Republic of th'e Philippines Department of Env1ronment and Natural Resources MINES AND GEOSCIENCES BUREAU MIMAROPA Region 7/F DENR Building, 1515 Roxas Boulevard , Ermita, Manila Telefax No. (+632) 563-021 5/ (+632) 310-1369 Email: [email protected]
MEMORANDUM
For
Thru
From
Subject
Date
The Regional Director (wM This Office
. ;I- f)-.c~! q
The Officer-in-Charge l .. yu./ in I/ fJt{ 11 Mine Safety, Environmd~t anqf$o~ial ~evelopment Division
The Undersigned
Report on the Jrd Quarter 2019 Multi-partite Monitoring Team's (MMTl Validation and Accomplishments of Citinickel Mines and Development Corporation ( CMDCl
13 November 2019
I. INTRODUCTION
Pursuant to Travel Order No. 733 dated 14 October 2019, the undersigned, together with Engrs. Ferdinand P. Olivares, Roel Anthony S. Luz and Venus V. Jesoro proceeded to Narra and Sofronio Espanola, Palawan to conduct MMT validation of CMDC on October 21-25, 201 9.
Prior to the fie ldwork, coordination was made w ith the other members of the MMT to ensure their active participation in the above undertaking. Hereunder are the members who participated in the validation:
1. Monica Mae B. Avengoza -2. Ferdinand P. Olivares 3. Roel Anthony S. Luz 4. Venus V. Jesoro 5. Leonard T. Caluya
MGB-MIMAROPA(Team Leader) MGB-MIMAROP A
6. Rudy M. Agsalog/ Henry Catapang-
MGB-MIMAROPA MGB-MIMAROP A CENRO Quezon CENRO-Narra Substation CENRO Brooke's Point PENRO
7. Carlos A. Padrigo 8. Roland G. Talabucon 9. Perlita C. Qui ling 1 0. Richard A. Roy 11. Emerico G. Cabanday, Jr. 12. Eric M. Tejano 13. Meduline Caminong
PCSDS PHO PG-ENRO MENRO Espanola MENRO Narra
"MINING SHALL BE PRO-PEOPLE AND PRO-ENVIRONMENT IN SUSTAINING WEALTH CREATION AND IMPROVED QUALITY OF LIFE"
'
14. Eugene P. Sumaydeng 15. Aristotle S. Supe 16. Antonio E. Francisco
MAO Narra MAO Espanola LGU Brgy. Labog
17. Jessie G. Galang 18. Joseph C. Aguirre
LGU Brgy. Pulot Interior LGU Brgy. San Isidro
19. Rodelio M. Vicente IP /ICC Narra 20. Jonathan J. Ong IP /ICC Espanola 21. Roberto G. Aquino 22. Teofilo T. Tredez
PO Forest Organization NGO PANLIPI
23. Jainal M. Uy, Jr. 24. Pamela P. Miguel
CMDC Representative CMDC Representative
II. ENTRY MEETING
Before the start of the actual validation, the members held an entry meeting in CMDC's conference hall.
• Prayer • Roll call of MMT members • Update on CMDC's accomplishments and compliances. • Other Matters
0 Submission of AEPEP, ASHP, and ASDMP for CY 2020 o Community vehicle for Pulot Interior under SDMP o SDMP Guidelines o Status of SLUP o Presentation on farmland adjacent to mining operations o Distribution of the balance amount for the compensation of farmers o Formation of RIA T in relation w ith the complaint of farmers o Itinerary and grouping of members
Ill. FIELD FINDINGS AND OBSERVATIONS
A. Annual Environmental and Enhancement Program
• Pulot Nickel Mining Project 1. Total Volume Desilted: 780 m (Block C SP 01 and Pasi SP 01 & 02) Total
Expense: Php 150,720.00 2. Well-maintained siltation ponds and mine drainage system 3. Indistinc t water level markings at Block A Pit Bottom 4. Propagated a total of 70,791 seedlings 5. Harvested twelve (12) sacks of vermicompost 6. Performs regular in-house water sampling
Page 2 of 6
7. An estimated water consumption totaling to 10,200 m3 was administered for the regular road water sprinkling. Total Expense: Php 262,000.00
8. Regular maintenance of road including haulage road, pier stock yard and causeway were observed
9. Conducted mangrove tree planting activity in collaboration w ith the local government units of Brooke's Point and Abo- Abo 1 July 2019 Participated the coastal clean - up in Barangay lraray, Sofronio Espanola I September 201 9 *as reported by CMDC
1 0. The planted trees in Block C is found in good and healthy condition due to the application of fertilizer on individual plants and conducts regular maintenance
11 . The regular enrichment and maintenance of trees on Block A-1 and the adjacent rehab areas converted to the density of growth of grass and shrubs leads to increase of biomass and good condition
