Tender No. 04/2020 Hire of Plant & Equipment

32
Dungog Shire Council Request for Tender Tender No. 04/2020 Hire of Plant & Equipment Closing Date: 2:00pm Tuesday 2 June 2020 Contract Period: 12 Months From: 1 July 2020 To: 30 June 2021

Transcript of Tender No. 04/2020 Hire of Plant & Equipment

Dungog Shire Council

Request for Tender

Tender No. 04/2020

Hire of Plant & Equipment

 

Closing Date:  2:00pm Tuesday 2 June 2020 Contract Period:  12 Months From:  1 July 2020 To:  30 June 2021 

2

CONTENTS                             Page No. 1.    TENDER REQUIREMENTS                4  

2.    GENERAL CONDITIONS OF CONTRACT            7  

3.     SPECIAL CONDITIONS                9   3.01  Interpretation                  9   3.02  Service of Notices                    9   3.03  Nature and Duration of contract                9   3.04    General Obligations                  10 

3.04.1  Compliance with Directives                10 3.04.2  Code of Conduct                  10 3.04.3  Assignment of Contract                  10 

  3.05  Workplace Health and Safety                10 3.05.1  General WHS Requirements                10 3.05.2  Quarries                    11 3.05.3  Protective Personal Equipment                11 3.05.4  Plant and Equipment                  11 3.05.5  Notifications                  12 3.05.6  Certification                  12 3.05.7  Legislative Compliance                  12 3.05.8  Non Compliance                  12 

  3.06  Hire Commencement, Notification, Stand Down and Cancellation        12   3.07    Government Information (Public Access) Act 2009 (GIPA Act)        13 

3.07.1  Consultation (GIPA Act, s. 54)                13  

4.      PAYMENTS                  14  4.01    Payment Rates and Periods – Plant with Operator           14  4.02    Payment Rates and Periods – Plant Only (No Operator supplied)        14  4.03    Rise and Fall                  15  4.04     Deduction of Monies                  15  4.05    Payments to Contractor                  15  4.06    Overtime                  15  4.07    Transportation                  15  4.08    Travelling                  16  

5.      INSURANCE                  17  5.01    Public Risk Insurance                  17  5.02    Workers Compensation Insurance              17  5.03    Third Party Insurance                  17  5.04    Council's Indemnity                  17  5.05    Theft, Loss or Damage Insurance               17  

6.      OPERATIONS                  18  6.01    Declaration of Wages                  18  6.02    Compliance with Law                  18  6.03    Vehicles Loads                  18  6.04    Competency of Labour                  18  6.05    Property Damage                  18  6.06    Minor Repairs                  19  6.07    Fuels, Oils etc.                  19  6.08    Lights                  19  6.09    Equipment                  19  6.10    Hungry Boards                  19  6.11    Haulage Unit Markings                  19    

3

 6.12    Utility Services                  19  6.13    Transportation of Loads                  19  6.14    Cancellation of Work                  19  6.15    Additional Acquisitions                  20  6.16    Plant Only – Dry Hire                  20  6.17    Plant Delivery Receipts                  20  6.18    Water Cart Inspections for Town Hydrant Use            20  6.19    Outriggers                  20  6.20    Communications                  20   

7.      TERMINATIONS                  21  7.01    Dismissals                  21  7.02    Termination of Agreement                21  7.03    Disposals and Replacements                21 

 

 CONTRACT AGREEMENT                  22 

 

 DECLARATION                  23 

 

 FIRST SCHEDULE                  24        Plant Details                  24        Operators / Drivers Listing                25 

        

 SECOND SCHEDULE                26 

 

 WAGES DECLARATION PROFORMA                27 

 

 SUBCONTRACTORS STATEMENT PROFORMA              28 

 

 APPENDIX 1 – Daily Truck, Plant and Water Cart Hire Minimum Requirements    30 

         Proforma Document 

  

APPENDIX 2 – Statement of Business Ethics              31 

4

1.  TENDER REQUIREMENTS 

1.1  PURPOSE OF PROPOSED CONTRACT 

Supply of Hire Plant and Equipment to Dungog Shire Council for the period 01 July 2020 to 30 June 2021. 

1.2  INVITATION 

Any incorporated body willing to fulfil the requirements of the proposed Contract is invited to submit a tender to the Council by the deadline, 2.00pm Tuesday 2 June 2020. Responsibility for  lodgement prior to the deadline lies solely with the Tenderer.  Tender lodgement information is provided in the tender document.  Council is not bound to accept the lowest tender or any tender submitted. 

1.3  WHEN & WHERE TENDER DOCUMENTS CAN BE OBTAINED 

Tender documents are available free of chargefrom: 

Dungog Shire Council  198 Dowling Street, Dungog NSW 2420 

or by calling 

Customer Service  (02) 4995 7777 

     

1.4  REQUESTS FOR INFORMATION CONCERNING PROPOSED CONTRACT All enquiries  relating  to  the proposed  contract must be directed  to  the nominated Project Officer, between 9.00am and 4.00pm, Monday to Friday.  Verbal enquiries must be confirmed in writing: 

Nigel Atkins  Works Manager  (02) 4995 7777        

or email:  [email protected]  

1.5  PRE‐TENDER MEETING   

A pre‐tender meeting is NOT to be held. 

1.6  ADVERTISEMENT PLACED IN 

Sydney Morning Herald:  Tuesday  5 May 2020 

Newcastle Herald:  Saturday  2 May 2020 

Dungog Shire Council Website: 

Period 4 May 2020 to 2 June 2020 

1.7  TENDERERS TO NOTE  

In the preparation and submission of the tender and without limiting the Tenderer’s obligations: 

The Tenderer  shall  submit  the Tenderer’s Declaration, any other declaration  required and all Schedules, which are to be fully completed and accompanied by further supporting information where necessary. 

The Tenderer shall not submit a tender without a firm intention to proceed. 

The Tenderer shall not engage in any form of collusive practice. 

The  Tenderer  shall  not  directly  or  indirectly  canvass  support  from  an  elected  member  or employee of Council. 

 

5

 

1.8  LODGMENT METHOD (Clause 10 of the Conditions of Tendering) Tenders, complete in all respects will ONLY be accepted by either one of the following means:  

I. Submitted electronically with the subject title:  Tender 04/2020 – Plant and Equipment Hire  

And email to:  [email protected]   

II. Submitted by enclosing submission document in a sealed envelope and the envelope marked legibly as follows:   

  Tender 04/2020 – Plant and Equipment Hire  

 And either:    Delivered by hand or by courier and placed in the:    Tender Box    Dungog Shire Council    198 Dowling Street    Dungog  NSW 2420       Or    Mailed to the Tender Box addressed as follows:    Tender Box    Dungog Shire Council    198 Dowling Street    Dungog  NSW 2420       So as to be received before the closing time and date for tender.       Time: 2:00 pm     

  Date: Tuesday 2 June 2020  

   Tenders  submissions  are  to  be  received  prior  to  the  closing  time  on  the  due  date.  It  is  the responsibility of  the Tenderer  to ensure  that  the  tender  is  received on or before  the stated closing time.  Late  tender  will  only  be  considered  in  accordance  with  the  Local  Government  (General Regulation).   

   

6

 

 

1.9  “VALUE FOR MONEY” ASSESSMENT. 

Council is not bound to accept the lowest tender or any tender submitted.  Council, in its discretion, will  accept  the  tender  that  it determines provides  the most  advantageous  result.   Tenders will be assessed  on  “conformity  to  the  documentation”  and  “value  for money”  (the most  cost  effective offer determined by considering all price and non‐price  factors  relevant  to  the proposed contract), and the following criteria:‐  

‐  Tender Price      ‐  Availability    ‐  Suitability    ‐  Reliability 

‐  Machine Age      ‐  Machine Performance      ‐  Operator Ability 

‐  Previous Experience    ‐  Assessed capacity to undertake task  ‐  WHS 

1.10  ADDITIONAL CONDITIONS 

The “Conditions of Contract” contained in the next section govern this tender. 

