Bahrain Muharraq Sewage Treatment Plant BOO

Who we are

Samsung Group: Affiliates by Sector

1) Based on consolidated financial statements of each company (2018)

Electronics

Engineering & Heavy Industries

Financial Services

Services

Samsung Venture Investment

Samsung Card

Samsung Fire & Marine Insurance

Samsung Life Insurance

Samsung Asset Management

Samsung Securities

Samsung Biologics

Samsung Economics Research Institute

Cheil Worldwide

Hotel Shilla

Samsung Medical Center

S-1 Corporation

Samsung Bioepis

Samsung Welstory

Samsung C&T (Fashion)

Samsung C&T (Trading & Investment Group)

Samsung C&T (Resort · Construction)

Samsung Heavy Industries

Samsung C&T Engineering &

Construction Group

SamsungEngineering

HydrocarbonPowerIndustrial & Environmental

BuildingCivilHousing

ShipbuildingOffshoreWind Energy

$ 5.0 Bil1)

$ 11.1 Bil1)

$ 8.9 Bil1)

6Affiliates

11Affiliates

6Affiliates

3Affiliates

Samsung Electro-Mechanics

Samsung SDI

Samsung Electronics

Samsung Display

Samsung SDS

Samsung Corning Advanced Glass

2

World’s LargestEthylene Plant

World’s LargestEO/EG Plant

World’s LargestGSP/ESP Plant

Growth Milestone

AccumulatedProject Award

World’s Largest MBRWater Treatment Plant

World’s Largest Mobile Display Cleanroom

Samsung Engineering’s 1st Overseas Power Plant

Foundation 1st EPC Project 1st Overseas EPC Project

1st EPC Projectin MENA5)

$50 BillionMilestone6)

World’s Largest Aluminum Plant

Power

Hydrocarbon

Ind. & Env.

’70 ’87 ’89 ’98 ’12

1) The Top 250 International Contractors, 2013; 2) Top 15 Oil & Gas EPC Contractors by Contracts Under Execution, 2Q 2013; 3) Fertil-2 Ammonia/Urea Project in UAE (2014); 4) 2013 Top EPC Contractors; 5) Middle East & North Africa; 6) Accumulated project award; ※ ‘World’s largest’ means the largest plant in the world at the time of completion

Ranked #12)Ranked #131)

Ranked #24)Fertil-2 Project3)

'70 '80 '90 '00 '10

3

Key Figure

$12.5B

$5.0BRevenue (’18)

Order Backlog (’18)

115

24

Total Number of On-going Projects(As of Mar. 2018)

Total Number of Countries2)

Top 53th

129Mil.

ENR Ranking1)

Incident Free Man-hour3)

1) The Top 250 International Contractors (’18); 2) Based on on-going projects (’18); 3) Shaybah Project in Saudi Arabia

4

Organization & Leadership

Sung An ChoiPresident and CEO

5

Jae-hoon ChoiEVP

MarketingDiv.

Kun LoEVP

New BusinessDiv.

Business Division Corporate FunctionFunctional Division

Chan-sul JungSEVP

Engineering Div.

Plant BusinessDiv.

Jong-jin LeeEVP

Man-su ParkSEVP

Ind. & Env.Business Div.

Choon-ki ChoiVP

ConstructionDiv.

Yun-ki SungEVP

ProcurementDiv.

Kang-joon KimSEVP/CFO

CorporateSupport Div.

Chang-hwan LeeGM

Safety & Environment

Quality Management

Legal & Contract

Project Innovation Center

Risk Management

Corporate Mgmt & Planning

HR Mgmt / Communication

Audit

Finance / Accounting & Tax

Global Resource

1) CoE pursues specific functional excellence(e.g. Engineering, Procurement, etc.) company-wide; 2) LSC supports local projects

6

HeadquarterSeoul, Korea

: Head Quarter

: CoE(Center of Excellence)

: LSC(Local Support Center)

(As of June. 2019)12

Global Offices

5Center of Excellence1)

7Local Support Center2)

Total Workforce

9,304(As of June. 2019)