12. The health of newly planted trees are good as evidence of vibrant color of the leaves.
13. There are thousands of indigenous harden planted species in the nursery area that are ready to be p lanted
14. The mangroves are in healthy cond ition 15. The nursery is well maintained 16. Planted bamboos on road and stockpile area are in good condition
• Toronto Nickel Mining Project 1. Desi lted 3,366 cu. m at Balitien Si ltation Pond, Km 2.5 Siltation Pond,
Stockyard Siltation Pond 2. Total seedlings inventory was 1 6,656 of various species located in Central
Forest Nursery. Stacks of plastic stored at the Nursery deteriorating into micro plastics
3. It was observed that CMDC is continuously producing vermicompost. Area near vermicompost has been turned into a storage area
4. 2. 1 0 has. p lanted for Mined-out Area Land Preparation I Progressive Rehabilitation. 2.46 has. p lanted for Mined-out Tree Planting , Enrichment, and Maintenance
5. CMDC consumed 1,891 .8 c u.m of water for its regular road water sprinkling.
6. Rough Haulage Road experienced along Mine Site 7. Acacia mangium on Rehab 4 Block B is found stunted compared to
nearby Agoho trees 8. Planted trees on Rehab 5 Block A are found to have been properly
enriched and maintained 9. Survival rate of planted trees in rehab areas is high due to application of
fertilizers
Page 3 of 6
B. Annual Safety and Health Program
l. The company's ASHP for 2019 was approved for implementation on January 21, 2019 by MGB MIMAROPA, denominated as ASH P /ERPP _MIMAROP A_20 19 _02
2. Company policy statement on safety and health, and environment are posted at the entrance of the company compound and in all workplaces, visible to all workers and visitors.
3. With safety engineers and inspectors for both sites duly registered with the MGB MIMAROPA.
4. Complied with the implementation of Safety & Health program as well as the mandatory reportorial requirements (on-time submission).
C. Annual Social Development and Management Program
• Pulot Nickel Mining Project 1 . Low physical and financial accomplishment (Physical - 33% , Financial -
34%) 2. Complied with all the mandatory and reportorial requirements in the
development and monitoring of ASDMP 3. Tribal Hall construction behind schedule 4. There are unimplemented projects based on the approved ASDMP for 2019.
• Toronto Nickel Mining Project 1. Accomplished 45.4% of the quarter's physical target with corresponding
46.9% financial accomplishment. The Development of Host and Neighboring Communities covered the bulk of the physical and financial accomplishments at 89.5% and 64.7%, respectively.
2. Low physical and financial accomplishments for IEC and DMTG PPAs 3. Complied with the mandatory legal requirements
IV. EXIT MEETING
At the end of the actual monitoring, the MMT held its exit meeting at the CMDC conference hall.
