PLUMBING NOTES LEGEND VICINITY MAP SITE ... - DPWH
-
Upload
khangminh22 -
Category
Documents
-
view
5 -
download
0
Transcript of PLUMBING NOTES LEGEND VICINITY MAP SITE ... - DPWH
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE
EXECUTED IN ACCORDANCE WITH THE PROVISIONS OF THE
PHILIPPINE PLUMBING CODE, THE NATIONAL BUILDING CODE
AND THE RULES AND REGULATIONS OF THE LOCALITY.
2. COORDINATE THE DRAWINGS WITH OTHER RELATED
DRAWING SPECIFICATIONS THE ENGINEER AND OR ARCHITECT
SHALL BE NOTIFIED IMMEDIATELY OF ANY OTHER DISCREPANCIES
FOUND HEREIN.
3. ALL PIPES SHALL BE INSTALLED AS INDICATED ANY
RELOCATION REQUIRED FOR PROPER EXECUTION OF
PLUMBING WORKS SHALL BE WITH PROPER APPROVAL
FROM THE ENGINEER AND OR ARCHITECT.
4. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL
MAINTAIN A ONE (1) PERCENT SLOPE MINIMUM UNLESS
OTHERWISE SPECIFIED.
5. WATER SUPPLY PIPES TO FIXTURES SHALL BE SIZED IN
ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS.
6. ALL BRANCHES OF FIXTURES OR GROUP OF FIXTURES SHALL
BE PROVIDED WITH AIR CHAMBER MADE OF CAPPED VERTICAL
EXTENSION PIPE NIPPLE.
7. ALL WATER LINES SHALL BE HYDROSTATICALLY TESTED AT
120 PSI FOR A PERIOD OF 24 HOURS BEFORE BURIED OR
COVERED. ALL GALVANIZED IRON PIPES DIRECTLY IN
CONTACT WITH THE SOIL SHALL BE PROVIDED WITH TWO (2) COATS
OF ASPHALT AND WRAPPED WITH JUTE CLOTH AND SOAKED IN
MELTED ASPHALT.
8. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT
THE SITE AND COORDINATE THE WORK WITH THE SEWER AND
STORM DRAINAGE LINE, EFFLUENT DISPOSAL POINT AND THE
WATER LINE SERVICE.
9. ALL PIPES AND OTHER DIMENSIONS ARE IN MILIMETERS (mm)
UNLESS OTHERWISE SPECIFIED.
PLUMBING NOTES
POLYVINYL CHLORIDE SOIL PIPE
POLYVINYL CHLORIDE VENT. ACROSS CEILING
POLYVINYL CHLORIDE VENT. PIPE
POLYVINYL CHLORIDE VENT. STACK
POLYVINYL CHLORIDE VENT THROUGH ROOF / WALL
POLYVINYL CHLORIDE WASTE PIPE
POLYVINYL CHLORIDE WASTE STACK
ROOF DRAIN
URINAL DRAIN
WATER CLOSET
LAVATORY
COUNTER SINK
CONCRETE DRAIN PIPE
CLEAN OUT
CHECK VALVE
HOSE BIBB
FLOOR DRAIN
GALVANIZED IRON COLD WATER LINE (SCH. 40)
GALVANIZED IRON COLD WATER RISER (SCH. 40)
GATE VALVE
MANHOLE
POLYVINYL CHLORIDE DOWNSPOUT
POLYVINYL CHLORIDE DRAIN PIPE
PVCSP
PVCVAC
PVCVP
PVCVS
PVCVTR / W
PVCWP
PVCWS
RD
UD
WC
LAV
CS
CDP
CO
CV
HB
FD
GICWL
GICWR
GV
MH
PVCDS
PVCDP
LEGEND
VICINITY MAP1
P - 1
NTSSCALE
SITE DEVELOPMENT PLAN2
P - 1
METERS1:100SCALE
TERESA STREET
