    Hasil Pemantauan Teknis kontinuitas dan tekanan aliran air di area

    Pelayanan

    I. Dasar kegiatan pemantauan

    1. Pertemuan pelanggan tanggal 22 Mei 2013, di Bendungan Hilir

    2. Surat kesediaan Pelanggan Nomor 01/BR/SRV-PEL/V/2013, Tanggal 22 Mei 2013

    II. Lokasi Pemantauan dan Waktu pemantauan .

    1. Sampel Area : Bendungan Hilir

    2. Zona Novak : 110010108

    3. Zona Norek/nomen : 000604636

    4. Nama Pelanggan : Kudjang N Kelana

    5. Alamat Pelanggan : Jl D Towuti EII,24

  • 7/28/2019 HASIL PEMANTAUAN TEKNIS KONTINUITAS DAN TEKANAN AIR DI BENDUNGAN HILIR

    2/3

    : Area Monitoring

  • 7/28/2019 HASIL PEMANTAUAN TEKNIS KONTINUITAS DAN TEKANAN AIR DI BENDUNGAN HILIR

    3/3

    Jam 11:16:45 11:32:34 11:48:38 12:04:27 12:20:41 12:36:29 12:52:42 13:08:32 13:24:45 13:40:33 13:56:47 14:12:36 14:28:24 14:44:38 15:00:27 15:16:40 15:32:29 15:48:42 16:04:30 16:20:44 16:36:33 16:52:47 17:08:35 17:56:33

    Tekanan 1.01 1.00 1.01 1.04 1.04 0.99 1.06 1.06 1.03 1.04 1.01 1.08 1.07 1.09 1.08 1.12 1.11 1.10 1.12 1.21 1.24 1.24 1.29 1.46

    Standar 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75

    Jam 18:12:47 18:29:32 19:17:41 20:21:37 20:37:41 20:53:44 21:09:32 21:25:45 21:41:49 22:46:42 23:02:31 23:18:44 23:34:47 23:50:25 23:50:25 00:06:29 01:27:26 01:43:47 01:59:25 02:31:31 02:47:34 03:19:39 03:51:32 04:23:47

    Tekanan 1.57 1.58 1.23 1.21 1.24 1.32 1.04 1.03 0.78 0.76 0.74 0.79 0.80 0.80 0.80 0.80 0.81 0.75 0.75 0.53 0.85 0.90 0.91 1.36

    Standar 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75

    Jam 04:39:25 05:11:32 05:43:47 05:59:36 06:15:39 06:31:42 06:47:30 07:04:40 07:15:22 08:09:32 08:26:42 08:42:45 08:58:48 09:14:26 09:30:29 09:46:32 10:02:49 10:34:30 10:50:43 11:14:35

    Tekanan 1.33 1.56 1.79 1.74 1.72 1.63 1.56 1.64 1.69 1.76 1.78 1.70 1.63 1.30 1.31 1.31 1.32 1.24 1.28 1.24

    Standar 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75

    DATA HASIL PEMANTAUAN

    110010108 Bendungan hilir 23 Mei 20131. Tabel Data

    2. Grafik

    atm