• Prayer • Presentation of reports • Other Matters
o Attendance of MMT members in the quarterly MMT monitoring/validation
Page 4 of6
V. COMMENTS AND RECOMMENDATIONS
A. Annual Environmental and Enhancement Program
• Pulot Nickel Mining Project 1. Continue regular dredging of SCSs, siltation ponds and pit bottoms 2. Conduct monitoring of the stability and structural integrity of siltation and
erosion control structures 3. Generate a mine drainage map for monitoring purposes 4. Continue production of native trees seedlings, shrubs and grasses to be
used in MRP, NGP and TRP 5. Formulate a standard operating procedure I manual for nursery
management and rehabilitation operations* 6. Continue production of vermicompost to be used in rehabilitation and
reforestation programs 7. Continue the maintenance and protection of the established reforested
and rehabilitated areas 8. Continue the regular water sparkling of mine roads including haulage
road, pier stock yard and causeway 9. Introduce compost materials to reduce dependency on commerc ial
fertilizer and for soil conditioning 1 0. Increase the number of planted bamboo by introducing it other areas
• Toronto Nickel Mining Project 1. Continue regular dredging of SCSs, siltation ponds and pit bottoms 2. Conduc t monitoring of the stability and structural integrity of siltation and
erosion control structures 3. Continue the production of seedlings to be used in rehabilitation and
reforestation 4. Continue production of vermicompost to be used in rehabilitation and
reforestation 5. Organize and clean the storage area near the vermicompost area 6. Intensify rehabilita tion activities of mined-out areas 7. Continue the regular water sparkling of mine roads inc luding haulage
road, pier stock yard and causeway. Scrape-off excess fine dusts 8. Introduce/enric h c limax species on Rehab 4 Block B planted with acacia
mangium for eventual disposal of said invasive sp ecies as it is no longer recommended for rehabilitation program
9. Grow new species, specia lly banana
B. Annual Safety and Health Program
1 . Continue complying with the mandatory / regulatory requirements
Page 5 of 6
2. Conduct road regrading and regular road maintenance along mine access roads at TNMP
3. Conduct dust suppression measures (i.e. regular water sprinkling; and road scraping/grading) at stockyard area (access road) going to the causeway to prevent dust emanation
C. Annual Social Development and Management Program
• Pulot Nickel Mining Project 1. Fast Track implementation of projects 2. Continue complying with the legal requirements 3. Fast track the construction of the tribal halls before end of the year 4. Close coordination with the contractors to fast track the implementation
of the projects
• Toronto Nickel Mining Project 1. Close monitoring of the remaining PPAs to be implemented for the last
quarter Target accomplishment: at least 85 % 2. Low physical and financial accomplishments for IEC and DMTG PPAs 3. Consider publication of IEC materials (pamphlets/brochures) showcasing
the companies' social and environmental commitments and accomplishments
4. Take advantage of the social events in the community in conducting IECs; Ensure proper documentation
5. Strictly comply with the construction plan/program of works for infrastructure projects being implemented
6. Post a list of the implemented and for implementation projects at conspicuous location in each beneficiary barangay for transparency purposes
7. Follow up with regard to the corresponding implemented PPA reports with the LGU
8. Continue compliance with the existing laws, rules, and other pertinent regulations
VI. ACTION REQUESTED
For the Regional Director's information and further instructions.
l VENGOZA
Page 6 of6
Name of Company
Location
Date of Monitoring
Monitored By
Team L
PG - ENRO
RUDY M. AGSALOG ~
CENRO-NARRA Substa.ti
Republic of the Philippines Department of Environment and Natural Resources
MINES & GEOSCIENCES BUREAU Regional Office No. IV-B (MIMAROPA) 7/F DENR Bldg., 1515 Roxas Blvd., Ermita, Manila Telefax: (632) 536-0215; email: [email protected]
MONITORING REPORT
CITINICKEL MINES & DEVELOPMENT CORPORATION (CMDC)
Narra and Sofronio Espanola, Palawan
October 21-25, 2019
MMTforCMDC
Control No.: 3Q2019CMDC
z
FERDINAND P.OLIVARES
MGB-MIMAROPA
~
PERLI~ING PCSDS
i~('
~~t~ PHO
ARISTO E S. SUPE
MAO- s. Espanola
PotForest Organization
NE(b;SANO
PO -Irrigators Association
Concurred: "
CMDC
JASPER TABANGAY/0
BUNDAC
AVPP Rep.
MMT Validation of Accomplishment under the Mine Rehabilitation and National Greening Program NGP) for the Third Quarter CY 2019 (October 21-25, 2019)
Citinickel Mines and Development Corporation (CMDC) Bgy. Bato-bato, Narra, Palawan
Members of the Team (DENR):
1. Roland G.Talabucon 2. Henry Catapang 3. Rhante Sarmiento 4. Marjorie Bacosa
• The following activities were inspected by the Mine Rehabilitati October 23, 2019 ;
• Mine area Rehabilitation and Re-vegetation;
• Establishment of Plantation and National Greening Program(NGP)
• Nursery and Seedling Production
10/25/201~
on
1
''
Mined-out Rehabilitation Project
'- I' j:?;'}l ! -· ' , ' r Y ~ .- , '· . . ; . Portion of Re
Portion of Block A Species Planted: Agoho
10/25/201
3
..
Mined-out Rehabilitation Project
Closer view of 1 Block A
Mined-out Rehabilitation Project
10/25/201
A
4
Mined-out Rehabilitation Project ~' ~ ~~
~~'il~ f.~!_ { ::; .. ,.~ li
Date of planting 15, 2019
Mined-out Rehabilitation Project
Date Planted: Planted Species: Apitong-Baboy, Sandana
10/25/201'
5
Mined-out Rehabilitation Project
~?f~!Ll~ ll~
Nursery & Seedling Production
Nursing-stage seed! 2, 975 comprised of Maladuhat specie
10/25/ 201!
