REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN : REVITALISASI RUANG KELAS SMA 2 LOKASI : TANAH SAREAL KOTA BOGOR No. URAIAN PEKERJAAN I PEKERJAAN PERSIAPAN DAN BONGKARAN II LANTAI 1 1 PEKERJAAN GALIAN TANAH DAN URUGAN 2 PEKERJAAN PASANGAN 3 PEKERJAAN BETON 4 PEKERJAAN TANGGA DALAM DAN LUAR 5 PEKERJAAN PLAFOND 6 PEKERJAAN KUSEN PINTU JENDELA 7 PEKERJAAN SANITAIR 8 PEKERJAAN INSTALASI LISTRIK 9 PEKERJAAN PENGECATAN JUMLAH LANTAI 1 III LANTAI 2 1 PEKERJAAN URUGAN 2 PEKERJAAN PASANGAN 3 PEKERJAAN BETON 4 PEKERJAAN ATAP DAN PLAFOND 5 PEKERJAAN KUSEN PINTU DAN JENDELA 6 PEKERJAAN SANITAIR 7 PEKERJAAN INSTALASI LISTRIK 8 PEKERJAAN PENGECATAN DAN PENYELESAIAN JUMLAH LANTAI 2 JUMLAH PPN 10 % JUMLAH TOTAL DIBULATKAN TERBILANG : SATU MILYAR SERATUS TUJUH BELAS JUTA LIMA RATUS TUJUH P Bogor, 24 Jul penawar, CV. PUTRA SIN

description

Format Progress

Transcript of Format Progress

Page 1: Format Progress

REKAPITULASIRENCANA ANGGARAN BIAYA

PEKERJAAN : REVITALISASI RUANG KELAS SMA 2LOKASI : TANAH SAREAL KOTA BOGOR

No. URAIAN PEKERJAAN JUMLAH HARGA

(Rp.)

I PEKERJAAN PERSIAPAN DAN BONGKARAN 36,232,750.00

II LANTAI 11 PEKERJAAN GALIAN TANAH DAN URUGAN 9,052,738.40 2 PEKERJAAN PASANGAN 78,768,650.50 3 PEKERJAAN BETON 253,017,043.20 4 PEKERJAAN TANGGA DALAM DAN LUAR 36,450,125.20 5 PEKERJAAN PLAFOND 11,231,250.00 6 PEKERJAAN KUSEN PINTU JENDELA 45,143,200.00 7 PEKERJAAN SANITAIR 5,891,390.00 8 PEKERJAAN INSTALASI LISTRIK 7,683,600.00 9 PEKERJAAN PENGECATAN 41,617,820.50

JUMLAH LANTAI 1 488,855,817.80 III LANTAI 2

1 PEKERJAAN URUGAN 2,951,650.00 2 PEKERJAAN PASANGAN 136,592,509.50 3 PEKERJAAN BETON 37,702,986.50 4 PEKERJAAN ATAP DAN PLAFOND 231,874,778.40 5 PEKERJAAN KUSEN PINTU DAN JENDELA 35,510,510.00 6 PEKERJAAN SANITAIR 7,449,450.00 7 PEKERJAAN INSTALASI LISTRIK 7,022,640.00 8 PEKERJAAN PENGECATAN DAN PENYELESAIAN 31,841,505.70

JUMLAH LANTAI 2 490,946,030.10

JUMLAH 1,016,034,597.90 PPN 10 % 101,603,459.79 JUMLAH TOTAL 1,117,638,057.69 DIBULATKAN 1,117,638,000.00

TERBILANG : SATU MILYAR SERATUS TUJUH BELAS JUTA LIMA RATUS TUJUH PULUH LIMA RIBU RUPIAH.-

Bogor, 24 Juli 2014penawar,CV. PUTRA SINTHA

Page 2: Format Progress

Muhammad DindinDirektur

Page 3: Format Progress

1,120,000,000.00

(2,362,000.00)

Page 4: Format Progress

DAFTAR KUANTITAS DAN HARGAKegiatan

Pekerjaan : REVITALISASI RUANG KELAS SMAN 2Lokasi : TANAH SAREAL KOTA BOGOR

NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN DAN BONGKARAN

1 Papan Nama Proyek 1.00 ls 450,000.00 450,000.00 0.04

2 Bongkaran Atap, Plafond dan Lisplank Existing 1.00 ls 12,000,000.00 12,000,000.00 1.18

3 Bongkaran Dinding Existing 1.00 ls 7,500,000.00 7,500,000.00 0.74

4 Bongkaran Kusen Existing 1.00 ls 1,200,000.00 1,200,000.00 0.12

5 Perapihan Atap dan Listplank Depan Ruang TU 1.00 ls 3,000,000.00 3,000,000.00 0.30

6 Perapihan Plafond + List Depan Ruang TU 1.00 ls 3,500,000.00 3,500,000.00 0.34

7 Bongkaran Tangga Luar (Sebagian) 1.00 ls 1,900,000.00 1,900,000.00 0.19

8 Pas. Bouwlank 99.00 m1 42,250.00 4,182,750.00 0.41

9 Administrasi Dan Dokumentasi 1.00 ls 2,500,000.00 2,500,000.00 0.25

JUMLAH 36,232,750.00 3.566 3.57

II. LANTAI 1 -

1 PEKERJAAN GALIAN TANAH DAN URUGAN -

1 Pek. Galian Tanah Pondasi Tapak 71.76 m3 34,650.00 2,486,484.00 0.24

2 Pek. Galian Tanah Pondasi Batu Kali 6.12 m3 34,650.00 212,058.00 0.02

3 Pek. Galian Tanah Sloof 13.48 m3 34,650.00 467,082.00 0.05

4 Urugan Pasir Bawah Pondasi Tapak tb = 5 cm 1.50 m3 247,000.00 370,500.00 0.04

5 Urugan Pasir Bawah Pondasi Batu Kali tb = 5 cm 0.30 m3 247,000.00 74,100.00 0.01

6 Urugan Pasir Bawah Lantai tb = 5 cm 8.17 m3 247,000.00 2,017,990.00 0.20

7 Lantai Kerja Bawah Pondasi Tapak tb = 5 cm 1.50 m3 900,780.00 1,351,170.00 0.13

8 Urugan Tanah Kembali Pondasi Tapak 58.36 m3 17,380.00 1,014,296.80 0.10

9 Urugan Tanah Kembali Pondasi Batu Kali 3.52 m3 17,380.00 61,177.60 0.01

10 Urugan Pasir Bawah Sloof tb = 5 cm 2.02 m3 247,000.00 498,940.00 0.05

11 Lantai Kerja Bawah Sloof tb = 5 cm 2.02 m3 247,000.00 498,940.00 0.05

JUMLAH 9,052,738.40 0.891 0.89

2 PEKERJAAN PASANGAN -

1 Pas. Pondasi Batu Kali Menerus Ad. 1 : 4 (Depan Ruang TU) 2.30 m2 842,710.00 1,938,233.00 0.19

2 Pas. Bata merah Ad. 1 : 4 (tambal sulam) + Depan Ruang TU 175.85 m2 114,550.00 20,143,617.50 1.98

3 Pas. Plesteran dan acian dinding Ad. 1 : 4 351.70 m2 47,880.00 16,839,396.00 1.66

4 Pas. Keramik Lantai 30 x 30 cm setara mulia (tambal sulam) 163.45 m2 136,920.00 22,379,574.00 2.20

5 Pas. Keramik Lantai 20 x 20 cm setara mulia corak (KM) 3.00 m2 178,620.00 535,860.00 0.05

6 Pas. Keramik Dinding 20 x 25 cm setara mulia berwarna t = 2 m (KM) 13.00 m2 195,690.00 2,543,970.00 0.25

7 Pas. Alumunium Composite Panel (Listplank Beton + Kolom Beton Teras ) 15.00 m2 959,200.00 14,388,000.00 1.42

JUMLAH 78,768,650.50 7.753 7.75

3 PEKERJAAN BETON -

1 Pek. Plat Pondasi Setempat Type P1 120/120 K.225 7.20 m3 4,694,600.00 33,801,120.00 3.33

2 Pek. Plat Pondasi Setempat Type P2 80/80 K.225 3.20 m3 4,276,600.00 13,685,120.00 1.35

3 Pek. Sloof Type S1 20/25 K.225 4.70 m3 4,231,130.00 19,886,311.00 1.96

4 Pek. Sloof Type S2 15/20 K.225 1.45 m3 3,908,280.00 5,667,006.00 0.56

5 Pek. Sloof Type S3 15/20 K.225 0.26 m3 3,908,280.00 1,016,152.80 0.10

6 Pek. Kolom Type K1 30/30 + Kolom Pedestal K. 225 7.38 m3 5,124,990.00 37,822,426.20 3.72

7 Pek. Kolom Type K2 20/20 + Kolom Pedestal K. 225 3.44 m3 5,393,050.00 18,552,092.00 1.83

8 Pek. Kolom Type KP 12/12 K.225 0.29 m3 4,975,050.00 1,442,764.50 0.14

9 Pek. Balok Lintel 11/11 K.225 58.00 m1 90,000.00 5,220,000.00 0.51

10 Pek. Balok Beton Type B1 30/60 K.225 11.81 m3 6,020,050.00 71,096,790.50 7.00

11 Pek. Balok Beton Type B2 20/30 K.225 4.42 m3 5,393,050.00 23,837,281.00 2.35

12 Pek. Balok Beton Type B3 15/20 K.225 0.32 m3 4,975,050.00 1,592,016.00 0.16

13 Pek. Plat Lantai Beton tb = 12 cm K.225 30.12 m3 90,000.00 2,710,800.00 0.27

14 Pek. Dak Beton tb = 10 cm (Teras) K.225 1.75 m3 4,694,600.00 8,215,550.00 0.81

15 Pek. Listplank Beton 8/65 K.225 1.10 m3 4,437,270.00 4,880,997.00 0.48

16 Pek. Topian Beton 8/50 K.225 0.70 m3 4,437,270.00 3,106,089.00 0.31

17 Pek. Rabat Beton (Samping Kiri Bangunan) 0.92 m3 526,660.00 484,527.20 0.05

JUMLAH 253,017,043.20 24.902 24.90

Page 5: Format Progress

4 PEKERJAAN TANGGA DALAM & LUAR -

1 Pek. Galian Tanah Pondasi (Tangga Dalam) 1.76 m3 17,380.00 30,588.80 0.00

2 Urugan Pasir Bawah Pondasi tb = 5 cm (Tangga Dalam) 0.07 m3 247,000.00 17,290.00 0.00

3 Lantai Kerja Bawah Pondasi tb = 5 cm (Tangga Dalam) 0.07 m3 750,000.00 52,500.00 0.01

4 Urugan Tanah Kembali Pondasi (Tangga Dalam) 0.98 m3 17,380.00 17,032.40 0.00

5 Pek. Plat Pondasi Type PT K.225 (Tangga Dalam) 0.30 m3 4,276,600.00 1,282,980.00 0.13

6 Pek. Kolom Pedestal K.225 (Tangga Dalam) 0.34 m3 5,124,990.00 1,742,496.60 0.17

7 Pek. Plat Lantai Beton tb = 12 cm K.225 (Tangga Dalam & Luar) 2.90 m3 4,694,600.00 13,614,340.00 1.34

8 Pek. Anak Tangga Beton K.225 (Tangga Dalam & Luar) 0.80 m3 4,437,270.00 3,549,816.00 0.35

9 Pek. Balok Tangga 20/30 K.225 (Tangga Dalam) 0.18 m3 6,020,050.00 1,083,609.00 0.11

10 Pek. Kolom Type KP 12/12 K.225 (Tangga Dalam & Luar) 0.20 m3 4,975,050.00 995,010.00 0.10

11 Pek. Ring Balk Beton 15/20 K.225 (Tangga Dalam & Luar) 0.88 m3 3,908,280.00 3,439,286.40 0.34

12 Pas. Bata Merah Ad. 1 : 4 (Tangga Dalam & Luar) 23.20 m2 114,550.00 2,657,560.00 0.26

13 Pas. Plesteran dan acian dinding Ad. 1 : 4 (Tangga Dalam & Luar) 46.40 m2 47,880.00 2,221,632.00 0.22

14 Pas. Keramik Lantai 30 x 30 cm setara mulia (tangga dalam & luar) 30.00 m2 136,920.00 4,107,600.00 0.40

15 Pek. Pengecetan Dinding + Kolom setara Vinilex (Tangga Dalam & Luar) 46.40 m2 35,310.00 1,638,384.00 0.16

JUMLAH 36,450,125.20 3.587 3.59

5 PEKERJAAN PLAFOND -

1 Water Proofing Dak Beton (Teras) 17.50 m2 35,000.00 612,500.00 0.06

2 Pas. Talang Tegak Pipa PVC Dia. 4" AW (Teras) 8.00 m1 47,500.00 380,000.00 0.04

3 Plafond Beton Expose 409.55 m2 25,000.00 10,238,750.00 1.01

JUMLAH 11,231,250.00 1.105 1.11

6 PEKERJAAN KUSEN PINTU DAN JENDELA -

1 Pas. Kusen Pintu Alumunium P1 (Lengkap) 5.00 bh 3,244,000.00 16,220,000.00 1.60

2 Pas. Kusen Pintu Alumunium P2 (Lengkap) 5.00 bh 2,961,000.00 14,805,000.00 1.46

3 Pas. Kusen Jendela Alumunium Type J1 (Lengkap) 5.00 bh 2,330,000.00 11,650,000.00 1.15

4 Pas. Kusen Bouvenlight Alumunium Type BV1 ( Lengkap) 2.00 bh 691,000.00 1,382,000.00 0.14

5 Pas. Kusen Bouvenlight Alumunium Type BV2 ( Lengkap) 1.00 bh 831,200.00 831,200.00 0.08

6 Pas. Pintu PVC (KM) 1.00 bh 255,000.00 255,000.00 0.03

JUMLAH 45,143,200.00 4.443 4.44

7 PEKERJAAN SANITAIR -

1 Pas. Pipa PVC Dia. 1/2" AW (Lengkap) 20.00 m1 26,360.00 527,200.00 0.05

2 Pas. Pipa PVC Dia. 3/4" AW (Lengkap) 20.00 m1 27,540.00 550,800.00 0.05

3 Pas. Pipa PVC Dia. 1" AW (Lengkap) 20.00 m1 47,500.00 950,000.00 0.09

4 Pas. Pipa PVC Dia. 4" AW (Lengkap) 24.00 m1 105,440.00 2,530,560.00 0.25

5 Pas. Kran Air 1.00 bh 47,200.00 47,200.00 0.00

6 Pas. Floor Drain 1.00 bh 85,630.00 85,630.00 0.01

7 Pas. Closed Duduk 1.00 bh 1,200,000.00 1,200,000.00 0.12

JUMLAH 5,891,390.00 0.580 0.58

8 PEKERJAAN INSTALASI LISTRIK -

1 Pas. Instalasi titik Lampu NYM 3x2,5 mm 19.00 ttk 264,680.00 5,028,920.00 0.49

2 Pas. Instalasi Stop Kontak NYM 3x2,5 mm 6.00 ttk 69,400.00 416,400.00 0.04

3 Pas. Instalasi Saklar NYM 3x2,5 mm 8.00 ttk 73,830.00 590,640.00 0.06

4 Pas. Saklar Tunggal 3.00 bh 73,830.00 221,490.00 0.02

5 Pas. Saklar Ganda 5.00 bh 84,830.00 424,150.00 0.04

6 Pas. Stop Kontak 6.00 bh 35,000.00 210,000.00 0.02

7 Pas. Lampu SL 18 watt 7.00 bh 36,000.00 252,000.00 0.02

8 Pas. Lampu TL 20 watt 12.00 bh 45,000.00 540,000.00 0.05

JUMLAH 7,683,600.00 0.756 0.76

9 PEKERJAAN PENGECETAN -

1 Pek. Pengecetan dinding + kolom setara Vinilex 761.90 m2 35,310.00 26,902,689.00 2.65

2 Pek. Pengecetan Plafond Beton Expose setara Vinilex 409.55 m2 35,930.00 14,715,131.50 1.45

JUMLAH 41,617,820.50 4.096 4.10

Page 6: Format Progress

III Lantai 2 -

1 PEKERJAAN URUGAN -

1 Urugan Pasir Bawah Lantai tb = 5 cm 11.95 m3 247,000.00 2,951,650.00 0.29

JUMLAH 2,951,650.00 0.291 0.29

2 PEKERJAAN PASANGAN -

1 Pas. Bata Merah Ad. 1 : 4 242.45 m2 114,550.00 27,772,647.50 2.73

2 Pas. Plesteran dan acian dinding Ad. 1 : 4 484.90 m2 47,880.00 23,217,012.00 2.29

3 Pas. Keramik Lantai 30 x 30 cm setara mulia 239.00 m2 136,920.00 32,723,880.00 3.22

4 Pas. keramik Lantai 20 x 20 cm setara mulia corak (KM) 4.50 m2 178,620.00 803,790.00 0.08

5 Pas. Keramik Dinding 20 x 25 cm setara mulia berwarna t = 2 m (KM) 22.00 m2 195,690.00 4,305,180.00 0.42

6 Pas. Railing Besi Pipa Stainless Steel Dia. 2,5" ( Seluruh Parapet Dinding) 56.20 m2 850,000.00 47,770,000.00 4.70

JUMLAH 136,592,509.50 13.444 13.44

3 PEKERJAAN BETON -

1 Pek. KolomType K3 20/20 K.225 0.96 m3 5,393,050.00 5,177,328.00 0.51

2 Pek. KolomType K4 15/20 K.225 1.98 m3 5,393,050.00 10,678,239.00 1.05

3 Pek. KolomType KP 12/12 K.225 0.13 m3 5,393,050.00 701,096.50 0.07

4 Pek. Balok Lintel 11/11 K.225 50.00 m1 90,000.00 4,500,000.00 0.44 5 Pek. Balok 15/20 Type RB K.225 2.42 m3 4,975,050.00 12,039,621.00 1.18

