JADWAL WAKTU PELAKSANAAN KEGIATAN : PENYELENGGARAAN HIBAH KOMPETISI INSTITUSI SUB KEGIATAN : 0 PEKERJAAN : PENYEKATAN RUANG BACA PERPUSTAKAAN LOKASI : UNIVERSITAS PALANGKA RAYA HARI KERJA 90 (SEMBILAN PULUH) HARI KALENDER No. URAIAN PEKERJAAN JUMLAH HARGA BOBOT BULAN I BULAN II BULAN (Rp.) ( % ) I II III IV I II III IV I II I. PERSIAPAN 7,400,000.00 5.956 2.978 2.978 A. ## I PEKERJAAN RANGKA & DINDING SEKAT RUANGAN 59,104,221.58 47.569 11.892 11.892 11.892 11.892 II ## 4,397,017.10 3.539 1.180 1.180 1.180 III PEKERJAAN PENGECATAN 6,448,761.32 5.190 1.298 1.298 1.298 IV ## 23,000,000.00 18.511 2.644 2.644 2.644 2.644 2.644 B. ## 23,900,000.00 19.235 4.809 4.809 4.809 4.809 C. MASA PEMELIHARAAN Jumlah 124,250,000.00 100.000 Rencana Bobot / Minggu (%) ## 2.978 14.870 11.892 13.072 13.072 8.633 7.453 8.751 8.751 3.942 Rencana Komulatif (%) ## 2.978 17.848 29.740 42.812 55.884 64.517 71.970 80.721 89.472 93.414 P 0.000 2.978 17.848 29.740 42.812 55.884 64.517 71.970 80.721 89.472 93.

description

CFNGHNNFTGUJUFFTJGFHJJDRTYSEYHDTJTYDRTJTYJDTYYYYYYYYYYYYJDTETYDTYKTYKJTYKTDTYKDTYKDTYKDY

Transcript of Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

Page 1: Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

JADWAL WAKTU PELAKSANAAN

KEGIATAN : PENYELENGGARAAN HIBAH KOMPETISI INSTITUSISUB KEGIATAN : 0PEKERJAAN : PENYEKATAN RUANG BACA PERPUSTAKAANLOKASI : UNIVERSITAS PALANGKA RAYA

HARI KERJA 90 (SEMBILAN PULUH) HARI KALENDERKETERANGANNo. URAIAN PEKERJAAN JUMLAH HARGA BOBOT BULAN I BULAN II BULAN III

(Rp.) ( % ) I II III IV I II III IV I II III IV

I. PERSIAPAN 7,400,000.00 5.956 2.978 2.978

A. ###

I PEKERJAAN RANGKA & DINDING SEKAT RUANGAN 59,104,221.58 47.569 11.892 11.892 11.892 11.892

II ### 4,397,017.10 3.539 1.180 1.180 1.180

III PEKERJAAN PENGECATAN 6,448,761.32 5.190 1.298 1.298 1.298 1.298

IV ### 23,000,000.00 18.511 2.644 2.644 2.644 2.644 2.644 2.644 2.644

B. ### 23,900,000.00 19.235 4.809 4.809 4.809 4.809

C. MASA PEMELIHARAAN 180 (Seratus Delapan Puluh) Hari Kalender

Jumlah 124,250,000.00 100.000

Rencana Bobot / Minggu (%) ### 2.978 14.870 11.892 13.072 13.072 8.633 7.453 8.751 8.751 3.942 3.942 2.644

Rencana Komulatif (%) ### 2.978 17.848 29.740 42.812 55.884 64.517 71.970 80.721 89.472 93.414 97.356 100.000

