Page 1 of 22 APPENDIX 1 Annual Financial Report 1 April 2013 to 31 March 2014 1. S106 Actual Income 2011-13 1.1. The total “actual” monies received for 2013/14 was £7.874,006. This was 18% higher than the previous year. Previous years receipts were: 2012/13 - £6,572,926 2011/12 - £4,387,367 2010/11 - £3,915,597 2009/10 - £2,536,254 2008/09 - £2,312,008 2007/08 - £2,952,258 No funds were paid back to any developers in 2013/14. 1.2 Significant income was received on the following applications: 11/02432 St Marys Park (Former Badnells Pit And Jenkinsons Yard And Spoore Merry) Blackamoor Lane Maidenhead £400,000 12/00986 Castle Hill Y & C Centre, High Town Road, Maidenhead Maidenhead £172,232 07/02786 Former Symantec Building, St Cloud Way, Maidenhead Maidenhead £132,979 13/00572 55 - 57 Cookham Road Maidenhead Maidenhead £106,0701 12/01732 Ascot Corner, Wells Lane Ascot £213,921 11/00391 27-29 Albany House Market Street Maidenhead £139,679 12/01265 Abba Warehouses,Gibbs House,Kennel Ride Ascot Ascot £177,641 12/02101 Land at St Peters Road and Malvern Road Maidenhead Maidenhead £279808 11/01807 West Burnside & Burnside,Burleigh Road, Ascot £263,382 11/03425 Wichita, Villa Flora & Dormer Cottage, Shoppenhangers Rd Maidenhead £226,580 12/03419 7 And 8 And 9 Bridge Avenue Maidenhead £405,680 11/02432 St Marys Park (Former Badnells Pit And Jenkinsons Yard And Spoore Merry) Blackamoor Lane Maidenhead Maidenhead £1,385,878 12/00057 Bardfield Place, Bagshot Road Ascot £193,412 11/03293 Hurstleigh Park Coronation Road Ascot £793,811 11/02156 East Berkshire College,Boyn Hill Ave, Maidenhead 424,489 13/03276 The Ridge And The Ridge Cottage Ridgemount Road e Sunningdale £104,882 12/02101 Land at St Peters Road and Malvern Road Maidenhead £205,404 13/00839 Laggan Cottage And Laggan House Lady Margaret Road Sunningdale £113,651

Transcript of Appendix 3

Page 1 of 22

APPENDIX 1 Annual Financial Report

1 April 2013 to 31 March 2014 1. S106 Actual Income 2011-13 1.1. The total “actual” monies received for 2013/14 was £7.874,006. This was 18% higher than

the previous year. Previous years receipts were: 2012/13 - £6,572,926 2011/12 - £4,387,367

2010/11 - £3,915,597 2009/10 - £2,536,254 2008/09 - £2,312,008 2007/08 - £2,952,258

No funds were paid back to any developers in 2013/14. 1.2 Significant income was received on the following applications:

11/02432 St Marys Park (Former Badnells Pit And

Jenkinsons Yard And Spoore Merry) Blackamoor Lane

Maidenhead £400,000

12/00986 Castle Hill Y & C Centre, High Town Road, Maidenhead

Maidenhead £172,232

07/02786 Former Symantec Building, St Cloud Way, Maidenhead

Maidenhead £132,979

13/00572 55 - 57 Cookham Road Maidenhead Maidenhead £106,0701 12/01732 Ascot Corner, Wells Lane Ascot £213,921 11/00391 27-29 Albany House Market Street Maidenhead £139,679

12/01265 Abba Warehouses,Gibbs House,Kennel Ride Ascot

Ascot £177,641

12/02101 Land at St Peters Road and Malvern Road Maidenhead

Maidenhead £279808

11/01807 West Burnside & Burnside,Burleigh Road, Ascot £263,382

11/03425 Wichita, Villa Flora & Dormer Cottage, Shoppenhangers Rd

Maidenhead £226,580

12/03419 7 And 8 And 9 Bridge Avenue Maidenhead £405,680

11/02432 St Marys Park (Former Badnells Pit And Jenkinsons Yard And Spoore Merry) Blackamoor Lane Maidenhead

Maidenhead £1,385,878

12/00057 Bardfield Place, Bagshot Road Ascot £193,412

11/03293 Hurstleigh Park Coronation Road Ascot £793,811 11/02156 East Berkshire College,Boyn Hill Ave, Maidenhead 424,489 13/03276 The Ridge And The Ridge Cottage

Ridgemount Road e Sunningdale £104,882

12/02101 Land at St Peters Road and Malvern Road Maidenhead £205,404 13/00839 Laggan Cottage And Laggan House Lady

Margaret Road Sunningdale £113,651

Page 2 of 22

The table below reflects the split of the income over the service areas.