6 Pek. Balok 15/20 Type BP K.225 0.84 m3 4,975,050.00 4,179,042.00 0.41

7 Pek. Plat Meja Beton Tb = 10 cm (Wastafel KM) 0.10 m3 4,276,600.00 427,660.00 0.04

JUMLAH 37,702,986.50 3.711 3.71

4 PEKERJAAN ATAP DAN PLAFOND -

1 Pas. Rangka Atap Baja Ringan 391.63 m2 175,000.00 68,535,250.00 6.75

2 Pas. Penutup Atap Multi Roof Berpasir 391.63 m2 121,880.00 47,731,864.40 4.70

3 Pas. Nok Atap Multi Roof Berpasir 54.00 m1 68,470.00 3,697,380.00 0.36

4 Pas. Atap Poly Carbont + Rangka Pipa Carbon Steel Dia. 2" (Tangga Luar) 21.40 m2 450,000.00 9,630,000.00 0.95

5 Pas. Plafond Gypsum Tb = 9 mm Rangka Hollow Galvalum 339.15 m2 275,120.00 93,306,948.00 9.18

6 Pas. List Plafond Gypsum 276.00 m1 22,350.00 6,168,600.00 0.61

7 Pas. Listplank GRC (Tumpang Sari) 76.80 m1 36,520.00 2,804,736.00 0.28

JUMLAH 231,874,778.40 22.822 22.82

5 PEKERJAAN KUSEN PINTU DAN JENDELA -

1 Pas. Kusen Pintu Alumunium Type P1 (Lengkap) 1.00 bh 2,250,000.00 2,250,000.00 0.22

2 Pas. Kusen Pintu Alumunium Type P2 (Lengkap) 2.00 bh 3,750,000.00 7,500,000.00 0.74

3 Pas. Kusen Jendela Alumunium Type J1 (Lengkap) 7.00 bh 2,830,190.00 19,811,330.00 1.95

4 Pas. Kusen Bouvenlight Alumunium Type BV1 (Lengkap) 6.00 bh 850,190.00 5,101,140.00 0.50

5 Pas. Kusen Bouvenlight Alumunium Type BV2 (Lengkap) 1.00 bh 573,040.00 573,040.00 0.06

6 Pas. Pintu PVC (KM) 1.00 bh 275,000.00 275,000.00 0.03

JUMLAH 35,510,510.00 3.495 3.50

6 PEKERJAAN SANITAIR -

1 Pas. Pipa PVC Dia. 1/2" AW (Lengkap) 16.00 m1 26,360.00 421,760.00 0.04

2 Pas. Pipa PVC Dia. 3/4" AW (Lengkap) 16.00 m1 27,540.00 440,640.00 0.04

3 Pas. Pipa PVC Dia. 1" AW (Lengkap) 16.00 m1 14,625.00 234,000.00 0.02

4 Pas. Pipa PVC Dia. 4" AW (Lengkap) 20.00 m1 47,500.00 950,000.00 0.09

5 Pas. Kran Air 1.00 bh 47,200.00 47,200.00 0.00

6 Pas. Floor Drain 1.00 bh 85,630.00 85,630.00 0.01

7 Pas. Wastafel (Lengkap Cermin) 2.00 bh 1,585,110.00 3,170,220.00 0.31

8 Pas. Closed Duduk 1.00 bh 2,100,000.00 2,100,000.00 0.21

JUMLAH 7,449,450.00 0.733 0.73

7 PEKERJAAN INSTALASI LISTRIK -

1 Pas. Instalasi titik Lampu NYM 3x2,5 mm 18.00 ttk 264,680.00 4,764,240.00 0.47

2 Pas. Instalasi Stop Kontak NYM 3x2,5 mm 2.00 ttk 264,680.00 529,360.00 0.05

3 Pas. Instalasi Saklar NYM 3x2,5 mm 3.00 ttk 264,680.00 794,040.00 0.08

4 Pas. Saklar Tunggal 2.00 bh 35,000.00 70,000.00 0.01

5 Pas. Saklar Ganda 1.00 bh 45,000.00 45,000.00 0.00

6 Pas. Stop Kontak 2.00 bh 35,000.00 70,000.00 0.01

7 Pas. Lampu SL 18 watt 6.00 bh 45,000.00 270,000.00 0.03

8 Pas. Lampu TL 20 watt 12.00 bh 40,000.00 480,000.00 0.05

JUMLAH 7,022,640.00 0.691 0.69

8 PEKERJAAN PENGECETAN DAN PENYELESAIAN -

1 Pek. Pengecetan dinding + kolom setara Vinilex 504.90 m2 35,310.00 17,828,019.00 1.75

2 Pek. Pengecetan Plafond + List setara Vinilex 339.15 m2 35,930.00 12,185,659.50 1.20

3 Pek. Pengecetan Listplank setara Vinilex 23.04 m2 35,930.00 827,827.20 0.08

4 Pembersihan Lokasi 1.00 ls 1,000,000.00 1,000,000.00 0.10

JUMLAH 31,841,505.70 3.134 3.13

Page 7: Format Progress

100.000

1,016,034,597.90 ………………

Page 8: Format Progress

36,232,750.00

9,052,738.40

78,768,650.50

253,017,043.20

Page 9: Format Progress

36,450,125.20

11,231,250.00

45,143,200.00

5,891,390.00

7,683,600.00

41,617,820.50

Page 10: Format Progress

2,951,650.00

136,592,509.50

37,702,986.50

231,874,778.40

35,510,510.00

7,449,450.00

7,022,640.00

31,841,505.70

Page 11: Format Progress

1,016,034,597.90

Page 12: Format Progress

REKAPITULASI KEMAJUAN PEKERJAANSMAN 2 Bogor

No. URAIAN PEKERJAAN

I. PEKERJAAN PERSIAPAN DAN BONGKARAN 3.57 -

II. LANTAI 1

1 PEKERJAAN GALIAN TANAH DAN URUGAN 0.89 -

2 PEKERJAAN PASANGAN 7.75 -

3 PEKERJAAN BETON 24.90 -

4 PEKERJAAN TANGGA DALAM DAN LUAR 3.59 -

5 PEKERJAAN PLAFOND 1.11 -

6 PEKERJAAN KUSEN PINTU JENDELA 4.44 -

7 PEKERJAAN SANITAIR 0.58 -

8 PEKERJAAN INSTALASI LISTRIK 0.76 -

9 PEKERJAAN PENGECATAN 4.10 -

III LANTAI 2

1 PEKERJAAN URUGAN 0.29 -

2 PEKERJAAN PASANGAN 13.44 -

3 PEKERJAAN BETON 3.71 -

4 PEKERJAAN ATAP DAN PLAFOND 22.82 -

5 PEKERJAAN KUSEN PINTU DAN JENDELA 3.50 -

6 PEKERJAAN SANITAIR 0.73 -

7 PEKERJAAN INSTALASI LISTRIK 0.69 -

8 PEKERJAAN PENGECATAN DAN PENYELESAIAN 3.13 -

Jumlah 100.00 -

MENGETAHUI Bogor ,19 Agustus 2013

CV. PUTRASHINTA

Muhammad Dindin

Direktur

BOBOT

%

PRESTASI PEKERJAAAN SAMPAI DENGAN MINGGU INI %

Page 13: Format Progress

LAPORAN KEMAJUAN PEKERJAANSMAN 2 Bogor

No. URAIAN PEKERJAAN SAT. VOL. BOBOT PRESTASI S/D MINGGU LALU PRESTASI MINGGU INI PRESTASI S/D MINGGU INI

Volume Progress Terhadap Volume Progress Terhadap Volume Progress Terhadap Bobot (%) Bobot (%) Bobot (%)

I. PEKERJAAN PERSIAPAN DAN BONGKARAN

1 Papan Nama Proyek ls 1.00 0.04 - - - - - - - 2 Bongkaran Atap, Plafond dan Lisplank Existing ls 1.00 1.18 - - - - - - - 3 Bongkaran Dinding Existing ls 1.00 0.74 - - - - - - - 4 Bongkaran Kusen Existing ls 1.00 0.12 - - - - - - - 5 Perapihan Atap dan Listplank Depan Ruang TU ls 1.00 0.30 - - - - - - - 6 Perapihan Plafond + List Depan Ruang TU ls 1.00 0.34 - - - - - - - 7 Bongkaran Tangga Luar (Sebagian) ls 1.00 0.19 - - - - - - - 8 Pas. Bouwlank m1 99.00 0.41 - - - - - - - 9 Administrasi Dan Dokumentasi ls 1.00 0.25 - - - - - - -

Sub Total 3.57 -

II. LANTAI 1

1 PEKERJAAN GALIAN TANAH DAN URUGAN

1 Pek. Galian Tanah Pondasi Tapak m3 71.76 0.24 - - - - - - - 2 Pek. Galian Tanah Pondasi Batu Kali m3 6.12 0.02 - - - - - - - 3 Pek. Galian Tanah Sloof m3 13.48 0.05 - - - - - - - 4 Urugan Pasir Bawah Pondasi Tapak tb = 5 cm m3 1.50 0.04 - - - - - - - 5 Urugan Pasir Bawah Pondasi Batu Kali tb = 5 cm m3 0.30 0.01 - - - - - - - 6 Urugan Pasir Bawah Lantai tb = 5 cm m3 8.17 0.20 - - - - - - - 7 Lantai Kerja Bawah Pondasi Tapak tb = 5 cm m3 1.50 0.13 - - - - - - - 8 Urugan Tanah Kembali Pondasi Tapak m3 58.36 0.10 - - - - - - - 9 Urugan Tanah Kembali Pondasi Batu Kali m3 3.52 0.01 - - - - - - -

10 Urugan Pasir Bawah Sloof tb = 5 cm m3 2.02 0.05 - - - - - - - 11 Lantai Kerja Bawah Sloof tb = 5 cm m3 2.02 0.05 - - - - - - -

Sub Total 0.89 -

2 PEKERJAAN PASANGAN

1 Pas. Pondasi Batu Kali Menerus Ad. 1 : 4 (Depan Ruang TU) m2 2.30 0.19 - - - - - - - 2 Pas. Bata merah Ad. 1 : 4 (tambal sulam) + Depan Ruang TU m2 175.85 1.98 - - - - - - - 3 Pas. Plesteran dan acian dinding Ad. 1 : 4 m2 351.70 1.66 - - - - - - - 4 Pas. Keramik Lantai 30 x 30 cm setara mulia (tambal sulam) m2 163.45 2.20 - - - - - - - 5 Pas. Keramik Lantai 20 x 20 cm setara mulia corak (KM) m2 3.00 0.05 - - - - - - - 6 Pas. Keramik Dinding 20 x 25 cm setara mulia berwarna t = 2 m (KM) m2 13.00 0.25 - - - - - - - 7 Pas. Alumunium Composite Panel (Listplank Beton + Kolom Beton Teras ) m2 15.00 1.42 - - - - - - -

7.75 -

3 PEKERJAAN BETON

1 Pek. Plat Pondasi Setempat Type P1 120/120 K.225 m3 7.20 3.33 - - - - - - - 2 Pek. Plat Pondasi Setempat Type P2 80/80 K.225 m3 3.20 1.35 - - - - - - - 3 Pek. Sloof Type S1 20/25 K.225 m3 4.70 1.96 - - - - - - - 4 Pek. Sloof Type S2 15/20 K.225 m3 1.45 0.56 - - - - - - - 5 Pek. Sloof Type S3 15/20 K.225 m3 0.26 0.10 - - - - - - - 6 Pek. Kolom Type K1 30/30 + Kolom Pedestal K. 225 m3 7.38 3.72 - - - - - - - 7 Pek. Kolom Type K2 20/20 + Kolom Pedestal K. 225 m3 3.44 1.83 - - - - - - - 8 Pek. Kolom Type KP 12/12 K.225 m3 0.29 0.14 - - - - - - - 9 Pek. Balok Lintel 11/11 K.225 m1 58.00 0.51 - - - - - - -

10 Pek. Balok Beton Type B1 30/60 K.225 m3 11.81 7.00 - - - - - - - 11 Pek. Balok Beton Type B2 20/30 K.225 m3 4.42 2.35 - - - - - - - 12 Pek. Balok Beton Type B3 15/20 K.225 m3 0.32 0.16 - - - - - - - 13 Pek. Plat Lantai Beton tb = 12 cm K.225 m3 30.12 0.27 - - - - - - - 14 Pek. Dak Beton tb = 10 cm (Teras) K.225 m3 1.75 0.81 - - - - - - - 15 Pek. Listplank Beton 8/65 K.225 m3 1.10 0.48 - - - - - - - 16 Pek. Topian Beton 8/50 K.225 m3 0.70 0.31 - - - - - - - 17 Pek. Rabat Beton (Samping Kiri Bangunan) m3 0.92 0.05 - - - - - - -

24.90 -

4 PEKERJAAN TANGGA DALAM & LUAR

1 Pek. Galian Tanah PoHollow 4x4 cm m3 1.76 0.003 - - - - - - - 2 Urugan Pasir Bawah Pondasi tb = 5 cm (Tangga Dalam) m3 0.07 0.002 - - - - - - - 3 Lantai Kerja Bawah Pondasi tb = 5 cm (Tangga Dalam) m3 0.07 0.005 - - - - - - - 4 Urugan Tanah Kembali Pondasi (Tangga Dalam) m3 0.98 0.002 - - - - - - - 5 Pek. Plat Pondasi Type PT K.225 (Tangga Dalam) m3 0.30 0.126 - - - - - - - 6 Pek. Kolom Pedestal K.225 (Tangga Dalam) m3 0.34 0.171 - - - - - - - 7 Pek. Plat Lantai Beton tb = 12 cm K.225 (Tangga Dalam & Luar) m3 2.90 1.340 - - - - - - - 8 Pek. Anak Tangga Beton K.225 (Tangga Dalam & Luar) m3 0.80 0.349 - - - - - - - 9 Pek. Balok Tangga 20/30 K.225 (Tangga Dalam) m3 0.18 0.107 - - - - - - -

10 Pek. Kolom Type KP 12/12 K.225 (Tangga Dalam & Luar) m3 0.20 0.098 - - - - - - - 11 Pek. Ring Balk Beton 15/20 K.225 (Tangga Dalam & Luar) m3 0.88 0.339 - - - - - - - 12 Pas. Bata Merah Ad. 1Plat besi t. 3mm m2 23.20 0.262 - - - - - - - 13 Pas. Plesteran dan acian dinding Ad. 1 : 4 (Tangga Dalam & Luar) m2 46.40 0.219 - - - - - - - 14 Pas. Keramik Lantai 30 x 30 cm setara mulia (tangga dalam & luar) m2 30.00 0.404 - - - - - - - 15 Pek. Pengecetan Dinding + Kolom setara Vinilex (Tangga Dalam & Luar) m2 46.40 0.161 - - - - - - -

3.59 -

5 PEKERJAAN PLAFOND

1 Water Proofing Dak BeHollow 4x4 cm m2 17.50 0.060 - - - - - - - 2 Pas. Talang Tegak Pipa PVC Dia. 4" AW (Teras) m1 8.00 0.037 - - - - - - - 3 Plafond Beton Expose m2 409.55 1.008 - - - - - - -

