A PEKERJAAN RUANG COSTUMER SERVICE

1. Pekerjaan Civil

1 Bongkar partisi kaca + pintu lama 1 unit .+ perapian ex bongkaran M2  

2 Plester Aci M2  

3 Pasang partisi gypsum 2 sisi t = Full M2  

4 Pasang Walpaper Partisi t = Full ex. Taiwan M3  

5 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

6 Cat dinding t=3 m M2  

7 List Plafond 5cm M'  

8 Drop plafond gypsum M2  

9 Cat plafond M2  

10 Pasang Kaca Mati + Pintu Kaca uk. 180cmx210cm + pengadaan lot

11 Pasang Kaca Film merk sparta warna silver M2

12 Upah Pasang Kusen + Pintu ke arah Sekretaris Manager unit

13 Pasang Keramik ex Pintu Kaca seperti existing M2

Sub Total Pekerjaan 1

2. Pekerjaan Eletrical

1 Instalasi Kabel Telepon ± 11 m + Outlet Telepon Supreme + Outlet Clipsal unit  

2 Instalasi Kabel Data ± 11 m + Outlet Data unit  

3 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  

4 Instalasi + Upah Pasang Lampu Downlight 4 besar (Supreme) unit  

5 Instalasi + Upah Pasang Lampu Halogen unit  

6 Instalasi Saklar + Outlet Saklar Double unit  

Sub Total Pekerjaan 2

3. Pekerjaan AC dan Plumbing

1 Instalasi + Unit AC Split 1 PK merk Panasonic Terima Dingin unit  

2 Instalasi + Upah Pasang Unit Return Grill titik  

Sub Total Pekerjaan 3

4. Pengadaan Furniture

1 Meja Costumer Service uk 60cmx120cm ex High Point one OD 302 unit  

2 Credenza uk. P:4m; L:30cm finish HPL unit  

3 Pengadaan kursi tunggu tamu ex Indachi D-004 unit  4 Pengadaan kursi tunggu tamu ex Indachi D-002 unit  

Sub Total Pekerjaan 3

B PEKERJAAN RUANG MEETING

1. Pekerjaan Civil

1 Bongkar ex Tangga + Partisi dan Pintu .+ perapian ex bongkaran M2  

2 Pasang partisi gypsum 2 sisi t = Full M2  

3 Pasang Walpaper Partisi t = Full M2  

4 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

5 Cat dinding t=3 m M3  

6 List Plafond 5cm M'  7 Cat Plafond M

5  

8 Upah Pasang Pintu + Kaca + Finishing ex R. Pajak unit  

TOTAL HARGA A. PEKERJAAN RUANG COSTUMER SERVICE

BQ

PEKERJAAN RENOVASI KANTOR DHARMAWANGSA S

No URAIAN PEKERJAAN KETERANGAN QTY

Page 2: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 2/22

S

5 List Plafond M'  

6 Cat Plafond M2  

7 Upah Pasang Pintu + Kaca + Finishing ex Ruang lama unit  

Sub Total Pekerjaan 1

2. Pekerjaan Eletrical

1 Instalasi Kabel Telepon ± 20 m + Outlet Telepon Supreme unit  

2 Instalasi Kabel Data ± 20 m + Outlet Data Supreme + Outlet Clipsal unit  

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit  

4 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit  

5 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  

Sub Total Pekerjaan 2

3. Pekerjaan AC dan Plumbing

1 Instalasi + Upah Pasang Unit Return Grill titik  

Sub Total Pekerjaan 3

4. Pengadaan Furniture

1 Pengadaan Meja meeting bulat ex High Point One CT 3D uk : di unit  

2 Pengadaan kursi meeting ex Indachi D-2004 unit  

3 Credenza Fin HPL dlm melaminto uk 30cmx300cm finish HPL unit  

Sub Total Pekerjaan 4

D PEKERJAAN RUANG SEKRETARIS MANAGER

1. Pekerjaan Civil

1 Bongkar partisi gypsum + pintu lama 2 unit M2  

2 Pasang partisi gypsum 2 sisi t = Full M2  

3 Pasang Walpaper Partisi t = Full M2  

4 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

5 Pasang partisi gypsum 2 sisi t = 1m M2  

6 Pasang Walpaper Partisi t = 1m M2  7 Pasang plint kayu bagian atas penutup partisi Kayu + Finish M'  

8 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

9 List Plafond M'  

10 Cat Plafond M2  

Sub Total Pekerjaan 1

2. Pekerjaan Eletrical

1 Instalasi Kabel Telepon ± 11 m + Outlet Telepon Supreme unit  

2 Instalasi Kabel Data ± 11 m + Outlet Data Supreme + Outlet Clipsal unit  

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit  

4 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit  

5 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  Sub Total Pekerjaan 2

3. Pekerjaan AC dan Plumbing

1 Instalasi + Upah Pasang Unit Diffuser AC unit  

2 Instalasi + Upah Pasang Unit Return Grill titik  

Sub Total Pekerjaan 3

E PEKERJAAN RUANG CHIEF ACC

1. Pekerjaan Civil

1 Bongkar partisi gypsum + pintu lama 1 unit M2  

