 Har a Satuan Total Hara R . R . A PEKERJAAN RUANG COSTUMER SERVICE 1. Pekerjaan Civil 1 Bongkar partisi kaca + pintu lama 1 unit .+ perapian ex bongkaran M 2 10.19  30,000 Rp 305,550 Rp 2 Plester Aci M 2 1.81  50,000 Rp 90,500 Rp 3 Pasang part isi gypsum 2 sisi t = Full M 2 26.24  115,000 Rp 3,017,600 Rp 4 Pasang Walpaper Partisi t = Full ex. Taiwan M 3 55.92  50,000 Rp 2,796,000 Rp 5 Pasang plint kayu bagian bawah partisi Kayu + Finish M' 20.30  14,000 Rp 284,200 Rp 6 Cat di nding t =3 m M 2 1.81  15,000 Rp 27,150 Rp 7 List Pl af ond 5cm M' 30.70  15,000 Rp 460,500 Rp 8 Drop plafond gypsum M 2 12.00  100,000 Rp 1,200,000 Rp 9 Cat pl afond M 2 56.45  15,000 R 846,750 R 10 Pasang Kaca Mati + Pintu Kaca uk. 180cmx210cm + pengadaan lot 1.00 200,000 Rp 200,000 Rp 11 Pasang Kaca Film merk sparta warna silver M 2 6.00 90,000 R 540,000 R 12 Upah Pasang Kusen + Pintu ke arah Sekretaris Manager unit 1.00 200,000 Rp 200,000 Rp 13 Pasang Keramik ex Pintu Kaca seperti existing M 2 1.00 100,000 R 100,000 R Sub Total Pekerjaan 1 10,068,250 Rp 2. Pekerjaan Eletrical 1 Instalasi Kabel Telepon ± 11 m + Outlet Telepon Supreme + Outlet Clipsal unit 4.00  200,000 Rp 800,000 Rp 2 Instalasi Kabel Data ± 11 m + Outlet Data unit 4.00  200,000 Rp 800,000 Rp 3 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit 6.00  200,000 Rp 1,200,000 Rp 4 Instalasi + Upah Pasang Lampu Downlight 4 besar (Supreme) unit 16.00 200,000 Rp 3,200,000 Rp 5 Instalasi + Upah Pasang Lampu Halogen unit 3.00  200,000 Rp 600,000 Rp 6 Instalasi Saklar + Outlet Saklar Double unit 2.00  200,000 Rp 400,000 Rp Sub Total Pekerjaan 2 7,000,000 Rp 3. Pekerjaan AC dan Plumbing 1 Instalasi + Unit AC Split 1 PK merk Panasonic Terima Dingin unit 1.00  4,250,000 Rp 4,250,000 Rp 2 Instalasi + Upah Pasang Unit Return Grill titik 4.00  200,000 Rp 800,000 Rp Sub Total Pekerjaan 3 5,050,000 Rp 4. Pengadaan Furniture 1 Meja Costumer Service uk 60cmx120cm ex High Point one OD 302 unit 4.00  837,000 Rp 3,348,000 Rp 2 Credenza uk. P:4m; L:30cm finish HPL unit 1.00  6,150,000 Rp 6,150,000 Rp 3 Pengadaan kursi tunggu tamu ex Indachi D-004 unit 1.00  2,100,000 Rp 2,100,000 Rp 4 Pengadaan kursi tunggu tamu ex Indachi D-002 unit 2.00  1,050,000 Rp 2,100,000 Rp Sub Total Pekerjaan 3 13,698,000 Rp 35,816,250 Rp B PEKERJAAN RUANG MEETING 1. Pekerjaan Civil 1 Bongkar ex Tangga + Partisi dan Pintu .