RAB Perpipaan

53
REKAPITULASI RENCANA ANGGARAN BIAYA PERPIPAAN + BANGUNAN PEL Kegiatan : Program P2TPD Dinas Kesehatan Kab. Bulukumba Lokasi Pekerjaan : Pembangunan Jaringan Perpipaan + Bangunan Peleng Tahun Anggaran Volume : 5,500 m Kabupaten NO URAIAN PEKERJAAN VOLUME JUMLAH HARGA SATUAN (Rp) 1 2 3 4 I PEK. PENDAHULUAN 12,324,167.40 II PEKERJAAN UTAMA Pengadaan Pipa 277,796,740.00 Pengadaan Accessories 15,768,700.00 Pemasangan Pipa 72,565,305.48 Pemasangan Accessories 6,552,316.49 III PEKERJAAN BANGUNAN PELENGKAP Pek. Hidrant Umum 25 7,370,984.14 Pek. Rangka Struktur Turbine 127,105,012.80 Pek. Pengadaan dan Pemasangan Turbin Angin ### Pengadaan Dan Instalasi Listrik 10,739,421.69 IV Pekerjaan Pengeboran 2 141,992,126.09 Jumlah (A) DIBULATKAN (B) PPn 10% (tidak dipungut)(10% x B = C) Jumlah (B + C) DIBULATKAN Terbilang : Tiga Milyar Sembilan Ratus Delapan Juta Sembilan Ratus Sepuluh Ribu Rupiah Bulukumba, Pimpinan Kegiatan Mengetahui / Meny Program P2TPD Dinas Kesehatan Kepala Dinas Kesehatan K Kab. Bulukumba Hasanuddin, SKM. M.Kes Dr. Hj. Rusni Sufra Nip: 196212110 198303 1 021 Pangkat : Pembin Nip ; 19530103 1980

Transcript of RAB Perpipaan

Page 1: RAB Perpipaan

REKAPITULASI RENCANA ANGGARAN BIAYA PERPIPAAN + BANGUNAN PELENGKAP

Kegiatan : Program P2TPD Dinas Kesehatan Kab. Bulukumba Lokasi : Kel. Mariorennu Pekerjaan : Pembangunan Jaringan Perpipaan + Bangunan Pelengkap Tahun Anggaran : 2010Volume : 5,500 m Kabupaten : Bulukumba

NO URAIAN PEKERJAAN VOLUMEJUMLAH

JUMLAH (Rp)HARGA SATUAN (Rp)

1 2 3 4 5

I PEK. PENDAHULUAN 12,324,167.40 12,324,167.40 II PEKERJAAN UTAMA

Pengadaan Pipa 277,796,740.00 277,796,740.00 Pengadaan Accessories 15,768,700.00 15,768,700.00 Pemasangan Pipa 72,565,305.48 72,565,305.48 Pemasangan Accessories 6,552,316.49 6,552,316.49

III PEKERJAAN BANGUNAN PELENGKAPPek. Hidrant Umum 25 7,370,984.14 184,274,603.40 Pek. Rangka Struktur Turbine 127,105,012.80 127,105,012.80 Pek. Pengadaan dan Pemasangan Turbin Angin 2,917,800,000.00 2,917,800,000.00 Pengadaan Dan Instalasi Listrik 10,739,421.69 10,739,421.69

IV Pekerjaan Pengeboran 2 141,992,126.09 283,984,252.18

Jumlah (A) 3,908,910,519.44 DIBULATKAN (B) 3,908,910,000.00

PPn 10% (tidak dipungut)(10% x B = C) 390,891,000.00 Jumlah (B + C) 4,299,801,000.00

DIBULATKAN 4,299,801,000.00

Terbilang : Tiga Milyar Sembilan Ratus Delapan Juta Sembilan Ratus Sepuluh Ribu Rupiah

Bulukumba, Februari 2010Pimpinan Kegiatan Mengetahui / Menyetujui

Program P2TPD Dinas Kesehatan Kepala Dinas Kesehatan Kab. BulukumbaKab. Bulukumba

Hasanuddin, SKM. M.Kes Dr. Hj. Rusni Sufran. M.KesNip: 196212110 198303 1 021 Pangkat : Pembina Tk.I

Nip ; 19530103 198011 2 001

Page 2: RAB Perpipaan

RENCANA ANGGARAN BIAYAKegiatan : Program P2TPD Dinas Kesehatan Kab. Bulukumba LokasiPekerjaan : Pembangunan Jaringan Perpipaan + Bangunan Pelengkap Tahun AnggaranVolume : 5,500 m Kabupaten

NO URAIAN PEKERJAANVOL. / HARGASAT. SATUAN

1 2 3 4

A. PEK. PENDAHULUAN1. 1 Pengukuran Jalur Pipa dan Pematokan 5,500.00 926.95

2 Papan Nama Proyek 1.00 ls 350,000.00 3 Administrasi dan Dokumentasi 1.00 ls 1,000,000.00 4 Back Up Data dan As Built Drawing 1.00 ls 750,000.00 5 Direksikeet 3 x 3 meter 9.00 m2 458,435.55 6 Mobilisasi Peralatan dan Tenaga Kerja 1.00 ls 1,000,000.00

J U M L A H AB. PEKERJAAN UTAMA

1. Pengadaan Pipa

Termasuk Pengangkutan Ke Lokasi Pekerjaan1 Pipa PVC Paralon std S - 12,5 RRJ 3" 4,580.00 54,571.00

2 Pipa PVC Paralon std S - 12,5 RRJ 2" 920.00 27,588.00 3 Pipa GIP 4" (pelintas) 30.00 m1 79,300.00 4 Pipa GIP 1" (pelintas) 8.00 m 12,700.00

J U M L A H2. Pengadaan Accessories

1 Long Bend Ø 3" (raubber ring) 6.00 bh 133,300.00

4.00 bh 116,700.00 2 Bell Reducer Ø 3" x Ø 2" (raubber ring) 2.00 bh 74,600.00 3 TS TEE Ø 3" (raubber ring) 3.00 bh 50,000.00 4 TS TEE Ø 3" - 2"(raubber ring) 2.00 bh 65,000.00 5 Ventil Udara Ø 13 mm 2.00 bh 425,000.00 6 Clamp Sadlle Ø 2" x 0,5" 25.00 bh 24,400.00 7 DOP 3.00 bh 36,800.00 8 Stop Kran Ø 3" (Flange) 6.00 bh 500,000.00 9 WaterMeter 3/4 25.00 bh 350,000.00

10 Stop Kran Ø 3/4 " 25.00 bh 30,100.00 J U M L A H

3. Pemasangan Pipa1 Pipa PVC Paralon std S - 12,5 RRJ 3" 4,580.00 13,452.57

2 Pipa PVC Paralon std S - 12,5 RRJ 2" 920.00 11,139.44 3 Pipa GIP 4" (pelintas) 30.00 m1 18,533.33 4 Pipa GIP 1" (pelintas) 8.00 m 18,533.33

J U M L A H4. Pemasangan Accessories

1 Bell Bend Ø 3" 6.00 bh 72,072.04

4.00 bh 66,811.88 2 Bell Reducer Ø 3" x Ø 2" (raubber ring) 2.00 bh 79,878.06 3 TS TEE Ø 3" (raubber ring) 3.00 bh 76,660.08 4 TS TEE Ø 3" - 2"(raubber ring) 2.00 bh 76,660.08 5 Ventil Udara Ø 13 mm 2.00 bh 61,200.00 6 Clamp Sadlle Ø 2" x 0,5" 25.00 bh 61,200.00 7 DOP 3.00 bh 76,660.08 8 Stop Kran Ø 3" (Flange) 6.00 bh 61,200.00 9 WaterMeter 3/4 25.00 bh 61,200.00

10 Stop Kran Ø 3/4 " 25.00 bh 61,200.00

m1

Pipa PVC, Tekanan Nominal 10 kg/cm2

m1

m1

- Ø 3" 90o

- Ø 3" 45o

m1

m1

- Ø 3" 90o

- Ø 3" 45o

Page 3: RAB Perpipaan

NO URAIAN PEKERJAANVOL. / HARGASAT. SATUAN

1 2 3 4

J U M L A HJ U M L A H B

Page 4: RAB Perpipaan

NO URAIAN PEKERJAANVOL. / HARGASAT. SATUAN

1 2 3 4

C. PEKERJAAN BANGUNAN PELENGKAP1 Pek. Hidrant Umum

1 Galian Tanah 1.22 13,900.00

2 Urugan Tanah 0.61 161,687.50

3 Urugan Sirtu Bawah Lantai 2.10 209,275.00

4 Pasangan Batu Kosong 1.43 313,942.50

5 Pasangan Pondasi Batu Kali 1 : 4 2.78 528,470.90

6 0.70 624,977.00

7 0.70 624,977.00

8 Pekerjaan Plesteran Camp. 1 : 4 6.16 26,724.90

9 Pekerjaan Acian dengan Semen 6.16 5,557.50

10 1.00 unit 3,219,300.00

11 Pas.Pipa PVC 3/4" aw 12.00 m' 5,458.75 12 Kran Air 1/2" inc. install 6.00 Bh 73,000.00 13 Plampung Ø 3/4" inc. install 1.00 unit 101,200.00

