Summary of Pending Vendor Registrations
Total 257 Cases as on 27/3/2018
SN Directorate 2013 2014 2015 2016 2017 Total
1. M&C - - 5 6 1 12
2. Telecom - 2 1 4 4 11
3. QA/Mech - 1 3 10 16 30
4. Wagon - - 4 13 14 31
5. Traction Installation 2 1 3 8 9 23
6. QA/Civil - - 6 4 6 16
7. Elect.Loco - - - - 1 1
8. Motive Power - 1 1 1 - 3
9. QA/S&T - 2 17 15 12 46
10. Signal 1 12 9 14 10 46
11. QA/Electric - 1 1 3 2 7
12. Carriage - - - 3 4 7
13. PS&EMU - 1 10 7 6 24
TOTAL 3 21 60 88 85 257
1 2 3 4 5 6 7 8 9
2
1.0 Pending Vendor Registrations /Vendor Approval details:
S. No.
Vendor Name Item for which applied
Date of original
application
(through
letter / web
portal) (1st Reference)
Committed timeline
(Reasonabl
e period)
for disposal
of the application
Communication exchanged between Vendor & RDSO
(Dates of letters /emails)
Extended Timelines
Reasons for Delay Current Status
RDSO Vendor
1 2 3 4 5 6 7 8 9
M&C
1. M/s Shieldarc
Equipment
Pvt. Ltd.
Kolkata(WB)
MIG/MAG Solid
Class–I &III to IRS-
M-46/03
12.01.15 &
02.09.2016
(i)Letter sent on 29.06.2015
regarding requirements of STR
not full filled by firm
(ii)Letter sent on 10.2.16 for
time bound reply for closure.. (iii) Letter received on
06.03.2016 from firm for
withdrawal of class – VI &
again applies for class –III wire
on 02.09.2016.
(iv) Doc. rcvd on 23.09.16 scrutinized and letter sent on
25.10.2016,
(v) Doc received on
21.12.2016,
(vi) Letter sent on 05.07.2017. (vii) Doc. Received on
26.09.2017.
(viii) Visit approved on
17.10.17
(ix) Samples under testing
from 04.12.2017
September -
2018
Non compliance of
deficiency from firm
side
i.)STR Verification
ii.)Visited to firm on
27.11.17 & 28.11.17.
iii.) Samples under
testing w.e.f. 04.12.2017
2. 1 GEE Ltd., Howrah(WB)
MMAW electrode under Class C2,
E2 to IRS M-28/12
13.08.2015 (i) Visited in Aug. 2017 for STR verification, capacity
assessment & sampling.
(ii)Letter sent on 25.09.2017
for testing charges.
(iii) A letter received on 07.11.2017 from firm for
withdrawal of E1 class
March-2018
No delay Under process of approval
1 2 3 4 5 6 7 8 9
3
electrode.
(iv) Testing charges received on 11.11.2017
(v) Samples under testing from
20.11.2017
3. 1 Nouveaux
Industries Pvt.
Ltd., Tirupur(TN)
MIG/MAG Solid
Class–I, VI, VII to
IRS-M-46/13
20.10.15 (i) Visit approved on 4.9.2017.
(ii) A letter sent to firm on
08.09.2017 (iii)Firm conformed visit on
13.09.2017
(iv) Letter sent on 18.10.2017
for testing charges.
(v) Samples under testing
05.12.2017
March-2018
No delay i.)Visited in Sept. -17,
ii.)Samples received.
Testing charges received on 23.11.17.
iii.) Under Testing w.e.f.
05.12.2017
4. 2 Royal Arc
Electrode Ltd.
Valsar (Gujrat)
MIG/MAG Fluxed
core wire Class–
VIII to IRS-M-
46/13
06.10.15 (i) Visited in July- 2017 for
STR verification, capability
assessment & Sampling.
(ii) Samples rcvd
(iii) Letter sent on 05.10.2017
for testing charges. (iv) Testing charges received on
04.11.17
(v) Testing completed.
March-2018
No delay (i)Samples rcvd
(ii) Testing charges
received on 04.11.17
(iii) testing completed.
(iv) under process for
approval
5. 2 Premier
Industrial
corporation Mumbai
MIG/MAG Solid
wire
Class– I, III, IV,VI,VII to
IRSM46/13
11.02.2016 (i) visited in July- 2017 for STR
verification, capability
assessment & Sampling. (ii) Samples rcvd in August-
2017.
((v) Samples under testing
19.09.2017
March-2018
No delay Under testing w.e.f.
19.09.2017
6. 2 Premier
Industrial
corporation Mumbai
SAW Wire & Flux
W1,W2,W4
F1,F2,F4 To IRSM:239/01
11.02.2016 (i) Visited in Aug 2017 for STR
verification, capability
assessment & Sampling. (ii) Samples rcvd.
(iii) Letter sent on 16.10.2017
for submission of testing
charges
(iv) Testing charges received. (v) Samples under testing
25.10.2017
April-2018
No delay Under testing w.e.f.
25.10.2017
7. 2 MW Wire MIG/MAG solid 08.07.2016 (i) Visited in Aug 2017 for STR April-2018 No delay Under testing w.e.f.
1 2 3 4 5 6 7 8 9
4
Tech(P) Ltd. wire Class–I &VI to
IRS-M-46/13
verification, capability
assessment & Sampling. (ii)Testing charges received on
27.09.2017
(iii) Samples under testing
09.10.2017
09.10.2017
8. M/s Mishra
Dhatu Nigam Ltd. Hyderabad-
500058
MMAW electrodes,
Cl. B3, B4,C2, M6 &M7 to
IRSM:28/12
11.08.2016 (i)Deficiency letter sent on
19.09.16. (ii) Doc. rcvd 05.06.2017
(iii) A letter sent on
04.07.2017.
(iii) Reminder sent on
06.09.2017
(iv) Final reminder sent on 02.11.2017
(v)Applied on 28.11.2017 for D
class for compliance of group
criteria and rejected on
29.11.17 due to wrong filling up the invoice request.
(vi) Application received for
class D
(vii) Visit planed in last week of
Jan’2018.
Sept-2018 No delay i)Reminder sent on
06.09.17 ii.) Final reminder sent
on 02.11.2017
iii)Application received
for class D
iv)Letter sent for visit
confirmation on 12.01.2018
v) firm’s letter received on
14.01.2018 requested for
postpone the visit up to
May ’18. vi) Firm’s request is
accepted due to less than
three vendors. Visit
planned in May.
9. 2 Royal Arc
Electrode Ltd.Valsar
(Gujarat)
MIG/MAG Fluxed
core Class–II & V to IRS-M-46/13
03.08.2016 (i) visited in July- 2017 for STR
verification, capability assessment & Sampling.
(ii) Samples rcvd and testing
fee is to be levied by firm.
iii) Letter sent on 05.10.2017
for testing charges. (iv) Testing charges received on
04.11.17
(v) Under Testing for class II
from 06.11.2017
(vi) testing completed for class
v
March-2018
No delay Under Testing for class II
from 03.11.2017 iii) testing completed for
class V
iv) under testing for Cl
.II
v) under process for approval for class V
10. Nouvaux
Industries
SAW class-
W1,W2,W4,F1,F2,F
4 to IRSM 39/01
23.09.16 (i) Visit approved on 4.9.2017.
(ii) A letter sent to firm on
08.09.2017
(iii)Firm conformed visit on
April -2018
No delay i)Visited in Sept. -17,
ii) Samples received and
part of testing charges is
received on 05.1.2018
1 2 3 4 5 6 7 8 9
5
13.09.2017
(iv) Letter sent on 18.10.2017 for testing charges.
(v) Reminder sent on
28.12.2017
iii) Under Testing for
class W1,W2,W4 wire w.e.f. 23.01.2018
flux w.e.f.
0703.18
11. 3 Accurate
weldarc Pvt. Ltd.
Raipur.
MIG-MAG solid
wire Cl. I, III, IV,
VI, VII to IRSM:46/13
25.08.17 (i) A letter sent on 13.09.2017
(ii) Letter sent on 13.10.17
(iii.) Reply received on 11.12.17
Sept-2018 No delay (i) Letter sent on
13.09.17
(ii)Letter sent on 13.10.17
iii.) Reply received on
11.12.17
iv) Visit planned in
Feb’18
v) firm’s letter received on 29.01.2018 requested for
postpone the visit.
vi) Visit planned in April
12. 5 Sigma
Corporation,
Chennai
M&P Lubricants 26/08/2015 i) Complete application form
received on 26.8.15 with 5th
Item. ii) 1stdeficiency letter issued on
17/02/2016 iii) Compliance received on
23/02/2016.
iv)2nd Deficiency note issued on
31/05/16.
V) On not getting any response from the firm, Reminder issued
on18/08/2016.
vi)Compliance Received on
22/09/2016 vii)Deficiency note issued on
21/08/2017. viii) Compliance received on
09/10/2017.
ix)No compliance received till
date therefore
Final closure notice sent on 27/11/2017 giving 15 days
time
May 18
Non compliance of
the requirements as
per apex documents,
STR & Technical
specifications from
vendors
i)No compliance received
till date therefore
Final closure notice sent on 27/10/2017 giving 15
days time.
ii) Compliance received
on 21/11/17.
iii) Visit done on
28.12.17& 29.12.17 iv)Sample received
iv.)testing charges
received on 22.1.18
v.) testing under testing,
w.e.f 25.01.18
1 2 3 4 5 6 7 8 9
6
TELECOM
13. M/s Delta Embedded
solutions Pvt.
Ltd pune.
On – board wireless PA System
for
Passenger Trains
(RDSO/SPN/TC/1
04/2014, Ver. 0.0)
16.11.2016 NIL 23.8.2017 ---- Due to some technical issues
regarding policy for
this item a
processing of the
case was
suspended. Now Railway Board
permitted the firm
to conduct proof of
concept (POC) of
the system on the
Mumbai Rajdhani Express Train.
1. No approved vendor
for item
2. Proof of concept (POC)
trial of the system in
completed in Mumbai
Rajdhani Express
Train.
Further processing is
being done.
14. M/s Securinex
Nic, Parwanoo
Integrated
Passenger
Information
System as per
RDSO/ SPN/ TC/61/2015 Rev-
4, Amendt.-1
21.4.2017 NIL 2.8.2017 ---- ---- CCA conducted &
deficiencies advised to
firm on 22-2-2018.
15. RT Vision
technologies(P )
Ltd.
Electronic LC Gate
Telephone System
02.04.2014 NIL Sample submitted.
16. Electric
Equipment Company Pvt.
Ltd.
Electronic LC Gate
Telephone System
21-03-16 NIL 17-05-16, 24-10-16, 06-02-17,
22.09.2017
---- ---- Under CCA approval.
17. M/s Kriti
Industries (I)
Ltd. Dhar (MP
Permanently
Lubricated HDPE
Duct
17.05.2016 NIL 28.08.2017 ---- Capacity- Cum-
Capability approval has
been granted to the
firm. Firm has been
advised for submission of test sample on
10.11.2017.
18. M/s Veer
Vissions Pvt. Ltd.
Parwanoo (H.P.)
Permanently
Lubricated HDPE
Duct
12.04.2017 NIL 30.06.2017 ---- Deficiencies in QAP and
other incomplete
documents advised to the
firm vide letter dt. 9.11.2017.
1 2 3 4 5 6 7 8 9
7
19. M/s Tijaria
Polypipes Ltd. Jaipur
Permanently
Lubricated HDPE Duct
18.05.2017 NIL 28.08.2017 ---- CCA approval under
scrutiny.
20. M/s Veekay
Plast Jaipur.
Permanently
Lubricated HDPE
Duct
10.08.2017 NIL 28.08.2017 ---- Deficiencies advised to
the Firm vide letter
dt.16.10.2017.
21. M/s Ampson
Engg. Pvt. Ltd.,
Thane
Joint Enclosure for
Armoured Optical
Fiber Cable
11.12.2015 NIL 24.07.17 ---- Case is being scrutinized
further.
22. M/s HI Light Industries
HOWRAH
Emergency Socket Box FRP Material
RDSO/ SPN/
TC/44/2002
Version 2,
amendment-3.
20.10.2016 Vendor
Reference
ID:
QAS2016/
2683
NIL 1. This office letter dated 16.05.2017 the firm has
been advised to submit
necessary documents.
2. Firm’s reply & documents
vide letter dated 05.08.2017 received in this office on
23.08.2017 14.09.2017
---- ---- CCA conducted.
Deficiencies advised on
16.1.2018.
23. 2 M/s Punjab
Communication
Ltd, Chandigarh
SMPS Based
Telecom Integrated
Power Supply
Systems (TIPSS) as
per spec no. RDSO / SPN/TC
/102/2013 Rev.1
23.06.2014
Vendor
Reference ID
QAS2014/
1533
NIL 23/12/2014
31/05/2015
08/06/2015
16/09/2015
20/01/2016 18/08/2017
---- ---- 1. No approved vendor
for item
2. Firm is advised to
submit prototype
sample. On
dt.13.10.2017
QUALITY ASSURANCE /MECHANICAL
24. 3 M/s Jindal Steel
Power Ltd. Ramgarh
(Jharkhand)
Spring Steel
Rounds 55Si7 & 60Si7 to IS: 3195
05.07.2014 Firm has been issued Show
cause notice on 13.12.2017 to submit the compliance of
advised deficiencies found
during STR verification within
30 days.
June2018 Delay due to non
clarity regarding splitting of facilities at
two separate
locations.
STR Verification
25. Climax Overseas
Pvt Ltd, Gurgaon,
Haryana
Elastomeric Pads 12.04.2015 Capability assessment
completed. Firm advised to prepare sample and submit
sample testing charges on
01.12.2017.
July’2018 Firm wants drawing
changed from RDSO drawaing.
Sample testing
26. Brand Alloys
Private Limited,
Kolkata
HT CBC coupler for
freight
03.10.2015 Case Temporary Closed on
19.01.2017, reopened & compliance forwarded to zonal
office on 22.8.17 for
Aug'2018 - Sample Testing
1 2 3 4 5 6 7 8 9
8
verification. Capability
assessment completed and firm advised to prepare sample on
19.01.2018
27. Chemin Spring
India Pvt. Ltd,
Haridwar
Hot Coiled Helical
springs for
Locomotives
07.12.2015 Firm is advised to prepare
samples for testing on
18.11.2016. Firm asked about no. of sample to be prepared for
testing and field trial in
May’2017. The case has been
referred to MP Dte. for
clarification of specification in
this regard.
Nov’2018 Delayed compliance
of STR by the firm
and Non clarity in
specification about field trail.
Sample Testing
28. Rahul Precision, Dhar
Elastomeric Pads 27.01.2016 Dir/BB has advised on 06.03.17 for TC due to non-
compliance of def. observed.
Compliance received &
forwarded to zonal office on
13.04.2017 for its verification.
June'2018 Non compliance by the firm.
STR Verification
29. Rahul Precision Works Pvt. Ltd,
Dhar (MP)
Rubber Spring of High Capacity Draft
Gear for CBC of
Wagons
02.02.2016 Case forwarded to zonal office on 03.01.17 after reopening.
Case recommended for TC by
Dir/ BB due to non-compliance
STR on 13.4.17. Firm's reply
received & forwarded to zone on
29.6.17 for verification.
June'2018 Non compliance by the firm.
STR Verification
30. Rahul Precision Works Pvt. Ltd.,
Dhar( MP)
Centre Pivot Washer
02.02.2016 Case forwarded to zonal office on 12.01.17, returned to HQ for
TC on 13.4.2017 due to non-
compliance. SCN issued to firm
on 25.4.2017. Firm reply
received & forwarded to zone on 27.06.17.
April 2018 Non compliance by the firm.
STR Verification
31. Precision
Industrial
System, Gwalior.
Class 'A' foundry 18.02.2016 Compliance received on
17.05.2017. AIE-I visited on
11& 12th Sept,17 for
verification. Still not fully
complying the requirement. Compliance awaited.
Mar'2018 Non compliance by
the firm.
STR Verification
32. Sterling Bolts
Pvt Ltd, Kolkata
Axle end steel high
tensile cap screws
01.03.2016 Due to non-compliance
observed during STR
May'2018 Non compliance by
the firm.
STR Verification
1 2 3 4 5 6 7 8 9
9
verification & sent for
Temporary Closure on 31.08.17 by Zone. SCN issued to firm on
14.09.2017.
33. Climax overseas
private limited,
Gurgaon.
Metal Bonded
Rubber Pads for
Side Bearer
13.06.2016 Case Temporary Closed on
07.12.2016 due to non-
compliance of deficiencies.
Compliance received on 20.6.17, forwarded to Zonal
office for STR verification on
31.08.17.
May'2018 Non compliance by
the firm.
STR Verification
34. M/s Maa
Foundry Pvt.
Ltd., Orisha
Narrow Jaw, Wide
Jaw and Modified
Adapter
30.07.2016 STR verification done & found
OK. QA checked & approved.
Sample checked & found as per requirement. Report awaited.
May'2018 No delay. Sample Testing
35. Lal Baba
Industrial
Corpn, Howrah
Screw coupling for
Coaching stock
28.10.2016 Sample testing done. Director's
visit schedule on 13.9.17.
June’2018 No delay. Sample Testing
36. Jai Multi
Engineering Co.
Mohali
Centre Pivot Top &
Bottom
03.12.2016 Temporary Closed on
10.07.2017. Case reopened and
firm has been asked for sample
preparation and testing on 01.02.2018
Apr’2018 - Sample Testing
37. M/s Ravindra
Trading
Company,
Chennai
Slack Adjesters and
Spares for Freight
Stock IRSA 750
03.12.2016 Forwarded to Dir/BB on
30.06.2017 for STR verification.
Dir/BB has recommended for
TC due to noncompliance of
STR, SCN issued from HQ on 29.8.2017.
Dec'2018 - STR Verification
38. Mishra Dhatu
Nigam Limited,
Hyderabad
SS round 60Si7 &
Gr 55Si7
22.03.2017 Case Temporary Closed due to
non-compliance of deficiency
on 24.07.2017.
June’2018 STR Verification
39. Mishra Dhatu
Nigam Limited,
Hyderabad
SS round 52Cr4
Mo2V
22.03.2017 Case Temporary Closed due to
non-compliance of deficiency
on 24.07.2017.
June’2018 STR Verification
40. Mandeep
Industries, Lucknow
Elastomeric Pads 02.05.2017 STR conducted & firm has been
advised for sample preparation on 10.07.2017. Firm has
informed for readiness of
sample on 14.8.17.
May’2018 No delay. Sample
Testing
41. M/s Ravindra Slack Adjesters and 20.04.2017 Forwarded to Dir/BB on Nov'2018 STR Verification
1 2 3 4 5 6 7 8 9
10
Trading
Company, Chennai
Spares for Freight
Stock
30.06.17 for STR verification.
Dir/BB has recommended for TC due to noncompliance of
STR, SCN issued from HQ on
29.8.17.
42. Suyog Rubber (I)
Pvt Ltd
Side bearer & imp
side bearer for loco
17.05.2017 Temporary Closed on
07.08.2017. Case reopened and
forwarded to Zonal Office for STR Verification on 21.12.2017
June’2018 STR Verification
43. Sunflag Iron &
Steel Co.Ltd.
Bhandara
Spring Steel
Rounds for FIAT
Bogie Coil Spring
31.05.2017 Case forwarded to Dir/BB for
STR verification on 7.07.2017.
SCN issued by HQ on 16.08.17
due to def noticed during STR
verification.
Jan’2019 STR Verification
44. Jayaswal Neco Industries Ltd.
Raipur
Spring Steel Rounds for FIAT
Bogie Coil Spring
08.06.2017 Case forwarded to Dir/BB for STR verification. SCN issued by
HQ on 17.08.17 due to def
noticed during STR verification.
Jan’2019 STR Verification
45. Bhushan Power & Steel Co. Ltd.
Sambalpur
Spring Steel Rounds for FIAT
Bogie Coil Spring
08.06.2017 Case forwarded to Dir/BB for STR verification. SCN issued by
HQ on 17.08.17 due to def
noticed during STR verification.
Jan’2019 STR Verification
46. Climax overseas private limited,
Gurgaon.
Side bearer and improved side
bearer for
locomotives
09.06.2017 After initial scrutiny SCN issued on 17.07.17. Case
Temporary Closed on
18.08.2017. After compliance
by firm STR verification done
and firm advised for sample
preparation on 06.02.2018
June’2018 Sample Testing
47. RL Steels & Energy Ltd.,
Aurangabad.