7

2.   GENERAL CONDITIONS OF CONTRACT  

2.01  Tenders will  only  be  accepted  on  the  attached  Schedule  of  Rates  Forms  as  shown  in  the  First Schedule. 

 

2.02  Applicants are to advise what arrangements will be made for repair or replacement of machinery in the event of breakdown or availability of alternate operators and ability to supply plant at short notice. 

 

2.03  For hire periods over  50 hours  expected duration or material quantities over  1,000m3, Council reserves the right to negotiate a lower hire rate with individual contractors. 

 2.04  Plant Hire Contractors are required to sign the Declaration.  Failure to do so will render a quotation 

null and void.  2.05  Council reserves the right to stand down hired plant, which does not comply or is not operated in 

accordance with Work Health & Safety Act and Construction Safety Act and Regulations.  2.06  Payments for plant hire which  includes operator hire shall not be made unless  legible daily plant 

hire dockets have been certified by the Operator of the plant or equipment and Council’s Works Supervisor or site representative responsible for the works.  Plant Hire Dockets are to be supplied by  the  Contractor  for  each  item  of  plant  on  a  daily  basis,  and  shall  have,  as  a  minimum requirement, all the information as detailed in the tables shown in the section Plant Hire Docket ‐ Minimum Requirements within this tender document.  

       In  the  case of Dry Hired Plant,  'External Plant Hire  Sheets' will be  completed by  the Ganger or 

Works Supervisor responsible for the works and submitted to Council’s accounts section weekly.       Individual  invoices shall be supplied  for each plant per period of hire.    Invoices are  to  reference 

appropriate docket numbers for the particular plant hired.       Invoices must be submitted to Council no later than the 20th of the month for payment at the end 

of the month.  2.07  Performance Assessment may be undertaken on all plant hired for periods  in excess of 30 hours 

based on productivity and quality of services.  

2.08  Variances between order  and  invoice  amounts will be monitored by management on  a  routine basis. 

 

2.09  Contractors  dissatisfied  with  hiring  decisions  should  refer  their  concerns  in  writing  marked 'CONFIDENTIAL' addressed to the General Manager. 

 2.10  Performance Assessment shall be made available on request to Contractors if not the subject of a 

claim for hire payment, damages or such other matter not in Council's interest.  2.11  Each applicant must legibly complete all applicable Schedules in full.  Council are willing to accept, 

for dry hire only plant  and  equipment,  external  schedules/list of  items, provided  all  relevant information is provided in full. 

 2.12  Unless included on applicable schedule, C Rate shall be paid at the A rate.  

8

2.13  B Rate shall be included for all plant (excluding watercarts and haulage units)   2.14  Minimum hire periods to be  included on schedule  for all plant. Unless noted otherwise, the hire 

rate shall be hourly for remainder of the work period after the minimum hire period has elapsed.  2.15  Each  applicant must  state  distinctly  on  the  envelope  enclosing  his  Tender  ‘TENDER  04/2020  ‐ 

PLANT AND EQUIPMENT HIRE'.   Submissions must be addressed to the General Manager of the Council and received by the same before the time fixed for the closing of tenders. 

  2.16  The Council  shall not be bound  to  accept  the  lowest or  any particular  tender.    Factors  such  as 

availability,  suitability,  reliability,  age,  operator  and machine  performance,  service  backup,  etc. shall be taken into consideration. 

 2.17  Council will  keep  an  up‐to‐date  schedule  of  rates  at  all  times.    Supervisory  staff will  use  this 

schedule when hiring equipment.  2.18  Fresh quotations will be invited at around 12 monthly intervals to allow all persons the opportunity 

of submitting current prices.  

 

9

3.   SPECIAL CONDITIONS   3.01  Interpretation 

 

‘Allowable Deductions’ shall mean any of the following:‐  

a) Any cost or expenses  incurred by Council  in remedying any breach or damage caused to the Council by the Contractor, his servants or agents in the performance of the obligations of the Contractor hereunder. 

b) Costs incurred by the Council in repairing Plant when authorised to do so by the Contractor.   

      ‘Contractor’  unless  the  context  otherwise  admits  shall  include  the  servants  and  agents  of  the Contractor. 

 

     ‘Council’ means the Council of the Shire of Dungog.  

     ‘Works Manager’ means the Council’s Works Manager or his representative.  

     ‘Plant’  includes equipment, motor vehicles and  implements whether powered by fuel, electricity, gas or otherwise or not. 

 

     ‘A  Rate’  means  that  rate  which  includes  wages,  insurance,  licences,  fuels  etc.  and  all  other operating and overhead costs relevant to the operation of the plant. 

 

     ‘B  Rate’  means  that  rate  which  includes  the  labour  and  overhead  costs  in  addition  to  any opportunity cost for hire of the plant. 

 

     ‘C  Rate’  means  that  rate  which  includes  wages,  insurance,  licences,  fuels  etc.  and  all  other operating and overhead costs relevant to the operation of the plant.  ‘C Rate’ is paid on Weekends, Public Holidays and Callouts (see Clause 4.01). 

 

     ‘Plant Only Rate’ means that rate which applies  for hire of plant excluding  labour and  fuel costs and shall cover a period of up to nine (9) machine clock hours/day. 

 

     ‘Bulk Rate’ means that rate as agreed to between the Council and the Contractor for hire periods in excess of 50 hours continuously or 1,000m3 in total. 

 

     Where herein used words importing the singular number or plural number shall include the plural number and singular number respectively and words importing the masculine gender shall include the feminine or neuter gender. 

 

 3.02  Service of Notices  

Subject as otherwise provided herein, any notice to be given hereunder may be given by hand or by prepaid post addressed to the Council or Contractor at the address shown in the Agreement for Hire of Plant or Labour of which these General Conditions form part.  Any notice sent by post shall be deemed to have been served on the second day after posting excluding the day of posting. 

 

3.03  Nature and Duration of Contract  

The contract is for the day to day hire to Council of haulage units and plant with drivers/operators on an hourly basis.  The duration of the Contract is for one year only. 

  

10

3.04  General Obligations     3.04.1  Compliance with Directives 

 

The Contractor shall take upon himself the whole risk of performing his obligations under the Contract.    He  shall  also  comply  with  all  reasonable  and  lawful  directions  of  the Works Manager or his representative.  

   3.04.2  Code of Conduct  

In  accordance  with  Councils  Code  of  Conduct,  Councillors  are  not  to  contact  or  issue instructions  to  any  of  Council’s  contractors  or  tenderers.    In  the  event  that  a  Councillor attempts  to  influence  a  contractor,  the  contractor  shall  report  such  circumstances  to  the Councils General Manager.  Contractors  should make  themselves  and  their  staff  aware  of Councils Statement of Business Ethics which  is attached.    If Contractor’s are  found to have canvassed Councillors or Council Staff (including the offering of  incentives, gifts or benefits) regarding any matter in relation to this tender, that Contractor’s Tender will be void and not considered by Council. 

 

   3.04.3  Assignment of Contract  

The Contactor shall not assign this Contract or assign, mortgage, charge or encumber all or any of  the monies payable or  to become payable under  this Contract or any other benefit whatsoever arising or which may arise, under this Contract, to any person.  Sub‐letting of this Contract  will  not  be  accepted  nor  engagement  of  sub‐contractors  without  the  written agreement of the General Manager. 