J U M L A H C2 Pek. Rangka Struktur Turbin

A Pondasi Rangka Struktur Turbin1 Galian Tanah 36.36 13,900.00

2 Urugan Tanah kembali 25.14 6,662.50

3 Lantai kerja (rabat Beton 1:3;5) 3.30 624,977.00

4 Beton Bertulang (1:2:3) 11.22 2,623,207.50 B Fabrikasi Rangka Struktur1 Pipa GIP Medium A Ø 3" 209.00 m 145,200.00 2 Pipa GIP Medium A Ø 1,5" 666.00 m 60,550.00 3 Plat Sepatu uk 30x30cm tebal 8mm 22.00 unit 64,616.26 4 Angkur 15mm 88.00 Bh 75,000.00 6 Pengecatan Rangka 135.58 m2 11,760.75 5 Biaya Fabrikasi dan instal rangka 875.00 m 16,740.68

J U M L A H 3 Pengadaan dan Instalsi Turbin Angin

1 Wind Turbine dia 1m (200 watt) 140.00 unit 18,200,000.00 2 Charge Controller 140.00 Bh 1,350,000.00 3 Inverter 5KW 6.00 Bh 19,800,000.00 4 Battery 100aH 20.00 Bh 1,850,000.00 5 Frame ukuran 3625x5790 (alum, t 2") 10.00 unit 2,500,000.00

J U M L A H D4 Pengadaan Dan Instalasi Listrik

1 Pas. Kabel NFA2X 2x10mm 1,500.00 m 3,755.00 2

30.00 btg 170,230.72

J U M L A H D

m3

m3

m3

m3

m3

Pekerjaan Rabat Beton 1 : 3 : 5 Lantai Dudukan

m3

Pekerjaan Rabat Beton 1 : 3 : 5 Tempat Cuci

m3

m2

m2

Pekerjaan Pasangan Bak Penampungan 2 m3

m3

m3

m3

m3

Tiang penyangga Gip Ø 1,5" 6 m inc dudukan beton 20x20x60cm

Page 5: RAB Perpipaan

RENCANA ANGGARAN BIAYA: Kel. Mariorennu : 2010: Bulukumba

JUMLAHHARGA

5

5,098,247.45 350,000.00 1,000,000.00 750,000.00 4,125,919.95 1,000,000.00 12,324,167.40

249,935,180.00

25,380,960.00 2,379,000.00 101,600.00 277,796,740.00

799,800.00

466,800.00 149,200.00 150,000.00 130,000.00 850,000.00 610,000.00 110,400.00 3,000,000.00 8,750,000.00 752,500.00 15,768,700.00

61,612,750.56

10,248,288.25 556,000.00 148,266.67 72,565,305.48

432,432.21

267,247.51 159,756.12 229,980.24 153,320.16 122,400.00 1,530,000.00 229,980.24 367,200.00 1,530,000.00 1,530,000.00

Page 6: RAB Perpipaan

JUMLAHHARGA

5

6,552,316.49 372,683,061.97

Page 7: RAB Perpipaan

JUMLAHHARGA

5

16,958.00

98,629.38

439,477.50

448,937.77

1,469,149.10

437,483.90

437,483.90

164,625.38

34,234.20

3,219,300.00

65,505.00 438,000.00 101,200.00

7,370,984.14

505,404.00

167,495.25

2,062,424.10

29,432,388.15 - 30,346,800.00 40,326,300.00 1,421,557.78 6,600,000.00 1,594,550.71 14,648,092.81 127,105,012.80

2,548,000,000.00 189,000,000.00 118,800,000.00 37,000,000.00 25,000,000.00

2,917,800,000.00

5,632,500.00

5,106,921.69

10,739,421.69

Page 8: RAB Perpipaan

ANALISA HARGA LUMSUMITEM PEKERJAAN PENGADAAN TURBIN ANGIN DAN INSTALASI

No Uraian Volume Satuan Harga Satuan Total Harga Harga Barang ( C ) 1.00 ea $ 1000 Harga Barang ( C ) $ 1000 ea Rp 11,000.00 Rp 11,000,000.00 Insurance ( I ) (2%) 2.00% Rp 11,000,000.00 Rp 220,000.00 Ongkos kirim ( F ) 20% 20.00% Rp 11,000,000.00 Rp 2,200,000.00

Total CIF (A) Rp 13,420,000.00

10.00% Rp 13,420,000.00 Rp 1,342,000.00

PPN = (CIF + bea masuk) * 10% 10.00% Rp 14,762,000.00 Rp 1,476,200.00 PPh = (CIF + bea masuk) * 7.5% 7.50% Rp 14,762,000.00 Rp 1,107,150.00

Jumlah Tagihan Pajak (B) Rp 3,925,350.00

Biaya kirim dari Jakarta ke Bulukumba / kg 10.00 kg 15,465.00 Rp 154,650.00

1.00 LS 350,000.00 Rp 350,000.00

Biaya Komisioning (pengetesan 48 Jam 1.00 LS 350,000.00 Rp 350,000.00

Jumlah Pekerjaan Lokal (C) Rp 854,650.00

Jumlah Material On Site dan Instalasi = A + B + C Rp 18,200,000.00

Note : $1 = Rp 11,000,-

Bea Masuk MFN (Most Favourable Nations) CIT * (10%)

Biaya Instalasi (turbin ke rumah panel , diambil jarak rata rata

Page 9: RAB Perpipaan

DAFTAR ANALISA HARGA SATUAN PERPIPAAN

A. PEKERJAAN PATOK Patok dibuat dari kayu 5/7 pjg : 50 cm dgn ujung diruncingkan :

1. 1 m2 Pengecatan : Dinding / kayu / Besi 0.2600 kg Cat Kayu / Besi @ Rp. 36,700.00 = Rp. 9,542.00 0.0025 oh Mandor @ Rp. 47,500.00 = Rp. 118.75 0.0700 oh Pekerja @ Rp. 30,000.00 = Rp. 2,100.00

Rp. 11,760.75

2. Biaya Pembuatan 100 Patok :

0.0250 Kayu Kaso Kls. II @ Rp. 3,145,000.00 = Rp. 78,625.00

0.6500 Pengecatan @ Rp. 11,760.75 = Rp. 7,644.49 0.1000 oh Mandor @ Rp. 47,500.00 = Rp. 4,750.00 1.0000 oh Tukang Kayu @ Rp. 45,000.00 = Rp. 45,000.00 1.0000 oh Pekerja @ Rp. 30,000.00 = Rp. 30,000.00 1.0000 ls Biaya Pemasangan @ Rp. 100,000.00 = Rp. 100,000.00 1.0000 ls Biaya Pengukuran @ Rp. 100,000.00 = Rp. 100,000.00

Rp. 366,019.49 Biaya Pembuatan 1 Patok : Rp. 1,452.46

3. Biaya Pengukuran 500 m Uiset Jalur Pipa : 1.0000 oh Mandor @ Rp. 47,500.00 = Rp. 47,500.00 5.0000 oh Pekerja @ Rp. 30,000.00 = Rp. 150,000.00 11.0000 bh Patok @ Rp. 1,452.46 = Rp. 15,977.04 1.0000 ls Alat Bantu @ Rp. 250,000.00 = Rp. 250,000.00

463,477.04

Rp. 926.95

B. PEKERJAAN PEMASANGAN PIPA 1. Pemasangan Per Batang Pipa PVC Dia. 3":

1.2600 Galian Tanah Biasa @ Rp. 13,900.00 = Rp. 17,514.00

0.3150 Urugan Pasir @ Rp. 145,915.00 = Rp. 45,963.23

1.0395 Urugan Tanah dan Pemadatan @ Rp. 6,662.50 = Rp. 6,925.67 1.0000 Btg Penurunan dan Penyetelan Pipa @ Rp. 10,312.50 = Rp. 10,312.50

80,715.39 Biaya Pemas. Per meter Pipa PVC Dia. 3" : Rp. 13,452.57

2. Pemasangan Per Batang Pipa PVC Dia. 2" :

0.9000 Galian Tanah Biasa @ Rp. 13,900.00 = Rp. 12,510.00

0.2700 Urugan Pasir @ Rp. 145,915.00 = Rp. 39,397.05

0.6930 Urugan Tanah dan Pemadatan @ Rp. 6,662.50 = Rp. 4,617.11 1.0000 Btg Penurunan dan Penyetelan Pipa @ Rp. 10,312.50 = Rp. 10,312.50

66,836.66 Biaya Pemas. Per meter Pipa PVC Dia. 2" : Rp. 11,139.44

C. PEMASANGAN TEE / DOP 1. Pemasangan Tee / Dop pada Pipa Dia. 100 mm dan < 100 mm :

1.0000 bh Penyetelan @ Rp. 61,200.00 = Rp. 61,200.00

0.0048 Blok Beton @ Rp. 618,842.00 = Rp. 2,970.44

0.0400 Bekisting Biasa @ Rp. 312,241.00 = Rp. 12,489.64 76,660.08

D. PEMASANGAN REDUCER 1. Pemasangan Reducer pada Pipa Dia. 100 mm dan < 100 mm :

1.0000 bh Penyetelan @ Rp. 61,200.00 = Rp. 61,200.00

0.0100 Blok Beton @ Rp. 618,842.00 = Rp. 6,188.42

0.0400 Bekisting Biasa @ Rp. 312,241.00 = Rp. 12,489.64 79,878.06

m3

m2

Biaya Pengukuran dan Pematokan Per Meter ( m1 ) :

m3

m3

m3

m3

m3

m3

m3

m2

m3

m2

Page 10: RAB Perpipaan

DAFTAR ANALISA HARGA SATUAN PERPIPAAN

F.

