ELECTRICAL SHEET LIST - PLUMBING

26
MEP 000 UO OREGON BACH FESTIVAL OREGON BACH FESTIVAL February 5, 2016 MEP COVER SHEET SHEET LIST - MECHANICAL Sheet Number Sheet Name M101 LEVEL 1 - THERMAL ZONING M102 LEVEL 2 - THERMAL ZONING M201 LEVEL 1 - HVAC PLAN M202 LEVEL 2 - HVAC PLAN M203 ROOF - HVAC PLAN M601 RISER DIAGRAMS M901 MECHANICAL DETAILS M902 MECHANICAL DETAILS M903 MECHANICAL DETAILS MEP 000 MEP COVER SHEET SHEET LIST - ELECTRICAL Sheet Number Sheet Name E101 ELECTRICAL SITE PLAN E301 LEVEL 1 - POWER AND SIGNAL PLAN E501 ELECTRICAL SINGLE LINE DIAGRAM E505 SIGNAL SINGLE LINE DIAGRAM E601 ENLARGED PLANS SHEET LIST - PLUMBING Sheet Number Sheet Name P001 BASIS OF DESIGN P002 SCHEDULES P200 UNDERGROUND PLAN - PLUMBIING P201 LEVEL 1 - FLOOR PLAN P202 LEVEL 2 - FLOOR PLAN P203 ROOF - FLOOR PLAN P401 PLUMBING WATER RISER DIAGRAMS P402 PLUMBING SANITARY RISER DIAGRAMS P403 PLUMBING STORM RISER DIAGRAMS P601 ENLARGED PLANS P901 PLUMBING DETAILS

Transcript of ELECTRICAL SHEET LIST - PLUMBING

MEP 000

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

MEP COVER SHEET

SHEET LIST - MECHANICALSheet Number Sheet Name

M101 LEVEL 1 - THERMAL ZONINGM102 LEVEL 2 - THERMAL ZONINGM201 LEVEL 1 - HVAC PLANM202 LEVEL 2 - HVAC PLANM203 ROOF - HVAC PLANM601 RISER DIAGRAMSM901 MECHANICAL DETAILSM902 MECHANICAL DETAILSM903 MECHANICAL DETAILSMEP 000 MEP COVER SHEET

SHEET LIST - ELECTRICALSheet Number Sheet Name

E101 ELECTRICAL SITE PLANE301 LEVEL 1 - POWER AND SIGNAL PLANE501 ELECTRICAL SINGLE LINE DIAGRAME505 SIGNAL SINGLE LINE DIAGRAME601 ENLARGED PLANS

SHEET LIST - PLUMBINGSheet Number Sheet Name

P001 BASIS OF DESIGNP002 SCHEDULESP200 UNDERGROUND PLAN - PLUMBIINGP201 LEVEL 1 - FLOOR PLANP202 LEVEL 2 - FLOOR PLANP203 ROOF - FLOOR PLANP401 PLUMBING WATER RISER DIAGRAMSP402 PLUMBING SANITARY RISER DIAGRAMSP403 PLUMBING STORM RISER DIAGRAMSP601 ENLARGED PLANSP901 PLUMBING DETAILS

