BHAKRA DAM

161
rE w{?,i j;.-.6r$m ift }Bq BHAKRA BEAS MANAGE,ME,NT BOARI) IRRIGATION WING E,ME,RGE,NCY ACTION PLAN / DISASTE,R MANAGE,ME,NT PLAN FOR BHAKRA DAM DOC NO. BHD/DE,SIGN/EAP ISSIJE NO:-02 (Reference DOC NO.-MR/IMS lPlzl) . MR/I}j4SIPIZ3 EFFECTIVE DATE: 12-01 -20 1 9 DIRECTOR DESIGN B& DESIGN DIRECTORATE BBMB (IW), NANGAL TOWNSHIP TEL: 01881-223108

Transcript of BHAKRA DAM

rE w{?,i j;.-.6r$m ift }Bq

BHAKRA BEAS MANAGE,ME,NT BOARI)

IRRIGATION WING

E,ME,RGE,NCY ACTION PLAN / DISASTE,R

MANAGE,ME,NT PLAN

FOR

BHAKRA DAM

DOC NO. BHD/DE,SIGN/EAPISSIJE NO:-02

(Reference DOC NO.-MR/IMS lPlzl). MR/I}j4SIPIZ3

EFFECTIVE DATE: 12-01 -20 1 9

DIRECTOR DESIGNB& DESIGN DIRECTORATE

BBMB (IW), NANGAL TOWNSHIPTEL: 01881-223108

BHAKRA BEASMANAGE,MENT

BOARD

BHAKRA NANGAL PROJECT'INTEGRATED MANAGEMENT SYSTEM

Doc. No.BHDIDESIGN/BAP-Date:12-07-2019Issue No. 02Page. I of 1

Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISII{G OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKESOR OTHERS. dIeC

FORWARD

Emergency situation may arise out of flood, water leakage, other accidents,

terrorist attack and other disaster/natural calamity such as earthquake etc at any time.

These disasters may cause serious loss to life and property.

Under such situation, the risks should be foreseen to the extent possible well in

advance and actions need to be taken be well documented, practiced and revised as per

situation. This will ensure the preparedness in respect of all related aspects to avoid the

disasters and to minimize the losses. lt will also help to ensure immediate corrective

actions to plug the situation by arranging all possible means required to prevent any

emergency occurrence.

Better management, planning, coordination, rehearsals, collective and sincere

efforts by all at all time will help to achieve the desired objectives. The Emergency Action

Plan for Bhakra Dam has been prepared based on the guideline of Central water

Commission & data/information provided by the field offices.

This EAP will prove as an effective tool to handle the unforeseen situation to some

extent. All concerned of Bhakra Project to go through this EAP meticulously in letter &

spirit and also to educate their fellow colleagues accordingly. Deep involvement and

cooperation of all concerned and its associates is expected in effective implementation of

this emergency action plan.

=r*r,Kffi-2 q

Er S.K. BbdiDirector / Design,Bhakra Beas Design Dte,BBMB, Nangal Township.

lssued By

rL#&^ka

Senior Design Engineer,Bhakra Beas Design Dte,BBMB, Nangal Township.

Prepared By

$

Er. A.(. AggaruualChief E[rgineer,BhakraNangal Township.

:'...1 ". ,.':t''

BIIAKRA BEASMANAGEMENT

BOARD

BHAI(RA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKESoR orHERS.COntrOlled

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. I of4Page Revision No. 0

TABLE OF CONTENTS

Item No. Title Paqe No.'1.0 Introduction 1-2

11 Emergency Action Plan 2-4

12 Notification Flow Chart 4-5

20 Responsibilities 5-7

21 Responsibility for evacuation, rescue & relief 7 -17

2.2 Control Room 17-18

2.3. EAP Coordinator "Responsibility" 18

2.4 Approval of the Plan 18-'19

30 Emergency Procedures 19

3.1 Emergency ldentification, evaluation & classification 19-23

32 Notification Proced ures 23-24

321 Event Report 24-25-26

40 Preventive Actions 26

41 Surveillance 26

42 Access to site 27

43 Emergency supplies and Resources 27

431 Material Availability 27-28

4.3.2 Machinery/Equipment availability 28

433 Contractors 28-29

Reviewed and Approved By lssued By

BHAKRA BEASMANAGE,MEN

.f BOARD

BHAI(RA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07 -2019Issue No. 02Page.Z of 4Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISII\G OUT OF ITYDROLOGICAL

FAILURES, EARTHQUAKES OR OTHERS.

ControlBed

434 Labour 29

435 Engineers Experts 29

4.4 Co-ordinating lnformation on flows 29-31

4.5 Providing alternative sources of power 31-32

5.0 Execution of work at site 32-33

6.0 lnundation Maps 33-34

70 Description & location of NHC 34

80 Trainings 34-35

9.0

g1@to be discharged by different officers

ffi

Duties-Dut

Duties &

Drrt

Dutbs &

Duties &

35

35-36

92 36-37

9.3 37-40

94

t5-eG

40-42

42

42-43

g7

93g9

eioeT1

ea

43-44

44

44-47

47-51

51-56

56-58

5B-6b

6G61913 Outies A nesponsibilities of XEN,Bhakra Elect.Divn.Nangal

914 Duties & Responsibilities of Supdt.Proc. C/Stores lJlvn,Nangal

Dutres a nesp

D utres & Res p o ;n o', 6;. "1

p u o B a rvt a H ts p rta I ,'rtl a n g a I

61-64915

el6 64-65

I17 65-66

Prepared By

ASE.

Reviewed and APProved BY rl.ssued By

\ U).I-LL\ /--rsE/HO(MR)

BHAKRA BEASMANAGEMENT BOARD

BI{AKRA NANGAL PRO.IE CTINTEGRATED MANAGEMENT SYSTEM

TITLE: BMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKESOR OTHERS.

LIST OF ANNEXURES

Sr.

No.

Title Annexure Page

No.

I Layout Plan of Bhakra Dam 1-3

2 Salient Features of Bhakra Dam il 4-6

3 Alert Levels for emergency conditions ilt 7-12

4 Notification FlowChart IV 13-16

5 Narrative information listing of persons to be notified by Each individual 17 -31

6 Sample warning messages for different situations VI 32

7 List of Deputy Commissioners of Punjab & H.P. districts And lndian

Army, lndian X Navy & ln X ldian Air Force

vil 33-34

8. Name of Panchayats of Teh..Bangana and Tehsil Sri Naina Devi (H.P) vilt 35-36

I List of villages D/S of Bhakra Dam along with name of Sarpanch and

their contact numbers

IX 37

'10. List containing contact numbers of Media persons X 3B-39

11 List of facilities to be made available Each control room XI 40

12 Plan showing sites of higher elevations xil 41

13 Name of agencies lifting water from Bhakra Reservoir And Nangal Pond xilt 42

14. List of persons to be contacted during emergency XIV 43-47

15 List containing signatures of all parties XV 4B

16 Alternative contacts of persons to be notified as per N.F.C XVI 49 50

17 Report forms for emergency situation XVII 51-54

1B List of experts/retirees well conversant with Dam repairs XVIII 55

19 Repair and maintenance schedule for upkeep XIX 56-62

Of different components of Bhakra Dam

Prepared By Reviewed and Approved By

Directo,r^pesign

tl-,

BHAKRA BEASMANAGEMENT

BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHDIDESIGN/EAP-Date:12-07-2019Issue No. 02Page.4 of4Page Revision No. 0

TITLE: EMERGENCY ACTION PI,ANFORHANDLING SITUATION ARISING OUT OT'

HYDROLOGICAL F'AILURES, EARTHQUAKES ORorHERS. Controlleil

20.

Plan showing alternative routes for approaching Bhakra

Dam from different sites

XX 63

21. List of machinery for construction activities at Emergency

site

XXI 64

22. List of machinery with XEN Bhakra Mechanical Division,

Nangal/List of operators

XXI I 65-66

23 List of XXlll machinery /Equipments with BSL Project,

Sundernagar and Beas Dam Talwara

XXIII 67

24 List of contractors XXIV 68,69

25. List of firms XXV 70-71

26 List of contractors for labour arrangement XXVI 72

27. List of officers to be informed of floods XXVII 73

28, List of employees of RM&SR Divn/Loading centre on

Reservoir rim.

XXVIII 74-77

29. List of persons wot"king in Dam area XXIX &XXX

7B-84

30. Organizational set up of Bhakra Dam Nangal XXXI B5

3'1. List of Persons deployed at discharge sites u/s &d/s of XXXI I B6-BB

Bhakra Dam on River Sutlej

Reviewed and Approved By

Direltor flesign

Prepared By ls-sued By

k[L-

BHAKRA BEASMANAGEMENT

BOARD

BHAI(RA NANGAL PROJECTINTEGRATED MANAGEMEI{T SYSTEM

TITLE: EMERGENCY ACTION PLANFORIIANDI,ING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAI(ES QRorHERS. comtromeo

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. l of66Page Revision No. 0

1.0 INTORODUCTION

The present emergency action plan is designed for such a gigantic project which roosts

prominently in the world map of large dam. The Bhakra Dam is a concrete reality. lt is a straight

gravity dam rising 740 ft above the deepest foundation and 550 ft above the river bed level and span

the narrow gauge with a length of 1 700 ft at the top. The dam section has a downstream slope 0. B lJ:

lV and a vertical face on the upstream side above EI.'1350 ft with a slope of 0.35 H: 1 V below this

level which joins the upstream strut through a large fillet to provide support to the heel of the dam and

confine the clay stone underneath. The layout plan of the dam has been appended as Annexure_l

which also shows sectional view of Bhakra Dam and various inspection & drainage galleries within

dam body. The dam was constructed systematically according to a pre-meditated plan of blocks

(monoliths). The faces of the monoliths forming the longitudinal and transverse joint were provided

with keys and these joints were grouted to make the dam act as a single integrated structure.

The dam has an important feature as an over flow spillway 260 ft wide which is centrally

located in the body of the dam with a discharging capacity of 197300 cusecs at El. '1685 ft. having four

number Radial gates (50 x 47.5 ft). Sixteen number River outlets have also been provided in the

spillway portion arranged in two tiers at El.1320 ft and E .1420 ft eight numbers on either side of the

central training wall. The purpose of River outlets is to meet with the day to

Reviewed and Approved By

il

]qsued By

\\\&hrdnD'Director Desion

d^{I

Prepared By

BHAKRA BEASMANAGEMENT

BOARD

BHAKRA I{ANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION P'ANFORHANDLING SITUATION ARISING OUT OF

HYDROLO GICAL FAILURE S, EARTHQ UAKESoR orHERS. Ceftf-ollcO

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page.2 of 66Page Revision No. 0

,)

day irrigation & power requirement, disposal of floods and passage of density Currents.

Further ten number welded plates steel penstocks are also located five each on either side of

the spillway in non over flow section in order to feed two number power plants on d/s of Bhakra Dam

each on left & right side These power plants have the generating capacity of 540 MW (10g x 5) and

785 MW (157x5) respectively. For detail refer Annexure-ll salient features of the project.

1.1 EMERGENCY AGTION PLAN

The emergency action plan is a necessity for the size & magnitude of a project like Bhakra

Darm due its location in the seismically active zone ancl its typical geology, the potential emergency

may arise out of any situation involving flood due to breach or other structural failures as well as major

floods without a breach included. other unusual situations may also arise by sudden overtopping of

the dam, due to existing spillway capacity falling short despite the best efforts to route the floods.

Another factor involves which may make the stability of the dam questionable r.e. unusual seepage or

piping through the dam or excessive uplift pressures beneath the dam body, sliding of the side slopes

/ embankments, earthquake damages and land slide generated waves within the reservoirs,

equipment mal functions, foundation failure, and sabotage. Any one of these factors can trigger the

disaster which may disrupt normal human life in its established social traditional and economic

system The destruction of environment caused by extra ordinary natural phenomena or human

created

ASE-I OKReviewed and Approved By

Director Design

BHAKRA BEASMANAGEMENT

BOARD

TITLE: EMERGENCY ACTION PLANFOR. HANDLING SITUATION ARISII{G OUT OF

TIYDROLOGICAL FAILURES, EARTHQUAKES ORi 'J

5i {.:r+.,SlCr orHERS. COntfOlled

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHDIDESIGry/EAP.Date:12-07-2419Issue No. 02Page.3 of66Page Revision No. 0

hazards results into hardship and suffering beyond redemption unless outside help is managed to the

affected populace. A hazard happens to be a perceived event which threatens both life and property.

A disaster is the realization of this type of hazard. lt may turn out to be a disaster if proper

management and mitigation measures are not ensured to alleviate the suffering of the people of the

affected area. Emergency action plan in its ambit identifies potential emergency condition at a dam

and specific pre planned actions to be followed to minimize property damages and loss of life.

Broadly the causes responsible for such type of disasters may be classified as.

(a) Hydrologic: such as flooding due to large releases, seepage slumping, piping, embankment

cracking, embankment deformation, movement of concrete section (sliding or overturning), settlement

failure of spillway gates or supporting structures, outlet works, equipment malfunctions etc.

(b) Earthquake: This natural cause which may have impact on the structural stability of the dam

resulting into embankment piping, cracking and movement of concrete section.

(c) Other events: These include equipment failure security/criminal action, structural fire, land

slide, wild fires, storm of extreme intensity, cloud burst and sabotage etc.

Emergency action plan requires the project authorities to moderate or alleviate the problems at

the dam. lt includes procedures and information to assist the authorities in issuing early warning and

notifications messages to responsible

Reviewed and Approved By

Director Design

Prepared By n lssued Bv

U**so( *,v

downstream ln this E.A.P. potential emergency or imminent emergency arising due to hydrologic

reasons as classified earlier, has been considered as most likely occurrence.

1.2 Notification FIow Chart: - N,F,C. is a very important component of the E.A.P. which may

meet emergency conditions.

(a) Failure is imminent or has occurred.

(b) Potential emergency situation has developed or is developing

(c) Flood is occurring or is expected

The Bhakra Dam was commissioned and dedicated to the nation on22nd October, 1963 by our

first Prime Minister Pt. Jawahar Lal Nehru. The dam since its commissioning has been run so far by

tlre ever vigilant administratron. ln the past the emergencies arising out of the situations have been

managed deftly and efficiently. The uncertainty about the future requires the same vigilance and keen

watch dog behavior as an emergent need of the times to come. The efforts in the past have been

fruitful as the running and the maintenance of the project has been carried out according to the

provisions of the codes and procedures as laid down in the operation and maintenance manuals.

Despite all these good input and stringent efforts these may fall short of the likely natural

aforesaid unprecedented events. ln order to cope with the future emergencies and the statutory

compulsions of the present time, four number alert level situation developing very slowly to situation

of inevitable catastrophe are summarized as below and find mention at Arrnexure-lll Also four

number N.F.C.

,.-'.,,

BI{AKRA BEASMANAGEME,NT

BOARD

Pi;p;ied By- -AsE-t fi

\sylssued BySE/l-1Q(MR)

TITLE: EMERGENCY ACTION PLANFORIIANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURBS, EARTHQUAKES,ORorHERS. COftfOIoriroll';e

Reviewed and Approved ByDirector Design

BHAI(RA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/BAP-Date:12-07-2019Issue No. 02Page. 4 of 66Page Revision No. 0

01,!*-th'

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 5 of 66Page Revision No. 0

covering the afore mentioned situations have been incorporated as annexure -lV so as to pass on the

information about the developing situation to all responsible and concerned officers. The narrative

information supplementing the flow chart of different situation as above has been provided and

appended at annexure-V with detail. Sample warning messages explicitly giving a brief specific

situation are also attached as annexure-Vl. An updated copy of the NFC is posted in all the offices of

the officers having responsibility in the EAP.

2.0 RESPONSIBILITIES

BBMB administration is responsible for the upkeep and maintenance of Bhakra Dam besides

two other Pro.lects on River Beas (BSL Unit -l and Beas Project Unit - ll). The duties and

responsibilities are clearly defined in respect of the different divisional engineers placed under

different controls as per org. chart at Annexure-XXXl. However in order to make emergency plan

more effectively implemented, the personnel manning the project should be aware of the

responsibilities at the time of developing inevitable or imminent situations. Such situations demand

that Executive Engineer Bhakra Dam, Xen Reservoir Management and Xen, Bhakra Mech., and Xen

Bhakra Electrical will be responsible to perform pivotal role at site of emergency on the project Above

all Executive Engineer Bhakra Dam Division would be handling the situation through the acttve

participation of the other associates being overall in charge of the Bhakra Dam including all related

vital structures. Xen, Bhakra Dam would determine and identify the triggering events which require

emergency action and ensure

BHAKRA BEASMANAGEMENT

BOARD

Prepared By Reviewed and Approved By

Director Design

f lssued Bv

L{fuff{, &

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMBRGENCY ACTION PLAI{FORTIANDLING SITUATION ARISING OUT OF

HYDROJ.OGICAL FAILURE S, EARTHQUAKES

__rL

BHAI(RA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

f)oc. No.BHD/DESIGN/EAP-Date:12-01-2019Issue No. 02Page.6 of66Page Revision No. 0

TITLE: EMERGBNCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

I-IYDROLOGICAL FAILURBS, EARTHQUAKPSoR orI{ER.l COntrOUed

BHAKRA BEASMANAGE,MENT

BOARD

deputing of responsible personnel to meet such exigency. This may include incident of sabotage. ln

this case Xen, Bh. Dam Division will immediately inform Project Security Officer who will act promptly

as per his duties and responsibilities. The most likely situation expected to develop may be due to

unprecedented high floods in Sutlej catchment. He will immediately inform his high offices i.e. S.E.

Bhakra Dam Circle & Chief Engineer, Bhakra Dam as per flow chart of External Alert contained at

Annexure-lV. He will also inform Xen, Bhakra Mech., SDE Water Regulation, Xen, Nangal Dam and

others as per N.F.C. However, under certain special circumstances the duty of informing the

developing emergency or imminent emergency, the power may be delegated to SDO lnstrumentation.

ln an inevitable mishap all agencies/partner states to whom water is being supplied or the districts of

the states through which the river Sutlej runs past will be informed about the exigency well in time as

per N.F.C. The list of the Deputy Commissioners of the district through which the river Sutlej

transverses its course has been appended as Annexure- VIl.

The appended N.F.C. amply explains the route and destination to where the information of the

mishap is to be passed on.

It may also be made imperative and followed in true sense that the flood discharging

facilitation/installations are manned by the efficient and the most experienced operators and the

procedures for their operation during such hours of emergency are strictly carried out in accordance

with the provisions of the O & M. The brief sequence of operation of the gates at Bhakra Dam and

Nangal Dam may be depicted and the staff be made well aware

Prepared By Reviewed and Approved By

Director Design

ti-!"4-.]&1iry'hr*f,,-

BHAKRA BEASMANAGEMENT

BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page.7 of 66Page Revision No. 0

TITLF: EMN,RGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKTSoR orHERs. COntrolled

of it. Xen, Nangal Dam would ensure on the reception of imminent emergency flood situation

information that all lhe24 nos. bays of Nangal Dam are, operated at the notice of shortest period of

time with the help of departmental work force or contracted work force. The periodic seminars or

instructive training sessions may also be made part of emergency plan. This will go a long way in

handling the emergency situation aptly.

ln an eventuality of grim flood situation such as inundation which may threaten the township or

other populated areas upstream or downstream of Bhakra Dam, Xen, Bhakra Dam would notify

promply to all departmental and civil authorities with the due approval of high authorities of BBMB as

per N.F.c. having concern with the cropping up situation. This also includes peripheral districts on the

rim of the reservoir (such as District Una & Bilaspur of Himachal Pradesh). The list detailing the

contact numbers of various villages Sarpanches and N.G.O.',s upstream and downstream of Bhakra

have been appended as Annexure -Vlll to X'

2.1 RESPoNSIBILITY FoR EVAGUATIoN, RESGUE, RELIEF;

To grapple with the unprecedented situation effectively, Chief Engineer, Bhakra Dam who is a

project head would act swiffly on the basis of precise and accurate feed back information supplied by

the s.E. Bhakra Dam circle, s.E., Nangal Mechanical circle and their under associate team members

and ensure minimum panic amongst his team officers and deploy the resources at his command to

tide over the situation and have all the possible help by notifying

Reviewed and APProved BY

Director,Design

I]I]AKRA t]BASMANAGEMENT

BOARD

District Magistrate who is the Chairman of the Co-ordination Relief Committee Ropar and call help

from lndian Army, Indian Navy and lndian Air Force (contact numbers appended as Annexure- Vll)

through Chairman Office. Other central agencies such as I"M.D. CWC etc. will have to be informed as

per N.F.C. as they have also the responsibility to discharge by issuing warning messages through

various media such as audio, visual & print media etc. (list attached as Annexure--X). Above all

another important action to be taken would be to get the water releases from Dehar Power Plant and

Kol Dam stopped that discharges into river Sutlej through Chief Engineer, B.S.L. Sundernagar as well

as to Chief Engineer/System Operation, Chandigarh.

Further to cope with the developing/imminent / emergent situation such as unprecedented high

floods as above, the officers enlisted below in various teams would study/handle the situation

promptly without any hitch or hesitation. They would be responsible to act with alacrity on

identification and declaration of emergency of external alert level (Red) in consultation / approval of

high officers. A siren will be sounded in the presence of S.E. Headquarter (EAP co-ordinator) S.E.,

B D.C. and S.E., N.M.C. The mode of sounding siren will be as follows:

(a) ln case of emergency, the duration and number of sound blasts will be 2 minutes BLOW 30

seconds BREAK for 4 times.

(b) For all clear signals it will be continuous siren for 5 minutes which will be sounded upon the

direction of Chief Engineer, Bhakra Dam after the emergency is over.

l

l

Prepared By

ASE-I

Reviewed and Approved By

Di'ffi"'ion

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page.8 of66Page Revision No. 0

fITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL T'AIr,URES, EARTI{QUAKES ORorHERS. COntf&_

BI{AKRA BEASMANAGEMENT

BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Datezl?-07-2019Issue No. 02Page.9 of66Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

TIYDROLOGICAL FAILURES, EARTH QUSESoR orHERS. COntrOlled

*.1'$.'L

It is also added that the sirens installed at Bhakra Dam and in Township area would sound

simultaneously at the time of declaration of the emergency. The staff operating the sirens need be

made well conversant of the emergency sounding mode as described. The operation of the alarms

will be checked periodically. lts proper functioning will be done and confirmed by testing annually

when the EAP is reviewed every year.

Xen Bhakra Dam will monitor the situation with a precise period of time and continuously

informing s.E. (B.D.C) and s.E. (N.M.C.). Different set of teams have been constituted with the aim of

meeting the challenging situations

2.1.1 Team at Dam site for rescue & evacuation operation

XEN BHAKRA DAM(TEAM HEAD)1.SDO lnstrumentation2.SDO Road & ColonY3. SDO, S,O.S.4.Chief Fire Officer5.SDO Horticulture

orvru. i xeru RM/SR DlVlSloN

1.SDO, BSR2.SDO Silt SurveY3 ARO Silt

XEN BHAKRA MECHDIVISION1.SDO,Pt. lnstallation2.SDO Gates Gearing3. SDO Field Sub Divn.

ffigetting out of control and in which case the flooding becomes

inevitable (as per case IV of Notification flow chart), this team would arrange with all their mental

resources at their command and ensure the evacuation, rescue & relief of the persons entrapped

inside/outside the dam or in any surrounding area. The team with their under associates would:-

(a) Rescue and transport the casualties if any on the priority basis to first aid centre'

lssued BY

Q,nLt*, -Reviewed and APProved BY

Director

&{

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-(17-2019Issue No. 02Page. 10 of66Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFORHANDI,ING SITUATION ARISING OUT OF

I{YDROLOGICAL FAILURES, EARTHQUAKESoR orHER.l CoitiO[ed

BI-IAKRA BE,ASMANAGEMENT

BOARD

Transport all workers in the affected areas to the assembly point on premeditated place.

Take roll call of the persons assembled after evacuation.

The responsible persons as nominated by the Xen shall pass on the information in respect of

absenteeism/missing persons to the control room at site.

Will put in all the efforts with the help of fire fighting staff, divers or other present personneI of

army/navy at site.

They will also shoulder the responsibility as delegated by the SE (BDC) and SE (NMC) and

Chief Engineer, Bhakra Dam.

They will maintain daily diary of events and work progress & submit report in this regard to

higher officers as well as to the established control room.

They may use the facilities available at each control room as per annexure --XI

.Ensure that lists of persons in dam area working under XEN RM&SR, XEN, BDD, XEN

Bhakra Mechanical and Electrical Division is readily available with them as detailed at

Annexure XXV|ll, XXIX & XXX.

2.1.2. Team at Nangal Township and adjoining area for rescue and evacuation operation.

ln addition to above if the danger of the flood looms large on the

Area downstream Bhakra Dam including Nangal Township and adjoining areas,

- _-- PrepareO gy Reviewed and Approved By

ASE.I

(a)

(b)

(c)

(d)

(e)

(0

(g)

(h)

irector Desio

il'-P\

Doc. No.BHD/DESIGN/EAP.Dile:12-07-2019Issue No. 02

Page. ll of66Page Revision No. 0

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

BHAKRA BEASMANAGE,MENT

BOARD

TNLE' EMERGENCY ACTION PLANFORHA.NDLING SITUATION ARISII{G OUT OF

HYDROI,OGICAL FAILURES, EARTHQUAKESoR orHERs.controlled

then the under mentioned team of the officers with their under associates would act on war footing'

TEAM AXEN Building Construction & TownshiP Division

1.SDO Estate2.SDO Enforcement3.SDO Water SuPPIY

TEAM B

XEN HYDROLOGY1.A.D.E, Regulation2.A.D.E., HYdrologY3. A.R.O., Meteorol

holeofthetownshipandDubettacolonyareaetc

team A would take care of rescue and evacuation operations for an area lying on the right side of the

road leading from singh sabha Gurdwara to BBMB Workshop whereas team B would be looking after

therescue&evacuationoperationsleftofthesaidroad,

(a)Theywillberesponsibleforattendingtherescueandevacuationoperationsofthe

entrappedpersonsonprioritybasisandprovidefirstaidormedicalaidimmediately

throughtransportingthevictims/orcausalities,ifanytothenearbymedicalcentre'

(b)Theevacuatedpersonswillbetransportedtothesheltersathigherelevation(plan

attachedatAnnexure-Xll.wheretheaffectedpersons

Reviewed and APProved BY

Director De

{

Prepared BY

ASE-I

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 12 of66Page Revision No. 0

TITI,E: EMERGENCY ACTION I,LANITORHANDI,ING SITUATION ARISTNG OUT OF

I{YDROLOGICAL FAILURES, EARTHQUAKES OR

i''' : : 'THERS' controlleil

I]HAKI{A BEASMANAGEMENT

BOARD

may be stationed with temporary housing such as tents, nearby school buildings or religious

places such as Mandir & Gurdwara etc.

(a) They will contact the local NGO's and Village sarpanches as per the list attached at

Annexure - lX for having immediate help of men and material during the period of such

emergency. This may also include food and clothing etc.

(b) They will also collect the information regarding the loss of human life, live stock and loss to

the housing etc. They will pass this information to the control room established in the

colony at safe and easily accessible pre planned place.

(c) The routine roll call of the personnel deployed for such operations shall be made invariably

in assembly point. Absenteeism/missing persons will be reported to the control room and

to the higher authorities also.

(d) They will also keep contact daily with the high offices for fresh instructions as well as seek

their guidance if need be.

(e) They will also make efforts to keep the water supply system running if possible or

otheruuise make alternate arrangement for water supply to ease the hardship of the

sufferers of the area.

(0 They will also inform various agencies drawing water for different purposes from the

Nangal Pond about the inevitable flooding situation. The contact numbers of such

agencies have been listed as per attached Annexure--Xlll.

Prepared By

ASE-I

Reviewed and Approved By

Director Design

Pase Revision No. 0

Doc. No.BHD/DESIGN/EAP-Dztel2-07-2019Issue No. 02

Page.13 of66

BHAKRA NANGAI, PROJECTINTEGRATED MANAGEMENT SYSTEM

BHAKRA BEASMANAGEMENT BOARD

rtrt Et ntvtnnGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL

FATLURE s, EARTHQUAKE s o"8lT_Ettfu a* o

(i) They will maintain daily diary of events and work progress and submit report in this regard

to the higher officers as well as to the established control room'

0) They may use the facilities available at each control room as per Annexure- Xl'Thay may

contact the NGO,s and village sarpanches as per Annexure-lX

2.1.3 Team for maintenance of electric supply at Bhakra and

Nangal TownshiP area

XEN, BHAKRA EICCTRICAL DIVISION

1. SDO, Bhakra Electrical

2. SDO, Nangal Electrical

3. SDO, Construction (BC&Township Divn )

4. SDO, R&M Sub Division

5. SDO, P.M & T Sub Division.

The team would make efforts to keep the electric supply system in the emergency

running both at Bhakra area as well as in the downstream area including Nangal

Township.

They will make arrangement to provide temporary lights for such an emergency

period wherever needed.

The routine checkup / roll call shall be exercised on particular pre planned

assembly point. The absentees or missing persons would be immediately reported

to the nearest control room.

They will organize safe shut down wherever required'

(a)

(c)

(b)

Reviewed and APProved BYPrepared BY

. .... .'',,;.

BHAKRA BEASMANAGEMENT BOARD

Doc. No.BHD/I)ESIGN/EAP-Datezl?-D7-2019Issue No.02 ,,*",$fi[IPage. 14 of66Page Revision No. 0

(a) They will organize all support services like power, temporary lighting and operation

of the water pumps.

(b) They will also help in dewatering inundated areas in dam or in the township area.

(c) They will also keep contact daily with the high officers for fresh instructions as well

as seek their guidance if need be.

(d) They will maintain daily diary of events and work progress and submit report in this

regard to higher officers as well as to the established control room.

(e) They may use the facilities available at each control room as per Annexure- Xl.

They may contact the NGO,s and village Sarpanches as per Annexure-lX

2.1.4 Security Team for Bhakra Dam & Township Area.

Project Security Officer (DSP)

'1 . lnspector Security (ClD)

2. Sub lnspector

3. A"S.l. with trained Security personals

This security team would meet the challenge of imminent emergency or inevitable flooding

situation through their efforts and try to secure the emergency operations from all angles. For this it

will be more worthwhile that Project Security Officer establish two teams i.e. one for Bhakra Dam area

. and other for Nangal township area and keep a close watch on the ongoing emergency operations.

Broadly they will be responsible to:

P repare

ASE

BIIAKIIA NANGAL PROJBCTINTEGRATBD MANAGBMIINT SYS'TEM

TITLE: EMERGENCY ACTION PI,ANFORTIANDLING SITUATION ARISING OUT OF'

HYDROLOGICAL FAILURES,EARTIIOUAKBS OR OTHERS.

Project Security Officer

1. lnspector Security

2. Sub lnspector

3. A.S.l. with trained Security personals

Reviewed and Approved By

Director Design

lssued By

hft{,fu

lMtu-*\ts'e***.5r

BHAKRA BEASMANAGEME,NT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHDIDESIGN/EAP-Dilezl}-07-2019Issue No. 02

Page. 15 of66Page Revision No. 0

-TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROLO GI c AL FAJ|HIR U$ffrtlsit.

(a)

(b)

(c)

(d)

(e)

(f)

Man all projects entrY Points

Ensure proper access to the emergency services

Prioritize the vehicle movement to the emergency site

control the traffic and divert through alternative routes.

