2 766 994 - - (302 383) - - (302 383) 2 464 611Specialised vehicles - - - - - - - - - - - - - -Other assets 927 563 444 (372 451 256) 101 847 751 - - - 656 959 939 - - (4 987 980) (70 999 423) - (75 987 403) 580 972 536

13 870 431 278 (7 642 023 102) 461 934 608 - - (7 158 093) 6 683 184 691 - - (5 290 363) (461 530 353) (8 424 712) (475 245 428) 6 207 939 263

Agricultural/Biological assets

Agricultural - - - - - - - - - - - - - -Biological assets - - - - - - - - - - - - - -

- - - - - - - - - - - - - -

Intangible assets

Computers - software & programming 68 098 675 (4 594 450) 54 745 798 - - - 118 250 023 - - - (2 168 929) - (2 168 929) 116 081 094Other - - - - - - - - - - - - - -

68 098 675 (4 594 450) 54 745 798 - - - 118 250 023 - - - (2 168 929) - (2 168 929) 116 081 094

Investment properties

Investment property 94 072 539 (5 897 063) - - - - 88 175 476 - - - (534 238) - (534 238) 87 641 238

94 072 539 (5 897 063) - - - - 88 175 476 - - - (534 238) - (534 238) 87 641 238

Total

Land and buildings 1 267 582 533 - - - - - 1 267 582 533 - - - - - - 1 267 582 533Infrastructure 11 182 945 890 (7 099 343 637) 324 817 067 - - (5 070 592) 4 403 348 728 - - - (363 256 013) (8 424 712) (371 680 725) 4 031 668 003Community Assets 489 572 417 (170 228 209) 35 269 790 - - (2 087 501) 352 526 497 - - - (27 274 917) - (27 274 917) 325 251 580Heritage assets 2 766 994 - - - - - 2 766 994 - - (302 383) - - (302 383) 2 464 611Specialised vehicles - - - - - - - - - - - - - -Other assets 927 563 444 (372 451 256) 101 847 751 - - - 656 959 939 - - (4 987 980) (70 999 423) - (75 987 403) 580 972 536Agricultural/Biological assets - - - - - - - - - - - - - -Intangible assets 68 098 675 (4 594 450) 54 745 798 - - - 118 250 023 - - - (2 168 929) - (2 168 929) 116 081 094Investment properties 94 072 539 (5 897 063) - - - - 88 175 476 - - - (534 238) - (534 238) 87 641 238

14 032 602 492 (7 652 514 615) 516 680 406 - - (7 158 093) 6 889 610 190 - - (5 290 363) (464 233 520) (8 424 712) (477 948 595) 6 411 661 595

Page 66

Appendix FDisclosures of Grants and Subsidies in terms of Section 123 MFMA, 56 of 2003

June 2019

Name ofGrants

Name oforgan ofstate or

municipalentity

Quarterly Receipts Quarterly Expenditure Grants and Subsidies delayed / withheld

Sep Dec Mar Jun Sep Dec Mar Jun Dec MarMuseumSubsidy

KZN - Dept ofEdu & Culture

- 192 000 - - 388 672 414 076 459 263 459 263 - -

Housingoperationaacc

KZN - Dept ofHousing

1 155 111 896 166 1 395 797 - 3 219 488 3 254 569 3 272 640 3 196 096 - -

MunicipalInfrastructureGrant

NationalTreasury

30 000 000 40 000 000 34 604 000 - 20 709 827 21 546 926 22 504 993 39 842 254 - -

FinancialManagementGrant

NationalTreasury

2 650 000 - - - 296 294 217 457 1 419 896 644 353 - -

Equitableshare

NationalTreasury

135 940 000 108 752 000 81 563 000 - - - - - - -

EPWP 1 298 000 2 335 000 1 556 000 - 1 604 092 1 802 741 1 700 978 81 189 - -InfrastructureSkillsDevelopmentGrant

NationalTreasury

2 300 000 - - - 1 166 301 1 133 699 - - - 2 700 000

MunicipalSystemsImprovement

NationalTreasury

- - 1 055 000 - - - - 255 000 - -

WasteWaterInfrastructure

NationalTreasury

- - - - - - - - - -

Electrification NationalTreasury

2 000 000 2 000 000 2 000 000 - 955 659 3 673 460 179 750 191 131 4 919 600 -

eSikhawinihostelrefurbishment

KZN - Dept ofHosing

23 304 27 407 28 484 29 543 - - - - - -

INEP Nationaltreasury

- - - - - - 2 039 102 611 067 - -

Section 5 - Page 67 - 07 February 2020 - 02:49 PM

BeachProtection

KCDM 130 000 - - - - - - - - -

FuneralSpeaker

KZN - Dept ofHosing

- - - - - - - - - -

Libraries -InternetAccess

KZN - Dept oflibrary services

- 1 576 000 - - 302 639 273 663 295 181 279 056 - -

LibrarySubsidy

KZN - Dept oflibrary services

- 8 275 000 - - 3 140 379 3 413 319 3 084 665 3 149 855 - -

Career Expo Dept of publicworks

- - - - - - - - - -

AssetDonated

Dept of Arts &Culture

- - - - - - - - - -

AssetDonated

Dept of sport - - - - - - - - - -

Richards BayAirport

KZN -EconomicDevelopment &Tourism

- - - - - - - 184 494 - -

Servicedelivery onElectricalServices

KZN - COGTA - - - - - - - - - -

Informaltrading stalls

KZN - COGTA - - - - - - - - - -

TourismDevelopment

KZN - COGTA - - - - - - - - - -

MunicipalExcellenceAward

KZN - COGTA - - - - - - - - - -

Implement ofthe enhanceddiscountbenefit

KZN - Housing 3 238 3 273 3 411 50 313 - - - 24 000 - -

Comm DevProgramme

KZN - COGTA - - - - - - - - - -

GIS KZN - COGTA - - - - - - - - - -Sport & Rec Dept of Sport 2 616 500 50 000 2 616 500 2 616 500 1 729 129 1 217 115 - 2 924 826 - -Cleanesttown

Water Affairs - - 100 000 - - - - 96 290 - -

Restructuringgrant

NationalTreasury

- - - - - - - - - -

178 116 153 164 106 846 124 922 192 2 696 356 33 512 480 36 947 025 34 956 468 51 938 874 4 919 600 2 700 000Note: A municipality should provide additional information on how a grant was spent per Vote. This excludes allocations from the Equitable Share.

Section 5 - Page 68 - 07 February 2020 - 02:49 PM