Transcript of APPENDIX A COST ESTIMATE DETAILS
Municipal District of Bighorn No. 8, Harvie Heights Creek May 25, 2015
Preliminary Debris-Flood and Debris-Flow Mitigation Design – FINAL Project No.: 1286006
HarvieHeights_Mitigation_Report_Final
BGC ENGINEERING INC.
APPENDIX A
COST ESTIMATE DETAILS
Appendix A May 25, 2015
Harvie Heights Preliminary Debris-Flood Mitigation Design Project No.: 1286006
Page A-1
BGC ENGINEERING INC.
A.1 Unit rates used for cost estimates
Category Item Unit cost Unit Notes
Preparation
Mobilization and demobilization
$ 100,000 l.s.Unit cost is highly uncertain. Costs ranged from $10k to more than $1M for recent Town of Canmore work.
Clearing, grubbing and disposal
$ 10 m2
AT (2014) unit cost is $2 for clearing. Additional cost included to account for disposal.
Construction
Fill selection and placement
$ 40 m3
Based on AT (2014) unit cost for pit run gravel, ranging from $20.00 to $35.43 for supply.
Geosynthetic reinforced soil (GRS) berm
$ 60 m3
Additional $20 assumed for reinforcement cost and placement.
Modular block facing for GRS berm
$ 260 m2
Estimate provided by United Lock Block, including supply and installation.
Foundation and/or channel excavation and shaping
$ 30 m3 Based on AT (2014) unit cost for channel excavation, $26.85.
Common excavation and disposal
$ 20 m3 Based on AT (2014) unit cost for excavation, $10.23, plus disposal.
Culvert installation
Steel pipe culvert, supply and install (1000 mm)
$ 4,000 m
Based on AT (2014) unit cost list for typical culvert diameter of 900 mmplus premium added for pipe ramming.
Erosion protection
Riprap supply and place - Class 3
$ 140 m3
Based on 75th percentile of bids received by the Town of Canmore in 2013.
Riprap supply and place - Class 4
$ 175 m3
Based on 75th percentile of bids received by the Town of Canmore in 2013.
Grout reinforcement $ 60 m3
Based on concrete cost of $200 per cubic meter and ~30% void ratio around riprap.
Articulated concrete mats
$ 300 m2
Based on 75th percentile of bids received by the Town of Canmore in 2013.
Engineering
Engineering design, construction management & environmental permitting
10% %Percentage of capital costs. Assumed, high uncertainty.
Appendix A May 25, 2015
Harvie Heights Preliminary Debris-Flood Mitigation Design Project No.: 1286006
Page A-2
BGC ENGINEERING INC.
Cost estimates are considered to be “conceptual-level”, associated with an accuracy of roughly -
25% to +75%, given the design assumptions described in this report. Variations larger than this
are possible if the design concepts or risk reduction targets are significantly changed. Each
cost estimate is based on estimated quantities (e.g. volume of earthworks) and assumed unit
rates, which are based on contractor bids on related projects for the Town of Canmore and a
summary of unit rates tabulated by Alberta Transportation (AT, 2014). It is important to note
that the cost estimate is highly sensitive to riprap costs.
A.2 Harvie Heights Preliminary Debris-Flood Mitigation Design Cost Breakdown
North Harvie Heights Diversion Berms
Harvie Heights Saddle Berm
Category Item Quantity Unit Unit cost Item total cost
Preparation
Mobilization and demobilization
1 l.s. $ 100,000 $ 100,000
Clearing, grubbing and disposal
4200 m3 $ 10 $ 42,000
Berm construction
Geosynthetic reinforced soil (GRS) berm
2,640 m3 $ 60 $ 158,400
Modular block facing for GRS berm
100 m2 $ 260 $ 26,000
CONSTRUCTION COSTS - ROUNDED SUBTOTAL $ 330,000
Engineering design, construction management & environmental permitting
1 percent 10% $ 33,000
ROUNDED TOTAL $ 360,000
Category Item Quantity Unit Unit cost Item total cost
Preparation
Mobilization and demobilization
0.5 l.s. $ 100,000 $ 50,000
Clearing, grubbing anddisposal
280 m3 $ 10 $ 2,800
Berm construction
Geosynthetic reinforced soil (GRS) berm
144 m3 $ 60 $ 8,640
CONSTRUCTION COSTS - ROUNDED SUBTOTAL $ 60,000
Engineering design, construction management & environmental permitting
1 percent 10% $ 7,000
ROUNDED TOTAL $ 70,000
Appendix A May 25, 2015
Harvie Heights Preliminary Debris-Flood Mitigation Design Project No.: 1286006
Page A-3
BGC ENGINEERING INC.