Palangka Raya, 08 April 2009

Hormat KamiPenawar,

CV. NURI JAYA SIMPATIPusat Palangka Raya

100

90

80

70

60

50

40

30

20

10

00.0002.978

17.848

29.740

42.812

55.884

64.517

71.970

80.721

89.47293.414

97.356100.000

Page 2: Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

ARIE PRASETYODirektur

Page 3: Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

JADWAL WAKTU PELAKSANAAN

KETERANGAN

Berita Acara Serah Terima ITanggal…………………

Berita Acara Serah Terima IITanggal…………………

180 (Seratus Delapan Puluh) Hari Kalender

Palangka Raya, 08 April 2009

CV. NURI JAYA SIMPATI

100

90

80

70

60

50

40

30

20

10

00.0002.978

17.848

29.740

42.812

55.884

64.517

71.970

80.721

89.47293.414

97.356100.000

Page 4: Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

REKAPITULASI BIAYA

I PERSIAPAN Rp 7,400,000.00

JUMLAH BIAYA PEKERJAAN PERSIAPAN Rp 7,400,000.00

A. #REF!

I PEKERJAAN RANGKA & DINDING SEKAT RUANGAN Rp 59,104,221.58

II #REF! Rp 4,397,017.10

III PEKERJAAN PENGECATAN Rp 6,448,761.32

IV #REF! Rp 23,000,000.00

JUMLAH BIAYA PEKERJAAN PEMBUATAN SKAT RUANGAN (A) Rp 92,950,000.00

B. #REF! Rp 23,900,000.00

JUMLAH BIAYA PEKERJAAN SKAT PEMBATAS RUANGAN (B) Rp 23,900,000.00

TOTAL PEKEJAAN FISIK (A+B+C) Rp 124,250,000.00

TERBILANG : #REF!

Palangka Raya, 11 Juni 2009

000

0

0

0

Page 5: Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

REKAPITULASI BIAYA

I PERSIAPAN Rp 1,500,000.00

JUMLAH BIAYA PEKERJAAN PERSIAPAN Rp 1,500,000.00

A. #REF!

I PEKERJAAN RANGKA & DINDING SEKAT RUANGAN Rp 17,284,214.04

II #REF! #REF!

III PEKERJAAN PENGECATAN Rp 20,973,540.06

IV #REF! #REF!

JUMLAH BIAYA PEKERJAAN PEMBUATAN SKAT RUANGAN (A) #REF!

B. #REF! Rp -

JUMLAH BIAYA PEKERJAAN SKAT PEMBATAS RUANGAN (B) Rp -

TOTAL PEKEJAAN FISIK (A+B+C) #REF!

TERBILANG : #REF!

Palangka Raya, 11 Juni 2009

000

0

0

0

Page 6: Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

DAFTAR KUANTITAS DAN HARGA

KEGIATAN : PENYELENGGARAAN HIBAH KOMPETISI INSTITUSI

SUB KEGIATAN : 0

PEKERJAAN : PENYEKATAN RUANG BACA PERPUSTAKAAN

LOKASI : UNIVERSITAS PALANGKA RAYA

TOTALNo URAIAN PEKERJAAN ANALISA VOLUME HARGA

(Rp)1 2 3 4 5 6I. PERSIAPAN1 Papan Nama Proyek Ls 1.00 Unit 400,000.00 400,000.00 2 Bangsal Kerja Ls 1.00 Unit 4,750,000.00 4,750,000.00 3 Pembersihan Awal dan Akhir Ls 1.00 Unit 2,250,000.00 2,250,000.00

7,400,000.00 A PEMBUATAN SKAT RUANGANI. PEKERJAAN RANGKA & DINDING SEKAT RUANGAN1 Pek. Rangka Dinding, Kasau 5/10, 5/5 06.6.55 152.60 M2 133,200.00 20,326,320.00 2 Pek. Dinding Plywood 4 mm 06.06.54e 111.06 M2 75,200.00 8,352,018.82 3 Pek. Dinding Kaca 5 mm 12.06.17 59.54 M2 123,571.25 7,357,246.87 4 Pek. Ventilasi Kayu 06.06.17 31.48 M2 378,250.00 11,906,553.50 5 Pek. List Dinding & Pintu 06.06.60 802.48 M' 12,130.00 9,734,082.40 6 Pek. Papan Lis Bawah Ls 81.60 M' 17,500.00 1,428,000.00

59,104,221.58 II. PEKERJAAN PINTU1 Pek. Pintu Panil 3 (Bh) 06.06.08 5.04 M2 394,500.00 1,988,280.00 2 Pek. Pintu Kaca 1 (Bh) 06.06.11 1.68 M2 324,300.00 544,824.00 3 Pek. Pasangan Kaca Pintu 1 (Bh) 06.06.54e 1.40 M2 123,571.25 172,999.75 4 Pek. Engsel Pintu 12.06.05 9.00 Bh 29,212.50 262,912.50 5 Pek. Kunci Pintu Biasa 12.06.02 3.00 Bh 158,725.00 476,175.00 6 Pek. Kunci Pintu Geser Ls 1.00 Bh 250,000.00 250,000.00 7 Pek. Rel Pintu Geser Lengkap Terpasang Ls 1.00 Unit 701,825.85 701,825.85

