1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED IN ACCORDANCE WITH THE PROVISIONS OF THE PHILIPPINE PLUMBING CODE, THE NATIONAL BUILDING CODE AND THE RULES AND REGULATIONS OF THE LOCALITY. 2. COORDINATE THE DRAWINGS WITH OTHER RELATED DRAWING SPECIFICATIONS THE ENGINEER AND OR ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY OTHER DISCREPANCIES FOUND HEREIN. 3. ALL PIPES SHALL BE INSTALLED AS INDICATED ANY RELOCATION REQUIRED FOR PROPER EXECUTION OF PLUMBING WORKS SHALL BE WITH PROPER APPROVAL FROM THE ENGINEER AND OR ARCHITECT. 4. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN A ONE (1) PERCENT SLOPE MINIMUM UNLESS OTHERWISE SPECIFIED. 5. WATER SUPPLY PIPES TO FIXTURES SHALL BE SIZED IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS. 6. ALL BRANCHES OF FIXTURES OR GROUP OF FIXTURES SHALL BE PROVIDED WITH AIR CHAMBER MADE OF CAPPED VERTICAL EXTENSION PIPE NIPPLE. 7. ALL WATER LINES SHALL BE HYDROSTATICALLY TESTED AT 120 PSI FOR A PERIOD OF 24 HOURS BEFORE BURIED OR COVERED. ALL GALVANIZED IRON PIPES DIRECTLY IN CONTACT WITH THE SOIL SHALL BE PROVIDED WITH TWO (2) COATS OF ASPHALT AND WRAPPED WITH JUTE CLOTH AND SOAKED IN MELTED ASPHALT. 8. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT THE SITE AND COORDINATE THE WORK WITH THE SEWER AND STORM DRAINAGE LINE, EFFLUENT DISPOSAL POINT AND THE WATER LINE SERVICE. 9. ALL PIPES AND OTHER DIMENSIONS ARE IN MILIMETERS (mm) UNLESS OTHERWISE SPECIFIED. PLUMBING NOTES POLYVINYL CHLORIDE SOIL PIPE POLYVINYL CHLORIDE VENT. ACROSS CEILING POLYVINYL CHLORIDE VENT. PIPE POLYVINYL CHLORIDE VENT. STACK POLYVINYL CHLORIDE VENT THROUGH ROOF / WALL POLYVINYL CHLORIDE WASTE PIPE POLYVINYL CHLORIDE WASTE STACK ROOF DRAIN URINAL DRAIN WATER CLOSET LAVATORY COUNTER SINK CONCRETE DRAIN PIPE CLEAN OUT CHECK VALVE HOSE BIBB FLOOR DRAIN GALVANIZED IRON COLD WATER LINE (SCH. 40) GALVANIZED IRON COLD WATER RISER (SCH. 40) GATE VALVE MANHOLE POLYVINYL CHLORIDE DOWNSPOUT POLYVINYL CHLORIDE DRAIN PIPE PVCSP PVCVAC PVCVP PVCVS PVCVTR / W PVCWP PVCWS RD UD WC LAV CS CDP CO CV HB FD GICWL GICWR GV MH PVCDS PVCDP LEGEND VICINITY MAP 1 P - 1 NTS SCALE SITE DEVELOPMENT PLAN 2 P - 1 METERS 1:100 SCALE TERESA STREET VALENZUELA PROPOSED RENOVATION OF ESPERANZA HEALTH CENTER EXISTING CHAPEL / MPB AND COVERED COURT EFFLUENT CONNECT TO NEAREST SWERAGE SYSTEM TAP TO EXISTING DRAINAGE LINE SEPTIC TANK CV WM GV TAP TO MAIN WATER LINE - PLUMBING NOTES - LEGEND - VICINITY MAP - SITE DEVELOPMENT PLAN P - 1 15 RENOVATION OF LYING-IN, ESPERANZA HEALTH CENTER AND LYING-IN-CLINIC City of Manila PROJECT NAME / LOCATION SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NATIONAL CAPITAL REGION NORTH MANILA ENGINEERING DISTRICT OFFICE OF THE DISTRICT ENGINEER Nagtahan, Sta. Mesa, Manila JULIET M. FAJARDO Chief, Planning and Design Section EULOGIO C. DIMAFELIX ENGINEER II SHEET CONTENTS PREPARED BY SURVEYED: DESIGNED: DRAWN: CHECKED: REVIEWED/SUBMITTED BY: GERARDO T. DE GUZMAN Assistant District Engineer RECOMMENDING APPROVAL: MEDEL F. CHUA District Engineer APPROVED BY: CONCURRED BY: NILO C. MARAYAG Engineer IV Head, Engineering & Civil Works Cluster, DOH - NCRO ARIEL I. VALENCIA, MD, MPH, CESO III Director IV, DOH - NCRO 31 REYNIEL JOHN S. MENDIOLA ENGINEER I DARWIN K. DIMAANO ENGINEER II MARK ANDREW M. MARTINO ENGINEERING AIDE - A ESPERANZA HEALTH CENTER TERESA ST., BRGY. 592, ZONE 59, STA. MESA, MANILA

Transcript of PLUMBING NOTES LEGEND VICINITY MAP SITE ... - DPWH

1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE

EXECUTED IN ACCORDANCE WITH THE PROVISIONS OF THE

PHILIPPINE PLUMBING CODE, THE NATIONAL BUILDING CODE

AND THE RULES AND REGULATIONS OF THE LOCALITY.

