PENERAPAN SHE - sibima.pu.go.id

43
PENERAPAN SHE Construction of Jakarta Mass Rapid Transit ( Underground Section) CP 104 & CP 105 Oleh : MUHAMMAD RIDHO Uji Keahlian Manajer Proyek (PMBOK) Jakarta, 29 Agustus 2016 PT. Wijaya Karya (Persero), Tbk

Transcript of PENERAPAN SHE - sibima.pu.go.id

Page 1: PENERAPAN SHE - sibima.pu.go.id

PENERAPAN SHE

Construction of Jakarta Mass Rapid Transit (Underground Section)CP 104 & CP 105

Oleh :

MUHAMMAD RIDHO

Uji Keahlian Manajer Proyek (PMBOK)Jakarta, 29 Agustus 2016

PT. Wijaya Karya (Persero), Tbk

Page 2: PENERAPAN SHE - sibima.pu.go.id

RIWAYAT HIDUP

Nama : Muhammad RidhoTTL : Jakarta, 9 Oktober 1990Status : MenikahAlamat : Jl. Karang Pola 2 No.7. Pasar Minggu

PENDIDIKAN2008 – 2012, Sarjana Kesehatan Masyarakat, Universitas Indonesia

RIWAYAT PEKERJAAN DI WIKA2012 – 2013, PT. Wijaya Karya Departemen Sipil Umum, Staff QSHE2013 – 2015, Proyek MRT Underground, SHE Officer 1052015 – Skrg, Proyek MRT Underground, SHE Manajer

Page 3: PENERAPAN SHE - sibima.pu.go.id

Nama Proyek Construction of Jakarta Mass Rapid Transit Underground Section Packet.CP 104 (Sta. 9+211 – Sta. 11+043)CP 105 (Sta. 11+043 – Sta. 13+103)

Lokasi proyek Jl. Sudirman, Jakarta SelatanDKI Jakarta – Indonesia

Tujuan proyek Untuk menyediakan transportasi massal yang aman, nyaman, dan terpercaya.

Pemilik proyek PT. Mass Rapid Transit JakartaJadwal pelaksanaan 57 bulan

Skema Proyek Joint VentureShimizu Corporation – Obayashi – Wijaya Karya – Jaya Konstruksi

Tipe Proyek Design & BuiltTipe Kontrak Lump sum contract

Berdasarkan FIDIC Yellow Book (Plan & Design Build)Designer Mott Mac DonaldLingkup pekerjaan Civil work, M/E, architect, and tunnel

PENJELASAN UMUM PROYEK

Page 4: PENERAPAN SHE - sibima.pu.go.id

PENJELASAN UMUM PROYEK

PROJECT STAKEHOLDER

Page 5: PENERAPAN SHE - sibima.pu.go.id

Phase-2:Length = 8.1km7-Stations(Including 6 UndergroundStations)

Phase-1:Length = 15.7km(Underground: 6.0km)13-Stations(Including 6 UndergroundStations)

6Contract Packages(CP101-CP106)

Total Length=23.8km20-Stations

PENJELASAN UMUM PROYEK

Page 6: PENERAPAN SHE - sibima.pu.go.id

Jakarta MRT South-North Corridor Phase-1

Underground: 5.9kmCP104-106

CP101/102Tokyu・WIKA

CP103Obayashi・

Shimizu・JAYACP106

SMCC・HK

Elevated: 9.8kmCP101-103

CP104/105Shimizu・Obayashi・

WIKA・JAYA

LINGKUP PROYEK (2)

Page 7: PENERAPAN SHE - sibima.pu.go.id

C103

C106

Sudirman Street

322m 630m

PassThrough(200m)

1,080mPass

Through(220m)

PassThrough(200m)

Launching Shaft

Lift up Shaft

Cover:Min3.6m

Cover:Max15.9m

9.8m

10.7

m

12.0

m

14.4

m

Total Length = 3.89km① Underground Stations: 4-Stations② Transition Structure (U-shape & Box Culvert): 460m③ Shield Tunnel: 2.6km x 2-lines Inner Dia.=6.05m

LINGKUP PROYEK (3)