4,397,017.10 III. PEKERJAAN PENGECATAN1 Pek. Pengecatan Dinding Plywood 14.06.14 111.06 M2 18,518.00 2,056,684.63 2 Pek. Pengecatan Pintu, Ventilasi, Rangka & Lis 14.06.08 109.52 M2 40,101.50 4,392,076.69

6,448,761.32 IV. PEKERJAAN LAIN LAIN1 Pek. Pemasangan Karpet Bulu Untuk Lantai Ls 63.00 M2 170,000.00 10,710,000.00 2 Pek. Pengadaan Meja Komputer Ls 16.00 Bh 400,000.00 6,400,000.00 3 Pek. Pemindahan Titik Lampu & Jaringan Listrik Ls 1.00 Unit 600,000.00 600,000.00 4 Pek. Pemasangan Titik Lampu (Down Light) Ls 6.00 Titik 400,000.00 2,400,000.00 5 Sakhelar Tunggal Ls 4.00 Titik 20,000.00 80,000.00 6 Sakhelar Ganda Ls 3.00 Titik 20,000.00 60,000.00 7 Pek. Titik Lampu Dan Instalasinya Ls 6.00 Titik 190,000.00 1,140,000.00 8 Bola Lampu Tl Bambu 40 Watt Ls 6.00 Bh 150,000.00 900,000.00 9 Bola Lampu Sl 18 Watt Ls 6.00 Bh 85,000.00 510,000.00 10 Pek. Pembuatan Lis Beton Penahan Air Untuk Pintu Ls 1.00 Unit 200,000.00 200,000.00

23,000,000.00 TOTAL A 92,950,000.00

B PEMBUATAN SKAT PEMBATAS RUANGAN1 Pek. Pembuatan Skat Uk. 1,5 m x 1,25 m Ls 10.00 Bh 1,700,000.00 17,000,000.00 2 Pek. Pembuatan Skat Uk. 2 m x 1,25 m Ls 2.00 Bh 2,400,000.00 4,800,000.00 3 Pek. Pengecatan Sekat Ls 12.00 Bh 175,000.00 2,100,000.00

23,900,000.00 TOTAL B 23,900,000.00

T O T A L 124,250,000.00

REKAPITULASI PEKERJAAN FISIK :

I PERSIAPAN Rp. 7,400,000.00 A PEMBUATAN SKAT RUANGAN Rp. 92,950,000.00 B PEMBUATAN SKAT PEMBATAS RUANGAN Rp. 23,900,000.00

JUMLAH Rp. 124,250,000.00

TERBILANG : // SERATUS DUA PULUH EMPAT JUTA DUA RATUS LIMA PULUH RIBU RUPIAH //

Palangka Raya, 08 April 2009

HARGA SATUAN UPAH DAN BAHAN

(Rp.)

Page 7: Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

Hormat KamiPenawar,

CV. NURI JAYA SIMPATIPusat Palangka Raya

ARIE PRASETYODirektur

Page 8: Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

DAFTAR KUANTITAS DAN HARGA

KEGIATAN :

SUB KEGIATAN :

PEKERJAAN :

LOKASI : PALANGKA RAYA

TOTAL

No URAIAN PEKERJAAN ANALISA VOLUME HARGA

(Rp)

