APPENDIX A COST ESTIMATE DETAILS

8
Municipal District of Bighorn No. 8, Harvie Heights Creek May 25, 2015 Preliminary Debris-Flood and Debris-Flow Mitigation Design FINAL Project No.: 1286006 HarvieHeights_Mitigation_Report_Final BGC ENGINEERING INC. APPENDIX A COST ESTIMATE DETAILS

Transcript of APPENDIX A COST ESTIMATE DETAILS

Municipal District of Bighorn No. 8, Harvie Heights Creek May 25, 2015

Preliminary Debris-Flood and Debris-Flow Mitigation Design – FINAL Project No.: 1286006

HarvieHeights_Mitigation_Report_Final

BGC ENGINEERING INC.

APPENDIX A

COST ESTIMATE DETAILS

Appendix A May 25, 2015

Harvie Heights Preliminary Debris-Flood Mitigation Design Project No.: 1286006

Page A-1

BGC ENGINEERING INC.

A.1 Unit rates used for cost estimates

Category Item Unit cost Unit Notes

Preparation

Mobilization and demobilization

$ 100,000 l.s.Unit cost is highly uncertain. Costs ranged from $10k to more than $1M for recent Town of Canmore work.

Clearing, grubbing and disposal

$ 10 m2

AT (2014) unit cost is $2 for clearing. Additional cost included to account for disposal.

Construction

Fill selection and placement

$ 40 m3

Based on AT (2014) unit cost for pit run gravel, ranging from $20.00 to $35.43 for supply.

Geosynthetic reinforced soil (GRS) berm

$ 60 m3

Additional $20 assumed for reinforcement cost and placement.

Modular block facing for GRS berm

$ 260 m2

Estimate provided by United Lock Block, including supply and installation.

Foundation and/or channel excavation and shaping

$ 30 m3 Based on AT (2014) unit cost for channel excavation, $26.85.

Common excavation and disposal

$ 20 m3 Based on AT (2014) unit cost for excavation, $10.23, plus disposal.

Culvert installation

Steel pipe culvert, supply and install (1000 mm)

$ 4,000 m

Based on AT (2014) unit cost list for typical culvert diameter of 900 mmplus premium added for pipe ramming.

Erosion protection

Riprap supply and place - Class 3

$ 140 m3

Based on 75th percentile of bids received by the Town of Canmore in 2013.

Riprap supply and place - Class 4

$ 175 m3

Based on 75th percentile of bids received by the Town of Canmore in 2013.

Grout reinforcement $ 60 m3

Based on concrete cost of $200 per cubic meter and ~30% void ratio around riprap.

Articulated concrete mats

$ 300 m2

Based on 75th percentile of bids received by the Town of Canmore in 2013.

Engineering

Engineering design, construction management & environmental permitting

10% %Percentage of capital costs. Assumed, high uncertainty.

Appendix A May 25, 2015

Harvie Heights Preliminary Debris-Flood Mitigation Design Project No.: 1286006

Page A-2

BGC ENGINEERING INC.

Cost estimates are considered to be “conceptual-level”, associated with an accuracy of roughly -

25% to +75%, given the design assumptions described in this report. Variations larger than this

are possible if the design concepts or risk reduction targets are significantly changed. Each

cost estimate is based on estimated quantities (e.g. volume of earthworks) and assumed unit

rates, which are based on contractor bids on related projects for the Town of Canmore and a

summary of unit rates tabulated by Alberta Transportation (AT, 2014). It is important to note

that the cost estimate is highly sensitive to riprap costs.