2 Pasang partisi gypsum 2 sisi t = Full M2  

3 Pasang Walpaper Partisi t = Full M2  

4 Pasang plint kayu bagian bawah partisi Kayu + Finish M'

TOTAL HARGA C. PEKERJAAN RUANG BULDING MANAGER

TOTAL HARGA E. PEKERJAAN RUANG SEKRETARIS MANAGER

Page 3: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 3/22

4 Pasang plint kayu bagian bawah partisi Kayu + Finish M  

6 Pasang Walpaper Partisi t = 1m M2  

7 Pasang plint kayu bagian atas penutup partisi Kayu + Finish M'  

8 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

9 List Plafond M'  

10 Cat Plafond M2  

11 Upah Pasang Pintu + Modifikasi + Finishing unit  

Sub Total Pekerjaan 1

2. Pekerjaan Eletrical

1 Instalasi Kabel Telepon ± 22 m + Outlet Telepon Supreme unit  

2 Instalasi Kabel Data ± 22 m + Outlet Data Supreme + Outlet Clipsal unit  

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit  

4 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit  

5 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  

Sub Total Pekerjaan 2

3. Pekerjaan AC dan Plumbing

1 Instalasi + Unit AC Split 1 PK merk Panasonic Terima Dingin unit  

2 Instalasi + Upah Pasang Unit Return Grill titik  

Sub Total Pekerjaan 3

4. Pengadaan Furniture

1 Pengadaan Meja Staff Pajak uk 120x75 ex High Point One OD 032+PD1 unit  

2 Lemari Gantung uk 30cmx450cm unit  

3 Rak / Credenza Fin HPL dlm melaminto uk 30cmx125cm finish HPL unit  

Sub Total Pekerjaan 4

G PEKERJAAN STAFF MARKETING

1. Pekerjaan Civil

1 Bongkar partisi gypsum + pintu lama 1 unit M2  

2 Pasang partisi gypsum 2 sisi t = Full M2  

3 Pasang Walpaper Partisi t = Full M2

 4 Pasang plint kayu bagian atas penutup partisi Kayu + Finish M'  

5 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

6 Pasang partisi gypsum 2 sisi t = 1m M2  

7 Pasang Walpaper Partisi t = 1m M2  

8 Pasang plint kayu bagian atas penutup partisi Kayu + Finish M'  

9 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

10 List Plafond M'  

11 Cat Plafond M2  

12 Upah Pasang Pintu + Modifikasi + Finishing unit  

Sub Total Pekerjaan 1

2. Pekerjaan Eletrical

1 Instalasi Kabel Telepon ± 15 m + Outlet Telepon Supreme unit  

2 Instalasi Kabel Data ± 15 m + Outlet Data Supreme + Outlet Clipsal unit  

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit  

4 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit  

5 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  

Sub Total Pekerjaan 2

3. Pekerjaan AC dan Plumbing

1 Relokasi AC Split unit  

2 Instalasi + Upah Pasang Unit Return Grill titik  

Sub Total Pekerjaan 3

4. Pengadaan Furniture

1 Pengadaan Meja Marketing uk 120x75 ex High Point One OD 032+PD1 unit  

2 P d M j S i M k ti k 120 44 Hi h P i t O OD 030 it

TOTAL HARGA F. PEKERJAAN RUANG STAFF ACC & STAFF PAJAK

Page 4: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 4/22

2 Pengadaan Meja Samping Marketing uk 120x44 ex High Point One OD 030 unit

4. Pengadaan Furniture

1 Pengadaan Meja Kasir uk: 160x75 ex High Point One OD 036+PD1 unit  

2 Rak / Credenza Fin HPL dlm melaminto uk 30cmx70 unit  

Sub Total Pekerjaan 4

H PEKERJAAN KORIDOR PANTRY

1. Pekerjaan Civil1 Cat Dinding M

2  

2 Pasang Walpaper Partisi t = Full M2  

3 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

4 List Plafond M'  

5 Cat Plafond M2  

Sub Total Pekerjaan 1

2. Pekerjaan Eletrical

4 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit  

1 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit  

2 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  

Sub Total Pekerjaan 2

3. Pekerjaan AC dan Plumbing

1 Relokasi AC Split Terima Dingin unit  

2 Instalasi + Upah Pasang Unit Return Grill titik  

Sub Total Pekerjaan 3

I PEKERJAAN RUANG SERVER

1 Cat Dinding M2  

2 box telepon tambah isi sesuai kebutuhan unit  

3 box data tambah isi sesuai kebutuhan unit  

4 box listrik penambahan box kecil +isi Supreme unit  

5 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit  

6 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  7 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit  