REHEARSAL ROOM2220 SF

TSH

TS

TS

TS

TS

TS

TS

TS

H

HSERVEDFROMABOVE

TS

TS

AVERAGESENSORREADINGS

AHU 1-1

CO2

CO2

CO2

STORAGE440 SF

ELEC140 SF

MEN140 SF WOMEN

160 SF

LOBBY510 SF

BOARDROOM530 SF

TELECOM70 SF

MECH.170 SF

ELEV .50 SF

UNISEX60 SF

JANITOR60 SF

ARTISTIC DIR.180 SF

VEST.50 SF

VEST.140 SF1

1

1

1

~HUMIDITYCONTROL~

2

Exhibit M101

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

LEVEL 1 - THERMAL ZONING

SCALE: 3/32" = 1'-0"1 LEVEL 1 - FLOOR PLAN - THERMAL ZONING

SHEET NOTESA. BUILDING TIED INTO CENTRAL UO CAMPUS SIEMENS SYSTEM

B. ALL DIV 23 EQUIPMENT CONTROLLED/MONTIORTED BY SIEMENS

C. NON-ADJUSTABLE TEMPERATURE SENSORS

D. INTEGRATE SENSORS @ ALL OPERABLE WINDOWS

E. ROOM/ZONE OCCUPANCY FROM DIV 26 SENSOR - HARD CONTACT

F. ALL IN ONE SENSOR WHERE MULTIPLE FUNCTIONS ARE NOTED

#KEYED NOTES1. ELECTRIC REHEAT TERMINAL UNIT ZONE

2. LOCAL BAS WORKSTATION LOCATION; DESK W/ COMPUTER TERMINAL

~OPEN TO BELOW~

TS

TS

TS

TS

TSTS

TS

TSCO2

CO2

CONF / OFFICE100 SF

OFFICE100 SF

OFFICE100 SF

OFFICE100 SF

OFFICE100 SF

DIR. OFFICE200 SF

LIBRARY440 SF

UNISEX60 SF

OPEN OFFICE1430 SF

WORK AREA270 SF

CO2

1

1

1

1

1

11

1 ELEV.50 SF

TS

Exhibit M102

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

LEVEL 2 - THERMAL ZONING

SCALE: 3/32" = 1'-0"1 LEVEL 2 - FLOOR PLAN - THERMAL ZONING

SHEET NOTESA. BUILDING TIED INTO CENTRAL UO CAMPUS SIEMENS SYSTEM

B. ALL DIV 23 EQUIPMENT CONTROLLED/MONTIORTED BY SIEMENS

C. NON-ADJUSTABLE TEMPERATURE SENSORS

D. INTEGRATE SENSORS @ ALL OPERABLE WINDOWS

E. ROOM/ZONE OCCUPANCY FROM DIV 26 SENSOR - HARD CONTACT

F. ALL IN ONE SENSOR WHERE MULTIPLE FUNCTIONS ARE NOTED

VEST.140 SF

ARTISTIC DIR.180 SF

MECH.170 SF

VEST.50 SF

MEN140 SF

LOBBY510 SF

STORAGE440 SF WOMEN

160 SF

JANITOR60 SF UNISEX

60 SF

ELEC140 SF

TELECOM70 SF

ELEV .50 SF

BOARDROOM530 SF

VEST.500 SF

REHEARSAL ROOM2220 SF

SERVED

FROM

ABOVE

1-1

AHU

15 TON UNIT - HEAT PUMP

CUSTOM SOLUTION

(ENERGY LABS, MAMMOTH, OR EQUIV)

DISPLACEMENT VENTILATION

LOW NOISE FAN SELECTION

ACOUSTICAL PACKAGE

INTEGRAL SOUND TRAPS

COMPRESSOR BLANKETS

100% ECONOMIZER

54x22

UNDERFLOOR LOW VELOCITY DUCTWORK

ROUTES IN ~30" DEEP CONCRETE CAVITY

8" DIA SWIRL IN-FLOOR DIFFUSER

FLUSH (STEPPED BORE ) INSTALLATION

SPILL BASKET

(TYP OF 120)

RETURN RISER CHASE IN CORNER

HIGH GRILLE

12ø

1-1

FCU

1-2

FCU

OSA INTAKE

26x14

26x14

UP

16ø16ø

UPUP

10ø

GRAVITY

DRAIN

3/4"CD

1-3

FCU

SOUND TRAPS

ACOUSTICAL

SCREEN

VIBRO-ACOUSTICS

M201

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

LEVEL 1 - HVAC PLAN

SCALE: 3/32" = 1'-0"1 Level 1 - FLOOR PLAN - HVAC

SHEET NOTESA. SEE ZONING PLANS FOR ELECTRIC REHEAT TERMINAL UNIT COUNTS.

FINAL EASILY ACCESSABLE LOCATIONS TO BE COORDIANTED.

OPEN OFFICE1430 SF

LIBRARY440 SF

OFFICE100 SF

CONF / OFFICE100 SF

OFFICE100 SF

OFFICE100 SF

ELEV.50 SF

DIR. OFFICE200 SF

OFFICE100 SF

STORAGE30 SF

UNISEX60 SF

WORK AREA270 SF

DN

DN

30x30

30x30

14ø

26x16

14ø

20ø

12ø

14ø

12ø

UP

UP UP

12ø

M202

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

LEVEL 2 - HVAC PLAN

SCALE: 3/32" = 1'-0"1 Level 2 - FLOOR PLAN - HVAC

SHEET NOTESA. SEE ZONING PLANS FOR ELECTRIC REHEAT TERMINAL UNIT COUNTS.

FINAL EASILY ACCESSABLE LOCATIONS TO BE COORDIANTED.

B. NO FIBERGLASS ACOUSTICAL LINER

C. PROVIDE BALANCE DAMPERS ON ALL SUPPLY, RETURN & EXHAUST BRANCHES

D. PROVIDE 2' MINIMUM STRAIGHT DUCT BEFORE CONNECTION WITH VAV NECK

LOWER ROOF

UPPER ROOF

R-1AHU

20 TON UNIT - HEAT PUMPPACKAGE SOLUTION

(AAON OR EQUIV.)SPRING ISOLATION CURB

100% ECONOMIZER

R-1CU

2 TON UNIT - SPLIT SYSTEM(MITSUBISHI OR EQUIV.)

NEOPRENE MOUNTSSERVES TELECOM ROOM

STANDBY POWER

OSA INTAKE

R-1

EF

500 CFMUPBLAST EXHAUST FAN

ECM

ELEVATOROVERRUN

R-2CU

2 TON UNIT - SPLIT SYSTEM(LIEBERT OR EQUIV.)NEOPRENE MOUNTS

SERVES MUSIC STORAGESTANDBY POWER

R-3

CU

2 TON UNIT - SPLIT SYSTEM(MITSUBISHI OR EQUIV.)

NEOPRENE MOUNTSSERVES TELECOM ROOM

STANDBY POWER

M203

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

ROOF - HVAC PLAN

SCALE: 3/32" = 1'-0"1 ROOF - FLOOR PLAN - HVAC

1ST FLOOR

2ND FLOOR

LOWER ROOF

UPPER ROOF

OFFICE BAR REHEARSAL ROOM

~PRESSURIZED PLENUM~

55x22 RETURN RISER

CORNER CHASE

55x22 SUPPLY MAIN

LOW VELOCITY AIR DISCHARGE (40-60 FPM)

