Transcript of Enterprise Asset Management
eAM Issues and Resolutions
By: Syed Mustafa Arshad 1 | P a g e
Issues and Resolution
By: Syed Mustafa Arshad Senior eAM/SCM Functional Consultant Email: [email protected]
Enterprise Asset Management
eAM Issues and Resolutions
By: Syed Mustafa Arshad 2 | P a g e
Contents Work Request Stuck in "On Work Order" Status: ................................................................................... 5
PM Generate Work Order Not Generating All Work Orders: ................................................................. 5
Work Orders Stuck in Release-Pending Status: ...................................................................................... 5
Construction Estimate- WIP Class not Picked Automatically at Lines: ................................................... 6
Work Order Release Notification- Additional Info Button Not Working: ............................................... 6
PM-Generate Work Order Date Parameters: ......................................................................................... 6
Failure Entry Issues: ................................................................................................................................ 7
Asset Routes- Activity History not available: .......................................................................................... 8
Construction Estimate- Line Disappear when Operation Entered: ........................................................ 8
Construction Estimate- Auto-Request material Check for Work Orders: ............................................... 8
Construction Estimate- Activity Field Blanks at Creation: ...................................................................... 9
Mass Complete- Some Work Orders Missed in Selection: ..................................................................... 9
Work Orders Stuck in Release Pending Status: ..................................................................................... 10
Department Approvers List of Values is Empty: ................................................................................... 10
Create New Responsibility- Buttons Not Working: ............................................................................... 11
Resource Charge Type vs. Maintenance Routing Charge Type: ........................................................... 11
OSP Work Orders in Release-Pending: ................................................................................................. 12
Error when Adding OSP Resource to Released Work Order: ................................................................ 12
Resource Disabled But still Populated on Work Order: ........................................................................ 13
Responsibility Error when creating Work Orders from Construction Estimate: .................................. 13
Activity Suppression Working: .............................................................................................................. 14
Requisition Generation in Incomplete Status: ...................................................................................... 14
Requisition Import Run Delay: .............................................................................................................. 15
Character Limit for Asset Number and Asset Group: ........................................................................... 16
Cons Estimate- Non Purchasable/Stock able Item Error: ..................................................................... 16
Work Order Cost Estimation: ................................................................................................................ 16
Preventive Maintenance: Activity Routing Update .............................................................................. 17
Activity Based Attachments on Work Order: ........................................................................................ 17
Construction Estimate Work Order Search:.......................................................................................... 18
Work Order Approval Notification- Asset Number Display: ................................................................. 18
Work Order Closure and Its Purchase Order: ....................................................................................... 19
Quality form Data Deletion Using HTML: ............................................................................................. 19
Error when forecasting PM Work Orders: ............................................................................................ 19
eAM Issues and Resolutions
By: Syed Mustafa Arshad 3 | P a g e
Work Order Material Line Issued Quantity Displayed Zero: ................................................................. 20
Cons Estimate- No Routing Lines Displayed for Activity with OSP: ...................................................... 21
Construction Unit Quantity Personalization: ........................................................................................ 22
Account field Locked at PR with Destination Type Shop Floor: ............................................................ 22
Requisition Import Request Completes in Error: .................................................................................. 23
Work Order Status Failed Closed: ......................................................................................................... 24
Quality Plan Name to be Populated on Java from HTML: .................................................................... 24
Asset Group and Failure Analysis: ......................................................................................................... 25
Purpose of Interleave Check in Resource> Employees: ........................................................................ 25
Construction Estimate: Apply Default Sorting Basis: ............................................................................ 25
Failure Entry Missing at Asset Routes Work Order Completion: .......................................................... 26
Work Order Transactions | View Resource Transactions Error: ........................................................... 26
One-Step Issue driving Quantity to Negative: ...................................................................................... 27
Allocated Material Transactions Still Pending: ..................................................................................... 27
eAM Issues and Resolutions
By: Syed Mustafa Arshad 5 | P a g e
Work Request Stuck in "On Work Order" Status: Issue: Work Request Stuck in "On Work Order" Status even after work order is cancelled.
Steps to Reproduce:
1. Create a Work Request.
2. Create Work Order from Work Request
3. Cancel Work Order.
4. Status of Work Request is expected to change to "Cancelled" but it remains on Work Order.
Cause: This is the intended behaviour for the work request. The work request are remaining with
the status "On work order"
Solution: An Enhancement Request is raised.
Bug 12991332 - WORK REQUEST IS STUCK ON STATUS ON WORK ORDER WHEN THE WO IS
CANCELLED, has been created for this.
The ER contains the information about creating a new status for the work request and to apply it to
the work request in the case of a cancelled work order
Data fix is available in ID 1360131.1.
PM Generate Work Order Not Generating All Work Orders: Issue: Generate PM Work Order request not generating all Preventive Maintenance work orders
forecasted.
Steps to reproduce:
1. Forecast PM Work Orders.
2. Run Preventive Maintenance Request
3. Some forecasted work orders are missed in generation
Cause: Recognised as Application Bug. Bug 10042960 - EAMPMSDU: GENERATE WORK ORDERS IS
NOT GENERATING ANY WORK ORDER.
Solution: patch 16392690:R12.EAM.B
After applying patch there may be some change in info on pm e.g Suggested next service start date.
So it need to be uploaded.
Work Orders Stuck in Release-Pending Status: Issue: Some Work Orders got Stuck in "Released- Pending" with no notification sent to any user even
when no Approval flow was setup on those Work Orders:
Steps to Reproduce: Unknown.
