JALAN POROS & DESA TAMBAHAN.pdf

Post on 17-Dec-2015

275 views 5 download

Transcript of JALAN POROS & DESA TAMBAHAN.pdf

  • 2+500

    143.

    975

    144.

    175

    2+550

    140.

    325

    140.

    525

    2+600

    135.

    575

    135.

    775

    2+700

    136.

    825

    137.

    025

    2+725

    140.

    325

    140.

    525

    2+750

    144.

    575

    144.

    775

    2+800

    148.

    575

    148.

    775

    2+825

    148.

    825

    149.

    025

    2+850

    148.

    850

    149.

    050

    2+885

    149.

    650

    149.

    850

    2+900

    150.

    000

    150.

    200

    3+000

    149.8

    00150.0

    00

    02 29' 58,34" LS120 21' 48,14" BT

    Koordinat

    Rencana Plat DuikerP = 1,0 Mtr

    Gunung

    Gunung

    STATION (STA)

    POTONGANMEMANJANG

    SKALA :

    Vertikal 1 : 400 Horisontal 1 : 2000

    RENCANATANAH ASLI

    SITUASI 1 : 2000

    ELEVASI DESIGN

    ELEVASI EXISTING

    PEKERJAAN ASPAL AC - BC

    LAPIS PONDASI AGREGAT KELAS C PEKERJAAN BAHU JALAN

    M2M3

    M3M3

    LAPIS PONDASI AGREGAT KELAS B M3

    PENY. BADAN JALAN/PEMBERSIHAN

    PLAT DUIKER Unit

    NAMA PROYEK

    PEMERINTAH KAB. LUWU UTARADINAS SOSIAL TENAGA KERJA

    DAN TRANSMIGRASISekretariat : Jalan Simpurusiang No. 27 Telp. 0473-21013

    Masamba

    KETERANGAN GAMBAR

    DIPERIKSA

    L O K A S I

    KONSULTAN PERENCANA

    KODE GBR JML. LBR NO. LBR

    TEAM LEADER

    SURVEYOR

    CAD DRAFTER

    - POTONGAN MEMANJANG

    - SITUASI

    Ir. MAKMURIANTO

    MENGETAHUI

    PEDO

    PEJABAT PEMBUAT KOMITMEN (PPK)

    YULIATMOJO YUNUSNip. 19610715 198503 1 003

    GORONG - GORONG M

    JEMBATAN M

    DISETUJUI

    KEPALA DINAS PEKERJAAN UMUMKABUPATEN LUWU UTARA

    Ir. M. ANUGERAH ALI ANWARNip. 19600920 199203 1 006

    KECAMATAN MASAMBA

    PEMBENTUKAN BADAN JALANRUAS UPT LANTANG TALLANG

    SEGMEN II

    KEPALA DINAS SOSIALTENAGA KERJA DAN TRANSMIGRASI

    KAB. LUWU UTARA

    YANSEN TEMPO, SENip. 19650110 199303 1 013

    SUPRATNO, ST

    +126.000

    +130.000

    +134.000

    +138.000

    +142.000

    +146.000

    +150.000

    +154.000

    +126.000

    +130.000

    +134.000

    +138.000

    +142.000

    +146.000

    +150.000

    +154.000

  • 3+000

    149.8

    00150.0

    00

    3+100

    149.4

    50149.6

    50

    3+200

    149.2

    00149.4

    00

    3+260

    149.1

    60149.3

    60

    Rencana Jembatan KayuBentang = 16 Mtr

    STATION (STA)

    POTONGANMEMANJANG

    SKALA :

    Vertikal 1 : 400 Horisontal 1 : 2000

    RENCANATANAH ASLI

    SITUASI 1 : 2000

    ELEVASI DESIGN

    ELEVASI EXISTING

    PEKERJAAN ASPAL AC - BC

    LAPIS PONDASI AGREGAT KELAS C PEKERJAAN BAHU JALAN

    M2M3

    M3M3

    LAPIS PONDASI AGREGAT KELAS B M3

    PENY. BADAN JALAN/PEMBERSIHAN

    PLAT DUIKER Unit

    NAMA PROYEK

    PEMERINTAH KAB. LUWU UTARADINAS SOSIAL TENAGA KERJA

    DAN TRANSMIGRASISekretariat : Jalan Simpurusiang No. 27 Telp. 0473-21013

    Masamba

    KETERANGAN GAMBAR

    DIPERIKSA

    L O K A S I

    KONSULTAN PERENCANA

    KODE GBR JML. LBR NO. LBR

    TEAM LEADER

    SURVEYOR

    CAD DRAFTER

    - POTONGAN MEMANJANG

    - SITUASI

    Ir. MAKMURIANTO

    MENGETAHUI

    PEDO

    PEJABAT PEMBUAT KOMITMEN (PPK)

    YULIATMOJO YUNUSNip. 19610715 198503 1 003

    GORONG - GORONG M

    JEMBATAN M

    DISETUJUI

    KEPALA DINAS PEKERJAAN UMUMKABUPATEN LUWU UTARA

    Ir. M. ANUGERAH ALI ANWARNip. 19600920 199203 1 006

    KECAMATAN MASAMBA

    PEMBENTUKAN BADAN JALANRUAS UPT LANTANG TALLANG

    SEGMEN II

    KEPALA DINAS SOSIALTENAGA KERJA DAN TRANSMIGRASI

    KAB. LUWU UTARA

    YANSEN TEMPO, SENip. 19650110 199303 1 013

    SUPRATNO, ST