2. S106 Accounts

The following tables give the overall picture of the S106 accounts by service, ward and parish. It should be noted: The “income” figure is provided on an invoiced basis rather than cash received in

line with the council’s accounts. Controls exist so that no expenditure is made until actual money is received.

the small differences in total figures between the three tables is due to the

‘rounding up’ of the numerous individual application balances and the effect of this on sorting the balances under different headings.

Table 1 - the proposed capital spend for 2014-2015 includes bids that have been

approved up to 1 July 2014. Further project bids may be made and approved throughout the year.

Tables 2 & 3 the capital programme spend shows the amounts that were spent

from funds that were received in the particular ward/parish and does not reflect where the spend occurred.

Affordable Housing

Town Management

Open Space

Economic Dev

Highways

Biodiversity

Education

Community

Archives

Libraries

Public Art

Indoor Sport

Air Quality Allotments Thames Basin SPA

Page 3 of 22

Table 1 – S106 Accounts by Service Area

SERVICE AREA Opening Balance 01/04/2013 Invoiced Income

2013-14 Revenue Spend 2013-14 Capital Spend

2013-14 Closing Balance 31/03/2014

Proposed Capital Spend 2014-15 as at 01/07/2014

£ % £ % £ % £ % £ % £ % Affordable Housing 3,041,871 21.28% 816,878 10.43% 1,867,649 30.30% 1,991,100 12.54% 54,000 1.45%

Air Quality 20,576 0.14% 155,333 1.98% 175,909 1.11%

Allotments 3,371 0.02% 21,334 0.27% 2,680 0.04% 22,025 0.14%

Archiving 13,553 0.09% 1,961 0.03% 15,514 0.10%

Biodiversity 15,401 0.11% 7,006 0.09% 10796.63 0.18% 11,611 0.07% 5,000 0.13%

Car Parking 47,084 0.33% 47,084 0.30% Community Facilities 524,253 3.67% 298,775 3.81% 223,040 3.62% 599,988 3.78%

234,162 6.30%

Economic Development 7,094 0.05% -5,724 -0.07% 1,370 0.01%

Education 3,462,777 24.27% 2,405,707 30.64% 865,301 14.04% 5,003,183 31.52% 42,101 1.13%

Highways 3,181,113 22.25% 1,200,295 15.33% 647,163 10.50% 3,734,245 23.53% 2,378,288 64.03%

Indoor Sports 212,846 1.49% 355,726 4.54% 187,174 3.04% 381,398 2.40% 38,000 1.02%

Library Services 864,456 6.05% 275,748 3.52% 65,000 72.67% 29,000 0.47% 1,046,204 6.59% 207,000 5.57%

Open Space 1,950,047 13.64% 1,274,724 16.28% 24,441 27.33% 1,592,564 25.84% 1,607,767 10.13% * 201,686 5.43% * Public Art & Heritage 521,813 3.65% 386,290 4.93% 140,526 2.28% 767,577 4.84% 255,388 6.88%

Public Transport 39,693 0.28% 2,034 0.03% 37,659 0.24% 14,966 0.40% Special Protection Area (SPA)

132,273 0.93% 599,216 7.65% 527,520 8.56% 203,969 1.28% 198,005

5.33%

Town Centre Enhancements 126,274 0.88% 44,303 0.57% 68,780 1.12% 101,797 0.64%

85,623 2.31%

Traffic Calming 120,090 0.84% 120,090 0.76% Workplace Travel Plans 4,500 0.03% 500 0.01% 5,000 0.03%

TOTAL 14,295,339 100.00% 7,831,817 100.00% 89,441 100.00% 6,164,226 100% 15,873,490 100.00% 3,714,219 100%

Page 4 of 22

Notes: A. Open Space Of the closing balance £620,995 is funds that are to be spent on Parish land open space projects and is uncommitted

Of the closing balance £49,505 is held for the Waterways Project but as yet uncommitted to a project and £6,686 is committed in the 14-15 Capital programme

B. Highways Of the closing balance £74,782 is held for the Waterways Project but as yet uncommitted to a project and £52,824 is committed in the 14-15 Capital programme

C. Public Art & Heritage Of the closing balance £314,012 is held for the Waterways Project but as yet uncommitted to a project and £236,387 is committed in the

