KOMBINASI :
1.
U =
1,4D
2.
U = 1,2D +
1,6L3. U = 1,38D + 1,0L + 0,39QEX + 1,3QEY4. U = 1,30D + 1,0L - 0,39QEX + 1,3QEY5. U = 1,10D + 1,0L + 0,39QEX - 1,3QEY6. U = 1,02D + 1,0L - 0,39QEX - 1,3QEY7. U = 1,38D + 1,0L +1,3QEX + 0,39 QEY8. U = 1,30D + 1,0L +1,3QEX - 0,39 QEY9. U = 1,10D + 1,0L -1,3QEX + 0,39 QEY10
. U = 1,02D + 1,0L -1,3QEX - 0,39 QEY11
. U = 0,72D + 0,4QEX + 1,3QEY12
. U = 0,80D - 0,4QEX + 1,3QEY13
. U = 1,0D + 0,4QEX - 1,3QEY14
. U = 1,08D - 0,4QEX - 1,3QEY15
. U = 0,72D +1,3QEX +0,39QEY16
. U = 1,00D - 1,3QEX + 0,39QEY17 U = 0,80D + 1,3QEX - 0,39QEY
.18
. U = 1,08D - 1,3QEX - 0,39QEY
Tabel Momen Maksimum Terfaktor Balok B47
Jenis
Balok
Momen Tumpuan Momen Lapangan
M⁻ (KNm) M⁺ (KNm) M⁻ (KNm) M⁺ (KNm)B47 342.192 0.791 0 304.12
Data Propertis balok pada elemen B47 :
f'c Ec fy Es εs b hMpa Mpa Mpa Mpa fy/Es mm mm
25.0 23500 360 200000 0.00180 400600
1. Perancangan Tulangan Lentur
a. Menentukan Tulangan Tumpuan
1) Momen tumpuan negatif
Mu⁻ = 342.192 kNm
Tabel Penulangan
P Øsengkang Øtul-1 Jml tul-1 As ds dmm mm mm bh mm² mm mm
25 10 19 82267.0
8 25 575
Cb = 600
600+fy×d
= 600600+360
×575
= 359.38 mm
Co = 0,75×cb
= 0,75×359.38= 270 mm
ao = β1×co
= 0,85×270= 229 mm
Co = 0,85×αo×b×f'c
= 0,85×229×400×25= 1947363.281 N
Mno = Co×(d−ao
2 )=1947363.281×(575−
2292 )
= 896661901.5 Nmm
= 896.661 kNm
Mro = ∅×Mno= 0,8×896.661= 717.329 kNm
717.329 kNm > Mu- = 342.192 kNm (cukup tulangan
tunggal)
a)Penulangan Perlu (As perlu)
Rn =Mu
(∅×b×d2)
= 342192000
(0,80×400×5752 )
= 3,234
m = fy
(0,85× [f' ] )
= 360
(0,85×25)
= 16,941
𝜌b = (0,85×f'c )
fy×β1×
600(600+fy )
= (0,85×25)
360×0,85× 600
(600+360 )
= 0,03136
𝜌min = 1,4fy
= 1,4360
= 0,00389
𝜌max = 0,75×ρb
= 0,75×0,314= 0,0235
𝜌perlu = 1m׿¿
= 116,941׿¿
= 0,0098
b)Syarat Rasio tulangan
𝜌min ≤ 𝜌perlu ≤ 𝜌maks
0,00389 ≤ 0,0098 ≤ 0,0235
Yang dipakai 𝜌perlu = 0,0098
𝜌maks < 𝜌b
0,0235 < 0,03136 (Daktail)
As perlu = ρperlu×b×d
= 0,0098×400×575= 2253 mm2
As min = (1,4×b×d)
fy
= (1,4×400×575 )
360
= 894.4 mm2
Dipilih susunan tulangan As = 8D19, dengan As = 2267.08
mm2
𝜌use = As
(b×d )
= 2267.08
(400×575 )
= 0,0099
Syarat luas tulangan
As ≥ As perlu
2267.1 mm2 ≥ 2267.08 mm2 (Memenuhi persyaratan)
c)Pemeriksaan penempatan tulangan
Jarak bebas datar
Jbd = ¿
= 400−((2×25 )+(2x10)+ (8×19) )8−1
= 25.42 mm > 25 mm (OK)