OCCUPIED ZONE (70-75 DEG F)

STRATIFIED ZONE (80-85 DEG F)

AHU R-1

AHU 1-1

CU R-1CU R-2 EF R-1

EARTH

12"DIA

30x30

26x14

FSD FSD FSD FSD FSD

PS PS

+0.05" +0.05"

FCU 1-1FCU 1-2

CU R-3

FCU 1-3

RS/RD

TERMINAL UNITS (TYP)

VAV

VAV

M601

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

RISER DIAGRAMS

SCALE: NONE1 RISERS - HVAC

NOTES: (ADD TO NOTES ABOVE AS APPLICABLE.)

2. FOR ACUTE CARE FACILITIES AND SURGERY CENTERS: THE INSIDE SURFACE OF THEDISCHARGE PLENUM SHALL INCLUDE 24 GAUGE SHEET METAL FOR A CLEANABLESURFACE.3. HEATING WATER COIL MUST BE 2-ROW MINIMUM FOR IMPROVED TEMPERATURECONTROL AND INCREASED LIFE.

RECTANGULAROR ROUND MAINSUPPLY DUCT.

STRAIGHT INLET DUCT SHALL BE MINIMUM1.5 DUCT DIAMETERS IN LENGTH. ROUNDBRANCH DUCT MAY MATCH TERMINALINLET SIZE WITHIN FIVE FEET OF MAIN,BUT MUST BE UPSIZED FOR GREATERDISTANCES TO OVERCOME PRESSUREDROP.

NOTES:1. SHEET METAL OUTLET PLENUM SHALL BE LINED WITH 1" THICK INSULATION WITH FIBER-FREE

LINER. INSIDE CLEAR DIMENSIONS SHALL BE 2" HIGHER THAN UNIT HEIGHT AND 4" WIDER THANUNIT WIDTH.

60" MINIMUM TO FIRSTTAKE-OFF.

45 DEGREE OR CONICAL ENTRYBRANCH TAKE-OFF

SHEET METAL PLENUMWITH 1" LINER.

ELECTRIC COIL

DISCHARGE TEMPERATURESENSOR, 5' DOWNSTREAMOF HEATING COIL (MIN)

1"x20 GAUGE STEELSTRAP TO UPPERATTACHMENT (TYP)

MANUAL VOLUME DAMPERAT EACH TAKE-OFF, WHEREMULTIPLE TAKE-OFFS OCCUR.

VAV TERMINAL

TS

VD

VD

VD VD

NOTES:1. PROVIDE DUCT LINER AND/OR EXTERNAL DUCT INSULATION AS NOTED ON PLANS OR IN SPECIFICATIONS.2. PROVIDE HANGERS AND SEISMIC BRACING PER SMACNA AND BUILDING CODE REQUIREMENTS.3. LOCATE MANUAL BALANCING DAMPERS IMMEDIATELY DOWNSTREAM OF EACH DUCT TAP.4. CUSHION HEADS OR BULLHEAD TEES ARE NOT ALLOWED.5. MAINTAIN MINIMUM 36" CLEARANCE BETWEEN LEADING OR TRAILING ELBOW JOINT AND DUCT TAP FITTINGS.6. RADIUSED ELBOWS OR TURNING VANES REQUIRED ON RECTANGULAR DUCT SYSTEM ELBOWS. SINGLE

THICKNESS VANES UP TO 25" HEIGHT AND DOUBLE THICKNESS VANES IN DUCTS GREATER THAN 25" HEIGHT.

FLEXIBLE DUCT, 7'MAX LENGTH W/ ONE90 DEGREE BEND

CONICAL OR LO-LOSS 45DEGREE BOOT FITTINGWITH VOLUME DAMPER

ROUND SHEETMETAL DUCT

SQUARE TO TOROUNDTRANSITION

15 DEGREE TYPICAL, 30DEGREE MAXIMUM

TYPICAL SQUARE NECKDIFFUSER. SIZE OF DUCTDROP TO MATCH DIFFUSERNECK SIZE.45 DEGREE

LO-LOSS BOOTTAP ORCONICAL TAP

SPLITTER DAMPER WHERE SHOWN. DO NOTUSE ON VAV SYSTEMS

REDUCER TO MATCH DIFFUSERNECK SIZE IF BRANCH DUCT ISOVERSIZED. LOCATE ATCONNECTION TO DIFFUSER.