14-15 Capital programme

Page 5 of 22

Table 2 – S106 Accounts by Ward

WARD Opening Balance 01/04/2013 Invoiced Income

2013-14 Revenue Spend 2013-14 Capital Spend

2013-14 Closing Balance 31/03/2014

£ % £ % £ % £ % £ % Ascot & Cheapside 1,053,398 7.37% 0 0.00% 0.00% 1,001,032 16.24% 52,366 0.33% Belmont 706,324 4.94% 186,669 2.38% 0.00% 394,273 6.40% 498,720 3.14% Bisham 5,640 0.04% 0.00% 0.00% 0.00% 5,640 0.04% Boyn Hill 455,522 3.19% 520,784 6.65% 0.00% 384,305 6.23% 592,001 3.73% Bray 311,207 2.18% 38,482 0.49% 4726.1 5.28% 126,847 2.06% 218,116 1.37% Castle Without 1,020,536 7.14% 36,423 0.47% 7261.5 8.12% 254,524 4.13% 795,174 5.01% Clewer East 213,616 1.49% 63,779 0.81% 9701.9 10.85% 77,300 1.25% 190,392 1.20% Clewer West 0 0.00% 0.00% 0.00% 0.00% 0 0.00% Clewer North 419,253 2.93% 294,568 3.76% 584.43 0.65% 148,567 2.41% 564,669 3.56% Clewer South 99,694 0.70% 0.00% 0.00% 32,913 0.53% 66,781 0.42% Cookham 411,821 2.88% 51,937 0.66% 5304.5 5.93% 86,517 1.40% 371,937 2.34% Cox Green 191,489 1.34% 0.00% 4664.7 5.22% 59,492 0.97% 127,332 0.80% Datchet 3,123 0.02% 45644.74 0.58% 0.00% 3450.51 0.06% 45,317 0.29% Eton & Castle (E) 186,712 1.31% 23,541 0.30% 8961 10.02% 43,512 0.71% 157,780 0.99% Eton & Castle (w) 2,354 0.02% 0.00% 0.00% 698.81 0.01% 1,655 0.01% Eton Wick 0 0.00% 105,171 1.34% 0.00% 0.00% 105,171 0.66% Furze Platt 111,584 0.78% 629,929 8.04% 7671.5 8.58% 116,007 1.88% 617,834 3.89% Horton 22,929 0.16% 5,062 0.06% 0.00% 1,533 0.02% 26,458 0.17% Hurley & Walthams (H) 11,136 0.08% 99,428 1.27% 0.00% 9,248 0.15% 101,316 0.64% Hurley & Walthams (S) 26,137 0.18% 0.00% 0.00% 4,099 0.07% 22,038 0.14% Hurley & Walthams (WSL) 388,453 2.72% 7,946 0.10% 1171.9 1.31% 17,810 0.29% 377,417 2.38% Hurley & Walthams (WW) 105,996 0.74% 7,329 0.09% 0.00% 42,904 0.70% 70,420 0.44% Maidenhead Riverside 1,078,034 7.54% 1,743,243 22.26% 5130 5.74% 25,131 0.41% 2,791,016 17.58% Old Windsor 111,994 0.78% 28,413 0.36% 0.00% 46,429 0.75% 93,977 0.59% Oldfield 2,612,084 18.27% 942,209 12.03% 1155.9 1.29% 795,032 12.90% 2,758,105 17.38% Park 445,890 3.12% 29,231 0.37% 0.00% 107,060 1.74% 368,061 2.32% Pinkneys Green 101,948 0.71% -5,214 -0.07% 6,409 7.17% 41,077 0.67% 49,248 0.31% Sunningdale 1,816,670 12.71% 694,698 8.87% 0.00% 1,191,850 19.33% 1,319,518 8.31% Sunninghill & South Ascot 2,333,737 16.33% 2,267,427 28.95% 26,022 29.09% 1,142,881 18.54% 3,432,261 21.62% Wraysbury 63,177 0.49% 0 -0.08% 675.86 0.76% 9,732 0.16% 52,770 0.33% To be reconciled 13/14 -21,373 -0.15% 21,373 0.27% 0.00% 0.00% 0 0.00% TOTAL 14,295,339 100.00% 7,831,817 100.00% 89,441 100.00% 6,164,226 100.00% 15,873,489 100.00%

Page 6 of 22

Table 3(a) – S106 accounts by Parish

PARISH Opening Balance 01/04/2013 Invoiced Income

2013-14 Revenue Spend 2013-14 Capital Spend

2013-14 Closing Balance 31/03/2014

£ % £ % £ % £ % £ %

Bisham 5,640 0.04% 0 0 0 5,640 0.04%

Bray 311,207 2.18% 38,482 0.49% 4726 5.28% 126,847 2.06% 218,116 1.37%

Cookham 411,821 2.88% 51,937 0.66% 5304 5.93% 86,517 1.40% 371,937 2.34%

Cox Green 191,489 1.34% 0 4664 5.22% 59,492 0.97% 127,332 0.80%

Datchet 3,123 0.02% 45,644 0.58% 0 0.00% 3450.51 0.06% 45,317 0.29%

Eton Town Council 186,713 1.31% 128,711 1.64% 8961 10.02% 43,512 0.71% 262,951 1.66%

Horton 22,929 0.16% 5,062 0.06% 0 1,533 0.02% 26,458 0.17%

Hurley 0 0.00% 99,428 1.27% 0 9,248 0.15% 90,180 0.57%

Maidenhead* 5,076,633 35.51% 4,017,620 51.30% 20,367 22.77% 1,755,825 28.48% 7,318,061 46.10%

