JALAN POROS & DESA TAMBAHAN.pdf

2
2+500 43.975 144.175 2+550 40.325 140.525 2+600 35.575 135.775 2+700 36.825 137.025 2+725 40.325 140.525 2+750 44.575 144.775 2+800 48.575 148.775 2+825 48.825 149.025 2+850 48.850 149.050 2+885 49.650 149.850 2+900 50.000 150.200 3+000 9.800150.000 02° 29' 58,34" LS 120° 21' 48,14" BT Koordinat Rencana Plat Duiker P = 1,0 Mtr Gunung Gunung STATION (STA) POTONGANMEMANJANG SKALA : Vertikal 1 : 400 Horisontal 1 : 2000 RENCANA TANAH ASLI SITUASI 1 : 2000 ELEVASI DESIGN ELEVASI EXISTING PEKERJAAN ASPAL AC - BC LAPIS PONDASI AGREGAT KELAS C PEKERJAAN BAHU JALAN M2 M3 M3 M3 LAPIS PONDASI AGREGAT KELAS B M3 PENY. BADAN JALAN/PEMBERSIHAN PLAT DUIKER Unit NAMA PROYEK PEMERINTAH KAB. LUWU UTARA DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI Sekretariat : Jalan Simpurusiang No. 27 Telp. 0473-21013 Masamba KETERANGAN GAMBAR DIPERIKSA L O K A S I KONSULTAN PERENCANA KODE GBR JML. LBR NO. LBR TEAM LEADER SURVEYOR CAD DRAFTER - POTONGAN MEMANJANG - SITUASI Ir. MAKMURIANTO MENGETAHUI PEDO PEJABAT PEMBUAT KOMITMEN (PPK) YULIATMOJO YUNUS Nip. 19610715 198503 1 003 GORONG - GORONG M JEMBATAN M DISETUJUI KEPALA DINAS PEKERJAAN UMUM KABUPATEN LUWU UTARA Ir. M. ANUGERAH ALI ANWAR Nip. 19600920 199203 1 006 KECAMATAN MASAMBA PEMBENTUKAN BADAN JALAN RUAS UPT LANTANG TALLANG SEGMEN II KEPALA DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB. LUWU UTARA YANSEN TEMPO, SE Nip. 19650110 199303 1 013 SUPRATNO, ST +126.000 +130.000 +134.000 +138.000 +142.000 +146.000 +150.000 +154.000 +126.000 +130.000 +134.000 +138.000 +142.000 +146.000 +150.000 +154.000

Transcript of JALAN POROS & DESA TAMBAHAN.pdf

  • 2+500

    143.

    975

    144.

    175

    2+550

    140.

    325

    140.

    525

    2+600

    135.

    575

    135.

    775

    2+700

    136.

    825

    137.

    025

    2+725

    140.

    325

    140.

    525

    2+750

    144.

    575

    144.

    775

    2+800

    148.

    575

    148.

    775

    2+825

    148.

    825

    149.

    025

    2+850

    148.

    850

    149.

    050

    2+885

    149.

    650

    149.

    850

    2+900

    150.

    000

    150.

    200

    3+000

    149.8

    00150.0

    00

    02 29' 58,34" LS120 21' 48,14" BT

    Koordinat

    Rencana Plat DuikerP = 1,0 Mtr

    Gunung

    Gunung

    STATION (STA)

    POTONGANMEMANJANG

    SKALA :

