Tugas Gorong2 Pak Ismail

download Tugas Gorong2 Pak Ismail

of 16

Transcript of Tugas Gorong2 Pak Ismail

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    1/16

    Soal ILHAM TRI

    DIO DIKA A

    8m

    Diket :

    V1 = V2 = 0.7m/det K = 60

    a = 1.25 l/det/a V! = 1.5

    L"a# a$ea %$%!a#% = 700Ha I = 0.0003

    0.002&

    Hitung :

    1. 'lea#% d*+#t$eam !$+!,!$+!

    2. Ke%la+!a+ '+e$!%

    3. 'lea#% -#t$eam !$+!,!$+!

    &. Re+a+a teal !$+!,!$+! %la ea+ e+da$aa+ 15 T+

    Penyelesaian :

    1. Elevasi downstream gorong-gorong

    De%t = a . L"a# a$ea %$%!a#% = 875 L/det = 0.875

    = A . V

    0875 m3/det = A . 07 m3/det

    A = 0875 m3/det = 1.25

    07 m/det

    = 0.875 m = 1 V = 0.7

    / = 2 K = 60

    A = ( m. ).

    = ( 2 ). = 2 282

    2.34 = &82 = &.30

    R = A/ = 062

    ,,,,,, I = 0.0003

    07 =

    = 0.84 ,,, 0.4 m

    = 2. = 1.78 ,, 178 m

    %la+!a+ $"de = = 0.5 OK

    A = .H =

    m2

    L"a# e+ama+! a#a 9a+! d%daat = 1.25 m2

    m3/det ,,,,,

    = 2.(m2 1)1/2

    = 32 =

    32

    /&82 =

    V = K . R2/3. I1/2

    60 . (062)2/3. (00003)1/2

    10.1810.

    V2V1 V!

    1018H = 04 m

    = 18 m

    10.20

    :H=

    = 18 m

    ; = 030 m

    =05

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    2/16

    = 2H =

    (1 22) . 04 . 1/2

    = 2.88

    ,, e$at Ke+da$aa+ = 15000 !/m

    , L"a# e$#e!% a+@a+! = (1 . 18 ) m2

    = 1.8

    , e$at #e+d%$% et+ = (18 288) m2 . 2&00

    = 11232

    Va2. L

    (K . R1/6)2. R

    152. 8

    (60 . 0&51/6)2. 0&5

    = 1 . (15 , 07)2/ 2.! =

    = 18 m

    ; = 030 m

    :H ttal

    15 T+75 T+75 T+

    1 m'TO K225I II

    III

    H = 040

    T = H ; H et+ =22 m

    H = 1 m

    H et+ = 1 m

    = 18 m

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    3/16

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    4/16

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    5/16

    . (3113030018)

    . (3113030123)

    m/det

    m

    B

    0.727101 60

    0.017321 0.7

    (!$+!2)

    1.54 m2

    m3/det

    .18H

    H = 04 m

    =1

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    6/16

    3.57 m

    11.08 m

    1.54 m2

    3.57 m

    0.&5 m

    ) ? . 2

    m2

    !/m3

    K!/m

    H = 04 m

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    7/16

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    8/16

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    9/16

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    10/16

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    11/16

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    12/16

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    13/16

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    14/16

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    15/16

  • 7/24/2019 Tugas Gorong2 Pak Ismail

    16/16