Old Windsor 111,994 0.78% 28,413 0.36% 0 46,429 0.75% 93,977 0.59%

Shottesbrooke 26,137 0.18% 0 0 4,099 0.07% 22,038 0.14%

Sunningdale 1,816,670 12.71% 694,698 8.87% 0 1,191,850 19.33% 1,319,518 8.31%

Sunninghill & Ascot 3,387,134 23.69% 2,267,427 28.95% 26,022 29.09% 2,143,913 34.78% 3,484,626 21.95%

Waltham St Lawrence 388,453 2.72% 7,946 0.10% 1171.9 1.31% 17,810 0.29% 377,417 2.38%

White Waltham 105,996 0.74% 7,329 0.09% 0 42,904 0.70% 70,420 0.44%

Windsor* 2,201,342 15.40% 424,001 5.41% 17548 19.62% 621,063 10.08% 1,986,732 12.52%

Wraysbury 63,177 0.49% 0 -0.08% 675 0.76% 9,732 0.16% 52,770 0.33%

Unallocated** -21,373 -0.15% 21,373 0.27% 0 0 0

TOTAL 14,295,339 100.00% 7,831,817 100% 89,441 100.00% 6,164,226 100.00% 15,873,490 100.00% * Not in a parish area but included for comparison purposes ** Expenditure to be reconciled

Page 7 of 22

Table 3(b) S106 Developer Contributions – Closing balances 31 March 2014 The tables below show the funds collected as a result of development by Parish and service area. It should be noted that these funds may not be spent directly within that Parish but will be used to provide services for the benefit of that parishes’ residents Bisham Bray Cookham Cox Green Datchet Eton Horton Hurley Air Quality 0 0 0 0 0 0 0 0

Affordable Housing 0 0 0 0 0 0 0 0

Allotments 0 127 122 0 124 846 26 61

Archiving 0 23 23 0 47 225 0 23

Biodiversity 0 81 93 0 79 0 0 0

Car Parking 0 0 0 0 0 0 0 0

Community Facilities 0 1,245 1,221 0 1,228 7,781 0 5,803

Economic Development 0 0 1,369 0 0 0 0

Education 0 15,826 19,578 0 12,555 94,533 56,051

Highways 0 7,825 12,208 0 9,243 5,640 3,002 0

Indoor Sports 0 2,838 3,410 0 3,467 2,073 557 0

Library Services 0 1,345 1,293 0 1,180 5,585 60 224

Open Space 0 7,246 10,016 0 15,403.60 9,024 1,618 37,267

Public Art & Heritage 0 1,927 2,606 0 2,318 3,004

Public Transport 0 0 0 0

Special Prot Area (SPA) 0 0 0 0

Town Centre Enhancement 0 0 0 0

Traffic Calming 0 0 0 0

Workforce Travel Plan 0 0 0 0

Total 0 38,483 51,939 0 45,644.6 1,28,711 5,038 99,429

Page 8 of 22

Maidenhead Old Windsor

Shottesbrooke Sunningdale Sunninghill & Ascot

Waltham St Lawrence

White Waltham

Windsor Wraysbury

Air Quality 155,332 0 0 0 0 0 0 0 0

Affordable Housing 96,825 0 0 113,232 606,821 0 0 0 0

Allotments 14,459 0 0 912 3,575 63 0 1,163 0

Archiving 328 0 0 107 1,103 23 0 60 0

Biodiversity 4,777 61 0 464 1,154 40 0 232 0

Car Parking 0 0 0 0 0 0 0 0

Community Facilities 222,877 0 0 8603 37,781 590 0 11,648 0

Economic Development -4714 0 0 0 0 -588 1,5910 0

Education 1,343,480 0 0 129,789 541,031 406 0 192,337 0

Highways 769,196 23,892 0 147,453 158,264 4,720 12,045 46,827 0

Indoor Sports 240,566 778 0 21,923 56708 1,511 0 21,895 0

Library Services 214,876 0 0 9,583 28,417 603 0 12,583 0

Open Space 653,055 3681 0 114,820 318,729 -1,194 -4,127 109,185 0

Public Art & Heritage 296,358 0 11,783 50675 1,184 0 16,435 0

Public Transport 0 0 0 0 0 0 0 0

Special Prot Area (SPA) 0 0 136,049 463,167 0 0 0 0

Town Centre Enhancement 9,704 0 0 0 0 0 13,227 0

Traffic Calming 0 0 0 0 0 0 0 0

Workforce Travel Plan 500 0 0 0 0 0 0 0

Total 4,017,619 28,412 0 694,718 2,267,425 7,946 7,330 424,001 0 0

Page 9 of 22

3. Debt Recovery Good progress has been made in reducing the level of debt on S106 agreements. Part payments have been made on all debts and payment plans put in place to clear historical debts

S106 Recovery cases 2012-2014*

*Invoices that remain unpaid for more than 3 months are deemed “recovery” cases.