2. COORDINATE THE DRAWINGS WITH OTHER RELATED

DRAWING SPECIFICATIONS THE ENGINEER AND OR ARCHITECT

SHALL BE NOTIFIED IMMEDIATELY OF ANY OTHER DISCREPANCIES

FOUND HEREIN.

3. ALL PIPES SHALL BE INSTALLED AS INDICATED ANY

RELOCATION REQUIRED FOR PROPER EXECUTION OF

PLUMBING WORKS SHALL BE WITH PROPER APPROVAL

FROM THE ENGINEER AND OR ARCHITECT.

4. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL

MAINTAIN A ONE (1) PERCENT SLOPE MINIMUM UNLESS

OTHERWISE SPECIFIED.

5. WATER SUPPLY PIPES TO FIXTURES SHALL BE SIZED IN

ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS.

6. ALL BRANCHES OF FIXTURES OR GROUP OF FIXTURES SHALL

BE PROVIDED WITH AIR CHAMBER MADE OF CAPPED VERTICAL

EXTENSION PIPE NIPPLE.

7. ALL WATER LINES SHALL BE HYDROSTATICALLY TESTED AT

120 PSI FOR A PERIOD OF 24 HOURS BEFORE BURIED OR

COVERED. ALL GALVANIZED IRON PIPES DIRECTLY IN

CONTACT WITH THE SOIL SHALL BE PROVIDED WITH TWO (2) COATS

OF ASPHALT AND WRAPPED WITH JUTE CLOTH AND SOAKED IN

MELTED ASPHALT.

8. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT

THE SITE AND COORDINATE THE WORK WITH THE SEWER AND

STORM DRAINAGE LINE, EFFLUENT DISPOSAL POINT AND THE

WATER LINE SERVICE.

9. ALL PIPES AND OTHER DIMENSIONS ARE IN MILIMETERS (mm)

UNLESS OTHERWISE SPECIFIED.

PLUMBING NOTES

POLYVINYL CHLORIDE SOIL PIPE

POLYVINYL CHLORIDE VENT. ACROSS CEILING

POLYVINYL CHLORIDE VENT. PIPE

POLYVINYL CHLORIDE VENT. STACK

POLYVINYL CHLORIDE VENT THROUGH ROOF / WALL

POLYVINYL CHLORIDE WASTE PIPE

POLYVINYL CHLORIDE WASTE STACK

ROOF DRAIN

URINAL DRAIN

WATER CLOSET

LAVATORY

COUNTER SINK

CONCRETE DRAIN PIPE

CLEAN OUT

CHECK VALVE

HOSE BIBB

FLOOR DRAIN

GALVANIZED IRON COLD WATER LINE (SCH. 40)

GALVANIZED IRON COLD WATER RISER (SCH. 40)

GATE VALVE

MANHOLE

POLYVINYL CHLORIDE DOWNSPOUT

POLYVINYL CHLORIDE DRAIN PIPE

PVCSP

PVCVAC

PVCVP

PVCVS

PVCVTR / W

PVCWP

PVCWS

RD

UD

WC

LAV

CS

CDP

CO

CV

HB

FD

GICWL

GICWR

GV

MH

PVCDS

PVCDP

LEGEND

VICINITY MAP1

P - 1

NTSSCALE

SITE DEVELOPMENT PLAN2

P - 1

METERS1:100SCALE

TERESA STREET

VA

LE

NZ

UE

LA

PROPOSED

RENOVATION OF

ESPERANZA HEALTH

CENTER

EXISTING CHAPEL / MPB

AND COVERED COURTEFFLUENTCONNECT TO NEAREST

SWERAGE SYSTEM

TAP TO EXISTINGDRAINAGE LINE

SEPTIC TANK

CVWMGV

TAP TO MAINWATER LINE

- PLUMBING NOTES

- LEGEND

- VICINITY MAP

- SITE DEVELOPMENT PLAN

P - 1

15

RENOVATION OF LYING-IN,

ESPERANZA HEALTH CENTER

AND LYING-IN-CLINIC

City of Manila

PROJECT NAME / LOCATION SHEET NO.

