JADWALJADWAL PELAKSANAAN PEKERJAAN

KEGIATAN:PEMBANGUNAN JALANPEKERJAAN:PENINGKATAN JL. SUMBERSARI DAN JL. PARAKAN ASRI DALAMLOKASI:KECAMATAN ARCAMANIK

NOURAIAN PEKERJAANHARGAKontrak AwalMC 0 %WAKTU PELAKSANAANKET.MASASat.SATUAN KuantitasBobotJumlah HargaKuantitasBobotJumlah HargaMEIJUNIJULIAGUSTUSSEPTPEMELIHARAANRp.( % )Rp.( % )Rp. 07 - 160 17 - 23024 - 3101 - 07008 - 14015 - 2122 - 3001 - 07008 - 14015 - 2122 - 3101 - 07008 - 14015 - 2122 - 2829 - 04IIIIII

I. PEKERJAAN PERSIAPAN100%1ERROR:#REF!Ls1,260,000.001.000.181,260,000.001.000.180.18

2ERROR:#REF!Ls300,000.001.000.04300,000.001.000.040.04

3ERROR:#REF!Bh210,000.001.000.03210,000.001.000.030.03ERROR:#REF!4ERROR:#REF!Ls180,000.001.000.03180,000.001.000.030.0020.0020.0020.0020.0020.0020.0020.0020.0020.0020.0020.0020.0020.0020.0020.002ERROR:#REF!5ERROR:#REF!Ls1,200,000.001.000.171,200,000.001.000.170.090.086

6Pembuatan Dokumentasi, Photo dan Asbuit DrawingLs300,000.001.000.04300,000.001.000.040.010.010.014

7Penjagaan dan KeamananLs240,000.001.000.03240,000.001.000.030.0020.0020.0020.0020.0020.0020.0020.0020.0020.0020.0020.0020.0020.0020.0020.00275%3,690,000.00II. PEKERJAAN JLN PJ = 182 m Lb = 10 m PEKERJAAN JLN PJ = 418 m Lb = 2.25 - 3.4 m1Lapis Pondasi Atas (LPA) Kls Am3207,363.00101.203.0020,985,135.6078.31ERROR:#REF!3.00

2Galian tanah keras berbatum368,012.004.600.04312,855.20114.22ERROR:#REF!0.0450%3Galian tanah biasa dan normalisasi tali-tali airm336,182.00295.781.5310,701,911.96295.78ERROR:#REF!1.53

4Pembuangan tanah bekas galianm253,773.00300.382.3116,152,333.74362.23ERROR:#REF!2.31

5Pemasangan plastik betonm23,715.003002.101.6011,152,801.502869.60ERROR:#REF!0.800.80

6Memotong, membengkokan dan memasang besi tulangan untukkg15,035.001279.802.7519,241,793.00271.50ERROR:#REF!2.7550%dan dowel7Cutting dan aspal silentm11,400.003540.584,035,600.00242.50ERROR:#REF!0.290.29258Cetakan beton jalan dengan flatform (sewam280,046.00109.201.258,741,023.20110.00ERROR:#REF!0.630.63

9Beton Struktur K-350 m3871,158.00552.3268.89481,157,986.56530.84ERROR:#REF!11.48111.48111.48111.48111.48111.481

10Lapis perekat (Tack Coat)lt9,219.004060.543,742,914.00513.00ERROR:#REF!0.130.130.130.13

11Penghamparan Lapis Permukaan Aspal Beton AC/WCL Tebal = 4 cmm31,993,725.0054.0815.44107,820,648.0068.40ERROR:#REF!3.863.863.863.86

12Pasangan Kerb Type C Jl. Masuk uk : 16 x 18 x 20 m58,381.001791.5010,450,199.00179ERROR:#REF!1.50

13Pemberesan Sisa Pekerjaan dan PembuanganLs300,000.001.000.04300,000.001.00ERROR:#REF!0.040%

100694,795,201.76ERROR:#REF!