Project Sites

3,991

5,313HQ & Global Offices

18Nationalities

88%Bachelor’s Degree or higher

32%Certified Engineers

Overseas Projects

7

• Chunan Municipal Waste Incinerator, Korea• Seonam Sludge Incinerator, Korea• Samsung Electronics Industrial Waste Incinerator• GC Oxirane PO Project, Thailand• Long Son Petrochemicals Polyolefins Package#B/C Project, Vietnam• Petronas RAPID Package#6A LLDPE Project, Malaysia• Petronas RAPID Package#11 EO/EG Project, Malaysia• PTTGC Olefins Reconfiguration Project, Thailand• PTT Wangnoi Compressor Station Project, Thailand• TOCGC EO/EG Expansion2 Project, Thailand• Samsung Electro-Mechanics Binhai-2 Project, China• Samsung Electro-Mechanics Tianjin P2 Project, China• Samsung Electro-Mechanics Vietnam Project, Vietnam

• Lotte Chemical MEG-1 Project, USA• YPFB Ammonia/Urea Project, Bolivia

• SOCAR Ammonia/Urea Project, Azerbaijan• Nexen Tire Project, Czech• Samsung SDI K Project, Hungary

• MOW Muharraq Sewage Treatment Plant & Incinerator, Bahrain• ICAD wastewater Treatment Plant, UAE• ADNOC Gas Processing Nitrogen Gas Injection Project, UAE• ADNOC Refining Carbon Black & Delayed Coker (CBDC) Project, UAE• ADNOC Refining Crude Flexibility Project, UAE• ADNOC Refining Waste Heat Recovery Project, UAE• Bapco Modernization Project, Bahrain• DRPIC Duqm Refinery Package#2 Project, Oman• ENI Zubair Oil Field Development GOSP Project, Iraq• Gazprom Badra GSP Project, Iraq• JUPC EO/EG Project, Saudi Arabia• KNPC MAB Package#1 Clean Fuel Project, Kuwait• LUKOIL West Qurna Phase-2 GOSP Project, Iraq• Sonatrach Skikda Refinery Project, Algeria• TIMIMOUN Gas Field Development GOSP Project, Algeria

Business Portfolio

8

Upstream

Refinery

Gas

Petrochemical

Hydrocarbon

ManufacturingFacilities

IT Facilities

Industrial & Environmental

Water Treatment,Environmental

(Waste/Air)

Power

HCSEZ ICAD Industrial Wastewater Treatment DBO Project

Environmental Business Overview

3.1 상품 확장 단계Progress in Environmental BusinessHistory of overseas expansion based on ample experiences in domestic Incineration, municipal sewerage and wastewater treatment in Korea and Samsung manufacturers

10

Wastewater

1970

Water Supply

1980 1990 2000 2010

Cheil Industry Samsung Electronics

Air PollutionPrevention

Samsung Electronics Samsung Electronics (Display Division)

Solid WasteTreatment

Jeonju Paper, Korea

Jeonnam West, KoreaSamsung Electronics

Seonam City, Korea

Current

Cheil Industry

Municipal Waste

Textile Semi-conductor

Textile

Songdo Mansu STP

1st BOT domesticMuharraq, Bahrain

1st BOT Overseas

Waste To EnergyCheonan, Korea

Textile Textile

Skikda Refinery 1st Refinery

Electrical Appliance

Drinking water

Ultra PureWater

Samsung Chemical Samsung Electronics (Display Division)

Chemical

Environmental Business Value Chain

11

We can provide Total Project Management across the Entire Value Chain

Flexibility in role within diverse project structures

EPC Contractand/or

O&M Contract

Client

Client-owned Projects

Client

Developer-financed Projects

SPC(Project Company)

EPC Contract or O&M Contract

Concession Agreement

EquityLenders

Debt

Project Development EPC Operation &

MaintenanceR&D

Engineering Procurement Construction Asset Management Field R&D TrainingF/S Project

Finance

Partner for your water & waste business with optimization technologies for resources ProjectsBusiness Projects

Municipal &

IndustrialWastewater

WasteDisposal

WaterSupply

De-nitrification & De-phosphorous : 17 plants Activated Sludge Process : 50 plants

Clarifier • 60 plants

Continuous Sand Filtration • 15 plants

Reverse Osmosis • 20 plants

Ion Exchange• 40 plants

Stocker Type : 7 plants Fluidized bed : 6 plants Recycling Plant : 3 plants

Specialized in Water & Waste Facilities

12

Environmental Engineering CapacityEngineering capability brought up through combination of deep knowledge on subject areas and ample experiences in the industry

Total Water/Waste Engineers

Experienced in IT Wastewater

Under 1 yr20 engineers

7-10 yrs9 engineers

1-3 yrs49 engineers

Over 10 yrs5 engineers

3-7 yrs51 engineers

Under 3 yrs12 engineers Over 20 yrs

25 engineers

15-20 yrs22 engineers

10-15 yrs22 engineers

7-10yrs28 engineers

5-7 yrs11 engineers

147(91%)

53%Key men

160

61%Lead

Engineer

3-5 yrs53 engineers

Field of Expertise

Engineering

Ph.D.