 

3.05  Workplace Health and Safety     3.05.1  General WHS Requirements 

DSC  is  obligated  to  provide  and maintain,  so  far  as  is  practicable,  a  work  place  for  its employees  and  non  employees,  that  is  safe  and without  risk  to  health  and  safety.  As  a condition of this contract, the contractors or subcontractors that may be engaged to perform a service on DSC’s behalf will at all times  identify and exercise all necessary precautions for the  health  and  safety  of  all  persons  including  Contractor  employees, DSC  employees  and members of the public who may be affected by the services. Contractors and sub‐contractors will  also  exercise  all  necessary  environmental  risk mitigation measures  and minimise  the environmental impact of their work.   The  Contractor  will  ensure  familiarisation  to  all  occupational  health  and  safety  policies, procedures  or measures  implemented  or  adopted  by  DSC  and/  or  the  occupiers  of  any premises at or within which the Contractor will perform works under this contract and shall comply with all such policies, procedures and measures. 

 

 All  contract  personnel  supplied  to  Council  are  required  to  undertake  or  have  undertaken WorkCover approved General Induction for Construction Work in NSW prior to commencing work with  Council.    Contract  personnel  are  required  to  carry  their General  Induction  for Construction Work in NSW card with them at all times whilst engaged by Council and must be able to produce this card to Council representatives on request.  

Work Activity Induction Training where required, shall be undertaken by Contract personnel at Council's Works Depot prior  to  commencing work with Council.   The  induction  is  to be carried out by Council  staff  at  a  time  suitable  to Council.   Payment will NOT be made by Council for the time the contract personnel attend the induction. 

11

 

All  contractors  and  their  employees  must  adhere  to  the  provisions  of  Council's  safety practices and policies.  These provisions may be in addition to, but not in substitution of, any other safety requirement of any  legislation or condition of contract.   Failure to observe any safety requirement will be in breach of this agreement.  

3.05.2  Quarries  

Contractors operating within Council's quarries must adhere  to  the provisions of  the Work Health and Safety Act and associated regulations, the Mine Health and Safety Act, the Mine Health and Safety Regulation and the regulations and rules thereunder.  

3.05.3      Personal Protective Equipment  

The  contractors  shall  supply  for  their  staff  fit  for  purpose  personal  protective  equipment complying with relevant legislation and be applied through risk assessment, legislation and in line with Dungog Shire Councils protocol/procedures and WHS policies.  In particular the following shall be worn as a minimum by all contractors:‐  

‐ All  contractors and  their employees engaged by Council must wear a high visibility safety vest or shirt which complies with  the Australian Standard AS 1742.3  ‐ Clause 3.17.2.   

‐   Footwear complying with Australian Standard AS 2210 shall be worn. ‐ For sun protection shirts shall be long sleeve and the use of broad brimmed hats and    eye protection shall be encouraged. ‐ Safety helmets that comply with appropriate standards must be worn:‐ 

i) Wherever there is a danger of material falling from above; ii) When working within the operating range of cranes, backhoes or excavators; iii) Wherever signposted as a mandatory requirements; or iv) As directed by Council’s Works Manager or his representative. 

 

3.05.4   Plant and Equipment  

Contractor’s  vehicles  and  plant must  be mechanically  sound  and  adequately maintained.  Unsafe equipment shall be either made safe or removed off the site.  

All plant hired with an operator is to carry a fully stocked medium risk First Aid kit (vehicle or portable).  All  hired  plant  is  to  be  fitted with  appropriate with  rotating  or  flashing  amber  lights,  fire extinguishers and a reversing or movement buzzer/alarm that satisfies the requirements of the NSW Work Health and Safety Act and/or Mine Safety Authority as applicable ‐ this safety equipment shall have been tested at appropriate intervals to ensure compliance.    

Council may at any  time during  the  tendered period undertake a safety  inspection  for any item  of  plant.    If  an  item  of  Plant  is  deemed  unsafe  by  Council’s Works Manager  or  his representative then it will be immediately off‐hired until appropriate repairs or modifications can be made.  Council will only pay the applicable hire rate until the time the plant item has been  off‐hired.    Council  will  accept  no  responsibility  for  any  costs  in  relation  to disestablishment or reestablishment of plant as a result of being placed off‐hire due to safety reasons.  

12

3.05.5  Notification  

Contractors shall promptly advise Council in writing of: ‐ All accidents involving personal injury and loss of time. ‐ All dangerous occurrences with accident potential.  

This notification is in addition to, but not in substitute of, any requirement of legislation.  

3.05.6   Certification  

Certification  issued under  the  requirements of  legislation must be held by all persons who operate or undertake tasks where such certification is mandatory.  Such certificates shall be produced when requested by Council’s Works Manager or his representative.  

3.05.7   Legislative Compliance  

The Contractor must comply with and ensure that its employees, subcontractors and agents comply  with  any  Acts,  regulations,  local  laws  and  by‐laws,  Codes  of  Practice,  Australian Standards  and  DSC WHS  Policy  and  Procedures which  are  in  any way  applicable  to  this contract or the performance of the services under this contract.  

3.05.8  Non Compliance   If during the performance of works under contract, DSC informs the Contractor that it is the     opinion of DSC that the contractor is:  

 

a) Not conducting work in compliance with the Contractor’s Health and Safety Plan, and/or Work Method Statement, WHS management procedures, relevant legislation or WHS procedures provided by DSC from time to time; 

 or  

b) Conducting the work in such a way as to endanger the WHS of employees and non‐   employees.  

  DSC  may  direct  the  Contractor  to  suspend  the  work  until  such  time  as  the  Contractor satisfies DSC that the work will be resumed in conformity with applicable WHS provisions.  During  periods  of  suspension  referred  to  above,  DSC  shall  not  be  required  to make  any payment whatsoever to the Contractor.   If the Contractor fails to rectify any breach of health and safety requirements for which the work  has  been  suspended,  or  if  the  Contractor’s  performance  has  involved  recurring breaches  of  health  and  safety,  DSC may  terminate  the  work  forthwith,  without  further obligation to the Contractor. In this event, DSC’s liability shall be limited to payment for the work performed and costs incurred by the Contractor up to the time of termination.  

3.06    Hire Commencement, Notification, Stand Down and Cancellation    

Plant will be required irregularly on an hourly or daily basis unless hired on a plant only basis where a daily rate will apply.  

The Contractor shall manage the plant so that it will be ready to commence operations at the time when Council's works starts on the site and/or as directed by the Site Supervisor, Works Manager  or  their  representative.   He  shall  then  continue  to work  the  plant  as  requested during  the period of hire.   Notice will be given at  least 12 hours  in advance of  the  time of commencement except in cases of emergency (e.g. road collapse, floods, bushfires, etc.). 

13

 Where Council  is  required  to  Stand Down hired plant  for whatever  reason,  the minimum notification will be given as follows:‐ ‐    Plant with Operator ‐ Notification by 7.00am; and ‐    Dry Hired Plant (no operator) ‐ Notification by 8.00am.  Council will not be  liable for any costs  in relation to plant hire or operator costs where the above timeframes for notification are met.  

3.07    Government Information (Public Access) Act 2009 (GIPA Act)    3.07.1  Consultation (GIPA Act, s. 54)  

 

1.  Council will  take  reasonably  practicable  steps  to  consult with  the Contractor  before providing any person with access to  information relating to the Contract,  in response to an access application under  the Government  Information  (Public Access) Act 2009 (GIPA Act), if it appears that: 

 

(a) the information: i. includes personal information about the Contractor or its employees; ii. concerns  the  Contractor’s  business,  commercial,  professional  or  financial 

interests; or iii. concerns research that has been,  is being, or  is  intended to be, carried out by 

or on behalf of the Contractor; or iv. concerns  the affairs of a government of  the Commonwealth or another State 

(and the Contractor is that government);  

(b) the  Contractor  may  reasonably  be  expected  to  have  concerns  about  the disclosure of the information; and 

 

(c) those  concerns may  reasonably be expected  to be  relevant  to  the question of whether  there  is  a  public  interest  consideration  against  disclosure  of  the information. 

