NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 I KANTOR PELAYANAN PERIZINAN TERPADU 400,000,000 399,190,000 1 Jasa Konsultansi Penyusunan SIMYANDU APBD 400,000,000 Fedrik Hendrik, S.Sos Konsultan I KOTA DOBO 07/04/2016 - 900/23/IV/2016 PT. MITRA PRIMA UTAMA 399,190,000 PT. Mitra Prima Utama II DINAS PERIKANAN 5,059,862,600 4,712,586,900 1 Pengadaan Peralatan Pengolahan Terasi Udang DAU 499,950,000 Hanny M. Lawata, S.Pi Barang KAB.KEP. ARU 11/04/2016 - 05/PPKDLP21.06/IV/2 016 CV. Petra Gemilang 484,330,000 CV. Petra Gemilang CV. BARUNA JAYA BHAKTI 2 Pengadaan Alat Penangkapan Ikan Gill Net Multifilament Ukuran 4 inch DAU 229,774,600 Hanny M. Lawata, S.Pi Barang KAB.KEP. ARU 11/04/2016 - 05/2106/IV/2016 CV. Petra Gemilang 218,339,000 CV. Petra Gemilang 3 Belanja Jasa Konsultan Perencanaan Kajian Rencana Pengelolaan Perikanan Tangkap Berbasis Pendekatan Ekosistem (PL) DAU 250,000,000 Hanny M. Lawata, S.Pi Konsultan I KAB.KEP. ARU 27/05/2016 - 25/21.06/2016 4 Pengadaan Sarana Perikanan Tangkap Kapal Ikan Ukuran 3 GT (Kayu) Dengan Alat Tangkap Trammel Net DAU 630,000,000 Hanny M. Lawata, S.Pi Konstruksi I KAB.KEP. ARU 27/05/2016 - 25/21.06/2016 CV. Multi Karunia 627,810,000 CV. Multi Karunia 5 Pengadaan Sarana Perikanan Tangkap Kapal Ikan Ukuran 4 GT (Kayu) Dengan Alat Tangkap Gill Net (DAK) DAK 631,125,000 Hanny M. Lawata, S.Pi Konstruksi I KAB.KEP. ARU 27/05/2016 - 25/21.06/2016 CV. Multi Karunia 629,057,000 CV. Multi Karunia 6 Pengadaan Sarana Perikanan Tangkap Kapal Ikan Ukuran 4 GT (Kayu) Dengan Alat Tangkap Gill Net (DAU) DAU 631,125,000 Hanny M. Lawata, S.Pi Konstruksi I KAB.KEP. ARU 27/05/2016 - 25/21.06/2016 Mitra Permai Mandiri 602,608,000 Mitra Permai Mandiri Multi Karunia 7 Pengadaan Sarana Budidaya Rumput Laut DAU 475,000,000 Johanis S. Soenarjo, S.Pi Barang KAB.KEP. ARU CV. Multi Karunia 470,897,900 CV. Multi Karunia CV. AGUNG BINA SARANA TANGGAL DAN NOMOR SURAT MASUK Keterangan WAKTU PROSES LELANG 10 12 MEI- 8 JUNI 21 APRIL-2 MEI 21 ARIL-2 MEI LELANG GAGAL / DIKEMBALIKAN 9 JULI- 26 JULI 9 JULI- 26 JULI 9 JULI- 1 AGUSTUS 22 JUNI - 1 JULI REKAP DATA PAKET ULP KABUPATEN KEPULAUAN ARU TAHUN 2016 SUMBER DANA NAMA POKJA PEMENANG SELESAI LELANG

Transcript of REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI...

Page 1: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

I KANTOR PELAYANAN PERIZINAN TERPADU 400,000,000 399,190,000

1 Jasa Konsultansi Penyusunan SIMYANDU APBD 400,000,000 Fedrik Hendrik, S.Sos Konsultan IKOTA

DOBO

07/04/2016 -

900/23/IV/2016

PT. MITRA

PRIMA UTAMA√ 399,190,000

PT. Mitra Prima

Utama

II DINAS PERIKANAN 5,059,862,600 4,712,586,900

1 Pengadaan Peralatan Pengolahan Terasi Udang DAU 499,950,000 Hanny M. Lawata, S.Pi BarangKAB.KEP.

ARU

11/04/2016 -

05/PPKDLP21.06/IV/2

016

CV. Petra

Gemilang√ 484,330,000

CV. Petra

Gemilang

CV. BARUNA

JAYA BHAKTI

2Pengadaan Alat Penangkapan Ikan Gill Net

Multifilament Ukuran 4 inchDAU 229,774,600 Hanny M. Lawata, S.Pi Barang

KAB.KEP.

ARU

11/04/2016 -

05/2106/IV/2016

CV. Petra

Gemilang√ 218,339,000

CV. Petra

Gemilang

3

Belanja Jasa Konsultan Perencanaan Kajian Rencana

Pengelolaan Perikanan Tangkap Berbasis Pendekatan

Ekosistem (PL)

DAU 250,000,000 Hanny M. Lawata, S.Pi Konsultan IKAB.KEP.

ARU

27/05/2016 -

25/21.06/2016

4Pengadaan Sarana Perikanan Tangkap Kapal Ikan

Ukuran 3 GT (Kayu) Dengan Alat Tangkap Trammel NetDAU 630,000,000 Hanny M. Lawata, S.Pi Konstruksi I

KAB.KEP.

ARU

27/05/2016 -

25/21.06/2016

CV. Multi

Karunia√ 627,810,000

CV. Multi

Karunia

5

Pengadaan Sarana Perikanan Tangkap Kapal Ikan

Ukuran 4 GT (Kayu) Dengan Alat Tangkap Gill Net

(DAK)

DAK 631,125,000 Hanny M. Lawata, S.Pi Konstruksi IKAB.KEP.

ARU

27/05/2016 -

25/21.06/2016

CV. Multi

Karunia√ 629,057,000

CV. Multi

Karunia

6

Pengadaan Sarana Perikanan Tangkap Kapal Ikan

Ukuran 4 GT (Kayu) Dengan Alat Tangkap Gill Net

(DAU)

DAU 631,125,000 Hanny M. Lawata, S.Pi Konstruksi IKAB.KEP.

ARU

27/05/2016 -

25/21.06/2016

Mitra Permai

Mandiri√ 602,608,000

Mitra Permai

Mandiri

Multi Karunia

7 Pengadaan Sarana Budidaya Rumput Laut DAU 475,000,000Johanis S. Soenarjo,

S.PiBarang

KAB.KEP.

ARU

CV. Multi

Karunia√ 470,897,900

CV. Multi

Karunia

CV. AGUNG

BINA SARANA

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

12 MEI- 8 JUNI

21 APRIL-2 MEI

21 ARIL-2 MEI

LELANG GAGAL /

DIKEMBALIKAN

9 JULI- 26 JULI

9 JULI- 26 JULI

9 JULI- 1 AGUSTUS

22 JUNI - 1 JULI

REKAP DATA PAKET

ULP KABUPATEN KEPULAUAN ARU TAHUN 2016

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

Page 2: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

Mitra Permai

Mandiri

8 Pengadaan Sarana Budidaya Rumput Laut DAK 525,000,000Johanis S. Soenarjo,

S.PiBarang

KAB.KEP.

ARU

07/08/2016 -

08/422/2016CV. ANGGREK √ 521,247,000 CV. ANGGREK

Mitra Permai

Mandiri

9 Pengadaan Kebun Bibit Rumput Laut APBN 400,000,000Johanis S. Soenarjo,

S.PiBarang

KAB.KEP.

ARU

07/08/2016 -

08/422/2016

CV. Multi

Karunia√ 395,000,000

CV. Multi

Karunia

CV. Agung

Bina Sarana

10 Pengadaan Paket Budidaya Rumput Laut 16 Unit APBN 437,888,000Johanis S. Soenarjo,

S.PiBarang

KAB.KEP.

ARU

DOBO,AGUSTUS,2016-

08/422/2016

CV. KARYA

LESTARI√ 435,000,000

CV. KARYA

LESTARI

Mitra Permai

Mandiri

CV. Multi

Karunia

11 Renovasi Gedung Kantor DAU 350,000,000Johanis S. Soenarjo,

S.PiKonstruksi I

KAB.KEP.

ARU

07/08/2016 -

08/422/2016CV. MESKIM √ 328,298,000

CV.

GORANGAY

CV. HENGKA

LESTARI

CV.

GORANGAY

ANUGERAH

BINTANG

BERLIAN CV

22 JUNI - 1 JULI

26 AGUSTUS - 05

SEPTEMBER

14 NOVEMBER-25

NOVEMBER

22 JUNI - 1 JULI

Page 3: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

III DINAS PERHUBUNGAN 27,689,040,000 27,746,034,656

1Pengadaan Jasa Konsultan Perencanaan Pembuatan

Kapal fiber PenumpangDAU 191,000,000

Antonius F.

Rahanubun, STKonsultan I

KAB.KEP.

ARU

02/08/2016 -

08.02/2016PT. Evership √ 186,000,000 PT. Evership

CV. CAROLIV

CV. ROYAL

PERDANA

2 Pengadaan Kapal Angkutan Rakyat DAU 644,000,000 Ridwan Bungin, ST Konstruksi IKAB.KEP.

ARU

11/07/2016 -

550.05/27/2016CV. SERENA √ 643,750,000

CV. KARYA

LESTARI

CV. FLA

ARMARONTA

CV. KARYA

LESTARI

3Pengadaan dan Pemasangan Rambu-Rambu Lalu

Lintas LautDAU 1,411,350,000 Ridwan Bungin, ST Konstruksi I

KAB.KEP.