1. 1.0000 bh Penyetelan @ Rp. 61,200.00 = Rp. 61,200.00

0.0100 Blok Beton @ Rp. 618,842.00 = Rp. 6,188.42

0.0150 Bekisting @ Rp. 312,241.00 = Rp. 4,683.62 72,072.04

G.1. Pemasangan Bend pada Pipa Dia. 100 mm dan < 100 mm :

1.0000 bh Penyetelan @ Rp. 61,200.00 = Rp. 61,200.00

0.0015 Blok Beton @ Rp. 618,842.00 = Rp. 928.26

0.0150 Bekisting @ Rp. 312,241.00 = Rp. 4,683.62 66,811.88

H PEKERJAAN PEMASANGAN, PENURUNAN DAN PENYETELAN PIPA 1. 1 BATANG ( 6 METER ) PIPA PVC

Pipa Dia. 100 mm dan < Dia. 100 mm 0.0150 oh Mandor @ Rp. 47,500.00 = Rp. 712.50 0.0800 oh Tukang Pipa @ Rp. 45,000.00 = Rp. 3,600.00 0.1500 oh Pekerja @ Rp. 30,000.00 = Rp. 4,500.00 1.0000 oh Peralatan @ Rp. 1,500.00 = Rp. 1,500.00

= Rp. 10,312.50 Sehingga pekerjaan penyetelan Pipa PVC uk < dia 100 mm untuk 1 Meter = 1,718.75

Biaya Pemasangan Pipa PVC dia 3/4" 1.1000 m' Pipa 3/4 @ Rp. 3,400.00 = Rp. 3,740.00 1.0000 Biaya penyetelan @ Rp. 1,718.75 = Rp. 1,718.75

5,458.75

PEKERJAAN PENURUNAN DAN PENYETELAN PIPA 2. 1 BATANG ( 6 METER ) PIPA GIP

Pipa Dia. 4''mm dan < Dia. 4" 0.0200 oh Mandor @ Rp. 47,500.00 = Rp. 950.00 0.7500 oh Tukang Pipa @ Rp. 45,000.00 = Rp. 33,750.00 2.5000 oh Pekerja @ Rp. 30,000.00 = Rp. 75,000.00 1.0000 oh Peralatan @ Rp. 1,500.00 = Rp. 1,500.00

= Rp. 111,200.00 Sehingga pekerjaanPenyetelan Pipa GIP uk < dia 100 mm untuk 1 Meter = 18,533.33

I PEK. PENURUNAN / PENYAMBUNGAN FITTING (BEND/TEE/REDUCER/FLANGE SOCKET/FLANGET SPIGOT/ GIL BOULT JOINT) DAN SEJENISNYA :

1. Pipa Dia. 100 mm dan < Dia. 100 mm 0.1200 oh Mandor @ Rp. 47,500.00 = Rp. 5,700.00 0.4000 oh Tukang Pipa @ Rp. 45,000.00 = Rp. 18,000.00 1.2000 oh Pekerja @ Rp. 30,000.00 = Rp. 36,000.00 1.0000 oh Peralatan @ Rp. 1,500.00 = Rp. 1,500.00

= Rp. 61,200.00

J

1. Pipa Dia. 100 mm dan < Dia. 100 mm 0.1200 oh Mandor @ Rp. 47,500.00 = Rp. 5,700.00 0.4000 oh Tukang Pipa @ Rp. 45,000.00 = Rp. 18,000.00 1.2000 oh Pekerja @ Rp. 30,000.00 = Rp. 36,000.00 1.0000 ls Peralatan @ Rp. 1,500.00 = Rp. 1,500.00

= Rp. 61,200.00

PEMASANGAN BEND 90o

Pemasangan Bend 90o pada Pipa Dia. 100 mm dan < 100 mm :

m3

m2

PEMASANGAN BEND 45o ,22,5o , & 11./14o

m3

m2

PEK. PENURUNAN / PENYAMBUNGAN FITTING (GATE VALVE /CHECK VALVE/WATER METER/BUTTERFLY VALVE) DAN SEJENISNYA

Page 11: RAB Perpipaan

JENIS PEKERJAAN Fabrikasi Rangka strukturITEM PEKERJAAN

Kode Analisa Uraian Koofisien Harga Satuan Jumlah Harga

Analisa (Rp.) (Rp.)

- Bahan -. Elektroda Baja 0.0350 kg 110,000.00 3,850.00 -. Plat Besi T 8 mm 120 x 240 cm 0.0381 cm 1,378,500.00 52,520.85 -. Welding Set 0.1500 hr 30,312.75 4,546.91

Jumlah (A) 60,917.76

Tenaga -. Pekerja Terampil 0.0250 Oh 35,000.00 875.00 -. Tukang Las 0.0600 Oh 45,000.00 2,700.00 -. Mandor 0.0026 Oh 47,500.00 123.50

Jumlah (B) 3,698.50

Jumlah (A + B) 64,616.26

JENIS PEKERJAAN

ITEM PEKERJAAN

Kode Analisa Uraian Koofisien Harga Satuan Jumlah Harga

Analisa (Rp.) (Rp.)

ap Bahan -. Kabel NFA2X 2x10mm 1.0000 M 3,410.00 3,410.00

Jumlah (A) 3,410.00

ap. Sup Tenaga -. Pekerja 0.0100 Oh 30,000.00 300.00 -. Tukang Listrik 0.0010 Oh 45,000.00 45.00

Jumlah (B) 345.00

Jumlah (A + B) 3,755.00

: Plat Sepatu uk 30x30cm tebal 8mm

: Pemasangan Kabel Listrik

: 1 m1

Page 12: RAB Perpipaan

DAFTAR HARGA BAHAN TAHUN 2010

NO. JENIS BAHAN SAT.HARGA

KETERANGANSTANDARD(Rp)

1 2 3 4 5

BAHAN DASAR1 Batu Kali :

- Batu Kali Utuh (Besar) M³ 185,300.00 - Batu Kali (Kecil Disaring) M³ 192,400.00 - Batu Split 3 - 5 cm M³ 221,500.00 - Batu Split 2 - 3 cm M³ 263,900.00

2 Batu Gunung (Royalty) - Batu Gunung (Royalti) M³ 124,500.00

3 Tanah - Timbunan / Urug M³ 121,900.00 - Urugan Pilihan M³ 127,500.00

4 Pasir : - Timbunan / Urug M³ 113,700.00 - Pasangan M³ 156,100.00 - Beton M³ 209,500.00

5 Kerikil - Kerikil Sungai Tersaring M³ 252,500.00 - Sirtu M³ 166,500.00 - Sirtu Tersaring M³ 216,500.00

8 Semen (PC) - Tonasa 50 Kg Zak 59,250.00 - Tonasa 40 Kg Zak 47,400.00

9 Batu Merah Bh 700.00 10 Bambu Bh 11,000.00 11 Ijuk Ikat12 Flux Oil / Modifier Ltr 4,300.00 13 Kerosine / Minyak Tanah Ltr 9,500.00 14 Alat - alat Kerja (3 alat) Set 103,000.00 15 Minyak Diesel / Solar Ltr 6,000.00 16 Premium / Bensin Ltr 6,000.00 17 Minyak Pelumas / Oli Ltr 27,000.00 18 P r e m I x Ltr 7,500.00 19 Minyak Bekisting ltr 11,300.00

Page 13: RAB Perpipaan

1 2 3 4 5BAHAN KAYU

1 Kayu Kls. II - Balok M³ 3,145,000.00 - Papan M³ 3,531,400.00

BAHAN BESI1 Besi Beton Kg 14,500.00 P. Besi (1 mtr)