+ perapian ex bongkaran M 2 41.50  40,000 Rp 1,660,000 Rp 2 Pasang part isi gypsum 2 sisi t = Full M 2 27.58  115,000 R 3, 171, 700 R 3 Pasang Walpaper Partisi t = Full M 2 44.38  50,000 Rp 2,219,000 Rp 4 Pasang plint kayu bagian bawah partisi Kayu + Finish M' 16.70  14,000 Rp 233,800 Rp 5 Cat di nding t =3 m M 3 5.60  15,000 Rp 84,000 Rp 6 List Plafond 5cm M' 16.80  15,000 Rp 252,000 Rp 7 Cat Plafond M 5 22.75  15,000 Rp 341,250 Rp 8 Upah Pasang Pintu + Kaca + Finishing ex R. Pajak unit 1.00  200,000 Rp 200,000 Rp Sub Total Pekerjaan 1 8,161,750 Rp 2. Pekerjaan Eletrical 1 Instalasi Kabel Telepon ± 9 m + Outlet Telepon Supreme unit 1.00  200,000 Rp 200,000 Rp 2 Instalasi Kabel Data ± 9 m + Outlet Data Supreme + Outlet Clipsal unit 2.00  200,000 Rp 400,000 Rp 3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit 3.00  200,000 Rp 600,000 Rp 4 Instalasi + Upah Pasang Lampu Downlight 4 besar (Supreme) unit 6.00  200,000 Rp 1,200,000 Rp 5 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit 1.00  200,000 Rp 200,000 Rp 6 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit 3.00  200,000 Rp 600,000 Rp Sub Total Pekerjaan 2 3,200,000 Rp 3. Pekerjaan AC dan Plumbing 1 Relokasi AC Split Terima Dingin unit 1.00  300,000 Rp 300,000 Rp 2 Instalasi + Upah Pasang Unit Return Grill titik 2.00  200,000 Rp 400,000 Rp Sub Total Pekerjaan 3 700,000 Rp 4. Pengadaan Furniture 1 Pengadaan meja meeti ng HOD 5052 ex High Ponit five uk 120x75 unit 6.00  1,154,750 Rp 6,928,500 Rp 2 Pengadaan meja meeti ng HCT 5531 ex High Ponit five uk 150x75 (1/ unit 2.00  534,750 Rp 1,069,500 Rp 3 Pengadaan kursi meeting ex Indachi D-2004 unit 8.00  595,000 Rp 4,760,000 Rp 4 Credenza Fin HPL dlm melaminto uk 30cmx200cm finish HPL unit 1.00  3,100,000 Rp 3,100,000 Rp Sub Total Pekerjaan 4 15,858,000 Rp 27,919,750 Rp C PEKERJAAN RUANG BUI LDI NG MANAGER 1. Pekerjaan Civil 1 Bongkar part isi gypsum + pint u lama 2 uni t M 2 42.00  30,000 Rp 1,260,000 Rp 2 Pasang part isi gypsum 2 sisi t = Full M 2 27.86  115,000 Rp 3,203,900 Rp 3 Pasang Walpaper Partisi t = Full M 2 66.78  50,000 Rp 3,339,000 Rp 4 Pasang plint kayu bagian bawah partisi Kayu + Finish M' 16.20  14,000 Rp 226,800 Rp TOTAL HARGA A. PEKERJAAN RUANG COSTUMER SERVICE TOTAL HARGA A. PEKERJAAN RUANG MEETING BQ PEKERJAAN RENOVASI KANTOR DHARMAWANGSA SQUARE No URAIAN PEKERJAAN KETERANGAN QTY SAT.