Page 8: PENERAPAN SHE - sibima.pu.go.id

Pekerjaaan Arsitek - Concourse Slab

Page 9: PENERAPAN SHE - sibima.pu.go.id

Pekerjaaan Arsitek - Base Slab

Page 10: PENERAPAN SHE - sibima.pu.go.id

Pekerjaaan Arsitek - Entrance

Page 11: PENERAPAN SHE - sibima.pu.go.id

Pekerjaaan Arsitek - Entrance

Page 12: PENERAPAN SHE - sibima.pu.go.id

Pekerjaaan Arsitek - Entrance

Page 13: PENERAPAN SHE - sibima.pu.go.id

Reinstatement / Pengembalian Kondisi Awal

Page 14: PENERAPAN SHE - sibima.pu.go.id

Manajemen K3L

1. Kebijakan

2. Perencanaan

3. Penerapan & Operasional

4. Pemeriksaan & Perbaikan

5. Tinjauan Manajemen

6. House keeping

Page 15: PENERAPAN SHE - sibima.pu.go.id

Kebijakan

NOTE: Dipasang pada

tempat yang strategis. Disosialisasikan

kepada seluruhkaryawan dan pekerja. Karyawan dan pekerja

memahami KebijakanSHE WIKA.

NOTE: Dipasang pada

tempat yang strategis. Disosialisasikan

kepada seluruhkaryawan dan pekerja. Karyawan dan pekerja

memahami KebijakanSHE WIKA. Kebijakan HSE SOWJ - JV

Page 16: PENERAPAN SHE - sibima.pu.go.id

Risk ID Identified Risk Description of Risk Initial RiskAnalysis

1.5 Bored Tunnel Construction

Security DistruptionGangguan Keamanan

Injury or fatalityCedera atau kematian

1.5.107

Failure of hydraulic jackingequipment

Kegagalan peralatanhydraulic jack

Consequence:Major

Likelihood:Likely

Risk TreatmentAction Plan Ref. No. Possible Treatment Residual Risk

Analysis

Regular eqiuipment InspectionInspeksi Peralatan Rutin

Equipment trial without the load prior to every workTrial peralatan tanpa beban setiap memulai pekerjaan

Bored Tunnel Construction

Consequence:Minor

Likelihood:Unlikely

1.5.105.1

1.5.105.2

HIGHLIGHTED RISKS

Page 17: PENERAPAN SHE - sibima.pu.go.id

Hydraulic Jack failure countermeasure

EquipmentCheck

EquipmentCheck

Equipmenttrial without

load

Equipmenttrial without

load

Closesupervision

during activity

Closesupervision

during activity

HIGHLIGHTED RISKS

Page 18: PENERAPAN SHE - sibima.pu.go.id

Risk ID Identified Risk Description of Risk Initial RiskAnalysis

1.5

1.5.114 Working at HeightBekerja di ketinggian

Falling from HeightJatuh dari ketinggian

Consequence:Major

Likelihood:PossibleInjury or fatality

Cedera atau kematian

King Post Cutting

Risk TreatmentAction Plan Ref. No. Possible Treatment Residual Risk

Analysis

Install hard barricade surrounding the area

Memasang hard barricade di sekeliling area

Provide proper w arning sign

Sediakan rambu-rambu peringatan yang jelas

Instruc Worker to use full body harness

Memerintahkan pekerja untuk memakai full body harness

1.5.114.1Consequence:

MajorLikelihood:

Unlikely

1.5.114.2

1.5.114.3

King Post Cutting

HIGHLIGHTED RISKS

Page 19: PENERAPAN SHE - sibima.pu.go.id

Working at height Countermeasure

Barricadearea

Barricadearea

Use BodyHarness

Use BodyHarness

HIGHLIGHTED RISKS

Page 20: PENERAPAN SHE - sibima.pu.go.id

Risk ID Identified Risk Description of Risk Initial RiskAnalysis

1.5 King Post Cutting

1.5.115 Working at HeightBekerja di ketinggian

Falling from HeightJatuh dari ketinggian

Consequence:Major

Likelihood:PossibleInjury or fatality

Cedera atau kematian

Risk TreatmentAction Plan Ref. No. Possible Treatment Residual Risk

Analysis

Provision of f ire extinguisher

Penyediaan APAR

Barricade surrounding the area

Memasang barricade di sekeliling area

Spary water to control fire spark

Menyiram air untuk mengendalikan bunga api

King Post Cutting

1.5.115.1Consequence:

MinorLikelihood:

Unlikely

1.5.115.2

1.5.115.3

HIGHLIGTHTED RISKS

Page 21: PENERAPAN SHE - sibima.pu.go.id

Hot Work countermeasure

Barricadesurrounding

area

Barricadesurrounding

area

Spray water tocontrol fire

spark

Spray water tocontrol fire

spark

HIGHLIGHTED RISKS

Page 22: PENERAPAN SHE - sibima.pu.go.id

PENTAATAN PERATURAN PERUNDANGAN

Page 23: PENERAPAN SHE - sibima.pu.go.id

SASARAN & PROGRAM

Program K3L : Induksi K3L (Orientasi) Pelatihan K3L Pelatihan untuk pekerjaan Khusus Penyegaran pelatihan K3L Pelatihan Emergensi / latihan evakuasi Safety Talk Tool Box Talk Rapat Komite K3L Rapat K3L Investigasi dan Analisis Kecelakaan Pertolongan pertama dan laporan

kecelakaan

Papan Pengumuman K3L Rambu Rambu K3L Poster dan Spanduk K3L Papan Statistik K3L Inspeksi dan Audit Pemeliharaan mesin dan alat berat Analisis Bahaya Labeling bahan kimia Monitoring HIV/AIDS Pencegahan Demam Berdarah dengan

Fogging dan Bubuk Abate

Sasaran K3 :Zero accident

Sasaran Lingkungan :Pengendalian :

1. Limbah air2. Polusi udara3. Kebisingan4. Getaran

Page 24: PENERAPAN SHE - sibima.pu.go.id

PENERAPAN & OPERASIONAL

SOWJ JV SHE Organization Chart

(E) = Environment(P) = Paramedic / First Aider

Muhammad RidhoSHE

Abdul AzizSHE Officer CP 104

Leonardo PangaribuanSHE Officer CP 105

Putra GintingFaisal Hidayat

Enka RafsanjanieNanang KomaraSHE Supervisor

Novian Aji (E)Ananda G. Dipo (E)

SHE Supervisor

Hasan YarkuranArif (P)

SHE Supervisor

Irfan SadiFaiz Fahmi (P)

SHE Supervisor

Rendi A.(E)Rezky F.

SHE Supervisor

Safety ManTransition :1. Riyandi2. Ade Sanjaya3. Zakie4. Hauzan5. David6. Arif Hidayat

Safety Man Senayan:1. Erwin2. Widodo3. Iwan

Safety Man Istora :1. Ayrie2. Imam B3. Dimas

Safety ManSetiabudi :1. Muhammad

Riyanto2. Hanafi3. Pangki4. Dhani

Safety ManBendungan :1. Mamiek2. Ade Sulaemi3. Ahmad Sopari

Melisa AyuSHE Technical Admin.

Pandu N. (E)Enviro Supervisor

Page 25: PENERAPAN SHE - sibima.pu.go.id

PENERAPAN & OPERASIONALSTRUKTUR TANGGAP DARURAT

Page 26: PENERAPAN SHE - sibima.pu.go.id

a) Pompa air berlumpurb) Tampung di bak

sedimentasi.c) Penambahan additif.d) Cek sedimentasi.e) Cek air sebelum di

buang ke drainase kota

Pengendalian air buangan bore pile & D-Wall

a)

b)

c)

d) e)

PENERAPAN & OPERASIONAL

Page 27: PENERAPAN SHE - sibima.pu.go.id

a) Truk material yg keluarmasuk harus dibersihkan diwashing bay.

b) Pembersihan endapan diwashing bay.

c) Temporary disposal di lokasiproyek.

b) a)

c)

PENGENDALIAN GALIAN TANAHPENERAPAN & OPERASIONAL

Page 28: PENERAPAN SHE - sibima.pu.go.id

a) Pengukuran kebisinganb) Pengukuran udara/debuc) Pengukuran vibrasi/getaran

a)

c)

b)