Spring Steel Rounds for FIAT
Bogie Coil Spring
21.06.2017 Case forwarded to Dir/BB for STR verification. SCN issued by
HQ on 29.08.17 due to def
noticed during STR verification.
Jan’2019 No delay. STR Verification
48. Balaji Rubber
Factory, Pune
Centre Pivot
Washer
05.07.2017 After scrutiny Def with SCN
issued on 06.09.17.
May'2018 Initial
Scrutiny
49. Balaji Rubber
Factory, Pune
Rubber Buffer
Spring for freight
stock
12.07.2017 After scrutiny Def with SCN
issued on 06.09.17.
May'2018 Initial
Scrutiny
50. Nava Nirman Fabrication Pvt
HT CBC Coupler (56-BD-07) & its
05.07.2017 Forwarded to Zonal office for
STR verification on 12.09.2017.
Sep'2018 STR Verification
1 2 3 4 5 6 7 8 9
11
Ltd, Kolkata components
51. Balaji Rubber
Factory, Pune
Side bearer Rubber
Spring for
locomotive
12.07.2017 After initial scrutiny,
Deficiencies advised to the firm
with SCN on 12.09.17.
June'2018 Initial
Scrutiny
52. Frontier Springs Ltd, Kanpur
Screw Coupling 31.07.2017 After initial scrutiny, Deficiencies advised to the firm
with SCN on 13.09.17.
Apr'2018 Initial Scrutiny
53. JSL Life Style
Ltd, Haryana
Body Side Wall,
End Wall and Flap
Door of BOXNR
Wagons
17.08.2017 After initial scrutiny,
Deficiencies advised to the firm
with SCN on 13.09.17.
June'2018 Initial
Scrutiny
WAGON
I Item : LWLH 25 t axle load bogie
54. M/s Siena Engineering Pvt.
Ltd.
LWLH25 Bogie 06/05/17 One year Deficiencies advised to firm vide this office letter dated
28/07/17.Last reminder sent
to firm on 08/09/2017
NA Delay on account of firm
Team of RDSO officials has been nominated for
capability assessment
II Item : Spring loaded Side Bearers (SLSB) to RDSO Drg. No. WD-12007-S/01 & WD-12008-S/01
55. M/s G B Spring
Pvt Limited
SLSB 25/06/16 One year STR/capability completed and
deficiencies have been advised
to firm vide this letter dt.
15/05/17 and last reminder letter sent on 11/08/17.
One year Delay on account of
firm
Show Cause Notice
issued on 09.03.18
56. M/s Oriental
Foundry Pvt. Ltd
SLSB 19/08/16 One year After STR verification, the
prototype of side bearers to
drg no WD-12008-S/01 has
been completed. For proto
samples for proto testing of SB to drg no WD-12007-
S/01 yet to be offered by the
firm. Last reminder sent on
21/11/17 to firm & requested
to confirm availability of
adequate capacity furnace and confirm the readiness of
samples of SB to drg no. WD-
12007-S/01 for necessary
proto testing
Six months Delay on account of
firm
Type testing underway.
Likely to be completed
this month
1 2 3 4 5 6 7 8 9
12
57. M/s Kalimata
Ispat Industries Pvt Ltd
Spring loaded side
bearer
06/05/17 One year STR/ capability has been done
from 22.07.2017 to 23/07/17 & 17.08.2017. Proto testing of
SB to drg no 12008-S/01 has
been completed. Samples of
SB to drg no WD-12007-S/01
are yet to be offered by the firm for necessary proto
testing. Firm has been advised
to confirm their readiness vide
this office letter dt. 21/11/17.
NA Waiting for firm
readiness for prototype testing
Type testing underway.
Likely to be completed this month
58. M/s CHEMIN
Springs India
Pvt Ltd
Spring loaded side
bearer
17/05/17 One year Deficiencies letter has been
sent on 20/06/17.Last
reminder sent on 01/11/17.
NA Delay on account of
firm
Documents received.
Under scrutiny
III Item : High Capacity draft gears to STR No. WD-71-BD-15
59. Burnstandard,
Kolkata
-Fresh registration
under WD-71-BD-
15
18.04.16 Sept’17 RDSO letter-
02.11.16,12.07.17
June’18 STR verification held
up for want of
documents from firm
Show cause notice issued
on 08.03.18
60. Raneka
Industries Ltd.
Dhar(MP)
-do- 15.09.16 March’18
Firm’s letter-
20.02.17,14.04.17,17.06.17
,28.08.17
RDSO letter-24.03.17, 29.05.17, 27.07.17
Type tests commenced
w.e.f.27.02.18
61. Wabtac-
texmaco,
Kolkata
-do- 12.12.16 March’18 Firm’s letter-
26.05.17,03.07.17,02.08.17,
28.08.17, 12.09.17
RDSO letter-
16.06.17, 31.07.17
June’18 Delay on account of
firm
Team of RDSO officials
has been nominated for
STR verification
62. Amstead Steel Foundries
(India) Pvt.
Solan (H.P.)
-do- 07.03.17 June’18 Firm’s letter 07.03.17, 27.07.17
RDSO letter
11.04.17, 12.07.17, 17.08.17
Show cause notice issued on 20.02.18
63. Besco(Wagon
division),
Kolkata
-do- 17.05.17 June’18 Firm’s letter
28.06.17,23.08.17
RDSO letter
23.06.17,27.07.17, 08.09.17
Show cause notice issued
on 20.02.18
IV Item : High tensile CBC couplers to WD-70-BD-10
64. M/s. Jai Multi,
Mohali
Fresh registration
under WD-70-BD-
10
05.04.15 April’17 Firm’s letter-
18.07.15,14.11.15
15.02.16,27.05.16
03.09.16,11.04.17
Sept’18 Registration process
got delayed due to
non installation
of facilities like
Team of RDSO officials
has been nominated for
follow up audit
1 2 3 4 5 6 7 8 9
13
18.08.17
RDSO letter- 03.06.15,16.09.15
10.12.15,29.04.16
25.08.16,23.06.17
21.07.17(reminder)
sand reclamation
plant, solidification software etc by firm
65. M/s. Atul Engg.
Udyog, Agra
-do- 15.05.15 May’17 Firm’s letter-
15.05.15,01.09.15 21.03.16,28.06.16
12.09.16
RDSO letter-
16.06.15,28.09.15
17.05.16,29.08.16
21.07.17(reminder) STR verification report
approved on 24.05.17
Vide letter dt 22.06.17 firm’s
QAP approved for
manufacture of 25 sets.
May’18 Registration process
got delayed due to non installation
of facilities like
sand reclamation
plant, solidification
software etc by firm
Samples for NML
picked-up on 06.01.18.samples
under testing at NML
66. M/s Om Besco Rail Product,
Dhanbad
-do- 10.11.15 June’17 Sept’18
Sample failed in NML testing. Firm
vide letter dt.
01.06.17 advised to
submit revised QAP.
Firm’s QAP
submitted vide letter dt. 12.07.17 was
approved vide this
office letter dt.
27.07.17
Firm has communicated its
readiness to
manufacture 25 sets for
type tests.
67. Kharagpur Metal
Reforming Industries,Kharagpur
-do- 18.11.15 Dec’17 Firm’s letter-
20.04.16,03.01.17 22.02.17,10.07.17
RDSO letter-
18.12.15
STR verification report
approved on 17.08.17 Firm submitted QAP on
21.08.17
Firm has been advised to
submit revised QAP
July’18 Firm took a long
time to offer 25 Nos coupler for type
testing
Type testing completed.
Report under preparation
1 2 3 4 5 6 7 8 9
14
68. Simplex Casting,
Ltd. Bhilai
-do- 10.03.17 June’18 Firm’s letter-14.03.17
RDSO letter-13.04.17, 12.07.17(reminder)
Firm has been advised
to submit QAP for manufacture of 25 Nos
coupler for type testing
69. Siena Engg Pvt
Ltd
Pithampur, Distt Dhar
-do- 06.05.17 March’18 Firm’s letter-09.05.17,
29.08.17 RDSO letter-
05.06.17, 12.07.17 (reminder)
Sept’18 Type tests are
getting delayed as
firm has not manufactured 25
nos coupler for type
testing even after 2
months of approval
of QAP.
QAP approved, firm
advised to inform about
their readiness for manufacturing 25 sets
70. Sanmar Foundries
limited,
Viralimalai
-do- 21.12.16 June’18 Firm’s letter- 18.08.17
RDSO letter-
08.09.17
Firm applied online on 21.12.17 but
submitted
documents vide
letter dt. 18.8.17
Show cause notice issued on 28.02.18
71. NF Forgings Pvt.
Ltd.
-do- 12.09.17 Sept’18 STR verification done by
RDSO officials .Report
under preparation
72. Shree Kedar Metal Foundries
10.10.17 Sept’18 Team of RDSO officials has been nominated for
STR verification
V Item : Investment casting items to STR No WD-70-BD-10
73. M/s. Dinesh
Ispat Pvt. Ltd.,
Bhilai
-do- 28.06.16 Dec’17 Firm’s letter-
23.08.16,02.09.16,25.10.16,
17.05.17,31.05.17 , 21.07.17,
04.08.17
RDSO letter- 09.08.16,30.09.16, 15.06.17
June’18 Registration getting
delayed due to non
compliance of
deficiencies observed
during STR verification by firm
Firm has been given time
till 30th April to submit
compliance of deficiencies
74. Sanmar
Foundries
Limited,
Viralimalai
-do- 25.05.16 Dec’17 Firm’s letter-
25.01.17,18.04.17
RDSO letter-
20.07.16,01.03.17, 11.05.17
June’18 STR verification held
up for want of
documents from firm
Show cause notice issued
on 28.02.18
75. Vikas Hi-tech
Casting, Howrah
-do- 17.02.17 Dec’17 Firm’s letter-
10.05.17,14.06.17 15.07.17
RDSO letter-
07.04.17,24.05.17,30.06.17,
Firm has been placed in
the ‘List of RDSO Vendors for Developmental
Orders”.
1 2 3 4 5 6 7 8 9
15
31.07.17
Nomination of RDSO officials for STR verification-17.08.17
VI Item : BMBS for freight stocks fitted with CASNUB bogie to RDSO specification No- WD- 23-BMBS-2008 Rev-1
76. M/s-GDR
MEKTEK
Banglore-
Karnataka(
Licensee of M/s- Escorts Limited)
-do- 29.12.2016 June’18 Firm’s letter
06.01.2017,07.03.2017,
25.04.2017, 12.05.2017
16.08.2017
RDSO letter- 01.02.17,30.03.17
05.06.17 & 21.08.2017
Approval of STR verification
report-17.08.2017
Firm’s QAP has been
approved for
manufacture of 5 sets
BMBS for type testing
77. M/s- Advance
Diesel Engine Pvt Limited,
Rajkot Gujrat (
Licensee of M/s-
Escorts )
-do- 30.12.2016 June’18 Firm’s letter
03.01.2017,07.01.2017 , 08.03.2017, 25.042017
22.05.2017, 31.05.2017
RDSO letter-
31.01.2017, 29.03.2017
16.06.2017, 21.08.2017
Approval of STR verification report-17.8.17
Type tests commenced
w.e.f 04.02.18
78. M/s- Webtec-
Texmaco rail
private Limited
Kolkata
10.07.2017 June’19 Firm’s letter
03.07.2017,29.08.2017
Letter of non compliance
sent on 04.10.17. Firm
has sought time till
07.04.18 to submit
compliance
VII Item : Non Asbestos ‘K’ type High friction Composition Brake Block for Freight stock,840 mm wheel dia.
79. M/s Hindustan Composites
Limited
Aurangabad
Non Asbestos ‘K’ type High friction
Composition Brake
Block for Freight
stock,840 mm
wheel dia.
14/03/2016 June’18 Firm’s letter-18/03/2016, 09/06/2016,27/12/2016
RDSO letter-
24/05/2016, 24/08/2016,
27/09/2016
March’19 (sample failed in dynamometer test) :
results
communicated to
firm-11.08.16
30 days show cause notice issued on
16.11.17.Firm’s reply
dated 19.11.2017
received
80. M/s Bony
Polymers Pvt. Ltd. Faridabad
-do- 27/06/2016 June’18 Firm’s letter-
29/06/2016,02/09/2016 RDSO letter-
25/07/16,07/10/2016
March’19 (sample failed in
dynamometer test ) results
communicated to
firm- 30.09.16
30 days show cause
notice issued on 09.11.17. Firm’s reply
received
1 2 3 4 5 6 7 8 9
16
81. Om Besco Super
Friction Pvt. Ltd. Ponta Sahib
-do- 12/07/2016 June’18 Firm’s letter-
18/07/2016,25/02/2017,22/03/2017,15/06/2017,08/07/
2017
RDSO letter-14/02/2017,
10/03/2017,05/06/2017,02/
08/2017
March’19 (sample failed in
dynamometer test ) : results
communicated to
firm- 02/08/2017
Show cause notice issued on 22.02.18
VIII Non Asbestos ‘K’ type High friction Composition Brake Block for Freight stock,1000 mm wheel dia.
82. M/s- Wabtec- Texamco Rail
Pvt limited,
Kolkata.
Non Asbestos ‘K’ type High friction
Composition Brake
Block for Freight
stock, 1000 mm
wheel dia.
13/02/17 Dec’18 Firm’s letter- 03/03/17
RDSO letter-
16/03/17
Show cause notice issued on 08.03.18
IX Non Asbestos ‘L’ type High friction Composition Brake Block for Freight stock,1000 mm wheel dia.
83. M/s- Wabtec- Texamco Rail
Pvt limited,
Kolkata.
Non Asbestos ‘L’ type High friction
Composition Brake
Block for Freight
stock,1000 mm
wheel dia.
02/02/17 Dec’18 Firm’s letter- 03/03/17, 27/04/17,
18/07/17, 10/08/17
RDSO letter-
16/03/17, 20/06/17,
04/08/17, 13.09.17
Team of RDSO officials has been nominated for
STR verification
X Non Asbestos ‘L’ type High friction Composition Brake Block for Freight stock, 840 mm wheel dia.
84. M/s Hindustan
Composites Limited
Aurangabad
Non Asbestos ‘L’
type High friction Composition Brake
Block for Freight
stock, 840 mm
wheel diameter
02/03/17 Dec’18 Firm’s letter-
07/07/17, 06/07/2007, 27/07/17, 24/8/17
RDSO letter-
28/03/17, 06/04/17,
16/05/17, 24/08/17
Nomination of RDSO officials for STR verification-23.05.17
Firm vide email dt.
24.08.17 informed that reply 840mm
wheel diameter is
not available for
dynamometer
testing
Firm placed in the RDSO
‘List of Vendors for Developmental Orders’
TRACTION INSTALLATION
85. M/s Santoshi
Hyvolt
125sq.mm
(37/2.10mm) Cd-
Cu Catenary wire
01.09.2017 Firm Letter dated:-
11.10.2017, 08.11.2017,
28.11.2017, 11.12.2017,
14.02.2018
RDSO Letter dated:-
18.09.2017, 11.10.2017, 25.10.207, 28.11.2017,
11.12.2017, 17.01.2018
Case is being put up for
closer.
86. M/s Siemens
Limited,
Control & Relay
Panel
31.05.2017 Firm Letter dated:-
31.05.2017.
Firm has not submitted
the compliance of STR
1 2 3 4 5 6 7 8 9
17
Goa Incorporating
numerical type protective relays
for 25 kV Ac
Traction.
RDSO Letter dated:-
24.08.2017, 01.11.2017 09.11.2017
and valid factory License.
Firm have been asked to submit the compliance
vide RDSO letter dated
24.08.17. Firm’s reply is
awaited. A meeting was
held in RDSO on 26.9.2017 wherein the
deficiencies
communicated vide letter
dated 24.08.2017 with
documents M/s Siemens.
M/s Siemens confirmed that they will revert back
at the earliest. Reminder
has been sent to Firm
vide letter dated
01.11.2017 for submission of
compliance of RDSO
letter dated 24.8.17.
Again notice has been
issued on 09.11.2017
regarding submission of compliance of RDSO
letter dated 24.08.2017
in 30 days. Firm Reply is
awaited.
87. M/s Megawin,
Salem
25kV DP Circuit
Breaker
17.12.2015 RDSO-5.1.16
FIRM-30.1.16 RDSO-18.2.16
FIRM-2.3.16
RDSO-21.3.16
RDSO-11.5.16
Capacity assessment -17.5.16
RDSO-9.6.16 FIRM-3.9.16
RDSO - 3.10.16
FIRM – 2.12.16
RDSO-14.6.17
Firm – 5.7.17
Factory Inspection done
on 17.5.2016 and In-house prototype testing
carried out during
Aug.2017. Balance tests
schedule awaited &
reminder issued to firm
on 05.12.2017.
88. M/s Megawin, salem
25kV DP Interrupter
17.12.2015 Factory Inspection done on 17.5.2016 and In-
house prototype testing
carried out during
Aug.2017. Balance tests
1 2 3 4 5 6 7 8 9
18
FIRM-6.7.17
RDSO-13.8.17 Testing-14.8.17 to 26.8.17.
Firm-5.9.17
RDSO- 05.12.2017
schedule awaited &
reminder issued to firm on 05.12.2017.
89. M/s Siemens
Ltd.
220/132/110/66k
V Circuit Breaker
19.12.2016 RDSO-10.02.17
FIRM- 11.07.17
RDSO-12.7.17 Firm - 5.9.17
RDSO- 26.09.2017
FIRM- 04.10.17
RDSO- 24.10.17
Capacity assessment -26 &
27.10.17 RDSO- 01.11.2017
RDSO-17.01.2018
FIRM- 24.01.2018
FIRM- 08.03.2018
FIRM- 19.03.2018
Capability assessment of
the firm has been carried
out on 26.10.2017to 27.10.2017and firm
advised to submit
designs drawing vide this
office letter on
01.11.2017. Firm vide
letter dated 19.03.2018 has submitted the
drawing, under scrutiny.
90. M/s Tritech Corporation
Motorised Isolator 24.5.17 Firm On-line application-24.05.17
RDSO- 19.07.2017.
Firm- 12.08.2017
RDSO-13.09.2017.
Firm- 11.10.2017.
RDSO-10.11.2017 RDSO-30.11.2017
Firm-22.01.2018.
RDSO- 07.02.2018
Firm-05.03.2018
RDSO- 19.03.2018
Design & Drawing has been approved vide letter
dated 19.03.18. Firm has
to offer the Prototype
test.
91. M/s NSS Stores Supply Agency
Pvt. Ltd.,
Kolkata
SGCI fittings 09.06.2016 QAE
2016/3640
Firm-09.06.2016. Firm-20.08.2016
RDSO-30.08.2016
RDSO-09.11.2016
FIRM-17.11.2016
Firm-14.12.2016 RDSO-09.01.2017
RDSO-13.01.2017.
Firm-7.02.2017.
RDSO-15.02.2017
Firm has submitted the internal test report.
Nomination for prototype
has been done. A letter
regarding prototype date
has been sent.
1 2 3 4 5 6 7 8 9
19
Firm-11.04.2017.
Firm email dated 12.09.2017 Firm mail- 27.12.2017
Rdso-1.02.2018
Firm mail- 5.02.2018
Rdso mail- 07.02.2018
Rdso-12.02.18 Firm mail-27.02.2018
Rdso-20.03.2018
92. M/s Super engi-
tech pvt. Ltd.,
Rajkot
SGCI fittings QAE
2016/3768
09.08.2016
Firm- 09.08.16.
RDSO- 06.09.2016.
Firm -30.09.2016.
RDSO- 18.10.2016.
Firm -22.11.16. RDSO-02.01. 2017.
RDSO- 04.09.17.
RDSO-4.10.2017
RDSO-02.11.2017
RDSO 20.11.2017 FIRM mail- 29.01.2018
RDSO mail- 07.02.2018
Vide RDSO letter dated
20.11.2017 firm has been
advised to develop the
prototype sample & send
the internal test report
93. M/s Sight &
Sound, New
Delhi
Three Pulley ATD
with 2400kgf
tension
QAE
2017/4206
04.04.2017
Firm-04.04.2017
RDSO-02.june.17
RDSO-10.11.2017.
RDSO-18.12.2017
Firm- 22.01.2018
Firm has been advised to
submit the compliance of
specification and QAP on
dated2.6.2017 & through
email on dated 10.11.2017. Reminder on
dated 18.12.2017 to
sumit the compliance..
Firm has submited the
compliance on dated 22.01.2018 and is under
examination.
94. M/s Khatri
Castings (P) Ltd.
