STRUCTURAL DRAWINGS Volume 3: Tender Drawings

35
Scale: Drawn by: Date: Client: Project Title: Checked by: R B A Realini Bader Associates Limited Architects Engineers Planners 72 Wellington Street, Freetown Drawing Title: Sheet Size: Project status: Design: Tender: Contract / Construction: A3 MLY 25/11/2016 16:59:52 Rehabilitation / Completion and Outfitting Work for Office Building Sierra Leone Field Office of the African Dvelopment Bank (ADB) August, 2016 SL/ADB/ST-CS Structural - Cover Sheet INY Y Regent Road, Hill Station, Freetown STRUCTURAL DRAWINGS Volume 3: Tender Drawings

Transcript of STRUCTURAL DRAWINGS Volume 3: Tender Drawings

Scale:

Drawn by:

Date:

Client: Project Title:

Checked by:

R BA

RealiniBaderAssociates Limited

ArchitectsEngineersPlanners72 Wellington Street, Freetown

Drawing Title:

Sheet Size:Project status: Design: Tender: Contract / Construction: A3

MLY

25/11/2016 16:59:52

Rehabilitation / Completion andOutfitting Work for OfficeBuilding

Sierra Leone Field Office ofthe African DvelopmentBank (ADB)

August, 2016

SL/ADB/ST-CS

Structural - Cover Sheet

INY

Y

Regent Road, Hill Station, Freetown

STRUCTURAL DRAWINGS

Volume 3: Tender Drawings

56

51

56 70 60 68 69

56

51

63

52

4444

59

56

58

4633

49

Existing reinforced concrete wall

Existing column

1. The figures are concrete compressivestrength readings N/mm2.

3. Beam readings are written on thebeams.

2. Column readings are written on thebeams.

4. Slab readings are written on the openspaces.5. Circled readings are those that fallbelow the specified concretecompressive strength of 25N/mm2,these imply problem area.

Existing beams

H

3

1

2

4

A B C D E F G

Existing column to be demolished

Existing column pad

Existing staircase to be demolished

N

57 56 52

54

54

51

Existing Slab thickness 150mm

6. The contractor is responsible forverification of the structural designbefore proceeding with construction ofstructural elements.

1 :100

Existing

Basement Plan

Schmidt Hammer

Result

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

LEGEND:-

SL/ADB/ST-01

63

50

69

5442

10

4045

70

47

70

57

6744

70

50

57

68

7058

46

61

69 47

28

66 55

25

542438 53

1324

36

15

61

1. The figures are concrete compressivestrength readings N/mm2.

3. Beam readings are written on thebeams.

2. Column readings are written on thebeams.

4. Slab readings are written on the openspaces.5. Circled readings are those that fallbelow the specified concretecompressive strength of 25N/mm2,these imply problem area.

H

3

1

2

4

A B C D E F G I

Existing beams to be demolished

Existing column

Existing beams

Existing slab to be demolished

Existing column to be demolished

70

5540

Existing staircase to be demolished

N

22

63

55

35

50

60 68

5757

53

54 54 54

4747 47

Existing Slab thickness 150mm

6. The contractor is responsible forverification of the structural designbefore proceeding with construction ofstructural elements.

1 : 100

Existing

Ground Floor Plan

Schmidt Hammer

Result

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

LEGEND:-

SL/ADB/ST-02

55

59

60

21

2410

28

26

30

24

12

27 38

18

55

70

58

20 17

18

21

70

1. The figures are concrete compressivestrength readings N/mm2.

3. Beam readings are written on thebeams.

2. Column readings are written on thebeams.

4. Slab readings are written on the openspaces.5. Circled readings are those that fallbelow the specified concretecompressive strength of 25N/mm2,these imply problem area.

H

3

1

2

4

A B C D E F G I

51

Existing beams to be demolished

Existing column

Existing beams

Existing slab to be demolished

Existing column to be demolished

Existing staircase to be demolished

N

Existing Slab thickness 150mm

6. The contractor is responsible forverification of the structural designbefore proceeding with construction ofstructural elements.

1 : 100

Existing First Floor

Plan Schmidt

Hammer Result

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

LEGEND:-

SL/ADB/ST-03

Existing beams

1. The figures are concrete compressivestrength readings N/mm2.

3. Beam readings are written on thebeams.

2. Column readings are written on thebeams.

4. Slab readings are written on the openspaces.5. Circled readings are those that fallbelow the specified concretecompressive strength of 25N/mm2,these imply problem area.

H

3

1

2

4

A B C D E F G I

Existing slab to be demolished

N

Existing beams to be demolished

Existing Slab thickness 150mm

2118

21

20

17

19

6. The contractor is responsible forverification of the structural designbefore proceeding with construction ofstructural elements.