RENCANA KONTRAK AWAL698,485,201.760.261.582.323.633.380.8212.2811.4811.4811.7711.7915.564.004.005.490.15KUMULATIF KONTRAK AWAL069,848,520.180.261.844.157.7911.1711.9924.2735.7647.2459.0170.8086.3790.3694.3699.85100.00PROGRES REALISASI 768,333,721.94KUMULATIF REALISASI768,333,721.94DEVIASI / SELISIH

Bnandung, 31 MEI 2010Dibuat Oleh :Pengawas LapanganSPOKONSULTAN SUVERVISIKONTRAKTOR PELAKSANAPELAKSANADINAS BINA MARGA KOTA BANDUNGDINAS BINA MARGA KOTA BANDUNGPT.GELAR BUANA PERSADACV. LINGGASARICV. LINGGASARI

JEMI SAFARYADI, STRUSLIAZWAR, STTAOPIK NUGRAHA NIP. 19740224 20080 11 002NIP. 19550310 198 703103SITE ENGINEERSITE MANAGERSITE MANAGER

1.1Mob alat berat

FIELD ENGINEERING

KEGIATAN:ERROR:#REF!KONSULTAN PENGAWAS :ERROR:#REF!PEKERJAAN:ERROR:#REF!NOMOR KONTRAK:ERROR:#REF!NOMOR KONTRAK:ERROR:#REF!TANGGAL KONTRAK:ERROR:#REF!TANGGAL KONTRAK:ERROR:#REF!PELAKSANA:ERROR:#REF!JENIS PEKERJAAN:ERROR:#REF!

R E K A P I T U L A S INOURAIAN PEKERJAANSATUANKONTRAKFE/CCOKETERANGAN(KUANTITAS(KUANTITAS)ERROR:#REF!1ERROR:#REF!Ls1.001.00

Mengetahui,Disetujui Oleh,Diperiksa Oleh,Dibuat Oleh,Pejabat Pelaksana Teknis KegiatanKetua Pokja Perencana Wilayah UjungbeurungKonsultan PengawasKontraktorDBMP Kota BandungDBMP Kota BandungPT. Gelar Buana PersadaCV. Intan Putera

Dedi Supriadi, S.SosMoh. Deni Jakaria, BE.SapDeni MulyanaRicky BudimanNip. 19670305 199403 1 007Nip. 19701127 199911 1 001Site EngineerSite Manager

1.2Papan Nama Proyek

FIELD ENGINEERING

KEGIATAN:ERROR:#REF!KONSULTAN PENGAWAS :ERROR:#REF!PEKERJAAN:ERROR:#REF!NOMOR KONTRAK:ERROR:#REF!NOMOR KONTRAK:ERROR:#REF!TANGGAL KONTRAK:ERROR:#REF!TANGGAL KONTRAK:ERROR:#REF!PELAKSANA:ERROR:#REF!JENIS PEKERJAAN:ERROR:#REF!

SKETSA

R E K A P I T U L A S INOURAIAN PEKERJAANSATUANKONTRAKFE/CCOKETERANGAN(KUANTITAS(KUANTITAS)ERROR:#REF!1ERROR:#REF!Bh1.001.00

Mengetahui,Disetujui Oleh,Diperiksa Oleh,Dibuat Oleh,Pejabat Pelaksana Teknis KegiatanKetua Pokja Perencana Wilayah UjungbeurungKonsultan PengawasKontraktorDBMP Kota BandungDBMP Kota BandungPT. Gelar Buana PersadaCV. Intan Putera

Dedi Supriadi, S.SosJemi SafariyadiDeni MulyanaRicky BudimanNip. 19670305 199403 1 007Nip. 19740224 200801 1 002Site EngineerSite Manager

1.3 Direksikeet

FIELD ENGINEERING

KEGIATAN:ERROR:#REF!KONSULTAN PENGAWAS :ERROR:#REF!PEKERJAAN:ERROR:#REF!NOMOR KONTRAK:ERROR:#REF!NOMOR KONTRAK:ERROR:#REF!TANGGAL KONTRAK:ERROR:#REF!TANGGAL KONTRAK:ERROR:#REF!PELAKSANA:ERROR:#REF!JENIS PEKERJAAN:ERROR:#REF!