Valsad, Gujrat
Five Pulley ATD
QAE
2017/4228
09.04.2017
RDSO-12.06.2017
RDSO-07.11.2017
RDSO14.12.2017
Firm Capability
assessment has been
done on dated
07.11.2017 Firm has been advised to
develop prototype test on
dated 14.12.2017 and
submit the internal test
1 2 3 4 5 6 7 8 9
20
report. Report is awaited.
95. M/s Khatri Castings (P)
Ltd., Valsad,
Gujrat
Three Pulley ATD with 2400kgf
tension
QAE 2017/4229
09.04.2017
Firm-22.05.2017 RDSO-12.06.2017
Firm-Dated 26.09.2017 letter
received on 10.10.17
RDSO-16.10.17 considered for
capacity assessment
RDSO-07.11.2017 RDSO-14.12.2017
Firm- 12.01.2018
RDSO-08.2.2018
Firm has been advised to submit the compliance of
specification and QAP on
dated,12.06.2017 &
29.09.2017..Capability
assessment has been
done on dated 07.11.2017, Firm advised
to develop prototype on
dated 14.12.2017,
Firm submit the partial
internal test report on
dated 12.1.2018. RDSO advised to firm to
submit the compliance of
internal test report.
Awaited.
96. M/s NSS Store supply Agency
Pvt. Ltd.
Harwah, Kolkata
Three Pulley ATD with 2400kgf
tension
QAE 2017/ 4191,
24.03.2017
Firm- 14.03.2017 RDSO-28.04.2017
Firm -13.11.2017
Firm 22.11.2017
Firm 15.12.2017
Firm has been advised to submit the compliance
on dated 28.4.2017.Firm
submitted the
compliance on dated
13.11.2017/ 22.11.2017.
Firm approved for capability assessment on
dated 28.11.2017.
Firm inform to RDSO
that endurance test
ensurance test was not ready on dated
15.12.2017. STR
verification is being
carried out by QA/Elect.
97. M/s Kamgar
Engineering works (I) Pvt.
Ltd. Mumbai
Five Pulley ATD
QAE 2016/
4004 10.12.2016
RDSO-24.01.2017
Firm-06.03.2017 RDSO-20.03.2017
Firm-21.06.2017
Firm-21.08.2017 Received on
30.08.17.
Capability assessment
has been done on dated 06.11.2017. Firm advised
to develop prototype test
on dated 24.11.2017 with
compliance of capability
1 2 3 4 5 6 7 8 9
21
RDSO- 13.09.17
Firm- 19.09.17 received on 25.09.17
RDSO 03.10.17, Firm is
advised for capacity assess-
ment RDSO-06.11.2017
RDSO 24.11.2017 RDSO-10.01.2018
FIRM 24.2.2018
assessment.
Firm submit the compliance of capability
assessment on dated
24.2.2018 but not
submitted the internal
test report. Internal test report is awaited.
98. M/s Kamgar
Engineering
works (I) Pvt.
Ltd. Mumbai
Three Pulley ATD
with 2400kgf
tension
QAE 2017/
4245,
31.05.2017
Firm- 31.05.2017 (incomplete
documents received)
RDSO- Firm advised
telephonically.
Firm-16.09.17, received on 21.09.17
RDSO- 03.10.17, Firm is
advised for capacity
assessment.
RDSO 06.11.2017 RDSO 24.11.2017
RDSO-10.01.2018
FIRM 24.2.2018
Capability assessment
has been done on dated
06.11.2017. Firm advised
to develop prototype test
on dated 24.11.2017 with compliance of capability
assessment.
Firm submit the
compliance of capability
assessment on dated 24.2.2018 but not
submitted the internal
test report. Internal test
report is awaited
99. M/s Pfisterer
limited, through
PPS International,
New Delhi
Spring ATD QAE2016/
4084,
28.12.2016
RDSO-12.05.2017
RDSO EMAIL -13.10.2017
RDSO-09.01.2018 FIRM-06.02.2018
Firm advised to submit
the compliance of
documents on dated 12.05.2018. Reminder
through email on dated
13.10.2017.
RDSO again reminded to
firm on dated 09.01.2018.
Firm submit the
compliance in dated
06.02.2018 and is under
examination.
100. M/s D2 Engineering,
Korea
Spring ATD QAE2016/ 3420,
23.02.2016
RDSO-06.07.16 RDSO-14.07.2016
Firm-05.08.2016
RDSO-16.08.16
Firm-30.08.16
On 23.10.17 Letter is sent to Railway Board for
sanction of proposal for
capability assessment
and prototype testing.
1 2 3 4 5 6 7 8 9
22
RDSO-30.09.16
RDSO-06.12.16. Firm-16.12.16
Firm-10.01.17
Firm-1.02.17
RDSO- 24.04.2017
Firm-27.04.17 RDSO -05.05.17
DEE/PS Railway board
forwarded to remarks of Railway board finance on
dated 31.01.2018.
Railway Board has been
requested to advised
DRA/Tokyo for carrying out firm assessment and
prototype testing at M/s
D2 engineering Seoul,
Korea on dated
01.03.2018.
101. M/s Shree Steel
wire rope limited, Mumbai
Three Pulley ATD
with 2400kgf tension
QAE
2017/4275 26.04.2017
Firm- 13.05.2017
RDSO-29.08.17 RDSO e-mail 13.10.2017
Firm- 03.11.2017
RDSO-09-01.2018
Capability assessment
has been done on dated 21.12.2017.
Firm has been advised to
develop Prototype on
dated 09.01.2018.
Awaited.
102. M/s Narmada Transmission
Pvt. Ltd., Bhopal
Short Neutral Section Assembly
QAE2013/ 1583
27.04.2013
Firm -17.12.13 & 21.10.13 RDSO - 03.01.2014,
09.03.2015 & 27.04.2015.
Firm - 28.04.15, 11.05.2015,
26.05.2015 &16.07.2015,
RDSO - 11.09.2015,
Firm -. 17.11.2015, 25.12.2015, 02.02.2016.
RDSO - 05.02.2016.
Firm -03.03.2016,
11.03.2016, 30.03.2016,
05.07.2016, 18.07.2016, 19.07.2016.
RDSO -17/18.08.2016;
Firm -30.08.2016.
RDSO - 19.06.2017.
Firm - 18.08.2017.
RDSO -12.09.2017 RDSO:01.12.2017
Firm:16/17/19.01.2018
RDSO:13.02.2018
On 27.04.2013 firm applied, RDSO advised to
firm for submission of
documents in 2014.
STR was revised during
2015-2016 to indigenes
the subject item. On 18.07.2016 firm
complied paper
screening.
On 17.08.2016 it was
informed to firm that firm has found capable for
manufacturing.
On 12.09.2017, the
drawing of firm was
approved and advised to
offer proto-type tests. On 19.01.2018 firm
submitted Internal tests
results.
On 13.02.2018, RDSO
1 2 3 4 5 6 7 8 9
23
sent comment.
Firm is being given notice for early submission
failing which the case
shall be closed.
103. M/s Polyfluro
Ltd Bangalore
Short Neutral
Section Assembly
QAE2014/
2374
24.12.2014
Firm - 07.11.2014
RDSO - 12.01.2015,
27.04.2015. Firm - 13.05.2015,
25.06.2015.
RDSO -04.01.2016.
Firm - 28.12.2015.
RDSO -04.02.2016,
01.07.2016. Firm -01.06.2016,
29.09.2016, 05.11.2016.
RDSO - 06.12.2016.
Firm -18.03.2017.
RDSO -31.03.2017. RDSO -24.04.2017.
RDSO -01.12.2017.
Firm applied on
24.12.2014.
Paper screening clear on 03.10.2016.
After satisfactory
capability assessment,
On 06/07.12.2016, it
was informed to firm that
firm has found capable for manufacturing.
On 24.04.2017 the
design drawing approved
and advised to offer
proto-type tests. Reminder sent on
01.12.2017 for the same.
Firm is being given notice
for early submission
failing which the case
shall be closed.
104. M/s Siemens Germany
Short Neutral Section Assembly
QAE2016/ 3637
17.05.2016
RDSO - 21.07.2016 RDSO-21.03.2017
Firm-17.04.2017
RDSO email dated -
14.07.2017
RDSO email dated .04.10.2017
Firm’s Email- 04.10.2017.
RDSO email- 05.10.2017.
RDSO- 16.10.17.
Firm: 03.11.2017.
RDSO: 28.12.2017. Firm : 09.02.2018
Compliance of specification, Drawings,
Schedule of guaranteed
technical particulars;
QAP is awaited from the
Firm. However On dated
11.02.2018, firm has
submitted declaration
regarding factory license,
and it is under
consideration.
105. M/s Narmada
Transmission
Pvt. Ltd., Bhopal
Light Weight
Section Insulator
assembly
QAE2015/
2699
05.05.2015.
Firm - 15.12.2014,
28.06.2016.
RDSO -09.03.2015,
On 13.02.2018, it is
again advised to submit
compliance of
1 2 3 4 5 6 7 8 9
24
08.06.2016.
RDSO email-28.09.2017 Firm’s email-11.10.2017
RDSO-30.10.2017
RDSO:20.12.2017
Firm:01.01.2018,16.01.2018
RDSO:13.02.2018
specifications, Scheduled
of Guaranteed Technical Particular, revised
drawing & QAP.
106. M/s Siemens Germany
Light Weight Section Insulator
assembly
QAE2016/ 3637
21.06.2016
RDSO -10.01.2017. RDSO email dated
.04.10.2017
Firm’s Email- 04.10.2017.
RDSO email- 05.10.2017.
Firm’s Email-05.10.2017,
RDSO:13.10.2017 Firm:03.11.2017
RDSO:26/27.12.2017
Firm: 09.02.2018.
Compliance of specification, Schedule of
guaranteed technical
particulars; QAP is
awaited from the Firm.
However On dated
11.02.2018, firm has submitted declaration
regarding factory license,
and it is under
consideration.
107. M/s AF
Switzerland
Light Weight
Section Insulator assembly
QAE/1797
17.10.2013
Firm’s letter- 01.11.2013,
24.12.2013, RDSO: 25.06.2014.
Firm:24.07.2014
RDSO08.10.2014
Firm:07.11.2014
RDSO: 23.01.2015.
Firm:29.07.2015 RDSO: 30.09.2015.
RDSO:12.05.2016
RDSO.30.01.2017.
Firm:22.03.2017,03.10.2017
RDSO:18.10.2017 Firm: 25.10.2017.
RDSO: 16.11.2017.
Firm: 16.01.2018.
Firm applied on
17.10.2013. On 23.01.2015, Design
drawing approved.
On 29.07.2015 Firm
submitted proposal to
change in design.
On 30.07.2015 & 30.01.2017 RDSO
advised to submit revised
design documents,
SOGTP,QAP etc.
ON 22.03.2017, firm requested for time upto
May 2017.
On 03.10.2017, firm
submitted documents.
On 18.10.2017, firm
advised to submit Documents of MOA,
Power of Attorney,
Compliance of
specification, QAP.
1 2 3 4 5 6 7 8 9
25
On 06.11.2017, firm
submitted partial reply. On 16.11.2017, advised
to submit remaining
compliance which was
asked by letter dated
18.10.2017 & comments on submitted documents.
On 16.01.2018, firm
submitted deviation in
specification, firm is
being given notice for
early submission failing which the case shall be
closed.
QUALITY ASSURANCE / CIVIL
108. M/s ALISHAN
STEELS
PRIVATE
LIMITED, DURGAPUR
SGCI Insert 12/6/2016 - Online application submitted
on 06.12.2016. Documental
deficiency advised to the firm
on date 13.04.2017. Reminder issued on 13.09.17.
STR Verification done on
27th&28th Oct.’2017
20.07.18 Nil STR Verification done on
27th&28th Oct.’2017.
Deficiencies advised to
firm on 03.11.2017. Firm submitted compliance.
STR verified on 18th Jan.
2018. Infrastructure
cleared on 25.01.2018.
Firm deposited sample
testing charges on 16.02.2018. ITR
submitted on 26.02.2018
by the firm which is
under scrutiny.
109. M/s KGN
Deccan Engg Industries Pvt
Ltd, Hyderabad
500037
SGCI Insert 13/12/2016 - Online application submitted
on 13.12.2016. Documental deficiency advised to the firm
on date 27.02.2017.
Deficiency complied by the
firm on date
30.06.2017.AIE/QAC/CE was nominated for infrastructure
verification on 05/07/2017.
Firm was visited on date
01&02 August 2017 for
20.07.18 Nil Firm advised to submit
ITR 0n 03.10.2017. Reminder issued on
25.10.2017. ITR on
17.10.2017. ITR
submitted on 05.12.17.
letter issued on 11.12.2017 for
submission of Testing
Charges. Reply awaited
from firm. Sample testing
1 2 3 4 5 6 7 8 9
26
infrastructure verification and
infrastructure verified and firm was advised on date
12.09.2017 to submit gauge
checking charges online and
submit two set of gauges for
checking and approval by this office. Firm's reply awaited.
charges deposited on
02.01.2018. Sample drawn on 16.02.2018.
Sample sent to M&C on
19.02.2018. Test report is
awaited.
110. M/s Khetsidas
Machine Tool
Works Private
Limited
SGCI Insert 09.01.17 - Online application submitted
on 09.01.2017. Documental
deficiency advised to the firm
on date
13.04.2017.Deficiency
complied by the firm on date 07.07.2017. AIE/QAC/CE
was nominated for
infrastructure verification on
11/07/2017. firm vide letter
dated 12.09.17 requested to do STR verification after
27.09.17.
19.07.18 Nil STR verification done on
06.10.2017. Deficiencies
advised on 16.10.2017.
Notice issued on
12.12.2017. Firm
submitted compliance. Visit planned for
reverification on
15/16.01.2018. STR
verified on 16.01.2018.
Infrastructure cleared on 25.01.2018. Firm
deposited sample testing
charges on 30.01.2018
without ITR. ITR is still
awaited.
111. M/s Ked Sati
Iron & Steel Pvt. Ltd. Kolkata
GRSP 10mm 27-08-15 - Firm applied on 27.08.2015.
Documents scrutinized . Documental deficiencies
conveyed to the firm vide this
office letter dated 04.02.2016.
Firm replied vide letter dtd.
13.05.16. Deficiencies observed in QAP have been
advised to the firm vide this
office letter dtd 19.07.16.
Firm submitted the reply
which was not found
satisfactory. Deficiencies observed were communicated
to the firm vide this office
letter dated 08/15.09.16. As
the firm failed to reply,
15.07.18 firm has not
complied deficiencies in
documents.
ITR submitted on
17.10.2017.Deficiencies advised on 08.11.2017.
fresh ITR submitted on
28.11.17. ITR deficiency
advised on 04.12.2017.
Reply is awaited from firm. Vide this office letter
dated 08.01.2018 firm
advised to submit ITR
within 15 days, failing
which, case shall be
closed. Firm vide their letter dated 19.01.2018
(Received on
24/25.01.2018)
submitted detailed ITR.
1 2 3 4 5 6 7 8 9
27
therefore, letter to the firm
issued vide this office letter dated 03.08.2017. Now, firm
submitted the reply recd. on
08.08.2017. firm advised for
submission of ITR vide this
office letter dated 14.09.17 & 03.10.17.
Firm advised vide letter
dated 12.02.2018 to deposit testing
charges.Firm advised
again on 13.03.18 for
submission of charges
within 15 days.
112. M/s Maruti
Heavy Engg.
Udyog ,
Bharatpur
GRSP 10mm 01.09.15 - Firm applied on
1.09.2015.Documents
scrutinized . Documental
deficiencies conveyed to the
firm vide this office letter
dated 19.02.2016. Firm vide their letter dated 05.07.2016
have submitted the reply.
Deficiencies advised to the
firm on 11.09.17.
15.07.18 Delay in documents
scrutiny.
Firm replied on
02.11.2017.Firm advised
for STR verification after
21.11.2017 onward. STR
verification done from
18.12.2017 to 20.12.2017. Firm advised
to deposit testing charges
and submit ITR vide letter
dated 28.12.2017. Reply
is awaited from firm. Firm deposited testing
charges on
07.02.2018.Charges
deposited by the firm.
Sample drawal done on
27.2.18 to 28.02.18. Sample sent to M & C dte
on 01.03.18 for testing.
Test report received on
16.03.18, report under
scrutiny.
113. Surya Alloys Industries Ltd.,
Kolkata
6.2 mm CGRSP 01.02.2017 - Case transferred to QA Civil Dte on Apr'2014. Firm has
submitted application,
registration charges and
QAP. The QAP was
scrutinizes and deficiencies
conveyed on 19.07.2013. The firm submitted revised QAP
on 03.08.2013. the firm
applied for shifting for 6.2
mm CGRSP from existing
31.07.18 the case was closed on 22.11.16 due to
the reason that firm
changed work
address during fresh
registration. Firm
appealed to ADG and appellate
authority permitted
to start the case
again.
Firm advised to submit ITR on 31.10.2017 after
approval of gauges. Notice
issued to the firm on
19.12.2017. ITR
deficiencies advised on
01.01.2018. Reply is awaited from firm.
Subsequently, firm again
advised regarding sample
drawl as per Amendment
1 2 3 4 5 6 7 8 9
28
premises. Shifting of work
address is not allowed as per ISO documents. Firm asked
vide this office letter dt.
16.09.15 to confirm their new
work address. Firm vide letter
dated 24.9.2015 have confirmed their work address
as the new address. After
scrutiny of the application
submitted, documental
deficiencies observed were
communicated to the firm vide this office letter dtd.
27.04.16. Firm did not
given any reply, again firm
was advised to submit the
required documents upto 30.08.16 vide this office letter
of dtd. 29.07.16. Firm
submitted the reply vide letter
dtd. 18.08.16. Vide this office
letter dated 22.11.2016,
firm's case was closed. Firm represented to ADG RDSO.
ADG have advised to process
the case further on
25.01.2017. Accordingly,
clarification was sought for documental deficiency
observed vide this office letter
dated 17.02.2017..Firm
submitted reply vide letter dt
04.5.17 (Rcvd on 09.5.17).
Deficiencies observed against firm's reply dt. 4.5.17 have
been communicated to the
firm vide this office letter
dt. 19.6.17.Firm submitted
compliance on 03.07.2017 through email. After
2 of 2017 on
03.01.2018.Firm again advised on 26.02.18 to
submit ITR with in 15
days. Firm submitted ITR
on 05.03.18. Short
comings found in ITR along with Testing charge
GST invoice advised to
firm on 13.03.18
1 2 3 4 5 6 7 8 9
29
satisfactory compliance Infra
verification visit was carried out in Aug.2017. firm advised
to deposit gauge checking
charges on 12.09.17.
114. M/s Ravindra
Industries,
Bahadurgarh
CGRSP 6.2mm 30.05.2017 - Firm applied on
30.05.2017.Deficiencies
advised to firm on 04.09.17. reply from the firm is awaited.
30.07.18 delay in scrutiny of
document and
verification of charges.
STR verification done on
14.10.2017.firm advised
for gauges charges submission on
23.10.2017. Firm advised
for testing charges on
30.11.17 and submission
of ITR. ITR submitted by
the firm on 26.12.2017. Vide this office letter
dated 08.01.2018, firm
advised for detailed ITR,
deposit testing charges
qas per Amendment 2 of 2017 and drawl of sample
will be done as per
amended specification.
115. M/s Ked Sati
Iron & Steel Pvt.
Ltd. Kolkata
NYLON CORD
ELASTOMERIC
PAD
08.09.2015 - Firm applied on 08.09.2015.
Documents scrutinized and
deficiencies advised to firm on
2.02.16. Reply received vide letter dtd. 14.05.16. After
scrutiny, it was observed that
deficiencies still exists.
Accordingly, firm advised the
balance deficiencies vide this office letter dated 31.08.16.
As the firm did not submit the
compliance, hence, a show
cause notice was issued vide
this office letter dtd. 16.02.17.
Firm submitted the compliance vide their letter
dtd. 14.04.2017 which was
not satisfactory. Hence firm
was again issued final show
31.07.18 firm took lot of time
in complying with
documental
deficiencies.
Deficiencies advised to
the firm on 14.09.17&
03.10.17. firm submitted
incomplete QAP’s on 18.10.17. deficiency
advised on 08.11.2017.
QAP submitted on
27.11.2017. Returned
with deficiencies on 30.11.2017. Resubmitted
on 19.12.2017. QAP
deficiencies advised to
firm on 05.01.2018. Firm
submitted QAP on
17/24.01.2018. QAP approved (With
correction) on
09.02.2018. Firm advised
vide letter dated
1 2 3 4 5 6 7 8 9
30
cause notice vide this office
letter dated 26-05-17 for closure of case Reply
submitted by the firm vide
their letter dated 11.06.2017
(recd. on 04.08.2017). QAP
deficiencies advised to the firm on 14.09.17.