6
Nursery & Seedling Production
Findings:
1. Acacia mangium on Rehab 4 Block B is found stunted compared to nearby Agoho trees.
Out-planting comprised of Mancono, Malakatmon
2. Planted trees in Rehab 5 Block A are found to have been properly enriched and maintained.
3. Survival rate of planted trees in rehab areas is high due to application of fertilizers.
10/25/201~
7
Recommendations:
1. Introduce/enrich climax species on Rehab 4 Block B planted with Acacia mangium for eventual disposal of said invasive specie as it is no longer recommended for rehabilitation program.
2. Continue the maintenance and enrichment of newly-planted trees on Rehab 5 Block A to ensure high survival.
3. Introduce compost materials vis-a-vis fertilizer to reduce dependency on chemical/commercial fertilizer.
4. Grow new species, particularly Banaba specie. 5. Continue the best practices of maintenance and enrichment
work on all rehab areas to ensure success of Mining Forest Program.
10/25/201~
8
Citinickel Mines AND D ( Y l lO, MfHI COlPOlA II O N
Pulot Nickel Mining Project
MINE REHABILITATION FOREST NURSERY &
NATIONAL GREENING PROGRAM (NGP)
3RD MMT VALIDATION OCTOBER 21-25, 2019
A 11, Management
Sy,.lem ; ISO 14001:2015
TOVRhelnla~
riR"'Pv ~~
TREE PLANTING OPERATION/ MAINTENANCE
10/25/2019
1
6tOZ/SZ/Ot
6U!tUeld JOJ ApeaJ 6u!lpaas
·s::>dQB9 · ~g
liKt!]JUU1'®11IJ ~~~ IT.ll.Tiill ~fillillD[IDJilllli 6llJ]]Jllilaxl](D "'-'->··"'"'"'~·
nD~!~KffiffiWMJdJ(J) ~dJ "-.J.!.j~
..
TillilJl] l])~(fj (J)[prnBJill11ID~~al] [lill[D[~fillLlC&lifl miT ill~ITIDffi~~JlllJ rPffiD[JJ!JA}fJ):KJli1lk001~
~'i]'lfi1W'~
'• Before (September
2018)
Total of 24,314 assorted seedling
planted in 11.70 ha. Last September 2019
(Block A mine out area)
Present status(September 2019) Block A-2 reforestation
area
During planting
10/25/2019
3
TITim IPilJi~ITTI~Ku illiPrmmiD~rnl
Present status(September 2019) Block A entrance
1:liDOO IP~CU (J)IPIIRmlKD~aJ1 BlockC
r
10/25/2019
4
s
(pJe~ >fOOJS<)OV\I:J) 6U!JUl:?ld JUaW40!JUa JOJ (ooqweq) .10 6u!1paas OS~ ,10 II?JOl _ .
610l/Sl/01
~il ~illlWWll00£1}) J1DLWJlJ~1JJ Wilf~ff{JJ(f) D(D ...... "'l:ll-""·'-'-'l,;,~
[ID~(J)illiDfEUUdiQ) ID~di \!...ll!...l~
~.
-'
''
The planted trees in block C is found in good healthy condition due to the application of fertilizer on ividual plants and regular maintenance. The regular enrichment and maintenance of trees on Block A-1 and the adjacent rehab areas
...,n\/crtorl to the density of growth of grass and shrubs lead to increase of biomass and good
The health of newly planted trees are good as evidence of vibrant color of the leaves. Again, due to religious maintenance.
There are couple of thousand indigenous harden planted species in the nursery area that are ready plant. The mangroves are found in healthy condition . The nursery is found to be well maintained.
. Planted bamboos on road and on stockyard area are in good condition.
mmendations:
Introduce compost materials to reduce dependency on commercial fertilizer and for soil conditioning. Continue enrichment on the newly planted trees to ensure survival. Continue maintain the introduced grass and other planted trees on temporary re-greening program area. Continue replace some dead mangrove to continue the density of the specie on the planted area. Commence introducing other indigenous specie on the rehab area to assure its diversity. Increase the numbers of planted bamboo by introducing it to the other areas. Continue the best practices of maintenance and enrichment work on all rehab areas to ensure the success of mining forest program.