2 P a k u - Paku Biasa Kg 15,200.00

3 K a w a t - Beton Kg 13,400.00

4 Besi Plat

- 10 mm = 120 x 240 mm Lbr 1,378,500.00

5 Besi Strep - 30,3 mm Btg Cek Teknik Sipil - 35,4 mm Btg Untuk Besi Strep - 46,4 mm Btg Per kg - 40,6 mm Btg - 50,6 mm Btg

6 Besi Siku - 30.30.3 m' - 40.40.3 m' - 40.40.4 m' - 50.50.4 m' - 50.50.5 m' - 60.60.6 m' - 70.70.7 m'

7 Besi CNP - 100 x 6 mtr m' - 125 x 6 mtr m' - 150 x 6 mtr m'

8 Besi UNP - 50 x 6 mtr m' - 65 x 6 mtr m' - 80 x 6 mtr m' - 120 x 6 mtr m' - 150 x 6 mtr m'

8 Besi IWF Kg9 Rangka Aluminium Btg

10 Stainles Stell m'11 Plat Mur, Plong, Baut / Begel U Set12 Baja

- Gulungan Uk. Ringan / Tralis Kg - Anyaman Bronjong Kg - Anyaman Bronjong Galpanis Kg - Baut - baut Kg - Baja Galvanisasi Kg - Baja Struktur Kg - paku - paku Jembatan Kg

BAHAN PIPA1 Pipa Besi GIP

- ø 1" - 6 m m' 12,700.00 - ø 1,5" - 6 m m' 18,100.00 - ø 3" - 6 m m' 51,800.00 - ø 4" - 6 m m' 79,300.00

uk 30X30 +siku 15x15 = Rp 64.617,19

Page 14: RAB Perpipaan

2 Pipa Besi GIP Medium A - ø 1,5" - 6 m m' 60,550.00 - ø 2" - 6 m m' 74,300.00 - ø 3" - 6 m m' 145,200.00

3 Jenis Pipa Standar SNI (P = 6.00 meter)Pipa PVC Pralon Std. S - 12,5 RRJ ø 2" m' 27,588.00 Pipa PVC Pralon Std. S - 12,5 RRJ ø 3" m' 54,571.00 Pipa PVC Pralon Std. S - 12,5 RRJ ø 4" m' 66,000.00 Pipa PVC Diameter 6 " m' 139,200.00 Pipa PVC Diameter 8" m' 213,900.00 Pipa PVC Diameter 10 " m' 333,100.00

4 Lem Pipa Klg 33,200.00 5 Isolasi Pipa Bh 1,700.00 6 Sealed Pipe set 3,600.00 7 Sealed Pipe / Gasket (Washtafel) set 153,100.00 8 Sambungan Pipa PVC bh 3,600.00 9 Sambungan Pipa Galvanis bh 39,100.00

10 Long Bend Ø 3" (raubber ring)

a bh 133,300.00

b bh 116,700.00 11 Bell Reducer Ø 3" x Ø 2" (raubber ring) bh 74,600.00 12 TS TEE Ø 3" (raubber ring) bh 50,000.00 13 TS TEE Ø 3" - 2"(raubber ring) bh 65,000.00 14 TS TEE Ø 3" - 3/4" (raubber ring) bh 228,100.00 15 TS TEE Ø 2" - 3/4" (raubber ring) bh 47,400.00 16 Ventil Udara Ø 13 mm bh 425,000.00 17 DOP bh 36,800.00 18 Stop Kran Ø 3" (Flange) bh 500,000.00 19 WaterMeter 3/4 bh 350,000.00 20 Stop Kran Ø 3/4 " bh 30,100.00 21 Kran Air 1/2" bh 73,000.00 22 Clamp sadle bh 24,400.00 23 Plampung Ø 3/4" bh 101,200.00 24 Bak Fiber 2M2 bh 3,219,300.00

MATERIAL SUMUR BOR1 Bentonite Zak 500,000.00 2 STTIP Kg 300,000.00 3 Pipa GIP A dia. 4 " Meter 79,300.00 4 Pipa Paralon PVC dia. 6 " Meter 139,200.00 5 Low Carbon Screen dia. 6" Meter 139,200.00 6 Pipa GIP A dia. 1.5 " Meter 60,550.00 7 Botton Plug dia. 6" Buah 500,000.00 8 Pengadaan & pemas. Patok tanda Buah 50,000.00 9 Pengadaan & pemas. Tutup sumur Buah 350,000.00

10 Alat Bantu( ayakan, botol, ember) Set /m 50,000.00 11 Pompa Submersible 1 Phase Buah 25,000,000.00 12 Pipa PVC dia.10 " Meter 333,100.00 13 Tali Selling Mtr 36,000.00 14 Acceasories pompa dan box control Set 1,500,000.00 15 Panel, kabel, acceasories, Tiang Set 3,500,000.00 16 Elektroda Baja kg 110,000.00

1 Dolken Kayu Galam Ø 8 - 10 / 4 m Lbr 18,000.00 2 Multipleks 9 mm Lbr 223,100.00 3 Cat Kayu Kg 36,700.00

- Ø 3" 90o

- Ø 3" 45o

Page 15: RAB Perpipaan

BAHAN INSTALASI LISTRIK1 Type NYFGBY

- 2 x 10 mm m' 3,410.00

Page 16: RAB Perpipaan

DAFTAR UPAH KERJA TAHUN 2010

NO. UPAH KERJA SAT.HRG. STANDARD

KET.(Rp.)

1 2 3 4 5

1 Pekerja Tak Terlatih Org / Hr 30,000.00 Pekerja Kurang Terlatih Org / Hr 32,500.00 Pekerja Terlatih Org / Hr 35,000.00

2 Tukang Kayu Org / Hr 45,000.00 Tukang Batu Org / Hr 45,000.00 Tukang Cat Org / Hr 45,000.00 Tukang Listrik Org / Hr 45,000.00 Tukang Pipa Org / Hr 45,000.00 Tukang Besi Org / Hr 45,000.00

3 Kepala Tukang Kayu Org / Hr 50,000.00 Kepala Tukang Batu Org / Hr 50,000.00 Kepala Tukang Cat Org / Hr 50,000.00 Kepala Tukang Listrik Org / Hr 50,000.00 Kepala Tukang Pipa Org / Hr 50,000.00 Kepala Tukang Besi Org / Hr 50,000.00

4 Mandor Org / Hr 47,500.00 5 Mekanik Org / Hr 55,000.00 6 Pembantu Mekanik Org / Hr 45,000.00 7 Operator - Terampil Org / Hr 55,000.00 8 Operator - Semi Terampil Org / Hr 45,000.00 9 Pembantu Operator Org / Hr 40,000.00

10 Sopir Truk Org / Hr 50,000.00 11 Sopir Personil Org / Hr 50,000.00 12 Pembantu Sopir Org / Hr 45,000.00

Geologist Org / Hr 100,000.00 Hidrogeologist Org / Hr 75,000.00 Asisten Geologist/ hidrogiologist Org / Hr 75,000.00 Ahli Pumping Org / Hr 50,000.00 Driller Org / Hr 50,000.00 Welder Org / Hr 45,000.00 Asisten Driller Org / Hr 45,000.00

Page 17: RAB Perpipaan

INDEKS DAFTAR HARGA BAHAN PIPA TAHUN 2010(Sumber : Hasil Survey Harga pipa standard SNI dari Mks ke Blk)

No. JENIS BAHAN KODE SAT. HARGA ONGKOS TAMBANG SUB OVER

PPH JUMLAH PEMBULATAN DASAR ANGKUT GALIAN C JUMLAH HEAD

(Rp.) (Rp.) (20%) (Rp.) (15% - 20%) 1,5% (8 + 9) (Rp.) (Rp.) 1 2 3 4 5 6 7 8 9 10 11 12

1 Pipa PVC Pralon Std. S - 10 SCJ ø 1/2" - btg 16,800.00 5,000.00 - 21,800.00 3,270.00 501.40 25,571.40 25,500.00

Pipa PVC Pralon Std. S - 10 SCJ ø 3/4" - btg 25,200.00 5,000.00 - 30,200.00 4,530.00 694.60 35,424.60 35,000.00

Pipa PVC Pralon Std. S - 10 SCJ ø 1" - btg 41,400.00 5,000.00 - 46,400.00 6,960.00 1,067.20 54,427.20 54,000.00

Pipa PVC Pralon Std. S - 10 SCJ ø 1 1/4" - btg 60,300.00 5,000.00 - 65,300.00 9,795.00 1,501.90 76,596.90 76,500.00

Pipa PVC Pralon Std. S - 10 SCJ ø 1 1/2" - btg 95,400.00 5,000.00 - 100,400.00 15,060.00 2,309.20 117,769.20 117,700.00