Catatan : Penulangan pada Perencanaan tulangan lentur
harus memperhitungkan pengaruh faktor geser dan momen
torsi yang terjadi
d)Kontrol kekuatan balok tulangan tunggal
Asumsi : Tulangan telah leleh, fy = fs = 360 Mpa
Keseimbangan gaya-gaya dalam (C = T )
Cc = Ts
0,85×a×b×f'c = As . fy
a = (As×fy)
(0,85×bxf'c)
= 2267×360
0,85×400×25= 96.02 mm
C = aβ1
= 96,020,85
= 113 mm
e)Pemeriksa regangan tulangan
ԑy = fyEs
= 360
200000
= 0,0018
ԑs = (d−c)c ×εc
= (575–113 )
113×0.003
= 0.01227
ԑs = 0,01201 > ԑy= 0,0018 (Asumsi benar,leleh)
f)Cek Momen
Maka Momen Nominal (Mn) dan Momen Rancang (Mr) dapat
dihitung
Cc = 0,85×a×b×f'c= 0,85×96×400×25= 816149 N
Mn = Cc×d−a2
= 81619×575−962
= 430103273.9 Nmm
Mr = ∅×Mn= 0,8×430103273.9
= 344082619 Nmm
= 344 kNm
Mr > Mu
344 kNm > 342.2 kNm (OK)
2)Momen tumpuan positif
Mu+etabs = 0.791 kNm
Syarat = Mu+ ≥ 13×Mu−¿tumpuan¿
= 0.791 < 13× 342.2
= 0.791 < 114.1
Mu+used = 114.1 kNm
Tabel Penulangan
PØsengkan
g Øtul-1Jml tul-
1 As ds dmm mm mm bh mm² mm mm
25 10 19 41133.5
4 25575
Cb = 600
600+fy×d
= 600600+360
×575
= 359.38 mm
Co = 0,75×cb
= 0,75×359.38= 270 mm
ao = β1×co
= 0,85×270
= 229 mm
Co = 0,85×αo×b×f'c
= 0,85×229×400×25= 1947363.281 N
Mno = Co×(d−ao
2 )=1947363.281×(575−
2292 )
= 896661901.5 Nmm
= 896.661 kNm
Mro = ∅×Mno= 0,8×896.661= 717.329 kNm
717.329 kNm > Mu+ = 114.1 kNm (cukup tulangan tunggal)
a)Penulangan Perlu (As perlu)
Rn = Mu
(∅×b×d2)
= 114064000
(0,80×400×5752 )
= 1.0781
m = fy
(0,85× [f' ])
= 360
(0,85×25)
= 16,941
𝜌b = (0,85×f'c )
fy×β1×
600(600+fy )
= (0,85×25)
360×0,85× 600
(600+360 )
= 0,03136
𝜌min = 1,4fy
= 1,4360
= 0,00389
𝜌max = 0,75×ρb
= 0,75×0,314= 0,0235
𝜌perlu = 1m׿¿
= 116,941׿¿
= 0,0031
b)Syarat Rasio tulangan
𝜌min ≤ 𝜌perlu ≤ 𝜌maks
0,00389 ≥ 0,0031 ≤ 0,0235
Yang dipakai 𝜌min = 0,00389
𝜌maks < 𝜌b
0,0235 < 0,03136 (Daktail)
As perlu = ρmin×b×d
= 0,00389×400×575= 894.4 mm2
As min = (1,4×b×d)
fy
= (1,4×400×575 )
360
= 894.4 mm2
Dipilih susunan tulangan As = 4D19, dengan As = 1133.54
mm2
𝜌use = As
(b×d )
= 1133.54
(400×575 )
= 0,005
Syarat luas tulangan
As ≥ As perlu
1133.54 mm2 ≥ 894.4 mm2 (Memenuhi persyaratan)
c)Pemeriksaan penempatan tulangan
Jarak bebas datar
Jbd = ¿
= 400−((2×25 )+(2x10)+ (4×19) )4−1
= 84.67 mm > 25 mm (OK)
Catatan : Penulangan pada Perencanaan tulangan lentur
harus memperhitungkan pengaruh faktor geser dan momen
