Perbandingan Standar Dengan Formasi Pks

download Perbandingan Standar Dengan Formasi Pks

of 6

description

draft

Transcript of Perbandingan Standar Dengan Formasi Pks

  • 5/26/2018 Perbandingan Standar Dengan Formasi Pks

    1/6

    MandorKepala

    KerjaOperator

    Pemb.

    OperatorMandor

    Kepala

    KerjaOperator

    Pemb.

    OperatorMandor

    Kepala

    KerjaOperator

    Pemb.

    OperatorMandor

    Kepala

    KerjaOperator

    Pemb.

    Operator

    1 Processing 1 - - - 1 - - - 1 - - - 1 - - -

    Penerimaan buah:- Kerani timbang - - 1 - - - 1 - - - 1 - - - 2 -

    - Sortasi - 1 5 - - 1 5 - - 1 5 - - 1 6 -

    Loading Ramp:

    - Loading Ramp - - 2 - - - 2 - - - 2 - - - 2 -

    - Capstand - - 1 1 - - 1 1 - - 1 1 - - 1 -

    - Track Liyer + Tali Sling - - 1 1 - - 1 1 - - 1 1 - - 1 1

    - Transfer Carriage - - 1 - - - 1 - - - 1 - - - 1 -

    Stearilization Station:

    - Rebusan - 1 2 - - 1 2 - - 1 2 - - - 4 -

    - Capstand + Rantai - - 2 2 - - 2 2 - - 2 2 - - 2 2

    Thresher Station:

    - Hoisting Crane - - 2 - - - 2 - - - 2 - - - 2 -

    - Auto Feeder - - 1 - - - 1 - - - 1 - - - 1 1

    - Stasiun Tankos - - - - - - - - - - - - - - - -

    Press Station:

    - Screw Press - 1 1 - - 1 1 - - 1 1 - - - 2 -- Cake Breaker Conveyor - - 1 - - - 1 - - - 1 - - - 1 -

    Clarification Station:

    - Sand Trap, CST - - 1 - - - 1 - - - 1 - - - 1 -

    - Oil Separator - - 1 - - - 1 - - - 1 - - - 1 -

    - Decanter Set - - 1 - - - 1 - - - 1 - - - 1 -

    - Fetput - - - 1 - - - 1 - - - 1 - - 1 -

    Kernel Station:

    - Depericarper - - 1 - - - 1 - - - 1 - - - 1 -

    - Polishing Drum - - - - - - 1 - - - 1 - - - - -

    - Hydrosiclone - - 1 - - - 1 - - - 1 - - - 1 1

    - Penurunan Inti - - 1 - - - 2 - - - 2 - - - - 1

    - Muat Truck / lansir Inti - - - - - - - 1

    Boiler Station:

    - Boiler Inspection - 1 1 - - 1 1 - - 1 1 - - 1 - -

    - Fire Up - - 1 - - - 1 - - - 1 - - - 2 -

    - Pengapian/Tarik Kerak - - 2 - - - 2 - - - 2 - - - 2 -Power Station:

    - Generator Set - 1 1 - - 1 1 - - 1 1 - - - 2 -

    Demint Plant:

    - Water Treatment - - 1 - - - 1 - - - 1 - - - 1 -

    Laboratorium Station:

    - Analist - 1 1 - - 1 1 - - 1 1 - - - 1 -

    - Sampler - - 1 - - - 1 - - - 1 - - - 1 -

    13 Stasion Limbah:

    - Kolam Limbah 1

    1 6 34 5 1 6 36 5 1 6 36 5 1 2 40 7

    46 48 48 50

    JUMLAH

    TOTAL

    KONDISI PKS PABATU

    30 TON

    8

    6

    2

    4

    5

    7

    11

    9

    3

    NO STATION

    10

    30 TON

    STANDAR KEBUTUHAN TENAGA

    45 TON 60 TON

    12

  • 5/26/2018 Perbandingan Standar Dengan Formasi Pks

    2/6

    MandorKepala

    KerjaOperator

    Pemb.

    OperatorMandor

    Kepala

    KerjaOperator

    Pemb.

    Operator

    1 Processing 1 - - - 1 - - -

    Penerimaan inti:

    - Kerani timbang - - 1 - - - 1 -

    - Analisa Inti Masuk - - 4 - - - 4 -

    Stasiun Kempa:

    - Kempa Inti - - 1 1 - 1 1 -

    - Kempa Cake - - 1 1 - 1 1 -

    4 Stasiun Minyakan: 1 2 1 4

    5 Stasion Bunker Inti: 1 2 4

    6 Stasion Pengisian Umpan: 2 2

    7 Pengolahan Ampas: - - 1

    Stasion Power Plant:

    - Boiler - 1 - - - 1 1 -

    - Fire Up - - 1 - - - 1 -

    - Pengapian/Tarik Kerak - - 2 - - - 2 -

    - Pengumpanan Cangkang - - - 2 - - - 2

    - Pengumpanan Tankos - - - 2 - - - 2

    Stasiun Turbin:

    - GENSET - 1 - - - 1 - -

    - Condensor - - 1 - - - 2 -

    Laboratorium Station:

    - Analist - 1 - - - - 2 -

    - Sampler - - 2 - - - 2 -

    1 3 17 10 1 5 28 4

    31 38

    12

    JUMLAH

    TOTAL

    STANDAR KEBUTUHAN TENAGA KONDISI TENAGA PPIS SAAT INI

    8

    9

    2

    3

    NO STATION

  • 5/26/2018 Perbandingan Standar Dengan Formasi Pks

    3/6

    MandorKepala

    KerjaTukang

    Pemb.

    TukangMandor

    Kepala

    KerjaTukang

    Pemb.