ARU

11/07/2016 -

550.05/27/2016

CV.

ANUGERAH

PERDANA

√ 1,406,289,000CV. MUTIARA

PUTIH

CV. MUTIARA

PUTIH

4 Pembuatan Kapal Fiber Penumpang DAK 11,999,900,000Antonius F.

Rahanubun, STKonstruksi I JAKARTA

27/07/2016 -

07.27/2016

PT. CAHAYA

ANGGUN

SEGARA

√ 11,979,500,000

PT. CAHAYA

ANGGUN

SEGARA

5Pengadaan Jasa Konsultan Pengawasan Pembuatan

Kapal Fiber PenumpangDAK 193,077,000

Antonius F.

Rahanubun, STKonsultan I JAKARTA

02/08/2016 -

08.02/VIII/2016

CV. ROYAL

PERDANA√ 189,860,000

CV. ROYAL

PERDANA

6Pengadaan Bangunan Rambu Bersuar Lalu Lintas

Darat267,854,000 Tonci Koljaan, S.Sos Konstruksi I

KOTA

DOBO

13/06/2016 -

07.01/VII/2016

CV. ARINDA

GOLDEN

VICTORIAS

√ 261,156,000

CV. ARINDA

GOLDEN

VICTORIAS

7Pengadaan Dokumen Master Plan Komunikasi dan

InformatikaDAU 345,059,000

Bakhtia

Kalengkongan, S.IpKonsultan I

KOTA

DOBO

13/06/2016 -

07.01/VII/2016ACN √ 343,000,000 ACN

07 AGUSTUS-31

AGUSTUS

18 AGUSTUS-31

AGUSTUS

14 AGUSTUS-29

AGUSTUS

17 MEI- 28 MEI

29 AGUSTUS - 19

SEPTEMBER

17 JULI-01 AGUSTUS

1 AGUSTUS-15

AGUSTUS

Page 4: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

8Jasa Penelitian Rancangan Teknis Terperinci (RTT)

Fasilitas Sisi Udara dan Fasilitas Sisi Darat

DAU

Perubahan1,800,000,000 Christian Koritelu, ST Konsultan I

KOTA

DOBO

20/09/2016 -

01/09/2016

PT. INDOSELA

PRATAMA√ 1,650,900,000

PT. INDOSELA

PRATAMA

PT.

GEODINAMIK

KONSULTAN

9Konstruksi Perpanjangan Runway Pesawat Bandar

Udara Rar Gwamar Dobo

DAU

Perubahan10,436,800,000 Christian Koritelu, ST Konstruksi I

KOTA

DOBO

20/09/2016 -

01/09/2016

PT. DIAN

SENTOSA√ 10,228,503,000

PT. PERKASA

JAYA INTI

PERSADA

PT. PERKASA

JAYA INTI

PERSADA

PT.

KUNIADJAJA

WIRABHAKTI

10Pengawasan Pekerjaan Perpanjangan Runway

Pesawat Bandar Udara Rar Gwamar DoboDAU 400,000,000 Christian Koritelu, ST Konsultan I

KOTA

DOBO

20/09/2016 -

01/09/2016

DANUREKSA

SARANA CIPTA√ 372,900,000

PT. MARGA

SARANA BHUMI

PT. MARGA

SARANA BHUMI

Pokja BarangPT. HASJRAT

ABADI484,176,656

PT. HASJRAT

ABADI

IV DINAS PERTAMBANGAN DAN ENERGI 25,587,360,727 25,357,656,000

1Belanja Jasa Konsultansi Perencanaan Pengadaan

dan Pemasangan PLTD Kecamatan APBD 771,100,000

Charles S.

Hairtaheuw, STKonsultan I

KEC.ARU

UTARA,KEC

.ARU

TENGAH,

KEC.ARU

SELATAN UT

08/09/2016 -

12/IX/2016

PT.

SULAPAAPPA

MEDIA UTAMA

√ 766,700,000

PT.

SULAPAAPPA

MEDIA UTAMA

2

Belanja Jasa Konsultansi Pengawasan Pembangunan

dan Pemasangan PLTD Kecamatan dan

Pembangunan Rumah Operator PLTD

APBD 579,238,000Charles S.

Hairtaheuw, STKonsultan I

KEC.ARU

UTARA,KEC

.ARU

TENGAH,

KEC.ARU

SELATAN UT

08/09/2016 -

12/IX/2016

CV. BIAS

MONARCHY

KONSUNTAN

√ 540,793,000

PT. BINA

SARANA EKA

TAMA

PT. BINA

SARANA EKA

TAMA

3Pengadaan dan Pembangunan PLTD Benjina

Kecamatan Aru TengahAPBD 7,858,040,000

Charles S.

Hairtaheuw, STKonstruksi I BENJINA

08/09/2016 -

09/IX/2016

PT.

KARYATAMA

MULTI PRIMA

√ 7,828,360,000PT. ANUGERAH

FUJI UTAMA

17 MEI - 17 JUNI

30 SEPTEMBER - 18

OKTOBER

03 OKTOBER-29

OKTOBER

Penunjukan Langsung

08 OKTOBER-07

NOVEMBER

01 OKTOBER - 25

OKTOBER

29 SEPTEMBER - 24

0KTOBER

Page 5: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

PT. ANUGERAH

FUJI UTAMA

4Pengadaan dan Pembangunan PLTD Tabarfane

Kecamatan Aru Selatan UtaraAPBD 4,908,660,000

Charles S.

Hairtaheuw, STKonstruksi I

TABARRFA

NE

08/09/2016 -

10/IX/2016

PT. RIDHO

TEKNIK√ 4,885,294,000

PT. RIDHIO

DWIPUTRA

PT. RIDHIO

DWIPUTRA

5Pengadaan dan Pembangunan PLTD Marlasi

Kecamatan Aru UtaraAPBD 6,574,500,000

Charles S.

Hairtaheuw, STKonstruksi I MARLASI

08/09/2016 -

11/IX/2016

PT.

KARYATAMA

MULTI PRIMA

√ 6,459,320,000

PT.

KARYATAMA

MULTI PRIMA

03 OKTOBER - 24

OKTOBER

03 OKTOBER-24

OKTOBER

Page 6: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

PT. RUDIHO

DWIPUTRA

6Pengadaan Rumah Operator PLTD Kecamatan Aru

UtaraAPBD 1,298,850,000

Charles S.

Hairtaheuw, STKonstruksi I MARLASI

13/09/2016 -

13/IX/2016

CV. Petra

Gemilang√ 1,293,904,000

CV. Petra

Gemilang

7Pengadaan Rumah Operator PLTD Kecamatan Aru

TengahAPBD 1,298,850,000

Charles S.

Hairtaheuw, STKonstruksi I BENJINA

13/09/2016 -

13/IX/2016

CV. KARYA

LESTARI√ 1,297,900,000

CV. KARYA

LESTARI

8Pengadaan Rumah Operator PLTD Kecamatan Aru

Selatan UtaraAPBD 1,298,850,000

Charles S.