Cause: Approval Management Bug. SR Update: This appears to be one-time issue as for similar work
orders, the issue cannot be reproduced.
eAM Issues and Resolutions
By: Syed Mustafa Arshad 6 | P a g e
Soultion:
If work orders are having same issue, then the datafix should be as follows:
update wip_discrete_jobs set status_type = 3 where wip_entity_id in
(select wip_entity_id from wip_entities where wip_entity_name = '&WO_NUMBER');
update eam_work_order_details set user_defined_status_id = 3, pending_flag = 'N' where
wip_entity_id in
(select wip_entity_id from wip_entities where wip_entity_name = '&WO_NUMBER');
commit;
You will have to enter the work order number.
Construction Estimate- WIP Class not Picked Automatically at Lines: Issue: System fails to pickup WIP Accounting Class automatically at Construction Estimate Lines.
Steps to Reproduce: Create Construction Estimate and add activities to it. When Asset number is
entered WIP Accounting class is not Picked up Automatically.
Cause: Standard Functionality.
Solution: This is application intended design to provide flexibility to users using construction
estimate.
Work Order Release Notification- Additional Info Button Not Working: Issue: When Work Order is released and sent for approval. Notification screen has button for
"Additional Information" when clicked nothing is done by system. Button is not working.
Steps to Reproduce:
1. Create Work Order and Release it
2. User will receive notification and Open it
3. When Additional Information Button clicked nothing happens.
Cause: Recognised as System Bug by oracle support.
Solution: Apply patch 10203771:R12.EAM.B.
PM-Generate Work Order Date Parameters: Issue: When report is run and date given System picks up date as 31-January-13 00:00:00 so it
actually misses Work Orders between time 31-January-13 00:00:00 to 31-January-13 23:59:59.
Steps to Reproduce:
1. Forecast PM Work Orders
eAM Issues and Resolutions
By: Syed Mustafa Arshad 7 | P a g e
2. Open Generate PM Work Orders Request
3. Give Parameters of date and run request
4. When Request is completed Open Log
5. Log has date like From: 1-January-13 00:00:00
To: 31-January-13 00:00:00
Cause: Parameters like that are standard for report.
Solution: It is not an issue. System actually don't miss any work order in between 00:00:00 to
23:59:59. It actually considers all work orders and later trunc time to 00:00:00.
Failure Entry Issues: Issues:
1. Failure date at work order completion must be equal to Work Order date but currently
system picks up Work Request date.
2. What are basis of time between failure when there is no last Service?
3. If no Work Request for Work Order, failure date is defaulted to system date. This could
cause issues if work order is back dated. System should pick up date of Work Order creation.
Steps to Reproduce:
1. Create Work Request.
2. Create Work order from it
3. Go to Complete Work Order and look for failure entry date.
Cause: Intended behaviour.
Solution:
1. This is the correct functionality. When a work request is used, the work request is earlier
then the work order. The actual failure date is NOT the work order date. The work request
became BEFORE the work order. When somebody noticed the faulty asset, they raised a WR.
therefore Failure date defaults to WR date in this case.
2. Mean Time Between Failures (mtbf) is calculated as the time between the asset creation and
the time of the failure. The difference between the creation date for the asset and the
failure date will be the time between failure (rounded).
3. Intended functionality. The Failure Date default is JUST A SYSTEM DEFAULT _ IT IS AN
EDUCATED GUESS. It cannot be 100% accurate. You have the option to change it.
In this case, the system realises that the actual failure date is not really known. The date at
which the work order is raised is not necessarily the failure date. The failure could happen
well before this date. The system defaults sysdate and you have to change it.
(If no Work Request/ Failure date available system picks up Asset Creation Date)
eAM Issues and Resolutions
By: Syed Mustafa Arshad 8 | P a g e
Asset Routes- Activity History not available: Issue: Activity history of work performed on Asset Routes is not available in Activity history of Asset
Numbers within an Asset Routes.
Steps to Reproduce:
1. Create Asset Route Work Order
2. Perform Activity and Complete work order
3. Activity can be seen in history of work performed on Asset Route
4. If you look for same Activity history to be available in Asset Numbers of Asset Routes it is
missing.
Cause: Intended Behaviour.
Solution: You created an Asset Route and created an Work Order on that Asset Route.
Then you entered the Asset Route details and observed the activity - this is normal as the activity
you assigned it to the asset route when you define it.
Then you search for one Asset Number from the Asset Route and your expectation is to see the
activity that is assigned to the Asset Route? If yes, then you will not see it, this being normal
behaviour - because you did not assign the activity to the asset number, but to the asset route. As
activity is not assigned to asset so it is not displayed.
Construction Estimate- Line Disappear when Operation Entered: Issue: Manually entered line on construction estimate disappears when operation Entered.
Steps to Reproduce:
1. Create a new construction estimate and try to add a line manually to it.
2. Enter relevant data including department and resources.
3. Click details to enter Standard Operation.
4. When you enter standard operation page refreshes and entered line disappears.
Cause: Intended Behaviour.
Solution: You need to define resources at standard operation definition to ensure that resources
and departments are populated when Standard Operation is entered at manual lines of construction
estimate.
Construction Estimate- Auto-Request material Check for Work
Orders: Issue: When you create work orders from Construction Estimate, auto request material is checked
for all material lines of Construction estimate by default. There is no field in construction estimate to
uncheck it.
