Post on 23-Apr-2023
Samsung Group: Affiliates by Sector
1) Based on consolidated financial statements of each company (2018)
Electronics
Engineering & Heavy Industries
Financial Services
Services
Samsung Venture Investment
Samsung Card
Samsung Fire & Marine Insurance
Samsung Life Insurance
Samsung Asset Management
Samsung Securities
Samsung Biologics
Samsung Economics Research Institute
Cheil Worldwide
Hotel Shilla
Samsung Medical Center
S-1 Corporation
Samsung Bioepis
Samsung Welstory
Samsung C&T (Fashion)
Samsung C&T (Trading & Investment Group)
Samsung C&T (Resort · Construction)
Samsung Heavy Industries
Samsung C&T Engineering &
Construction Group
SamsungEngineering
HydrocarbonPowerIndustrial & Environmental
BuildingCivilHousing
ShipbuildingOffshoreWind Energy
$ 5.0 Bil1)
$ 11.1 Bil1)
$ 8.9 Bil1)
6Affiliates
11Affiliates
6Affiliates
3Affiliates
Samsung Electro-Mechanics
Samsung SDI
Samsung Electronics
Samsung Display
Samsung SDS
Samsung Corning Advanced Glass
2
World’s LargestEthylene Plant
World’s LargestEO/EG Plant
World’s LargestGSP/ESP Plant
Growth Milestone
AccumulatedProject Award
World’s Largest MBRWater Treatment Plant
World’s Largest Mobile Display Cleanroom
Samsung Engineering’s 1st Overseas Power Plant
Foundation 1st EPC Project 1st Overseas EPC Project
1st EPC Projectin MENA5)
$50 BillionMilestone6)
World’s Largest Aluminum Plant
Power
Hydrocarbon
Ind. & Env.
’70 ’87 ’89 ’98 ’12
1) The Top 250 International Contractors, 2013; 2) Top 15 Oil & Gas EPC Contractors by Contracts Under Execution, 2Q 2013; 3) Fertil-2 Ammonia/Urea Project in UAE (2014); 4) 2013 Top EPC Contractors; 5) Middle East & North Africa; 6) Accumulated project award; ※ ‘World’s largest’ means the largest plant in the world at the time of completion
Ranked #12)Ranked #131)
Ranked #24)Fertil-2 Project3)
'70 '80 '90 '00 '10
3
Key Figure
$12.5B
$5.0BRevenue (’18)
Order Backlog (’18)
115
24
Total Number of On-going Projects(As of Mar. 2018)
Total Number of Countries2)
Top 53th
129Mil.
ENR Ranking1)
Incident Free Man-hour3)
1) The Top 250 International Contractors (’18); 2) Based on on-going projects (’18); 3) Shaybah Project in Saudi Arabia
4
Organization & Leadership
Sung An ChoiPresident and CEO
5
Jae-hoon ChoiEVP
MarketingDiv.
Kun LoEVP
New BusinessDiv.
Business Division Corporate FunctionFunctional Division
Chan-sul JungSEVP
Engineering Div.
Plant BusinessDiv.
Jong-jin LeeEVP
Man-su ParkSEVP
Ind. & Env.Business Div.
Choon-ki ChoiVP
ConstructionDiv.
Yun-ki SungEVP
ProcurementDiv.
Kang-joon KimSEVP/CFO
CorporateSupport Div.