    TukangMandor

    Teknik Umum

    Bengkel Umum - - - - 5 - - - 3

    Machines & Piping Inspection 1 1 - - - - - - -- Juru Gambar - - 1 - - - - - -

    - Electric Welder - - 2 1 - - - - -

    - Oxy Acetylene/carbide welder - - 1 - - - - - -

    - Turning Machine (Bubut) - - 2 - - - - - -

    - Shaping Machine (Sekrap) - - 1 - - - - - -

    - Pumping Equipment - - 2 2 - - - - -

    - Separator - - 1 2 - - - - -

    - Factory Machinary - - 2 2 - - - - -

    - Turbin Equipment/Boiler - - 1 1 - - - - -

    - Engine/Diesel - - 1 1 - - - - -

    - Oil Man - - 1 - - - - - -- Sipil/Bangunan - - 2 4 - - 7 - -

    - Jalan, Jembatan, Saluran Air - - 2 2 - - 15 - 1

    Bengkel Listrik

    Jaringan Listrik - - - - - - - - 2

    Panel dan Instalasi - - - - - - 9 - -

    Gulung Mild Dradge E. Motor - - - - - - - - -

    St. Penerimaan buah/Penebah:

    - Maintnance - - - - - - 2 - -

    St. Stearilization Station:

    - Maintenance - - - - - - 4 - -

    St. Press:

    - Maintenance- - - -

    - - 3 - -

    St. Clarification:

    - Maintenance - - - - - - 2 - -

    St. Pabrik Biji:

    - Maintenance - - - - - - 2 - -

    St. Water Treatment:

    - Maintenance/Operator - - - - - - - - -

    St. Tankos Carrier:

    - Pelaksana

    St. Kamar Mesin/PLTA:

    - Maintenance/Operator - - - - - - 1 - -

    - Listrik/Jaringan

    St. Boiler:

    - Maintenance - - - - - - 2 - -St. Pengawasan Mutu:

    - Laborant Harian

    St. Pengiriman CPO:

    - Pelaksana

    Gudang Inti:

    - Pelaksana

    Kolam Limbah:

    - Pelaksana

    Tankos Harian:

    16

    17

    FORMASI TENAGA KERJA BIDANG TEKNIK DIBAWAH KDP/K

    11

    13

    15

    9

    3

    4

    NO STATION

    KONDISI PKS PABATU KO

    30 TON

    STANDAR KEBUTUHAN

    TENAGA PKS 30/45/60 TON

    1

    2

    6

    7

    8

    10

    12

    14

  • 5/26/2018 Perbandingan Standar Dengan Formasi Pks

    4/6

    - Pelaksana

    Lori Rebusan:

    - Maintenance - - - - - - - - -

    St. PPIS:

    - Mesin Kempa Inti & Cake - - - - - - - - -

    - Gear Box & Installasi - - - - - - - - -

    - Power Plant - - - - - - - - -

    Bengkel Motor:

    - Mintenance - - 1 1 - - 5 - 1Perawatan Umum:

    - Mintenance - - - - - - 6 - -

    CD/Pemel Hal./Bangunan:

    - Pelaksana - - - 10 - - 15 - 3

    - Centeng Mess - - 1 - - - - - -

    Kerani:

    - Administrasi - - 1 1 - - 4 - 7

    - Pelayan - - - - - - - - -

    Transportasi:

    - Supir Manajer - - 1 - - - 1 - -- Supir Pool - - 6 - - - 6 - 1

    - Supir Bus - - 1 - - - - - -

    - Supir Truck - - 2 - - - 2 - -- Operator Alat Berat - - 4 2 - - 6 - -Pompa Air/Umbul:

    - Operator - - 3 - - - 2 - 1

    26 Lain-lain: - - - - - - - - -

    1 1 39 29 5 - 94 - 19

    70 99

    30

    69

    19

    37

    26

    181

    155144

    22

    JUMLAH

    TOTAL

    18

    20

    21

    25

    24

    23

    19

  • 5/26/2018 Perbandingan Standar Dengan Formasi Pks

    5/6

    Kepala

    KerjaTukang

    Pemb.

    TukangMandor

    Kepala

    KerjaTukang

    Pemb.

    Tukang

    1 - - 3 - 34 -

    - - - - - - -

    - 2 - - - - -

    - 8 - - - - -

    - 1 - - - - -

    - 2 - - - - -

    - 1 - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - - - - - - -

    - 1 - - - - -

    - 1 - - - - -- 4 - 1 - 11 -

    - 2 - - - - -

    1 2 - - - - -

    - 6 - - - 14 -

    - 2 - - - - -

    - 1 1 - - 25 -

    - 1 1 - - 22 -

    - 1 2 - - 12 -

    - 1 1 - - 8 -

    - 1 - - - 8 -

    - 3 - - - - -

    6

    - 6 - 1 - 21 -

    1 11

    - 1 1 - - 16 -

    1 2

    1 2

    1 5

    1 5

    T

    45 TON 60 TON

    DISI PKS TINJOWAN KONDISI PKS BAH JAMBI

  • 5/26/2018 Perbandingan Standar Dengan Formasi Pks

    6/6

    3

    - 1 - - - - -

    - 5 - - - - -

    - 2 - - - - -

    - 2 - - - - -

    - 1 - - - - -

    - 1 - - - - -

    - 2 36 - - - -

    - 1 - - - - -

    - 3 7 1 - 7 -

    - - 3 - - - -

    - 1 - - - - -

    - 6 - - - - -

    - 1 1 - - - -

    - 2 - - - - -- 4 1 - - 16 -

    - 4 2 - - 2 -

    - 21 - - - - -

    2 104 56 8 3 230 -

    181 241