1Nyngan Community Consultative Committee (NCCC)
Nyngan Solar PlantNCCC Inaugural Meeting
Facilitator: John Murray
6 November 2013
2Agenda
› Nyngan CCC Meeting
› 6 November 2013
› Welcome and introductions
› Apologies
› Proposed framework and objectives for the CCC
› Overview of Project Status
› Ongoing meeting schedule
› Any other business
› Next meeting and close
3Proposed framework and objectives for the CCC
› Review and finalise Terms of Reference
› Are there any other members we have missed?
› What topics/issues would the CCC like to discuss in this forum?
› Nyngan CCC Meeting
› 6 November 2013
4AGL overview of project status - who is AGL
› Nyngan CCC Meeting
› 6 November 2013
› AGL Energy is a 175-year old Australian company, founded in 1837.
› AGL Energy is a vertically integrated energy company –retail, wholesale, generation and is Australia’s leading renewable energy company
› AGL is one of the largest electricity and gas retailers in Australia, with over 3.8 million customer accounts.
» Our vision: “Creating energy solutions for the communities of today and tomorrow”
5AGL overview of project status – experience
› Nyngan CCC Meeting
› 6 November 2013
› AGL is the largest integrated renewable energy company in Australia, with 1,720 MW of wind, hydro, biomass and solar assets.
» Project partner First Solar
› Developer, owner and operator long-term community partner
› Project experience
» Housekeeping, gates, livestock and spraying
» Traffic and transport
» Dust and water
» Noise
6AGL overview of project status – project scope
› Nyngan CCC Meeting
› 6 November 2013
132kV Overhead Line (OHL)
CPP(NSP: Essential
Energy)
Two 132kv OHL feeds joining the
132kV Switchyard to the existing Nyngan-
Cobar 132kV OHL.
132kV Switchyard
CPP(NSP: Essential
Energy)
Connects the 132kV/33kV
Transformer Yard to the 132kV OHL.
132kV/33kV Transformer
Yard
CPP(AGL Operations)
Connects the Nyngan 102 MW
Power Station to the 132KV Switchyard.
102MW Power Station
First Solar(AGL Operations)
Nominal 102 MW (AC) from over 1.3
million solar PV modules covering approximately 250
hectares.
7AGL overview of project status – project scope
› Nyngan CCC Meeting
› 6 November 2013
132 kV OHL interface with existing Nyngan-Cobar 132kV
Barrier Highway Intersection
132 kV OHL line
132kV Switchyard
132kV/33kV Transformer Yard
102MW Nyngan Power Station
8AGL overview of project status – program
› Nyngan CCC Meeting
› 6 November 2013
› Connection Works Essential Energy has approved concept design
› Solar Plant 90% design review and HAZOP
› Nyngan Solar Plant – construction works program
› Barrier Hwy road works
9Overview of project status - First Solar
› Nyngan CCC Meeting
› 6 November 2013
› Key dates / project milestones
› Construction camp – Hospital Rd
› Traffic impacts
› Management of workers
› Employment opportunities and the process involved
10Contact details
› AGL:
» General enquiries, site tours, community events and complaints:
» Rosa Han and Helena Orel, Community Engagement Team
» P: 1800 039 600
» E: [email protected]
› First Solar:
» Enquiries and/or complaints relating to construction/camp
» Gavin Randall, Project Manager
» P: 0438 714 404
» E: [email protected]
› Facilitator:
» John Murray, Integrated Analysis
» P: 0413 452 341
» E: [email protected]
› Nyngan CCC Meeting
› 6 November 2013
11Ongoing meeting schedule and other business
› Nyngan CCC Meeting
› 6 November 2013
› How often does the CCC want to meet?