Steps to Reproduce:
eAM Issues and Resolutions
By: Syed Mustafa Arshad 9 | P a g e
1. Create Construction Estimate
2. Enter relevant data
3. Create Work Orders
4. Auto Request material is checked on created work orders material lines.
Cause: System Bug.
Solution: Apply Patch.16784664:R12.EAM.B.
Construction Estimate- Activity Field Blanks at Creation: Issue: Activity field blanks when Construction Unit is entered in Select Activities- Construction
Estimate. This issue is faced for activity which has more then 40 characters.
Steps to Reproduce:
1. Create Construction Unit with Activity which has more then 40 Characters.
2. Select it in Construction Estimate Creation
3. When Selected the system do not display name of activity and activity field is blank.
Cause: Bug. 16578508 : EAM FFL: ACTIVITY FIELD BLANKS AT CONSTRUCTION ESTIMATE CREATION.
Solution: To implement the solution, please execute the following steps
1. Download and review the readme and pre-requisites for Patch.16578508
2. Ensure that you have taken a backup of your system before applying the recommended
patch.
3. Apply the patch in a test environment.
4. Confirm the following file versions:
<EAMPEDSS.pls 120.0.12010000.4>
You can use the commands like the following:
strings -a $XX_TOP/filename |grep '$Header'
5. Retest the issue.
6. Migrate the solution as appropriate to other environments.
Mass Complete- Some Work Orders Missed in Selection: Issue: When we go to Maintenance Planning Work Bench and Click Mass Complete Some of Work
orders are checked and some are unchecked.
Steps to Reproduce:
1. Go to Workbench
2. Click Mass Complete
3. New Java Form will open displaying Work Orders. Some of them will be unchecked.
Cause: The work orders unchecked have some pending transactions available for completion e.g
Quality Form, pending operation completion, failure entry missing etc.
eAM Issues and Resolutions
By: Syed Mustafa Arshad 10 | P a g e
Solution: Standard behaviour. If you want all Work Orders to be checked first complete pending
transactions before Mass completion.
Work Orders Stuck in Release Pending Status: Issue: Work Orders are stuck in released pending with no user notified. These work orders had no
AME setup.
Steps to Reproduce: Unknown.
Cause: Unidentified System Bug.
Solution: Work orders having same issue, then the datafix should be as follows:
update wip_discrete_jobs set status_type = 3 where wip_entity_id in
(select wip_entity_id from wip_entities where wip_entity_name = '&WO_NUMBER');
update eam_work_order_details set user_defined_status_id = 3, pending_flag = 'N' where
wip_entity_id in
(select wip_entity_id from wip_entities where wip_entity_name = '&WO_NUMBER');
commit;
- You will have to enter the work order number.
Department Approvers List of Values is Empty: Issue: When attempting to setup users as EAM Department Approvers the LOV for Responsibilities is
empty except for responsibilities that have a responsibility key beginning with EAM.
Steps to Reproduce: The issue can be reproduced at will with the following steps:
1. EAM: Setup: Department Approvers
2. Query a Responsibility
3. Primary approver is null for the responsibilities with a responsibility key beginning with EAM
Cause:
1. This is a code issue as Oracle has an artificial requirement that Department Approvers have a
responsibility key beginning with 'EAM'. OR
2. Responsibility has "Responsibility Key" starting with words else then EAM.
3. Application is Enterprise Asset management instead of Manufacturing.
Solution: To implement the solution, please execute the following steps:
1. Download and review the readme and pre-requisites for Patch.14841358.
2. Ensure that you have taken a backup of your system before applying
the recommended patch.
3. Apply the patch in a test environment.
eAM Issues and Resolutions
By: Syed Mustafa Arshad 11 | P a g e
4. Confirm the following file versions:
EAMFDAPR.fmb 120.2.12010000.3
You can use the commands like the following:
strings -a $EAM_TOP/forms/US/EAMFDAPR.* |grep '$Header'
5. Retest the issue.
Create New Responsibility- Buttons Not Working: Issue: Created new responsibility but fields not working in it
Steps to Reproduce:
1. Create New Responsibility
2. Assign to user
3. Try to Open responsibility and click any function
4. No Response.
Cause: Inventory Organization not assigned to Responsibility created
Solution: Give Organization Access to Responsibility:
Go to Inventory> Setup> Organization> Organization Access.
Resource Charge Type vs. Maintenance Routing Charge Type: Issue: While defining resource, we enter charge type has four options available :
Manual
PO Move
WIP Move
PO Receipt
When we enter routing for an activity there is again option to enter resource for operation lines.
When we enter resource there is charge type :
PO Receipt
Manual
Why is it so that on routing there is only 2 charge types and why we need to enter it again when it
was already given in resources. Also purpose of each one of charge types is unknown.
Steps to Reproduce:
1. Create a New Resource and there is charge type available for entry.
2. Create Routing, go in department resources and there is field charge type.
Cause: Intended behavior.
Solution: Following was the response from SR:
eAM Issues and Resolutions
By: Syed Mustafa Arshad 12 | P a g e
1. In Resource form we have 4 types of charge because the resource can be used not only for
EAM but also for WIP module
WIP Move and PO Move are to be used only by WIP Module. This is because the charge
types are related to move transactions. In EAM as you know, we do not have any move
transactions.
In EAM we can only use types: Manual and PO Receipt
Manual > meaning that user will charge time whenever he/she wants during the WO life
(from Release to complete). Also user can choose not to charge time (create resource
transaction) at all.
