SAP AFS and Warehouse Management Equipment at Samsonite Agenda
-
Upload
independent -
Category
Documents
-
view
0 -
download
0
Transcript of SAP AFS and Warehouse Management Equipment at Samsonite Agenda
Your logo
SAP AFS and
Warehouse Management Equipment at
Samsonite
Wim Willems – M.I.S. Project
Coordinator
Kris Rooms – Manager Innovation
Agenda
3/10/2011 Page 2
Your logo
1. Introduction
2. Samsonite Europe : Logistics
3. WM Interfaces
4. Conclusions
5. Q&A
Agenda
Agenda
3/10/2011 Page 5
Agenda Your logo
SAP AFS (Apparel and Footwear Solutions) 2005 - 2011
• One SAP instance for 3 regions
• Europe 11/2007 : XI 3.0
• SAP is hosted in UK
Samsonite runs SAP AFS
Europe : Second Wave
WM Spare Parts
WM Finished Goods
WM Raw Materials + PP
• Data centre in Zaventem
• EDC in Oudenaarde for
Europe to South-Africa
600 km distance or
7 hrs by car
Agenda
3/10/2011 Page 6
Agenda Your logo
We have a unique logistic centre : Oudenaarde
• In total 3000 different product and colors for different brands
( Samsonite, American tourister, ...)
• Different packages : Single or group packed
• About 10.000 orders per day from all European contries centralized
in Oudenaarde.
• Maximum we have 39 outgoing trucks per day or about 2300 m3 or
25.800 boxes or 55.000 pieces
• Daily delivery to about 10.000 shops
• Personalized deliveries are possible ( anti-theft, labels, ...)
Samsonite Europe :
EDC Oudenaarde
Agenda
3/10/2011 Page 7
Agenda Your logo
Samsonite Europe :
Logistics Outbound Flow
Sales Orders
Outbound Deliveries
Picking Waves
Pick and Pack Sorter
Loading via Gate Sorter
Agenda
3/10/2011 Page 8
Agenda Your logo
Samsonite Europe :
Logistics Outbound Flow
Sales Orders
Outbound Deliveries
Picking Waves
Pick and Pack Sorter
Loading via Gate Sorter
Agenda
3/10/2011 Page 9
Agenda Your logo
N
SAMSONITE
Schaal : 1/500
06/10/2003
Denesting
Xylem
Pa
llets
Carton racks
ABS
Attache
Preparation
Inj. molding 5
Inj. molding 6
Inj. molding 7
Inj. molding 8
FGWH B Shipping B
FGWH C
Shipping A
Po
wd
erc
oa
ting
AB
S F
ram
es
Prestige
Extr
ud
er
& V
acu
um
form
ing
RMWH
LSC
Inj. molding 4
Inj. molding 3
Inj. molding 2
Inj. molding 1
LSC
LSC
LSC
LSC LSC
Pre
para
tion
Baskets
Pallets
Re
grin
de
r
WasteCorner
Batteries
CentralMaintenance
PurificationWater
PP-silos
MaintenanceCentral Whr
Tooling
PreparationShipping
Income
Sm
all
Inj. m
old
ing
LSC
LSC
Receving LSC
Oudenaarde
Layout 2004
LSC
LSC : 27.796 m²
Assy & prep. : 7.919 m²
Bakets : 3.690 m²
Inj. molding : 3.653 m²
Extr. & Vacuumforming : 1.263 m²
Frames & powderc. : 1.304 m²
RMWH & income : 6.574 m²
Maintenance & tooling : 3.242 m²
Offices : 2.192 m²
TOTAL : 57.633 m²
Kathe Draal (stock Abdij) 62m x 101m
Abdij (picking)
62m x 155m
Shipping Abdij
Baseliek 28m x 155m
Shipping
Baseliek
Dom 13m high
Pro
du
ctie
p
oly
pro
p
Productie polyprop
Tooling
Ass
em
bly
Samsonite Europe :
Warehouses
In total 2.000.000 pieces of luggage or 30.000 pallets • Highly automated warehouse • RF scanners • Barcoding
Agenda
3/10/2011 Page 10
Agenda Your logo
N
SAMSONITE
Schaal : 1/500
06/10/2003
Denesting
Xylem
Pa
llets
Carton racks
ABS
Attache
Preparation
Inj. molding 5
Inj. molding 6
Inj. molding 7
Inj. molding 8
FGWH B Shipping B
FGWH C
Shipping A
Po
wd
erc
oa
ting
AB
S F
ram
es
Prestige
Extr
ud
er
& V
acu
um
form
ing
RMWH
LSC
Inj. molding 4
Inj. molding 3
Inj. molding 2
Inj. molding 1
LSC
LSC
LSC
LSC LSC
Pre
para
tion
Baskets
Pallets
Re
grin
de
r
WasteCorner
Batteries
CentralMaintenance
PurificationWater
PP-silos
MaintenanceCentral Whr
Tooling
PreparationShipping
Income
Sm
all
Inj. m
old
ing
LSC
LSC
Receving LSC
Oudenaarde
Layout 2004
LSC
LSC : 27.796 m²
Assy & prep. : 7.919 m²
Bakets : 3.690 m²
Inj. molding : 3.653 m²
Extr. & Vacuumforming : 1.263 m²
Frames & powderc. : 1.304 m²
RMWH & income : 6.574 m²
Maintenance & tooling : 3.242 m²
Offices : 2.192 m²
TOTAL : 57.633 m²
Kathe Draal (stock Abdij) 62m x 101m