torsi yang terjadi
d)Kontrol kekuatan balok tulangan tunggal
Asumsi : Tulangan telah leleh, fy = fs = 360 Mpa
Keseimbangan gaya-gaya dalam (C = T )
Cc = Ts
0,85×a×b×f'c = As . fy
a = (As×fy)
(0,85×bxf'c)
= 1134×360
0,85×400×25= 48.008 mm
C = aβ1
= 48.0080,85
= 56.5 mm
e)Pemeriksa regangan tulangan
ԑy = fyEs
= 360
200000
= 0,0018
ԑs = (d−c)c ×εc
= (575–56.5 )
56.5 ×0.003
= 0.0275
ԑs = 0.0275 > ԑy= 0,0018 (Asumsi benar,leleh)
f)Cek Momen
Maka Momen Nominal (Mn) dan Momen Rancang (Mr) dapat
dihitung
Cc = 0,85×a×b×f'c= 0,85×48.008×400×25= 408074.4 N
Mn = Cc×d−a2
= 408074.4×575−48.0082
= 234642756 Nmm
Mr = ∅×Mn= 0,8×234642756= 187714204.8 Nmm
= 187.71 kNm
Mr > Mu
187.71 kNm > 114.1 kNm (OK)
g)Momen rencana negatif balok tumpuan
Data perancangan
Tabel data tulangan tarik
Øsengkang Øtul-1Jmltul-1 ds
mm mm bh mm10 19 8 25
Tabel data tulangan tekan
Øsengkang Øtul-1Jmltul-1 d'
mm mm bh mm10 19 4 25
Tabel data geometri balok
b h p d ds d' As As'mm mm mm mm mm mm mm mm
400 600 25 575 25 252267.1
1134
Keseimbangan gaya-gaya dalam asumsi awal tulangan tarik
dan tekan leleh semua Asumsi awal, tulangan tarik dan
tekan leleh semua
Ts = Cc + Cs
a = As'xfy0,85×b×fc
= 1133.54×3600,85×400×25
= 48.008 mm
c = aβ1
= 48.0080,85 = 56.5 mm
Pemeriksa regangan yang terjadi :
Regangan tarik
ԑs = (d−c)c ×εc
= (575–56.5 )
56.5×0.003
= 0,0027
ԑs = 0,0027 > ԑy = 0,0018 (Leleh)
Regangan tekan
ԑs = (c−d' )
c ×εc
= (56.48–25)
56.48×0,003
= 0.00167
ԑs = 0.00167 < ԑy = 0,0018 (Belum Leleh)
(ASUMSI SALAH)
Asumsi kedua, tulangan tarik leleh tulangan tekan belum
leleh :
Cc + Cs – T = 0
0,85×fc×β1×c×b+AS'× (fs
'−0,85fc)−(As×fy) = 0
0,85×fc×β1×c×b+As'×(c−d
d )×0,003×Es−As'x0,85fc−Asxfy = 0
0,85×fc×β1×c×b+As'×(cc )×600×d
'
c−As
'x0,85fc−As×fy = 0
0,85×25×0.85×56.482×b+(600×1134−2267.1×360 )×56.48−600×1134×25
= 0
7225 c2 – 136024.8 c – 17003100 = 0
Maka nilai C didapatkan berdasarkan rumus A,B,C :
C12=(−b±√b2−4ac2a )Sehingga diperoleh nilai :
c1 = 58.83 mm
c2 = -40 mm
a = β1×c
= 0,85×58.83= 50.01 mm
Pemeriksaan regangan yang terjadi
Regangan Tarik
ԑs = d−cc
×εc
= 575−58.83
58.83×0,003
= 0,026 > ԑy = 0,0018 (Leleh)
Regangan Tekan
ԑs’ = c−d'c ×ԑc
= 58.83−2558.83
×0,003
= 0.00172 < ԑy = 0,0018 (Belum Leleh)
Maka asumsi nilai kedua bahwa tulangan tekan belum leleh
adalah benar.