Ensure no unauthorized person is entry into the emergency site'

To permit with minimum delay the entry of authorized personnel and recognized outside

agencies, vehicles etc. involved in the emergency operations who come to help'

Anyotherresponsibilityasentrustedbythehighofficers.(g)

2.1.5 COMMUNICATION TEAM FOR ESTABLISHING COMMUNIGATION NETWORK

DURING EMERGENCY

S.D.O.HydrologY

Junior Engineer Design Directorate

Wireless OPerators = 3 Nos'

This team would look after the maintenance of communications system during emergency on

the project site or in Township area. They will be responsible for the following'

(a) To maintain communication network in working condition and its use at the call of an

emergency.

(b) To keep ready suitable staff to act as messengers in the event the communication systems

fails due to anY reason.

Reviewed and APProved BY

Director Design

"j

BHAKRA I{ANGAI, PRO.IECTTNTEGRATED MANAGEMENT SYSTBM

Doc. No.BHD/DESIGN/BAP-Date:12-07 -2019Issue No. 02Page. 16 of66Page Revision No.0

TITLE: EMERGENCY ACTION PLANFOR" IIANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAII,URES, EARTHOR OTHE

(a) To ensure timely repair / maintenance if the normal communication system goes out of order.

(b) To help ensure timely access to the fire brigade and other emergency services.

(c) To be ready for discharging any other duty as assigned by the higher officers.

(d) To maintain daily diary of events and work progress & submit report in this regard to higher

offices as well as to the established control room.

2.1,6 MEDICAL ASSISTANCE TEAM;

PRINCIPAL MEDICAL OFFICER BBMB HOSPITAL NANGAL

: 2. Dispensers & others paramedical

staff of Canal Hospital, Nangal

The medical aid team would handle the most delicate and important job assignment of

extending immediate medical assistance to the victims during the crucial hour of emergency at dam

site or in Township area. They will be responsible to.-

(a) set up first aid post at emergency site on pre meditated site as decided by the Xen, Bhakra

Dam Division at Bhakra and by the Xen, Township in the Colony area.

(b) Make available first aid equipments and medicines.

(c) Co-ordinate shifting of casualties to nearby Medical Centers/Hospitals"

i trepared By

i nsr-r CReviewed and Approved By

Director pesign

.-\ -lssued Bv

L\$#f ,*kl

1SMO2. Dispensers and other paramedical

staff of Canal Hospital, Nangal.

BHAKRA BEASMANAGEME,NT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHDIDESIGN/EAP-Date:72-07-2019Issue No. 02

Page.17 of66Pase Revision No. 0

rTTiN' EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL

FAILURBS, EARTHQUAKES "" ffiHttbtbo

(d) Arrange ample .sr{ingfbfirv,ehicles for the carriage of the casualties through Xen, Bhakra

Mechanical.

Keep liaison with other Govt. and non Govt. hospitals/dispensaries in the nearby area.

To maintain daily diary of events and work progress and submit report in this regard to higher

officers as well as to the established control room.

They may use the facilities available at each control room as per Annexure - Xl.

CONTROL ROOM

As an important component of E.A.P. two numbers control rooms will be set up each at Bhakra

Dam site as well as in Nangal Township area for monitoring & co-ordinating the actions of various

agencies involved in discharging their duties during an emergency.

Controt Room at Bhakra field office at RL

1400

Control Room at Bhakra Beas Training centre

NanqalTownshiP.

SDE-ll, PongDesign1. SDO Discharge2. ARO Concrete Lab.3. SDO Stock Verification

S.D. E- lll, BSL Section1. ADE of SDE-ll Section2. P.R.O.3. SDO Rlv. Sub Divn.

SuPervision / guidance of S'E

Headquarter Nangal who will ensure the smooth functioning and keep liaison with different

agencies operating at that time. The control room would be well equipped with all types of

information in relation to the

(e)

(f)

(g)

2.2

Reviewed and APProved BY

Director Design

Prepared By

ASE.I

BFIAKRA BEASMANAGI]MENT BOARD

BIID/DESIGN/EAP.Date:12-07-2019Issue No. 02Page. 18 of66Page Revision No. 0

On going activities like rescue, relief operation and other reconstructions/maintenance activities

etc.

The team leader would in each case execute the work in control room round the clock in three shifts

depending upon the seriousness of the situation. ln addition to the above, they will be having a

continuous contact with l.M.D. through Xen, Hydrology for any abrupt change in weather likely to

occur in the catchment area upstream. An update will also be maintained by them by having a

continuous flow of information from the control room set up by district civil authorities.

2.3 E.A.P.Co-ordinator's Responsibility

An EAP coordinator will be responsible for EAP related activities including preparing

revisions to the EAP, if any" He will also arrange trainings & drills on EAP. S.E (Hq) has been

assigned the duties of an EAP coordinator . He is well conversant with EAP and any involved party

can contact him for any quarry regarding the plan. His contact number has been given as per

Annexure. XIV All records in respect of trainings & drills will be maintained by him separately. All the

parties will be apprised timely about any latest amendment to EAP. A copy of the same will also be

supplied to each party. Review of the EAP will be conducted by the coordinator every year on or

about the same date. In case there is no revision is necessary, a statement that the review was made

and no revision to the plan was required has to be provided to the recipient of the original EAP.

2.4 Approval of the Plan

I}I{AKRA NANGAL PROJECTINTBGRATED MANAGEMENT SYSTI.]M

TITI,E: EMERGENCY ACTION PLAN}-ORHANDLING SITUATION ARISING OUT OI.-

HynnoLoGICAL FAILURES, EARTHeIIAKES onOTHERS.

i

i

Reviewed and Approved By

Directpr D($ign

BHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJBCTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date;12-07-2019Issue No. 02

Page. 19 of66Pase Revision No. 0

Uff,nt EUERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL

FAILURES, EARI'HQUAKES OBOTHERS.t Confrolled-

The plan should be duly approved by all the parties involved or supposed to be involved in its

implementation at the time of any mishap on Bhakra Dam assuming thereby that all parties involved

are aware of and fully agree to the roles assigned to them during such emergency. Accordingly, the

signatures of all the related parties have been appended as Annexure -XV. declaring thereby approval

of the plan.

3.0 EmergencY Procedures

3.1 Emergencyidentification,Evaluation&Glassification

It is mandatory on the part of Executive Engineer, Bhakra dam to determine and identify

situations that require an emergency action. Therefore establishment of procedures for timely

recognition are imperative. To serve as a guide at that time following emergency identification,

evaluation & classification procedure elemehts are detailed below:

3.1.1) A listing of the conditions or events which could lead to or indicate an existing or potential

emergency. situations involving flood emergencies due to a breach or other structural

failure as well as a major flood without a breach should be included. Unusual situations

such as those caused (a) by overtopping of a dam due to insufficient spillway capacity

during large inflows to the reservoir (b) by seepage or piping through the dam over long

internal conduits (c) slope embankment slides (d) earthquake damage & (e) landslide

generated waves within the reservoir. Hydraulics, hydrodynamics, hydrology, sediment

transport

Reviewed and APProved BY

rector De

{

Doc. No.BHD/DESIGN/EAP-Dzte:12-07-2019Issue No. 02Page.20 of66Page Revision No. 0

Mechanics and geo- technical aspects are all involved in breach formation and eventual dam

failure. The prominent causes can be listed as follows.

BHAKRA BEASMANAGEMENT BOARD

1)

2)

3)

4)

5)

6)

7)

B)

e)

Extreme storm

Landslide

Earthquake

Overlopping

Structural damage

Piping

Equipment malfunction

Foundation failure

Sabotage

The above unusual situations can be divided into 3 categories.

a) Hydrologic: These are related to flooding due to large releases, seepage, slumping,

piping, embankment ,deformation, embankment overtopping, movement of concrete

section cracking, embankment (sliding or over turning) settlement, failure of spillway gates

or supporting structures., spillway & outlet works releases, equipment malfunction, etc.

Earthquake: These are related to impact of earthquake at dam which could lead to

embankment piping, embankment cracking, embankment deformation, Iiquefaction and

movement of concrete section, etc.

Pre

b)

pared By

ASE-I A

_wReviewed and Approved By

Director Design

,h-?I

BHAKRA NANGAL PROJECTTNTEGRATBD MANAGEMENT SYSTEM

TITLE: EMBRGENCY ACTION PI,ANFORHANDLING SITUATION ARISING OI]T OF

HYDROLOGICAL FAI LU RES. EARTHOI]AXES ORorHERS. controlied

1:!,ftiriru'rq**5#

":-::'i.,;.:i;"

RHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DBSIGN/EAP-Datezl2-07-2019Issue No. 02

Page.2l of 66Pase Revision No. 0

rTTiT' EMERGENCY ACTION PLANFOR HANDLINGsrruATIoN ARISTIIG OUT OF ITYDROLOGTCAL

F AILURE s, E ARrH QUAKE s tudilfrHilefl_

c) All other events: These are related to hazardous material spills/ releases, equipment

failures, security / criminal actions, fish / wildlife impacts, wildfires, structural fires,

landslldes, extreme storm, sabotage, etc. One or more of the above unusual situations will

initiate declaration of an emergency for internal alert or external alert'

l.1.Zl A brief description of the means by which potential emergencies will be identified, including

the data & information collection system, monitoring arrangements, surveillance, inspection

procedures and other provisions for early detection of conditions indicating an existing or

potential emergency. Emergency events occur with unusual situations varying degrees of

severity and predictability. An emergency may develop gradually and be steadily monitored

providing ample response time. conversely, an emergency may develop suddenly

requiring immediate emergency response to prevent devastating loss of life or impacts to

structures or the environment. The following definitions are used to classify emergency

events according to an ascending and progressive order of severity to which the dam

downstream or off-site population, structures or environment are threatened. Condition

may dictate that situation is classified as imminent without passing through the less severe

situations. A smooth transition should occur, if the situation is classified as "developing"

prior to "imminent".

Reviewed and APProved BY

Director D-esign

J-4,l

fi,,,,

BIIAKRA BEAS ,,

'

MANAGEMENT BOARD

BHAKRA NANGAI, PROJECTINTEGRATED MANAGEMEN'I SYSTT]M

f)oc. No.I}HD/DESIGN/EAP-Datezl2-07-2019Issue No. 02Page.22 of 66Page Revision No. 0

TITI,E: IiMERGENCY ACTION I,I,ANFOIIIIANDLING SITUATION ARISING O1]T OT.'

iiyilxor,oGrcAL FATLTTRES, EARTr{euAKESOR OTHERS.- ^-^llol

Assessment of degree of seriousness of unusual situation is required. lt may be classified

as the Blue, Yellow, Orange and Red level alert according to their seriousness.

Guidelines lie mainly in the interface between the internal and external emergency planning,

being the two main aspects of the following:

a) Definition of alert levels: lf an incident happen with the dam or problem arises

related with the dam over its foundations or with landslides into the reservoir, earthquakes,

adverse meteorological situations or any other alert must be given to civil protection system.

The gravity of the problem may obviously vary with the situation, but in order to assure that all

the entities involved in emergency actions are behaving in accordance with the situation, the

alert levels need to be previously defined, and must be the same for the internal and external

emergency plan of each dam.

These alert levels are established in colors, from Blue, the lowest level that corresponds to a

routine or normal situation, to Red, corresponding to a serious or catastrophic situation.

The alert levels defined are presented in Annex-lll. lts underlying philosophy relates the gravity

of dam problems with the expected impacts in the downstream valley and the likelihood of the

total dam rupture.

b) Alert and Warning systems: When facing

the dam must judge the corresponding alert level

order to allow the development of the

problematic situation, the entity exploring

and notify the civil protection system, in

Prepared By Reviewed and Approved By

Doc. No.BHDIDESIGN/BAP-Datezl}-01-2019Issue No. 02

Page.23 of66Revision No.0

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

BHAKRA BEASMANAGEMENT BOARD

ffiY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR OTHERS.

necessary actions, according to the situation'

lf the dam rupture is very likely (orange alert level) or imminent (red level) give" external alert"

signal and the entity exploring the dam must warn population downstream of the dam ln

orange level, the warning indicates people to be ready for evacuation and in red alert to

evacuate quicklY.

Given that a dam rupture can be very sudden, it is assumed that people leaving up to a certain

distance downstream of the dam have to evacuate by their own means, with no time to wait for

civil protection helP.

3.1.3 procedures, aids, instructions and provisions for interpreting information and data to

assess the severity and magnitude of any existing or potential emergency should be clearly

defined. The tabre covering different emergency situations demanding entirery separate

approach to tackle each case is given as per Annexure-lll'

3.2 NOTIFICATION PROCEDURES

A list of all the persons which includes their name & position, office & home telephones

and who are to be notified in the event of any emergency including alternatives is required to

be attached in Emergency Action Plan. The same has been placed at Annexure- XIV & XVI'

The list indicating who is to make call to whom & in what priority has been attached as

Annexure.S.E,(Ho.)hasbeenassignedthedutyofspokespersontodisseminateinformation.

The news media including Radio, Television and newspapers should be utilized to the extent

available & aPProPriate.

lssued Bv

Q(hd,,4-Reviewed and APProved BY

Director Design

ry

Doc. No.BI{DIDESIGN/EAP-Date:12-07-2019Issue No. 02Ptge.24 of 66Page Revision No. 0

BHAKRA NANGAL PRO.TECTINTEGRATED MANAGEMENT SYSTBM

'IITLE: EMERGENCY ACTION PLANT'ORHA.NDLING SITT]ATION ARISING OUT OF

r{YD Ro L o G r c A L F A r

lYrtR r$offi?tmm

i)

ii)

iii)

iv)

BI-IAKRA BEASMANAGEMENT

BOARD

I Prepared By

The contact numbers of media persons are enlisted as per Annexure- X. The use of media

should be pre planned to the extent possible. Given below is an example of news releases

that would be most effective for each possible emergency situation.

The information which should be conveyed during notification can be given in the

following prescript message (for use by designee when making notification).

This is (name, title, agency) monitoring, Bhakra Dam

The date is and time is

The conditions at Dam are

We will notify you if the conditions at the canal change. We will give you the next briefing at

hours or sooner.

For further information contact at BBMB control room telephone No

This message will be sent to you in the text form of fax or other.

3.2.1 EVENT REPORT

The in-charge shall ensure that the following report forms are to be used when recording

various emergency situations and unusual occurrences.

orv)

vi)

nASE-I I /, o)k/

NI--t*___ ___

Reviewed and Approved By

o').1i"''n'

BHAKRA BE,AS

MANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page.25 of66Pase Revision No. 0

rTtT-N' EMERGENCY ACTIOI\ PLANFOR HANDLINGSITUATION ARISING OUT OF TTYDROLOGICAL

FAILURES, EARTHQUAI(ES OR O-THERS.Carfralled

ii)

Emergency Event/unusual occurrence Report for reporting emergency events and unusual

occurrences other than earthquakes, bomb threats and oil and hazardous spills. Form - '1'

Earthquake Damage Report - for reporting earthquakes - Form -2.

iii) Bomb threat Report - for reporting bomb threats - Form-3.

These forms have been attached as Annexure - XVll"

ln addition all persons involved including their names title & phone numbers and all

agencies notified should be documented separately during such mishap'

All corrective actions to be taken at site will be decided by S.E. (BDC) Nangal and Xen,

Bhakra Dam joinly. lf necessity arises Director Design, Engineers having expertise in the field

may also be consulted. The contact numbers of experts have been given in attached

Annexure- XVlll

Sanctions of funds required to meet such an exigency will be accorded by Chief Engineer,

Bhakra Dam in anticipation of sanction of estimate'

It is desirable for all officers receiving reports in respect of tackling situations and duties

assigned to record / maintain diary and messages be recorded if possible'

Photographs are also essential to provide complete documentation of the event'

The attendance at site should be24 hours a day during occurrence of such emergencies'

.{spued By r

WffiMR)FReviewed and APProved BY

Director Design

WI

BI.IAI(RA BEASMANAGEMENT BOARD

Doc. No.BHD/DESIGN/EAP.Date:12-07-2019Issue No. 02Page,26 of 66

Page Revision No. 0

BIIAKRA NANGAL PROJECTINTEGRATED MANAGBMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFORIIAI{DLING SITUATION ARISING OU'T OF

.'HYDROLOGICAL FAILURES, EAR'IHQUAKESOR OTHERS.

. Xen, Bhakra Dam Division will ensure that a formal status report for the dam facility is

developed during emergency event which contains the date, time, location of observation,

water level in the reservoir, inflows / outflows and other related parameters.

4.0 PREVENTIVE ACTIONS

preventive actions refer to pre-planned and emergency action required to be carried

out for preventing failure of dam embankment / breach of any emergency situation likely to

occur and to minimize loss of life & property. ln case of identification of emergency condition

as enlisted in Table on Annexure--lll the residents of the area likely to be affected wlll be given

warning for evacuation to the safer places without making any delay due to the procedural

notification. Xen, Bhakra Dam or his representative may take this step promptly after

identification of situation. The several types of preventive actions include:-

4,1 SURVEILLANCE

There should be round the clock surveillance of the dam and its appurtenants and on

the rim of reservoir (left & right) upto reasonable distance during the rainy season to attend to

any emergency situation if it happens to occur. For this, the posting of special observer of high

experience and keen observation is an important requirement of EAP during high flood period.

To ensure that the whole system (including civil structures & mechanical installations) is being

maintained well upto

Prepared

ASE.I

Reviewed and APProved BYBy

irector D

4esrgn

BHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Dile:12-01-2019Issue No. 02

Page.27 of 66

Pase Revision No. 0

Trrr.nr EMERGENCY ACTIoN PLANFoR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR OTHERS.Con{rolled-

' nii .

satisfactory level, the repair maintenance must be carried out as per requirement of o & M of Bhakra

Dam. ln addition it must be ensured that maintenance and upkeep of different components is carried

out as enlisted in Annexure - XIX attached with this document and it will be only possible through

deployment of well procedure conversant and trained staff. The list of such persons should be

displayed on a photo frame mounting at convenient safe places at dam site and list of local telephone

numbers inside the dam & outside the dam area is appended as Annexure- XXV|ll & XXIX. lt will be

updated from time to time for any change.

4.2 ACCESS TO THE SITE

It must be ensured that primary and secondary routes to site of emergency are well

maintained and site is easily approachable during the emergency hours. Means of access to site

should be clearly defined in case of emergency situation when it is urgently required to arrange for

reconstruction activities. A layout plan of the area showing alternative routes also for easy approach

is attached as Annexure- XX . As an alternate route Right bank of dam easily approachable for Raipur

Madan (+ -'15 Km.) Leftbankis approachablefrom Naina Devi(+- 18 Km.)'

4.3 EMERGENCY SUPPLIES AND RESOURGES

There are certain planning and organizational measures that can help Dam personnel and

local officials to manage emergency situations more safely and effectively. These include:

4.3.1 i) MATERIAL AVAILABILITY

Material needed for emergency repair may be stock piled at a nearby convenient safe place

from where it can be used whenever there is emergent

Reviewed and APProved BY

Director Design

I]IIAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTTN'I'EGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DI]SIGN/EAP-Date:12-07-2019lssue No. 02Page. 28 of 66Page Revision No. 0

TITI,E: EMI]RGENCY ACTION PI,ANF.ORHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILT]RBS, BARTIIQUAKES

need for small quantum emergency jobs. For major emergency need bulk supply sources be before

hand identified and their timely supply has to be ensured by Xen, Bhakra Dam Division. Material such

as earlh or sand gunny bag be kept ready in near vicinity of the dam for their immediate use.

4.3.2 ii) MACHINERY EQUTPMENT AVATLABTLITY

The different types of machinery required for carrying out different activities during course of

reconstruction has been mentioned in attached Annexure - XXl. Some machinery has been stationed

permanently at workshop R.L. 1400 ft to meet with any emergency along with operators as detailed in

Annexure- XXll. Detail of more machinery available with BBMB at other project sites such as BSL

Project, Sundernagar and Beas Dam at Talwara which can be arranged shortly is detailed at

Annexure -XXlll.

4.3.3 CONTRACTORS

lf required contractor / contractors can also be engaged at the time

of any emergency arising at Dam site likely to put the safety of structure in danger S.E. (BDC) in

consultation with Chief Engineer, Bhakra Dam will finally decide about engaging the services of

contractor/contractors immediately after inspectlng / evaluating the gravity of the situation. The list of

contractors having expertise in the field and supposed to be competent enough to handle emergency

srtuation of lesser magnitude has been appended as Annexure - XXIV along with type of machinery

available with them. The list also contains their contact numbers. However, for undertaking repair /

reconstruction jobs of high quantum, the list of

Prepared By Reviewed and Approved By

rector

{

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page.29 of66Pase Revision No. 0BHAKRA BEAS

MANAGEMENT BOARD

rrrf-n: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL

FAILURE s, EARTHQUAKE s o"f;ffiffobd_Very renowned firms

Annexure-XXV.

for reference & immediate contact at,i; ,.n,:i+_i+.va

4.3.4 LABOUR

The Labour required during the execution of the work will have to be arranged locally'

Xen, Bhakra Dam will make all such arrangements in shortest possible time' A list of contractors

who can make labour available has been appended as Annexure- XXVI'

4.3.5 ENGINEERS EXPERTS

During any emergency S.E. (BDC) / Xen Bhakra Dam will contact /call or request the

engineers/persons having expertise in the field. A list of persons/retiree who contributed a lot

during their service with the project has been attached as Annexure-XVlll' These persons may

prove helpful for better guidance to tackle/handle the situation promptly & properly'

4.4 CO- ORDINATING INFLOWS ON FLOWS:-

During monsoon period, Regulation Directorate officers (Director Water Regulation,

Senior Design Engineer, Water Regulation, will keep watch on the inflows at Bhakra Dam' ln

caseofhighfloodsimpinginginthereservoir,DirectorWaterRegulation/S'D'E'Water

Regulation will issue instructions to Executive Engineer, Mechanical, Division / SDo

permanent lnstallation sub Division to operate the spillway gates specifying the discharges to

be released/gate openings such that Bhakra Reservoir Elevation does not exceed El' 1690 ft

under any circumstances. SDO Permanent lnstallation Sub Division will

,^\ssqed By

tSXsffi))-Reviewed and APProved BY

Director Qesign

"P(\

BHAKRA NANGAL PRO.IECTTNTEGITATED MANAGBMENT SYSTEM

Doc. No.I}HD/DESIGN/EAI'-Date:12-07-2019Issue No. 02Page. 30 of 66Page Revision No. 0

TITLE: EMERGBNCY ACTION PLANFORI-IANDLING SITUATION AITISING OUT OI.'

HYDROLOGICAL FAILI]RES, EARTHQUAKES OR

Controlled

BHAKRA BEASMANAGEMENT

BOARD

issue instructions to his staff to open the gates accordingly as per the discharges / gate opening

intimated by Director Water Regulation / SDE Water Regulation and will confirm to SDE Water

Regulation and Xen, Nangal Dam, Xen Bhakra Dam and SDO & JE lnstrumentation. Consequently

Executive Engineer, Nangal Dam through his SDO orJ.E. will issue instructions to the head Jamadar

to operate the gates of Nangal Dam accordingly. Further, whenever the releases downstream Nangal

Dam including escapades at Lohand and Nakkian are more than 50,000 cusecs, Executive Engineer,

Nangal Dam Division, will issue the flood warnings to the officers mentioned in Annexure- XXVII

through Police Wireless system as well as through canal telegraph officers. The above whole action

will be repeated whenever the releases from Bhakra / Nangal Dam are increased /decreased to pass

the flood waters.

ln the emergency situation of Response level Orange & Red of external Alert, XEN Hydrology

will remain in touch invariably with lMD, CWC & catchment area of river Sutlej U/S of Bhakra Dam

and collect information about the floods impinging in the reservoir. He will also pass on this

i nformation to Di rectorAlVater

Regulation, S"E.(Hq), XEN Bhakra Dam & XEN, Bhakra Mechanical Division. XEN, Hydrology and

SDEA//ater Regulation will make day and night discharge observation arrangement at the important

discharge sites through their staff. A list of persons along with their contact number responsible for

the collection of information relating to inflows is attached as Annexure XXXll. lt will be ensured by the

concerned Executive Engineers that work of observations of discharge as

Prepared

ASE-I

By Reviewed and Approved By lssued By I

LNhcd,-ot

l

BHAKRA BEASMANAGE,MENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Datezl2-D7-20\9Issue No. 02Page.31 of66Pase Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR OJEE&S..^ r, ^,,i::"-"1,: LOntfOUeq

above and of all the instruments in the dam body runs smoothly even during the period of darkness,

inclement weather and non business hours.

On receipt of precise and accurate information about the high floods likely to impinge,

DirectorfuVater Regulation in consultation with the Member/lrrigation / Chief Engineer, Bhakra Dam

will arrange lowering of reservoir level in anticipation of the approaching floods with thorough study of

the situation.

Director Water Regulation will make request to C.E. BSL Sundernagar for stopping releases from

Dehar Power Plant into river Sutlej due to high floods.

4.5 PROVIDING ALTERNATIVE SOURCES OF POWER

ln the event of power failure during the crucial hours of emergency at site when different

activities are running simultaneously, it is very much imperative to have an alternative source of power

to meet with such situation so that execution may be carried out smoothly without any hindrance. For

restoring power supply to the radial gates ( in the event of failure of existing arrangement of power

supply , the controls be immediately connected to the feeder from the right bank power plant'

Besides a feed back arrangement of the power supply from Ganguwal through the left bank power

plant be established/ made. XEN Mechanical will get the supply restored through XEN Electrical and

concerned

Divisional Engineer of power wing. For running the other works, Xen, Bhakra Electrical may make

arrangements with the following sources:-

A. XEN, NANGAL DAM DIVISION

Mechanical WorkshoP

Nangal Dam Division

Capacity

20 KVA

Contact No.

01887-220563(O)

^lssued By

S/d,{dR) AReviewed and APProved BY

Director Design

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TI'I.LE: BMBRGENCY ACTION PLANFORHANDLING SITI-IATION ARISING OUT OF

HYDnOLOGICAL I'AII,URBS, EARTHQUAKBSoR orl{ERs.controtrEed

t-I

I

I

BIIAI(RA BE,AS

MANAGE,MENTBOARD

Doc. No.BIID/DESIGN/EAP-Date: 3l-12-2014Issue No. 02Page.32 of66Page Revision No. 0

ii)

B.

r)

ii)

iii)

iv)

Kotla Store C/O Kotla 1B KVASub Division,Kotla

PRIVATE AGENCIES

Mahajan Tent House, Nangal

Paul Ten Tent House, Nangal

Kalia Tent House, Nangal

PuriTent House, Sector-2 Naya Nangal

9888950249 (M)

921 6922454, 9216926454 (M)

01887-224705

01887-223286

01887-221230

The diesel generating sets with Nangal Dam Division are wheel operated and can be

transported to site with the help of any vehicle such as jeep or truck etc.

The available approach / route to site where diesel generating sets are to be installed will be

decided and conveyed by SDO instrumentation Bhakra. Also the name of operator will be pre decided

by SDO concerned so that smooth operations may be ensured during such emergency hours.

5.0 EXECUTION OF WORK AT SITE

The engineer in charge at site will ensure that the construction work at site of emergency is

being carried out stricly in accordance with construction drawings & specifications or any other

decision taken in consultation with experts, Chief Engineer, Bhakra Dam, SE, BDC, Director Design,

Director Dam, Safety & S.E. (NMC) at the site of emergency. They would decide depending upon the

quantum of repair/ reconstruction work, whether the work is to be got executed through large

construction firms or purely through the department or small contractors.

Reviewed and ApProved BY

rector

ry

-ffiirr;F

BHAKRA BEASMANAGE,ME,NT

BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 33 of 66

Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

I{YDROLOGICAL FAILURES, EARTHQUAKES OR.THERS' Controlled

For ensuring quality ARO and his staff would be requisitioned Engineer in charge of the site

would get the stock piled material tested for their suitability for all purposes before its use at site. The

control compaction of the soil desirable at any place of repair be maintained through the periodic

check up of the relative density of the soil. A complete record maintenance of the in-situ density is

mandatory. The reporting of such data shall be made at regular interval to higher authorities. Quality

control check up in the form of fabricated specimen need be exercised through inspecting agency,

ARO.

The daily progress at site will be recorded shift wise. All officers are supposed to perform their

duties as per list of responsibilities assigned to each individual division wise. Any discrepancy noticed

at site of work/ during execution should be brought to the knowledge of Engineer-in-charge and the

engineer in-charge shall try to remove/rectify such discrepancy promptly so that progress of work is

not suffered/

6,0 INUNDATION MAPS

lnundation maps are usually needed to develop an adequate evacuation plan when numbers

of dwellings are located downstream of the area where emergency has been taken place' The maps

show an outline of the area

covered by the excessive releases in case of mishap in detail to identify dwellings and other

significant features that are likely to be directly affected.

It is pertinent to mention here that the inundation maps for downstream area of Nangal Dam

are available with Punjab Drainage Department' lt is,

Reviewed and APProved BY

iis ,,I8:_' !rq!,

''\.l**sd

I]I-IAKRA BEASy1\4S!v!II I9ARp

therefore, required that inundation maps for the vulnerable reaches (in case of any expected mishap)

should be developed/ made available by Punjab Drainage Deptt. No action in this connection is

required to be taken by BBMB authorities.

7.0 DESCRIPTION OF LOCATION OF BHAKRA DAM

Bhakra Dam is a straight gravity concrete dam740 ft high above the deepest foundation level

and 550 ft high above the river bed on river Sutlej in lower Shiwalik hills. lt is located at approximately

354 km north of Delhi hearing its coordinates as 76o .24' El. Long & 31o -25' N Lat. The dam is

located in Village Bhakra of District Bilaspur of Himachal Pradesh which is 14 Km from Nangal

Township District Ropar in Punjab. lt has two power houses one on right side and another one on left

side. The Power House have installed generation capacity of 785 MW & 540 MW respectively. Dam

rs well connected both by rail as well as by road. The broad salient features of the project have been

appended for reference at Annexure -ll.

8.0 TRAINING

Training of people involved in EAP should be conducted to ensure that they are thoroughly

familiar with all elements of the plan availability of equipment and their responsibilities & duties under

the plan. Technically qualified personnel should be trained in problem detection and evaluation and

appropriate remedial (emergency & non emergency) measures. This training is essential for proper

evaluation of developing situations at all levels of responsibility which initially is usually based on

onsite observation. A sufficient number of people should be

Prepared By

ASE-I

M

BHAKRA NANGAL PROJECTIN'I'EGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-l)ate:72-07-2019Issue No. 02Page. 34 of 66Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFORI{ANDLING SITUATION ARISING OT]'I' OF

HYDRQLOGICAL }-ATLURBS,BARTHOUAKES OR OTI{ERS.

Reviewed and Approved By

Director Design

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

BHAKRA BEASMANAGEMENT BOARD

TTTT,N NVTTNGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES ORJfTHERS.

Doc. No.BHD/DESIGN/EAP-Datezl}-O7-2019Issue No. 02

Page.35 of66Pase Revision No. 0

trained to ensure adequate coverage at all times. A training plan could be included as an appendix to

the EAp Exercises simulating sectional breach / sliding or over topping due to high flood and failure

due to mal functioning of any of the mechanical installation are excellent training mechanism for

ensuring readiness cross training in more than one responsible position for each individual is

advisable in order to provide alternates. A careful roaster should be kept of training completed and

refresher training conducted.

g.0 Duties and responsibilities to be discharged by different officers during emergency

hours at Bhakra Dam are enlisted as below

Name / Desiqnation / Addressto notityllnform higher authorities of BBMB

/outside agencies about the mishap as per

notification flow chart of particular Alert level

as per situation at site.