2 Pipa PVC Pralon Std. S - 12,5 SCJ ø 2" - btg 121,200.00 5,000.00 - 126,200.00 18,930.00 2,902.60 148,032.60 148,000.00

Pipa PVC Pralon Std. S - 12,5 SCJ ø 2 1/2" - btg 171,600.00 5,000.00 - 176,600.00 26,490.00 4,061.80 207,151.80 207,000.00

Pipa PVC Pralon Std. S - 12,5 SCJ ø 3" - btg 248,100.00 5,000.00 - 253,100.00 37,965.00 5,821.30 296,886.30 296,800.00

Pipa PVC Pralon Std. S - 12,5 SCJ ø 4" - btg 364,500.00 5,000.00 - 369,500.00 55,425.00 8,498.50 433,423.50 433,000.00

3 Pipa PVC Pralon Std. S - 12,5 RRJ ø 2" - btg 125,700.00 5,000.00 - 130,700.00 19,605.00 3,006.10 153,311.10 153,000.00

Pipa PVC Pralon Std. S - 12,5 RRJ ø 2 1/2" - btg 178,200.00 5,000.00 - 183,200.00 27,480.00 4,213.60 214,893.60 214,800.00

Pipa PVC Pralon Std. S - 12,5 RRJ ø 3" - btg 257,700.00 5,000.00 - 262,700.00 39,405.00 6,042.10 308,147.10 308,000.00

Pipa PVC Pralon Std. S - 12,5 RRJ ø 4" - btg 378,300.00 5,000.00 - 383,300.00 57,495.00 8,815.90 449,610.90 449,600.00

4 Pipa GI Std. SIO Merk Bakrie ø 1/2" - btg 74,200.00 5,000.00 - 79,200.00 11,880.00 1,821.60 92,901.60 92,900.00

Pipa GI Std. SIO Merk Bakrie ø 1/2" - btg 224,900.00 5,000.00 - 229,900.00 34,485.00 5,287.70 269,672.70 269,600.00

Pipa GI Std. SIO Merk Bakrie ø 1/2" - btg 475,700.00 5,000.00 - 480,700.00 72,105.00 11,056.10 563,861.10 563,800.00

Page 18: RAB Perpipaan

Bulukumba, Februari 2005

Pemimpin Kegiatan Team Perencana,Kasi Bangunan, Kasubdin Cipta karya

H. H A M J A. S, ST DRS. BAMBANG HERU. P, M. SiNip. : 580 017 567 Pangkat : Pembina

Nip. : 580 016 635

Mengetahui :KEPALA DINAS KEPALA DINAS

……………………………………… PEKERJAAN UMUM KAB. BULUKUMBA

…………………………….. IR. BAHARUDDIN, MMPangkat : Pembina Tk. I Pangkat : Pembina Tk. I

Nip. : ………………… Nip. : 010 202 342

Mengetahui / Menyetujui :BUPATI BULUKUMBA,

H. ANDI PATABAI PABOKORI

Page 19: RAB Perpipaan

DAFTAR HARGA BAHAN TAHUN 2010NO. JENIS BAHAN SAT. HARGA STANDARD (Rp)

1 2 3 41 Batu Kali :

- Batu Kali Utuh (Besar) M³ 185,300.00 - Batu Kali (Kecil Disaring) M³ 192,400.00 - Batu Split 3 - 5 cm M³ 221,500.00 - Batu Split 2 - 3 cm M³ 263,900.00 - Batu Gunung (Royalti) M³ 124,500.00

3 Tanah - Timbunan / Urug M³ 121,900.00 - Urugan Pilihan M³ 127,500.00

4 Pasir : - Timbunan / Urug M³ 113,700.00 - Pasangan M³ 156,100.00 - Beton M³ 209,500.00

5 Kerikil - Kerikil Sungai Tersaring M³ 252,500.00 - Sirtu M³ 166,500.00 - Sirtu Tersaring M³ 216,500.00

8 Semen Pc 50 Kg Zak 59,250.00 9 Batu Merah Bh 700.00

10 Keramik 20 x 20 bh 2,000.00 11 Bambu Bh 11,000.00 12 Flux Oil / Modifier Ltr 4,300.00 13 Kerosine / Minyak Tanah Ltr 9,500.00 14 Alat - alat Kerja (3 alat) Set 103,000.00 15 Minyak Diesel / Solar Ltr 6,000.00 16 Premium / Bensin Ltr 6,000.00 17 Minyak Pelumas / Oli Ltr 27,000.00 18 P r e m I x Ltr 7,500.00 19 Minyak Bekisting ltr 11,300.00 20 Kayu Kls. II

- Balok M³ 3,145,000.00 - Papan M³ 3,531,400.00

21 Besi Beton Kg 14,500.00 22 Paku Biasa Kg 15,200.00 23 Besi

- Beton Kg 13,400.00 - Plat 8 mm = 120 x 240 mm Lbr 1,378,500.00 - Angkur 15 mm bh 75000

24 Pipa Besi GIP - ø 1" - 6 m m' 12,700.00 - ø 1,5" - 6 m m' 18,100.00 - ø 3" - 6 m m' 51,800.00 - ø 4" - 6 m m' 79,300.00

25 Pipa Besi GIP Medium A - ø 1,5" - 6 m m' 60,550.00 - ø 2" - 6 m m' 74,300.00 - ø 3" - 6 m m' 145,200.00

26 Jenis Pipa Standar SNI (P = 6.00 meter)Pipa PVC Pralon Std. S - 12,5 RRJ ø 2" m' 27,588.00 Pipa PVC Pralon Std. S - 12,5 RRJ ø 3" m' 54,571.00 Pipa PVC Pralon Std. S - 12,5 RRJ ø 4" m' 66,000.00 Pipa PVC Diameter 3/4 " m' 3,400.00 Pipa PVC Diameter 6 " m' 139,200.00 Pipa PVC Diameter 8" m' 213,900.00 Pipa PVC Diameter 10 " m' 333,100.00

27 Lem Pipa Klg 33,200.00 28 Isolasi Pipa Bh 1,700.00 29 Sealed Pipe set 3,600.00 30 Sealed Pipe / Gasket (Washtafel) set 153,100.00 31 Sambungan Pipa PVC bh 3,600.00 32 Sambungan Pipa Galvanis bh 39,100.00 33 Long Bend Ø 3" (raubber ring)a bh 133,300.00 b bh 116,700.00 c bh 116,700.00

34 Bell Reducer Ø 3" x Ø 2" (raubber ring) bh 74,600.00 35 TS TEE Ø 3" (raubber ring) bh 50,000.00

TS TEE Ø 3" - 2"(raubber ring) bh 65,000.00 TS TEE Ø 3" - 3/4" (raubber ring) bh 228,100.00 TS TEE Ø 2" - 3/4" (raubber ring) bh 47,400.00

36 Ventil Udara Ø 13 mm bh 425,000.00 37 DOP bh 36,800.00 38 a. Stop Kran Ø 3" (Flange) bh 500,000.00

b. Stop Kran Ø 2" (Flange) bh 450,000.00 39 WaterMeter 3/4 bh 350,000.00 40 Stop Kran Ø 3/4 " bh 30,100.00 41 Kran Air 1/2" inc. install bh 73,000.00 42 Clamp sadle bh 24,400.00 43 Plampung Ø 3/4" inc. install bh 101,200.00 44 Bak Fiber 2M2 bh 3,219,300.00 45 Wind Turbine dia 1m (200 watt) inc install bh 18,200,000.00 46 Charge Controller inc install bh 1,350,000.00 47 Inverter 5KW inc install bh 19,800,000.00

- Ø 3" 90o

- Ø 3" 45o

- Ø 2" 90o

Page 20: RAB Perpipaan

48 Battery 100aH inc install bh 1,850,000.00 49 Seng Gelombang BWG 33" BJLS 0.22 mm Feet 8,000.00 50 Pintu PVC inc. Install SET 300,000.00 1 2 3 452 Frame ukuran 3625x5790 (alum, t 2") ea 2,500,000.00 53 Bentonite Zak 500,000.00 54 STTIP Kg 300,000.00 55 Pipa GIP A dia. 4 " Meter 79,300.00 56 Pipa Paralon PVC dia. 6 " Meter 139,200.00 57 Low Carbon Screen dia. 6" Meter 139,200.00 58 Pipa GIP A dia. 1.5 " Meter 60,550.00 59 Botton Plug dia. 6" Buah 500,000.00 60 Pengadaan & pemas. Patok tanda Buah 50,000.00 61 Pengadaan & pemas. Tutup sumur Buah 350,000.00 62 Alat Bantu( ayakan, botol, ember) Set /m 50,000.00 63 Pompa Submersible 1 Phase Buah 25,000,000.00 64 Pompa Submersible 3 Phase Buah 27,000,000.00 65 Pipa PVC dia.10 " Meter 333,100.00 66 Tali Selling Mtr 36,000.00 67 Acceasories pompa Box Control inc install Set 1,500,000.00 68 Kabel dan tiang Tiang inc install Set 1,000,000.00 69 Elektroda Baja kg 110,000.00 70 Dolken Kayu Galam Ø 8 - 10 / 4 m Lbr 18,000.00 71 Multipleks 9 mm Lbr 223,100.00 72 Cat Kayu Kg 36,700.00 73 Kabel NFA2X