Prof. Engineer

R&D

- Professional Engineer Area

- Ph.D. Area

• Environmental Engineering

• Chemical Engineering

• Civil/Architectural Engineering

• Environmental

• Civil : Structural / Geotechnical

• Architectural

• Building Electrical

Ph.D.

Prof. Engineer

Experience Depth of Knowledge

13

Experiences in PPP Project Model

Subsidy56%

Equity11%

Debt32% Equity

30%Debt70% Subsidy

64%Equity

7%

Debt29%

On-going PPP Projects : Asset management for 519,000 ㎥/d of total capacity

Equity20%

Debt80%

Dong-bu STP Songdo & MansuSTP Yong-in STP Muharraq STP

Cheonan MSWIncinerator

Concession Agreement

DateDec. 2001 Dec. 2001 Jan. 2005 Feb. 2011 Apr. 2013

ConstructionPeriod

2002~2006 2002~2005 2005~2009 2011~20151999~2001(Ph.1)2013~2015(Ph.2)

O&M Period 2006~2021 (15yrs) 2005~2024 (20yrs) 2009~2029 (20yrs) 2015~2038 (24yrs) 2001~2030 (30yrs)

Capacity 135,000 ㎥/d 100,000 ㎥/d 256,000 ㎥/d 100,000㎥/d 570t/d(1+2stage)

Total Investment (app.) 130 mil. USD (app.) 120 mii. USD (app.) 760 mii. USD (app.) 550mil. USD (app.) 80mil. USD (Ph.2)

Source of Funding

14

Equity15%

Debt85%

Project Experience – Incineration

Client: Cheonan Municipality

Key Achievements– Total Capacity : 570 ton/day

(Municipal Waste and others)· Plant #1 : 320 ton/day· Plant #2 : 250 ton/day

– Process : Stoker type· Heat recovery : Waste heat boiler(For steam production)

· Flue gas treatment system: SNCR - SDR - Dual Bag filter

– Period· Plant #1 : (EPC) 1999.May ~ 2001.Oct

(O&M) 2001.Nov ~ Present· Plant #2 : (EPC) 2013.Apr ~ 2015.Sep

(O&M) 2015.Oct ~ Present

Air PollutionPrevention

IndustrialWaste Water

Treatment

MunicipalSewage

Treatment

Ultra-PureWater

Production

Incinerator/Waste-to-

Energy

WaterSupply

15

Plant #1Plant #2

Managementoffice

Project Experience – Incineration

Client: Seoul Municipality

Key Achievements– Total Capacity : 150 ton/day

– Process : Fluidized bed incinerator

· Heat recovery : Waste heat boiler

· Flue gas treatment system

: SNCR - SDR - Bag filter - Wet scrubber

– Scope : EPC , O&M

– Period

(EPC) 2000. Jan ~ 2002. Oct

(O&M) 2002. Nov ~ 2005.Oct

16

Air PollutionPrevention

IndustrialWaste Water

Treatment

MunicipalSewage

Treatment

Ultra-PureWater

Production

Incinerator/Waste-to-

Energy

WaterSupply

Project Experience – Incineration

Client: Samsung Electronics Co., Ltd.

Key Achievements– Total Capacity : 60 ton/day

– Process : Rotary Kiln + Stoker

· Heat recovery : Waste heat boiler

· Flue gas treatment system

: 1st Bag filter – 2nd Bag filter – SCR

※Acid gas absorption : Lime

De-dioxin : Activated Carbon

De-Nox : Amonia

– Scope : EPC

– Period : 1993. Jun ~ 1994. Sep

17

Air PollutionPrevention

IndustrialWaste Water

Treatment

MunicipalSewage

Treatment

Ultra-PureWater

Production

Incinerator/Waste-to-

Energy

WaterSupply

Project Experience – Incineration

18

Client: Ministry of Works (Bahrain)

Description– Total Capacity : 120ton/d

(Sewage 100,000 m3/Day)