10/25/2019
9
Citinickel Mines A N O DlV(LOPM(HI COIPO .AJI ON
q,!ranlt 'I""!
10/25/2019
Members of the Tea
1.Roland G.TalabuconPENRO
2. Carlos A.Padrigo-DE CENRO Brookes PT.
3. Aristotle Supe- MAO LGU Espanola
4. Giovanie G. Tinedo-CMDC Representative
5. Nalma A. Asmad-CMDC Representative
Mana{]emenr Syatom ISO 14001:2016
10
I
Citinickel Mines AHO OEVEl0P M £H ! COII P OI!.Af t ON ~::~ ..
....... --.. _ ...
4th Quarter 2019 MMT Monitoring
Air and Water Sampling Group
October 22 & 24,201 9 Toronto Nickel Mining Project
Citinickel Mines A.I'ID OEVElOP.ME,,IJ CO t, O RATIOH ~
..,~,.,m,.. ......... GO 14GO'I:2015o . -IIJ t -IIN
Member
Perlita Quiling PCSDS
Witnessed by: CMDC TNMP Personnel
10/25/ 2019
1
' .
CMOC- TORONTO NICKEL MINING PROJECT
BRGY. BATO-BATO. NARRA, PAlAWAN
TORONTO NICKEL MINING PROJECT AIR SAMPLING ACTIVITY
Station # 1: PUROK 5
10/25/2019
2
Date
Filter No.
Time Started
Initial Weight (g)
Temperature
Initial Flowrate (m•)
Final Flowrate (m•)
Weather Condition
Time Ended
Total Vehicular Count
Remarks
Date
Filter No.
Time Started
Initial Weight (g)
Temperature
Initial Flo wrote (m3}
Final Flowrate (m 3}
Weather Condition -Time Ended
Total Vehicular Count
Remarks
TORONTO NICKEL MINING PROJECT AIR SAMPLING ACTIVITY
Station# 2: ADMIN
: October 22, 20 19
: C01-009
: 12:45 PM
: 0.4123
: 32.00C
: 1.4
: 1.4
: Fair f-t--: 01 :45PM
: 6
: No production activity.
TORONTO NICKEL MINING PROJECT AIR SAMPLING ACTIVITY
Station# 3: CONTROL POINT
: October 22, 2019
: A07-019
: 11:31 AM
: 0.4101
: 32.0°C
: 1.2
: 1.2
: Fair
: 12:31 PM
: 9
: No production acHvlty.
10/25/2019
3
-Filter No.
Time Started
Initial Weight (g)
Temperature
Initial Flowrate {m3)
Final Flowrate (m")
Weather Condition
Time Ended
Total Vehicular Count
Remarks
Dote
Filter No.
Time Started
Initial Weight (g)
Temperature
Initial Flo wrote (m•j
Final Flowrate {m 3}
-Weather Condition
Time Ended
Total Vehicular Count
Remarks
TORONTO NICKEL MINING PROJECT AIR SAMPLING ACTIVITY
Station# 4: CAUSEWAY/PIER
October 22, 2019
: A07-022
: 8:30AM
: 0.4137
: 30.5°C
: 0.5
: 0.5
: Fair
: 9:30AM
: 7
: Noloading actlvHy.
TORONTO NICKEL MINING PROJECT AIR SAMPLING ACTIVITY
Station# 5: MINEPIT
: October 22. 20 19 _1 i ~Ml'JIJIIU
: A07-013 I tm!ll:ll!J -: 2:18PM
: 0.4119
: 32.00C
: 1.0
: 1.2
: Fair
: 3:18PM
: 1
: No production actlvHy.
10/25/2019
4
Date -· Filter No.
Time Started
Initial Weight {g)
Temperature
Initial Flowrate {m')
Final Flowrate {m')
Weather Condition
Time Ended
Total Vehicular Count
Remarks
Da te
Filter No.
Time Started
Initial Weight {g)
Temperature
Initial Flowrate (m•)
Final Flowrate (m 3}
- ----Weather Condition
Time Ended
Total Vehicular Count
Remarks
...
TORONTO NICKEL MINING PROJECT AIR SAMPLING ACTIVITY
Station# 6: KILOMETER 2.5
: October 22, 2019
: A07·019
: 3:36PM
: 0.4112
: 32.0 °C
: 2.1
: 1.5
: Fair
: 4:36PM
: 1
: No production activity.
