    Session 18 Layout Design

    Production Line Balancing.

    .

    D 0 8 5 4Supply Chain : Manufacturing and Warehousing

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    2/29

    Bina Nusantara University

    2

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    3/29

    Bina Nusantara University

    3

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    4/29

    Assembly line balancing is traditionally thought of as afacilities design and layout problem

    There are a variety of factors that contribute to the difficulty of the problem Precedence constrains: some tasks may have to be completed in a

    particular sequence Zoning restriction: Some tasks cannot be performed at the same

    workstation

    Let t 1, t 2, , t n be the time required to complete the respectivetasks

    Assembly Line Balancing

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    5/29

    The total work content (time) associated with the production of anitem, say T , is given by

    Assembly Line Balancing

    ==n

    iit T 1

    For a cycle time of C, the minimum number of workstations possibleis [ T /C], where the brackets indicate that the value of T /C is to berounded to the next larger integer

    Ranked positional weight technique: the method places a weight oneach task based on the total time required by all of the succeedingtasks. Tasks are assigned sequentially to stations based on theseweights

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    6/29

    Assembly Line Balancing

    Example 8.11 The Final assembly of Noname personal computers, a generic mail-order PCclone, requires a total of 12 tasks. The assembly is done at the Lubbock,

    Texas, plant using various components imported from the Far East. Thenetwork representation of this particular problem is given in the following

    figure.

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    7/29

    Precondition The job times and precedence relationships for thisproblem are summarized in the table below.

    Task Immediate Predecessors Time1 _ 12

    2 1 63 2 64 2 25 2 26 2 127 3, 4 78 7 5

    9 5 110 9, 6 411 8, 10 6

    12 11 7

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    8/29

    Assembly Line Balancing:Assembly Line Balancing:Helgeson and Birnie Heuristic (1961)Helgeson and Birnie Heuristic (1961)

    Ranked positional weight technique

    The solution precedence requires determining the positional weight of each task.

    The positional weight of task i is defined as the time required toperform task i plus the times required to perform alltasks having task i as a predecessor.

    t3 + t 7 + t 8 + t 11 + t 12 = 31Task Time Positional

    Weight

    1 12 702 6 58

    3 6 31

    4 2 27

    5 2 20

    6 12 29

    7 7 25

    8 5 18

    9 1 18

    10 4 17

    11 6 1312 7 7

    The ranking: 1, 2, 3, 6, 4, 7, 5, 8, 9, 10, 11, 12

    ti = 70, and the production rate is a unit per 15 minutes;The minimum number of workstations = [70 / 15] = 5

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    9/29

    Assembly Line Balancing:Helgeson and Birnie Heuristic (1961)

    The ranking: 1, 2, 3, 6, 4, 7, 5, 8, 9, 10, 11,

    12

    Task ImmediatePredecessors

    Time

    1 _ 12

    2 1 63 2 64 2 25 2 2

    6 2 127 3, 4 78 7 59 5 1

    10 9, 6 411 8, 10 612 11 7

    Station 1 2 3 4 5 6

    Tasks 1 2, 3, 4 5, 6, 9 7, 8 10, 11 12

    Processing time 12 14 15 12 10 7

    Idle time 3 1 0 3 5 8

    C=15

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    10/29

    T2=6

    C=15

    Station 1 2 3 4 5 6

    Tasks 1 2,3,4 5,6,9 7,8 10,11 12

    Processing time 12 14 15 12 10 7

    Idle time 3 1 0 3 5 8

    Cycle Time=15

    T1=12

    T2=6 T3=6 T4=2

    T5=2 T6=12 T9=1

    T5=2

    T8=5T7=7 T10=4

    T10=4 T11=6 T12=7

    T12=7

    15 Evaluate the balancing results bythe efficiency ti/NC

    The efficiencies for C=15 is 77.7%,C=16 is 87.5%, andC=13 is 89.7% isthe best one

    Helgeson and Birnie Heuristic (1961)

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    11/29

    C=15

    Station 1 2 3 4 5 6

    Tasks 1 2,3,4 5,6,9 7,8 10,11 12

    Processing time 12 14 15 12 10 7

    Idle time 3 1 0 3 5 8

    Helgeson and Birnie Heuristic (1961)Helgeson and Birnie Heuristic (1961)

    Station 1 2 3 4 5

    Tasks 1 2,3,4,5

    6,9 7,8,10 11,12

    Idle time 4 0 3 0 3

    C=16Increasing the cycletime from 15 to 16,the total idle timehas been cut downfrom 20 min/units to10 improvement in

    balancing rate.