To notify District Magistrate who is Chairman

Co-ordination Relief Committee, Ropar

To keep close watch on the different activities

being carried out by different agencies at the

time of emergency.

To accord all anticipation sanctions at site'

To make request / notifY Chief

9.1

C.E. Bhakra Dam

1 -Western Avenue, Nangal

01887-223024 (R)

01887-223001 (o)

^lssued Bv

Gf;ui,R)A-Reviewed and APProved BY

BIIAKRA BEASMANAGEME,NT

BOARD

Doc. No.BI{D/DESIGN/BAP-I)ate:12-07-2019Issue No. 02Page.36 of66Page Revision No. 0

BIIAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFORI{ANDLING SITUATION ARISING OUT OF

HYDI olo9l.t,5"-iHtR,S*lii8mf

9.2

s.E. (HO)

01887-223164

01887-223062

(o)

(R)

. Engineer BSL Sundernagar and Chief

Engineer, Beas Dam Talwara, Thein

Dam & NFL for providing required

resources as per Alert level

. To provide all types of information to

Board office in regard to evacuation

rescue & relief operation

. He will ensure the timely restoration of

all the works after emergency is over

. He will make requests to C.E. BSL for

stopping releases from Dehar Power

House into Satlej due to high floods

. He will also contact the large

constructional comPanies having

expertise in Dam construction activities

(Ref. Annexure-XXV)

He will also remain in touch with Kol Dam

authorities with regard to the position of

impending imminent floods of high intensity

. To notify / inform different agencies i

offices as per notification flow chart of

particular Alert level as per situation at

site

To keep constant liaison with Civil

BHAKRA BEASMANAGEMENT

BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Ptge.37 of 66Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAI(ES ORorHERS. ContrOlled

Authorities of Punjab & Himachal and

all other including all the Superintending

Engineers / Directors under Bhakra

Dam administration and issue permit to

security personals for entering in Dam

atea.

He will supervise the functioning of

control room and will be well equipped

with all type of information including

rescue & relief oPerations etc.

He will act as EAP Coordinator and

responsible for all EAP related activities

such as trainings, drills and revision to

EAP if any

Being spokesperson, he is required to

dissemlnate information and make

contact to utilize media as appropriate

at the time of emergency on behalf of

Chief Engineer, Bhakra Dam

9.2

s.E. (BDC)

01887-223017 (O)

. To have timelY and reliable

identification, evaluation & classification

of exlsting or potential emergency

condition as per information of XEN,

Bhakra Dam Division

To notify / inform different agencies /,

Reviewed and APProved BY

BHAKRA NANGAL PROJECTII\TEGRATED MANAGEMENT SYS'TEM

Doc. No.BHD/DBSIGN/EAP-Date:12-07-2019Issue No. 02Page.38 of66Page Revision No. 0

TITLE: EMERGENCY ACTION PI,ANFORI{ANDLING SITI]AT'ION ARISING OUT OF

I.IYDROLOGICAI, FAILURES, EARTIIQUAKES QRorrrERS. COitrolleO

BI-IAKRA BEASMANAGEMENT

BOARD

. offices as per notification flow chart of

particular Alert level as per situation at

site.

. To keep liaison with all SEs/Directors,

teams to handle disaster, XENs and

other involved directly / indirectly to

handle the disaster

. To keep close watch / supervrsion at

site when construction activities of any

quantum are in progress

. To ensure that work at site is being

carried out strictly as per construction

drawings and specifications or any

other decision taken in consultation with

experts, C.E. Bhakra Dam, Director

Design & Director, Dam Safety, SE

(NMC) at site

. He will ensure that there is no danger of

spread of any epidemics or water borne

diseases after the floods.

. He will also remain in touch with Kol

Dam authorities with regard to the

position of impending imminent floods

of high intensity

To accord sanction in anticipation as per

emergent Rules of DFR provisions

i

l

t*lSffi*\rq**sfl"::":r*"':::'

BHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 39 of 66

Pase Revision No. 0

rTTiE' EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURBS, EARTHQUAKES OR OTHERS. -.Coatrolled

. within his comPetencY

. To keep close watch on rescue, relief &

evacuation operations being carried out

by different teams

. To ensure proper access to site at the

earliest possible

. To provide all types of information

related to the execution of work to S.E.

(HQ)from time to time.

. Adequate lighting arrangements should

be ensured at all identified / vulnerable

sites well in advance in anticlpation of

any mishaP.

. To keep liaison with civil authorities who

have been carrying all rescue & relief

operation at site of emergency & also

remain in touch with control room of civil

authorities. Also to provide all type of

information to BBMB Control room at

Bhakra as well as in TownshiP area

He will ensure timely action to arrange for

some suitable / competent agency or agencies

to take up the reconstruction activities at dam

site / colony area to restore the occurred

Prepared

ASE-I

Reviewed and APProved BY

DtffiSDesisn

\

g;'

BHAKRA BEASMANAGEMENT

BOARD

9.4

s.E (NMC)

01887-223004 (o)

HANDLING SITUATION ARISING OUT OF

HyD Ro L o Grc AL "^Jly#R

rfrffir?BfiEE n"TTuniEnnERGENCY ACTIoN PLANFoR

Reviewed and APProved BY

damages due to floods.

He will ensure that releases from Dehar

Power House into Satluj have been

stopped during the Period of

unprecedented floods.

To use RePort Form No. 1,2 and 3

when recording various emergencY

situations and unusual occurrences'

These forms have been attached with

EAP as Annexure -XVll.

. To notfy / inform different agencies /

offices as per notification flow chart of

particular Alert level as pr situation at

site.

. To ensure that all related machinery /

equipments are in running conditions

and have been dePloYed as Per

requirement of S.E' BDC/XEN Bhakra

Dam Division

To ensure that all lighting arrangement have

been made at all emergency locations (Bhakra

& Colony Area) including requirement of power

supply

Prepared BY

,,r".ry

Doc. No.BHD/DESIGN/EAP.Datezl2-D1-2019Issue No. 02

Page. 40 of 66

Page Revision No.0

BHAKRA NANGAL PROJECTIN'T'EGRATED MANAGEMEN'T SYSTEM

ASE-I

^ lsEUed BY

GP"Y*#

BHAKRA BEASMANAGEMENT BOARD

BHAI(RA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM

Doc. No.BHDIDESIGNTEAP-Date:12-07-2019Issue No. 02

Page.41 of66Pase Revision No. 0

ffff-Et EMERGENCY ACTION PLANFOR HANDLINGSITUATIOI{ ARISING OUT OF HYDROLOGICAL

FATLURES, EARTHQUAI(ES Oi( OTHEBS. -- ControllPd

. to all equipments / machinerY

. To ensure that all type of material

available and required at site of

emergency is being delivered by Supdt.

Proc. Central Stores, Nangal T/Ship

. ln case of Power suPPlY failure

alternative arrangement for supply of

power to equiPment / machinerY & at

emergency locations should be

ensured.

. To ensure repair / mtc. of machinery, if

required, at site by deputing a team of

expert mechanics so as to carry smooth

working at site.

. He will put all efforts for an early

restoratlon of the normal work.

. To have liaison with S.E, Talwara

Circle, S.E. BSL Circle-ll, Sundernagar

and Ranjit Sagar Dam administration for

any required resources other than

available

Formation of purchase committee / committee

in consultation with C.E. Bhakra Dam for

procurement of material from appropriate

source

Reviewed and APProved BY

BHAI(RA BEASMANAGEMENT BOARD

Doc. No.BI{D/DESIGN/EAP.Date:12-07-2019Issue No. 02Page. 42 of 66

Page Revision No. 0

BHAKRA NANGAL PROJECT'IN'TEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACI.ION PLANFOR T'IANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR OTTIERS.

. through spot purchase

. To ensure procurement of different

lubrications and spare parts for smooth

running of machinery

. To remain in touch with C.E. Bhakra Dam,

S.E. BDC & SE (HO) during such

emergency hours.

Adequate lighting arrangements should be ensured

at all identified / vulnerable sites well in advance in

anticipation of any mishap.

9.5

Director Design ,01887-223108 (O)

Safety,01887 -2231 79 (O)

. Director Design should also ensure that

different tests of materials for their suitability

at the site of construction (to be carried out

in laboratory under his control) are

performed meticulously & promptly. He

must ensure that all the apparatus is in

working order and taboratory is well

equipped with trained staff.

. Director Design should inspect the

emergency site immediately when he gets

the information of such mishap and to offer

remedial/ suggestive measures at site

Director Design will ensure all time availability of

SDE's & ADE's & Drafting hands under the

administration for imparting any required guidance

to field persons at srte or issuance of construction

drawings, if necessary during the execution phase

of damaged site

Director, Dam Safety should inspect the site & when

he gets the information

9.6

Director / Dam

Reviewed and Approved BYPrepared By

srgn

BHAKRA BEASMANAGEMENT BOARD

RHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Datezl2-07-2019Issue No. 02

Page.41 of66Pase Revision No.0

TTTI,TibNTERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL

F ATLURE s, E ARrH Q UAKE s .i,fftThti.d_

. to all equipments / machinerY

. To ensure that all type of material

available and required at site of

emergency is being delivered by Supdt'

Proc. Central Stores, Nangal T/Ship

. ln case of Power suPPlY failure

alternative arrangement for supply of

power to equiPment / machinerY & at

emergency locations should be

ensured.

. To ensure repair / mtc. of machinery, if

required, at site by deputing a team of

expert mechanics so as to carry smooth

working at site.

. He will put all efforts for an early

restoration of the normal work.

. To have liaison with S.E' Talwara

Circle, S.E. BSL Circle-ll, Sundernagar

and Ranjit Sagar Dam administration for

any required resources other than

available

Formation of purchase committee / committee

in consultation with C.E. Bhakra Dam for

procurement of material from appropriate

source

Reviewed and APProved BY

BHAKRA BEASMANAGEMENT

BOARD

BIIAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHDIDESIGN/EAP-Datezl2-01-2019Issue No. 02

Page.43 of66Page Revision No. 0

TNLE' EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL

FAILURES, EARTHQUAKES OR OTHERS.

Controlled

. of any mishaP at Bhakra Dam and to

offer remedial / suggestive measures

for ensuring total safety of the structure

Director, Dam Safety, will also ensure the

availability of staff under his administration

during emergencY hours

To notify/inform different agencies I

offices as per notification flow chart of

particular Alert level as per situation at

site

To make request to C'E. BSL for

stopping releases from Dehar Power

Plant into Satlej due to high floods

To keep constant liaison with Member,

lrrigation, BBMB, Chandigarh, Chief

Engineer, Bhakra Dam, Nangal, SE

BDC & SE (HO) Nangal

He will issue directions to SDE, Water

Regulation, Nangal for making releases

d/s Nangal Dam.

He will also keep constant liaison with

l.M.D. during emergency of Period

He will arrange to lower the reservoir in

consultation with Member lrrigation/C E'

Bhakra Dam on receiPt of accurate

information of high floods

9.7

Director / Water Regulation

01887-223758 (O)

Reviewed and APProved BY

oif io'

BHAKRA BEASMANAGEME,NT

BOARD

Doc. No.BHD/DESIGN/BAP.Date:12-07-2019lssue No. 02Page.44 of 66

Page Revision No. 0

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTBM

TITI,E: EMERGENCY ACTION PI,ANFOR I{ANDI,INGSITUATION ARISING OUT OF I-IYDROI,OGICAI,

FAILURPS,.BARTHQUAKES OR OTHBRS.- Cortroilot

SDE Water regulation BBMB, Nangal

01887-223043(O)

Xen Nangal Dam Division

01887-220563 (O)

impinging the reservoir if the situation warrants so

. To notifyiinform different agencies / officesas per notification flow chart of particular

Alert level as per situation as site. He will pass on information as a warning

notice of emergency of routing high floods

to all the regulating agencies havingconcern with the water releases fromBhakra Dam and as contained in O & M of

Nangal Dam & Nangal hYdel channel(Annexure XXVII)

. To keep constant liaison with Director,Water Regulation, Nangal, SE, BDC'

Nangal SE, (HO) Nangal & XEN, NangalDam Division, XEN Bhakra Mechanicalduring such mishaP

. He will act promptly as per instructionscontained in O & M of Nangal Dam & NHC

. He will also make day & night dischargeobservation arrangement at the discharge

sites under his control through his staff and

also keep recordof other discharge sites under the control of

XEN Hydrology during such exigency.

. To post a special observer at dam site

during Period of high floods.

To notify / inform different agencies as per

notification flow chart of particular Alert

level as per situation at site and offlces to

be informed of floods as per Annex.XXVll

Reviewed and APProved BY

$ePrepared

ASE-I esrgn

B}IAKRA BE,AS

MANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHDIDESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 45 of 66

Pase Revision No. 0

rfff,f t EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISII{G OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR OTHERS.fnn*-^Ir

. To convey information regarding such

emergency to all control points / regulation

points on NHC

o To keep constant liaison with S.D.E' Water

regulations S.E. (B.D.C.)

. He will ensure the timely operation of all the

twenty four bays of Nangal Dam in the

event of an eminent potential emergency

situation

. He will remain vigilant and take all possible

measures to ensure safety of structures

under his control

. For hiring labour for the operation of gates

he may contact local contractors as per

Annex XVl.

. XEN should keep readily available with him

contact numbers of all the persons (skilled /

unskilled) working under his administration

. Record / strength of skilled workers of

different categories whose services are

required during emergency operation should

also be available

. XEN should keep a list of readilY

Reviewed and APProved BY

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

BHAKRA BEASMANAGEMENT

BOARD

i

l

iI

L

t_

available all types of stores under his

control along with available quantity of

each item

To ensure that daily diary is maintained

in respect of each activity carried out at

site by persons/staff under his control

and also the higher authortties are

appraised accordingly during such

emergency.

XEN, should ensure that strict watch is

being kept on the banks of Nangal

pond, Nangal dam abutments, flare out

wells & Nangal Dam itself during period

of such emergency

To ensure that timely action has been

taken in consultation with SE (BDC) &

C.E. Bhakra Dam to release water

through escapes / silt ejector if situation

so warrants .

. To ensure that each individual has been

informed about his duty well in advance

during such Period of crisis

. To provide all types of information

periodically to SE (BDC) & to control

room established in colonY area

XEN should ensure that material such

lspued ByPrepared By Reviewed and APProved BY

Di,$HPu.isn

\

#

Doc. No.I}HD/DESIGNTEAP-Dzte:12-07-2019Issue No. 02

Page.46 of66Page Revision No. 0

1rrln, EMERGENCY ACTIoN PLANFoRHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKES-OROTHERS.

.-r:i ri, ?

B}IAKRA BE,AS

MANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 47 of 66

Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYD RoL o Gr c AL " ^Jrrffi..t, "ffi

o as cement sand & aggregate available

in his stores is fresh. A batch number of

each material must be mentioned

clearly to ensure that good material as

per required specification has been

used

. XEN to ensure that all material being

used for execution of work at site has

been tested for lts suitability for all

purposes as Per sPecifications of

construction drawings.

. To ensure that all lighting arrangements

at Nangal Dam have been made

adequatelY through XEN Bhakra

Electrical during such Period of

emergency

. XEN will also inform R'E. Ganguwal

and Kotla Power houses about the

emergency situation at Bhakra

XEN shall also ensure attendance 24 hours at

Nangal Dam during such exigency at Bhakra

fo notity t inform different agencies / offices as

per notification flow chart of particular Alert

level as Per situation at site

9.10

XEN, RM & SR Divn

01887-223092 (O)

Reviewed and APProved BY

BHAKRA BEASMANAGEMENT

I]OARD

Doc. No.BIIDIDESIGN/EAP.Date:12-07-2019Issue No. 02

Page. 48 of 66

Page Revision No. 0

BI{AKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TTTLE' EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTI'IQUAKES OR OTHI]RS.

r ';'11 : Controllef,

. ifN should keep readily available wlth

him contact members of all Persons

skilled / unskilled working under his

control

. Record / strength of skilled workers of

different s whose services are required

during emergency operation should

also be available.

. XEN should keeP a list of readilY

available all types of stores under his

control along with available quantity of

each item

. XEN should also keeP a list of

alternative arrangement in the absence

of skilled workers, readily available

. XEN shall also keep a list of machinery

in working order under his control

readlly available

. Mode of conveyance & shortest

possible route to reach the emergency

site should be identified well in advance

on consultation with XEN Bhakra Dam

Division

To ensure that divers under his control are well

equipped and ready to perform any duty

assigned to them during an

Reviewed and APProved BY

BHAKRA BEASMANAGEMENT BOARD

BHAKRA I{ANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page.49 of66Page Revision No.0

TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FATLURES, EARIHQUAKJS .OR OTHERS. UONtTOIICd

emergencY hour

To maintain daily diary in respect of

activities performed by persons under

his control and aPPrise S.E' (BDC)

about the same

, He will maintain a constant liaison with

XEN Bhakra Dam Division and S E'

(BDC) during such eventualitY or

mishap.

, He will make a Pre Planned

arrangement for deploying the persons

on site of emergency so that work can

be performed smoothlY & PromPtlY'

r He will also inform village Pardhan U/S

about rising RWL as per Annexure Vlll'

o He will also ensure that all stock

present in his stores such as cement,

sand & aggregate is fresh and quite

suitable for its use at emergency site'

Batch of Piled uP cement should be

mentioned clearlY

. XEN will also ensure that no visitor pass

is issued to anyone and no vehicle will

be allowed to cross the toP of dam

during emergency

XEN will also ensure that the sufficient

Reviewed and APProved BY

mLn urnrncnNcv lcrroN PLANFoR HANDLING

I]i_IAKRA BEASMANAGE,MENT

BOAI{t)

SITUATION ARISING OUT OF ITYDROLOGICALFAILURESI fuIdTHqUAKES OR OTI{ERS.

Comtrolle*

I

I

I

. numUer of life saving jackets under his

control are in good working condition &

the persons concerned are well trained

to use them

XEN will also keeP a record of local

persons well trained in swimming I

diving & who can help in rescue & relief

operation at emergencY site'

XEN will also keeP a list of Persons

having private boats with them for

rescue operation during emergency

hours.

XEN should also ensure that

photography of the site of emergency

has been carried out intensively' All the

events have been covered fully till the

completion of execution work

XEN will also ensure that Public

Relation Officer under his administration

will look after the duties to be performed

by him under the overall control of S'E'

(HQ) Nangal who ls incharge of control

room to disseminate all information in

relation to mishaP at site

XEN shall also ensure attendance 24

Doc. No.BHDIDESIGN/BAP-Date:12-01-2019Issue No. 02

Page.50 of66Page Revision No. 0

BIIAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Reviewed and APProved BY lssued By

.q ')!{

BI_IAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGNIEAP-Dilezl}-D7-2019Issue No. 02

Page.51 of66Pase Revision No. 0

ffrf,f t nVfnRGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FATLURE s, EARTHQUAT(E s "tHIffiUc{

hours dur:lng such exigencY

XEN shall also maintain liaison with

loading centers of fishery department in

Bhakra reservoir for arrangement of

boats & boatmen, if required, during the

operation of rescue & relief as Per

Annex.XXVIll

XEN will also ensure that duties assigned

to him in team for rescue, relief and

evacuation operation at Bhakra are

discharged properly during emergency

hours.

io have timely and reliable identification

evaluation & classification of existing or

potential emergency condition in

consultation in with S.E. (BDC), SE

(NMC) & C.E. Bhakra Dam

To notify / inform different agencies /

offices as per notification flow chart of

particular Alert level as per situation at

site

XEN should keep readily available with

him contact numbers of all Persons

skilled / unskilled working under his

administration

9.11

XEN Bhakra Dam Division

01887-223075 (O)

Reviewed and APProved BY

Doc. No.I}IID/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page.52 of66Page Revision No. 0

BHAKRA NANGAL PROJBCTTNTEGRATED MANAGEMENT SYSTBM

TTTT,N UITTRGENCY ACTION PLANFOR HANDI,INGSITUATION ARISING OUT OF ITYDROLOGICAI,

tsAILUREF, EARTI{QUAKES OR O'I'HERS.

ControlledBHAKIIA BEASMANAGEMENT

BOARD

. Record / strength of skilled workers of

different categories whose services are

required during emergency operation

should also be available

. XEN should keep a llst of readilY

available all types of stores under his

control along with available quantity of

each item

. XEN should also keeP a list of

alternative arrangement in the absence

of skilled workers, readily available.

. XEN should also keeP a llst of

machinery in working order under his

control readilY available.

. Mode of conveyance & shortest

possible route to reach the emergency

site should be identified well in advance

in consultation with XEN R/M and XEN

Bhakra Mechanical

. To ensure that fire fighting arrangement

under his control is well equipped &

ready to Perform dutY in shortest

possible time during an emergency

hour.

To maintain daily diary in respect of activities

Performed bY Persons under

Reviewed and APProved BY

BHAKRA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page.53 of66Pase Revision No. 0BHAKRA BEAS

MANAGEMENT BOARD

UTT.N NNNNRGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FATLURES, EARTHQUAKE s o" otffff*ollud

his control and aPPrise S'E. (BDC)

about the same

, He will maintain a constant liaison with

XEN, Mech, XEN Elect, XEN RM, XEN

Ngl Dm and S.E. (BDC) during such

eventually or mishaP

, To ensure that all lighting arrangements

required are according to requirement

of work site

. To ensure that NFC's are Pasted in

Bhakra control room, Power houses &

at other keY locations.

o After identification of emergency

condition. He will stop all the routine

works being carried out at dam site and

in surrounding area.

. He will allow minimum possible persons

to work inside the dam bodY during

such Period.

. He will also keep a readily available

copy of keY drawings of Bhakra dam

He will ensure identification of sources

Reviewed and APProved BYPrepared BY

ASE-I

RT{AKRA BE,AS

I unxrtcpMENT BoARD

Doc. No.BIID/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page.54 of66Pase Revision No. 0

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TTTN TiVTNNCENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURE S, EARTH QUAKB S OB.Q}IERfr .E

. of suppiy of suitable aggregates, natural

or processed, from nearlY khads or

through contractors

. He will ensure proper stock piling of

aggregate for meeting the demand of

minor damages.

. He will make a Pre Planned

arrangement for deploying the person

on site of emergency so that work can

be Performed smoothlY & PromPtlY'

. He will also ensure that all stock

present in his stores such as cement'

sand, aggregate etc' is fresh and quite

suitable for its use at emergency site'

Batch of Pile uP cement should be

mentioned clearlY.

XEN will also ensure that proper arrangement

has been made to carrY

Riv'rewed and APProved BY

oirq{esisn

. ; - '8r+'t'

B}IAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGNIEAP-D*e:12-07-201.9Issue No. 02

Page.55 of66Pase Revision No. 0

TITT,N U'ITERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FATLURES, EARTHQUAI(ES "" tfff,fflud. Leveling of the site by survey party and

assist during the repair construction

activities of different controlling points'

. XEN shall ensure that Report Form No'

1, 2 and 3 are to be used when

recording various emergency situation

and unusual occurrences. These forms

have been attached with EAP at

Annexure XVll

. XEN Shall also ensure attendance 24

hours at Bhakra Dam during such

exigencY .

. XEN will also ensure that a formal

status report for dam facility has been

developed by him as per requirement'

r XEN will ensure that work at site is

being carried out strictlY as Per

construction drawings & specifications

or any other decision taken in

consultation with experts, C'E Bhakra

Dam, S.E. (BDC), Director Design,

Director / Dam Safety & S.E' (NMC) at

site of emergency

He will seek immediate help from civil

authorities through higher offices or directly in

case of any Potential

Reviewed and APProved BY

RHAKRA NANGAL PROJECT

TNTEGRATED MANAGEMENT SYSTEM

ffi TroN PLA|{FoR HANDLING

SITUATION ARISING OUT OF IIYDROLOGICAL. FAILURES, EARTHQUAKES OR OTHERS.

Doc. No.BIIDIDESIGN/EAP-Datezl2-O7'Issue No. 02

Page.56 of66Revision No. 0BHAKRA BE,AS

MANAGEME,NT BOARD

Prepared BY

9.12

XEN BC & TownshiP Divn'

olBB7-223040 (o)

EmergencY due to sabotage.

fo notity / inform different agencies /

offices as per notification flow chart of

particular alert level as per situation at

site

XEN should keep readily available with

him contact numbers of all Personsskilled / unskilled working under his

administrationRecord / strength of skilled workers of

different categories whose services are

required during emergency operation

should also be availableHe will ensure that there is no danger

of spread of anY ePidemics or water

borne diseases after the floods'

XEN should keeP a list of readilY

available all types of stores under his

control along with available quantity of

each item

Reviewed and APProved BY

)#f

i:*p,E*,;e-\,&.*ff-

;t. BHAKRABEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Dile:12-07-2019Issue No. 02

Page.57 of66Pape Revision No. 0

rlrrrnt EVTERGENCY ACTION PLAI{FOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OLOTHERS.- Corfrolled

To maintain daily diary in respect of

activities performed by persons during

such eventuality or mishap & report to

(sE, BDC).

He will make a Pre Planned

arrangement for deploying the persons

on site of emergency so that work can

be performed smoothlY & PromPtlY.

He will also ensure that all stock

present in his stores such as cement,

sand, aggregate etc. is fresh and quite

suitable for its use at emergency site'

Batch of Piled uP cement in stores

should be mentioned clearlY.

XEN will also ensure Providing

shed/toilets for temporary stay of

persons engaged in execution of work

at site in shifts and also to provide

temporarY stores at site as Per

requirement of XEN Bhakra Dam

Division

He will also seek helP from civil

authorities as well as N'G.O's coming

fonrvard for the Purpose

Reviewed and APProved BYPrepared

ASE.I

By

({

Doc. No.BT.ID/DESTGN/EAP-Date:12'07-2019Issue No. 02

Page.58 of66Page Revision No. 0

BHA.XRA NANGAL PROJECT

INTEGRATED MANAGEMENT SYSTEM

N PLANFOR HAI{DLING- siiualloN ARISING our oF ITYDRoLoGICAL

FAILURES, EARTI{QUAKES OR OTHERS.BHAKRA BEAS

MANAGEMENTBOARD

9.13

XEN Bhakra Elect' Division

01887-223094 (O)

T" nohfy / inform different agencies /

offices ,t put notification flow chart of

particular Alert Ievel as per situation at

siteXEN should keep readily available with

him contact numbers of all Persons

skilled i unskilled working under his

administration

Record / strength of skilled workers of

different categories whose services are

required during emergency operations

should be available.

XEN should keeP a list of readilY

available all types of stores under hts

control along with available quantity of

each item.

ffe w,tt arrange to make mobile van

announcements through public address

system about the emergencY

He will also ensure cleanliness and

sanitation of the area during & after the

occurrence of such mishaP

XEN shall also ensure attendance 24

hours durrng such exigencY

XEN shall also make all arrangements

for temporary dispensary at site-to give

first aid to all during rescue & relief

operation.

Rev'rewed and APProved BYPrepared BY

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page.59 of66Pase Revision No. 0

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

BHAKRA BEASMANAGEMENT BOARD

TrrLEr EMERGnxCv acrroN PLANFoR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR gfry

XEN should also keeP a list of

alternative arrangement in the absence

of skilled workers readily available'

, XEN should also keeP a list of

machinery in working order under his

control along with names of operators

readily available with him

, . Mode of conveyance & shortest

possible route to reach the emergency

site should be identified well in advance

in consultation with XEN Bhakra Dam

. XEN will ensure that adequate lighting

arrangements have been made at all

vulnerable points both at Bhakra & in

T/Ship area

. XEN will ensure that all lighting

arrangements have been made at

emergency site including requirement of

power suPPlY to all equiPment I

machinery and to bring to the notice of

S.E.(NMC) regarding each activity

performed / completed at site and to the

satisfaction of Persons working I

executing the job at site

XEN will ensure that daily diary of each

Reviewed and APProved BY

oir{esisnPrepared BY

0ASE_'

w

BHAKRA BEASMANAGEMENT BOARD

Doc. No.BHD/DESIGN/EAP-Date:12-01-2019Issue No. 02

Page. 60 of 66

Page Revision No.0

BHAKRA NANGAL PROJECT

INTEGRA'TED MANAGEMENT SYST'EM

rrrlf , nUnnCENCY ACTION PLANFOR

TTAXNT,TNG SITUATION ARISING OUT OF

HYDROLOGICAI, FAILURES, EARTHQUAKES OR

Supdtt. Proc. C/Stroes Divn Nangal Township'

01887-223011 (O)

. etr"nt / activity performed at site ls

maintained

. XEN will ensure that in case of power

failure adequate arrangement to run the

equipment on alternative source of

Power has been made

. XEN will maintain a liaison with XEN

Bhakra Dam, XEN R/M, XEN Mech ' SE

(NMC) & SE (BDC) during emergency

hours

. XEN will make a Pre Planned

arrangement for deploying the persons

on site of emergency so that work can

be Performed smoothlY & PromPtlY'

. XEN will also ensure that sound

arrangement under his control is trouble

free & well maintained to use at

emergency site to give warning for

evacuation of inhabitants in the near

vicinitY of mishaP.

XEN will also ensure attendance-24 hours

during such exigencY

OffGt sh"rld keeP readY with him

contact numbers of all persons skilled /

unskilled working under his

administration

Rev-iewed and APProved BYPrepared BY

Doc. No.BHD/DESIGN/EAP-Da/te:12-07-2019Issue No. 02

Page.61 of66Pase Revision No. 0

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYqTEU

BHAKRA BEASMANAGEMENT BOARD

@IONPLANFORHANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL

FAILURES, EARTHQUAKES OR

Record / .trength of skilled workers of

different categories whose services are

required during emergency operation

should also be available

Officer should keep a list of readily

available all types of stores under his

control along with available quantity of

each item. He should also apprise SE

(NMC) about the same from time to

time.

. Officer should also keeP a list df

alternative arrangement in the absence

of skilled workers readily available

Officer will ensure delivery of all

material/stores quickly for its use at

emergencY site

Officer will make arrangements at

shortest notice for the materials from

other projects, if required.

@rent agencies / offices as

per notification flow chart of particular Alert

level as Per situation at

9.15

XEN Bhakra Mechanical Division Nangal

01887-223038 (R)

Reviewed and APProved BY

DirmrrsisnPrepared BY

BHAI(RA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHDIDESIGN/EAP-Datezl}-01-2019Issue No. 02

Page.63 of 66

Pase Revision No. 0BHAKRA BEASMANAGEMENT BOARD

ffi ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF ITYDROLOGICAL

FAILURES, EARTHQUAKES OR OTHERS.,' I\,ontrolleq

nraintaineO in respect of each activity

carried out at site by persons under his

control & to aPPrise SE (NMC)

XEN will ensure the stock Piling of

lubricants & spare parts at site where

the machinery has already been kept

permanentlY.