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

NATIONAL CAPITAL REGION

NORTH MANILA ENGINEERING DISTRICT

OFFICE OF THE DISTRICT ENGINEER

Nagtahan, Sta. Mesa, Manila

JULIET M. FAJARDO

Chief, Planning and Design SectionEULOGIO C. DIMAFELIX

ENGINEER II

SHEET CONTENTS PREPARED BY

SURVEYED:

DESIGNED:

DRAWN:

CHECKED:

REVIEWED/SUBMITTED BY:

GERARDO T. DE GUZMAN

Assistant District Engineer

RECOMMENDING APPROVAL:

MEDEL F. CHUA

District Engineer

APPROVED BY: CONCURRED BY:

NILO C. MARAYAG

Engineer IV

Head, Engineering & Civil Works Cluster, DOH - NCRO

ARIEL I. VALENCIA, MD, MPH, CESO III

Director IV, DOH - NCRO

31

REYNIEL JOHN S. MENDIOLA

ENGINEER I

DARWIN K. DIMAANO

ENGINEER II

MARK ANDREW M. MARTINO

ENGINEERING AIDE - A

ESPERANZA HEALTH CENTER

TERESA ST., BRGY. 592, ZONE 59,

STA. MESA, MANILA

STO.

UP

UP

RA

MP

U

P

RAMP UP

WATER TANK

ENTRANCE

UP

UP

TO 3RD

FLR.

OPEN AREA

LAVWCFD

F

LAVWCFD

F

SHO

SDWC

LAV

FFD

FFD

LAVWC

LAVWC

LAV

CO CO

CO

CO

CO

100mm Ø PVC PIPE (VERTICAL)

75mm Ø PVCVP (VERTICAL)

100m

m Ø

PVCS

P10

0mm

Ø PV

CSP

50mm

Ø P

VCVA

C50

mm Ø

PVC

VAC

75mm Ø PVCWP

75mm Ø PVCSP

75mm Ø PVCVAC

100mm Ø PVC PIPE (VERTICAL)

75mm Ø PVCVP (VERTICAL)50mm Ø PVCVAC100mm Ø PVCSP

50mm

Ø P

VCVA

C10

0mm

Ø PV

CSP

75mm Ø PVCWP100mm Ø PVCSP

75mm Ø PVCWP

100mm Ø PVCSP

50mm Ø PVCVAC

100mm Ø PVC PIPE (VERTICAL)

75mm Ø PVCVP (VERTICAL)

CO

100mm Ø PVCWP

50mm Ø PVCVAP

WC

LAV

F

CO F

LAV

WC

100m

m Ø

PVCW

P

50mm

Ø P

VCVA

C

FD

LAV

FD

CO

LAV

WCFDLAVF

CO

100m

m Ø

PVCW

P50

mm Ø

PVC

VAC

100mm Ø PVCWP

50mm Ø PVCVAC

COFWC

FDLAV

75mm Ø PVCVP (VERTICAL)

100mm Ø PVC PIPE (VERTICAL)

100m

m Ø

PVCW

P

50mm

Ø P

VCVA

C

100mm Ø PVCWP50mm Ø PVCVAC

100mm Ø PVC PIPE (VERTICAL)

CO

FFD

WC

LAV

EFFLUENTCONNECT TO NEAREST

SWERAGE SYSTEM

CO

CO

CO

MH

MH

GROUND FLOOR SEWER LINE LAYOUT1

P - 2

METERS1:100SCALE

SECOND FLOOR SEWER LINE LAYOUT2

P - 2

METERS1:100SCALE

150mm Ø PVC 150mm Ø PVC

150mm Ø PVC 150mm Ø PVC

150m

m Ø

PVC

150m

m Ø

PVC

150m

m Ø

PVC

150m

m Ø

PVC

TAP TO EXISTINGDRAINAGE LINE

PVCDS

100mmØ DS (TYP.)

CB CB CB

CB CB CB

CB

CB

CB

CB

PVCDS PVCDS

PVCDS

PVCDS PVCDS PVCDS

RENOVATION OF LYING-IN,

ESPERANZA HEALTH CENTER

AND LYING-IN-CLINIC

City of Manila

PROJECT NAME / LOCATION SHEET NO.

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

NATIONAL CAPITAL REGION

NORTH MANILA ENGINEERING DISTRICT

OFFICE OF THE DISTRICT ENGINEER

Nagtahan, Sta. Mesa, Manila

JULIET M. FAJARDO

Chief, Planning and Design SectionEULOGIO C. DIMAFELIX

ENGINEER II

SHEET CONTENTS PREPARED BY

SURVEYED:

DESIGNED:

DRAWN:

CHECKED:

REVIEWED/SUBMITTED BY:

GERARDO T. DE GUZMAN

Assistant District Engineer

RECOMMENDING APPROVAL:

MEDEL F. CHUA

District Engineer

APPROVED BY: CONCURRED BY:

NILO C. MARAYAG

Engineer IV

Head, Engineering & Civil Works Cluster, DOH - NCRO

ARIEL I. VALENCIA, MD, MPH, CESO III

Director IV, DOH - NCRO

31

REYNIEL JOHN S. MENDIOLA

ENGINEER I

DARWIN K. DIMAANO

ENGINEER II

MARK ANDREW M. MARTINO

ENGINEERING AIDE - A

- GROUND FLOOR SEWER LINE

LAYOUT

- SECOND FLOOR SEWER LINE

LAYOUT

P - 2

16

AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
13
AutoCAD SHX Text
12
AutoCAD SHX Text
11
AutoCAD SHX Text
14

UP

UP

TO ROOF

DECK

CR

100mm Ø PVC PIPE (VERTICAL)

75mm Ø PVCVP (VERTICAL)

100mm Ø PVC PIPE (VERTICAL)

75mm Ø PVCVP (VERTICAL)

WCFD

F

SS

100m

m Ø

PVCW

P

50mm

Ø P

VCVA

C

SS

CO

FDWC

LAV

CO

75mm Ø PVCVP (VERTICAL)

100mm Ø PVC PIPE (VERTICAL)

F

WC

FD

CO

LAV

100m

m Ø

PVCW

P

50mm

Ø P

VCVA

C

LAV

UR

STO.

UP

UP

RA

MP

U

P

RAMP UP

WATER TANK

ENTRANCE

LAVWC

FD

F

LAVWC

FD

F

SHO

SDWC

LAV

FFD

FFD

LAVWC

LAVWC

LAV

25mmØ GICWL (VERTICAL PIPE)

25mm

Ø GI

CWL

25mmØ GICWL (VERTICAL PIPE)

25mm

Ø GI

CWL

25mm

Ø GI

CWL

25mm

Ø GI

CWL

25mmØ GICWL

25mmØ GICWL

25mmØ GICWL

50mmØ GI PIPE (VERTICAL)

PUMPTANK

50mmØ GI PIPE

50mm

Ø GI

PIP

E50

mmØ

GI P

IPE

TAP TO MAINWATER LINE

CVWMGV

THIRD FLOOR SEWER LINE LAYOUT1

P - 3

METERS1:100SCALE

GROUND FLOOR WATER LINE LAYOUT2

P - 3

METERS1:100SCALE

RENOVATION OF LYING-IN,

ESPERANZA HEALTH CENTER

AND LYING-IN-CLINIC

City of Manila

PROJECT NAME / LOCATION SHEET NO.

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

NATIONAL CAPITAL REGION

NORTH MANILA ENGINEERING DISTRICT

OFFICE OF THE DISTRICT ENGINEER

Nagtahan, Sta. Mesa, Manila

JULIET M. FAJARDO

Chief, Planning and Design SectionEULOGIO C. DIMAFELIX

ENGINEER II

SHEET CONTENTS PREPARED BY

SURVEYED:

DESIGNED:

DRAWN:

CHECKED:

REVIEWED/SUBMITTED BY:

GERARDO T. DE GUZMAN

Assistant District Engineer

RECOMMENDING APPROVAL:

MEDEL F. CHUA

District Engineer

APPROVED BY: CONCURRED BY:

NILO C. MARAYAG

Engineer IV

Head, Engineering & Civil Works Cluster, DOH - NCRO

ARIEL I. VALENCIA, MD, MPH, CESO III

Director IV, DOH - NCRO

31

REYNIEL JOHN S. MENDIOLA

ENGINEER I

DARWIN K. DIMAANO

ENGINEER II

MARK ANDREW M. MARTINO

ENGINEERING AIDE - A

- THIRD FLOOR SEWER LINE

LAYOUT

- GROUND FLOOR WATER LINE

LAYOUT

P - 3

17

AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
13
AutoCAD SHX Text
12
AutoCAD SHX Text
11
AutoCAD SHX Text
14

UP

UP

TO 3RD

FLR.

OPEN AREA

UP

UP

TO ROOF

DECK

CR

CO

WC

LAV

F

F

LAV

WC

FD

LAV

FD

LAV

WCFDLAV

F

FWC

FDLAV

WCFD

F

SS

SS

FDWC

LAV

F

WC

FD

LAV

FD

WC

LAV

LAV

UR

GV

25mm

Ø GI

CWL

25mmØ GICWL 25mmØ GICWL

25mm

Ø GI

CWL

25mm

Ø GI

CWL

25mmØ GICWL

25mmØ GICWL

TANK

25mmØ GICWL (VERTICAL PIPE)25mmØ GICWL (VERTICAL PIPE)

25mmØ GICWL (VERTICAL PIPE)

F

25mmØ GICWL (VERTICAL PIPE)

25mmØ GICWL

25mm

Ø GI

CWL

25mm

Ø GI

CWL

25mm

Ø GI

CWL

25mm

Ø GI

CWL

25mmØ GICWL

25mmØ GICWL (VERTICAL PIPE)

25mmØ GICWL (VERTICAL PIPE)

25mmØ GICWL (VERTICAL PIPE)

50mmØ GI PIPE (VERTICAL)

SECOND FLOOR WATER LINE LAYOUT1

P - 4

METERS1:100SCALE

THIRD FLOOR WATER LINE LAYOUT1

P - 4

METERS1:100SCALE

RENOVATION OF LYING-IN,

ESPERANZA HEALTH CENTER

AND LYING-IN-CLINIC

City of Manila

PROJECT NAME / LOCATION SHEET NO.

