i
CONTENT LIST
S. NO. CONTENTS PAGE NO.
1.0 EXECUTIVE SUMMARY 1
2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 4
(i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 4
(ii) BRIEF DESCRIPTION OF NATURE OF THE PROJECT 4
(iii) NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY /REGION 7
(iv) DEMAND-SUPPLY GAP 8
(v) IMPORTS VS. INDIGENOUS PRODUCTION 8
(vi) EXPORT POSSIBILITY 8
(vii) DOMESTIC/EXPORT MARKETS 8
(viii) EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT 8
3.0
PROJECT DESCRIPTION 9
(i) TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY 9
(ii) LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, AND PROJECT
BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES
9
(iii) DETAILS OF ALTERNATIVE SITE CONSIDRATION AND BASIS OF SELECTING THE
PROPOSED SITE PARTICULARLY THE ENVIRONMENTAL CONSIDERATIONS GONE
SHOULD BE HIGHLIGHTED
11
(iv) SIZE OR MAGNITUDE OF OPERATION 11
(v) PROJECT DESCRIPTION WITH PROCESS DETAILS (A SCHEMATIC DIAGRAM/ FLOW CHART
SHOWING THE PROJECT LAYOUT, PROJECT COMPONENTS SHOULD BE GIVEN)
11
(vi) RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY SOURCE,
MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT OF RAW MATERIAL
AND FINISHED PRODUCT
15
(vii) RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED IN THE PROJECT, IF
ANY, SHOULD BE BRIEFLY OUTLINED
15
(viii) AVAILABILITY OF WATER ITS SOURCE, ENERGY /POWER REQUIREMENT AND SOURCE 16
(ix) QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR
MANAGEMENT/DISPOSAL
16
4.0 SITE ANALYSIS 16
(i) CONNECTIVITY 16
(ii) LAND FORM, LAND USE AND LAND OWNERSHIP 17
(iii) TOPOGRAPHY AND DRAINAGE 17
(iv) EXISTING LAND USE PATTERN {AGRICULTURE, NON-AGRICULTURE, FOREST, WATER
BODIES (INCLUDING AREA UNDER CRZ)}, SHORTEST DISTANCES FROM THE PERIPHERY
OF THE PROJECT TO PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE
SANCTUARY, ECO SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE
RIVER), CRZ. IN CASE OF NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE
NOTIFICATION
17
(v) EXISTING INFRASTRUCTURE 20
(vi) SOIL CLASSIFICATION 20
ii
S. NO. CONTENTS PAGE NO.
(vii) CLIMATIC DATA FROM SECONDARY SOURCES 20
(viii) SOCIAL INFRASTRUCTURE AVAILABLE 20
5.0 PLANNING BRIEF 20
(i) PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, AND TRANSPORTATION ETC.)
TOWN AND COUNTRY PLANNING/DEVELOPMENT AUTHORITY CLASSIFICATION
20
(ii) POPULATION PROJECTION 20
(iii) LAND USE PLANNING 20
(iv) ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & SOCIAL) 21
(v) AMENITIES/FACILITIES 21
6.0 PROPOSED INFRASTRUCTURE 21
(i) INDUSTRIAL AREA (PROCESSING AREA) 21
(ii) RESIDENTIAL AREA (NON PROCESSING AREA) 21
(iii) GREEN BELT/PLANTATION DEVELOPMENT 21
(iv) SOCIAL INFRASTRUCTURE 22
(v) CONNECTIVITY 22
(vi) DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER) 22
(vii) SEWERAGE SYSTEM 22
(viii) INDUSTRIAL WASTE MANAGEMENT 22
(ix) SOLID WASTE MANAGEMENT 23
(x) POWER REQUIREMENT & SUPPLY/SOURCE 23
7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN 23
(i) POLICY TO BE ADOPTED (CENTRAL/STATE)IN RESPECT OF THE PROJECT AFFECTED
PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND LANDLESS LABORERS
(BRIEF OUTLINE TO BE GIVEN)
23
8.0 PROJECT SCHEDULE & COST ESTIMATES 23
(i) LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE OF COMPLETION (TIME
SCHEDULE FOR THE PROJECT TO BE GIVEN)
23
(ii) ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY
OF THE PROJECT
23
9.0 ANALYSIS OF PROPOSAL 23
iii
LIST OF TABLES
TABLE NO. TABLE PAGE NO.
1. SALIENT FEATURES OF THE PROJECT 1
2. GREENBELT DEVELOPMENT AND PLANTATION PLAN 3
3. STATUS OF EXISTING EC AND ITS CONSENTS 5
4. EMPLOYMENT POTENTIAL 8
5. LOCATION DETAILS 9
6. LIMESTONE RESERVES/RESOURCES AS PER UNFC 13
7. PAST PRODUCTION DETAILS 14
8. YEAR WISE COMBINED PRODUCTION OF ALL MINERALS (IN TONNES) 14
9. MINING DETAILS 15
10. ENVIRONMENTAL SETTINGS OF THE AREA 18
11. STAGE WISE LAND USE DETAIL 21
12. GREENBELT DEVELOPMENT AND PLAN 22
LIST OF FIGURES
FIGURE NO. FIGURE PAGE NO.
1. LOCATION MAP 10
2. PROCESS FLOW CHART OF MINING 12
3. ENVIRONMENTAL SETTING MAP 19
ANNEXURES LIST
ANNEXURE NO ANNEXURE PAGE NO
I 33RD EAC MOM 24 - 30
II. MINING LEASE DOCUEMNTS 31 - 47
IIIA. EXISTING EC DATED 19.03.2001 48 - 51
IIIB EDS (NAME CHANGE) 52
IIIC CERTIFICATION OF EXISTING EC BY RO, MOEFCC 53 - 93
IV CTE IN FAVOR OF CCCPL DATED 11.04.2001 94 - 112
IVA CTO IN FAVOR OF CCCPL DATED 24-07-2001 113 - 126
IVB CTO IN FAVOR OF CCCPL DATED 04-04-2002 127 - 130
IVC CTO IN FAVOR OF CCCPL DATED 02-04-2003 131 - 134
IVD CTO IN FAVOR OF CCCPL DATED 24-04-2004 135 - 138
IVE CTO IN FAVOR OF CCCPL DATED 28-06-2005 139 - 142
IVF CTO IN FAVOR OF CCCPL DATED 04-04-2006 143 - 146
IVG CTO IN FAVOR OF CCCPL DATED 26-04-2007 147 - 150
IVH CTO IN FAVOR OF CCCPL DATED 24-04-2008 151 - 154
IVI CTO IN FAVOR OF CCCPL DATED 12-05-2010 155 - 160
IVJ CTO IN FAVOR OF CCCPL DATED 03-05-2011 161 - 164
IVK CTO IN FAVOR OF CCCPL DATED 13-07-2012 165 - 172
IVL CTO IN FAVOR OF CCCPL DATED 31-05-2013 173 - 176
iv
IVM CTO IN FAVOR OF CCCPL DATED 30-10-2014 177 - 180
IVN CTO IN FAVOR OF CCCPL DATED 27-07-2015 181 - 186
IVO CTO IN FAVOR OF CCCPL DATED 29-06-2016 187 - 194
IVP CTO IN FAVOR OF CCCPL DATED 23-05-2017 195 - 202
IVQ CTO IN FAVOR OF CCCPL DATED 17-09-2018 203 - 210
IVR CTO IN FAVOR OF CCCPL DATED 13-08-2020 211 - 218
V MINING PLAN APPROVAL LETTER 219 - 220
VI COPY OF AUTHENTICATED PRODUCTION FIGURES 221 - 222
VII AFFIDAVIT UNDER COMMON CAUSE 223
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 1
PRE-FEASIBILITY REPORT
1.0 EXECUTIVE SUMMARY
� M/s. Chettinad Cement Corporation Pvt Ltd. was incorporated in the year 1962 with the
register of Companies, Chennai, and Tamil Nadu. The company commenced the commercial
production in the year 1967at Puliyur Plant located at Karur District. Company has an existing
Captive cement plant located in Karikkali Village, Taluk-Guziliamparai, District-Dindigul with
capacity of 4.5 million TPA. Environment Clearance was obtained from MoEFCC vide letter
noJ-11011/518/2009-IA II ( I) dated Aug 2nd, 2010
� Limestone Requirement of existing cement plant is being met from Dholipatti Mine, Seethai
Nagar Mine and Devermalai Mine.