SKETSA

R E K A P I T U L A S INOURAIAN PEKERJAANSATUANKONTRAKFE/CCOKETERANGAN(KUANTITAS(KUANTITAS)ERROR:#REF!1ERROR:#REF!M26.006.00

Mengetahui,Disetujui Oleh,Diperiksa Oleh,Dibuat Oleh,Pejabat Pelaksana Teknis KegiatanKetua Pokja Perencana Wilayah UjungbeurungKonsultan PengawasKontraktorDBMP Kota BandungDBMP Kota BandungPT. Gelar Buana PersadaCV. Intan Putera

Dedi Supriadi, S.SosJemi SafariyadiDeni MulyanaRicky BudimanNip. 19670305 199403 1 007Nip. 19740224 200801 1 002Site EngineerSite Manager

1.4Dokmtsi&Asbuilt

FIELD ENGINEERING

KEGIATAN:ERROR:#REF!KONSULTAN PENGAWAS :ERROR:#REF!PEKERJAAN:ERROR:#REF!NOMOR KONTRAK:ERROR:#REF!NOMOR KONTRAK:ERROR:#REF!TANGGAL KONTRAK:ERROR:#REF!TANGGAL KONTRAK:ERROR:#REF!PELAKSANA:ERROR:#REF!JENIS PEKERJAAN:ERROR:#REF!

R E K A P I T U L A S INOURAIAN PEKERJAANSATUANKONTRAKFE/CCOKETERANGAN(KUANTITAS(KUANTITAS)ERROR:#REF!1ERROR:#REF!Ls1.001.00

Mengetahui,Disetujui Oleh,Diperiksa Oleh,Dibuat Oleh,Pejabat Pelaksana Teknis KegiatanKetua Pokja Perencana Wilayah UjungbeurungKonsultan PengawasKontraktorDBMP Kota BandungDBMP Kota BandungPT. Gelar Buana PersadaCV. Intan Putera

Dedi Supriadi, S.SosJemi SafariyadiDeni MulyanaRicky BudimanNip. 19670305 199403 1 007Nip. 19740224 200801 1 002Site EngineerSite Manager

1.1Galian drainase

FIELD ENGINEERING

KEGIATAN:ERROR:#REF!KONSULTAN PENGAWAS :ERROR:#REF!PEKERJAAN:ERROR:#REF!NOMOR KONTRAK:ERROR:#REF!NOMOR KONTRAK:ERROR:#REF!TANGGAL KONTRAK:ERROR:#REF!TANGGAL KONTRAK:ERROR:#REF!PELAKSANA:ERROR:#REF!JENIS PEKERJAAN:ERROR:#REF!

GAMBAR TEKNIK

NoSTA.RINCIAN PERHITUNGAN VOLUMEKET.PosisiPanjang (m) Lebar (m)Tinggi (m)Luas (m2)Volume (m3)Ka/Full/KiSegmentabc = Tr x 0.5d = a x be = d x c 108

JL. BBK. BETAWI

Sub Total Halaman Ini0.0 Jumlah Kumulatif Halaman Ini0.0

Mengetahui,Disetujui,Diperiksa Oleh,Dibuat Oleh,Petugas MonitoringPerencana,Konsultan PengawasKontraktorDBMP Kota BandungDBMP Kota BandungPT. Gelar Buana PersadaERROR:#REF!

Jemi SafariyadiAsep SuheriDadan KusdiawanRicky BudimanNip. 19740224 200801 1 00219711020 200801 1 004InspectorSite Manager

FIELD ENGINEERING

KEGIATAN:ERROR:#REF!KONSULTAN PENGAWAS :ERROR:#REF!PEKERJAAN:ERROR:#REF!NOMOR KONTRAK:ERROR:#REF!NOMOR KONTRAK:ERROR:#REF!TANGGAL KONTRAK:ERROR:#REF!TANGGAL KONTRAK:ERROR:#REF!PELAKSANA:ERROR:#REF!JENIS PEKERJAAN:ERROR:#REF!