12.02.2018 for internal
development and submit ITR. Firm again advised
on 08.03.18 to submit
ITR and deposit testing
charge. On 13.03.18 firm
intimated that cut off date of sample drawl is
29.04.2018.
116. M/s Eastern
Track UdyogPvt.
Ltd. Kolkata
Nylon Cord
Elastomeric Pad
14-09-15 - Firm applied on 14.09.2015.
Documents scrutinized and
deficiencies advised to firm on
2.02.16. Reply received vide
letter dtd. 14.05.16. After scrutiny, it was observed that
deficiencies still exists.
Accordingly, firm advised the
balance deficiencies vide this
office letter dated 31.08.16. As the firm did not submit the
compliance, hence, a show
cause notice was issued vide
this office letter dtd. 16.02.17.
Firm submitted the
compliance vide their letter dtd. 14.04.2017 which was
not satisfactory. Hence firm
was again issued final show
cause notice vide this office
letter dated 26-05-17 for closure of case. Reply
submitted by the firm vide
their letter dated 11.06.2017
(recd. on 04.08.2017). QAP
deficiencies advised to the
firm on 14.09.17.
31.07.18 firm took lot of time
in complying with
documental
deficiencies.
Deficiencies advised to
the firm on 14.09.17&
03.10.17. firm submitted
incomplete QAP’s on
18.10.17. Deficiency advised on 08.11.2017.
QAP submitted on
27.11.17. Returned with
deficiencies on 30.11.17.
Resubmitted on 19.12.17. QAP deficiencies advised
to firm on 05.01.2018.
QAP approved (With
corrections) on
09.02.2018. Firm advised
vide this office letter dated 12.02.2018 for
internal development,
submit ITR and deposit
testing charges. Firm
again advised on 08.03.18 to submit ITR and
deposit testing charge. On
13.03.18 firm intimated
that cut off date of sample
drawl is 29.04.2018.
117. M/s Hevea Rubber
Technologies
Pvt. Ltd.
Kottayam
NYLON CORD ELASTOMERIC
PAD
16-09-15 - Firm applied on 16.09.2015. Documents scrutinized.
Documents scrutinized and
deficiencies advised to firm on
2.02.16. Firm vide their letter
31.07.18 firm took lot of time in complying with
documental
deficiencies.
STR verification done in Dec.’2017. Case is under
process. Firm vide this
office letter dated
04.01.2018 advised the
1 2 3 4 5 6 7 8 9
31
dated 12.03.2016 (recd on
15.03.2016) have submitted the compliance. The
documents were scrutinised
and balance deficiencies
advised to firm vide this office
letter dated 18.10.16. Firm submitted the reply vide their
letter dtd. 22.11.16 (received
on 29.11.16). Documental
deficiencies advised to the
firm vide this office letter
dated 21.03.2017. Since the firm failed to reply, another
letter dated 10.08.2017
issued to comply the
deficiencies. firm submitted
compliance on 05.09.17.
QAP deficiencies, deposit
testing charges and internal development after
approval of QAP. Firm
vide their e-mail dated
23.01.2018 informed this
office that they will take action before 25th
February. No reply
received so far.
118. M/s Jyoti Cero Rubber ,
Jamshedpur
NYLON CORD ELASTOMERIC
PAD
18-09-15 - Firm applied on 18.09.2015. Documents scrutinized and
deficiencies advised to firm on
03.02.16. Firm replied vide
letter dtd. 23.07.16 (recd. On
03.08.16). After scrutiny, it
was observed that deficiencies still exists. Accordingly, firm
advised to submit the balance
deficiencies vide this office
letter dated 07.09.16. As the
firm did not submit the compliance, hence, a show
cause notice was issued vide
this office letter dtd. 16.02.17.
Firm submitted compliance
on 16.03.2017 against which
deficiencies advised vide this office letter dt.13.6.2017.
Firm submitted reply vide
their letter dated 12.07.2017
received on 19.07.2017. After
satisfactory reply submitted
31.07.18 firm took lot of time in complying with
documental
deficiencies.
STR verification done in Nov.’2017. Case is under
process. Firm vide this
office letter dated
03.01.2018 advised QAP
deficiencies, deposit
testing charges and internal development
(after approval of QAP).
QAP approved on
16.01.2018.Firm again
advised on 12.03.2018 to submit ITR and deposit
testing charge with in 15
days.
1 2 3 4 5 6 7 8 9
32
by the firm, visit for Infra
verification planned in Sep.'2017.
119. M/s ASP Pvt.
Ltd., Howrah
High Tensile Fish
Bolt & Nuts
09.10.2016 - Firm submitted on-line
application on 09.10.2016.
Detailed application
submitted by the firm vide
letter dt. 14.10.2016. Deficiencies issued to the firm
vide letter dt. 09.02.2017.
Reminder issued to the firm
vide letter dt.15.03.2017 for
submission of reply. Vide
letter dt. 21.03.2017, firm submitted the
compliance. As deficiencies
were not fully complied
therefore deficiencies were
again advised to the firm vide letter dt. 04.05.2017.
Compliance submitted by the
firm vide letter dt.
13.06.2017. Infrastructure
structure verification visit has
been carried out from 21.7.2017 to 23.07.2017. The
firm has been advised vide
letter dated 09.08.2017 to
manufacture samples of HTS
fish bolt & nuts and submit ITR to this office. Reply
awaited from the firm.
31.03.2018 Due to delay in
submission of
compliance of
deficiencies by the
firm.
ITR received on
16.10.2017. ITR
scrutinised and
nomination for sample
drawls done. Sample drawl visit completed on
01.12.2017. Sample is
under testing at NTH,
Kolkata. Test report
received on 03.02.2018
Heat treatment facility is not available and case is
under examination.
120. M/s Ked Sati
Iron and Steel
Pvt. Ltd.,
Kolkata
High Tensile Fish
Bolt & Nuts
19.03.2017 - Firm submitted on-line
application on 09.10.2016.
Detailed application
submitted by the firm vide
letter dt. 19.03.2017. Deficiencies were issued to
the firm vide letter dt.
27.03.2017. Compliance
submitted by the firm vide
14.03.18 No delay Nomination for
infrastructure verification
done. STR verification
completed on
20.12.2017. Firm advised for internal production
and submission of ITR on
03.01.2018. The firm
submitted ITR on
1 2 3 4 5 6 7 8 9
33
letter dt. 15.06.2017. As
deficiencies were not fully complied therefore Vide letter
dt. 18.07.2017, deficiencies
has been advised again to the
firm. Reply awaited from the
firm.
06.02.2018. Nomination
for sample drawl done. Visit planned on
23.03.2018.
121. M/s Champion Advanced
Materials Pvt.
Ltd., Mumbai
GLUE 21.08.2017 - Application recd on 21.08.2017. Firm submitted
registration fee on
27.09.2017. Deficiencies
advised to the firm on
17.11.2017. Reply awaited.
31.05.18 No delay Letter from firm received on 27.11.2017 with copy
of detailed application
along with relevant
documents. Deficiencies
advised to the firm on
03.01.2018. Firm submitted reply on
05.02.2018. Nomination
done and infrastructure
verification done on
8.03.2018 & 09.3.2018 Case under process.
122. Eastern Track
UdyogPvt. Ltd.,
Kolkata
Glass Filled Nylon -
66 Insulating
Liners
26.04.2016 - Firm applied on 26.04.2016
for fresh registration for
Drawing no . RT-3702 & RT-
3706 after restoration and
continuation of firm's name in
Master list of Approved Vendors. Firm was informed
on 08.06.16 through email for
STR verification for fresh
items in June 2016. Firm's
request received on 09.06.2016 to plan the visit
after 10.7.2016. Visit planned
from 12.8.2016 onward. Firm
visited from 23.08.2016 to
24.08.2016. Firm submitted
QAP for approval during visit. QAP scrutinized &
deficiencies conveyed to the
firm on 28-10-16. Firm was
also advised to deposit gauge
28/07/2018 Due to delay
in Compliance of
deficiencies by firm.
Revised QAP & ITR
received. Firm was
advised vide email dated
21.11.2017 for
submission of GSTN.
GSTN details received on 02.01.2018. Reply is
awaited from firm. Notice
issued to firm on
07.03.2018 for not
submission of charges..
1 2 3 4 5 6 7 8 9
34
inspection charges and
submit the two sets of inspection gauges of Drg no
RT-3702 & RT-3706 on 28.10
16. Reminder issued on
15/12/2016. Show cause
notice issued on 20.1.17. Firm submitted two sets
inspection gauges on
07.02.17 without depositing
of gauge checking charges.
Firm was informed on
22.02.17 to deposit gauge checking charges and
to submit revised QAP. Firm
deposited the gauge
inspection charges vide their
letter dated 19/03/2017. Charges verified on
21/03/2017 and Firm was
informed by g-mail on dated
13.4.2017 to submit the ITR
of gauge inspection. ITR of
gauges was submitted by the firm on 27.04.2017 . Gauges
checked and approved on
01.5.17. Firm was informed
on 11.5.17 for submission of
revised QAP. QAP submitted on 5.6.17 by the firm. QAP
scrutinized, deficiency
conveyed to the firm on
10.7.17. Compliance is still
awaited.
123. Sheth& Co.
Silvasa
Glass Filled Nylon -
66 Insulating Liners
21.03.2017 - Firm applied online on
21.03.2017 for registration of additional factory permission
for manufacture & supply of
GFN -66 insulating liners to
Drg No. RT-3707 & RT-3708
.Administrative clearance was
31/05/2018 Compliance received and
visit is planned in Dec.’2017. Firm advised
on 23.11.2017for inability
in carrying out STR
verification from
24.11.2017 to
1 2 3 4 5 6 7 8 9
35
given on 20.04.2017.
Documents received on line and same verified.
Deficiencies noticed conveyed
to the firm on 18.5.17.
Compliance received on
23.6.17. Documents checked and found satisfactory. RDSO
official nominated for STR
verification on 07.07.17. Firm
visited from 07.8.17 to
09.8.17. STR found
unsatisfactory. Deficiencies conveyed to the firm on
30.8.17. Compliance is
awaited.
29.11.2017. Firm was
advised 0n 23.11.2017 for confirmation of readiness
for STR verification. STR
verification done from
19.12.2017 to
21.12.2017. Quality Audit of the firm done on 29.01.
2018 to 01.02.2018.
Sample sent to CIPET,
Ahmadabad for testing.
Test report received on
27.02.2018 and case is under process.
ELECTRIC LOCO
124. D. H.
Associates,
Bangalore
T M Bearings for
TAO-659 (NU328
& NH318)
13-Sep-2017 Firm had been requested
to submit required
documents vide letter no. EL/2.2.13/DHA/NU
328 dated 16.10.2017
MOTIVE POWER
125. M/s Yongji
Xinshisu
Electric
Equipment Co. Ltd., P.R. China
Control System,
AC- AC Traction for
4500HP EMD
Locomotives & its sub-assemblies
04.09.2014 RDSO to firm 29.12.2014
Firm to RDSO 08.01.2015
Firm to RDSO 14.+02.2015
RDSO to firm 15.09.2015 Firm to RDSO 25.01.2015
RDSO to Firm 10.02.2016
Firm to RDSO 13.04.2017.
RDSO to firm 04.10.2017
Firm’s compliance as
per RDSO
Specification is yet
to be resolved.
Firm complied the necessary documents.
RA/Berlin has been advised for Capability
& Capacity
assessment on
04.10.2017.
As the post of RA/Berlin is vacant at
present, a proposal
sent to Railway Board
on 09.12.2017 for
deputation of RDSO official for Capability &
Capacity assessment
on 05.03.18.
However, Railway Board has given
1 2 3 4 5 6 7 8 9
36
observation that the
assessment can be scheduled by
RA/Berlin after his
joining.
Proposal for sending RDSO official for
capacity assessment sent to Railway Board
on 23.03.2018 with
the approval of
DG/RDSO.
126. M/s Saini
Electrical and
Engineering Works,
Ambernath
[East], Dist.
Thane
3 Phase Squirrel
Cage Induction
Motor for 5500HP AC-AC WDG5
Locomotives
21.09.2015 From Vendor- 24.09.15,
03.11.15
Delay in arranging
Testing facilities by
Firm.
Capability assessment carried out on 25 &
26.10.2017.
Letter sent to DLW on dt: 31.01.2018 to know the production
plan of WDG5
locomotives.
Matter is being referred to Railway
Board for policy
decision regarding vendor development
for items of WDG5
loco.
On 19.03.18, matter has been referred to
Railway Board for policy decision
regarding vendor
development for items
of WDG5 loco.
127. M/s Unijules
Life Sciences
Ltd., Nagpur
Cleaning Solvent
for Electrical
Rotating Machines of Diesel Electric
Locomotives
23.11.2016 From Vendor: 23.11.16,
23.03.17,06.04.17, 11.04.17,
18.04.17,03.07.17, 20.07.17, 31.07.17, 22.08.17, 01.12.17,
07.12.17, 08.03.18, 15.03.18
To Vendors: 21.03.17,
22.03.17,21.04.17, 21.08.17,
Delay in compliance
of shortcomings by
the firm
Capability assessment done on 22.09.17.
On 07.12.17, Firm sent internal type test
results and found in order.
1 2 3 4 5 6 7 8 9
37
30.08.17,31.08.17, 04.09.17,
12.09.17, 04.10.17, 01.11.17, 12.12.17, 01.03.18,08.03.18,
13.03.18, 23.03.18
Cleaning solvent received at CB Loco
workshop on 31.01.18.
On 01.03.18, advised to firm for
demonstration at
Charbagh loco
workshop and
reminder given on 08.03.18.
On 23.03.18, advised firm for demonstration
of cleaning solvent to
be done on 26.03.18.
QUALITY ASSURANCE / S&T
128. Thermo Cables
Ltd
PVC Insulated
Railway Signalling
Indoor Single Core Cable
1/9/2014 Deficiencies observed in
submitted papers during initial
scrutiny advised to firm on 31.01.2014 Firm's
reply recd on 25.07.2014.
Again, letter for leftover
deficiencies issued to firm on
21.12.2016. Firm's reply recd on 23.03.2017. Advice for
carrying out CCA sent to
firmed unit on 08.05.17.
Sample under
type test from
24-10-2017
Thermo Cables Ltd Sample under type test
from 24-10-2017
129. SPM Power &
Telecom Private
Limited
PIJF Telephone
Cable
9/10/2014 Deficiencies observed in
submitted papers during
initial scrutiny sent to firm on
24.10.14. Firm's reply received on 31.10.14 & 03.12.14.
Again, deficiencies sent to firm
on 20.05.15. Firm's reply
received on 01.06.15 7. Again,
deficiency sent to firm on 30.09.15. Reminder sent to
firm on 29.06.16 and 25.01.17.
Firm's reply received on
16.02.17 & 23.03.17. Advice
for carrying out CCA sent to
firmed unit on 01.05.17.
Advised for
submission of
prototype
sample on 31.10.2017
Advice for conducting
Capability assessment
sent to DI/SBC vide this
office letter no. RDSO/2014/QS/PIJF/
1618 dtd 01-05-17.
Advised for submission of
prototype sample on
31.10.2017
1 2 3 4 5 6 7 8 9
38
Capacity assessment
scheduled by field unit in 3rd week of Sept., 2017. Advised
for submission of prototype
sample on 31.10.2017
130. Singla Cables PVC Insulated
Armoured,
Unscreened Underground
Power Cable
5/1/2015 Deficiencies noticed during
initial scrutiny sent to firm on
29.06.2015. Firm's reply recd on 11.09.2015. Again,
deficiency sent on 06.11.2015.
Firm's reply received on
7.4.17. Again, Deficiency sent
on 25.05.2017. Firm's reply
recd on 24.07.2017. Advice for carrying out CCA sent to field
unit on 29.8.17. Advise for
submission of prototype
sample sent to firm vide letter
no. RDSO/2015/QS/Cable/ 1635 dtd 17-11-17
Advise for submission of
prototype sample sent to
firm vide letter no. RDSO/2015/QS/Cable/1
635 dtd 17-11-2017
131. Gupta Power
Infrastructure
Limited
PVC Insulated
Signalling Indoor
Single Core Cable
5/13/2015 Deficiencies observed in
documents on initial scrutiny
sent to firm on 06.10.2015.
Firm's reply recd on
07.04.2016. Again, deficiency
sent on 27.07.2016. Firm's reply recd on 13.12.2016.
Advice for carrying out CCA
sent to field unit on
02.02.2017. Assessing officer
visited firm's premised on 24.6.2017 and observed
deficiencies. Capability
assessment report received on
04-10-17.Advise to submit
prototype samples given to firm
on 16-10-17.
Samples yet to
be submitted by
the firm
Advise to submit
prototype samples given
to firm on 16-10-17..
132. . SBEE Cables
India Limited
PVC Insulated
Armoured,
Unscreened,
Underground
6/25/2015 Deficiencies in papers on initial
scrutiny sent to firm on
10.11.2015. Firm's reply on
08.02.2016. Again, deficiencies
Samples yet to
be submitted by
the firm
Sample under type test in
Signal Lab vide test note
No.
RDSO/2015/QS/Cable/1
1 2 3 4 5 6 7 8 9
39
Railway Signaling
Cable
advised to firm on 05.04.2016.
Firm's reply on 16.05.2016. Again, deficiencies advised to
firm on 10.10.2016. Firm's
reply on 03.02.2017. Advice for
carrying out CCA sent to field
unit on 16.02.2017. Advice for submission of prototype
sample sent to firm on 20.6.17.
640 Vol-I (2730)
dtd.08.11.2017
133. SBEE Cables
(India) Limited
PVC Insulated
Armoured,
Unscreened
Underground
Power Cable
6/25/2015 Deficiencies in papers on initial
scrutiny sent to firm on
29.10.2015. Firm's reply recd
on 15.01.2016. Advice for
carrying out CCA sent to field unit on 05.07.2016. Advice for
submission of prototype
sample sent to firm on
20.06.2017. Prototype samples
submitted to RDSO Signal lab for type testing vide this office
test note no. RDSO/2015/QS/
Cable/1640 Vol I (2730) dtd
08-11-17.
Samples under
testing at signal
lab dt.
08.11.2017
Samples under testing at
signal lab dt. 08.11.2017
134. SBEE Cables
(India) Limited
PVC Insulated
Signalling Indoor
Multi Core Cable
6/25/2015 Deficiencies in documents on
initial scrutiny sent to firm on
29.10.2015. Firm's reply recd on 15.01.2016. Again,
Deficiency letter sent on
02.06.16. Firm's reply recd on
13.06.2016. Advise for carrying
out CCA sent on 05.07.2016. Advise for submission of
prototype sample by firm sent
on 10.08.2017 Prototype
sample submitted to Signal lab
vide this letter no.
RDSO/2015/ QS/ Cable/1647 (2733) dtd 08-11-17
Samples under
testing at signal
lab dt. 08.11.2017
Samples under testing at
signal lab dt. 08.11.2017
135. SBEE Cables
(India) Limited
PVC Insulated
Signalling Indoor
Single Core Cable
6/25/2015 Deficiencies in documents on
initial scrutiny sent to firm on
14.10.2015. Firm's reply recd
Samples under
testing at signal
lab dt.
Samples under testing at
signal lab dt. 08.11.2017
1 2 3 4 5 6 7 8 9
40
on 15.01.2016. Advice for
carrying out CCA sent to field unit on 01.04.2016. Advice for
submission of prototype
sample sent to firm on
10.08.2017. Prototype sample
submitted to Signal lab vide this letter no. RDSO/2015/
QS/ Cable/ 1646 (2732) dtd
08-11-17
08.11.2017
136. . Sunrise
Technology
Solar Photo Voltaic
Module
9/15/2015 Deficiencies in documents
during initial scrutiny sent to
Firm on 11/2/16. Reply
received on 18/4/ 2016. Again deficiencies advised to firm on
17/06/2016. Reply received on
24/2/17 & 31/7/17. Advice
for carrying out CCA sent to
field unit on 04-09-17. Advice to submit prototype samples
given to firm within 03 months
vide this office letter no.
RDSO/2015/QS/SPVM/Sunri
se dtd 19-12-17
Advice to submit
prototype samples given
to firm within 03 months
vide this office letter no. RDSO/2015/QS/SPVM/S
unrise dtd 19-12-17.
137. Pranava
Electronics
Transformer-
Rectifier Set
9/17/2015 Deficiency during initial
scrutiny sent to firm on 28.08.17.Reply received. Case
under process for permission of
prototype sample
Deficiencies sent to firm
during initial application stage vide this office letter
no. RDSO/2016/
QS/Trans- Rect/1689 dtd
28-08-17. Case under
process for permission of prototype sample.