4. Forecast There were 131 new S106 Agreements with financial contributions completed in 2013-

2014, compared with 136 in 2012-2013. The prediction of projected income from S106 agreements with any certainty is difficult.

This is due to not knowing if, or when, a development may commence and the recognition that permissions exist on the same site for alternative schemes. There were 195 agreements on extant permissions as at 9 June 2014, with a total possible income of £17.5m.

Due to the changes in the CIL Regulations regarding pooling of S106 agreements we will

be unable to use S106 agreements after 6 April 2015 for generic contributions. Only site specific measures and Affordable Housing will be negotiated.

5. 2013/14 Spend and Forecast 2014/2015 Proposed Spend

5.1 A total of over £6 million of S106 funds was spent on Capital Projects making a difference

to our Borough. These projects include: A4 Mhd Bridge-Ray Pk Av Gateway Feature 2013/2014 19,094.50 Budget Only NDS Devolved Capital 260,433.40

Page 10 of 22

Charters L.C.-Recovering AWP (2013/14) 128,323.00 Charters R.C.-Changing Facilities (2012/13) 340,000.00 Clewer Green Expansion 30,061.84 Cycle Network 7,701.15 Cycle Network 2013/2014 134,358.69 Extension Foundation Area Holyport Primary PCP 3,400.67 Feasibility-sheltered hous.& supported accomm. 31,375.00 Improvement of ICT Provision at Youth Centres 4,801.40 Lady Elizabeth House Refurbishment 54,337.60 Leisure Facilities – Build 2,597.25 Libraries-PC Booking Software (2012/13) 2,000.00 Lowbrook Classroom Expansion 82,909.78 Magnet L.C.-Dance Studio Mezzanine Floor (2013/14) 65,078.51 Magnet L.C.-New Sauna, Steam Room etc. (2013/14) 25,000.00 Maidenhead Environmental Improvements 105,000.00 Maidenhead Heritage Centre-Improvements (2012/13) 3,000.00 Maidenhead Waterways 313,414.70 New Boyn Grove Library (2013/14) 1,000.00 New Dedworth Library (2012/13) 11,000.00 Norden Farm-Refurbishment (2012/13) 19,943.77 P&OS – Purchase of Floral Arch and Crowns 20,000.00 P&OS-Allens Field Improvements (2012/13) 46,434.20 P&OS-Biodiversity Projects (2013/14) 6,427.76 P&OS-Braywick Park-Recovering AWP (2013/14) 131,998.00 P&OS-Braywick Pavilion and Park (2012/13) 51,745.13 P&OS-Dedwth Manor Footbll Pitch/Ply Area (2012/13) 51,019.95 P&OS-Desborough Park Skate Park (2013/14) 37,514.69 P&OS-Firtree Walk Landscape Improvements (2013/14) 120,119.18 P&OS-Green Ways Imps. Cookham-Bray (2012/13) 1,433.76 P&OS-Home Park Improvements Ph.IV (2012/13) 46,864.07 P&OS-Kidwells Pk Floodlighting & Improvmts (12/13) 76,215.59 P&OS-Moffy Hill Play Area (2013/14) 29,999.00 P&OS-Parks Improvements (2012/13) 27,004.44 P&OS-Parks Improvements (2013/14) 154,539.33 P&OS-Town Moor, Maidenhead (2012/13) 28,352.87 P&OS-Victory Fields Skateboard Extension (2013/14) 15,000.00 Purchase of Land Allens Field 323,000.00 Replacement Street Lighting 80,000.00 Rights of Way Major Projects 2013/2014 16,204.49 S106 Academies and other LEA’s 143,176.80 S106 Payments – SAMM 36,904.59 S106 Payments – SANG 278,575.89 S106 Payments to Parish Councils 214,511.00 South Ascot Village School – Additional Class 153,319.24 St Edmund Campion Expansion PCP 50,997.68 Stafferton Way Extension (LTP/PROM) 2013/2014 50,000.00 Traffic Management Schemes 2,742.42 Traffic Management Schemes 2013/2014 39,542.17

Page 11 of 22

Traffic Signal Review (incl UTC) 2013/2014 42,985.00 TVAC-Atheletics Track Replacement (2013/14) 16,500.00 Windsor & Eton Accessibility Imps-2013/2014 3,000.00 Windsor Christmas Lights 38,506.75 Windsor Girls 14-19 Upgrade 141,001.24 Windsor High St & Park St Paving Enhancements 8,000.00 Windsor L.C.-Bodyzone Gym Extension (2012/13) 60,500.00 Windsor Library-Improvements (2012/13) 15,000.00 Windsor Museum (2012/13) 17,000.00 Windsor Public Arts (2012/13) 4,939.92 Windsor Wayfinding System 20,850.00 Youth Centre & Equipment Modernisation Programme 23,589.85 Youth Service – Centre Improvements 49,528.50 Youth Services Modernisation Programme 2013-14 8,077.07 Housing Projects 1,836,274.09 TOTAL 6,164,225.93