GAMBAR TEKNIK

NoSTA.RINCIAN PERHITUNGAN VOLUMEKET.PosisiPanjang (m) Lebar (m)Tinggi (m)Luas (m2)Volume (m3)Ka/Full/KiSegmentabcd = a x be = d x c

17P80400.0+-0425.0+Ki25.000.601.0015.0015.00Ka25.000.601.0015.0015.00JL. BBK. BETAWI

180425.0+-0450.0+Ki25.000.601.0015.0015.00Ka25.000.601.0015.0015.00

19P90450.0+-0475.0+Ki25.000.601.0015.0015.00Ka25.000.601.0015.0015.00

200475.0+-0500.0+Ki25.000.601.0015.0015.00Ka25.000.601.0015.0015.00

21P100500.0+-0525.0+Ki25.000.601.0015.0015.00Ka20.000.601.0012.0012.00

220525.0+-0550.0+Ki25.000.601.0015.0015.00Ka25.000.601.0015.0015.00

23P110550.0+-0575.0+Ki25.000.601.0015.0015.00Ka25.000.601.0015.0015.00

240575.0+-0600.0+Ki25.000.601.0015.0015.00Ka25.000.601.0015.0015.0025P120600.0+-0625.0+Ka260625.0+-0650.0+108Ka27P130650.0+-0675.0+Ka280675.0+-0700.0+Ka29P140700.0+-0725.0+Ka300725.0+-0750.0+Ka31P150750.0+-0775.0+Ka320775.0+-0800.0+KaSub Total Halaman Ini222.00 Jumlah Kumulatif Halaman Ini222.00

Mengetahui,Disetujui,Diperiksa Oleh,Dibuat Oleh,Petugas MonitoringPerencana,Konsultan PengawasKontraktorDBMP Kota BandungDBMP Kota BandungPT. Gelar Buana PersadaERROR:#REF!

ParnoAsep SuheriDadan Kusdiawan, STRicky BudimanNip. 19740224 200801 1 002Nip. 19711020 200801 1 004InspectorSite Manager

FIELD ENGINEERING

KEGIATAN:ERROR:#REF!KONSULTAN PENGAWAS :ERROR:#REF!PEKERJAAN:ERROR:#REF!NOMOR KONTRAK:ERROR:#REF!21.5NOMOR KONTRAK:ERROR:#REF!TANGGAL KONTRAK:ERROR:#REF!8.6TANGGAL KONTRAK:ERROR:#REF!20PELAKSANA:ERROR:#REF!JENIS PEKERJAAN:ERROR:#REF!

GAMBAR TEKNIK

NoSTA.RINCIAN PERHITUNGAN VOLUMEKET.PosisiPanjang (m) Lebar (m)Tebal Rencana (m)Luas (m2)Volume (m3)Ka/Cl//Full/KiSegmentabcd = a x be = d x c 33P00800.0+-0825.0+Ki25.000.500.2012.502.50Ka25.000.500.2012.502.50Jl. Sumbersari340825.0+0850.0+Ki25.000.500.2012.502.50Ka25.000.500.2012.502.5035P10850.0+0875.0+Ki25.000.500.2012.502.50Ka25.000.500.2012.502.50360875.0+0900.0+Ki25.000.500.2012.502.50Ka25.000.500.2012.502.5037P20900.0+0925.0+Ki25.000.300.207.501.50Ka25.000.500.2012.50380925.0+0950.0+Ki25.000.500.2012.50Ka25.000.500.2012.5039P30950.0+0975.0+Ki25.000.500.2012.50Ka25.000.500.2012.50400975.0+1000.0+Ki25.000.500.2012.50Ka25.000.50