� Environment Clearance for Existing Dholipatti Mine (138.785 ha) with consented production
capacity 1.40 million TPA was granted by MoEF under EIA Notification, 1994 vide letter No J-
11015/27/2000 – IA.II(M) Dated 19.03.2001.
� Present proposal is for validation of existing EC Validation of EC under Gazette Notification
S.O 1530(E) dated 06.04.2014 for Dholipatti Limestone Mine (ML Area- 138.785 ha)
withexisting Limestone Production capacity- 1.40 MTPA and Waste 1.68 MTPA (Total
Excavation 3.08 MTPA) situated at Villages-Dholipatti, Palayam&Karikkali, Taluk-Guziliamparai,
District-Dindigul, State- Tamil Nadu.
� Application for validation of EC was submitted to MoEFCC on 07.10.2018 under the Provision
of Notification S.O. 1530 (E) dated 06.04.2018.
� Essential Details were sought by MoEFCC on 02.11.2018, reply of same was submitted to
MoEFCC on 08.01.2019. Again, Essential Details were sought by MoEFCC on 01.02.2019 which
was met vide our reply dated 27.04.2021.
� Project was considered for ToR by EAC in their 31st meeting held on 11.06.2021. As per Minutes
uploaded on Parivesh, "The Committee returned the proposal in present form. PP is required
to apply afresh for obtaining Terms of Reference". (Annexure I)
Table-1
Salient Features of the Project
S. No. Particulars Details
A. Nature of the Project Opencast Fully Mechanized Limestone Mine
B. Size of the Project
1. Mining Lease Area 138.785 ha (21.095 ha: Govt. land & 117.69 ha: Private land)
2. Production capacity Limestone:1.40 Million TPA
Waste: 1.68 Million TPA
Total Excavation:3.08 Million TPA
C. Location Details
1. Villages Dholipatti, Palayam&Karikkali
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 2
S. No. Particulars Details
2. Tehsil Guziliamparai
3. District Dindigul
4. State Tamil Nadu
5. Latitude & Longitude Latitude: 10°42'22.1" to 10°43'52.4"
Longitude: 78°06'16.5" to 78°07'25.6"
6. Toposheet No. of the Study area 58 J/2
D. Cost Details
1. Total Project Cost Rs. 67.15 Crores
2. Cost for Environment Protection
Measures
Capital Cost: Rs. 20.0 Lakhs
Recurring Cost:4 Lakh/Annum
E. Requirements of The Project
1. Water Requirement (KLD) 51 KLD which is sourced from rain water harvested and stored in
mine pit.
2. Power Requirement(MW) 200 KVA
Source: Tamil Nadu Electricity Board
3. Man Power Requirement
(Number of persons)
33 persons are employed which are Locals/outsiders (contract
based) as per their eligibility.
ENVIRONMENT MANAGMENT PLAN
A. AIR QUALITY MANAGEMENT
� Drilling machines is being/will be equipped with wet/ dry drilling with de-dusting
arrangements to prevent dust emission.
� Controlled blasting is being/will be practice and optimum use of explosive energy will
help in reducing the air pollution.
� Use of Rock breaker in place of secondary blasting to reduce generation of fly rocks and
ground vibration.
� Avoiding overloading & Water Sprinkling on the haul roads within the mine area.
� Proper maintenance (preventive as well as scheduled maintenance) of vehicles is being
carried out regularly for minimization of generation of gaseous pollutants.
� PPE’s including dust masks will be provided to workers & operators working in dusty
zones.
� Vehicular emissions will be kept under norms by regular maintenance of vehicles &
HEMM.
� Total 10 Ha area will be convert into green belt/plantations. At present total 6.14 Ha area
has been covered under greenbelt.
� Periodic air quality monitoring is being/will be carried out.
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 3
B. WATER QUALITY MANAGEMENT
� 2 KLD domestic wastewater generated from mines office is being disposed of in soak pit
via septic tank.
� Retaining walls, Garland drains, along the periphery of pits and dumps & settling tanks is
being constructed arrest surface run-offs.
� Water harvesting structures is being developed.
� Water level is monitored regularly.
C. NOISE POLLUTION CONTROL
� Drilling is done with sharp drill bits.
� Blasting is carried out during day time only.
� Controlled blasting technique has been adopted to reduce noise, vibration and fly rock
movements.
� Rock breakers are used to avoid secondary blasting.
� Explosives charge per hole and per delay is maintained as per DGMS guidelines.
� Adequate silencers in HEMM will be provided to reduce generation of noise.
� All HEMMs are equipped with closed cabins for operators.
� Proper maintenance, oiling and greasing of machines at regular intervals is done.
� Personal Protective Equipment, earmuffs and earplugs are used as a protective measure
from the high noise level generated at the mine site and wherever required.
� Total 10 Ha area will be convert into green belt/plantations. At present total 6.14 Ha area
has been covered under greenbelt.
� Noise level monitoring is carried out regularly.
D. GREEN BELT DEVELOPMENT
� The total mining lease area is 138.785 ha.
