REKAPITULASI PEKERJAAN SLOOF (ADDENDUM I)PROYEK WARE HOUSE AMPLAS - MEDAN

BLOK B 29 UNIT

NO URAIAN SATUAN VOLUME KETERANGAN

1 Galian tanah M3 51.3172 Beton lantai kerja, tb = 50mm, mutu K-100 M3 9.5033 Beton cor mutu K-225 M3 50.6834 Bekisting / acuan M2 506.8325 Pembesian:

- D 13 mm Kg 3960.455- Ø 6 mm kg 1083.369

Medan, 25 Januari 2013Diajukan Oleh, Diperiksa Oleh,KONTRAKTOR BURSA PROPERTY

SARIPUDDIN RAHMAD S.PROJECT MANAGER PIMPRO

Page 2: BACK UP DATA BLOK B

PROYEK WARE HOUSE AMPLAS - MEDAN BACK-UP DATA ADDENDUM I

TOTAL LUAS 25.277,70 M2 (57 UNIT) GALIAN TANAH SLOOF BLOK BTanggal: 25 Januari 2013

Sketsa:

NO. GUDANGPENAMPANG SLOOF VOLUME

KETERANGANLebar (m') Tinggi (m') Panjang (m')

B 01 0.30 0.27 35.24 2.854B 02 0.30 0.27 18.225 1.476B 03 0.30 0.27 18.225 1.476B 04 0.30 0.27 18.225 1.476B 05 0.30 0.27 18.225 1.476B 06 0.30 0.27 18.225 1.476B 07 0.30 0.27 18.225 1.476B 08 0.30 0.27 18.225 1.476B 09 0.30 0.27 18.225 1.476B 10 0.30 0.27 18.225 1.476B 11 0.30 0.27 18.225 1.476B 12 0.30 0.27 18.225 1.476B 13 0.30 0.27 18.225 1.476B 14 0.30 0.27 18.225 1.476B 15 0.30 0.27 18.225 1.476B 16 0.30 0.27 18.225 1.476B 17 0.30 0.27 18.225 1.476B 18 0.30 0.27 18.225 1.476B 19 0.30 0.27 26.225 2.124B 20 0.30 0.27 26.225 2.124B 21 0.30 0.27 26.225 2.124B 22 0.30 0.27 26.225 2.124B 23 0.30 0.27 26.225 2.124B 24 0.30 0.27 26.225 2.124B 25 0.30 0.27 26.225 2.124B 26 0.30 0.27 26.225 2.124B 27 0.30 0.27 26.225 2.124B 28 0.30 0.27 26.225 2.124B 29 0.30 0.27 26.225 2.124

JUMLAH TOTAL 51.317

Diajukan Oleh, Diperiksa Oleh,KONTRAKTOR BURSA PROPERTY

HENDRA SAFRIZA THAMBOSSite Manager Site Manager

(m3)

Page 3: BACK UP DATA BLOK B

PROYEK WARE HOUSE AMPLAS - MEDAN BACK-UP DATA ADDENDUM I

TOTAL LUAS 25.277,70 M2 (57 UNIT) BETON LANTAI KERJA (K100) SLOOF BLOK BTanggal: 25 Januari 2013

Sketsa:

NO. GUDANGPENAMPANG SLOOF VOLUME

Lebar (m') Tinggi (m') Panjang (m')

B 01 0.30 0.05 35.24 0.529B 02 0.30 0.05 18.225 0.273B 03 0.30 0.05 18.225 0.273B 04 0.30 0.05 18.225 0.273B 05 0.30 0.05 18.225 0.273B 06 0.30 0.05 18.225 0.273B 07 0.30 0.05 18.225 0.273B 08 0.30 0.05 18.225 0.273B 09 0.30 0.05 18.225 0.273B 10 0.30 0.05 18.225 0.273B 11 0.30 0.05 18.225 0.273B 12 0.30 0.05 18.225 0.273B 13 0.30 0.05 18.225 0.273B 14 0.30 0.05 18.225 0.273B 15 0.30 0.05 18.225 0.273B 16 0.30 0.05 18.225 0.273B 17 0.30 0.05 18.225 0.273B 18 0.30 0.05 18.225 0.273B 19 0.30 0.05 26.225 0.393B 20 0.30 0.05 26.225 0.393B 21 0.30 0.05 26.225 0.393B 22 0.30 0.05 26.225 0.393B 23 0.30 0.05 26.225 0.393B 24 0.30 0.05 26.225 0.393B 25 0.30 0.05 26.225 0.393B 26 0.30 0.05 26.225 0.393B 27 0.30 0.05 26.225 0.393B 28 0.30 0.05 26.225 0.393B 29 0.30 0.05 26.225 0.393