– Process: FBC type

– Scope : Investment, EPC, O&M

– Period: 2011.2 ~2014.1

(~2040, 26.5 years O&M)

Air PollutionPrevention

IndustrialWaste Water

Treatment

MunicipalSewage

Treatment

Ultra-PureWater

Production

Incinerator/Waste-to-

Energy

WaterSupply

Client: Samsung Display

Description– Total Capacity : 280,000 m3/Day

– Treats wastewater from Samsung Display production process

– Largest WWTP capacity in the world

– Process

Water: UF (GE-Zenon)

Wastewater: Samsung Media

MBR (GE-Zenon)

Incinerator/Waste-to-Energy

Air PollutionPrevention

MunicipalSewage

Treatment

IndustrialWaste Water

Treatment

Ultra-PureWater

Production

Project Experience – Environmental

19

WaterSupply

Client: Higher Corporation for SpecialisedEconomic Zones (HCSEZ)

Description– Total Capacity : 80,000 m3/Day

⋅ Stage 1 : 40,000 m3/Day

⋅ Stage 2 : 40,000 m3/Day

– Treats wastewater from IndustrialCity of Abu Dhabi

– The DBO project with 20 months ofconstruction and 60 months of O&M

– Process

⋅ Conventional Activated SludgeAir PollutionPrevention

MunicipalSewage

Treatment

IndustrialWaste Water

Treatment

Ultra-PureWater

Production

Project Experience – Environmental

Abu Dhabi

ArabianGulf

ICAD-II

ICAD I

ICAD II

ICAD III

20

Incinerator/Waste-to-Energy

WaterSupply

Client: Ministry of Works (Bahrain)

Description– Total Capacity : 100,000 m3/Day

– First independent sewage treatment facility in Bahrain

– SECL's first and major investment project outside of Korea

– Samsung Equity Investment:US$ 28.7 million

– O&M Period: 26.5 years

– Process: Sequence Batch Reactor

Project Experience – Environmental

Air PollutionPrevention

IndustrialWaste Water

Treatment

MunicipalSewage

Treatment

Ultra-PureWater

Production

EPC Contract

Pump Station(24ea)STM : 15.9KmWWCN : 5.0Km

Outfall

Intermediate P/S

21

Incinerator/Waste-to-Energy

WaterSupply

Client: Yong-In Municipality

Description– The largest environmental PPP in

Korea (TIC: US$ 760 million)

– 15 STPs with aggregate capacity of256,000m3/d (850,000 Pop. Equiv.)

– Underground STP facility with ground level community amenity

– O&M Period: 20 years

– IWA Project Innovation Awards Winner 2008

Project Experience – Environmental

Air PollutionPrevention

IndustrialWaste Water

Treatment

MunicipalSewage

Treatment

Ultra-PureWater

Production

IWA Project Innovation Awards2008 East Asia & Pacific

WINNERDesign Projects

22

Incinerator/Waste-to-Energy

WaterSupply

Client: Incheon Municipality

Description– Total Capacity : 100,000 m3/day

(300,000 population equivalent)

– 2 Sewage Plants

Songdo STP : 30,000 m3/day

Mansu STP : 70,000 m3/day

– SECL’s first PPP project withTIC of US$ 120 million

– O&M Period: 20 years

– Process: Activated Sludge Process

Project Experience – Environmental

Air PollutionPrevention

IndustrialWaste Water

Treatment

MunicipalSewage

Treatment

Ultra-PureWater

Production

23

Incinerator/Waste-to-Energy

WaterSupply

Project Experience – Environmental

Client: Samsung Electronics

Description– Total Capacity : 43,400 m3/Day

– Provides ultra-pure water (UPW) used in semi-conductor manufacturing and cleansing processes

– The UPW production facility is often installed inside the semi-conductor or display production FAB or in a utility buildings

– The facility is made in modules which are assembled on site

ROPre-Filter

AC Tower

MDG

CEDI Unit

Samsung Electronics K1 UPW Facility in Utility Building 1

Air PollutionPrevention

MunicipalSewage

Treatment

Ultra-PureWater

Production

24

Incinerator/Waste-to-Energy

WaterSupply

IndustrialWaste Water

Treatment

Project Experience – Environmental

Client: Samsung Display

Description– Total Capacity : 310,000 m3/Day

– Treats water from nearby river to be used for the production of display

– Part of the treated water is then further processed to ultra-pure water

– Treatment Process:Screen + Coagulation + UF

– Checmical Feeding Process:Activated Carbon Process

Air PollutionPrevention

MunicipalSewage

Treatment

Water Supply

Ultra-PureWater

Production

25

Incinerator/Waste-to-Energy

IndustrialWaste Water

Treatment

Project Experience – Hydrocarbon

26

ClientAbu Dhabi Oil Refining Company

Description- Off-site & Utilities Systems

• Steam Generation

• Sea Water Intake System

• Desalination (MSF)