2.  If, following consultation between Council and the Contractor, the Contractor objects to disclosure of some or all of the information, the Contractor must provide details of any such objection (including the information objected to and the reasons for any such objection) within 5 days of the conclusion of the consultation process.  

 

3.  In  determining  whether  there  is  an  overriding  public  interest  against  disclosure  of government  information, Council will take  into account any objection received by the Contractor. 

 

4.  If the Contractor objects to the disclosure of some or all of the information but Council nonetheless decides to release the information, Council must not provide access until it has  given  the Contractor  notice  of Council’s  decision  and  notice  of  the Contractor’s right to have that decision reviewed.  

 

5.  Where Council has given notice  to  the Contractor  in accordance with  sub‐clause  (4), Council must not provide access to the information: (a)  before the period for applying for review of the decision under Part 5 of the GIPA 

Act has expired; or  (b)  where any review of the decision duly applied for is pending.    

6.  The reference in sub‐clause (5)(a) to the period for applying for review of the decision under Part 5 of the GIPA Act does not include the period that may be available by way of extension of time to apply for review. 

14

4.  PAYMENTS      4.01  Payment Rates and Periods – Plant with Operator 

 

When  requested  by  Council  at  any  time  during  the  contract  period,  the  Contractor  shall supply  and  operate  plant  for which  the  Council  shall  pay  the  Contractor  in  the  following manner :‐  

The ‘A’ rate, ‘B’ rate, ‘C’ rate or no rate depending upon the following circumstances :‐  

4.01.1  The 'A' rate will be paid from the start of the works onsite and until the cessation of work on the site and/or in accordance with Council's working hours for that site or as directed by the Supervisor.  Payment will be made on the time worked to nearest quarter hour. 

 

4.01.2  The 'B' rate will be paid instead of the 'A' rate when the plant is rendered idle on site to wet weather after commencement of work on  the day of hire or  for  reasons outside Council's control.   However,  if  the  idle period  is utilised  for minor adjustments and  is  less  than one hour per day or shift the 'A' rate shall be paid instead.  The ‘B’ rate will also be paid when the plant is being floated by Council’s Low Loader (Clause 4.08). 

 4.01.3  On Weekends, Public Holidays and on call‐outs (where work commences after 4.30pm), the 

‘C’ rate will be paid  instead of the  ‘A’ rate. This rate will apply  from the start of the works onsite  and  until  the  cessation  of  work  on  the  site  and/or  in  accordance  with  Council's working hours for that site or as directed by the Supervisor.  Payment will be made on time worked to the nearest quarter hour. 

 4.01.4  No rate will be paid if the plant is rendered idle due to breakdown or wet weather other than 

previously stated and as per Clause 3.04.5 above.    Where  plant  and  labour  are  worked  outside  normal  weekday  working  hours  (except  as 

described in Clause 4.01.3 above), Council will pay either the ‘A’ or ‘B’ where applicable; no additional penalty rates will be paid. 

 4.01.5  Bulk Water Charges ‐ Where a Contractor is supplying a watercart and is obtaining bulk water 

from the relevant Water Authority, Council will be liable for payment of the bulk water to the Contractor at the applicable Water Authority cost plus a maximum margin of 15% plus GST.  Water charges are to be included on water cart Daily Plant sheets and associated invoices to which  the water  supply was  applicable.   Council  is  not  responsible  for  any  other  charges regarding standpipe hire and/or usage.   

   4.02  Payment Rates and Periods – Plant Only (No Operator supplied) 

 

When  requested by Council at any  time during  the  contract period,  the Contractor  shall  supply plant for which the Council shall pay the Contractor in the following manner :‐  

    The 'Plant Only' rate will be paid provided the plant is not rendered idle for the greater part of the normal working  hours  of  the Council  for  that day  due  to breakdown or  for  reasons within  the Contractor's control, whereupon no rate will be paid. 

    Council’s standard days for the dry hire of plant and equipment is Monday to Friday.  Where plant is worked outside normal working hours or during Saturdays, Sundays or Public Holidays, Council will pay the ‘Plant Only’ rate.  No additional penalty rates will be paid.  

No rate will be paid  if the plant  is rendered  idle due to breakdown or wet weather as per Clause 3.04.5 above. 

15

 4.03  Rise and Fall  

This quotation is for the period 01.07.2020 to 30.06.2021 inclusive.  The hire rates will be fixed for the full contract period and no claim for rise and fall due to price adjustments or any other reason will be accepted.  All hire rates are to be GST inclusive.  

4.04  Deduction of Monies  

The  Council  shall  be  entitled  to  deduct  from  monies  due  to  the  Contractor  any  allowable deductions. 

   4.05  Payments to Contractor 

 

Payment  shall  be  made  by  the  Council  to  the  Contractor  at  intervals  corresponding  with statements submitted and as referred to  in the General Conditions.   The Contractor shall furnish the following records with each claim for payment:‐ i) Sub‐contractors Statement regarding Workers Compensation, Pay‐roll Tax, and Remuneration 

(Proforma form attached); and ii) Records relating to the operation of each plant item for the given period.  

 4.06  Overtime   

The  Council  shall  be  able  to work  either  plant  or  plant  and  labour  outside  of  normal  Council working hours when necessary.   Payment will be at either  'A'  rate,  'B'  rate or plant only  rate as applicable (except as described in Clause 3.01.3 above). 

 

   4.07  Transportation 

 

Council will  pay  an  establishment  charge where  applicable  for  the  transportation  of  a machine (excluding haulage units and watercarts) to the worksite only.  No separate establishment charge will apply for the floating of a machine away from the work site.  

The  establishment  charge  is  to  be  a  lump  sum  or  distance  based  quote  (km  ‐  one  way)  for establishment of the machine to any work site within Dungog Shire. 

 

If a machine  is floated from a  location, which  is further from Council’s work site than the normal storage place  for  the machine, Council will only pay  the  charge applicable  to  float  the machine between the machine’s normal storage place and Council’s work site.  

Council will not be  responsible  for  the  returning or coming of Plant  to  the work  site during  the course of the work.  However, when the Plant is transferred from one Council work site to another during  the  period  of  supply  the  Council will  pay  to  the  Contractor  the  'A'  rate  (or  ‘C’  rate  if applicable)  if  such  plant  is  transferred  under  its  own  power.    The  'B'  rate  plus  establishment charges will be paid where the float is provided by the Contractor during the transfer period within normal  working  hours  (6.30am  to  4.30pm).    ‘Establishment  only’  will  be  paid  outside  normal working hours.  'B' rate only will be paid if the transfer is made by Council's float or an outside hire float during normal working hours.  

Establishment details including origin, destination and distances are to be included on the Daily Plant sheet submitted to Council's Supervisor, separate invoices will not be accepted. 

 

16

When a hired item of plant breaks down and the Contractor is unable to repair or replace it, transporting charges  for  the  replacement/removal of  this  item of plant will not be paid by Council.  This will only apply should replacement plant be required to complete the work for which the time of plant was originally hired.  

 4.08  Travelling No allowance will be paid for travelling to the start of, nor at the completion of, the work. 

 

17

5.   INSURANCE  

 5.01  Public Risk Insurance The Contractor shall during the term of this Agreement effect and maintain Public Risk Insurance with a minimum  indemnity  limit of $20 million on any one occurrence  in  the  joint names of  the Contractor and the Council against  legal  liability for death and/of bodily  injury to persons and/or damage  to or  loss or destruction of property arising out of  the use of any plant supplied  to  the Council or for work performed by the labour.  