JUMLAH TOTAL 9.503

Diajukan Oleh, Diperiksa Oleh,KONTRAKTOR BURSA PROPERTY

HENDRA SAFRIZA THAMBOSSite Manager Site Manager

(m3)

Page 4: BACK UP DATA BLOK B

BACK-UP DATA ADDENDUM I

BETON LANTAI KERJA (K100) SLOOF BLOK BTanggal: 25 Januari 2013

KETERANGAN

Diperiksa Oleh,BURSA PROPERTY

THAMBOSSite Manager

Page 5: BACK UP DATA BLOK B

PROYEK WARE HOUSE AMPLAS - MEDAN BACK-UP DATA ADDENDUM I

TOTAL LUAS 25.277,70 M2 (57 UNIT) BEKISTING/ACUAN SLOOF BLOK BTanggal: 25 Januari 2013

Sketsa:

NO. GUDANGPENAMPANG VOLUME (M2) JUMLAH

KETERANGANTinggi (m') Panjang (m') SISI KIRI SISI KANAN VOLUME (M2)

B 01 0.40 35.24 14.10 14.096 28.192B 02 0.40 18.225 7.29 7.290 14.580B 03 0.40 18.225 7.29 7.290 14.580B 04 0.40 18.225 7.29 7.290 14.580B 05 0.40 18.225 7.29 7.290 14.580B 06 0.40 18.225 7.29 7.290 14.580B 07 0.40 18.225 7.29 7.290 14.580B 08 0.40 18.225 7.29 7.290 14.580B 09 0.40 18.225 7.29 7.290 14.580B 10 0.40 18.225 7.29 7.290 14.580B 11 0.40 18.225 7.29 7.290 14.580B 12 0.40 18.225 7.29 7.290 14.580B 13 0.40 18.225 7.29 7.290 14.580B 14 0.40 18.225 7.29 7.290 14.580B 15 0.40 18.225 7.29 7.290 14.580B 16 0.40 18.225 7.29 7.290 14.580B 17 0.40 18.225 7.29 7.290 14.580B 18 0.40 18.225 7.29 7.290 14.580B 19 0.40 26.225 10.49 10.490 20.980B 20 0.40 26.225 10.49 10.490 20.980B 21 0.40 26.225 10.49 10.490 20.980B 22 0.40 26.225 10.49 10.490 20.980B 23 0.40 26.225 10.49 10.490 20.980B 24 0.40 26.225 10.49 10.490 20.980B 25 0.40 26.225 10.49 10.490 20.980B 26 0.40 26.225 10.49 10.490 20.980B 27 0.40 26.225 10.49 10.490 20.980B 28 0.40 26.225 10.49 10.490 20.980B 29 0.40 26.225 10.49 10.490 20.980

JUMLAH TOTAL 506.832

Diajukan Oleh, Diperiksa Oleh,KONTRAKTOR BURSA PROPERTY

HENDRA SAFRIZA THAMBOSSite Manager Site Manager

Page 6: BACK UP DATA BLOK B

PROYEK WARE HOUSE AMPLAS - MEDAN BACK-UP DATA ADDENDUM I

TOTAL LUAS 25.277,70 M2 (57 UNIT) BETON COR MUTU K 225 SLOOF BLOK BTanggal: 25 Januari 2013

Sketsa:

NO. GUDANGPENAMPANG SLOOF VOLUME

Lebar (m') Tinggi (m') Panjang (m')

B 01 0.20 0.40 35.24 2.819B 02 0.20 0.40 18.225 1.458B 03 0.20 0.40 18.225 1.458B 04 0.20 0.40 18.225 1.458B 05 0.20 0.40 18.225 1.458B 06 0.20 0.40 18.225 1.458B 07 0.20 0.40 18.225 1.458B 08 0.20 0.40 18.225 1.458B 09 0.20 0.40 18.225 1.458B 10 0.20 0.40 18.225 1.458B 11 0.20 0.40 18.225 1.458B 12 0.20 0.40 18.225 1.458B 13 0.20 0.40 18.225 1.458B 14 0.20 0.40 18.225 1.458B 15 0.20 0.40 18.225 1.458B 16 0.20 0.40 18.225 1.458B 17 0.20 0.40 18.225 1.458B 18 0.20 0.40 18.225 1.458B 19 0.20 0.40 26.225 2.098B 20 0.20 0.40 26.225 2.098B 21 0.20 0.40 26.225 2.098B 22 0.20 0.40 26.225 2.098B 23 0.20 0.40 26.225 2.098B 24 0.20 0.40 26.225 2.098B 25 0.20 0.40 26.225 2.098B 26 0.20 0.40 26.225 2.098B 27 0.20 0.40 26.225 2.098B 28 0.20 0.40 26.225 2.098B 29 0.20 0.40 26.225 2.098