Harvie Heights Creek Culvert Protection at Trans-Canada Highway
Water Treatment Plant berm and Culvert
Category Item Quantity Unit Unit cost Item total cost
Preparation
Mobilization and demobilization
1 l.s. $ 100,000 $ 100,000
Clearing, grubbing and disposal
360 m2 $ 10 $ 3,600
Berm Construction
Riprap berm supply and place – Class 4
140 m3 $ 175 $ 24,500
Culvert installation
Steel pipe culvert, supply and Install (1000 mm)
120 m $ 4,000 $ 480,000
Inlet protection (pre-cast concrete box)
1 each $ 30,000 $ 30,000
CONSTRUCTION COSTS - SUBTOTAL $ 640,000
Engineering design, construction management & environmental permitting
1 percent 10% $ 64,000
ROUNDED TOTAL $ 700,000
Category Item Quantity Unit Unit cost Item total cost
Preparation Mobilization and demobilization
1 l.s. $ 100,000 $ 100,000
Berm construction
Common excavation and disposal
450 m3 $ 20 $ 9,000
Erosion protection
Riprap supply and place –Class 4
1,130 m3 $ 175 $ 197,750
Grout reinforcement 530 m3 $ 60 $ 31,800
CONSTRUCTION COSTS - ROUNDED SUBTOTAL $ 340,000
Engineering design, construction management & environmental permitting
1 percent 10% $ 34,000
ROUNDED TOTAL $ 370,000
Municipal District of Bighorn No. 8, Harvie Heights Creek May 25, 2015
Preliminary Debris-Flood and Debris-Flow Mitigation Design – FINAL Project No.: 1286006
HarvieHeights_Mitigation_Report_Final
BGC ENGINEERING INC.
APPENDIX B
MATRIX SHORT-TERM MITIGATION DESIGN DRAWINGS
A -
Bow
Val
ley
Wild
land
End T
ypic
al D
itch C
ross s
ection
Begin
Berm
/Ditch T
ransitio
n
0+00
0
0+050
0+100
0+150
0+200
0+240
0+225
0+000
0+050
0+100
0+150
0+200
Insta
ll 0.2
5 m
Sta
ndard
Curb
and G
utt
er
Use D
epre
ssed C
urb
Cro
ssin
g
at
Drive W
ays
0+00
0
0+050
0+100
0+150
0+200
0+240
0+00
0
0+050
0+100
0+150
0+200
0+240
Exis
ting C
ulv
ert
(Fill
Exis
ting c
ulv
ert
with L
ean C
oncre
te M
ix)
End B
erm
/Ditch
Tra
nsitio
n B
egin
Full
Berm
Cro
ss S
ection
Elevation (m)
Elevation (m)
Nort
hD
itch-A
pril2
014
1340
1344
1348
1352
1356
1360
1364
1368
1372
1340
1344
1348
1352
1356
1360
1364
1368
1372
0+
000
0+
100
0+
200
0+
240
Invert
of
Ditch t
o T
ie
into
Toe o
f S
lope o
f B
erm
-5.6
2%
-4.9
2%
-5.1
3%
-5.6
9%
-5.2
7%
-1.0
0%
Ditch I
nvert
1.0
m F
lat
Gra
vel S
hould
er
1.0
m
Min
. 1.0
mV
aries
± 5
%
Exis
ting G
round
Existing Edge
of Pavement
± 2
%
2
1
2
1
Key E
rosio
n M
att
ing
Into
Sid
e S
lope
Zone t
o b
e C
leare
d
5 t
o 6
m
0.5
m
± 5
%
2
1
2
1
Min
. 1.0
m
0.5
m
Min
. 0.5
m
Existing Edge
of Pavement
± 2
%
21
21
Exis
ting G
round
21
1.0
m
Varies
Insta
ll E
rosio
n
Matt
ing
Elevation (m)
Elevation (m)
1340
1344
1348
1352
1356
1360
1364
1368
1372
1340
1344
1348
1352
1356
1360
1364
1368
1372
0+
000
0+
100
0+
200
0+
225
Top o
f B
erm
-3.2
3%
-2.8
8%
-2.1
5%
-5.2
2%
-1.9
3%
-2.0
9%
Plot 1:1 = Tabloid (L) F:\18527\Drafting\Harvie Heights\2014\18527-DIV-C3D-14.dwg - SP-Ditch - Thursday, August 14, 2014 2:47:40 PM - Mija Lee
M.D
. of
Big
horn
No.