1 : 100

Existing Roof

Beams

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

LEGEND:-

SL/ADB/ST-04

27711

reinforcedconcrete

wall

H

C1

IN

C1

C1C1

C1

C1C1C1 C1

C2 C2

C2

C1

3

1

2

4

A B D E F GC

C1

Existing Beam Maintained

New Beam

New Retaining WallExisting Retaining Wall Maintained

New Column Footings and trenches

Existing Columns Maintained

Existing columns Modified

Legend

New Columns

Existing Slab Maintained

New Slab

C2

Existing Column Footings

C1

C1

1 : 100

Proposed Basement

Structural Layout PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/ST-05

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

duct

N

C2

C1 C1 C1 C1 C1 C1

C2C2

C2

C2

C2

C1C1 C1C1C1 C1

C2

H

3

1

2

4

A B C D E F G

C1

Type A

Type A

Type

A

Type

A

Type

B

Type

B

Type

B

Type A Type A

Type B

Type

A

Type A

C2C2C2

C2

C1

C2 C2

Type

B

Type A

Type A

Type A

I

Type AType A

Type A

Type

A

Type

B

Type

B

Type

B

C2C1C1

C2

C1

Type B

Type A

Existing Beam Maintained

New Beam

New Retaining WallExisting Retaining Wall Maintained

New Column Footings and trenches

Existing Columns Maintained

Existing columns Modified

Legend

New Columns

Existing Slab Maintained

New Slab

Existing Column Footings

1 : 100

Proposed Ground

Floor Structural

Layout

PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/ST-06

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

duct

N

C2

C1 C1 C1 C1 C1 C1

C2C2

C2

C2

C2

C1C1 C1C1C1 C1

C2

H

3

1

2

4

A B C D E F G I

C1 Type AType A

Type A

Type A

Type A

Type A

Type

A

Type

ATy

pe A

Type

B

Type

B

Type

B

Type

B

Type

B

Type A Type A Type A

Type A Type A Type A

Type A Type AType A

Type

A

Type

A

Type

A

Type

A

Type

A

Type

A

Type A Type A Type A Type AType A

Type A

Existing Beam Maintained

New Beam

New Retaining WallExisting Retaining Wall Maintained

New Column Footings and trenches

Existing Columns Maintained

Existing columns Modified

Legend

New Columns

Existing Slab Maintained

New Slab

Existing Column Footings

C1

C1 C1

C2 C2 C2

C2

C2

C2

C2 C2

C2

1 : 100

Proposed First

Floor Structural

Layout

PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/ST-07

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

duct

N

C2

C1 C1 C1

C2C2 C2

C2

C2

C2

C1C1C1C1C1C1

C1C1

C1 C1 C1

C2

C2

C2 C2 C2 duct

H

3

1

2

4

A B C D E F G I

C2

C2 C2

Type A Type A Type A Type A Type A Type A

Type A

Type AType AType AType AType A

Type A

Type

A

Type

A

Type

A

Type

BTy

pe B

Type

BTy

pe B

Type

BTy

pe B

Type

B

Type

B

Type

B

Type

BTy

pe B

Type

B

Type B

Type B Type B Type B Type B

Type B

Type B Type B

Type B

Type

ATy

pe A

Type

A

Type A

Type A

Existing Beam Maintained

New Beam

New Retaining WallExisting Retaining Wall Maintained

New Column Footings and trenches

Existing Columns Maintained

Existing columns Modified

Legend

New Columns

Existing Slab Maintained

New Slab

Existing Column Footings

1 : 100

Proposed

Structural Roof

Beams

PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/ST-08

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

SECTION Y-Y

SECTION Y-Y

BASE C1

Y1602-150P B2

Y1204-200P T2

Y1203-200P T1Y1601-150P B1

75mm Blinding concrete

NGL.

Y1602-150P B1

Y1204-200P T2

Y1203-200P T1Y1601-150P B2

75mm Blinding concrete

NGL.