� At present 8.50 ha area has already been developed under greenbelt/plantation. While
another 6.34 ha area is proposed to be developed. The proposed greenbelt development
and plantation plan is given below:
Table 2
Greenbelt Development and plantation Plan
Total proposed area for Green belt & Plantation (in Ha): 14.84
Area covered under Green Belt & Plantation (in Ha) 8.5 As on 20.07.2021
Balance area to be covered under Green Belt & Plantation (in Ha) 6.34
No.of Sapling Covered so far : 10930
S.No Year No. of Target Sapling
(in Nos)
Area to be covered in
Ha Location Name of Species
1
2021-22
(after
Aug’21)
2340 2.34 Safety/Barrier Zone at
Palayam Pit
Pongamia
Pinnata(Pungan) ,
AcaciaLeducopholoea
(Velvel&Azadirachta 2 2022-23 2000 2.00 Safety/Barrier Zone at
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 4
Kolinchinwadi Pit indica(Neem)
3 2023-24 2000 2.00 Safety/Barrier Zone at
Mettukalathur Pit
Total 6340 6.34
2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION
(i) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT
IDENTIFICATION OF PROJECT
Present proposal is for validation of existing EC Validation of EC under Gazette Notification
S.O 1530(E) dated 06.04.2014 for Dholipatti Limestone Mine (ML Area- 138.785 ha) with
existing Limestone Production capacity- 1.40 MTPA and Waste 1.68 MTPA (Total Excavation
3.08 MTPA) situated at Villages-Dholipatti, Palayam&Karikkali, Taluk-Guziliamparai, District-
Dindigul, State- Tamil Nadu.
IDENTIFICATION OF PROJECT PROPONENT
� The Chettinad Group is today engaged in activities such as Cement, Silica, Engineering,
Information Technology, Plantations, Steel & Textile Trading, Shipping, Transportation,
Stevedoring, Clearing & Forwarding and Logistics
� M/s. Chettinad Cement Corporation Pvt Ltd. was incorporated as Public Limited
Company in the year 1962 but has converted into Chettinad Cement Corporation
Private Limited (CCCPL) under Section 18 of Companies Act 2013.
� CCCPL is operating three Cement Plants in Tamil Nadu viz. Puliyur near Karur, Karikkali
near Dindigul and Kilapaluvur near Ariyalur.
� Thus, presently it has a consolidated capacity of 11.7 MTPA cement of various grades by
employing the modern Dry Process Technology.
� CCCPL is producing Ordinary Portland Cement, Portland Pozzolana Cement, Slag
Cement, etc. and marketing their products like OPC 53 Grade & OPC43 Grade, PPC,
Sulphur Resistant Cement, Super Grade Cement.
� Its head quarter is in Chennai (Tamil Nadu).
(ii) BRIEF DESCRIPTION OF THE NATURE OF PROJECT
� Present proposal is for validation of existing EC Validation of EC under Gazette
Notification S.O 1530(E) dated 06.04.2014 for Dholipatti Limestone Mine (ML Area-
138.785 ha) withexisting Limestone Production capacity- 1.40 MTPA and Waste 1.68 MTPA
(Total Excavation – 3.08 MTPA) situated at Villages-Dholipatti, Palayam & Karikkali, Taluk-
Guziliamparai , District-Dindigul, State- Tamil Nadu.
� Environment Clearance for Existing Dholipatti Mine (138.78.5 ha) with consented
production capacity 1.40 million TPA was granted by MoEFCC on 19.03.2001 under EIA
Notification, 1994. Application for validation of EC was submitted to MoEFCC on
07.10.2018 under the Provision of Notification S.O. 1530 (E) dated 06.04.2018.
� Essential Details were sought by MoEFCC on 02.11.2018, reply of same was submitted to
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 5
MoEFCC on 08.01.2019. Again, Essential Details were sought by MoEFCC on 01.02.2019
which was met vide our reply dated 27.04.2021.
� Project was considered for ToR by EAC in their 31st meeting held on 11.06.2021. As per
Minutes uploaded on Parivesh, "The Committee returned the proposal in present form.
PP is required to apply afresh for obtaining Terms of Reference
A. SCREENING CATEGORY
As per EIA Notification dated 14th September, 2006 as amended on date, the project falls
under Category “A”(>100 ha), Project or Activity 1(a)(3) for Mining of Mineral.
B. MINING LEASE STATUS
� Dholipatti Mining Lease was granted to Chettinad Cement by Government of Tamil Nadu
vide G.O (Ms). No. 23 Industries (D2) Dept. dated 09.01.1989 for a period of 20 years over
an extent of 138.785 Hectares (Ha) in village-Dholipatti, Palayam and Karikkali Taluk-
Guziliamparai District- Dindigul, State-Tamil Nadu.
� The Lease was valid from 01.03.1989 to 28.02.2009.
� Further, as per the Mines and Minerals (Development and Regulation) (MMDR)
Amendment Act 2015, the period of the lease will be valid upto 28.02.2039 i.e. for a period
of 50 years from the date of Initial Grant and the new GO (Ms) No. 39 dated 09.04.2018.
� Mining lease documents are enclosed as Annexure II
C. STATUS OF EXISTING EC AND ITS CONSENTS AND MINING PLAN
Table-3
Status of Existing EC and Its Consents
Existing Environment Clearances (EC)
S.
No.
Particular Letter No & Date Ref
1. Environment Clearance for existing
Limestone Production Capacity of 1.40
Million TPA
Letter no. J-11015/27/2000-1A-II(M)dated 19.03.2001 Annexure IIIA
2. Name change in existing EC from
Chettinad Cement Corporation limited
to Chettinad Cement Corporation Pvt
Ltd
Under Process with MoEFCC
Application for Name change in EC was submitted to
MoEFCC on 29.02.2020. Essential details sought by
MoEFCC on 22.06.2021 "EC letter was granted by
MoEF&CC on 19th March 2001 under the provision of
EIA Notification, 1994 which is valid for 5 years after
revalidation name can be changed"
Annexure IIIB
2. Certification of Existing EC by RO,
MoEFCC
E.P./12.1/237/TN/647 dated 22.07.2021 Annexure IIIC
Existing Consent ToEstablish (CTE)
1. CTE for Limestone Production Capacity Consent order no. 2094 validity from 11.04.2001 Annexure IV
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 6
of 1.40Million TPA
Existing Consent To Operate (CTO)
S.No. Particular Letter No & Date Ref
1. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 15288 (Under Air Act) and Order
No 19236 (Under Water Act)
Valid from 11.04.2001 to 31.03.2002
Annexure IVA
2. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 15288 (Under Air Act) and Order
No 19236 (Under Water Act)
Valid from 04.04.2002 to 31.03.2003
Annexure IVB
3. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 15286 (Under Air Act) and Order
No 19236 (Under Water Act)
Valid from 02.04.2003 to 31.03.2004
Annexure IVC
4. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 15288 (Under Air Act) and Order
No 19236 (Under Water Act)
Valid from 24.04.2004 to 31.03.2005
Annexure IVD
5. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 15288 (Under Air Act) and Order
No 19236 (Under Water Act)
Valid from 28.06.2005 to 31.03.2006
Annexure IVE
6. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 15288 (Under Air Act) and Order
No 19236 (Under Water Act)
Valid from 04.04.2006 to 31.03.2007
Annexure IVF
7. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 15286 (Under Air Act) and Order
No 19236 (Under Water Act)
Valid from 26.04.2007 to 31.03.2008
Annexure IVG
8. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 15286 (Under Air Act) and Order
No 19236 (Under Water Act)
Valid from 24.04.2008 to 31.03.2010
Annexure IVH
9. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 15286 (Under Air Act) and Order
No 19236 (Under Water Act)
Valid from 15.05.2010 to 31.03.2011
Annexure IVI
10. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 15286 (Under Air Act) and Order
No 19236 (Under Water Act)
Valid from 03.05.2011 to 31.03.2012
Annexure IVJ
11. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 15286 (Under Air Act) and Order
No 19236 (Under Water Act)
Valid from 13.07.2012 to 31.03.2013
Annexure IVK
12. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 15286 (Under Air Act) and Order
No 19236 (Under Water Act)
Annexure IVL
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 7
Valid from 31.05.2013 to 31.03.2014
13. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 15286 (Under Air Act) and Order
No 19236 (Under Water Act)
Valid from 30.10.2014 to 31.03.2015
Annexure IVM
14. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 15082142901 (Under Air Act) and
Order No 15081142901 (Under Water Act) dated
27.07.2015 (Valid from 27.07.2015 to 31.03.2016)
Annexure IVN
15. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 160824181551 (Under Air Act) and
Order No 160814181551 (Under Water Act) dated
29.06.2016 (Valid from 29.06.2016 to 31.03.2017)
Annexure IVO
16. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 170817951474 (Under Air Act) and
Order No . 170827951474 (Under Water Act) dated
23.05.2017 (Valid from 23.05.2017 to 31.03.2018)
Annexure IVP
17. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 1808212292047 (Under Air Act)
and Order No. 1808112292047 (Under Water Act)
dated 17.09.2018 (Valid from 17.09.2018 to
31.03.2020)
Annexure IVQ
18. CTO for existing Limestone Production
Capacity of 1.40Million TPA
Consent order no. 2008231518840 (Under Air Act)
and Order No. 2008131518840 (Under Water Act)
dated 17.09.2018 (Valid from 13.08.2020 up to
31.03.2025)
Annexure IVR
Mining Plan
1.