    The production ratehas to be reduced fromone unit/15 minutes toone unit/16minute;

    Station 1 2 3 4 5 6

    Tasks 1 2,3 6 4,5,7,9 8,10 11,12

    Idle time 1 1 1 1 4 0

    C=13

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    12/29

    C=15

    Station 1 2 3 4 5 6

    Tasks 1 2,3,4 5,6,9 7,8 10,11 12

    Processing time 12 14 15 12 10 7

    Idle time 3 1 0 3 5 8

    Helgeson and Birnie Heuristic (1961)

    Station 1 2 3 4 5

    Tasks 1 2,3,4,5

    6,9 7,8,10 11,12

    Idle time 4 0 3 0 3

    C=16

    Station 1 2 3 4 5 6

    Tasks 1 2,3 6 4,5,7,9 8,10 11,12

    Idle time 1 1 1 1 4 0

    C=13

    13 minutes appear to be the minimumcycle time with sixstation balance.

    Increasing thenumber of stationsfrom 5 to 6 resultsin a greatimprovement in

    production rate;

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    13/29

    Stochastic Scheduling: Static Case

    Single machine case: Suppose that processing times are randomvariables. If the objective is to minimize average weighted flow time,

    jobs are sequenced according to expected weighted SPT. That is, if jobtimes are t 1, t 2, . . ., and the respective weights are u 1, u 2, . . . then job i precedes job i+1 if

    E(t i )/u i < E(t i+1 )/u i+1

    Multiple Machines: Requires the assumption that the distribution of jobtimes is exponential, (memoryless property). Assume parallelprocessing of n jobs on two machines. Then the optimal sequence is toto schedule the jobs according to LEPT (longest expected processingtime first).

    Johnsons algorithm for scheduling n jobs on two machines in thedeterministic case has a natural extension to the stochastic case aslong as the job times are exponentially distributed.

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    14/29

    Stochastic Scheduling: Queueing Theory

    A typical queueing process

    The basic phenomenon of queueing arises whenever a shared facility needs tobe accessed for service by a large number of jobs or customers. (Bose)

    The study of the waiting times, lengths, and other properties of queues.(Mathworld)

    Applications:

    Telecommunications Health servicesTraffic control Predicting computer performance

    Airport traffic, airline ticket sales Layout of manufacturing systemsDetermining the sequence of computer operations

    Service FacilityCustomers arriving Served customers leaving

    Discouraged customers leaving

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    15/29

    Examples of Queueing Theory

    http://www.bsbpa.umkc.edu/classes/ashley/Chaptr14/sld006.htm

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    16/29

    Stochastic Scheduling: Dynamic Analysis

    View network as collections of queues

    FIFO data-structures

    Queuing theory provides probabilistic analysis of these queues

    Typical operating characteristics of interest include: Lq = Average number of units in line waiting for service

    L = Average number of units in the system (in line waiting for service andbeing serviced)

    Wq = Average time a unit spends in line waiting for service W = Average time a unit spends in the system Pw = Probability that an arriving unit has to wait for service Pn = Probability of having exactly n units in the system P0 = Probability of having no units in the system (idle time) U = Utilization factor, % of time that all servers are busy

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    17/29

    Characteristics of Queueing Processes

    Arrival pattern of customers

    Service pattern of servers

    Queue discipline

    System capacity

    Number of service channels

    Number of service stages

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    18/29

    Characteristics of Queueing Processes

    Arrival pattern of customers Probability distribution describing the times between successive

    customer arrivals Time independent Stationary arrival patterns Time dependent Non-stationary

    Batch or Bulk customer arrivals Probability distribution describing the size of the batch

    Customers behavior while waiting Wait no matter how long the queue becomes

    If the queue is too long, customer may choose not to enterinto the system

    Enter, wait, and choose to leave without being serviced If there is more than one waiting line, customer may

    switch jockey

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    19/29

    Characteristics of Queueing Processes

    Arrival pattern of customers

    Service pattern of servers Single or Batch May depend on the number of customers waiting state dependent Stationary or Non-stationary

    Queue discipline Manner in with customers are selected to service First Come First Served (FCFS) Last Come First Served (LCLS) Random Selection for Service (RSS) Priority Schemes