XEN should have with him a list of

machinery (Required by him) available

at other Projects under BBMB along

with operators (Annex XXll)

XEN should have a list of suitable /

required machinery available with other

departments such as XEN, ASHC, RTP,

XEN, BML, Patiala

XEN will ensure that persons who have

been assigned different duties during

emergency hour are discharging it

properly & PromPtlY'

XEN should keeP close liaison with

XEN, Bhakra Dam who is overall in

charge of the site for all tYPes of

assignments / requirements in relation

to execution of work

XEN shall also ensure attendance 24

hours during such exigencY

Reviewed and APProved BY

Doc. No.BHD/DESIGN/EAP'Datezl2'07-2019Issue No. 02

Page. 64 of 66

Page Revision No. 0

TTTTN.XNA NANGAL PROJECT

INTEGRATED MANAGEMEryT ITITEU

HYDROLO GICAL FAILURE S, BARTHQ-U{iI*P

TITLE, EMERGB|{CY ACTION PI'ANFOR

HANDLING SITI]ATION ARISING OUT OF

BHAKRA BEAS

MANAGEMENT BOARD

i e.i6PMOBBMB HosPital, Nangal01887-223102 (o)

. Xen will ensure the immediate power

supply arrangement to Radial gates if

existing arrangement of supply fails ( As

per para 4.5 of this document)

;- PN/IO wll immediately move to the

emergency site for assisting in rescue &

relief operation after getting information

about such eventualitY

. PMO will move to the site along with a

team of Doctors and other allied staff

well equipped to give first aid to injured

persons

. PMO will keep a constant liaison with

CMO Anandpur Sahib, Kiratpur Sahib &

RoPar and NFL if some Persons are

required to be shifted there for

immediate medical services / treatment

. PMO will ensure every sort of aid to

persons which is available in any of

nearbY hosPltals / disPensarY

He will try to make all arrangements in shortest

possible time by opening temporary dispensary

at site with the help of XEN Township so that

immediate medical aid be grven to

nevrer reO and APProved BYl

I

l

IlI

I

I

I

lL ., ---, --

'":l::

6,

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Datezl2-07-2019Issue No. 02

Page.65 of66Page Revision No. 0

**llS"la*%Lqffi

'{ '}r '

BHAKRA BEASMANAGEMENT BOARD

TITLB EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYD Ro L QGI c AL " ^JiHy"::, ^"83fl #fffr 8dt

. victims at the site of emergency

. PMO will immediately make all

arrangements to refer patient to PGI'

Chandigarh if situation warrants so

. PMO will keep record with him of every

person who has been given medical aid

by BBMB temporary dispensary at site

. PMO will ensure a complete availability

of every type of medicine in advance,

doctors and other staff for extending

helP during the hours of emergency

. PMO will arrange to provide 24 hours

medical service through his staff at site

of emergencY

PMO will keep constant liaison with SE (Ha)

and keep on apprising him about the situation

at site in respect of rescue & relief operations'

victims or any fatalitY.

PSO w'll ,rrange to inform /notify Bomb

squad /Sniffer dog agencies as per list

attached at annexure Vll in case of

sabotage.

9.17Project SecuritY Officer01887-223060 (o)

Reviewed and Approved BY

Direc\or DPign

Prepared BY

ASE-I

.^ lssped BY

\MefldRf

BI{AKRA BEASNAGEMENT BOARD

Prepared BY

I}HAKRA NANGAL PROJECTINTEGI1ATED MANAGE,MENT SYSTEM BI{D/DESIGN/EAP-

Dzte:12-07-2019Issue No. 02

Page.66 of66Page Revision No. 0

. Seeking any help required during such

emergency hours

. He will arrange guide all the persons at

works site to deal with such situation

(Bomb like thing) through his team

associates under his control.

. He will ask any help required during

such emergency from SE/HQ/SE (BDC)

BBMB authorities He will remain tn

constant touch with ADGP, ClD, Punjab

. SSP Ropar

. DC Ropar

. ADGP, ClD, HP (DSP/HP)

. S.P.(Una) and ,S.P.(BilasPur)

. He will ensure that Persons under

control are comPetent enough

controlitackle such a situation'

He will ensure that incident has been recorded

in the Event report form as per Annexure XVll'

Reviewed and APProved BY

his

to

TTTTI-N JUERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, 4,\RT4QUAKqS

I

II

I

lr

llti

I

tsu<t-JA&6

iu<N*JJ

+Pi6 *H

jr!{a

rir!1:

iiii.lt.!l{;ililil;iiili:iili{!tiii

l;sii!

I

lle4_t vEo\ ZZe € trU$..rF.9-RA-ata-- o'.

-: l-l -r- O t-r oJzQlz=e,iEgEt!9!9HrY:tquLr

^nAv)^ht lfi H !l ir'l H

=

--.''-.".-/'-- ':..-

i/&y,?'l ( (

$)

'r ,:i

1,

I

7;'r.

*,,/'l'6al

ii

*l*,\

l

afrlV4

3

rrl,dkl

Jtu

Z,rr<zt-)^&a9&?E

7O

l< (,l.zlQalzDlz1lYz16 ctz 3lFr 3lrr FlF cn

l3

zHFaal-rztrlari

zzt.lF

frlF-rz

3Utrl

Fl

rrlzz4

r-..1rV4

A.\IEH-2A' de' \/4' <i;i-l \-/4,1A\,rz

z

C.9,a8+-Ll

s<E6i5

^&m

co.t5ooLo_oroC(s-o0)

=c)'=o)t

Brfriii, Lli I l;1.,-E'lr i lvl iir,l

S I liliJ{i}i I l5li1d;' H$!ii

l,ni:

tq

I

t*i ?I-t !Elo\ Z2Z 6 trOT..r€.9-NA-acDL- O'-

.:FlI d.q 6za;2a.il.jeg 3 $t!O:! cq ? c{ c(A M A g] A A,HH-

i,l

ir:L ,I

*rrr1r-\.. - ---\'i '...

(t€)rrl

-',oiE9dEle f;_oYHY

*arrHr-. (ip7cZ&a<4a-t7,'")I.,D

i)fr3a

zht

z

hzrl

z3U

U,Zkl

..

trljFi

IF

z,r!F,a

ir i"=aa'z.r'3)AAJIi<O'zz7>.

XF

HF.z

;!'a{i;r.iit ..--11 ri',:ili'riil.i

t_,1{,!il

iil{

iiil'!

.tf.

II

Iii'i.iltli

il

Fzt-

z<czzA-\<xEl*H

r

1i. d@

d

tru

t

co]CooLoo-

Ec(U

ooBo)'t0)t

co!0)LGo0)L

L

f1*1ffi"*:*u-

'L;r:....',,r::,'

BHAKRA BEASMANAGEMENT

BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP.Date;12-07-2019Issue No. 02

Page. 03 of 88

Page Revision No. 0

rlrfnt EUERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

IIYDROLOGICAL FAILURES,E ARrH QU AI(E s o"c6Etl8u.

O

)" tt. ,,cla..'u. I ,J

i&,^, ('")' \{ \'..r \ \ ..{z

*of .,'... \1"-)t' . rY'

-"1 )t.\ '\ >,1

'i'ro

.,.,'{1t , 1"'' .11i,;:'f $i"'i'iiii'i

+

" " t$i ril'ffi

''11-t:ffi'"''i"'

-. il

t'-rl;1,Jl

','" "t' i""'"

tt ii,l

:,::u

.,,,t\)

6ALLEflY SYSTIII

SOlTl',1AiIC L,{YOUT

Reviewed and APProved BY

oi,"ffiu'isnPrepared

ASE.I

By

f,

I r a.-._.

i&*Tilk'qq.*;;;l*-

' .: .:lrr".,:.':''

B}{AKRA BEASMANAGEMEN

T BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page.4 of88Page Revision No. 0

TITLE: EMERGBNCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKES ORorHERS. Coitrolled

Annexure-!l (i)SALIENT FEATURES OF BHAKRA DAM

BASIC DATA

Name of Project

Type of Project

Purpose

River Basin

LOCATION DAM

Type of Dam

Elevation at the top of dam

Maximum, height of dam from

deepest foundation level

Maximum height of Dam above river bed

Length at top

Length at bottom

Width at top

Width at bottom

RESERVOIR

Maximum reservoir level

Normal reservoir level

Dead storage level

Gross storage capacity at El.1685 ft

Live storage capacity at El.1685 ft

Bhakra Dam

Multipurpose Hydroelectric Project

lrrigation and Hydro Power

lndus

Near Village Bhakra, Distt BilaspurHimachal Pradesh

Straight gravity concrete Dam

E1.51 8.16m (1700 ft)

225.55 m (740 ft)

167.64 m (550 ft)

518.16 m (1700 ft)

99.06 m (325 ft)

9.14 m (30 ft)

190.50 m(625 ft)

E|.515.11 m(1690 ft) .

E1.513.58 m (1680 ft).

E1.445.62 m(a62 ft)9621.14 million cum(7.80 MAF)

7189.33 million cum(S.83 MAF)

Prepared

MReviewed and Approved By

ASE-I Director D^esign

BI{AKRA BE,ASMANAGEMENT

BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page.S of 88Page Revision No.0

TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKES OR,THERS' Controlled

Dead storage capacity

Catchment area upto dam site

Reservoir length

SPILLWAY

Type spillway

No. of Bays and size of flood control

Gates

Type of gates

Maxirnum overflow through spillway

lncluding river outlet

Crest Elevation

Effective crest width

RIVER OUTLET

No. of outlets

Size of outlets

Shape of outlets

Maximum discharge at head El.513.SBBm

(1685 ft) per outlet

i) Outlet atE1.402.336m(1320 ft)

ii) Outlet alEl.432.B16 m(1420f1)

Type of Gate

I

I

i

Annexure-ll (ii)

2431.81 million cum (1.97 MAF)

56876 sq.km (21960 sq miles)

96.56 km (60 miles)

Overflow gated chute

Four50x47. 5 ft (1 5.24mx1 4.48m)

Radial gates

2, 90,000 Cs (8212 cumecs)

E1.501.46 m (1645.211 ft)

4No.15.24m (50') wide bays=60.96m (200')

16 Nos in two horizontal tier of B each with Central

lines at

E|.402.336m (1 320ft) and E|.1.432.81 6m (1420ft)

2.64 x2.64 m (8.67 x8.67 ft)

Horse shoe with flat bottom, vertical sides and semi

circular roof

188.00 cumec (6638 cusec)

160.13 cumec (5656 cusec)

Jet flow fixed wheel tyPe

Reviewed and APProved BY

',..1,'.i,'t'

BHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PRO.IECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR OTIIERS.

Bhakra Power Plants

Number of power housesOriginal installed capacity of LeftBank Power Plant

Present capacity after up ratingOf Left Bank Power Plant

Original installed capacity of RightBank Power Plant

Present capacity after up rating of RightBank Power Plant

Total present capacity after up rating ofBhakra Power Plants

BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 6 of 8tiPage Revision No. 0Annexure-ll (iii)

2

5x90MW = 450 MW

(2x108+3x126) MW = 594 MW

5x120 MW = 600 MW

5x157 MW = 785 MW

1379 MW

*ln the special 139th meeting of the Bhakra Beas Management Board held on 29th August,

1990, it was decided that the maximum level of Bhakra should be kept as 1680 ft for the

storage purpose. The criteria in vague for the filling of Bhakra reservoir being followed is as

under:

The reservoir should not be filled beyond

i) 502 .92 m(1650 ft) by31st July

ii) 509.02 m(1670 ft) by 15th August

iii) 512.06 m( 1680 ft) by 3'1't August

And the filling above this level should be attempted after ensuring the due safe

guards.

Prepared

ASE-I

Reviewed and Approved By

I0)l!-lrlx

1e,l

CI.s, IaioolE\-]gato

coEq)

oLooEc(0-o0)B.q0)t_

z

4

t(

az3

z(,

Uzti

Id

rd

trl]E]arit3klF]

Nc\<J_\ -t

co:o -TPul6u)IL

E

!o\-/ >\tscnolro

q)(t)

(no

trAE .:PO)-r\J9/L<r-\r(s

.i.=-J, o63i

= = o CA-Y -!Li '\) 5 _ hE-.o.!-uesEEtraE*€= o.;- ^,4 Errt cd-C c)K=eE{EEilnco5€ 9;i.3€ -E E ^aZ. A-'\,) a Z- <) Ia:F 1r. ;d

:=v*6i .a

I

o0!

U

oo

bD

kl:llaOl

.EQ I

oo E sl: !.il.= o cdlL O- Fl-o.E UlO al El* \ (ut^#I -<l srlL u il:. > 6loo x (,lcX9)::€ ebo ,. q=0-) bO=9du$* r-cJ o.) .=cd - "'_Bd k-v oo9OCC)

; b.=c >=()=co^ V A14- F

aa

P e, n E fr?E '6.e E t i dEc):'i-X.c)>.cg-t.)EE9.= i ==co==-?\o3dq.c :i :EiEE9:;::g i qE>'60;'E+e-E68 ; t=akSHEiIi f : e':E;€= eAEEg; 5'E;FEH?sE>r .-r .e/ L n

E i =: -= 3 y; r u E eEo., c o tryt u? U U g),.= EtF-?3H€E:$:€i-3ri E E iE ; s 3 E # i, E E q.

?EAEtsTfiE;3tHE=€;f;E=ri;EEiT.33t = fl o, [o:5 !I)q; ti I I .9 ,n S * ii 9^ 9P: LEEvZE:;;-E;PS€A

HaE?E>"€SESfsrEth S olo- D i.'cz: >,l- -- - - r) a a a a aa) - u A-z c th i-)

t cg-O (.) 6or3 0 > >

Lro

Eor4

ao(sHoCd

qr

oIo()PC)

lelcdl:=I()IH

H

lolzO

li 0)

v,(J, t

I

lflvJAA

fro\ ZZa troq^=.9ER^wA(, - - cH'a

;EI2:-A?Eesr,r,oiJi c! a cn c(arAAEO..o,.

zI!F.(n

i>YalJl-

AZtl rr)

Jti<(,zzz,>&e)V t-',.

I t-llFt7,

Zlr<zn"jil)n

E5t? &e4Aei*u)o- trr |lzcY

lt.'. =

cl< \r 3\afr4lz7=llql zt At9; eln;^ =IA F Elr, < <l-': P trlE F-

l?aIF

A-ilAA*X

-:H.{*, co F"r"': <6

-U,.' . 04 "a-l'": g *<HE-l V!4a2

.odA

P=)<

FEg.=aaAtr>,A a(/)(-)

\2 E= z E=eZ =i '= A.:>T. _ (.) )'i - cs cc

- <g >i ,i -l cs oiJ.na-aL.-s ! '\ \/ L- b= Z'zoXtti;E:=-;EEqE}Es 35 *i g: € H I E qi , '2?; c..i ..i + '

P

E

()-oaa

E!0)

cd

aocd

r-l

a

EE EHE E-fr 83, 6P.E't.'|-'F/-c:5; =rB : e E-E HEE€ ?1.a t'oE E g -.! >E€Ef;

=s =ne ;3+ #$ gEg*Eg;.Eif a:=;i $ertrE:.i'€{ €ri';EE E3r5i;ryqP5; -*'sEq"-=foi+*E E: E ; E I i e; ' * E

IfiIE;E ;fr€E$Ee:E;i*+;EreI ;i ;[:tE;iE;$5S==EE.*EEi;lf'erbeE*-o 9 - oo.gsE Es i: U 3 3, 3..: ;iIeHAE=surs€rgr**Egy=Le,e3 35€;f fr u i=-:3efrH-V. . . . ... .x o.blJ.] 5 O

COcc .9)93oOes\p(XhNo0)B0)'=c)t

co:o -TPut6a0)L

o_0)

l.oi

I0)

Nq)

zlr<za"j</vil,-l A ll

?E5,)ticf)droriI{-{FXCY<ur-il>Zxiu od 1V=4 -^n1(nY'z briu;)iak?

l-': P rrlrri 3It otr

) ._ _-__

?-f.]3,(t

YalJl-

cz*. tr)

F.l ll

ZZ7.>dani4X3

B]37;

a

Cn^<Yul:tr7,:a

;>?H;\,a2

z,

z

a

bJ

I

t-l o,ZO9inE(2L-tr

-.El I o v

iQ?z?..;3eEtO ;ri .s ? c,i

a..aq)utlJu-t&

I0)

X0),t

(uHT

tl,!{t

{

coE

za

0)

q)bl

I

I"l o'ZOOT.rf-RAwCn--+i

o E..r; ^z<a1':,iaEEt!o g.,i cq ? c6AMA.,.iA.!gH-F

coro0)

oLo-oEc(sroo

=oo)

l(_

mE-To iltka0)LI

"o

6FbOtr>,Q ACN

.B= '= d Fc B t-E EterE e* h= E ec isps6 a# EE E €a EE:h,: ri-EE'-: 'Vn1E**€EiE::B'-8s5 5=El+;E! EgE E. . ' ' ':'i7 > HC-tr'cg ):E

= ['6 #E 8 > o E

* ..i .r + ,ri

Ee I.r E-+ q Eu .(;s 3tE:'EU E" E*-U EEE E-s;;#a, 1e g*T, riE I:AEIe'.Ei" iIu *

EE aH??SEegg EiE :sr*irA!g3;sg.;;3=Eql6os-Bh?

ii;E3'g? iHEEEE :iEg;iEEE f,IEEf,# geE Eaif,! ! ilEg[;EsItEsflEaEEEEsElE H H j o ' ' ' ' 'l2 *el.E a.t 6tchs o

E

aotiC)

b0oEOa

()til0)

la-oIO

tal-VtolcAt!lol,<talcJll&

(.)bo

q)L!0)H<

Zll]<znYi

&^39 /,,v425i iJi r/)o, fr r.\zcYlF-', X Cl< lr 3\zaxlzlPlB < nlY z7lkl t Dtz 3 trlFrstl.': , Er1E HIF U)

lFi

atHILilaaFzHzf=l

z

HF

t43z

3U

J

zz

l?

AHn-t

A.\<X+1 'A-

tZtrM=i

. x,t Z.* .'ldH,.i v*4a2

-lz

co!c)

oLo_o_

13c$io0)

=G)'=q)t

SZ=coc-TP r.!oA0)L

o_

'o*g()trI:

iO e, !{.5EE

(, l-r>.o

>'

I,oo o.9i a c..rcdll(d7'p u

OH2Ci 0; U ';=iJ>.=M 6) r) d H

==<a

-o-l.=E.: cf*crs HE'eg 4Ef;Eu=EiEE=i:Bii=gr-itrtrcad2..!58 trEEcf.E.,g.g3 *EEEs€HsgsE

oOOOOO

aotiC)abI

c.)E

(6

a

Cd

cda)$<

-o

oco()OI

o63a

(Ji

io.q 6)P-d

".oo= >.ts^H*t tr:=H 2(E oi q- Efr-or-- aP c\o ooii 63'- C

:.1 Gl (g

d-vZ().= '.= " O.

9otr:'atrPoc.l

;i ^'e

cdaaa

.;<' a -6='*R-LU-

Y-Ui;!gAn).)a- a Ca--sdy,xF 2r-4:s Y (*6V

(E'= (J a.-F()()

=IoHS(JX,;:rJ O. () t-i

o

()

cdli(_)

Io

ac)

ol

a(J

(HoO

c

30J g-j g: E .2'Ff,Lfrl

H=EEs' Ea 9 EooEldf .9olr -6 i:E o n.a T1 E c +3ie =+ F" o ;.o9oS i -- .3 6'--.;a.j_.'i^aX->cooCuaXcE-:ocr'u

Xo-. b !> i= -oY tr ooo !: =o

cr'-j F o-o9: = w s;j;q9;3=g I re

'-AEteeEii n =

r-1 8.,=i-E=4,U0)*.9= 8=.<.E'a! c- Hts * - 9.5u a a= 03 3il

Ef=6cyi'Io,E E E:X=€s;1=I = E7 tr E tri;J - oo c cd'E - 3 >.':ii b -.4 I - B

7-iots-oooE"'"o';3DE#n:iE= $+H; s E: g H F A E * ;,€lt.6 S3.=3-a -g.g;.-.9':9?E3?Ed ,.re.:.EEg=sm=:EHEESE5c1;u'Jdi'6 'E=.!l+

q)

q)L,:oJ

I0.)

x(,)

z

a

obJ

A

O€T"rFr-a=sz=g3y.A 3s

I

rizaE]

QzO

I2e

>o*a)f;r. !-l

!Fr

H5Zea<1A*ElZ,*Llp

'l EL,

t-a

zIz

trz4Oi

z3

]Ut.-1/1U1zlri

IEii !.rI /',ti:lr

t-r

Ft_

aklt-,a

YaCZ*a)*4.Jkl<(,27,z>,{oH IJJVF

frl3z

O.\<xLrl -CF<acd <":/4?H*z

z

E.q,a0)

mioooLo_o!c(s

Eo

=o),=ox.

coCT(l) iltk(n0)L(L

ll -? >.d -v>O.-1Od-.t

-.ij=-As €dt>.lJrd.avO- cg $.l ard, 9e<gg'caq' A'E E 3 Hr,.AfLu#!S X.: E.,\

e:s; ; iu : ,sE e=

EE=E € [i € erI gp

EtcA E E€ ; EE! :€iEai E EI : *g? ilB#EEE E t:.aa Ec: ue

EryEsi E :gfE H;3.EEg.,trPE,, ; 'i3o=.o 9=E *9IIi:I i=Eei[.iiE g!ErE:!:€€srgiE;I € B

='gE B

*r;;3#drEia$rrfrE -tEEflEEEAEIF;iEEgEPE:E

Pr

oF

ao

-a

c.i+1

oliC6

a

oda4

lilcdI

l,rI

INlool\Ol*Ilat'-I

I !-.,1l{t€l&

Iq)

X6)

alr.l I

Fdlal>laF.(zklafrl

zzrdF

H3z

t-(UF]

i

zz

L!l<

za

0)

o\e€TerF

l- OiIZ*I3r,c!?d

I

tiza

: [r]z<

Zlt<2?i<xE

9 &vizci iri u)o, tri l-lZC\lh 6 gl< U r-.1*2ill0 a <lzl=1tx < n14A*I> F Elr4<<l.': F lrll:i frlJ ;-,tl?aI F-<

n&(-,/

tft

Fzrrlztr.]czZ

09..1

!.1

u4ri

l,r.l

U)o-ob

65 00

Hotrx o0(dE Cdn.L€-aOa)-* 'i?Ubo6) o.=boe-oh0.)oH.OEo'd-;-=o=e.:l qR oJ

^ -- A

!Yu:g9UEVUiHA**:HUU.i

a

zrr<2iei!r--]Atl

c(Et*tuA,v?E6J*cAcrI.14'-CYtsr-{t-,, X CYoH>zeoa{zpnF,l'41 O9;nI!I'D

rrk?rat.l?aFr

ljtal&ill i

*sie$i

zf-li-(

-?Y-aoztl. tr)t4 allri<(,()<zzzzn-M t-.

fEltiz,

H

(n ^;-<ElL] :COF<aa/ i)u=IUn2

z

zA)

(,)

obl

I

F{ ort-- -ZA 6(l$*-r€

FNAqA='o

EEsEr.rag3g,oiJi c{ ? d

A.A q.t-t ,rt t-t - Il

mTO

0)

ooo_

ocooo)

=0)'=o)t

C.g)oq)oL

oooL

5

={€eco-o -:-9r!GA(DLI

t=-am)>Eld

w

Co),a0)oLooo'L

i-

coE0)

o!o-o_

oC($ro0)

l=l0)l>t0)IE

^*co'15 -TpLu6aoLL

I0)

xc)

itt.."exH I lx#

/, I !

il;t:,rEt!Yllielsl

I

; _..l* I rili ;l

*t; *ir

1-I

i *{.)l:1 r,

H43t I

l'1 4l t

i +i I,l ''!i I

'l *

*'1-+ v

&,*

t?

Llfu*

r:l-"1,

n

.e u!iI I'i

""d

nt

--r*{+

I

&

" I**]!::J

xsL!

rial

!k

***!,Nt:-r.i;;.i+*rEr3i'. ,l -l'

rs*j:hq -a*

iTL*

(!sTtle

:;E":r*r!

fi*l' lxr

ii\

i'J 'I

ti.{

F]

FrI1JFl

zHrrlFzat-.,j

\M

!rcaF

HO

FlH<

zoF()fJr

Fz

u --:i* -o'it{t "--,#.' r**

i'I

)I]

,/,,

fl

zah

q)

o)OJ

I

tl a'Za 69T".rPtsRAhv)a . v

dE.\93iEEE u,o 9,1 cg !2 cg

eFqAEPr

Z. I

l<2?*rl\J|.1iCEr(l'a ?9 &e

<83O_ Er t-i

lA r- {lil x cl< (l F<

lzfrilzp*1ti14aIO * HI n '2, t4.

Itn U Dlz Fi ltIr4 3 3I_': P lllE t-'r

llalFr

\3 IalHI3l. (r)l

Y a,llIIl-

AZ&. g)td €.

<(,o<zzZ>I< alc 6lV t..l< <Itr trIEnlr'.tz

al&lc9.1

FzF]

rrl(,

za

a.a,^<

E4ifg

I(,)t<

Nq)

mti L!

r#

k, 11r,hm n i wtailr = ury a

H il +i i:.^15 *1 .,i,tAf;i llitl U' lL

$n gH -*n -3 -{l

Uut ru -ila t] -9 l-J l!lln /,4,'i r-!' f.

dU j gil

,H Hit ,!ft ufffrf, il u Lrr

;{ N l'

ul

pfi litl '- r.fi rr

l1T "N lfEm

la,

,t;i !

H ; ^' u',i)n {l ll i1

ut;r'a;

d

E{^Cn.{qftTYut{bJ.HilHt- F"l

iv'(4'lre 't'1

Lrl,.kJfrN'a 7,

r,,

'1,. il^ c !flu I,, aiiFl -lJ*r :il

dF: a! lrJ:l-{ il ra h .- !4 lllll * ,.Ur nri liH# iln *v nZil ll 'uH _,rJ ?.,

[ri i{ ii;: sc' n b!q i:;^tn!U Li D-; 6.,'f, iil ,#fi,

q{ vttd d urr

il,s EHE E qd

-I r i!.1rrl ilrl

C.?a0)o

E-.olH

c0cc)

oLo_o_

!C(I,

!oBc)';0)t

di.t

t4 r)(.J

jrq

g

d l-lnTr

,r,

+i n

llli l,ln - rqH

ill r,

L]lq

& q r,

ilon'j

4.,o o i16Int ;i

(Jil .tu,,ul r"llr

ot :1

n

UETin f d l4.l! tlt ,/,.,t! il

lud",

i,r nt ri ,il il';l

"Jl rlt' li e 'r'ri!t,u ii ( r.i

H ! ll r1r t'rili rJ ^l U 4r ,li ,ln I li,l !

{ ill .!rlr J sI

UJa

c0ro0.)L(Uoo)L

o_

IA- I4\i<q zZo 6 trU$.-r€.9AtrOE.9

,EI2rP.rai;3s,&OiJi cg ? cd dA AA A O?

^ A,- -rl;l

er!3

F3=aCZCH

i.J f-l<(,zzz>{arlEIX3

ri3z

qJri-v-7s S

11r /'., .: !I-t \J .^i i-av)lA|i t4 a,rlr?! i.-:^lJftY''trEEi1 F

<ne"l*92o- tr 14

;CX2ir-{?- -a\ O< l, t-r- z*,6a?z7A74r,9;e-^I:

rr3?E! F<

?at'"

oc,

Aa\<xE]HmF<atY. t4E*<iitsri V*nm\*z

zl\z

Htdt-tUI{H

r-1lll) li\aLl?a=l='1 rHfrllLg l

Illl---lI

lcol=ilo 1iA BO-ao- 0)l<olp b or-Lfi !-{ I13 L)l0)l't

o)l"lt_-tl^. iI.-\f&o i1^J:lmlo-ri19 ur l

$A

t9

l"I

t

I()

XI

'l--l ---i-,.l l;,i

li ffiffiffiq$$ffir lfu*'ffifur

ffiim H l,t,llHtd,h'lHlffit ::i,ui :Ell i,

n ffit+lffiirrffi:fiffiie ffE'qffi,#r*ii*it

rriEs6 \:iffirq4:l Fui,i

Ifi ri *rur?. ,HHt{El i i nl

t. \1itrffi,$Fil+*uFp? HTflffi['fl ',Hi"i

B 1?3#ffi;ltfl.

za

o

ol

I

I-l a,Za oaU$^aHRAka\- o

;Ef,.ilnz,?ez.-.;3jj3EOrli cg ? d

AMA@A

13arc3

-?Y-a:'.t.CZ*. Lr)

jri<(,ZZz>{oVFr

rI]t-,iz

at.l

Fr

at-l

F

frl

ard

zaJii

zn<-l

fri t123+/i

Z>?tu

>pZrafr,2*al'1 -z<H7#CF;-P

a

!

a-j<xolc0r<6cz?tl*z

z

H:5

JIt

ttn,iJ

x?

9:

ic

o

3>2F-19!i

-1T-lli lo I

i I lI I

tElI =l

3f,

,l'ni

J

o!

b

i!

f

o

" I "i "

E

!E 7t

^l

1

l

:<:J

?a-

U

La

s

o

i

U

l

o

tJ

i)(tII!ir

riU

)oa

oF

U

ta ;r uCoi

l.l!lo;

o

!&';o

5@rn

O;:E

U

It r,

l!;..uo;

_.1

"ll.ttl+t

L,t

tu6

(J :E

qiE

!

;o

t\

5o

a

a

U

-T*'L - -l lo -E

-t,L

I

J

l,llq6 I

L1

=-t .

I l;s !l7I;! |

il l

i4 |

ri I?:1

E

-AXI

aE

xi-lto- li {

ll:1Il.-

E

o;:oO:3

;9

,o:FO {l

trl--]

-.1

-1

i:I'f

I

.'_l^-t;al_r l^!:lx;!

thESI rsIL__

t;

OIoo

-ttli j

F

vioa I:

E

J

,0 L _-llz i

_J-l .! I

-"-J-3_ I-r li:E I

I ld;o I

!e6

r:1rrq<6aEcA E

F

o{.:

{o

oE

6a

illc

t-s I

:l:ll I l.a-J l^9

I

ql

!-

Fr

U

l_

t!

a

o;npo

ILt-t,

!0iq4i,3E!a

d

n" /\ll Lt\1..' l,lt: /

r. ';(-\d/

)r.. !.,1 ,/(i, +, t-/or/; nN/ \,A\

Fr;

qai

:*{E c.5

I0)

Xo

L'ooL

coo

a'gE

o

dY

IoF

z

aa)

I

Fi a,\-l

Za 6U$.r€HR LCD:- O

EE*,:dae=$oi.l cq ? (nAAAq)^l-l Jl - )-l I*(

Fl

9.,

*arr. rrl

F,l

Z&6<1AZer.l D

PfrFra

zl]

z

/,tuz

z3U

(,zkl

ztitlF<

F

riF<

-?=aCZe. 9)AAFl fn

zzz>{o&aX3

rd3z

A.\<Yllt_aoF<aJZ?H*z

.2.

c0c0)

oLo_o_

!cG!o

=o,;0)v.

coE0)L$o-o)!

o_

BHAKRA NAI{GAL PROJECTINTEGRATED MANAGEMENT SYSTEM

BHAKRA BEASMANAGEMENT BOARD

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAI,

FAILURE S, EARTH QUAKE S OIBTFS&EA

Doc. No.BHD/DESIGN/EAPDate:12-07-2019Issue No. 02Page. 17 of88Page Revision No. {)

Annexure-V(l&ll)

lnternal Alert BIue

Narrative information listing of persons to be notified by each individual as per NFC

i. After knowing about the occurrence of a disaster JE will make single call to SDO

lnstrument & SDO lnstrumentation will make four number calls as below

l.tcalt to XEN Bhakra Dam Division 01887-223075(0), 9463998256

2nd call to SDO R/M 9BB2103103 (M)

3,d call to S DO Permanent I nstallatio n 01 BB7 -22321 9(O), 9465225304(M )

4th call to SDE Dam Safely 01887'223140(O), 9463598397(M)'

SDO R/M will make a single call to XEN RM/SR, 01887-223092(0), 9463998256

XEN Bhakra Dam will make seven number calls as under

l.tcall to s.E. BDC 01887-223017(0), 01887-227000@, 9468177095

2nd call to Chief Engineer, Bhakra Dam 01 BB7-223001 (O), 01 BB7-223024@, 7888697174,

3'd cal I to S. E. (Hq) Nang a I 01 BB7 -2231 64(0), 0 1 BB7 -223237 @,941702 1 604 (M)

4th call to XEN Bhakra Mechanical 018872231 17 (O), 9417202040

Sth call to XEN RM &SR 01887-223092(0), 9463998256

6th call to XEN Electrical 01887-223094(0), 94639984'19

7th call to Director Dam Safety 01887-223179 (O), 01887-223089@, 9463998230

SDE/Dam Safety will ensure that messages have been delivered to

2.