Modification in approved Mining Plan
and Progressive Mine Closure Plan for
1.40 Million TPA of limestone
production capacity has been
approved from IBM Chennai
Letter no. TN/DGL/LST/ROMP/1525.MDS dated
13.11.2018.
Annexure V
(iii) NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY/ REGION
� M/s. Chettinad Cement Corporation Pvt Ltd. was incorporated in the year 1962 with the
register of Companies, Chennai, and Tamil Nadu. The company commenced the
commercial production in the year 1967. Company has a existing Captive cement plant
located in Karikkali, Taluk- Guziliamparai, District-Dindigul with Cement Production
capacity of 4.5 million TPA.
� Total Limestone requirement of the Cement Plant is 6.70 MTPA which is being fulfilled
by Dholipatti Mines (1.40 MTPA), Seethai Nagar Mines (4.5 MTPA) and Devarmalai
Mines (0.80 MTPA).
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 8
(iv) DEMAND – SUPPLY GAP
Limestone produced from the Dholipatti Limestone mine is being/ meet the
requirement/demand of limestone of the own integrated cement plant located at Villages:
Karikkali, Taluk – Guziliamparai, District Dindigul.
(v) IMPORTS vs. INDIGENOUS PRODUCTION
The Limestone mined out from this Limestone Mine is used for captive purpose in the
existing Cement Plant of the company.
(vi) EXPORT POSSIBILITY
There is no export possibility as the mine is for captive use.
(vii) DOMESTIC/EXPORT MARKETS
The Limestone mined out from this Limestone Mine is used for captive use in the existing
Cement Plant of the company. Thus there will be no other users for the limestone from this
mine.
(viii) EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT
The total man power requirement in the mine will be 37 persons. Unskilled /semi-skilled
manpower are hired from the local area and skilled manpower are hired from outside.
Preference is given to the locals as per their eligibility. Details of the same are given in
following table:
Table - 4
Employment Details
S. No. Designation Requirement in no.
1. Mines Manager 1
2. Assistant Manager cum Mining Engineer 3
3. Geologist 1
4. Surveyor 1
5. Foreman 3
6. Electrical Foreman 1
7. Mechanical Foreman 1
8. Mechanical Engineers 1
9. Driller-cum-compressor operator 3
10. Blaster 1
11. HEMM Operator 5
12. Mechanic cum fitter 3
13. Electrician 1
14. Explosives Van and truck driver 1
15. Clerk 1
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 9
S. No. Designation Requirement in no.
16. Helpers, Mazdoors 4
17. Watchman cum Challan issuer 2
Total 33
Source: Modified Approved Mining Plan & progressive mine closure plan
3.0 PROJECT DESCRIPTION
(i) TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS IF ANY
� Type of Project: Present proposal is for validation of existing EC Validation of EC under
Gazette Notification S.O 1530(E) dated 06.04.2014 for Dholipatti Limestone Mine (ML Area-
138.785 ha) with existing Limestone Production capacity- 1.40 MTPA and Waste 1.68 MTPA
(Total Excavation – 3.08 MTPA) situated at Villages-Dholipatti, Palayam & Karikkali, Taluk-
Guziliamparai , District-Dindigul, State- Tamil Nadu.
Interlinked Project: Company has a existing Captive cement plant located in Karikkali, Taluk-
Guziliamparai, District-Dindigul with Cement Capacity of 4.5 million TPA. Environment
Clearance was obtained vide letter J-11015/27/2000 – IA.II(M) Dated 19.03.2001.
(ii) LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, AND PROJECT
BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES
Table- 5
Location Details
Location Details
1. Village Dholipatti, Palayam&Karikkali
2. Taluk Guziliamparai
3. District Dindigul
4. State Tamil Nadu
5. Latitude & Longitude Latitude: 10°42'22.1" to 10°43'52.4"
Longitude: 78°06'16.5" to 78°07'25.6"
6. Toposheet No. 58 J/2
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 10
Figure 1: Location Map of the Mine Site
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 11
(iii) DETAILS OF ALTERNATIVE SITE CONSIDERATION AND BASIS OF SELECTING THE PROPOSED
SITE PARTICULARLY THE ENVIRONMENTAL CONSIDERATIONS SHOULD BE HIGHLIGHTED
As this is an existing mine so, no alternative site has been taken into consideration as the
mineral (Limestone) has already been proved with adequate reliability at this site.
(iv) SIZE OR MAGNITUDE OF OPERATION
Dholipatti Limestone Mine (ML Area- 138.785 ha) with existing Limestone Production
capacity- 1.40 MTPA and Waste 1.68 MTPA (Total Excavation – 3.08 MTPA) situated at Village –
Dholipatti, Palayam & Karikkali, Taluk-Guziliamparai, District-Dindigul, State- Tamil Nadu of
M/s. Chettinad Cement Corporation Pvt Ltd.
(v) PROJECT DESCRIPTION WITH PROCESS DETAILS (A SCHEMATIC DIAGRAM/ FLOW CHART
SHOWING THE PROJECT LAYOUT, PROJECT COMPONENTS SHOULD BE GIVEN)
a. GEOLOGY OF AREA:
Regional Geology:
The crystalline limestone of Tamilnadu is classified broadly under the following four major
categories: - Thirunelveli - Ramanathapurarn deposits, MaduraiDindigul -- Tiruchirapalli
deposits, Madukkarai - Ettimadai deposits, and Sankaridurg - Tiruchengodu - Nammakal
deposits.
