Africa: Rwanda National (quasi metropolitan) urban structure

18
RWANDA URBAN STRUCTURE 140319 Pedro B. Or/z NATIONAL CONTEXT FOR AN URBAN SYSTEM 130 km Kibuye Kayonza

Transcript of Africa: Rwanda National (quasi metropolitan) urban structure

RWANDA URBAN STRUCTURE    

140319  Pedro  B.  Or/z  

NATIONAL CONTEXT FOR AN URBAN SYSTEM

130 km

Kibuye Kayonza

Infrastructure    Rwanda  Annual  Infrastructure  (290)  and  Energy  (192)  Budget:  500  m  USD    Backbone  Highway:  150  km,  2  m  USD/Km        =    300  m  USD  Base  economy  main  roads:  500  km,  1  m  USD/km      =    500  m  USD  Peripheral  Transversal  roads:  350  km,  .8  m  USD/Km  =    300  m  USD  

                   1.100  m  USD  Train:  Kigali  to  Tanzania:  100  km,  8  m  USD/Km      =    800  m  USD  Kigali  to  Kibuye:  100  km,  8  m  USD/Km        =    800  m  USD      14  ciFes    How  much?  (Poli/cal  decision)  each  one      =    100  m  USD  

                   1.400  m  USD    Total                    3.300  m  USD  Time  span  10  years                      330  m  USD/year  Loan  for  3.300  m  USD                   200 m USD/year            8%  of  Na/onal  Budget  

Housing              Rwanda  Housing  Authority  Annual  Budget:  23  m  USD  Max.  unit  cost  (10.000  building  +  5.000  urban  services)  =    15.000  USD    2  m  new  urban  dwellers,  (30%  urbaniza/on)  500.000  dwellings,  10/15.000  USD/u.        =      5.000/7.500  m  USD  If  4  m  new  urban  dwellers,  (45%  urbaniza/on)          +  5.000/7.500  m  USD  Total  Investment  needs:            =  10.000  m  USD    Annual  needs  70.000:  (15.000/u.)        =      1.000  m  USD  Annual  public  needs  35.000  (60%)        =          600 m USD 24%  of  Na/onal  Budget  

Food for thought: Range of Figures

Kigali Annual Housing needs 35.000 housing units 70 units/Hectare 500 Hectares 2.5 km2 / Annual

Local  prioriFes:    (Musance,  Gitarama)    

-­‐  Roads  (Neighbor  Centr)        22%  ?  -­‐  Electricity    (NC)                22%  ?  -­‐  Water  supply  (NC)              22%  ?  -­‐  Social  faciliFes:                  16  %  ?  

-­‐  Market  -­‐  Workshops  -­‐  Stadium  

-­‐  Special  Projects                20  %  ?    -­‐  Urban  expansion    -­‐  Industrial  area    -­‐  Job  training              .      .                        100  %  

Muhanga 1)  Bypass 2)  Street network: Feeding streets 3)  Neighborhood centralities: Services Provision 4)  Social facilities: Economic Capital. Social Capital 5)  Residential expansion areas 6)  Economic development: Industrial area and skills.

 

1

2

3

4

5

6

Thank You

130 km

Kibuye

Kayonza

www.PedroBOrFz.com