: 700 m3/hr x 2 units

(33,600 m3/day)

• Cooling Water

• Flare

• WWTP Air PollutionPrevention

MunicipalSewage

Treatment

Water Supply

Ultra-PureWater

Production

Incinerator/Waste-to-Energy

IndustrialWaste Water

Treatment

Project Experience – Environmental

Client: Samsung Electronics

Description– Total Capacity : 107,700 CMM

– Filters noxious gases emitted during the production of semi-conductors or display materials from the FAB

– Installed on the roof of FAB

– Uses large-scale equipment and ducts for volume processing of air

MunicipalSewage

Treatment

Ultra-PureWater

Production

Air PollutionPrevention

27

IndustrialWaste Water

Treatment

Incinerator/Waste-to-Energy

WaterSupply

Project Experience – Industrial & Environmental

28

ManufacturingFacilities

– Won “Korea construction environmental management Award(2016,2017)”

– Environmental facilities, substation and utility supply facility in the world’s largest semiconductor production plant

IT Facilities

Power

Client: Samsung Electronics

Scope: Utility Supply Facility154kV SubstationWaste Water Treatment(50,000m3/d)Ultrapure Water(31,000m3/d)Air Pollution Prevention(200,679m3/min)

Key AchievementsWater

Treatment,Environmental

Project Experience – Industrial

29

IT Facilities

Power

WaterTreatment,

Environmental

Client: Nexen Tire

Key Achievements– Nexen’s First Abroad Manufacturing

Plant

Product: PCR Tire 16,000 EA/Day

Site Area: 654,000m2Total Floor Area: 136,000m2

ManufacturingFacilities

Project Experience – Power

30

Client: ARAMCO(Saudi Arabian Oil Company)

Scope: EPC LSTK

Awarded in ‘11.01 / Period: ‘11.02 ~ ‘14.03 (38 months)

System : 750MW CCPP (GTG: MHI 501F x 4, HRSG:Macchi x 4, STG: Siemens x 2, HP Boiler: Macchi x 3)

Gas

Coal

Oil

1) Combined Cycle Power Plant

Client: KST Electric Power Company

Capacity: 433 MW

Key Achievements

– Samsung Engineering’s first overseas power plant

– Completed with 3.4 millionincident- free man-hours

31

Project Experience – Power

Gas

Coal

Oil

Hydrocarbon

Upstream

Refinery

Gas

Petrochemical

Power

Gas

Coal

Oil

31

Client: Saudi Arabian Oil Company(ARAMCO)

Capacity• Gas Treat Facilities/NGL Recovery

Trains 2,400 MMSCFD• Oil – 750,000 BPD• Gas – 4,000 MMSCFD• Power: 660MW

Major Challenges

– First multi-package complex

– Geographically remote area

– Five separate job sites

Project Experience – Hydrocarbon & Power

Project Experience – Hydrocarbon

33

Upstream

Refinery

Gas

EO/EG

Fertilizer

Others

Petr

oche

mic

al

Ethylene/Propylene

Client: Groupement TIMIMOUN(Sonatrach, Total, Cepsa)

Capacity• Condensate 423.5 BPD• Gas 177.5 MMSCFD

Major Challenges

– Extreme wild site condition (Sahara Desert)- Heatwave & Sandstorm - Long transportation distance (1600km from Port)

– 3 Client Joint Venture Organization

Project Experience – Hydrocarbon

34

Upstream

Refinery

Gas

EO/EG

Fertilizer

Others

Petr

oche

mic

al

Ethylene/Propylene

Client: Abu Dhabi Oil Refining Company(TAKREER)

Capacity• Carbon Black Unit 40,600 MTPA• Delayed Coker Unit 29,500 BPSD

Major Challenges– Multi-unit process

- 12 Process & 23 U&O Units- 8 Licensors

– Mega project management- Equipment 2,445 Pieces- Piping 2,800,000 Diameter Inch- Steel structure 48,000 Ton