PO Receipt > this is used only for OSP resources. At the time of PO receipt automatically
system will create the resource transaction for the resource associated with the OSP item
2. When you create a maintenance Routing and add a resource, the Charge type will
automatically be defaulted from the Resource setup, but in can be overwritten at Routing
level, as needed
3. When you create WO and use the maintenance routing, the charge type will be defaulted
from the routing, but it can be overwritten at WO level.
4. When you create WO and use the maintenance routing, the charge type will be defaulted
from the routing, but it can be overwritten at WO level.
OSP Work Orders in Release-Pending: Issue: When OSP resource is added to a newly created work order and work order is released, work
order is stuck in Release-Pending.
Steps to Reproduce:
1. Create Work Order
2. Add Activity which has OSP Routing or manually add an OSP resource
3. Release Work Order
4. Work Order will be in released pending with no user notified
Cause: This is because no Person is assigned to user who is creating and releasing this work order.
Solution: Assign person to User creating Work Order.
Error when Adding OSP Resource to Released Work Order: Issue: When OSP resource is added to a released work order and work order is applied system
displays following error:
Steps to Reproduce:
1. Go in Update of Released Work Order
2. Add OSP resource to an Operation
3. Click Apply/Save
eAM Issues and Resolutions
By: Syed Mustafa Arshad 13 | P a g e
4. System Displays above error
Cause: This is because no Person is assigned to user who is adding OSP resource to released work
order.
Solution: Assign person to User creating Work Order.
Resource Disabled But still Populated on Work Order: Issue: A resource which is part of routing is disabled from resource form but still it appears when a
new work order is created and activity is assigned to it.
Steps to Reproduce:
1. Open a resource Form
2. Assign resource an End Date
3. Create a Work Order and give activity which has same resource on it
4. Resource line still appear after being disabled
Cause: Intended-Behaviour
Solution: Disabling resource will not remove it from activity lines on work order. If you want to
remove it from work order user need to disable resource operation on Activity routing.
Responsibility Error when creating Work Orders from Construction
Estimate: Issue: After filling up required data when we click Create Work Order button following error is
displayed:
Steps to Reproduce:
1. Create Construction Units
2. Add Construction Units to Estimate
3. Enter Relevant Data
4. Click Create Work Order button
5. Above Error is displayed
Cause: The error was due to a hard coded responsibility id in package –
EAM_CONSTRUCTION_EST_PVT. The following bug addresses the issue:
Bug 10082577 - EAM - ERROR WHEN CREATING WORK ORDER FROM CONSTRUCTION
ESTIMATE.
The entity with header id (1) generated the following error(s).
Responsibility (55240) is invalid.
The Work Order WO4458 received an error status since a severe error occurred in the
work order while performing attribute validations.
eAM Issues and Resolutions
By: Syed Mustafa Arshad 14 | P a g e
Solution: To implement the solution, please execute the following steps:
1. Download and review the readme and pre-requisites for Patch 10082577:R12.EAM.B
2. Ensure that you have taken a backup of your system before applying the recommended
patch.
3. Apply the patch in a test environment.
4. Confirm the following file versions:
EAMVCESB.pls 120.0.12010000.28
EAMVCESS.pls 120.0.12010000.3
You can use the commands like the following:
strings -a $EAM_TOP/filename |grep '$Header'
5. Retest the issue.
6. Migrate the solution as appropriate to other environments.
Activity Suppression Working: Issue: Please explain working of activity suppression. What is to be done if we want to Suppress 5
activities against one.
Steps to Reproduce: Not Applicable
Cause: Not Applicable
Solution: Following points should be considered when using activity suppression:
1. In activity suppression form a Parent Activity is given on Header
2. The Activity which is given as child is suppressed when Parent Activity is performed
3. Only one Child Can be defined against one Parent Activity
4. If there are 3 Activities A, B ,C which need to be suppressed against Parent Z suppression will
work in following order:
Z Parent of A
A Parent of B
B Parent of C
5. Parent Activity last service is updated to Child activity Preventive PM.
Requisition Generation in Incomplete Status: Issue: When an OSP resource is added to work order and work order is released, requisition is
generated in Approved/In Process. Requisition must generate in incomplete status.
Steps to Reproduce:
1. Add OSP resource Item to Work Order
2. Release Work Order
eAM Issues and Resolutions
By: Syed Mustafa Arshad 15 | P a g e
3. Requisition Import program Runs
4. Search for requisition generated
5. Requisition will be in Approved/In Process status
Cause: This is because when work order is released an auto "Requisition Import" program is run and
parameters passed for workflow are "Yes" so requisition is approved or remains in "In-Process".
Solution:
1. Apply Patch 4276433:R12.WIP.B
2. After patch Application a new parameter is Available in WIP Parameters> Outside
processing> Requisition Status, change it to incomplete
3. Change WIP:Initiate Approval Process after Requisition Import to "NO".
4. Retest the Issue Requisition will be in incomplete status.
If still issue exist (In 12.1.3 additional patches are to be applied) then follow below action plan
instead of above:
1. Apply following Patches:
Patch 12783535:R12.FND.B
Patch 4276433:R12.WIP.B
Patch 16689986:R12.PO.B
Patch 17269099:R12.EAM.B
2. After patch Application a new parameter is Available in WIP Parameters> Outside
processing> Requisition Status, change it to incomplete
3. Change WIP:Initiate Approval Process after Requisition Import to "NO".
4. Retest the Issue Requisition will be in incomplete status.
Requisition Import Run Delay: Issue: We want to stop requisition import run on Work Order release having OSP resource as we
want to run it using scheduling later.