3.

Reviewed and Approved BY

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 18 of88Page Revision No. 0

NTNXNA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTBM

0

BTIAKRA BEASMANAGEMENT BOARD

Tnrn' nntnncnNcY ACTToN PLANFoRTIANDLING SITUATION ARISING OUT OF

HYDROLOGICALFAJLTHtHILtTffiSTff '

Annexure-V

each individuar as per rist and wiil make a singre cail to Director, Dam safety,01BB7-

22317 g (o),0 1 BB7 -2230 89@, 946 399 82 3 0 (M)

5, XEN RM/SR will make a single call to SE, BDC, 01887-223017(0), o1BB7-227000@,

94681 770s5

6. XEN Bhakra Mechanicar wi* make a singre ca, to sE, NMC o1BB7-223004(0),01887-

227062@,9417202076

7. XEN Bhakra Erectricarwi, make a single call to sE, NMC o1BB7-223004(0), 9417202076

B. SDo permanent lnstallation will make a single call to XEN Bhakra Mech' 01887-

2231 17(O), 9417 202040(M)

9. S.E. BDC will make two number calls as below

1st call to C.E. Bhakra Dam 01 887-223001(O), 01 BB7-223024@, 7888697174'

2ndcalltoS'E'BhakraPowerHousesolBBT-223261(o)

l0.ChiefEngineerBhakraDamwillmaketwonumbercallsasunder,t,t cal I to M embe r/l rrig ation O 17 2-501 17 52-53(0), O 17 22661 499 94 17 022944

2nd cail to CE. Generatio n 0l BB7-223355(0), 01887223146@9417216056

lssued Bv

Nffifi-\-Reviewed and APProved BY

Di,."y:T.is.Prepared BY

BHAKRA I{ANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 19 of88Page Revision No. 0

TITLE :' EM'ERGBNQ}?ACTION PLANF0RHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKBS OR

Controllefl

BHAKRA BEASMANAGEMENT

BOARD

Annexure-V(l-lll)

lnternal Alert YellowNarrative information listing of persons to be notified by each individual as per NFC

l After knowing about the occurrence of a disaster JE will make single cail to SDO lnstrument & SDO

lnstrumentation will make eight number calls as below'1't call to XEN Bhakra Dam Division 01887-223075(0), 9463998256

2nd call to SDO Hydrotogy 7973205990, 9463718386

3'd call to SDO Reservoir Management g882103103(M)

4th call to SDE Dam safety o1BB7-223140(o),9463598397, 9815553455

5th callto SDO Discharge O|BBT-223173(O), 946399g1gs

6th call to Chief Fire Officer, Nangat O|BBT-223101 (O),

7th call to sDo Permanent installation olBBT-223219(o), 946s22s304

Btr' call to Photographer g41Z SAgl 42

2. SDO Hydrology will make a call to XEN'HydrologyO1887-223083-0, 7589303748 and another

call to SDO lnstrumentation 01887-223045,7589303795, in case he gets 1't hand information

about the disaster.

3. XEN Hydrology will remain in constant touch with IMD & catchment upstream Bhakra 011-

27662607(tMD)

4 SDO R/M will make two number calls as below

1't call to XEN RM&SR 01887-223092 (O), 9463998256

2nd call to Supdt. Procurement 01887-223011(O), 01 887-227400@, 9463998419

1. SDE, Dam Safety will make two number calls as below

1't call to Director, Dam Safety 01887-223179(O), 01887- 223089@, 9463998230

2nd call to ensure that messages have been delivered to each individual as per NFC

',T:::

MReviewed ,nd Approved By

Tzl'"''',"

-tI

I

I

I

gUAXru NANGAL PROJECT

INTEGRATED MANAGEMENT SYSTEM

BHAKRA BEASMANAGEMENT BOARD

FATLURES, EARTHQUAKES Oi oqlq

ANFOR HANDLING--inua.uoN

ARrsrNG our oF ITYDRoLoGTcAL

6.

7.

B.

Doc. No.BHDIDESIGN/EAP.Datetl2-D1-2079Issue No. 02

Page. 20 of 88

Pase Revision No. 0

Annexure-V

sDo Discharge wi, make a singre cail to sDE, water RegulationoiSST-223043(0), 9694096244

sDo permanent rnstaration sub Division wi, make a singre ca, to XEN Bhakra Mechanical

Division 01887 -2231 1 7(O), 9417 2O2O4O

XEN Bhakra Dam Division will make ten number calls as below

1'tcalltoS.E.BDCO1887-223017(0)'01887-227OOO@'9468177095

2nd callto Chief Engineer, Bhakra Dam 01 887-223001(O), o1 887-223024@' 7888697174

3,d cail to S E.(Hq) Nangat o1al7-223164(0), 01887-223237(R),9417021604

4thcalltoXENBhakraMechanicalolBST-223117(o),9417202040

5th call to XEN RM &SR 01887-223092(0)' 9463998256(M)

6th call to XEN Nangal Dam, 01887-220563(0)' 7589303892

7th call to XEN Bhakra Electrical 01887-223094(0), 9463998419(M)

SthcalltoDirectorDesign,NangalolBST.223los(o),9417202097

9th cail to Director, Dam safety 01887-223179(O), 01887-2230-89@' 9463998230

lOthcalltoSDE,WaterRegulationolSST-223043(0),9694096244

S.E. (BDC) will make three number calls as below

l.tcallto Chief Engineer, Bhakra Dam 01 887-223001(o), 01 887-223024@' 7888697174

2nd Callto contact experts (Annexure XVlll)

3'd call to S.E. Bhakra Power Houses 01887-223261(O)'

ChiefEngineer,BhakraDamwillmakefivenumbercallsasbelow

1't call to Member. lrrigation 0172-5011752-53

2nd callto Chairman, BBMB 072-5011750-51

3th call to C.E. Generation 01887'223355(0)

RevCIwed and APProved BY

esign

I

10

By

fi

Prepared

ASE-I

Doc. No.BHD/DESIGN/EAP-Dile:12-07-2019Issue No. 02Page.2l of88Page Revision No. 0

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDRSLOGICAL FAILURES, EARTHQUAIGS ORorHERS. COntrOlled

BHAKRA BEASMANAGE,MENT

BOARD

11

Annexure-V

4th call to C.E. BSL Project, Sundernagar 0'1907-262333(0),

5th call to C.E. Pong Dam, Talwara 0'1883-237131(O)

S.E.(Hq.) will make a phone call to Sectt. BBMB, i.e. Chairman and Member (l)C h a nd i g a rh 0 17 2-254857 2(O)XEN Bhakra Mechanical will make a single call to S.E. (NMC) 01887-223004(0),

941720276

XEN RM & SR will make a single call to SE (BDC) 01887-223017(O), 01887-227000@,

94681 77095

XEN Nangal Dam will make a single call to S.E. (BDC) 01887-223017(0),01887-

227000@, 9468177095

XEN Bhakra Electrical will make a single call to S.E, (NMC) 01887-223004(0),

e417202076(M)

SDE Water Regulation will make two number calls as below

1't call to Director, Water Regulation 01887-223758(0), 9463598550,

2nd call to XEN Nangal Dam 01887-220563(0), 7589303892

Director Water Regulation will make two calls as below

1st call to Member, lrrigation 0172-5011752-53

2nd call to IMD New Delhi 011-27662607

S.E.(NMC) will make two number calls as below

1't call to SE, Talwara Circle for Machinery 01883-236013(O), 01883-236114@

2nd call to S.E. Circle-ll, BSL, Project, Sundernagar for Machinery 01907-262354(0),

01907-262398@

12.

13

14.

15

16

17

1B

Reviewed and Approved By

Direqtor Pesigno/^A

\

YPrepared By

BHAKRA NANGAL PROJECTINTEGRATEDMA@

?'.]::.ild

BHAKRA BEASMANAGEMENT

BOARD

TITLB EMERGENCY ACTION PLANFOR, .HANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKES OR

orHERS" cootrolled

Doc. No.BHD/DESIGN/EAP-Datezl2-D7-2019Issue No. 02

Page.22 of88Page Revision No. 0

Annexure-V(l-V)

External Alert Orange

Narrative information listing of persons to be notified by each individual as per NFC

1. After knowing about the occurrence of a disaster JE will make single call to sDo lnstrument & sDo

Instrumentation will make ten number calls as below

l,tcallto XEN Bhakra Dam Division 01887-223075(0), 9463998256

2ndcalltoSDOHydrology,7973205990'9463718386

3,dcalltoSDoReservoirManagementgSS2l03l03(M)

4th call to SDE Dam Safety 01887-223140(O)

5thcalltoSDoRoadandColony01887.223118,7589322346

6th call to sDo Permanent installation 01887 -2232 1 9(O), 9465225304(M)

TthcalltoSDodischargeolsST-223173(o),9463998185(M)

Sthca|ltoChiefFireofficerNangalolssT-223101(o)

9th call to photographer to cover the event at site 9417589142(M)

1oth call to sDo Bhakra Electrical. 01887-2231 18(O), 9417773829(M)

2.sDoHydrologywillmaketwonumbercallsifhegetstheinformationaboutdisasterfirst1't call to XEN Hydrology 01887-223083(0)' 7589303748

2nd call to sDo lnstrumentation 01 887-224537@, 9463595152' 7589303795

3. SDO R/M will make two number calls as below

l.tcalltoXENRM&SR01887-223092(0),9463998256(M)

2nd cail to Supdt. procurement Nangal 01887-223011(o), 01887-227400@' 9463998419

Reviewed and APProved BY

oi'"9{'ion^tt,fi

ilf****iW ffi..:P.TYT

BHAKRA BEASMANAGEMENT

BOARD

4.

Annexure-V

SDE, Dam Safety will make four number calls as below

1't call to Director, Dam Safety 01887-223179 (O), 01887-223089@, 9463998230

2nd call to XEN Township 01887-223040(0), 9417333940, 9530903085

3'd call to Police Station Nangal 01887-223100

4th call to: He will ensure that messages have been delivered to each individual as per NFC

SDO Road and Colony will make two number calls as below

l.tcall to village Pradhans d/s Bhakra Dam & NGO's to get ready the persons for evacuation

immediately2nd Call to Check Post Barmala 01887-223192

SDO Discharge will make a single call to SDE.Water Regulation 01887-223043(0), iAAAOg6TqnXEN Hydrology to remain in constant touch with IMD/CWC & catchment area u/s IMD 011-

27 662607,M-O9A r 8553839, CWC 01 1 -26108855-0/0 1 1 -26913645- R

XEN RM & SR will make three number calls as below

l.tcallto S.E. Bhakra Dam Circle, Nangal 01887-223017(O), 01887-227000@, 9468177095

2nd call to civil authorities Una 01975-225800

3'd call to SP Una 01975-223216,225056

Xen Bhakra Mech, will make a phone call to S.E.NMC, 01887-223004(0), 01887-227062@,

9417202076

XEN Bhakra Dam will make ten number calls as below

1't call to S E BDC 01887'223017(0), 01887-227000@, 9468177095

2nd call to Chief Engineer, Bhakra Dam O1 887-223001(O), 01 887-223024@ 7888697174

3'd call to S. E. (Hq) Nangal 01 887 -2231 64(0), 0'1 887 -223237 @, 941702 1 604(M)

4th cail to XEN Bhakra Mechanical01887-2231 17(O), 9417202040

5th call to XEN RM &SR 018870223092(0), 9463998256(M)

b.7

L

'10.

Doc. No.BHD/DESIGN/EAP-Dile:12-07-2019Issue No. 02Page.23 of88Page Revision No. 0

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGEI{CY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAK&STOR OTIIERS'Lontrolled

Prepared By Reviewed and Approved BY

)*lDirector Qesign

Doc. No.BIID/DESIGN/EAP.Dztezl}-}7-2019Issue No. 02

Page. 24 of 88

Page Revision No. 0

BHAKRA NANGAL PROJECT

INTEGRATED@

BHAKRA BEASMANAGEMENT

BOARD

Ti@cTIoNPLANFoRTT,q.NULIXG SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKES OR

Contro

Annexure-V

11.

12.

6thcalltoXENNangalDam018B7-22o563(o),75B9303B

TthcalltoSDE,WaterRegulationolBBT-223043(0),9694096244

Bth cail to Director Design, Nangal o1BB7-223108,9417202097(M)

9th cail to Director, Dam Safety 01887-223179 (O) O|BB7-223089@ 9463998230

1.th cail to XEN Bhakra Electrical oiBBT-223094(0)' 9463998419(M)

.r1th cail to p.s.o in case of sabotag e -o1BB7-223060(0) 223104@

S.E. (BDC) will make three number calls as below

1't call to chief Engineer, Bhakra Dam 01 887-223001(O)' 01 887'223024@ 7888697174

2nd call to Experts as per list at Annexure-XVlll

3d calr to s.E. Bhakra power Houses o1BB7-223261(o) 223252@

ChiefEngineer,BhakraDamwillmakeSevennumbercallsasbelow'l't call to Member' lrrigation 0172-50752-53

2nd call to Chairman, BBMB 0172-5011750' 5011751

3d call to Distt. Magistrate & Chairman Co-ordination Relief Committee' Ropar

4th call to C.E' System Operation' Chd'0172-2653660

5thcalltoC'E'Generation'Chd'01887-223355(0)

6thcalltoC,E.BSLProject,Sun-dernagarolgoT-262333(0)'

7th call to C.E. Pong Dam' Talwara 01883-237131(O)

Bth call to C'E' Ranjit Sagar Dam 0172-2549176

13. S.E.(Hq) Nangal will make thirteen number calls as below

1't call to Secretary, BBMB' 0172-5011759(0)

Reviewed and APProved BY

Directhr.D#ign

Prepared BY

Doc. No.BHDIDESIGNIEAP-Date:12-07-2019Issue No. 02Page.25 of 88Page Revision No. 0

BHAKRA NANGAL PROJECTINTBGRATED MANAGEMEN'T SYSTEM

TITLE: EMERGENCY ACTION PLANFORHAI{DLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKESoR orHER.. L'ftfOlle0

BHAKRA BE,ASMANAGEMENT

BOARD

2nd call to Civil Hospital Anandpur Sahib 01887-232193

3'd call to Civil Hospital Ropar 0188'1 -1221141

4th call to keep constant liaison with civil authorities, Ropar.

5th call to SSP Traffic Ropar 01881 -220119

6th call to News Media as per list at Annexure-X

7th call to SSP Ropar 01881-220119

8th callto DSP Ropar 01881 -22}1gg

9th call to DSP Anandpur Sahib 1887-232068

'1Oth call to DFO Ropar 0'188'1-222231

1 1th call to SDM Anandpur Sahib 01887-232036

12th callto NFL Hospital Naya Nang al01887-220622

13th call to Fire Tender NFL, Naya Nangal 01887-220648

14 Secretary BBMB will make four number calls as below

1 .t cal I to sect. Rajasthan I rrig ation 01 41 -2227 7 17 (O), 01 41 -257 4455@

2nd call to Sect. Haryana lrrigation 0172-2713496 (O), 0172-2706285@

3,d cat I to Sect. Pu njab I rri g ati on 0 17 2-27 43442(0), 017 2-27 27 049 R)

4th call to Deputy Commissioner (lndus) MoWR Delhi 011-24100787'(R)

15. Member lrrigation will make two number calls

1't call to Chairman, BBMB, 0172-5011750-51

2nd call to Chairman, CWCO1 1-26108855(0) 01 1-26913645@

'16. SDE, Water Regulation will make two calls as below

1.t call to Director, Water Regulation 01887-223758(0), 223143@,9463598550

2nd call to XEN Nangal Dam 01887-220563 (O)' 7589303892

17 XEN Township will make five number calls as below

1't callto Mobile Van announcements d/s Bhakra and in Nangal area

2nd call to Pl\lO Canal Hospital, Nangal 01887-223012 (O)

3d call to Punjab Pollution Control Board Member Secretary, Patiala 0175-2215802

Annexure-V

Reviewed and Approved BY

BIIAKRA NANGAL PROJECT

INTEGRATEDMA@

BHAKRA sBa$u itMANAGEMENT BOARD

ffiYACTIONPLANFORTUNOT,TNG SITUATION ARISING OUT OF

nor.-otrc^r."Jrrg*r*tr"T$ffi

19.

20

Doc. No.BIID/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 26 of 88

Revision No. 0

Annexure-V

4thcalltoMunicipalCommitteeNangalolssT-220589,220586

5thcalltoAnnouncementfromGurdwaras&MandirM.9417143501(GurudwaraGhatSahib)

ls.Director,WaterRegulationwillmaketwonumbercallsasbelow1't call to Member, lrrigation 0172-5011752-53

2nd callto IMD New DelhiO11-27662607

3,dcalltoDirector/PowerRegulationChandigarh0172-2652820,

4th callto C.E System Operation' Chandigarh 0172-2653660

5th call to IMD Shimla 0177-2624976'26224396

XENBhakraElectricalwillmakeasinglecalltos'E'NMC'01887-223004(0)'9417202076

Chairman BBMB will make two number calls as below

1.t call to Mop Govt. of tndia 011-23717474, 23710411, 23719205(0) 011-23092372'

23098852@

2nd callto lndian ArmY

(i) Station Commander Chandi Mandir 0172.2868761.Extn 6240, Exln.6242 Civil No.0172-

2589564,

(ii) Chandimandir Help line 0172-2589624

21 S.D.O. Permanent lnstallation will make single callto XEN Bhakra Mechanical 01887 -2231 17(O)'

9417202040

22 S.E.NMC Nangalwill make three No' calls as below

l.tcallto s.E. Talwara operation for machinery 01883-2360',13 (o) 236114 @

2ndcalltoSEBSLCircle-lsunderNagarformachinery0lgoT_262400(o),262442@

3,d call to sE BSL Circle-ll Sunder Nagar for machinery 01907-262354 (o)

23PSowillmakethreeNo.callsincaseofterroristattackasbelow'1't ca I I D i recto r/ S ecu rity 017 2-50 1 17 62-63 (o)' 22242569@

2nd call to all concerned as per Annexure-Vll

3d cail to c.E Bhakra Dam, 01 BB7-z23oo1 (o),223024 @, 7888697174

eweO anO APProved BYPrepared BY

BHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGBMENT SYSTEM

Doc. No.BHD/DIISIGN/EAP-Date:12-07-2019Issue No. 02Page. 27 of 88Pase Revision No. 0

TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKES OROTHERS.

Annexure-V(l-V)

External Alert RED

Narrative information of persons to be notified by each individual as per NFC

1. After knowing about the occurrence of disaster JE will make single call to SDO lnstrument & SDO

lnstrument will make ten number calls as below

lstcallto XEN Bhakra Dam Division,01887-223075(0), 9463998256 (M)

2nd callto SDO Hydrology 01887-223241 @,7973205990

3'd call to SDO Reservoir Management 9882103103 (M)

4thcall to SDE Dam Safety 01887-223140 (O), 9463598397

Sth callto SDO Road and Colony 01887-223118(o),224338 @, 7589322346

6th callto SDO Permanent Installation 01887-223219(O), 224350@,9465225304 (M)

7th callto SDO discharge 01887223173(0), 9463998185 (M)

8th call to Chief Fire Officer Nangal 01887-223101 (O)

9th call to photographer to cover the event at site 9417589142

1Oth call to SDO Bhakra Electrical 01887-223118 (O), 9417773829 (M)

2. SDO Hydrology will make two number calls if he gets the information about disaster first

1't callto XEN Hydrology 01887-223083 (O), 01887-223089 @, 9463998230

2nd call to SDO,JE lnstrumentation 01887-224537 @, 223045(0), 9463595152, 7589303795

3 SDO R/M will make four number calls as below

1'l callto XEN R/M 01 887-223092 (O), 7589303748

2nd call to all village Pardhan u/s Bhakra Dam & NGO's of the area as perAnnexure-Vlll

3,d call to Superintendent Procurement 01887-22301 1 (O), 01887-227400 @ 9463998419

4th callto SDO Pollution Control Board, Bilaspur 01978-223550

4. SDE Dam Safety will make four number calls as below

'l.tcallto Director, Dam Safety01887-223179 (O), 01887-223089 @, 9463998230

2nd call to XEN Township 01887-223040 (O), 9417333940, 9530903085

3'd call to Police Station Nangal 01887-223100

4th callto. He will ensure that messages have been delivered to each individual as per NFC

5. SDO Road and Colony will make two number calls as below

RevEWed and Approrcd By

BHAKRA NANGAL PROJECTINTEGRATEDMA@

irf i 'li s

BHAKRA BEASMANAGEMENT

BOARD

TITLL EMERGENCY ACTION PLANFOR

HANDLING SITUATION ARISING OUT OF

HyDRo Lo crc AL "HHH"},T;ff;;,tH ""

6.

7.

Doc. No.BHDiDESIGN/E,AP-Date:12-07-2019Issue No. 02

Page. 28 of 88

Page Revision No. 0

Annexure-V

1.tca[ to viilage pradhan d/s Bhakra Dam & NGOs to evacuate the persons rmmediately (Annexure lX)

2nd Callto Check Post Barmala01887-223192

sDo Discharge wi, make a singre phone cail to sDE, water Regulation 01887-223043(0) 9694096244 M)

XENHydrologywillmakeacalltoFisheryDeptt,Bilaspur'01978-224068(0),[email protected]

remaintnconstanttouchwithCWC&withlMDandwithcatchmentarea.

XEN RM & SR will make seven number calls as below

l"tcallto s.E. Bhakra Dam circle, Nangal 01887-223017 (O), 01887-227000@' 9468177095(M)

2nd call to Civil authorities Bilaspur 01978-224155

3'd call to SP Bilaspur 01978-224500

4th call to Civil authorities Una 01975- 225800

Sth callto SP Una 01975-223216,225056

6th callto Civil Hospital Bilaspur 01978-222580

7th callto DFO, Bilaspur 01978-224809

Xen Bhakra Mech, wi, make a phone calt to s.E.NMC, o1BB7-223004(0)' 01887-227062@'

e417202076(M)

XEN Bhakra Dam will make ten number calls as below

1'tcalltos.E.BDC0lBBT-223017(0),01887-227oOO@,9468177095(M)

2nd callto chief Engineer, Bhakra Dam 01887-223001(O), 01887-223024@'7888697174

3,d can to s. E. (Hq) Nangat 01 BB7 -223104(0), o 1 BB7 -223237@, 94 1 702 1 604(M)

4lhcalltoXENBhakraMechanicalolBBT.223llT(o)'9417202040(M)

SlhcaIItoXENRM&SRo1BB7-223092(o),9463998256(M)

6th cailto XEN Nangal Dam 01887-220563(O),7589303892(M)

TthcalltosDE,WaterRegulationolBBT-223043(0),9694096244M)

8th callto Director Design, Nangal 01887-223108 (o), 9417202097(M)

9th callto Director, Dam Safety 01887-223179(0) 01887-223089@, 9463998230(M)

1Orh callto XEN Bhakra Electrical 01887-223094(0), O|BB7-227400@' 9463998419(M)

9.

10.

Reviewed and APProved BY

oirect*flsn

BI{AKRA NANGAL PROJBCTTNTEGRATBD MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Datezl2-07-2019Issue No. 02Page. 29 of 88Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROI,OGICAL {AILURES, EARTHQUAKES ORorHERS. Coutnoffed

BHAKRA BEASMANAGEMENT

BOARD

Annexure-V

11.

'11lh call to PSO in case of sabotage 01887-223060(0), 01887- 223104@

Chief Engineer, Bhakra Dam will make six number calls as below

1sl call to Member. lrrigation 0172-5011752-53

2nd call to Chairman, BBMB 0172-5011750-51

3'd call to Distt. Magistrate & Chairman Co-ordination Relief Committee, Ropar

4th callto C.E System operation, Chd.0172-2653660

Sth call to C.E. Generation 01887-223355(0), 01887-223146 @

6th call to C.E. BSL Project, Sundernagar,01907-262333(0), 01907-262444@

7th callto General Manager, Kol Dam Project, 01978-245061

S E. (BDC) will make three number calls as below

1't callto Chief Engineer, Bhakra Dam 01887-223001(O),01887-223024@,7888697174

2nd call to Experts as per list at Annexure-XVlll

3'd call to S.E. Bhakra Power Houses 01887-223261(0)

S.E. (Hq) Nangalwill make Fourteen number calls as below

1't callto Secretary, BBMB, 0172-2548572 (O)

2nd call to Civil Hospital Anandpur Sahib 01887-232193

3'd callto Civil Hospital Ropar 01881-221141

4th call to keep constant liaison with civil authorities5th call to all concerned D.Cs of Punjab State as per Annexure-Vll6th call to SSP Traffic Ropar 01881 -220119.

7th call to News Media as per list at Annexure-X

Bth callto SSP Ropar 01881-220119

9th callto DSP Ropar 01881-220199

1Oth call to DSP Anandpur Sahib 01 887-232068

11th call to DFO Ropar 01881-222231

12th call to SDM Anandpur Sahib 01 BB7-232036 , '

13th call to NFL Hospital Naya Nangal01887-220622

14th callto Fire Tender NFL 01887-220648

Secretary BBMB will make four number calls as below

12

IJ

14.

I

Reviewed and Approved By

olrCr *sisn\

nHr\fn q. NANGAL PROJECTINTEGRATEDMAN@

BHAKRA BEASMANAGEMENT BOARD

TITLE, EMERGENCY ACTION PLANFOR

HANDLING SITUATION ARISING OUT OF

IIYDROLO GICAL FAILURE S, EARqIQI]

Doc. No.BHD/DESIGNiEAP-Datezl}-D7-2019Issue No. 02

Page.30 of88Revision No. 0

Annexure-V

,1 st call to Sectt. Rajasth an l rrigation o1 4 1 -2227 7 17 (o) 0 1 41 -257 4455@

2nd cat I to Sectt. p u njab I rrigation O 17 2-27 43442, 27 45603(0) 0 1 7 2-27 27 049@

3'dcalltoSectt.Haryanalrrlgation,olT2-2713496(0)0172-2706285@

4th call to Deputy commissioner (lndus) MoWR Delhi 01 1-24100787-(R)

15. Member lrrigation will make two number calls

1't callto Chairman, BBMB, 0172-5011750-51

2nd cal| to Chairman, CWC 011-26108855(0) 011-26913645@

16. SDE, Water Regulation will make two calls as below

lstcalltoDirector,WaterRegulationolBBT-223758(o)'9463598550

2ndcalltoXENNangalDam0lSBT-220563(o)7589303892

17. XEN Township will make five number calls as below

l.tcalltoMobileVanannouncementsd/sBhakraandinNangalarea

2nd callto PMo Canal Hospital, Nangal 01887-223012 (o) 01887-22333,1@

3d call to punjab pollution Control Board Member Secretary, Patiala 0175-2215802

4th callto Municipal committee Nangal 01887-220589, 220586

5lhcalltoAnnouncementfromGurdwaras&MandirM.g41714350,1(GurudwaraGhatSahib)

18. Director, Water Regulation will make two number calls as below

1't call to Member' lrrigation 0172-50117 52-53

2nd callto IMD New Delhi 011-27662607

3'd call to Director/ Power Regulation chandigarh 0172-2652820

4thcalltoC'Esystemoperation,Chandigarh0lT2-2653660

5th callto IMD Shimla 0177-2624976'26224396

lg.XENBhakraElectricalwillmakeasing|ecalltoS.E.NMC,o18B7-223004(0|,9417202076

20 Chairman BBMB will make two number calls as below

l.tcallto MoP Govt. of lndia 0,1 1-23717474,23710411,2371g205(o)011-23092372, 23098852@

2nd call to lndian ArmY

(i) station cornmander chandima ndir 0172-2808761-Extn 6240, Exln'6242 civil No'0172-2589564'

(ii) Chandimandir Help line 0172-2589624

21 S,D.o. Permanent lnsta|lation will make single ca|l to XEN Bhakra Mechanical 01887.223117(o)

9417202040

S.E.NMC Nangalwill make three No' calls as below

Prepared BY .-.{ss9pd BY

tbHeRr-Reviewed and APProved BY

ASE-I

BHAKRA BEAS

BHAKRANANMIryJE GRATED MAI{A GEMENT SYiTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page.31 of 88Page Revision No. 0

TITLE: "*rO"SITUATION ARISIIVG OUT OF HYUNOIOGICAL

FAILURES, BARTEIQUAKES t%'rTF8ftta

23

Annexure-V

1stca, to s.E. Tarwara operation for machinery 01883-236013 (o) 236114 @2nd call to sE BSL circle-1 Sunder Nagar for machinery 01 907-262400(o),262442 @3'd call to sE BSL circre-il sunder Nagar for machinery 01 go7_26x5a

@)PSo will make three No. cails in case of terrorist attack as berow1't call Director/ security o1z2-so1 1162-63 (o), 22242s6@2nd call to all concerned as per Annexure_Vll3'd call to c.E Bhakra Dam, oIBBZ-223001 (o), 223024@, 94 122160s1

Reviewed anO RpproveO Ay

Doc. No.BIIDIDESIGN/EAP-Date:12-07 -2019

Issue No.02Page. 32 of 88

Page Revision No.0

BHAKRA NANGAL PROJECTINTEGRATED@{l-

t',,Fex=\-s{_*y-.-,;,?,.,i:,.:..

BHAKRA BEASMANAGEMENT

BOARD

@AcrroNPLANFoRfra.Nol,wc srruATroN ARISTNG our oF

TIYDROLOGICAL FAILURES, EARTHQUAKES OR

oTIIERS' controlled

1.

2.

3.

4.

Annexure-Vl

SampleWarningMessagesfordifferentsituations

Blue situation of Emergency (lnternalAlert)

i) Land slide, occurred in Timber Rope-way area endangering trolley operation

ii)SmallleakageobservedfromthesealoftheradialGateNo.----RULeftside

Yellow Situation of Emergency (lnternal Alert)

i) Leakage observed from 18', dia penstock fill pipe in gallery---- El'-----

ii)StressmetersinBlock20El--.showingincreasedstressesPlumb line in Block 20 showing higher deflection

Orange Situation of Emergency (External Alert)

i) Widening of crack in foundation gallery st'--- ch

ii) Heavy land slide occurred in Left abutment u/s

Red Situation of emergency (External Alert)

i) High inflow of t 150,000 cs are coming (More floods expected as Per IMD) over

toPing imminent

ii)SpillwayradialgateNo.----gotstuckandinoperativeandRWLrising

.--- HeavY leakage observed

near check Post

Rev'lewed and APProved BY

Directer!eq0n

Prepared

ASE-I

By

fi

II INTEGRATED MANAGEMENT SYSTEMI ''***;#,' J TITLE: EMERGENCY ACTION PLANFOR HAN

] "*

] srru,r-i'roN lnrsrNc our oF HyDRoLoGrcAL FATLURES, I

IJIIAsnn ocn: I EARTHeUAKES OR OTHERS. rrr.rr,rcnivrnxr soano ,

- Cb[trglletl ,'

Lrsi or orpurv coMMrssroNERS oF puNJAB & HTMAcHAL pRADEST{ DrsrnrcrS

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSI'TUATION ARISING OUT OF HYDROLOGICAL FAILURES,

EARTHQUAKESOROTHERS. !Contrelleo

BHD/DESIGN/EAP-Dfie:12-07-2019Issue No. 02Page. 33 of88Page Revision No. 0

Annexure-Vll(i)

Sr.