8 Relokasi AC Split Terima Dingin unit  

9 Instalasi + Upah Pasang Unit Return Grill titik  

J PEKERJAAN GUDANG

1. Pekerjaan Civil

1 Bongkar partisi gypsum + pintu lama 2 unit M2  

2 Pasang partisi gypsum 2 sisi t = Full M2  

3 Pasang plint kayu bagian bawah partisi Kayu + Finish M'  

4 Cat Dinding M3  

5 List Plafond M'  6 Cat Plafond M

2  

7 Upah Pasang Pintu + Modifikasi dari geser ke Pintu Swing+ Finishing unit  

Sub Total Pekerjaan 1

2. Pekerjaan Eletrical

1 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 4 besar (Supreme) unit  

2 Instalasi Saklar + Outlet Saklar 4 besar (Supreme) unit  

3 Instalasi Stop Kontak + Outlet Stop Kontak Supreme + Outlet Clipsal unit  

4 Instaslasi + Unit Exhaust Fan KDK 10" unit  

Sub Total Pekerjaan 2

3. Pekerjaan AC dan Plumbing

1 Instalasi + Upah Pasang Unit Diffuser AC unit  

2 Instalasi + Upah Pasang Unit Return Grill titik  

Sub Total Pekerjaan 3

TOTAL HARGA G. PEKERJAAN RUANG KASIR

TOTAL HARGA G. PEKERJAAN KORIDOR PANTRY

TOTAL HARGA E. PEKERJAAN RUANG SERVER

Page 5: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 5/22

Sub Total Pekerjaan 3

PEKERJAAN RENOVASI KANTOR DHARMAWANGSA SQUARE

7-Mar 8-Mar

A PEKERJAAN RUANG COSTUMER SERVICE1. Pekerjaan Civil

1 Bongkar partisi kaca + pintu lama 1 unit 0.17% 0.17%

2 Plester Aci 0.05% 0.03% 0.03%

3 Pasang partisi gypsum 2 sisi t = Full 1.69% 0.56%

4 Pasang Walpaper Partisi t = Full 1.56%

5 Pasang plint kayu bagian bawah partisi 0.16%

6 Cat dinding t=3 m 0.02%

7 List Plafond 0.26%

8 Drop plafond gypsum 0.67%

9 Cat plafond 0.47%10 Pasang Kaca Mati + Pintu Kaca 0.11% 0.11%

11 Pasang Kaca Film 0.30%

12 Upah Pasang Kusen + Pintu ke arah Sekretaris Manager 0.11% 0.06%

13 Pasang Keramik ex Pintu Kaca 0.06%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 11 m + Outlet Telepon 0.45%

2 Instalasi Kabel Data ± 11 m + Outlet Data 0.45%

3 Instalasi Stop Kontak + Outlet Stop Kontak 0.67%

4 Instalasi + Upah Pasang Lampu Downlight 1.79%

5 Instalasi + Upah Pasang Lampu Halogen 0.34%6 Instalasi Saklar + Outlet Saklar 0.22%

3. Pekerjaan AC dan Plumbing 0.00%

1 Instalasi + Unit AC Split 1 PK merk Panasonic 2.37%

2 Instalasi + Upah Pasang Unit Return Grill 0.45%

4. Pengadaan Furniture 0.00%

1 Meja Costumer Service uk 60cmx120cm 1.87%

2 Credenza 3.44%

3 Pengadaan kursi tunggu tamu 1.17%

4 Pengadaan kursi tunggu tamu 1.17%

B PEKERJAAN RUANG MEETING 0.00%1. Pekerjaan Civil 0.00%

1 Bongkar ex Tangga + Partisi dan Pintu 0.93% 0.46% 0.46%

2 Pasang partisi gypsum 2 sisi t = Full 1.77% 0.59% 0.59%

3 Pasang Walpaper Partisi t = Full 1.24%

4 Pasang plint kayu bagian bawah partisi 0.13%

5 Cat dinding t=3 m 0.05%

6 List Plafond 0.14%

BobotNo URAIAN PEKERJAAN

Page 6: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 6/22

7 Cat Plafond 0.19%

8 Upah Pasang Pintu + Kaca + Finishing ex R. Pajak 0.11% 0.11%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 9 m + Outlet Telepon 0.11%