Hairtaheuw, STKonstruksi I

TABARRFA

NE

13/09/2016 -

13/IX/2016CV. MESKIM √ 1,296,210,000 CV. MESKIM

9 Pengadaan dan Pemasangan Lampu SHS 999,272,727KOTA

DOBO

06/10/2016 -

14/X/2016

ARJUNA

KENCANA√ 989,175,000

ARJUNA

KENCANA

01 OKTOBER - 13

OKTOBER

01 OKTOBER - 13

OKTOBER

01 OKTOBER - 13

OKTOBER

26 OKTOBER- 07

NOVEMBER

Page 7: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

V DINAS PEKERJAAN UMUM DAN PENATAAN RUANG 93,383,425,000 92,188,447,000

1Perencanaan Peningkatan Jalan Hotmix Ruas Jalan

Cabang Empat-WangelDAU 105,800,000 Listiawaty, ST Konsultan II

KOTA

DOBO

10/10/2016 -

620/09/2016CV. BERKO √ 102,520,000 CV. BERKO

CV. TRI CIPTA

KONSULTAN

CV. LEISILAS

MANDIRI

CONSULTANTS

CV. KINAMI

CV. SIMETRIS

2 Perencanaan Peningkatan Jalan Marlasi - Tasinwaha DAU 193,600,000 Listiawaty, ST Konsultan II

DESA

MARLASI

DESA

TASINWAH

A

20/09/2016 -

620/08/2016

PT LEISILAS

MANDIRI

CONSULTANTS

√ 170,500,000 CV. SIMETRIS

CV. SIMETRIS

CV. CAROLIV

TRI CIPTA

KONSLTAN

CV. KINAMI

2 JUNI - 24 JUNI

27 MEI - 20 JUNI

Page 8: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

CV. RIZKY

UTAMA

CONSULTANT

CV. BERKO

3 Perencanaan Peningkatan Jalan Sirtu Leting - Marlasi DAU 121,470,000 Listiawaty, ST Konsultan II

DESA

LETING,

DESA

MARLASI

02/08/2016 -

620/05/2016CV. CAROLIN √ 118,500,000

CV. LEISILAS

MANDIRI

CONSULTANTS

TRI CIPTA

KONSLTAN

CV. KINAMI

CV. RIZKY

UTAMA

CONSULTANT

CV. BERKO

CV. LEISILAS

MANDIRI

CONSULTANTS

2 JUNI - 24 JUNI

Page 9: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

4 Perencanaan Pembangunan Jalan Tunguwatu - Gorar DAU 130,000,000 Listiawaty, ST Konsultan II

DESA

TUNGUWAT

U,DESA

GORAR

30/05/2016 -

600/104/2016

Desa

Tunguwatu,

Desa Gorar

5Perencanaan Pembangunan Jembatan Penghubung

Desa Apara Tahap IIDAU 89,000,000 Listiawaty, ST Konsultan II

DESA

APARA

18/08/2016 -

620/06/2016CV. BERKO √ 85,190,000 CV. BERKO

CV. KINAMI

CV. TRI CIPTA

KONSULTAN

6Perencanaan Pembangunan Jembatan Penghubung

Desa WaifualDAU 100,000,000 Listiawaty, ST Konsultan II

DESA

WAIFUAL

16/09/2016 -

620/07/2017

PT LEISILAS

MANDIRI

CONSULTANTS

√ 84,640,000 CV. SIMETRIS

CV. KINAMI

CV. RIZKY

UTAMA

CONSULTANT

CV. SIMETRIS

CV. BERKO

7 Perencanaan Pembangunan Sumur Dalam DAU 87,600,000 Edwin Nanlohy, ST Konsultan IIDESA

LETING

13/05/2016-

600/152/2016CV. BERKO √ 85,250,000 CV. BERKO

8 Perencanaan Pembangunan Jembatan Pasar DAU 110,850,000 Edwin Nanlohy, ST Konsultan IIKOTA

DOBO

13/05/2016 -

600/152/2016CV. BERKO √ 105,820,000 CV. BERKO

CV. MULTI

REKAYASA

CV. LEISILAS

MANDIRI

CONSULTANTS

9 Perencanaan Pembangunan Gedung Kantor BPPKAD DAU 110,600,000 Edwin Nanlohy, ST Konsultan IIKOTA

DOBO

13/05/2016-

600/152/2016CV. BERKO √ 106,780,000 CV. BERKO

23 MEI - 13 JUNI

23 MEI - 13 JUNI

25 MEI - 20 JUNI

2 JUNI - 24 JUNI

23 MEI - 13 JUNI

DIKEMBALIKAN

Page 10: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

PT. DELIMA

LAKSANA TATA

CV. MULTI

REKAYASA

CV. LEISILAS

MANDIRI

CONSULTANTS

10 Peningkatan Jalan Hotmix Ruas Jalan Lingkar RSU DAK 345,000,000 Listiawaty, ST Konstruksi IIKOTA

DOBO

13/05/2016 -

600/152/201/2016

PEMBANGUNA

N PASSO√ 342,588,000

PEMBANGUNA

N PASSO

MALUKU

AGUNG

SEJAHTERA

CV. PIRRELI

11 Peningkatan Jalan Lapen Puncak Kawasan PDAM DAK 360,000,000 Listiawaty, ST Konstruksi IIKOTA

DOBO

13/05/2016 -

600/152/201/2016

PEMBANGUNA

N PASSO√ 358,256,000

PEMBANGUNA

N PASSO

CV. PIRRELI

MALUKU

AGUNG

SEJAHTERA

12 Pembangunan Jembatan Penghubung Desa Maijuring DAK 1,320,000,000 Listiawaty, ST Konstruksi IIDESA

MAIJURING

12/04/2016 -

641/66/2016

CV. BERSAMA

MEMBANGUN

ARU

√ 1,299,780,000CV. KARYA

LESTARI

Mitra Permai

Mandiri

CV. KARYA

LESTARI

13 Perencanaan Pembangunan Sumur Dalam dan SPAM DAU 141,500,000 Edwin Nanlohy, ST Konsultan IIKAB.KEP.

ARU

12/07/2016 -

022.2/VII/2016CV. BERKO √ 136,400,000 CV. BERKO

PLASSA

KOSULTAN

CV. CAROLIV

29 JUNI-25 JULI

1 JULI-22 JULI

1 JULI-22 JULI

30 JULI-16 AGUSTUS

Page 11: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

14Pembangunan Jembatan Penghubung Desa Wokam -

Dusun LamerangDAK 434,500,000 Irwan Rahman Konstruksi II

DESA

WOKAM-

DUSUN

LAMERANG

11/07/2016 -

021.1/VI/2016

CV. BERSAMA

MEMBANGUN

ARU

√ 431,485,000CV. MEDAN

JAYA MAKMUR

CV. CITRA ARU

PERSADA

CV. MEDAN

JAYA MAKMUR

30 JULI-15 AGUSTUS

Page 12: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

15Pembangunan Jembatan Penghubung Desa

Kabalukin - Kecamatan KorpuyDAK 550,000,000 Irwan Rahman Konstruksi II

DESA

KABALUKIN-

DESA

KORPUY

11/07/2016 -

021.1/2116

CV. Kulareal

Still√ 547,138,000

CV. Kulareal

Still

16 Pembangunan Jembatan Penghubung Desa Leting DAK 755,000,000 Irwan Rahman Konstruksi IIDESA

LETING

11/07/2016 -

021.1/VI/2016

CV. Petra

Gemilang√ 749,996,000

CV. UTARA

PERMAI

CV. UTARA

PERMAI

17 Pembangunan Workshop DAK 750,000,000 Listiawaty, ST Konstruksi IIKAB.KEP.

ARU

25/07/2016/ -

620/04/2016

CV. VALLITA

MANDIRI√ 748,900,000

CV. VALLITA

MANDIRI

CV. KARYA

ANAK

NUSANTARA

18Penyusunan Dokumen Rencana Induk Sistem

Penyediaan Air Minum (RI-SPAM) di Kab. Kep. AruDAU 863,300,000 Edwin Nanlohy, ST Konsultan II

KAB.KEP.

ARU

02/08/2016 -

600/438/2016

PT. ALLES KLAR

PRIMA√ 849,200,000

PT. ALLES KLAR

PRIMA

19 Peningkatan Jalan Sirtu Leting - Marlasi DAK 2,435,000,000 Listiawaty, ST Konstruksi IIKAB.KEP.

ARU

02/08/2016 -

620/05/2016

CV. ARU

BUANA

PRATAMA

√ 2,378,000,000

CV. ARU

BUANA

PRATAMA

MEDAMA CV

PEMBANGUNA

N PASSO

MALUKU

AGUNG

SEJAHTERA

CV. PIRRELI

20 Pembangunan Jalan Tanah Gaimar-Jelia DAK 980,000,000 Irwan Rahman Konstruksi II

DESA

GAIMAR-

DESA JELIA

09/08/2016 -

021.5/VIII/2016

MALUKU

AGUNG

SEJAHTERA

√ 945,301,000

MALUKU

AGUNG

SEJAHTERA

CV.PIRRELI

PEMBANGUNA

N PASSO

21Pembangunan Jalan Tanah RSU-Jalan Baru (Kamar

Mayat)DAK 483,000,000 Irwan Rahman Konstruksi II

KOTA

DOBO

09/08/2016 -

021.4/2016

CV. ARU

BUANA

PRATAMA

√ 478,170,000

CV. ARU

BUANA

PRATAMA

22Pembangunan Jalan Tanah (Belakang Dewan Lama -

Jalan Baru Kampis)DAK 805,000,000 Irwan Rahman Konstruksi II

KOTA

DOBO

09/08/2016 -

021.5/VIII/2016

CV. ARU

BUANA

PRATAMA

√ 748,650,000

CV. ARU

BUANA

PRATAMA

04 AGUSTUS-13

SEPTEMBER

24 AGUSTUS-10

SEPTEMBER

31 AGUSTUS - 13

SEPTEMBER

15 SEPTEMBER-30

SEPTEMBER

31 AGUSTUS - 13

SEPTEMBER

30 JULI-15 AGUSTUS

06 AGUSTUS-25

AGUSTUS

24 AGUSTUS-10

SEPTEMBER

Page 13: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

KRISEDA JAYA

CV

23Pembangunan Jalan Tanah (Jalan Rabiajala SMAN 3 -

Bandara)DAK 2,185,000,000 Irwan Rahman Konstruksi II

KOTA

DOBO

09/08/2016 -

021.5/VIII/2016

CV. ARU

BUANA

PRATAMA

√ 2,050,135,000

CV. ARU

BUANA

PRATAMA

MEDAMA CV

24 Pembangunan Sumur Dalam + Assesories DAK 1,100,000,000 Edwin Nanlohy, ST Konstruksi IIDESA

LETING

18/08/2016 -

600/873/2016

CV. KARYA

PUTRA ARU√ 1,090,223,000

CV. KARYA

PUTRA ARU

CV, ARU JAYA

25 Pembangunan Jembatan Pasar DAU 2,225,000,000 Edwin Nanlohy, ST Konstruksi IIKOTA

DOBO

18/08/2016 -

600/873/2016

CV. ARU

BUANA

PRATAMA

√ 2,001,165,000

CV. ARU

BUANA

PRATAMA

CV. ARINDA

GOLDEN

VICTORIAS

26Pembangunan Jembatan Penghubung Desa Apara

Tahap IIDAK 1,780,000,000 Listiawaty, ST Konstruksi II

DESA

APARA

18/08/2016 -

620/06/2016

CV. BERSAMA

MEMBANGUN

ARU

√ 1,751,780,000

CV. ARINDA

GOLDEN

VICTORIAS

CV. ARINDA

GOLDEN

VICTORIAS

CV. TRIGUNA

MULIA

01 SEPTEMBER - 13

SEPTEMBER

24 AGUSTUS-10

SEPTEMBER

24 AGUSTUS-10

SEPTEMBER

29 AGUSTUS - 13

SEPTEMBER

Page 14: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

27Peningkatan Jalan Hotmix Ruas Jalan Cabang Empat -

WangelDAK 2,116,000,000 Listiawaty, ST Konstruksi II

KOTA

DOBO

18/08/2016 -

620/06/2016Kota Dobo √ 2,106,105,000

Bintang

Maluku

28 Pembangunan Jalan Tanah Popjetur - Fatural DAK 1,680,000,000Junaidi I. Dabumona,

STKonstruksi II

POPJETUR-

FATURAL

24/08/2016 -

146.1/VIII/2016CV. PIRRELI √ 1,627,881,000

CV.