Chang-hwan LeeGM
Safety & Environment
Quality Management
Legal & Contract
Project Innovation Center
Risk Management
Corporate Mgmt & Planning
HR Mgmt / Communication
Audit
Finance / Accounting & Tax
Global Resource
1) CoE pursues specific functional excellence(e.g. Engineering, Procurement, etc.) company-wide; 2) LSC supports local projects
6
HeadquarterSeoul, Korea
: Head Quarter
: CoE(Center of Excellence)
: LSC(Local Support Center)
(As of June. 2019)12
Global Offices
5Center of Excellence1)
7Local Support Center2)
Total Workforce
9,304(As of June. 2019)
Project Sites
3,991
5,313HQ & Global Offices
18Nationalities
88%Bachelor’s Degree or higher
32%Certified Engineers
Overseas Projects
7
• Chunan Municipal Waste Incinerator, Korea• Seonam Sludge Incinerator, Korea• Samsung Electronics Industrial Waste Incinerator• GC Oxirane PO Project, Thailand• Long Son Petrochemicals Polyolefins Package#B/C Project, Vietnam• Petronas RAPID Package#6A LLDPE Project, Malaysia• Petronas RAPID Package#11 EO/EG Project, Malaysia• PTTGC Olefins Reconfiguration Project, Thailand• PTT Wangnoi Compressor Station Project, Thailand• TOCGC EO/EG Expansion2 Project, Thailand• Samsung Electro-Mechanics Binhai-2 Project, China• Samsung Electro-Mechanics Tianjin P2 Project, China• Samsung Electro-Mechanics Vietnam Project, Vietnam
• Lotte Chemical MEG-1 Project, USA• YPFB Ammonia/Urea Project, Bolivia
• SOCAR Ammonia/Urea Project, Azerbaijan• Nexen Tire Project, Czech• Samsung SDI K Project, Hungary
• MOW Muharraq Sewage Treatment Plant & Incinerator, Bahrain• ICAD wastewater Treatment Plant, UAE• ADNOC Gas Processing Nitrogen Gas Injection Project, UAE• ADNOC Refining Carbon Black & Delayed Coker (CBDC) Project, UAE• ADNOC Refining Crude Flexibility Project, UAE• ADNOC Refining Waste Heat Recovery Project, UAE• Bapco Modernization Project, Bahrain• DRPIC Duqm Refinery Package#2 Project, Oman• ENI Zubair Oil Field Development GOSP Project, Iraq• Gazprom Badra GSP Project, Iraq• JUPC EO/EG Project, Saudi Arabia• KNPC MAB Package#1 Clean Fuel Project, Kuwait• LUKOIL West Qurna Phase-2 GOSP Project, Iraq• Sonatrach Skikda Refinery Project, Algeria• TIMIMOUN Gas Field Development GOSP Project, Algeria
Business Portfolio
8
Upstream
Refinery
Gas
Petrochemical
Hydrocarbon
ManufacturingFacilities
IT Facilities
Industrial & Environmental
Water Treatment,Environmental
(Waste/Air)
Power
3.1 상품 확장 단계Progress in Environmental BusinessHistory of overseas expansion based on ample experiences in domestic Incineration, municipal sewerage and wastewater treatment in Korea and Samsung manufacturers
10
Wastewater
1970
Water Supply
1980 1990 2000 2010
Cheil Industry Samsung Electronics
Air PollutionPrevention
Samsung Electronics Samsung Electronics (Display Division)
Solid WasteTreatment
Jeonju Paper, Korea
Jeonnam West, KoreaSamsung Electronics
Seonam City, Korea
Current
Cheil Industry
Municipal Waste
Textile Semi-conductor
Textile
Songdo Mansu STP
1st BOT domesticMuharraq, Bahrain
1st BOT Overseas
Waste To EnergyCheonan, Korea
Textile Textile
Skikda Refinery 1st Refinery
Electrical Appliance
Drinking water
Ultra PureWater
Samsung Chemical Samsung Electronics (Display Division)
Chemical
Environmental Business Value Chain
11
We can provide Total Project Management across the Entire Value Chain
Flexibility in role within diverse project structures
EPC Contractand/or
O&M Contract
Client
Client-owned Projects
Client
Developer-financed Projects
SPC(Project Company)
EPC Contract or O&M Contract
Concession Agreement
EquityLenders
Debt
Project Development EPC Operation &
MaintenanceR&D
Engineering Procurement Construction Asset Management Field R&D TrainingF/S Project
Finance
Partner for your water & waste business with optimization technologies for resources ProjectsBusiness Projects
Municipal &
IndustrialWastewater
WasteDisposal
WaterSupply
De-nitrification & De-phosphorous : 17 plants Activated Sludge Process : 50 plants
Clarifier • 60 plants
Continuous Sand Filtration • 15 plants
Reverse Osmosis • 20 plants
Ion Exchange• 40 plants
Stocker Type : 7 plants Fluidized bed : 6 plants Recycling Plant : 3 plants
Specialized in Water & Waste Facilities
12
Environmental Engineering CapacityEngineering capability brought up through combination of deep knowledge on subject areas and ample experiences in the industry
Total Water/Waste Engineers
Experienced in IT Wastewater
Under 1 yr20 engineers
7-10 yrs9 engineers
1-3 yrs49 engineers
Over 10 yrs5 engineers
3-7 yrs51 engineers
Under 3 yrs12 engineers Over 20 yrs
25 engineers
15-20 yrs22 engineers
10-15 yrs22 engineers
7-10yrs28 engineers
5-7 yrs11 engineers
147(91%)
53%Key men
160
61%Lead
Engineer
3-5 yrs53 engineers
Field of Expertise
Engineering
Ph.D.