fs’ = εs'×Es
= 0.00172 x 200000
= 345.02 MPa
Cc = 0,85×a×b×f'c
= 0.85 x 50.01 x 400 x 25
= 425046.13 N
Cs = As'×fs
'
= 1134 x 345.02
= 391102.67 N
Maka Momen Nominal (Mn) dan Momen Rancang (Mr) dapat
dihitung :
Mn = Cc×(d−a2 )+Cs× (d−d')
= 425046.13×(575−50.012 )+391102.67× (575−25 )
= 459507968.2 Nmm
= 460 kNm
Mr = ∅×Mn
= 0,8×460
= 367.606 kNm
Mr = 367.606 kNm ≥ Mu = 342.192 kNm (OK)
h)Momen rencana positif balok tumpuan
Data balok :
As = 2267.08 mm2
As’ = 1134 mm2
ds’ = 50 + 10 + 1/2. 19 = 44.5 mm
d’ = 25 mm
d = h – ds
= 600 – 44.5
= 555.5 mm
Asumsi : tulangan tarik leleh tulanagn tekan belum leleh
Keseimbangan gaya – gaya dalam
Cc + Cs – T = 0
0,85×fc×β1×c×b+AS'× (fs
'−0,85fc)−(As×fy) = 0
0,85×fc×β1×c×b+As'×(c−d
d )×0,003×Es−As'x0,85fc−Asxfy = 0
0,85×fc×β1×c×b+As'×(cc )×600×d
'
c−As
'x0,85fc−As×fy = 0
0,85×fc×β1×c2×b+(600×As'−As×fy )×c−600×As'×d' = 0
0,85×25×0.85×56.482×b+(600×1134−2267.1×360 )×56.48−600×1134×25
= 0
7225 c2 – 136024.8 c – 17003100 = 0
Maka nilai C didapatkan berdasarkan rumus A,B,C :
C12=(−b±√b2−4ac2a )Sehingga diperoleh nilai :
c1 = 58.83 mm
c2 = -40 mm
a = β1×c
= 0,85×58.83= 50.01 mm
Pemeriksaan regangan yang terjadi
Regangan Tarik
ԑs = d−cc
×εc
= 555−58.83
58.83×0,003
= 0,0253 > ԑy = 0,0018 (Leleh)
Regangan Tekan
ԑs’ = c−d'c ×ԑc
= 58.83−2558.83
×0,003
= 0.00172 < ԑy = 0,0018 (Belum Leleh)
Maka asumsi nilai kedua bahwa tulangan tekan belum leleh
adalah benar.
fs’ = εs'×Es
= 0.00172 x 200000
= 345.02 MPa
Cc = 0,85×a×b×f'c
= 0.85 x 50.01 x 400 x 25
= 425046.13 N
Cs = As'×fs
'
= 1134 x 345.02
= 391102.67 N
Maka Momen Nominal (Mn) dan Momen Rancang (Mr) dapat
dihitung :
Mn = Cc×(d−a2 )+Cs× (d−d')
= 425046.13×(555−50.012 )+391102.67× (555−25 )
= 443412447 Nmm
= 443 kNm
Mr = ∅×Mn
= 0,8×443
= 354.72 kNm
Mr = 354.72 kNm ≥ Mu = 114.064 kNm (OK)
b. Menentukan Tulangan Lapangan
Dengan cara perhitungan yang sama pada perhitungan
tulangan lapangan negatif dan lapangan positif didapat
hasil :
1) Tulangan lapangan negatif : 4D19
2) Tulangan lapangan positif : 7D19
Tabel rekapitulasi momen balok atap
Jenis
Balok
Momen Tumpuan Momen Lapangan
M⁻ (KNm) M⁺ (KNm) M⁻ (KNm) M⁺ (KNm)B47 342.192 0.791 0 304.12B44 200.605 0.811 0 168.001B5 342.526 0.791 97.764 214.637B70 106.480 0.991 0 13.962
Tabel rekapitulasi tulangan tumpuan balok atap
NOBALOK TUMPUAN
HASILTULANGAN
P(mm)D n
B47 M(-) 19 8 25M(+) 19 4 25
B44 M(-) 19 6 30M(+) 19 4 30
B5 M(-) 19 8 10M(+) 19 4 10