138. Plaza Power &
Infrastructure
Co
Solar Photo Voltaic
Module
9/17/2015 Deficiencies in papers during
initial scrutiny sent to firm on
17/02/2016. Reply received on
08/06/2016 & 16/01/2017.
Again deficiencies advised to firm on 02/06/2017. Reply
received on 20/06/2017.
Advise for carrying out CCA
sent to field unit on
Timeline for
Capability
assessment:
15.10.2017
Advice to submit
prototype samples given
to firm within 03 months
vide this office letter no.
RDSO/2015/QS/SPVM/Plaza power dtd 26-12-17.
1 2 3 4 5 6 7 8 9
41
12/09/2017. Advice to submit
prototype samples given to firm within 03 months vide this
office letter no.
RDSO/2015/QS/ SPVM /Plaza
power dtd 26-12-17.
139. 2 Fortune Art
Wires & Cables Pvt Limited
PVC Insulated
Armoured, Unscreened
Underground
Power Cable
10/12/2015 Deficiencies on initial scrutiny
sent to firm on 01.04.2016. Firm's reply recd on
22.06.2017. Again, deficiency
sent on 05.09.2017. Reply
received on 18-10-2017.
Compliance of STR of clause
no. 5.13, 5.15 and 5.16 asked from DI/SBC within 10 days.
Advice to submit prototype
samples given to firm vide this
office letter no.
RDSO/2015/QS/Cable/1653 dtd 20-12-17.
Samples yet to
be submitted by the firm
Advice to submit
prototype samples given to firm vide this office
letter no.
RDSO/2015/QS/Cable/1
653 dtd 20-12-17
140. Fortune Art
Wires & Cables
Pvt Limited
PVC Insulated
Armoured,
Unscreened,
Underground
Railway Signaling
Cable
10/12/2015 Deficiencies on initial scrutiny
sent to firm on 23.11.2105.
Firm's reply on 23.02.2016.
Again, deficiencies sent to firm
on 06.04.2016. Reminder on
09.11.2016. Firm's reply on 22.05.2017. Advice for carrying
out CCA sent to field unit on
06.06.2017. Firm advised for
submission of prototype
sample vide letter no. RDSO/2015/QS/ Cable/1648-
I dtd.09.10.2017
Firm advised for
submission of prototype
sample vide letter no.
RDSO/2015/QS/Cable/1
648-I dtd.09.10.2017
141. Digital
Communication
& Control Pvt.
Ltd
Relay QN1 11/26/2015 Advice for carrying out CCA
sent to field unit on 16.06.16.
Deficiencies in CCA report
observed and referred back to field unit on 19.09.16. Reply
received on 27.09.16. Again
deficiencies sent on 30.11.16.
Reply received on 05/12/16.
1 month after
satisfactory type
test report.
Prototype sample asked
on 12.5.17. Samples for
type testing received on
14.9.17. sent for type testing to Lab on
14.09.17.
1 2 3 4 5 6 7 8 9
42
Again deficiencies sent on
20.02.17. Reply received finally on 22.02.17. Advice for
submission of prototype
sample sent to the firm on
12.05.17. Prototype samples
received for type testing on 12.9.17 and sent for type
testing to lab on 14.09.17
142. Digital
Communication
& Control Pvt.
Ltd
Relay QNA1 12/17/2015 Advice for carrying out CCA
sent to field unit on 16.06.16.
Deficiencies in CCA report sent
back to field unit on19.09.16.
Reply received on 27.09.16. Again deficiencies sent on
30.11.16. Reply received on
05/12/16. Again deficiencies
sent on 20.02.17. Final
compliance received on 22.02.17. Advice for
submission of prototype
sample by firm sent on 12.5.17
1 month after
satisfactory type
test report.
Samples for type testing
received on 1.9.17. Sent
for type testing to Lab on
14.09.17.
143. . Digital
Communication
& Control Pvt.
Ltd
Relay QBA1 12/17/2015 Advice for carrying out CCA
sent on 16.06.16. Deficiencies
in CCA report sent on
19.09.16. Reply received on 27.09.16. Again deficiencies
sent on 30.11.16. Reply
received on 05/12/16. Again
deficiencies sent on 20.02.17.
Reply received on 22.02.17. Advice for submission of
prototype sample by firm sent
on 12.05.17. Prototype samples
received for type testing on
12.9.17 and sent for type
testing to lab on 14.09.17.
1 month after
satisfactory type
test report.
Samples for type testing
received on 1.9.17. Sent
for type testing to Lab on
14.09.17.
144. . Digital
Communication
& Control Pvt.
Ltd
Relay QL1 12/17/2015 Advice for carrying out CCA
sent on 16.06.16. Deficiencies
in CCA report sent on19.09.16.
Reply received on 27.09.16.
1 month after
satisfactory type
test report.
Samples for type testing
received on 1.9.17. Sent
for type testing to Lab on
14.09.17.
1 2 3 4 5 6 7 8 9
43
Again deficiencies sent on
30.11.16. Reply received on 05/12/16. Again deficiencies
sent on 20.02.17. Reply
received on 22.02.17. Advice
for submission of prototype
sample by firm sent on 12.05.17. Prototype samples
received for type testing on
12.9.17 and sent for type
testing to lab on 14.09.17.
145. . Electro Star Power Supply Unit
For Telecom
Installations at Way Side Stations
In 25 KV
Electrified Area
2/22/2016 Deficiencies during initial
scrutiny advised to firm on
27.04.16. Firm's reply received on 11.05.16. Letter for carrying
out CCA on 13.06.16. CCA
report received on 15.07.16.
Deficiencies in CCA report sent
on 24.08.16. Reminder letter sent on 06.12.16. Compliance
of deficiencies regarding CCA
received on 29.12.16. Again
deficiencies sent on 20.04.17.
Reminder letter sent on
18.07.17. Compliance of deficiencies received on
04.08.17. Advice for
submission of prototype
sample on 15-09-17.Advised
for submission of prototype sample on 10.10.2017. Again
advised for submission of
prototype sample within three
months on 26.12.2017.
Samples yet to
be submitted by
the firm
Firm advised to submit
prototype samples for
type test on 15.9.2017 Advised for submission of
prototype sample on
10.10.2017. Again
advised for submission of
prototype sample within three months on
26.12.2017.
146. .
Electro Star Desk Type
Electronic Magneto
Telephone
2/22/2016 Deficiencies during initial
scrutiny advised to firm on
27.04.16. Firm's reply received on 11.05.16. Letter for carrying
out CCA on 13.06.16. CCA
report received on 15.07.16.
Deficiencies in CCA report sent
Samples yet to
be submitted by
the firm
Deficiencies observed in
Capability assessment
complied 4.8.17.Firm advised to submit
prototype samples for
type test on 15.9.2017
Advised for submission of
1 2 3 4 5 6 7 8 9
44
on 24.08.16. Reminder letter
sent on 06.12.16. Compliance of deficiencies regarding CCA
received on 29.12.16. Again
deficiencies sent on 20.04.17.
Reminder letter sent on
18.07.17. Compliance of deficiencies received on
04.8.17. Advice for submission
of prototype sample on 15-09-
17. Advised for submission of
prototype sample on
10.10.2017. Again advised for submission of prototype
sample within three months on
26.12.2017.
prototype sample on
10.10.2017. Again advised for submission of
prototype sample within
three months on
26.12.2017.
147. . Sandhu
Technocrats (P)
Ltd.
Motor For Electric
Point Machine
2/22/2016 Deficiency during initial
scrutiny sent to Firm on
01/06/2016.Reply received on 18/07/2016. Again
deficiencies advised to firm on
15/11/2016. Firm replied on
10/02/2017 & 06/06/2017.
Advice for carrying out CCA
sent on 24/07/2017. Advice given to firm to submit proto-
type samples on 31-10-2017
Timeline for
CCA:
15.10.2017
Advice given to firm to
submit prototype samples
on 31-10-2017
148. . Electrostar Transformer-
Rectifier Set
3/21/2016 Deficiency during initial
scrutiny sent to firm vide this
office letter no. RDSO/2016/
QS/Trans- Rect/1693 dtd 28-8-17. Advise for submission of
prototype sample by firm given
vide this office letter no.
RDSO/ 2016/QS/Trans-
Rect/1693 dtd 10-10-17.
Deficiencies in papers
advice to firm Advise for
submission of prototype
sample by firm given vide this office letter no.
RDSO/2016/QS/Trans-
Rect/1693 dtd 10-10-17.
149. . Electrostar Inverter - Sine
Wave
3/21/2016 Deficiency during initial
scrutiny advised to firm vide
this office letter no.RDSO/
2016/ QS/Inverter/1694 dtd
Deficiencies sent to firm
during initial application
stage Advise for
submission of prototype
1 2 3 4 5 6 7 8 9
45
28-08-17. Advise for
submission of prototype sample by firm given vide this
office letter no. RDSO/2016/
QS/Trans-Rect/1693 dtd
10/10/17.
sample by firm given vide
this office letter no. RDSO/2016/QS/Trans-
Rect/1693 dtd 10-10-17.
150. . CELTEK
Batteries Pvt.Ltd.,
LMLA cell 4/22/2016 Deficiency during initial
scrutiny sent to firm on 06/06/2016.Reply received on
15/11/2016 .Again Deficiency
letter issued on 21/12/2016.
Firm replied on 16/01/2017.
Advice for carrying out CCA
sent on 14/03/2017. CCA report recd. On 8.5.17. Some
MP not available with firm.
Advise to submit prototype
sample given to firm on
25/10/17
Advise to submit
prototype sample given to firm on 25-10-17.
151. . HTL Ltd 24 Fiber Armoured Optic Fiber Cable
6/30/2016 Deficiency on initial scrutiny sent to firm on 30.08.16.
Reminder sent to firm on
23.12.16 and 10.03.17
6.Firm's reply received on
10.04.17. Advice for carrying
out CCA sent on 30.06.17. CCA report received on
05.10.2017. Advised for
submission of prototype
sample on 02.11.2017.
CCA report received on 05.10.2017. Advised for
submission of prototype
sample on 02.11.2017.
152. . Paramount
Wires And Cables Ltd.
24 Fiber Armoured
Optic Fiber Cable
6/30/2016 Deficiency on initial scrutiny
sent to firm on 02.09.16 4.Reminder sent on 23.12.16.
Firm's reply received on
24.03.17 and 12.06.17. Advice
for carrying out CCA sent on
10.07.17. Advised for submission of prototype
sample on 31.10.2017.
Advised for submission of
prototype sample on 31.10.2017.
153. . Enersys India
Batteries Private
VRLA Battery 7/25/2016 Deficiency during initial
scrutiny sent to firm on
Timeline for
Capability
Advise to submit
prototype sample given to
1 2 3 4 5 6 7 8 9
46
Limited 2/09/2016. Reply received on
25/11/2016 & 03/05/2017. Again deficiency letter issued
on 25/05/2017. Firm replied
on 12/06/2017. Advice for
carrying out CCA sent on
23/08/2017. Advise to submit prototype sample given to firm
on 21-11-17.
assessment:
31.10.2017. If assessment
report is in
order, sample
submission
advice: 15th Nov., 2017.
firm on 21-11-17.
154. . Orient Relay &
Equipments
Relay QN1K 24 V
DC 1000 Ohm
9/16/2016 Deficiencies observed during
initial scrutiny sent to firm on
08.05.2017. Firm's reply regd
compliance of deficiencies on
16.05.17, 08.06.17. Firm requested for waiver of capacity
assessment on 14.07.17.
Firm's request considered and
prototype samples asked from
firm on 15.9.17.
Samples to be
submitted by the
firm.
prototype samples asked
from firm on 15.9.17.
155. . Allied Engineering
Works Pvt. Ltd.
PVC Insulated Armoured,
Unscreened,
Underground
Railway Signaling
Cable
9/16/2016 Advice for carrying out CCA sent on 14.12.2016. Reminder
to DI/NDLS on 11.07.2107.
Firm complied deficiencies
pointed out by assessing officer
on 19.8.2017. CCA report is
being sent by field unit shortly to HQ. Firm advised to submit
prototype sample vide letter
No. RDSO/
2016/QS/Cable/1687 Vol-I
dtd.10.11.2017
Firm advised to submit prototype sample vide
letter No.
RDSO/2016/QS/Cable/1
687 Vol-I dtd.10.11.2017
156. . Orient Relay & Equipments
Relay QNA1K 24 VDC 1000 Ohm
9/16/2016 Deficiencies observed during initial scrutiny sent to firm on
08.05.2017. Firm's reply regd
compliance of deficiencies on
16.05.17, 08.06.17. Firm
requested for waiver of capacity assessment on 14.07.17.
Firm's request considered and
prototype samples asked from
firm on 15.9.17.
Samples to be submitted by the
firm.
prototype samples asked from firm on 15.9.17.
1 2 3 4 5 6 7 8 9
47
157. . Orient Relay &
Equipments
AC Lamp Proving
Relay (Metal-to- Carbon Contact)for
LED Signal
9/30/2016 Deficiencies observed during
initial scrutiny sent to firm on 08.05.2017. Firm's reply regd
compliance of deficiencies on
16.05.17, 08.06.17. Firm
requested for waiver of capacity
assessment on 14.07.17. Firm's request considered and
prototype samples asked from
firm on 15.9.17.
Samples to be
submitted by the firm.
prototype samples asked
from firm on 15.9.17.
158. . Om Optel
Industries Pvt.
Ltd.
24 Fiber Armoured
Optic Fiber Cable
10/20/2016 Deficiency during initial
scrutiny sent to firm on
10.03.17 5. Firm's reply
received on 07.04.17. Advice for carrying out CCA sent on
26.05.17. Advised for
submission of prototype
sample on 01.11.2017.
Advised for submission of
prototype sample on
01.11.2017.
159. . Broadweb ELB with hand
generator
12/12/2016 Deficiency during initial
scrutiny sent to firm on 23/03/2017. Reply received on
11/04/2017. Again, deficiency
letter is issued on
10/07/2017.Firm replied on
08/08/2017. Advice to
conduct CCA sent on 09.9.2017. Capability
assessment report received on
09-11-17. Capability report
returned back to DI/CC for
compliance of deficiencies in CCA on 20/12/2017.
Timeline for
Capability assessment:
30.10.2017. If
assessment
report is in
order, sample
submission advice:30 Nov.,
2017.
Capability assessment
report received on 09-11-17. Capability report
returned back to DI/CC
for compliance of
deficiencies in CCA on
20/12/2017.
160. . CMI energy
India Pvt Ltd
Sigg Cable 1/19/2017 Deficiency on initial scrutiny
sent to firm vide this office
letter no. RDSO/2017/QS/
Cable/ 1700 Vol I dtd 06-06-
17. Field Unit advised for CCA of firm vide letter No.RDSO/
2017/ QS/ Cable/1700 Vol-I
dtd. 16.10.2017. Firm advised
to submit prototype sample
Deficiencies in papers
during initial application
stage sent to firm on
6.6.2017. Firm advised to
submit prototype sample vide letter No.
RDSO/2017/QS/Cable/1
700 Vol-II dtd.18.12.2017
1 2 3 4 5 6 7 8 9
48
vide letter No. RDSO/2017/
QS/ Cable/1700 Vol-II dtd.18.12.2017
161. . Cosine
Communications
TFBC 1/24/2017 Deficiency during initial
scrutiny sent to firm vide this
office letter no.
RDSO/2017/QS/TFBC/1716
dtd 11-09-17. Advise for capability assessment sent vide
this office letter no.
RDSO/2017/QS/TFBC/1716
dtd 23-10-17
Advise for capability
assessment sent vide this
office letter no.
RDSO/2017/QS/TFBC/1
716 dtd 23-10-17
162. . Sandhu
Technocrats Ltd.
EPM 220 mm 2/9/2017 Advice for carrying out CCA
sent to firm vide this office letter no. RDSO/2017/QS/
EPM (220mm)/Sandhu dtd 15-
09-17. Advice to submit
prototype sample given to firm
on 04-12-17.
Advice to submit
prototype sample given to firm on 04-12-17.
163. . Star Electric Co. Point motor 2/9/2017 Deficiency during initial
scrutiny sent to firm on 27/04/2017.Reply received on
29/05/2017. Advice for
carrying out capability
assessment given to DI/NDLS
on 25-10-17.
Advice for carrying out
capability assessment given to DI/NDLS on 25-
10-17.
164. . Star Electric Co. Clamp point lock 2/9/2017 Deficiency during initial scrutiny sent to firm on
27/04/2017.Reply received on
29/05/20147. Advise for
carrying out capability
assessment given to DI/NDLS
on 20-12-17.
Advise for carrying out capability assessment
given to DI/NDLS on 20-
12-17.
165. . Swarn Infratel P Ltd
Sigg. Cable 2/9/2017 Deficiency on initial scrutiny sent to firm on 13.06.2017.
Firm's reply received on
04.07.2017. Advice for carrying
out CCA sent on 31.07.2017.
Firm has requested field unit to visit only after 21.9.17. Firm
advised to submit prototype
Firm advised to submit prototype sample vide
letter No.
RDSO/2017/QS/Cable/1
703 Vol-I dtd.20.10.2017
1 2 3 4 5 6 7 8 9
49
sample vide letter No.
RDSO/2017/QS/Cable/1703 Vol-I dtd.20.10.2017
166. . Swrn Inrtel Pvt.
Ltd.
Power cable 2/13/2017 Deficiency on initial scrutiny
sent on 01.06.2017. Firm's
reply recd on 04.07.2017.
Advice for carrying out CCA
sent on 23.08.2017. Firm has requested to visit firm after
21.09.17. Advise for
submission of prototype
sample given to firm vide this
office letter no. RDSO/2017/
QS/ Cable/1709 dtd 23-10-17
Samples to be
submitted by the
firm.
Advise for submission of
prototype sample given to
firm vide this office letter
no.
RDSO/2017/QS/Cable/1709 dtd 23-10-17
167. . NED Energy
Ltd.
LM batteries 3/10/2017 Deficiency during initial
scrutiny sent to firm vide this
office letter RDSO/2017/QS/
VRLA/NED Energy dtd 11- 05-
17. Advise to submit prototype
sample given to firm on 28-12-17.
Compliance
awaited from the
firm.
Advise to submit
prototype sample given to
firm on 28-12-17.
168. . Broadweb DC-DC Converters 4/28/2017 Deficiency during initial
scrutiny stage sent to firm vide
this office letter no. RDSO/
2017/ QS/ DC-DC
Converter/1719 dtd 11-09-17 Advise for submission of
prototype samples by firm vide
this office letter no.
RDSO/2017/QS/DC-DC
Converter/1719 dtd 01-12-17.
Compliance
awaited from the
firm.
Advise for submission of
prototype samples by firm
vide this office letter no.
RDSO/2017/QS/DC-DC
Converter/1719 dtd 01-12-17.
169. . Broadweb Transformers 4/28/2017 Deficiency during initial
scrutiny stage sent to firm vide this office letter no. RDSO
/2017/ QS/ Trans-former/
1720 dtd 11-9-17
Compliance
awaited from the firm.
Deficiencies during initial
application stage sent to firm on 11-09-17 Repley
recieved on 02.01.2018.
Case under process.
170. . Himalaya
Communication
Ltd.
24 Fiber OFC 6/25/2017 Advice given to DI/NDLS for
carrying out capability
assessment vide this office letter no.
RDSO/2017/QS/OFC/1714 dtd
Advised DI/NDLS for
capability assessment on
18-09-17 CCA report received on 15.12.2017.
Case under process for
1 2 3 4 5 6 7 8 9
50
18-09-17 CCA report received
on 15.12.2017. Case under process for permission of
advised for prototype sample
permission of advised for
prototype sample
171. . Eltek SGS Pvt.
Ltd
SMPS Based Power
Plant For Indian
Railways Telecom
Equipments
18-03-2015 Acceptance test conducted on
06.4.2017. Case transferred
from telecom directorate with
pending issue for major outsourcing. Major outsourcing
approved by DG on 24-11-17.
Prototype sample under type
testing from 18.12.2017.
Sample under type test
from 18.12.2017
172. . Delta Power
Solutions
SMPS Based Power
Plant For Indian Railways Telecom
Equipments
29-04-2015 CCA report recied on
28.11.2016. Case transferred from telecom directorate with
pending issue for major
outsourcing. Firm requested
vide this office letter no.