A.2 Harvie Heights Preliminary Debris-Flood Mitigation Design Cost Breakdown

North Harvie Heights Diversion Berms

Harvie Heights Saddle Berm

Category Item Quantity Unit Unit cost Item total cost

Preparation

Mobilization and demobilization

1 l.s. $ 100,000 $ 100,000

Clearing, grubbing and disposal

4200 m3 $ 10 $ 42,000

Berm construction

Geosynthetic reinforced soil (GRS) berm

2,640 m3 $ 60 $ 158,400

Modular block facing for GRS berm

100 m2 $ 260 $ 26,000

CONSTRUCTION COSTS - ROUNDED SUBTOTAL $ 330,000

Engineering design, construction management & environmental permitting

1 percent 10% $ 33,000

ROUNDED TOTAL $ 360,000

Category Item Quantity Unit Unit cost Item total cost

Preparation

Mobilization and demobilization

0.5 l.s. $ 100,000 $ 50,000

Clearing, grubbing anddisposal

280 m3 $ 10 $ 2,800

Berm construction

Geosynthetic reinforced soil (GRS) berm

144 m3 $ 60 $ 8,640

CONSTRUCTION COSTS - ROUNDED SUBTOTAL $ 60,000

Engineering design, construction management & environmental permitting

1 percent 10% $ 7,000

ROUNDED TOTAL $ 70,000

Appendix A May 25, 2015

Harvie Heights Preliminary Debris-Flood Mitigation Design Project No.: 1286006

Page A-3

BGC ENGINEERING INC.

Harvie Heights Creek Culvert Protection at Trans-Canada Highway

Water Treatment Plant berm and Culvert

Category Item Quantity Unit Unit cost Item total cost

Preparation

Mobilization and demobilization

1 l.s. $ 100,000 $ 100,000

Clearing, grubbing and disposal

360 m2 $ 10 $ 3,600

Berm Construction

Riprap berm supply and place – Class 4

140 m3 $ 175 $ 24,500

Culvert installation

Steel pipe culvert, supply and Install (1000 mm)

120 m $ 4,000 $ 480,000

Inlet protection (pre-cast concrete box)

1 each $ 30,000 $ 30,000

CONSTRUCTION COSTS - SUBTOTAL $ 640,000

Engineering design, construction management & environmental permitting

1 percent 10% $ 64,000

ROUNDED TOTAL $ 700,000

Category Item Quantity Unit Unit cost Item total cost

Preparation Mobilization and demobilization

1 l.s. $ 100,000 $ 100,000

Berm construction

Common excavation and disposal

450 m3 $ 20 $ 9,000

Erosion protection

Riprap supply and place –Class 4

1,130 m3 $ 175 $ 197,750

Grout reinforcement 530 m3 $ 60 $ 31,800

CONSTRUCTION COSTS - ROUNDED SUBTOTAL $ 340,000

Engineering design, construction management & environmental permitting

1 percent 10% $ 34,000

ROUNDED TOTAL $ 370,000

Municipal District of Bighorn No. 8, Harvie Heights Creek May 25, 2015

Preliminary Debris-Flood and Debris-Flow Mitigation Design – FINAL Project No.: 1286006

HarvieHeights_Mitigation_Report_Final

BGC ENGINEERING INC.

APPENDIX B

MATRIX SHORT-TERM MITIGATION DESIGN DRAWINGS

A -

Bow

Val

ley

Wild

land

End T

ypic

al D

itch C

ross s

ection

Begin

Berm

/Ditch T

ransitio

n

0+00

0

0+050

0+100

0+150

0+200

0+240

0+225

0+000

0+050

0+100

0+150

0+200

Insta

ll 0.2

5 m

Sta

ndard

Curb

and G

utt

er

Use D

epre

ssed C

urb

Cro

ssin

g

at

Drive W

ays

0+00

0

0+050

0+100

0+150

0+200

0+240

0+00

0

0+050

0+100

0+150

0+200

0+240

Exis

ting C

ulv

ert

(Fill

Exis

ting c

ulv

ert

with L

ean C

oncre

te M

ix)

End B

erm

/Ditch

Tra

nsitio

n B

egin

Full

Berm

Cro

ss S

ection

Elevation (m)

Elevation (m)

Nort

hD

itch-A

pril2

014

1340

1344

1348

1352

1356

1360

1364

1368

1372

1340

1344

1348

1352

1356

1360

1364

1368

1372

0+

000

0+

100

0+

200

0+

240

Invert

of

Ditch t

o T

ie

into

Toe o

f S

lope o

f B

erm

-5.6

2%

-4.9

2%

-5.1

3%

-5.6

9%

-5.2

7%

-1.0

0%

Ditch I

nvert

1.0

m F

lat

Gra

vel S

hould

er

1.0

m

Min

. 1.0

mV

aries

± 5

%

Exis

ting G

round

Existing Edge

of Pavement

± 2

%

2

1

2

1

Key E

rosio

n M

att

ing

Into

Sid

e S

lope

Zone t

o b

e C

leare

d

5 t

o 6

m

0.5

m

± 5

%

2

1

2

1

Min

. 1.0

m

0.5

m

Min

. 0.5

m

Existing Edge

of Pavement

± 2

%

21

21

Exis

ting G

round

21

1.0

m

Varies

Insta

ll E

rosio

n

Matt

ing

Elevation (m)