Steps to Reproduce:
1. Add OSP resource Item to Work Order
2. Release Work Order
3. Requisition Import program Runs
4. Search for requisition generated
5. Requisition will be in Approved/In Process status
Cause: Intended Behaviour.
Solution: Requisition Import cannot be delayed to run it through scheduling later. It can be
completely stopped and no data will be populated in table. Change WIP Parameters> Outside
Processing> Requisition Creation Time to Manual. If this is done all Requisition will required to be
generated manually by users and users will need to assign work orders to requisitions.
eAM Issues and Resolutions
By: Syed Mustafa Arshad 16 | P a g e
(This was required when user wanted to generate Requisitions in incomplete status and it was
intended to schedule Requisition Import with workflow parameter as "No" but later patch was
provided and issue was resolved.)
Character Limit for Asset Number and Asset Group: Issue: What is maximum Number of Character limit for Asset Numbers and Asset Groups? Please
also explain how it can be increased.
Steps to Reproduce:
1. Go to Asset Numbers Form
2. Enter Asset Number
3. Enter Asset Group
Cause: N.A
Solution:
Asset group details are stored in mtl_system_items_b in segment1 column and length is 40
characters.
Asset numbers are stored in csi_item_instances in instance_number column and length is 30
characters.
Its character limit cannot be increased.
Cons Estimate- Non Purchasable/Stock able Item Error: Issue: When "Create Work Order" is clicked on Construction Estimate following Error is displayed:
Steps to Reproduce:
1. Create Construction Estimate
2. Populate activities, assets and other relevant information.
3. Click Create Work Order
4. Above Error is Displayed
Cause: Model work order lines has some "Inactive Items".
Solution: Remove Inactive Items from BOM lines or Re activate items which were inactive.
Work Order Cost Estimation: Issue: What are basis for Cost Estimation at work order? At what point system estimate costs.
Steps to Reproduce:
1. Create A Work Order with material/resource lines.
eAM Issues and Resolutions
By: Syed Mustafa Arshad 17 | P a g e
2. Cost is estimated automatically
3. Add new lines in Work Order
4. Check for cost updation
5. No Cost is updated
Cause: Not Applicable
Solution: During wok order creation, there is automatic call to estimate the work order cost based
on defined/existing costs at the time when work order is created.
Further, if more materials or resources are added to work order, you can click on Estimate to re-
estimate the work order cost. If work order will not be re-estimated, the initial estimated cost will be
considered.
Preventive Maintenance: Activity Routing Update Issue: If routing of an activity available on PM is updated and later a work order is created from PM
schedule the work order do not reflect changes which were made in PM.
Steps to Reproduce:
1. Go to PM
2. Copy its activity
3. Go to Activity Routing and update
4. Create Work Order from PM schedule
5. Check for Operation and Material lines
6. Routing on Work Order will not reflect changes for added/deleted lines
Cause: Unknown- Raise SR
Solution: Remove activity from PM and assign again. Retest the issue the work order will now reflect
required changes.
Activity Based Attachments on Work Order: Issue: We want a file to be displayed on work order each time a unique activity work order is
created. We tried to attach file to Master activities but when we try to create work order no
attachment is available.
Steps to Reproduce:
1. Open Inventory> Items> Master Items: Search for Activity
2. Go to View> Attachments
3. Attach file which should be viewed at work order
4. Create Work Order for that Activity
5. No file is available in work order attachments
Cause: Wrong procedure being used for attachments
eAM Issues and Resolutions
By: Syed Mustafa Arshad 18 | P a g e
Solution: For display of attachments for activity on Work Order routing do the following:
1. Go to Activity Routing for which you want attachment at work order
2. Go to View> Attachments> Enter Category as Miscellaneous (always for display at work
order header level)
3. Enter/Attach file and save
4. Create work order manually or through PM
5. Attachment will be available at work order header
Note: During data uploading try to upload Attachments before creation of PM- Recommended.
Construction Estimate Work Order Search: Issue: We do not find any suitable criteria (Work Order type for example) to search construction
estimate work orders using maintenance workbench for mass release.
Steps to Reproduce:
1. Create Construction Unit
2. Generate Work Orders from it
3. Go to Enterprise Asset Management> Work Order Planning> Maintenance Workbench
4. No criteria available to search for construction Estimate work orders
Cause: Intended Behaviour
Solution: An Enhancement Request: 16828986 is raised for inclusion of this feature for future
releases. For now following work around can be used.
User can use work around to search for construction estimate work order using its work order status
for releasing. Create a new Status type for construction estimate work orders and use status type to
search for work orders using workbench.
Work Order Approval Notification- Asset Number Display: Issue: There is no asset number field available for display in notification for Work Order approval.
Steps to reproduce:
1. Create a Work Order
2. Release it so notification is sent to relevant user
3. Login from approver and search for work order notification
4. Open notification
5. No Field available that displays Asset Number
Cause: Intended Behaviour
Solution: Currently, it's not possible to display Asset Number in Work Order Release Approval
Notification page. This is coming from the Workflow code and EAM does not have this feature to
eAM Issues and Resolutions
By: Syed Mustafa Arshad 19 | P a g e
allow Workflow display asset numbers. An Enhancement Request: 16826351 is raised for
consideration of inclusion of this feature for future releases.
Work Order Closure and Its Purchase Order: Issue: How work order is linked to PO receiving completion? Can we complete and close Work
Order before PO is received?