2 Instalasi Kabel Data ± 9 m + Outlet Data 0.22%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.34%

4 Instalasi + Upah Pasang Lampu Downlight 0.67%

5 Instalasi Saklar + Outlet Saklar 0.11%

6 Instalasi Stop Kontak + Outlet Stop Kontak 0.34%

3. Pekerjaan AC dan Plumbing 0.00%

1 Relokasi AC Split 0.17%

2 Instalasi + Upah Pasang Unit Return Grill 0.22%

4. Pengadaan Furniture 0.00%

1 Pengadaan meja meeting HOD 5052 3.87%

2 Pengadaan meja meeting HCT 5531 0.60%

3 Pengadaan kursi meeting 2.66%

4 Credenza Fin HPL dlm melaminto 1.73%

C PEKERJAAN RUANG BUILDING MANAGER 0.00%

1. Pekerjaan Civil 0.00%

1 Bongkar partisi gypsum + pintu lama 2 unit 0.70% 0.70%

2 Pasang partisi gypsum 2 sisi t = Full 1.79% 0.60%

3 Pasang Walpaper Partisi t = Full 1.87%

4 Pasang plint kayu bagian bawah partisi 0.13%

5 List Plafond 0.17%

6 Cat Plafond 0.11%

7 Upah Pasang Pintu + Kaca + Finishing ex Ruang lama 0.11%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 20 m + Outlet Telepon 0.11%

2 Instalasi Kabel Data ± 20 m + Outlet Data 0.11%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.22%

4 Instalasi Saklar + Outlet Saklar 0.11%

5 Instalasi Stop Kontak + Outlet Stop Kontak 0.22%

3. Pekerjaan AC dan Plumbing 0.00%

1 Instalasi + Upah Pasang Unit Return Grill 0.22%

4. Pengadaan Furniture 0.00%

1 Pengadaan Meja meeting bulat 0.52%

2 Pengadaan kursi meeting 1.33%

3 Credenza Fin HPL dlm melaminto 2.57%

D PEKERJAAN RUANG SEKRETARIS MANAGER 0.00%

1. Pekerjaan Civil 0.00%

1 Bongkar partisi gypsum + pintu lama 2 unit 0.33%

2 Pasang partisi gypsum 2 sisi t = Full 1.06%

3 Pasang Walpaper Partisi t = Full 1.05%

4 Pasang plint kayu bagian bawah partisi 0.10%

Page 7: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 7/22

5 Pasang partisi gypsum 2 sisi t = 1m 0.17%

6 Pasang Walpaper Partisi t = 1m 0.14%

7 Pasang plint kayu bagian atas penutup partisi 0.02%

8 Pasang plint kayu bagian bawah partisi 0.05%

9 List Plafond 0.12%

10 Cat Plafond 0.12%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 11 m + Outlet Telepon 0.11%

2 Instalasi Kabel Data ± 11 m + Outlet Data 0.11%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.45%

4 Instalasi Saklar + Outlet Saklar 0.11%

5 Instalasi Stop Kontak + Outlet Stop Kontak 0.22%

3. Pekerjaan AC dan Plumbing 0.00%

1 Instalasi + Upah Pasang Unit Diffuser AC 0.20%

2 Instalasi + Upah Pasang Unit Return Grill 0.11%

E PEKERJAAN RUANG CHIEF ACC 0.00%

1. Pekerjaan Civil 0.00%1 Bongkar partisi gypsum + pintu lama 1 unit 0.18%

2 Pasang partisi gypsum 2 sisi t = Full 0.92%

3 Pasang Walpaper Partisi t = Full 0.70%

4 Pasang plint kayu bagian bawah partisi 0.08%

5 List Plafond 0.06%

6 Cat Plafond 0.05%

7 Upah Pasang Pintu + Modifikasi + Finishing 0.11%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 17 m + Outlet Telepon 0.11%