B70 M(-) 19 4 30M(+) 19 4 30
Tabel rekapitulasi rasio tulangan tumpuan balok atap
NOBALOK Tumpuan ρmax ρbalan
ce
ρmax <ρbalanc
e
B47M(-) 0.02
35 0.0314 DAKTAIL
M(+) 0.0235 0.0314 DAKTAIL
B44M(-) 0.02
35 0.0314 DAKTAIL
M(+) 0.0235 0.0314 DAKTAIL
B5 M(-) 0.02 0.0314 DAKTAIL
35
M(+) 0.0235 0.0314 DAKTAIL
B70M(-) 0.02
35 0.0314 DAKTAIL
M(+) 0.0235 0.0314 DAKTAIL
Tabel rekapitulasi tulangan lapangan balok atap
NOBALOK LAPANGAN
HASILTULANGAN
P(mm)D n
B47 M(-) 19 4 25M(+) 19 7 25
B44 M(-) 19 4 30M(+) 19 4 30
B5 M(-) 19 5 25M(+) 19 7 25
B70 M(-) 19 4 30M(+) 19 4 30
Tabel rekapitulasi rasio tulangan lapangan balok atap
NOBALOK
Lapangan
ρmax
ρbalance
ρmax <ρbalanc
e
B47M(-) 0.0
24 0.0314 DAKTAIL
M(+) 0.024 0.0314 DAKTAIL
B44M(-) 0.0
24 0.0314 DAKTAIL
M(+) 0.024 0.0314 DAKTAIL
B5M(-) 0.0
24 0.0314 DAKTAIL
M(+) 0.024 0.0314 DAKTAIL
B70 M(-) 0.0 0.0314 DAKTAIL
24
M(+) 0.024 0.0314 DAKTAIL
Tabel rekapitulasi momen balok lantai 1
Jenis
Balok
Momen Tumpuan Momen Lapangan
M⁻ (KNm) M⁺ (KNm) M⁻ (KNm) M⁺ (KNm)B57 428.903 1.980 0 370.274B65 171.172 2.155 0 175.309B70 92.766 2.703 9.275 0.119
Tabel rekapitulasi tulangan tumpuan balok lantai 1
NOBALOK TUMPUAN
HASILTULANGAN
P(mm)D n
B57 M(-) 22 8 10M(+) 19 4 10
B65 M(-) 19 4 30M(+) 19 4 30
B70 M(-) 19 4 30M(+) 19 4 30
Tabel rekapitulasi rasio tulangan tumpuan balok lantai 1
NOBALOK Tumpuan ρmax ρbalan
ce
ρmax <ρbalanc
eB57 M(-) 0.02
35 0.0314 DAKTAILM(+) 0.02 0.0314 DAKTAIL
35
B65M(-) 0.02
35 0.0314 DAKTAIL
M(+) 0.0235 0.0314 DAKTAIL
B70 M(-) 0.0235 0.0314 DAKTAIL
M(+) 0.0235 0.0314 DAKTAIL
Tabel rekapitulasi tulangan lapangan balok lantai 1
Tabel rekapitulasi rasio tulangan lapangan balok lantai 1
NOBALOK
Lapangan
ρmax
ρbalance
ρmax <ρbalanc
e
B57M(-) 0.0
24 0.0314 DAKTAIL
M(+) 0.024 0.0314 DAKTAIL
B65M(-) 0.0
24 0.0314 DAKTAIL
M(+) 0.024 0.0314 DAKTAIL
B70M(-) 0.0
24 0.0314 DAKTAIL
M(+) 0.024 0.0314 DAKTAIL
NOBALOK LAPANGAN
HASILTULANGAN
P(mm)D n
B57 M(-) 19 4 25M(+) 22 8 25
B65 M(-) 19 4 30M(+) 19 5 30
B70 M(-) 19 4 30M(+) 19 4 30
2. Perencanaan Tulangan Geser
Balok yang ditinjau pada perancangan tulangan geser
ini menggunakan balok yang sejenis dengan balok yang
digunakan pada perancangan tulangan lentur, yaitu balok
B47. Beberapa rumus yang digunakan sebagai dasar untuk
perhitungan tulangan geser/begel balok tercantum dalam
pasal-pasal SNI 03-2847-2002, sebagai berikut :
Mlap tumpuanGayageser
F'c 25 Fy 240