Prof. Engineer
R&D
- Professional Engineer Area
- Ph.D. Area
• Environmental Engineering
• Chemical Engineering
• Civil/Architectural Engineering
• Environmental
• Civil : Structural / Geotechnical
• Architectural
• Building Electrical
Ph.D.
Prof. Engineer
Experience Depth of Knowledge
13
Experiences in PPP Project Model
Subsidy56%
Equity11%
Debt32% Equity
30%Debt70% Subsidy
64%Equity
7%
Debt29%
On-going PPP Projects : Asset management for 519,000 ㎥/d of total capacity
Equity20%
Debt80%
Dong-bu STP Songdo & MansuSTP Yong-in STP Muharraq STP
Cheonan MSWIncinerator
Concession Agreement
DateDec. 2001 Dec. 2001 Jan. 2005 Feb. 2011 Apr. 2013
ConstructionPeriod
2002~2006 2002~2005 2005~2009 2011~20151999~2001(Ph.1)2013~2015(Ph.2)
O&M Period 2006~2021 (15yrs) 2005~2024 (20yrs) 2009~2029 (20yrs) 2015~2038 (24yrs) 2001~2030 (30yrs)
Capacity 135,000 ㎥/d 100,000 ㎥/d 256,000 ㎥/d 100,000㎥/d 570t/d(1+2stage)
Total Investment (app.) 130 mil. USD (app.) 120 mii. USD (app.) 760 mii. USD (app.) 550mil. USD (app.) 80mil. USD (Ph.2)
Source of Funding
14
Equity15%
Debt85%
Project Experience – Incineration
Client: Cheonan Municipality
Key Achievements– Total Capacity : 570 ton/day
(Municipal Waste and others)· Plant #1 : 320 ton/day· Plant #2 : 250 ton/day
– Process : Stoker type· Heat recovery : Waste heat boiler(For steam production)
· Flue gas treatment system: SNCR - SDR - Dual Bag filter
– Period· Plant #1 : (EPC) 1999.May ~ 2001.Oct
(O&M) 2001.Nov ~ Present· Plant #2 : (EPC) 2013.Apr ~ 2015.Sep
(O&M) 2015.Oct ~ Present
Air PollutionPrevention
IndustrialWaste Water
Treatment
MunicipalSewage
Treatment
Ultra-PureWater
Production
Incinerator/Waste-to-
Energy
WaterSupply
15
Plant #1Plant #2
Managementoffice
Project Experience – Incineration
Client: Seoul Municipality
Key Achievements– Total Capacity : 150 ton/day
– Process : Fluidized bed incinerator
· Heat recovery : Waste heat boiler
· Flue gas treatment system
: SNCR - SDR - Bag filter - Wet scrubber
– Scope : EPC , O&M
– Period
(EPC) 2000. Jan ~ 2002. Oct
(O&M) 2002. Nov ~ 2005.Oct
16
Air PollutionPrevention
IndustrialWaste Water
Treatment
MunicipalSewage
Treatment
Ultra-PureWater
Production
Incinerator/Waste-to-
Energy
WaterSupply
Project Experience – Incineration
Client: Samsung Electronics Co., Ltd.