6Y16 05

Y10 05 Y10 05

4Y16 06

6Y16 06

Y10 05

COLUMN TYPE C1 COLUMN TYPE C2

Y10 05

BASE C2

4Y16 06

1 : 40

Proposed Column

Details PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/ST-09

AutoCAD SHX Text
450
AutoCAD SHX Text
300
AutoCAD SHX Text
300
AutoCAD SHX Text
300
AutoCAD SHX Text
1700
AutoCAD SHX Text
850
AutoCAD SHX Text
850
AutoCAD SHX Text
450
AutoCAD SHX Text
1200
AutoCAD SHX Text
600
AutoCAD SHX Text
Min 1000
AutoCAD SHX Text
400
AutoCAD SHX Text
1700
AutoCAD SHX Text
Varies
AutoCAD SHX Text
01
AutoCAD SHX Text
04
AutoCAD SHX Text
04
AutoCAD SHX Text
04
AutoCAD SHX Text
04
AutoCAD SHX Text
03
AutoCAD SHX Text
625
AutoCAD SHX Text
625
AutoCAD SHX Text
450
AutoCAD SHX Text
1500
AutoCAD SHX Text
750
AutoCAD SHX Text
750
AutoCAD SHX Text
1500
AutoCAD SHX Text
Varies
AutoCAD SHX Text
Min 1000
AutoCAD SHX Text
250
AutoCAD SHX Text
300
AutoCAD SHX Text
600
AutoCAD SHX Text
600
AutoCAD SHX Text
01
AutoCAD SHX Text
04
AutoCAD SHX Text
04
AutoCAD SHX Text
04
AutoCAD SHX Text
03
AutoCAD SHX Text
R10 05-200
AutoCAD SHX Text
300
AutoCAD SHX Text
R10 05-200
AutoCAD SHX Text
300
AutoCAD SHX Text
Y
AutoCAD SHX Text
Y
AutoCAD SHX Text
1500
AutoCAD SHX Text
Y
AutoCAD SHX Text
Y
AutoCAD SHX Text
750
AutoCAD SHX Text
750
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

150

1 : 10

Proposed Beam/Slab

Details PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/ST-10

AutoCAD SHX Text
2Y12
AutoCAD SHX Text
450
AutoCAD SHX Text
300
AutoCAD SHX Text
4Y16
AutoCAD SHX Text
4Y12
AutoCAD SHX Text
Type A
AutoCAD SHX Text
450
AutoCAD SHX Text
300
AutoCAD SHX Text
4T16
AutoCAD SHX Text
3T12
AutoCAD SHX Text
Type A
AutoCAD SHX Text
R10-225P
AutoCAD SHX Text
2Y12
AutoCAD SHX Text
R10-225P
AutoCAD SHX Text
300
AutoCAD SHX Text
150
AutoCAD SHX Text
300
AutoCAD SHX Text
300
AutoCAD SHX Text
4Y16
AutoCAD SHX Text
4Y12
AutoCAD SHX Text
300
AutoCAD SHX Text
R10-225P
AutoCAD SHX Text
150
AutoCAD SHX Text
150
AutoCAD SHX Text
300
AutoCAD SHX Text
4Y16
AutoCAD SHX Text
4Y12
AutoCAD SHX Text
R10-225P
AutoCAD SHX Text
Type B
AutoCAD SHX Text
Type B
AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.
AutoCAD SHX Text
Y12-150P T1
AutoCAD SHX Text
Y16-200P B2
AutoCAD SHX Text
Y12-150P T2
AutoCAD SHX Text
Y16-200P B1

Lift

TYPE A

TYPE A

TYPE A

TYPE B

TYPE B

TYPE A

TYPE D

TYPE D TY

PE

F

TY

PE

C

TY

PE

B

TY

PE

B

TY

PE

A

TY

PE

A

TY

PE

B

TY

PE

B

TY

PE

E

TY

PE

E

TY

PE

A

TY

PE

A

TYPE E

N HA B C D E F G I

4

1

3

Roof Truss

Legend

1 :100

SL/ADB/ST-11

Roof Truss Layout

PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: Oct, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

for sierra leone field office of the African Development

Bank (ADB)

October, 2016

Client:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

Not To Scale

SL/ADB/ST-12

Roof Truss Details

PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: Oct, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

for sierra leone field office of the African Development

Bank (ADB)

October, 2016

Client:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

AutoCAD SHX Text
6000
AutoCAD SHX Text
1500
AutoCAD SHX Text
1500
AutoCAD SHX Text
1500
AutoCAD SHX Text
TYPE B
AutoCAD SHX Text
1500
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
1000
AutoCAD SHX Text
1000
AutoCAD SHX Text
1000
AutoCAD SHX Text
1 400
AutoCAD SHX Text
TYPE A
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
5800
AutoCAD SHX Text
900
AutoCAD SHX Text
1000
AutoCAD SHX Text
1000
AutoCAD SHX Text
1000
AutoCAD SHX Text
1000
AutoCAD SHX Text
900
AutoCAD SHX Text
1500
AutoCAD SHX Text
TYPE E
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
C
AutoCAD SHX Text
1 900
AutoCAD SHX Text
4500
AutoCAD SHX Text
1500
AutoCAD SHX Text
1500
AutoCAD SHX Text
1500
AutoCAD SHX Text
TYPE D
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
1 900
AutoCAD SHX Text
3000
AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