- 2 x 10 mm m' 3,410.00

DAFTAR UPAH KERJA TAHUN 2010

NO. UPAH KERJA SAT.HRG. STANDARD

(Rp.)1 2 3 4

1 Pekerja Tak Terlatih Org / Hr 30,000.00 Pekerja Kurang Terlatih Org / Hr 32,500.00 Pekerja Terlatih Org / Hr 35,000.00

2 Tukang Kayu Org / Hr 45,000.00 Tukang Batu Org / Hr 45,000.00 Tukang Cat Org / Hr 45,000.00 Tukang Listrik Org / Hr 45,000.00 Tukang Pipa Org / Hr 45,000.00 Tukang Besi Org / Hr 45,000.00

3 Kepala Tukang Kayu Org / Hr 50,000.00 Kepala Tukang Batu Org / Hr 50,000.00 Kepala Tukang Cat Org / Hr 50,000.00 Kepala Tukang Listrik Org / Hr 50,000.00 Kepala Tukang Pipa Org / Hr 50,000.00 Kepala Tukang Besi Org / Hr 50,000.00

4 Mandor Org / Hr 47,500.00 5 Mekanik Org / Hr 55,000.00 6 Pembantu Mekanik Org / Hr 45,000.00 7 Operator - Terampil Org / Hr 55,000.00 8 Operator - Semi Terampil Org / Hr 45,000.00 9 Pembantu Operator Org / Hr 40,000.00

10 Sopir Truk Org / Hr 50,000.00 11 Sopir Personil Org / Hr 50,000.00 12 Pembantu Sopir Org / Hr 45,000.00 13 Geologist Org / Hr 100,000.00 14 Hidrogeologist Org / Hr 75,000.00 15 Asisten Geologist/ hidrogiologist Org / Hr 75,000.00 16 Ahli Pumping Org / Hr 50,000.00 17 Driller Org / Hr 50,000.00 18 Welder Org / Hr 45,000.00 19 Asisten Driller Org / Hr 45,000.00

Bupati Kabupaten Bulukumba

A.M Sukri Sappewali

Page 21: RAB Perpipaan

REKAPITULASI RENCANA ANGGARAN BIAYA PERPIPAAN + BANGUNAN PELENGKAP

Kegiatan : Program P2TPD Dinas Kesehatan Kab. Bulukumba Lokasi : Desa CarammingPekerjaan : Pembangunan Jaringan Perpipaan + Bangunan Pelengkap Tahun Anggaran : 2010Volume : 7150 M Kabupaten : Bulukumba

NO URAIAN PEKERJAAN VOLUMEJUMLAH

JUMLAH (Rp)HARGA SATUAN (Rp)

1 2 3 4 5

I PEK. PENDAHULUAN 13,853,641.64 13,853,641.64 II PEKERJAAN UTAMA

Pengadaan Pipa 259,405,850.00 259,405,850.00 Pengadaan Accessories 14,501,600.00 14,501,600.00 Pemasangan Pipa 86,291,151.41 86,291,151.41 Pemasangan Accessories 6,879,272.63 6,879,272.63

III PEKERJAAN BANGUNAN PELENGKAPPek. Hidrant Umum 33 6,544,681.81 215,974,499.89

IV Pekerjaan Pengeboran 2 200,105,838.63 400,211,677.26 Pekerjaan Reservoir (Tower) 1 43,882,321.04 43,882,321.04

Jumlah 1,041,000,013.87 DIBULATKAN (B) 1,041,000,000.00

PPn 10% (tidak dipungut)(10% x B = C) 104,100,000.00 Jumlah (B + C) 1,145,100,000.00

DIBULATKAN 1,145,100,000.00

Terbilang : Satu Milyar Empat Puluh Satu Juta Rupiah

Bulukumba, Februari 2010Pimpinan Kegiatan Kepala Dinas Kesehatan Kab. Bulukumba

Program P2TPD Dinas KesehatanKab. Bulukumba

Hasanuddin, SKM. M.Kes Dr. Hj. Rusni Sufran. M.KesNip: 196212110 198303 1 021 Pangkat : Pembina Tk.I

Nip : 19530103 198011 2 001

Page 22: RAB Perpipaan

RENCANA ANGGARAN BIAYAKegiatan : Program P2TPD Dinas Kesehatan Kab. Bulukumba LokasiPekerjaan : Pembangunan Jaringan Perpipaan + Bangunan Pelengkap Tahun AnggaranVolume : 7150 m Kabupaten

NO URAIAN PEKERJAANVOL. / HARGASAT. SATUAN

1 2 3 4

A. PEK. PENDAHULUAN1. 1 Pengukuran Jalur Pipa dan Pematokan 7,150.00 926.95

2 Papan Nama Proyek 1.00 ls 350,000.00 3 Administrasi dan Dokumentasi 1.00 ls 1,000,000.00 4 Back Up Data dan As Built Drawing 1.00 ls 750,000.00 5 Direksikeet 3 x 3 meter 9.00 m2 458,435.55 6 Mobilisasi Peralatan dan Tenaga Kerja 1.00 ls 1,000,000.00

J U M L A H AB. PEKERJAAN UTAMA

1. Pengadaan Pipa

Termasuk Pengangkutan Ke Lokasi Pekerjaan1 Pipa PVC Paralon std S - 12,5 RRJ 3" 2,150.00 54,571.00

2 Pipa PVC Paralon std S - 12,5 RRJ 2" 5,150.00 27,588.00 J U M L A H

2. Pengadaan Accessories1 Long Bend Ø 3" (raubber ring)

1.00 bh 133,300.00

2.00 bh 116,700.00 2 Bell Reducer Ø 3" x Ø 2" (raubber ring) 2.00 bh 74,600.00 3 TS TEE Ø 3" - 2"(raubber ring) 1.00 bh 65,000.00 4 Ventil Udara Ø 13 mm 1.00 bh 425,000.00 5 Clamp Sadlle Ø 2" x 0,5" 33.00 bh 24,400.00 6 DOP 4.00 bh 36,800.00 7 WaterMeter 3/4 33.00 bh 350,000.00 8 Stop Kran Ø 3/4 " 33.00 bh 30,100.00

J U M L A H3. Pemasangan Pipa

1 Pipa PVC Paralon std S - 12,5 RRJ 3" 2,150.00 13,452.57

2 Pipa PVC Paralon std S - 12,5 RRJ 2" 5,150.00 11,139.44 J U M L A H

4. Pemasangan Accessories1 Bell Bend Ø "

1.00 bh 72,072.04

2.00 bh 72,072.04 2 Bell Reducer Ø 3" x Ø 2" (raubber ring) 2.00 bh 79,878.06 3 TS TEE Ø 3" - 2"(raubber ring) 1.00 bh 76,660.08 4 Ventil Udara Ø 13 mm 1.00 bh 61,200.00 5 Clamp Sadlle Ø 2" x 0,5" 33.00 bh 61,200.00 6 DOP 4.00 bh 76,660.08 7 WaterMeter 3/4 33.00 bh 61,200.00 8 Stop Kran Ø 3/4 " 33.00 bh 61,200.00

J U M L A HJ U M L A H B

m1

Pipa PVC, Tekanan Nominal 10 kg/cm2

m1

m1

- Ø 3" 90o

- Ø 2" 90o

m1

m1

- Ø 3" 90o

- Ø 2" 90o

Page 23: RAB Perpipaan

NO URAIAN PEKERJAANVOL. / HARGASAT. SATUAN

1 2 3 4

C. PEKERJAAN BANGUNAN PELENGKAP1 Pek. Hidrant Umum

1 Galian Tanah 1.03 13,900.00

2 Urugan Tanah 0.52 161,687.50

3 Urugan Sirtu Bawah Lantai 1.95 209,275.00

4 Pasangan Batu Kosong 0.99 313,942.50

5 Pasangan Pondasi Batu Kali 1 : 4 1.90 528,470.90

6 0.60 624,977.00

7 0.56 624,977.00

8 Pekerjaan Plesteran Camp. 1 : 4 5.40 26,724.90

9 Pekerjaan Acian dengan Semen 5.40 5,557.50

10 1.00 unit 3,219,300.00

11 Pas.Pipa PVC 3/4" aw 12.00 m' 5,458.75 12 Kran Air 1/2" inc. install 6.00 Bh 73,000.00 13 Plampung Ø 3/4" inc. install 1.00 unit 101,200.00

J U M L A H CD PEKERJAAN RESERVOIR (TOWER)