Monitoring kebisingan, udara,dan getaran

PENERAPAN & OPERASIONAL

Page 29: PENERAPAN SHE - sibima.pu.go.id

SIMULASI PENANGANAN KEADAAN DARURATSIMULASI PENANGANAN KEADAAN DARURAT

PENERAPAN & OPERASIONAL

Telah dilakukan simulasi keadaan darurat, minimal 1x dalam 1 tahun. Telah ditetapkan meeting point dan petunjuk arah evakuasi sesuai lay out. Dilakukan evaluasi hasil simulasi keaadaan darurat . Hasil evaluasi didokumentasikan dan disimpan rekamannya. Telah ditunjuk penanggung jawab evakuasi property / dokumen.

Telah dilakukan simulasi keadaan darurat, minimal 1x dalam 1 tahun. Telah ditetapkan meeting point dan petunjuk arah evakuasi sesuai lay out. Dilakukan evaluasi hasil simulasi keaadaan darurat . Hasil evaluasi didokumentasikan dan disimpan rekamannya. Telah ditunjuk penanggung jawab evakuasi property / dokumen.

Page 30: PENERAPAN SHE - sibima.pu.go.id

SOSIALISASI & PELATIHAN K3LSOSIALISASI & PELATIHAN K3LPENERAPAN & OPERASIONAL

Page 31: PENERAPAN SHE - sibima.pu.go.id

Toolbox meeting SHE meeting SHE morning talk SHE induction Papan informasi

K3L

Toolbox meeting SHE meeting SHE morning talk SHE induction Papan informasi

K3L

PENERAPAN & OPERASIONAL

INFORMASI & KOMUNIKASIINFORMASI & KOMUNIKASI

Page 32: PENERAPAN SHE - sibima.pu.go.id

PENERAPAN & OPERASIONAL

Dokumen K/N dan kontrakpengadaan memuat aspekK3L.

Pernyataan komitmen K3Loleh vendor.

Dokumen K/N dan kontrakpengadaan memuat aspekK3L.

Pernyataan komitmen K3Loleh vendor.

ASPEK SAFETY DALAM KONTRAKASPEK SAFETY DALAM KONTRAK

Page 33: PENERAPAN SHE - sibima.pu.go.id

Pemasanganan rambu dan spanduk. Pemakaian APD. Sistem Ijin Kerja. Pengawasan pekerjaan. Pengawasan pemasangan skafolding. Housekeeping (gudang).

Pemasanganan rambu dan spanduk. Pemakaian APD. Sistem Ijin Kerja. Pengawasan pekerjaan. Pengawasan pemasangan skafolding. Housekeeping (gudang).

PENERAPAN & OPERASIONAL

Page 34: PENERAPAN SHE - sibima.pu.go.id

Alat berat telah dilengkapi dengan SIA & operator telah memiliki SIOserta telah diinduksi pengelolaan K3L proyek.

Petugas K3L telah memastikan alat berat telah memenuhi aspek K3L. Operator telah menggunakan APD yang sesuai. Petugas safety mempunyai daftar induk alat berat & operator.

Alat berat telah dilengkapi dengan SIA & operator telah memiliki SIOserta telah diinduksi pengelolaan K3L proyek.

Petugas K3L telah memastikan alat berat telah memenuhi aspek K3L. Operator telah menggunakan APD yang sesuai. Petugas safety mempunyai daftar induk alat berat & operator.

PENERAPAN & OPERASIONAL

INSPEKSI ALAT ANGKAT & ANGKUTINSPEKSI ALAT ANGKAT & ANGKUT

Page 35: PENERAPAN SHE - sibima.pu.go.id

Dilakukan minimal 2 minggu sekali. Dilakukan oleh tim manajemen proyek bersama

owner / konsultan. Dibuat rekaman. Dilakukan tindak lanjut temuan safety patrol.

Dilakukan minimal 2 minggu sekali. Dilakukan oleh tim manajemen proyek bersama

owner / konsultan. Dibuat rekaman. Dilakukan tindak lanjut temuan safety patrol.