1.11 -

6 PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pas. Kusen Pintu Alu Hollow 4x4 cm bh 5.00 1.596 - - - - - - - 2 Pas. Kusen Pintu Alumunium P2 (Lengkap) bh 5.00 1.457 - - - - - - - 3 Pas. Kusen Jendela Alumunium Type J1 (Lengkap) bh 5.00 1.147 - - - - - - - 4 Pas. Kusen Bouvenlight Alumunium Type BV1 ( Lengkap) bh 2.00 0.136 - - - - - - - 5 Pas. Kusen Bouvenlight Alumunium Type BV2 ( Lengkap) bh 1.00 0.082 - - - - - - - 6 Pas. Pintu PVC (KM) bh 1.00 0.025 - - - - - - -

4.44 -

7 PEKERJAAN SANITAIR

1 Pas. Pipa PVC Dia. 1 Hollow 4x4 cm m1 20.00 0.052 - - - - - - - 2 Pas. Pipa PVC Dia. 3/4" AW (Lengkap) m1 20.00 0.054 - - - - - - - 3 Pas. Pipa PVC Dia. 1" AW (Lengkap) m1 20.00 0.094 - - - - - - - 4 Pas. Pipa PVC Dia. 4" AW (Lengkap) m1 24.00 0.249 - - - - - - - 5 Pas. Kran Air bh 1.00 0.005 - - - - - - - 6 Pas. Floor Drain bh 1.00 0.008 - - - - - - - 7 Pas. Closed Duduk bh 1.00 0.118 - - - - - - -

0.58 -

8 PEKERJAAN INSTALASI LISTRIK

1 Pas. Instalasi titik Hollow 4x4 cm ttk 19.00 0.495 - - - - - - - 2 Pas. Instalasi Stop Kontak NYM 3x2,5 mm ttk 6.00 0.041 - - - - - - - 3 Pas. Instalasi Saklar NYM 3x2,5 mm ttk 8.00 0.058 - - - - - - - 4 Pas. Saklar Tunggal bh 3.00 0.022 - - - - - - - 5 Pas. Saklar Ganda bh 5.00 0.042 - - - - - - - 6 Pas. Stop Kontak bh 6.00 0.021 - - - - - - - 7 Pas. Lampu SL 18 watt bh 7.00 0.025 - - - - - - - 8 Pas. Lampu TL 20 watt bh 12.00 0.053 - - - - - - -

0.76 -

Page 14: Format Progress

9 PEKERJAAN PENGECETAN

1 Pek. Pengecetan dindiHollow 4x4 cm m2 761.90 2.648 - - - - - - - 2 Pek. Pengecetan Plafond Beton Expose setara Vinilex m2 409.55 1.448 - - - - - - -

4.10 -

III Lantai 2

1 PEKERJAAN URUGAN

1 Urugan Pasir Bawah Lantai tb = 5 cm m3 11.95 0.291 - - - - - - - 0.29 -

2 PEKERJAAN PASANGAN

1 Pas. Bata Merah Ad. 1 Hollow 4x4 cm m2 242.45 2.733 - - - - - - - 2 Pas. Plesteran dan acian dinding Ad. 1 : 4 m2 484.90 2.285 - - - - - - - 3 Pas. Keramik Lantai 30 x 30 cm setara mulia m2 239.00 3.221 - - - - - - - 4 Pas. keramik Lantai 20 x 20 cm setara mulia corak (KM) m2 4.50 0.079 - - - - - - - 5 Pas. Keramik Dinding 20 x 25 cm setara mulia berwarna t = 2 m (KM) m2 22.00 0.424 - - - - - - - 6 Pas. Railing Besi Pipa Stainless Steel Dia. 2,5" ( Seluruh Parapet Dinding) m2 56.20 4.702 - - - - - - -

13.44 -

3 PEKERJAAN BETON

1 Pek. KolomType K3 20Hollow 4x4 cm m3 0.96 0.510 - - - - - - - 2 Pek. KolomType K4 15/20 K.225 m3 1.98 1.051 - - - - - - - 3 Pek. KolomType KP 12/12 K.225 m3 0.13 0.069 - - - - - - - 4 Pek. Balok Lintel 11/11 K.225 m1 50.00 0.443 - - - - - - - 5 Pek. Balok 15/20 Type RB K.225 m3 2.42 1.185 - - - - - - - 6 Pek. Balok 15/20 Type BP K.225 m3 0.84 0.411 - - - - - - - 7 Pek. Plat Meja Beton Tb = 10 cm (Wastafel KM) m3 0.10 0.042 - - - - - - -

3.71 -

4 PEKERJAAN ATAP DAN PLAFOND

1 Pas. Rangka Atap BajHollow 4x4 cm m2 391.63 6.745 - - - - - - - 2 Pas. Penutup Atap Multi Roof Berpasir m2 391.63 4.698 - - - - - - - 3 Pas. Nok Atap Multi Roof Berpasir m1 54.00 0.364 - - - - - - - 4 Pas. Atap Poly Carbont + Rangka Pipa Carbon Steel Dia. 2" (Tangga Luar) m2 21.40 0.948 - - - - - - - 5 Pas. Plafond Gypsum Tb = 9 mm Rangka Hollow Galvalum m2 339.15 9.183 - - - - - - - 6 Pas. List Plafond Gypsum m1 276.00 0.607 - - - - - - - 7 Pas. Listplank GRC (Tumpang Sari) m1 76.80 0.276 - - - - - - -

22.82 -

5 PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pas. Kusen Pintu Alu Hollow 4x4 cm bh 1.00 0.221 - - - - - - - 2 Pas. Kusen Pintu Alumunium Type P2 (Lengkap) bh 2.00 0.738 - - - - - - - 3 Pas. Kusen Jendela Alumunium Type J1 (Lengkap) bh 7.00 1.950 - - - - - - - 4 Pas. Kusen Bouvenlight Alumunium Type BV1 (Lengkap) bh 6.00 0.502 - - - - - - - 5 Pas. Kusen Bouvenlight Alumunium Type BV2 (Lengkap) bh 1.00 0.056 - - - - - - - 6 Pas. Pintu PVC (KM) bh 1.00 0.027 - - - - - - -

3.50 -

6 PEKERJAAN SANITAIR

1 Pas. Pipa PVC Dia. 1/2" AW (Lengkap) m1 16.00 0.042 - - - - - - - 2 Pas. Pipa PVC Dia. 3/4" AW (Lengkap) m1 16.00 0.043 - - - - - - - 3 Pas. Pipa PVC Dia. 1" AW (Lengkap) m1 16.00 0.023 - - - - - - - 4 Pas. Pipa PVC Dia. 4" AW (Lengkap) m1 20.00 0.094 - - - - - - - 5 Pas. Kran Air bh 1.00 0.005 - - - - - - - 6 Pas. Floor Drain bh 1.00 0.008 - - - - - - - 7 Pas. Wastafel (Lengkap Cermin) bh 2.00 0.312 - - - - - - - 8 Pas. Closed Duduk bh 1.00 0.207 - - - - - - -

0.73 -

Page 15: Format Progress

7 PEKERJAAN INSTALASI LISTRIK

1 Pas. Instalasi titik Lampu NYM 3x2,5 mm ttk 18.00 0.469 - - - - - - - 2 Pas. Instalasi Stop Kontak NYM 3x2,5 mm ttk 2.00 0.052 - - - - - - - 3 Pas. Instalasi Saklar NYM 3x2,5 mm ttk 3.00 0.078 - - - - - - - 4 Pas. Saklar Tunggal bh 2.00 0.007 - - - - - - - 5 Pas. Saklar Ganda bh 1.00 0.004 - - - - - - - 6 Pas. Stop Kontak bh 2.00 0.007 - - - - - - - 7 Pas. Lampu SL 18 watt bh 6.00 0.027 - - - - - - - 8 Pas. Lampu TL 20 watt bh 12.00 0.047 - - - - - - -

0.69 -

8 PEKERJAAN PENGECETAN DAN PENYELESAIAN

1 Pek. Pengecetan dinding + kolom setara Vinilex m2 504.90 1.755 - - - - - - - 2 Pek. Pengecetan Plafond + List setara Vinilex m2 339.15 1.199 - - - - - - - 3 Pek. Pengecetan Listplank setara Vinilex m2 23.04 0.081 - - - - - - - 4 Pembersihan Lokasi ls 1.00 0.098 - - - - - - -

3.13 -

Total 100.00 -

DIPERIKSA DIBUAT OLEH MENGETAHUI 1. Kurniawati Arik Purwani,SE,MSi :......................... KONTRAKTOR

CV. PUTRASHINTA

2. Rahmadi : .........................

3. R.Muhamad Al Idris : ........................

Muhammad Dindin

Direktur

Page 16: Format Progress

REKAPITULASI KEMAJUAN PEKERJAANSMAN 2 Bogor

Rp 36,232,750.00

Rp 9,052,738.40

Rp 78,768,650.50

Rp 253,017,043.20

Rp 36,450,125.20

Rp 11,231,250.00

Rp 45,143,200.00

Rp 5,891,390.00

Rp 7,683,600.00

Rp 41,617,820.50

Rp 2,951,650.00

Rp 136,592,509.50

Rp 37,702,986.50

Rp 231,874,778.40

Rp 35,510,510.00

Rp 7,449,450.00

Rp 7,022,640.00

Rp 31,841,505.70

JUMLAH Rp 1,016,034,597.90

PPN 10% Rp 101,603,459.79

TOTAL Rp 1,117,638,057.69

DIBULATKAN Rp 1,117,638,000.00

JUMLAH HARGA (Rp)

Page 17: Format Progress

LAPORAN KEMAJUAN PEKERJAANSMAN 2 Bogor

450,000.00 450,000.00

12,000,000.00 12,000,000.00

7,500,000.00 7,500,000.00

1,200,000.00 1,200,000.00

3,000,000.00 3,000,000.00

3,500,000.00 3,500,000.00

1,900,000.00 1,900,000.00

42,250.00 4,182,750.00

2,500,000.00 2,500,000.00

36,232,750.00

34,650.00 2,486,484.00

34,650.00 212,058.00

34,650.00 467,082.00

247,000.00 370,500.00

247,000.00 74,100.00

247,000.00 2,017,990.00

900,780.00 1,351,170.00

17,380.00 1,014,296.80

17,380.00 61,177.60

247,000.00 498,940.00

247,000.00 498,940.00

9,052,738.40

842,710.00 1,938,233.00

114,550.00 20,143,617.50

47,880.00 16,839,396.00

136,920.00 22,379,574.00

178,620.00 535,860.00

195,690.00 2,543,970.00

959,200.00 14,388,000.00

78,768,650.50

4,694,600.00 33,801,120.00

4,276,600.00 13,685,120.00

4,231,130.00 19,886,311.00

3,908,280.00 5,667,006.00

3,908,280.00 1,016,152.80

5,124,990.00 37,822,426.20

5,393,050.00 18,552,092.00

4,975,050.00 1,442,764.50

90,000.00 5,220,000.00

6,020,050.00 71,096,790.50

5,393,050.00 23,837,281.00

4,975,050.00 1,592,016.00

90,000.00 2,710,800.00

4,694,600.00 8,215,550.00

4,437,270.00 4,880,997.00

4,437,270.00 3,106,089.00

526,660.00 484,527.20

253,017,043.20

17,380.00 30,588.80

247,000.00 17,290.00

750,000.00 52,500.00

17,380.00 17,032.40

4,276,600.00 1,282,980.00

5,124,990.00 1,742,496.60

4,694,600.00 13,614,340.00

4,437,270.00 3,549,816.00

6,020,050.00 1,083,609.00

4,975,050.00 995,010.00

3,908,280.00 3,439,286.40

114,550.00 2,657,560.00

47,880.00 2,221,632.00

136,920.00 4,107,600.00

35,310.00 1,638,384.00

36,450,125.20

35,000.00 612,500.00

47,500.00 380,000.00

25,000.00 10,238,750.00

11,231,250.00

3,244,000.00 16,220,000.00

2,961,000.00 14,805,000.00

2,330,000.00 11,650,000.00

691,000.00 1,382,000.00

831,200.00 831,200.00

255,000.00 255,000.00

45,143,200.00

26,360.00 527,200.00

27,540.00 550,800.00

47,500.00 950,000.00

105,440.00 2,530,560.00

47,200.00 47,200.00

85,630.00 85,630.00

1,200,000.00 1,200,000.00

5,891,390.00

264,680.00 5,028,920.00

69,400.00 416,400.00

73,830.00 590,640.00

73,830.00 221,490.00

84,830.00 424,150.00

35,000.00 210,000.00

36,000.00 252,000.00

45,000.00 540,000.00

7,683,600.00

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Page 18: Format Progress

35,310.00 26,902,689.00

35,930.00 14,715,131.50

41,617,820.50

247,000.00 2,951,650.00

2,951,650.00

114,550.00 27,772,647.50

47,880.00 23,217,012.00

136,920.00 32,723,880.00

178,620.00 803,790.00

195,690.00 4,305,180.00

850,000.00 47,770,000.00

136,592,509.50

5,393,050.00 5,177,328.00

5,393,050.00 10,678,239.00

5,393,050.00 701,096.50

90,000.00 4,500,000.00

4,975,050.00 12,039,621.00

4,975,050.00 4,179,042.00

4,276,600.00 427,660.00

37,702,986.50

175,000.00 68,535,250.00

121,880.00 47,731,864.40

68,470.00 3,697,380.00

450,000.00 9,630,000.00

275,120.00 93,306,948.00

22,350.00 6,168,600.00

36,520.00 2,804,736.00

231,874,778.40

2,250,000.00 2,250,000.00

3,750,000.00 7,500,000.00

2,830,190.00 19,811,330.00

850,190.00 5,101,140.00

573,040.00 573,040.00

275,000.00 275,000.00

35,510,510.00

26,360.00 421,760.00

27,540.00 440,640.00

14,625.00 234,000.00

47,500.00 950,000.00

47,200.00 47,200.00

85,630.00 85,630.00

1,585,110.00 3,170,220.00

2,100,000.00 2,100,000.00

7,449,450.00

Page 19: Format Progress

264,680.00 4,764,240.00

264,680.00 529,360.00

264,680.00 794,040.00

35,000.00 70,000.00

45,000.00 45,000.00

35,000.00 70,000.00

45,000.00 270,000.00

40,000.00 480,000.00

7,022,640.00

35,310.00 17,828,019.00

35,930.00 12,185,659.50

35,930.00 827,827.20

1,000,000.00 1,000,000.00

31,841,505.70

Page 20: Format Progress

REKAPITULASI KEMAJUAN PEKERJAANSMAN 2 Bogor

No. URAIAN PEKERJAAN

I. PEKERJAAN PERSIAPAN DAN BONGKARAN 3.57 -

II. LANTAI 1

1 PEKERJAAN GALIAN TANAH DAN URUGAN 0.89 -

2 PEKERJAAN PASANGAN 7.75 -

3 PEKERJAAN BETON 24.90 -

4 PEKERJAAN TANGGA DALAM DAN LUAR 3.59 -

5 PEKERJAAN PLAFOND 1.11 -

6 PEKERJAAN KUSEN PINTU JENDELA 4.44 -

7 PEKERJAAN SANITAIR 0.58 -

8 PEKERJAAN INSTALASI LISTRIK 0.76 -

9 PEKERJAAN PENGECATAN 4.10 -

III LANTAI 2

1 PEKERJAAN URUGAN 0.29 -

2 PEKERJAAN PASANGAN 13.44 -

3 PEKERJAAN BETON 3.71 -

4 PEKERJAAN ATAP DAN PLAFOND 22.82 -

5 PEKERJAAN KUSEN PINTU DAN JENDELA 3.50 -

6 PEKERJAAN SANITAIR 0.73 -

7 PEKERJAAN INSTALASI LISTRIK 0.69 -

8 PEKERJAAN PENGECATAN DAN PENYELESAIAN 3.13 -

Jumlah 100.00 -

MENGETAHUI Bogor ,19 Agustus 2013

CV. PUTRASHINTA

Muhammad Dindin

Direktur

BOBOT

%

PRESTASI PEKERJAAAN SAMPAI DENGAN MINGGU INI %

Page 21: Format Progress

LAPORAN KEMAJUAN PEKERJAANSMAN 2 Bogor

No. URAIAN PEKERJAAN SAT. VOL. BOBOT PRESTASI S/D MINGGU LALU PRESTASI MINGGU INI PRESTASI S/D MINGGU INI

Volume Progress Terhadap Volume Progress Terhadap Volume Progress Terhadap Bobot (%) Bobot (%) Bobot (%)

