Inherent Moisture
%
Ash %
VolatileMatter %
Sulphur % Calorific Value
MJ/kg
Ash FusionTemperature
SwellingNumber
2.6 29.2 18.7 0.30 16.7 >1400°C <0.5
TYPICAL ANALYSIS -
Pulverised fuel? No – flame not radiant
Unsatisfactory for power station boilers
Chain grate stokers?
No – for the same reason
Unsatisfactory for industrial boilers
Coke production? No – no coking properties
Useless for coke production
Quality domestic fuel?
No – poor washability
Unsatisfactory for domestic grates
Gasification for bulk chemicals, ammonia, liquid fuels?
Ideal, as already demonstrated by testing
No swelling properties, high ash fusion temperature, low sulphur
SO –– WHAT IS THIS COAL GOOD FOR?
Using Sengwa coal for CTL – a major opportunity
Sengwa coal’s non-swelling, high ash fusion features are ideal for CTL
Sasol were planning a 80,000 bbl/day new plant - the Mafutha project
This has come to a halt:Market uncertainty - a new 400,000 bbl/day oil refinery plannedCopenhagen Accord - the SA Government is pledged to tax CO2The Waterberg coals for Mafutha have unsuitable propertiesThere is insufficient water in the area of the coalfield
None of these objections apply to Zimbabwe and the Sengwa coal field
This is an environmentally benign flowsheet with zero liquid effluent, generating less carbon dioxide than a power station burning the same amount of coal.
Zimbabwe has not signed the Copenhagen Accord, and so there is no obligation to sequester the carbon dioxide emitted
THE ENVIRONMENTAL IMPACT?
•Positive impact on balance of payments – at 40,000 bbl/day there will be at least a $1 billion annual fuel import saving from 2018 onwards, excluding revenue from exports
•Energy Security – no liquid fuel supply crises for the next 70+ years
•Job creation (from the Mafutha data) -Over 20,000 direct jobs at the peak period of
constructionEstimated 4,600 direct permanent jobsApprox 2,500-3,000 indirect permanent jobs to support the
venture. The town at Sengwa would be the size of Kwekwe
•Skills development – a large percentage of the 20,000 staff required for construction will have to be trained. This will create skills for the further development of Zimbabwe
WHAT WOULD A CTL OPERATION AT SENGWA DO FOR ZIMBABWE?