VA
LE
NZ
UE
LA
PROPOSED
RENOVATION OF
ESPERANZA HEALTH
CENTER
EXISTING CHAPEL / MPB
AND COVERED COURTEFFLUENTCONNECT TO NEAREST
SWERAGE SYSTEM
TAP TO EXISTINGDRAINAGE LINE
SEPTIC TANK
CVWMGV
TAP TO MAINWATER LINE
- PLUMBING NOTES
- LEGEND
- VICINITY MAP
- SITE DEVELOPMENT PLAN
P - 1
15
RENOVATION OF LYING-IN,
ESPERANZA HEALTH CENTER
AND LYING-IN-CLINIC
City of Manila
PROJECT NAME / LOCATION SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
NATIONAL CAPITAL REGION
NORTH MANILA ENGINEERING DISTRICT
OFFICE OF THE DISTRICT ENGINEER
Nagtahan, Sta. Mesa, Manila
JULIET M. FAJARDO
Chief, Planning and Design SectionEULOGIO C. DIMAFELIX
ENGINEER II
SHEET CONTENTS PREPARED BY
SURVEYED:
DESIGNED:
DRAWN:
CHECKED:
REVIEWED/SUBMITTED BY:
GERARDO T. DE GUZMAN
Assistant District Engineer
RECOMMENDING APPROVAL:
MEDEL F. CHUA
District Engineer
APPROVED BY: CONCURRED BY:
NILO C. MARAYAG
Engineer IV
Head, Engineering & Civil Works Cluster, DOH - NCRO
ARIEL I. VALENCIA, MD, MPH, CESO III
Director IV, DOH - NCRO
31
REYNIEL JOHN S. MENDIOLA
ENGINEER I
DARWIN K. DIMAANO
ENGINEER II
MARK ANDREW M. MARTINO
ENGINEERING AIDE - A
ESPERANZA HEALTH CENTER
TERESA ST., BRGY. 592, ZONE 59,
STA. MESA, MANILA
STO.
UP
UP
RA
MP
U
P
RAMP UP
WATER TANK
ENTRANCE
UP
UP
TO 3RD
FLR.
OPEN AREA
LAVWCFD
F
LAVWCFD
F
SHO
SDWC
LAV
FFD
FFD
LAVWC
LAVWC
LAV
CO CO
CO
CO
CO
100mm Ø PVC PIPE (VERTICAL)
75mm Ø PVCVP (VERTICAL)
100m
m Ø
PVCS
P10
0mm
Ø PV
CSP
50mm
Ø P
VCVA
C50
mm Ø
PVC
VAC
75mm Ø PVCWP
75mm Ø PVCSP
75mm Ø PVCVAC
100mm Ø PVC PIPE (VERTICAL)
75mm Ø PVCVP (VERTICAL)50mm Ø PVCVAC100mm Ø PVCSP
50mm
Ø P
VCVA
C10
0mm
Ø PV
CSP
75mm Ø PVCWP100mm Ø PVCSP
75mm Ø PVCWP
100mm Ø PVCSP
50mm Ø PVCVAC
100mm Ø PVC PIPE (VERTICAL)
75mm Ø PVCVP (VERTICAL)
CO
100mm Ø PVCWP
50mm Ø PVCVAP
WC
LAV
F
CO F
LAV
WC
100m
m Ø
PVCW
P
50mm
Ø P
VCVA
C
FD
LAV
FD
CO
LAV
WCFDLAVF
CO
100m
m Ø
PVCW
P50
mm Ø
PVC
VAC
100mm Ø PVCWP
50mm Ø PVCVAC
COFWC
FDLAV
75mm Ø PVCVP (VERTICAL)
100mm Ø PVC PIPE (VERTICAL)
100m
m Ø
PVCW
P
50mm
Ø P
VCVA
C
100mm Ø PVCWP50mm Ø PVCVAC
100mm Ø PVC PIPE (VERTICAL)
CO
FFD
WC
LAV
EFFLUENTCONNECT TO NEAREST
SWERAGE SYSTEM
CO
CO
CO
MH
MH
GROUND FLOOR SEWER LINE LAYOUT1
P - 2
METERS1:100SCALE
SECOND FLOOR SEWER LINE LAYOUT2
P - 2
METERS1:100SCALE
150mm Ø PVC 150mm Ø PVC
150mm Ø PVC 150mm Ø PVC
150m
m Ø
PVC
150m
m Ø
PVC
150m
m Ø
PVC
150m
m Ø
PVC
TAP TO EXISTINGDRAINAGE LINE
PVCDS
100mmØ DS (TYP.)