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

NATIONAL CAPITAL REGION

NORTH MANILA ENGINEERING DISTRICT

OFFICE OF THE DISTRICT ENGINEER

Nagtahan, Sta. Mesa, Manila

JULIET M. FAJARDO

Chief, Planning and Design SectionEULOGIO C. DIMAFELIX

ENGINEER II

SHEET CONTENTS PREPARED BY

SURVEYED:

DESIGNED:

DRAWN:

CHECKED:

REVIEWED/SUBMITTED BY:

GERARDO T. DE GUZMAN

Assistant District Engineer

RECOMMENDING APPROVAL:

MEDEL F. CHUA

District Engineer

APPROVED BY: CONCURRED BY:

NILO C. MARAYAG

Engineer IV

Head, Engineering & Civil Works Cluster, DOH - NCRO

ARIEL I. VALENCIA, MD, MPH, CESO III

Director IV, DOH - NCRO

31

REYNIEL JOHN S. MENDIOLA

ENGINEER I

DARWIN K. DIMAANO

ENGINEER II

MARK ANDREW M. MARTINO

ENGINEERING AIDE - A

- SECOND FLOOR WATER LINE

LAYOUT

- THIRD FLOOR WATER LINE

LAYOUT

P - 4

18

S

T

O

.

U

P

U

P

R

A

M

P

U

P

R

A

M

P

U

P

W

A

T

E

R

T

A

N

K

E

N

T

R

A

N

C

E

U

P

U

P

T

O

3

R

D

F

L

R

.

O

P

E

N

A

R

E

A

LAVWC FDF

LAV

WCFD

F

SHOSDWC

LAV

FFD

FFD

LAV

WC

LAV

WC

LAV

CO

CO

CO

CO

CO

100mm Ø PVCSP

100mm Ø PVCSP

50mm Ø PVCVAC

50mm Ø PVCVAC

75mm Ø PVCWP

75mm Ø PVCSP

75mm Ø PVCVAC

100mm Ø PVC PIPE (VERTICAL)

75mm Ø PVCVP (VERTICAL) 50mm Ø PVCVAC

100mm Ø PVCSP

50mm Ø PVCVAC

100mm Ø PVCSP

75mm Ø PVCWP

100mm Ø PVCSP

75mm Ø PVCWP

100mm Ø PVCSP

50mm Ø PVCVAC

100mm Ø PVC PIPE (VERTICAL)

75mm Ø PVCVP (VERTICAL)CO WC

LAVF

COF

LAV

WC

100mm Ø PVCWP

50mm Ø PVCVAC

FD

LAV

FD

CO

LAV

WCFDLAV

FCO

100mm Ø PVCWP

50mm Ø PVCVAC

100mm Ø PVCWP

50mm Ø PVCVAC

CO

FWCFD

LAV

75mm Ø PVCVP (VERTICAL)

100mm Ø PVC PIPE (VERTICAL)

100mm Ø PVCWP

50mm Ø PVCVAC

100mm Ø PVCWP

50mm Ø PVCVAC

100mm Ø PVC PIPE (VERTICAL)

FFDWC

LAV

EFFLUENT

CONNECT TO NEAREST

SWERAGE SYSTEMCOCO

CO

MHMH

CO

100mm Ø PVC PIPE (VERTICAL)

75mm Ø PVCVP (VERTICAL)

GROUND FLOOR ISOMETRIC SEWER LINE LAYOUT1

P - 5

METERS1:100SCALE

SECOND FLOOR ISOMETRIC SEWER LINE LAYOUT2

P - 5

METERS1:100SCALE

150mm Ø PVC

150mm Ø PVC

150mm Ø PVC

150mm Ø PVC

150mm Ø PVC

150mm Ø PVC

150mm Ø PVC

TAP TO EXISTING

DRAINAGE LINE

PVCDS

100mmØ DS (TYP.) 150mm Ø PVC

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

PVCDS

PVCDS

PVCDS

PVCDS

PVCDS

PVCDS

FD

FD

RENOVATION OF LYING-IN,

ESPERANZA HEALTH CENTER

AND LYING-IN-CLINIC

City of Manila

PROJECT NAME / LOCATION SHEET NO.