I. PEKERJAAN PERSIAPAN DAN BONGKARAN

1 Papan Nama Proyek ls 1.00 0.04 - - - - - - - 2 Bongkaran Atap, Plafond dan Lisplank Existing ls 1.00 1.18 - - - - - - - 3 Bongkaran Dinding Existing ls 1.00 0.74 - - - - - - - 4 Bongkaran Kusen Existing ls 1.00 0.12 - - - - - - - 5 Perapihan Atap dan Listplank Depan Ruang TU ls 1.00 0.30 - - - - - - - 6 Perapihan Plafond + List Depan Ruang TU ls 1.00 0.34 - - - - - - - 7 Bongkaran Tangga Luar (Sebagian) ls 1.00 0.19 - - - - - - - 8 Pas. Bouwlank m1 99.00 0.41 - - - - - - - 9 Administrasi Dan Dokumentasi ls 1.00 0.25 - - - - - - -

Sub Total 3.57 -

II. LANTAI 1

1 PEKERJAAN GALIAN TANAH DAN URUGAN

1 Pek. Galian Tanah Pondasi Tapak m3 71.76 0.24 - - - - - - - 2 Pek. Galian Tanah Pondasi Batu Kali m3 6.12 0.02 - - - - - - - 3 Pek. Galian Tanah Sloof m3 13.48 0.05 - - - - - - - 4 Urugan Pasir Bawah Pondasi Tapak tb = 5 cm m3 1.50 0.04 - - - - - - - 5 Urugan Pasir Bawah Pondasi Batu Kali tb = 5 cm m3 0.30 0.01 - - - - - - - 6 Urugan Pasir Bawah Lantai tb = 5 cm m3 8.17 0.20 - - - - - - - 7 Lantai Kerja Bawah Pondasi Tapak tb = 5 cm m3 1.50 0.13 - - - - - - - 8 Urugan Tanah Kembali Pondasi Tapak m3 58.36 0.10 - - - - - - - 9 Urugan Tanah Kembali Pondasi Batu Kali m3 3.52 0.01 - - - - - - -

10 Urugan Pasir Bawah Sloof tb = 5 cm m3 2.02 0.05 - - - - - - - 11 Lantai Kerja Bawah Sloof tb = 5 cm m3 2.02 0.05 - - - - - - -

Sub Total 0.89 -

2 PEKERJAAN PASANGAN

1 Pas. Pondasi Batu Kali Menerus Ad. 1 : 4 (Depan Ruang TU) m2 2.30 0.19 - - - - - - - 2 Pas. Bata merah Ad. 1 : 4 (tambal sulam) + Depan Ruang TU m2 175.85 1.98 - - - - - - - 3 Pas. Plesteran dan acian dinding Ad. 1 : 4 m2 351.70 1.66 - - - - - - - 4 Pas. Keramik Lantai 30 x 30 cm setara mulia (tambal sulam) m2 163.45 2.20 - - - - - - - 5 Pas. Keramik Lantai 20 x 20 cm setara mulia corak (KM) m2 3.00 0.05 - - - - - - - 6 Pas. Keramik Dinding 20 x 25 cm setara mulia berwarna t = 2 m (KM) m2 13.00 0.25 - - - - - - - 7 Pas. Alumunium Composite Panel (Listplank Beton + Kolom Beton Teras ) m2 15.00 1.42 - - - - - - -

7.75 -

3 PEKERJAAN BETON

1 Pek. Plat Pondasi Setempat Type P1 120/120 K.225 m3 7.20 3.33 - - - - - - - 2 Pek. Plat Pondasi Setempat Type P2 80/80 K.225 m3 3.20 1.35 - - - - - - - 3 Pek. Sloof Type S1 20/25 K.225 m3 4.70 1.96 - - - - - - - 4 Pek. Sloof Type S2 15/20 K.225 m3 1.45 0.56 - - - - - - - 5 Pek. Sloof Type S3 15/20 K.225 m3 0.26 0.10 - - - - - - - 6 Pek. Kolom Type K1 30/30 + Kolom Pedestal K. 225 m3 7.38 3.72 - - - - - - - 7 Pek. Kolom Type K2 20/20 + Kolom Pedestal K. 225 m3 3.44 1.83 - - - - - - - 8 Pek. Kolom Type KP 12/12 K.225 m3 0.29 0.14 - - - - - - - 9 Pek. Balok Lintel 11/11 K.225 m1 58.00 0.51 - - - - - - -

10 Pek. Balok Beton Type B1 30/60 K.225 m3 11.81 7.00 - - - - - - - 11 Pek. Balok Beton Type B2 20/30 K.225 m3 4.42 2.35 - - - - - - - 12 Pek. Balok Beton Type B3 15/20 K.225 m3 0.32 0.16 - - - - - - - 13 Pek. Plat Lantai Beton tb = 12 cm K.225 m3 30.12 0.27 - - - - - - - 14 Pek. Dak Beton tb = 10 cm (Teras) K.225 m3 1.75 0.81 - - - - - - - 15 Pek. Listplank Beton 8/65 K.225 m3 1.10 0.48 - - - - - - - 16 Pek. Topian Beton 8/50 K.225 m3 0.70 0.31 - - - - - - - 17 Pek. Rabat Beton (Samping Kiri Bangunan) m3 0.92 0.05 - - - - - - -

24.90 -

4 PEKERJAAN TANGGA DALAM & LUAR

1 Pek. Galian Tanah PoHollow 4x4 cm m3 1.76 0.003 - - - - - - - 2 Urugan Pasir Bawah Pondasi tb = 5 cm (Tangga Dalam) m3 0.07 0.002 - - - - - - - 3 Lantai Kerja Bawah Pondasi tb = 5 cm (Tangga Dalam) m3 0.07 0.005 - - - - - - - 4 Urugan Tanah Kembali Pondasi (Tangga Dalam) m3 0.98 0.002 - - - - - - - 5 Pek. Plat Pondasi Type PT K.225 (Tangga Dalam) m3 0.30 0.126 - - - - - - - 6 Pek. Kolom Pedestal K.225 (Tangga Dalam) m3 0.34 0.171 - - - - - - - 7 Pek. Plat Lantai Beton tb = 12 cm K.225 (Tangga Dalam & Luar) m3 2.90 1.340 - - - - - - - 8 Pek. Anak Tangga Beton K.225 (Tangga Dalam & Luar) m3 0.80 0.349 - - - - - - - 9 Pek. Balok Tangga 20/30 K.225 (Tangga Dalam) m3 0.18 0.107 - - - - - - -

10 Pek. Kolom Type KP 12/12 K.225 (Tangga Dalam & Luar) m3 0.20 0.098 - - - - - - - 11 Pek. Ring Balk Beton 15/20 K.225 (Tangga Dalam & Luar) m3 0.88 0.339 - - - - - - - 12 Pas. Bata Merah Ad. 1Plat besi t. 3mm m2 23.20 0.262 - - - - - - - 13 Pas. Plesteran dan acian dinding Ad. 1 : 4 (Tangga Dalam & Luar) m2 46.40 0.219 - - - - - - - 14 Pas. Keramik Lantai 30 x 30 cm setara mulia (tangga dalam & luar) m2 30.00 0.404 - - - - - - - 15 Pek. Pengecetan Dinding + Kolom setara Vinilex (Tangga Dalam & Luar) m2 46.40 0.161 - - - - - - -

3.59 -

5 PEKERJAAN PLAFOND

1 Water Proofing Dak BeHollow 4x4 cm m2 17.50 0.060 - - - - - - - 2 Pas. Talang Tegak Pipa PVC Dia. 4" AW (Teras) m1 8.00 0.037 - - - - - - - 3 Plafond Beton Expose m2 409.55 1.008 - - - - - - -

1.11 -

6 PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pas. Kusen Pintu Alu Hollow 4x4 cm bh 5.00 1.596 - - - - - - - 2 Pas. Kusen Pintu Alumunium P2 (Lengkap) bh 5.00 1.457 - - - - - - - 3 Pas. Kusen Jendela Alumunium Type J1 (Lengkap) bh 5.00 1.147 - - - - - - - 4 Pas. Kusen Bouvenlight Alumunium Type BV1 ( Lengkap) bh 2.00 0.136 - - - - - - - 5 Pas. Kusen Bouvenlight Alumunium Type BV2 ( Lengkap) bh 1.00 0.082 - - - - - - - 6 Pas. Pintu PVC (KM) bh 1.00 0.025 - - - - - - -

4.44 -

7 PEKERJAAN SANITAIR

1 Pas. Pipa PVC Dia. 1 Hollow 4x4 cm m1 20.00 0.052 - - - - - - - 2 Pas. Pipa PVC Dia. 3/4" AW (Lengkap) m1 20.00 0.054 - - - - - - - 3 Pas. Pipa PVC Dia. 1" AW (Lengkap) m1 20.00 0.094 - - - - - - - 4 Pas. Pipa PVC Dia. 4" AW (Lengkap) m1 24.00 0.249 - - - - - - - 5 Pas. Kran Air bh 1.00 0.005 - - - - - - - 6 Pas. Floor Drain bh 1.00 0.008 - - - - - - - 7 Pas. Closed Duduk bh 1.00 0.118 - - - - - - -

0.58 -

8 PEKERJAAN INSTALASI LISTRIK

1 Pas. Instalasi titik Hollow 4x4 cm ttk 19.00 0.495 - - - - - - - 2 Pas. Instalasi Stop Kontak NYM 3x2,5 mm ttk 6.00 0.041 - - - - - - - 3 Pas. Instalasi Saklar NYM 3x2,5 mm ttk 8.00 0.058 - - - - - - - 4 Pas. Saklar Tunggal bh 3.00 0.022 - - - - - - - 5 Pas. Saklar Ganda bh 5.00 0.042 - - - - - - - 6 Pas. Stop Kontak bh 6.00 0.021 - - - - - - - 7 Pas. Lampu SL 18 watt bh 7.00 0.025 - - - - - - - 8 Pas. Lampu TL 20 watt bh 12.00 0.053 - - - - - - -

0.76 -

Page 22: Format Progress

9 PEKERJAAN PENGECETAN

1 Pek. Pengecetan dindiHollow 4x4 cm m2 761.90 2.648 - - - - - - - 2 Pek. Pengecetan Plafond Beton Expose setara Vinilex m2 409.55 1.448 - - - - - - -

4.10 -

III Lantai 2

1 PEKERJAAN URUGAN

1 Urugan Pasir Bawah Lantai tb = 5 cm m3 11.95 0.291 - - - - - - - 0.29 -

2 PEKERJAAN PASANGAN

1 Pas. Bata Merah Ad. 1 Hollow 4x4 cm m2 242.45 2.733 - - - - - - - 2 Pas. Plesteran dan acian dinding Ad. 1 : 4 m2 484.90 2.285 - - - - - - - 3 Pas. Keramik Lantai 30 x 30 cm setara mulia m2 239.00 3.221 - - - - - - - 4 Pas. keramik Lantai 20 x 20 cm setara mulia corak (KM) m2 4.50 0.079 - - - - - - - 5 Pas. Keramik Dinding 20 x 25 cm setara mulia berwarna t = 2 m (KM) m2 22.00 0.424 - - - - - - - 6 Pas. Railing Besi Pipa Stainless Steel Dia. 2,5" ( Seluruh Parapet Dinding) m2 56.20 4.702 - - - - - - -

13.44 -

3 PEKERJAAN BETON

1 Pek. KolomType K3 20Hollow 4x4 cm m3 0.96 0.510 - - - - - - - 2 Pek. KolomType K4 15/20 K.225 m3 1.98 1.051 - - - - - - - 3 Pek. KolomType KP 12/12 K.225 m3 0.13 0.069 - - - - - - - 4 Pek. Balok Lintel 11/11 K.225 m1 50.00 0.443 - - - - - - - 5 Pek. Balok 15/20 Type RB K.225 m3 2.42 1.185 - - - - - - - 6 Pek. Balok 15/20 Type BP K.225 m3 0.84 0.411 - - - - - - - 7 Pek. Plat Meja Beton Tb = 10 cm (Wastafel KM) m3 0.10 0.042 - - - - - - -

3.71 -

4 PEKERJAAN ATAP DAN PLAFOND

1 Pas. Rangka Atap BajHollow 4x4 cm m2 391.63 6.745 - - - - - - - 2 Pas. Penutup Atap Multi Roof Berpasir m2 391.63 4.698 - - - - - - - 3 Pas. Nok Atap Multi Roof Berpasir m1 54.00 0.364 - - - - - - - 4 Pas. Atap Poly Carbont + Rangka Pipa Carbon Steel Dia. 2" (Tangga Luar) m2 21.40 0.948 - - - - - - - 5 Pas. Plafond Gypsum Tb = 9 mm Rangka Hollow Galvalum m2 339.15 9.183 - - - - - - - 6 Pas. List Plafond Gypsum m1 276.00 0.607 - - - - - - - 7 Pas. Listplank GRC (Tumpang Sari) m1 76.80 0.276 - - - - - - -

22.82 -

5 PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pas. Kusen Pintu Alu Hollow 4x4 cm bh 1.00 0.221 - - - - - - - 2 Pas. Kusen Pintu Alumunium Type P2 (Lengkap) bh 2.00 0.738 - - - - - - - 3 Pas. Kusen Jendela Alumunium Type J1 (Lengkap) bh 7.00 1.950 - - - - - - - 4 Pas. Kusen Bouvenlight Alumunium Type BV1 (Lengkap) bh 6.00 0.502 - - - - - - - 5 Pas. Kusen Bouvenlight Alumunium Type BV2 (Lengkap) bh 1.00 0.056 - - - - - - - 6 Pas. Pintu PVC (KM) bh 1.00 0.027 - - - - - - -

3.50 -

6 PEKERJAAN SANITAIR

1 Pas. Pipa PVC Dia. 1/2" AW (Lengkap) m1 16.00 0.042 - - - - - - - 2 Pas. Pipa PVC Dia. 3/4" AW (Lengkap) m1 16.00 0.043 - - - - - - - 3 Pas. Pipa PVC Dia. 1" AW (Lengkap) m1 16.00 0.023 - - - - - - - 4 Pas. Pipa PVC Dia. 4" AW (Lengkap) m1 20.00 0.094 - - - - - - - 5 Pas. Kran Air bh 1.00 0.005 - - - - - - - 6 Pas. Floor Drain bh 1.00 0.008 - - - - - - - 7 Pas. Wastafel (Lengkap Cermin) bh 2.00 0.312 - - - - - - - 8 Pas. Closed Duduk bh 1.00 0.207 - - - - - - -

0.73 -

Page 23: Format Progress

7 PEKERJAAN INSTALASI LISTRIK

1 Pas. Instalasi titik Lampu NYM 3x2,5 mm ttk 18.00 0.469 - - - - - - - 2 Pas. Instalasi Stop Kontak NYM 3x2,5 mm ttk 2.00 0.052 - - - - - - - 3 Pas. Instalasi Saklar NYM 3x2,5 mm ttk 3.00 0.078 - - - - - - - 4 Pas. Saklar Tunggal bh 2.00 0.007 - - - - - - - 5 Pas. Saklar Ganda bh 1.00 0.004 - - - - - - - 6 Pas. Stop Kontak bh 2.00 0.007 - - - - - - - 7 Pas. Lampu SL 18 watt bh 6.00 0.027 - - - - - - - 8 Pas. Lampu TL 20 watt bh 12.00 0.047 - - - - - - -

0.69 -

8 PEKERJAAN PENGECETAN DAN PENYELESAIAN

1 Pek. Pengecetan dinding + kolom setara Vinilex m2 504.90 1.755 - - - - - - - 2 Pek. Pengecetan Plafond + List setara Vinilex m2 339.15 1.199 - - - - - - - 3 Pek. Pengecetan Listplank setara Vinilex m2 23.04 0.081 - - - - - - - 4 Pembersihan Lokasi ls 1.00 0.098 - - - - - - -

3.13 -

Total 100.00 -

DIPERIKSA DIBUAT OLEH MENGETAHUI 1. Kurniawati Arik Purwani,SE,MSi :......................... KONTRAKTOR

CV. PUTRASHINTA

2. Rahmadi : .........................

3. R.Muhamad Al Idris : ........................

Muhammad Dindin

Direktur

Page 24: Format Progress

REKAPITULASI KEMAJUAN PEKERJAANSMAN 2 Bogor

Rp 36,232,750.00

Rp 9,052,738.40

Rp 78,768,650.50

Rp 253,017,043.20

Rp 36,450,125.20

Rp 11,231,250.00

Rp 45,143,200.00

Rp 5,891,390.00

Rp 7,683,600.00

Rp 41,617,820.50

Rp 2,951,650.00

Rp 136,592,509.50

Rp 37,702,986.50

Rp 231,874,778.40

Rp 35,510,510.00

Rp 7,449,450.00

Rp 7,022,640.00

Rp 31,841,505.70

JUMLAH Rp 1,016,034,597.90

PPN 10% Rp 101,603,459.79

TOTAL Rp 1,117,638,057.69

DIBULATKAN Rp 1,117,638,000.00

JUMLAH HARGA (Rp)