    Vertikal 1 : 400 Horisontal 1 : 2000

    RENCANATANAH ASLI

    SITUASI 1 : 2000

    ELEVASI DESIGN

    ELEVASI EXISTING

    PEKERJAAN ASPAL AC - BC

    LAPIS PONDASI AGREGAT KELAS C PEKERJAAN BAHU JALAN

    M2M3

    M3M3

    LAPIS PONDASI AGREGAT KELAS B M3

    PENY. BADAN JALAN/PEMBERSIHAN

    PLAT DUIKER Unit

    NAMA PROYEK

    PEMERINTAH KAB. LUWU UTARADINAS SOSIAL TENAGA KERJA

    DAN TRANSMIGRASISekretariat : Jalan Simpurusiang No. 27 Telp. 0473-21013

    Masamba

    KETERANGAN GAMBAR

    DIPERIKSA

    L O K A S I

    KONSULTAN PERENCANA

    KODE GBR JML. LBR NO. LBR

    TEAM LEADER

    SURVEYOR

    CAD DRAFTER

    - POTONGAN MEMANJANG

    - SITUASI

    Ir. MAKMURIANTO

    MENGETAHUI

    PEDO

    PEJABAT PEMBUAT KOMITMEN (PPK)

    YULIATMOJO YUNUSNip. 19610715 198503 1 003

    GORONG - GORONG M

    JEMBATAN M

    DISETUJUI

    KEPALA DINAS PEKERJAAN UMUMKABUPATEN LUWU UTARA

    Ir. M. ANUGERAH ALI ANWARNip. 19600920 199203 1 006

    KECAMATAN MASAMBA

    PEMBENTUKAN BADAN JALANRUAS UPT LANTANG TALLANG

    SEGMEN II

    KEPALA DINAS SOSIALTENAGA KERJA DAN TRANSMIGRASI

    KAB. LUWU UTARA

    YANSEN TEMPO, SENip. 19650110 199303 1 013

    SUPRATNO, ST

    +126.000

    +130.000

    +134.000

    +138.000

    +142.000

    +146.000

    +150.000

    +154.000

    +126.000

    +130.000

    +134.000

    +138.000

    +142.000

    +146.000

    +150.000

    +154.000

  • 3+000

    149.8

    00150.0

    00

    3+100

    149.4

    50149.6

    50

    3+200

    149.2

    00149.4

    00

    3+260

    149.1

    60149.3

    60

    Rencana Jembatan KayuBentang = 16 Mtr

    STATION (STA)

    POTONGANMEMANJANG

    SKALA :

    Vertikal 1 : 400 Horisontal 1 : 2000

    RENCANATANAH ASLI

    SITUASI 1 : 2000

    ELEVASI DESIGN

    ELEVASI EXISTING

    PEKERJAAN ASPAL AC - BC

    LAPIS PONDASI AGREGAT KELAS C PEKERJAAN BAHU JALAN

    M2M3

    M3M3

    LAPIS PONDASI AGREGAT KELAS B M3

    PENY. BADAN JALAN/PEMBERSIHAN

    PLAT DUIKER Unit

    NAMA PROYEK

    PEMERINTAH KAB. LUWU UTARADINAS SOSIAL TENAGA KERJA

    DAN TRANSMIGRASISekretariat : Jalan Simpurusiang No. 27 Telp. 0473-21013

    Masamba

    KETERANGAN GAMBAR

    DIPERIKSA

    L O K A S I

    KONSULTAN PERENCANA

    KODE GBR JML. LBR NO. LBR

    TEAM LEADER

    SURVEYOR

    CAD DRAFTER

    - POTONGAN MEMANJANG

    - SITUASI

    Ir. MAKMURIANTO

    MENGETAHUI

    PEDO

    PEJABAT PEMBUAT KOMITMEN (PPK)

    YULIATMOJO YUNUSNip. 19610715 198503 1 003

    GORONG - GORONG M

    JEMBATAN M

    DISETUJUI

    KEPALA DINAS PEKERJAAN UMUMKABUPATEN LUWU UTARA

    Ir. M. ANUGERAH ALI ANWARNip. 19600920 199203 1 006

    KECAMATAN MASAMBA

    PEMBENTUKAN BADAN JALANRUAS UPT LANTANG TALLANG

    SEGMEN II

    KEPALA DINAS SOSIALTENAGA KERJA DAN TRANSMIGRASI

    KAB. LUWU UTARA

    YANSEN TEMPO, SENip. 19650110 199303 1 013

    SUPRATNO, ST