Not To Scale

SL/ADB/ST-13

Roof Truss Details

PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: Oct, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

for sierra leone field office of the African Development

Bank (ADB)

October, 2016

Client:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

AutoCAD SHX Text
12500
AutoCAD SHX Text
TYPE F
AutoCAD SHX Text
1500
AutoCAD SHX Text
2500
AutoCAD SHX Text
2500
AutoCAD SHX Text
1000
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
B
AutoCAD SHX Text
2500
AutoCAD SHX Text
2500
AutoCAD SHX Text
3200
AutoCAD SHX Text
15000
AutoCAD SHX Text
TYPE C
AutoCAD SHX Text
1500
AutoCAD SHX Text
2500
AutoCAD SHX Text
2500
AutoCAD SHX Text
1000
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
5426
AutoCAD SHX Text
5426
AutoCAD SHX Text
B
AutoCAD SHX Text
1500
AutoCAD SHX Text
2500
AutoCAD SHX Text
2500
AutoCAD SHX Text
1000
AutoCAD SHX Text
3200
AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

Not To Scale

SL/ADB/ST-14

Roof Truss Details

PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: Oct, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

for sierra leone field office of the African Development

Bank (ADB)

October, 2016

Client:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

AutoCAD SHX Text
Detail D
AutoCAD SHX Text
Detail B
AutoCAD SHX Text
6mm Thick Gusset Plate
AutoCAD SHX Text
RHS 75 x 75
AutoCAD SHX Text
RHS 50 x 75
AutoCAD SHX Text
RHS 75 x 75
AutoCAD SHX Text
6mm Thick Gusset Plate
AutoCAD SHX Text
RHS 50 x 75
AutoCAD SHX Text
RHS 50 x 75
AutoCAD SHX Text
75
AutoCAD SHX Text
RHS 50 x 75
AutoCAD SHX Text
Detail A
AutoCAD SHX Text
Ridge Cap
AutoCAD SHX Text
6mmThick Gusset Plate
AutoCAD SHX Text
2RHS 50 x 50
AutoCAD SHX Text
RHS 75 x 75
AutoCAD SHX Text
Coloured Alu-Zinc
AutoCAD SHX Text
50x75 Timber Purlin
AutoCAD SHX Text
50x50 Cleat
AutoCAD SHX Text
Detail E
AutoCAD SHX Text
6mm Thick Gusset Plate
AutoCAD SHX Text
50 x 50 Cleats
AutoCAD SHX Text
Holding down bolt
AutoCAD SHX Text
R/C Beam
AutoCAD SHX Text
RHS 75 x 75
AutoCAD SHX Text
75
AutoCAD SHX Text
60
AutoCAD SHX Text
22
AutoCAD SHX Text
o
AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

Y12-1

50P

Y1208-150P

FIRST FLOOR

GROUND FLOOR

BASEMENT FLOOR

Y12-150P

Y1205-150PY1206-150P

Y1204-150P

Y1202-150P

Y1201-150P

Y1203-1

50P

C1C2

Y1202-150P

1 : 40

Proposed R/C

Details For

Staircase No.1

PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/ST-15

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

Y1202-150P

Y12-150P

Y1205-150P

Y1201-150P

Y1206-150P

Y1204-150P

Y1203-150P

Y1205-150P

600

2600

100

200

1 : 30

R/C Roof Slab With

Parapet & Details

For Staircase No.2

PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/ST-16

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.
AutoCAD SHX Text
Y12 @200 c/c
AutoCAD SHX Text
Y12 @150 c/c
AutoCAD SHX Text
Y16 @150 c/c Top
AutoCAD SHX Text
Y16@150 c/c Bottom

300 1900 300

300

1900

300

y1206-150P

y1205-150P

y1207-150P

y1206-150P

Basement

y1206-150P

y1205-150P

y1207-150P

y1208-150P

y1201-200mm T2

y1603-200mm B2

150mm Thick Roof Slab

(Height to be determined on site)

2500

300 1900 300

300

02 02 02 02 02 02 02

02 02

02

04

02

04

100mm Blinding

concrete

y1201-200mm T2

Lift Base

04 04 04 04 04 04 04 04 04

y1603-200mm B2

02 02

04 04

1 : 75

R/C Details For

Lift Shaft PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/ST-17

AutoCAD SHX Text
Y1202-200P T1
AutoCAD SHX Text
Y1604-200P B1
AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.
AutoCAD SHX Text
Y1604-200P B1
AutoCAD SHX Text
Y1201-200P T2
AutoCAD SHX Text
Y1202-200P T1
AutoCAD SHX Text
Y1603-200P B2
AutoCAD SHX Text
Y1202-200P T1
AutoCAD SHX Text
Y1604-200P B1