Page 25: Format Progress

LAPORAN KEMAJUAN PEKERJAANSMAN 2 Bogor

450,000.00 450,000.00

12,000,000.00 12,000,000.00

7,500,000.00 7,500,000.00

1,200,000.00 1,200,000.00

3,000,000.00 3,000,000.00

3,500,000.00 3,500,000.00

1,900,000.00 1,900,000.00

42,250.00 4,182,750.00

2,500,000.00 2,500,000.00

36,232,750.00

34,650.00 2,486,484.00

34,650.00 212,058.00

34,650.00 467,082.00

247,000.00 370,500.00

247,000.00 74,100.00

247,000.00 2,017,990.00

900,780.00 1,351,170.00

17,380.00 1,014,296.80

17,380.00 61,177.60

247,000.00 498,940.00

247,000.00 498,940.00

9,052,738.40

842,710.00 1,938,233.00

114,550.00 20,143,617.50

47,880.00 16,839,396.00

136,920.00 22,379,574.00

178,620.00 535,860.00

195,690.00 2,543,970.00

959,200.00 14,388,000.00

78,768,650.50

4,694,600.00 33,801,120.00

4,276,600.00 13,685,120.00

4,231,130.00 19,886,311.00

3,908,280.00 5,667,006.00

3,908,280.00 1,016,152.80

5,124,990.00 37,822,426.20

5,393,050.00 18,552,092.00

4,975,050.00 1,442,764.50

90,000.00 5,220,000.00

6,020,050.00 71,096,790.50

5,393,050.00 23,837,281.00

4,975,050.00 1,592,016.00

90,000.00 2,710,800.00

4,694,600.00 8,215,550.00

4,437,270.00 4,880,997.00

4,437,270.00 3,106,089.00

526,660.00 484,527.20

253,017,043.20

17,380.00 30,588.80

247,000.00 17,290.00

750,000.00 52,500.00

17,380.00 17,032.40

4,276,600.00 1,282,980.00

5,124,990.00 1,742,496.60

4,694,600.00 13,614,340.00

4,437,270.00 3,549,816.00

6,020,050.00 1,083,609.00

4,975,050.00 995,010.00

3,908,280.00 3,439,286.40

114,550.00 2,657,560.00

47,880.00 2,221,632.00

136,920.00 4,107,600.00

35,310.00 1,638,384.00

36,450,125.20

35,000.00 612,500.00

47,500.00 380,000.00

25,000.00 10,238,750.00

11,231,250.00

3,244,000.00 16,220,000.00

2,961,000.00 14,805,000.00

2,330,000.00 11,650,000.00

691,000.00 1,382,000.00

831,200.00 831,200.00

255,000.00 255,000.00

45,143,200.00

26,360.00 527,200.00

27,540.00 550,800.00

47,500.00 950,000.00

105,440.00 2,530,560.00

47,200.00 47,200.00

85,630.00 85,630.00

1,200,000.00 1,200,000.00

5,891,390.00

264,680.00 5,028,920.00

69,400.00 416,400.00

73,830.00 590,640.00

73,830.00 221,490.00

84,830.00 424,150.00

35,000.00 210,000.00

36,000.00 252,000.00

45,000.00 540,000.00

7,683,600.00

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Page 26: Format Progress

35,310.00 26,902,689.00

35,930.00 14,715,131.50

41,617,820.50

247,000.00 2,951,650.00

2,951,650.00

114,550.00 27,772,647.50

47,880.00 23,217,012.00

136,920.00 32,723,880.00

178,620.00 803,790.00

195,690.00 4,305,180.00

850,000.00 47,770,000.00

136,592,509.50

5,393,050.00 5,177,328.00

5,393,050.00 10,678,239.00

5,393,050.00 701,096.50

90,000.00 4,500,000.00

4,975,050.00 12,039,621.00

4,975,050.00 4,179,042.00

4,276,600.00 427,660.00

37,702,986.50

175,000.00 68,535,250.00

121,880.00 47,731,864.40

68,470.00 3,697,380.00

450,000.00 9,630,000.00

275,120.00 93,306,948.00

22,350.00 6,168,600.00

36,520.00 2,804,736.00

231,874,778.40

2,250,000.00 2,250,000.00

3,750,000.00 7,500,000.00

2,830,190.00 19,811,330.00

850,190.00 5,101,140.00

573,040.00 573,040.00

275,000.00 275,000.00

35,510,510.00

26,360.00 421,760.00

27,540.00 440,640.00

14,625.00 234,000.00

47,500.00 950,000.00

47,200.00 47,200.00

85,630.00 85,630.00

1,585,110.00 3,170,220.00

2,100,000.00 2,100,000.00

7,449,450.00

Page 27: Format Progress

264,680.00 4,764,240.00

264,680.00 529,360.00

264,680.00 794,040.00

35,000.00 70,000.00

45,000.00 45,000.00

35,000.00 70,000.00

45,000.00 270,000.00

40,000.00 480,000.00

7,022,640.00

35,310.00 17,828,019.00

35,930.00 12,185,659.50

35,930.00 827,827.20

1,000,000.00 1,000,000.00

31,841,505.70

Page 28: Format Progress

REKAPITULASI KEMAJUAN PEKERJAANSMAN 2 Bogor

No. URAIAN PEKERJAAN

I. PEKERJAAN PERSIAPAN DAN BONGKARAN 3.57 -

II. LANTAI 1

1 PEKERJAAN GALIAN TANAH DAN URUGAN 0.89 -

2 PEKERJAAN PASANGAN 7.75 -

3 PEKERJAAN BETON 24.90 -

4 PEKERJAAN TANGGA DALAM DAN LUAR 3.59 -

5 PEKERJAAN PLAFOND 1.11 -

6 PEKERJAAN KUSEN PINTU JENDELA 4.44 -

7 PEKERJAAN SANITAIR 0.58 -

8 PEKERJAAN INSTALASI LISTRIK 0.76 -

9 PEKERJAAN PENGECATAN 4.10 -

III LANTAI 2

1 PEKERJAAN URUGAN 0.29 -

2 PEKERJAAN PASANGAN 13.44 -

3 PEKERJAAN BETON 3.71 -

4 PEKERJAAN ATAP DAN PLAFOND 22.82 -

5 PEKERJAAN KUSEN PINTU DAN JENDELA 3.50 -

6 PEKERJAAN SANITAIR 0.73 -

7 PEKERJAAN INSTALASI LISTRIK 0.69 -

8 PEKERJAAN PENGECATAN DAN PENYELESAIAN 3.13 -

Jumlah 100.00 -

MENGETAHUI Bogor ,19 Agustus 2013

CV. PUTRASHINTA

Muhammad Dindin

Direktur

BOBOT

%

PRESTASI PEKERJAAAN SAMPAI DENGAN MINGGU INI %

Page 29: Format Progress

LAPORAN KEMAJUAN PEKERJAANSMAN 2 Bogor

No. URAIAN PEKERJAAN SAT. VOL. BOBOT PRESTASI S/D MINGGU LALU PRESTASI MINGGU INI PRESTASI S/D MINGGU INI

Volume Progress Terhadap Volume Progress Terhadap Volume Progress Terhadap Bobot (%) Bobot (%) Bobot (%)

I. PEKERJAAN PERSIAPAN DAN BONGKARAN

1 Papan Nama Proyek ls 1.00 0.04 - - - - - - - 2 Bongkaran Atap, Plafond dan Lisplank Existing ls 1.00 1.18 - - - - - - - 3 Bongkaran Dinding Existing ls 1.00 0.74 - - - - - - - 4 Bongkaran Kusen Existing ls 1.00 0.12 - - - - - - - 5 Perapihan Atap dan Listplank Depan Ruang TU ls 1.00 0.30 - - - - - - - 6 Perapihan Plafond + List Depan Ruang TU ls 1.00 0.34 - - - - - - - 7 Bongkaran Tangga Luar (Sebagian) ls 1.00 0.19 - - - - - - - 8 Pas. Bouwlank m1 99.00 0.41 - - - - - - - 9 Administrasi Dan Dokumentasi ls 1.00 0.25 - - - - - - -

Sub Total 3.57 -

II. LANTAI 1

1 PEKERJAAN GALIAN TANAH DAN URUGAN

1 Pek. Galian Tanah Pondasi Tapak m3 71.76 0.24 - - - - - - - 2 Pek. Galian Tanah Pondasi Batu Kali m3 6.12 0.02 - - - - - - - 3 Pek. Galian Tanah Sloof m3 13.48 0.05 - - - - - - - 4 Urugan Pasir Bawah Pondasi Tapak tb = 5 cm m3 1.50 0.04 - - - - - - - 5 Urugan Pasir Bawah Pondasi Batu Kali tb = 5 cm m3 0.30 0.01 - - - - - - - 6 Urugan Pasir Bawah Lantai tb = 5 cm m3 8.17 0.20 - - - - - - - 7 Lantai Kerja Bawah Pondasi Tapak tb = 5 cm m3 1.50 0.13 - - - - - - - 8 Urugan Tanah Kembali Pondasi Tapak m3 58.36 0.10 - - - - - - - 9 Urugan Tanah Kembali Pondasi Batu Kali m3 3.52 0.01 - - - - - - -

10 Urugan Pasir Bawah Sloof tb = 5 cm m3 2.02 0.05 - - - - - - - 11 Lantai Kerja Bawah Sloof tb = 5 cm m3 2.02 0.05 - - - - - - -

Sub Total 0.89 -

2 PEKERJAAN PASANGAN

1 Pas. Pondasi Batu Kali Menerus Ad. 1 : 4 (Depan Ruang TU) m2 2.30 0.19 - - - - - - - 2 Pas. Bata merah Ad. 1 : 4 (tambal sulam) + Depan Ruang TU m2 175.85 1.98 - - - - - - - 3 Pas. Plesteran dan acian dinding Ad. 1 : 4 m2 351.70 1.66 - - - - - - - 4 Pas. Keramik Lantai 30 x 30 cm setara mulia (tambal sulam) m2 163.45 2.20 - - - - - - - 5 Pas. Keramik Lantai 20 x 20 cm setara mulia corak (KM) m2 3.00 0.05 - - - - - - - 6 Pas. Keramik Dinding 20 x 25 cm setara mulia berwarna t = 2 m (KM) m2 13.00 0.25 - - - - - - - 7 Pas. Alumunium Composite Panel (Listplank Beton + Kolom Beton Teras ) m2 15.00 1.42 - - - - - - -

7.75 -

3 PEKERJAAN BETON

1 Pek. Plat Pondasi Setempat Type P1 120/120 K.225 m3 7.20 3.33 - - - - - - - 2 Pek. Plat Pondasi Setempat Type P2 80/80 K.225 m3 3.20 1.35 - - - - - - - 3 Pek. Sloof Type S1 20/25 K.225 m3 4.70 1.96 - - - - - - - 4 Pek. Sloof Type S2 15/20 K.225 m3 1.45 0.56 - - - - - - - 5 Pek. Sloof Type S3 15/20 K.225 m3 0.26 0.10 - - - - - - - 6 Pek. Kolom Type K1 30/30 + Kolom Pedestal K. 225 m3 7.38 3.72 - - - - - - - 7 Pek. Kolom Type K2 20/20 + Kolom Pedestal K. 225 m3 3.44 1.83 - - - - - - - 8 Pek. Kolom Type KP 12/12 K.225 m3 0.29 0.14 - - - - - - - 9 Pek. Balok Lintel 11/11 K.225 m1 58.00 0.51 - - - - - - -

10 Pek. Balok Beton Type B1 30/60 K.225 m3 11.81 7.00 - - - - - - - 11 Pek. Balok Beton Type B2 20/30 K.225 m3 4.42 2.35 - - - - - - - 12 Pek. Balok Beton Type B3 15/20 K.225 m3 0.32 0.16 - - - - - - - 13 Pek. Plat Lantai Beton tb = 12 cm K.225 m3 30.12 0.27 - - - - - - - 14 Pek. Dak Beton tb = 10 cm (Teras) K.225 m3 1.75 0.81 - - - - - - - 15 Pek. Listplank Beton 8/65 K.225 m3 1.10 0.48 - - - - - - - 16 Pek. Topian Beton 8/50 K.225 m3 0.70 0.31 - - - - - - - 17 Pek. Rabat Beton (Samping Kiri Bangunan) m3 0.92 0.05 - - - - - - -

24.90 -

4 PEKERJAAN TANGGA DALAM & LUAR

1 Pek. Galian Tanah PoHollow 4x4 cm m3 1.76 0.003 - - - - - - - 2 Urugan Pasir Bawah Pondasi tb = 5 cm (Tangga Dalam) m3 0.07 0.002 - - - - - - - 3 Lantai Kerja Bawah Pondasi tb = 5 cm (Tangga Dalam) m3 0.07 0.005 - - - - - - - 4 Urugan Tanah Kembali Pondasi (Tangga Dalam) m3 0.98 0.002 - - - - - - - 5 Pek. Plat Pondasi Type PT K.225 (Tangga Dalam) m3 0.30 0.126 - - - - - - - 6 Pek. Kolom Pedestal K.225 (Tangga Dalam) m3 0.34 0.171 - - - - - - - 7 Pek. Plat Lantai Beton tb = 12 cm K.225 (Tangga Dalam & Luar) m3 2.90 1.340 - - - - - - - 8 Pek. Anak Tangga Beton K.225 (Tangga Dalam & Luar) m3 0.80 0.349 - - - - - - - 9 Pek. Balok Tangga 20/30 K.225 (Tangga Dalam) m3 0.18 0.107 - - - - - - -

10 Pek. Kolom Type KP 12/12 K.225 (Tangga Dalam & Luar) m3 0.20 0.098 - - - - - - - 11 Pek. Ring Balk Beton 15/20 K.225 (Tangga Dalam & Luar) m3 0.88 0.339 - - - - - - - 12 Pas. Bata Merah Ad. 1Plat besi t. 3mm m2 23.20 0.262 - - - - - - - 13 Pas. Plesteran dan acian dinding Ad. 1 : 4 (Tangga Dalam & Luar) m2 46.40 0.219 - - - - - - - 14 Pas. Keramik Lantai 30 x 30 cm setara mulia (tangga dalam & luar) m2 30.00 0.404 - - - - - - - 15 Pek. Pengecetan Dinding + Kolom setara Vinilex (Tangga Dalam & Luar) m2 46.40 0.161 - - - - - - -

3.59 -

5 PEKERJAAN PLAFOND

1 Water Proofing Dak BeHollow 4x4 cm m2 17.50 0.060 - - - - - - - 2 Pas. Talang Tegak Pipa PVC Dia. 4" AW (Teras) m1 8.00 0.037 - - - - - - - 3 Plafond Beton Expose m2 409.55 1.008 - - - - - - -

1.11 -

6 PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pas. Kusen Pintu Alu Hollow 4x4 cm bh 5.00 1.596 - - - - - - - 2 Pas. Kusen Pintu Alumunium P2 (Lengkap) bh 5.00 1.457 - - - - - - - 3 Pas. Kusen Jendela Alumunium Type J1 (Lengkap) bh 5.00 1.147 - - - - - - - 4 Pas. Kusen Bouvenlight Alumunium Type BV1 ( Lengkap) bh 2.00 0.136 - - - - - - - 5 Pas. Kusen Bouvenlight Alumunium Type BV2 ( Lengkap) bh 1.00 0.082 - - - - - - - 6 Pas. Pintu PVC (KM) bh 1.00 0.025 - - - - - - -

4.44 -

7 PEKERJAAN SANITAIR

1 Pas. Pipa PVC Dia. 1 Hollow 4x4 cm m1 20.00 0.052 - - - - - - - 2 Pas. Pipa PVC Dia. 3/4" AW (Lengkap) m1 20.00 0.054 - - - - - - - 3 Pas. Pipa PVC Dia. 1" AW (Lengkap) m1 20.00 0.094 - - - - - - - 4 Pas. Pipa PVC Dia. 4" AW (Lengkap) m1 24.00 0.249 - - - - - - - 5 Pas. Kran Air bh 1.00 0.005 - - - - - - - 6 Pas. Floor Drain bh 1.00 0.008 - - - - - - - 7 Pas. Closed Duduk bh 1.00 0.118 - - - - - - -