Mnl (-)kNm
Mnr (+)kNm Vu kN d 550 dp 10
ds 50 n 4342.192 304.12 240.54 b 400
h 600
Panjang bentang bersih balok (ln) :
ln = L – lebar kolom pengapit sisi kolom yang sejajar
arah bentang balok
= 8200 – ( ½ x (550 + 0))
= 7925 mm = 7.925 m
Menentukan gaya geser perlu balok (Vu,b) :
Vu1,max = Mnl+Mnrln
+Vu
= 342+304.17.93
+240.54
= 322.1 kN
Vu1,max = −Mnl+Mnr
ln+Vu
= −342+3047.93
+240.54
= 159 kN
Penampang kritis pertama sejarak d dari muka tumpuan :
Vu,1 d = Vu1,min + (ln−dln×Vu1,max−Vu1,min)
= 159 + (7.93−0.5757.93×322.1−158.98)
= 310.259 kN
Penampang kritis pertama sejarak 2h dari muka tumpuan :
Vu,1,2h = Vu1,min + (ln−2hln×Vu1,max−Vu1,min)
= 159 + (7.93−1.27.93×322.1−158.98)
= 297.39 kN
Vc = Ø16 √f'cbwd
= 0,75 x 16 √25 x 400 x 550
= 137500 N
= 137.5 kN
Vc,maks = 23 √f'cbwd
= 23 √25 x 400 x 550
= 733333.3 N
= 733 kN
Menentukan daerah penulangan
1. Bila Vu < ØVc2 = 240.5 kN > 137.52 = 68.8 kN
(Tidak Ok)
Kondisi 1 menyatakan tidak perlu begel jika memenuhi
syarat
Gambar kondisi 1 geser
2. Bila ØVc2 ≤ Vu ≤ ØVc = 68.750 kN ≤ 240.54 kN >
137.50 kN (Tidak Ok)
Kondisi 2 dipasang tulangan begel/sengkakng minimum
jika memenuhi syarat
Gambar kondisi 2 geser
3. Bila Vu > ØVc = 240.5 kN > 137.5 kN (Ok)
Maka gaya geser ditahan oleh begel jika memenuhi
syarat
Gambar kondisi 3 geser
Karena gaya geser melebihi ØVc maka di gunakan rumus :
Vs = vu,perluØ - Vc
= 240.50.75 - 137.5
= 183.22 kN
Vs > 13 √f'cbwd
183.22 kN< 13 √25x400x550
183.22 kN< 366.67 kN (Tidak Ok)
Maka digunakan jarak antar tulangan
Av = 75√f'cbs1200fy
= 75√25x400x10001200x240
= 520.8 mm2
Avmin = bs3fy
= 400x10003x240
= 555.6 mm2
Av yang dipakai : 556 mm2, dengan S = 1000 mm
S = n0,25πdp2s
Av
= 4x0,25x3.14x10x1000555.6
= 565 mm
Kontrol spasi begel :
S ≤ d/4 = 550/4 = 138 mm
S ≤ 300
Digunakan P10 – 100
Menghitung luasan tul. sengkang:
Av = 2 x As
= 2 x (0.25 x 3.14 x 102)
= 157 mm2
Kontrol atas tulangan geser yang digunakan
Vs = AvxFyxds
= 157x240x550100
= 207240 N = 207 kN
VR = ø(Vs+Vc)
= 0.75 x (207+138)
= 258.56 kN
VR > Vu
258.56 kN > 240.54 kN (OK)
Tabel Rekapitulasi tulangan geser atap
No.Balok
Øtulangan
Spasibegel
Kondisi
n(buah)
B47 P10 100 3 4B44 P10 250 3 4B5 P10 100 3 4B70 P10 275 2 4
Tabel Rekapitulasi tulangan geser lantai
No.Balok
Øtulangan
Spasibegel
Kondisi
n(buah)
B47 P10 80 3 6B44 P10 180 3 4B70 - - 1 4
3. Perencanaan Tulangan Torsi
Pengaruh torsi pada komponen struktur non-prategang