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

NATIONAL CAPITAL REGION

NORTH MANILA ENGINEERING DISTRICT

OFFICE OF THE DISTRICT ENGINEER

Nagtahan, Sta. Mesa, Manila

JULIET M. FAJARDO

Chief, Planning and Design SectionEULOGIO C. DIMAFELIX

ENGINEER II

SHEET CONTENTS PREPARED BY

SURVEYED:

DESIGNED:

DRAWN:

CHECKED:

REVIEWED/SUBMITTED BY:

GERARDO T. DE GUZMAN

Assistant District Engineer

RECOMMENDING APPROVAL:

MEDEL F. CHUA

District Engineer

APPROVED BY: CONCURRED BY:

NILO C. MARAYAG

Engineer IV

Head, Engineering & Civil Works Cluster, DOH - NCRO

ARIEL I. VALENCIA, MD, MPH, CESO III

Director IV, DOH - NCRO

31

REYNIEL JOHN S. MENDIOLA

ENGINEER I

DARWIN K. DIMAANO

ENGINEER II

MARK ANDREW M. MARTINO

ENGINEERING AIDE - A

- GROUND FLOOR ISOMETRIC

SEWER LINE LAYOUT

- SECOND FLOOR ISOMETRIC

SEWER LINE LAYOUT

P - 5

19

AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
13
AutoCAD SHX Text
12
AutoCAD SHX Text
11
AutoCAD SHX Text
14

U

P

U

P

T

O

R

O

O

F

D

E

C

K

C

R

100mm Ø PVC PIPE (VERTICAL)75mm Ø PVCVP (VERTICAL)

WCFDF

SS

100mm Ø PVCWP

50mm Ø PVCVACSS

CO

FDWCLAV

CO

75mm Ø PVCVP (VERTICAL)

100mm Ø PVC PIPE (VERTICAL)

F

WC

FDCO LAV

100mm Ø PVCWP

50mm Ø PVCVAC

LAV

UR

S

T

O

.

U

P

U

P

R

A

M

P

U

P

R

A

M

P

U

P

W

A

T

E

R

T

A

N

K

E

N

T

R

A

N

C

E

LAV

WC FD

FLAV

WCFD

F

SHOSDWC

LAV

F

FD

FFD

LAV

WC

LAV

WC

LAV

25mmØ GICWL (VERTICAL PIPE)

25mmØ GICWL

25mmØ GICWL (VERTICAL PIPE)

25mmØ GICWL

25mmØ GICWL 25mmØ GICWL

25mmØ GICWL

25mmØ GICWL

25mmØ GICWL

50mmØ GI PIPE (VERTICAL)

PUMP

50mmØ GI PIPE

50mmØ GI PIPE

50mmØ GI PIPE

TAP TO MAIN

WATER LINE

CVWM

GV

75mm Ø PVCVP (VERTICAL)

100mm Ø PVC PIPE (VERTICAL)

THIRD FLOOR ISOMETRIC SEWER LINE LAYOUT1

P - 6

METERS1:100SCALE

GROUND FLOOR ISOMETRIC WATER LINE LAYOUT2

P - 6

METERS1:100SCALE

FD

RENOVATION OF LYING-IN,

ESPERANZA HEALTH CENTER

AND LYING-IN-CLINIC

City of Manila

PROJECT NAME / LOCATION SHEET NO.

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

NATIONAL CAPITAL REGION

NORTH MANILA ENGINEERING DISTRICT

OFFICE OF THE DISTRICT ENGINEER

Nagtahan, Sta. Mesa, Manila

JULIET M. FAJARDO

Chief, Planning and Design SectionEULOGIO C. DIMAFELIX

ENGINEER II

SHEET CONTENTS PREPARED BY

SURVEYED:

DESIGNED:

DRAWN:

CHECKED:

REVIEWED/SUBMITTED BY:

GERARDO T. DE GUZMAN

Assistant District Engineer

RECOMMENDING APPROVAL:

MEDEL F. CHUA

District Engineer

APPROVED BY: CONCURRED BY:

NILO C. MARAYAG

Engineer IV

Head, Engineering & Civil Works Cluster, DOH - NCRO

ARIEL I. VALENCIA, MD, MPH, CESO III

Director IV, DOH - NCRO

31

REYNIEL JOHN S. MENDIOLA

ENGINEER I

DARWIN K. DIMAANO

ENGINEER II

MARK ANDREW M. MARTINO

ENGINEERING AIDE - A

- THIRD FLOOR ISOMETRIC

SEWER LINE LAYOUT

- GROUND FLOOR ISOMETRIC

WATER LINE LAYOUT

P - 6

20

AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
13
AutoCAD SHX Text
12
AutoCAD SHX Text
11
AutoCAD SHX Text
14

U

P

U

P

T

O

3

R

D

F

L

R

.