Abdij (picking)
62m x 155m
Shipping Abdij
Baseliek 28m x 155m
Shipping
Baseliek
Dom 13m high
Pro
du
ctie
p
oly
pro
p
Productie polyprop
Tooling
Ass
em
bly
Samsonite Europe :
SAP WM Implementation
VANAS Towers
Pick & Pack
Sorter Gate Sorter
Manual Cranes
Dambach fixed cranes (Egemin soft) Gate Sorter
E&K moving automated cranes Gate Sorter
Agenda
3/10/2011 Page 11
Agenda Your logo
FOUNDED MID-2005
– LEGAL ENTITIES : GD-LUXEMBURG & BELGIUM
– ACTIVITIES IN LUXEMBURG, BELGIUM, SWITZERLAND & FRANCE
SAP SERVICE PARTNER since 2006
Member of FINANCIAL EXCELLENCE VALUE CIRCLE 2011
Intensum
EDI / ALE B2B / B2C
SWIFT
FX Dealing Platform Document Tracking
Tool
Agenda
3/10/2011 Page 12
Agenda Your logo
XI
– Existing interfaces should not slow down WMS-INTERFACES – JDBC- and FILE Adapter QUEUES should not block WMS-
INTERFACES SAP AFS
– Large amount of Idocs should be processed in a very short period
– EGEMIN INTERFACE needs to be finished E2E < 20 seconds
Interfaces :
Requirements
Agenda
3/10/2011 Page 13
Agenda Your logo
N
SAMSONITE
Schaal : 1/500
06/10/2003
Denesting
Xylem
Pa
llets
Carton racks
ABS
Attache
Preparation
Inj. molding 5
Inj. molding 6
Inj. molding 7
Inj. molding 8
FGWH B Shipping B
FGWH C
Shipping A
Po
wd
erc
oa
ting
AB
S F
ram
es
Prestige
Extr
ud
er
& V
acu
um
form
ing
RMWH
LSC
Inj. molding 4
Inj. molding 3
Inj. molding 2
Inj. molding 1
LSC
LSC
LSC
LSC LSC
Pre
para
tion
Baskets
Pallets
Re
grin
de
r
WasteCorner
Batteries
CentralMaintenance
PurificationWater
PP-silos
MaintenanceCentral Whr
Tooling
PreparationShipping
Income
Sm
all
Inj. m
old
ing
LSC
LSC
Receving LSC
Oudenaarde
Layout 2004
LSC
LSC : 27.796 m²
Assy & prep. : 7.919 m²
Bakets : 3.690 m²
Inj. molding : 3.653 m²
Extr. & Vacuumforming : 1.263 m²
Frames & powderc. : 1.304 m²
RMWH & income : 6.574 m²
Maintenance & tooling : 3.242 m²
Offices : 2.192 m²
TOTAL : 57.633 m²
Kathe Draal (stock Abdij) 62m x 101m
Abdij (picking)
62m x 155m
Shipping Abdij
Baseliek 28m x 155m
Shipping
Baseliek
Dom 13m high
Pro
du
ctie
p
oly
pro
p
Productie polyprop
Tooling
Ass
em
bly
Interfaces :
Implementation
VANAS Towers
JDBC : Oracle
Scanning
Dambach Cranes (Egemin soft) XML files
E&K cranes HTTP
SAP AFS
Confirm TO
Create TO
XI
WMTORD
WMTOCO
Agenda
3/10/2011 Page 16
Agenda Your logo Interfaces :
Dambach Cranes Egemin
Inbound deliveries
Movements in the Warehouse
Agenda
3/10/2011 Page 17
Agenda Your logo
XI connector
– DAMBACH CRANES
– EGEMIN SOFTWARE
Interfaces :
Optimizations (1)
Agenda
3/10/2011 Page 18
Agenda Your logo
Queue prioritization
– High Priority Queue (WMS)
– Normal Priority Queue (All Other flows)
– Low Priority Queue (Italian flows)
– Large Message Queue (Messages > 20Mb)
Pick and Pack Sorter
– SAP sents 1 IDoc per Picking Wave (multi-truck = multi-shipment)
– Pick & Pack Sorter sents1 message when everything is scanned for this shipment 1 IDoc per scanned TO
Gate Sorter
– SAP sents 1 IDoc per loading zone (warehouse)
– Gate Sorter sents 1 message when everything is scanned in this warehouse 1 IDoc per HU
Interfaces :
Optimizations (2)
Agenda
3/10/2011 Page 19
Agenda Your logo
Monitoring by support team
Tracking by SAP Document nb
Easy and fast monitoring
On-line
End-to-End
Interfaces :
Monitoring
Intensum Document Tracking Tool
Webdynpro JAVA
Agenda
3/10/2011 Page 21
Agenda Your logo Volumes
WM Average/d Peak/h
SAP OUT 1500
WMTORD 1400
WMCATO 10
ZWM_EU_GATESORTER 80
SAP IN 27000
WMTOCO 8000
WMCATO 10
ZWM_EU_GATESORTER 19000
PI 3000 - 3500
TOTAL Average/d Peak/h
SAP OUT 6000
IN 28000
PI 6500 - 7000
Agenda
3/10/2011 Page 22
Agenda Your logo
Dambach / Egemin Software
E2E time < 20 seconds : < 10 seconds
Gate Sorter
Stress testing 17 min, after tuning SAP 3 min
HU are set to ‘Loaded’ in update task
Pick and Pack Sorter
VANAS towers
E&K cranes
Processing Time
PI ok
SAP to be tuned
Conclusions
Agenda
3/10/2011 Page 23
Agenda Your logo
Q&A