No.

Office Address Name of Officers Telephone numbers

Office Residence

D.C.Ropar Sh. Sumeet Jarangal 01881-221150 950'1 946999 , 01881-221250

2 D.C.Nawanshahar Sh. Vinay Bublani01823-221301

98 1 4700098 , 01823-221301

J D.C. JalandharSh. Varinder Kumar

Sharma0181-2224783 855601 '165'l , 0181-2459664

4

E

6-

D.C.LudhianaSh. Pardeep Kumar

Aggarwal

016'1-24031009463837820 , 0161 -2404055

D.C.Patiala Sh. Kumar Anil 0175-2311300987 27 6357 7, 017 5-231 1 302-

303

D.C Ferozpur Sh. Chander Gaind 01632-244008 981421 1 333, 0 1 632 -244006

i- D.C.Kapurthala Sh. D.P.S Kharbanda 01822-233777 98 1 530 421 3, 0 1 822-2337 7 6

1

2

Punjab Police Admin

SSP Ropar Sh. Swapan Sharma01881-221273,

01881-2201209779911 1 1 0, 01 881-2201 19

SP Head quarter Sh. Jagjit Singh 01881-220119 9878950009

t--4-5*-

DSP APS Sh. Chand Singh 01887-232068 977 9042006, 9877 47 91 00

DSP Nangal Sh. G.P Singh 01887 -227 100 98 1 5509024

SHO Nangal Sh Sumit Morh 01887-223100 85881 09009

Himac hal Pradesh Admin

i-_- DC Una Sh. Rakesh Kumar 01975-225800 70 1 8999701, 0197 5-225900

i- DC Bilaspur Sh. Vivek Bhatia 01978-224155 B9BB280'1 16. 01 97 8-2241 50

3 SP una - Sh Diwakar Sharma 01975-225056 701 8995900

4 SP Bilaspur Sh. Arif H. Sheikh 01978-224500 0197 8-224180, 765095040 1

5

6-DSP Naina Devi sh. Sanjay Sharma 01 978-288080 9816904428

SHO PS Una Sh. Sarabjeet Singh 01975-226028 981 6486909

7 SHO PS BanganaSh. Parkash Chand

Sharma01975-262043 9418167351

8 SHO PS Kot Kahloor 01 978-288031

lndian Army

Station Commander Chandimandir 0172-2868761, Ext.6240 Ext.6242

Civil No 0'172-2589564

-t

Lj

'lL

It-I

I

l

t_ -_1_

Reviewed and Approved By

Doc. No.BHD/DESIGN/EAP-Date:12-01-2019Issue No' 02

Page. 34 of 88

e Revision No. 0

BHhKRA NANGAL PROJECT

INTEGRATED@

BHAKRA BEASMANAGEMENT BOARD

Tm[n entnncENcY ACTIoN PLANFoRHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUASTSf R

Llsr of contact numbers for sniffer Dog/Bomb Disposal squad/Firefighting Tenders Annexure-Vll(ii)

Dog Squad

1

,

Office Address Name Telephone numbers Residence

9779580903

0172-276000S.S.P. ChandigarhMrs. Nilambari

Jagadale0172-2760001

9779926162D.S.P Line Chandigarh Sh. DaleeP Ratan 01 /'2-Z(VA6t o

0181-222012678370991 00,

9814187924

4

S.S.P Jalandhar Sh. Navjot Singh

9815772609Sl Dhani Ram 0161:[240Uv

D(Jlrlu 5q

1

2

P.C.R RooPnagar9779513708

81 46999598D.G.P Arm Battalion' Jalandhar

lnsp. Harjinder Singh

Sh. Ravinder Singh 0181-2456272

EAMAI\987881 5699

1 'C Balbir Singh

01823-226524 94 1 73795682

3

SBS Nagar I HC: Jaspal Singh94 1 73831 03

9463705280HoshiarPurHC: Satnam Singh

HC: Dilbag Singh01882-2475068

01B1-2240609 L_:',*:',',y:4 Jalandhar II

Fire Fighting Tendt

I1

,51

ABMB Fire Station Olinda

BBMB fire Station Nangal u16d l -z/c tv

llFl- F-iailon NaYa Nangal u'l|60 l'zLva+o

941 8903501Fire Station Una Sh. Nitin Dhiman o19 l5-ZZO tv t

01978-222227 70188214695

6

7

I

Fire Station BilasPurFO. Subasn unanoer

Mishra981 5979045

991 5988000nssistant Divn. Fire Officer

M.C. HoshiarPur

FO. Sadiq Masih

SFO. Surinder Singh01882-222222

9418021617,

941 8903501Commandant Home Guard

Una 12 Battalion

ROrn Otticer Dheeraj

Sharma01975-223345

SGSST Ghanoliu'!66 l-lzt t)r

Prepared BY

ASE-I

BHAI(RA BEASMANAGEMENT

BOARD

f)oc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 35 of88Page Revision No. 0

BIIAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKESoR orrIERS'

ComtrolEed

Annexure-Vlll

Name of Panchayats of Tehsil Sri Naina Devi, Distt. Bilaspur (H.P.)

Prepared By

Sr.No

Name ofvillage

Pardhan TelephoneNo/Mobile

Approximate K.M.from Damsite

Population side

1 Bhakra Parbhat Singh 0941 81 45409 2 750 Left

2 Khulmi Parbhat Singh -do- 4 324 Left

3 Makari Narinder Kumar 09418445304 6 575 Left

4 Khal Sudesh Kumari 09418295634 B 470 Left

5 Saloa Sudesh Kumari -do- 10 480 Left

6 Saran Sudesh Kumari -do- 10 200 Left

7 Dharda Sudesh Kumari -do- 12 100 Left

B Kamand

Aala

Sudesh Kumari -do- 14 80 Left

I Kanfara Shakuntla Devi 09459930692 14 100 Left

10 Kharkarhi Shakuntla Devi -do- 16 100 Left

11 Bhated Shakuntla Devi -do- 16 250 Left

12 chilt Shakuntla Devi -do- 17 100 Left

13 Maleta Shakuntla Devi -do- 18 100 Left

Reviewed and Approved By

BHAKRA BEASMANAGEMENT

BOARD

BHAKRA NANGAL PROJECT

INTEGRATED MANAGEMENT SYSTEM

Name of Panchayats of Tehsil Bangana Distt. Una (H.P)

Doc. No.BHD/DESIGN/EAP-Datezl2-D7-2019Issue No. 02

Page. 36 of88Page Revision No. 0

Annexure-Vlll

TNiilEMERGENCY ACTION PLANFOR

IIANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKESoR oTHERS' CeftfOlleU

ApproximateK.M. fromDam site

Population SideSr.No

Name ofvillage

Pardhan TelephoneNo/Mobile

4 170 Right1 Paroian Pushpa

Devi

94594888e6

6 100 Right2 Kusiala -do- -do-

7 670 Right

R,ght

3 Dobar Ram Piari 96151 47 /U4

I 5704 'lRaiPur i -oo-

I Bador I

-do-

10 100 Right5

6

Androli -do- -do-817 Right

R'ght

I Riotrtl--I Risht

Kolka Raghbir

Singh

0980589'1367 1'2

14 5707 Dohak Mohinder

Pal

098U534U2-l /

-do- '15 500B Bihru -do-

15 400I Badhgar -do- -do-

19 300 Risht10 Mandli -do- -do-

nevieweO and APProved BY

oirectglp{on

lssue{By

'[}LIhry t*

BHAKRA BEASNAGEME,NT BOARD

Doc. No.BHD/DESIGN/LAP-Date:L2-07-2019Issue No. 02

Page. 37 of88Pase Revision No. 0

BIIAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFOR

. HANDLING SITUATION ARISING OUT OF

HYIiflOLOGICAL FAILURES, EARTHQUAKES OR

s

N

I

Annexure-lX

LIST OF VILLAGES FALLS ON D/S OF BHAKRA DAM AND NAME OF NGO'S /

SARPUNCH AND THEIR CONTACT NUMBERAS

r.

o.

Name of village Name of Gram

Panchayat/Pardhan

Telephone No. Approx.

Pupulation

Remarks

Kangra welfare

Sociqty

Sohan lal 931 64951 01 NGO

Sanatan Dharam

Sabha

Ramesh Gulati 981 5750760 NGO

Jinda Jeev

Besahara Ashram

Ashok Sachdeva 98761 65358 NGO

Salangri Sh.Kewal Singh 01 975-201 901 294

Neilla/Olinda/

Golethai

Smt.lndira 9478870615 1370

Talwara Sh. Amrik Singh 8146857692 3000

Changar Handola Sh.Ranbir Singh 987621601 3 1100

Bangarh (Fatewal) Sh.Ravi 9816437233 1280

Swamipur Sh.Rajinder Paul 9216524313 904

10 Khera Bagh Kulwinder Kaur 8146599202 350

t_lZ

I

J

I

:l

t

'4i--l5L

I

r-i6It- ,

f

lBI

I

t0I

IrII

Reviewed and APProved BY

Dirqdlot-DCsign

---_ NUATNA NANGAL PROJECT

INTEGRATED MANAGEMENT SYSTEM

BHAKRA BEASMANAGEMENT BOARD

LANFOR HANDLING

SITUATION ARISING OUT OF HYDROLOGICALr.qlr,uRE S, B ARTH QUAKE S

"r\r$rllfltfe d

Doc. No.BHD/DESIGN/EAP-Dile12-07-2019Issue No. 02

Page.38 of88Pase Revision No. 0

ANNEXURE-X(i&ii)

Aiit (Pb. I'Iindi)

lndianExpress

The Tribune

RozanaSpokesman

Daily Jag Bani

LISTCONTAININGCONTACTNUMBERSoFMEDIAPERSONSName of PaPerMobile No.

Amar Ujjala

HindustanTimes

981 531 5344Mr. AjaY Verma,5 5 66 li,MHC,M.Maj ra, Chandi garh

98152019294635411Mr. Hitl"ttVictor, # 62l,Phase-11

981401 50002705215ffillarka"*"1jit Singh, 50 1 /1 6-C,

98r44115622680295ffiE*ltt Strgh, 1 156, Phase-5,

Danik Bhaskar98728801 342708845tvt. Up"ndra Sen GuPta, 3124,

Housing Board Dhanas Chd'981 5501653

Mrs Neel"m Sharma, 346-A, Sec'

5071701FAX 0172-2651.291

Sr. Associate Auditor

921,666260sMiK"fird.t Bh atia 522, Phase-6

9888726834trrtr. Vi"uy Kumar, 3308, sector

45D Chd.

Re./lewed and APPloved BY

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Datezl2-O7-2019Issue No. 02Page. 39 of88Page Revision No. 0

TITLE: F{{F,RGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURBS, EARTHQUAKBSoR orHERS. COmtrOlf,ed

BHAKRA BEASMANAGEMENT

BOARD

DOORDARSHAN JALANDHAR (TV)

1. Director Doordarshan,T.V. CTIANNEL

Zee News

A.B.C. Network

ALL INDIA RADIO JALANDHAR

i. Director AIR

PRESS TRUST OF INDIA

1. Mr.Ashwani Kumar Anand

I-TNI

1. Mr,. V.K. Jallali

"":::l

Kk

AI{NEXURE-X

2254268(0),2205101@

0t61-441312

2t24t4,212797

2458177 (O),2452395@

98729-76281-M

98141-28468

95\72-2704299-O

95172-2707034-O

95172-2705814-FAX

II

i_

Reviewed and Approved By

oire^clpr Besignryl

-- BHAKRAFANGAL PROJECT

INTEGRATED@

BI{AKRA BEAS

MANAGE,MENT BOARD

FORIIANDLING

SITUATION ARISING OUT OF HYDROLOGICALM.u,unrs,EARrHQUAKEs?\""rfr1',otfed

Doc. No.BHD/DESIGN/EAP-D*ezl2-07-2019Issue No. 02

Page. 38 of 88

Revision No. 0

ANNEXURE-X(i&iD

Amar Ujjala

HindustanTimes

Ajit (Pb.I'{indi)

Eng,Tribune/PTI

lndianExpress

The Tribune

RozanaSpokesman

,Ipugd BY

lS#fuKr -

LIST CONTAINING CONTACT NUMBERS OF MEDIA PERSONS

Name of PaPerMobile No.

981 531 53442594903-6Mr. AjaY Verma,5 5 66 b,MHC,M'Maj ra, Chandi garh

98r52019294635411Mr Httl"ryVictor, # 621,Phase-1 1

98140150002705215Mr. ffik""*"l1,t Singh, 501/16-C'

Chandigarh98144rr562

dEa"ltt Sr"gh, 1 1 56, Phase-5,

Mohalli Danik Bhaskar98728801 34Vf. Up.nara Sen GuPta, 3124,

Housing Board Dhanas Chd'9815501653

N'I* N*1"* Sharma,346-4, Sec'

5071701FAX 0172-2651291

Sr. Associate Auditor

92t666260594632-89009Mrdlrttd.t B[aia 522, Phase-6

Daily Jag Bani9888726834Mt. VinuY Kumar, 3308, sector

4sD Chd.

nevieweO and APqroved BYPrepared BY

LANFOR HANDLING

SITUATION ARISING OUT OF HYDROLOGICALrarr,unrs, EARTHQUAKES OR OTHERS'

Cortrolled

f'IIAI\ISA I.\A1\UAL TI(\-,JI],\- I

INTEGRATED@

BHAKRA BEASMANAGEMENT

BOARD

FAGILITIESToMADEAVAILABLEINEACHcoNTRoLRooM

1. Emergency rescue lights (5 Nos')

2. Diving masks (2 Nos')

3. SafetY nets (5 mx5 m = 5 Nos')

4. Safety rope (1000 m long 25 mm dia)

5. RoPe Ladders (10 m long 5 Nos')

6. Full body harness (safety belts 10 Nos')

7. Ascending & Descending device (5 Nos')

B. Safety Helmets with head lamps (10 nos')

9. Ear muffsidust respirators/gumboots/safety shoes for 10 persons

l0.ElectricHandgloves/chemicalhandgloves'(5paireach)'

11. Fire extinguishers (5 Nos')

12. Mobile D.G.Set

13. Stretchers (5 Nos') First aid kits ('10 Nos')

14. Artificial Resuscitators (5 Nos')

15. Hand Light torches (5 Nos')

BIID/DESIGN/EAP-Dilezl2-07-2019Issue No. 02

Page.40 of88Page Revision No. 0

Annexure-Xl

lssued BY

.m8&ffi,RevreweOtnd APProved BY

oirectglp{sn

\

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP.Date:12-07-2019Issue No. 02Page.4l of88Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES.QR OTH ERS.,,, ,,r,,. t ontrolledBHAI(RA BEASMANAGEMENT

BOARI)

Annexure-XII

t'

-i

iiF

rI

r r.' H iil ..."..,o**iJf

slu)l]:i<Jlst7l-l_.F

IglcflEI'_rlc0 I

cl(),

-ft- ''r-l

!D1{lJ

.L

{xC

,OgO-

Reviewed and Approved By

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 42 of 88

Page Revision No. 0

BHA.KRA NANGAL PROJECTINTEGRATEDMA@

RHAKRA BEASMANAGEMENT

BOARD

Tmr,E, rtvtEncnNcY ACTToN PLANFoRHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKES OR

orHERS. Controlled

Annexure-Xlll

Name of Agencies lifting Water from Bhakra Reservolr

Name of Agencies Lifting Water from Nangal Pond

Name of AgencY

+91-1 978-244069(o)

Fax +91-1978-

244067

www acc limited

Com.

Manager-Finance

Gagal Cement WorksACC t-imited Gagal Cement

Works P.O.Barmana

Distt.BilasPur (HP)

01978-222579 (O)Executive EngineerExecutive Engineer

lrr.& Pub. Health Divn'

Bilaspur(H.P.)

Contact Number

zNlqapq17284563

Name of AgencY

SDO Water SuPPIY

9417012327@FL,NayaNangal9872526372

Bhabour Sahib

Bharmotti TemPle

Nanksar Gurudwara

Reviewed and APProved BY

BHAKRA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESICN/EAP-Date:12-07-2019Issue No. 02Page. 43 of88Page Revision No. 0

. XIITLD: EMERGENCY ACTION PLANFORIIANDLING SITUATION ARISING OUT OF-

IIYDROLOGICAL FAI LURES. EARTHOI.I.AKES ORorHERS. eqi$f$lf&

BFIAKRA BEASMANAGEMENT

BOARD

I,IS'[ OF MOBILES NOS OF BHAKRA DAM ADMINISTRARTIONSr. No Name of officer Er. Designation Office Resi. Mobile No.

1 Er. Ashwani KumarAggarwal

Chief Engineer 01887-223001 0187-223024 7888697174

2 Er. Mohan Singh SE/HQ 01887-223164 01887 -223237 9417021604

aJ Er. Navpreet Singh ADE to CE/BD 01887-223164 9815288212

4 sh. Dharam Pal AccountOfficer/Budget

01887-223256 9463906189

5 Smt. Raksha Devi PS to ChiefEnsineer/BD

01887 -223001 973650s893

6 Sh. Gurbux Singh Section Officer/E,stablishment

01887-223168 7973607 163

7 Sh. Sandeep Jettley Supdt./Works 01887 -223164 8847420469

8 Sh. Kuldeep Singh PA to SE/HQ 01887 -223164 9878202101

Bhakra Dam Circle

Husan Lal Kamboj Dy. ChiefEngineer.

2230t7 227000 9417862698

BC & Township Division

Er. ManwinderSingh

XEN BCShip

8. TI 223040 223032 9530903085

2 Sukhdev Singh SDO/ WaterSuply

223148 9417284563

aJ Surinder Dhiman SDO/Enforcement 223040

4 Gulshan Sharma SDO/Estate 223040 9417478653

5 T.S. Mokha SDO/Const 223040 9814015203

Prepared By Reviewed and Approved By

^"(Dir srg n

lssued Bv

,fu?t*r u

EHAKRA NANGAL PROJECT

INTEGRATED MANAGEMENT SYSTEM

BHAKRA BEASMANAGEMENT

BOARD

ffiYACTIONPLANFORUANOITXG SITUATION ARISING OUT OF

IIYDROLOGICAL FAILURES, EARTHQUAKES OR

orHERs. Controlled

Doc. No.BHD/DESIGN/EAP-Date;72-07-2019Issue No. 02

Page. 44 of88Page Revision No.0

\

Bhakra Dam Division

223015 94639982561

,

V.K. Garg Addl.SE.Bh.DamDivn

7s89322346B.K. Saini SDO/Road &

Colony BhakraS/Divn

22'3 | t6

75893037e5SDO/Instt. 2230451J

4

Satnam Singh

SDO/SOS9781568643

SDO Horticulture5 Taiinder Stngh

9417021604

g4tT94ru

RM&SR

@I DIVN

DIVNl-- zz3o:s -I [-1

2;J

fTx-r.sGurdial Singh SDO/Silt SurveY

9882103 IUJSubodh Kumar SDO/RM Sub

Divn.941 I 160 t/.+

4 Pardeep SinghKataria

SDO/SPtttwaY

n^* Tti.,isi7589303892

XEN NangalDam Divn.

220563 2230641

,

Er. C.P Singh

895067 t 88u

9417861111Er. Yogesh SDO / Kotla 26535U

-SDO / NangalDam

220563aJ

4

Er. Harbilas

7589303't6lEr. Anil Mahajan SDO / Gate &

Gearing

22\)563

I Fi-nlal\angAl rYrEU

227062 9417202076I(.K. Sood S.E. NMC 223004

1 941618893 Iaor,lspnquc 223tJ04

2 Ashok Kumar

nevieweO and Approved BY

Directbr lPsign

Prepared BY

ASE-I

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYS'I'EM

Doc. No.BHDIDESIGN/EAP-Date:12-07-2019Issue No. 02Page. 45 of88Page Revision No. 0

TITLtr]: EMERGENCY ACTION PLANFOR".TJANDLTNG STTUATTON ARTSTNG OUT OF

HYDROLOGICAL FAILURES, EARTHQI]AKES QRoTH ERr. cOitrolle0

I]HAKRA BEASMANAGEMENT

BOARD

Bhakra Mechanical Division

I Avtar Singh Xen Ilh.Mech.f)n.

223117 9417202040

2 Ashok Kumar SDO/Transport 223129 94161 8893 I

aJ Rajbir Singh SDO / Railway

S/Dn.9417393452

4 Er. Mehar Singh SDO PermanentInstallation

9465225304

Nangal Vorkshop Division

I Er. R.K Singla Add.S.E.W/Shop 223015 227400 9463998419

2 Jitender Kumar SDO, Mech-1 9417 184057

-)

-4-

Gurwinder Singh SDO, Mech-II 9463990520

Er. Sukhchain Singh SDO, StructureShop

98725-3 0085

-tEr. Anil KumarBaiai

SDO, TP&l SubDivision

9417789247

6 Er. Vikas Garg SDO, Galv. Shop 766s066661

-i-Proc. C/Stores & Disposal Division

E;. Rx stngl, - FlxecutiveEngineer

223011 227400 9463998419

1 V.K.Dwivedi ASP-III 9417230208

-) Kuideep Singh SDOiC/Store 223191 9478318s4

4 v,:ay SDO Disposal 223011 9417351765

Reviewed and Approved ByPrepared B

srg n

--_-BIIAKRA NANGAL PROJECT

TNTEGRATED MANAGEMENT SYSTEM

BI{AKRA BEASMANAGEMENT

BOARD

TiffiTIONPLANFORnLinuNc srruArroN ARrsrNG oul9j

HYDROLOGICAL FAILURES, EARTHQUAKES OR

.THERS' cootroltq!

Doc. No.BIIDIDESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 46 of88Page Revision No. 0

Dam SafetY Directorate

-- mrTs -I 223089 94639-98230Director

1 Er. Arvind KumarSharma

941,7652752PA / DamSafety

2231792 Rehmat AIi

223311 9463598391SDE/ DamSafety

2231403 H.D.KaPila

ffi,Saiian Singh

94787 -86824ADE/DamSafety

4

9988242642ADE/DamSafety

5

6

9417394568ADE/DamSafety

Krishan Kumar

9417202091

9463%4549

158q,4TOA,

IrusrE,[

S.K. Bedi

Rajesh Vashisht

S.K.Aggerwal

Paramltstngh

c"tp"l St"gh

D.N Sood

fffi; K'trl*.I

-

I Vikas Kumar

Director 223108

SDE/I 2230862

SDE/IIJ

9463698414SDE/IV

49417201184

9463918789ADE

ADE/I5

69464251645

9988165660ADE/II

7

ADEAII8

I\I

By

fi

Prepared RevieweI and APProved BY

oirectfiofisn

BI{AKRA NANGAL PROJECTINTtrGRATED MANAGEMENT SYSTBM

BHAKRA BEASMANAGE,MENT

BOARD

BHD/DESIGN/EAP.Dfie;12-07-2079Issue No. 02Page. 47 of88Page Revision No. 0

,-----I

l

l-

l-----

-T

I

Prepared

ASE-I

Reviewed and Approved By

Dire .ffihlr ]

TITLE: EMERGENCY ACTION PLANFORIIAI{DLING SITUATION ARISING OUT OF

nyoncir,oclcAl, FAILURIS, EARTHQUAKES ORorrrERS. Conf.Olled

Water Regulation Directorate

1 Satish Singla Director 223758 9463598550

2 Mahinder Singh SDE 44

Ilydrology Division

1 JP Singh Xen 223083 75893-03748

2 Manish Kumar SDO/Hydrology 79732-05990

-) v.K Mittal SDO Discharge 223241 94t7334003

4 Naunihal Singh ADE/Hyd. 223083 9465958858

Ilospital BBMB Nangal

Dr. Manjit Singh P.M.O 223012 e4641 37 527

2

;--"--)

Dr.Anita S.M.O 223012 9417853418

Dr.ShaiiniChaudary

S.M.O 223012 94630s8s79

4 Dr.P.P.Singh M.O 2230t2 9417064672

5 Dr.J.P. Singh M.O 223012 9855329394

6 Dr.Sachin Saini M.O 223012 9463824617

7 Dr.Anil Gupta M.O 223012 88474r2738

- BHAKRANANGALPROJECTINTEARATED MANAGEMENT SYST-EryI

BHAKRA BEASMANAGEMENT

BOARD

NFORHANDLING

SITUATION ANTSINC OUT OT HYDRO_L-O_GICAL FAILURES'

EARTHQUAKES OR OTHERS.- Controlled

Doc. No.BHD/DESIGN/EAPDate:12-07-2019Issue No. 02

Page. 48 of 88

Page Revision No'

001

ANNEXURE-XV

LIST CONTAINING SIGNATURE OF ALL PARTIES

@am,NangalBBMB' Nangal

SE. (li;adquarfer),BBMB, Nangal

S,E. Bhakra Dam Circle, Nangal

SE Nangal ffichan'rcal Circle' Nangal;

MB' Nangal

ffiMB,NangalffiBMB,Nangalffipital,Nangal

6.

7.

B.

nilv'reweo and APProved BYBy

ff

Prepared

ASE.I

BHAI(RA BEASMANAGEMENT BOARD

ALTERNATIVE CONTACTS OF PERSONS TO BE NOTIFIED AS PER N. F.C

l)oc. No. I

BHD/DF]SI(;N/EAP L

-Date:12-01-2019Issue No. 02

Page. 49 of88Page Revision No. 0

ANNEXURE-XVl (l&ll)

2

J

4

5

;b

iB

o

1

1

1

1

$.Ng.

l-

1

1

1

1

l;t

i

t!

I

l

I

L

t-I

1

a

Ii _l_

BHAKRA NANGAL PROJECTINTEGRATED MANAGEM EN'I SYSTEM

l.ITLE: EMERGENCY AC.I.ION PLANF.OR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR OTHERS.

r. I Person to be Notifiedo. I

l-S oO 1co ncerneO I a rr akra O'a m

Dam Division

Alternative contact

SDO lnstrumentation Sub Division, Nangal-O1887 -223095,7589303795

SDO (2.d) Bhakra Dam Division -do-7589303795

I XEN Bhakra Dam Division

2''d SDO. Bhakra Dam DivisionI

i

l

XEN RM&SR Division 01887 -223092-0,,94639-98256(M)

SDO, lnstrumentation Sub Division 01887 -223095,

7589303795

er frfangdL__I Fire calls (NFL)

iNGo'sI lo.ri PrnCiiavat

01887-223101

01887-220648

Kangra Welfare Socrety f.tangal-981 5378347(M)

@ourcan-' o 98725263 7 4M)

Supdtt. Procurement, Nangal ASP, Procurement 01887 -22301 1

0. I Canal Hospital, Nangal 01 BB7 -22333 1 -R, 223012 (O)

Civil Hospital Anandpur Sahib 01887-232193

2. I Director, Dam SafetyI

3. I XEN, Bhakra Electrical Divn.

I

SDE, Dam Safety. 223140-0, 94635-98397

-75893-44349

4 IXEN

Townsmp, r.tangat SDO Estate,9417478653

Director, Design, Nangal

xf f.r bfraf<ra uecfra-nrci

, Nangal

5 | oir;aior o".',gnJ\rng,

6. i SDE, Dam Safetyt___7. I xrru, Hydrology

B

9-

Director,Dam Safety-01887 -223089 R, 94639-98230

ADEW

79732-05990

SOf-f -Ousgn DfeW86'q 9463934549

SDO Field Mech. Sub Division,Bhakra

@LPRoJECTrNrncnar@

BHAKRA BEAS

MANAGEMENT BOARD

OR HANDLTNG-^itruarroN ARISING our oF HI?\o-!-o-G-I-cAL

rLu,unns, EARTHQUAKES OR OTH

Doc. No.BHD/DESIGN/EAP.Datezl}'}'l'2019Issue No' 02

Page. 50 of 88

e Revision No. 0

SDO, Nangal Dam

01887 -223522.(R) 941 7861 7 1 1 (M)

@-224612-R87-223080-C

SOE, Water Regulation

01 887 -223043-0, 7 589303748

S-e.1HO;, Nangal

01 887 -2231 64-0, 9417 0-21604(M)

S-e- (HO) Nangal

01 887 -2231 64-0, 9417 0-21604(M)

XENTSHe rqnandPur Sahib

Membel Power' BBMB,Chandigarh

017 2-501 17 54-o, 501 1 755-0

' 5011753-0

ADC, RoPar

SE -Bffii rcle-l l, su nde rn ag ar

01907-262354 0.,

SE. fatwara Circle, Talwara

01883-236013-O,

OV. SecretarY, lrrigation

0172-5011767-o

DSP=opa{, o(E 81 -2201 1 e'

Xff.t ruangal Dam Division

x E N-R rvl & s R D I v i s i o n, N a n g a I

ffition,Nangal

Director, Water Reg ulation

SEBhakra Dam Circle

01887 -2230 1 7-O, 94681 -77095-MS.E. (Ho), Nangal

fficle,Nangal

ffiDam,Nangal

S.E. GenerationCircle, PSEB,Anandpy1 t?U!ffihandigarh

C#irmarr, BBMB, Chandigarh

Oistf trrtagistrate, RoPar

Cfrief fnglneer , BSL, Sundernagar

Chief Engmeer' Beas Dam' Talwara

@handigarh

Reviewed and APProved BY

oire,toh-{ionPrepared BY

Doc. No.BHDiDESIGN/EAP-Date:12-07.2019Issue No. 02

Page.51 of 88Pase Revision No. 0

Annexure-XVII(i-iv)

M-1Emergency event /unusual Occurrence Report

For use when reporting emergencies or unusual occurrences other than eartliquake

oil and hazardous substance spills and bomb threats. For any of the three aforementioned emergencies use the

appropriate repoft fonn because this is a general form, theie will be sections that do not pertain to the emergency

.Only fill out those sections that are applicable to the emergency.