I Pekerjaan Tanah 1 Galian Tanah Pondasi 13.20 m3 13,900.00 2 Urugan Tanah kembali 0.54 m3 6,662.50 3 Urugan Sirtu Bawah Lantai 3.40 m3 209,275.00 4 Urugan Pasir Bawah Lantai dan Pondasi 0.54 m3 145,915.00

JUMLAH III Pekerjaan Batu dan Beton

1 Pasangan Batu Kosong 2.82 m3 313,942.50 2 Pasangan Batu Kali 1:4 6.79 m3 528,470.90 3 Pek. Dinding Batu Bata 1:4 15.78 m2 84,652.30 4 Pekerjaan Beton 12.12 m3 2,623,207.50 5 Rabat Beton Lantai R. Panel 0.5 m3 624,977.00 7 Plasteran 1:4 27.24 m2 26,724.90 8 Acian Semen 27.24 m2 5,557.50 9 Pek. Lantai Keramik 20X20 14.00 m2 107,827.20

10 Pek Dinding Keramik 20x20 5.00 m2 110,101.70 JUMLAH II

III Pek. Pintu, dan tangga1 Tangga Besi

a. Pipa GIP Medium A Ø 1,5" 18.50 m 60,550.00 b. Biaya Fabrikasi dan Install 18.50 m 16,740.68

7 Pintu PVC inc. Install 1.00 set 300,000.00 JUMLAH III

IV Pekerjaan Pengecatan 1 Pengecatan Dinding 27.24 m2 11,760.75

JUMLAH IVJUMLAH D

m3

m3

m3

m3

m3

Pekerjaan Rabat Beton 1 : 3 : 5 Lantai Dudukan

m3

Pekerjaan Rabat Beton 1 : 3 : 5 Tempat Cuci

m3

m2

m2

Pekerjaan Pasangan Bak Penampungan 2 m3

Page 24: RAB Perpipaan

RENCANA ANGGARAN BIAYA: Desa Caramming: 2010: Bulukumba

JUMLAHHARGA

5

6,627,721.69 350,000.00 1,000,000.00 750,000.00 4,125,919.95 1,000,000.00 13,853,641.64

117,327,650.00

142,078,200.00 259,405,850.00

133,300.00

233,400.00 149,200.00 65,000.00 425,000.00 805,200.00 147,200.00 11,550,000.00 993,300.00 14,501,600.00

28,923,016.09

57,368,135.31 86,291,151.41

72,072.04

144,144.07 159,756.12 76,660.08 61,200.00 2,019,600.00 306,640.33 2,019,600.00 2,019,600.00 6,879,272.63 367,077,874.04

Page 25: RAB Perpipaan

JUMLAHHARGA

5

14,317.00

84,077.50

408,086.25

310,803.08

1,004,094.71

374,986.20

349,987.12

144,314.46

30,010.50

3,219,300.00

65,505.00 438,000.00 101,200.00 6,544,681.81

183,480.00 3,597.75 711,535.00 78,794.10 977,406.85

885,317.85 3,588,317.41 1,335,813.29 31,793,274.90 312,488.50 727,986.28 151,386.30 1,509,580.80 550,508.50 40,854,673.83

- 1,120,175.00 309,702.53 300,000.00 1,729,877.53

320,362.83 320,362.83 43,882,321.04

Page 26: RAB Perpipaan

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)12 JENIS PEKERJAAN

ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.4.1 Bahan -. Semen Portland (PC 50 K 0.1040 Zak 59,250.00 -. Pasir Pasang 0.0200 M³ 156,100.00

Jumlah (A)

6.4.2 Tenaga -. Pekerja 0.2000 Oh 30,000.00 -. Tukang Batu 0.1500 Oh 45,000.00 -. Kepala Tukang 0.0150 Oh 50,000.00 -. Mandor 0.0100 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)13 JENIS PEKERJAAN

ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.47.1 Bahan -. Ubin Keramik 30 x 30 cm 11.1111 Bh - -. Semen Portlan (PC 50 Kg) 0.2276 Zak 59,250.00 -. Pasir Pasang 0.0420 M³ 156,100.00 -. Semen Warna (PC 40 Kg) 0.0375 Zak 47,400.00

Jumlah (A)

6.47.2 Tenaga -. Pekerja 0.2500 Oh 30,000.00 -. Tukang Batu 0.1200 Oh 45,000.00 -. Kepala Tukang 0.0120 Oh 50,000.00 -. Mandor 0.0125 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAAN

: PEKERJAAN PLESTERAN: 1 m² Plesteran Batu Bata 1 : 4 (Tebal 15 mm)

: PEKERJAAN LANTAI: 1 m² Pasangan Lantai Keramik Ukuran 30 x 30 cm

Page 27: RAB Perpipaan

ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHANBERDASARKAN SNI - 2001 (EDISI REVISI)

14 JENIS PEKERJAANITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.44.1 Bahan -. Ubin Keramik 20 x 20 cm 25.0000 Bh - -. Semen Portlan (PC 50 Kg) 0.2276 Zak 59,250.00 -. Pasir Pasang 0.0420 M³ 156,100.00 -. Semen Warna (PC 40 Kg) 0.0375 Zak 47,400.00

Jumlah (A)

6.44.2 Tenaga -. Pekerja 0.6200 Oh 30,000.00 -. Tukang Batu 0.3500 Oh 45,000.00 -. Kepala Tukang 0.0350 Oh 50,000.00 -. Mandor 0.0300 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)15 JENIS PEKERJAAN

ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.44.1 Bahan -. Keramik 20 x 25 cm (War 20.0000 Bh Err:509-. Semen Portlan (PC 50 Kg) 0.1860 Zak 59,250.00 -. Pasir Pasang 0.0180 M³ 156,100.00 -. Semen Warna (PC 40 Kg) 0.0375 Zak 47,400.00

Jumlah (A)

6.44.2 Tenaga -. Pekerja 0.6200 Oh 30,000.00 -. Tukang Batu 0.3500 Oh 45,000.00 -. Kepala Tukang 0.0350 Oh 50,000.00 -. Mandor 0.0300 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)16 JENIS PEKERJAAN

: PEKERJAAN LANTAI: 1 m² Pasangan Lantai Keramik Ukuran 20 x 20 cm

: PEKERJAAN LANTAI: 1 m² Pasangan Dinding Keramik Ukuran 20 x 25 cm

: PEKERJAAN KAYU

Page 28: RAB Perpipaan

ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.1.1 Bahan -. Balok Kls. I (Jati / Bayam) 1.1000 M³ -

Jumlah (A)

6.1.2 Tenaga -. Pekerja 6.0000 Oh 30,000.00 -. Tukang Kayu 20.0000 Oh 45,000.00 -. Kepala Tukang 2.0000 Oh 50,000.00 -. Mandor 0.3000 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)17 JENIS PEKERJAAN

ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.7.1 Bahan -. Papan Kls. I (Jati / Bayam 0.0400 M³ -

Jumlah (A)

6.7.2 Tenaga -. Pekerja 1.0000 Oh 30,000.00 -. Tukang Kayu 2.5000 Oh 45,000.00 -. Kepala Tukang 0.2500 Oh 50,000.00 -. Mandor 0.0500 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)18 JENIS PEKERJAAN

ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

: 1 m³ Pas. Kusen Pintu dan Jendela Kls. I (Jati / Bayam)

: PEKERJAAN KAYU: 1 m² Pas. Pintu Panil Kls. I (Jati / Bayam)

: PEKERJAAN KAYU + KACA: 1 m² Pas. Pintu dan Jendela Kaca Kls. II (Kamper / Meranti)

Page 29: RAB Perpipaan

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)BINGKAI KACA (I)

6.10.1 Bahan -. Papan Kls. II (Kamper / M 0.0350 M³ 3,531,400.00

Jumlah (A)

6.10.2 Tenaga -. Pekerja 0.8000 Oh 30,000.00 -. Tukang Kayu 2.0000 Oh 45,000.00 -. Kepala Tukang 0.2000 Oh 50,000.00 -. Mandor 0.0400 Oh 47,500.00

Jumlah (B)KACA BENING 5 MM (II)

6.17.1 Bahan -. Kaca Bening 5 mm 1.1000 M² -

Jumlah (A)

6.17.2 Tenaga -. Pekerja 0.0150 Oh 30,000.00 -. Tukang Kayu 0.1500 Oh 45,000.00 -. Kepala Tukang 0.0150 Oh 50,000.00 -. Mandor 0.0008 Oh 47,500.00

Jumlah (B)

Jumlah (I + II)

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)19 JENIS PEKERJAAN

ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.12.1 Bahan -. Papan Kls. I (Jati / Bayam 0.0640 M³ -

Jumlah (A)

6.12.2 Tenaga -. Pekerja 1.0000 Oh 30,000.00 -. Tukang Kayu 3.0000 Oh 45,000.00 -. Kepala Tukang 0.3000 Oh 50,000.00 -. Mandor 0.3000 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