0.58 -

8 PEKERJAAN INSTALASI LISTRIK

1 Pas. Instalasi titik Hollow 4x4 cm ttk 19.00 0.495 - - - - - - - 2 Pas. Instalasi Stop Kontak NYM 3x2,5 mm ttk 6.00 0.041 - - - - - - - 3 Pas. Instalasi Saklar NYM 3x2,5 mm ttk 8.00 0.058 - - - - - - - 4 Pas. Saklar Tunggal bh 3.00 0.022 - - - - - - - 5 Pas. Saklar Ganda bh 5.00 0.042 - - - - - - - 6 Pas. Stop Kontak bh 6.00 0.021 - - - - - - - 7 Pas. Lampu SL 18 watt bh 7.00 0.025 - - - - - - - 8 Pas. Lampu TL 20 watt bh 12.00 0.053 - - - - - - -

0.76 -

Page 30: Format Progress

9 PEKERJAAN PENGECETAN

1 Pek. Pengecetan dindiHollow 4x4 cm m2 761.90 2.648 - - - - - - - 2 Pek. Pengecetan Plafond Beton Expose setara Vinilex m2 409.55 1.448 - - - - - - -

4.10 -

III Lantai 2

1 PEKERJAAN URUGAN

1 Urugan Pasir Bawah Lantai tb = 5 cm m3 11.95 0.291 - - - - - - - 0.29 -

2 PEKERJAAN PASANGAN

1 Pas. Bata Merah Ad. 1 Hollow 4x4 cm m2 242.45 2.733 - - - - - - - 2 Pas. Plesteran dan acian dinding Ad. 1 : 4 m2 484.90 2.285 - - - - - - - 3 Pas. Keramik Lantai 30 x 30 cm setara mulia m2 239.00 3.221 - - - - - - - 4 Pas. keramik Lantai 20 x 20 cm setara mulia corak (KM) m2 4.50 0.079 - - - - - - - 5 Pas. Keramik Dinding 20 x 25 cm setara mulia berwarna t = 2 m (KM) m2 22.00 0.424 - - - - - - - 6 Pas. Railing Besi Pipa Stainless Steel Dia. 2,5" ( Seluruh Parapet Dinding) m2 56.20 4.702 - - - - - - -

13.44 -

3 PEKERJAAN BETON

1 Pek. KolomType K3 20Hollow 4x4 cm m3 0.96 0.510 - - - - - - - 2 Pek. KolomType K4 15/20 K.225 m3 1.98 1.051 - - - - - - - 3 Pek. KolomType KP 12/12 K.225 m3 0.13 0.069 - - - - - - - 4 Pek. Balok Lintel 11/11 K.225 m1 50.00 0.443 - - - - - - - 5 Pek. Balok 15/20 Type RB K.225 m3 2.42 1.185 - - - - - - - 6 Pek. Balok 15/20 Type BP K.225 m3 0.84 0.411 - - - - - - - 7 Pek. Plat Meja Beton Tb = 10 cm (Wastafel KM) m3 0.10 0.042 - - - - - - -

3.71 -

4 PEKERJAAN ATAP DAN PLAFOND

1 Pas. Rangka Atap BajHollow 4x4 cm m2 391.63 6.745 - - - - - - - 2 Pas. Penutup Atap Multi Roof Berpasir m2 391.63 4.698 - - - - - - - 3 Pas. Nok Atap Multi Roof Berpasir m1 54.00 0.364 - - - - - - - 4 Pas. Atap Poly Carbont + Rangka Pipa Carbon Steel Dia. 2" (Tangga Luar) m2 21.40 0.948 - - - - - - - 5 Pas. Plafond Gypsum Tb = 9 mm Rangka Hollow Galvalum m2 339.15 9.183 - - - - - - - 6 Pas. List Plafond Gypsum m1 276.00 0.607 - - - - - - - 7 Pas. Listplank GRC (Tumpang Sari) m1 76.80 0.276 - - - - - - -

22.82 -

5 PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pas. Kusen Pintu Alu Hollow 4x4 cm bh 1.00 0.221 - - - - - - - 2 Pas. Kusen Pintu Alumunium Type P2 (Lengkap) bh 2.00 0.738 - - - - - - - 3 Pas. Kusen Jendela Alumunium Type J1 (Lengkap) bh 7.00 1.950 - - - - - - - 4 Pas. Kusen Bouvenlight Alumunium Type BV1 (Lengkap) bh 6.00 0.502 - - - - - - - 5 Pas. Kusen Bouvenlight Alumunium Type BV2 (Lengkap) bh 1.00 0.056 - - - - - - - 6 Pas. Pintu PVC (KM) bh 1.00 0.027 - - - - - - -

3.50 -

6 PEKERJAAN SANITAIR

1 Pas. Pipa PVC Dia. 1/2" AW (Lengkap) m1 16.00 0.042 - - - - - - - 2 Pas. Pipa PVC Dia. 3/4" AW (Lengkap) m1 16.00 0.043 - - - - - - - 3 Pas. Pipa PVC Dia. 1" AW (Lengkap) m1 16.00 0.023 - - - - - - - 4 Pas. Pipa PVC Dia. 4" AW (Lengkap) m1 20.00 0.094 - - - - - - - 5 Pas. Kran Air bh 1.00 0.005 - - - - - - - 6 Pas. Floor Drain bh 1.00 0.008 - - - - - - - 7 Pas. Wastafel (Lengkap Cermin) bh 2.00 0.312 - - - - - - - 8 Pas. Closed Duduk bh 1.00 0.207 - - - - - - -

0.73 -

Page 31: Format Progress

7 PEKERJAAN INSTALASI LISTRIK

1 Pas. Instalasi titik Lampu NYM 3x2,5 mm ttk 18.00 0.469 - - - - - - - 2 Pas. Instalasi Stop Kontak NYM 3x2,5 mm ttk 2.00 0.052 - - - - - - - 3 Pas. Instalasi Saklar NYM 3x2,5 mm ttk 3.00 0.078 - - - - - - - 4 Pas. Saklar Tunggal bh 2.00 0.007 - - - - - - - 5 Pas. Saklar Ganda bh 1.00 0.004 - - - - - - - 6 Pas. Stop Kontak bh 2.00 0.007 - - - - - - - 7 Pas. Lampu SL 18 watt bh 6.00 0.027 - - - - - - - 8 Pas. Lampu TL 20 watt bh 12.00 0.047 - - - - - - -

0.69 -

8 PEKERJAAN PENGECETAN DAN PENYELESAIAN

1 Pek. Pengecetan dinding + kolom setara Vinilex m2 504.90 1.755 - - - - - - - 2 Pek. Pengecetan Plafond + List setara Vinilex m2 339.15 1.199 - - - - - - - 3 Pek. Pengecetan Listplank setara Vinilex m2 23.04 0.081 - - - - - - - 4 Pembersihan Lokasi ls 1.00 0.098 - - - - - - -

3.13 -

Total 100.00 -

DIPERIKSA DIBUAT OLEH MENGETAHUI 1. Kurniawati Arik Purwani,SE,MSi :......................... KONTRAKTOR

CV. PUTRASHINTA

2. Rahmadi : .........................

3. R.Muhamad Al Idris : ........................

Muhammad Dindin

Direktur

Page 32: Format Progress

REKAPITULASI KEMAJUAN PEKERJAANSMAN 2 Bogor

Rp 36,232,750.00

Rp 9,052,738.40

Rp 78,768,650.50

Rp 253,017,043.20

Rp 36,450,125.20

Rp 11,231,250.00

Rp 45,143,200.00

Rp 5,891,390.00

Rp 7,683,600.00

Rp 41,617,820.50

Rp 2,951,650.00

Rp 136,592,509.50

Rp 37,702,986.50

Rp 231,874,778.40

Rp 35,510,510.00

Rp 7,449,450.00

Rp 7,022,640.00

Rp 31,841,505.70

JUMLAH Rp 1,016,034,597.90

PPN 10% Rp 101,603,459.79

TOTAL Rp 1,117,638,057.69

DIBULATKAN Rp 1,117,638,000.00

JUMLAH HARGA (Rp)

Page 33: Format Progress

LAPORAN KEMAJUAN PEKERJAANSMAN 2 Bogor

450,000.00 450,000.00

12,000,000.00 12,000,000.00

7,500,000.00 7,500,000.00

1,200,000.00 1,200,000.00

3,000,000.00 3,000,000.00

3,500,000.00 3,500,000.00

1,900,000.00 1,900,000.00

42,250.00 4,182,750.00

2,500,000.00 2,500,000.00

36,232,750.00

34,650.00 2,486,484.00

34,650.00 212,058.00

34,650.00 467,082.00

247,000.00 370,500.00

247,000.00 74,100.00

247,000.00 2,017,990.00

900,780.00 1,351,170.00

17,380.00 1,014,296.80

17,380.00 61,177.60

247,000.00 498,940.00

247,000.00 498,940.00

9,052,738.40

842,710.00 1,938,233.00

114,550.00 20,143,617.50

47,880.00 16,839,396.00

136,920.00 22,379,574.00

178,620.00 535,860.00

195,690.00 2,543,970.00

959,200.00 14,388,000.00

78,768,650.50

4,694,600.00 33,801,120.00

4,276,600.00 13,685,120.00

4,231,130.00 19,886,311.00

3,908,280.00 5,667,006.00

3,908,280.00 1,016,152.80

5,124,990.00 37,822,426.20

5,393,050.00 18,552,092.00

4,975,050.00 1,442,764.50

90,000.00 5,220,000.00

6,020,050.00 71,096,790.50

5,393,050.00 23,837,281.00

4,975,050.00 1,592,016.00

90,000.00 2,710,800.00

4,694,600.00 8,215,550.00

4,437,270.00 4,880,997.00

4,437,270.00 3,106,089.00

526,660.00 484,527.20

253,017,043.20

17,380.00 30,588.80

247,000.00 17,290.00

750,000.00 52,500.00

17,380.00 17,032.40

4,276,600.00 1,282,980.00

5,124,990.00 1,742,496.60

4,694,600.00 13,614,340.00

4,437,270.00 3,549,816.00

6,020,050.00 1,083,609.00

4,975,050.00 995,010.00

3,908,280.00 3,439,286.40

114,550.00 2,657,560.00

47,880.00 2,221,632.00

136,920.00 4,107,600.00

35,310.00 1,638,384.00

36,450,125.20

35,000.00 612,500.00

47,500.00 380,000.00

25,000.00 10,238,750.00

11,231,250.00

3,244,000.00 16,220,000.00

2,961,000.00 14,805,000.00

2,330,000.00 11,650,000.00

691,000.00 1,382,000.00

831,200.00 831,200.00

255,000.00 255,000.00

45,143,200.00

26,360.00 527,200.00

27,540.00 550,800.00

47,500.00 950,000.00

105,440.00 2,530,560.00

47,200.00 47,200.00

85,630.00 85,630.00

1,200,000.00 1,200,000.00

5,891,390.00

264,680.00 5,028,920.00

69,400.00 416,400.00

73,830.00 590,640.00

73,830.00 221,490.00

84,830.00 424,150.00

35,000.00 210,000.00

36,000.00 252,000.00

45,000.00 540,000.00

7,683,600.00

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

Page 34: Format Progress

35,310.00 26,902,689.00

35,930.00 14,715,131.50

41,617,820.50

247,000.00 2,951,650.00

2,951,650.00

114,550.00 27,772,647.50

47,880.00 23,217,012.00

136,920.00 32,723,880.00

178,620.00 803,790.00

195,690.00 4,305,180.00

850,000.00 47,770,000.00

136,592,509.50

5,393,050.00 5,177,328.00

5,393,050.00 10,678,239.00

5,393,050.00 701,096.50

90,000.00 4,500,000.00

4,975,050.00 12,039,621.00

4,975,050.00 4,179,042.00

4,276,600.00 427,660.00

37,702,986.50

175,000.00 68,535,250.00

121,880.00 47,731,864.40

68,470.00 3,697,380.00

450,000.00 9,630,000.00

275,120.00 93,306,948.00

22,350.00 6,168,600.00

36,520.00 2,804,736.00

231,874,778.40

2,250,000.00 2,250,000.00

3,750,000.00 7,500,000.00

2,830,190.00 19,811,330.00

850,190.00 5,101,140.00

573,040.00 573,040.00

275,000.00 275,000.00

35,510,510.00

26,360.00 421,760.00

27,540.00 440,640.00

14,625.00 234,000.00

47,500.00 950,000.00

47,200.00 47,200.00

85,630.00 85,630.00

1,585,110.00 3,170,220.00

2,100,000.00 2,100,000.00

7,449,450.00

Page 35: Format Progress

264,680.00 4,764,240.00

264,680.00 529,360.00

264,680.00 794,040.00

35,000.00 70,000.00

45,000.00 45,000.00

35,000.00 70,000.00

45,000.00 270,000.00

40,000.00 480,000.00

7,022,640.00

35,310.00 17,828,019.00

35,930.00 12,185,659.50

35,930.00 827,827.20

1,000,000.00 1,000,000.00

31,841,505.70

Page 36: Format Progress

REKAPITULASI KEMAJUAN PEKERJAANSMAN 2 Bogor

No. URAIAN PEKERJAAN

I. PEKERJAAN PERSIAPAN DAN BONGKARAN 3.57 -

II. LANTAI 1

1 PEKERJAAN GALIAN TANAH DAN URUGAN 0.89 -

2 PEKERJAAN PASANGAN 7.75 -

3 PEKERJAAN BETON 24.90 -

4 PEKERJAAN TANGGA DALAM DAN LUAR 3.59 -

5 PEKERJAAN PLAFOND 1.11 -

6 PEKERJAAN KUSEN PINTU JENDELA 4.44 -

7 PEKERJAAN SANITAIR 0.58 -

8 PEKERJAAN INSTALASI LISTRIK 0.76 -

9 PEKERJAAN PENGECATAN 4.10 -

III LANTAI 2

1 PEKERJAAN URUGAN 0.29 -

2 PEKERJAAN PASANGAN 13.44 -

3 PEKERJAAN BETON 3.71 -

4 PEKERJAAN ATAP DAN PLAFOND 22.82 -

5 PEKERJAAN KUSEN PINTU DAN JENDELA 3.50 -

6 PEKERJAAN SANITAIR 0.73 -

7 PEKERJAAN INSTALASI LISTRIK 0.69 -

8 PEKERJAAN PENGECATAN DAN PENYELESAIAN 3.13 -

Jumlah 100.00 -

MENGETAHUI Bogor ,19 Agustus 2013

CV. PUTRASHINTA

Muhammad Dindin

Direktur

BOBOT

%

PRESTASI PEKERJAAAN SAMPAI DENGAN MINGGU INI %

Page 37: Format Progress

LAPORAN KEMAJUAN PEKERJAANSMAN 2 Bogor

No. URAIAN PEKERJAAN SAT. VOL. BOBOT PRESTASI S/D MINGGU LALU PRESTASI MINGGU INI PRESTASI S/D MINGGU INI

Volume Progress Terhadap Volume Progress Terhadap Volume Progress Terhadap Bobot (%) Bobot (%) Bobot (%)

I. PEKERJAAN PERSIAPAN DAN BONGKARAN

1 Papan Nama Proyek ls 1.00 0.04 - - - - - - - 2 Bongkaran Atap, Plafond dan Lisplank Existing ls 1.00 1.18 - - - - - - - 3 Bongkaran Dinding Existing ls 1.00 0.74 - - - - - - - 4 Bongkaran Kusen Existing ls 1.00 0.12 - - - - - - - 5 Perapihan Atap dan Listplank Depan Ruang TU ls 1.00 0.30 - - - - - - - 6 Perapihan Plafond + List Depan Ruang TU ls 1.00 0.34 - - - - - - - 7 Bongkaran Tangga Luar (Sebagian) ls 1.00 0.19 - - - - - - - 8 Pas. Bouwlank m1 99.00 0.41 - - - - - - - 9 Administrasi Dan Dokumentasi ls 1.00 0.25 - - - - - - -

Sub Total 3.57 -

II. LANTAI 1

1 PEKERJAAN GALIAN TANAH DAN URUGAN

1 Pek. Galian Tanah Pondasi Tapak m3 71.76 0.24 - - - - - - - 2 Pek. Galian Tanah Pondasi Batu Kali m3 6.12 0.02 - - - - - - - 3 Pek. Galian Tanah Sloof m3 13.48 0.05 - - - - - - - 4 Urugan Pasir Bawah Pondasi Tapak tb = 5 cm m3 1.50 0.04 - - - - - - - 5 Urugan Pasir Bawah Pondasi Batu Kali tb = 5 cm m3 0.30 0.01 - - - - - - - 6 Urugan Pasir Bawah Lantai tb = 5 cm m3 8.17 0.20 - - - - - - - 7 Lantai Kerja Bawah Pondasi Tapak tb = 5 cm m3 1.50 0.13 - - - - - - - 8 Urugan Tanah Kembali Pondasi Tapak m3 58.36 0.10 - - - - - - - 9 Urugan Tanah Kembali Pondasi Batu Kali m3 3.52 0.01 - - - - - - -