Key Achievements– Total Capacity : 60 ton/day
– Process : Rotary Kiln + Stoker
· Heat recovery : Waste heat boiler
· Flue gas treatment system
: 1st Bag filter – 2nd Bag filter – SCR
※Acid gas absorption : Lime
De-dioxin : Activated Carbon
De-Nox : Amonia
– Scope : EPC
– Period : 1993. Jun ~ 1994. Sep
17
Air PollutionPrevention
IndustrialWaste Water
Treatment
MunicipalSewage
Treatment
Ultra-PureWater
Production
Incinerator/Waste-to-
Energy
WaterSupply
Project Experience – Incineration
18
Client: Ministry of Works (Bahrain)
Description– Total Capacity : 120ton/d
(Sewage 100,000 m3/Day)
– Process: FBC type
– Scope : Investment, EPC, O&M
– Period: 2011.2 ~2014.1
(~2040, 26.5 years O&M)
Air PollutionPrevention
IndustrialWaste Water
Treatment
MunicipalSewage
Treatment
Ultra-PureWater
Production
Incinerator/Waste-to-
Energy
WaterSupply
Client: Samsung Display
Description– Total Capacity : 280,000 m3/Day
– Treats wastewater from Samsung Display production process
– Largest WWTP capacity in the world
– Process
Water: UF (GE-Zenon)
Wastewater: Samsung Media
MBR (GE-Zenon)
Incinerator/Waste-to-Energy
Air PollutionPrevention
MunicipalSewage
Treatment
IndustrialWaste Water
Treatment
Ultra-PureWater
Production
Project Experience – Environmental
19
WaterSupply
Client: Higher Corporation for SpecialisedEconomic Zones (HCSEZ)
Description– Total Capacity : 80,000 m3/Day
⋅ Stage 1 : 40,000 m3/Day
⋅ Stage 2 : 40,000 m3/Day
– Treats wastewater from IndustrialCity of Abu Dhabi
– The DBO project with 20 months ofconstruction and 60 months of O&M
– Process
⋅ Conventional Activated SludgeAir PollutionPrevention
MunicipalSewage
Treatment
IndustrialWaste Water
Treatment
Ultra-PureWater
Production
Project Experience – Environmental
Abu Dhabi
ArabianGulf
ICAD-II
ICAD I
ICAD II
ICAD III
20
Incinerator/Waste-to-Energy
WaterSupply
Client: Ministry of Works (Bahrain)
Description– Total Capacity : 100,000 m3/Day
– First independent sewage treatment facility in Bahrain
– SECL's first and major investment project outside of Korea
– Samsung Equity Investment:US$ 28.7 million
– O&M Period: 26.5 years
– Process: Sequence Batch Reactor
Project Experience – Environmental
Air PollutionPrevention
IndustrialWaste Water
Treatment
MunicipalSewage
Treatment
Ultra-PureWater
Production
EPC Contract
Pump Station(24ea)STM : 15.9KmWWCN : 5.0Km
Outfall
Intermediate P/S
21
Incinerator/Waste-to-Energy
WaterSupply
Client: Yong-In Municipality
Description– The largest environmental PPP in
Korea (TIC: US$ 760 million)
– 15 STPs with aggregate capacity of256,000m3/d (850,000 Pop. Equiv.)
– Underground STP facility with ground level community amenity
– O&M Period: 20 years
– IWA Project Innovation Awards Winner 2008
Project Experience – Environmental
Air PollutionPrevention
IndustrialWaste Water
Treatment
MunicipalSewage
Treatment
Ultra-PureWater
Production
IWA Project Innovation Awards2008 East Asia & Pacific
WINNERDesign Projects
22
Incinerator/Waste-to-Energy
WaterSupply
Client: Incheon Municipality
Description– Total Capacity : 100,000 m3/day
(300,000 population equivalent)
– 2 Sewage Plants
Songdo STP : 30,000 m3/day
Mansu STP : 70,000 m3/day
– SECL’s first PPP project withTIC of US$ 120 million
– O&M Period: 20 years
– Process: Activated Sludge Process
Project Experience – Environmental
Air PollutionPrevention
IndustrialWaste Water
Treatment
MunicipalSewage
Treatment
Ultra-PureWater
Production
23
Incinerator/Waste-to-Energy
WaterSupply
Project Experience – Environmental
Client: Samsung Electronics
Description– Total Capacity : 43,400 m3/Day
– Provides ultra-pure water (UPW) used in semi-conductor manufacturing and cleansing processes
– The UPW production facility is often installed inside the semi-conductor or display production FAB or in a utility buildings
– The facility is made in modules which are assembled on site
ROPre-Filter
AC Tower
MDG
CEDI Unit
Samsung Electronics K1 UPW Facility in Utility Building 1
Air PollutionPrevention
MunicipalSewage
Treatment
Ultra-PureWater
Production
24
Incinerator/Waste-to-Energy
WaterSupply
IndustrialWaste Water
Treatment
Project Experience – Environmental
Client: Samsung Display
Description– Total Capacity : 310,000 m3/Day
– Treats water from nearby river to be used for the production of display
– Part of the treated water is then further processed to ultra-pure water
– Treatment Process:Screen + Coagulation + UF
– Checmical Feeding Process:Activated Carbon Process
Air PollutionPrevention
MunicipalSewage
Treatment
Water Supply
Ultra-PureWater
Production
25
Incinerator/Waste-to-Energy
IndustrialWaste Water
Treatment
Project Experience – Hydrocarbon
26
ClientAbu Dhabi Oil Refining Company
Description- Off-site & Utilities Systems
• Steam Generation
• Sea Water Intake System
• Desalination (MSF)
: 700 m3/hr x 2 units
(33,600 m3/day)
• Cooling Water
• Flare
• WWTP Air PollutionPrevention
MunicipalSewage
Treatment
Water Supply
Ultra-PureWater
Production
Incinerator/Waste-to-Energy
IndustrialWaste Water
Treatment
Project Experience – Environmental
Client: Samsung Electronics
Description– Total Capacity : 107,700 CMM
– Filters noxious gases emitted during the production of semi-conductors or display materials from the FAB
– Installed on the roof of FAB
– Uses large-scale equipment and ducts for volume processing of air
MunicipalSewage
Treatment
Ultra-PureWater
Production
Air PollutionPrevention
27
IndustrialWaste Water
Treatment
Incinerator/Waste-to-Energy
WaterSupply
Project Experience – Industrial & Environmental
28
ManufacturingFacilities
– Won “Korea construction environmental management Award(2016,2017)”
– Environmental facilities, substation and utility supply facility in the world’s largest semiconductor production plant
IT Facilities
Power
Client: Samsung Electronics
Scope: Utility Supply Facility154kV SubstationWaste Water Treatment(50,000m3/d)Ultrapure Water(31,000m3/d)Air Pollution Prevention(200,679m3/min)
Key AchievementsWater
Treatment,Environmental
Project Experience – Industrial
29
IT Facilities
Power
WaterTreatment,
Environmental
Client: Nexen Tire
Key Achievements– Nexen’s First Abroad Manufacturing
Plant
Product: PCR Tire 16,000 EA/Day
Site Area: 654,000m2Total Floor Area: 136,000m2
ManufacturingFacilities
Project Experience – Power
30
Client: ARAMCO(Saudi Arabian Oil Company)
Scope: EPC LSTK
Awarded in ‘11.01 / Period: ‘11.02 ~ ‘14.03 (38 months)
System : 750MW CCPP (GTG: MHI 501F x 4, HRSG:Macchi x 4, STG: Siemens x 2, HP Boiler: Macchi x 3)
Gas
Coal
Oil
1) Combined Cycle Power Plant
Client: KST Electric Power Company
Capacity: 433 MW
Key Achievements
– Samsung Engineering’s first overseas power plant
– Completed with 3.4 millionincident- free man-hours
31
Project Experience – Power
Gas
Coal
Oil
Hydrocarbon
Upstream
Refinery
Gas
Petrochemical
Power
Gas
Coal
Oil
31
Client: Saudi Arabian Oil Company(ARAMCO)
Capacity• Gas Treat Facilities/NGL Recovery
Trains 2,400 MMSCFD• Oil – 750,000 BPD• Gas – 4,000 MMSCFD• Power: 660MW
Major Challenges
– First multi-package complex
– Geographically remote area
– Five separate job sites
Project Experience – Hydrocarbon & Power
Project Experience – Hydrocarbon
33
Upstream
Refinery
Gas
EO/EG
Fertilizer
Others
Petr
oche
mic
al
Ethylene/Propylene
Client: Groupement TIMIMOUN(Sonatrach, Total, Cepsa)
Capacity• Condensate 423.5 BPD• Gas 177.5 MMSCFD
Major Challenges
– Extreme wild site condition (Sahara Desert)- Heatwave & Sandstorm - Long transportation distance (1600km from Port)
– 3 Client Joint Venture Organization
Project Experience – Hydrocarbon
34
Upstream
Refinery
Gas
EO/EG
Fertilizer
Others
Petr
oche
mic
al
Ethylene/Propylene
Client: Abu Dhabi Oil Refining Company(TAKREER)
Capacity• Carbon Black Unit 40,600 MTPA• Delayed Coker Unit 29,500 BPSD
Major Challenges– Multi-unit process
- 12 Process & 23 U&O Units- 8 Licensors
– Mega project management- Equipment 2,445 Pieces- Piping 2,800,000 Diameter Inch- Steel structure 48,000 Ton
Project Experience – Hydrocarbon
35
Upstream
Refinery
Gas
EO/EG
Fertilizer
Others
Petr
oche
mic
al
Ethylene/Propylene
ClientAbu Dhabi Oil Refining Company
Description
- Off-site & Utilities Systems
• Steam Generation
• Sea Water Intake System
• Desalination (33,600 m3/day, MSF)
• Cooling Water
• BFW & Demon. Water
• WWTP (910 m3/day)
Project Experience – Hydrocarbon
36
Upstream
Refinery
Gas
EO/EG
Fertilizer
Others
Petr
oche
mic
al
Ethylene/Propylene
Client: Lotte Chemical Louisiana LLC.