CB CB CB
CB CB CB
CB
CB
CB
CB
PVCDS PVCDS
PVCDS
PVCDS PVCDS PVCDS
RENOVATION OF LYING-IN,
ESPERANZA HEALTH CENTER
AND LYING-IN-CLINIC
City of Manila
PROJECT NAME / LOCATION SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
NATIONAL CAPITAL REGION
NORTH MANILA ENGINEERING DISTRICT
OFFICE OF THE DISTRICT ENGINEER
Nagtahan, Sta. Mesa, Manila
JULIET M. FAJARDO
Chief, Planning and Design SectionEULOGIO C. DIMAFELIX
ENGINEER II
SHEET CONTENTS PREPARED BY
SURVEYED:
DESIGNED:
DRAWN:
CHECKED:
REVIEWED/SUBMITTED BY:
GERARDO T. DE GUZMAN
Assistant District Engineer
RECOMMENDING APPROVAL:
MEDEL F. CHUA
District Engineer
APPROVED BY: CONCURRED BY:
NILO C. MARAYAG
Engineer IV
Head, Engineering & Civil Works Cluster, DOH - NCRO
ARIEL I. VALENCIA, MD, MPH, CESO III
Director IV, DOH - NCRO
31
REYNIEL JOHN S. MENDIOLA
ENGINEER I
DARWIN K. DIMAANO
ENGINEER II
MARK ANDREW M. MARTINO
ENGINEERING AIDE - A
- GROUND FLOOR SEWER LINE
LAYOUT
- SECOND FLOOR SEWER LINE
LAYOUT
P - 2
16
UP
UP
TO ROOF
DECK
CR
100mm Ø PVC PIPE (VERTICAL)
75mm Ø PVCVP (VERTICAL)
100mm Ø PVC PIPE (VERTICAL)
75mm Ø PVCVP (VERTICAL)
WCFD
F
SS
100m
m Ø
PVCW
P
50mm
Ø P
VCVA
C
SS
CO
FDWC
LAV
CO
75mm Ø PVCVP (VERTICAL)
100mm Ø PVC PIPE (VERTICAL)
F
WC
FD
CO
LAV
100m
m Ø
PVCW
P
50mm
Ø P
VCVA
C
LAV
UR
STO.
UP
UP
RA
MP
U
P
RAMP UP
WATER TANK
ENTRANCE
LAVWC
FD
F
LAVWC
FD
F
SHO
SDWC
LAV
FFD
FFD
LAVWC
LAVWC
LAV
25mmØ GICWL (VERTICAL PIPE)
25mm
Ø GI
CWL
25mmØ GICWL (VERTICAL PIPE)
25mm
Ø GI
CWL
25mm
Ø GI
CWL
25mm
Ø GI
CWL
25mmØ GICWL
25mmØ GICWL
25mmØ GICWL
50mmØ GI PIPE (VERTICAL)
PUMPTANK
50mmØ GI PIPE
50mm
Ø GI
PIP
E50
mmØ
GI P
IPE
TAP TO MAINWATER LINE
CVWMGV
THIRD FLOOR SEWER LINE LAYOUT1
P - 3
METERS1:100SCALE
GROUND FLOOR WATER LINE LAYOUT2
P - 3
METERS1:100SCALE
RENOVATION OF LYING-IN,
ESPERANZA HEALTH CENTER
AND LYING-IN-CLINIC
City of Manila
PROJECT NAME / LOCATION SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
NATIONAL CAPITAL REGION
NORTH MANILA ENGINEERING DISTRICT
OFFICE OF THE DISTRICT ENGINEER
Nagtahan, Sta. Mesa, Manila
JULIET M. FAJARDO
Chief, Planning and Design SectionEULOGIO C. DIMAFELIX
ENGINEER II
SHEET CONTENTS PREPARED BY
SURVEYED:
DESIGNED:
DRAWN:
CHECKED:
REVIEWED/SUBMITTED BY:
GERARDO T. DE GUZMAN
Assistant District Engineer
RECOMMENDING APPROVAL:
MEDEL F. CHUA
District Engineer
APPROVED BY: CONCURRED BY:
NILO C. MARAYAG
Engineer IV
Head, Engineering & Civil Works Cluster, DOH - NCRO
ARIEL I. VALENCIA, MD, MPH, CESO III
Director IV, DOH - NCRO
31
REYNIEL JOHN S. MENDIOLA
ENGINEER I
DARWIN K. DIMAANO
ENGINEER II
MARK ANDREW M. MARTINO
ENGINEERING AIDE - A
- THIRD FLOOR SEWER LINE
LAYOUT
- GROUND FLOOR WATER LINE
LAYOUT
P - 3
17
UP
UP
TO 3RD
FLR.