TORONTO NICKEL MINING PROJECT AIR SAMPLING ACTIVITY
Station # 7: BARANGAY SITE
: October 24, 20 19
: A03·049
: 9:29AM
: 0.4142
: 30.5 °C
: 0.8
: 0.8
: Fair
: 10:36 AM
: 0
: No production and transferring actlvHies.
10/25/2019
5
Date --Filter No.
Time Started
Initial Weight (g)
Temperature
Initial F/owrate (m 3}
Final Flowrate (m3)
Weather Condition
Time Ended
Total Vehicular Count
Remarks
TORONTO NICKEL MINING PROJECT AIR SAMPLING ACTIVITY
Station# 8: SITIO CABULUAN
: 5:00PM
: 0.4034
: 30.1 °C
: 1.0
: 1.0
: Fair
: 6:00PM
: 244
CMOC- TORONTO NICKEL MINING PROJECT
BRGY. BATO-BATO. NARRA. PI>J.AWAJI
10/25/2019
6
TORONTO NICKEL MINING PROJECT WATER SAMPLING ACTIVITY Station# 1: EAST OF CAUSEWAY
TORONTO NICKEL MINING PROJECT WATER SAMPLING ACTIVITY Station # 2: WEST OF CAUSEWAY
10/25/2019
7
TORONTO NICKEL MINING PROJECT WATER SAMPLING ACTIVITY Station # 3: FRONT OF CAUSEWAY
TORONTO NICKEL MINING PROJECT WATER SAMPLING ACTIVITY
Station # 4: PUROK 7 COMMUNAL DAM
10/25/2019
8
Coordinates
Time
Weather Condition
Water Appearance
Temperature, ·c pH
ORP, mv
Conductivity, mS/cm
Turbidity, NTU
DO, mg/L
TDS, giL
Salinity, ppt
SW Specific Gravity, ot
Remarks
Coordinates
Time
Weather Condition
Water Appearance
Temperature, ·c pH
ORP. mv
Conductivity. mS/cm
Turbidity. NTU
DO, mg /L
TDS, giL
Salinity. ppt
SW Specific Gravity, of
Remarks
TORONTO NICKEL MINING PROJECT WATER SAMPLING ACTIVITY
Station# 7: BALITIEN UPSTREAM
: 3:40PM
Fair
Clear
27.56
: 8.58
133
: 0.718
: 0.0
: 6.38
:
:
0.460
0.3
0.0
None
TORONTO NICKEL MINING PROJECT WATER SAMPLING ACTIVITY
Station# 8: COMMUNAL DAM
3:12AM
Fair
Clear
28.68
8.56
122
: 0.586
: 0.0
7.49
0.374
: 0.3
: 0.0
10/25/2019
10
Time
Wea ther Condition
Water Appearance
Tempera ture. ·c pH
ORP, mv
Conductivity, mS/cm
Turbid ity, NTU
DO. mg/L
TDS, g/L
Salinity, ppt
SW Specific Gravity, ot
Remarks
Coordinates
Time
Weather Condition
Water Appearance
Temperature, ·c pH
ORP. mv
Conductivity. mS/cm
Turbidity, NTU
DO. mg/L
TDS, g/L
Salinity, ppt
SW Specific Gravity, ot
1Remarks
:
:
:
TORONTO NICKEL MINING PROJECT WATER SAMPLING ACTIVITY
Station # 9: PINAGDUGUAN UPSTREAM/FALLS
11:37 AM
fair
Clear
29.62
8.55
133
: 0.776
: 0.0
6.30
0.497
0.4
0.0
Presence of people Swimming
TORONTO NICKEL MINING PROJECT WATER SAMPLING ACTIVITY
Station# 10: PINAGDUGUAN DELTA
9:44AM ':"; II ,1-: ..,-.,. ;:, ,,~ .. ;· .. r' .... :;) ·~,-,:l
fair
Clear
: 30.67
: 8.08
146
: 10.2
1.8
6.70
6.31
5.70
0.0 i
low tide I
10/25/2019
11
Coordinates
Time
Weather Condition
Wafer Appearance
Temperature. ·c pH
ORP,mv
Conductivity, mS/cm
Turbidity, NTU
DO, mg/L
TDS, giL
Salinity, ppt
SW Specific Gravity, of
Remarks
Coordinates
Time
Weather Condition
Wafer Appearance
Temperature, ·c
TORONTO NICKEL MINING PROJECT WATER SAMPLING ACTIVITY
Station# 11: ADMIN SILTATION POND
11 :59 AM
Fair
Slightly Turbid
34.12
8.42
157
0.338
9.7
5.66
0.220
0.2
0.0
low discharge during the lime of sampling
TORONTO NICKEL MINING PROJECT WATER SAMPLING ACTIVITY
Station# 12: PIERYARD SILTATION POND
pH NO DISCHARGE I ORP, mv DURING THE TIME Conductivity, mSicm : OF SAMPLING (DRY Turbidity, NTU SEASON).