5.2 Service Area Reports

5.2.1 Air Quality

During 2014-2015 it is intended to use part of the air quality balance of funds on the purchase and maintenance of a new AQ (NO2 PM10) monitoring station at Frascati Way subject to be approval by Corporate Management Team. This project can be achieved by releasing circa £50,000 from the section 106 monies received from the development in St Mary's Park, Blackamoor Lane, Maidenhead. The scope for this project is defined within the terms of the developer’s contribution; to use the funds for the purchase of an air quality monitoring station in Maidenhead and for the ongoing maintenance and data verification. In February 2014 Cabinet approved a recommendation to declare two new Air Quality Management Areas (AQMAs). Within this recommendation was a mandate to undertake PM10 monitoring in Maidenhead. The aim of this monitoring is to verify that the PM10 national air quality objectives are not being exceeded within the Borough

5.2.2 Affordable Housing

£1,836,000 of S106 fund was made available under a contract with Housing Solutions Limited to provide affordable homes through a Do It Yourself Shared Ownership scheme. The scheme, which is available throughout the Borough, allows qualifying applicants who cannot afford to buy on the open market to select a suitable property on the open market. Housing Solutions Limited purchase the property and then sell the applicant the proportion that they can afford, charging them rent on the remaining equity. Applicants can “staircase” up to a higher level of ownership when they are able to afford to do so.

Page 12 of 22

A new resident receiving their key

Discussions are underway with regard to future housing projects supported by S106 receipts. Negotiations are conducted bearing in mind the need to secure value for money and particularly to balance risks for all parties in the current housing market. This includes the end user in the case of home ownership solutions where there are challenges around high housing prices and additional constraints on mortgage availability

5.2.3 Car Parking

The funds held for car parking are restricted by the legal agreement for use on the Meadow Lane Car Park in Windsor. Negotiations have been ongoing to bring this project to fruition and the aim is for this to be utilised in the current financial year (2014-2015).

5.2.4 Community Facilities

The main areas of expenditure were: • Facilities at Marlow Road, Pinkneys Green, Windsor and Eton Wick Youth Centres. • Kidwells Park and Desborough Park Skate Parks • Play areas at Grenfell Park, Moffy Hill and Shifford Crescent • Facilities at Lady Elizabeth House • Youth Centre ICT provision • Counselling facilities at Youth Talk • Devolution to the Parishes Projects currently allocated in the current Capital Programme • Furze Platt Leisure Facility £140k • Charters Youth Centre £15k • Manor Community Centre £75k • Hurley Canoe Centre £74k • Marlow Road, Pinkneys Green, Windsor and Eton Wick Community Centres £87k

5.2.5 Education

Education – In total, £3.416m of S106 monies has been spent on school buildings since the borough started collecting S106 monies. Recent projects include:

• Furze Platt Senior - new maths block £105k • Newlands Girls’ - new swimming facilities £147k • South Ascot Village Primary - ‘bulge’ classroom £159k • St Edward’s Royal Free Middle - Expansion £152k

£5.181m is shown as unspent against the Education S106 funds. This money can be divided into the categories below.

Page 13 of 22

1. Unspent money that has been assigned to projects that are underway/recently completed:

This totals £2.159m (42% of the total unspent amount). This S106 funding has been allocated to specific projects that have been approved and are now due to start, underway or recently completed but awaiting closing of the accounts.

The projects being funded (or parted funded) by the £2.159m include:

• All Saints CE Junior - permanent expansion £207k • Datchet St Mary’s Primary - ‘bulge’ classroom £17k • Dedworth Green and Homer - ‘bulge’ classrooms £92k • Furze Platt Junior - new classroom and library £245k • Lowbrook Primary - ‘bulge’ classroom £29k • Oldfield Primary - relocation and expansion £748k • Riverside Primary - expansion £306k • The Queen Anne RF Controlled First - classroom enlargement £115k • Trevelyan Middle - classroom enlargement £82k • Windsor Girls’ - New sports hall £330k

Total £2.159m

2. Unspent money that is being saved towards specific projects

This totals £0.183m (4% of the total). School building projects are generally quite costly and the sums received through S106 are often not enough to fund projects by themselves. In a number of cases, therefore, schools/the borough are pooling different funding streams, and/or saving up S106 contributions over a period of years.

The projects in this category include:

• St Michael’s Primary - new admin accommodation £56k • St Mary’s Primary - new classrooms £109k • Various - Various £18k

Total £0.183m

3. Unspent money being put aside to cope with the secondary sector expansion programme

This totals £1.903m (37% of the total). Demand for secondary age education in the borough is expected to rise significantly in the second half of the decade, and the Royal Borough will be consulting, in Autumn 2014, on specific proposals to meet the first part of this demand.