: PEKERJAAN KAYU: 1 m² Pas. Pintu dan Jendela Jalusi Kls. I (Jati / Bayam)

Page 30: RAB Perpipaan

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)20 JENIS PEKERJAAN

ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.27.1 Bahan -. Balok Kls. I (Jati / Bayam) 1.1000 M³ - -. Besi Strip 15.0000 Kg - -. Paku Biasa 2" - 5" 0.8000 Kg 15,200.00

Jumlah (A)

6.27.2 Tenaga -. Pekerja 4.0000 Oh 30,000.00 -. Tukang Kayu 12.0000 Oh 45,000.00 -. Kepala Tukang 1.2000 Oh 50,000.00 -. Mandor 0.2000 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)21 JENIS PEKERJAAN

ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.28.1 Bahan -. Balok Kls. II (Kamper / M 1.1000 M³ 3,145,000.00 -. Besi Strip 15.0000 Kg - -. Paku Biasa 2" - 5" 0.8000 Kg 15,200.00

Jumlah (A)

6.28.2 Tenaga -. Pekerja 4.0000 Oh 30,000.00 -. Tukang Kayu 12.0000 Oh 45,000.00 -. Kepala Tukang 1.2000 Oh 50,000.00 -. Mandor 0.2000 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

: PEKERJAAN KAYU: 1 m³ Pas. Konstruksi Kuda - Kuda Kls. I (Jati / Bayam)

: PEKERJAAN KAYU: 1 m³ Pas. Konstruksi Kuda - Kuda / Gording Kls. II (Kamper / Meranti)

Page 31: RAB Perpipaan

BERDASARKAN SNI - 2001 (EDISI REVISI)22 JENIS PEKERJAAN

ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.39.1 Bahan -. Balok Kls. II (Kamper / M 0.0120 M³ 3,145,000.00 -. Paku Biasa 2" - 5" 0.1000 Kg 15,200.00

Jumlah (A)

6.39.2 Tenaga -. Pekerja 0.1500 Oh 30,000.00 -. Tukang Kayu 0.2500 Oh 45,000.00 -. Kepala Tukang 0.0250 Oh 50,000.00 -. Mandor 0.0750 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)23 JENIS PEKERJAAN

ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.1.1 Bahan -. Eternit 100 x 100 cm 1.1000 Lbr - -. Paku 0.0100 Kg 15,200.00

Jumlah (A)

6.1.2 Tenaga -. Pekerja 0.0300 Oh 30,000.00 -. Tukang Kayu 0.0700 Oh 45,000.00 -. Kepala Tukang 0.0070 Oh 50,000.00 -. Mandor 0.0015 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)24 JENIS PEKERJAAN

ITEM PEKERJAAN

: PEKERJAAN KAYU: 1 m² Pas. Rangka Langit - Langit 100 x 100 cm Kls. II (Kamper / Meranti)

: PEKERJAAN LANGIT - LANGIT: 1 m² Langit - Langit Eternit 100 x 100 cm (Tebal = 6 mm)

: PEKERJAAN KAYU: 1 m' Pas. Listplank Uk. 2/30 cm Kls. I (Jati / Bayam)

Page 32: RAB Perpipaan

INSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.39.1 Bahan -. Papan Kls. I (Jati / Bayam 0.0060 M³ - -. Paku Biasa 2" - 5" 0.0500 Kg 15,200.00

Jumlah (A)

6.39.2 Tenaga -. Pekerja 0.1000 Oh 30,000.00 -. Tukang Kayu 0.2000 Oh 45,000.00 -. Kepala Tukang 0.0250 Oh 50,000.00 -. Mandor 0.0050 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)25 JENIS PEKERJAAN

ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.60.1 Bahan -. Kayu Profil 1.0500 M' Err:509

Jumlah (A)

6.60.2 Tenaga -. Pekerja 0.0210 Oh 30,000.00 -. Tukang Kayu 0.0210 Oh 45,000.00 -. Kepala Tukang 0.0020 Oh 50,000.00 -. Mandor 0.0010 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)26 JENIS PEKERJAAN

ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBA

: PEKERJAAN KAYU: 1 m' Pas. List Plafound Kayu Profil

: PEKERJAAN ATAP: 1 m² Pas. Atap Seng Gelombang

Page 33: RAB Perpipaan

TAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.38.1 Bahan -. Seng Gelombang BWG 33" 6.0000 Ft - -. Paku Seng (Payung) RRT 0.0200 Kg Err:509

Jumlah (A)

6.38.2 Tenaga -. Pekerja 0.0210 Oh 30,000.00 -. Tukang Kayu 0.0210 Oh 45,000.00 -. Kepala Tukang 0.0020 Oh 50,000.00 -. Mandor 0.0010 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)27 JENIS PEKERJAAN

ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!

Kode Analisa Uraian Koofisien Harga Satuan

Analisa (Rp.)

6.39.1 Bahan -. Seng Plat BJLS 0.28 mm 0.3000 Lbr - -. Paku Seng (Payung) RRT 0.0200 Kg Err:509

Jumlah (A)

6.39.2 Tenaga -. Pekerja 0.0210 Oh 30,000.00 -. Tukang Kayu 0.0210 Oh 45,000.00 -. Kepala Tukang 0.0020 Oh 50,000.00 -. Mandor 0.0010 Oh 47,500.00

Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)28 JENIS PEKERJAAN

: PEKERJAAN ATAP: 1 m² Pas. Atap Nok Seng

: PEKERJAAN PENGECETAN

Page 34: RAB Perpipaan

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)

Jumlah Harga(Rp.)

6,162.00 3,122.00

9,284.00

6,000.00 6,750.00 750.00 475.00 13,975.00

23,259.00

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)

Jumlah Harga(Rp.)

- 13,485.30 6,556.20 1,777.50

21,819.00

7,500.00 5,400.00 600.00 593.75 14,093.75

35,912.75

ANALISA HARGA SATUAN BIAYA PEKERJAAN

Page 35: RAB Perpipaan

ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHANBERDASARKAN SNI - 2001 (EDISI REVISI)

Jumlah Harga(Rp.)

- 13,485.30 6,556.20 1,777.50

21,819.00

18,600.00 15,750.00 1,750.00 1,425.00 37,525.00

59,344.00

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)

Jumlah Harga(Rp.)

Err:509 11,020.50 2,809.80 1,777.50

Err:509

18,600.00 15,750.00 1,750.00 1,425.00 37,525.00

Err:509

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)

Page 36: RAB Perpipaan

Jumlah Harga(Rp.)

-

-

180,000.00 900,000.00 100,000.00 14,250.00 1,194,250.00

1,194,250.00

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)

Jumlah Harga(Rp.)

-

-

30,000.00 112,500.00 12,500.00 2,375.00 157,375.00

157,375.00

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)

Page 37: RAB Perpipaan

Jumlah Harga(Rp.)

249,499.00

123,599.00

123,599.00

24,000.00 90,000.00 10,000.00 1,900.00 125,900.00 7,985.63

-

-

450.00 6,750.00 750.00 35.63 7,985.63

257,484.63

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)

Jumlah Harga(Rp.)

-

-

30,000.00 135,000.00 15,000.00 14,250.00 194,250.00

194,250.00

Page 38: RAB Perpipaan

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)

Jumlah Harga(Rp.)

- - 12,160.00

12,160.00

120,000.00 540,000.00 60,000.00 9,500.00 729,500.00

741,660.00

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)

Jumlah Harga(Rp.)

3,459,500.00 - 12,160.00

3,471,660.00

120,000.00 540,000.00 60,000.00 9,500.00 729,500.00

4,201,160.00

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

1 m³ Pas. Konstruksi Kuda - Kuda / Gording Kls. II (Kamper / Meranti)

Page 39: RAB Perpipaan

BERDASARKAN SNI - 2001 (EDISI REVISI)

Jumlah Harga(Rp.)

37,740.00 1,520.00

39,260.00

4,500.00 11,250.00 1,250.00 3,562.50 20,562.50

59,822.50

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)

Jumlah Harga(Rp.)

- 152.00

152.00

900.00 3,150.00 350.00 71.25 4,471.25

4,623.25

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)

1 m² Pas. Rangka Langit - Langit 100 x 100 cm Kls. II (Kamper / Meranti)

Page 40: RAB Perpipaan

Jumlah Harga(Rp.)

- 760.00

760.00

3,000.00 9,000.00 1,250.00 237.50 13,487.50

14,247.50

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)

Jumlah Harga(Rp.)

Err:509

Err:509

630.00 945.00 100.00 47.50 1,722.50

Err:509

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)

Page 41: RAB Perpipaan

Jumlah Harga(Rp.)

- Err:509

Err:509

630.00 945.00 100.00 47.50 1,722.50

Err:509

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)

Jumlah Harga(Rp.)

- Err:509

Err:509

630.00 945.00 100.00 47.50 1,722.50

Err:509

ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)