PEMBANGUNA

N PASSO

CV.

PEMBANGUNA

N PASSO

MALUKU

AGUNG

SEJAHTERA

29 Pembangunan Jalan Tanah Jerol - Korpuy DAK 1,120,000,000Junaidi I. Dabumona,

STKonstruksi II

JEROL-

KORPUY

24/08/2016 -

146.1/VIII/2016

PEMBANGUNA

N PASSO√ 1,070,210,000

PEMBANGUNA

N PASSO

MALUKU

AGUNG

SEJAHTERA

CV. PIRRELI

30 Pembangunan Jalan Tanah Popjetur - Gaimar DAK 1,854,500,000Junaidi I. Dabumona,

STKonstruksi II

POPJETUR-

GAIMAR

24/08/2016 -

146.1/VIII/2016

MALUKU

AGUNG

SEJAHTERA

√ 1,800,140,000

CV. MALUKU

AGUNG

SEJAHTERA

CV. PIRRELI

PEMBANGUNA

N PASSO

31 Pembangunan Jalan Tanah Popjetur - Ngaibor DAK 2,380,000,000Junaidi I. Dabumona,

STKonstruksi II

POPJETUR-

NGAIBOR

24/08/2016 -

146.1/VIII/2016

MALUKU

AGUNG

SEJAHTERA

√ 2,292,504,000PEMBANGUNA

N PASSO

CV. PIRRELI

PEMBANGUNA

N PASSO

32 Pembangunan Jalan Tanah Benjina - Papakula Kecil DAK 700,000,000Junaidi I. Dabumona,

STKonstruksi II

BENJINA-

PAPAKULA

KECIL

24/08/2016 -

146.1/VII/2016CV. PIRRELI √ 687,703,000

MALUKU

AGUNG

SEJAHTERA

MALUKU

AGUNG

SEJAHTERA

PEMBANGUNA

N PASSO

33 Pembangunan Gedung Kantor BPPKAD DAK 1,921,535,000 Edwin Nanlohy, ST Konstruksi IIKOTA

DOBO

13/05/2016 -

600/152/2016

Mitra Permai

Mandiri√ 1,914,262,000

CV. FAJAR

BERKAH ABADI

28 AGUSTUS - 12

SEPTEMBER

04 SEPETMBER-17

SEPTEMBER

04 SEPTEMBER- 18

SEPTEMBER

21 september - 03

oktober

02 SEPTEMBER-17

SEPTEMBER

02 SEPTEMBER-17

SEPTEMBER

Page 15: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

CV. FAJAR

BERKAH ABADI

35 Pembangunan Jalan Tanah Papakula - Irloy DAK 1,820,000,000Junaidi I. Dabumona,

STKonstruksi II

PAPAKULA-

IRLOY

02/09/2016 -

158.1/2016

MALUKU

AGUNG

SEJAHTERA

√ 1,789,376,000

MALUKU

AGUNG

SEJAHTERA

PEMBANGUNA

N PASSO

CV. PIRRELI

36 Pembangunan Jalan Tanah Irloy - Lorang DAK 1,260,000,000Junaidi I. Dabumona,

STKonstruksi II

IRLOY-

LORANG

02/09/2016 -

158.1/2016

MALUKU

AGUNG

SEJAHTERA

√ 1,217,188,000

MALUKU

AGUNG

SEJAHTERA

15 SEPTEMBER-30

SEPTEMBER

15 SEPTEMBER-30

SEPTEMBER

Page 16: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

CV. PIRRELI

PEMBANGUNA

N PASSO

37Pembangunan Jembatan Penghubung Desa Kalar-

KalarDAK 645,000,000

Junaidi I. Dabumona,

STKonstruksi II

DESA

KALAR-

KALAR

02/09/2016 -

158.1/2016

CV. TRIO ALVA

LESTARI√ 642,200,000

CV. TRIO ALVA

LESTARI

38Pembangunan Jembatan Penghubung Fatural -

PopjeturDAK 1,500,000,000

Junaidi I. Dabumona,

STKonstruksi II

FATURAL-

POPJETUR

02/09/2016 -

158.1/2016

KARYA INDAH

ARU√ 1,467,000,000

CV. CITRA ARU

PERSADA

CV. CITRA ARU

PERSADA

39 Pembangunan Jembatan Kayu Besi Tua DAU 450,000,000 Roberth J. Enus Konstruksi IIKOTA

DOBO

07/09/2016 -

001.1/IX/2016CV. ARI BEWA √ 446,623,000 CV. ROMAN

CV. ROMAN

40 Pengawasan Pembangunan Jalan Lapen DAK 125,000,000Junaidi I. Dabumona,

STKonsultan II

KOTA

DOBO

12/09/2016-

001.1/IX/2016

KARYA

ENGINEER

KONSULTAN

√ 106,250,000CV. DWI PUTRA

PRATAMA

CV. DWI PUTRA

PRATAMA

CV. CAROLIV

CV. INDAL

TECHNIC

CONSULTANT

41Pengawasan Pembangunan Jalan Ruas Batugoyang-

JorangDAK 230,000,000 Onisimus Dumgair Konsultan II

BATUGOYA

NG-

JORANG

25/10/2016 -

600/207.b/2016

Batugoyang-

Jorang

42Pengawasan Peningkatan Jalan Wokam Sp.