MIN 36" BEFOREAND AFTER ELBOW

VD

CENTERLINE RADIUSEQUALS 1.5 TIMES WIDTH

ROUND NECKDIFFUSER (TYP)

VD

TRANSITION

AIR FLOW

M901

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

MECHANICAL DETAILS

SCALE: NONE2 VAV W/ ELECTRIC REHEATSCALE: NONE1 SUPPLY DUCT FITTINGS

NOTES:1. DAMPER BLADES2. ELECTRIC ACTUATOR MOTOR INTERLOCKED WITH SMOKE DETECTOR OR FIRE ALARM SYSTEM. COORDINATE WITH ELECTRICAL

DESIGN FOR POWER, CONTROL WIRING AND SEQUENCE OF OPERATION.3. ELECTRIC RESETTABLE FUSIBLE LINK CLOSES AND LOCKS THE DAMPER WHEN TEMPERATURE EXCEEDS PRESET TEMPERATURE.

DAMPER MAY BE RESET BY PRESSING RESET BUTTON. INTEGRAL DAMPER BLADE INDICATOR SWITCH FOR REMOTE MONITORING OFOPEN AND CLOSED POSITIONS.

4. STEEL RETAINING ANGLES, MINIMUM 1-1/2"x1-1/2"x0.060", FASTENED TO FIRE DAMPER SLEEVE. ANGLES SHALL BE INSTALLED ON ALLFOUR SIDES OF DAMPER AND ON EACH SIDE OF THE WALL. FASTEN ANGLE TO SLEEVE WITH #10 SHEET METAL SCREWS (MINIMUM).ANGLE GAGE AND FASTENING METHOD AS PERMITTED AS A CONDITION OF DAMPER LISTING. REFER TO MANUFACTURER'S WRITTENINSTALLATION INSTRUCTIONS. MINIMUM 1" ANGLE OVERLAP ON ALL SIDES OF PARTITION WALL.

5. DAMPER SLEEVE ON OPPOSITE SIDE OF WALL FROM ACTUATOR MUST BE MINIMUM 3" AND MAXIMUM OF 6" LONG.6. DUCT CONNECTION AS PERMITTED AS A CONDITION OF DAMPER LISTING. FLANGED BREAK-AWAY STYLE DUCT/SLEEVE

CONNECTIONS ARE SHOWN.7. ACCESS DOOR SHOWN ON BOTTOM OF SLEEVE FOR ACCESS TO FIRE DAMPER BLADES. PANEL TO BE HINGED WITH AIRTIGHT SEAL.

ACCESS SIZE MUST BE MINIMUM OF 12" BY 12" OR THE WIDTH OF DUCT IF SMALLER THAN 12" WIDE. ACCESS PANEL MUST BELABELED WITH THE WORDS, "FIRE DOOR - DO NOT OBSTRUCT" IN LETTERS NO LESS THAN 1" IN HEIGHT. EXTERNAL INSULATIONSHALL NOT CONCEAL ACCESS UNLESS A LABEL IS ATTACHED TO THE INSULATION WHICH INDICATES THE EXACT LOCATION OF THEOPENING.

8. DUCT SMOKE DETECTOR MOUNTED ON DUCT SLEEVE OPPOSITE ACTUATOR WITHIN FIVE FEET OF DAMPER. OR, AREA SMOKEDETECTORS CONNECTED TO CENTRAL FIRE ALARM SYSTEM. SMOKE DETECTORS SHALL BE ADDRESSABLE AND UNIQUELY TAGGED

9. LOCATE 3/4" HIGH WHITE PLASTIC LAMINATE SIGNS WITH 3/8" HIGH BLACK LETTERING WITH THE INITIALS "FSD" AND UNIQUE NUMBERON THE WALL DAMPER ACCESS PANEL. ATTACH WITH EPOXY ADHESIVE.

10. FIRE/SMOKE DAMPER DETAIL FOR REFERENCE ONLY. FIRE DAMPERS SHALL BE STATE FIRE MARSHAL APPROVED. INSTALL PERMANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS WHICH SHALL BE MADE AVAILABLE TO INSPECTION AUTHORITIES.

11. UL 555 & 555S COMPLIANT. LISTINGS: RUSKIN#R5531, GREENHECK#R13317, POTTORFF#R11767, NAILOR#R9492, CESCO#R6462 .12. REFER TO SPECIFICATION SECTION 233113 FOR ADDITIONAL REQUIREMENTS.

1"

8

7

6

8

23

4

5 1 8

109#

SLEEVE

RATEDFLOOR

DUCT

DUCT

CONCRETE EXPANSIONANCHOR BOLT (TWO PERSIDE)

1/4" TEK SCREWS(MIN 2 PER SIDE)

UPBLAST EXHAUST FANCONTINUOUS 1/2"X2"RUBBER SEAL ALLAROUND

NOTES:1. COORDINATE ANCHORAGE REQUIREMENTS WITH STRUCTURAL DESIGN.

INSULATION

FRT DF#1LEVELING BLOCK.SHAPE TO LEVELUNIT.

