BANGLADESH
National Agricultural Technology Project (NATP): Phase 1
[IDA Cr. No. 4386 BD and IFAD Cr. No. 739 BD]
PROCUREMENT PLAN
FY - 2007 to 2013
Department of Agricultural Extension (DAE)
Ministry of Agriculture (MOA)
July 2009
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Contract Value
(Threshold)
Goods >=US$300,000 ICB All contracts of value US$100,000 or more.
<US$300,000 NCB First contract by each implementing agency regardless of value and all contracts of
value US$100,000 or more
As per PPR RFQ/Shopping Post-review
<US$ 2,000 DC Prior-review (on a case by case basis, as per paragraph 3.6 of the Procurement
Guidelines)
>= US$2,000,000 ICB All contracts.
<US$2,000,000 NCB First contract by each implementing agency regardless of value in NCB and thereafter,
all contracts valued US$500,000 or more
As per PPR RTM Post-review
As per PPR RFQ Post-review
<US$200,000 FBS All contracts of US$100,000 or more
<US$100,000 LCS/CQ Post review
>=US$50,000 IC All contracts
<US$50,000 IC Post review
Selective contracts <=
US$100,000 and meeting the
requirements of paras 3.9 to 3.12
of the Consultant Guidelines
SSS Prior agreement and prior review.
QCBS
Procurement Threshold Table
Expenditure
Category
Procurement MethodContracts Subject to Prior
a/ Review
a/ Prior review threshold would be reviewed after 18 months and adjusted, if necessary. In addition, applicable guidelines may also be re-designated, based
upon the review.
All contracts.
Works
Services >=US$200,000
Total estimated
value of contract
(in 000' US$)
Total number of
packages
Number of contract
awarded up to June
30, 2009
Total value of awarded
contracts up to June
30,2009(in 000'US$)
1 Goods 1836.35 24 18 846
2 Works 1907.79 21 1 24
3 Services 666.04 15 8 191
4410.18
Procurement Plan Summary
Procurement Plan for Goods Contract
Sl. No. Contract package
Number1
Contract Description Unit Qty/ Nos. Estimated Price in
US$ ‘000 (Actual
Contract Price in
Contract Currency)
Procedure/
Method
PPR/BG Prior Review2
(Yes / No)
Planned Date of Bid
Opening/ Proposals
Submission (Actual Date
of Bid Opening/ Proposals
Submission)
Planned Date of
Contract Signing
(Actual Date of
Contract Signing)
Planned Date of
Delivery/ Completion
(Actual Date of
Delivery/
Completion)
Name of Supplier/
Contractor /
Consultant
Progress of
Procurement as
of ________
(date)
Remarks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1
PG/DAE/01/07-08Computer and Accessories, and MIS
equipments for PIU-DAE and P&E of DAEno.
56 88.276
[BDT 54,22,463]
NCB PPR Yes (17-May-08) (16-Jul-08) (22- Aug-08) Flora Ltd Completed First NCB contract
for prior review.
2PG/DAE/02/07-08
Office Equipments - Fax Machine, Scanner,
Intercom set, Photocopier etc.no.
8 11.909
[BDT 8,28,150]
NCB PPR No (11-May-08) (16-Jul-08) (22- Aug-08) BD Machine Completed
3
PG/DAE/03/07-08
Office Furniture for PIU- DAE and Upazila
(Table, Chair, Computer Table, Compute Chair,
Steel Alimra, File Cabinet etc.
no.
112 24.422
[BDT 11,30,955]
NCB PPR No (11-May-08) (17-Jul-08) (22- Aug-08) DesignPlus Completed
4
PG/DAE/04/07-08Electrical Equipments/Electronic Goods - Split
type A/C, Camera, Refrigerator, TV, IPS etc. Y1no.
16 14.134
[BDT 7,85,683]
NCB PPR No (11-May-08) (17-Jul-08) (20- Aug-08) OTOBI Ltd Completed
(Lot-1)) Computer and Accessories (80
Upazila) - (Desktop computer, Printer, UPS,
GPRS etc.) and
no. 80141.98
BDT [68,83,900]
NCB BG Yes (15-Dec-08) (17-Feb-09) 20-May-09 Thakral Information
System Private Ltd.
Completed
Lot-2 Equipments and software for MIS, LAN
conection and Web Server etc. Y2LS LS
15.00
BDT [7,34,600]
NCB BG Yes (15-Dec-08) (10-Feb-09) 16-Apr-09 Connect BD. Ltd. Completed
6
PG/DAE/06/08-09 Jeep (4WD) (For PIU-DAE) no. 1
62.792
BDT[63,09,000]
NCB PPR No (04-Nov-08) (13-Nov-08) 30-Jan-08 Navana Motors Ltd Completed
7
PG/DAE/07/08-09 Motor Cycle (95 for Upazila no. 95
155.416
[BDT [78,84050]
NCB BG Yes (25-Nov-08) (07-Apr-09) 7-Jun-09 Motodrive Ltd. Completed
Lot-1 Equipments for pesticide laboratory. no. 79115.06
BDT 53,94,708
NCB BG Yes (05-Feb-09) (07-Apr-09) 30-Jun-09 M.N. Mallick &
Company
Completed
Lot-2 Office Equipments for Pesticides Lab. no. 910.40
[BDT 9,81,113]
NCB PPR No (05-Feb-09) (24-Mar-09) 24-May-09 Xebec IT Services Completed
Lot-3 Computer and Accessories for Pesticides
lab.Set 2
10.90
[BDT 3,76,800]
NCB PPR No (05-Feb-09) (31-Mar-09) 24-May-09 Liza Enterprise Completed
9
PG/DAE/09/08-09Office Furniture for DAE (80 sets Computer
table & Chair, Table & Chair for experts etc.) Y1no. 92
15.698
BDT 9,83,480
NCB PPR No (22-Jan-09) (18-May-09) 17-Jun-09 Otobi Ltd. Completed
10
PG/DAE/10/08-09Furniture for FIAC - Chair , Table, Almira, File
cabinet etc. Y2Set 570
894.791
[BDT 2,08,73,400]
NCB BG Yes (25-Feb-09) (31-Mar-09) 11-May-09 Icon Architects Ltd. Completed
Lot-1:Miscellaneous Equipments and materials
for PIU and Field (Digital camera, video
camera,Scanner-1, Photocopier etc.) Y2
no. LS 9.74
NCB PPR No (15-Dec-08) (15-Jan-09) - Dropped
Lot-2 Information dessemination materials
(Booklet on project, letter head pad, Writing
Pad, Technology dissemination materials etc.)no. LS 7.14
NCB PPR No (15-Dec-08) (15-Jan-09) - Dropped
Lot-3: Vertical Blind
sq.feet 11902.14
[BDT110250]
NCB PPR No (11-Feb-09) (31-Mar-09) 17-May-09 Liza Enterprise Completed
Lot-4: Bags for Workshops
no. 4204.80
BDT280980]
NCB PPR No (11-Feb-09) (31-Mar-09) 17-May-09 Liza Enterprise Completed
12PG/DAE/12/09-10
Laboratory apparatus, glassware, chemicals
and consumablesno. 2 28.70 NCB
PPR No 15-Aug-09 15-Sep-09 15-Dec-09
(i) Computer and Accessories (for 25 Upazilas)
(Desktop computer, Printer, UPS, GPRS etc.)
and (ii) Equipments and software MIS for PE
no. 25 39.24 NCB
PPR
No
15-Aug-09 15-Sep-09 15-Feb-10
and (ii) Equipments and software MIS for PE no. LS 7.17 NCB No15-Aug-09 15-Sep-09 15-Feb-10
PG/DAE/13/09-10
PG/DAE/11/08-09
PG/DAE/08/08-09
PG/DAE/05/08-09
13
5
8
11
Sl. No. Contract package
Number1
Contract Description Unit Qty/ Nos. Estimated Price in
US$ ‘000 (Actual
Contract Price in
Contract Currency)
Procedure/
Method
PPR/BG Prior Review2
(Yes / No)
Planned Date of Bid
Opening/ Proposals
Submission (Actual Date
of Bid Opening/ Proposals
Submission)
Planned Date of
Contract Signing
(Actual Date of
Contract Signing)
Planned Date of
Delivery/ Completion
(Actual Date of
Delivery/
Completion)
Name of Supplier/
Contractor /
Consultant
Progress of
Procurement as
of ________
(date)
Remarks
PG/DAE/14.1/09-10
Miscellaneous Equipments and materials.
(Digital camera for field, Field equipment
etc.)(As per need.) Y3
no. LS 14.00 NCB
PPR
No
15-Aug-09 15-Sep-09 15-Dec-09
PG/DAE/14.2/09-10 Scanner-1, Photocopier-1 ,laminating machine
etc.no. 3 2.30 RFQ
PPRNo
15-Aug-09 15-Sep-09 15-Dec-09
PG/DAE/14.3/09-10 Bags for Workshops
no. 450 5.30 NCBPPR
No15-Aug-09 15-Sep-09 15-Dec-09
15PG/DAE/15/09-10 Motor Cycle (for 25 Upazila & PIU) Y3 no. 29 45.48 NCB
PPRNo
15-Aug-09 15-Sep-09 30-Mar-10
16PG/DAE/16/09-10
Furniture for FIAC - Chair, Table, Almira, File
Cabinet etc. Y3no. 50 47.00 NCB
PPRYes
15-Nov-09 30-Dec-09 28-Mar-10
Lot-1: Equipments ans software for MIS (P&E)
(Need based) Y4no. LS 6.28 NCB
PPR No 15-Jul-10 15-Aug-10 15-Oct-10
Lot-2: Laboratory apparatus, glassware,
chemicals and consumablesno. LS 27.14 NCB
PPR No 15-Jul-10 15-Aug-10 15-Oct-10
18PG/DAE/18/10-11
Miscellaneous Equipments and Materials (Need
based) Y4no. LS 6.28 NCB
PPR No 15-Jul-10 15-Aug-10 15-Oct-10
19PG/DAE/19/12-13
Equipments ans software for MIS (P&E) (Need
based) Y5no. LS 9.41 NCB
PPR No 15-Jul-12 15-Aug-12 15-Oct-12
**20PG/DAE/20/07-08 Office gate and Signboard no. LS 2.87
BDT[1,99,445]RFQ
PPR No 29-May-08 1-Jun-08 12-Jun-08
Allaksa Enterprise
Completed
**21PG/DAE/21/07-08 Furniture for Director's Room no. LS 2.87
BDT [1,95,800] RFQ
PPR No 29-May-08 23-Jun-08 7-Jul-08
Xebec Ltd
Completed
**22PG/DAE/22/07-08 Procurement of cash Book and Stock Book no. LS
2.87
BDT [1,15,200] RFQ
PPR No 20-May-08 23-Jun-08 7-Jul-08
Likhon International
Completed
23PG/DAE/23/08-09 Procurement of Spiral Binding Note Book no. LS 2.87
BDT [1.99,500]RFQ
PPR No 20-Aug-08 14-Oct-08 27-Oct-08Collegiate Binding
and Printing
Completed
24PG/DAE/24/08-09 Procurement of Project Brochure no. LS
2.87
BDT [1,97,000]RFQ
PPR No 4-Jan-09 14-Jan-09 25-Jan-09 Collegiate Binding
and Printing
Completed
Note: For the packages **20,**21 and **22 the total estimateed cost was less than BDTk. 500,000.00 but due to inflation, the market price increase of that Goods. As a result, the total paid amount exceed BDTk. 500,000.00
14
PG/DAE/17/10-11
17
Procurement Plan for Service Contracts
Sl.
No.
Contract package
Number1
Contract Description Unit Qty/ Nos. Estimated Price in
US$ ‘000
(Actual Contract
Price in Contract
Currency)
Procedure/
Method
PPR/BG Prior
Review2
(Yes / No)
Planned Date of Bid
Opening/ Proposals
Submission (Actual
Date of Bid
Opening/ Proposals
Submission)
Planned Date of
Contract Signing
(Actual Date of
Contract
Signing)
Planned Date
of Delivery/
Completion
(Actual Date of
Delivery/
Completion)
Name of
Supplier/
Contractor/
Consultant
Progress of
Procurement
as of
________
(date)
Remarks
1 2 3 4 5 6 7 8 9 10 11 12
1 PS/DAE/01/07-08 Procurement expert mm 12 15.84
[BDT 11,04,000]
SIC PPR No 21-Apr-08 25-Sep-08 24-Aug-09 A. Rashid Dhali Completed
2 PS/DAE/02/07-08 Training and Communication
Expert
mm 60 (Initailly for
24 months)
79.20
[BDT 22,08,000]
SIC PPR No 21-Apr-08 12-Nov-08 11-Nov-10 Dr. Md. Mustak
Ahmed
Completed
3 PS/DAE/03/07-08 Monitoring and Evaluation
Expert
mm 60 (Initailly for
24 months)
79.20
[BDT 22,08,000]
SIC PPR No 21-Apr-08 1-Sep-08 31-Aug-10 Md. M. M.
Rahman
Completed
4 PS/DAE/04/08-09 Manager (Financial
Management)
mm 60 (Initailly for
24 months)
79.20
[BDT 22,08,000]
SIC PPR No 21-Apr-08 8-Oct-08 7-Oct-10 Md. Z. Islam Completed
5 PS/DAE/05/08-09 Data Analyst and Computer
Operator- Position 1
mm 60 (Initailly for
24 months)
17.219
[ BDT 4,80,000]
SIC PPR No 21-Apr-08 2-Nov-08 1-Nov-10 Md. Muslem
Uddin
Completed
6 PS/DAE/06/08-09 Data Analyst and Computer
Operator- Position 1
mm 60 (Initailly for
24 months)
17.219
[BDT 4,80,000]
SIC PPR No 21-Apr-08 9-Nov-08 8-Nov-10 Syeda Nazneen
Jahan
Completed
7 PS/DAE/07/07-09 Accountant mm 60 (Initailly for
24 months)
21.52
[BDT 6,00000]
SIC PPR No 21-Apr-08 27-Nov-08 26-Nov-10 Arifur Rahman Completed
8 PS/DAE/08.1~8.5/0
7-12
National Consultants -
Monitoring & Evaluation and
need based.- five packages.
persons 5 65.00 SIC PPR NO Need Based Need Based Need Based
9 PS/DAE/09/07-12 National Consultants - Overview
and analysis of project impact
(Short-term)
persons 1 12.00 SIC PPR No Need Based Need Based Need Based
10 PS/DAE/10/07-12 Consultant for National Policy
updating (1 person)
persons 1 21.52 SIC PPR NO Need Based Need Based Need Based
11 PS/DAE/11/07-12 Dev. Agril. Extn. Polocy persons 1 21.52 SIC PPR NO Need Based Need Based Need Based
12 PS/DAE/12/07-12 International Consultants for
policy framework (NAP and
other issues.)
persons 1 52.30 SIC BG Yes Need Based Need Based Need Based
13 PS/DAE/13/07-12 International Consultants for
policy framework (NAEP and
other issues.)
persons 1 52.30 SIC BG Yes Need Based Need Based Need Based
14 PS/DAE/14/08-09 Hiring consulting firm for works
works contract for PIU-DAE
component (survey, bidding
docpreparation for renovation
and repairing.
Nos 1.00 60 .00
BDT.
(3997118.28)
QCBS PPR No 3-Nov-08 11-Feb-09 22-May-09 Shaheedullah &
Associates
Completed
15 PS/DAE/15/07-12 Hiring consulting firm for
supervision of works contract for
PIU-DAE component.
LS LS 72.00 LCS PPR No 15-Aug-09 15-Oct-09 30-Apr-10
There shall be
other sub-
packages
under this
package for
hiring of
consultant as
per need.
Initially for 24
months. TOR
Reviewed by
WB.
Page 6 PP - Service
Sl.
No.
Contract package
Number1
Contract Description Unit Qty/
Nos.
Estimated Price
in US$ ‘000
(Actual Contract
Price in Contract
Currency)
Procedure/
Method
PPR/B
G
Prior
Review2
(Yes / No)
Planned Date of
Bid Opening/
Proposals
Submission
(Actual Date of
Bid Opening/
Proposals
Submission)
Planned Date
of Contract
Signing
(Actual Date
of Contract
Signing)
Planned Date of
Delivery/
Completion
(Actual Date of
Delivery/
Completion)
Name of
Supplier/
Contractor /
Consultant
Progress of
Procureme
nt as of
________
(date)
Remarks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 PW/DAE/01/08-09 Pesticide Testing Laborator and PIU-
DAE
LS 5 40.292
BDT [1681323]
NCB PPR No 2-Mar-08 25-Mar-09 25-Jun-09 Al-Aksa
Enterprise
Completed Prior review of
The Bank for first
NCB Contract.
(a)Renovation and Repair of District
training center(Dhaka),two Upazilla
training Center(Savar, Dhamrai
under Dhaka district) and(Gazipur
sadar, kaliakoir, kapasia, Sreepur
under Gazipur district) and twenty
nine FIAC [attached annex-1(a)]
no. 36 83.64 NCB PPR Yes 1-Sep-09 1-Oct-09 1-Mar-10 Prior review of
The Bank for first
NCB Contract.
(b) Renovation and Repair of eight
Upazilla training Center
(Mymensingh sadar, Trisal, Fulbaria,
Fulpur, Gofagoan, Haluaghat,
Gouripur, Muktagacha under
Mymensingh ditrict and twenty four
FIAC [attached annex-1(b)]
no. 32 76.54 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
c) Renovation and Repair of seven
Upazilla training Center(Kishorganj
sadar, Bhoirab, Kuliarchar, Kotiadi
under Kishoreganj districrt ) and (
Nalitabari, Sreebordi, Nokla under
Sherpur district) and twenty four
FIAC [attached annex-1(c)]
no. 31 68.13 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
Sub total= no. 99 228.31 NCB PPR Yes 1-Sep-09 1-Oct-09 1-Mar-10 Prior review of
The Bank for first
NCB Contract.
(a)Renovation and Repair of District
training center (Narsinghdi), four
Upazilla training Center (Belabo,
Monohordi, Shibpur, Polash and
sixteen FIAC attached annex 2-(a)
(b) Renovation and Repair of eight
no. 21 51.00 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
(b) Renovation and Repair of eight
Upazilla training Center (Sylhet
sadar, Golapganj,Biani Bazer,
Jointapur, Fenchuganj, Dakhhin
Surma and twenty eight
FIACattached annex-2(b).
no. 34 63.49 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
Procurement Plan for Works Contract
3
PW/DAE/02.1/09-102
PW/DAE/02.2/09-10
c) Renovation and Repair of seven
Upazilla training Center
(Moulavibazer sadar, Kulaura,
Sreemongal, komalganj, Rajnagar
under Moulavibazer district) and
twenty nine FIAC attached annex-
2(c).
no. 34 67.13 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
Sub total= no. 89 181.62 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
(a)Renovation and Repair of 2
Upazilla training Center (Rangpur
Sadar, Pirgachha under Rangpur
district) and twenty one FIAC
attached annex -3(a) .
no. 23 30.17 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
(b) Renovation and Repair of one
Upazilla training Center((Pirganj
under Rangpur district) and twenty
four FIAC attachec annex-3(b)
no. 25 29.71 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
(c) Renovation and Repair of six
Upazilla training Center(Dinajpur
sadar, parbartipur, khansam,
kaharole, Cirribandar, Birganj) and
twenty seven FIAC attached annex -
3(c)
no. 33 86.43 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
Sub total= no. 81 146.31 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
(a)Renovation and Repair of District
training center (Comilla), four
Upazilla training Center
(Daudkandi,Chandin,Laaksam,
Chowddagram and twenty five FIAC
attached annex 4-(a)
(b) Renovation and Repair of eight
no. 30 79.01 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
(b)Renovation and Repair of District
training center (Brahmanbaria), four
Upazilla training Center ( Sadar,
Akhaura, Koshba,Nobinagar and
twenty one FIAC attached annex 4-
(b)
no. 26 65.45 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
(c)Renovation and Repair of District
training center (chadpur), two
Upazilla training Center (Hajiganj,
Matlab(North) and twenty five FIAC
attached annex 4-(c)
no. 16 38.44 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
Sub total= no. 72 182.90 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
6 PW/DAE/04.1/09-10 (a)Renovation and Repair of District
training center (Tangail), eight
Upazilla training Center (Sadar,
Modupur, Bhuapur, Delduar, Kalihati,
Shakhipur, Ghatail, Gopalpur and
thirty one FIAC attached annex 5-(a)
no. 40 106.57 NCB PPR No 1-Sep-09 1-Oct-09 1-Mar-10
PW/DAE/03.1/09-104
3
PW/DAE/03.1/09-104
PW/DAE/02.2/09-10
PW/DAE/03.2/09-105
(a)Renovation and Repair of
fourUpazilla training Center (Sadar,
Bariagram, lalpur,Singra) under
Natore district and twenty eight FIAC
attached annex -6(a) .
no. 32 72.27 NCB PPR No 15-Sep-09 15-Oct-09 30-Mar-10
(b)Renovation and Repair of 2
Upazilla training Center
(Sadar,Shibganj,Sonatola) under
Bogra district and eighteen FIAC
attached annex -6(b) .
no. 21 39.82 NCB PPR No 15-Sep-09 15-Oct-09 30-Mar-10
(c)Renovation and Repair of three
Upazilla training Center (Sherpur,
Kahaloo,Dhunut) under Bogra district
and sixteen FIAC attached annex -
6(c) .
no. 19 41.17 NCB PPR No 15-Sep-09 15-Oct-09 30-Mar-10
Sub total= no. 72 153.26 NCB PPR No 15-Sep-09 15-Oct-09 30-Mar-10
8 PW/DAE/05.1/09-10 Renovation and Repair of District
training center (Chittagong),
fiveUpazilla training Center
(Mirersharai, hathazari, Anowara,
Potiya, Swandip and twenty two
FIAC attached annex 7
no. 28 68.09 NCB PPR No 15-Sep-09 15-Oct-09 30-Mar-10
9 PW/DAE/05.2/09-10 Renovation and Repair of District
training center (Coxbazer),two
Upazilla training Center (sadar,
Ramu) and nine FIAC attached
annex 8
no. 12 24.69 NCB PPR No 15-Sep-09 15-Oct-09 30-Mar-10
10 PW/DAE/06.1/09-10 Renovation and Repair of District
training center (Kushtia),three
Upazilla training Center
(sadar,Beramara, Mirpur) and twenty
one FIAC attached annex 9
no. 25 55.31 NCB PPR No 15-Sep-09 15-Oct-09 30-Mar-10
11 PW/DAE/06.2/09-10 Renovation and Repair of District
training center (Jhenaidah), three
Upazilla training Center (sadar,
Kaliganj, Kotechadpur) and twenty
nine FIAC attached annex-10
no. 33 63.96 NCB PPR No 15-Sep-09 15-Oct-09 30-Mar-10
12 (a) Renovation and Repair of three
Upazilla training Center
(Monirampur, Keshobpur,
Jhikorgacha) under Jessore disrict
and twenty six FIAC attached annex-
11 (a)
no. 24 44.87 NCB PPR No 25-Sep-09 25-Oct-09 15-Apr-10
(b) Renovation and Repair of District
training center (Jhenaidah), three
Upazilla training Center
(sadar,Kaliganj,Kotechadpur) and
twenty nine FIAC attached annex -
11(b)
no. 29 41.64 NCB PPR No 25-Sep-09 25-Oct-09 15-Apr-10
Sub total= no. 53 86.51 NCB PPR No 25-Sep-09 25-Oct-09 15-Apr-10
13 PW/DAE/08/09-10 Renovation of Pesticide Testing
Laborator
LS LS 17.20 NCB PPR No 25-Sep-09 25-Oct-09 15-Apr-10
PW/DAE/04.2/09-107
PW/DAE/07.1/09-10
14 PW/DAE/09.1/09-10 Renovation and Repair of District
training center (Khulna),four Upazilla
training Center (Dakope, Paikgacha,
Botiaghata, Dumuriar under Khulna
district) and thirty two FIAC attached
annex 12
no. 37 68.98 NCB PPR No 25-Sep-09 25-Oct-09 15-Apr-10
15 PW/DAE/9.2)/09-10 Renovation and Repair of District
training center (Satkhira),two
Upazilla training Center (Kolaroa,
Tala under Satkhira district) and
twenty two FIAC attached annex 13
no. 25 44.96 NCB PPR No 25-Sep-09 25-Oct-09 15-Apr-10
16 PW/DAE/10.1/09-10 Renovation and Repair of District
training center (Rajbari),one Upazilla
training Center (Pangsa) and twenty
one FIAC attached annex 14
no. 23 35.23 NCB PPR No 25-Sep-09 25-Oct-09 15-Apr-10
17 PW/DAE/10.2/09-10 Renovation and Repair of District
training center (Faridpur),three
Upazilla training Center (sadar,
Modhukhali, Alfadanga) and seven
FIAC attached annex 15
no. 11 22.57 NCB PPR No 25-Sep-09 25-Oct-09 15-Apr-10
(a) Renovation of District Training
Center(Natore,Bogra)
no. 2 10.90 NCB PPR No 15-Aug-10 15-Oct-10 30-Mar-11
(b) Renovation of District Training
Center (Dinaajpur, Rangpur)
no. 2 8.74 NCB PPR No 15-Aug-10 15-Oct-10 30-Mar-11
(c) Renovation of District Training
Center(Sylhet, Moulavibazer)
no. 2 17.22 NCB PPR No 15-Aug-10 15-Oct-10 30-Mar-11
(d) Renovation of District Training
Center(Gazipur, Kishoreganj)
no. 2 25.42 NCB PPR No 15-Aug-10 15-Oct-10 30-Mar-11
(e Renovation of District Training
Center(Mtymensingh, Sherpur)
no. 2 12.85 NCB PPR No 15-Aug-10 15-Oct-10 30-Mar-11
Sub total= no. 10 75.13 NCB PPR No 15-Aug-10 15-Oct-10 30-Mar-11
19 PW/DAE/12/10-11 Pesticide Testing Laborator and PIU-
DAE
LS LS 40.29 NCB PPR No 15-Sep-10 30-Oct-10 30-Mar-11
20 PW/DAE/13/10-11 FIAC at Union Parishad Complex LS 125 120.85 NCB PPR No 15-Sep-10 30-Oct-10 30-Mar-11
21 PW/DAE/14/11-12 FIAC at Union Parishad Complex LS 125 120.85 NCB PPR No 15-Sep-11 30-Oct-11 30-May-12
22 PW/DAE/15/11-12 Renovation of Pesticide Testing
Laborator Y5
LS LS 24.18 NCB PPR No 15-Jul-11 15-Aug-11 15-Feb-12
18 PW/DAE/11/10-11
Annexure: The name of FIAC which to be renovated
Annex-1(a) Annex-1(b) Annex-1(c) Annex-2(a) Annex-2(b) Annex-2(c) Annex-3(a)
Tatuljhara Oshtodhor Roshidabad Meherpara Khadimnagar Khalilpur Rajendrapur
Shutipara Ghagra Maria Nuralapur Thukerbazar Upperkagabola Uttom
Sombag Boyra Gazaria Karimpur Mogolgaon Ekatona Horidebpur
Kushura Khagdohor Gobria Abdullapur Panchdona Kandigaon Amtoil Mominpur
Balia Chor Ishwardia Soyshuti Binnabaid Dhaka (South) Nazirabad Saddo Pushkoroni
Amta Sakura Shalua Baznab Fulbari Giasnagar Pashuraam
Suapur Motbari Faridpur Belabo Pashchim Amura Brahmonbazar Taampaat
Dhamrai Radhakanai Korgaon Kachikata Bhadeshwar Baromchaal Chandanpaat
Gangutia Aashim Patuli Mumurdia Gotashia Sharifgonj Vatera Tapodhan
Mirzapur Fulbaria Aasmita Barochapa Lakhhonabond Joychandi Kallyani
Kaultia Tarakanda Peragaon Machhimpur Laxmipasha Hajipur Itakumari
Kashimpur Barobaria Kakorkandi Dulalpur Uttor Badepasha Prithimpasha Parul
Baria Jassora Naalitabari Ayubpur Alinagar Kormodha Pirgachha
Pubail Moshakhali Nonni Zoshore Charkhai Kaadipur Onnoda Nagar
Fulbaria Bildora Kalashpar Joynagar Dubaag Dasherbazar Saola
Chapair Dhara Ramchandrapur Gazaria Shaola Nizbahadurpur Tambulpur
Maddhapara Achintopur Singa Boruna Kurakbazar Uttor Shahbajpur Koikuri
Dhalzora Gouripur Bhelua Matiura Sujanagar Kaandi
Barishab Dulla K.K. Chor Tilpara Dokhhinvag (South) Shaheedbag
Shinghosree Tarati Kurikahonia Mollapur Saatgaon Ka: Balapara
Torgaon Kumarghata Urfa Muria Bhoonbir Tepamodhupur
Ghagotia Basati Pathakata Lauta Kalapur
Toge Mankone Talki Bianibazar (**) Sindurkhan
Gazipur Kheruazani Chor Oshtadhor Chiknagul Kalighat
Maona Fenchugonj (**) Rahimpur
Telihati Maijgaon Shomsernagar
Kaoraid Daudpur Islampur
Boromi Tetli Munshibazar
Rajabari Silaam Rajnagar
Lalabazar
(**) Estimate not included
Annex-3(b) Annex-3(c) Annex-4(a) Annex-4(b) Annex-4(c) Annex-5 Annex-6(a)
Panchgachhi Chehelgazi Panchthubi Sultanpur Bishnupur Baghil Kazura
Ramnathpur Sundorbon Amratoli Masihata Balia Dainna Piprul
Pirgonj Fazilpur Jagonnathpur Chandura Sakhua Gala (***) Barohorishpur
Barodarga Shekhpura Sundolpur Bishnupur Jogra (***) Satni
Bhendabari Shorsa Mohammadpur
(South)
Bodhonti Chitoshi (East) Mirzabari Dighapotia
Choitrokole Awuliapur Boaropara Ramrail Chitoshi (West) Arjuna Laxmipur
Kholabaria
Kumedpur Uthrail Keronkhal Chompoknagar Sadullapur Oloa Kafuria
Madonkhali Shankarpur Madhaiya Natai (South) Baganbari Falda Biprobel Ghoria
Raipur Aashkorpur Mohichail Mojlishpur Durgapur Elasin Halsha
Chotra Kolompur Dulai Nawabpur Monionda Fatepur (East) Atia 1 No. Joari
Ranipukur Palashbari Zoaag Mulgram Farazikandi Dubail 5 No. Majgaon
Pairabond Monmothpur Gallai Badoir Ekhlaspur Delduar 6 No. Golappur
Kafrikhal Hamidpur Barera Binauti Zahirabad Fazilhati 4 No. Nagar
Latifpur Goaldihi Etbarpur Kuti Kalakanda Salla Kadimchilan
Moyenpur Aangarpara Chandina (**) Kaimpur Alenga Arbab
Gopalpur Khamarpara Aajgora Naatghor Bangra Chongdhupoil
Barohajratpur Rosulpur Peria Biddyakut Paikara Duaria
Durgapur Sundarpur Moukra Koitala Kokdohora Durduria
Ramnathpur Shaitara Aadra Shibpur Nagbari Lalpur
Gopalpur Veeail Jodda Laur Fatehpur Kalia Ishwardi
Kutubpur Tetulia Kashinagar Ibrahimpur Hatibandha Singra (**)
Bishnupur Shibrampur Sreepur Baheratail Tazpur
Modhupur Palashbari Shuvopur Deulabari Sherkole
Kalupara Shatogram Konkapout Rasulpur Lalore
Mohammadpur Jagonnathdighi Dhalapara Hatiandaha
Vognagar Aalkora Deopara Kalom
Satore Dighalkandi Itali
Lokerpara Chowgram
Ghatail UP Dahia
Hemnagar
Nogda Shimla
Alamnagar
Dhopakandi