NMLK

7

6

5

2825422517252325

2225

121385075

Type C

C3

C4 C4 C4

C4 C4 C4 C4

C3

C3

C3

C3

C3

Type C

Type CType C

Type CType C

Typ

e C

Typ

e C

Typ

e C

Typ

e C

Typ

e C

Typ

e C

Type C

Type C

Typ

e C

Typ

e C

J

C4

C4

C3

3263

1 : 40

Generator House

Structural

Foundation Layout

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

LEGEND:-

Beams

Columns

SL/ADB/ST-18

Footing

P/C Strips

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

NMLK

7

6

5

282542251725

2325

2225

12138

5075

C3

C4 C4 C4

C4 C4 C4 C4

C3

C3 C3

C3

C3

C3

C4

C4

J

3263

1 : 40

Generator House

Floor Slab

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

LEGEND:-

Columns

SL/ADB/ST-19

Floor Slab 150mm thick with

12mm rod meshed at 150mm

spacing C-C

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

225

300

SECTION M-M

Va

ries

1200

400400400

1200

225

400

900

Va

ries

225

COLUMN TYPE C4

900

338

225

338

900

338 225 338

900

225

225

COLUMN TYPE C3

SECTION K-K

400

BEAM TYPE C

1 : 30

Generator House

Structural DetailsBWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

SL/ADB/ST-20

AutoCAD SHX Text
3T12
AutoCAD SHX Text
R10-150P
AutoCAD SHX Text
3T16
AutoCAD SHX Text
M
AutoCAD SHX Text
NGL.
AutoCAD SHX Text
M
AutoCAD SHX Text
R807-225
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
SECTION M-MSECTION M-M
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
Y1002-150P B2
AutoCAD SHX Text
Y1001-150P B1
AutoCAD SHX Text
4Y1603
AutoCAD SHX Text
K
AutoCAD SHX Text
4Y1603
AutoCAD SHX Text
NGL.
AutoCAD SHX Text
K
AutoCAD SHX Text
R807-225
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
SECTION K-KSECTION K-K
AutoCAD SHX Text
K
AutoCAD SHX Text
Y1201-150P B1
AutoCAD SHX Text
K
AutoCAD SHX Text
Y1202-150P B2
AutoCAD SHX Text
Y1004
AutoCAD SHX Text
Y1003
AutoCAD SHX Text
Y1004
AutoCAD SHX Text
Y1201-150P B1
AutoCAD SHX Text
Y1202-150P B2
AutoCAD SHX Text
4Y1603
AutoCAD SHX Text
Y1004
AutoCAD SHX Text
Y1201-150P B1
AutoCAD SHX Text
Y1202-150P B2
AutoCAD SHX Text
6Y1603
AutoCAD SHX Text
Y1004
AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

8O Q

30023003002300300

45

0

40

00

36

00

45

09P

Type D

Typ

e D

Typ

e D

Typ

e D

C5

C5

Type D

Type D Type D

C5

C5

C5

C5

1 : 100

Water Tank Structural

Foundation Layout

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

LEGEND:-

SL/ADB/ST-21

Beams

Columns

Footing

P/C Strips

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

40

00

57001501

50

8O Q

9P

1 : 100

Water Tank

Ground Floor

Slab Details

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

LEGEND:-

SL/ADB/ST-22

Columns

Floor Slab 200mm thick with

16mm rod meshed at 150mm

spacing C-C

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

45

0

40

00

31

00

45

0

1350

25

63

1600

Y16 B1

Y16 T1

Y12-150P T1

Y16-200P B2 Y12-150P T2

200 Y16-200P B1

Y16 T2Y16 B2

42

00

8

O Q

9

P

1 : 100

Water Tank

Mezzanine Floor

Suspended Slab

Details

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

LEGEND:-

SL/ADB/ST-23

Columns

Reinforcement

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

40

00

Y16 B1

5400

Y16 B2

Y16 T1 Y16 T2 Y16 T2 Y16 B1

Y12-150P T1

Y16-200P B2 Y12-150P T2

200 Y16-200P B1

8

O Q

9

P

1 : 100

Water Tank Typical

First Floor and

Suspended Slab

Details

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

LEGEND:-

SL/ADB/ST-24

Columns

Reinforcement

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

SECTION Y-Y

BASE C5

Y1602-150P B2

Y1204-200P T2

Y1203-200P T1Y1601-150P B1

75mm Blinding concrete

NGL.