CONCRETE ROOFROOFINGCANT STRIPSCOUNTER FLASHING

FACTORY STEELCURB (8" HIGH MIN)

3" MIN

M902

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

MECHANICAL DETAILS

SCALE: NONE1 FSD FLOOR AIRFOIL BLADESCALE: NONE2 UPBLAST EXHAUST FAN

ADJUST THROW OF VERTICAL

BLADES FOR 1/3 OF AIR

STRAIGHT AND 1/3 OF AIR TO 45

DEGREES RIGHT AND 1/3 OF AIR

TO 45 DEGREES LEFT.

ADJUST THROW OF HORIZONTAL

BLADES FOR 1/2 OF AIR

STRAIGHT AND 1/2 OF AIR TO 22.5

DEGREES DOWN.

MAINTAIN

MINIMUM 10'

AFF

DUCT MOUNTED

SUPPLY

REGISTER

NOTES:

1. ADJUST INITIAL AIR FLOW DIRECTIONS AS SHOWN. FINAL AIR BALANCE SHALL ADJUST FLOW

DIRECTIONS TO REDUCE AIR VELOCITIES IN OCCUPIED SPACE TO 50 FPM (MAXIMUM).

SUPPLY DUCT

OPPOSED BLADE DAMPER

12"

MIN

NOTES:

1. NON-ROOM SIDE ADJUSTABLE, DAMPER ACCESSED VIA DIFFUSER FACE REMOVAL.

2. STEPPED BORE INSTALLATION FOR FLUSH INSTILLATION WITH FLOOR. COORDINATE WITH GC.

MOUNTING RING

TRIM RING

FLOOR

DIFFUSER AND

CONTROL BASKET

STEPPED BORE

INSTALLATION

M903

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

MECHANICAL DETAILS

SCALE: 1/8" = 1'-0"1 EXPOSED DUCT SUPPLY REGISTERSCALE: 1/8" = 1'-0"2 UFAD DIFFUSER

(E) UTILITY TUNNELELECTRICAL POINTOF CONNECTIONIN TUNNEL

PROPOSED VAULTACCESS LOCATION(TYPICAL)

90' - 0"69

' - 0

"

50' - 0"

100'

- 0"

100'

- 0"

ELECTRICAL ROOM 140SEE 2/E6.01

1

UTILITYTRANSFORMERS

(3) 3" CONDUITS

(1) 3" CONDUITS

E101

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

ELECTRICAL SITE PLAN

SCALE: 1" = 40'-0"1 ELECTRICAL SITE PLAN

#KEYED NOTES1 PROVIDE (1) 4" CONDUITS (SPARE) AND (1) 4" CONDUITS

WITH (3) #2 MV-105 15KV CABLES PER SERVICE.

VEST.140 SF

ARTISTIC DIR.180 SF

MECH.170 SF

VEST.50 SF

MEN140 SF

LOBBY510 SF

STORAGE440 SF WOMEN

160 SF

JANITOR60 SF UNISEX

60 SF

ELEC140 SF

TELECOM70 SF ELEV .

50 SF

BOARDROOM530 SF

VEST.500 SF

REHEARSAL ROOM2220 SF

E6012

E6011

E301

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

LEVEL 1 - POWER AND SIGNAL PLAN

SCALE: 3/32" = 1'-0"1 Level 1 - FLOOR PLAN - POWER AND SIGNAL

1N1-4PNL

600A MCB480Y/277V

125.3

XFR

75 KVA

1N1-2208Y/120V

.

.

225.4

1N1-2SECT. 1

PNL

225A MCB120Y/208V

1E1-4PNL

175A MCB480Y/277V

50.3

XFR

30 KVA

1E1-2208Y/120V

.

.

110.4

1E1-2PNL

100A MCB120Y/208V

1N1-2SECT. 2

PNL

SE-RATED SE-RATED

CAMPUSNORMALXFMR500KVA

CAMPUSEMERGENCYXFMR150KVA

E501

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

ELECTRICAL SINGLE LINE DIAGRAM

SCALE: NONE1 ELECTRICAL SINGLE-LINE DIAGRAM

BEP 110 PP

PP SW

FDU

TELECOM RM

TO OREGONHALL VIA SITECONDUITS/UTILITY TUNNEL

W

(2) (2) (2) (2) CABLEQTY. PERDEVICE

CABLE PROVIDEDBY UO NTS

BEP

110

PP

SW

FDU

= COPPER CROSS-CONNECT

= PATCH CORDS (BY OWNER)

= BUILDING ENTRANCE PROTECTOR BLOCKS

= 110-BLOCKS

= 48-PORT CAT5E PATCH PANEL

= OWNER PROVIDED NETWORK SWITCH

= FIBER DISTRIBUTION UNIT

LEGEND

E505

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

SIGNAL SINGLE LINE DIAGRAM

SCALE: 1/4" = 1'-0"1 SIGNAL SINGLE LINE DIAGRAM

PNL-1N1-4

PNL-1E1-4

PNL-1N1-2 (SECT. 1)

PNL-1N1-2 (SECT. 2)

