PERHITUNGAN HARGA SATUAN TERTINGGI BGN
KABUPATEN/KOTA MALUKU TENGGARA
PROVINSI MALUKUBULAN / TRIWULAN November / IV (Empat)
TAHUN ANGGARAN 2011(DALAM RUPIAH)
GEDUNG BERTINGKAT RUMAH NEGARA
KLAS SEDERHANA KLAS SEDERHANA TIPE C TIPE B TIPE A
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
GEDUNG RUMAH NEGARA
KLAS SEDERHANA TIPE C TIPE B TIPE A
DEPAN #REF! #REF! #REF! #REF! #REF!
SAMPING #REF! #REF! #REF! #REF! #REF!
Langgur, 03 November 2011
BUPATI MALUKU TENGGARA,
Ir. ANDERIAS RENTANUBUN
GEDUNG PER-M2
GEDUNG TIDAK BERTINGKAT
KLAS TIDAK SEDERHANA
KLAS TIDAK SEDERHANA
PAGAR PER-M1
KLAS TIDAK SEDERHANA
MENU UTAMA
(DALAM RUPIAH)
HARGA SATUAN BANGUNAN GEDUNG NEGARA PER-M2
GEDUNG BERTINGKAT RUMAH NEGARA
TIPE C TIPE B TIPE A
0 0 0 0 0 0 0
DATA HARGA BAHAN BANGUNAN DAN UPAH KERJA
DATA HARGA BAHAN BANGUNAN
NO NAMA BAHAN SATUAN KETERANGAN
1 2 3 4 5
A. BAHAN PASANGAN 1 PASIR BETON m3 536,3002 PASIR PASANG m3 536,3003 PASIR URUG m3 429,0004 SEMEN PC (50 Kg) zak 82,0005 KERIKIL BETON UK. 3 cm s/d 4 cm m3 429,0006 KERIKIL KORAL m3 321,800
B. BAHAN PONDASI 7 BATU KALI / BATU BELAH / BATU GUNUNG m3 321,800C. BAHAN LANTAI8 KERAMIK 30 X 30 m2 72,600D. BAHAN DINDING9 BATAKO UK. 20 X 40 X 10 bh 2,400
10 BATU BATA UK. 5.5 X 11 X 23 bh 1,20011 BATU TELA UK. 20 X 30 X 10 bh 1,20012 BETON ROSTER / KERAWANG bh 3,600E. BAHAN PENUTUP LANGIT-LANGIT13 ETERNIT, UK. 100 X 100 lbr 54,50014 KAYU LAPIS 4 MM UK 120 X 240 lbr 151,300F. BAHAN PENUTUP ATAP 15 BUBUNGAN GENTENG PLENTONG "S" bh 016 GENTENG PLENTONG "S" bh 017 SENG DATAR BJLS 0.3 m 81,10018 SENG GELOMBANG KECIL lbr 105,90019 BUBUNGAN ASBES GELOMBANG m 46,00020 ASBES GELOMBANG KECIL lbr 71,400
GEDUNG TIDAK BERTINGKAT
KLAS SEDERHANA
KLAS TIDAK SEDERHANA
KLAS SEDERHANA
KLAS TIDAK SEDERHANA
HARGA DASAR (BASIC PRICE)
Rp
PILIH SALAH SATU SESUAI DENGAN BAHAN YANG TERSEDIA
PILIH SALAH SATU SESUAI BAHAN YANG TERSEDIA
PILIH SALAH SATU SESUAI DENGAN BAHAN YANG TERSEDIA
G. BAHAN KAYU21 KAYU BALOK KLAS I m3 4,477,00022 KAYU BALOK KLAS II m3 3,388,00023 KAYU PAPAN KLAS II m3 3,388,00024 KAYU PAPAN KLAS III m3 2,420,00025 KAYU PAPAN KLAS IV m3 2,178,00026 KAYU LAPIS 4 mm UK. 8" X 4" lbr 108,90027 KAYU LAPIS 12 mm UK. 8" X 4" lbr 223,900H. BAHAN BESI28 BESI BETON POLOS DIA. 10 mm Kg 19,10029 BESI BETON ULIR DIA. 13 mm Kg 27,80030 KAWAT BENDRAT / BETON Kg 27,50031 PAKU UK. 3 CM - 7 CM Kg 35,70032 PAGAR BRC JADI (T 1M) m 302,50033 BESI PROFIL C a PIPA BESI DIA. 2" m 151,300I. BAHAN SANITAIR / SALURAN AIR