6Y16 05

Y10 05

6Y16 06

Y10 05

COLUMN TYPE C5

1 : 100

Water Tank

Structural Details

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

SL/ADB/ST-25

AutoCAD SHX Text
450
AutoCAD SHX Text
300
AutoCAD SHX Text
1700
AutoCAD SHX Text
850
AutoCAD SHX Text
850
AutoCAD SHX Text
450
AutoCAD SHX Text
1200
AutoCAD SHX Text
600
AutoCAD SHX Text
Min 1000
AutoCAD SHX Text
250
AutoCAD SHX Text
1700
AutoCAD SHX Text
Varies
AutoCAD SHX Text
01
AutoCAD SHX Text
04
AutoCAD SHX Text
04
AutoCAD SHX Text
04
AutoCAD SHX Text
04
AutoCAD SHX Text
03
AutoCAD SHX Text
625
AutoCAD SHX Text
625
AutoCAD SHX Text
450
AutoCAD SHX Text
R10 05-200
AutoCAD SHX Text
300
AutoCAD SHX Text
Y
AutoCAD SHX Text
Y
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
450
AutoCAD SHX Text
300
AutoCAD SHX Text
R10-255P
AutoCAD SHX Text
4T12
AutoCAD SHX Text
6T12
AutoCAD SHX Text
Beam-Type-D
AutoCAD SHX Text
4T10
AutoCAD SHX Text
4T12
AutoCAD SHX Text
450
AutoCAD SHX Text
300
AutoCAD SHX Text
R10-225P
AutoCAD SHX Text
Beam-Type-D
AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

44

50

8600

C6 C6 C6 C6

C6 C6 C6

Type F

Type FType F Type F

Type F

Typ

e F

Typ

e F

Typ

e F

Typ

e F

Type F

C6

R

10

11

S T U

1 : 30

Drivers/Security/

Waiting Area Lounge

Foundation Structural

Layout

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

LEGEND:-

SL/ADB/ST-26

Beams

Columns

Footing

P/C Strips

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

44

50

8600

C6 C6 C6 C6

C6 C6 C6 C6

R

10

11

S T U

1 : 30

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

LEGEND:-

SL/ADB/ST-27

Columns

Floor Slab 150mm thick with

12mm rod meshed at 150mm

spacing C-C

Drivers/Security/

Waiting Area Lounge

R/C Floor Slab

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contraction is responsible for verification of the structural design before proceeding with construction of structural elements.

300

300

Va

ries

300

900

300

300

300

900

300 300 300

900

COLUMN TYPE C6

300

300

SECTION K-K

BEAM TYPE F

Not To Scale

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

SL/ADB/ST-28

Drivers/Security/

Waiting Area Lounge

Structural Details

AutoCAD SHX Text
3T12
AutoCAD SHX Text
3T16
AutoCAD SHX Text
4Y1603
AutoCAD SHX Text
K
AutoCAD SHX Text
4Y1603
AutoCAD SHX Text
NGL.
AutoCAD SHX Text
K
AutoCAD SHX Text
R807-225
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
SECTION K-KSECTION K-K
AutoCAD SHX Text
K
AutoCAD SHX Text
Y1601-150P B1
AutoCAD SHX Text
K
AutoCAD SHX Text
Y1602-150P B2
AutoCAD SHX Text
R8-150P
AutoCAD SHX Text
Y1004
AutoCAD SHX Text
Y1004
AutoCAD SHX Text
Y1601-150P B1
AutoCAD SHX Text
Y1602-150P B2
AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

15

50

2300

Type G

Typ

e G

Typ

e G

C7

C7

C7 C7

C7

C7

C7

C7

Y16-200P B2

Y16-200P B1 100

Not To Scale

Back Security Post

Foundation Structural

Layout,Ground Floor

Slab & Suspended

Slab Details

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

LEGEND:-

SL/ADB/ST-29

Beams

Columns

Footing

P/C Strips

Floor Slab 100mm thick with

16mm rod meshed at 150mm

spacing C-C

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

200

200

Va

ries

200

800

300

200

300

800

300 200 300

800

COLUMN TYPE C7

200

200

SECTION K-K

BEAM TYPE G

Not To Scale

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

SL/ADB/ST-30

Back Security Post

Structural Details

AutoCAD SHX Text
3T12
AutoCAD SHX Text
3T16
AutoCAD SHX Text
4Y1603
AutoCAD SHX Text
K
AutoCAD SHX Text
4Y1603
AutoCAD SHX Text
NGL.
AutoCAD SHX Text
K
AutoCAD SHX Text
R807-225
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
02
AutoCAD SHX Text
SECTION K-KSECTION K-K
AutoCAD SHX Text
K
AutoCAD SHX Text
Y1601-150P B1
AutoCAD SHX Text
K
AutoCAD SHX Text
Y1602-150P B2
AutoCAD SHX Text
R8-150P
AutoCAD SHX Text
Y1004
AutoCAD SHX Text
Y1004
AutoCAD SHX Text
Y1601-150P B1
AutoCAD SHX Text
Y1602-150P B2
AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