1 2 3 4 5 6

PEMBUATAN SKAT RUANGAN

I. PERSIAPAN

1 Pembersihan Awal dan Akhir, Pengukuran Ls 1.00 Unit 1,500,000.00 1,500,000.00

Sub Total I 1,500,000.00

II. PEKERJAAN RANGKA & DINDING SEKAT RUANGAN

1 Pek. Pembongkaran Partisi Ls 201.30 M2 5,500.00 1,107,150.00

2 Pek. Pemasangan Partisi 06.6.55 273.96 M2 59,049.00 16,177,064.04

Sub Total II 17,284,214.04

III. PEKERJAAN PENGECATAN

1 Pek. Pengecatan Dinding & Partisi SNI 14.6.15 1,169.30 M2 11,546.89 13,501,778.48

2 Pek. Pengecatan Plafond SNI 14.6.15 647.08 M2 11,546.89 7,471,761.58

Sub Total III 20,973,540.06

IV PEKERJAAN LAIN LAIN

1 Pek. Pindah AC termasuk Servis Ls 13.00 Unit 350,000.00 4,550,000.00

2 Pek. Pindah CCTV Ls 1.00 Unit 6,500,000.00 6,500,000.00

3 Pek. Angkut Perlengkapan Kantor ( Transport + Tenaga) Ls 1.00 Unit 12,000,000.00 12,000,000.00

Sub Total IV 23,050,000.00

TOTAL JUMLAH BIAYA PEKERJAAN 62,807,754.10

DIBULATKAN 62,800,000.00

TERBILANG : ENAM PULUH DUA JUTA DELAPAN RATUS RIBU RUPIAH

Palangka Raya, 11 Juni 2009

HARGA SATUAN UPAH DAN BAHAN

(Rp.)

Page 9: Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

DAFTAR ANALISA

ANALISA URAIAN PEKERJAAN DAN ANALISAHARGA SATUAN

(Rp.)

a b c d e f06.06.08 1 M2 Pasangan Pintu Panil Kayu Lanan

0.0400 M3 Kayu 2,989,100.00 119,564.00 1.0000 Oh Pekerja 68,000.00 68,000.00 0.0500 Oh Mandor 98,300.00 4,915.00 2.5000 Oh Tukang Kayu 83,100.00 207,750.00 0.2500 Oh Kepala Tukang 90,700.00 22,675.00

sub total 303,340.00 119,564.00 422,904.00 06.06.11 1 M2 Pasangan Rangka Pintu dan Jendela Kaca Kayu Lanan

0.0350 M3 Kayu 2,989,100.00 104,618.50 0.8000 Oh Pekerja 68,000.00 54,400.00 0.0400 Oh Mandor 98,300.00 3,932.00 2.0000 Oh Tukang Kayu 83,100.00 166,200.00 0.2000 Oh Kepala Tukang 90,700.00 18,140.00

sub total 242,672.00 104,618.50 347,290.50 06.06.17 1 M2 Pasangan Jalusi Mati Kayu Lanan

0.0600 M3 Kayu 2,989,100.00 179,346.00 0.1500 Kg Paku 19,200.00 2,880.00 0.5000 Oh Pekerja 68,000.00 34,000.00 0.0200 Oh Mandor 98,300.00 1,966.00 2.0000 Oh Tukang Kayu 83,100.00 166,200.00 0.2000 Oh Kepala Tukang 90,700.00 18,140.00

sub total 220,306.00 182,226.00 402,532.00 06.06.54e 1 M2 Pasangan Dinding Pemisah Plywood 4 mm

0.2900 M2 Plywood 67,900.00 19,691.00 0.1000 Kg Paku 19,200.00 1,920.00 0.1500 Oh Pekerja 68,000.00 10,200.00 0.0750 Oh Mandor 98,300.00 7,372.50 0.4500 Oh Tukang Kayu 83,100.00 37,395.00 0.0450 Oh Kepala Tukang 90,700.00 4,081.50

sub total 59,049.00 21,611.00 80,660.00 06.6.55 1 M2 Pasang Rangka Dinding Pemisah Kayu Lanan

0.0750 Oh Mandor 98,300.00 7,372.50 0.0450 Oh Kepala Tukang kayu 90,700.00 4,081.50 0.4500 Oh Tukang kayu 83,100.00 37,395.00 0.1500 Oh Pembantu Tukang 68,000.00 10,200.00 0.0195 M3 Kayu lanan, balok 2,989,100.00 58,287.45 0.0070 M3 Kayu lanan, papan 2,989,100.00 20,923.70 0.1000 Kg Paku biasa 2"-5" 19,200.00 1,920.00

sub total 59,049.00 81,131.15 140,180.15 06.06.60 1 M' Pasangan List Plapond Kayu Profil

1.0500 M' Kayu Profil 8,500.00 8,925.00 0.0210 Oh Pekerja 68,000.00 1,428.00 0.0010 Oh Mandor 98,300.00 98.30 0.0210 Oh Tukang Kayu 83,100.00 1,745.10 0.0020 Oh Kepala Tukang 90,700.00 181.40

sub total 3,452.80 8,925.00 12,377.80 12.06.02 1 Bh Pasang Kunci Tanam Biasa

1.0000 Bh Kunci Tanam Biasa 117,600.00 117,600.00 0.0100 Oh Pekerja 68,000.00 680.00 0.0050 Oh Mandor 98,300.00 491.50 0.5000 Oh Tukang Kayu 83,100.00 41,550.00 0.0600 Oh Kepala Tukang 90,700.00 5,442.00

sub total 48,163.50 117,600.00 165,763.50 12.06.05 1 Bh Pasang Ensel Pintu

1.0000 Bh Ensel Pintu 15,800.00 15,800.00 0.0150 Oh Pekerja 68,000.00 1,020.00 0.0075 Oh Mandor 98,300.00 737.25 0.1500 Oh Tukang Kayu 83,100.00 12,465.00 0.0150 Oh Kepala Tukang 90,700.00 1,360.50

UPAH (Rp.)