2 Instalasi Kabel Data ± 17 m + Outlet Data 0.11%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.22%

4 Instalasi Saklar + Outlet Saklar 0.11%

5 Instalasi Stop Kontak + Outlet Stop Kontak 0.22%

3. Pekerjaan AC dan Plumbing 0.00%

1 Instalasi + Upah Pasang Unit Diffuser AC 0.20%

2 Instalasi + Upah Pasang Unit Return Grill 0.11%

4. Pengadaan Furniture 0.00%

1 Lemari Gantung uk Fin HPL dlm melaminto 1.23%

F PEKERJAAN STAFF ACC & STAFF PAJAK 0.00%

1. Pekerjaan Civil 0.00%1 Bongkar partisi gypsum + pintu lama 1 unit 0.43%

2 Pasang partisi gypsum 2 sisi t = Full 1.37%

3 Pasang Walpaper Partisi t = Full 1.50%

4 Pasang plint kayu bagian bawah partisi 0.15%

5 Pasang partisi gypsum 2 sisi t = 1m 0.52%

6 Pasang Walpaper Partisi t = 1m 0.30%

7 Pasang plint kayu bagian atas penutup partisi 0.06%

Page 8: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 8/22

8 Pasang plint kayu bagian bawah partisi 0.13%

9 List Plafond 0.18%

10 Cat Plafond 0.18%

11 Upah Pasang Pintu + Modifikasi + Finishing 0.11%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 22 m + Outlet Telepon 0.67%

2 Instalasi Kabel Data ± 22 m + Outlet Data 0.67%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.45%

4 Instalasi Saklar + Outlet Saklar 0.22%

5 Instalasi Stop Kontak + Outlet Stop Kontak 0.78%

3. Pekerjaan AC dan Plumbing 0.00%

1 Instalasi + Unit AC Split 1 PK merk Panasonic 2.37%

2 Instalasi + Upah Pasang Unit Return Grill 0.34%

4. Pengadaan Furniture 0.00%

1 Pengadaan Meja Staff Pajak uk 120x75 1.12%

2 Lemari Gantung 3.02%

3 Rak / Credenza Fin HPL dlm melaminto 1.06%G PEKERJAAN STAFF MARKETING 0.00%

1. Pekerjaan Civil 0.00%

1 Bongkar partisi gypsum + pintu lama 1 unit 0.28%

2 Pasang partisi gypsum 2 sisi t = Full 0.63%

3 Pasang Walpaper Partisi t = Full 1.35%

4 Pasang plint kayu bagian atas penutup partisi 0.08%

5 Pasang plint kayu bagian bawah partisi 0.13%

6 Pasang partisi gypsum 2 sisi t = 1m 0.13%

7 Pasang Walpaper Partisi t = 1m 0.11%

8 Pasang plint kayu bagian atas penutup partisi 0.02%9 Pasang plint kayu bagian bawah partisi 0.03%

10 List Plafond 0.07%

11 Cat Plafond 0.15%

12 Upah Pasang Pintu + Modifikasi + Finishing 0.11%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 15 m + Outlet Telepon 0.45%