A copy of a  'Certificate of Currency' shall be submitted with the Quotation.   In the event that the Insurance  cover  lapses within  the  Contract  period,  the  Contractor  shall  forward  a  copy  of  the renewal Policy to Council within seven (7) days of renewal.  

 5.02  Workers Compensation Insurance The Contractor shall affect insurance as required by Workers' Compensation Legislation in respect of any labour supplied to the Council.  A copy of a  'Certificate of Currency' shall be submitted with the quotation.   In the event that the Insurance  cover  lapses within  the  Contract  period,  the  Contractor  shall  forward  a  copy  of  the renewed Policy to Council within seven (7) days of renewal.  

5.03  Third Party Insurance All plant that is capable of meeting the definition of a motor vehicle as defined in the Motor Traffic Act,  as  amended  (NSW)  is  to  be  registered  and  compulsorily  insured  in  accordance  with  the provisions  of  the  Road  Transport  Act  2013,  as  amended  and  the Motor  Vehicles  (Third  Party Insurance) Act 1942, as amended, respectively by the Contractor.  Where plant only is supplied to the Council by the Contractor and that plant is capable of meeting the definition of motor vehicles as defined in the Road Transport Act 2013 as amended, then such plant must be insured against the risks of loss or damage to other persons property. 

 

 5.04  Council's Indemnity Any damage to the plant during its period of supply to the Council shall be the responsibility of the Contractor whether or not such plant is supplied with labour.  The Contractor shall indemnify the Council  against  all  claims made  against  the  Council  and  fall within  the  categories  of  insurance above referred to.  Any injury occasioned to a third party or loss or damage to property (including Council's property) caused by  labour supplied by the Contractor shall be the responsibility of the Contractor.   Except  for  such damage  caused by unforeseen  circumstances  that occur whilst  the plant  is being used  in accordance with the explicit directions of the Council's Officer‐In‐Charge of work; provided that the Contractor is not otherwise negligent.  By entering  into  this  agreement,  contractors  acknowledge  that  they  are  aware  and  accept  that Council’s Fleet  insurance does not provide for any Replacement conditions and that these tender specifications  form  the  basis  of  this  contract.   Where  there  is  conflict  between  a  contractors agreement and Council’s contract, Council’s contract shall take precedence.  

 5.05  Theft, Loss or Damage Insurance Plant hired on a plant only basis must be insured against theft, loss or damage during its period of hire  to  Council.    Any  claims  arising  from  theft,  loss  or  damage which  is  not  a  direct  result  of Council's negligence, or failure to take adequate care, shall be the responsibility of the Contractor. 

18

6.   OPERATIONS  

 6.01  Declaration of Wages Where labour is supplied, the Contractor shall furnish to the Council each month a declaration that all wages due and owing to  labour supplied by him have been  fully paid  in respect of which  the relevant period of supply relates.  A proforma declaration is included for use.  

 6.02  Compliance with Law The Contractor shall comply with and give all notices required by any Act of Parliament Ordinance Regulation or By‐Law of any authority which has jurisdiction effecting the plant or labour supplied in pursuance of  this Agreement and he  shall pay and  indemnify  the Council against any  fees or charges  legally demandable under any such Act of Parliament Ordinance Regulation or By‐Law  in respect of  the plant or  labour.   Without affecting  the generality of  the  foregoing  the Contractor acknowledges that all persons engaged by the Contractor to assist him in performing this Contract shall be for all purposes and to the extent permitted by law the employee solely of the Contractor and  that  in  respect  of  each  such  employee  the  Contractor  shall  comply  with  and  provide  all notices, returns or other documents or contributions required by any Act of Parliament Ordinance or Regulation relating to or affecting or conferring upon such employees any benefits  or payments relating  to  remuneration,  recreation  or  other  leave,  long  service,  superannuation,  sickness, incapacity to work or of a similar nature.   The Contractor agrees that he will  indemnify and keep indemnified the Council against any liability loss or outgoing incurred by the Council at any time as a  result of  the Contractor's  failure or neglect  to comply with such  requirements whether or not such liability loss or outgoing arises after completion of the period concerning which the supply is made. 

 

 6.03  Vehicle Loads All vehicles shall comply with  load  limits as prescribed by the Roads Act 1993 and  its regulations.  Any breaches for overloading will be the sole responsibility of the Contractor.  

 6.04  Competency of Labour If  labour  is the subject of supply to the Council under this Agreement, the Contractor shall, upon request,  produce Certificates  of Competency  for  that  labour  before  the  commencement  of  the period of supply and before new or additional labour is supplied.  In addition any change of labour shall be  immediately notified  to  the Works Manager.   Further,  the Contractor and/or  the  labour shall furnish such records relating to the operation of each item of plant that meets that definition of motor vehicles as defined under the Traffic Act, 1909 as amended and required by Council.  The Contractor shall also furnish particulars of the plant to be supplied for each work.  The provision of any Act or Regulation  in  force applying  to  load  limitations of plant  shall be observed and  these shall  be  displayed  on  all  plant  clearly  in  a  prominent  position  all weights  and  capacities  as  are required by law.  All  necessary  licences  as  prescribed  under  the  State  Transport  (Co‐ordination)  Act  131,  as amended shall be produced to the Council for inspection on demand.  All contractors must ensure their drivers and/or operators have  the  relevant  licence or WorkCover  ticket  for  the equipment that they are driving or operating and that they are carried with them at all times.  

 6.05  Property Damage Where  labour  is supplied by the Contractor, all  fences and works of any description met with or on/near  the  site  of  the work  that  are  damaged  by  the  plant  or  labour  are  to  be  replaced  or 

19

repaired by  the Contractor and  left  in  the  same order and condition as  they were prior  to  such damage and to the satisfaction of the Works Manager.  

 6.06  Minor Repairs All  plant  shall  be  supplied  in  good  working  order  and  maintained  in  that  condition  at  the Contractor's  expense  for  the  duration  of  the  term  supplied.    The  Contractor  shall  carry  out  all maintenance and breakdown repairs to the plant of whatever description expeditiously and at his own expense.  As far as practicable all adjustments and repairs shall be carried out on wet days or outside normal working hours.    The Contractor  shall provide  tools  and  equipment  to  carry out necessary repairs.  

 6.07  Fuels, Oils etc. The Contractor shall supply at his own expense, unless otherwise agreed to by Council, all fuel, oil, grease and spare parts and anything necessary for the continuing and satisfactory operation of the plant.  

6.08  Lights The Contractor shall fit suitable and efficient lights to the plant at his own expense when notified by the Council that the plant is required for work during the hours of darkness.  

 6.09  Equipment Haulage units  shall be  fitted with  speedometer  in good working order and be provided with an approved hydraulic or other power operated tipping gear.  

 6.10  Hungry Boards Haulage  units with  hungry  boards  attached, which  in  the opinion  of  the Works Manager make loading difficult, will not be hired.  

 6.11  Haulage Units Markings All haulage units shall have their load capacity in tonnes clearly marked on a position on the body that is clear and legible to the satisfaction of the Work Mangers or their representative.  

 6.12  Utility Services The Contractor shall cause the greatest care to be exercised during the progress of the work when labour is supplied to avoid damage to any utility service whether gas, water, sewer, electric power, telephone, with the limits of the work and will be liable for any such damage caused by him or his servants or agents directly or indirectly including loss of profits arising from such damage.  