TINDAKAN PERBAIKAN & PEMERIKSAAN

SAFETY PATROLSAFETY PATROL

Page 36: PENERAPAN SHE - sibima.pu.go.id

TINDAKAN PERBAIKAN & PEMERIKSAAN

Page 37: PENERAPAN SHE - sibima.pu.go.id

Laporan audit telah tersedia. Ada tindak lanjut atas temuan. Ada verifikasi temuan audit. RTP diselesaikan maksimal 2 bulan setelah audit.

Laporan audit telah tersedia. Ada tindak lanjut atas temuan. Ada verifikasi temuan audit. RTP diselesaikan maksimal 2 bulan setelah audit.

TINDAKAN PERBAIKAN & PEMERIKSAAN

AUDITAUDIT

Page 38: PENERAPAN SHE - sibima.pu.go.id

Inspeksi alat bantu (kelengkapan pengaman alat, instalasi listrik terlindung, aman, & rapi sertadibuat dokumentasinya).

Inspeksi K3 (dibuat jadwal inspeksi secara periodik dengan checklist sesuai HIRARC, setiappenyimpangan dimonitor, dianalisis, & ditindaklanjuti serta dibuat dokumentasi.

Peralatan K3 (isi kotak PP dan pemeliharan APAR dilakukan sesuai perundangan, bidai & tandusiap untuk digunakan).

Inspeksi lingkungan (dilakukan pengukuran debu, cahaya/penerangan, & kebisingan).

Inspeksi alat bantu (kelengkapan pengaman alat, instalasi listrik terlindung, aman, & rapi sertadibuat dokumentasinya).

Inspeksi K3 (dibuat jadwal inspeksi secara periodik dengan checklist sesuai HIRARC, setiappenyimpangan dimonitor, dianalisis, & ditindaklanjuti serta dibuat dokumentasi.

Peralatan K3 (isi kotak PP dan pemeliharan APAR dilakukan sesuai perundangan, bidai & tandusiap untuk digunakan).

Inspeksi lingkungan (dilakukan pengukuran debu, cahaya/penerangan, & kebisingan).

TINDAKAN PERBAIKAN & PEMERIKSAAN

INSPEKSI K3INSPEKSI K3

Page 39: PENERAPAN SHE - sibima.pu.go.id

Dibuat pelaporan kecelakaan kerja &penyakit akibat kerja, investigasi, dananalisis.

Dibuat tindak lanjut atas hasil analisisdan investigasi kecelakaan kerja &penyakit akibat kerja.

Dibuat pelaporan kecelakaan kerja &penyakit akibat kerja, investigasi, dananalisis.

Dibuat tindak lanjut atas hasil analisisdan investigasi kecelakaan kerja &penyakit akibat kerja.

TINDAKAN PERBAIKAN & PEMERIKSAANPENANGANAN KECELAKAANPENANGANAN KECELAKAAN

Page 40: PENERAPAN SHE - sibima.pu.go.id

Mempunyai rujukan ke Puskesmas / rumahsakit terdekat yang mempunyai dokterHiperkes / dokter yang ditunjuk.

Seluruh pekerja telah diasuransikan diJamsostek.

Tersedia ruang klinik di lokasi proyek.

Mempunyai rujukan ke Puskesmas / rumahsakit terdekat yang mempunyai dokterHiperkes / dokter yang ditunjuk.

Seluruh pekerja telah diasuransikan diJamsostek.

Tersedia ruang klinik di lokasi proyek.

TINDAKAN PERBAIKAN & PEMERIKSAAN

KLINIK PROYEK & RS RUJUKANKLINIK PROYEK & RS RUJUKAN

Page 41: PENERAPAN SHE - sibima.pu.go.id

TINJAUAN MANAJEMEN

Tinjauan manajemen dilakukan setiap 3 bulan. Dihadiri oleh BOD anggota JV.Materi K3L dibahas secara intensif. Notulen rapat didistribusi ke setiap perwakilan JV.

Tinjauan manajemen dilakukan setiap 3 bulan. Dihadiri oleh BOD anggota JV.Materi K3L dibahas secara intensif. Notulen rapat didistribusi ke setiap perwakilan JV.

Page 42: PENERAPAN SHE - sibima.pu.go.id

ENVIRONMENTAL REPORT

Page 43: PENERAPAN SHE - sibima.pu.go.id

TERIMA KASIH