OPEN AREA
UP
UP
TO ROOF
DECK
CR
CO
WC
LAV
F
F
LAV
WC
FD
LAV
FD
LAV
WCFDLAV
F
FWC
FDLAV
WCFD
F
SS
SS
FDWC
LAV
F
WC
FD
LAV
FD
WC
LAV
LAV
UR
GV
25mm
Ø GI
CWL
25mmØ GICWL 25mmØ GICWL
25mm
Ø GI
CWL
25mm
Ø GI
CWL
25mmØ GICWL
25mmØ GICWL
TANK
25mmØ GICWL (VERTICAL PIPE)25mmØ GICWL (VERTICAL PIPE)
25mmØ GICWL (VERTICAL PIPE)
F
25mmØ GICWL (VERTICAL PIPE)
25mmØ GICWL
25mm
Ø GI
CWL
25mm
Ø GI
CWL
25mm
Ø GI
CWL
25mm
Ø GI
CWL
25mmØ GICWL
25mmØ GICWL (VERTICAL PIPE)
25mmØ GICWL (VERTICAL PIPE)
25mmØ GICWL (VERTICAL PIPE)
50mmØ GI PIPE (VERTICAL)
SECOND FLOOR WATER LINE LAYOUT1
P - 4
METERS1:100SCALE
THIRD FLOOR WATER LINE LAYOUT1
P - 4
METERS1:100SCALE
RENOVATION OF LYING-IN,
ESPERANZA HEALTH CENTER
AND LYING-IN-CLINIC
City of Manila
PROJECT NAME / LOCATION SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
NATIONAL CAPITAL REGION
NORTH MANILA ENGINEERING DISTRICT
OFFICE OF THE DISTRICT ENGINEER
Nagtahan, Sta. Mesa, Manila
JULIET M. FAJARDO
Chief, Planning and Design SectionEULOGIO C. DIMAFELIX
ENGINEER II
SHEET CONTENTS PREPARED BY
SURVEYED:
DESIGNED:
DRAWN:
CHECKED:
REVIEWED/SUBMITTED BY:
GERARDO T. DE GUZMAN
Assistant District Engineer
RECOMMENDING APPROVAL:
MEDEL F. CHUA
District Engineer
APPROVED BY: CONCURRED BY:
NILO C. MARAYAG
Engineer IV
Head, Engineering & Civil Works Cluster, DOH - NCRO
ARIEL I. VALENCIA, MD, MPH, CESO III
Director IV, DOH - NCRO
31
REYNIEL JOHN S. MENDIOLA
ENGINEER I
DARWIN K. DIMAANO
ENGINEER II
MARK ANDREW M. MARTINO
ENGINEERING AIDE - A
- SECOND FLOOR WATER LINE
LAYOUT
- THIRD FLOOR WATER LINE
LAYOUT
P - 4
18
S
T
O
.
U
P
U
P
R
A
M
P
U
P
R
A
M
P
U
P
W
A
T
E
R
T
A
N
K
E
N
T
R
A
N
C
E
U
P
U
P
T
O
3
R
D
F
L
R
.