34 BAK MANDI FIBRE GLASS 70 X 70 X 66 bh 2,087,30035 BAK RESERVOIR FIGRE GLASS KAP. 1000 ltr bh 3,025,00036 BUIS BETON 1/2 DIA. 20 CM bh 14,50037 PIPA GIP DIA. 1" m 28,60038 PIPA GIP DIA. 1 1/2" m 56,90039 PIPA GIP DIA. 2" m 63,80040 PIPA PVC DIA. 1/2" m 3,00041 PIPA PVC DIA. 3/4" m 3,70042 PIPA PVC DIA. 2" m 30,70043 PIPA PVC DIA. 3" m 44,80044 PIPA PVC DIA. 4" m 73,80044 KLOSET DUDUK KERAMIK bh 1,089,00045 KLOSET JONGKOK KERAMIK STANDAR bh 302,50046 URINOAR KERAMIK STANDAR bh 986,20047 WASTAFEL GANTUNG KERAMIK bh 251,100J BAHAN FINISHING
48 CAT BESI Kg 27,80049 CAT DINDING Kg 32,10050 CAT KAYU Kg 27,800K. BAHAN LAIN - LAIN51 KACA BENING 5 MM m2 102,90052 POMPA TANGAN bh 151,30053 INSTALASI LISTRIK titik 272,300
DATA UPAH KERJA
NO TENAGA KERJA SATUAN
1 MANDOR ORG 78,7502 KEPALA TUKANG ORG 75,0003 TUKANG BATU ORG 63,7504 LADEN TUKANG BATU ORG 68,7505 TUKANG BESI ORG 65,0006 LADEN TUKANG BESI ORG 65,0007 TUKANG KAYU ORG 65,0008 LADEN TUKANG KAYU ORG 65,0009 TUKANG CAT ORG 65,000
10 LADEN TUKANG CAT ORG 65,00011 TUKANG BONGKAR ORG 65,00012 PEKERJA GALIAN & URUG ORG 60,00013 TUKANG LISTRIK ORG 65,00014 TUKANG PIPA ORG 65,000
Langgur, 03 November 2011
BUPATI MALUKU TENGGARA,
Ir. ANDERIAS RENTANUBUN
HARGA SURVAI (Rp)
STRUKTUR PEMBIAYAAN TUGAS PEMBANTUANBELANJA MODAL PEMBANGUNAN/REHABILITASI GEDUNG KANTOR
TAHUN ANGGARAN 2012
Program : Bina Pembangunan DaerahSatkerKab/Kota : Maluku TenggaraKegiatan : Pembangunan Sarana dan Prasarana Kantor Pemerintahan Daerah
NO URAIAN KEGIATAN VOLUME SATUAN JUMLAH1 2 3 4 5
BELANJA MODAL PEMBANGUNAN/REHAB GED. KANTOR1 Biaya Perencanaan Paket 74,323,610 1,904,600,0002 Biaya Pengawasan Paket 52,733,133 74,323,6103 Biaya Konstruksi Fisik Pemb. Kantor Camat Kei Kecil 1,152 m2 1,531,888 52,733,1334 Biaya Pengelola Proyek Paket 12,808,385 1,764,734,873
- Unsur Lokasi Proyek (65%) 12,808,385- Unsur Inst. Teknis (35%)
Langgur, 03 November 2011
Kepala Dinas Pekerjaan Umum,Perumahan, Pertambangan dan Energi
Kabupaten Maluku Tenggara
PROTUS REMETWA, STNIP. 19570905 198103 1 021
BIAYA PENGAWASAN TEKNIS
Pekerjaan : Pengawasan Teknis Pembangunan Gedung Kantor Camat Kei Kecil Tahap IVVolume : 1 (satu) PaketLokasi : Langgur, Kab. Maluku TenggaraJangka Waktu : 90 (sembilan puluh) hari
NO URAIAN KEGIATAN SATUAN WAKTU Kwantitas
A. BIAYA LANGSUNG PERSONIL 30,000,000
I BIAYA TENAGA AHLI1 Ketua Tim (Penanggung Jawab Teknis) OH 90 1 150,000 13,500,0002 Ahli Arsitektur OH 90 1 100,000 9,000,0003 Ahli Sipil OH 90 1 - -4 Ahli M.E.P OH 90 1 - -5 Ahli Estimator OH 90 1 - -6 Ahli Spesifikasi OH 90 1 - -
22,500,000II BIAYA ASISTEN TENAGA AHLI
1 Ass. Ketua Tim OH - 1 - -2 Ass. Ahli Arsitektur OH - 1 - -3 Ahli Sipil OH - 1 - -4 Ass. Ahli M.E.P OH - 1 - -5 Ass. Ahli Estimator OH - 1 - -6 Ass. Ahli Spesifikasi OH - 1 - -
-III BIAYA STAF PENDUKUNG
1 Administrasi Bulan 3 1 750,000 2,250,0002 Sekretaris Bulan 3 1 - -3 Juru Gambar/Drafter OH - - - -4 Juru Hitung OH - - - -5 Operator Komputer Bulan 3 1 1,000,000 3,000,0006 Office Boy/Pramubakti Bulan 3 1 750,000 2,250,0007 Tenaga Surveyor/Pengukuran (1 team) OH - - - -
7,500,000B. BIAYA LANGSUNG NON PERSONIL 16,439,212
I BIAYA KANTOR1 Biaya Sewa Kantor Bulan 3 1 500,000 1,500,0002 Biaya Pemeliharaan Kantor Bulan 1 - -3 Alat Tulis Kantor (ATK) Ls 1 1 1,000,000 1,000,0004 Sewa Komputer Lengkap Unit 1 1 1,500,000 1,500,0005 Sewa Kamera Digital Set 1 - -6 Sewa Alat Ukur Set 1 1 - -7 Sewa Alat Gambar Set 1 - -8 Sewa Alat Laboratorium Set 1 - -
2,500,000II BIAYA TRANSPORT
1 Biaya Tiket Kali 1 -2 Uang Harian Kali 1 -
3 Transportasi Lokal Kali 90 1 30,000 2,700,0004 Peralatan Penunjang Survey (1 team) Set 1 -
2,700,000III BIAYA PELAPORAN
1 Laporan Pendahuluan Ex - - -2 Laporan Antara Ex 1 1 1,500,000 1,500,0003 Laporan Akhir Ex 3 3 3,000,000 9,000,0004 Dokumen Lelang Ex - - -5 Biaya Rapat LS 1 1 739,212 739,212
HargaSatuan
(Rp)
Jumlah Harga(Rp)
11,239,212
BIAYA PERENCANAAN TEKNIS
Pekerjaan : Perencanaan Teknis Pembangunan Gedung Kantor Camat Kei Kecil Tahap IVVolume : 1 (satu) PaketLokasi : Langgur, Kab. Maluku TenggaraJangka Waktu : 21 (dua puluh satu) hari
NO URAIAN KEGIATAN SATUAN WAKTU Kwantitas
A. BIAYA LANGSUNG PERSONIL 40,825,000
I BIAYA TENAGA AHLI1 Ketua Tim (Penanggung Jawab Teknis) OH 21 1 250,000 5,250,0002 Ahli Arsitektur OH 21 1 200,000 4,200,0003 Ahli Sipil OH 21 1 200,000 4,200,0004 Ahli M.E.P OH 21 1 200,000 4,200,0005 Ahli Estimator OH 21 1 200,000 4,200,0006 Ahli Spesifikasi OH 21 1 - -
22,050,000II BIAYA ASISTEN TENAGA AHLI
1 Ass. Ketua Tim OH 21 1 175,000 3,675,0002 Ass. Ahli Arsitektur OH 21 1 100,000 2,100,0003 Ahli Sipil OH 21 1 100,000 2,100,0004 Ass. Ahli M.E.P OH 21 1 100,000 2,100,0005 Ass. Ahli Estimator OH 21 1 100,000 2,100,0006 Ass. Ahli Spesifikasi OH 21 1 - -
12,075,000III BIAYA STAF PENDUKUNG
1 Administrasi Bulan 1 1 750,000 750,0002 Sekretaris Bulan 1 1 -3 Juru Gambar/Drafter OH 21 1 100,000 2,100,0004 Juru Hitung OH 21 1 100,000 2,100,0005 Operator Komputer Bulan 1 1 1,000,000 1,000,0006 Office Boy/Pramubakti Bulan 1 1 750,000 750,0007 Tenaga Surveyor/Pengukuran (1 team) OH - - - -
6,700,000B. BIAYA LANGSUNG NON PERSONIL 25,241,918