Y16-200P B2 Y16-200P B1

300

2000

15

00

Y16-200P T2 Y16-200P T1

1 : 30

Concrete Plinth For

Fire Hydrant Pump

Layout

BWB

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

SL/ADB/ST-31

AutoCAD SHX Text
1. All dimension are millimters unless otherwise stated 2. Concrete shall be C35P/20 3. Minimum cover Reinforcement shall be: 75mm Foundation 50mm Columns 40mm Beams And Slabs 4. All Foundation are to bear directly on rock any loose fill to be excavated to rock and back filled with lean mix concrete or as specified by consultant 5. The Contractor is responsible for verifying site conditions including all dimensions, prior to commencing construction. 6. The Contractor is responsible for verifying the quality of steel required for construction 7. All Beam shown with section shall always have bottom steel turned up 10x diameter of the steel 8. This Drawing is to be read in conjunction with specifications and contract document where applicable and as directed by Engineer. 9. The contractor is responsible for verification of the structural design before proceeding with construction of structural elements.

12 0.230

BENDING DETAILS

12 0.266

STAIRCASE No. 1

01

02

03

10

14

10

3

2

1

7.389

2.000

2.450

221.67

56.00

24.50

0.024

30

28

10

10

1

10

04

12

10

1

2.600

26.00 0.01

10

05

10

10.01

10

06

12

12

BUTTOM

BUTTOM

TOP

TOP12

10

50

1

1

10

50

2000

3589

1800

1750

125 125

2000

450

2000

450

2.450 24.50 0.024

2000

600

2000

600

2000

600

450

450

125

2.600

2.600

2.600

26.00

26.00

26.00

0.01

0.01

BENDING DETAILS

12 0.133

STAIRCASE No: 2

02

03

10

10

2

1

4.783

2.100

133.924

21.000

0.021

BUTTOM 28

10

10

1

10

04

12

44

120.000 0.020

10

05

10

50

10.010

10

06

07

12

12

BUTTOM

BUTTOM

TOP

12

10 1 10

0.024

3250

450

450

125

1.025

8.030

10.25

80.300

0.080

BUTTOM

1500

3283

1500

600

1500

600

1500

3280

2.000

21.000

2.100

07

08

TOP

TOP

B

U

T

T

O

M

T

O

P

12

10

i

n

t

h

e

e

l

e

m

e

n

t

o

f

e

l

e

m

e

n

t

s

Total

Number

BAR

MARK

M

M

S

u

b

t

o

t

a

l

(

m

)

D

I

A

M

E

T

E

R

Symbol (m)

T

o

t

a

l

m

a

s

s

(

t

)

L

O

C

A

T

I

O

N

L

e

n

g

t

h

(

m

)

i

n

t

h

e

e

l

e

m

e

n

t

o

f

e

l

e

m

e

n

t

s

Total

Number

BAR

MARK

M

M

S

u

b

t

o

t

a

l

(

m

)

D

I

A

M

E

T

E

R

Symbol (m)

T

o

t

a

l

m

a

s

s

(

t

)

L

O

C

A

T

I

O

N

L

e

n

g

t

h

(

m

)

1750

125 125

B

U

T

T

O

M

T

O

P

1 : 30

Staircase No.1 & 2

Bending DetailsPH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineersPlanners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

SL/ADB/ST-32

BAR

MARK

M

M

12 1.216

BENDING DETAILS

S

u

b

t

o

t

a

l

(

m

)

D

I

A

M

E

T

E

R

Symbol (m)

T

o

t

a

l

m

a

s

s

(

t

)