O
P
E
N
A
R
E
A
LAVWC FDF
LAV
WCFD
F
SHOSDWC
LAV
FFD
FFD
LAV
WC
LAV
WC
LAV
CO
CO
CO
CO
CO
100mm Ø PVCSP
100mm Ø PVCSP
50mm Ø PVCVAC
50mm Ø PVCVAC
75mm Ø PVCWP
75mm Ø PVCSP
75mm Ø PVCVAC
100mm Ø PVC PIPE (VERTICAL)
75mm Ø PVCVP (VERTICAL) 50mm Ø PVCVAC
100mm Ø PVCSP
50mm Ø PVCVAC
100mm Ø PVCSP
75mm Ø PVCWP
100mm Ø PVCSP
75mm Ø PVCWP
100mm Ø PVCSP
50mm Ø PVCVAC
100mm Ø PVC PIPE (VERTICAL)
75mm Ø PVCVP (VERTICAL)CO WC
LAVF
COF
LAV
WC
100mm Ø PVCWP
50mm Ø PVCVAC
FD
LAV
FD
CO
LAV
WCFDLAV
FCO
100mm Ø PVCWP
50mm Ø PVCVAC
100mm Ø PVCWP
50mm Ø PVCVAC
CO
FWCFD
LAV
75mm Ø PVCVP (VERTICAL)
100mm Ø PVC PIPE (VERTICAL)
100mm Ø PVCWP
50mm Ø PVCVAC
100mm Ø PVCWP
50mm Ø PVCVAC
100mm Ø PVC PIPE (VERTICAL)
FFDWC
LAV
EFFLUENT
CONNECT TO NEAREST
SWERAGE SYSTEMCOCO
CO
MHMH
CO
100mm Ø PVC PIPE (VERTICAL)
75mm Ø PVCVP (VERTICAL)
GROUND FLOOR ISOMETRIC SEWER LINE LAYOUT1
P - 5
METERS1:100SCALE
SECOND FLOOR ISOMETRIC SEWER LINE LAYOUT2
P - 5
METERS1:100SCALE
150mm Ø PVC
150mm Ø PVC
150mm Ø PVC
150mm Ø PVC
150mm Ø PVC
150mm Ø PVC
150mm Ø PVC
TAP TO EXISTING
DRAINAGE LINE
PVCDS
100mmØ DS (TYP.) 150mm Ø PVC
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
FD
FD
RENOVATION OF LYING-IN,
ESPERANZA HEALTH CENTER
AND LYING-IN-CLINIC
City of Manila
PROJECT NAME / LOCATION SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
NATIONAL CAPITAL REGION
NORTH MANILA ENGINEERING DISTRICT
OFFICE OF THE DISTRICT ENGINEER
Nagtahan, Sta. Mesa, Manila
JULIET M. FAJARDO
Chief, Planning and Design SectionEULOGIO C. DIMAFELIX
ENGINEER II
SHEET CONTENTS PREPARED BY
SURVEYED:
DESIGNED:
DRAWN:
CHECKED:
REVIEWED/SUBMITTED BY:
GERARDO T. DE GUZMAN
Assistant District Engineer
RECOMMENDING APPROVAL:
MEDEL F. CHUA
District Engineer
APPROVED BY: CONCURRED BY:
NILO C. MARAYAG
Engineer IV
Head, Engineering & Civil Works Cluster, DOH - NCRO
ARIEL I. VALENCIA, MD, MPH, CESO III
Director IV, DOH - NCRO
31
REYNIEL JOHN S. MENDIOLA
ENGINEER I
DARWIN K. DIMAANO
ENGINEER II
MARK ANDREW M. MARTINO
ENGINEERING AIDE - A
- GROUND FLOOR ISOMETRIC
SEWER LINE LAYOUT
- SECOND FLOOR ISOMETRIC
SEWER LINE LAYOUT
P - 5
19
U
P
U
P
T
O
R
O
O
F
D
E
C
K
C
R
100mm Ø PVC PIPE (VERTICAL)75mm Ø PVCVP (VERTICAL)
WCFDF
SS
100mm Ø PVCWP
50mm Ø PVCVACSS
CO
FDWCLAV
CO
75mm Ø PVCVP (VERTICAL)
100mm Ø PVC PIPE (VERTICAL)
F
WC
FDCO LAV
100mm Ø PVCWP
50mm Ø PVCVAC
LAV
UR
S
T
O
.