Tunguwatu-KobamarDAK 100,000,000 Irwan Rahman Konsultan II

TUNGUWAT

U-

KOBAMAR

22/08/2016 -

021.7/VIII/2016CV. CAROLIV √ 99,715,000

CV. INDAL

TECHNIC

CONSULTANT

CV. INDAL

TECHNIC

CONSULTANT

43 Pembangunan Jalan Ruas Jorang - Batugoyang DAK 14,500,000,000 Onisimus Dumgair Konstruksi II

JORANG-

BATUGOYA

NG

19/08/2016 -

600.03/VIII/2016

PT. VANNI

PRIMA√ 14,355,000,000 PT. JAR ABIL

PT. JAR ABIL

44 Pembangunan Jalan Wokam Sp. Tunguwatu-Kobamar DAK 7,633,500,000 Irwan Rahman Konstruksi II

TUNGUWAT

U-

KOBAMAR

22/08/2016 -

021.7/VIII/2016

KARYA BUMI

NASIONAL

PERKASA

√ 7,556,824,000

KARA BUMI

NASIONAL

PERKASA

05 OKTOBER - 23

OKTOBER

17 SEPTEMBER - 30

SEPTEMBER

27 SEPTEMBER - 11

OKTOBER

06 OKTOBER-24

OKTOBER

01 OKTOBER - 17

OKTOBER

04 SEPTEMBER- 18

SEPTEMBER

03 SEPTEMBER-18

SEPTEMBER

Page 17: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

CV. PIRRELI

MALUKU

AGUNG

SEJAHTERA

45 Pembangunan Jembatan Penghubung Desa Jirlay DAK 360,000,000Junaidi I. Dabumona,

STKonstruksi II

DESA

JIRLAY

13/09/2016 -

159.1/IX/2016

CV. TRIO ALVA

LESTARI√ 355,000,000

CV. TRIO ALVA

LESTARI

46 Pembangunan Jalan Lapen Kota Dobo DAK 7,250,000,000Junaidi I. Dabumona,

STKonstruksi II

KOTA

DOBO

19/08/2016 -

021.12/VIII/2016

PT.VANNI

PRIMA√ 7,243,300,000

PT.VANNI

PRIMA

47 Pembangunan Jembatan Beton (Ruas BBM-TPU) DAK 1,500,000,000Junaidi I. Dabumona,

STKonstruksi II

KOTA

DOBO

19/09/2016 -

021.12/VIII/2016

CV. UTARA

PERMAI√ 1,495,140,000

CV. UTARA

PERMAI

48Pembangunan Jembatan Beton(Ruas DPR Kantor

Bupati)DAK 1,500,000,000

Junaidi I. Dabumona,

STKonstruksi II

KOTA

DOBO

19/09/2016 -

021.12/VIII/2016

Mitra Permai

Mandiri√ 1,462,068,000

MITRA PERMAI

MANDIRI

49Pembangunan Jembatan Penghubung Desa

TabarfaneDAU 750,000,000 Roberth J. Enus Konstruksi II

DESA

TABARFANE

16/09/2016 -

022.1/IX/2016

CV. MANDALA

KARYA√ 746,482,000

CV. MANDALA

KARYA

50 Pembangunan Jembatan Penghubung Desa Waifual DAK 1,999,700,000 Listiawaty, ST Konstruksi IIDESA

WAIFUAL

16/09/2016 -

620/07/2016

CV. CITRA ARU

PERSADA√ 1,892,000,000

CV. CITRA ARU

PERSADA

CV. BUDHI

MULIA

51 Peningkatan Jalan Marlasi - Tasinwaha DAK 3,872,000,000 Listiawaty, ST Konstruksi Ii

MARLASI-

TASINWAH

A

16/09/2016 -

620/08/2016

PT. LOULUSA

KARYA

MANDIRI

√ 3,833,280,000 PT. JAR ABIL

PT. BUMI

CENRAWASIH

KONSTRUKSI

PT. JAR ABIL

52 Pengawasan Jalan Marlasi - Tasinwaha DAU 116,160,000 Listiawaty, ST Konstruksi II

MARLASI-

TASINWAH

A

16/09/2016 -

620/08/2016

KARYA

ENGINEER

KONSULTAN

√ 101,500,000

KARYA

ENGINEER

KONSULTAN

18 SEPTEMBER - 30

SEPTEMBER

17 SEPTEMBER - 06

OKTOBER

03 OKTOBER- 15

OKTOBER

21 SEPTEMBER - 10

OKTOBER

17 SEPTEMBER - 30

SEPTEMBER

21 september - 08

oktober

18 SEPTEMBER - 07

OKTOBER

18 SEPTEMBER - 30

SEPTEMBER

Page 18: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

CV. DWI PUTRA

PRATAMA

CV. BERKO

CV CAROLIV

CV. INDAL

TECHNIC

CONSULTANT

53 Pembangunan Sumur Air Minum Desa Mesiang DAK 597,610,000 Konstruksi IIDESA

MESIANG

05/03/2016 -

600/186/2016

CV. SINAR

BERKAT√ 595,160,000

CV. SINAR

BERKAT

54 Rehabilitasi Gedung Kantor Pengadilan Negeri DAU 945,000,000 Konstruksi IIKOTA

DOBO

21/11/2016 -

600/179/2016

CV. KARYA

ANAK

NUSANTARA

√ 895,240,000

CV. KARYA

ANAK

NUSANTARA

CV. TEGUH

KARSA

55 Pembangunan Bendungan/Embung Desa Kabalsiang 902,500,000

DESA

KABALSIAN

G

26/10/2016 -

600/173/2016

CV. CITRA ARU

PERSADA√ 899,900,000

CV. CITRA ARU

PERSADA

56 Pembangunan Bendungan/Embung Desa Batuley 702,500,000DESA

BATULEY

26/10/2016 -

600/173/2016

CV. CITRA ARU

PERSADA√ 700,597,000

CV. CITRA ARU

PERSADA

57 Pembangunan Bendungan/Embung Desa Benjuring 702,500,000DESA

BENJURING

26/10/2016 -

600/173/2016

CV. KARYA

LESTARI√ 700,600,000

CV. KARYA

LESTARI

58 Pembangunan Bendungan/Embung Desa Kumul 802,500,000DESA

KUMUL

26/10/2016 -

600/173/2016

CV. KARYA

ANAK

NUSANTARA

√ 799,630,000

CV. KARYA

ANAK

NUSANTARA

59 Peningkatan Jalan Hotmix Lokasi TPU 2,660,000,000KOTA

DOBO

01/11/2016 -

620/12/2016

BINTANG

MALUKU√ 2,595,772,000

BINTANG

MALUKU

PEMBANGUNA

N PASSO

CV. PIRRELI

60 Jasa Pengawasan 126,200,000 √

KARYA

ENGINEER

CONSULTANT

√ 117,470,000

KARYA

ENGINEER

CONSULTANT

61 Pembangunan Sumur Air Minum Desa Koba Selfara 500,000,000

DESA

KOBASELFA

RA

23/09/2016 -

660.C/173/2016CV. ARU JAYA √ 450,000,000

CV. SINAR

BERKAT

CV. SINAR

BERKAT

13 OKTOBER-27

OKTOBER

28 NOVEMBER-19

DESEMBER

28 NOVEMBER-19

DESEMBER

05 NOVEMBER-18

NOVEMBER

05 NOVEMBER-18

NOVEMBER

05 NOVEMBER-18

NOVEMBER

05 NOVEMBER-18

NOVEMBER

03 NOVEMBER-16

NOVEMBER

25 OKTOBER-11

NOVEMBER

Page 19: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

62 Pembangunan Sumur Air Minum Desa Londe 500,000,000DESA

LONDE

23/09/2016 -

660.C/173/2016

CV. SURYA

LESTARI√ 495,400,000

CV. ARU

ISLAND

CV. ARU

ISLANDS

63 Pembangunan Sumur Air Minum Desa Jabulenga 500,000,000

DESA

JABULENG

A

23/09/2016 -

660.C/173/2016

CV. SINAR

BERKAT√ 498,500,000

CV. ARU

ISLAND

CV. ARU

ISLANDS

64Pembangunan Penimbunan Kantor Kejaksaan

Kepulauan Aru950,000,000

KOTA

DOBO

23/09/2016 -

600/178/2016

CV. DIMENSI

KONSTRUKSI√ 945,200,000

CV. DIMENSI

KONSTRUKSI

65 Pembangunan Sumur Air Minum Desa Dosimar 500,000,000DESA

DOSIMAR

23/09/2016 -

660.C/173/2016

CV. SINAR

BERKAT√ 499,500,000

CV. SINAR

BERKAT

66 Pembangunan Jalan Lapen Dalam Kota Dobo 1,450,000,000KOTA

DOBO

23/09/2016 -

600/178/2016

BINTANG

MALUKU√ 1,410,700,000

BINTANG

MALUKU

PEMBANGUNA

N PASSO

CV. PIRRELI

67 Pembangunan Sumur Air Minum Desa Lau-lau 500,000,000DESA LAU-

LAU

23/09/2016 -

660.C/173/2016CV. ARU JAYA √ 495,000,000 CV. ARU JAYA

CV. SINAR

BERKAT

68 Pembangunan Sumur Air Minum Desa Foket 500,000,000DESA

FOKET

23/09/2016 -

660.C/173/2016

CV.CITRA ARU

PERSADA√ 499,000,000

CV. CITRA ARU

PERSADA

69 Pembangunan Sumur Air Minum Desa Kobamar 500,000,000DESA

KOBAMAR

23/09/2016 -

660.C/173/2016CV. ARU JAYA √ 499,000,000 CV. ARU JAYA

70 Pembangunan Sumur Air Minum Desa Goda-goda 500,000,000

DESA

GODA-

GODA

23/09/2016 -

660.C/173/2016

CV. ARU

ISLANDS√ 499,000,000

CV. ARU

ISLANDS

71 Pembangunan Sumur Air Minum Desa Irloy 500,000,000DESA

IRLOY

23/09/2016 -

660.C/173/2016

CV. DIMENSI

KONSTRUKSI√ 483,871,000

CV. SINAR

BERKAT

CV. SINAR

BERKAT

13 OKTOBER-27

OKTOBER

13 OKTOBER-27

OKTOBER

13 OKTOBER-25

OKTOBER

13 OKTOBER-25

OKTOBER

14 OKTOBER - 03

NOVEMBER

03 OKTOBER-14

OKTOBER