STT/Tele/SMPS/Delhta/788/
dtd 23-10-17 to submit reasons for outsourcing from
overseas. Firm submitted
reasons vide letter no. Nil dtd
08-12-17. DG has approved for
outsourcing on 21-12-17. Firm
advised for submission of prototype sample on
26.12.2017
Firm advised for
submission of prototype sample on 26.12.2017
173. . Statcon Power
Control Ltd
SMPS Based Power
Plant For Indian
Railways Telecom
Equipments
01-03-2017 Fresh application received on
01-03-17. Case transferred
from telecom directorate.
Deficiencies advised to firm vide this office letter no.
STT/Tele/SMPS/48
V/Statcon/841 dtd 01-11-17
regarding partnership firm.
Firm advised for deficiencies regarding fresh registration on
01.11.2017
Firm advised for
deficiencies regarding
fresh registration on
01.11.2017
SIGNAL
174. M/s CLS LED Signal Lamps 24.05.2016 18 months Firm Case put up to 31.12.18 Got late due to CCA waived off. Firm has
1 2 3 4 5 6 7 8 9
51
Industries,
New Delhi
for subsidiary
Colour Light Signals
Specification No.
RDSO/SPN/153
/2011 Rev. 4.1
submitted
required documents n
08.06.2016,
firm also
requested for
waive off the CCA and
grant
permission
for type test
directly.
waive off CCA
on 29.11.2017. CCA waived off
on 15.12.17.
Letter for
sample
submission issued on
03.01.2018.
decision of
continuation of specification in SSC.
been asked to submit the
sample for type test on 03.01.2018.
175. M/s Beacon Industries,
Dehradun
LED Signal Lamps for Main &
Subsidiary Signal
(Route, Shunt &
Calling-ON) Colour
Light Signals Specification No.
RDSO/SPN/153
/2011 Rev. 4.1.
15.12.2014 18 months Permission for CCA given
on
13.05.2017,
cca
recommendation received
on
08.03.2016.
Deficiency
advised to the
firm on 18.04.2017.
Compliance received on
20.09.2017.
31.12.18 Got late due to decision of
continuation of
specification in SSC.
CCA completed. Letter to the firm for submission of
prototype sample put up
on 15.01.2018.
176. M/s Efftronics
LED Signal Lamps
for Main Colour
Light Signals
(Integrated)
Specification No. RDSO/SPN/199/2
010 Rev. 1.0.
01.01.2016 18 months 10.05.16 &
27.12.16
Initial
deficiencies
27.01.17 Letter for
submitting
CCA &
prototype
samples
26.04.17 Deficiencies
of CCA
11.07.16 &
03/09.01.17
Compliance of
deficiencies.
12.02.17 CCA Report &
Samples
submitted
19.05.17
25.07.17
Compliance of deficiencies.
28.02.18 Late compliance of
documents and
deficiencies by the
firm.
Type test completed on
18.12.2017. IP-65, UV
stabilization & ABS Test
reports are awaited from
the firm since 09.01.2018.
177. M/s Konark
Industries Pvt.
LED Signal
RDSO/SPN/199/2
08.05.2015 18 months 27.08.15 To
firm /DI/SBC
10.12.15
Compliance
30.05.18 Late compliance of
deficiencies by the
Item under Type Testing
in Signal lab w.e.f
1 2 3 4 5 6 7 8 9
52
Ltd., SBC 010 Rev. 1.0 for
compliance of deficiency.
05.02.16 To
firm /DI/SBC
for
compliance of deficiency.
25.07.17 To
firm /DI/SBC
for
compliance of
deficiency.
received in
Signal Dte. 03.04.17
Compliance
received in
Signal Dte.
26.12.17 Compliance
received in
Signal Dte.
firm 13.10.17. The climatic
test over, now sample have to send for vibration
test .Firm has also
submitted compliance of
deficiencies on 26.12.17
which is under scrutiny in parallel.
178. M/s Beacon
Industries
Dehradun
LED Signal Lamps
for Main Colour
Light Signals
(Integrated)
Specification No. RDSO/SPN/199/2
010 Rev. 1.0.
15.12.14 18 months 11.05.15
27.08.15
Letter to
submit CCA
10.05.16 14.12.16
Deficiencies
sent
02.03.16
CCA submitted.
01.08.16
10.01.17
04.07.17 Compliance
received
31.12.18 Late compliance of
documents/
deficiencies by the
firm.
CCA compliance received
on 05.07.17.
Case put up on 04.12.17
for submission of
prototype sample.
179. M/s Power
Technologies
Corporation
Dehradun
LED Signal Lamps
for Main Colour
Light Signals
(Integrated) Specification No.
RDSO/SPN/199/2
010 Rev. 1.0.
01.08.14 18 months Clearance for
field trial for
500 nos.
given as per RDSO/
SPN/199/20
10 (Draft) but
firm did not
supply as got delisted due
to legal
issues.
30.06.18 1. Samples Failed in
Type test once.
2. Late compliance
of documents and deficiencies.
3. Delay due to
policy issue.
Corrected QAP &
compliance of deficiencies
are received on
19.06.2017 case put up on 07.12.2017.
180. M/s. Trusine
Electronics Pvt.
Ltd. New Delhi
Fuse Auto
Changeover
System (FACS) as per Spec. No.
RDSO/SPN/
209/2012 Rev. 1.0.
28.02.2014
14 months 1. 1st sample
failed on
05.01.16. 2. Firm asked
to resubmit
the sample.
3. Firm
30.05.18 Samples failed in
Type testing and
firm was advised for re-submission of
improved samples
on 05.01.16. 2nd
sample late
Type test started on
15.01.2018
1 2 3 4 5 6 7 8 9
53
submitted
2nd sample in Nov. 17.
4. Sample
received after
acceptance
test on 21.12.2017.
5.Test note
sent to lab on
03.01.18
submitted by the
firm in Dec-17.
181. M/s RT Vision
Technologies (P)
Ltd, Noida
Fuse Auto
Changeover
System (TYPE-II) (FACS) as per
Spec. No.
RDSO/SPN/
209/2012 Rev. 1.0.
08.12.15 14 months 18.12.15
Deficiency
letter. 05.02.16
Deficiency
letter.
16.03.16 for
sample submission
and 30.12.16
for extension
of time.
28.12.15
compliance
submitted. 14.02.16
compliance
submitted.
Sample
submission received in
signal Dte on
14.09.17
30.04.18
Firm was advised for
sample submission
on 16.03.16
Climatic test completed.
Sample sent for vibration
test on 15.01.2018.
182. M/s. Paras
Plastics, Mumbai
Non-Metallic
colour light signal Housing of various
types for Railway
Signalling
Spec. no.
RDSO/SPN/194/2006 Rev. 2.0
03.11.16 12 Months 27.03.17
Deficiency letter
Compliance
received on 01.11.17. Letter
for CCA on
15.12.17 to DI.
31.12.18 CCA report is awaited
since 15.12.2017.
183. M/s. Akshay
Engg Kolkata
Non-Metallic
colour light signal
Housing of various
types for Railway Signalling
Spec. no.
RDSO/SPN/194/2
006 Rev. 2.0
30.06.17 12 Months 14.08.17
Deficiency
letter
25.10.17 letter to firm
for submit
sample.
05.09.17
compliance
submitted.
18.12.17 Samples
submitted.
30.06.18 No delay Type test completed.
Visual & dimension check
completed. Check list for
approval is under process.
1 2 3 4 5 6 7 8 9
54
184. M/s.
Connectwell Industries Pvt.
Ltd., Mumbai
Modular Terminal
Blocks, Fuse terminal blocks &
miniature fuse
links as per
RDSO/SPN/
189/2004 Rev. 2.0
19.07.14 12 Months 11.09.14
Deficiency letter
20.10.14 for
CCA
02.02.15
Deficiency in
CCA sent
21.06.16
Deficiency in
CCA again sent
20.06.17
Deficiency in
CCA again
sent to DI on 19.12.17.
07.10.14
compliance submitted
01.12.14 CCA
received
26.04.16 Deficiency
complied sent
by QA
10.04.17
Deficiency
complied sent by QA
31.07.18 Deficiency in the
CCA of the firm was advised to QA on
20.06.17 Since
awaited for CCA.
Letter sent to DI/Mumbai
for some shortcoming in CCA on 19.12.2017.
(No vendor in approved
list)
185. M/s. Elmex
Electric Pvt Ltd,
Vadodara
Modular Terminal
Blocks, Fuse
terminal blocks &
miniature fuse
links as per RDSO/SPN/
189/2004 Rev. 2.0
21.07.14 12 Months 08.09.14 for
CCA
08.05. 15
information for type
testing
procedure
12.01.15
CCA received
31.07.18 While type test
format was under
finalization
Type testing completed on
03.02.2018. Awaited for
climatic and material test
report from CPRI
Bangalore.
186. M/s. Wago
Limited, Noida
Modular Terminal
Blocks, Fuse
terminal blocks & miniature fuse
links as per
RDSO/SPN/
189/2004 Rev. 2.0
22.07.14 12 Months 20.10.14
Deficiency
letter
10.12.14 for
CCA
13.05.16
Deficiency in CCA sent
11.07.17
Deficiency in
28.11.14
compliance
submitted 23.02.16 CCA
received
23.11.16 some
deficiency
complied
No response
received
31.07.18 CCA has taken lot of
time and compliance
of CCA deficiency is still not complied.
Deficiencies reminder
letter sent to firm & QA
on 06.09.17. (No vendor)
1 2 3 4 5 6 7 8 9
55
CCA again
and reminder on 06.09.17
sent
187. M/s. Phoenix
Contact(I) Pvt.
Ltd., New Delhi
Modular Terminal
Blocks, Fuse
terminal blocks &
miniature fuse links as per
RDSO/SPN/
189/2004 Rev. 2.0
08.08.14 12 Months 07.01.15
Deficiency
letter
17.04.15 for
CCA
24.08.16
Deficiency in
CCA sent 27.06.17
Deficiency in
CCA again
sent
06.04.15
compliance
submitted
13.07.16 CCA received
03.04.17 some
deficiency
complied
No response
received
31.07.18 CCA has taken lot of
time and compliance
of CCA deficiency is
still not complied.
Compliance submitted by
QA in CCA documents is
under scrutiny since
18.12.17. Case put up for further decision. (No
vendor)
188. Electronic
Equipment Company
Battery Operated
LED based Flashing Tail Lamp
for Railway
Vehicles
23.12.2014 15 months 16.1.15
deficiencies 16.2.15 CCA.
30.9.15
deficiencies in
CCA.
31.5.16
deficiencies in CCA.
31.3.17
deficiencies in
CCA.
25.09.17, deficiencies in
QAP & Annex
1 advices.
2.2.15
compliance. 2.7.15 CCA
report.
22.12.15
compliance of
CCA
21.12.16 compliance of
CCA.
4.5.17
compliance of
CCA. 13.12.17
Compliance of
CCA.
31.10.18 Late submission of
compliance of Deficiencies in CCA
report and
documents.
Deficiencies in QAP as
obtained with CCA report & Annexure-1 of A4 is
intimated & asked for
compliance on
25.09.2017. Compliance
of CCA report is received
on 20.12.17 under scrutiny.
189. Broadweb
Technologies
Battery Operated
LED based
Flashing Tail Lamp for Railway
Vehicles
28.01.2016 15 months 15.3.16
deficiencies.
17.10.16 deficiencies.
15.6.17 CCA
09.01.2018
deficiencies in
20.6.16
compliance.
2.3.17
compliance.
14.09.17 CCA
31.10.18 Delay in Submission
of documents by the
firm.
Deficiencies in CCA report
is intimated to DI/QA and
firm. Compliance is awaited.
1 2 3 4 5 6 7 8 9
56
CCA. Rd.
190. Hublit Lighting Pvt. Ltd.
Battery Operated LED based
Flashing Tail Lamp
for Railway
Vehicles
24.04.16 15 months 14.07.17 deficiencies
18.09.17
reminder of
deficiencies
20.11.17
Deficiencies in
documents.
08.01.2018
45 day notice.
27.10.17 Documents
from firm.
05.01.2018
Documents
from firm.
13.01.2018 Documents
from firm.
31.12.18 Non submission of documents from the
firm.
Documents are under scrutiny.
191. M/s VTL Data Logger
IRS:S-99/2006
16.04.14 15 months RDSO (CCA permission):
04.08.14, RDSO (QA): 02.09.14,
RDSO (QA) :27.10.14 (CCA
completed),
RDSO : 04.12.14,Vendor
(Compliance): 16.12.14,RDSO
(permission for sample) : 07.01.15,
Vendor submitted the sample
which failed in type testing.
RDSO (permission for
improved prototype): 14.11.17
& 18.12.17.
30.06.18 Delay by vendor as
1st prototype sample failed.
Proto type sample failed.
Permission for 2nd (improved) sample given
to firm. Firm has been
advised to submit
improved prototype
sample by 17.03.2018.
192. M/s Medha
EI634
EI (SPN/192)
23.01.15 33 months Deficiency letter sent to firm
on 27.02.15, 27.03.15,
18.09.15, 20.10.15 and
26.11.15.
Deficiencies complied by firm on 09.06.15, 03.08.15,
26.10.15 and 23.12.15.
Sample submitted ion
31.12.15 then submitted design change on 26.10.16
parallel field trial started from
30.12.16.
RDSO: (functional test)
31.12.18 Vendor introduced
hardware change in
certain modules. So
all tests and trials
were done again.
Firm is advised to start
type testing on
02.02.2018.
1 2 3 4 5 6 7 8 9
57
03.08.17.
RDSO: 02.02.2018
193. Kyosan India
Private Limited
EI (SPN/203)
17.02.2015 09 months Deficiency letter sent to firm
on 11.03.15, 06.07.15
(reminder), 24.09.15, 01.12.16
(reminder) 02.11.17.
Compliance received from firm
on 07.08.15, 25.01.17, 13.10.17 and 24.11.17. (Still
some more documents
required)
28.02.18 Non compliance by
vendor. Given time
as new Specification
developed and
vendors are
required.
Awaiting reply from
vendor regarding
mandatory documents.
(only one vender)
194. HBL Power
System
Ltd,
EI (SPN/192) 07.07.2016 33 months Deficiencies letter sent on
30.07.16and 28.02.17.
Compliance received on 12.08.16, 17.11.16, 20.03.17,
10.04.17.
RDSO (for CCA) : 01.09.2017
RDSO (for sample
manufacture) : 08.01.2018.
30.04.19 No delay CCA done. Firm asked to
submit prototype sample
latest by 07.04.2018.
195. Safeconnect
Communication (India) Pvt Ltd
EI (SPN/203) 07.09.2017 09 months RDSO(deficiencies) :25.10.17
Vendor (compliance) : 03.11.2017
Firm was called for
clarification on 22.12.17 and
asked to comply pending
deficiencies.
30.06.18 No delay Firm to comply pending
deficiencies. (only one vendor)
196. Safeconnect Communication
(I) P.Ltd
EI (SPN/192) 07.09.2017 09 months RDSO(deficiencies) :25.10.17 Vendor (compliance) :
03.11.2017
Firm was called for
clarification on 22.12.17 and
asked to comply pending
deficiencies.
June 18 No delay Firm to comply pending deficiencies
197. Siemens Ltd. Automatic Fire Detection & Alarm
System for
Signalling
Installation
30/01/2017 15 months From RDSO to firm letter No. STS/E/AFDAS/Siemens on
27.03.17.
From firm to RDSO letter No.
Nil on Nil.
From RDSO to firm letter No. STS/E/AFDAS/Siemens on
14.07.17.
30.06.18 Deficiencies not timely complied by
the firm.
Deficiencies of documents are yet to set right.
(No vendor)
1 2 3 4 5 6 7 8 9
58
Reminder was sent on
18.12.2017. Second reminder was sent on
30.01.2018.
198. Honeywell
Security & Fire
(A Div of
Honeywell International
India Pvt. Ltd.)
Automatic Fire
Detection & Alarm
System for
Signaling Installation
10/3/2017 15 months From RDSO to firm letter No.
STS/E/AFDAS/Honeywell on
30.03.17.
From firm to RDSO letter No. Nil on 07.07.17.
From RDSO to firm letter No.
STS/E/AFDAS/Honeywell on
28.07.17.
From firm to RDSO dated
06.09.2017 and 08.10.2017. From RDSO to firm on
20.11.2017.
Firm submitted compliance on
27.12.17.
Cleared for CCA on 02.01.2018 subjected to
compliance of deficiencies
noticed.
30.04.18 Deficiencies not
timely complied by
the firm.
Letter sent to
ED/QA/S&T/NDLS for
CCA on 02.01.2018.
(no vendor)
199. Ravel
Electronics Pvt
Ltd
Automatic Fire
Detection & Alarm
System for
Signalling Installation
3/4/2017 15 months From RDSO to firm letter No.
STS/E/AFDAS/Ravel dated
12.07.17.
from firm to RDSO dated 07.11.2017
From RDSO to firm on
15.12.2017.
From RDSO to firm on
31.01.2018 (reminder).
30.06.18 Deficiencies not
timely complied by
the firm.
Deficiencies of documents
are yet to set right.
(no vendor)
200. PARK TELESOLUTION
S PVT.LTD
Automatic Fire Detection & Alarm
System for
Signalling
Installation
30/05/2017 15 months From RDSO to firm letter No. STS/E/AFDAS/Park on
27.07.17.
from firm to RDSO on
12.10.2017.
RDSO to firm on 06.12.2017. From RDSO to firm on
18.01.2018 (reminder).
31.08.18 Deficiencies not timely complied by
the firm.
Deficiencies of documents are yet to set right.
(no vendor)
201. M/s Siemens
Ltd.
MSDAC
(ACM200)
15.12.2015 09 months 1. Document received-by the
firm.
30.04.18 Non submission of
documents by firm
The firm has not
submitted reply yet.
1 2 3 4 5 6 7 8 9
59
2. 1st deficiencies letter sent-
15.02.17 3. 2nd reminder letter sent to
the firm –
26.04.17
4. 3rd reminder letter sent to
the firm-11.09.17. 5. Firm’s representative from
Germany called on 11.10.17
for clarification and
discussions.
6. One more letter to comply
the items by 31.03.2018, has been issued on 12.12.2017.
7. For compliance of climatic
test as per RDSO spn firm has
started type testing at
NASIK/NABL accredited lab on 3.01.18.
complying cross
approval policy.
Issues like safety case,
severity of climatic tests and certification from
OEM/user railway for
provenness criterion etc.
For compliance of climatic
test as per RDSO spn firm has started type testing at
NASIK/NABL accredited
lab on 3.01.18.
202. M/s Vista
Information
System(P Ltd)
. MSDAC
(ESSO-M)
23.11.2016 09 months 1. Documents received-
25.01.17
2. Documents scrutiny-
24.04.17
3. Deficiencies letter sent-
22.06.17. 4. Reminder given on
28.09.17.
5. dated 12.12.17 notice for
closure if no compliance is
received till 10 Jan 18. 6. Though firm has asked
further two months for
compliance but case is put up
for closure.
30.06.18 Non-compliance of
Cross Approval
policy.
The firm has not
submitted reply yet.
Dated 12.12.17 a notice is
issued for closure if no
compliance is received till
10 Jan 18.Though firm has asked further two
months for compliance
but case is put up for
closure.
203. M/s HBL Power
Systems ltd
MSDAC 09.03.15 28 months 1. Documents received-
01.06.15
2.Documents scrutiny- 09.10.15
3. Deficiencies letter sent-
27.11.15
4.2nd deficiencies letter sent-
31.10.19 1. Late compliance
of documents for
CCA. 2. ISA not yet
decided by the firm.
The firm has to submit
prototype sample latest
by 18.03.18.
1 2 3 4 5 6 7 8 9
60
09.02.16
5.Documents sent for CCA-16.05.16
6.Documents received after
CCA-07.10.16
7. A deficiencies letter sent to
DI/SBC related to CCA-06.04.17
8.Documents received after
CCA & under scrutiny-
08.08.17.
9. Permission for submission
of prototype sample has been given on 3.11.2017.
204. M/s Medha :
MSDAC (MAC181) 07.08.13
28 months 1. Medha MAC 181 : Type
testing completed in
31.08.2017.
2. Series trial permission has
been given on 23.10.2017. 3. After the approval of ckt
diagram, Series trial started
on 9.12.17.
4. Serial trial of 30 days is
completed. Performance report
of series trial is received on 16.01.2018 which is under
scrutiny.
5. Permission for 2nd phase of
standalone trial (60 days) is
given 19.01.2018
30.04.18 Delay by firm in
compliance of
documents for CCA
and late submission
of prototype sample. ISA report received
for standalone trial.
Since functional test
was not done
properly it has been
redone.