Transcript of Kurva S DS

Page 1: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 1/22

A PEKERJAAN RUANG COSTUMER SERVICE

1. Pekerjaan Civil

1 Bongkar partisi kaca + pintu lama 1 unit .+ perapian ex bongkaran M2  

2 Plester Aci M2  

3 Pasang partisi gypsum 2 sisi t = Full M2  

4 Pasang Walpaper Partisi t = Full ex. Taiwan M3  

5 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

6 Cat dinding t=3 m M2  

7 List Plafond 5cm M'  

8 Drop plafond gypsum M2  

9 Cat plafond M2  

10 Pasang Kaca Mati + Pintu Kaca uk. 180cmx210cm + pengadaan lot

11 Pasang Kaca Film merk sparta warna silver M2

12 Upah Pasang Kusen + Pintu ke arah Sekretaris Manager unit

13 Pasang Keramik ex Pintu Kaca seperti existing M2

Sub Total Pekerjaan 1

2. Pekerjaan Eletrical

1 Instalasi Kabel Telepon ± 11 m + Outlet Telepon Supreme + Outlet Clipsal unit  

2 Instalasi Kabel Data ± 11 m + Outlet Data unit  

3 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  

4 Instalasi + Upah Pasang Lampu Downlight 4 besar (Supreme) unit  

5 Instalasi + Upah Pasang Lampu Halogen unit  

6 Instalasi Saklar + Outlet Saklar Double unit  

Sub Total Pekerjaan 2

3. Pekerjaan AC dan Plumbing

1 Instalasi + Unit AC Split 1 PK merk Panasonic Terima Dingin unit  

2 Instalasi + Upah Pasang Unit Return Grill titik  

Sub Total Pekerjaan 3

4. Pengadaan Furniture

1 Meja Costumer Service uk 60cmx120cm ex High Point one OD 302 unit  

2 Credenza uk. P:4m; L:30cm finish HPL unit  

3 Pengadaan kursi tunggu tamu ex Indachi D-004 unit  4 Pengadaan kursi tunggu tamu ex Indachi D-002 unit  

Sub Total Pekerjaan 3

B PEKERJAAN RUANG MEETING

1. Pekerjaan Civil

1 Bongkar ex Tangga + Partisi dan Pintu .+ perapian ex bongkaran M2  

2 Pasang partisi gypsum 2 sisi t = Full M2  

3 Pasang Walpaper Partisi t = Full M2  

4 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

5 Cat dinding t=3 m M3  

6 List Plafond 5cm M'  7 Cat Plafond M

5  

8 Upah Pasang Pintu + Kaca + Finishing ex R. Pajak unit  

TOTAL HARGA A. PEKERJAAN RUANG COSTUMER SERVICE

BQ

PEKERJAAN RENOVASI KANTOR DHARMAWANGSA S

No URAIAN PEKERJAAN KETERANGAN QTY

Page 2: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 2/22

S

5 List Plafond M'  

6 Cat Plafond M2  

7 Upah Pasang Pintu + Kaca + Finishing ex Ruang lama unit  

Sub Total Pekerjaan 1

2. Pekerjaan Eletrical

1 Instalasi Kabel Telepon ± 20 m + Outlet Telepon Supreme unit  

2 Instalasi Kabel Data ± 20 m + Outlet Data Supreme + Outlet Clipsal unit  

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit  

4 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit  

5 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  

Sub Total Pekerjaan 2

3. Pekerjaan AC dan Plumbing

1 Instalasi + Upah Pasang Unit Return Grill titik  

Sub Total Pekerjaan 3

4. Pengadaan Furniture

1 Pengadaan Meja meeting bulat ex High Point One CT 3D uk : di unit  

2 Pengadaan kursi meeting ex Indachi D-2004 unit  

3 Credenza Fin HPL dlm melaminto uk 30cmx300cm finish HPL unit  

Sub Total Pekerjaan 4

D PEKERJAAN RUANG SEKRETARIS MANAGER

1. Pekerjaan Civil

1 Bongkar partisi gypsum + pintu lama 2 unit M2  

2 Pasang partisi gypsum 2 sisi t = Full M2  

3 Pasang Walpaper Partisi t = Full M2  

4 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

5 Pasang partisi gypsum 2 sisi t = 1m M2  

6 Pasang Walpaper Partisi t = 1m M2  7 Pasang plint kayu bagian atas penutup partisi Kayu + Finish M'  

8 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

9 List Plafond M'  

10 Cat Plafond M2  

Sub Total Pekerjaan 1

2. Pekerjaan Eletrical

1 Instalasi Kabel Telepon ± 11 m + Outlet Telepon Supreme unit  

2 Instalasi Kabel Data ± 11 m + Outlet Data Supreme + Outlet Clipsal unit  

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit  

4 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit  

5 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  Sub Total Pekerjaan 2

3. Pekerjaan AC dan Plumbing

1 Instalasi + Upah Pasang Unit Diffuser AC unit  

2 Instalasi + Upah Pasang Unit Return Grill titik  

Sub Total Pekerjaan 3

E PEKERJAAN RUANG CHIEF ACC

1. Pekerjaan Civil