Steps to Reproduce:
1. Create Work Order with OSP resource
2. A requisition Will be generated
3. Create PO and complete Receiving
4. Try to close complete Work Order
5. Error Occurs
Cause: Intended Behaviour. System allow user to complete work order but do not allow to close
work order.
Solution: All transactions related to Work Order must close before work order can be closed. Close
or Finally close the PO before closing the work order to ensure no error occurs at work order closure.
Quality form Data Deletion Using HTML: Issue: Is there any option to delete data entered on Quality form using HTML to delete using HTML
page?
Steps to Reproduce: N.A
Cause: Intended Behaviour
Solution: There is no option to delete the results from the maintenance super use responsibility..
The same issue is reported as an Enhancement request. Please refer to the below ER.
Bug 2991702 : ABILITY TO DELETE A QUALITY RESULTS RECORD FROM SELF SERVICE MAINTENANCE
Error when forecasting PM Work Orders: Issue: We tried to forecast PM Work Orders Area wise. We entered horizon and run the forecast but
system displayed following error:
eAM Issues and Resolutions
By: Syed Mustafa Arshad 20 | P a g e
Steps to Reproduce: The issue can be reproduced at will with the following steps:
1. EAM > Work Order Planning > Maintenance Workbench
2. . Choose a Department > Launch > Forecast
3. Enter horizon and run the forecast
Cause: System Bug
Solution: Normally this issue is faced after upgrade to 12.1.3 [Note 1520615.1]. It is a System
Bug 13810027:R12.EAM.B. Issue is fixed in WriteTableVistor.java 120.13.12010000.10 via patch
13810027:R12.EAM.B. Please follow below action Plan:
1. Download and review the readme and pre-requisites for Patches 16067566:R12.EAM.B and
13810027:R12.EAM.B.
2. Ensure that you have taken a backup of your system before applying the recommended
patch.
3. Apply the patch in a test environment.
4. Confirm the following file versions:
WriteTableVistor.java 120.13.12010000.10
PMSchedule.java 120.21.12010000.7
You can use the commands like the following:
strings -a $JAVA_TOP/oracle/apps/eam/pm/scheduling/PMSchedule* |grep '$Header'
strings -a $JAVA_TOP/oracle/apps/eam/pm/scheduling/WriteTableVistor* |grep '$Header'
5. Retest the issue.
6. Migrate the solution as appropriate to other environments.
Work Order Material Line Issued Quantity Displayed Zero: Issue: Self-Service Apps show zero issued quantity to an EAM Work Order when issued from on-hand
quantity. It should show quantity issued.
Steps to Reproduce: The issue can be reproduced at will with the following steps:
1. Create work order.
2. Issue Material to a Work Order. The component issued has On-Hand quantity.
3. See that Self-Service shows zero issued quantity for the Work Order.
4. Java Forms shows the correct issued quantity.
Cause: Issue is caused by fault in code.
Solution: The issue is resolved by upgrading to file
eAM Issues and Resolutions
By: Syed Mustafa Arshad 21 | P a g e
MtlInventoryItemsVO.xml 120.11.12010000.8
MtlInventoryItemsVORowImpl.java 120.5.12010000.9 or higher.
The following bug outlines this
BUG:13623020 - AFTER 10411897, QUANTITY ISSUED IS NULL IN SELF-SERVICE (INCORRECT)
CORRECT IN FORMS
Please apply the Patch 12673371:R12.EAM.B and retest. OR
Instead of the controlled patch that needs a password, please apply the below one that is fully
released.
Patch 12673371:R12.EAM.B - INCONSISTENCY ON HAND QUANTITY ON WORK ORDER PAGE
This also have the version brought by the controlled patch and should resolve the issue.
After appliance, bounce apache and oacore service to assure the java files are properly loaded and
retest the issue again
Cons Estimate- No Routing Lines Displayed for Activity with OSP: Issue: When we try to enter activity which has OSP resource line in Construction Estimate no data is
populated in model work order lines.
1. We entered a routing for an activity with OSP resource and other resources. We entered the
activity in construction unit and unit was entered in construction estimate. As we clicked
next and estimate workbench page opened all lines for that activity were missing. With
other activities not involving OSP resource construction estimate works fine.
2. We tried to enter the OSP line manually to new construction estimate and system gave a
blank error on saving.
3. We tried to enter OSP line in construction estimate with other activity lines system displayed
error.
Steps to Reproduce:
1. Select an activity with OSP resource in it
2. Create Construction Unit for that Activity
3. Enter Construction Unit in Construction Estimate
4. No lines for selected activity were populated
Cause: The issue is caused by the following setup: cost for the resource was not set.
Solution: Enter cost for OSP and other resources. To implement the solution, please execute the
following steps:
1. Go into the responsibility: EAM
2. Navigate to setup > BOM > resources-> rates -> and set up the rates.
3. Retest the issue.
4. Migrate the solution as appropriate to other environments.
eAM Issues and Resolutions
By: Syed Mustafa Arshad 22 | P a g e
Construction Unit Quantity Personalization: Issue: We enter a Construction Unit in "Select Activities" page of Construction Estimate, system asks
to enter Construction Unit Quantity as 1. We are trying to default it as 1 using personalization but
we are unable to do so.
Steps to Reproduce:
1. Go to Select Activities Page of Construction Estimate
2. Set up Personalization to default value of Unit Quantity as 1
3. Enter Construction Unit in Select Activities
4. Default Value not populated and personalization not working
Cause: The Construction Unit quantity is a field that is generate by java code, and thus any
personalization will not work. The value needs to be entered manually and TAB pressed in order for
the code to pull the activities from the Construction Unit.