I BIAYA KANTOR1 Biaya Sewa Kantor Ls 1 1 1,500,000 1,500,0002 Biaya Pemeliharaan Kantor Ls 1 1 1,500,000 1,500,0003 Alat Tulis Kantor (ATK) Ls 1 1 1,500,000 1,500,0004 Sewa Komputer Lengkap Unit 1 1 1,500,000 1,500,0005 Sewa Kamera Digital Set 1 - -6 Sewa Alat Ukur Set 1 1 3,000,000 3,000,0007 Sewa Alat Gambar Set 1 - -8 Sewa Alat Laboratorium Set 1 - -
7,500,000II BIAYA TRANSPORT
1 Biaya Tiket Kali 1 -2 Uang Harian Kali 1 -3 Transportasi Lokal Kali 2 1 400,000 800,0004 Peralatan Penunjang Survey (1 team) Set 1 1 1,500,000 1,500,000
2,300,000III BIAYA PELAPORAN
1 Laporan Pendahuluan Ex 1 1 2,000,000 2,000,0002 Laporan Antara Ex 1 1 2,000,000 2,000,0003 Laporan Akhir Ex 3 1 2,500,000 7,500,0004 Dokumen Lelang Ex 1 1 2,500,000 2,500,000
HargaSatuan
(Rp)
Jumlah Harga(Rp)
5 Biaya Rapat LS 1 1 1,441,918 1,441,91815,441,918
REKAPITULASI BIAYA PERENCANAAN
Pekerjaan : Perencanaan Teknis Pembangunan Gedung Kantor Camat Kei Kecil Tahap IVVolume : 1 (satu) PaketLokasi : Langgur, Kab. Maluku TenggaraJangka Waktu : 21 (dua puluh satu) hari
NO URAIAN KEGIATAN JUMLAH1 2 3
A. BIAYA LANGSUNG PERSONIL
I BIAYA TENAGA AHLI 22,050,000.00II BIAYA ASISTEN TENAGA AHLI 12,075,000.00III BIAYA STAF PENDUKUNG 6,700,000.00
B. BIAYA LANGSUNG NON PERSONIL
I BIAYA KANTOR 7,500,000.00II BIAYA TRANSPORT 2,300,000.00III BIAYA PELAPORAN 15,441,918.00
JUMLAH 66,066,918.00PPN 10% 6,606,691.80TOTAL 72,673,609.80PEMBULATAN 72,673,610.00
Langgur, 03 November 2011Kepala Dinas Pekerjaan Umum,
Perumahan, Pertambangan dan EnergiKabupaten Maluku Tenggara,
PROTUS REMETWA, STNIP. 19570905 198103 1 021
Terbilang :Tujuh Puluh Dua Juta Enam Ratus Tujuh Puluh Tiga Ribu Enam Ratus Sepuluh Rupiah
REKAPITULASI BIAYA PENGAWASAN
Pekerjaan : Pengawasan Teknis Pembangunan Gedung Kantor Camat Kei Kecil Tahap IVVolume : 1 (satu) PaketLokasi : Langgur, Kab. Maluku TenggaraJangka Waktu : 90 (sembilan puluh) hari
NO URAIAN KEGIATAN JUMLAH1 2 3
A. BIAYA LANGSUNG PERSONIL
I BIAYA TENAGA AHLI 22,500,000.00II BIAYA ASISTEN TENAGA AHLIIII BIAYA STAF PENDUKUNG 7,500,000.00
B. BIAYA LANGSUNG NON PERSONIL
I BIAYA KANTOR 2,500,000.00II BIAYA TRANSPORT 2,700,000.00III BIAYA PELAPORAN 11,239,212.00
JUMLAH 46,439,212.00PPN 10% 4,643,921.20TOTAL 51,083,133.20PEMBULATAN 51,083,133.00
Langgur, 03 November 2011Kepala Dinas Pekerjaan Umum,
Perumahan, Pertambangan dan EnergiKabupaten Maluku Tenggara,
PROTUS REMETWA, STNIP. 19570905 198103 1 021
Terbilang :Lima Puluh Satu Juta Delapan Puluh Tiga Ribu Seratus Tiga Puluh Tiga Rupiah