Project Experience – Hydrocarbon

35

Upstream

Refinery

Gas

EO/EG

Fertilizer

Others

Petr

oche

mic

al

Ethylene/Propylene

ClientAbu Dhabi Oil Refining Company

Description

- Off-site & Utilities Systems

• Steam Generation

• Sea Water Intake System

• Desalination (33,600 m3/day, MSF)

• Cooling Water

• BFW & Demon. Water

• WWTP (910 m3/day)

Project Experience – Hydrocarbon

36

Upstream

Refinery

Gas

EO/EG

Fertilizer

Others

Petr

oche

mic

al

Ethylene/Propylene

Client: Lotte Chemical Louisiana LLC.

Capacity• MEG 700,000 MTPA

Key Achievements– 1st petrochemical complex in USA of

Korean petrochemical company

– Successful co-work with reputable USA construction partner such as modularization of major facilities erected by mega ringer crane(3,200 ton)

Traditional EPC

Conceptual &Feasibility Study FEED Detail

Engineering Procurement Construction/Commissioning O&M

Now 00’sUpstream

Refinery

Gas

Petro-chemical

Hyd

roca

rbon

Power

Industrial1)

Environmental2)

Indu

stria

l &En

viro

nmen

tal

90’s

70’s 80’s

Extended EPC

1) Includes IT Facilities and Manufacturing Facilities; 2) Includes Water Treatment and Environmental(Waste, Air)

37

Path to ‘Total Engineering Solution Provider’

38

Appendix I - Project Experience List – WTP/WWTP/UPW/AIR

No. Client Project Name Type Capacity COD Remarks1 Samsung Electronics Pyeongtaek P Process Water Treatment Plant WTP 250,000 m³/d 2020 EPC LSTK

2 Samsung Display Tangjeong T.C Industrial Water Treatment Phase-7 Project WTP 60,000 m³/d 2017 EPC LSTK

3 Samsung Display Tangjeong T.C Industrial Water Treatment Phase 1~6 Project WTP 250,000 m³/d 2012 EPC LSTK

4 K - Water Jeonnam West Area Water Treatment Plant WTP 30,000 m³/d 2007 EPC LSTK

5 K - Water Daecheong Water Treatment Plant WTP 346,000 m³/d 2002 EPC LSTK

6 K - Water Onsan WTP Sludge Treatment Project WTP 341,000 m³/d 2001 EPC LSTK

7 Samsung Electronics Tangjeong T.C Wastewater Treatment Plant WWTP 280,000 m³/d 2018 EPC LSTK

8 Samsung Electronics Pyeongtaek Wastewater Treatment Plant WWTP 110,000 m³/d 2019 EPC LSTK

9 Asan city Asan Underground Sewage Treatment & Reuse WWTPReuse

45,000 m³/d27,000 m³/d 2017 EPC LSTK

10 Ministry of Works (MOW) MOW Muharraq Sewage Treatment BOT Project WWTP 100,000 m³/d 2014 BOT

11 Yongin City Yongin Sewage Treatment BTO Project WWTP 167,530 m³/d 2010 BTO

12 Busan City Busan Dongbu Sewage Treatment BTO Project WWTP 135,000 m³/d 2006 BTO

13 Incheon City Incheon Songdo Sewage Treatment Plant WWTP 70,000 m³/d 2006 EPC LSTK

14 Samsung Display A3 Ultrapure Water System Project UPW(RO) 130,000 m³/d 2018 EPC LSTK

15 Samsung Electronics SMD A2 Ultrapure Water System Project UPW(RO) 115,000 m³/d 2011 EPC LSTK

16 Samsung Display Asan Tangjeong T8 Ultrapure Water System Phase 1~2 Project UPW(RO) 136,000 m³/d 2010 EPC LSTK

17 Sudokwon Landfill Management Corp. SLC Sudokwon Landfill Project Landfill 86,700,000 m³ 2015 PC

18 Samsung Electronics Pyeongtaek P2 Air Pollution Prevention Facility Project Air Pollution Prevention 315,088 m³/min 2019 EPC LSTK

19 Samsung Electronics Xian X2 Air Pollution Prevention Facility Project Air Pollution Prevention 114,347 m³/min 2019 EPC LSTK

20 Samsung Electronics Pyeongtaek P1 Air Pollution Prevention Facility Project Air Pollution Prevention 200,679 m³/min 2019 EPC LSTK