U
P
U
P
R
A
M
P
U
P
R
A
M
P
U
P
W
A
T
E
R
T
A
N
K
E
N
T
R
A
N
C
E
LAV
WC FD
FLAV
WCFD
F
SHOSDWC
LAV
F
FD
FFD
LAV
WC
LAV
WC
LAV
25mmØ GICWL (VERTICAL PIPE)
25mmØ GICWL
25mmØ GICWL (VERTICAL PIPE)
25mmØ GICWL
25mmØ GICWL 25mmØ GICWL
25mmØ GICWL
25mmØ GICWL
25mmØ GICWL
50mmØ GI PIPE (VERTICAL)
PUMP
50mmØ GI PIPE
50mmØ GI PIPE
50mmØ GI PIPE
TAP TO MAIN
WATER LINE
CVWM
GV
75mm Ø PVCVP (VERTICAL)
100mm Ø PVC PIPE (VERTICAL)
THIRD FLOOR ISOMETRIC SEWER LINE LAYOUT1
P - 6
METERS1:100SCALE
GROUND FLOOR ISOMETRIC WATER LINE LAYOUT2
P - 6
METERS1:100SCALE
FD
RENOVATION OF LYING-IN,
ESPERANZA HEALTH CENTER
AND LYING-IN-CLINIC
City of Manila
PROJECT NAME / LOCATION SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
NATIONAL CAPITAL REGION
NORTH MANILA ENGINEERING DISTRICT
OFFICE OF THE DISTRICT ENGINEER
Nagtahan, Sta. Mesa, Manila
JULIET M. FAJARDO
Chief, Planning and Design SectionEULOGIO C. DIMAFELIX
ENGINEER II
SHEET CONTENTS PREPARED BY
SURVEYED:
DESIGNED:
DRAWN:
CHECKED:
REVIEWED/SUBMITTED BY:
GERARDO T. DE GUZMAN
Assistant District Engineer
RECOMMENDING APPROVAL:
MEDEL F. CHUA
District Engineer
APPROVED BY: CONCURRED BY:
NILO C. MARAYAG
Engineer IV
Head, Engineering & Civil Works Cluster, DOH - NCRO
ARIEL I. VALENCIA, MD, MPH, CESO III
Director IV, DOH - NCRO
31
REYNIEL JOHN S. MENDIOLA
ENGINEER I
DARWIN K. DIMAANO
ENGINEER II
MARK ANDREW M. MARTINO
ENGINEERING AIDE - A
- THIRD FLOOR ISOMETRIC
SEWER LINE LAYOUT
- GROUND FLOOR ISOMETRIC
WATER LINE LAYOUT
P - 6
20
U
P
U
P
T
O
3
R
D
F
L
R
.
O
P
E
N
A
R
E
A
U
P
U
P
T
O
R
O
O
F
D
E
C
K
C
R
CO WCLAV
FLAV
WC
FD
LAV
FD
LAV
WCFD
F
FWCFD
WC FDF
SS
SS
FDWCLAV
F
WC
FDLAV
FDWC
LAV
LAV
UR
GV
25mmØ GICWL
25mmØ GICWL
25mmØ GICWL
25mmØ GICWL
25mmØ GICWL
25mmØ GICWL
25mmØ GICWL
25mmØ GICWL (VERTICAL PIPE)
F
25mmØ GICWL
25mmØ GICWL
25mmØ GICWL
25mmØ GICWL
25mmØ GICWL
25mmØ GICWL
25mmØ GICWL (VERTICAL PIPE)
25mmØ GICWL (VERTICAL PIPE)
25mmØ GICWL (VERTICAL PIPE)
50mmØ GI PIPE (VERTICAL)
F
LAV
LAV
F
TANK
25mmØ GICWL (VERTICAL PIPE)
25mmØ GICWL (VERTICAL PIPE)
25mmØ GICWL (VERTICAL PIPE)
SECOND FLOOR ISOMETRIC WATER LINE LAYOUT1
P - 7
METERS1:100SCALE
THIRD FLOOR ISOMETRIC WATER LINE LAYOUT2
P - 7
METERS1:100SCALE
RENOVATION OF LYING-IN,
ESPERANZA HEALTH CENTER
AND LYING-IN-CLINIC