8
Dis
cla
imer:
Th
e in
form
atio
n c
on
tain
ed
he
rein
ma
y b
e c
om
pile
d f
rom
nu
me
rou
s t
hir
d p
art
y m
ate
ria
ls t
ha
t a
re s
ub
ject
to p
eri
od
ic c
ha
ng
e
with
ou
tp
rio
r n
otifica
tio
n.
Wh
ile e
ve
ry e
ffo
rt h
as b
ee
n m
ad
e b
y M
atr
ix S
olu
tio
ns I
nc.
to e
nsu
re t
he
accu
racy o
f th
e in
form
atio
n p
rese
nte
d a
t
the
tim
e o
fp
ub
lica
tio
n,
Ma
trix
So
lutio
ns I
nc.
assu
me
s n
o lia
bility f
or
an
y e
rro
rs,
om
issio
ns,
or
ina
ccu
racie
s in
th
e t
hir
d p
art
y m
ate
ria
l.
No
rth
Peri
mete
r D
itch
, an
d B
erm
Sit
e P
lan
, P
rofi
le a
nd
Cro
ss S
ecti
on
s
Harv
ie H
eig
hts
Flo
od A
ssessm
ent
M.
Lee
D.
Cooper
B.
Shis
tow
ski
18527-D
IV-C
3D
-14
July
2014
Da
te:
Te
ch
nic
al:
Dra
wn
:P
roje
ct:
Re
vie
we
r:
Fig
ure
5N
o.
DA
TE
DE
SC
RIP
TIO
NB
Y
RE
VIS
ION
PE
RM
ITS
TA
MP
UT
M83-1
1
40
20
0
Mete
rs1:2
000.0
004
20
Re
fere
nce
:E
xis
tin
g g
rou
nd
su
rfa
ce
de
rive
d f
rom
LiD
AR
ob
tain
ed
fro
m A
irb
orn
e I
ma
gin
g I
nc.
(Pro
ject
12
28
, V
inta
ge
: S
ep
t. 2
00
9)
Co
nto
urs
: 1
m M
ino
r In
terv
al
5m
Majo
r In
terv
al
Perm
it t
o P
racti
ce
No
.: P
5540
Pla
n V
iew
Horizonta
l S
cale
Vert
ical S
cale
A -
Dit
ch
Pro
file 1
:2000
1:1
000
Typ
ical
1 m
Dit
ch
Secti
on
Scale
1:1
00
Typ
ical
Berm
Secti
on
Scale
1:1
00
Tra
nsit
ion
Secti
on
fro
m D
itch
to
Berm
Scale
1:1
00
Horizonta
l S
cale
Vert
ical S
cale
A -
Berm
Pro
file 1
:2000
1:1
000
Typic
al D
itch S
ection (
Inte
rim
)
Typic
al B
erm
Section
Perc
ent
Passin
g
100
50-8
0
20-5
0
0-2
0
Dia
mete
r (m
m)
300
200
175
125
Mass (
kg)
40
10 7 3
Sto
ne S
ize
Gra
dation o
f C
lass 1
M R
ipra
p
Nom
inal
175
7
Perc
enta
ges a
re q
uote
d b
y m
ass.
Siz
es
quote
d a
re e
quiv
ale
nt
spherical dia
mete
rs,
and a
re f
or
guid
ance o
nly