03 OKTOBER - 17

OKTOBER

06 OKTOBER-19

OKTOBER

13 0KTOBER - 27

OKTOBER

13 OKTOBER - 27

OKTOBER

Page 20: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

72 Pembangunan Sumur Air Minum Desa Algadang 500,000,000

DESA

ALGADAN

G

23/09/2016 -

660/173.C/173/2016CV. ARU JAYA √ 499,300,000 CV. ARU JAYA

73 Pembangunan Sumur Air Minum Desa Ponum 500,000,000DESA

PONUM

23/09/2016 -

660.C/173/2016

CV. DIMENSI

KONSTRUKSI√ 498,800,000

CV. DIMENSI

KONSTRUKSI

74 Pembangunan Sumur Air Minum Desa Korpuy 500,000,000DESA

KORPUY

23/09/2016 -

660.C/173/2016

CV. ARU

ISLANDS√ 497,900,000

CV. ARU

ISLANDS

75 Pembangunan Sumur Air Minum Desa Kalar-kalar 500,000,000

DESA

KALAR-

KALAR

23/09/2016 -

660.C/173/2016

CV. SINAR

BERKAT√ 497,200,000

CV. SINAR

BERKAT

06 OKTOBER - 19

OKTOBER

03 OKTOBER - 17

OKTOBER

13 OKTOBER - 25

OKTOBER

06 OKTOBER - 19

OKTOBER

Page 21: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

76Pembngunan Jembatan Beton/Gorong-gorong masuk

keluar TPA 2 unit600,000,000

KOTA

DOBO

23/09/206 -

660.C/173/2016

CV. KARYA

LESTARI√ 597,689,000

CV. KARYA

LESTARI

77 Pembangunan Sumur Air Minum Desa Lamerang 500,000,000DESA

LAMERANG

23/09/2016 -

660.C/173/2016

CV. SURYA

LESTARI√ 498,900,000 CV. ARU JAYA

CV.ARU JAYA

78 Pembangunan Penimbunan POLRES Kepulauan AruKOTA

DOBO

23/09/2016/ -

600/178/2016

CV. ARU

ISLANDS√ 945,000,000

CV. ARU

ISLANDS

VI RUMAH SAKIT UMUM DAERAH CENDRAWASIH 14,194,060,658 14,094,338,810

1Belanja Jasa Konsultansi Perencanaan Rehabilitasi

Berat/Total Poliklinik Terpadu DAU 195,415,000

dr. Hentji H. Darakay,

M.KesKonsultan I

KOTA

DOBO

09/09/2016 -

445/913/IV/2016

exindo

consultant√ 190,000,000

exindo

consultant

2 Belanja Modal Pembangunan Rumah Dokter DAU 400,000,000dr. Hentji H. Darakay,

M.KesKonstruksi I

KOTA

DOBO

09/05/2016 -

445/913/IV/2016CV. MESKIM √ 395,085,000 CV. MESKIM

3 Pembangunan Rumah Dokter Spesialis DAU 300,000,000dr. Hentji H. Darakay,

M.KesKonstruksi I

KOTA

DOBO

09/05/2016 -

445/913/IV/2016

CV. Petra

Gemilang√ 295,924,000

CV. Petra

Gemilang

4 Pengadaan Bahan Obat Generik DAU 1,891,023,760dr. Hentji H. Darakay,

M.KesBarang

KOTA

DOBO

09/05/2016 -

445/913/IV/2016

GATRA

PERSADA √ 1,864,236,550

GATRA

PERSADA

5 Pengadaan Bahan Kimia Reagen DAU 699,584,400dr. Hentji H. Darakay,

M.Kes

PT. MEDIKA ARSIH

MANDIRI

KOTA

DOBO

09/05/2016 -

445/913/IV/2016Kota Dobo √ 689,370,000

PT. MEDIKA

ARSIH MANDIRI

17 MEI - 28 MEI

24 MEI - 6 JUNI

24 MEI - 6 JUNI

06 JUNI-16 JUNI

09 JUNI-20 JUNI

03 OKTOBER - 14

OKTOBER

03 OKTOBER - 15

OKTOBER

06 OKTOBER - 19

OKTOBER

Page 22: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

6 Pengadaan Obat Paten (PL) DAU 999,081,860dr. Hentji H. Darakay,

M.KesBarang

KOTA

DOBO

25/07/2016 -

445/118.2/2016Kota Dobo √ 996,799,100

PT. DELTA

INTAN MANDIRI

7 Pengadaan Bahan Habis Pakai DAU 999,852,000dr. Hentji H. Darakay,

M.KesBarang

KOTA

DOBO

27/04/2016 -

445/84.1/IV/2016

PERMATA

HUSADA

LESTARI

√ 992,244,000

PERMATA

HUSADA

LESTARI

8Rehabilitasi Berat/Total Interen Pria Menjadi Ruang

IsolasiDAU 600,000,000

dr. Hentji H. Darakay,

M.KesKonstruksi I

KOTA

DOBO

27/04/2016 -

445/84.1/IV/2016CV. MESKIM √ 597,624,000 CV. MESKIM

CV. ARU CITRA

MARITIM

9 Gas Medis Sentral DAU 3,989,113,638dr. Hentji H. Darakay,

M.KesKonstruksi I

KOTA

DOBO

17/07/2016 -445-

120;/2016

SURYA GAS

INDUSTRI√ 3,982,506,160

CV. MARINDO

ETAM

CV. MARINDO

ETAM

CV. RIA PRIMA

PUTRI AMBAR

10 Rehabilitasi Berat/Total Poli Klinik Terpadu Berlantai Dua DAU 4,000,000,000dr. Hentji H. Darakay,

M.KesKonstruksi I

KOTA

DOBO

19/08/2016 -

445/159/2016

PT. TRI PILAR

KONSTRUKSI√ 3,980,000,000

PT. TRI PILAR

KONSTRUKSI

11Belanja Konsultasi Pengawasan Rehabilitasi Berat Total

Poliklinik Terpadu119,990,000

KOTA

DOBO

19/08/2016 -

445/159/2016

CV. GRIYA

HASANDE

KONSULTAN

√ 110,550,000

CV. GRIYA

HASANDE

KONSULTAN

06 JUNI-16 JUNI

10 JULI-27 JULI

29 JULI-16 AGUSTUS

PT. TRI PILAR

KONSTRUKSI

06 SEPTEMBER - 17

SEPTEMBER

Page 23: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

VII BAGIAN UMUM DAN PERLENGKAPAN SETDA 2,477,861,000 2,170,922,000

1 Pembuatan Speed Boat DAU 1,499,861,000Jeheskel Dumgair,

S.SosKonstruksi I

JAKARTA

UTARA

23/05/2016 -

027/193/2016

CV. RATU MINA

PERSADA√ 1,433,861,000

CV. RATU MINA

PERSADA

CV. SERENA

CV. SITU

PANJALU

2 Pemeliharaan Gedung Kantor Bupati A, B, C, D. DAU 500,000,000Jeheskel Dumgair,

S.SosKonstruksi I

KOTA

DOBO

18/08/2016 -

027/223/2016

KARYA PUTRA

ARU√ 497,415,000

KARYA PUTRA

ARU

3 Pengadaan AC Duduk DAU 240,000,000Jeheskel Dumgair,

S.SosBarang

KOTA

DOBO

23/08/2016 -

027/225/2016

MITRA PERMAI

MANDIRI√ 239,646,000

Mitra Permai

Mandiri

4 Pengadaan Sound System DAU 238,000,000Mariana E. Duarkossu,

SHBarang

KOTA

DOBO

23/08/2016 -

027/225/2016Kota Dobo

VIII DINAS KESEHATAN 14,975,287,947 14,886,712,690

1Peningkatan Puskesmas Non Rawat Inap Menjadi

Puskesmas Rawat Inap (Desa Wakua)DAK 720,000,000 Zulaiha, SKM Konstruksi I

DESA

WAKUA

27/05/2016 -

602/436/2016

CV. Kulareal

Still√ 715,788,000

CV. Kulareal

Still

2Peningkatan Puskesmas Non Rawat Inap Menjadi

Puskesmas Rawat Inap (Desa Jerol)DAK 720,000,000 Zulaiha, SKM Konstruksi I

DESA

JEROL

27/05/2016 -

602/436/2016

CV. SENJA

UTAMA√ 716,274,000

CV. SENJA

UTAMA

3Peningkatan Puskesmas Non Rawat Inap Menjadi

Puskesmas Rawat Inap (Desa Karaway)DAK 720,000,000 Zulaiha, SKM Konstruksi I

DESA

KORAWAY

27/05/2016 -

602/436/2016

CV. Kulareal

Still√ 714,380,000

CV. Kulareal

Still

4Peningkatan Puskesmas Non Rawat Inap Menjadi

Puskesmas Rawat Inap (Desa Benjuring)DAK 720,000,000 Zulaiha, SKM Konstruksi I

DESA

BENJURING

27/05/2016 -

602/436/2016

CV. TEGUH

KARSA√ 715,226,000

CV. TEGUH

KARSA

5 Pengadaan Bidan Kit DAK 781,879,560 Rul Barjah, SH BarangKOTA

DOBO

27/05/2016 -

602/436/2016

PT. Dwiputra

Mitra

Bersaudara

√ 774,057,900

PT. Dwiputra

Mitra

Bersaudara

22 JUNI-11 JULI

12 JUNI-25 JUNI

12 JUNI-25 JUNI

12 JUNI-25 JUNI

12 JUNI-25 JUNI

5 JUNI - 20 JUNI

23 AGUSTUS - 06

SEPTEMBER

26 AGUSTUS - 5

SEPTEMBER

Page 24: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

CV.

SANGKAKALA

BERSINAR

6 Pengadaan Obat Buffer Stock DAK 2,309,996,500 Rul Barjah, SH BarangKOTA

DOBO

20/07/2016 -

023/291/2016

GATRA

PERSADA√ 2,305,380,000

GATRA

PERSADA

7 Pengadaan Set Kesehatan Gigi dan Mulut DAK 1,949,591,000 Rul Barjah, SH BarangKOTA

DOBO

19/09/2016 -

023/136/2016

PT.