Elevation (m)

1340

1344

1348

1352

1356

1360

1364

1368

1372

1340

1344

1348

1352

1356

1360

1364

1368

1372

0+

000

0+

100

0+

200

0+

225

Top o

f B

erm

-3.2

3%

-2.8

8%

-2.1

5%

-5.2

2%

-1.9

3%

-2.0

9%

Plot 1:1 = Tabloid (L) F:\18527\Drafting\Harvie Heights\2014\18527-DIV-C3D-14.dwg - SP-Ditch - Thursday, August 14, 2014 2:47:40 PM - Mija Lee

M.D

. of

Big

horn

No.

8

Dis

cla

imer:

Th

e in

form

atio

n c

on

tain

ed

he

rein

ma

y b

e c

om

pile

d f

rom

nu

me

rou

s t

hir

d p

art

y m

ate

ria

ls t

ha

t a

re s

ub

ject

to p

eri

od

ic c

ha

ng

e

with

ou

tp

rio

r n

otifica

tio

n.

Wh

ile e

ve

ry e

ffo

rt h

as b

ee

n m

ad

e b

y M

atr

ix S

olu

tio

ns I

nc.

to e

nsu

re t

he

accu

racy o

f th

e in

form

atio

n p

rese

nte

d a

t

the

tim

e o

fp

ub

lica

tio

n,

Ma

trix

So

lutio

ns I

nc.

assu

me

s n

o lia

bility f

or

an

y e

rro

rs,

om

issio

ns,

or

ina

ccu

racie

s in

th

e t

hir

d p

art

y m

ate

ria

l.

No

rth

Peri

mete

r D

itch

, an

d B

erm

Sit

e P

lan

, P

rofi

le a

nd

Cro

ss S

ecti

on

s

Harv

ie H

eig

hts

Flo

od A

ssessm

ent

M.

Lee

D.

Cooper

B.

Shis

tow

ski

18527-D

IV-C

3D

-14

July

2014

Da

te:

Te

ch

nic

al:

Dra

wn

:P

roje

ct:

Re

vie

we

r:

Fig

ure

5N

o.

DA

TE

DE

SC

RIP

TIO

NB

Y

RE

VIS

ION

PE

RM

ITS

TA

MP

UT

M83-1

1

40

20

0

Mete

rs1:2

000.0

004

20

Re

fere

nce

:E

xis

tin

g g

rou

nd

su

rfa

ce

de

rive

d f

rom

LiD

AR

ob

tain

ed

fro

m A

irb

orn

e I

ma

gin

g I

nc.

(Pro

ject

12

28

, V

inta

ge

: S

ep

t. 2

00

9)

Co

nto

urs

: 1

m M

ino

r In

terv

al

5m

Majo

r In

terv

al

Perm

it t

o P

racti

ce

No

.: P

5540

Pla

n V

iew

Horizonta

l S

cale

Vert

ical S

cale

A -

Dit

ch

Pro

file 1

:2000

1:1

000

Typ

ical

1 m

Dit

ch

Secti

on

Scale

1:1

00

Typ

ical

Berm

Secti

on

Scale

1:1

00

Tra

nsit

ion

Secti

on

fro

m D

itch

to

Berm

Scale

1:1

00

Horizonta

l S

cale

Vert

ical S

cale

A -

Berm

Pro

file 1

:2000

1:1

000

Typic

al D

itch S

ection (

Inte

rim

)

Typic

al B

erm

Section

Perc

ent

Passin

g

100

50-8

0

20-5

0

0-2

0

Dia

mete

r (m

m)

300

200

175

125

Mass (

kg)

40

10 7 3

Sto

ne S

ize

Gra

dation o

f C

lass 1

M R

ipra

p

Nom

inal

175

7

Perc

enta

ges a

re q

uote

d b

y m

ass.

Siz

es

quote

d a

re e

quiv

ale

nt

spherical dia

mete

rs,

and a

re f

or

guid

ance o

nly