The rocks in the area are crystalline in nature and form part of Great Archaean complex of
peninsular India. All the rocks domains possess evidence of deep seated metamorphism,
under conditions of high temperature and pressure. The crystalline limestone and associated
rocks appear to be meta-sediments. Though the Original chemical composition of these
sediments has been retained in some of the bands, at other places these sediments must have
interacted intimately with the other intrusive and have therefore given rise to rocks of
complex composition.
The limestone out crops stand out above the surrounding ground level and are covered by
thin veneer of overburden and calcareous kankar.
Local Geology:
The limestone deposits of Palayam, Dholipatt; &Karikkali area belong to Madurai Dindigul
Tiruchi limestone belt. The rock types encountered within the area are crystalline limestone
calc-gneiss, Pegmatite and granite gneiss. The pegmatite and granite gneiss are found as
intrusive bodies within the limestone. The beds are sub vertical at all places.
b. METHOD OF MINING
Mining operations is carried out by fully mechanized opencast method, utilizing Heavy Earth
Moving Machinery (HEMM) in conjunction with drilling and blasting with the use of suitable
explosives and same shall continue in future also. The limestone deposit is developed and
worked by conventional mechanized method considering various technical parameters like
surface topography, continuation of limestone deposit, quality variations, geo technical
aspects, required rate of production etc.
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 12
The top soil is already removed hence, drilling and blasting will be used to excavate the
mineral further. Controlled Blasting is carried out. DTH drills of 100/115 mm diameter are being
used for drilling of blast holes. The blast holes are being drilled in square and staggered
pattern with spacing and burden of 3.5m x 2.5m.A minimum width of working bench 10m is
being maintained for safe operation of mining machinery. The individual benches are sloped
at 80ofrom horizontal and the overall pit slope has been planned to be maintained less than
45○.
The hydraulic excavator of 2.1 m3 bucket capacity in combination with Taurus dumpers
(on contract, capacity: 35T) are being used for loading of materials. Rock breakers are
utilized for sizing the large boulders before transportation to the integrated cement plant.
Fragmented limestone is loaded by hydraulic excavators into the tippers. The limestone is
transported by tippers directly to the cement plant for stacking in stockpile and is being used
as main raw material for clinker/cement manufacturing.
Figure 2: Process flow chart of Mining
Sequence of Mining
Soil and OB/SB/IB removal
No topsoil is likely to be generated during the review of mine plan period as topsoil is already
removed and used for afforestation.
Drilling
High capacity equipments are deployed. Drilling is being carried out with the help of sharp drill
bits which help in reducing noise. Sub-drilling is kept just adequate to tear-off the bench
bottom.
Blasting
Drilling
EXCAVATION, REMOVAL OF SOIL
Loading
Hauling by dumper
Fragmenting by rock breaker &
Transportation to Cement Plant.
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 13
Blasting
The blasting operations in the mine is being carried out by deep hole drilling and blasting
using delay detonators, which reduces the ground vibrations. Further, the ground vibrations
are being controlled by using modern shock tubes with delay non- electric detonators.
Blasting operations is being carried out only during day time as per DGMS guidelines. Blasting
is being performed strictly as per the guidelines specified under MMR, 1961. No secondary
blasting is being done in this mine. The oversized boulders generated during primary blasting
are being segregated and reduced in size by deploying hydraulic rock breaker. Explosive is
being used for blasting purpose which is stored in licensed explosive magazines and
Ammonium Nitrate Store rooms.
Loading
The hydraulic excavator of 3.5 m3 bucket capacity is presently being used for loading of
materials. Blasted limestone is being loaded by hydraulic excavators into the dump trucks for
onward dispatch to the crusher (for limestone) and at temporarily waste dump(for waste).
Transportation
Crushed Limestone is being/ will be transported from mine site to the Cement Plant via
Covered Conveyor Belt. Cement Plant is 8.2 km south to existing Mine site.
c. MINEABLE RESERVES AND RESOURCES
Table -6
Limestone Reserves/Resources as per UNFC
Classification Code Quantity
(million tons)
Grade
A. Total Mineral Reserve 15.93 +35% CaO
Proved Mineable Reserve 111 11.13
Probable Mineable Reserve 121 & 122 4.80
B. Total Remaining Resources 6.546
Feasibility Mineral Resource 211 6.546
Pre-Feasibility Mineral Resource 221 & 222 Nil
Measured Mineral Resource 331 Nil
Indicated Mineral Resource 332 Nil
Inferred Mineral Resource 333 Nil
Reconnaissance Mineral Resource 334 Nil
Total Reserves + Resources 22.476
Source: Modified Mining Plan & progressive mine closure plan
Anticipated Life of Mine
Considering the total limestone reserve of 15.93 million tonne, as per the EC the life of the
mine was estimated to be 11 years. But according to the present proposal the life of the mine
is estimated to be 8 years.
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 14
d. MINING DETAILS
This is an existing mine. Details of past production since year 1993 is given below:
Table – 7
PAST PRODUCTION DETAILS
S. No Year
Production
Quantity
(in tonne)
S. No Year
Production
Quantity
(in tonne)
1. 1993-94 250.00 15. 2007-08 608018.30
2. 1994-95 5300.00 16. 2008-09 778125.30
3. 1995-96 4200.00 17. 2009-10 889562.90
4. 1996-97 14710.00 18. 2010-11 907387.05
5. 1997-98 19500.18 19. 2011-12 1279303.60
6. 1998-99 15382.00 20. 2012-13 816887.00
7. 1999-2000 1009.00 21. 2013-14 490953.10
8. 2000-01 1000.00 22. 2014-15 375625.40
9. 2001-02 254768.39 23. 2015-16 213251.45
10. 2002-03 862117.00 24. 2016-17 249205.05
11. 2003-04 931316.18 25. 2017-18 278723.20
12. 2004-05 940147.10 26. 2018-19 414046.75
13. 2005-06 809237.15 27. 2019-20 565452.70
14. 2006-07 756638.30 28. 2020-21 591502.150
Production figures have been authenticated by Assistant Director Geology and Mining, Collectorate,
District: Dindigul, Tamil Nadu, dated 31.05.2021. Copy of same is enclosed as Annexure VI. Affidavit
under Common Cause is enclosed as Annexure VII.
Table - 8
YEAR WISE COMBINED PRODUCTION OF ALL MINERALS (IN TONNES)
Year Pit no.