Capacity• MEG 700,000 MTPA
Key Achievements– 1st petrochemical complex in USA of
Korean petrochemical company
– Successful co-work with reputable USA construction partner such as modularization of major facilities erected by mega ringer crane(3,200 ton)
Traditional EPC
Conceptual &Feasibility Study FEED Detail
Engineering Procurement Construction/Commissioning O&M
Now 00’sUpstream
Refinery
Gas
Petro-chemical
Hyd
roca
rbon
Power
Industrial1)
Environmental2)
Indu
stria
l &En
viro
nmen
tal
90’s
70’s 80’s
Extended EPC
1) Includes IT Facilities and Manufacturing Facilities; 2) Includes Water Treatment and Environmental(Waste, Air)
37
Path to ‘Total Engineering Solution Provider’
38
Appendix I - Project Experience List – WTP/WWTP/UPW/AIR
No. Client Project Name Type Capacity COD Remarks1 Samsung Electronics Pyeongtaek P Process Water Treatment Plant WTP 250,000 m³/d 2020 EPC LSTK
2 Samsung Display Tangjeong T.C Industrial Water Treatment Phase-7 Project WTP 60,000 m³/d 2017 EPC LSTK
3 Samsung Display Tangjeong T.C Industrial Water Treatment Phase 1~6 Project WTP 250,000 m³/d 2012 EPC LSTK
4 K - Water Jeonnam West Area Water Treatment Plant WTP 30,000 m³/d 2007 EPC LSTK
5 K - Water Daecheong Water Treatment Plant WTP 346,000 m³/d 2002 EPC LSTK
6 K - Water Onsan WTP Sludge Treatment Project WTP 341,000 m³/d 2001 EPC LSTK
7 Samsung Electronics Tangjeong T.C Wastewater Treatment Plant WWTP 280,000 m³/d 2018 EPC LSTK
8 Samsung Electronics Pyeongtaek Wastewater Treatment Plant WWTP 110,000 m³/d 2019 EPC LSTK
9 Asan city Asan Underground Sewage Treatment & Reuse WWTPReuse
45,000 m³/d27,000 m³/d 2017 EPC LSTK
10 Ministry of Works (MOW) MOW Muharraq Sewage Treatment BOT Project WWTP 100,000 m³/d 2014 BOT
11 Yongin City Yongin Sewage Treatment BTO Project WWTP 167,530 m³/d 2010 BTO
12 Busan City Busan Dongbu Sewage Treatment BTO Project WWTP 135,000 m³/d 2006 BTO
13 Incheon City Incheon Songdo Sewage Treatment Plant WWTP 70,000 m³/d 2006 EPC LSTK
14 Samsung Display A3 Ultrapure Water System Project UPW(RO) 130,000 m³/d 2018 EPC LSTK
15 Samsung Electronics SMD A2 Ultrapure Water System Project UPW(RO) 115,000 m³/d 2011 EPC LSTK
16 Samsung Display Asan Tangjeong T8 Ultrapure Water System Phase 1~2 Project UPW(RO) 136,000 m³/d 2010 EPC LSTK
17 Sudokwon Landfill Management Corp. SLC Sudokwon Landfill Project Landfill 86,700,000 m³ 2015 PC
18 Samsung Electronics Pyeongtaek P2 Air Pollution Prevention Facility Project Air Pollution Prevention 315,088 m³/min 2019 EPC LSTK
19 Samsung Electronics Xian X2 Air Pollution Prevention Facility Project Air Pollution Prevention 114,347 m³/min 2019 EPC LSTK
20 Samsung Electronics Pyeongtaek P1 Air Pollution Prevention Facility Project Air Pollution Prevention 200,679 m³/min 2019 EPC LSTK
39
Appendix II - Project Experience List – IncinerationNo. Client Location Type of Waste Incinerator Type Capacity (ton/d) Completion