BAHAN (Rp.)

JUMLAH (Rp.)

Page 10: Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

ANALISA URAIAN PEKERJAAN DAN ANALISAHARGA SATUAN

(Rp.)

a b c d e f

UPAH (Rp.)

BAHAN (Rp.)

JUMLAH (Rp.)

sub total 15,582.75 15,800.00 31,382.75

12.06.17 1 M2 Pasang Kaca, tebal 5 mm1.1000 M2 Kaca 106,300.00 116,930.00 0.0150 Oh Pekerja 68,000.00 1,020.00

0.00075 Oh Mandor 98,300.00 73.73 0.1500 Oh Tukang Kayu 83,100.00 12,465.00 0.0150 Oh Kepala Tukang 90,700.00 1,360.50

sub total 14,919.23 116,930.00 131,849.23

14.06.08 1 M2 Pengecetan Bidang Kayu Baru 0.2000 Kg Cat Meni 42,500.00 8,500.00 0.1500 Kg Plamir 27,800.00 4,170.00 0.1700 Kg Cat Dasar 25,800.00 4,386.00 0.2600 Kg Cat Penutup 2 Kali 42,300.00 10,998.00 0.0700 Oh Pekerja 68,000.00 4,760.00 0.0900 Oh Tukang Cat 83,100.00 7,479.00 0.0060 Oh Kepala Tukang 90,700.00 544.20 0.0025 Oh Mandor 98,300.00 245.75

sub total 13,028.95 28,054.00 41,082.95 14.06.14 1 M2 Pengecatan Tembok/Dinding Baru

0.1000 Kg Plamir 56,300.00 5,630.00 0.1000 Kg Cat Dasar 25,800.00 2,580.00 0.2600 Kg Cat Penutup 2 Kali 13,500.00 3,510.00 0.0200 Oh Pekerja 68,000.00 1,360.00 0.0630 Oh Tukang Cat 83,100.00 5,235.30 0.0063 Oh Kepala Tukang 90,700.00 571.41 0.0025 Oh Mandor 98,300.00 245.75

sub total 7,412.46 11,720.00 19,132.46 SNI 14.6.10 1 M2 Pengecatan Bidang Kayu Lama

(2 Lapis Cat Penutup)0.0525 Oh Pekerja 68,000.00 3,570.00 0.0019 Oh Err:540 98,300.00 186.77 0.0788 Oh Err:540 83,100.00 6,548.28 0.0030 Oh Err:540 90,700.00 272.10 0.2500 Kg Cat Penutup 2 Kali 13,500.00 3,375.0000 0.1920 Ltr Thinner 25,300 4,857.60

sub total 10,577.15 8,232.60 18,809.75 SNI 14.6.15 1 M2 Pekerjaan Mengecat Dinding Lama

(1 Lapis Cat Dasar, 2 Lapis Cat Penutup)0.0280 Oh Pekerja 68,000.00 1,904.00 0.0420 Oh Err:540 83,100.00 3,490.20 0.0042 Oh Err:540 90,700.00 380.94 0.0025 Oh Err:540 98,300.00 245.75 0.1200 Kg Err:540 25,800 3,096.0000 0.1800 Kg Cat Penutup 2 Kali 13,500.00 2,430.0000

sub total 6,020.89 5,526.00 11,546.89

Page 11: Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

DAFTAR SATUAN HARGA DAN BAHAN

KOTA PALANGKA RAYA

NO URAIAN TENAGA DAN BAHAN SATUAN

1 2 3 4

A. UPAH TENAGA KERJA1 Mandor Orang/Hari 98,300 2 Pekerja Orang/Hari 68,000 3 Tukang Gali Tanah Orang/Hari 68,000 4 Kepala Tukang Batu Orang/Hari 90,700 5 Tukang Batu Orang/Hari 83,100 6 Pembantu Tukang Batu Orang/Hari 68,000 7 Kepala Tukang Kayu Orang/Hari 90,700 8 Tukang Kayu Orang/Hari 83,100 9 Pembantu Tukang Kayu Orang/Hari 68,000