Series/Stand alone trial:-
Series trial permission
has been given on
23.10.2017.
After the approval of ckt diagram, Series trial
started on 9.12.17.
Performance report of
series trial is received on
16.01.2018 which is
under scrutiny. Permission for 2nd phase
of standalone trial (60
days) is given 19.01.2018
205. M/s GG Tronics MSDAC 01.10.15* 28 months CCA was completed on 01.04.2010.
Prototype sample was
submitted on 10.04.2013.
Firm was delisted for almost
two years.
*After Re-listing sample was resubmitted on 01.10.2015.
ISA engaged on 18.11.2016.
Type testing permission from
Govt Lab given on 17.02.17.
31.12.18 Delay by firm in compliance of
documents for CCA
and late submission
of prototype sample.
Subsequent delays
are due to delisting of the firm.
Permission for Parallel field trial of prototype
sample given on
20.11.2017.
1 2 3 4 5 6 7 8 9
61
permission for field trial for
prototype sample on 20.11.2017
206. M/s Insys
Digital Systems
SSDAC 04.12.2014 27 months 1.Documents received-
12.02.15
2.Documents scrutiny-
17.02.15
3. Deficiencies letter sent-18.02.15
4.Documents sent for CCA-
15.06.15
5.Reminder letter for CCA-
19.01.16
6.Deficiencies letter related to CCA-12.05.16
7. 2nd reminder letter for
CCA-19.01.17
8.3rd reminder letter for CCA-
26.04.17 9. Documents received after
CCA and under scrutiny-
12.06.17.
10. Permission for submission
of prototype sample has been
given on 30.10.2017. 11. One more letter to
expedite the submission of
sample in time has been given
on 11.12.17, with a notice
that if same is not done in time, closure of the case will
be initiated.
12.DI/SBC has been advised
to carryout stage inspection
on 10.01.2018.
31.07.19 1. Late compliance
of documents for
CCA.
2.DI/SBC did not
submit QAP,STR & assessment report
in requisite format.
3. ISA not yet
decided by the firm
Permission for
submission of prototype
sample has been given on
30.10.2017.DI/SBC has
been advised to carryout stage inspection on
10.01.2018.
207. M/s HBL Power
Systems ltd
SSDAC 29.03.2014 27 months 1.Document received-16.05.14
2.Scrutiny of doc.-25.06.14 3.First letter of deficiencies
sent to firm-01.07.14
4.The Firm sent deficiencies
related documents-30.09.14
30.06.19 1.Late compliance of
documents for CCA. 2. Firm could not
submit prototype
sample in due time
and then failure of
Improved sample has
submitted to DI/SBC, acceptance test
conducted, report is
awaited.
1 2 3 4 5 6 7 8 9
62
5.Documents sent for CCA -
28.10.14 6.Documents received after
CCA- 07.04.15
7.Firm has given permission
for manufacture prototype
sample-18.05.15 8.Extension for permission to
manufacture prototype
sample- 05.05.16
9.DI/SBC sent test report and
a letter for pick up the
prototype sample-26.09.16 10.A deficiencies letter sent to
DI/SBC-15.12.16
11.DI/SBC again send some
documents related to
deficiencies – 12.05.17 12.Sample sent to RDSO lab
for type testing with test note
dt - 25.07.17
13. Sample sent to RDSO lab
for type testing & Functional
testing started on 25.09.2017. 13 During type test (
Functional test), it is noticed
that the prototype sample is
not in conformity to
specification. 14. Letter to M/s HBL issued
on 15.11.2017 for improving
the system (as per para 13
above).
15. In compliance for changes
in system firm has replied vide their letter dated 14.12.17,
they have completed
mechanical changes. Software
up gradation and testing will
be completed by 20.12.17. Then modified sample will be
sample.
3. ISA report not yet received.
4. Firm has to
submit improved
sample.
1 2 3 4 5 6 7 8 9
63
offered to Dir/inspection/
SBC. 16. Improved sample has
submitted to DI/SBC,
acceptance test conducted,
report is awaited.
208. M/s Siemens
Ltd.
Advanced Auxiliary
Warning System(AAWS)
09.02.15 On
line registration
with Vendor
Reference ID
QAS2015/18
42.
Documents received on
23.02.2015
18 months (1) 08.05.15 – Check list after
scrutiny of doc.for fresh vendor registration
(2) 12.05,15 - Letter of
deficiencies to the Firm
(3) 23.09.15. – Reply of this
letter with required
documents by the Firm (4) 05.10.15 – Revised Check
list
(5) 06.10.15 - A letter for
Capacity-cum-capability
assessment to the QA/S&T/Mumbai
(6) 12.01.16 - Capacity
Assessment report by
QA/S&T/Mumbai
(7) 16.02.16 - Letter of
deficiencies to the Firm for compliance of deficiencies
observed by DI/Mumbai
during CCA.
(8) 04.05.16 - Reply of this
letter with required documents received from the
Firm.
(9) 11.07.16 - Letter to the
firm for permission of submit
the proto type sample.
(10) Sample received at DI/Mumbai and Acceptance
test (Routine test) reports
submitted by DI/Mumbai 0n
27.10.16.
(11) 03.02.17 - Letter of the
30.06.18 Late compliance of
the documents by the firms for CCA.
Permission for conducting
climatic test at Nasik in Govt lab is given on
23.10.2017.
One more letter to
expedite the climatic
testing of the sample been
given on 12.12.17. (only one vendor)
1 2 3 4 5 6 7 8 9
64
firm requesting for type test to
be done at firm’s premises. (12)19.07.17 – Type Test
started and functional test
conducted at firm’s premises,
(13) permission for conducting
climatic testing at NABL accredited lab at Nasik has
been given on 23.10.2017.
14. One more letter to
expedite the climatic testing of
the sample been given on
12.12.17.
209. M/s Medha Servo Drives
Pvt. Ltd.
Track Magnet & Opto coupler card
of Advanced
Auxiliary Warning
System(AAWS)
14.02.17 Letter of the
Firm to the
RDSO for
initiation the
approval of Track Magnet
18 months (1) 12.04.17 - Letter to the WR for performance feedback of
installed TM & OC card in
Mumbai division.
(2) 12.04.17 - Letter to the
firm for submission of the modified QAP.
(3) One more letter to expedite
the submission of modified
QAP has been given on
12.12.17, with a notice that if
same is not done by 31.12.2017 then closure of
the case will be initiated.
4. Modified QAP received on
12.01.2018.
5. Modified QAP is under scrutiny for giving permission
for manufacturing prototype
sample. .
31.07.18 No reply from vendor regarding
modified QAP.
However since only
one firm is approved
firm, RDSO is following it up for
developing
additional vendors.
Waiting for revised QAP from firm. Reminder letter
sent to firm on
07.10.2017.
Modified QAP received on
12.01.2018. Modified QAP is under scrutiny for
giving permission for
manufacturing prototype
sample.
210. M/S Medha
Hyderabad.
SSBPAC 29.09.16
(Vendor ref
ID: QAS
2012/459 Dt. 16.02.12)
27 months 1. For CCA letter issued on
04.05.12
2. CCA report received dt
07.06.12 3. Permission for parallel
field trial granted dt 18.01.13
4. Type test sample received&
test note sent dt 06.06.13
June 18 Initial Independent
Safety Assessment
report was
withdrawn by ERTL (E) Kolkata.
Fresh Independent
Safety Assessor (ISA)
engaged by firm.
Parallel field trial
completed, ISA report
awaited.
A reminder letter dt 24.10.2017 has been
issued regarding status of
ISA report.
ISA report received on
1 2 3 4 5 6 7 8 9
65
5. ERTL (E), as ISA
recommended for standalone trial dt 18.08.14,
6. ISA report was withdrawn
by ERTL (E) dt 24.12.14
7. A reminder letter dt
24.10.2017 has been issued regarding status of ISA report.
8. One more letter to submit
the ISA report has been given
on 12.12.17, with a notice
that if same is not done by 10
Jan 18, then closure of the case will be initiated.
9. ISA report received on
12.01.2018.
10. Case under process for
standalone trial.
12.01.2018. (only one
vendor )
211. M/s Pragati Electrocom Pvt.
Ltd., Gurgaon
Earthing & Bonding system for
signalling
equipments
28.09.2016 15 months By RDSO: 22.07.16, 21.12.16, 02.03.17, 16.05.17
By Firm: 16.08.16, 29.09.16,
17.11.16, 15.12.16, 09.01.17
By DI/Jaipur: 04.07.17
1. Deficiencies of documents sent to firm on 21.12.16.
2. Compliance of deficiencies
of documents finally
submitted by firm on
09.01.17. 3. Case sent for CCA on
02.03.17.
4. CCA report submitted on
04.07.17.
Permission to submit
Prototype sample given on 11.10.2017.
5. Firm has offered the sample
for acceptance test to
DI/Jaipur on 1.01.18.
30.06.18 Non compliance of deficiencies of
documents timely
and delay in
receiving CCA.
Permission to submit Prototype sample given on
11.10.2017.
Firm has offered the
sample for acceptance
test to DI/Jaipur on
1.01.18. (No approved vendor)
212. M/s JMV LPS Earthing & 16.08.2013/ 15 months By RDSO: 30.12.13, 14.07.14, 30.06.18 Spec. & STR have Requisite documents have
1 2 3 4 5 6 7 8 9
66
Ltd., Noida Bonding system for
signalling equipments
29.11.2016 17.09.14, 22.07.16, 24.01.17,
20.04.17
By Firm: 12.08.13, 14.01.14,
04.08.14, 08.10.14, 25.11.16,
24.01.17, 01.06.17
By QA/S&T: 09.12.14
1. Deficiencies of documents
sent to firm on 24.01.17.
2. Compliance of deficiencies
of documents finally
submitted by firm on 01.06.17.
3. Requisite documents have
been sent to Director
Inspection Delhi for CCA on
23.10.2017. 4. CCA has been carried out
on 16.11.2017 by
Dir/Insp/QA-NDLS. Report
from Dir/Insp/QA-NDLS
awaited.
5. CCA report received on 26.12.18.
6. permission for submission
of prototype sample has been
given on 10.01.2018
been revised and
issued on dt. 22.07.16. Firm has
submitted the
documents as per
revised/latest ISO
documents and revised specification
& revised STR on.
29.11.16.
Non compliance of
deficiencies of
documents timely by firm.
been sent to Director
Inspection Delhi for CCA on 23.10.2017.CCA has
been carried out on
16.11.2017 by
Dir/Insp/QA-NDLS.
Report from Dir/Insp/QA-NDLS
received on
CCA report received on
26.12.18. Permission for
submission of prototype
sample has been given on 10.01.2018. (No approved
vendors)
213. M/s Cape
Electric Pvt. Ltd., Kanya
Kumari
Earthing &
Bonding system for signalling
equipments
22.09.16 15 months By RDSO: 22.07.16, 09.02.17,
20.04.17, By Firm: 12.09.16, 01.12.16,
16.12.16, 01.06.17, 04.03.17,
16.06.17, 21.07.17, 31.08.17,
01.09.17.
1. Deficiencies of documents
sent to firm on 09.02.17. 2. Compliance of deficiencies
of documents finally
submitted by firm on
01.09.17.
3. Requisite documents have
30.06.18 Non compliance of
deficiencies of documents timely by
firm.
Requisite documents have
been sent to Director Inspection Bangalore for
CCA on 23.10.2017..
CCA has been carried out
on 09.11.2017 by
Dir/Insp/QA/SBC. Cover
note from Dir/Insp/QA-SBC has been received
through email dt
16.11.2017.
Based on that permission
to submit the prototype is
1 2 3 4 5 6 7 8 9
67
been sent to Director
Inspection Bangalore for CCA on 23.10.2017.
4. CCA has been carried out
on 09.11.2017 by
Dir/Insp/QA-NDLS. Cover
note from Dir/Insp/QA-SBC has been received through
email dt 16.11.2017. based on
that permission to submit
prototype sample has been
given on 07.12.17.
given on 07.12.17. (No
approved vendors)
214. M/s Fast
Electrode, Pune
Earthing &
Bonding system for signalling
equipments
29.08.17 15 months By RDSO: 30.12.13, 14.07.14,
22.07.16, 02.03.17, 18.05.17, 10.07.17
By Firm: 07.03.14,
1. Firm has applied on line
under ID: QAS2017/3055 as a fresh vendor on dt. 29.08.17
and case is under scrutiny.
2. Deficiency letter sent to
firm on 28.09.2017.
3. Reminder dated 12.12.17.
4. Firm has submitted the documents in which QAP/STR
is not in line to QOD
30.11.18 Spec. & STR have
been revised and issued on dt.
22.07.16. Firm was
advised vide this
office letter No.
STS/E/E&B/Genl., dt.22.07.16 to
submit the
documents as per
revised/latest ISO
documents and
revised specification & revised STR.
Firm has applied on line
under ID: QAS2017/3055 as a fresh vendor on dt.
29.08.17 and case is
under scrutiny.
Firm has submitted the
documents in which QAP/STR is not in line to
QOD
* No approved firms for
this item.
215. M/s Pearl
Electronics &
Power System,
Roorkee
Fail Safe Electronic
Flasher Device as
per
RDSO/SPN/173/2002
07.11.15
(On line)
15 months Deficiency letter sent to firm
by RDSO on 09.09.15,
20.05.16, 02.11.16
Deficiencies compliance by the firm on 01.03.16, 11.07.16,
03.04.17, 02.06.17 &
05.09.17.
30.09.18 Non-compliance of
QAP, STR & other
legal documents
timely by the firm. Firm submitted
compliance of
deficiencies on
05.09.17.
CCA request on
25.09.2017.
CCA report on 17.11.17.
Letter for prototype sample to be submitted
within 3 months was sent
on 13.12.17.
1 2 3 4 5 6 7 8 9
68
216. M/s Tirupati
Plastomactics Pvt. Ltd., Jaipur
Double Walled
Corrugated HDPE Duct for Railway
Signaling as per
RDSO/SPN/204/2
011 Ver.1.1 with
amend.1
Registration
ID-QAS2016/26
88 dt.
25.10.16
12 months Deficiency letter sent to firm
on 05.01.17, 10.03.17, 05.06.17, 18.07.17 &
01.09.17.
Deficiencies compliance by the
firm on 15.02.17, 21.08.17, &
06.09.17, 06.11.17
31.03 18 Non-compliance of
QAP, STR & other legal documents
timely by the firm.
Firm submitted
compliance of
deficiencies on 06.11.17
CCA report received on
05.12.17. Letter for prototype sample to be
submitted within 3
months was sent on
21.12.2017.
217. M/s Rex
Polyextrusion
Pvt. Ltd., Sangli
Double Walled
Corrugated HDPE
Duct for Railway Signaling as per
RDSO/SPN/204/2
011 Ver.1.1 with
amend.1
Registration
ID-QAS2016/
2706 dt. 16.11.16
12 months Deficiency letter sent to firm
on 05.01.17, 24.04.17.
Deficiencies compliance by the firm on 10.03.17, 09.05.17,
06.09.17 & 13.07.17. Firm
asked to submit prototype
sample on 23.10.17. Prototype
sample submitted on 04.12.17. Acceptance test
report received on 26.12.17.
28.02.18 Non-compliance of
QAP, STR & other
legal documents timely by the firm.
Firm submitted
compliance of
deficiencies on
13.07.17.
Acceptance test report
received on 29.01.2018,
under scrutiny.
218. M/s Duraline
India Pvt. Ltd.,
Neemrana,
Alwar
Double Walled
Corrugated HDPE
Duct for Railway
Signaling as per
RDSO/SPN/204/2011 Ver.1.1 with
amend.1
Registration
ID-
QAS2017/29
08 dated
04.05.17
12 months Deficiency letter sent to firm
on 05.07.17 & 01.09.17 &
11.09.17, 13.10.17, 08.11.17
Deficiencies compliance by the
firm on 28.08.17, 16.10.17 and 22.11.17.
30.04.18 Non-compliance of
QAP, STR & other
legal documents
timely by the firm.
Firm submitted compliance of
deficiencies on
22.11.17.
Case sent for CCA on
07.12.17. CCA has
completed as informed by
AIE/JU, report is awaited.
219. M/s Statcon
Energiaa (P)
Ltd.
SMPS based
Integrated Power
Supply system (IPS)
03.06.2016 18 Months 26.07.16,
04.10.16,
02.12.16 14.12.16 ,
10.01.17,
31.05.17,
18.10.17
21.06.16,
28.07.16,
14.11.16, 11.01.17,
20.01.17,
13.06.17,
20.07.17,
30.10.17
31.12.18 No delay Letter for prototype
sample to be submitted
within 3 months was sent on 05.02.2018.
220. M/s Polycab
Wires Pvt Ltd,
Halol, Gujrat
Thin Walled Cable
for 3-phase
locomotives
QAE
2016/3931
dt: 26.10.16
26.10.18
1. QAE/8.1.25.1/ Polycab dt:
19.04.17
2. PWPL/HALOL /UH3/ E-
beam/2017-18/008 dated
: 12.05.17 3. QAE/8.1.25.1/Polycab
dt:19.07.17,
- Prototype samples
under development
by firm.
a. Capability assessment
approved on
19.07.2017 and firm
advised to develop the
prototype sample, vide RDSO letter no.
QAE/8.1.25.1/
1 2 3 4 5 6 7 8 9
69
4. Firm’s email dated 23.10.17. Polycab
dated:19.07.17. b) Firm again reminder
to develop the sample
on dt:16.10.2017
b. Firm has assured to
submit samples to RDSO for prototype by
mid nov, 17.
221. Thin Walled Cables
for Conventional
Locomotives &
EMUs/ Coaching
Stock ( Chemical curing process /
Electron Beam
Irradiation curing
process)
QAE2016/39
93 dt:
14.11.16
14.11.18
222. M/s Mittal
Batteries Pvt. Ltd., Plot No.
24, IDA Kothur
Dist. – Mahboob
Nagar-509228,
Telangana
State.
10 V 75 Ah for
Loco And
10 V 90 Ah for
EMUs batteries
QAE2014/21
05 dt:02.06.14
02.06.16 1. MBPL/RDSO/Vendor/6V12
0Ah/01 dt: 02.06.14 2. EL/6.7.53/Mittal battery
dt: 08.08.14
3. MBPL/RDSO/Vendor/6V12
0Ah/02 dt:04.09.14
4. EL/6.7.53/Mittal battery
dt:25.09.14 5. MBPL/RDSO/Vendor/6V12
0Ah/03 dt:01.10.14
6. MBPL/RDSO/Vendor/6V12
0Ah/04 dt: 08.12.14
7. EL/6.7.53/Mittal battery dt:06.02.15
8. MBPL/RDSO/Vendor/6V12
0Ah/05 dt: 04.04.15
9. EL/6.7.53/Mittal battery
dt:02.11.15
10. MBPL/RDSO/Vendor/6V120Ah/10 dt: 18.03.16
&21.03.16
11. EL/6.7.53/Mittal battery
dt:25.04.16
02.06.18
Compliance of
RDSO specification for alternate
proposed item is still
awaited.
a) Firm had applied for
fresh Vendor Registration of 6 V 120
Ah battery on
02.06.2014.
b) Capacity cum
capability assessment
has been cleared on 02.11.15.
c) As per Railway Board
letter No. 2007/
Elect.(G) /138/1 dated
16.12.15, 100% use of VRLA battery in place
of 120 Ah LMLA
battery.
d) Hence firm has
requested on
21.03.2016 for prototype approval of
10 V 75 Ah & 90 Ah
battery in lieu of 6 v
120 Ah LMLA battery
1 2 3 4 5 6 7 8 9
70
12. MBPL/RDSO/TA/10B75-
90AH/03 dt: 02.06.16 13. EL/6.7.53/Mittal battery
dt:29.09.16 &14.12.16
14. MBPL/RDSO/TA/10B75-
90AH/04 dt: 04.01.17
&15.02.17 15. EL/6.7.53/Mittal battery
dt:28.04.17 &02.06.17
16. MBPL/RDSO/EMUType
approval/02 dt:23.06.17
17. EL/6.7.53/Mittal battery
dt:20.07.17 18. MBPL/RDSO/Inhouse test
report/ 10 V 75
&90AH/003 dt:09.08.17
19. EL/6.7.53/Mittal battery
dt:22.08.17
to which RDSO agreed
on 25.04.2016. firm was advised to get
design/ drawings &
offer prototype for
inspection
e) Being another battery capacity assessment
was not repeated.
f) Documents for Design
/drawings
progressively
submitted by 15.02.17 and approved by RDSO
on 28.04.17.
g) Firm was advised to
submit the compliance
of shortcomings vide letter no.