Total Tentative
Excavation Top Soil OB/SB/IB
ROM
Total Waste
Ore :OB
Ratio Ore
Mineral reject
1 2 3 4 5 6 7 8 9
(Tonnes) (Tonnes) (Tonnes) (Tonnes) (Tonnes) (Tonnes) (T : T)
2019 - 20 Year 2019-20 is completed
2020 - 21 Year 2019-20 is completed
2021 – 22 (from
July 21)
Metukalathur, 838562 Nil
429321 327392 81848 511169
Palayam – I, 478707 137750 272765 68191 205942
SUB TOTAL 1317269
567072 600157 150039 717111 1:1.19
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 15
2022 - 23 Metukalathur, 727180
Nil 354218 298370 74592 428811
Palayam – I, 601356 218805 306041 76510 295315
SUB TOTAL 1328536 573024 604410 151103 724126 1:1.20
2023 -24
Palayam – I, 1371328
Nil
588480 626278 156570 745050
Kolichiwadi 1000650 680159 256393 64098 744258
Metukalathur, 707814 411161 237323 59331 470491
SUB TOTAL 3079793 1679800 1119994 279998 1959799 1:1.75
GRAND TOTAL 5725598 Nil 2819896 2324561 581140 3401036 1:1.46
Source: Modification of the Approved Review of Mining Plan
Table - 9
Mining details
S. No. Particulars Details
1. Method of mining Fully Mechanized Opencast mining
2. Total Geological Reserves 22.476 million tonnes (as on 3o.06.2021)
3. Total Mineable reserves 11.13 million tonnes (as on 01.07.2021)
4. Life of the Mine 8 Years @ 1.40 Million TPA
5. Bench Height 10 m
6. Bench Width 10 m
8. Elevation Range 200 to 219 m AMSL
9. Present working depth 41 m
10. Ultimate Working Depth 70 m
11. ROM/Waste Ratio (Tonnes: Tonnes) 1:1.20
12. Number of Working Days 300 days
13. Number of shifts per day 2 Shifts
Source: Modification of the Approved Review of Mining Plan
(vi) RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY SOURCE,
MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT OF RAW MATERIAL AND
FINISHED PRODUCT
� This is a Limestone Mining project; thus no raw material is required.
� Excavated limestone is being/will be transported to the cement plant via road.
� Limestone is being/will be used for captive purpose in the existing Cement Plant of the
company for cement manufacturing located at Villages: Karikkali, Taluk Guziliamparai,
District – Dindigul.
(vii) RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED IN THE PROJECT, IF ANY,
SHOULD BE BRIEFLY OUTLINED.
� Only small quantity of Top soil was removed from the broke open area and stacked at
the earmarked place and used for developing green belt activities. As on date mined
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 16
out Top soil at initial stage of mining operation is about 90000 M3 and the same has
been utilized for green belt development around the mining lease area. In future there
could be a possible generation of Top soil for a quantity of 37200 M3 and the entire
quantity will also be utilized for afforestation.
� 2 KLD of Domestic wastewater generated from mines office is being disposed of in
soak pit via septic tank. Retaining walls, Garland drains, along the periphery of pits and
dumps & settling tanks is being constructed arrest surface run-offs. Septic tanks and
soak pits are provided for disposal of domestic waste water.
(viii) AVAILABILITY OF WATER ITS SOURCE, ENERGY /POWER REQUIREMENT AND SOURCE
SHOULD BE GIVEN
A. Water Requirement
Total water requirement for the project is about 51 KLD. Same is being sourced from
the harvested rain water stored in mine pits.
B. Power Requirement
Total power requirement for the mining project after expansion will be 200 KVA which
is being sourced from Tamil Nadu Electricity Board.
(ix) QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR
MANAGEMENT/DISPOSAL
SOLID WASTE
� The solid waste generated is mainly hard rock consisting of calc-gneiss, pegmatite and
granite gneiss, it does not siltation or erosion in the dump yards.
� Garland drains (2.5 X 2 X 2 m) – 2nos are being/ will be made all along the periphery of
dumpsites to prevent the water carrying the wash off to enter into the mines.
� The slopes of the dump sites will be terraced and planted with grasses, legumes etc. to
arrest soil erosion to a great extent.
LIQUID WASTE
� The water collected in the garland drains will flow towards the settling tanks.
� Settling tanks are installed to collect the water from dump yards. The wash off is
allowed to settle and the pure and clean water is used for plantation purpose and for
wetting of haul roads.
4.0 SITE ANALYSIS
(i) CONNECTIVITY
� Nearest Highway is SH SH-75 (~3 km by road towards in East direction).
� Nearest Town is Karur (~ 35 Km in North Direction).
� The nearest railway station is Palayam (3 km in East direction).
� The nearest airport is Trichy (~80 km in NE direction)
� The site is well connected with communication facilities like telephone, fax and as such,
no constraints are envisaged in this aspect as the Tehsil and District headquarters are
near to the site.
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 17
(ii) LAND FORM, LAND USE AND LAND OWNERSHIP
The mining lease area forms a part of plain terrain with a gentle slope towards east.
There will be a permanent change of land use due to mining activities.
The total ML Area is 138.785 ha out of which 21.095 ha is Govt. land & 117.69 ha is
Private land. At conceptual stage; total excavated area 63.60 ha out of which 35.42
ha will be backfilled and 28.18 will be converted into water reservoir. 19.63 ha will be
used as dump, 2.78 ha will be under road, 0.50 ha under infrastructure, 10 ha area will
be developed as green belt/plantation on safety zone & 42.255 ha will remain
undisturbed.
(iii) TOPOGRAPHY & DRAINAGE
The area is generally plain flat with an elevation of about 200 m RL in the central part to
219 m RL in the NW side. The area is plain flat terrain with a gentle slope towards East.
There is no perennial water body within the lease area. The study area of 10Kms radius
around the mining lease there is no perennial river. There are natural seasonal streams
and nallahs surrounding the mine leases which are active during rainy season and
remains dry for most of the year.
The general topography of the entire leased area is a very gentle slope towards east.
The regional drainage is dendritic in pattern. The main source of water in the area is
rainfall. The seepage water as well as the rain water during monsoon accumulating the
mine pit will be pumped out and used for domestic, green belt and dust suppression
activities. The depth of ground water table is about 120m. The water will not be
encountered during mining
(iv) EXISTING LAND USE PATTERN (AGRICULTURE, NON-AGRICULTURE, FOREST, WATER
BODIES (INCLUDING AREA UNDER CRZ)), SHORTEST DISTANCES FROM THE PERIPHERY OF
THE PROJECT TO PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY,
ECO SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ. IN
CASE OF NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE NOTIFICATION SHOULD
BE GIVEN
� The total ML Area is 138.785 ha out of which 21.095 ha is Govt. land &117.69 ha is Private
land. The mining lease area forms a part of plain terrain with a gentle slope towards
east. There will be a permanent change of land use due to mining activities.
� No forest land falls in the mine lease area.
� No National Park, Wildlife Sanctuary exists within study area.