i

n

t

h

e

e

l

e

m

e

n

t

o

f

e

l

e

m

e

n

t

s

Total

Number

TOP

2975

20

0

12 0.266

16

16

LIFT SHAFT BASE

L

O

C

A

T

I

O

N

01

02

03

04

TOP

BOTTOM

BOTTOM

80

80

80

80

1

1

1

1

80

80

80

80

3.4

3.4

3.4

3.4

269

269

269

269

0.678

0.678

2975

20

0

2975

20

0

2975

20

0

12 1.216

BENDING DETAILS

TOP

2475

12

5

12 0.266

10

LIFT ROOF SLAB

01

02

03

34

34

4

1

1

1

2.73

2.73

0.5

93

93

20.01

2475

12

5

100

12

1.216

12

BENDING DETAILS

2250

12

0.266

LIFT SHAFT

Front

Back

136

68

136

1

1

1

1

9

9

5.2

348.8

348.8

0.678

0.678

BUTTOM

34

34

4

10

0

1

0

0

1

0

0

05

06

07

08

Front

Back

136

12

136

68

136

136

507.3

507.3

5.13

9

20

0

2250

9

2250

20

0

2250

S

P

A

C

E

R

B

A

R

S

i

n

t

h

e

e

l

e

m

e

n

t

o

f

e

l

e

m

e

n

t

s

Total

Number

BAR

MARK

M

M

L

e

n

g

t

h

(

m

)

S

u

b

t

o

t

a

l

(

m

)

D

I

A

M

E

T

E

R

Symbol (m)

T

o

t

a

l

m

a

s

s

(

t

)

L

O

C

A

T

I

O

N

i

n

t

h

e

e

l

e

m

e

n

t

o

f

e

l

e

m

e

n

t

s

Total

Number

BAR

MARK

M

M

S

u

b

t

o

t

a

l

(

m

)

D

I

A

M

E

T

E

R

Symbol (m)

T

o

t

a

l

m

a

s

s

(

t

)

L

O

C

A

T

I

O

N

L

e

n

g

t

h

(

m

)

L

e

n

g

t

h

(

m

)

1 : 30

Lift Shaft Base &

Slab Bending

Details

PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineersPlanners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

SL/ADB/ST-33

12

16

BENDING DETAILS

TOP

3900

15

0

12

Water tank Mezzanine Floor Slab

TOP

BOTTOM

BOTTOM

27

27

19

19

1

1

1

1

27

27

19

19

2.950

2.950

71.50

71.50

2650

15

0

15

0

15

0

15

0

2650

15

0

15

01

50

3900

4.200

4.200

79.80

79.80

16

0.071

0.071

0.079

0.079

2688

15

0

12TOP

BOTTOM

1

1

13

18

15

0

15

0

15

0

2688

2.988

2.988

37.70

53.78

16

0.037

0.053

13

19

1775

15

0

12TOP

BOTTOM

1

1

13

18

15

0

15

0

15

0

1775

2.075

2.075

26.98

37.35

16

0.027

0.037

13

18

08

12

16

BENDING DETAILS

TOP

Roof Slab & Parapet Water Tank

01

02 BOTTOM

27

35

1

1

27

35

5.600

4.200

151.20

147.00

3900

15

0

15

0

5300

15

0

15

0

0.150

0.140

16

16

BENDING DETAILS

Roof Slab & Parapet Water Tank

01

02

B

O

T

T

O

M

35

35

1

1

27

35

5.600

4.200

151.20

147.00

3900

15

0

15

0

5300

15

0

15

0

0.150

0.140

12

351

354.200

147.00

2000

50

0

0.07

T

O

PB

A

C

K

F

R

O

N

T

P

A

R

A

P

E

T

H

O

R

I

Z

O

N

T

A

L

V

E

R

T

I

C

A

L

i

n

t

h

e

e

l

e

m

e

n

t

o

f

e

l

e

m

e

n

t

s

Total

Number

BAR

MARK

M

M

S

u

b

t

o

t

a

l

(

m

)

D

I

A

M

E

T

E

R

Symbol (m)

T

o

t

a

l

m

a

s

s

(

t

)

L

O

C

A

T

I

O

N

L

e

n

g

t

h

(

m

)

i

n

t

h

e

e

l

e

m

e

n

t

o

f

e

l

e

m

e

n

t

s

Total

Number

BAR

MARK

M

M

S

u

b

t

o

t

a

l

(

m

)

D

I

A

M

E

T

E

R

Symbol (m)

T

o

t

a

l

m

a

s

s

(

t

)

L

O

C

A

T

I

O

N

L

e

n

g

t

h

(

m

)

i

n

t

h

e

e

l

e

m

e

n

t

o

f

e

l

e

m

e

n

t

s

Total

Number

BAR

MARK

M

M

S

u

b

t

o

t

a

l

(

m

)

D

I

A

M

E

T

E

R

Symbol (m)

T

o

t

a

l

m

a

s

s

(

t

)

L

O

C

A

T

I

O

N

L

e

n

g

t

h

(

m

)

B

O

T

T

O

M

T

O

P

1 : 30

Water Tank

Mezzanine Slab &

Typical Slab

Bending Details

PH

SDD A3

RealiniBaderAssociates Limited

ArchitectsEngineersPlanners

Scale: August, 2016Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

August, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES:-

R BA

SL/ADB/ST-34