MANUNGGALI

NG KARSA

PERSADA

√ 1,939,245,000PT. DELTA

INTAN MANDIRI

PT. DELTA

INTAN MANDIRI

8 Pengadaan Set Laboratorium DAK 1,400,000,000 Rul Barjah, SH BarangKOTA

DOBO

20/06/2016 -

023/91/2016

PERMATA

HUSADA

LESTARI

√ 1,396,780,000

PERMATA

HUSADA

LESTARI

9 Pengadaan Sarana Penyimpanan DAK 594,380,390 Rul Barjah, SH BarangKOTA

DOBO

20/06/2016 -

023/91/2016

PT. DELTA

INTAN MANDIRI√ 589,374,500

PT. DELTA

INTAN MANDIRI

10 Rehabilitasi Puskesmas (Desa Ngaibor) DAK 400,000,000 Zulaiha, SKM Konstruksi IDESA

NGAIBOR

04/08/2016 -

602.1/704/2016

CV. Kulareal

Still√ 398,207,000

CV. Kulareal

Still

11 Rehabilitasi Puskesmas (Desa Doka Barat) DAK 400,000,000 Zulaiha, SKM Konstruksi I

DESA

DOKA

BARAT

04/08/2016 -

602.1/704/2016

CV. MILAN

JAYA√ 396,404,000

CV. MILAN

JAYA

12 Rehabilitasi Puskesmas (Desa Kalar-Kalar) DAK 400,000,000 Zulaiha, SKM Konstruksi I

DESA

KALAR-

KALAR

04/08/2016 -

602.1/704/2016

CV. NATASYA

PRATAMA√ 397,900,000

CV. Natasya

Pratama

13 Rehabilitasi Puskesmas (Desa Mesiang) DAK 400,000,000 Zulaiha, SKM Konstruksi IDESA

MESIANG

04/08/2016 -

602.1/704/2016

CV. BERSAMA

MEMBANGUN

ARU

√ 398,203,000

CV. ARINDA

GOLDEN

VICTORIAS

CV. ARINDA

GOLDEN

VICTORIAS

14 Pengadaan Obat PKD DAK 1,499,998,612 Rul Barjah, SH BarangKOTA

DOBO

10/10/2016 -

023/372/2016

PT. DELTA

INTAN MANDIRI√ 1,489,904,900

PT. DELTA

INTAN MANDIRI

23 AGUSTUS-06

SEPTEMBER

14 AGUSTUS-29

AGUSTUS

22 AGUSTUS- 06

SEPTEMBER

14 AGUSTUS-29

AGUSTUS

24 SEPTEMBER - 03

OKTOBER

14 AGUSTUS-25

AGUSTUS

24 SEPTEMBER - 03

OKTOBER

14 AGUSTUS-25

AGUSTUS

24 SEPTEMBER - 04

OKTOBER

Page 25: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

15 Pengadaan Radio Komunikasi 375,000,000 BarangKOTA

DOBO

24/11/2016 -

023/731/2016

CV. Petra

Gemilang√ 372,000,000

CV. Petra

Gemilang

CV. TRIASA

MANDIRI

16 Pengadaan Obat Buffer Stock 854,441,885KOTA

DOBO

15/09/2016 -

02/PPK/2016

PT. CITRA

TUNAS MEDIKA√ 852,208,390

PT. CITRA

TUNAS MEDIKA

17 Pengadaan Obat PKD 730,000,000KOTA

DOBOGITA PERSADA √ 715,380,000 GITA PERSADA

IXBADAN PERENCANAAN, PENELITIAN DAN

PENGEMBANGAN DAERAH2,349,995,000 3,853,405,500

1Penyusunan Kajian Produk Unggulan Pedesaan

Kabupaten Kepulauan AruAPBD 390,000,000

Adolof Pokar, SPi.,

M.SiKonsultan I

KAB.KEP.AR

U

07/06/2016 -

050.13/257/2016

PT. TJIPTA

ANDHIKA

PERSADA

√ 388,437,500

PT. TJIPTA

ANDHIKA

PERSADA

2Penyusunan Rencana Strategis Perekonomian

Kabupaten Kepulauan AruAPBD 390,000,000

Adolof Pokar, SPi.,

M.SiKonsultan I

KAB.KEP.AR

U

07/06/2016 -

050.13/257/2016

PT. Belaputera

Interplan√ 388,663,000

PT. Belaputera

Interplan

3Updating Sistem Perencanaan yang Terintegrasi

dengan Aplikasi PenganggaranAPBD 450,000,000 Konsultan I

KAB.KEP.AR

U

07/06/2016 -

050.13/257/2016

CV. JOGJA

MEDIA

TELEMATIKA

√ 449,006,000

CV. JOGJA

MEDIA

TELEMATIKA

4Pengembangan Aplikasi Sistem Pemetaan Data

Penduduk Miskin Kab. Kep. Aru350,000,000

KAB.KEP.AR

U

07/06/2016 -

050.13/257/2016

PT. GAYUH

SARANA

MAKMUR

√ 348,939,000

PT. GAYUH

SARANA

MAKMUR

5 Studi Kajian Penyusunan Sumber-sumber PAD 250,000,000 √26/10/2016 -

050.13/547/2016

CV. MITRA

CONSULTANT

ENGINEERING

√ 249,000,000

CV. MITRA

CONSULTANT

ENGINEERING

6 Pembangunan Sistem Informasi/Inovasi Daerah (SIDA) 250,000,000 √26/10/2016 -

050.13/547/2016CV. LP2D √ 249,000,000 CV. LP2D

7Belanja Modal Peralatan dan Mesin Pengadaan

Personal Computer269,995,000 √

26/10/2016 -

050.13/547/2016

CV. ARINDA

GOLDEN

VICTORIAS

√ 269,500,000

CV. ARINDA

GOLDEN

VICTORIAS

2 JULI-29 JULI

28 NOVEMBER-19

DESEMBER

02 NOVEMBER-14

NOVEMBER

24 JUNI-29JULI

24 JUNI-29JULI

21 JULI-17 AGUSTUS

23 JULI-17 AGUSTUS

31 JULI-23 AGUSTUS

31 OKTOBER-10

NOVEMBER

02 NOVEMBER-14

NOVEMBER

Page 26: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

X BADAN PENANGGULANGAN BENCANA DAERAH 801,950,000 755,430,000

1 Konstruksi Gedung Gudang Logistik DAU 801,950,000 Djemy Haryanto, SP Konstruksi IKOTA

DOBO

10/06/2016-

360/110/2016

CV. VALLITA

MANDIRI√ 755,430,000

CV. Sava

Arsindo

CV. KARYA

ANAK

NUSANTARA

CV. SAVA

ARSINDO

CV. ARU CITRA

MARITIM

XI BADAN PENGELOLA PERBATASAN DAERAH 11,943,185,000 11,496,714,000

1Pembangunan Gedung Kantor BPP Daerah Kabupaten

Kepulauan AruAPBN 1,025,000,000

Arman Walay,

S.Pi.,M.Ec.DevKonstruksi I

KOTA

DOBO

27/05/2016 -

510.2/377.2016

CV. Petra

Gemilang√ 1,018,221,000

CV. Petra

Gemilang

2 Belanja Jasa Konsultansi Perencanaan Jalan DAK 137,000,000Arman Walay,

S.Pi.,M.Ec.DevKonsultan I

JORANG-

GOMARME

TY

27/05/2016 -

602.1/382/2016

Jorang -

Gomarmeti

3 Pengadaan Long Boat dan Sarana Pendukung APBN 720,300,000Arman Walay,

S.Pi.,M.Ec.DevBarang

KAB.KEP.AR

U

11/07/2016 -

523.41/422/2016

CV. PERMATA

KARYA√ 719,240,000

CV. PERMATA

KARYA

4 Pengadaan Konstruksi Prasarana Air Minum DAK 1,185,885,000Arman Walay,

S.Pi.,M.Ec.DevKonstruksi I

DESA

KAREY

11/07/2016 -

602.1/505/2016

CV. KARYA

PUTRA ARU√ 1,042,491,000

CV. KARYA

PUTRA ARU

CV. ARU JAYA

5 Pengadaan Konstruksi Jalan DAK 6,530,000,000Arman Walay,

S.Pi.,M.Ec.DevKonstruksi I

DESA

GOMARME

TY -

JORANG

05/08/2016 -

600.1/582/2016

PT. FAJAR BARU

GEMILANG√ 6,508,127,000

PT. VANNI

PRIMA

PT. VANNI

PRIMA

6 Belanja Modal Pengadaan Konstruksi Jalan DAK 1,745,000,000Arman Walay,

S.Pi.,M.Ec.DevKonstruksi I

DESA

GOMARME

TY-

GOMARSU

05/08/2016 -

021.4/VIII/2016FA VICTORIA √ 1,623,000,000 FA VICTORIA

7Perencanaan Pembangunan/Peningkatan Jalan Desa

Tunguwatu-Selibata-bata200,000,000

LONGAR-

MESIANG

14/10/2016 -

510.2/475/2016

CV. INDAL

TECHNIC

CONSULTANT

√ 198,478,000

PT. PADU

RAKSA

KONSULTAN

PT. PADU

RAKSA

KONSULTAN

21 OKTOBER-31

OKTOBER

10 JULI-27 JULI

15 JULI-25 JULI

14 AGUSTUS-29

AGUSTUS

8 AGUSTUS-27

AGUSTUS

14 JULI-1 AGUSTUS

08 AGUSTUS-24

AGUSTUS

DIKEMBALIKAN

Page 27: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

PT. SISARTI

BAKSYAT

ASASTA

8Perencanaan Pembangunan Peningkatan Jalan Desa

Tunguwatu-Kobamar200,000,000

TUNGWATU-

KOBAMAR

14/10/2016 -

510.2/475/2016

CV. INDAL

TECHNIC

CONSULTANT

√ 189,000,000

PT.

BALAPUTERA

INTERPLAN

PT.

BALAPUTERA

INTERPLAN

PT. PADU

RAKSA

KONSULTAN

9Perencanaan Pembangunan Peningkatan Jalan Desa

Longgar-Mesiang200,000,000

TUNGWATU-

SELIBATA

14/10/2016 -

510.2/475/2016

PT. SISARTI

BAKSYAT

ASASTA

√ 198,157,000

PT. SISARTI

BAKSYAT

ASASTA

PT.