PNL-1E1-2

XFR-1N1-2XFR-1E1-2

WALL SPACE FORACCESS CONTROLAND INTRUSIONDETECTION PANELS

TWO-POSTEQUIPMENT RACK10" WIDE VERTICALCABLE MANAGEMENT

TELECOMMUNICATIONSMAIN GROUNDING BUSBAR

(3) 4" INCOMING SITE CONDUITSFROM UTILITY TUNNEL

WALL SPACE FOR VOICE-FIELDTERMINATIONS (110BLOCK/PROTECTOR BLOCKS)

WALL SPACE FOR CATVTERMINATIONS

18" WIDE LADDER RACK CABLETRAY (TYP)

3/4" ACX PLYWOOD BACKBOARDW/FIRE-RETARDANT PAINT

E601

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

ENLARGED PLANS

SCALE: 1/4" = 1'-0"2 ENLARGED PLAN - ELECTRICAL ROOMSCALE: 1/4" = 1'-0"1 ENLARGED PLAN - TELECOM ROOM

P001

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

BASIS OF DESIGN

1.1 PLUMBING BASIS OF DESIGN

A. THIS BUILDING IS A NEW TWO-STORY CONCERT HALL AND OFFICE SPACE.

B. THE DESIGN INCLUDES THE FOLLOWING NOTABLE FEATURES, BUT IS NOT LIMITED TO THISSCOPE. CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL CONTRACT DOCUMENTS ANDCOORDINATING WITH ALL DISCIPLINES.

C. CODES AND STANDARDS1. AMERICANS WITH DISABILITIES ACT (ADA)2. NFPA 99: HEALTH CARE FACILITIES CODE, 2012 EDITION3. OREGON BUILDING CODES ENFORCED BY THE AUTHORITY HAVING JURISDICTION (AHJ):

a) 2010 OREGON STRUCTURAL SPECIALTY CODE (OSSC) (BASED ON THE 2009INTERNATIONAL BUILDING CODE WITH STATE AMENDMENTS).

b) 2011 OREGON PLUMBING SPECIALTY CODE (OPSC) (BASED ON THE 2009 UNIFORMPLUMBING CODE WITH STATE AMENDMENTS).

c) 2010 OREGON MECHANICAL SPECIALTY CODE (OMSC) BASED ON THE 2009INTERNATIONAL MECHANICAL CODE AND THE 2009 INTERNATIONAL FUEL GASCODE (IMC).

D. WATER SUPPLY1. MINIMUM AVAILABLE WATER PRESSURE (STATIC): _____ PSI AVAILABLE FROM

MUNICIPAL WATER SERVICE2. COLD WATER PIPE SIZE: 2” INCHES3. COLD WATER METER SIZE: 1 1/2” INCHES4. COLD WATER DEMAND: 48 GPM (DESIGN TOTAL)5. COLD WATER AVAILEBLE: 130 GPM (FUTURE TOTAL)6. REFER TO PLUMBING CALCULATIONS AND SCHEDULES FOR FUTHER CRITERIA

E. DOMESTIC HOT WATER:1. DOMESTIC HOT WATER SUPPLY TEMPERATURE: 120°F2. DOMESTIC HOT WATER RECIRCULATION TEMPERATURE: 90°F. ABOVE THIS

TEMPERATURE THE RECIRCULATING PUMP WILL BE OFF.3. DOMESTIC INCOMING COLD WATER TEMPERATURE: 55°F4. DOMESTIC HOT WATER HEATER SETPOINT TEMPERATURE: 140°F

F. SANITARY SEWER:1. BUILDING SEWER SIZE 4 INCHES AT 2% SLOPE2. TOTAL CAPACITY 216 DRAINAGE FIXTURE UNITS3. CONNECTED LOAD 46.5 DRAINAGE FIXTURE UNITS

G. STORM DRAIN:1. RAINFALL INTENSITY 1.3 INCHES/HOUR2. TOTAL SQUARE FOOTAGE: 6160 SQFT3. PIPE SIZE: 6”

PLUMBING BASIS OF DESIGN

P002

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

SCHEDULES

PLUMBING FIXTURE SCHEDULETAG FIXTURE MANUFACTURER MODEL

ADA(Y/N)

FLOW(GPF/GPM)

CONNECTION SIZEREMARKSW V HW CW

FD-1 FLOOR DRAIN 0 4"FS-1 FLOOR SINK 0 4"OD-1 OVERFLOW DRAIN JR SMITH 0 4" SEE PLANS FOR SIZERD-1 ROOF DRAIN JR SMITH 0 6" SEE PLANS FOS SIZEWC-1 WATER CLOSET WALL HUNG KOHLER KINGSTON LITE K-4330 N 1.28 4" 2" 1 1/4" 1.28 GALLONS PER FLUSH (GPF) SLOAN 111-1.28, OLSONITE NO.95 SEATWC-2 WATER CLOSET WALL HUNG ADA KOHLER KINGSTON LITE K-4330 Y 1.28 4" 2" 1 1/4" 1.28 GALLONS PER FLUSH (GPF) SLOAN 111-1.28, OLSONITE NO.95 SEATUR-1 URINAL KOHLER K-4960-T BARDON LITE N 0.5 2" 1 1/2" 3/4" 0.125 GALLONS PER FLUSH (GPF) SLOAN 186-0.125L-1 LAVATORY WALL HUNG ADA KOHLER BROOKELINE K-220204 Y 0.5 1 1/2" 1 1/2" 1/2" 1/2" 0.5 GPM CHICAGO 2200