2 Instalasi Kabel Data ± 15 m + Outlet Data 0.45%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.22%

4 Instalasi Saklar + Outlet Saklar 0.11%

5 Instalasi Stop Kontak + Outlet Stop Kontak 0.56%3. Pekerjaan AC dan Plumbing 0.00%

1 Relokasi AC Split 0.17%

2 Instalasi + Upah Pasang Unit Return Grill 0.22%

4. Pengadaan Furniture 0.00%

1 Pengadaan Meja Marketing uk 120x75 0.56%

2 Pengadaan Meja Samping Marketing uk 120x44 0.25%

3 Pengadaan Meja Staff Marketing uk 120x75 1.12%

Page 9: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 9/22

4 Lemari Gantung Fin HPL dlm melaminto 2.68%

H PEKERJAAN RUANG KASIR 0.00%

1. Pekerjaan Civil 0.00%

1 Bongkar partisi gypsum + pintu lama 2 unit 0.28%

2 Pasang partisi gypsum 2 sisi t = Full 0.29%

3 Pasang Walpaper Partisi t = Full 0.65%

4 Pasang plint kayu bagian bawah partisi 0.06%5 List Plafond 0.08%

6 Cat Plafond 0.05%

7 Upah Pasang Pintu + Modifikasi dari geser ke Pintu Swing+ Finishing 0.14%

8 Pasang Kaca Kasir + Ambalan 0.56%

9 Pasang Sanblast 0.27%

2. Pekerjaan Eletrical 0.00%

1 Instalasi Kabel Telepon ± 12 m + Outlet Telepon 0.11%

2 Instalasi Kabel Data ± 12 m + Outlet Data 0.11%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.11%

4 Instalasi Saklar + Outlet Saklar 0.11%5 Instalasi Stop Kontak + Outlet Stop Kontak 0.22%

3. Pekerjaan AC dan Plumbing 0.00%

1 Instalasi + Unit AC Split 1/2 PK merk Panasonic 1.90%

2 Instalasi + Upah Pasang Unit Return Grill 0.11%

4. Pengadaan Furniture 0.00%

1 Pengadaan Meja Kasir uk: 160x75 0.62%

2 Rak / Credenza Fin HPL dlm melaminto 0.61%

H PEKERJAAN KORIDOR PANTRY 0.00%

1. Pekerjaan Civil 0.00%

1 Cat Dinding 0.04%

2 Pasang Walpaper Partisi t = Full 1.16%

3 Pasang plint kayu bagian bawah partisi 0.11%

4 List Plafond 0.14%

5 Cat Plafond 0.11%

2. Pekerjaan Eletrical 0.00%

4 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.34%

1 Instalasi Saklar + Outlet Saklar 0.11%

2 Instalasi Stop Kontak + Outlet Stop Kontak 0.45%

3. Pekerjaan AC dan Plumbing 0.00%

1 Relokasi AC Split 0.17%2 Instalasi + Upah Pasang Unit Return Grill 0.22%

I PEKERJAAN RUANG SERVER 0.00%

1 Cat Dinding 0.09%

2 box telepon tambah isi 2.23%

3 box data tambah isi 2.79%

4 box listrik penambahan box kecil +isi 0.56%

5 Instalasi Saklar + Outlet Saklar 0.11%

6 Instalasi Stop Kontak + Outlet Stop Kontak 0.22%

7 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.14%

Page 10: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 10/22

8 Relokasi AC Split 0.17%

9 Instalasi + Upah Pasang Unit Return Grill 0.11%

J PEKERJAAN GUDANG 0.00%

1. Pekerjaan Civil 0.00%

1 Bongkar partisi gypsum + pintu lama 2 unit 0.18%

2 Pasang partisi gypsum 2 sisi t = Full 0.74%

3 Pasang plint kayu bagian bawah partisi 0.07%

4 Cat Dinding 0.19%

5 List Plafond 0.08%

6 Cat Plafond 0.05%

7 Upah Pasang Pintu + Modifikasi dari geser ke Pintu Swing+ Finishing 0.14%

2. Pekerjaan Eletrical 0.00%

1 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.14%

2 Instalasi Saklar + Outlet Saklar 0.11%

3 Instalasi Stop Kontak + Outlet Stop Kontak 0.22%

4 Instaslasi + Unit Exhaust Fan 0.25%

3. Pekerjaan AC dan Plumbing 0.00%

1 Instalasi + Upah Pasang Unit Diffuser AC 0.20%

2 Instalasi + Upah Pasang Unit Return Grill 0.11%

K PEKERJAAN RUANG POMPA EXISTING 0.00%

1 Cat Dinding 0.11%

2 Upah Pasang Pintu + Modifikasi dari geser ke Pintu Swing+ Finishing 0.14%

3 Instalasi + Upah Pasang Armature Lampu TL 2x 36W 0.14%

4 Instalasi Saklar + Outlet Saklar 0.22%

5 Instaslasi + Unit Exhaust Fan 0.25%

L PEKERJAAN FINISHING 0.00%

1 Perbaikan Plafond ex Instalasi ME 0.84%1.95% 2.52%

0.00% 1.95% 4.47%

FREE :