10 Kepala Tukang Besi Orang/Hari 90,700 11 Tukang Besi Orang/Hari 83,100 12 Pembantu Tukang Besi Orang/Hari 68,000 13 Kepala Tukang Cat Orang/Hari 90,700 14 Tukang Cat Orang/Hari 83,100 15 Pembantu Tukang Cat Orang/Hari 68,000

B. BAHAN BANGUNAN SATUAN HARGA (Rp.) 1 2 3 41 Pasir Urug M3 62,500 2 Pasir Pasang M3 85,700 3 Pasir Beton M3 89,200 4 Tanah Urug Biasa M3 73,800 5 Tanah Urug Pilihan M3 113,000 6 Kerikil Sungai M3 161,600 7 Batu Kali/Batu Belah M3 339,700 8 Batu Pecah 1 - 2 cm/Koral M3 601,700 9 Batu Bata Buah 900

10 Bataco Buah 2,760 11 Semen PC (isi 40 Kg/Zak) Kg 1,600 12 Semen Putih Kg 2,033 13 Semen Merah Kg 1,663 14 Kapur Aduk/Pasang Kg 12,100 15 Kawat Beton/Bendrat Kg 25,000 16 Besi Beton Polos Kg 13,662 17 Balok Kayu Kelas I (Ulin) M3 7,472,800 18 Papan Kayu Kelas I (Ulin) M3 8,874,000 19 Balok Kayu Kelas II (Banuas, Plepek, Sejenisnya)) M3 4,857,400 20 Papan Kayu Kelas II (Banuas, Plepek, Sejenisnya)) M3 4,468,800 21 Balok Kayu Kelas II (Lanan) M3 2,989,100 22 Papan Kayu kelas II (Lanan) M3 2,989,100 23 Balok Kayu Kelas III Kayu Hutan) M3 1,942,900 24 Papan Kayu Kelas III (Kayu Hutan) M3 1,942,900 25 Kayu Dolken/Galam Batang 17,700 26 Plywood 3 mm Lembar 50,600 27 Plywood 3 mm Lembar 150,000 28 Plywood 3 mm Lembar 79,800 29 Plywood 4 mm Lembar 67,900 30 Keramik Ukuran 30 x 30 cm M2 57,300 31 Seng Gelombang BJLS 30 Lembar 55,200 32 Seng Gelombang BJLS 27 Lembar 54,000 33 Seng Talang BJLS (lebar 30 cm) M' 33,000 34 Keramik Ukuran 20 x 20 cm M2 55,000 35 Genteng Metal Lembar 62,500

HARGA (Rp)

Page 12: Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

36 Bubungan Genteng Metal P = 1 m Lembar 51,600 37 Sirap Ulin Lembar 2,105 38 Paku Kayu Kg 19,200 39 Paku Ulin Kg 29,200 40 Paku Seng Kg 31,800 41 Paku Sirap Kg 38,400 42 Paku Triplek Kg 27,100 43 Paku Reng Kg 22,700

BAHAN BANGUNAN SATUAN HARGA (Rp.) 1 2 3 4

44 Besi Beugel Kg 18,800 45 Engsel Jendela Buah 12,100 46 Engsel Pintu Buah 15,800 47 Kunci Tanam 2 Slang (merk yale) Buah 186,000 48 Grendel Biasa Buah 13,300 49 Espagnolet Buah 37,400 50 Handle Jendela Kuningan Buah 15,400 51 Hak Angin Besar Kuningan Buah 43,200 52 Kunci Pintu Biasa Buah 117,600 53 Hak Angin Besar Kuningan Buah 17,500 54 Kaca Bening Ukuran 5 mm M2 106,300 55 Bak Mandi Fiberglass 70 x 70 cm Buah 276,000 56 Closed Jongkok Keramik Buah 156,000 57 Titik Lampu dan Instilasi (Bangunan Beton) Buah 193,900 58 Stop Kontak + Instilasi (Bangunan Beton) Buah 193,900 59 Sakhelar Tunggal Buah 20,400 60 Sakhelar Ganda Buah 20,400 61 Lampu TL 32 Watt Merk Philip (Lengkap) Buah 85,400 62 Lampu TL Bambu 20 Watt Buah 106,300 63 Lampu TL Bambu 40 Watt Buah 156,300 64 Cat Tembok (Merk Matex/Setara) 5 kg Kg 13,500 65 Cat Kayu (Merk Planton/Setara) Kg 42,300 66 Cat Kayu Dasar Kg 25,800 67 List Profil Kayu Lanan M' 8,500 68 Cat Manie Platon Kg 42,500 69 Plamur Tembok Kg 56,300 70 Politur Liter 45,000 71 Dempul Kayu Kg 27,800 72 Minyak Cat (Tinner A) Liter 25,300 73 Residu/Ter Liter 31,300 74 Paving Stone M2 222,900 75 Paku Genteng Metal Kg 31,300 76 Ampelas Lembar 4,200 77 Besi Angker Kg 27,000 78 Lem Kayu/Fox Kg 37,500