 6.13  Transportation of Loads Haulage  units  shall  transport materials  loaded  to  that  section  of  the works  as  directed  by  the Supervisor and then deposit the material as directed.  Haulage units shall proceed from the place of  loading to the point of delivery and return only by such route as  instructed by the Supervisor, completing  each  journey  with  a  minimum  of  delay.    Drivers  shall  assist  in  the  loading  and unloading of their haulage units as directed by the Supervisor.  

 6.14  Cancellation of Work In the event of the work for plant being cancelled when it reaches the depot or job, the Contractor will be paid for the cost of transportation only of the plant, as per Clause 3.08, to the depot or job, at such rates as Council deems equitable.    

20

 6.15  Additional Acquisitions Additional plant acquisitions may be added to an existing contract at the rate of any similar item of plant or a rate notified to the Council in writing prior to its hire.  

 6.16  Plant Only – Dry Hire All plant submitted under Plant Only Rates (Dry Hire) shall be supplied with appropriate Standard Operating Procedures for the safe operation of the item of plant.  All enclosed plant shall be fitted with air‐conditioning, which shall be  in  full working order when  the Plant arrives at  the  job site.  Any enclosed Plant that  is delivered to the site for Dry hire purposes that does not have working air‐conditioning shall not be accepted and Council will not be  liable for any costs (establishment, time, labour or otherwise) sustained by the supplier in delivering said plant.  If the air‐conditioning breaks  down  during  the  period  of  hire,  Council  would  expect  that  repairs  be made  within  a reasonable period of time or other arrangements made to the satisfaction of the Works Manager.  

 6.17  Plant Delivery Receipts All plant hired under this agreement, will be hired under the conditions as specified in this tender document.  If a delivery receipt is supplied by the Plant Hire Contractor, the signature of a Council representative upon  this  receipt will not constitute an agreement between Council and  the Hire Company, merely receipt of delivery of the item of plant.  

 6.18  Water Cart Inspections for Town Hydrant Use All water carts that are required to draw water from town supply hydrants in Dungog Shire will be required  to  have  inspections  as  prescribed  by  Hunter  Water  Corporation.    Any  applicable inspection fees will be the responsibility of the Contractor.   It should be noted that Dungog Shire Council is not the water authority for Dungog Shire.  All applicable fees for water used on Council works will be the responsibility of Council.  

 6.19  Outriggers All plant and equipment with outriggers  (backhoes, cranes,  rubber  tyred excavators, etc.) are  to utilise rigger pads or similar to protect road and ground surfaces from damage.  

 6.20  Communications All plant, which includes operator hire, shall be fitted with a working UHF radio.  

21

7.   TERMINATIONS  

 7.01  Dismissals The Works Manager may require the dismissal within twenty four (24) hours by the Contractor or any Agent, Overseer, Foreman, Workman or other person employed by the Contractor by way of labour  for  the  performance  of  this  agreement  and  in  the  event  of  the Contractor's  refusing  or neglecting  to  comply with  such  requisition no  further payment will be made on account of  the work  until  such  dismissal  is  carried  out  and  this  condition  shall  operate  notwithstanding  the provisions of any other term of this Agreement.  

 7.02  Termination of Agreement The General Manager shall be entitled to terminate this Agreement at any time by notice in writing to the Contractor, three (3) days notice being sufficient.    In the case of any such termination the Contractor shall not be entitled to compensation and all monies due and owing to the Contractor at the date of termination to the terms of this Agreement shall be paid to the Contractor.  

 7.03  Disposals and Replacements Where  the Contractor disposes of plant which  is  the subject of a hire contract with  the Council, Council shall be entitled to terminate this Agreement in pursuance of Clause 6.02 hereof, provided that where such plant  is to be replaced by similar plant and the Contractor so notifies Council  in writing  that  the  replacement plant will be  subject  to  the  same  rates as  the disposed plant,  the Council shall not be so entitled to terminate the Contract. 

22

CONTRACT AGREEMENT TENDER FOR HIRE OF PLANT 2020/2021 

 

TRADING NAME  .................................................................................................................. hereby quote(s) to 

supply to the Council of the Shire of Dungog at any time between 1st July 2020 and 30th  June 2021 the 

plant with or without labour described in the First Schedule hereto, at the rates shown in the First Schedule 

hereto, which plant and  labour are  insured  in accordance with the details  in the Second Schedule hereto, 

subject to and in accordance with the General and Special Conditions of the Contract both of which, should 

any contract be executed between the Council and myself  (itself)  in respect of the subject matter of this 

quotation, shall be deemed to be incorporated in such an Agreement as if more fully set forth therein. 

 

 

TRADING NAME ...................................................................................................................................... 

additionally agrees to be bound by the conditions of Tenders described. 

  SIGNED by the said    ………………………………  ……………………………………..    ......../......../........      Representatives Name             Signature               Date   Address   .....................................................................  ....................................................................................     Telephone ........................................ ..........................   Mobile  ......................................................................   Email ...........................................................................  ............................................. ......................................   In the presence of  :‐  ………………………………  ……………………………………..    ......../......../........         Witness Name             Signature               Date   Address   .....................................................................  ....................................................................................           

NOTE :    Applicants  where  applicable,  should  ensure  that  they  are  fully  conversant  with  the regulations and their obligations under the Prescribed Payments System of Taxation. 

23

DECLARATION  I hereby certify that plant hire to DUNGOG SHIRE COUNCIL shown on the First Schedule will be covered by the nominated Insurance Policies, registered in accordance with the Motor Traffic Act and will comply fully with all noise and registration requirements.  I  declare  that  no member  of my  family,  partnership,  business  associate  or  employee(s)  except  persons detailed below  (see notes) associated with or has  interests  in matters  relating  to Council's which would affect my performance or execution of the service for which my plant may be hired at the time of lodging this Quotation.  

FAMILY OR BUSINESS ASSOCIATION  

Name  Relationship to Council  Relationship to Contractor 

     

     

     

     

   ..................................................................          ......../......../........    Contractor's Signature              Date  NOTES :  Persons are relatives if they are  :‐  Parents, grandparents, brothers, sisters, uncles, aunties, nephews, nieces, natural or adopted children or grandchildren of the person or persons spouse or de facto partner; or spouses or de facto partners of the person or of the relatives listed above.  Persons are closely associated with members or staff  if they have a direct  interest  in a matter, before the Council and they are:‐  Close friends, a body (or bodies) corporate of which the members of staff are Directors or members of the governing body or bodies; proprietary companies  in which the members of staff hold shares whose total nominal value exceeds $1,000 or 1% of the total nominal value of the issued share capital, whichever is the greater;  beneficiaries  (or  objects)  of  a  discretionary  trust  of which  the members  of  staff  are  trustees; partners in a business or enterprise with members of staff; or providing (or can be reasonably expected to provide) a fee/commission/reward to members of staff for professional or other services.  

24

FIRST SCHEDULE (all details pertaining to Plant item and staff must be completed)  I / We offer the following Plant and Equipment for hire to Dungog Shire Council at the rates set out below for the period 01.07.2020 to 30.06.2021 (inclusive) subject to the General Terms and Conditions in the attached sheets.  

Tender  Tender 04/2020 – Hire of Plant and Equipment 

Tenderers  Details   

Tenderers Representative (Name)   

Signature    Date   

 

Plant Details  Plant 1  Plant 2   Plant 3 

Type of Plant (eg Backhoe)       

Make       

Model       

Year of Manufacture       

Engine Capacity       

Load Capacity (kg)        

Operating Weight (Kg)       

Registration No       

ROPs (Yes/No)       

Attachments       

       

       

Plant Based at:       

 

RATES (GST Inclusive)  $  $  $ 

Hourly ‘A’ Rate Wet Hire        

Hourly ‘B’ Rate  Wet Hire        

Hourly ‘C’ Rate  Wet Hire        

Hourly Rate Dry Hire       

Weekly Rate Dry Hire (Hr)       

Additional Equipment – (Hr)       

       

       

Establishment ‐ to job only       

Minimum Hire Period         

Please Note  Unless noted otherwise the hire rate shall be hourly for remainder of the work period after the minimum hire period has elapsed.  