DO, mg/L
TDS. giL
Salinity, ppt
SW Specific Gravity, of
Remarks
10/25/2019
12
h
,
Citinickel Mines AHD D[VE.\O P MEHI COfiPOlA fi ON ~~1!
.... -~,.,_ ...
Acknowledgement
The sampling team was successfully completed the
Air and Water sampling activities despite limited
no. of MMT representative.
Citinickel Mines loHD CH'<~El0P/04EH1 (QJI,OfiATIO'I ~
... _
.,.., .... IS01400'1::201S
... -IOt'IMI:tl,..,
Recommendation
• Maintain quality of sampling protocol.
• Provide new uniform for MMT sampling team.
• PM-1 0 sampling activity is recommended on the next
sampling activity.
10/ 25/ 2019
13
Other Observation
• During the water sampling activity on October 22, 2019 at Station 4 (Purok 7 Communal Dam), the team observed quarrying activity situated along the
downstream portion of the communal dam (Purok 7); This was also observed during
3rd Quarter 2019 sampling activity. Presence of heavy equipment, movable
crushing machineries, siltation ponds and crushed gravel materials were noted.
• This undertaking may affect the existing water sampling station of the Company at
Pinagduguan Delta (Station 1 0).
Other Observation
Hauling of logs
10/25/2019
14
. '
.,
~ ,
Citinickel Mines (~J 5::. T0VR~ AHO DE VE lO P MEN t C0AP0CAli0N . _...:w.-.,
~--
Maraming Salamat!
Citinickel Mines ~· =..: .. TO~nd
AHD O£V[t0P,_ENT CQI: P 01: A11 0 N , , -.-~ 9-.ntl
4th Quarter 2019 MMT Monitoring
Air and Water Sampling Group
October 23, 201 9 Pulot Nickel Mining Project
10/25/2019
15
4th Quarter MMT Monitoring
October 21-25, 2019 Air and Water Sampling Group
CMDC - Brgy. Punang, Espanola, Palawan
ESPANOLA SAMPLING MEMBERS
Perlita I. Quiling
Hamrin Alip
Jessie G. Galang
Antonio Francisco
PCSDS LGU- Punang
LGU-Interior
LGU-Labog
j
10/25/2019
1
..
Filter No.: A07- 005
Time Started: 1:36 p.m.
Initial Weight : 0.4106
Temperature: 34.7" C
Initial Flow rate,m3: 0.5 Final Flow rate, m3: 0.5 Humidity: 23%
Weather Condition: CLOUDY
Time Ended: 2:36 p.m.
Vehicle pass by: 0
Remarks: On-going hauling operation
Filter No.: A07- 004
Time Started: 2:44p.m.
Initial Weight: 0.4182
Temperature: 30.3 • C
Initial Flow rate,m3: 0.5
Final Flow rat e, m3: 0.5
Humidity: 23%
Weather Condition: CLOUDY
Time Ended: 3:44p.m .
Vehicle pass by: 56
Remarks: On-going hauling operation
10/ 25/ 2019
Station 1: MARIBONG BASKETBALL COURT
Station 2: OLD ADMIN BUB.DING
2
Filter No.: A07- 003
Time Started: 3:52p.m.
Initial Weight: 0.4146
Temperature: 31.9 o C
Initial Flow rate,m3:1.4 Final Flow rate, m3: 1.4
Humidity: 31%
Weather Condition: CLOUDY
Time Ended: 4:52p.m.
Vehicle pass by: 33
Remarks: On-going hauling operation
Filter No.: A07- 002
Time Started: 5:02p.m.
Initial Weight: 0.4138
Temperature: 32.1 o C
In itial Flow rate,m3: .8
Final Flow rate, m3: .9
Humidity: 45%
Weather Condition: Cloudy
Time Ended: 6:02a.m.