10 Urugan Pasir Bawah Sloof tb = 5 cm m3 2.02 0.05 - - - - - - - 11 Lantai Kerja Bawah Sloof tb = 5 cm m3 2.02 0.05 - - - - - - -

Sub Total 0.89 -

2 PEKERJAAN PASANGAN

1 Pas. Pondasi Batu Kali Menerus Ad. 1 : 4 (Depan Ruang TU) m2 2.30 0.19 - - - - - - - 2 Pas. Bata merah Ad. 1 : 4 (tambal sulam) + Depan Ruang TU m2 175.85 1.98 - - - - - - - 3 Pas. Plesteran dan acian dinding Ad. 1 : 4 m2 351.70 1.66 - - - - - - - 4 Pas. Keramik Lantai 30 x 30 cm setara mulia (tambal sulam) m2 163.45 2.20 - - - - - - - 5 Pas. Keramik Lantai 20 x 20 cm setara mulia corak (KM) m2 3.00 0.05 - - - - - - - 6 Pas. Keramik Dinding 20 x 25 cm setara mulia berwarna t = 2 m (KM) m2 13.00 0.25 - - - - - - - 7 Pas. Alumunium Composite Panel (Listplank Beton + Kolom Beton Teras ) m2 15.00 1.42 - - - - - - -

7.75 -

3 PEKERJAAN BETON

1 Pek. Plat Pondasi Setempat Type P1 120/120 K.225 m3 7.20 3.33 - - - - - - - 2 Pek. Plat Pondasi Setempat Type P2 80/80 K.225 m3 3.20 1.35 - - - - - - - 3 Pek. Sloof Type S1 20/25 K.225 m3 4.70 1.96 - - - - - - - 4 Pek. Sloof Type S2 15/20 K.225 m3 1.45 0.56 - - - - - - - 5 Pek. Sloof Type S3 15/20 K.225 m3 0.26 0.10 - - - - - - - 6 Pek. Kolom Type K1 30/30 + Kolom Pedestal K. 225 m3 7.38 3.72 - - - - - - - 7 Pek. Kolom Type K2 20/20 + Kolom Pedestal K. 225 m3 3.44 1.83 - - - - - - - 8 Pek. Kolom Type KP 12/12 K.225 m3 0.29 0.14 - - - - - - - 9 Pek. Balok Lintel 11/11 K.225 m1 58.00 0.51 - - - - - - -

10 Pek. Balok Beton Type B1 30/60 K.225 m3 11.81 7.00 - - - - - - - 11 Pek. Balok Beton Type B2 20/30 K.225 m3 4.42 2.35 - - - - - - - 12 Pek. Balok Beton Type B3 15/20 K.225 m3 0.32 0.16 - - - - - - - 13 Pek. Plat Lantai Beton tb = 12 cm K.225 m3 30.12 0.27 - - - - - - - 14 Pek. Dak Beton tb = 10 cm (Teras) K.225 m3 1.75 0.81 - - - - - - - 15 Pek. Listplank Beton 8/65 K.225 m3 1.10 0.48 - - - - - - - 16 Pek. Topian Beton 8/50 K.225 m3 0.70 0.31 - - - - - - - 17 Pek. Rabat Beton (Samping Kiri Bangunan) m3 0.92 0.05 - - - - - - -

24.90 -

4 PEKERJAAN TANGGA DALAM & LUAR

1 Pek. Galian Tanah PoHollow 4x4 cm m3 1.76 0.003 - - - - - - - 2 Urugan Pasir Bawah Pondasi tb = 5 cm (Tangga Dalam) m3 0.07 0.002 - - - - - - - 3 Lantai Kerja Bawah Pondasi tb = 5 cm (Tangga Dalam) m3 0.07 0.005 - - - - - - - 4 Urugan Tanah Kembali Pondasi (Tangga Dalam) m3 0.98 0.002 - - - - - - - 5 Pek. Plat Pondasi Type PT K.225 (Tangga Dalam) m3 0.30 0.126 - - - - - - - 6 Pek. Kolom Pedestal K.225 (Tangga Dalam) m3 0.34 0.171 - - - - - - - 7 Pek. Plat Lantai Beton tb = 12 cm K.225 (Tangga Dalam & Luar) m3 2.90 1.340 - - - - - - - 8 Pek. Anak Tangga Beton K.225 (Tangga Dalam & Luar) m3 0.80 0.349 - - - - - - - 9 Pek. Balok Tangga 20/30 K.225 (Tangga Dalam) m3 0.18 0.107 - - - - - - -

10 Pek. Kolom Type KP 12/12 K.225 (Tangga Dalam & Luar) m3 0.20 0.098 - - - - - - - 11 Pek. Ring Balk Beton 15/20 K.225 (Tangga Dalam & Luar) m3 0.88 0.339 - - - - - - - 12 Pas. Bata Merah Ad. 1Plat besi t. 3mm m2 23.20 0.262 - - - - - - - 13 Pas. Plesteran dan acian dinding Ad. 1 : 4 (Tangga Dalam & Luar) m2 46.40 0.219 - - - - - - - 14 Pas. Keramik Lantai 30 x 30 cm setara mulia (tangga dalam & luar) m2 30.00 0.404 - - - - - - - 15 Pek. Pengecetan Dinding + Kolom setara Vinilex (Tangga Dalam & Luar) m2 46.40 0.161 - - - - - - -

3.59 -

5 PEKERJAAN PLAFOND

1 Water Proofing Dak BeHollow 4x4 cm m2 17.50 0.060 - - - - - - - 2 Pas. Talang Tegak Pipa PVC Dia. 4" AW (Teras) m1 8.00 0.037 - - - - - - - 3 Plafond Beton Expose m2 409.55 1.008 - - - - - - -

1.11 -

6 PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pas. Kusen Pintu Alu Hollow 4x4 cm bh 5.00 1.596 - - - - - - - 2 Pas. Kusen Pintu Alumunium P2 (Lengkap) bh 5.00 1.457 - - - - - - - 3 Pas. Kusen Jendela Alumunium Type J1 (Lengkap) bh 5.00 1.147 - - - - - - - 4 Pas. Kusen Bouvenlight Alumunium Type BV1 ( Lengkap) bh 2.00 0.136 - - - - - - - 5 Pas. Kusen Bouvenlight Alumunium Type BV2 ( Lengkap) bh 1.00 0.082 - - - - - - - 6 Pas. Pintu PVC (KM) bh 1.00 0.025 - - - - - - -

4.44 -

7 PEKERJAAN SANITAIR

1 Pas. Pipa PVC Dia. 1 Hollow 4x4 cm m1 20.00 0.052 - - - - - - - 2 Pas. Pipa PVC Dia. 3/4" AW (Lengkap) m1 20.00 0.054 - - - - - - - 3 Pas. Pipa PVC Dia. 1" AW (Lengkap) m1 20.00 0.094 - - - - - - - 4 Pas. Pipa PVC Dia. 4" AW (Lengkap) m1 24.00 0.249 - - - - - - - 5 Pas. Kran Air bh 1.00 0.005 - - - - - - - 6 Pas. Floor Drain bh 1.00 0.008 - - - - - - - 7 Pas. Closed Duduk bh 1.00 0.118 - - - - - - -

0.58 -

8 PEKERJAAN INSTALASI LISTRIK

1 Pas. Instalasi titik Hollow 4x4 cm ttk 19.00 0.495 - - - - - - - 2 Pas. Instalasi Stop Kontak NYM 3x2,5 mm ttk 6.00 0.041 - - - - - - - 3 Pas. Instalasi Saklar NYM 3x2,5 mm ttk 8.00 0.058 - - - - - - - 4 Pas. Saklar Tunggal bh 3.00 0.022 - - - - - - - 5 Pas. Saklar Ganda bh 5.00 0.042 - - - - - - - 6 Pas. Stop Kontak bh 6.00 0.021 - - - - - - - 7 Pas. Lampu SL 18 watt bh 7.00 0.025 - - - - - - - 8 Pas. Lampu TL 20 watt bh 12.00 0.053 - - - - - - -

0.76 -

Page 38: Format Progress

9 PEKERJAAN PENGECETAN

1 Pek. Pengecetan dindiHollow 4x4 cm m2 761.90 2.648 - - - - - - - 2 Pek. Pengecetan Plafond Beton Expose setara Vinilex m2 409.55 1.448 - - - - - - -

4.10 -

III Lantai 2

1 PEKERJAAN URUGAN

1 Urugan Pasir Bawah Lantai tb = 5 cm m3 11.95 0.291 - - - - - - - 0.29 -

2 PEKERJAAN PASANGAN

1 Pas. Bata Merah Ad. 1 Hollow 4x4 cm m2 242.45 2.733 - - - - - - - 2 Pas. Plesteran dan acian dinding Ad. 1 : 4 m2 484.90 2.285 - - - - - - - 3 Pas. Keramik Lantai 30 x 30 cm setara mulia m2 239.00 3.221 - - - - - - - 4 Pas. keramik Lantai 20 x 20 cm setara mulia corak (KM) m2 4.50 0.079 - - - - - - - 5 Pas. Keramik Dinding 20 x 25 cm setara mulia berwarna t = 2 m (KM) m2 22.00 0.424 - - - - - - - 6 Pas. Railing Besi Pipa Stainless Steel Dia. 2,5" ( Seluruh Parapet Dinding) m2 56.20 4.702 - - - - - - -

13.44 -

3 PEKERJAAN BETON

1 Pek. KolomType K3 20Hollow 4x4 cm m3 0.96 0.510 - - - - - - - 2 Pek. KolomType K4 15/20 K.225 m3 1.98 1.051 - - - - - - - 3 Pek. KolomType KP 12/12 K.225 m3 0.13 0.069 - - - - - - - 4 Pek. Balok Lintel 11/11 K.225 m1 50.00 0.443 - - - - - - - 5 Pek. Balok 15/20 Type RB K.225 m3 2.42 1.185 - - - - - - - 6 Pek. Balok 15/20 Type BP K.225 m3 0.84 0.411 - - - - - - - 7 Pek. Plat Meja Beton Tb = 10 cm (Wastafel KM) m3 0.10 0.042 - - - - - - -

3.71 -

4 PEKERJAAN ATAP DAN PLAFOND

1 Pas. Rangka Atap BajHollow 4x4 cm m2 391.63 6.745 - - - - - - - 2 Pas. Penutup Atap Multi Roof Berpasir m2 391.63 4.698 - - - - - - - 3 Pas. Nok Atap Multi Roof Berpasir m1 54.00 0.364 - - - - - - - 4 Pas. Atap Poly Carbont + Rangka Pipa Carbon Steel Dia. 2" (Tangga Luar) m2 21.40 0.948 - - - - - - - 5 Pas. Plafond Gypsum Tb = 9 mm Rangka Hollow Galvalum m2 339.15 9.183 - - - - - - - 6 Pas. List Plafond Gypsum m1 276.00 0.607 - - - - - - - 7 Pas. Listplank GRC (Tumpang Sari) m1 76.80 0.276 - - - - - - -

22.82 -

5 PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pas. Kusen Pintu Alu Hollow 4x4 cm bh 1.00 0.221 - - - - - - - 2 Pas. Kusen Pintu Alumunium Type P2 (Lengkap) bh 2.00 0.738 - - - - - - - 3 Pas. Kusen Jendela Alumunium Type J1 (Lengkap) bh 7.00 1.950 - - - - - - - 4 Pas. Kusen Bouvenlight Alumunium Type BV1 (Lengkap) bh 6.00 0.502 - - - - - - - 5 Pas. Kusen Bouvenlight Alumunium Type BV2 (Lengkap) bh 1.00 0.056 - - - - - - - 6 Pas. Pintu PVC (KM) bh 1.00 0.027 - - - - - - -

3.50 -

6 PEKERJAAN SANITAIR

1 Pas. Pipa PVC Dia. 1/2" AW (Lengkap) m1 16.00 0.042 - - - - - - - 2 Pas. Pipa PVC Dia. 3/4" AW (Lengkap) m1 16.00 0.043 - - - - - - - 3 Pas. Pipa PVC Dia. 1" AW (Lengkap) m1 16.00 0.023 - - - - - - - 4 Pas. Pipa PVC Dia. 4" AW (Lengkap) m1 20.00 0.094 - - - - - - - 5 Pas. Kran Air bh 1.00 0.005 - - - - - - - 6 Pas. Floor Drain bh 1.00 0.008 - - - - - - - 7 Pas. Wastafel (Lengkap Cermin) bh 2.00 0.312 - - - - - - - 8 Pas. Closed Duduk bh 1.00 0.207 - - - - - - -

0.73 -

Page 39: Format Progress

7 PEKERJAAN INSTALASI LISTRIK

1 Pas. Instalasi titik Lampu NYM 3x2,5 mm ttk 18.00 0.469 - - - - - - - 2 Pas. Instalasi Stop Kontak NYM 3x2,5 mm ttk 2.00 0.052 - - - - - - - 3 Pas. Instalasi Saklar NYM 3x2,5 mm ttk 3.00 0.078 - - - - - - - 4 Pas. Saklar Tunggal bh 2.00 0.007 - - - - - - - 5 Pas. Saklar Ganda bh 1.00 0.004 - - - - - - - 6 Pas. Stop Kontak bh 2.00 0.007 - - - - - - - 7 Pas. Lampu SL 18 watt bh 6.00 0.027 - - - - - - - 8 Pas. Lampu TL 20 watt bh 12.00 0.047 - - - - - - -

0.69 -

8 PEKERJAAN PENGECETAN DAN PENYELESAIAN

1 Pek. Pengecetan dinding + kolom setara Vinilex m2 504.90 1.755 - - - - - - - 2 Pek. Pengecetan Plafond + List setara Vinilex m2 339.15 1.199 - - - - - - - 3 Pek. Pengecetan Listplank setara Vinilex m2 23.04 0.081 - - - - - - - 4 Pembersihan Lokasi ls 1.00 0.098 - - - - - - -

3.13 -

Total 100.00 -

DIPERIKSA DIBUAT OLEH MENGETAHUI 1. Kurniawati Arik Purwani,SE,MSi :......................... KONTRAKTOR

CV. PUTRASHINTA

2. Rahmadi : .........................

3. R.Muhamad Al Idris : ........................

Muhammad Dindin

Direktur

Page 40: Format Progress

REKAPITULASI KEMAJUAN PEKERJAANSMAN 2 Bogor

No. URAIAN PEKERJAAN

I. PEKERJAAN PERSIAPAN DAN BONGKARAN 3.57 -

II. LANTAI 1

1 PEKERJAAN GALIAN TANAH DAN URUGAN 0.89 -

2 PEKERJAAN PASANGAN 7.75 -

3 PEKERJAAN BETON 24.90 -

4 PEKERJAAN TANGGA DALAM DAN LUAR 3.59 -

5 PEKERJAAN PLAFOND 1.11 -

6 PEKERJAAN KUSEN PINTU JENDELA 4.44 -

7 PEKERJAAN SANITAIR 0.58 -

8 PEKERJAAN INSTALASI LISTRIK 0.76 -

9 PEKERJAAN PENGECATAN 4.10 -

III LANTAI 2

1 PEKERJAAN URUGAN 0.29 -

2 PEKERJAAN PASANGAN 13.44 -

3 PEKERJAAN BETON 3.71 -

4 PEKERJAAN ATAP DAN PLAFOND 22.82 -

5 PEKERJAAN KUSEN PINTU DAN JENDELA 3.50 -

6 PEKERJAAN SANITAIR 0.73 -

7 PEKERJAAN INSTALASI LISTRIK 0.69 -

8 PEKERJAAN PENGECATAN DAN PENYELESAIAN 3.13 -

Jumlah 100.00 -

MENGETAHUI

CV. PUTRASHINTA

Muhammad Dindin

Direktur

BOBOT

%

PRESTASI PEKERJAAAN SAMPAI DENGAN MINGGU INI %

Page 41: Format Progress

LAPORAN KEMAJUAN PEKERJAANSMAN 2 Bogor

No. URAIAN PEKERJAAN SAT. VOL. BOBOT PRESTASI S/D MINGGU LALU PRESTASI MINGGU INI PRESTASI S/D MINGGU INI

Volume Progress Terhadap Volume Progress Terhadap Volume Progress Terhadap Bobot (%) Bobot (%) Bobot (%)