� Details of Environmental settings around the mine site are given in the table below:
Revalidation of EC of Dholipatti Limestone Mine (ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA (Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 18
Table - 10
Environmental Settings of the Area
S.No. Particulars Details
1. Nearest Town Karur (~ 35 Km in North Direction)
2. Nearest State/National Highway SH-75(~3 km by road towards East direction )
3. Nearest Railway Station Palayam (~3 km in Eastdirection)
4. Nearest Airport Trichy (~80 km in NE direction)
5. National Park, Wild Life Sanctuaries,
Biosphere Reserves, Tiger Reserves,
Wildlife Corridors etc. within 10km radius
None
6. Reserved / Protected Forest within 10km
radius (Boundary to boundary distance)
Toppai Swamimalai RF (~6 km in SE direction)
7. Nearest water bodies Vallianaikulam pond (~8 km in NNE direction)
8. Seismic Zone Zone – II as per IS: 1893 (Part-I) : 2002
Source: Google Earth & SOI Toposheet
Revalidation of EC of Dholi[patti Limestone Mine(ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA(Total Excavation: 3.08 Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District:
Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 19
Figure 3: Environmental Setting Map of Study Area
Revalidation of EC of Dholi[patti Limestone Mine(ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA(Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 20
(v) EXISTING INFRASTRUCTURE
This is an existing mine hence, existing infrastructure facilities will be used.
(vi) SOIL CLASSIFICATION
The entire limestone band is completely concealed under the top soil except in one or two
places where outcrops are seen. The soil around the lease boundary is used for agricultural
purposes.
(vii) CLIMATIC DATA FROM SECONDARY SOURCES
This area has a tropical climate and this area is too hot in summer. The average annual
temperature is 31.5 °C. In a year, the average rainfall is 650 mm. The temperatures are
highest on average in May, at around 41.5°C. In January, the average temperature is 21.5°C.
It is the lowest average temperature of the whole year. Relative humidity ranged between
67.2% and 69.2%.During rainy season, spanning September to November, rainfall occurs. The
total rainfall during the study period was 650mm.Wind speed and wind directions were
observed. During the month of May the wind speed Was a maximum of 4.82 Km/Hr. During
the month of September recorded a maximum value of 3.32 Km/Hr it was found that the
wind speed is more during the day time compare to nights. Predominant wind direction was
SW in post monsoon, NE during winter season and SW during monsoon
(viii) SOCIAL INFRASTRUCTURE AVAILABLE
The site is well connected with social infrastructure facilities like medical, post office,
schools, police stations etc. and as such no constraints are envisaged in this aspect. Tehsil
and district headquarter are near to the site.
5.0 PLANNING BRIEF
(i) PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, TRANSPORTATION ETC.) TOWN
AND COUNTRY PLANNING/DEVELOPMENT AUTHORITY CLASSIFICATION.
The project proposed by M/s Chettinad Cement Corporation Pvt Limited is due for
validation of EC for its Limestone mine. Existing Mining Lease area falls in Govt & Private
land. The Limestone mined out from this Limestone Mine is being used for captive use in
the existing Cement Plant of the company. The mined out limestone is transported to the
captive cement plant by a covered conveyer (2.8 km).
(ii) POPULATION PROJECTION
Total manpower is 33 persons. Preference is being/ will be given to the locals as per the
eligibility.
(iii) LAND USE PLANNING
The total ML area is 138.785 ha. Based on exploration carried out in the area, reserves
estimated considering various constraints and statutory barrier of 7.5 m of ML, a total of 4
nos. of pits shall be formed within ML upto conceptual stage. As the conceptual land use
pattern total excavated area 63.60 ha out of which 35.42 ha will be backfilled and 28.18 will
be converted into water reservoir. 19.63 ha will be used as dump, 2.78 ha will be under road,
0.50 ha under infrastructure, 10 ha area will be developed as green belt/plantation on safety
Revalidation of EC of Dholi[patti Limestone Mine(ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA(Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 21
zone & 42.255 ha will remain undisturbed. Details of the environmental sensitivity of the ML
Area:
Table - 11
Stage Wise Land Use Detail
S. No Particular Existing land use
(In Ha)
At the end of the plan
period (In Ha)
Conceptual period
(In Ha)
1. Area of excavation 45.45 46.55 63.60
2. Overburden/dump 11.72 19.63 19.63
3. Mineral Storage/Sub grade 0.00 1.04 0.00
4. Infrastructure 0.50 0.52 0.52
5. Roads 3.28 3.28 2.78
6. Others (Green belt & Safety
zone) 8.5 14.84 14.84
7. Undisturbed area 69.335 52.925 37.415
Total 138.785 138.785 138.785
Source: Modification of the Approved Review of Mining Plan
(iv) ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & SOCIAL)
Chettinad Cement Corporation Pvt Limited has / will assess the demand of infrastructure
(Physical & Social) in nearby area and same is being/will be developed in under corporate
social responsibilities programs.
(v) AMENITIES/FACILITIES
Chettinad Cement Corporation Pvt Limited has developed / will develop the
Amenities/Facilities in the nearby area of the project site as per requirement of local
people the nearby area of under corporate social responsibilities programs.
6.0 PROPOSED INFRASTRUCTURE
(i) INDUSTRIAL AREA (PROCESSING AREA)
Existing limestone mining lease area is138.785ha and existing infrastructure facilities will be
utilized for this project.
(ii) RESIDENTIAL AREA (NON PROCESSING AREA)
No area of mining lease area is being used or will be used for residential/township purpose.
(iii) GREEN BELT
� The total mining lease area is 138.785 ha.
� At present 8.5 ha area has already been developed under greenbelt/plantation. While
another 1.5 ha area is proposed to be developed. The proposed greenbelt development
plan is given below:
Revalidation of EC of Dholi[patti Limestone Mine(ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA(Total Excavation: 3.08
Million TPA) At Villages: Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
Pre-Feasibility Report
M/s. Chettinad Cement Corporation Pvt Ltd. 22
Table 12
Greenbelt Development and plantation Plan
Total proposed area for Green belt & Plantation (in Ha): 14.84
Area covered under Green Belt & Plantation (in Ha) 8.5 As on 20.07.2021
Balance area to be covered under Green Belt & Plantation (in Ha) 6.34
No.of Sapling Covered so far : 10930
S.No Year No. of Target Sapling
(in Nos)
Area to be covered in
Ha Location Name of Species
1
2021-22
(after
Aug’21)
2340 2.34 Safety/Barrier Zone at
Palayam Pit Pongamia
Pinnata(Pungan) ,
AcaciaLeducopholoea
(Velvel&Azadirachta
indica(Neem)
2 2022-23 2000 2.00 Safety/Barrier Zone at
Kolinchinwadi Pit
3 2023-24 2000 2.00 Safety/Barrier Zone at
Mettukalathur Pit
Total 6340 6.34
(iv) SOCIAL INFRASTRUCTURE
Expansion in Limestone Mining project will result in growth of the surrounding areas by
increased direct and indirect employment including ancillary development and supporting
infrastructure.
(v) CONNECTIVITY
The area is easily approachable by road, rail, and air. Nearest HighwaysareSH-75(~1 km in
East direction).The nearest railway station is Palayam (~0.5 km in Eastdirection).The nearest
airport is Indore International Airport Trichy (~65 km in ENE direction).The site is well
connected with communication facilities like telephone, fax and as such, no constraints are
envisaged in this aspect as the Tehsil and District headquarters are near to the site.