1 Jeonju Paper Junjoo Paper Sludge C 200 1984. 072 Samsung Electronics Suwon Wastewater Sludge C 50 1986. 123 Junjoo Paper Junjoo Paper Sludge+Bark F 260 1988. 034 Samsung Total Chemical Daesan Wastewater Sludge C 66 1991. 025 JunjooPaper Junjoo Paper Sludge+Bark C 480 1991. 116 Shingang Paper Jinjoo Paper Sludge C 70 1993. 087 Samsung Electro-Mechanics Jochiwon Synthetic resins waste P 15 1993. 12
8 Samsung Electronics Ontyang Synthetic resins waste P 15 1993. 12
9 Samsung Electronics Suwon Synthetic resins waste S 84 1994. 0710 Samsung Techwin Sachun Synthetic resins waste P 15 1994. 0811 Newlake Osan Paper Sludge+Synthetic resins waste S 95 1995. 0812 Jeil Gumi Synthetic resins waste S 85 1995. 1013 Onyang Pulp Chungwon Paper Sludge+Synthetic resins waste F 380 1995. 1214 Samsung Electronics Asan Waste Home appliance RC 52 199715 Chunan City Chunan Municipal waste S 200 2001. 0916 Sungnam City Sungnam Sewage Sludge (100x2) F 200 2001. 1017 Gayang STP Seoul Sewage Sludge F 150 2002. 0918 Nanji STP Seoul Sewage Sludge F 150 2002. 09
19 Electronic Industrial Environmental authority Yongin Waste Home appliance
(16,000t/d) RC 53 2003. 07
20 Gosung Gosung Municipal waste S 25 200221 Asan City Asan Industrial waste, Wastewater Sludge F 30 200622 Cheonan City Cheonan Municipal waste S 570 ~201523 Bahrain MOW Muharraq Sewage Sludge F 120 2014
* Incinerator Type - S : Stoker type , C : Cyclone type , F : FBC type , P : Pyrolysis type , R : Rotary Kiln type
40
Appendix III - Project Experience List – PowerNo. Project Name Description Location Remarks
1 InterGen SLP CCPP 210MW (1xGTG+1xHRSG+1xSTG) Mexico SLP EPC LSTK
2 Wasit Cogen & Steam Generation 750MW / CCPP (4xGTG + 4xHRSG + 2xSTG +3xHP BLR) Wasit Area, KSA EPC LSTK
3 Shaybah NGL Power Generation 660MW / SC (11xGTG) Shaybah, KSA EPC LSTK
4 Norte-ll IPP Project 433MW / CCPP(2xGTG + 2xHRSG + 1xSTG)
Chihuahua, Mexico EPC LSTK
5 Incheon Non-Hyun Co-gen Power Plant
85MWth1) / NG (51Gcal/h for district heating)(1xSTG + 1xBLR) Incheon, Korea EPC LSTK
6 Ansan Co-gen Plant 183MWth1) / LSWR 102Gcal/h for district heating) (1xSTG + 1xBLR) Ansan, Korea EPC LSTK
7 Sihwa Co-gen Power Plant 50MWth1) / B-C Oil (Steam 110t/h) (1xSTG + 1xBLR) Sihwa, Korea EPC LSTK
8 PTT ESP Project 50MW / SC (2xGTG) Thailand EPC LSTK
9 PTT GSP-6 Project 50MW / SC (2xGTG) Thailand EPC LSTK
10 APPC PDH/ PP Project 46MW / SC (2xGTG) K.S.A EPC LSTK
11 PEMEX Salamanca Refinery Project 64MW / SC (2xGTG) Mexico EPC LSTK
12 SPC PDH/PP Project 46MW / SC (2xGTG) K.S.A EPC LSTK
13 PTT GSP-5 Project 51MW / SC (GTG / 1X25MW, 2X13MW) Thailand EPC LSTK
14 Songchla GSP-1 Project 62MW / SC (1xGTG) Thailand EPC LSTK
15 KHALDA WDGD Project 80MW / SC (8xGTG) Egypt EPC LSTK
16 TPI Co-gen Project 35MW / Co-gen (Steam 110t/h) (1xSTG + 1xBLR) Thailand EPC LSTK
17 Indonesia Bali GTG 84MW / SC (1xGTG) Indonesia EPC LSTK