MS-1 MOP SINK STERN WILLIAMS CRS-2200BP N 2.5 3" 3" 3/4" 3/4" CHICAGO 897-CRCF WITH VACUUM BREAKERS-1 SINK ELKAY DLR-2222-10 Y 1.5 2" 1 1/2" 1/2" 1/2" CHICAGO 201-G8AE2805F317AB WITH GOOSNECK AND WRIST BLADE HANDLES, PROVIDE VALVE & SUPPLY

TUBING FOR COFFEE MAKER

DOMESTIC WATER HEATER SCHEDULE

TAG # MANUFACTURER MODEL NUMBER LOCATIONVOL

(GAL)RECOV(GPH)

EWT(°F)

LWT(°F)

CONNECTIONSIZE ELECTRICAL UNIT SIZE

(L"xW"xH")OPER.

WT. (LBS) NOTESCW (IN) HW (IN) KW VOLTS PH MCAEWH 1 AO SMITH SDE-30 MECH ROOM 30 35 55 120 1 1 6 408 3 8 26X26X36 375 1-2 NOTES 1. COORDINATE WITH ELECTRICAL FOR POWER AND DISCONNECT AS REQUIRED. 2. SMALL TANK TYPE, ELECTRIC WATER HEATER.

EXPANSION TANK SCHEDULETAG # MANUFACTURER MODEL NUMBER LOCATION

TANKVOL.(GAL)

ACCEPT. VOL.(GAL)

SYSTEMVOL. (GAL)

FILL PRESS.(PSIG)

OPER.PRESS.(PSIG)

RELIEFPRESS.(PSIG)

MIN. TEMP.(°F)

MAX.TEMP. (°F)

SYSTEMCONN. (IN)

SIZE DIA xH (IN)

OPER. WT.(LBS) NOTES

ET 1 WATTS DETA-5 MECH ROOM 3.5 1.3 0 10 75 85 55 120 3/4" 10X14 30 1-3 NOTES 1. PROVIDE TANK RATED FOR ASME WORKING PRESSURE OF 125 PSIG. 2. PROVIDE TANK WITH VERTICAL CONFIGURATION. 3. ANCHOR TO HOUSEKEEPING PAD. COORDINATE WITH STRUCTURAL DESIGN.

DOMESTIC RECIRCULATION PUMP SCHEDULETAG # MANUFACTURER MODEL NUMBER LOCATION TYPE

FLOW(GPM)

HEAD (FTWG) RPM

CONNECTION SIZE(IN)

ON/OFFSETPOINT (°F)

ELECTRICAL EMERGPOWER

(Y/N)OPER.

WT. (LBS) NOTESHP WATTS VOLTS PHCP 1 BELL & GOSSETT NBF-9U/LW MECH ROOM INLINE 5 6 2800 1/2" 90 41 115 1 No 10 1-4

NOTES 1. COORDINATE WITH ELECTRICAL FOR POWER AND DISCONNECT AS REQUIRED. 2. PUMP TO CONTAIN LESS THAN 0.25% LEAD CONTENT ON WETTED SURFACE FOR DOMESTIC DISTRIBUTION. 3. MAXIMUM WORKING PRESSURE 150 PSIG AND MAXIMUM OPERATING TEMPERATURE OF 225° F. 4. PROVIDE AQUASTAT TO OPERATE PUMP WHEN HOT WATER RETURN TEMPERATURE DROPS BELOW SETPOINT.