25

The tenderer shall list details of the Operator/Drivers (At time of submission) Tender  Tender 04/2020 – Hire of Plant and Equipment 

Tenderers  Details   

Tenderers Representative (Name)   

Signature    Date   

Name (Full Name) 

Company Position 

 

Yrs of Exp 

Licence No 

Class  Safe work NSW 

Induction Certificate No. 

(White Card) 

           

I here certify that all of the staff listed above have been appropriately trained in the operation; hold the relevant qualification/licences; and have been deemed  competent by  the  tenderer  to operate/drive the item of plant that which they will be assigned.  

Tenderers Representative (Name)   

Signature    Date   

26

SECOND SCHEDULE           TO :   DUNGOG SHIRE COUNCIL  FROM :  .......................................................................................................................... (Applicant)  INSURANCE This letter is to confirm that I have in force, the undermentioned Insurance Policies:‐ (Certificates of Currency to be enclosed).  PUBLIC LIABILITY  

Insurer   ..................................................  Policy No.  ................................................... 

Coverage From  ......./......../........  To    ......../......../........ 

Limit of Indemnity ...............................................  ($20,000,000 minimum requirement) 

PRINCIPAL EXTENSIONS    Hoists, Cranes, Unregistered Vehicles Cranes            Cross Liability Clause Principals            Indemnity ‐ Dungog Shire Council            Liability for any Sub‐Contractor 

 

WORKERS COMPENSATION 

Insurer   ..................................................  Policy No.  ................................................... 

Coverage From  ......./......../........  To    ......../......../........ EXTENSION :     Principals indemnity ‐ Subsection (3) of Section 6 of the            NSW Worker's Act 1987 and as amended.  Any employees of Sub‐Contractors engaged by me will be insured by the Sub‐Contractor.   MOTOR VEHICLE All motor vehicles and plant owned by me and/or for which I am responsible and registered for use under the relevant Motor Traffic Act, are insured under a Comprehensive/Third Party Property Damage.  

Insurer   ..................................................  Policy No.  ................................................... 

Coverage From  ......../......../........  To    ......../......../........  Third Party Property Damage Liability Limit   ...............................................................                ($20,000,000 minimum requirement)  EXTENSION :         Indemnity to Principal  

ANY EXCESS NOMINATED UNDER THE POLICY IS PAYABLE BY THE INSURED.  Yours faithfully,    ....................................................  (Applicant)        ........ / ........ / ........ Date  

27

STATUTORY DECLARATION

I, (Full name of Declarant) of (Address) do hereby solemnly declare and affirm that :- 1. I am the representative of the Contractor : (Name of Contractor and ACN if applicable) in the Officer Bearer capacity of : (Position Title of Declarant) the said Contractor having a contract for : (Name of Contract)

with Dungog Shire Council and I am in a position to know the facts attested to. (Name of Principal)

2. All workers who have at any time been engaged by the Contractor have been paid all moneys due and payable to them for

the performance of work under the Contract and the supply of materials for use in work under the Contract, with the exception of the subcontractors and suppliers and the respective amounts listed below : (INSERT NAMES AND ADDRESSES OF WORKERS, THE AMOUNTS OWNING, AND WHETHER IN RESPECT OF WAGES, HOLIDAY PAY, ALLOWANCES, ETC.)

3. All subcontractors and suppliers to the Contractor have been paid all moneys due and payable to them for the

performance of work under the Contract and the supply of materials for use in work under the Contract, with the exception of the subcontractors and suppliers and the respective amounts listed below : (INSERT NAMES AND ADDRESSES OF SUBCONTRACTORS AND SUPPLIERS, THE AMOUNTS OWING AND WHETHER IN RESPECT OF MATERIALS SUPPLIED, WORK PERFORMED, ETC.)

4. The Contractor has been informed by each subcontractor by Statutory Declaration in equivalent terms to this declaration

that all workers, subcontractors, and suppliers engaged by them or their subcontractors have been paid all moneys due and payable to them in respect of their work under the Contract, with the exception of the workers, subcontractors and suppliers and the respective amounts listed below. I am not aware of anything to the contrary, and on the basis of the contents of the statutory declarations provided I believe that information to be true : (INSERT NAMES AND ADDRESSES, THE AMOUNTS OWING AND WHETHER IN RESPECT OF WAGES, MATERIALS, ETC. )

I make this solemn declaration, as to the matter aforesaid, according to the law in this behalf made, and subject to the punishment by law provided for any wilfully false statement in any such declaration. (Signature of Declarant) Declared at this (day month year) before me (Justice of Peace (JP) or authorised person)

28

SUBCONTRACTOR’S STATEMENT OPT 011 07-07 REGARDING WORKERS COMPENSATION, PAY-ROLL TAX AND RUMUNERATION (Note 1)

□ Workers Compensation s175B Workers Compensation Act 1987

□ Pay-roll Tax Schedule 2 Part 5 Payroll Tax Act 2007

□ Remuneration ss127, 127A Industrial Relations Act 1996

Sub Contractor: _______________________________________________ ABN: ______________________________ (Business Name)

of _________________________________________________________________________________________________ (Address of subcontractor)

has entered into a contract with __________________________________________________________________ (Note 2) (Business name of principal contractor)

ABN: ________________________ For work between: ____ / ____ / ______ and ____ / ____ / ______ (Note 3) (Date) (Date)

and/or Payment Claim Details: ___________________________________________________________________ (Note 4)

Nature of contract work: ________________________________________________________________________ (Note 5) DECLARATION

I, _______________________________________ a Director of / a person authorised by the subcontractor

on whose behalf this declaration is made, hereby state that the abovementioned subcontractor is either: A sole trader or partnership without workers or subcontractors (Note 6).

OR

Has and will maintain in force valid workers compensation insurance, policy ___________________ (Policy Number)

held with _______________________________________ as indicated on the attached Certificate of (Insurance Company)

Currency dated ____ / ____ / _____ , in respect of work done in connection with the contract, during any period of the contract and has paid all workers compensation insurance premiums payable in connection with the contract (Note 7).

Is Is not also a principal contractor in connection with the work under contract (Note 8).

Has Has not been given a written statement by subcontractors in connection with the work.

Is Is not required to be registered as an employer under the Pay-roll Tax Act 1971 _____________. (Pay-roll tax client No.)

Has paid all pay-roll tax due in respect of employees who performed the work for the principal contractor, as required at the date of this statement (Note 9).

Has paid all remuneration payable to relevant employees, for work done under the contract during the period outlined above (Note 10). Signature _________________________________ Full Name ___________________________________ (please print)

Position/Title ________________________________________________ Dated ____ / ____ / _____

WARNING Any subcontractor, who knowingly provides a principal contractor with a written statement that is false, is guilty of an offence

(Maximum penalty 100 units or $11,000). Any written statement will not relieve the principal contractor of liability if, at the time the written statement was provided, the

principal contractor believed the written statement to be false. The principal contractor must retain a copy of any written statement for a period of not less than five years (Pay-roll tax), six

years (Remuneration) or seven years (Workers compensation). This statement must be accompanied by the relevant certificate of Currency to comply with section 175B of the Workers

Compensation Act 1987.