Page 13: Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

DAFTAR HARGA SATUAN PERALATAN

NO. U R A I A N HARGA SATUAN SATUAN( Rp. )

1 DUMP TRUCK 164,294,400.00 UNIT2 TRUCK BAK KAYU 128,355,000.00 UNIT3 TANDEM ROLLER 162,651,400.00 UNIT4 THRE WHEEL ROLLER 200,233,800.00 UNIT5 AIR COMPRESSOR 61,610,400.00 UNIT6 ASPHALT SPRAYER 46,207,800.00 UNIT7 WATER PUMP 5,590,000.00 UNIT8 CONCRETE VIBRATOR 71,187,800.00 UNIT9 CONCRETE MIXER 22,590,400.00 UNIT

10 PNEUMATIC TIRE ROLLER 462,078,000.00 UNIT11 ASPHALT MIXING PLANT 1,776,433,200.00 UNIT12 ASPHALT FINISHER 200,233,800.00 UNIT13 ROLLER VIBRATOR 385,065,000.00 UNIT14 MOTOR GRADER 590,433,000.00 UNIT15 WHELL LOADER 462,078,000.00 UNIT16 EXCAVATOR 1,026,840,000.00 UNIT17 BOLDOZER 349,125,600.00 UNIT18 STONE CRUSHER 770,130,000.00 UNIT

Page 14: Pen Batang DTYKDTYKGaringFJKUFTGJDDTJDTYJTYRDJGTFKTFUJRDYJ

DAFTAR KUANTITAS DAN HARGA

KEGIATAN :

SUB KEGIATAN :

PEKERJAAN :

LOKASI : PALANGKA RAYA

TOTAL

No URAIAN PEKERJAAN ANALISA VOLUME HARGA

(Rp)

1 2 3 4 5 6

PEMBUATAN SKAT RUANGAN

I. PERSIAPAN

1 Pembersihan Awal dan Akhir, Pengukuran Ls 1.00 Unit 1,500,000.00 1,500,000.00

Sub Total I 1,500,000.00

II. PEKERJAAN RANGKA & DINDING SEKAT RUANGAN

1 Pek. Pembongkaran Partisi Ls 226.56 M2 5,500.00 1,246,080.00

2 Pek. Pemasangan KembaliPartisi 06.6.55 147.52 M2 59,049.00 8,710,908.48

Sub Total II 9,956,988.48

III. PEKERJAAN PENGECATAN

1 Pek. Pengecatan Dinding & Partisi SNI 14.6.15 1,169.30 M2 11,546.89 13,501,778.48

Sub Total III 13,501,778.48

IV PEKERJAAN LAIN LAIN

1 Pek. Pemasangan Stop Kontak Ls 37.00 Unit 120,000.00 4,440,000.00

2 Pek. Pemasangan Kaca film Ls 27.60 M2 150,000.00 4,140,000.00

3 Pek. Pemasangan Karpet Ls 50.25 M2 170,000.00 8,542,500.00

4 Pek. Angkut Perlengkapan Kantor ( Transport + Tenaga) Ls 1.00 Unit 12,000,000.00 12,000,000.00

Sub Total IV 29,122,500.00

TOTAL JUMLAH BIAYA PEKERJAAN 54,081,266.96

DIBULATKAN 54,000,000.00

TERBILANG : LIMA PULUH EMPAT JUTA RUPIAH

HARGA SATUAN UPAH DAN BAHAN

(Rp.)