1 Bongkar partisi gypsum + pintu lama 1 unit M2  

2 Pasang partisi gypsum 2 sisi t = Full M2  

3 Pasang Walpaper Partisi t = Full M2  

4 Pasang plint kayu bagian bawah partisi Kayu + Finish M'

TOTAL HARGA C. PEKERJAAN RUANG BULDING MANAGER

TOTAL HARGA E. PEKERJAAN RUANG SEKRETARIS MANAGER

Page 3: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 3/22

4 Pasang plint kayu bagian bawah partisi Kayu + Finish M  

6 Pasang Walpaper Partisi t = 1m M2  

7 Pasang plint kayu bagian atas penutup partisi Kayu + Finish M'  

8 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

9 List Plafond M'  

10 Cat Plafond M2  

11 Upah Pasang Pintu + Modifikasi + Finishing unit  

Sub Total Pekerjaan 1

2. Pekerjaan Eletrical

1 Instalasi Kabel Telepon ± 22 m + Outlet Telepon Supreme unit  

2 Instalasi Kabel Data ± 22 m + Outlet Data Supreme + Outlet Clipsal unit  

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit  

4 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit  

5 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  

Sub Total Pekerjaan 2

3. Pekerjaan AC dan Plumbing

1 Instalasi + Unit AC Split 1 PK merk Panasonic Terima Dingin unit  

2 Instalasi + Upah Pasang Unit Return Grill titik  

Sub Total Pekerjaan 3

4. Pengadaan Furniture

1 Pengadaan Meja Staff Pajak uk 120x75 ex High Point One OD 032+PD1 unit  

2 Lemari Gantung uk 30cmx450cm unit  

3 Rak / Credenza Fin HPL dlm melaminto uk 30cmx125cm finish HPL unit  

Sub Total Pekerjaan 4

G PEKERJAAN STAFF MARKETING

1. Pekerjaan Civil

1 Bongkar partisi gypsum + pintu lama 1 unit M2  

2 Pasang partisi gypsum 2 sisi t = Full M2  

3 Pasang Walpaper Partisi t = Full M2

 4 Pasang plint kayu bagian atas penutup partisi Kayu + Finish M'  

5 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

6 Pasang partisi gypsum 2 sisi t = 1m M2  

7 Pasang Walpaper Partisi t = 1m M2  

8 Pasang plint kayu bagian atas penutup partisi Kayu + Finish M'  

9 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

10 List Plafond M'  

11 Cat Plafond M2  

12 Upah Pasang Pintu + Modifikasi + Finishing unit  

Sub Total Pekerjaan 1

2. Pekerjaan Eletrical

1 Instalasi Kabel Telepon ± 15 m + Outlet Telepon Supreme unit  

2 Instalasi Kabel Data ± 15 m + Outlet Data Supreme + Outlet Clipsal unit  

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit  

4 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit  

5 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  

Sub Total Pekerjaan 2

3. Pekerjaan AC dan Plumbing

1 Relokasi AC Split unit  

2 Instalasi + Upah Pasang Unit Return Grill titik  

Sub Total Pekerjaan 3

4. Pengadaan Furniture

1 Pengadaan Meja Marketing uk 120x75 ex High Point One OD 032+PD1 unit  

2 P d M j S i M k ti k 120 44 Hi h P i t O OD 030 it

TOTAL HARGA F. PEKERJAAN RUANG STAFF ACC & STAFF PAJAK

Page 4: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 4/22

2 Pengadaan Meja Samping Marketing uk 120x44 ex High Point One OD 030 unit

4. Pengadaan Furniture

1 Pengadaan Meja Kasir uk: 160x75 ex High Point One OD 036+PD1 unit  

2 Rak / Credenza Fin HPL dlm melaminto uk 30cmx70 unit  

Sub Total Pekerjaan 4

H PEKERJAAN KORIDOR PANTRY

1. Pekerjaan Civil1 Cat Dinding M

2  

2 Pasang Walpaper Partisi t = Full M2  

3 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

4 List Plafond M'  

5 Cat Plafond M2  

Sub Total Pekerjaan 1

2. Pekerjaan Eletrical

4 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit  

1 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit  

2 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  

Sub Total Pekerjaan 2

3. Pekerjaan AC dan Plumbing

1 Relokasi AC Split Terima Dingin unit  

2 Instalasi + Upah Pasang Unit Return Grill titik  

Sub Total Pekerjaan 3

I PEKERJAAN RUANG SERVER

1 Cat Dinding M2  

2 box telepon tambah isi sesuai kebutuhan unit  

3 box data tambah isi sesuai kebutuhan unit  

4 box listrik penambahan box kecil +isi Supreme unit  

5 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit  

6 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  7 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit  