City of Manila
PROJECT NAME / LOCATION SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
NATIONAL CAPITAL REGION
NORTH MANILA ENGINEERING DISTRICT
OFFICE OF THE DISTRICT ENGINEER
Nagtahan, Sta. Mesa, Manila
JULIET M. FAJARDO
Chief, Planning and Design SectionEULOGIO C. DIMAFELIX
ENGINEER II
SHEET CONTENTS PREPARED BY
SURVEYED:
DESIGNED:
DRAWN:
CHECKED:
REVIEWED/SUBMITTED BY:
GERARDO T. DE GUZMAN
Assistant District Engineer
RECOMMENDING APPROVAL:
MEDEL F. CHUA
District Engineer
APPROVED BY: CONCURRED BY:
NILO C. MARAYAG
Engineer IV
Head, Engineering & Civil Works Cluster, DOH - NCRO
ARIEL I. VALENCIA, MD, MPH, CESO III
Director IV, DOH - NCRO
31
REYNIEL JOHN S. MENDIOLA
ENGINEER I
DARWIN K. DIMAANO
ENGINEER II
MARK ANDREW M. MARTINO
ENGINEERING AIDE - A
- SECOND FLOOR ISOMETRIC
WATER LINE LAYOUT
- THIRD FLOOR ISOMETRIC
WATER LINE LAYOUT
P - 7
21
10
0
PVC
OUTLET
PVC
INLET
INLET
OUTLET
10
01
00
70
0
75
150400150
700
40
01
50
15
0
150400150
700
2% SLOPE
50
50
2% SLOPE
60
0 m
in
.
(V
AR
IA
BL
E)
DRAINAGE PIPE
150mm THK. CHB w / 100 mm
Ø REBARS HOR. EVERY 2 -
LAYERS
VERT. @ 600 mm O.C.
PLAN
SECTION
100 mm Ø PVCDS
CATCHBASIN DETAIL SECTION
SCALE METERS
5
P - 8
1:20
50
600
50
50 50
10
0
100 250250
3-10mmØ (E.W.)
10mmØ BAR HANDLE
500
COVER DETAIL
SCALE METERS
4
P - 8
1:20
MH MH
200 600 200
150
1100 150 700 150 1100 150
1000 3200
150
4650
90
05
06
00
50
90
0
15
02
50
01
50
28
00
6
A - 4
6
A - 4
2 - 10 mm Ø EXTRA BARS
TOP / BOTTOM ON
TWO PARALLEL SIDES
S-1a - 100mm THK. + FIN. SLAB w/
10 mm Ø REBARS @ 300 mm O.C.
BENT UP 2 OUT OF 3 @ L/4
FROM FACE SUPPORT BOTHWAYS
S2 - 100mm THK. + FIN. SLAB w/ 10mmØ
REBARS @ 300 mm O.C. BENT UP 2/3 OUT
@ L/4 FACE SUPPORT AND SHORT SPAN
10 mm Ø TEMP. BARS @ 300 mm EW
DETAIL PLAN OF SEPTIC TANK
SCALE METERS
1
P - 8
1:40
MH MH
12
51
55
03
501
00
VA
R.
10
0
21
25
NGL
600
150 1000 150 3200 150
WATER
LEVEL
150 700 150
4650
100 mm thk. SLAB w/
10 mm Ø REBARS @
300 mm BOTHWAYS
2 % SLOPE
DIGESTIVE CHAMBER
GRAVEL BEDDING
LEACHING
CHAMBER
PLASTERED w/ WATERPROOFING
COMPOUND OR APPLY ONE FACE
BITUMEN TAR
WALLS REINFORCEMENT
10 mm Ø VERT. & HOR. BARS
@ 200 mm Ø O.C. BOTHWAYS
INLET
AIR SPACE
150 x 300 mm RC BEAM w/ 2 - 16 mm Ø
TOP & BOT. REBARS & 10 mm Ø STIRRUPS
1 @ 50, 3 @ 100, REST @ 300 mm O.C.