O

P

E

N

A

R

E

A

U

P

U

P

T

O

R

O

O

F

D

E

C

K

C

R

CO WCLAV

FLAV

WC

FD

LAV

FD

LAV

WCFD

F

FWCFD

WC FDF

SS

SS

FDWCLAV

F

WC

FDLAV

FDWC

LAV

LAV

UR

GV

25mmØ GICWL

25mmØ GICWL

25mmØ GICWL

25mmØ GICWL

25mmØ GICWL

25mmØ GICWL

25mmØ GICWL

25mmØ GICWL (VERTICAL PIPE)

F

25mmØ GICWL

25mmØ GICWL

25mmØ GICWL

25mmØ GICWL

25mmØ GICWL

25mmØ GICWL

25mmØ GICWL (VERTICAL PIPE)

25mmØ GICWL (VERTICAL PIPE)

25mmØ GICWL (VERTICAL PIPE)

50mmØ GI PIPE (VERTICAL)

F

LAV

LAV

F

TANK

25mmØ GICWL (VERTICAL PIPE)

25mmØ GICWL (VERTICAL PIPE)

25mmØ GICWL (VERTICAL PIPE)

SECOND FLOOR ISOMETRIC WATER LINE LAYOUT1

P - 7

METERS1:100SCALE

THIRD FLOOR ISOMETRIC WATER LINE LAYOUT2

P - 7

METERS1:100SCALE

RENOVATION OF LYING-IN,

ESPERANZA HEALTH CENTER

AND LYING-IN-CLINIC

City of Manila

PROJECT NAME / LOCATION SHEET NO.

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

NATIONAL CAPITAL REGION

NORTH MANILA ENGINEERING DISTRICT

OFFICE OF THE DISTRICT ENGINEER

Nagtahan, Sta. Mesa, Manila

JULIET M. FAJARDO

Chief, Planning and Design SectionEULOGIO C. DIMAFELIX

ENGINEER II

SHEET CONTENTS PREPARED BY

SURVEYED:

DESIGNED:

DRAWN:

CHECKED:

REVIEWED/SUBMITTED BY:

GERARDO T. DE GUZMAN

Assistant District Engineer

RECOMMENDING APPROVAL:

MEDEL F. CHUA

District Engineer

APPROVED BY: CONCURRED BY:

NILO C. MARAYAG

Engineer IV

Head, Engineering & Civil Works Cluster, DOH - NCRO

ARIEL I. VALENCIA, MD, MPH, CESO III

Director IV, DOH - NCRO

31

REYNIEL JOHN S. MENDIOLA

ENGINEER I

DARWIN K. DIMAANO

ENGINEER II

MARK ANDREW M. MARTINO

ENGINEERING AIDE - A

- SECOND FLOOR ISOMETRIC

WATER LINE LAYOUT

- THIRD FLOOR ISOMETRIC

WATER LINE LAYOUT

P - 7

21

10

0

PVC

OUTLET

PVC

INLET

INLET

OUTLET

10

01

00

70

0

75

150400150

700

40

01

50

15

0

150400150

700

2% SLOPE

50

50

2% SLOPE

60

0 m

in

.

(V

AR

IA

BL

E)

DRAINAGE PIPE

150mm THK. CHB w / 100 mm

Ø REBARS HOR. EVERY 2 -

LAYERS

VERT. @ 600 mm O.C.

PLAN

SECTION

100 mm Ø PVCDS

CATCHBASIN DETAIL SECTION

SCALE METERS

5

P - 8

1:20

50

600

50

50 50

10

0

100 250250

3-10mmØ (E.W.)

10mmØ BAR HANDLE

500

COVER DETAIL

SCALE METERS

4

P - 8

1:20

MH MH

200 600 200

150

1100 150 700 150 1100 150

1000 3200

150

4650

90

05

06

00

50

90

0

15

02

50

01

50

28

00

6

A - 4

6

A - 4

2 - 10 mm Ø EXTRA BARS

TOP / BOTTOM ON

TWO PARALLEL SIDES

S-1a - 100mm THK. + FIN. SLAB w/

10 mm Ø REBARS @ 300 mm O.C.

BENT UP 2 OUT OF 3 @ L/4

FROM FACE SUPPORT BOTHWAYS

S2 - 100mm THK. + FIN. SLAB w/ 10mmØ

REBARS @ 300 mm O.C. BENT UP 2/3 OUT

@ L/4 FACE SUPPORT AND SHORT SPAN

10 mm Ø TEMP. BARS @ 300 mm EW

DETAIL PLAN OF SEPTIC TANK

SCALE METERS

1

P - 8

1:40

MH MH

12

51

55

03

501

00

VA

R.