8 Relokasi AC Split Terima Dingin unit  

9 Instalasi + Upah Pasang Unit Return Grill titik  

J PEKERJAAN GUDANG

1. Pekerjaan Civil

1 Bongkar partisi gypsum + pintu lama 2 unit M2  

2 Pasang partisi gypsum 2 sisi t = Full M2  

3 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

4 Cat Dinding M3  

5 List Plafond M'  6 Cat Plafond M

2  

7 Upah Pasang Pintu + Modifikasi dari geser ke Pintu Swing+ Finishing unit  

Sub Total Pekerjaan 1

2. Pekerjaan Eletrical

1 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit  

2 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit  

3 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  

4 Instaslasi + Unit Exhaust Fan KDK 10" unit  

Sub Total Pekerjaan 2

3. Pekerjaan AC dan Plumbing

1 Instalasi + Upah Pasang Unit Diffuser AC unit  

2 Instalasi + Upah Pasang Unit Return Grill titik  

Sub Total Pekerjaan 3

TOTAL HARGA G. PEKERJAAN RUANG KASIR

TOTAL HARGA G. PEKERJAAN KORIDOR PANTRY

TOTAL HARGA E. PEKERJAAN RUANG SERVER

Page 5: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 5/22

Sub Total Pekerjaan 3

PEKERJAAN RENOVASI KANTOR DHARMAWANGSA SQUARE

7-Mar 8-Mar

A PEKERJAAN RUANG COSTUMER SERVICE1. Pekerjaan Civil

1 Bongkar partisi kaca + pintu lama 1 unit 0.17% 0.17%

2 Plester Aci 0.05% 0.03% 0.03%

3 Pasang partisi gypsum 2 sisi t = Full 1.69% 0.56%

4 Pasang Walpaper Partisi t = Full 1.56%

5 Pasang plint kayu bagian bawah partisi 0.16%

6 Cat dinding t=3 m 0.02%

7 List Plafond 0.26%

8 Drop plafond gypsum 0.67%

9 Cat plafond 0.47%10 Pasang Kaca Mati + Pintu Kaca 0.11% 0.11%

11 Pasang Kaca Film 0.30%

12 Upah Pasang Kusen + Pintu ke arah Sekretaris Manager 0.11% 0.06%

13 Pasang Keramik ex Pintu Kaca 0.06%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 11 m + Outlet Telepon 0.45%

2 Instalasi Kabel Data ± 11 m + Outlet Data 0.45%

3 Instalasi Stop Kontak + Outlet Stop Kontak 0.67%

4 Instalasi + Upah Pasang Lampu Downlight 1.79%

5 Instalasi + Upah Pasang Lampu Halogen 0.34%6 Instalasi Saklar + Outlet Saklar 0.22%

3. Pekerjaan AC dan Plumbing 0.00%

1 Instalasi + Unit AC Split 1 PK merk Panasonic 2.37%

2 Instalasi + Upah Pasang Unit Return Grill 0.45%

4. Pengadaan Furniture 0.00%

1 Meja Costumer Service uk 60cmx120cm 1.87%

2 Credenza 3.44%

3 Pengadaan kursi tunggu tamu 1.17%

4 Pengadaan kursi tunggu tamu 1.17%

B PEKERJAAN RUANG MEETING 0.00%1. Pekerjaan Civil 0.00%

1 Bongkar ex Tangga + Partisi dan Pintu 0.93% 0.46% 0.46%

2 Pasang partisi gypsum 2 sisi t = Full 1.77% 0.59% 0.59%

3 Pasang Walpaper Partisi t = Full 1.24%

4 Pasang plint kayu bagian bawah partisi 0.13%

5 Cat dinding t=3 m 0.05%

6 List Plafond 0.14%

BobotNo URAIAN PEKERJAAN

Page 6: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 6/22

7 Cat Plafond 0.19%

8 Upah Pasang Pintu + Kaca + Finishing ex R. Pajak 0.11% 0.11%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 9 m + Outlet Telepon 0.11%

2 Instalasi Kabel Data ± 9 m + Outlet Data 0.22%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.34%

4 Instalasi + Upah Pasang Lampu Downlight 0.67%

5 Instalasi Saklar + Outlet Saklar 0.11%

6 Instalasi Stop Kontak + Outlet Stop Kontak 0.34%

3. Pekerjaan AC dan Plumbing 0.00%

1 Relokasi AC Split 0.17%

2 Instalasi + Upah Pasang Unit Return Grill 0.22%

4. Pengadaan Furniture 0.00%

1 Pengadaan meja meeting HOD 5052 3.87%

2 Pengadaan meja meeting HCT 5531 0.60%

3 Pengadaan kursi meeting 2.66%

4 Credenza Fin HPL dlm melaminto 1.73%

C PEKERJAAN RUANG BUILDING MANAGER 0.00%

1. Pekerjaan Civil 0.00%

1 Bongkar partisi gypsum + pintu lama 2 unit 0.70% 0.70%

2 Pasang partisi gypsum 2 sisi t = Full 1.79% 0.60%

3 Pasang Walpaper Partisi t = Full 1.87%

4 Pasang plint kayu bagian bawah partisi 0.13%

5 List Plafond 0.17%

6 Cat Plafond 0.11%

7 Upah Pasang Pintu + Kaca + Finishing ex Ruang lama 0.11%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 20 m + Outlet Telepon 0.11%