QAE/6.7.53/Mittal
batteries dt. 28.04.17
& 02.06.17.
h) Firm has submitted the
compliance of some deficiencies .
i) Firm was advised to
submit the compliance
of remaining
shortcomings vide letter no.
QAE/6.7.53/Mittal
batteries dt. 20.07.17.
j) Firm has submitted the
compliance of
specification without Amend. No. 1 & 2.
k) Firm was advised to
submit the compliance
of amnd. No. 1 & 2 of
specification vide letter no. QAE/6.7.53/Mittal
1 2 3 4 5 6 7 8 9
71
batteries dt. 22.08.17.
l) Firm has submitted the compliance by mail on
18.09.17. which are
under scrutiny.
m) Letter issued to firm
on 16.08.2017 regarding witness the
type test of batteries.
Tests are to be start
from 16.11.2017.
223. M/s Lead Acid
Battery Co. (P)
Ltd., 8/3, KumudGhosal
Road,
Kolkata -
700057
10 Volt 90 Ah
LMLA Battery for
EMUs application
QAE2016/
3778 dt: 12.08.2016
12.08.18 1. LAB/RDSO-ELECT /16-
17/256 dt:20.09.16
2. QAE/6.7.47/90 LMLA dt:26.12.16
3. LAB/RDSO-ELECT /16-
17/337 dt:29.12.16
4. QAE/6.7.47/90 LMLA
dt:21.03.17 5. LAB/RDSO-ELECT /16-
17/455dt:28.03.17
6. QAE/6.7.47/90 LMLA
dt:07.07.17
7. LAB/RDSO-ELECT /17-
18/120 dt:10.07.17 8. LAB/RDSO-ELECT /17-
18/161 dt:09.08.17
9. QAE/6.7.47/90 & 525 dt:
06.09.17
- Capability
assessment under
progress.
a) Submitted documents
for capability
assessment progressively by
22.06.17.
b) Firm advised for getting
capability Assessment
done on 06.07.17. c) Firm requested to do it
after 06.09.17.
d) Capability Assessment
done in firm on 12 &
13.09.17
e) Letter issued to firm on 18.10.2017 for
clearance of capability
assessment & advised
to firm to develop the
prototype sample.
224. 2 V 525 AH Battery
QAE2017/4196 dt:
01.04.2017
01.04.19 1. LAB/RDSO-ELECT /17-18/ 12 dt :14.04.17
2. QAE/6.7.47/525 LMLA
dt:07.07.17
3. LAB/RDSO-ELECT /17-
18/120 dt:10.07.17
4. LAB/RDSO-ELECT /17-18/161 dt:09.08.17
5. QAE/6.7.47/90 & 525
dt:06.09.17
- Capability assessment under
Progress.
a) Submitted documents for capability
Assessment
progressively by
22.06.17.
b) Firm advised for getting
capability assessment done on 06.07.17.
c) Firm requested to do it
after 06.09.17.
d) Capability Assessment
1 2 3 4 5 6 7 8 9
72
done in firm on 12 &
13.09.17 e) Letter issued to firm on
18.10.2017 for
clearance of capability
assessment & advised
to firm to develop the prototype sample.
225. M/s ABI, Halol 25 KV Porcelain 9 -
tonne insulators
QAE2017/41
40
dt:10.02.17
10.02.19 1. QAE/INS/ABI dated
26.04.17
2. ABI/HAL/SS/RDSO/2017-
18 dated 11.05.17
3. QAE/INS/ABI dated
30.05.17 4. Firm’s letter no. nil dated
15.06.17 & 30.06.17
5. QAE/INS/ABI dated
04.08.17
6. ABI/HAL/SS/RDSO/2017-18 dated 17.08.17 &
04.09.17
- Firm yet to submit
some documents
required before
capability
assessment.
Firm has submitted the
compliance of
shortcomings on
04.09.17. Documents
are under scrutiny.
226. M/s Analog
Electronics,
Chennai
Electronic Time
Delay Relay for AC
coaches
QAE2015/25
38
dt:06.02.15
06.02.17 1. TDR/2702/15-001 dt.
10.02.15
2. EL/7.3.2/AE dt. 28.05.15
3. TDR/2206/15-002 dt.
23.06.15 4. QAE/7.3.2/AE dt. 27.12.16
5. QAE/7.3.2/AE dt.05.05.17
6. AE/NIL dt.02.06.17
7. QAE/7.3.2/AE dt.29.06.17
8. AE/ETDR/018/17-03 dt.01.08.17
9. QAE/7.3.2/AE dt.07.09.17
06.02.18 Firm yet to submit
some documents
required before
capability
assessment.
a. Vide letter no.
QAE/7.3.2/AE
07.09.2017(reminder),
firm is advised to
submit the requisite documents. Firm’s
reply is awaited.
b. Documents received
from firm on 11.10.17
which are under scrutiny.
CARRIAGE
227. GB Equipment,
Dehradun
Double acting
hydraulic Shock
Absorbers for ICF
Design Coaching stock for secondary
suspension to
RDSO Spec C-
17.10.2016 8 to 10
months
provided to
firms for submitting
all
compliance
29.05.17,
27.06.17,
26.07.17,
17.08.17, 14.09.17,
14.09.17,
11.08.17,
01.09.17,
27.10.17 19.12.17
30 months (After
satisfactory
testing in
Fatigue Testing Lab, the product
will be on 24
months field
Testing charges is
awaited from Testing
Dte.
Firm's document has
been examined for STR
verification. RDSO
official visited on 25.09.2017. Testing
charges from the firm
has been asked for
1 2 3 4 5 6 7 8 9
73
8703 Rev. 2 Feb`07 trial) endurance testing in
RDSO lab on 27.10.17.Firm has sent
the samples to ICAT
Gurgaon for tesiing.
Endurance & Damping
characteristics Testing started at ICAT.
228. M/s DAKO C.Z.
a.s.
Axle mounted Disc
Brake System of
LHB Coaches to
Spec. No.
RDSO/2011/CG-
04 (Rev.01)
15.07.2017 8 to 10
months
provided to
firms for
submitting
all compliance
04.08.17,
05.08.17
21.08.17
18.09.17
04.08.17,
17.08.17,
28.08.17
Nil - Firm technical design
cleared and now
capacity assessment
and STR verification
due. Proposal has been
sent to Railway Board on 20.09.17 for
sanction of official for
STR verification being
foreign manufactures.
Board has asked to frame policy regarding
bearing of cost of visit.
Letter sent to Railway
Board on 28.12.2017,
16.01.2018 for
sanction. Firm visited on 20-23.02.2018. Test
result awaited.
229. M/s Kurimoto,
Japan
Brake Disc of LHB
Coaches to Spec.
No.RDSO/2015/C
G
15.06.2016 8 to 10
months
provided to
firms for submitting
all
compliance
13.01.17 ,
27.02.17,
30.08.17
14.11.17 18.12.17
09.02.2017,
07.03.2017,
20.09.2017
19.12.17
Nil Reply awaited. Deficiency advised on
20.09.17. Reply
awaited. Firm asked
vide their letter dated 16.10.2017, one month
more i.e. upto
20.11.2017 to submit
required information.
Part document received
through email on 14.11.2017 and same
isl under scrutiny and
will be replied by
28.11.17. FEA report is
1 2 3 4 5 6 7 8 9
74
still awaited. FEA
report received found in order. letter sent to
firm consent of visit,
and asked to submit
revised QAP. under
nomination of official for visit. Letter sent to
Railway Board with
revised schedule on
25.01.2018 for
sanction. vide Railway
board letter no. 2010/M(C)/137/2018,
the case returned back
to RDSO for further
processing as per new
SOP. visit planned on 23-25.05.2018. case is
under clearance at
RDSO for finance
vetting.
230. M/s Wenshang
Highway
Locomotives Part Ltd., China
(through
Pioneer Fil-med
Pvt Ltd)
Brake Disc of LHB
Coaches to Spec.
No.RDSO/2015/CG
30.03.2017 8 to 10
months
provided to firms for
submitting
all
compliance
24.11.16,
05.01.17
04.10.17, 07-11-17,
10.11.17
09.02.2017 ,
17.05.2017,
25.10.2017, 17.11.2017,
29.12.17
Nil Reply awaited. Reply received from the
Firm on 26-10-17,
Firm has been advised for compliance of new
spec on 0311.2017. 7.
Reply received ,
examined , some def
still not complied, 11.11.2017. Firm
asked some
clarification about
testing, clarified on
14.11.2017. Revised
FEA report awaited. Letter sent to firm for
visit schedule. letter
sent to Railway Board
for sanction on
15.01.2018. vide
1 2 3 4 5 6 7 8 9
75
Railway board letter
no. 2010/M(C)/137/ 2018, the case retur
back to RDSO for
further processing as
per new SOP. visit
planned on 14-16.03.2018. case is
under clearance at
RDSO for finance
vetting.
231. M/s JWL,Kovis Brake Disc of LHB
Coaches to Spec.
No.RDSO/2015/CG
07.08.2017 8 to 10
months
provided to firms for
submitting
all
compliance
09.08.17
22.08.17.
21.09.17, 30.10.2017,
08.09.17,
26.09.17, 13.10.17,
25.10.17,
11.11.17
Nil Reply awaited. Reply received from the
Firm on 26-10-17 and
proposal has been sent to Railway Board on
20.09.17 for sanction
of official for STR
verification being
foreign manufactures. Board has asked to
frame policy regarding
bearing of cost of
visit.letter sent to
Railway Board on
28.12.2017,16.01.2018 for sanction. Letter
sent to Railway Board
with revised schedule
on 25.01.2018 for
sanction. firm visited on 20-23.02.2018. test
report is awaited.
232. M/s CRRC,
Qishuyan
Institute
Company Ltd.,
China (Through MGS India Pvt.
Ltd.)
Brake Disc of LHB
Coaches to Spec.
No.RDSO/2015/C
G
28.08.17 8 to 10
months
provided to
firms for
submitting all
compliance
28.08.17,
07.11.17,
21.11.17
20.09.17
11.11.17
29.12.17
Reply awaited. Deficiency sent on
20.09.17. Firm’s reply
awaited. Reply received
, examined , some
deficiencies still not complied, however
advised to firm for their
consent for payment of
visit charges on
1 2 3 4 5 6 7 8 9
76
11.11.2017. Consent
received on 21.11.17. However, policy
decision on bearing of
visit cost is required for
verification of STR of
foreign firms. Proposal on the same is under
deliberation at the
highest level. Letter
sent to firm for visit
schedule. letter sent to
Railway Board on 05.01.2018 for
sanction. Railway
Board asked
commitment for make
in India program of firm vide letter dated
12.01.2018.
communicated to firm
on 17.01.2018 fr their
reply. Letter sent to
Railway Board with revised schedule and
commitment given by
firm reg. make in India
on 25.01.2018 for
sanction. vide Railway board letter no.
2010/M(C)/137/2018,
the case returned back
to RDSO for further
processing as per new
SOP. visit planned on 09-11.04.2018. case is
under clearance at
RDSO for finance
vetting.
233. M/s S.C.
Rulmenti S.A.,
Direct Mounted
Double Row Self-
03.10.2016 N/A 03.10.2016,
27.03.2017,
17.11.2016,
09.08.17,
N/A Non-compliance by
the firm of
2nd stage of scrutiny
has been done and
1 2 3 4 5 6 7 8 9
77
320, Republicii
Street,Barlad-731108,
Romania
Aligning Spherical
Roller Bearings for use on ICF type
all-coil bogies for
passenger coaches
to RDSO Spec.No.
C-8527 (Rev.1) with ament.1, 2&
passenger coaches
to RDSO Spec.No.
C-8527 (Rev.1)
with ament.1, 2& 3
25.09.2017 14.11.2017 documents /
observations
observations advised
on 14.11.17, no reply received. Reminder
sent to firm on
10.01.18. Compliance
received on 01.02.18.
QAP & STR varification is planned w.e.f.
01.04.18 at their plant.
PS & EMU
234. M/s Exide Industries
Limited,
Kolkata–700
014.
70 Ah VRLA Batteries
19/11/2016 Vendor ID 4002
Under Prototype testing Short duration tests
started w.e.f 12.03.2018.
235. M/s Enertech
UPS Pvt. Ltd,
Mulshi, Pune-412115
4.5kW Underslung
type constant
Voltage Regulated battery Charger
08/08/2015 Vendor ID
2941
CCA cleared on
20/09/2017.
(xv) Fresh letter issued on 06.12.2017 to
complete Prototype
sample development
within 06 months’ time.
Design Doc & Internal tesr results submitted in
first week of Mar-2018,
which are under scrutiny
236. M/s Electronic
Equipment
Company Pvt.
Ltd. Kolkata-700 096
4.5kW Underslung
type constant
Voltage Regulated
battery Charger
28/11/2016 Vendor ID
4021
Capacity cum capability
assessment has been
cleared by RDSO on
07.06.2017. Prototype tests done. Lab test
reports awaited.
237. M/s Powernetics
Equpt. (I) Pvt.
Ltd. Mahape,
Navi Mumbai.-400710
4.5kW Underslung
type constant
Voltage Regulated
battery Charger
05/06/2014 Vendor ID
2114
CCA done on
12/12/2017 &
13/12/2017.
(xiii) CCA cleared and 06 months’ time has been
given to firm Prototype
1 2 3 4 5 6 7 8 9
78
development vide letter
No. EL/7.10.1/ LHB/ Powernetics dated
02.01.2018. Design Doc
submitted in first week
of Mar-2018 and under
scrutiny
238. M/s PI Engineering
Works,
Shikheda Road,
Industrial Area,
Modinagar
Ghaziabad-210 204
4.5kW Underslung type constant
Voltage Regulated
battery Charger
18/07/2016 Vendor ID
3716 Capacity cum capability
assessment has been
cleared by RDSO on
14.07.2017. Fresh letter
issued on 08.12.2017 to
complete Prototype
sample development within 06 months’ time.
Prototype not yet offered
239. M/s Autometer
Alliance Ltd.,C-
63, Sector-57,
Noida-201 307
4.5kW Underslung
type constant
Voltage Regulated
battery Charger
10/03/2017 ----- Offer from firm for
witnessing the prototype
test is received on
17/11/2017 and testing is to be done. Prototype
tests done. Lab test
reports awaited.
240. M/s Star
Electric
Company Ludhiana.
4.5kW Underslung
type constant
Voltage Regulated battery Charger
30/08/2017 Vendor ID
4488
Compliance of
shortcomings in
registration form, conveyed to the firm has
been received on
27.11.2017. CCA cleared
on 01.03.2018.
Prototype to be offered
by firm.
241. Saini Electrical and Engineering
Works, Anand
Nagar,
Ambernath
(East), Dist. Thane 421 506
AC motors for Conventional and
LHB RMPUs
31/08/2015 Vendor ID 2997
Capacity assessment waived off on 21-11-
2017. Firm to offer
prototype for testing.
242. Swagath Enng
Coimbatore -
AC motors for
Conventional and
12/09/2015 Vendor ID
3019
CCA approved 29-03-
2016. Prototype testing
1 2 3 4 5 6 7 8 9
79
641103.
Tamil Nadu
LHB RMPUs done during 20-09-2016
to 23-09-2016 found not complying and firm
asked to submit re-
prototype.
Re-prototype has been
carried out from 04.01.2018 to
07.01.2018. Firm has to
submit the external test
report.
243. Ronak
Industries
315-3A, Poonga Nagar,
M.G.Road,
Irugur,
Coimbatore -
641 103
AC motors for
Conventional and
LHB RMPUs
17/08/2015 Vendor ID
2954
CCA cleared in Feb-
2018. Firm to offer
prototype.
244. M/s RSI Switchgear Pvt
Ltd, F 252 &
253, Riico
Industrial Area,
Kehrani -
301019 (Bhiwadi Extn.) Distt.
Alwar,
Rajasthan
Switch Board Cabinet 355
26/09/2015 Vendor ID 3043
Capacity assessment waived off on 14-06-
2016. Firm offered
prototype in sept 2017.
Testing carried out 30-
11-2017 to 2-12-2017.
Firm to submit the shock and vibration test
report.
245. M/s Trolex Plot
no. 88B
Electronic City Hosur Road,
Bangalore:5601
00
Switch Board
Cabinet (EDTS:
(104)
04/08/2015 Vendor ID
2927
CCA cleared in Nov-2017
and prototype sample is
offered. Testing planned in Mar-2018.
246. M/s Pricol
Engineering
Industries Ltd., Coimbatore 641
031, India.
Switch Board
Cabinet (RDSO/
0184)
07/08/2015 Vendor ID
2940
CCA cleared. Prototype
offer received 5.3.2018
Testing planned in April-2018..
247. M/s Sidwal Switch Board 15/10/2015 Vendor ID CCA waived off on 18-
1 2 3 4 5 6 7 8 9
80
Refigeration
industries Private Ltd, Plot
no 23 , sector 6
Faridabd
Cabinet (EDTS:
355,RDSO:184)
03/06/2016 3092, 3632
01-2016.
Prototype offered. Testing done
03.12.2017 to
05.12.2017.
Results are under
scrutiny. Shock and vibration and
IP test reports received
on 21.2.2018. Under
scrutiny.
248. M/s Craftsman
Automation
Private Ltd., 123/4,
Sangothipalaya
m Road, Arasur
Post,
Coimbatore–641 407. Tamilnadu.
Switch Board
Cabinet (RDSO:
0184)
31/12/2015 Vendor ID
3301
Capacity assessment
visit on 11-09-2017.
Deficiencies advised to firm. Firm has submitted
compliance in Feb-18
end, which is to be
verified.
249. M/S Ramyaa
Electro Gear Pvt
Ltd, E6 & E6 B,
Arulampet Ii
Cross Street,
Thiru-Vi-Ka Industrial
Estate, Guindy,
Chennai -32
Switch Board
Cabinet (EDTS:
104)
26/09/2016
Vendor ID
3871
Prototype offer received
on 1.3.2018. Testing
planned in April-2018
250. M/s PD steel, C
146, Phase-VII,
Indl, area, Mohali-160055
Switch Board
Cabinet (RDSO:
0184)
05/04/2017 Vendor ID
4209
2017
CCA has been approved
on 22.01.2018.
Prototype offer received in Feb-18 end. Testing
planned in April-2018
251. M/s MV Electro
systems Pvt Ltd,
78, Pragati Vihar
Ind. Area, Sector 59, Faridabad,
Haryana
Switch Board
Cabinet (EDTS:
355)
21/07/2017 Vendor ID
4424
CCA has been approved
on 08.11.2017.
Prototype testing done
during 15.2.18 to 17.2.2018. Performance
test after Vibration test
is done on 07.03.2018.
1 2 3 4 5 6 7 8 9
81
Under approval
252. Bhawintron
Power Tech, Pvt.,
Ttd,Tiruvallur
Tamilnadu
Switch Board
Cabinet (RDSO: 0184)
28/07/2017 Vendor ID
4446
CCA has been approved
on 17.11.2017. Firm has to offer type test
253. Modern Rail
Tech Equipment
MFG Pvt. Ltd., Kolkata
Switch Board
Cabinet
(RDSO:0184,EDTS: 355)
31/07/2017
16/08/2017
Vendor ID
4449,
4470
CCA planned done on
13.3.2018. File to put
up.
254. GEMCO Limited,
63 A, Hoota
Gali, Industrial Area, Balevadi
post, Mysore,
Karnataka
500 KVA DA set 18/10/2016 Vendor ID
3920
Initial scrutiny
deficiencies advised on
20.11.2017. Reply awaited. Notice issued
on 05.03.2018.
255. Tractor India
Private Limited,
Plot No.1 H-1,Adda
Industrial area,
NH-2, Bypass
Road, Asansol,
West Bengal
500 KVA DA set 21/04/2016 Vendor ID
3530
Capacity assessment of
the firm has been
cleared and the type testing of Diesel Engine
of M/s Caterpillar,
Hossur, has been carried
by RDSO in August -
2017. Combined DA set
testing is done on 07.03.2018.
256. Sterling
Generators
Private limited,
Silvassa
500 KVA DA set 13/10/2015 Vendor ID
3087
Capacity assessment of
the firm has been
cleared by RDSO in April
2016. Firm has not
offered for prototype testing so far. Notice
issued in Dec-2017.
257. Nava Nirman
Fabrication Pvt.
Ltd vill:
Chakundi, P.O.:
Dankuni coal
IV Coupler
(400A, 750V)
19/05/2016 Vendor ID
3584
Firm has been visited for
assessment on
08.09.2017.Defficiencies
observed has been
advised on 03.11.2017.