(vi) DRINKING WATER
Purified drinking water generated from RO plant installed at Existing Cement Plant will be
utilized for Drinking purpose at mines.
(vii) SEWERAGE SYSTEM
The domestic effluent generated from mine office is being disposed of in soak pit via septic
tank.
(viii) INDUSTRIAL WASTE MANAGEMENT
2 KLD Waste water generates from mines office is being/will be disposed off in soak pit via
septic tank.
Revalidation of EC of Dholi[patti Limestone Mine(ML Area: 13
Million TPA) At Villages: Dholipatti, Palayam&Karikkali
(ix) SOLID WASTE MANAGEMENT
The solid waste generated is mainly hard rock consisting of calc
granite gneiss, it does not siltation or erosion in the dump yards.
sites will be terraced and planted with grasses, legum
extent. Garland drain are being/ will be made all along the periphery of dumpsites to
prevent the water carrying the wash off to enter into the mines.
(x) POWER REQUIREMENT AND SOURCE
Power requirement for the mining
sourced from Tamil Nadu Electricity Board.
7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN
(i) POLICY TO BE ADOPTED (CENTRAL/ST
PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND LANDLESS LABORER (BRIEF
OUTLINE TO BE GIVEN)
The total ML Area is 138.785 ha out of which 21.095 ha is Govt. land &
land. R&R will be followed as p
8.0 PROJECT SCHEDULE AND COST ESTIM
(i) LIKELY DATE OF START OF CONSTRUCTION AND LIKELY D
SCHEDULE FOR THE PROJECT TO BE GIVEN)
This is an existing mine.
(ii) ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY
OF THE PROJECT
���� Capital Cost of the Project:
���� Cost for Environment Protection for the Project:
• Capital Cost:
• Recurring Cost:
9.0 ANALYSIS OF PROPOSAL
This limestone mine project will result in growth of the surrounding areas by increased direct and
indirect employment in the region incl
Development of social amenities is
infrastructures, etc. No major adverse effect on environment is envisaged as the required
mitigation measures will be inbuilt in the project.
Mine(ML Area: 138.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA(Total Excavation: 3.08
Dholipatti, Palayam&Karikkali Tehsil: Guziliamparai, District: Dindigul, Tamil Nadu
SOLID WASTE MANAGEMENT
The solid waste generated is mainly hard rock consisting of calc-gneiss, pegmatite and
granite gneiss, it does not siltation or erosion in the dump yards. The slopes of the dump
sites will be terraced and planted with grasses, legumes etc. to arrest soil erosion to a great
Garland drain are being/ will be made all along the periphery of dumpsites to
prevent the water carrying the wash off to enter into the mines.
POWER REQUIREMENT AND SOURCE
ower requirement for the mining project after expansion will be 200 KVA which will be
Tamil Nadu Electricity Board.
ION AND RESETTLEMENT (R & R) PLAN
POLICY TO BE ADOPTED (CENTRAL/STATE)IN RESPECT OF THE PROJECT AFFECTED
PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND LANDLESS LABORER (BRIEF
OUTLINE TO BE GIVEN)
The total ML Area is 138.785 ha out of which 21.095 ha is Govt. land &
R&R will be followed as per Central and State Government Rules & notifications.
AND COST ESTIMATES
E OF START OF CONSTRUCTION AND LIKELY DATE OF COMPLETION (TIME
SCHEDULE FOR THE PROJECT TO BE GIVEN)
This is an existing mine.
ED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY
Capital Cost of the Project: Rs. 67.15 Crores
Cost for Environment Protection for the Project:
Capital Cost: Rs. 20.0 Lakhs
Recurring Cost: 4 lakh/Annum
ANALYSIS OF PROPOSAL
limestone mine project will result in growth of the surrounding areas by increased direct and
indirect employment in the region including ancillary development and supporting infrastructure.
Development of social amenities is in the form of medical facilities, education, communication,
No major adverse effect on environment is envisaged as the required
ion measures will be inbuilt in the project.
.785ha) Limestone: 1.40 Million TPA, Waste: 1.68 Million TPA(Total Excavation: 3.08
Pre-Feasibility Report
gneiss, pegmatite and
The slopes of the dump
es etc. to arrest soil erosion to a great
Garland drain are being/ will be made all along the periphery of dumpsites to
project after expansion will be 200 KVA which will be
E)IN RESPECT OF THE PROJECT AFFECTED
PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND LANDLESS LABORER (BRIEF
117.69 ha is Private
er Central and State Government Rules & notifications.
E OF COMPLETION (TIME
ED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY
limestone mine project will result in growth of the surrounding areas by increased direct and
supporting infrastructure.
in the form of medical facilities, education, communication,
No major adverse effect on environment is envisaged as the required
(.. /DownloadPfdF
FileName=GOY5L8rqG (.. /DownloadPfdF
FileName=GOY5L8rqG (.. /DownloadPfdF
FileName=GOY5L8rqG (auth/ACK_Mo
<
S.No Proposal Details Location Important Dates Category Company/Proponent Type ofproject
* Attached Files
1 ProposalNo
:IA/TN/MIN/180914/2020
File No :
ProposalName
:
Name change inEnvironment clearanceletter issued forExpansion andmodernisation ofDholipatti Limestonemines (10000 Tonnesto 1.4 MTPA) located atDholipatti, Palayam &Karikkali Villages,Vedasan
State:
TamilNadu
District :
Tehsil :
Date ofSubmissionfor EC
:08Jun2021
Date ofpreviousEC Granted
:19Mar2001
Non-Coal Mining CHETTINAD CEMENT CORPORATION PRIVATE LIMITED TransferEC
(HTTPS://SWACHHBHARAT.MYGOV.IN/) (WWW.DIGITALINDIA.GOV.IN) (HTTPS://DATA.GOV.IN/)
(HTTPS://INDIA.GOV.IN/) (HTTPS://WWW.MYGOV.IN/) (HTTP://MEITY.GOV.IN/) (HTTP://WWW.PMINDIA.GOV.IN/EN/)
(HTTP://WWW.NIC.IN/)
Close(X) Close(X)
EDS details related with Proposals
Sno. Proposal No. Essential Details Sought by MSCopy of Essential Details Sought
letter Sought on(Date)Query From
(MemberSecretary)
1 IA/TN/MIN/180914/2020 • please furnish status of EC as per the EIA notification S.O.1533(E) 14th September, 2006 . Please submit the followingdocuments: • Review of IBM approved Mining Plan in the name ofpresent project proponent. • NOC from previous project proponent.• Undertaking by present project proponent. • Lease deed in favourof present project proponent. • Undertaking Letter stating that thereis ‘no change in ownership’ or ‘change in ownership’ involved.
12/11/2020 MIN
2 IA/TN/MIN/180914/2020 EC letter was granted by MoEF&CC on 19th March 2001 under theprovision of EIA Notification, 1994 which is valid for 5 years afterrevalidation name can be changed
22/06/2021
3 IA/TN/MIN/180914/2020 verified 22/06/2021 MIN
52