Progress a11 - 22 Aug

download Progress a11 - 22 Aug

of 318

description

CWEWAEcascawewecwaeawecawecawecawecwaecwaeccwecwecwaecwaecwaecw

Transcript of Progress a11 - 22 Aug

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    No.

    100.00%100.00%

    5.00%

    100.00%100.00%

    0.00%100.00%

    100.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    PERSETASE MGG LALU

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

    No.

    PERSETASE MGG LALU

    0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

    No.

    PERSETASE MGG LALU

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%5.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

    No.

    PERSETASE MGG LALU

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    No.

    0.47%0.45%0.02%0.95%

    0.70%0.06%0.00%0.18%0.94%

    7.02%0.00%7.02%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    BOBOT MGG LALU

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

    No.

    BOBOT MGG LALU

    0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

    No.

    BOBOT MGG LALU

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.10%0.00%0.00%0.00%0.00%0.10%

    9.01%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

    No.

    BOBOT MGG LALU

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    No.

    0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%

    0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    PERSETASE MGG INI

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

    No.

    PERSETASE MGG INI

    0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

    No.

    PERSETASE MGG INI

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

    No.

    PERSETASE MGG INI

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    1

    0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    BOBOT MGG INI

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

    1

    BOBOT MGG INI

    0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

    1

    BOBOT MGG INI

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

    1

    BOBOT MGG INI

    Sidoarjo, 22 Agustus 2015

    PT. Yofa Bangun Abadi

    Project Manager

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    1

    100.00%100.00%

    5.00%

    100.00%100.00%

    0.00%100.00%

    100.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    PERSETASE S/D MGG INI

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

    1

    PERSETASE S/D MGG INI

    0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

    1

    PERSETASE S/D MGG INI

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%5.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

    1

    PERSETASE S/D MGG INI

    Sidoarjo, 22 Agustus 2015Dibuat Oleh,

    PT. Yofa Bangun Abadi

    Mas Dedi P.Project Manager

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    1

    0.47%0.45%0.02%0.95%

    0.70%0.06%0.00%0.18%0.94%

    7.02%0.00%7.02%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    BOBOT S/D MGG INI

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

    1

    BOBOT S/D MGG INI

    0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

    1

    BOBOT S/D MGG INI

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.10%0.00%0.00%0.00%0.00%0.10%

    9.01%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

    1

    BOBOT S/D MGG INI

    Sidoarjo, 22 Agustus 2015

    PT. Yofa Bangun Abadi

    Project Manager

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    No.

    100.00%100.00%

    5.00%

    100.00%100.00%

    0.00%100.00%

    100.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    PERSETASE MGG LALU

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

    No.

    PERSETASE MGG LALU

    0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

    No.

    PERSETASE MGG LALU

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%5.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

    No.

    PERSETASE MGG LALU

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    No.

    0.47%0.45%0.02%0.95%

    0.70%0.06%0.00%0.18%0.94%

    7.02%0.00%7.02%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    BOBOT MGG LALU

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

    No.

    BOBOT MGG LALU

    0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

    No.

    BOBOT MGG LALU

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.10%0.00%0.00%0.00%0.00%0.10%

    9.01%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

    No.

    BOBOT MGG LALU

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    No.

    0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%

    0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    PERSETASE MGG INI

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

    No.

    PERSETASE MGG INI

    0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

    No.

    PERSETASE MGG INI

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

    No.

    PERSETASE MGG INI

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    2

    0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    BOBOT MGG INI

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

    2

    BOBOT MGG INI

    0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

    2

    BOBOT MGG INI

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

    2

    BOBOT MGG INI

    Sidoarjo, 22 Agustus 2015

    PT. Yofa Bangun Abadi

    Project Manager

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    2

    100.00%100.00%

    5.00%

    100.00%100.00%

    0.00%100.00%

    100.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    PERSETASE S/D MGG INI

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

    2

    PERSETASE S/D MGG INI

    0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

    2

    PERSETASE S/D MGG INI

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%5.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

    2

    PERSETASE S/D MGG INI

    Sidoarjo, 22 Agustus 2015Dibuat Oleh,

    PT. Yofa Bangun Abadi

    Mas Dedi P.Project Manager

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    2

    0.47%0.45%0.02%0.95%

    0.70%0.06%0.00%0.18%0.94%

    7.02%0.00%7.02%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    BOBOT S/D MGG INI

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

    2

    BOBOT S/D MGG INI

    0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

    2

    BOBOT S/D MGG INI

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.10%0.00%0.00%0.00%0.00%0.10%

    9.01%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

    2

    BOBOT S/D MGG INI

    Sidoarjo, 22 Agustus 2015

    PT. Yofa Bangun Abadi

    Project Manager

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    No.

    100.00%100.00%

    5.00%

    100.00%100.00%

    0.00%100.00%

    100.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    PERSETASE MGG LALU

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

    No.

    PERSETASE MGG LALU

    0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

    No.

    PERSETASE MGG LALU

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%5.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

    No.

    PERSETASE MGG LALU

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    No.

    0.47%0.45%0.02%0.95%

    0.70%0.06%0.00%0.18%0.94%

    7.02%0.00%7.02%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    BOBOT MGG LALU

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%

    10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%

    VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%

    10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%

    VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%

    10.95%

    No.

    BOBOT MGG LALU

    0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%

    10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%

    Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI

    1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%

    10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%

    XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%

    Sub Total XI 9.08%

    Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70

    No.

    BOBOT MGG LALU

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.10%0.00%0.00%0.00%0.00%0.10%

    9.01%

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    Diperiksa Oleh,PT. Adhi Persada Properti

    KuscahyonoConstruction Manager

    No.

    BOBOT MGG LALU

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%

    Sub Total I 1.39%II PEKERJAAN TANAH

    1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%

    Sub Total II 1.41%III PEKERJAAN PONDASI

    1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%

    Sub Total III 7.21%IV PEKERJAAN BETON

    1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%

    Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN

    1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%

    Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA

    1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%

    No.

    0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%

    0.00%0.00%

    10.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%

    2.50%0.00%0.00%0.00%0.00%0.00%

    0.00%0.00%0.00%0.00%0.00%

    PERSETASE MGG INI

  • Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI

    NO URAIAN PEKERJAAN BOBOT

    6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun