5/26/2018 Perbandingan Standar Dengan Formasi Pks
1/6
MandorKepala
KerjaOperator
Pemb.
OperatorMandor
Kepala
KerjaOperator
Pemb.
OperatorMandor
Kepala
KerjaOperator
Pemb.
OperatorMandor
Kepala
KerjaOperator
Pemb.
Operator
1 Processing 1 - - - 1 - - - 1 - - - 1 - - -
Penerimaan buah:- Kerani timbang - - 1 - - - 1 - - - 1 - - - 2 -
- Sortasi - 1 5 - - 1 5 - - 1 5 - - 1 6 -
Loading Ramp:
- Loading Ramp - - 2 - - - 2 - - - 2 - - - 2 -
- Capstand - - 1 1 - - 1 1 - - 1 1 - - 1 -
- Track Liyer + Tali Sling - - 1 1 - - 1 1 - - 1 1 - - 1 1
- Transfer Carriage - - 1 - - - 1 - - - 1 - - - 1 -
Stearilization Station:
- Rebusan - 1 2 - - 1 2 - - 1 2 - - - 4 -
- Capstand + Rantai - - 2 2 - - 2 2 - - 2 2 - - 2 2
Thresher Station:
- Hoisting Crane - - 2 - - - 2 - - - 2 - - - 2 -
- Auto Feeder - - 1 - - - 1 - - - 1 - - - 1 1
- Stasiun Tankos - - - - - - - - - - - - - - - -
Press Station:
- Screw Press - 1 1 - - 1 1 - - 1 1 - - - 2 -- Cake Breaker Conveyor - - 1 - - - 1 - - - 1 - - - 1 -
Clarification Station:
- Sand Trap, CST - - 1 - - - 1 - - - 1 - - - 1 -
- Oil Separator - - 1 - - - 1 - - - 1 - - - 1 -
- Decanter Set - - 1 - - - 1 - - - 1 - - - 1 -
- Fetput - - - 1 - - - 1 - - - 1 - - 1 -
Kernel Station:
- Depericarper - - 1 - - - 1 - - - 1 - - - 1 -
- Polishing Drum - - - - - - 1 - - - 1 - - - - -
- Hydrosiclone - - 1 - - - 1 - - - 1 - - - 1 1
- Penurunan Inti - - 1 - - - 2 - - - 2 - - - - 1
- Muat Truck / lansir Inti - - - - - - - 1
Boiler Station:
- Boiler Inspection - 1 1 - - 1 1 - - 1 1 - - 1 - -
- Fire Up - - 1 - - - 1 - - - 1 - - - 2 -
- Pengapian/Tarik Kerak - - 2 - - - 2 - - - 2 - - - 2 -Power Station:
- Generator Set - 1 1 - - 1 1 - - 1 1 - - - 2 -
Demint Plant:
- Water Treatment - - 1 - - - 1 - - - 1 - - - 1 -
Laboratorium Station:
- Analist - 1 1 - - 1 1 - - 1 1 - - - 1 -
- Sampler - - 1 - - - 1 - - - 1 - - - 1 -
13 Stasion Limbah:
- Kolam Limbah 1
1 6 34 5 1 6 36 5 1 6 36 5 1 2 40 7
46 48 48 50
JUMLAH
TOTAL
KONDISI PKS PABATU
30 TON
8
6
2
4
5
7
11
9
3
NO STATION
10
30 TON
STANDAR KEBUTUHAN TENAGA
45 TON 60 TON
12
5/26/2018 Perbandingan Standar Dengan Formasi Pks
2/6
MandorKepala
KerjaOperator
Pemb.
OperatorMandor
Kepala
KerjaOperator
Pemb.
Operator
1 Processing 1 - - - 1 - - -
Penerimaan inti:
- Kerani timbang - - 1 - - - 1 -
- Analisa Inti Masuk - - 4 - - - 4 -
Stasiun Kempa:
- Kempa Inti - - 1 1 - 1 1 -
- Kempa Cake - - 1 1 - 1 1 -
4 Stasiun Minyakan: 1 2 1 4
5 Stasion Bunker Inti: 1 2 4
6 Stasion Pengisian Umpan: 2 2
7 Pengolahan Ampas: - - 1
Stasion Power Plant:
- Boiler - 1 - - - 1 1 -
- Fire Up - - 1 - - - 1 -
- Pengapian/Tarik Kerak - - 2 - - - 2 -
- Pengumpanan Cangkang - - - 2 - - - 2
- Pengumpanan Tankos - - - 2 - - - 2
Stasiun Turbin:
- GENSET - 1 - - - 1 - -
- Condensor - - 1 - - - 2 -
Laboratorium Station:
- Analist - 1 - - - - 2 -
- Sampler - - 2 - - - 2 -
1 3 17 10 1 5 28 4
31 38
12
JUMLAH
TOTAL
STANDAR KEBUTUHAN TENAGA KONDISI TENAGA PPIS SAAT INI
8
9
2
3
NO STATION
5/26/2018 Perbandingan Standar Dengan Formasi Pks
3/6
MandorKepala
KerjaTukang
Pemb.
TukangMandor
Kepala
KerjaTukang
Pemb.
TukangMandor
Teknik Umum
Bengkel Umum - - - - 5 - - - 3
Machines & Piping Inspection 1 1 - - - - - - -- Juru Gambar - - 1 - - - - - -
- Electric Welder - - 2 1 - - - - -
- Oxy Acetylene/carbide welder - - 1 - - - - - -
- Turning Machine (Bubut) - - 2 - - - - - -
- Shaping Machine (Sekrap) - - 1 - - - - - -
- Pumping Equipment - - 2 2 - - - - -
- Separator - - 1 2 - - - - -
- Factory Machinary - - 2 2 - - - - -
- Turbin Equipment/Boiler - - 1 1 - - - - -
- Engine/Diesel - - 1 1 - - - - -
- Oil Man - - 1 - - - - - -- Sipil/Bangunan - - 2 4 - - 7 - -
- Jalan, Jembatan, Saluran Air - - 2 2 - - 15 - 1
Bengkel Listrik
Jaringan Listrik - - - - - - - - 2
Panel dan Instalasi - - - - - - 9 - -
Gulung Mild Dradge E. Motor - - - - - - - - -
St. Penerimaan buah/Penebah:
- Maintnance - - - - - - 2 - -
St. Stearilization Station:
- Maintenance - - - - - - 4 - -
St. Press:
- Maintenance- - - -
- - 3 - -
St. Clarification:
- Maintenance - - - - - - 2 - -
St. Pabrik Biji:
- Maintenance - - - - - - 2 - -
St. Water Treatment:
- Maintenance/Operator - - - - - - - - -
St. Tankos Carrier:
- Pelaksana
St. Kamar Mesin/PLTA:
- Maintenance/Operator - - - - - - 1 - -
- Listrik/Jaringan
St. Boiler:
- Maintenance - - - - - - 2 - -St. Pengawasan Mutu:
- Laborant Harian
St. Pengiriman CPO:
- Pelaksana
Gudang Inti:
- Pelaksana
Kolam Limbah:
- Pelaksana
Tankos Harian:
16
17
FORMASI TENAGA KERJA BIDANG TEKNIK DIBAWAH KDP/K
11
13
15
9
3
4
NO STATION
KONDISI PKS PABATU KO
30 TON
STANDAR KEBUTUHAN
TENAGA PKS 30/45/60 TON
1
2
6
7
8
10
12
14
5/26/2018 Perbandingan Standar Dengan Formasi Pks
4/6
- Pelaksana
Lori Rebusan:
- Maintenance - - - - - - - - -
St. PPIS:
- Mesin Kempa Inti & Cake - - - - - - - - -
- Gear Box & Installasi - - - - - - - - -
- Power Plant - - - - - - - - -
Bengkel Motor:
- Mintenance - - 1 1 - - 5 - 1Perawatan Umum:
- Mintenance - - - - - - 6 - -
CD/Pemel Hal./Bangunan:
- Pelaksana - - - 10 - - 15 - 3
- Centeng Mess - - 1 - - - - - -
Kerani:
- Administrasi - - 1 1 - - 4 - 7
- Pelayan - - - - - - - - -
Transportasi:
- Supir Manajer - - 1 - - - 1 - -- Supir Pool - - 6 - - - 6 - 1
- Supir Bus - - 1 - - - - - -
- Supir Truck - - 2 - - - 2 - -- Operator Alat Berat - - 4 2 - - 6 - -Pompa Air/Umbul:
- Operator - - 3 - - - 2 - 1
26 Lain-lain: - - - - - - - - -
1 1 39 29 5 - 94 - 19
70 99
30
69
19
37
26
181
155144
22
JUMLAH
TOTAL
18
20
21
25
24
23
19
5/26/2018 Perbandingan Standar Dengan Formasi Pks
5/6
Kepala
KerjaTukang
Pemb.
TukangMandor
Kepala
KerjaTukang
Pemb.
Tukang
1 - - 3 - 34 -
- - - - - - -
- 2 - - - - -
- 8 - - - - -
- 1 - - - - -
- 2 - - - - -
- 1 - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- 1 - - - - -
- 1 - - - - -- 4 - 1 - 11 -
- 2 - - - - -
1 2 - - - - -
- 6 - - - 14 -
- 2 - - - - -
- 1 1 - - 25 -
- 1 1 - - 22 -
- 1 2 - - 12 -
- 1 1 - - 8 -
- 1 - - - 8 -
- 3 - - - - -
6
- 6 - 1 - 21 -
1 11
- 1 1 - - 16 -
1 2
1 2
1 5
1 5
T
45 TON 60 TON
DISI PKS TINJOWAN KONDISI PKS BAH JAMBI
5/26/2018 Perbandingan Standar Dengan Formasi Pks
6/6
3
- 1 - - - - -
- 5 - - - - -
- 2 - - - - -
- 2 - - - - -
- 1 - - - - -
- 1 - - - - -
- 2 36 - - - -
- 1 - - - - -
- 3 7 1 - 7 -
- - 3 - - - -
- 1 - - - - -
- 6 - - - - -
- 1 1 - - - -
- 2 - - - - -- 4 1 - - 16 -
- 4 2 - - 2 -
- 21 - - - - -
2 104 56 8 3 230 -
181 241