PINDAH INSTALASI POMPA 350,000

REFINISH MELAMIC CREDENZA CS + HANDLE 900,000

REFINISH MELAMIC MEJA CS 1,000,000

2,250,000

Lama Pekerjaan : 3 minggu

Bobot

Bobot Komulatif

Page 11: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 11/22

9-Mar 10-Mar 11-Mar 12-Mar 13-Mar 14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar

0.56% 0.56%

0.78% 0.78%

0.16%

0.02%

0.26%

0.67%

0.24% 0.24%

0.30%

0.06%

0.06%

0.45%

0.45%

0.67%

1.79%

0.34%0.22%

2.37%

0.45%

0.59%

0.62% 0.62%

0.13%

0.02% 0.02%

0.14%

Minggu I Minggu II

Page 12: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 12/22

0.19%

0.11%

0.22%

0.34%

0.67%

0.11%

0.34%

0.17%

0.22%

3.87%

0.60%

2.66%

1.73%

0.60% 0.60%

0.93% 0.93%

0.13%

0.17%

0.11%

0.11%

0.11%

0.11%

0.22%

0.11%

0.22%

0.22%

0.52%

1.33%

2.57%

0.33%

0.35% 0.35% 0.35%

0.52%

0.10%

Page 13: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 13/22

0.17%

0.14%

0.02%

0.05%

0.12%

0.12%

0.11%

0.11%

0.45%

0.11%

0.22%

0.20%

0.11%

0.18%

0.46% 0.46%

0.35%

0.08%

0.06%

0.05%

0.11%

0.11%

0.11%

0.22%

0.11%

0.22%

0.20%

0.11%

0.43%

0.46% 0.46% 0.46%

0.75%

0.15%

0.52%

0.30%

0.06%

Page 14: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 14/22

0.13%

0.18%

0.18%

0.11%

0.67%

0.67%

0.45%

0.22%

0.78%

2.37%

0.34%

Page 15: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 15/22

Page 16: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 16/22

7.79% 6.21% 1.81% 3.51% 1.17% 14.21% 1.38% 5.96% 4.93% 1.33% 1.92%

12.26% 18.48% 20.29% 23.80% 24.97% 39.18% 40.56% 46.52% 51.45% 52.78% 54.70%

Page 17: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 17/22

20-Mar 21-Mar 22-Mar 23-Mar 24-Mar 25-Mar 26-Mar 27-Mar

1.87%

3.44%

1.17%

1.17%

Minggu III

90.00%

100.00%

Page 18: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 18/22

0.52%

70.00%

80.00%

Page 19: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 19/22

0.35%

1.23%

0.75%

50.00%

60.00%

Page 20: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 20/22

1.12%

3.02%

1.06%

0.28%

0.31% 0.31%

0.67% 0.67%

0.08%

0.13%

0.13%

0.11%

0.02%0.03%

0.07%

0.15%

0.11%

0.45%

0.45%

0.22%

0.11%

0.56%

0.17%

0.22%

0.56%

0.25%

1.12%

30.00%

40.00%

Page 21: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 21/22

2.68%

0.28%

0.29%

0.65%

0.06%0.08%

0.05%

0.14%

0.56%

0.27%

0.11%

0.11%

0.11%

0.11%0.22%

1.90%

0.11%

0.62%

0.61%

0.04%

1.16%

0.11%

0.14%

0.11%

0.34%

0.11%

0.45%

0.17%0.22%

0.09%

2.23%

2.79%

0.56%

0.11%

0.22%

0.14%

20.00%

Page 22: Kurva S DS

5/14/2018 Kurva S DS - slidepdf.com

http://slidepdf.com/reader/full/kurva-s-ds 22/22

0.17%

0.11%

0.18%

0.74%

0.07%

0.19%

0.08%

0.05%

0.14%

0.14%

0.11%

0.22%

0.25%

0.20%

0.11%

0.11%

0.14%

0.14%

0.22%

0.25%

0.84%9.28% 12.18% 6.43% 4.71% 1.87% 6.51% 1.53% 2.79%

63.98% 76.16% 82.59% 87.30% 89.17% 95.68% 97.21% 100.00%