2 Instalasi Kabel Data ± 20 m + Outlet Data 0.11%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.22%

4 Instalasi Saklar + Outlet Saklar 0.11%

5 Instalasi Stop Kontak + Outlet Stop Kontak 0.22%

3. Pekerjaan AC dan Plumbing 0.00%

1 Instalasi + Upah Pasang Unit Return Grill 0.22%

4. Pengadaan Furniture 0.00%

1 Pengadaan Meja meeting bulat 0.52%

2 Pengadaan kursi meeting 1.33%

3 Credenza Fin HPL dlm melaminto 2.57%

D PEKERJAAN RUANG SEKRETARIS MANAGER 0.00%

1. Pekerjaan Civil 0.00%

1 Bongkar partisi gypsum + pintu lama 2 unit 0.33%

2 Pasang partisi gypsum 2 sisi t = Full 1.06%

3 Pasang Walpaper Partisi t = Full 1.05%

4 Pasang plint kayu bagian bawah partisi 0.10%

Page 7: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 7/22

5 Pasang partisi gypsum 2 sisi t = 1m 0.17%

6 Pasang Walpaper Partisi t = 1m 0.14%

7 Pasang plint kayu bagian atas penutup partisi 0.02%

8 Pasang plint kayu bagian bawah partisi 0.05%

9 List Plafond 0.12%

10 Cat Plafond 0.12%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 11 m + Outlet Telepon 0.11%

2 Instalasi Kabel Data ± 11 m + Outlet Data 0.11%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.45%

4 Instalasi Saklar + Outlet Saklar 0.11%

5 Instalasi Stop Kontak + Outlet Stop Kontak 0.22%

3. Pekerjaan AC dan Plumbing 0.00%

1 Instalasi + Upah Pasang Unit Diffuser AC 0.20%

2 Instalasi + Upah Pasang Unit Return Grill 0.11%

E PEKERJAAN RUANG CHIEF ACC 0.00%

1. Pekerjaan Civil 0.00%1 Bongkar partisi gypsum + pintu lama 1 unit 0.18%

2 Pasang partisi gypsum 2 sisi t = Full 0.92%

3 Pasang Walpaper Partisi t = Full 0.70%

4 Pasang plint kayu bagian bawah partisi 0.08%

5 List Plafond 0.06%

6 Cat Plafond 0.05%

7 Upah Pasang Pintu + Modifikasi + Finishing 0.11%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 17 m + Outlet Telepon 0.11%

2 Instalasi Kabel Data ± 17 m + Outlet Data 0.11%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.22%

4 Instalasi Saklar + Outlet Saklar 0.11%

5 Instalasi Stop Kontak + Outlet Stop Kontak 0.22%

3. Pekerjaan AC dan Plumbing 0.00%

1 Instalasi + Upah Pasang Unit Diffuser AC 0.20%

2 Instalasi + Upah Pasang Unit Return Grill 0.11%

4. Pengadaan Furniture 0.00%

1 Lemari Gantung uk Fin HPL dlm melaminto 1.23%

F PEKERJAAN STAFF ACC & STAFF PAJAK 0.00%

1. Pekerjaan Civil 0.00%1 Bongkar partisi gypsum + pintu lama 1 unit 0.43%

2 Pasang partisi gypsum 2 sisi t = Full 1.37%

3 Pasang Walpaper Partisi t = Full 1.50%

4 Pasang plint kayu bagian bawah partisi 0.15%

5 Pasang partisi gypsum 2 sisi t = 1m 0.52%

6 Pasang Walpaper Partisi t = 1m 0.30%

7 Pasang plint kayu bagian atas penutup partisi 0.06%

Page 8: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 8/22

8 Pasang plint kayu bagian bawah partisi 0.13%

9 List Plafond 0.18%

10 Cat Plafond 0.18%

11 Upah Pasang Pintu + Modifikasi + Finishing 0.11%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 22 m + Outlet Telepon 0.67%

2 Instalasi Kabel Data ± 22 m + Outlet Data 0.67%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.45%

4 Instalasi Saklar + Outlet Saklar 0.22%

5 Instalasi Stop Kontak + Outlet Stop Kontak 0.78%

3. Pekerjaan AC dan Plumbing 0.00%

1 Instalasi + Unit AC Split 1 PK merk Panasonic 2.37%

2 Instalasi + Upah Pasang Unit Return Grill 0.34%

4. Pengadaan Furniture 0.00%

1 Pengadaan Meja Staff Pajak uk 120x75 1.12%

2 Lemari Gantung 3.02%

3 Rak / Credenza Fin HPL dlm melaminto 1.06%G PEKERJAAN STAFF MARKETING 0.00%

1. Pekerjaan Civil 0.00%

1 Bongkar partisi gypsum + pintu lama 1 unit 0.28%

2 Pasang partisi gypsum 2 sisi t = Full 0.63%

3 Pasang Walpaper Partisi t = Full 1.35%

4 Pasang plint kayu bagian atas penutup partisi 0.08%

5 Pasang plint kayu bagian bawah partisi 0.13%

6 Pasang partisi gypsum 2 sisi t = 1m 0.13%

7 Pasang Walpaper Partisi t = 1m 0.11%

8 Pasang plint kayu bagian atas penutup partisi 0.02%9 Pasang plint kayu bagian bawah partisi 0.03%

10 List Plafond 0.07%

11 Cat Plafond 0.15%

12 Upah Pasang Pintu + Modifikasi + Finishing 0.11%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 15 m + Outlet Telepon 0.45%