[,ocation----

Brief description of events ( include caller's name and phone number

'1,"1:', ;i:'"

BI]AKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRA'I'ED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSI'I'UATION ARISING OUT OF TIYDROLOGICAL

FAILURES, EARTHQIIAKES OR qTI{EBS. xr - rLoatroueu

Peftinent Data

Size of affected area-----

[rxtent of damages-

E lfect of operations-------------

Poss ible cause--------

I{ate of discharge---

.Appearance of discharge

I;ore bay elevation----

Appearance of fore bay----------

Fore bay rise rate----- ----------Tail bay rise rate----------

Weather condition---

Injuries/loss of life--------

Witness-----

Others-------

Prepared

ASE-I

Reviewed and Approved ByBy

o'51ry','n"

---- SHAKRA NANGAL PROJECT

rNrEcnarED MANAGEMENT SYSIE\{

r,,q il{.r

BHAKRA BEAS

MANAGEMENT BOARD

HANDLING^^lsiiuerroN

ARTsING our oF HYDRo-L-o-GrcALr

ieriunns, E enrHQU exrs of,orlrERxl gd

Doc. No.BHD/DESIGN/EAP.Datetl2-}7-2019Issue No' 02

Page. 52 of 88

e Revision No. 0

Annexure-XVII FORM- 2

Earthquake Damage Report: For Reporting Earthquakes

The---------- dam (latitude ------------------------longitude-------

Lies within seismic zone---'----- ----where major damage can be expected from earthquake' The dam

has the possibility of being subject to moderate to severe ground shaking from nearby or distant moderate to large

magnitude earthquakes'

Earthquake Damage RePort

Date---------

Person RePorting Information

Feature Affected----

Description of Earthquake Effects

On structural conditions

Type of damage (slides subsidence etc-----------

Location----

SeveritY-----

Movement (direction magnitude)

Defl ection or Settlement Readings--

On hydraulic conditions

Type ofeffect (leakage or stoppage

Location----

Size of affected structure----

Estimated flow or change in flow------

Nature of discharge (including sediment)

Wave action damage-----

Others-------

Site Conditions

Water Surface elevation /stoppages-

Time---------

-{ssrpd BY

StH,ft'd,Rev6wed and APProved BY

BHAKRA NANGAL PROJECTINl'EGRA'I'ED MANAG EM ENT SYSTEM

Doc. No.BHD/DESIGN/EAP.Date:12-07-2019Issue No. 02Page. 53 of88Page Revision No. 0

T'ITI,E: EMERGENCY AC.IION PLANFOR TIANDLINGSITI]ATION ARISING OUT OF HYDROLOGICAI,

FAr LrrRES, EAR'rH QU A"rr t3fi?i6ilua

I

I

Iv

Annexure-XVII(iii)

l,ocation---

Size of alfected area--------

Estimated flow or change in flow-----

Nature of discharge (including sediment)--------- --

Wave action damage----

Other-------

Action

('hangc in operation

Irmergency repairs-----

Sun,eillance------------

Regional assistance needed (examination)---------

Public information provided---

. To facilitate analysis of conditions a map should be prepared showing the location and extent of a

damaged areas such as subsidence areas seeped areas springs and other pertinent data including

the dates of readings and site conditions at the time of observation. This map should be revised

periodically to show changing condition until they are stabilized.

Reviewed and Approved By

Direclor ppsign

Doc. No.BIID/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 54 of88Page Revision No. 0

@NANGALPROJECTINTEERATED MANAGEMENT SYS

BT{AKRA BEASMANAGEMENT

BOARD

TiffiONPLANFORn,q,iD LrN G sITUATToN ARrsrN G

-o-yl 9invnnolo Grc AL FATLURE S, EARTHQUAKE- .S O-R

orI{ERs. COntrolleilAnnexure-XVII

Bomb Threat Report: For Reporting Bomb Threat

BOMB THREAT

Place this card under your telephone

stion to ask

Rev'lewed and APProved BY

DirectorM

BFIAKRA BEASMANAGEMENT

BOARD

IiI

Ii

Doc. No.BHD/DESIGN/EAP-Datezl?-D7-2019Issue No. 02Page. 55 of88Page Revision No. 0

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITI,E: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES,,BARTIIQUAKES OR OTHERS.-. ICont-rolleo

ANNEXURE-XVIIILIST OF EXPERTS /RETIREES WELL CONVERSANT WITH DAM REPAIRS

Sr.No. Name Present address Contact No.

1 Er. P.A.KapoorRetd.Chairman,BBMB

Kothi No.661, Sector-1 5Faridabad

011-26412801,011-26417639

2 Sh.R.N.AgganrualRetd.Chairman,BBMB

1 I 1 35 Shikha AppartmentsSector-S,Mansa Devi Complex,Panchkula,Haryana

FAX 01 1-41684103

4 Sh. K.K.Khosla,Retd.Chief Engineer,Bhakra Dam

Sharma Store,Nangal TownshipDobetta Colony

01887-22487394178-19290

5 Sh. G.D.GuptaRetd. Chief Engineer,Bhakra Dam

H.N. 600 Sector 10, Panchkula 95172-2585084

b. Er. Y.P.MathurRetd. Chief Engineer (lrr.)

Shikar AppartmentE417 Mansa Devi ComplexPanchkula

0172-4665366-R94170-13507-M

7. Er. R.C.SharmaRetd.ARO (BBMB)

V.P.O. Raipur,Near Mehatpur,Distt. Una (HP)

01975-232781

B, Er.O.P.SharmaARO Retd.(BBMB)

VPO Nangal Salangari Distt.Una 01887-225992

I Sk. A.K. Dharmani,Retd. AE

Panchkula 98157-39732

lssued Bv

,!*Wffi, rReviewed and Approved By

-- BHAKRA NANGAL PRO JECT

mrrcurED@

BHAKRA BEASMANAGE,MENT

BOARD

Ti@NPLANFORnainr,mc srruArroN ARrsrN G

-o-Yl 9iIIYDROLOGICAL FAILURES' EARTHQUAKES OR

oTIIBRS. ContrOlled

BIID/DESIGN/EAP-Datezl}-}1-2019Issue No. 02

Page. 56 of88Page Revision No' 0

Repair and maintenance schedule for upkeep of different components of Bhakra Dam

Annexure-XlX

(l to viii)

steps would

maintenance. As an inPut

suffice. The

manual.

Daily:

. General inspection of civil works

o General cleaning of the dam and galleries

FortnightlY: -

. Emergency doors in spillway galleries

. SanitarY fittings

. Cleaning of SumPs & drains

MonthlY: -

. Joint drains & intermediate drains

. Clearance of glass etc from d/s face block joint

. Cleaning of d/s glazing of elevator towers

. Mosaic floor Polishing in Dam

(El1225ft, 1668 ft & 1700 ft)

Yearly: -

. cleaning of Air Headers of R/o and blowing of piezometric tubes

. Maintenance of air flow meters and air vents

. Replacement of sealing compound of contraction joints

o Repair of approaches to drain holes & ground water holes

adjunct to the

time schedule

avoidance of an emergency, some of the suggestive

should be adhered to as stipulated in operation &

Rt'rewed anilAPproved BY

oirectffiionPrepared

ASE.I fi

BHAKRA BE,ASMANAGEMENT BOARD

Doc. No.BIID/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 57 of88Page Revision No. 0

Annexure-XIX(ii)

. Clearance of D/S rock benches on both abutments

General: -

. lnspection of u/s face of dam

. lnspection of outlet & Penstock gate guides

. Maintenance of drain holes in draft tube when dewatered

List of number of instruments installed in and around the body of dam to keep a

watch on perlormance and to provide useful data (as mentioned below) should be

displayed at site also. The periodicity of observation on these instruments should

bestrictlyfollowed(ascontainedin O & M also)

SETAIL BF INSTRUMHNT"$ .IN tshfAKR.A BATVi

Er:scriptio n of LctrittioftT*"{str'*-r rfi.{1!xt

$T$l,f;SS *r*EYHR5 Bl*:*lq I* Ftw/L:":t14*rt mfiily: it.t"JL :5tial :f),1O ft:Tra'r*t1 ."1 r.J{:t:k. $tr,?Lqr 1..&**{t

11!r".,:...,

STft&I$I s.$H-['HR# B$s*k* 5.e{}&"s

J(}}NT MHTtrRs Hls*kts,?$&?-$

Fqrrlnr*hlly

HL 1fi8;5F{ls:r:k ?{.}

BHAKRA NANGAT, PROJEC'IINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFORt HANDLING SITUATION ARISING OUT OF

TIYDROLOGICAL FAILURES, BARTHQUAKES.ORorHERS. ci,ntrolleo

Peri{}diaity {}ffflhs{tr-vixti&fis

T*tal Hrs, trfI.ngtr,Lr m &,El!ls.

Fffrtn'l:!lhily

Reviewed and Approved By

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

BHAKRA BEASMANAGEMENT BOARD

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FA ILURE s, E ARr H QUA"rt oFo-I,4f$Slle il

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 58 of 88

Revision No. 0

Annexure-XIX(iii)

5r-NC'.

Description ofIr.lstrurrrent

LocatisrI Tota! Nc- oftrrrstrLrrlrerrt_s

Pericrdicity ofrOt serrlations

6" STRUCTURALtr.E5trCIT{SERECOR.DETT.S

,EL 10A3 Bl$ck20 8{ PP- EL1:_50

2 Forinightly

7. S_TRONG MOTIONACCELEGR()PHRESA IV

EL&20

160A-1378to83 Block

3 Fortnightly/As &when requined

a- STR(}NG TV]C)TIOT\JACCELEROGRAPHTTESI\

EL 154a L./S &Ft/5

2 Fortnig htly/as. &when requlred

9- STR"ONG TqOTIONACCELERCIGRAPI-IA800

EL1608, ]-3V8,1043

EXssk 20&1362 DinkY--I-unnel

4 Fortnightly/As &.when requi_red.

10, GR()UT\ID \^/ATER,HOLES

Left & RightAtrutrnents

25-i-l-4:39r* R-

Below RWI160(}-Fortnightly' "

AboveR\A/L1600*Weekit :

5r-l\I6-

trescr-iption crfIrrstrLr rrterat

Locatf o[l -I-otal No- ofInstrLrrrrents

Periodicity ofOlr:serarati orr s

1-1-- 1^/A-TER -TUBETTL-TMFTER

PP-I(U nit-I)Er._ 1150

1 M(frlthly

12. PLIJMB LINE Block15"204125

3-Linesa3-Cabines

Daily

13- DR.AI[\J HOL.E DarnEalleries-55e,4(Ja.b{,.! trrr entsa66

724 FortnightllT

L4- L'PLlFTPR,ESSUR.E PIPE& UPP cLtrn DHs-r)Ar."'1 POR'TIOF'}

In warlousGa!leries

53-+-a4:67 Beiow R\NL a600FortnigFrtlYAbowe R\A/L 1500\n/eekIy

_L 5. UPLIFTPR.ESSUREPIt,E5.-PP-I

EL 1a27-50-34 hl(}s.EL 1150-6nlos-

4D For-tnigl*ttly

eviewed and Approved BY

oi,"[email protected]

BHAKRA BEASMANAGEMENT BOARD

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 59 of88Pase Revision No. 0

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFOR. HANDLINGSITT]ATION ARISING OUT OF HYDROLOGICAL

.,Tr"r*rs, EARTHQUAKES "i "Iitr&Iled

Annexure-XlX(iv)

Precise Geodetic Observations

To watch the structural behaviors of Bhakra Dam, its appurtenant works, U/s & D/s rock

abutments and periphery of reservoir upto'10 Kms, top of dam, a network of survey

points has been installed. lt must be ensured that work on these points is carried out in

two phases as enlisted in operation manual.

t)$TATF{"$LGE SYSTHI!!Ilrainage ,sysEerr:r Ixr arrd as'rrund t?re botly of Darrr"

INSi'T:}ECTT(3!\IO ?r,lAXI\ITEN'TLI\ICH F!il\ltf,} CHECI(Ir\IG llclISC" ITErvtS.*. Splllraray e;>rxrrt gallery errrergerrcy ctesil.ire Sates-

€trean*rrg of, aIr freader of Fl"iwer Outletsq' Blourir*g of piexormeter tr"rbes.i> F4airrtenag.rge Of air ftor.rr rneter- SteplaCerreent ot

darrragerl sealing cstrrpour**{ im cr:rrrtraction jcrints ofrrarl<rr.rs GrIscks *rn top of darrr-

+ 1*trainterllarlCe crf ,approactres t0 draln *rt:les or: Left arrdSaigtrt abutrvrerrts-

+ Cteararrcs of l)"r's; roc*<-nibs tren,ct"*es sri troth abrrtrrrents.+ l"-lplift If ressure pipes irt the botiy of l}arrr, Pouven Plants,

cirainr hsles and grcrured v\rater troles to indicate tfrat ttredriainag€ ctr!rtairt prorrided for the punpos* isfu rrctio n inq eff,ectirreIY.

Reviewed and Approved By

BHAKRA BEASMANAGEMENT

BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 60 of 88Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR OTHERS.

E L H C-r[q.l C.c\.L F E^A-r[-] SR. E$PO\/!TETq Ar\IE} GOhITFT()L SYSTETVI

FotrIornrImg four substations ( 3B AO / 4 t- ,5\rc'lts) frarr_e lrreen prcl,rldetI irr t]re bodyof clarr:- Eler.rator sfraft:surhrstatiorr In trlcrct<I-y at €L

l- z x"3 -5t} fr- Hoist slraft sute station in block I2B at EI-

r_2I_3-5(} f,to-- Etrerrator to\Arer srrtrstation ir"r blocl< L7 at EL

,- 6a4 ft- I{oist tornrer sul> statir:rrr irr block 2B at EL

r- ss.4ft

CIfi!"CtJI-r GtIt.EAil<EFtS Ar IS(}LA-FrNGslrvlT'clt Es

+ trnspection, testing and rectification <:fsl..vitch getsrloil irrrrnersed circuitbreakers are done at Ieast once a yearpreferatlly after. errery 6 nl<>nths*

+ Operating rnechanisi-n, iUbrication ofrnechanical parts, c<>ntacts, tBnks, ailInsulators, insulating oil sh<>uld becl-recked periodically and L:e setright/replaced if requlred irnrnediately.

Reviewed and {pproved By

I]HAKRA BEASMANAGEMENT

BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAG EM ENT SYSTEM

TITLE: EMERGENCY AC.TION PLANFOR TIANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILTJRES, EARTHQUAKES OR OTHERS.

Controlled

Annexure-XlX(vii)

TRAN$FORMHRS* A rtgld system sf inspectionltesting *ild

recondititrning tras heen snvisagtrd in theoperation rnanua[:

Checki*S *il level, relayseantaets, fuses l*adlvoltage &tc.

Month ly

checktns th; uu*r*lnsffi gsl Qua rt*rly

ehecklng nil in transforrner fardieleetrie strength & watercsntent

Annually

Checking oil in transfnrmer foracidity and sludge

Alternate yea r

Overall inspecti*n andmaintenance

fvery 5 year

some other works to be attended to have been enlisted as below:'1. Penstock high head gates: Capital maintenance of each Penstock head gates should be

. carried out after every five year as per maintenance schedule drawn

2. Low head maintenance: -

Inspection of gate & roller in position be made by lowering the penstock stop logs in

respective unit as & when low head is achieved.

r. Penstock liner. Penstock Iiner should be visually inspected during shut down of

machines & repair / painting be carried out every year or where needed.

Prepared By Reviewed and Approved By

i

L

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 6I of88Page Revision No. 0

ASE.I sign

BHAI(RA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR OTHERST

Controlled

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 62 of 88Page Revision No. 0

Annexure-XIX (viii

Penstock trash racks:-

lnspection of Penstock trash racks be carried out through divers every year as &

when level as achieved to enable divers to make such inspection be got carriedout through remote operated vehicle to sufficient depth.

4. River outlets:

Capital maintenance of R/o carried out as per five year schedule drawnlnspection of R/o U/S conduit, U/s gate D/s liner by lowering emergency gate be

carried out very year as per schedule drawn

5. Radial gates:

U/s & d/s portion of all the four number radial gates be attended to meticulously asper o & M to ensure that gates are in proper working conditions.

Yearly inspection of all the permanent mechanical installation before & after everymonsoon period must be ensured by the field

Through inspection of Civil structure be ensured before & after every monsoon

Exposed surface of spillway and training walls and submerged portion of spillway &

its apron be inspected after floods visually, by divers and by using pneumatic caisson

system.

AII other instruction as contained in O & M of Bhakra or any other drawn schedule

later on be followed in the field stricfly.

Prepared By

BHAI(RA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 63 of 88Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES qR OTHERS.- -.Controltcu

Annexure-XX

'-:'- **: - ::':i: L'" -li

=--P i i ii-flui,^, ; ;. iF.q..I -r € -j \I: il r'i;';4 :l -'i{

r^-{ -l p 16 6..-- -l t { *: :l { 3 ei","+=* ''l ! d- ?al :l .$ i ,Y// :\l < o

(ili.i\\ t:i, t'i1I

\,.,.{:'a<.;;-)) i-\\. .^

'r \l:--- - ,l .:\. \----'j) (,a o

\ rld'-,7 1 ,.,t)\ \r 1{ // ./', //\\ \N \r-:=-=e-, //

*:r::j:-:.:: :f1;K.

.t..' ...-.--- .:

i.

,:

Ml;

$\r_

Eroc3\+

a\'\\^\\r .i-\E\1..r.-)-ii('

li El \\

il --,=/l UirA ll

//.: ////* //z

::-. ''.;'E^-) -3156 ^'j-c r:-Y .r*+ ';

r>:t

ol&os'&:: uc<{ M

lu5r:4.:

\.'r\\'.\\\r\){:r=.i.

\.r\r\

\

f"-.q:

!-

a)

a:)

{.9I6q-J*{{)ft{L r*J

)--

c( i^L& "L!J

I-- :"

L:dr5

;d.r'{L-rl Ctl .

,q lc

*-- /r\(-3_r{/};rrq

3"q_o-

:L.lra{;

!'l

si6r(,

I

o

"t{

,&{J

tE

J

3cr(.fiq

?f1f{3

:g.-e

- .,(!.,.i I i:-

a,+

b

*r

_c

J,t_gz

ri

::,d]0'!g

{:r

E"//t ,/ o*,'+Yr4

F(J*c\

Reviewed and Approved By

Doc. No.BHD/DESIGN/EAP.Date;12-01-2019Issue No. 02

Page. 64 of 88

Page Revision No. 0

REQIREMENT OF MACHINERY FOR CONSTRUCTION ACTIVITIES AT EMERGENCY

SITE

1. Diesel pump sets complete with suction

And delivery Pipes

2. Electric pump sets 5 HP to 40 HP with accessories

3. Generator sets

4. Compressors

5. Concrete Mixer (electric)

6. Concrete mixer (diesel)

7. Sheep foot rollers with frame complete

8. Chain Dozet D4,D6,D7,D8

9. Poclains

10. Front end loader

1 1. Wheel dozer

12. Tippers

13. Pneumatic comPactors

14. Crane 30T, caPacitY

15. Dragline 1 cum caPacitY

16. Concrete vibrators

11. Shuttering plates with she bolts

18. JCB Machines

19 Water sPrinklers

10 Nos

10 Nos

6 Nos

4 Nos

5 Nos

5 Nos

6 Nos

8 Nos

4 Nos

2 Nos

2 Nos

30 Nos

2 Nos

1No

2 Nos

6 Nos

400 mtr

4 Nos

4 Nos

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYS]TEM

q:!i-. 'i!id

BHAKRA BEASMANAGEMENT BOARD

rnt f' nnnBnCENCY ACTION PLANFOR HANDLING

SITUATION ARISING OUT OF HYDROLOGICALFAILURES, EARTHQUAKES OR OTHERS.

ANNEXURE.XXI

Reviewed and APProved BYPrepared By

BHAI(RA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07 -2019Issue No. 02Page. 65 of 88Pase Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF TIYDROLOGICAL

FArLURE s, E A R]. H Q u A.'tffio9#t$rgO

S.No. Description Qtv Present condition Remarks1. Euclid Trailer 1 Working1 Trailer 1 -do-

3. Tata Tiooer 12 -do'4. Water Sprinkler 1 tlo

5. Lorain Moto Crane Co

6. Mini Speed Shovel Crane 1 do

t. Voltas Omeqa Crane I -Co-

8 Mobile Crane 1 GO

9 Tata Draqline 1 dtt

10. Hvd. Excavator 1 do

ll Front End Loader 1 do

t2 Excavator cum Loader 2 do

11_t4

Crawler Dozer 2 -do-

Wheel Dozer I -do-

15 Motor Grader 2 One No. not inworking order

ANNEXURE-XXII (I & II)

[,IST OF MACHINERY WITH XEN BHAKRA MECHANICAL DIVISION, NANGAL

'['he machinery is generally stationed at EI-I400 Bhakra Dam when not in use or for repair &maintenance work. Quarter wise the machinery is deployed/statiorred at work site for which joborder is received by Sub Divisional Officer, Field.

Note: List of machinery received from SE, NMC, BBMB, Nangal

Prepared

ASE-I

By

fi

Reviewed and Approved By

Direetor Q@sign

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

BHAKRA BEASMANAGEMENT BOARD

TITLE: EMERGENCY ACTION PLANFORHANDLING SITUATION ARISING OUT OF

HYDROLOGICAL FAILURES, EARTHQUAKES ORorHERS. controlled

BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 66 of 88

Page Revision No.0

ANNEXURE-XXII(ii)

LIST OF OPERATORS

Sr.No. Name of OperatorS/Shri

Designation ResidentialAddress

Machine Contact No.

Sh. Som Raj Dumper

Operator

8-B BBMB Colony,

Nangal T/ship

Trailor 988816583

2 Narinder Paul Euclid Operator 9-P BBMB Colony,

Nangal T/ship

Tipper 1696196244

3 Sh. Janak Raj Tipper Operator Vill. Morbarhi P.O.

BhatoliTeh & Distt-

Una (HP)

Trailor Tipper 9418662638

4 Gopal Krishan -do- 19-WI/BBMB

Colony Nangal

Tipper 94]l14-08301

5 Arjan Singh Shovel Operator 19-J BBMB Colony

Nangal

Shovel Operator 9041 17 1181

6 Kamal Kumar De-Mag

Operator

3-l,Nangal JCB 98 1 5008628

7 Bishan Dass Loader Operator 2-SIBBMB Colony

Nangal

Loader Operator 9417 5-237 18

8 Ashok Kumar Dozer Operator 43-LtsBMB Colony

Nangal

Dozer 99r5160913

9 Gurbachan Singh Driver 29-0, BBMB

Nangal

Tipper 94170-55906

10 Partap Singh Tipper Operator iO5-06/FF /BBMBColonv Nansal

Tipper 991 5t47419

lt Rakesh Kumar -do- 286/G/BBMBColonv Naneal

-do- 98 1 660796 I

12 Satish Kumar -do- 599-G/BBMBColonv Nangal

-do- 9876001205

t3 Raman Kumar Dozer Operator 65-HHIBBMBColony Nangal

Dozer 9464869324

14 Nishan Singh Shovel Operator 32-FIBBMB ColonYNangal

Poclain 1888445478

Reviewed and Approved BYPrepared By

BHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07 -2019Issue No. 02

Page. 67 of88e Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES. EARTHQUAKES OR OTHERS. tCnnfrolle{l

ANNEXURE-XXIII

I,IST OF MACHII{ERY/EQUIPMENTS WITH BSL PROJECT SUI{DERNAGAR AND BEAS DAMTALWARA

Sr.No. Nomenclature of Equipment Total number of Remarksmachinery

a)1.

2.

3.

4.

5.

b)1.

c)1.

2.

Heavy Earthmoving EquipmentsL&T Poclain shovelCatterpiller wheel dozerCrawler TractorMotor graderExcavator point end loader'funneling EquipmentsG.D. Grout Pump

Construction EquipmentsDritling machines

CranesPumps

Type Pump,

3No1No2NoI No.2No

2No

5No3No45 No. V.T.Pumps, SS

SubmersiblePump,BareHole pump &

' Sump pumps etc

4No3No1No

9No1NolNo

1No1No.

4. Air compressor5. Generating set

6. Concrete mixer(d)l. TMB Tipper2. Water sprinkler3. Road Ruller

1. JCB2. Dozer

Note The above machinery will be available, if free from repair/maintenance work

Talwara Circle, Talwara

3. Tipper 4 No

Note The above machinery will be available, if free from repair/maintenance work

List of rnachinery/equipments received vide SE,Bhakra Dam Circle, BBMB, Nangal vide letter No'7455-

56/BM dated 9.8.2007.

Reviewed and Approved BY

DirqlEpesisn

\

BHAI(RA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTE M

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OT]T OF HYDROLOGICAL

FAILURES, EARTHQUA".T q)gfrfPdfied

BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 68 of 88Revision No. 0

ANNEXURE-XXIVLIST OF CONTRACTORS

-l

I

l

I

't

I

i

I

I

Sr.

Nos

Name and address Contact No. Machinery with the Contractor

M/S Sh. Harvir Singh Govt.Contractor, Vill. I(otla teh-Anandpur Sahib, Distt-Ropar8B)

9417 t947 15 Tractor, Mixture. Vibrator.

2 Sh. Baldev Raj Govt Contractor ,

Vill- Gag P.O. Jindwari Teh-Anandpur Sahib, Distt-Ropar(PB)

94t7559t60 Tractor, Mixture. Vibrator.

J M/S Sh. Inderjit SinghContractor, Mohala Bhaura,Anandpur Sahib, Distt-Ropar(PB)

9812033621 Mixture, Vibrator, Tractor andShuttering material.

4 M/S Salamipur Co-Op L&.CSociety Ltd. V.P.O New malikpurTeh-Nangal. Distt-RoparGB)

9501200029 Tractor, JCB, Generator,Mixture, & Vibrator

5 Sh. Subhash Chand Contractor22-Kilan Area Nangal. Township.Distt-Ropar(PB)

9815391770 JCB, Tractor, Mixture, Water,tanker, generator.

6 Sh. Neeraj Kumar Vill- Thalluh,Teh - nangal, Distt-Ropar(PB)

9872361393 Tractor, Mixture. Vibrator.

7 Sh. Paras ram Sharma Govt.Contractor, Vill. Bunga Sahib,Distt-Ropar(PB)

9818229800 Tractor, Mixture. Vibrator.

8 M/S R.R Builders #33- RailwavRoad Nangal.

9417501322 Tippers, Road Roller, Paver.JCB, tractor grader, MixtureGenerator, Mobile concreteplant.

9 Sh. Raman Kumar Govt.Contractor #2 BBMB, Hospitalcompound Nangal T/Ship. Teh -Nangal,Di stt-Ropar(PB )

9812281703

10 Sh. Chander I(shore Govt.Contractor VPO Basdehra, Distt-Una(HP)

9882952040 Tractor

Prepared B

ASE-I

Reviewed and Apploved By

BHAI(RA BEASMANAGEMENT BOARD

Doc. No.BHD/DESIGN/EAP-Date:12-07 -2019Issue No. 02Page. 69 of 88

Pase Revision No. 0

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE; EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FATLURES; EARTHQUAKES OR OTHERS.

ANNEXURE-XXIV

LIST OF CONTRACTORSSr.

Nos

Name and address Contact No. Machinery with the

Contractor

l1 Sh. Avinash Kumar GovtContractor Vill. Gag. P.O

Jindwari, Teh. Nangal DisttRonar(PB)

98s5282387 Tractor, JCB, Mixture,Vibrator

12 The Dasgrain Co-Op LeCSociety Limited, Dasgrain, P.O.

Jindwari Teh Nangal , Distt-Ropar (PB)

99r5718455 Tractor, JCB, Mixture,Vibrator, Generator Set,

Drill Machine HackHammer

t3 Sh. Raj Kumar Govt Contractor,Vil- Patti P.O. Manakpur Teh .

Nangal Distt. Ropar (PB)

83 520805 83 Welding Set, Drill Machine,Grinding machine, Cuttingmachine, mixture, tractor,iack Hammer and Vibrator.

l4 Sh. Kundan Lal Contractor, Vil-Thalluh Teh Nangal Distt.Ropar (PB)

9872383589 Tractor, Mixture. Vibrator.

Reviewed and Approved BY

Director #4,Prepared

ASE-I

By

({

BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 70 of 88Pase Revision No. 0

Sr.No. Name of Firm

1. M/s Gammon lndia Ltd. Gamman House, Veer Savarkar Marg, Prabhadevi Mumbai-400025 O22-

56614000, Tel: +91 2261114000 Fax:+ 912224300221, Emall: [email protected]

2. M/s Madhucon Projects Ltd, Flat No. 307 & 308, Third Floor Corporate Sewa Park, M,G. Roaci -

Gurgaon -122 002 lndiaTel: +91 124235234 Fax. +91 1242359234

Email : nd.hrd(Oma"dhucon. gom

3. M/s Malana Power Company Ltd. (MPCL), Bhilwara Towers, A-12, Sector -01, Noida-201301,

NCR Delhi fef: +91-124-2541810. Fax: +91-124-4277841.

4. M/s Larsen & Toubro Ltd, SCO 32, Madhya Marg, Sector 26D, Chandigarh, 160019 Phone:

0172 464 6845

5. M/s GMR Energy Ltd, $fu$ru Ar*b*ia-Chand:garh H.xpr**sivxy$ i$)) i-imlt*d R**1xnillx;*,

ilhern*igsr"i: R*aJ,Zir*Lpui"- 14t] fi*3, PLrnjxi:, lndi* Tel +91-1762-288198/288199

6. AFCON$ ITqFRA$TRIJCTI"IRE L!MITTD

AFCOhIS House, 16, Shah lndustrial Estate, Veera Desai Road, Azadnagar, Andheri (West;

Mumbai400053, lndia Tel: +91-22-6719 1000

Fax. +91 -22-2673 AA4712673 0026

7. M/s Essar Power Limited., (EPOL), Essar House 11, Keshavrao Khadye Marg P.O.7495,

Mahalaxmi,Mumbai-400034 lndia Phone: +91 (22) 6660 1100 Fax: +91 (22) 2495 4787 e-

ma i I : eggarpqwer@-essar. com

S. M/s Tata Power Company Limited, Bombay |-'ior"rs*, l-"{*mi M*di Str*et, F*rt, tulunr*ai *

s. 40*il0r .3{91}:??:t577-43$$, SS$$Sa8?, $?:t71WA+{$1)-2?-SSS5&E*1 , 0*S5SSS71 *Sr-ffi_*l$j

BHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR OTHERS.

Annexure-XXV

Reviewed and Approved By

Direqt[r Ddlign

BHAI(RA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAG EM ENT SYS'TEM

Doc. No.BHD/DESIGN/EAP-Date:.12-07 -2019Issue No. 02

Page. 7l of88Pase Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINCSITT]ATION ARISING OUT OT- HYDROLOGICAL

FAr LURES, EARrrr QUAKWS&ffimBd

1. M/s Torrent Power AEC Ltd., Nead Sffiee fsflrsslf Fmwe,r Limited, CIid Agra R*md, Anjur Fhata,

2. ilhiw*ndi 4?13*?. Fh Sq** S?$22 - ?41S**^

3. M/s Reliance Energy Ltd, H Block, 1st Floor, Dhirubhai Ambani Knowledge City, New

Mumbai Maharashtra 400710Tel: 022-3038 6010 Fax: 022-3037 6622

email : abhijit. [email protected]. in

4 M/s Kudos Agrohols Ltd, VILLAGE KURANWALABARWALA ROAD

DERABASSIPATIAI-A -Punjab - INDIA

e-rmail :[email protected]

5. M/s Jai Prakash Associate Ltd., Sector - 128 Noida Uttar Pradesh2O'I304

Tel: 0'1 20-4609000 Fax: 0120-4609496

e-mail: ial. [email protected]. in

6. M/s HEG Ltd, Secretarial Department Bhilwara Towers A-12, Sector 1 Noida (UP) 201301 NCR

Delhi e-mail : [email protected]

7. M/s Deccan Cement Ltd, 6th Floor, Deccan Chambers 6-3-666/8, Somajiguda Hyderabad -

500082 Andhra Pradesh, lndia Tel: 040 - 2331 01681 05521 0555 Fax: 040 - 2331 8366

e -mai I : info@d*c*-ftncement-s. com

B. Mis Kineta Power Pvt. Ltd, 4TH Fk:*r, Kin*ta Towers Piot l{i:.S1 to S4Venkteswara, Hills,

i-iyderabad-5S0034, Xg1' +(91 )40-23352S72173l7 4

-{ssqqd By

f,h&$H,Prepared

ASE-I

By

$

BHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EA}'-Date:12-07-2019Issue No. 02Page. 72 of 88Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR OTHERS..

uortrollei

Sr.No. Name of Contractor

i) Sh. Harbir Singh of Kotla

ii) Sh. Vinod Kumar of Nangal

iii) Sh Sardari Lal Village:Gag,near Ganguwal

iv) Sh. Rajinder Kumar of Ghanauli

v) Sh. Ravinder Kumar of Lohand

ANNEXURE.XXVI

LIST OF CONTRACTORS FOR LABOUR ARRANGEMENT

Contact No.