S106 funds for secondary sector provision are being set aside so that they can be used to fund schemes agreed following that consultation. The £1.903m sum is available to fund (or part-fund) projects at specific schools (or at a new school serving the same area) as follows: • Altwood £125k • Charters £749k • Cox Green £11k • Dedworth Middle £69k • Desborough College £1k

Page 14 of 22

• Furze Platt Senior £40k • Newlands Girls’ £572k • St Peter’s £9k • The Windsor Boy’s £286k • Trevelyan £31k • Windsor Girls’ £11k

Total £1.903m 4. Unspent money in subarea pots, available to spend on new primary school projects

This totals £0.561m (11% of the total). S106 funds for primary age education are now collected into ‘subarea pots’ rather than allocated to individual schools. Each pot contains the S106 monies collected from a distinct geographical area such as Ascot, Bisham and the Cookhams, and Datchet & Wraysbury, to spend on primary schools. The remaining £0.561m is unspent, and is available for spending as follows: • Ascot pot £227k • Bisham & the Cookhams pot £71k • East Windsor, Old Windsor & Park pot £139k • Eton pot £56k • Maidenhead Villages pot £67k

Total £0.561m

Just over 31% of these monies have been collected since the start of 2014. There are eligible schemes for these monies and decisions will now need to be taken about which projects to fund.

Note: £2.43m has been collected into the subarea pots in total and 77% is either already spent or assigned to projects referred to elsewhere in this summary. The remaining £0.561m represents, therefore, 23% of the total collected in the subarea pots.

5. Other unspent monies

This totals £0.375m (7% of the total). It is made up of:

• small pots of monies at three schools (Eton Porny First, Courthouse Junior, St Francis Catholic School) where no projects are currently planned, totalling £47k;

• £328k for new SEN Provision. It is likely that this sum will fund SEN related elements of the secondary school expansion programme.

5.2.6 Highways, Public Transport and Traffic Calming

Developer contributions are extensively utilised within Highways & Transport to deliver infrastructure projects in the following areas: • Cycle Improvements • Public Rights of Way • Road Safety • Street lighting • Public Transport Improvements • Highway accessibility Improvements (for example: installation of dropped crossing,

disabled access ramps) • Town centre enhancements

Page 15 of 22

• Traffic management

Projects delivered in 2013/14 include:

• Altwood Road – New Cycleway • Monkey Island Lane – New Cycleway • Norreys Drive – New Cycleway • A30 Sunningdale – Highway Improvements • Cannon Lane / Altwood Road – New Roundabout • Stafferton Link Road • Borough wide footway accessibility improvements • Safe Route to Schools – Footway Surface upgrades • Forest Green Road - Local Safety Schemes

Projects programmed for delivery in 2014/15 include:

• Traffic Signal Review • School Cycle / Scooter Parking • Highway Drainage • Intelligent Transport Systems • Local Safety Scheme • Peascod Street / Charles Street Environmental Improvements • Public Transport Improvements • Cycling Capital Programme • Reducing Congestion & Imp. Air Quality • Bridge Parapet Improvement Works • Moorbridge Road Gateway • Thames Path • Stafferton Way Link Road • Cycling Capital Programme • Public Rights of Way Bridge Maintenance • Rights of Way Major Projects • Intelligent Traffic Systems • School Cycle / Scooter Parking

Additionally, officer resources have been allocated to identify future schemes which may be funded from currently unallocated funds. This officer process will support the process agreed with the Lead Member for Highways & Transport, whereby extensive engagement with Ward Members and parishes will commence to identify local highway and transport priority projects which may be funded from this source.

5.2.7 Indoor Sport

Page 16 of 22

Improvements were undertaken at the Magnet Leisure centre to increase the facilities at the Bodyzone including the Health spa and changing rooms

5.2.8 Library

Funding for the purchase of additional library stock was covered from S106 receipts

in 2013/14 & will be covered in 2014/15. Provision of refurbishments to introduce self-service technology for some

community libraries will be covered from S106 receipts in 2014/15. S106 part-funded the new Boyn Grove Library which opened in April 2014

increasing capacity for the service to local residents.

Page 17 of 22

Other projects for 2014/15 include: Ascot Library £47K Ascot Durning Library is located within the Ascot Racecourse complex and is co-located with Ascot Community Room. £10K S106 funding has been allocated to make improvements to the Community Room. A further £37K has been allocated to re-orientate the existing customer counter within the Library and to replace outdated self-service technology. Introduction of modern self-service kiosks offer scope to extend self service delivery for residents. The new style self-service kiosks will offer capacity for residents to complete self service payments for a range of defined Council services in addition to those related to Library business and include CHIP and PIN functionality. Ascot Community Room, which is used on race days as a staff canteen, has scope, with some modifications and improvements, as a Library managed income generating space. The refurbished space, with improved flooring and updated modern decor will have potential to attract increased interest as an income generating space both in terms of leisure and learning pursuits. Cox Green Library £32K Cox Green Library is co-located with the Community Hall and Leisure Centre on the site of Cox Green Academy. It is a dual use Library serving both residents and students of Cox Green Academy. Introduction of self-service presents opportunity to develop service delivery for both customer groups. The refurbished space, including a customer POD will create an attractive ambience and a flexible library space more in keeping with the requirements of residents in the 21st century. A customer POD is a help point at which customers and staff can access a computer together, it takes less room than a traditional counter and enables staff to interact better with the customers. Maidenhead Library £68K Maidenhead Library, a Grade II listed iconic building, is undergoing S106-funded improvements to teenage, ICT and information services including new first floor shelving systems to increase capacity and create a modern and fit-for-purpose library service within the main town library.