2 Instalasi Kabel Data ± 15 m + Outlet Data 0.45%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.22%

4 Instalasi Saklar + Outlet Saklar 0.11%

5 Instalasi Stop Kontak + Outlet Stop Kontak 0.56%3. Pekerjaan AC dan Plumbing 0.00%

1 Relokasi AC Split 0.17%

2 Instalasi + Upah Pasang Unit Return Grill 0.22%

4. Pengadaan Furniture 0.00%

1 Pengadaan Meja Marketing uk 120x75 0.56%

2 Pengadaan Meja Samping Marketing uk 120x44 0.25%

3 Pengadaan Meja Staff Marketing uk 120x75 1.12%

Page 9: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 9/22

4 Lemari Gantung Fin HPL dlm melaminto 2.68%

H PEKERJAAN RUANG KASIR 0.00%

1. Pekerjaan Civil 0.00%

1 Bongkar partisi gypsum + pintu lama 2 unit 0.28%

2 Pasang partisi gypsum 2 sisi t = Full 0.29%

3 Pasang Walpaper Partisi t = Full 0.65%

4 Pasang plint kayu bagian bawah partisi 0.06%5 List Plafond 0.08%

6 Cat Plafond 0.05%

7 Upah Pasang Pintu + Modifikasi dari geser ke Pintu Swing+ Finishing 0.14%

8 Pasang Kaca Kasir + Ambalan 0.56%

9 Pasang Sanblast 0.27%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 12 m + Outlet Telepon 0.11%

2 Instalasi Kabel Data ± 12 m + Outlet Data 0.11%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.11%

4 Instalasi Saklar + Outlet Saklar 0.11%5 Instalasi Stop Kontak + Outlet Stop Kontak 0.22%

3. Pekerjaan AC dan Plumbing 0.00%

1 Instalasi + Unit AC Split 1/2 PK merk Panasonic 1.90%

2 Instalasi + Upah Pasang Unit Return Grill 0.11%

4. Pengadaan Furniture 0.00%

1 Pengadaan Meja Kasir uk: 160x75 0.62%

2 Rak / Credenza Fin HPL dlm melaminto 0.61%

H PEKERJAAN KORIDOR PANTRY 0.00%

1. Pekerjaan Civil 0.00%

1 Cat Dinding 0.04%

2 Pasang Walpaper Partisi t = Full 1.16%

3 Pasang plint kayu bagian bawah partisi 0.11%

4 List Plafond 0.14%

5 Cat Plafond 0.11%

2. Pekerjaan Eletrical 0.00%

4 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.34%

1 Instalasi Saklar + Outlet Saklar 0.11%

2 Instalasi Stop Kontak + Outlet Stop Kontak 0.45%

3. Pekerjaan AC dan Plumbing 0.00%

1 Relokasi AC Split 0.17%2 Instalasi + Upah Pasang Unit Return Grill 0.22%

I PEKERJAAN RUANG SERVER 0.00%

1 Cat Dinding 0.09%

2 box telepon tambah isi 2.23%

3 box data tambah isi 2.79%

4 box listrik penambahan box kecil +isi 0.56%

5 Instalasi Saklar + Outlet Saklar 0.11%

6 Instalasi Stop Kontak + Outlet Stop Kontak 0.22%

7 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.14%

Page 10: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 10/22

8 Relokasi AC Split 0.17%

9 Instalasi + Upah Pasang Unit Return Grill 0.11%

J PEKERJAAN GUDANG 0.00%

1. Pekerjaan Civil 0.00%

1 Bongkar partisi gypsum + pintu lama 2 unit 0.18%

2 Pasang partisi gypsum 2 sisi t = Full 0.74%

3 Pasang plint kayu bagian bawah partisi 0.07%

4 Cat Dinding 0.19%

5 List Plafond 0.08%

6 Cat Plafond 0.05%

7 Upah Pasang Pintu + Modifikasi dari geser ke Pintu Swing+ Finishing 0.14%

2. Pekerjaan Eletrical 0.00%

1 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.14%

2 Instalasi Saklar + Outlet Saklar 0.11%

3 Instalasi Stop Kontak + Outlet Stop Kontak 0.22%

4 Instaslasi + Unit Exhaust Fan 0.25%

3. Pekerjaan AC dan Plumbing 0.00%

1 Instalasi + Upah Pasang Unit Diffuser AC 0.20%

2 Instalasi + Upah Pasang Unit Return Grill 0.11%

K PEKERJAAN RUANG POMPA EXISTING 0.00%

1 Cat Dinding 0.11%

2 Upah Pasang Pintu + Modifikasi dari geser ke Pintu Swing+ Finishing 0.14%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.14%