    Preemptive case Non-preemptive case

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    20/29

    Characteristics of Queueing Processes

    Arrival pattern of customers Service pattern of servers Queue discipline System capacity

    Finite queueing situations = Limiting amount of waiting room

    Number of service channels Single-channel system Multi-channel system, generally assumed that parallel channels

    operate independently of each other

    Number of service stages

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    21/29

    Notation Used in Queueing Processes

    Full notation: A / B / X / Y / Z Shorthand: A / B / X

    A indicates the interarrival-time distribution Assumes: Y is infinity,B the probability distribution for service time Z = FCFSX number of parallel service channels

    Y the restriction on system capacityZ the queue discipline (FCFS)

    Symbol = Explanation

    AB

    M = Exponential, D = Deterministic, E k = Erlang type

    Hk = Mixture of k exponentials, PH = Phase type, G = General

    X Y

    1, 2, ... , infinity1, 2, ... , infinity

    Z FCFS, LCLS, RSS, PR = priority, GD = general discipline

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    22/29

    Queueing Processes: Littles Formulas

    One of the most powerful relationships in queueing theory was developed by

    John D.C. Little in the early 1960s.Formulas:

    and ,

    where is an average rate of customers entering the system, and

    W is an expected time customer will spend in the system

    W L = qq W L =

    1

    2

    3

    Number of customersin system

    Time, t

    t1 t2 t3 t4 t5 t6 t7 T

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    23/29

    Poisson Process & Exponential Distribution

    M: stands for "Markovian", implying exponential distribution for servicetimes or inter-arrival times, that carries the memoryless property

    past state of the system does not help to predict next arrival / departure

    n+1nn-1

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    24/29

    Calculating ExpectedSystem Measures for M/M/1

    The utilization rate: = / P0= 1

    P i= i(1 ), for i = 1, 2, 3,

    these formulas hold only if < 210

    CHARACTERISTIC SYMBOL FORMULA

    Utilization / Exp. No. in System L / ( ) = / (1-)Exp. No. in Queue Lq 2/ ( ) = 2 / (1-)Exp. Waiting Time W=L/ 1 / ( ) = / (1-)Exp. Time in Queue W q=L q / / ( ) = 2 / (1-)Prob. System is Empty P 0 1 ( / ) = 1 -

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    25/29

    Calculating ExpectedSystem Measures for M/M/m

    http://www.ece.msstate.edu/~hu/courses/spring03/notes/note4.ppt

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    26/29

    Calculating ExpectedSystem Measures for M/M/m

    Assumption- m servers- all servers have the same service rate - single queue for access to the servers- arrival rate n =

    - departure rate

    ( )( )+=

    ==

    ,1,,

    1,,2,1,0,

    mmnm

    mnnn

    m-1 m m+1210

    m

    mm(m-1)32

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    27/29

    Calculating ExpectedSystem Measures for M/M/m

    ( ) ( )( )1

    11

    00 1!!

    =+=

    mm

    nm

    P mm

    n

    n

    ( ) 021

    1! P

    m

    m L

    mm

    q

    =

    +

    m L L q += qq LW = 1+= qW W

    m-1 m m+1210

    m

    mm(m-1)32

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    28/29

    Example

    Unisex hair salon runs on a first-come, first-served basis. Customersseem to arrive according to a Poisson process with mean arrival rateof 5/hr. Because of Ms. H.R. Cutts excellent reputation, customersare always willing to wait. Average service time of 10 min isexponentially distributed.

    Calculate the average number of customers in the shop and theaverage number of customers waiting for a haircut.

    Calculate the percentage of time an arrival can walk right in withouthaving to wait at all.

    The waiting room has only 4 seats. What is the probability that acustomer upon arrival rill have to stand?

    Calculate average system waiting time, and the line delay.

  • 7/28/2019 Form rincian soal ujian mata kuliah CO OR.doc

    29/29

    Other Systems

    M/M/1/K - system with a capacity K eff = effective arrival rate

    M/D/1; M/G/1; M/G/

    Assignment: download the QTS add-in for Excel software to check the homework problems answers

    http://www.geocities.com/qtsplus/DownloadInstructions.htm#DOhttp://www.geocities.com/qtsplus/DownloadInstructions.htm#DOWNLOAD_INSTRUCTIONSWNLOAD_INSTRUCTIONS