10

0

21

25

NGL

600

150 1000 150 3200 150

WATER

LEVEL

150 700 150

4650

100 mm thk. SLAB w/

10 mm Ø REBARS @

300 mm BOTHWAYS

2 % SLOPE

DIGESTIVE CHAMBER

GRAVEL BEDDING

LEACHING

CHAMBER

PLASTERED w/ WATERPROOFING

COMPOUND OR APPLY ONE FACE

BITUMEN TAR

WALLS REINFORCEMENT

10 mm Ø VERT. & HOR. BARS

@ 200 mm Ø O.C. BOTHWAYS

INLET

AIR SPACE

150 x 300 mm RC BEAM w/ 2 - 16 mm Ø

TOP & BOT. REBARS & 10 mm Ø STIRRUPS

1 @ 50, 3 @ 100, REST @ 300 mm O.C.

100mm THK. + FIN. SLAB w/ 10 mm Ø REBARS

@ 200 mm O.C. BENT UP 2 OUT OF 3 @ L/4

FROM FACE SUPPORT BOTHWAYS

NGL

CO

MH

WATER LEVEL

2500

2800

150 150

10

0

10

0

100mm THK. + FIN. SLAB w/10 mm Ø

BENT UP 2 OUT OF 3 @L/4

FROM FACE SUPPORT BW

INLET

10 mm Ø REINFORCED

VERTICAL & HORIZONTAL

@ 200 mm O.C. BOTHWAYS

PLASTERED w/WATERPROOFING

COMPOUND OR APPLY ONE FACE

BITUMEN TAR

AIR SPACE

CROSS SECTION DETAIL

SCALE METERS

3

P - 8

1:40

100 mm thk. + FINISH SLAB w/ 10 mm Ø

REBARS @ 300 mm O.C. BOTHWAYS

12

51

55

03

501

00

VA

R.

10

0

21

25

LONGITUDINAL SECTION DETAIL

SCALE METERS

2

P - 8

1:40

LEGEND:

POLYVINYL CHLORIDE SOIL PIPE

POLYVINYL CHLORIDE VENT. ACROSS CEILING

POLYVINYL CHLORIDE VENT. PIPE

POLYVINYL CHLORIDE VENT. STACK

POLYVINYL CHLORIDE VENT THROUGH ROOF / WALL

POLYVINYL CHLORIDE WASTE PIPE

POLYVINYL CHLORIDE WASTE STACK

ROOF DRAIN

URINAL DRAIN

WATER CLOSET

LAVATORY

COUNTER SINK

CATCH BASIN

CONCRETE DRAIN PIPE

CLEAN OUT

CHECK VALVE

HOSE BIBB

FLOOR DRAIN

GALVANIZED IRON COLD WATER LINE (SCH. 40)

GALVANIZED IRON COLD WATER RISER (SCH. 40)

GATE VALVE

MANHOLE

POLYVINYL CHLORIDE DOWNSPOUT

POLYVINYL CHLORIDE DRAIN PIPE

PVCSP

PVCVAC

PVCVP

PVCVS

PVCVTR / W

PVCWP

PVCWS

RD

UD

WC

LAV

CS

CB

CDP

CO

CV

HB

FD

GICWL

GICWR

GV

MH

PVCDS

PVCDP

225 250 175

700

22

52

50

22

5

70

0

STEEL GRATING

225 250 225

700

10

50

50

10

0

STEEL GRATING

STEEL GRATING COVER

SCALE METERS

6

P - 8

1:20

SECTION

PLAN

4 - 10mm Ø BOTHWAYS

RENOVATION OF LYING-IN,

ESPERANZA HEALTH CENTER

AND LYING-IN-CLINIC

City of Manila

PROJECT NAME / LOCATION SHEET NO.

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

NATIONAL CAPITAL REGION

NORTH MANILA ENGINEERING DISTRICT

OFFICE OF THE DISTRICT ENGINEER

Nagtahan, Sta. Mesa, Manila

JULIET M. FAJARDO

Chief, Planning and Design SectionEULOGIO C. DIMAFELIX

ENGINEER II

SHEET CONTENTS PREPARED BY

SURVEYED:

DESIGNED:

DRAWN:

CHECKED:

REVIEWED/SUBMITTED BY:

GERARDO T. DE GUZMAN

Assistant District Engineer

RECOMMENDING APPROVAL:

MEDEL F. CHUA

District Engineer

APPROVED BY: CONCURRED BY:

NILO C. MARAYAG

Engineer IV

Head, Engineering & Civil Works Cluster, DOH - NCRO

ARIEL I. VALENCIA, MD, MPH, CESO III

Director IV, DOH - NCRO

31

REYNIEL JOHN S. MENDIOLA

ENGINEER I

DARWIN K. DIMAANO

ENGINEER II

MARK ANDREW M. MARTINO

ENGINEERING AIDE - A

- DETAIL OF SEPTIC TANK

- DETAIL OF CATCHBASIN

- SPOT DETAIL SECTION

- COVER DETAIL

- STEEL GRATING COVER

P - 8

22