I. PEKERJAAN PERSIAPAN DAN BONGKARAN

1 Papan Nama Proyek ls 1.00 0.04 - - - - - - - 2 Bongkaran Atap, Plafond dan Lisplank Existing ls 1.00 1.18 - - - - - - - 3 Bongkaran Dinding Existing ls 1.00 0.74 - - - - - - - 4 Bongkaran Kusen Existing ls 1.00 0.12 - - - - - - - 5 Perapihan Atap dan Listplank Depan Ruang TU ls 1.00 0.30 - - - - - - - 6 Perapihan Plafond + List Depan Ruang TU ls 1.00 0.34 - - - - - - - 7 Bongkaran Tangga Luar (Sebagian) ls 1.00 0.19 - - - - - - - 8 Pas. Bouwlank m1 99.00 0.41 - - - - - - - 9 Administrasi Dan Dokumentasi ls 1.00 0.25 - - - - - - -

Sub Total 3.57 -

II. LANTAI 1

1 PEKERJAAN GALIAN TANAH DAN URUGAN

1 Pek. Galian Tanah Pondasi Tapak m3 71.76 0.24 - - - - - - - 2 Pek. Galian Tanah Pondasi Batu Kali m3 6.12 0.02 - - - - - - - 3 Pek. Galian Tanah Sloof m3 13.48 0.05 - - - - - - - 4 Urugan Pasir Bawah Pondasi Tapak tb = 5 cm m3 1.50 0.04 - - - - - - - 5 Urugan Pasir Bawah Pondasi Batu Kali tb = 5 cm m3 0.30 0.01 - - - - - - - 6 Urugan Pasir Bawah Lantai tb = 5 cm m3 8.17 0.20 - - - - - - - 7 Lantai Kerja Bawah Pondasi Tapak tb = 5 cm m3 1.50 0.13 - - - - - - - 8 Urugan Tanah Kembali Pondasi Tapak m3 58.36 0.10 - - - - - - - 9 Urugan Tanah Kembali Pondasi Batu Kali m3 3.52 0.01 - - - - - - -

10 Urugan Pasir Bawah Sloof tb = 5 cm m3 2.02 0.05 - - - - - - - 11 Lantai Kerja Bawah Sloof tb = 5 cm m3 2.02 0.05 - - - - - - -

Sub Total 0.89 -

2 PEKERJAAN PASANGAN

1 Pas. Pondasi Batu Kali Menerus Ad. 1 : 4 (Depan Ruang TU) m2 2.30 0.19 - - - - - - - 2 Pas. Bata merah Ad. 1 : 4 (tambal sulam) + Depan Ruang TU m2 175.85 1.98 - - - - - - - 3 Pas. Plesteran dan acian dinding Ad. 1 : 4 m2 351.70 1.66 - - - - - - - 4 Pas. Keramik Lantai 30 x 30 cm setara mulia (tambal sulam) m2 163.45 2.20 - - - - - - - 5 Pas. Keramik Lantai 20 x 20 cm setara mulia corak (KM) m2 3.00 0.05 - - - - - - - 6 Pas. Keramik Dinding 20 x 25 cm setara mulia berwarna t = 2 m (KM) m2 13.00 0.25 - - - - - - - 7 Pas. Alumunium Composite Panel (Listplank Beton + Kolom Beton Teras ) m2 15.00 1.42 - - - - - - -

Sub Total 7.75 -

3 PEKERJAAN BETON

1 Pek. Plat Pondasi Setempat Type P1 120/120 K.225 m3 7.20 3.33 - - - - - - - 2 Pek. Plat Pondasi Setempat Type P2 80/80 K.225 m3 3.20 1.35 - - - - - - - 3 Pek. Sloof Type S1 20/25 K.225 m3 4.70 1.96 - - - - - - - 4 Pek. Sloof Type S2 15/20 K.225 m3 1.45 0.56 - - - - - - - 5 Pek. Sloof Type S3 15/20 K.225 m3 0.26 0.10 - - - - - - - 6 Pek. Kolom Type K1 30/30 + Kolom Pedestal K. 225 m3 7.38 3.72 - - - - - - - 7 Pek. Kolom Type K2 20/20 + Kolom Pedestal K. 225 m3 3.44 1.83 - - - - - - - 8 Pek. Kolom Type KP 12/12 K.225 m3 0.29 0.14 - - - - - - - 9 Pek. Balok Lintel 11/11 K.225 m1 58.00 0.51 - - - - - - -

10 Pek. Balok Beton Type B1 30/60 K.225 m3 11.81 7.00 - - - - - - - 11 Pek. Balok Beton Type B2 20/30 K.225 m3 4.42 2.35 - - - - - - - 12 Pek. Balok Beton Type B3 15/20 K.225 m3 0.32 0.16 - - - - - - - 13 Pek. Plat Lantai Beton tb = 12 cm K.225 m3 30.12 0.27 - - - - - - - 14 Pek. Dak Beton tb = 10 cm (Teras) K.225 m3 1.75 0.81 - - - - - - - 15 Pek. Listplank Beton 8/65 K.225 m3 1.10 0.48 - - - - - - - 16 Pek. Topian Beton 8/50 K.225 m3 0.70 0.31 - - - - - - - 17 Pek. Rabat Beton (Samping Kiri Bangunan) m3 0.92 0.05 - - - - - - -

Sub Total 24.90 -

4 PEKERJAAN TANGGA DALAM & LUAR

1 Pek. Galian Tanah PoHollow 4x4 cm m3 1.76 0.003 - - - - - - - 2 Urugan Pasir Bawah Pondasi tb = 5 cm (Tangga Dalam) m3 0.07 0.002 - - - - - - - 3 Lantai Kerja Bawah Pondasi tb = 5 cm (Tangga Dalam) m3 0.07 0.005 - - - - - - - 4 Urugan Tanah Kembali Pondasi (Tangga Dalam) m3 0.98 0.002 - - - - - - - 5 Pek. Plat Pondasi Type PT K.225 (Tangga Dalam) m3 0.30 0.126 - - - - - - - 6 Pek. Kolom Pedestal K.225 (Tangga Dalam) m3 0.34 0.171 - - - - - - - 7 Pek. Plat Lantai Beton tb = 12 cm K.225 (Tangga Dalam & Luar) m3 2.90 1.340 - - - - - - - 8 Pek. Anak Tangga Beton K.225 (Tangga Dalam & Luar) m3 0.80 0.349 - - - - - - - 9 Pek. Balok Tangga 20/30 K.225 (Tangga Dalam) m3 0.18 0.107 - - - - - - -

10 Pek. Kolom Type KP 12/12 K.225 (Tangga Dalam & Luar) m3 0.20 0.098 - - - - - - - 11 Pek. Ring Balk Beton 15/20 K.225 (Tangga Dalam & Luar) m3 0.88 0.339 - - - - - - - 12 Pas. Bata Merah Ad. 1Plat besi t. 3mm m2 23.20 0.262 - - - - - - - 13 Pas. Plesteran dan acian dinding Ad. 1 : 4 (Tangga Dalam & Luar) m2 46.40 0.219 - - - - - - - 14 Pas. Keramik Lantai 30 x 30 cm setara mulia (tangga dalam & luar) m2 30.00 0.404 - - - - - - - 15 Pek. Pengecetan Dinding + Kolom setara Vinilex (Tangga Dalam & Luar) m2 46.40 0.161 - - - - - - -

Sub Total 3.59 -

5 PEKERJAAN PLAFOND

1 Water Proofing Dak BeHollow 4x4 cm m2 17.50 0.060 - - - - - - - 2 Pas. Talang Tegak Pipa PVC Dia. 4" AW (Teras) m1 8.00 0.037 - - - - - - - 3 Plafond Beton Expose m2 409.55 1.008 - - - - - - -

Sub Total 1.11 -

6 PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pas. Kusen Pintu Alu Hollow 4x4 cm bh 5.00 1.596 - - - - - - - 2 Pas. Kusen Pintu Alumunium P2 (Lengkap) bh 5.00 1.457 - - - - - - - 3 Pas. Kusen Jendela Alumunium Type J1 (Lengkap) bh 5.00 1.147 - - - - - - - 4 Pas. Kusen Bouvenlight Alumunium Type BV1 ( Lengkap) bh 2.00 0.136 - - - - - - - 5 Pas. Kusen Bouvenlight Alumunium Type BV2 ( Lengkap) bh 1.00 0.082 - - - - - - - 6 Pas. Pintu PVC (KM) bh 1.00 0.025 - - - - - - -

Sub Total 4.44 -

7 PEKERJAAN SANITAIR

1 Pas. Pipa PVC Dia. 1 Hollow 4x4 cm m1 20.00 0.052 - - - - - - - 2 Pas. Pipa PVC Dia. 3/4" AW (Lengkap) m1 20.00 0.054 - - - - - - - 3 Pas. Pipa PVC Dia. 1" AW (Lengkap) m1 20.00 0.094 - - - - - - - 4 Pas. Pipa PVC Dia. 4" AW (Lengkap) m1 24.00 0.249 - - - - - - - 5 Pas. Kran Air bh 1.00 0.005 - - - - - - - 6 Pas. Floor Drain bh 1.00 0.008 - - - - - - - 7 Pas. Closed Duduk bh 1.00 0.118 - - - - - - -

Sub Total 0.58 -

8 PEKERJAAN INSTALASI LISTRIK

1 Pas. Instalasi titik Hollow 4x4 cm ttk 19.00 0.495 - - - - - - - 2 Pas. Instalasi Stop Kontak NYM 3x2,5 mm ttk 6.00 0.041 - - - - - - - 3 Pas. Instalasi Saklar NYM 3x2,5 mm ttk 8.00 0.058 - - - - - - - 4 Pas. Saklar Tunggal bh 3.00 0.022 - - - - - - - 5 Pas. Saklar Ganda bh 5.00 0.042 - - - - - - - 6 Pas. Stop Kontak bh 6.00 0.021 - - - - - - - 7 Pas. Lampu SL 18 watt bh 7.00 0.025 - - - - - - - 8 Pas. Lampu TL 20 watt bh 12.00 0.053 - - - - - - -

Sub Total 0.76 -

Page 42: Format Progress

9 PEKERJAAN PENGECETAN

1 Pek. Pengecetan dindiHollow 4x4 cm m2 761.90 2.648 - - - - - - - 2 Pek. Pengecetan Plafond Beton Expose setara Vinilex m2 409.55 1.448 - - - - - - -

Sub Total 4.10 -

III Lantai 2

1 PEKERJAAN URUGAN

1 Urugan Pasir Bawah Lantai tb = 5 cm m3 11.95 0.291 - - - - - - - Sub Total 0.29 -

2 PEKERJAAN PASANGAN

1 Pas. Bata Merah Ad. 1 Hollow 4x4 cm m2 242.45 2.733 - - - - - - - 2 Pas. Plesteran dan acian dinding Ad. 1 : 4 m2 484.90 2.285 - - - - - - - 3 Pas. Keramik Lantai 30 x 30 cm setara mulia m2 239.00 3.221 - - - - - - - 4 Pas. keramik Lantai 20 x 20 cm setara mulia corak (KM) m2 4.50 0.079 - - - - - - - 5 Pas. Keramik Dinding 20 x 25 cm setara mulia berwarna t = 2 m (KM) m2 22.00 0.424 - - - - - - - 6 Pas. Railing Besi Pipa Stainless Steel Dia. 2,5" ( Seluruh Parapet Dinding) m2 56.20 4.702 - - - - - - -

Sub Total 13.44 -

3 PEKERJAAN BETON

1 Pek. KolomType K3 20Hollow 4x4 cm m3 0.96 0.510 - - - - - - - 2 Pek. KolomType K4 15/20 K.225 m3 1.98 1.051 - - - - - - - 3 Pek. KolomType KP 12/12 K.225 m3 0.13 0.069 - - - - - - - 4 Pek. Balok Lintel 11/11 K.225 m1 50.00 0.443 - - - - - - - 5 Pek. Balok 15/20 Type RB K.225 m3 2.42 1.185 - - - - - - - 6 Pek. Balok 15/20 Type BP K.225 m3 0.84 0.411 - - - - - - - 7 Pek. Plat Meja Beton Tb = 10 cm (Wastafel KM) m3 0.10 0.042 - - - - - - -

Sub Total 3.71 -

4 PEKERJAAN ATAP DAN PLAFOND

1 Pas. Rangka Atap BajHollow 4x4 cm m2 391.63 6.745 - - - - - - - 2 Pas. Penutup Atap Multi Roof Berpasir m2 391.63 4.698 - - - - - - - 3 Pas. Nok Atap Multi Roof Berpasir m1 54.00 0.364 - - - - - - - 4 Pas. Atap Poly Carbont + Rangka Pipa Carbon Steel Dia. 2" (Tangga Luar) m2 21.40 0.948 - - - - - - - 5 Pas. Plafond Gypsum Tb = 9 mm Rangka Hollow Galvalum m2 339.15 9.183 - - - - - - - 6 Pas. List Plafond Gypsum m1 276.00 0.607 - - - - - - - 7 Pas. Listplank GRC (Tumpang Sari) m1 76.80 0.276 - - - - - - -

Sub Total 22.82 -

5 PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pas. Kusen Pintu Alu Hollow 4x4 cm bh 1.00 0.221 - - - - - - - 2 Pas. Kusen Pintu Alumunium Type P2 (Lengkap) bh 2.00 0.738 - - - - - - - 3 Pas. Kusen Jendela Alumunium Type J1 (Lengkap) bh 7.00 1.950 - - - - - - - 4 Pas. Kusen Bouvenlight Alumunium Type BV1 (Lengkap) bh 6.00 0.502 - - - - - - - 5 Pas. Kusen Bouvenlight Alumunium Type BV2 (Lengkap) bh 1.00 0.056 - - - - - - - 6 Pas. Pintu PVC (KM) bh 1.00 0.027 - - - - - - -

Sub Total 3.50 -

6 PEKERJAAN SANITAIR

1 Pas. Pipa PVC Dia. 1/2" AW (Lengkap) m1 16.00 0.042 - - - - - - - 2 Pas. Pipa PVC Dia. 3/4" AW (Lengkap) m1 16.00 0.043 - - - - - - - 3 Pas. Pipa PVC Dia. 1" AW (Lengkap) m1 16.00 0.023 - - - - - - - 4 Pas. Pipa PVC Dia. 4" AW (Lengkap) m1 20.00 0.094 - - - - - - - 5 Pas. Kran Air bh 1.00 0.005 - - - - - - - 6 Pas. Floor Drain bh 1.00 0.008 - - - - - - - 7 Pas. Wastafel (Lengkap Cermin) bh 2.00 0.312 - - - - - - - 8 Pas. Closed Duduk bh 1.00 0.207 - - - - - - -

Sub Total 0.73 -

Page 43: Format Progress

7 PEKERJAAN INSTALASI LISTRIK

1 Pas. Instalasi titik Lampu NYM 3x2,5 mm ttk 18.00 0.469 - - - - - - - 2 Pas. Instalasi Stop Kontak NYM 3x2,5 mm ttk 2.00 0.052 - - - - - - - 3 Pas. Instalasi Saklar NYM 3x2,5 mm ttk 3.00 0.078 - - - - - - - 4 Pas. Saklar Tunggal bh 2.00 0.007 - - - - - - - 5 Pas. Saklar Ganda bh 1.00 0.004 - - - - - - - 6 Pas. Stop Kontak bh 2.00 0.007 - - - - - - - 7 Pas. Lampu SL 18 watt bh 6.00 0.027 - - - - - - - 8 Pas. Lampu TL 20 watt bh 12.00 0.047 - - - - - - -

Sub Total 0.69 -

8 PEKERJAAN PENGECETAN DAN PENYELESAIAN

1 Pek. Pengecetan dinding + kolom setara Vinilex m2 504.90 1.755 - - - - - - - 2 Pek. Pengecetan Plafond + List setara Vinilex m2 339.15 1.199 - - - - - - - 3 Pek. Pengecetan Listplank setara Vinilex m2 23.04 0.081 - - - - - - - 4 Pembersihan Lokasi ls 1.00 0.098 - - - - - - -

Sub Total 3.13 -

Total 100.00 -

DIPERIKSA DIBUAT OLEH MENGETAHUI 1. Kurniawati Arik Purwani,SE,MSi :......................... KONTRAKTOR

CV. PUTRASHINTA

2. Rahmadi : .........................

3. R.Muhamad Al Idris : ........................

Muhammad Dindin

Direktur