dapat diabaikan jika momen puntir terfaktor Tu >
112
∅√f'c acp2
pcpData balok atap 47 :
B 400 mmH 600 mmds 25 mmP 25 mm
f'c 25 Mpa
Tu B4788100
0 Nmm
Tu ≥ 112
∅√f'c acp2
pcp
Acp = b x h
= 400 x 600
= 240000 mm²
Pcp = 2 x (b + h)
= 2 x (400 + 600)
= 2000 mm
Aoh = (b – (2xds) + p) x (h – (2xds) + p)
= (400 – (2x25) + 25) x (600 – (2x25) + 25)
= 215625 mm²
Poh = 2 x (b – (2xds) + p) + (h – (2xds) + p)
= 2 x (400 – (2x25) + 25) + (600 – (2x25) + 25)
= 431250 mm
Tu ≥ 112
x0.75√252156252
431250
881000 < 9000000 (Tdk terjadi torsi)
Tabel rekapitulasi tulangan torsi balok atap
No Balok Torsi/Tdk Tulangan
Jarak Tul(mm)
n(buah)
B47tdk trjdiTORSI D19 150 2
B44 terjadi D19 150 3
TORSI
B5tdk trjdiTORSI D19 150 2
B70terjadiTORSI D19 150 4
Tabel rekapitulasi tulangan torsi balok lantai 1
No.Balok Torsi/Tdk Tulang
anJarak Tul
(mm)n(buah)
B57 tdk trjdiTORSI D19 150 2
B65 terjadiTORSI D19 150 5
B70 tdk trjdiTORSI D19 150 2
4. Panjang Tulangan Penyaluran Tarik
Menurut pasal 14.2.3 SNI 03-2847-2002 memberikan
persamaan untuk panjang penyaluran tulangan tarik
sebagai berikut :
λd = 9xfyx (αxβ )xγxλ
10x (f'c )0.5x c+Ktrdb
x db ( untuk batang ulir atau
kawat ulir)
λd = 12xfyxαxβxλ25x (f'c)0.5
x db (untuk batang D19 dan lebih
kecil atau kawat ulir)
Syarat :
αβ ≤ 1.7
(c+Ktr)/db ≤ 2.5
F'C*0.5 ≤ 8.333 Mpa
λd harus ≥ 300 mm
Dik : (ketentuan diambil dari SNI Hal 118)
Fy =
360
Mpa γ =
0.8
α = 1 λ = 1
β =1.5
f'c =
25
Mpa
λd = 12x360x1x1.5x1
25x (25 )0.5 x 19
= 984.96 mm
λd tidak boleh kurang dari 8db atau 150 mm
5. Panjang Tulangan Penyaluran Tekan
Menurut pasal 14.2.3 SNI 03-2847-2002 memberikan
persamaan untuk panjang penyaluran tulangan tarik
sebagai berikut :
λd minimum 200 mm, nilai f untuk struktur yang
direncanakan terdapat gempa =1
λdb = db∗fy
4x (f'c)0.5
= 19∗3604x (25 )0.5
= 342 mm
λdb harus ≥ 0.04 x db x fy
λdb ≥ 0.04 x 19 x 360
342 mm ≥ 273.6 mm (Ok)
λd = λdb x f dan λd ≥ 200 mm
λd = 342 x 1 ≥ 200 mm (Ok)
Angkur (kait) tulangan :
Untuk diameter 10 mm hingga 25 mm,
r ≥ 4 x db
r ≥ 4 x 19
r ≥ 76 mm
diambil r = 80 mm
Tabel rekapitulasi panjang tulangan penyaluran balok
lantai atap
Letak
PanjangTul.Penyaluran Diameter
Tul.(mm)
Angkur/KaitTul.(mm)
Tarik(mm)
Tekan(mm)
Lantai
Atap984.96 342 D19 80
Tabel rekapitulasi panjang tulangan penyaluran balok
lantai 1
Letak
PanjangTul.Penyaluran
DiameterTul.(mm)
Angkur/KaitTul.(mm)
Tarik(mm)
Tekan(mm)
Lantai 1 984.96 342 D19 801425.6 396 D22 90