Solution: User needs to enter Unit Quantity Manually.
Account field Locked at PR with Destination Type Shop Floor: Issue: We want to change Charge Account in distribution at PR (in incomplete status) with
Destination Type "Shop Floor" but field is locked. Is there any way we can manually change this
account at PR when it is in incomplete status? Please provide solution.
Steps to Reproduce:
1. Create PR in incomplete status from Work Order
2. Open distributions
3. Try to change Account
4. Field is locked
Cause: Standard Functionality
Solution: The charge account on distributions with a destination type of Inventory or Shop Floor
cannot be updated after the document has been saved as per the standard functionality of the
application.
You need to create a new requisition and ensure that the correct charge account is defaulted or
entered on the document before saving.
Please refer to the following notes which explain the intended functionality:
How To Change Charge Account In Requisition Distribution [ID 443510.1]
Unable To Change The Charge Account For Enterprise Asset Management (EAM) Requisitions In
iProcurement [Doc ID 1420739.1]
eAM Issues and Resolutions
By: Syed Mustafa Arshad 23 | P a g e
Requisition Import Request Completes in Error: Issue: When work Order is released requisition import completes in Error with no error message in
Output. Requisition Import Exceptions Report was run and following error was displayed in Interface
lines.
(Requisition Import Output)
(Requisition Import Exceptions Report Output)
Steps to Reproduce:
1. Create and Release OSP work Order
2. Requisition Import Runs on Auto
3. Open Requisition Import Output which shows error in interface lines
4. Run Requisition Import Exceptions Report to find out error and above error is displayed
Cause: Person assigned to employee releasing work order is inactive
Solution: Activate Person Assigned or assign a activated person to employee.
eAM Issues and Resolutions
By: Syed Mustafa Arshad 24 | P a g e
Work Order Status Failed Closed: Issue: Work Order was closed and it is now in Failed Closed status with "Work Order Close Request"
completing in Error:
Steps to Reproduce:
1. Run Close Request
2. Work Order goes into Pending-Close Status
3. Requests Completes in Error as in above log file
4. Status of Work Order changes to Failed Close
Cause: Inventory period is not opened for date at which Work Order is closed.
Solution: Open Inventory Period for month in which work orders are being closed.
Quality Plan Name to be Populated on Java from HTML: Issue: We added a quality plan to be used on Work Order completion and added a "Button" that
takes user to Java Quality form. We want to populate Quality Plan Name for which "Open Java
Form" buttton is selected to open when java opens. Let us know if possible.
Steps to Reproduce: N/A
Cause: Intended Behavior
Solution: Ehancement Request (ER) <17544948> is raised with Oracle Development. Progress on
your ER can be monitored via My Oracle Support (MOS) at (https://support.oracle.com). This ER will
be reviewed and considered by Development ONLY for future releases. It will remain open until it is
either incorporated into the product, or it is deemed not feasible.
eAM Issues and Resolutions
By: Syed Mustafa Arshad 25 | P a g e
Asset Group and Failure Analysis: Issue: We created a Failure set and assigned Asset Group to it. Now we are trying to assign same
group to other failure set but are unable to do so as system do so and we are unable to find that
group in List of Values.
Steps to Reproduce:
1. Create Failure Set
2. Assign Asset Group
3. Try to Assign same Asset Group to other failure set
4. Asset Group not found in List of Values
Cause: Intended behaviour. Only One Failure Set can be assigned to an Asset Group.
Solution: Assign only one Failure Set to Asset group.
Purpose of Interleave Check in Resource> Employees: Issue: What is purpose of interleave check in Resource> Employees.
Steps to Reproduce: Not Applicable.
Cause: Not Applicable.
Solution: Interleave is a feature available in the WMS to interleave the tasks assigned to the
employees if required by the application. If you are not using the WMS then this filed Interleave is
not applicable.
Construction Estimate: Apply Default Sorting Basis: Issue: What are the basis in which Apply default applies sequence to construction Units when
selected "Apply Default by: Construction Unit"? Which Construction unit is selected first to apply
sequence when and in which sequence apply defaults applies sequences to Construction Unit?
Steps to Reproduce: Not Applicable.
Cause: Not Applicable.
Solution: src_cu_id (generated at back end when Construction Unit is created) is used as basis to
sort and assign sequence when "Apply default" is used.
eAM Issues and Resolutions
By: Syed Mustafa Arshad 26 | P a g e
Failure Entry Missing at Asset Routes Work Order Completion: Issue: When we complete Work Order of Asset Routes we are unable to see any open fields to enter
Failure Data.
Steps to Reporduce:
1. Create Asset Route Work Order
2. Perform relevant functions
3. Go to Complete Work order Page
4. Failure entry fields are greyed out
Cause: Intended Behaviour
Solution: This is the standard functionality.
Please refer to the bug below:
Bug 5569171 : EAMST2:FAILURE ENTRY REQUIRED IS DEFAULTED AS YES FOR ASSET ROUTE WO
The bug highlights the following points :
- Failure info entry and analysis is not supported for asset routes
- Complete WO page of the above WO
There is no failure information region for the WO as it is a WO on asset
route
This is standard and intended behaviour and is per design.