29

NOTES TO SUBCONTRACTORS STATEMENT

1. This form is prepared for the purpose of section 175B of the Workers Compensation Act 1987, Schedule 2 Part 5 of the Payroll Tax Act 2007 and section 127 of the Industrial Relations Act 1996. If this form is completed in accordance with these provisions, a principal contractor is relieved of liability for workers compensation premiums, pay-roll tax and remuneration payable by the subcontractor.

2. For the purpose of this statement, a principal contractor is a person (or other legal entity), who has entered into

a contract with another person (or other legal entity), referred to as the subcontractor, and employees/workers of that subcontractor will perform the work under the contract. The work must be connected to the business undertaking of the principal.

3. In order to meet the requirements of s127 Industrial Relations Act 1996, a statement in relation to

remuneration must state the period to which the statement relates.

Section 127(6) of the Industrial Relations Act 1996 defines remuneration as ‘remuneration or other amounts payable to relevant employees by legislation, or under an industrial instrument, in connection with work done by the employees’. Section 127(11) of the Industrial Relations Act 1996 states ‘to avoid doubt, this section extends to a principal contractor who is the owner or occupier of a building for the carrying out of work in connection with the building so long as the building is owned or occupied by the principal contractor in connection with a business undertaking of the principal contractor’.

4. Payment claim details - Where a subcontractor has entered into a payment schedule with a principal contractor

they must identify the period or payment to which the statement applies. 5. An accurate description of the work covered by the contract must be included.

6. In completing the statement, a subcontractor declares that they are a sole trader or partnership without workers

or subcontractors and is not required to hold workers compensation insurance.

7. In completing the statement, a subcontractor declares that workers compensation premiums payable up to and including the date(s) on the statement have been paid, and all premiums owing during the term of the contract will be paid.

8. It is important to not that a business could be both a subcontractor and a principal contractor, if a business ‘in

turn’ engages subcontractors to carry out work. If your business falls within this category you should also obtain statements from your subcontractors.

9. In completing the statement, a subcontractor declares that all payroll tax payable relating to work undertaken

as part of the contract has been paid.

10. In completing the statement, a subcontractor declares that all remuneration payable has been paid.

It is noted that definitions of employer, employee, remuneration and specific provisions for employers of outworkers in the clothing trades are as defined in s127A of the Industrial Relations Act 1996.

11. Failure to complete this statement may result in the principal contractor withholding any payment due to the

subcontractor. Any penalty for late payment under the contract does not apply to any payment withheld under this subsection. Subcontractors may wish to keep a copy of the statement for their own records.

For more information, please visit the WorkCover website www.workcover.nsw.gov.au, Office of State Revenue website www.osr.nsw.gov.au, or Office of Industrial Relations, Department of Commerce website www.commerce.nsw.gov.au. Copies of the Workers Compensation Act 1987, the Payroll Tax Act 2007 and the Industrial Relations Act 1996 can be found at www.legislation.nsw.gov.au.

30

APPENDIX 1 

PLANT HIRE DOCKETS ‐ MINIMUM REQUIREMENTS 

Hired Truck Daily Record  Hired Plant Daily Record  Hired Watercart Daily Record Docket Number  Docket Number  Docket Number Contractor Details  Contractor Details  Contractor Details Operators Name  Operators Name  Operators Name Operators Signature  Operators Signature  Operators Signature Truck Capacity  Plant Capacity  Truck Capacity Make  Make  Make Model   Model   Model  Registration/ Unit Number  Registration/ Unit Number  Registration/ Unit Number Description (i.e. Truck Only, Truck & Dog)  Date  Date Date  Day  Day Day  Start Time  Start Time Start Time  Finish Time  Finish Time Finish Time  Location/Site  Location/Site Location/Site  Description of Work  Description of Work Description of Work  Total Hours onsite  Number of Loads Number of Loads  Meal Breaks taken from________to_______  Total Hours onsite Total Hours onsite  Meal Breaks hours  Meal Breaks taken from________to_______ Meal Breaks taken from________to_______  Total Worked (Invoiced) Hours  Meal Breaks hours Meal Breaks hours  Applicable Rate ('A','B' or 'C')  Total Worked (Invoiced) Hours Total Worked (Invoiced) Hours  Attachments Used  Applicable Rate ('A','B' or 'C') Applicable Rate ('A','B' or 'C')  Attachment Hours  Water Source (Water, Mains) Pre‐start Safety Plant Inspection Checklist  Establishment by (i.e. Contractor, DSC, Not Applicable)  Meter Reading Start    Establishment (i.e. km or Number)  Meter Reading Finish    Establishment Origin & Destination  Total Water Usage (Invoiced)    Pre‐start Safety Plant Inspection Checklist  Pre‐start Safety Plant Inspection Checklist         Councils Representative Name  Councils Representative Name  Councils Representative Name Councils Representative Signature  Councils Representative Signature  Councils Representative Signature                 Notes  Notes  Notes Total Worked hours to be recorded per site  

Total Worked hours to be recorded per site  

Total Worked Hours and Water usage to be recorded per site 

One docket per day hire  One docket per day hire  One docket per day hire         

APPENDIX 2 

POLICY NO: C 1:21 POLICY TITLE: STATEMENT OF BUSINESS ETHICS Policy Background: This policy is developed as part of Councils corporate governance program, users should also refer to Councils policy on Corruption Prevention and Councils Code of Conduct. What is Business Ethics? Business Ethics is the application of ethical values to business behaviour. It applies to all aspects of business conduct and applies to the conduct of individuals and the conduct of the organisation as a whole. Key business Principles Council's business ethics statement outlines Councils expectations on how goods and service providers, and contractors are to deal with Council and vice versa. This aims to ensure: • Value for money • Fair, open and effective competition • Transparency What providers can expect from Dungog Shire Council Council strives to ensure all of its policies, procedures and practices relating to tendering, contracting and the purchasing of goods and services are based on best practice and the highest ethical standards. Council staff are bound by Dungog Shire Council's Code of Conduct. When staff do business with the private sector they are expected to: * Use public resources effectively and efficiently. * Deal fairly, honestly and ethically with all individuals and organisations. * Avoid conflicts of interest (whether real or perceived). Council's procurement activities are guided by the following business principles: * All potential suppliers will be treated impartially and be given equal access to information and opportunities to

submit bids. * Fully document all procurement activities and decisions to provide an effective audit trail and allow for the

effective performance review of contracts. * Council will purchase energy efficient equipment and environmentally friendly products wherever reasonably

possible. * Tenders will not be called unless Council has a firm intention to proceed to contract. * Council (Councillors and staff) will not disclose confidential information. What Council Expects from Providers Council requires all private sector providers to observe the following principles when doing business with Council: * Comply with Council's procurement policies and procedures. * Provide accurate and reliable advice and information when required * Declare actual or perceived conflicts as soon as become aware of the conflict. * Act ethically, fairly and honestly in all dealings with the Council. * Take all reasonable measures preventing the disclosure of confidential Council information. * Refrain from engaging in any form of collusive practice, including offering Council staff any incentive, gifts or

benefits. * Refrain from discussing Council business with the media. * Assist Council to prevent unethical practices in our business relationships.

32

Why Providers Need to Comply All Council suppliers of goods and services are required to comply with this statement. Failure to comply with this statement can lead to: * Termination of contracts * Loss of future work * Loss of reputation * Investigation for corruption * Criminal investigation POLICIES: The adopted Statement of Business Ethics be included in the following Council dealings: 1. Tenders - It will be attached to all tender documents 2. Expressions of Interest - attached to all expression of interest documentation 3. General Suppliers - in any mass mail outs carried out to our general suppliers (e.g. requests to provide

updated mailing / banking details) a copy of the statement of business ethics will be included. Date Policy Adopted 18 October 2005 Minute No 32797 Authority Council Resolution