4" F2" CW

CONNECT TO CIVIL

4" SS UP

2" SS UP

2" SS UP

2" SS UP

3" SS UP 4" SS UP

4" SS UP

4" SSCONNECT TO CIVIL

1 1/2" V UP 2" SS UP

4" SS UP

4" F UP

6" SDCONNECT TO CIVIL

2" CW UP

6" SD UP

P200

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

UNDERGROUND PLAN - PLUMBIING

SCALE: 3/32" = 1'-0"1 UNDERGROUND PLAN - PLUMBING

VEST.140 SF

ARTISTIC DIR.180 SF

MECH.170 SF

VEST.50 SF

MEN140 SF

LOBBY510 SF

STORAGE440 SF

WOMEN160 SF

JANITOR60 SF

UNISEX60 SF

ELEC140 SF

TELECOM70 SF

ELEV .50 SF

BOARDROOM530 SF

VEST.500 SF

REHEARSAL ROOM2220 SF

L-1L-1

WC-1

L-1L-1

WC-2WC-2

UR-1

2" CW 1" HW 3/4" HWC

3/4" HWC 1" HW 2" CW

3" OD DSN 18" AFF 3" SD UP 3" OD UP

3" SD UP 3" OD UP

4" S

D 2" SS DN

4" SS DN

2" SS DN

2" SS DN

P6011P601

3

2" V 2" CW 1" HW

3/4" HWC

4" OD DSN 18" AFF 6" SD DN

4" SD UP 4" OD UP

4" SD UP

P201

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

LEVEL 1 - FLOOR PLAN

SCALE: 3/32" = 1'-0"1 Level 1 - FLOOR PLAN - PLUMBING

OPEN OFFICE1430 SF

LIBRARY440 SF

OFFICE100 SF

CONF / OFFICE100 SF

OFFICE100 SF

OFFICE100 SF

ELEV.50 SF

DIR. OFFICE200 SF

OFFICE100 SF

STORAGE30 SF

UNISEX60 SF

WORK AREA270 SF

3" SD UP 3" OD UP 3" SD UP

3" OD UPP601

2

4" SD DN 4" OD DN

4" SD DN

P202

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

LEVEL 2 - FLOOR PLAN

SCALE: 3/32" = 1'-0"1 Level 2 - FLOOR PLAN - PLUMBING

LOWER ROOF

UPPER ROOFRD-1 (1,100 SQFT)OD-1

RD-1 (1,100 SQFT)OD-1

3" RD-1 (1,955 SQFT)OD-1

3" RD-1 (1,955 SQFT)OD-1

P203

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

ROOF - FLOOR PLAN

SCALE: 3/32" = 1'-0"1 Lower Roof - FLOOR PLAN - PLUMBING

2" CWSEE CIVIL FORCONTIUNATION

M

LEVEL 1

LEVEL 2

ROOF

PRVSET TO 75PSI

EWH1

MS-1

S-1

WC-

2

L-1

DF-1

L-1

L-1

L-1

L-1

UR-1

WC-

1

WC-

2

WC-

2

WHA

WHA

L-1

WC-

2

S-1

WHA

CP1

SEE DETAILP901

1

DOUBLE CHECK VALVEBACK FLOW PREVENTOR

WATER METER

4" FIRESEE CIVIL FORCONTIUNATION

LEVEL 1

LEVEL 2

DOUBLE DETECTORCHECK VALVE BACKFLOWPREVENTOR

CONTINUE TO FIRE SPRINKLERSYSTEM (BY OTHERS)

P401

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

PLUMBING WATER RISER DIAGRAMS

SCALE: NONE1 DOMESTIC WATER RISER DIAGRAM

SCALE: NONE2 FIRE RISER DIAGRAM

LEVEL 1

LEVEL 2

ROOF

4" FS-12" FD-1MS-1

S-1DF-1L-1L-1L-1L-1WC-1UR-1WC-2WC-2

S-1WC-2L-1

L-1 WC-2

4" SANITARYCONNECTO TO CIVIL

P402

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

PLUMBING SANITARY RISER DIAGRAMS

SCALE: NONE1 WASTE & VENT RISER DIAGRAM

LEVEL 1

LEVEL 2

ROOF

ROOF

4" DSN18" AFF

(3,910 SQFT)

3" DSN18" AFF

(2,200 SQFT)

6" SDCONNECT TO CIVIL

(6,110 SQFT)

3" OD-1 3" RD-1(1,955 SQFT)

3" OD-1 3" RD-1(1,955 SQFT)

3" OD-1 3" RD-1(1,100 SQFT)

3" OD-1 3" RD-1(1,100 SQFT)

P403

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

PLUMBING STORM RISER DIAGRAMS

SCALE: 12" = 1'-0"1 STORM WATER RISER DIAGRAM

L-1

WC-2MS-1

S-1 4" SS UP 4" SS DN 2" V

3" V UP

2" CW UP 1" HW UP 3/4" HWC UP

1 1/2" V

1 1/2" V 2" SS DN

2" CW 1" HW

3/4"

HW

C 1"

HW

2" C

W 2"

V

2" CW 1" HW 2" CW 1" HW

3/4" HWC

2" V

S-1WC-2

L-1

2" CW DN

3/4" HWC DN

4" V UP TO VTR

3" V DN

4" SS DN

1" HW DN

4" F DN

1EWH

1ET

1CP

FD-1 (2")

FS-1 (4")

2" V DN

P9011

2" DCV ON CW4" DDCV ON FIRE

2" CW 1" HW 3/4" HWC

2" V

MECH.170 SF

TO SPRINKLERS

P601

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

ENLARGED PLANS

SCALE: 1/4" = 1'-0"1 PLUMBING - LEVEL 1 RR

SCALE: 1/4" = 1'-0"2 PLUMBING - LEVEL 2 RR

SCALE: 1/4" = 1'-0"3 PLUMBING - WATER ENTRY

1"HWRSTRAINER

PRIMERTRAPCW

3/4"

3/4"

FLOOR SINKSPILL TO

AIR GAP

SEISMICLLY BRACEPER ZONEE (TYP)

SPILL T&P TO FLOOR SINK

HW (120)

HWR (90)

EWH1

CP1

ET1

THERMOMETER

P901

UO OREGON BACH FESTIVALOREGON BACH FESTIVALFebruary 5, 2016

PLUMBING DETAILS

SCALE: 1/8" = 1'-0"1 ELECTRIC WATER HEATER