JUMLAH TOTAL 50.683

Diajukan Oleh, Diperiksa Oleh,KONTRAKTOR BURSA PROPERTY

HENDRA SAFRIZA THAMBOSSite Manager Site Manager

(m3)

Page 7: BACK UP DATA BLOK B

BACK-UP DATA ADDENDUM I

BETON COR MUTU K 225 SLOOF BLOK BTanggal: 25 Januari 2013

KETERANGAN

Diperiksa Oleh,BURSA PROPERTY

THAMBOSSite Manager

Page 8: BACK UP DATA BLOK B

PROYEK WARE HOUSE AMPLAS - MEDAN BACK-UP DATA ADDENDUM I

TOTAL LUAS 25.277,70 M2 (57 UNIT) PEMBESIAN SENGKANG 6 mm SLOOF BLOK BTanggal: 25 Januari 2013

Sketsa:

NO. GUDANGJLH. Panjang Jlh. Batang Volume Berat Besi

KETERANGANPANJANG (m') (m') (Btg.) (m') (Kg)

a b c d= (a+b+c) e f=(d x e)

B 01 0.072 0.68 0.280 1.032 235.00 242.520 53.825B 02 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 03 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 04 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 05 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 06 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 07 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 08 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 09 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 10 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 11 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 12 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 13 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 14 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 15 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 16 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 17 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 18 0.200 0.68 0.280 1.160 122.00 141.520 31.409B 19 0.200 0.68 0.280 1.160 175.00 203.000 45.054B 20 0.200 0.68 0.280 1.160 175.00 203.000 45.054B 21 0.200 0.68 0.280 1.160 175.00 203.000 45.054B 22 0.200 0.68 0.280 1.160 175.00 203.000 45.054B 23 0.200 0.68 0.280 1.160 175.00 203.000 45.054B 24 0.200 0.68 0.280 1.160 175.00 203.000 45.054B 25 0.200 0.68 0.280 1.160 175.00 203.000 45.054B 26 0.200 0.68 0.280 1.160 175.00 203.000 45.054B 27 0.200 0.68 0.280 1.160 175.00 203.000 45.054B 28 0.200 0.68 0.280 1.160 175.00 203.000 45.054B 29 0.200 0.68 0.280 1.160 175.00 203.000 45.054

JUMLAH TOTAL 1083.369

Diajukan Oleh, Diperiksa Oleh,KONTRAKTOR BURSA PROPERTY

HENDRA SAFRIZA THAMBOSSite Manager Site Manager

Besi Sengkang Diameter Ø 6 mm - 15 cm

Page 9: BACK UP DATA BLOK B

PROYEK WARE HOUSE AMPLAS - MED BACK-UP DATA ADDENDUM I

TOTAL LUAS 25.277,70 M2 (57 UNIT) PEMBESIAN D 13 SLOOF BLOK BTanggal: 25 Januari 2013

Sketsa:

NO. GUDANG PANJANG (m')Jlh. Batang Volume Berat Besi

KETERANGAN(Btg.) (m') (Kg)

B 01 35.24 6.00 211.44 220.296B 02 18.225 6.00 109.35 113.930B 03 18.225 6.00 109.35 113.930B 04 18.225 6.00 109.35 113.930B 05 18.225 6.00 109.35 113.930B 06 18.225 6.00 109.35 113.930B 07 18.225 6.00 109.35 113.930B 08 18.225 6.00 109.35 113.930B 09 18.225 6.00 109.35 113.930B 10 18.225 6.00 109.35 113.930B 11 18.225 6.00 109.35 113.930B 12 18.225 6.00 109.35 113.930B 13 18.225 6.00 109.35 113.930B 14 18.225 6.00 109.35 113.930B 15 18.225 6.00 109.35 113.930B 16 18.225 6.00 109.35 113.930B 17 18.225 6.00 109.35 113.930B 18 18.225 6.00 109.35 113.930B 19 26.225 6.00 157.35 163.941B 20 26.225 6.00 157.35 163.941B 21 26.225 6.00 157.35 163.941B 22 26.225 6.00 157.35 163.941B 23 26.225 6.00 157.35 163.941B 24 26.225 6.00 157.35 163.941B 25 26.225 6.00 157.35 163.941B 26 26.225 6.00 157.35 163.941B 27 26.225 6.00 157.35 163.941B 28 26.225 6.00 157.35 163.941B 29 26.225 6.00 157.35 163.941

JUMLAH TOTAL 3960.455