39

Appendix II - Project Experience List – IncinerationNo. Client Location Type of Waste Incinerator Type Capacity (ton/d) Completion

1 Jeonju Paper Junjoo Paper Sludge C 200 1984. 072 Samsung Electronics Suwon Wastewater Sludge C 50 1986. 123 Junjoo Paper Junjoo Paper Sludge+Bark F 260 1988. 034 Samsung Total Chemical Daesan Wastewater Sludge C 66 1991. 025 JunjooPaper Junjoo Paper Sludge+Bark C 480 1991. 116 Shingang Paper Jinjoo Paper Sludge C 70 1993. 087 Samsung Electro-Mechanics Jochiwon Synthetic resins waste P 15 1993. 12

8 Samsung Electronics Ontyang Synthetic resins waste P 15 1993. 12

9 Samsung Electronics Suwon Synthetic resins waste S 84 1994. 0710 Samsung Techwin Sachun Synthetic resins waste P 15 1994. 0811 Newlake Osan Paper Sludge+Synthetic resins waste S 95 1995. 0812 Jeil Gumi Synthetic resins waste S 85 1995. 1013 Onyang Pulp Chungwon Paper Sludge+Synthetic resins waste F 380 1995. 1214 Samsung Electronics Asan Waste Home appliance RC 52 199715 Chunan City Chunan Municipal waste S 200 2001. 0916 Sungnam City Sungnam Sewage Sludge (100x2) F 200 2001. 1017 Gayang STP Seoul Sewage Sludge F 150 2002. 0918 Nanji STP Seoul Sewage Sludge F 150 2002. 09

19 Electronic Industrial Environmental authority Yongin Waste Home appliance

(16,000t/d) RC 53 2003. 07

20 Gosung Gosung Municipal waste S 25 200221 Asan City Asan Industrial waste, Wastewater Sludge F 30 200622 Cheonan City Cheonan Municipal waste S 570 ~201523 Bahrain MOW Muharraq Sewage Sludge F 120 2014

* Incinerator Type - S : Stoker type , C : Cyclone type , F : FBC type , P : Pyrolysis type , R : Rotary Kiln type

40

Appendix III - Project Experience List – PowerNo. Project Name Description Location Remarks

1 InterGen SLP CCPP 210MW (1xGTG+1xHRSG+1xSTG) Mexico SLP EPC LSTK

2 Wasit Cogen & Steam Generation 750MW / CCPP (4xGTG + 4xHRSG + 2xSTG +3xHP BLR) Wasit Area, KSA EPC LSTK

3 Shaybah NGL Power Generation 660MW / SC (11xGTG) Shaybah, KSA EPC LSTK

4 Norte-ll IPP Project 433MW / CCPP(2xGTG + 2xHRSG + 1xSTG)

Chihuahua, Mexico EPC LSTK

5 Incheon Non-Hyun Co-gen Power Plant

85MWth1) / NG (51Gcal/h for district heating)(1xSTG + 1xBLR) Incheon, Korea EPC LSTK

6 Ansan Co-gen Plant 183MWth1) / LSWR 102Gcal/h for district heating) (1xSTG + 1xBLR) Ansan, Korea EPC LSTK

7 Sihwa Co-gen Power Plant 50MWth1) / B-C Oil (Steam 110t/h) (1xSTG + 1xBLR) Sihwa, Korea EPC LSTK

8 PTT ESP Project 50MW / SC (2xGTG) Thailand EPC LSTK

9 PTT GSP-6 Project 50MW / SC (2xGTG) Thailand EPC LSTK

10 APPC PDH/ PP Project 46MW / SC (2xGTG) K.S.A EPC LSTK

11 PEMEX Salamanca Refinery Project 64MW / SC (2xGTG) Mexico EPC LSTK

12 SPC PDH/PP Project 46MW / SC (2xGTG) K.S.A EPC LSTK

13 PTT GSP-5 Project 51MW / SC (GTG / 1X25MW, 2X13MW) Thailand EPC LSTK

14 Songchla GSP-1 Project 62MW / SC (1xGTG) Thailand EPC LSTK

15 KHALDA WDGD Project 80MW / SC (8xGTG) Egypt EPC LSTK

16 TPI Co-gen Project 35MW / Co-gen (Steam 110t/h) (1xSTG + 1xBLR) Thailand EPC LSTK

17 Indonesia Bali GTG 84MW / SC (1xGTG) Indonesia EPC LSTK