100mm THK. + FIN. SLAB w/ 10 mm Ø REBARS
@ 200 mm O.C. BENT UP 2 OUT OF 3 @ L/4
FROM FACE SUPPORT BOTHWAYS
NGL
CO
MH
WATER LEVEL
2500
2800
150 150
10
0
10
0
100mm THK. + FIN. SLAB w/10 mm Ø
BENT UP 2 OUT OF 3 @L/4
FROM FACE SUPPORT BW
INLET
10 mm Ø REINFORCED
VERTICAL & HORIZONTAL
@ 200 mm O.C. BOTHWAYS
PLASTERED w/WATERPROOFING
COMPOUND OR APPLY ONE FACE
BITUMEN TAR
AIR SPACE
CROSS SECTION DETAIL
SCALE METERS
3
P - 8
1:40
100 mm thk. + FINISH SLAB w/ 10 mm Ø
REBARS @ 300 mm O.C. BOTHWAYS
12
51
55
03
501
00
VA
R.
10
0
21
25
LONGITUDINAL SECTION DETAIL
SCALE METERS
2
P - 8
1:40
LEGEND:
POLYVINYL CHLORIDE SOIL PIPE
POLYVINYL CHLORIDE VENT. ACROSS CEILING
POLYVINYL CHLORIDE VENT. PIPE
POLYVINYL CHLORIDE VENT. STACK
POLYVINYL CHLORIDE VENT THROUGH ROOF / WALL
POLYVINYL CHLORIDE WASTE PIPE
POLYVINYL CHLORIDE WASTE STACK
ROOF DRAIN
URINAL DRAIN
WATER CLOSET
LAVATORY
COUNTER SINK
CATCH BASIN
CONCRETE DRAIN PIPE
CLEAN OUT
CHECK VALVE
HOSE BIBB
FLOOR DRAIN
GALVANIZED IRON COLD WATER LINE (SCH. 40)
GALVANIZED IRON COLD WATER RISER (SCH. 40)
GATE VALVE
MANHOLE
POLYVINYL CHLORIDE DOWNSPOUT
POLYVINYL CHLORIDE DRAIN PIPE
PVCSP
PVCVAC
PVCVP
PVCVS
PVCVTR / W
PVCWP
PVCWS
RD
UD
WC
LAV
CS
CB
CDP
CO
CV
HB
FD
GICWL
GICWR
GV
MH
PVCDS
PVCDP
225 250 175
700
22
52
50
22
5
70
0
STEEL GRATING
225 250 225
700
10
50
50
10
0
STEEL GRATING
STEEL GRATING COVER
SCALE METERS
6
P - 8
1:20
SECTION
PLAN
4 - 10mm Ø BOTHWAYS
RENOVATION OF LYING-IN,
ESPERANZA HEALTH CENTER
AND LYING-IN-CLINIC
City of Manila
PROJECT NAME / LOCATION SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
NATIONAL CAPITAL REGION
NORTH MANILA ENGINEERING DISTRICT
OFFICE OF THE DISTRICT ENGINEER
Nagtahan, Sta. Mesa, Manila
JULIET M. FAJARDO
Chief, Planning and Design SectionEULOGIO C. DIMAFELIX
ENGINEER II
SHEET CONTENTS PREPARED BY
SURVEYED:
DESIGNED:
DRAWN:
CHECKED:
REVIEWED/SUBMITTED BY:
GERARDO T. DE GUZMAN
Assistant District Engineer
RECOMMENDING APPROVAL:
MEDEL F. CHUA
District Engineer
APPROVED BY: CONCURRED BY:
NILO C. MARAYAG
Engineer IV
Head, Engineering & Civil Works Cluster, DOH - NCRO
ARIEL I. VALENCIA, MD, MPH, CESO III
Director IV, DOH - NCRO
31
REYNIEL JOHN S. MENDIOLA
ENGINEER I
DARWIN K. DIMAANO
ENGINEER II
MARK ANDREW M. MARTINO
ENGINEERING AIDE - A
- DETAIL OF SEPTIC TANK
- DETAIL OF CATCHBASIN
- SPOT DETAIL SECTION
- COVER DETAIL
- STEEL GRATING COVER
P - 8
22