Page 18 of 22

Sunninghill Library £31K Sunninghill is a small community library centrally located in the heart of Sunninghill village. A capital investment of £7K has been approved to undertake electrical rewiring and fire alarm-related health and safety requirements. A further £31K of S106 funds has been invested to allow the opportunity to develop service delivery for residents by introduction of self service at the same time as the rewiring takes place. The refurbished space will include a customer POD and modern shelving units to maximise effective stock display thereby increasing capacity and will create an attractive ambience and a flexible library space. Windsor Library £12K Windsor Library has benefited from £15K S106 in 2013/14 and a further £12K S106 has been invested to complete the project of increasing capacity through implementing a new layout, modern furniture and design, and improved access to income-generating material. This should result in better use of staff resource, improvements to the first floor information service and improvements to the teenage offer.

5.2.9 Public Open Space

A number of major projects have been completed this year which have been accomplished with the help of S106 developer contributions. These include:

Major extension to Charters Leisure centre with new gym , reception , bar, changing rooms and viewing gallery as well as upgraded all weather pitch playing surface

New all weather playing surface at Braywick park

Improved landscaping along Firs walk ,Maidenhead , Ray Mill Island and Allens

Field in South Ascot

Extension to skate park in Kidwells and new skate park in Desborough Parks – Maidenhead

Page 19 of 22

Improved play areas in Windsor – Dedorth Manor ,Bruce walk, Batchelors acre.

Contribution toward the purchase of open space land in Ascot adjacent to Allen’s Field.

The photos below show some of these projects:

Dedworth skate park

Kidwells skate park

Spherical bollards and obelisk features included in the Firs Walk landscape and access improvements

Charters Astro pitch

Page 20 of 22

Charters Bar

Charters Reception

Charters Studio

Charters Bodyzone

Expenditure in 2014-2015 The major project to be undertaken in 2014-2015 is the provision of improved facilities at Furze Platt to include all weather pitches and indoor facilities. Other projects include: Osgood Park play area Keeler close play area Town Moor Car park Grenfell Park café WW1 commemoration areas in Kidwells Park and Bachelors Acre Entrances at Home Park Magnet play area

5.2.10 Public Art & Heritage

Guildhall and Museum £17K The Guildhall has benefitted from the restoration of the historic chairs and tables and the installation of blinds to create improved ultra violet light control on the stairs. This will help improve the visitor offer & protect the portraits hanging in the stairwell as well as increase the opportunity for income generation through events, meetings and wedding bookings. Norden Farm Centre for Arts £19K Norden Farm has benefitted from a series of improvements to provide increased capacity and with better seating, reception furniture and improved customer facilities. This should result in better use of staff resource, improvements to the café area and income generation.

Page 21 of 22

Maidenhead Heritage Centre £3K Maidenhead Heritage Centre has upgraded its display provision to provide enhanced visitor experience and opportunity for residents and visitors to learn about the history of the local area. Funds from Public Art and Heritage have also supported and are committed to the Waterways project. Future projects include some contributions to the Magna Carta 800th anniversary celebrations in June 2015, matched funding for World War One projects and the ‘Harmony’ Bandstand project for Alexandra Gardens. There are plans for a significant fountain on the roundabout at Ascot which may be a War and Horse WWI memorial - £60K. There are planned upgrades for exhibitions for the museum to included revamped displays and exhibition cases for the Guildhall space and for travelling exhibitions. Projects are underway associated with interpretation for Heritage Trails across the Borough.

5.2.11 SANG (Suitable Alternative Natural Green Space)

The Allens Field SANG has established itself during 2013-2014 and the use has increased which ensures the protection of the Thames Heath Basin SPA. During the year an adjacent piece of land became available for sale and responding to local resident’s wishes the Borough successfully bid for the land. In due course this land will be adopted as additional SANG capacity.

5.2.12 Town Centre Enhancements Windsor: S106 contributions were used in Windsor to fund a new wayfaring signpost project and Christmas Lights.

Page 22 of 22

The two projects continue into 2014-2015 with phase 2 of the wayfaring projects and additional Christmas lighting. Maidenhead Maidenhead Waterways is an exciting and critical scheme for the Town Centre regeneration and funds were used to support this waterways restoration project to detail design and go out to tender to a select list of specialist contractors with a programmed construction start in the Autumn of 2014.