NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN
(Rp.)
I. PEKERJAAN PERSIAPAN & KONSULTANSI
1 Persiapan ls 1 1,000,000
2 Desain konsultansi ls 1 2,500,000
Sub Total 1
II. PEKERJAAN MEKANIKAL
1 Anaerobic dan Aerobic Biofilter Reaktor Packed set 1 180,000,000
Type : Cilinder Capsule
Dimensi : 2.20 m x 7.00 m x 2.50 m (P x L x T)
Material : Fiberglass Reinforced Plastic (FRP)
Including :
- Anaerobic Bio Media ls 1 Termasuk
Type : Random ring (anti rusak)
Material : Polyvinyl Chlorine (PVC)
Diameter : 20 - 30 mm
Porosity : 95 - 96 %
- Aerobic Bio Media ls 1 Termasuk
Type : Random ring (anti rusak)+ Flying bioball
Material : Polyvinyl Chlorine (PVC) & HDPE plastik
Diameter : 20 - 30 mm
Porosity : 95 - 96 %
- Post Clarifier ls 1 Termasuk
Type : Tube Settler
Material : FRP Plastik
- Aeration System ls 1 Termasuk
System : Orifice Sparger System (Non Clogging)
Material : Polyvinyl Chlorine (PVC)
Brand : Wavin / Maspion / Setara
- Vent System ls 1 Termasuk
System : Air to Water (Non Chemical)
Material : Polyvinyl Chlorine (PVC)
Brand : Wavin / Maspion / Setara
- Pipe & Fitting's di dalam reaktor STP ls 1 Termasuk
Material : Polyvinyl Chlorine (PVC)
Brand : Wavin / Maspion / Setara
2 Pompa Inlet dan Cadangan Unit 2 4,000,000
Type : Submersible Pump
Capacity : 100 LPM
Total Head : 10 M
Power : 0.37 kW, 220 V, 1 ph
Brand : Tsurumi / APP / Setara
3 Blower Aerasi Unit 2 6,000,000
Type : Ring Blower
Capacity : 3.5 m3/menit, 2.100 mmAq
Power : 1.5 kW, 380 V, 3 ph
Brand : Mapcato / Setara
4 Pompa Resirkulasi Unit 1 3,000,000
Type : Submersible Pump
Capacity : 60 LPM
Total Head : 8 M
Power : 0.25 kW, 220 V, 1 ph
Brand : APP / Setara
Sub Total 2
TOTAL
(Rp.)
1,000,000
2,500,000
3,500,000
180,000,000
8,000,000
12,000,000
3,000,000
203,000,000
NO. URAIAN PEKERJAAN SAT VOLUME
III. PEKERJAAN ELEKTRIKAL
1 Control Panel ls 1
Type Outdoor
Material box Mild Steel Powder Catalog
Dimensi box 40 x 60 x 20 cm
Accessories : Main Circuit breaker, Overload, Indicator lamp,
Timer control, Water Level Control (WLC), Selector
Brand : Lokal
Kabel & Wiring (Standard PLN) lot 1
Kabel Tray lot 1
Support lot 1
Sub Total 4
II. PEKERJAAN PERPIPAAN
1 Perpipaan set 1
Material PVC AW
Brand Wavin, Paralon, etc
2 Fitting dan aksessories set 1
Material PVC AW
Brand Maspion,Langgeng, Paralon, etc
2 Valve dan aksessories set 1
Material Kuningan, PVC
Brand Alinco, Onda, etc
Sub Total 5
PEKERJAAN LAINNYA
Installation ls 1
Commissioning Test ls 1
Uji Kualitas Air di Laboratorium kali 2
Delivery Transport (Surabaya - Bandung) ls 1
Sub Total 1
PEKERJAAN BANGUNAN SIPIL
(Direkomendasikan dikerjakan kontraktor setempat)
1 Pondasi Instalasi m3 3.75
Dimensi 7.5 m x 2.5 m x 0.2 m (P x L x Tebal)
Material Cor beton bertulang
2 Rumah Blower unit 1
Material Pasangan bata dengan finishing & Pintu
3 Atap Canopy m2 24
Dimensi 8.0 m x 3.0 m x 3.0 m (P x L x Tinggi)
Material Pasangan bata dengan finishing
4 Bak Ekualisasi unit 6
Dimensi 0.8 m x 0.8 m x 3 m (P x L x T)
Material Beton bertulang
5 Bak Hasil Olahan dan Kolam Ikan unit 1
Material Pasangan bata dengan finishing
Sub Total 6
Total Harga STP
HARGA SATUAN TOTAL
(Rp.) (Rp.)
7,500,000 7,500,000
2,500,000 2,500,000
2,000,000 2,000,000
2,000,000 2,000,000
14,000,000
2,500,000 2,500,000.00
2,000,000 2,000,000.00
2,500,000 2,500,000.00
7,000,000.00
5,000,000 5,000,000.00
3,500,000 3,500,000.00
1,000,000 2,000,000.00
2,000,000 2,000,000.00
12,500,000.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0.00 q 40m3/dayD 0.8 m
240,000,000 H 3mV 1.507964m3t 0.037699 hari
0.904779 jamP 0.8 mL 0.8 mT 2.356194m