94172-94715

991 50-88349

94115-01332

98557 -29031

9417s-23930

Reviewed and Approved ByPrepared

ASE-I

By

fi

BHAKRA BEASMANAGEMENT BOARD

Doc. No.BHD/DESIGN/EAP.Date:12-07-2019Issue No. 02

Page. 73 of 88

Page Revision No. 0

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TTTLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGTCAL

FAILURES, EARTHQUAKES OR OTHER.II Ir ontroueo

ANNEXURE.XXVII

LIST OF OFFICERS TO BE INFORMED OF FLOODSWhenever the releases downstream Nangal Dam including escapages at Lohand and Nakkian are more

than 14000 cumecs (50,000 cusecs) the flood warning are required to be issued by Executive Engineer, Nangal

Dam Division through Police wireless and canal telegraph systems to the following:

1. Central Control Room, Civil Secretariat, Punjab, Chandigarh

2. Flood Control Room, Sinchai Bhawan, Sector 18, Chandigarh

3. Chief Engineer, Drainage, Punjab, Chandigarh

4. Chief Engineer, Canals, Punjab, Chandigarh

5. Deputy Commissioner, Ropar

6. Executive Engineer, Ropar Headworks, Ropar

1. SDO Ropar Head works, RoPar

I1 addition to above, tlie following officers may also be intimated

1. Financial Commissioner, Revenue ,Punjab, Chandigarh

2. Commissioner, Jalandhar Division, Jalandhar

3. Commissioner, Patiala Division, Patiala

4. Commissioner , Ferozepur Division, Ferozepur

5. DePutY Commissioner, Ludhiana

6. Deputy Commissioner, Kapurthala

1. DePutY Commissioner, FerozePur

8. SDM AnandPur Sahib

9. SHO,Nangal

i0. Concerned Railway Authorities

"":::: "KvReviewed and Approved BY

Direcffiisn\

tsIIAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL FAILURES,

EARTHQUAKES OR OTHERS.

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 74 of 88

Page Revision No. 0

Annexure-XXVIll

BHAKRA BEASMANAGEMENT BOARD

LIST OF EMOPLOYEES OF RM & B.S.R. SUB DIVISION BHAKRA

l

l

Il

I

II

l

I

Sr.No. I Name (S/Shri) Designation. Address Contact No.

List of Employees of BSR Sub Division

I I Sh. Kulwant Singh J.E. 27 -Wl nangal. | 941714577 4

Township I

2 Sh. Naresh Kumar J.E. 6-.4A NangalTownship

9417484787

1J Sh. Balwant Singh Chargman 12-MKT NangalTownship

94t8718473

4 Sh. Sanjay kumar Diesel Mech. 89-DD NangalTownship

981,6214969

5 Sh. Madan Chand Boat Driver 6-DD NangalTownship

9816137897

6 sh. Dev Dutt Fitter Vill. Sukhsal TehNansal Distt-Ropar

9815747205

7 Sh. Davinder Singh Chargeman 16-GG NangalTownship

9814494441

8 Sh. Shamsher Singh MTO 1-F Nangal Township 94t7 414357

9 Sh. Manjit Singh Carpenter 211-212-G NangalTownship

8360757795

10 Sh. Sher Singh -do- 35-G NangalTownship

8872768006

11 Sh. Raj Kumar Boatman 443-FF NangalTownship

9814387196

t2 Sh. Subash Kumar Helper 330-G NangalTownship

987291436 /

13 Sh. Som Nath -do- l2-B.DlC NangalTownship

858091 9782

t4 Sh. Suresh Kumar -do- 61-G NangalTownship

991 s 1 10626

15 Sh. Diwan Chand Beldar 408-FF NangalTownship

9592535738

t6 Sh. Darshan Singh -do- 114-75-G NangalTownship

7s89095078

t7 Sh. Jai Singh -do- Vill- Handola feh &Distt-Una (HP)

991611r2e7

t8 Sh. Maman Chad -do- 7837102061

t9 Sh. Anil Kumar -do- 351-FF Sh. NangalTownship

8872663786

20 Sh. Bachh Rai Chowkidar 150-DS/I1B 35t-t'FSh. Nangal TownshiP

y / /y+o6JJ6

tBv-L\

(MR)-i::: fif Reviewed and APProved BY

oi,...*(ion

I

I

BHAKRA BEAS

\4AM9lrvlENI !e4B8

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 75 of 88

Page Revision No. 0

BHAKRA NANGAI, PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAI LURES, EARTHQUAKES oR orH nn$gaflCoBtIL^.".

22

23

24 Mohan Lal

Prep.ared By

ASE-I

28

29

I

1

aJ

;-)

aaJJ

-)t

H.No 81-DD, Nangai

I 38l

lrql

t---140i

l

t--41i.____

i

l

4-CDIC 351-FF Sh. NangalTownshi

9988162897Sh. Karan Singh

2-CDIC Nangal Township 9465009689Sh. Madan Lal7696109110Choi Bazar Anandpur Sahib.

Distt-RooarDinesh Kapoor

93s6367930Vill-Johal P.O manakpur. Teh

, Distt-RoparPatwari

Q. No.36-HH Nangal, Distt-Ropar

809422\272Pardeep Kumar

9464242052Q. No-17-DS/EESuperviserChander Kanta8427864852Q.No.7-G/DC Nangal

Townshi9888569960Q.No.347-G Nangal

981s752560Q.No.6-B/DS/Rly NangalTownship

Paramjit kaur

8556924910VPO Golini, Teh NangalKuldeep Kaur

750806958 1Q.No. 83-TS Nangal Distt-

8427890255Q.No.27-X Nangal Township

Nangal Colony, Sharma Store

Bhakra Road, Teh Nangal.,Distt-Ropar

9417589172Subhash Chander

94635 1 5660Q.No 306-G NangalTownshi

Helper

8441635309Q.No 11 -S Q.No.34l-GNansal Townshi

Ravi Parkash

9779663323Q.No/ 37-B/DS Rly

Q.No.347-G NangalDarshan Singh

9464650312

q50 1 8+23 06

Vill- Dabeta, Teh Nangal,Distt-Ropar

Balwinder Kumar

Q. No.4-5 Lab NangalTownshi

Kanhya lal

6463390091Q. No.5O-TS/EE NangalTownshi

Govind

7508417222Q. No.83-TS/EE NangalMotian

700933 1 1 50Ashok Kumar

Reviewed and Approved BY

oi,&,r8usignI

BHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGTiAT"ED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Datetl?-D7-2019Issue No. 02

Page. 76 of 88

Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR OTHERS.

Controller

i42 Manoi Kumar Foreman H.No 1-O. Nangal 9417333077

43 Balinder Sineh Foreman Vill-Surewal, PO; Dher 9463192613

44 Chaman lal Work Mistry H.N 13-S. Nangal 991 s832880

45 Bhupinder Kaur Electrician H.No 23-R, Nangal 9463823632A/+o

i

Pawan Kumar Electrician H.No 6-K, Nangal 9463696118

47 Tarsem Lal ACO H.No 1-O, Nangal 98761,77866

i48 Ansrei Sineh ACO H.No 13-U. Nansal 7589238189

i49 Surinder Kumar Mason H.No 22-L, Nangal 9915826357

50 Satish Kumar Carpanter VPO- daroli, Teh -APS 9s92236411

51 Nirmal Sineh Risser Vill-Bhabour Sahib, PO-Bass 9878847429

52 Nav Rattan Risser H.No. 18-N, Nansal 7589953488

i53 Manieet kumar Painter H.No. 92-DD, Nansal 9417973319

54 Paramieet Sineh Painter H.No. 475-76 G, Nangal 9411973s52

r 55 Mahan Sineh Crane operator H.No. 19-G. Nangal 987892967 3

r56 Raiesh Kumar Crane operator H.No. 28-J, Nangal 9459411440

57 Tersam Lal MLO Vill-Khulmi, PO-Bhakra 98055781 14

58 Manohar Sineh Fitter H.No. 32-DD,Nangal 9463386695

i59 Tersam Sineh Fitter H.No. 3S-DD, Nansal 941 70803 53

i60 Sushil Kumar Fitter H.No. i O0-EE/DS, Nangal 9465762511

61 Kamal Dev Fitter H.No. 51-DD, Nangal 977976s6\6

62 Rakesh Kumar F itter H.No. 19-M, Nangal 98723 i 6855

163i

Sanleev Kumar Pump Operator VPO Raipur Sahore Teh & Distt'Ropar

941878204393t6492464

64 Inderjeet Cleaner H.No. 97,ward No.6 VPOSantoshgarh, Una (HP)

9816128400

65 Hariinder Singh T/Att. VPO Dehlan, Distt-Una (HP) 9805667473

66 Ram Saroop Chowkidar H.No. 387-G, Nangal 9878068483

167 Des Rai Store Attendant H.No. 63-DS/EE, Nangal 9815/2It/

68 Kamaliit Store Attendant H.No. 14-DS/EE, Nangal 991 5555 /9.

Prepared By

ASE-I

Issudd Bv

GH#A) -

BHAKRA BEASMANAGEMENT BOARD

Doc. No.BHD/DESIGN/EAP-Datez12-07-2019Issue No. 02

Page. 77 of 88

Page Revision No. 0

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING, OUT OF HYDROLOGICAL

FAILURES, EARrH QU A "tt "88illlHrro

69 Ram Niwas Store Attendant H.No. 11-K/DC, Nangal 9569249430

70 Nirpal Singh Skilled Labour VPO Bathu, Una (HP) 98053412739816324628

71 Salinder Sineh Beldar H.No. 9-BB/BDS, Nangal 9876085489

72 Badri Lal Beldar VPO Mehatpur, Distt-Una(HP)

93 1 8657508

/) Ram Krishan Beldar VPO Kalitran, Teh nangal.

Distt-Ropar (PB)8146294180

74 Badri Parshad Beldar H.No.5l5-16-G, Nangal 98 1 597980 1

75 Vimal Beldar H.No. 15 BDS/Rly, Nansal 6283513612

76 Jagtar Singh Beldar H.No. 20-2llH, Nangal 977902rr688146824183

77 Kamla Parshad Beldar H.No. 21-BDS, Nangal 981s703407

78 Birbal Sineh Reldar H.No. 14-Y, Nangal 82t9483654

79 Shiv Kumar Sr. D ver H.No. 3-U/Dobbeta ColonY 6280562314

80 Hem Raj Sr. D ver H.No. 9-V, Nangal 9464292302

81 Rohit Chandel Sr. Driver Ishwer Kutir-1, RakkerColony, Una (HP)

9882426268

82 Bhuoinder Sineh Sr. Driver H.No. 130-J, Nangal 7081165607

83 Shiv Kumar Supervisor Vill-Basdera, Nangal 7986153089

84 Jagtar Singh Beldar VPO Nikku nangal., Nangal,Ropar (PB)

82t9460049

l-

85 Baldev Sineh Beldar Vill-Kanchera 6280617720

86 Jagtar Singh Reldar VPO Dukil, Nangal, Ropar(PB)

8421 137859

87 Ram Dass Beldar VPO Paroian, Una, Nangal 9459654955

88 Baldev Singh Beldar H.No. l9-AA/DC, Nangal 9s01 10355877 103 1 93 80

Prepared By

ASE-I

Reviewed and APProved BY

oi,.*tht{=ion

- lssled Bv i

Gh*r*o l

RHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAG EMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date.l2-07-2019Issue No. 02

Page. 78 of 88Pase Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISTNG OUT OF HYDROLOGICAL

F A rLURE s, E ARrH Q u A* t Sohtlffied

-

&,^*ff-*t -f,-'"* BHAKITA rf,Lrpl.lsr'rg excl"{}\|lt{ifi r:rRrct-$n.r' {}.9}

Lli nl(i*ln!lfJ.t ilt.it*f ;,.i: rr.r:rirrv*.ir

,'..,. i hfir. r),,-r, tr-R *l.j :n',rsrai rinn, t{tttrr &r t}*s rgiaY

:3{144

I i<.r,rr .-r ,.u.,n, (r'\ Ax! rlu.\v I r I t.,\'t, t t

i ro*rttst a*6M t/'Y&As::+Ev Fr6rft,rt{D{ , t3*

I ,.r rilrl.!. qa.{{rtni..r r:.}};r*r _*S*& rfri, Itlt g,t.r{i{ X-? r{/tr-^

I :,!,ti :rirli:;:..r1:Li.? ir Lt?ii;itLr-vAr.q l)-Aiirltl .rrl1 _ ,' lr.rval0* Jf,-3\ {5u:rt,t,_trlTltqlriafr {:rs laf u r}il ! ()Lltntr&

, IaLrltt liAiil tri.f,Lt 0a1f!llai:!1r i.r< r,ot I *ar!,iri tiltla:(;{

,- ll)i.[E ii.1tsi lia]ilel F] I $nMlli]*l !rr II !all,rff {;t!r} et}i}& tFL[; t)as/irl{: {i{rlj]r alllJaf alatti t{}rtad atFt$rY^tlu

.nt :cL s ii r! lJ riL).)rr:1 {9} ii, S^.tll.Slt,:,1. . irr':r,--

i a*ttn aAi{lIaR *r r}0d trrr.Itl, I ', ,, ,llG,,I

IrP Ur uiLi (l ! iI tliar:k t*sr J{fp ca 04ill &tsH}

i (ritc! totr a,r,{} Lr*rr^{c:1 (:risd tar r,

: tJ,-- | rssi ta5

....., ,.__:... ,:L. .- - . ., ;...99.f;If o|*..6etor e!'166a le I'r/rr u. .iSit t P*wqH Psilr tP"t !6rtj5r!{3I7 ! P*Wtn FUilT PP: nrGHT/StrE

"":::: "R,|(

Annexure-XXIX (i)

v

Detail of staff taking observations in instrumentation sub division

il-r&' :''B'

. . *,1"-t ..

BHAKRA BEASMANAGEMENT BOARD

BTIAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 79 of88Pase Revision No. 0

.TITLE: EMEIIGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR OTHERS.l^nnirnllprl

Sr.No.

Name ofObservation

Name ofObserver

Designation Address Contact No.

1 Plumb LineWell/DeflectionObservation

l. Bhupinder

Singh

Supervisor l7-J, Nangal 94t86675s2

2. DavinderKumar

W/Mistry Vill- Sukhsal 99rs686279

3. Narinder

Singh

-do- 27-I, Nangal 981.s504621

4. Chander

Mohan

Fitter l0-HH, Nangal 9815016804

5. Mohinder

Singh

Fitter 16-FIH, Nangal 94t8296616

6. BlinderSingh

Helper I2-DS/BB,Nangal

9882638401

7. Balwan

Singh

Beldar 343-FF, Nangal 9418976331

8. Jarnail Singh Beldar 103-G, Nangal 8427411044

2

Daily seepage

report of concretestructure

Observation

Same as abovesr. No. 1to 8

Same as above

sr. No. 1to 8

Same as above

sr. No. 1to 8Same as abovesr. No. lto 8

Ashok Kumar Supervisor 8-9-FF Nangal 9417 19 1 828

0. Dila Ram Driller 2-W Nangal 8894409121

-) Daily drain holes& UPPS

Observation

Same as abovesr. No. lto 8

Same as abovesr. No. lto 8

Same as abovesr. No. lto 8

Same as abovesr. No. lto 8

Prepared By

ASE-I

Reviewed and ApProved BY

Direc

BHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 80 of 88Pase Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL FAILURES,

E ARTHQUAKES oR ot"t,rntrolled

I s'.I xo.

Name ofObservation

Name ofC)bserver

Designation Address Contact No.

4 1) Crack

observation

2) Wet spot

observation

3) Joint Drain

& Formobservation

Same as above sr.

No. 1,2, 5

Same as above sr.No. 1,2,5

Same as above sr.

No. 1,2, 5

Same as above sr.

No. 1,2,5

5 Ground waterholes observation

1. HussanChand

Beldar 556-60-FF,Nangal

8968s88905

2. KashmirSingh

Beldar 448-FF, Nangal 783 I 890748

3. Jagpal Singh Beldar 246-FF, Nangal 8894685957

4. TarlochanDass

Beldar 142-FF, Nangal 98821,85957

UPP Dam Portion& Power Houses

Observation

1. Sameel deen Fitter 20-G, Nangal 9530553211

2. KashmirSingh

Fitter 30-O, Nangal 1831890748

3. JagjiwanSineh

Fitter 142-FF, Nangal 7837634676

4. Madan Lal Fitter 142-FF. Nangal 98t5t277415. TarlochanDass

Beldar 142-FF, Nangal 9816166s72

6. JagpalSineh

Beldar 142-FF, Nangal 9882146014

7. DeepakKumar

Beldar 142-FF, Nangal 9417740498

8. JarnailSinsh

Beldar 142-FF, Nangal 8427411044

"":::: "$ryReviewed and AonTved By

oirecto,#6tn

BHAKRA BEASMANAGEMENT BOARD

Doc. No.BTID/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 8l of88Pase Revision No. 0

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYS'TEM

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

IFAILURES, EARTHQUAKES OR OTHERS.

[-.sr.I *o.t?

II

i

l-I

l

I

I

Prepared By

ASE.I

Y.

o.

Name ofObser-vation

Name ofObserver

Designation Address Contact No.

7 EmbeddedInstrument (Stress

Meters, joint Meters,Strin Meters)

1. BhupinderSineh

Supervisor l7-J, Nangal 9418667552

2. SurjitSineh

Beldar 431-G, Nangal 9592758885

3. JarnailSinqh

Beldar 103-G, Nangal 8427411044

4. BalwanSineh

Beldar 343-FF,Nangal

9418976337

8 Water TubeTitlmeters

Observation

1. BhupinderSingh

Supervisor i7-J, Nangal 9418667s52

9 Joint openingobservation

1. BhupinderSinsh

Supervisor 17-J, Nangal 9418667552

2. JarnailSineh

Beldar 103-G, Nangal 8427411044

t0 SMAs observation 1. JagtarSineh

JE 4-T Nangal 9464289665

I

I

BHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2079Issue No. 02

Page. 82 of 88

Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL FAILURES,

EARTHeUAKES oo orr**Ot O[cd

Annexure-VI

Detail of all officers/officials working in permanent installation sub division,:dn'ra

Sr.No.

EmployeeNo.

Name & Designation Address Contact No.

292297 Mehar Singh, SDO Kohti No. 32, Nursery Square, Nangal 9465225304

2 2s1287 Surinder kumar, JE Quarter No. 19-S, Nangal T/ShiP 94785 1 9835

J 342997 Jagatdeep Singh, JE Quarter No, 12-GG 9803719784

4 248375 Bhupinder Singh, Foreman Quarter No. 23-T, Nangal. 9878795429

5 247709 Choudhary Ram, Foreman Vill-Dobar, PO Raipur Madian, TehBanasana, Distt.Una (HP)

9459594552

6 249788 Ramesh Chand, Chargeman V&PO Manakpur, Teh Nangal. 9463389688

7 282099 Kuldeep Singh, Chargeman Quarter No. 22-W , Nangal 9914754026

8 274481 Tilak Raj, Chargeman V&PO Kulgran, Teh-Nangal 9463522629

9 406547 Shiv Kumar, Supervisot,o&M

V&PO Ajouli, The& Distt.Una 9463026473

10 247531 Piara Singh, Er. Fitter Qr. No. S-GG, Nangal 9878333932

11 246651 Amrik Singh, E.St.St. V&PO Dobetta, Nangal T/ShiP 73473 1 61 88

t2 53sr49 Balram Singh, Carpenter Qr. No. 36-HH, Nangal 9465174022

13 328216 Surinder Kurnar, Welder Qr. No. g}-HH,Nangal T/shiP 9465354150

l4 238712 Jail Singh, CRO Qr. No. 116 Near,11-U, Dobetta 9876125348

15 246632 Mohan Lal, CRO Qr. No. 12-W-I, Nangal 9781404553

16 247876 Kuldeep Singh, CRO Qr. No. 1-2, Nangal T/shiP 9417468261

l7 247861 Sunil Kumar, CRO Qr. No. 2-Market, Nangal 9478158533

18 248265 Sucha Singh, CRO Qr. No. i0-Y, Nangal 9915372247

BBMB, Nangal

Reviewed and APrepared By

ASE-I

Ir *::[F*"]h,,yq.*J^/.

",,: ;.,-. :1._..

BHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02

Page. 83 of 88

Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL FAILURES,

-'irj . r. EARTHQUAKESOROTHERS.

r'r t It

Annexure-VI

Detail of all officers/officials working in permanent installation sub division,BBMB. Nansal

t

t

L

il

I

I

i

Prepared By

ASE-I

Reviewed and Approved BY

oi,*#".ign\

an

Sr.No.

EmployeeNo.

Name & Designation Address Contact No.

19 248252 Manjeet Kumar, CRO Qr. No. 4-O. Nangal 9041264561

20 249075 Chander Mohan, CRO Qr. No. 14-T, Nangal 9417743143

21 247599 Ashwani Kumar, CRO V&PO Santokhgarh, Teh & Distt. Una 98145 12915

22 247986 Kamar Deen, CRO Qr. No. 22-N, Nangal 98551 19558

2_1 247857 Dalieet Singh, CRO Qr. No. 23-K,Nangal 9464257614

24 246683 Parwaish Singh, CRO Vill- Hambewal, PO. Nikku Nangal 82639 20U+

25

;.1,O

249223 Ajay Kumar, CRO Qr. No. 87-88 FF, Nangal 946486U390

248409 Sanjeev Kumar, CRO Qr. No. 380-81-82-FF, Nangal 99t5923537

27 328021 Ramesh Kumar, CRO Qr. No. 285-G, Nangai 98 1 4080206

fs 249219 Yogesh Kumar, CRO V&PO. Bass, Distt. RoPar (PB.) 946310 1 057

ii 246736 Manjit Singh, MC. Opt. Qr. No. 10-U, Dobetta ColonY, Nangal 950 I 822308

30 249439 Dharam Paul, Driller Qr. No. 4-W, Dobetta ColonY, Nangal 9872605866

31 328053 Dhani Ram, Driller Qr. No. 51-H, Nangal T/shiP 73077 49861

)1- 249238 Arun Kumar, Fitter Qr. No. 14-G, Nangal 9463125u6U

aaJJ

34

328379 Gopal Dass, Fitter Qr. No. 22-E,, Nangal 964690 /OO /

328662 Yog Raj, Driller Qr. No. 113-DD, Nangal 7696985909

35

{6-

246702

2M121

Surinder Kumar, CE. Painter

gubu nunl, aE- Pr".rt.,

Qr. No. 22-D, Nangal

Qr. No. 5-llH, Nangal

66 / //65U6Y

q8 1 s06z5ag

BHAKRA BEASMANAGEMENT BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 84 of 88Page Revision No. 0

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL FAILURES,

E ARTHA:AKE S OR''TTO.'O$CIT

Name & Designation Contact No.

9736915925248121 Rai Kumar, CE. Painter Qr. No. 137-H, Nangal

Sunil Dutt, CE. Painter Qr. No.518-FF, Nangal 9876248891

301 365 Ravinder Singh, CE. Painter Qr. No. 78-79-80-FF, Nangal 9779269399

Bhupinder Singh, T/Mate Qr. No. 3-L,Dobetta, Nangal 01881267622

9876949632249242 Satpal , SK/Labour Qr. No. 585-FF, Nangal

Kanshi parshad, Helper Qr. No. 301-G, Nangal 9041160985

09811462244247967 Vrjay Kumar, Helper V&PO- Raipur, Distt. Una (HP)

Vill-Hambewal, PO. Nangal., Distt- 8968978007327281 Bholi, Helper

7837028580248711 Ashok Kumar, Beldar Qr. No. 69-70-71,-FF, Nangal

8054045860Amarjit Singh, Beldar Qr. No. 480-81-G, Nangal

Harwant Singh, Beldar Qr. No. 27-28-29-JJ, Nangal 94t7281817

248758 Bal Krishan, Beldar Qr. No. 57-58-JJ, Nangal

9719220392248743 Hukam Chand, Beldar Qr. No. 137-G, Nangal

Jagdev Singh, Beldar Vill-Tupper, PO. Makri, Teh.NainaDevi Naneal

08988287249327774

9872885 868328182 Ramesh Kumar, Beldar Qr. No. 10-G, Nangal

Qr. No. 6-,4., Dobetta, Nangal 9855s74464328197 Kewal Singh, Beldar

9988 1 59613Mana Walam, Beldar Qr. No. 134-DSEE, Nangal

Vill-Thana, PO. Plassi, TehBasohli. Distt. Kathua (J&K

9196800s67Dharam Singh, Beldar

V&PO. Sabar, Teh. Basoli, Distt,kathua (J&K

8146728671Ajeet Singh, Beldar

9882s 12348328823 Manjeet Singh, Beldar Qr..No. 132-FF, Nangal

Vill-Choughat, PO. Paroian Una 9882426747334419 Ashwani Kumar, Beldar

Qr, No. 28-M, Nangal T/Ship 9463026764Mohan Lal, Carpenter

sETFlo(MR) ,----Reviewed and Approved By

Dirltor$esisn

Prepared By

ASE-I

Detail of all officers/officials working in permanent installationNansal

Annexure-VI

sub division, BBMB,

Doc. No.BHD/DESIGN/EAP.Date:12-07-2019Issue No. 02

Page. 85 of 88

Page Revision No. 0

BHAKRA NANGAL PROJECTTNTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAT, FAII,URES,

' ' EARTHQUAKES oR o'U6iltto[ed

i-EI

I

l_={:+i'l

i1siE!r

1I

Il1;liliI

III

t-I

I

.-E€ilt i=;,f

='!-lI -a-"1-- ,: -A1-

1

I

1 ..a|--.* :t-'*a

6r-* {t;l.i

i}1zt

=t4lxt*l?

--lEri=

&gi:;E*

,.11., :,tr,

I]T]AKRA BEASMANAGEMENT BOARD

dd4

Yfft

.d::q utLrt q*.(,f:J ?

"{{}Fdffi<(j}{;}

-!k&l!rl@@

Reviewed and Approved BYPrepared By

ASE.I

Doc. No.BHDIDBSIGN/EAP-Date:12-07-2019Issue No. 02Page. 86 of88Page Revision No. 0

BHAI(RA NANGAL PITOJE CTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FAILURES, EARTHQUAKES OR OTHE.RS.

;ontro[cd

" '_': ilin

BIIAKRA BEASMANAGEMENT

BOARD

Annexure-XXXll (i)

A Persons deployed at discharge sites Upstream Bhakra Dam on River Satluj

Sr.No

Name (S/Shri) Desg. Name of dischargesite

Contact No.

1 Basant Singh Work Mistry Kahu(Ghambar khad) 8219797372

2 Geeta Ram Beldar Kahu(Ghambar khad) 09736758622

3 Sharif Deen Gauge Reader Kahu(Ghambar khad) 0941 8431 898

4 Rajinder Shakya Wireless

Operator(Chargeman)

Berthin 9736457262

5 Madan Lal Gauge Reader Berthin 941 8849866

6 Suresh Kumar Helper Berthin 941 8369337

7 Sukhdev S/Attendent Daslehre (Berthin) 981 6380286

8 Sukhchain Gauge Reader Alikhed(Berthin) 9882076375

I Sarwan Kumar Gauge Reader Berthin 86280631 85

10 Hardyal Singh Wierless

Operator(chargeman)

Rampur(Nogli) 9418998147

11 Pardeep Kumar Gauge ReaderRampur (Nogli)

9418641412

12 Raj Kumar Boatman Rampur(Nogli) 7018491705

13 Shiv Kumar Gauge reader Rakchham(Rampur

Section)

98058821 37

14 Chander Prakash Gauge Reader Kalpa(Rampur

Section)

9418640471

15 Subhash Chander Gauge Reader Namgia (Rampur) 9418402605

16 Takpa Lotey Gauge Reader Kaza (Rampur

Section)

945931 3758

''":::: "ffK Reviewed and Agproved BY

oiredF#s,gn

':.:.:l'...::: '

BHAKRA BEASMANAGEMENT

BOARD-J

B Persons deployed at discharge sites d/s Bhakra

at RD 4000 ft & 175000 on NHC

TITLE: EMERGENCY ACTION PLANFOR HANDLINGSITUATION ARISING OUT OF HYDROLOGICAL

FATLURES, EARr H eu A KES oR^oqtlEdwe0.*rCU

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

Doc. No.BHD/DESIGN/EAP-Date:12-07-2019Issue No. 02Page. 87 of88Page Revision No. 0

Annexure-XXXll (ii)

Dam i.e. at Olinda on River Sutlej and

il-No.

Name (S/Shri) Desg. Name of discharge

site

Contact No.

1 Narinder Kumar Gauge Reader Olinda 9872961 353

-g4782632062 Kuldeep Kumar -do- Olinda

Tarsem Lal -do- Olinda 98 1 665676 /

4 Satpal Boatman Olinda 98761551 15

A Malkiat Singh Supervisor R. D.1 75000 9417 1-57 525

o Nirmal Singh Boatman R. D.1 75000 98764-63386

-eB7A-9912277 Roshan Lal Sunder Attendant R. D.1 75000

Lal Singh Gauge Reader R. D.1 75000 94170- I 1356

o Permjit Singh -do- R D 175000 9417 1 -57 072

10 Rakesh Kumar -do- R.D.175000 9441252404

11 Jagir Singh -do- R D 175000 94b309144 t

12 Yeogesh Kumar -do- R. D.1 75000 76961 87634

13

14-

Surinder Singh

Kdhan-Chara--

-do-

-Oo-

R.D 175000 987642504t)

gaos t zao45 -

C. Discharge Site at RD 4(

Sr. -frlamt(s/stro

)00 of NHC

Contact No.

Suresh Kumar

Vinod Kumar

Harish Kumar

Desg. Name of discharge

site

Gauge Reader 9878274925

Gauge Reader 9876781447

Boatman RD 4000 of NHC 9888897356

Gauge Reader 9467736684

Gauge Reader 9805620925Jagan Nath

BHAKRA BEASMANAGEMENT

BOARD

BHAKRA NANGAL PROJECTINTEGRATED MANAGEMENT SYSTEM

TITLE: EMERGENCY ACTION PLANFORI{ANDLING SITUATION ARISING OU.T OTHYDROLOGICAL FAILURES, EARTHQUAKES OR

r'Doc. No.BHD/DBSIGN/EAP-Date:12-07-2019Issue No. 02Page. 88 of88Page Revision No. 0

B

o

'i0

Annexure-XXXlt (iii)

LIST OF EMOPLOYEES OF EtectricatSUB D|VIS|ON BHAKRA

9465 1 66050

9878931 816

9478388569

9569237005

9418445579Sukhwinder Pat

Sukhwinder Kumai

Harbail Singh

ASE-I

9464966723

9417075666

99884398,1 1

- Prepaieo@-t-l

I

I

i

i

Reviewed and AppAoved By

Designation.Ramesh Kumar

9417773829

9417281363Lachhman Dass

9418780128Jatinder Singh

Ra1 Kumar

Darshan Singh Elect.G.-l

Shamser Singh

Avtar Singh

Vijay Kumar

Dhian Singh

Malkiat Chand

Elect.G.-l

Elect.G.-ll

EIect.G.-ll

Fitter.