4 Instalasi Saklar + Outlet Saklar 0.22%

5 Instaslasi + Unit Exhaust Fan 0.25%

L PEKERJAAN FINISHING 0.00%

1 Perbaikan Plafond ex Instalasi ME 0.84%1.95% 2.52%

0.00% 1.95% 4.47%

FREE :

PINDAH INSTALASI POMPA 350,000

REFINISH MELAMIC CREDENZA CS + HANDLE 900,000

REFINISH MELAMIC MEJA CS 1,000,000

2,250,000

Lama Pekerjaan : 3 minggu

Bobot

Bobot Komulatif

Page 11: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 11/22

9-Mar 10-Mar 11-Mar 12-Mar 13-Mar 14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar

0.56% 0.56%

0.78% 0.78%

0.16%

0.02%

0.26%

0.67%

0.24% 0.24%

0.30%

0.06%

0.06%

0.45%

0.45%

0.67%

1.79%

0.34%0.22%

2.37%

0.45%

0.59%

0.62% 0.62%

0.13%

0.02% 0.02%

0.14%

Minggu I Minggu II

Page 12: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 12/22

0.19%

0.11%

0.22%

0.34%

0.67%

0.11%

0.34%

0.17%

0.22%

3.87%

0.60%

2.66%

1.73%

0.60% 0.60%

0.93% 0.93%

0.13%

0.17%

0.11%

0.11%

0.11%

0.11%

0.22%

0.11%

0.22%

0.22%

0.52%

1.33%

2.57%

0.33%

0.35% 0.35% 0.35%

0.52%

0.10%

Page 13: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 13/22

0.17%

0.14%

0.02%

0.05%

0.12%

0.12%

0.11%

0.11%

0.45%

0.11%

0.22%

0.20%

0.11%

0.18%

0.46% 0.46%

0.35%

0.08%

0.06%

0.05%

0.11%

0.11%

0.11%

0.22%

0.11%

0.22%

0.20%

0.11%

0.43%

0.46% 0.46% 0.46%

0.75%

0.15%

0.52%

0.30%

0.06%

Page 14: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 14/22

0.13%

0.18%

0.18%

0.11%

0.67%

0.67%

0.45%

0.22%

0.78%

2.37%

0.34%

Page 15: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 15/22

Page 16: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 16/22

7.79% 6.21% 1.81% 3.51% 1.17% 14.21% 1.38% 5.96% 4.93% 1.33% 1.92%

12.26% 18.48% 20.29% 23.80% 24.97% 39.18% 40.56% 46.52% 51.45% 52.78% 54.70%

Page 17: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 17/22

20-Mar 21-Mar 22-Mar 23-Mar 24-Mar 25-Mar 26-Mar 27-Mar

1.87%

3.44%

1.17%

1.17%

Minggu III

90.00%

100.00%

Page 18: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 18/22

0.52%

70.00%

80.00%

Page 19: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 19/22

0.35%

1.23%

0.75%

50.00%

60.00%

Page 20: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 20/22

1.12%

3.02%

1.06%

0.28%

0.31% 0.31%

0.67% 0.67%

0.08%

0.13%

0.13%

0.11%

0.02%0.03%

0.07%

0.15%

0.11%

0.45%

0.45%

0.22%

0.11%

0.56%

0.17%

0.22%

0.56%

0.25%

1.12%

30.00%

40.00%

Page 21: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 21/22

2.68%

0.28%

0.29%

0.65%

0.06%0.08%

0.05%

0.14%

0.56%

0.27%

0.11%

0.11%

0.11%

0.11%0.22%

1.90%

0.11%

0.62%

0.61%

0.04%

1.16%

0.11%

0.14%

0.11%

0.34%

0.11%

0.45%

0.17%0.22%

0.09%

2.23%

2.79%

0.56%

0.11%

0.22%

0.14%

20.00%

Page 22: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 22/22

0.17%

0.11%

0.18%

0.74%

0.07%

0.19%

0.08%

0.05%

0.14%

0.14%

0.11%

0.22%

0.25%

0.20%

0.11%

0.11%

0.14%

0.14%

0.22%

0.25%

0.84%9.28% 12.18% 6.43% 4.71% 1.87% 6.51% 1.53% 2.79%

63.98% 76.16% 82.59% 87.30% 89.17% 95.68% 97.21% 100.00%