Work Order Transactions | View Resource Transactions Error: Issue: Go to View Resource transactions form and, then, for a given transaction, go to menu Tools -
View Accounting;
- at this point, following error is raised:
"Function not available to this responsibility"
Steps to Reproduce:
1. Go to View Resource Transaction
2. Select Record
3. Go to View> Accounting
4. Above Error is displayed
Cause: Functions not assigned to responsibility
Solution: Following 3 functions have to be added (without a prompt) to the menu assigned to your
EAM responsibility:
XLA_EVENT_FROM_TXN
XLA_XLAIQACL
XLA_LINESINQ_SUBLEDGER
eAM Issues and Resolutions
By: Syed Mustafa Arshad 27 | P a g e
Having assigned above 3 functions should grant you access to menu options Tools - View Accounting
(View Resource Accounting form) and Tools - View Accounting Events (which is self-service page).
One-Step Issue driving Quantity to Negative: Issue: One Step Material Issue driving quantity to negative. We have referred to the following note
ID 1293857.1
Steps to Reproduce: For one item we have 10 On Hand quantity and we allocated complete 10
quantity on a Work Order after that we have create a material requirement for the same item on
another work order and issued 1 quantity from One Step Material Issue, the system allowed to issue
the quantity and in material work bench the quantity turns negative.
Cause: Check Profile Option/ System Bug
Solution: Check for
1- Allow Negative Balance Check: in Organtization Parameter
2- Profile option INV:Override Neg for Backflush is NO.
But if issue still exists then than apply Patch 16826285:R12.INV.B
(This bug will be included in next 12.1 RUP (RUP7)
16826285:R12.INV.B was released 27 aug
Patch Description
Inventory RUP7 (VERSION 12.1.1 TO 12.1.3 [RELEASE 12.1]
Please refer the latest instructions on applying the Oracle Inventory, Receiving
and WMS: Logistics RUP7 or Inventory RUP7 on OracleMetaLink at
https://mosemp.us.oracle.com/epmos/faces/DocumentDisplay?id=1578818.1)
Allocated Material Transactions Still Pending: Issue: At month end when we try to close out Inventory period there are still some eAM material
transactions which are in allocated pending status even though work orders have either been closed
or in complete no charges (which means no material allocated).
Steps to Reproduce:
1. Go to Inventory Close Periods
2. Click to see Pending Transactions for month
3. Search by Job and Schedule
4. Allocated Pending transactions for "Complete - No Charges/ Closed" work orders appear
with no material allocated in actual.
Cause: Bug
eAM Issues and Resolutions
By: Syed Mustafa Arshad 28 | P a g e
Resolution: Following data fix can be used to clear out Allocated Pending transactions for month to
be closed:
For Complete- No Charges Work Orders:
delete from mtl_material_transactions_temp
where transaction_temp_id in ( select transaction_temp_id from
mtl_material_transactions_temp d,
mtl_txn_request_lines a,
wip_entities b,
wip_discrete_jobs c
where a.txn_source_id=b.WIP_ENTITY_ID
and b.WIP_ENTITY_ID=c.WIP_ENTITY_ID
and d.move_order_line_id=a.line_id
and d.transaction_status=2
and c.status_type=5)
For Closed Work Orders:
delete from mtl_material_transactions_temp
where transaction_temp_id in ( select transaction_temp_id from
mtl_material_transactions_temp d,
mtl_txn_request_lines a,
wip_entities b,
wip_discrete_jobs c
where a.txn_source_id=b.WIP_ENTITY_ID
and b.WIP_ENTITY_ID=c.WIP_ENTITY_ID
and d.move_order_line_id=a.line_id
and d.transaction_status=2
and c.status_type=12)
Duration Missing on PM Work Orders: Issue: When either using Maintenance Workbench or running Generate Preventive Maintenance
Work Orders to create PM Work Orders, Duration is not populating onto the Work Order.
Steps to Reproduce:
1. Create Work Order from either Maintenance Workbench or Generate Preventive
Maintenance Work Orders concurrent
2. The work order has a routing with the total hours as 1
3. Run the PM schedule
4. Observe Duration = 0 on the work order that was created
Cause: This is a setup issue.
eAM Issues and Resolutions
By: Syed Mustafa Arshad 29 | P a g e
Solution: The issue was due to Schedule Flag in activity Operation
resource set to 'No'. By default this flag is set to 'Yes'. Here is the
guideline from BOM user guide for this field:
Schedule Field
• Yes: Include this resource when scheduling an operation from a job or
repetitive schedule and calculating manufacturing lead time for the assembly.
• No: Do not include scheduling the operation or calculating the lead time.
Setting the filed to 'Yes' will show the duration in the work order.
Please refer to the BOM user guide for more information related to this.
Unable to Find Move Order for Transacted Material Line: Issue: We are unable to find a move Order number for Work Order line once it is transacted.
Steps to Reproduce:
1. Create Work Order
2. Allocate material against material line
3. Transact Move Order
4. Once transacted, there seems to be no search criteria available to find move order number
for that transacted line of work order
Cause: Unknown (Internally resolved)
Solution: The below query can be used to find out All Move Order Numbers generated for that
relevant Work Order.
SELECT a.REQUEST_NUMBER, mmt.TRANSACTION_SOURCE_ID, mmt.TRANSACTION_SOURCE_NAME, mmt.*
FROM mtl_material_transactions mmt,
mtl_txn_request_lines b,
mtl_txn_request_headers a,
wip_entities w
WHERE --mmt.transaction_id = 55356941
--AND
mmt.move_order_line_id = b.line_id
AND b.header_id = a.header_id
and mmt.TRANSACTION_SOURCE_ID = w.WIP_ENTITY_ID
and w.WIP_ENTITY_NAME = 'WO30683'
"Change Work Order Number to Relevant Work Order"