BALAPUTERA

INTERPLAN

19 OKTOBER-31

OKTOBER

19 OKTOBER-31

OKTOBER

Page 28: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

XII DINAS PEMADAM KEBAKARAN 120,000,000 484,050,200

1Penyusunan Rencana Sistem Proteksi Bencana

KebakaranAPBD 120,000,000 Arsad, S.Sos Konsultan I

KOTA

DOBO

22/06/2016 -

658/247/2016

PT. BELA

PUTERA

INTERPLAN

√ 119,050,200PT. Belaputera

Interplan

PT. TJIPTA

ANDHIKA

PERSADA

PT. GAYUH

SARANA

MAKMUR

2 Pengadaan Truk Sampah Pokja BarangPT. HASJRAT

ABADI√ 365,000,000

PT. HASJRAT

ABADI

XIII BADAN PENGELOLAAN KEUANGAN DAN ASET DAERAH 750,000,000 496,857,000

1 Pengadaan Laptop DELL Alinware 13 CT 01 APBD 250,000,000 J. Ubyaan, S.Sos BarangKOTA

DOBO

12/07/2016 -

797/181/2016Kota Dobo

2 Pengadaan Pasar Pedagang Kaki Lima APBD 500,000,000 J. Ubyaan, S.Sos Konstruksi IKOTA

DOBO

12/07/2016 -

797/182/2016

CV. PERMATA

KARYA√ 496,857,000

CV. PERMATA

KARYA

XIV DINAS KOPERASI DAN USAHA MIKRO 2,702,785,238 2,694,410,000

1 Pengadaan Bangunan Gedung Pasar DAK 1,793,495,238 J. Lekatompessy, S.Pi Konstruksi IKOTA

DOBO

22/08/2016 -

900/127/2016

CV. MUTIARA

PUTIH√ 1,790,000,000

CV. MUTIARA

PUTIH

CITRA ARU

PERSADA

2 Pembangunan Sentra Industri Kecil Menengah DAK 909,290,000 J. Lekatompessy, S.Pi Konstruksi IKOTA

DOBO19/09/2016 -900/147 CV.MESKIM √ 904,410,000

CV. PETRA

GEMILANG

Penujukan Langsung

22 AGUSTUS-06

SEPTEMBER

29 AGUSTUS - 10

SEPTEMBER

03 OKTOBER - 14

OKTOBER

12 JULI-04 AGUSTUS

Dikembalikan

Page 29: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

CV. PETRA

GEMILANG

XV DINAS PENDIDIKAN & KEBUDAYAAN 3,641,349,250 3,635,055,000

1Pengadaan Konstruksi Gedung Sekolah (SD Negeri 7

Dobo) Lelang UlangDAU 1,200,000,000 N.B. Rattu, S.Pd.SD Konstruksi I

KOTA

DOBO

05/08/2016 -

420/669/2016

CV. PERMATA

KARYA√ 1,197,423,000

CV. PERMATA

KARYA

2Pengadaan Konstruksi Gedung Sekolah (SD Yos

Sudarso 1 Dobo) Lelang UlangDAU 800,000,000 N.B. Rattu, S.Pd.SD Konstruksi I

KOTA

DOBO

05/08/2016 -

420/669/2016

CV. PERMATA

KARYA√ 797,507,000

CV. PERMATA

KARYA

3 Pengadaan Buku Perpustakaan 1,191,349,250KOTA

DOBO

05/08/2016 -

420/669/2016

CV. MILAN

JAYA√ 1,190,750,000

CV. MILAN

JAYA

CV. VEMA

INDAH

4 Pengadaan Speed Boat 450,000,000KOTA

DOBO

14/10/2016 -

420/901/2016

CV. PERMATA

KARYA√ 449,375,000

CV. PERMATA

KARYA

XVI DINAS PERTANIAN 5,137,968,000 5,115,184,000

1Pengadaan Alat Angkut Apung Bermotor Penumpang

Speed BoatDAU 390,000,000

Denny Dumgair,

S.Hut., MPBarang

KAB.KEP.

ARU

26/08/2016 -

179/008/2016

UD. AIRA FIBER

GLASS√ 387,500,000

CV. MULTI

KARUNIA

CV. SERENA

CV. MULTI

KARUNIA

21 OKTOBER-31

OKTOBER

12 SEPTEMBER-23

SEPTEMBER

21 SEPTEMBER - 30

SEPTEMBER

15 SEPTEMBER - 26

SEPTEMBER

15 NOVEMBER-24

NOVEMBER

Page 30: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

2 Belanja Bahan / Bibit Tanaman DAU 316,440,000Denny Dumgair,

S.Hut., MPBarang

KAB.KEP.

ARU

26/08/2016 -

179/008/2016

CV. AGRINDO

PERSADA√ 315,988,000

CV. KARYA

LESTARI

CV. KARYA

LESTARI

3 Belanja Pengadaan Bibit Tanaman DAU 279,981,000Denny Dumgair,

S.Hut., MPBarang

KAB.KEP.

ARU

26/08/2016 -

179/008/2016CV. ANGGREK √ 279,360,000 CV. ANGGREK

4Belanja Modal Peralatan dan Mesin-Pengadaan Alat

Pengolahan Tanah dan TanamanDAK 386,250,000

Denny Dumgair,

S.Hut., MPBarang

KAB.KEP.

ARU

26/08/2016 -

179/008/2016

CV. KARYA

LESTARI√ 386,000,000

CV. KARYA

LESTARI

5 Pembangunan Lumbung Pangan Masyarakat DAK 600,000,000Denny Dumgair,

S.Hut., MPKonstruksi I

DESA KOBA

SELFARA

05/09/2016 -

188/008/201626/08

CV. SAVA

ARSINDO√ 597,188,000

CV. SAVA

ARSINDO

6 Pengadaan Irigasi Tanah Dangkal Paket I DAK 270,999,000Denny Dumgair,

S.Hut., MPKonstruksi I

KOTA

DOBO

20/10/2016 -

211/004/2016

CV. KARYA

PUTRA ARU√ 268,527,000

CV. KARYA

PUTRA ARU

7 Pengadaan Irigasi Tanah Dangkal Paket II DAK 270,999,000Denny Dumgair,

S.Hut., MPKonstruksi I

KOTA

DOBO

20/10/2016 -

211/004/2016

CV.SURYA

LESTARI√ 267,582,000

CV. KARYA

PUTRA ARU

CV. KARYA

PUTRA ARU

8 Pengadaan Irigasi Tanah Dangkal Paket III DAK 270,999,000Denny Dumgair,

S.Hut., MPKonstruksi I

KOTA

DOBO

20/10/2016 -

211/004/2016

CV.ARU

ISLANDS√ 269,022,000

CV.ARU

ISLANDS

9 Pembangunan Penampung Limbah Ternak DAU 290,000,000KOTA

DOBO

04/11/2016 -

223/004/2016

CV.

GORANGAY√ 289,401,000

CV.

GORANGAY

10 Belanja Bibit Ternak DAU 410,300,000

DESA

POPJETURK

EC.ARSEL

10/10/2016 -

205/008/2016

CV. TRIASA

MANDIRI√ 409,976,000 CV. ARU INDAH

CV. ARU INDAH

30 SEPTEMBER - 10

OKTOBER

19 SEPTEMBER- 29

SEPTEMBER

17 SEPTEMBER - 27

SEPTEMBER

12 SEPTEMBER-23

SEPTEMBER

13 SEPTEMBER - 26

SEPTEMBER

14 NOVEMBER-25

NOVEMBER

07 NOVEMBER-17

NOVEMBER

12 NOVEMBER - 21

NOVEMBER

19 SEPTEMBER- 29

SEPTEMBER

Page 31: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

11 Bangunan Instalasi Perbibitan 680,000,000

DESA

POPJETURK

EC.ARSEL

10/10/2016 -

204/008/2016

CV. ARU CITRA

MARITIM√ 677,500,000

CV. ARU CITRA

MARITIM

12 Pembangunan Kandang Ternak 420,000,000

DESA

POPJETURK

EC.ARSEL

20/10/2016 -

211/004/2016

CV. SAVA

ARSINDO√ 417,900,000

CV. SAVA

ARSINDO

13 Pembangunan Jalan Tani 552,000,000

DESA

POPJETURK

EC.ARSEL

20/10/2016 -

211/004/2016

CV. NATASYA

PRATAMA√ 549,240,000

CV. NATASYA

PRATAMA

XVII SEKRETARIAT DPRD 1,119,250,000 1,114,465,000

1 Pengadaan Personal Computer DAU 229,250,000 BarangKOTA

DOBO

30/09/2016 -

170/108/2016

CV. MILAN

JAYA√ 227,150,000

CV. HENGKA

LESTARI

CV. HENGKA

LESTARI

2 Pengadaan Mebeleur DAU 565,000,000 BarangKOTA

DOBO

30/09/2016 -

170/108/2016

CV. MILAN

JAYA√ 563,000,000

CV. MILAN

JAYA

CV. VEMA

INDAH

3 Pengadaan Alat Studio Visual 325,000,000KOTA

DOBO

30/09/2016 -

170/105/2016

CV. MEDAN

JAYA MAKMUR√ 324,315,000

CV. MEDAN

JAYA MAKMUR

XVIIIDINAS PENGENDALIAN PENDUDUK DAN KELUARGA

BERENCANA669,000,000 666,881,000

1 Pembangunan Balai Penyuluh KB 669,000,000DESA

MARLASI

28/10/2016 -

476/129/2016CV. ANGGREK √ 666,881,000 CV. ANGGREK

XIX DINAS LINGKUNGAN HIDUP 603,000,000 602,415,000

26 OKTOBER-07

NOVEMBER

26 OKTOBER-07

NOVEMBER

16 NOVEMBER-25

NOVEMBER

16 NOVEMBER-25

NOVEMBER

05 NOVEMBER-15

NOVEMBER

04 NOVEMBER-14

NOVEMBER

04 OKTOBER-14

OKTOBER

Page 32: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

1 Pengadaan Kendaraan Bermotor Roda Tiga DAK 603,000,000KOTA

DOBO

16/11/2016 -

600/191/2016

CV. TRIASA

MANDIRI√ 602,415,000

CV. MILAN

JAYA

CV. MILAN

JAYA

XX BAGIAN ADMINISTRASI KESEJAHTERAAN RAKYAT SETDA 238,000,000 237,160,000

1 Pengadaan Sound Sistem DAU 238,000,000KOTA

DOBO

30/05/2016 -

400.02/46/2016CV. SERENA √ 237,160,000 CV. ARU JAYA

CV. ARU JAYA

XXI SATUAN POLISI PAMONG PRAJA 288,900,000

Pokja BarangPT. HASJRAT

ABADI288,900,000

PT. HASJRAT

ABADIPenunjukan Langsung

02 NOVEMBER-11

NOVEMBER

22 SEPTEMBER - 03

OKTOBER

Page 33: REKAP DATA PAKET ULP KABUPATEN KEPULAUAN · PDF fileNO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI KONTRAK 1 2 3 4 5 6 7 8 9 11 12 13 ... Belanja Jasa Konsultan Perencanaan

NO N A M A P A K E T HPS / OE PPK LOKASI PESERTA NILAI

KONTRAK

1 2 3 4 5 6 7 8 9 11 12 13

TANGGAL DAN

NOMOR SURAT

MASUK

Keterangan

WAKTU PROSES

LELANG

10

SUMBER

DANANAMA POKJA

PEMENANGSELESAI

LELANG

REKAPITULASI 213,843,380,420 212,996,814,756

5 TOTAL DANA / PAKET 213,843,380,420 212,996,814,756

6 JUMLAH PAKET 186

Keterangan :

- Persiapan Lelang

- Proses Lelang

- Selesai Lelang

NIP. 19740829 200604 1 003

Dobo , 26 September 2016

KEPALA UNIT LAYANAN PENGADAAN

KABUPATEN KEPULAUAN ARU

A. F. B. METURAN, SP