Veh icle pass by: 25
10/25/2019
Station 3: MIKE. Y ALDEZ
Station 4: SINGKAB
3
Filter No.: A07- 006
Time Started: 11:20 a.m.
Init ial Weight: 0.4076
Temperature: 35.7° C
Initial Flow rate,m3 : .8
Final Flow rate, m3: .8
Humidity: 29%
Weather Condition: Cloudy
Time Ended: 12:20 p.m.
Vehicle pass by: 126
Filter No.: A07- 050
Time Started: 10:05 a.m.
Init ial Weight: 0.4112
Temperature: 34.2° C
Init ial Flow rate,m3: .5
Final Flow rate, m3: .5
Humidity: 32%
Weather Condition: CLOUDY
Time Ended: 11:05 a.m.
Vehicle pass by: 20
Station 5: IDGHYIAY CR~G
Station 6: lf"MARt:A
m~~11l'll@=t;-ull?: :;:·rr:--~"""',br:;, u
10/25/2019
4
Filter No.: A07- 007
Time Started: 8:50a.m.
Initial Weight: 0.4140
Temperature: 30.6° C
Initia l Flow rate,m3: .5
Final Flow rate, m3: .5
Humidity: 55%
Weather Condition: CLOUDY
Time Ended: 9:50a.m.
Vehicle pass by: 2
Station 7: CAUSEYIAY SAMPUN6 Sf AND
4th Quarter MMT Monitoring
Water Sampling Group CMDC- Brgy. Punang, Espanola, Palawan
10/25/2019
5
PULOT NICKEL MINING PROJECT _____ ----,W.ATER SAMPLING
Observations
Coordinates: 9.0'26" N, 118.4'25"E
Time: 9:03 AM Weather Condition: J Water Appearance: Clear Temperature, ·c: 30.53 pH: 8.13 ORP, mv: 163 Conductivity, mS/cm: 43.7 Turbidity, NTU: 14.6 DO, mg/L: 5.14 TDS, g/L: 26.3 Salinity, ppt: 28.1 SW specific gravity, ot: 16.6
PULOT NICKEL MINING PROJECT WATER SAMPLING
Station# 2: Front of Causeway .-------------------~
Observations
Coordinates: 9.0'19" N, 118.4'18"E
Time: 9:07AM Weather Condition: Water Appearance: Clear Other Observation: Temperature, ·c: 30.59 pH: 8.29 ORP, mv: 148 Conductivity, mS/cm: 35 Turbidity, NTU: 16.3
DO, mg/L: 5.15 TDS, g/L: 21.4 Salinity, ppt: 22 SW specific gravity, ot: 12
10/25/2019
6
PULOT NICKEL MINING PROJECT WATER SAMPLING
Observations
Coordinates: 9' 0'21" N, 118' 4'12"E
Time: 9:10AM Weather Condition: ' Water Appearance: Clear Temperature, ·c: 30.16 pH: 8.31 ORP, mv: 152 Conductivity, mS/cm: 30 Turbidity, NTU: 19.4 DO, mg/L: 5.65 TDS, g/L: 17 Salinity, ppt: 18.4 SW specific gravity, ot: 9.5
Station # 3: West of
PULOT NICKEL MINING PROJECT WATER SAMPLING
Observations
Coordinates: 9'0'43" N, 118' 4' 9" E
Time: 11:22 AM Weather Condition: Water Appearance: Clear Other Observation: Temperature, ·c: 28.65 pH: 8.24 ORP, mv: 204 Conductivity, mS/cm: 4.91 Turbidity, NTU: 5.2 DO, mg/L: 5.97 TDS, g/L: 8.88 Salinity, ppt: 2.6 SW specific gravity, ot: 0.0
Station # 4: Pulot River Delta
10/25/2019
7
PULOT NICKEL MINING PROJECT WATER SAMPLING
Observations
Coordinates: 8'55'45" N, 118'0'43"E Time: 10:46 AM Weather Condition: Water Appearance: Clear Other Observation: Temperature, ' C: 28.61 pH: 8.72 ORP, mv: 184 Conductivity, mS/cm: 6.282 Turbidity, NTU: 2.6 DO, mg/L: 6.96 TDS, g/L: 0.184 Salinity, ppt: 0.1 SW specific gravity, ot: 0.0
PULOT NICKEL MINING PROJECT WATER SAMPLING
Observations
Coordinates: 9' 4'0" N, 117' 56'59"E
Time: 1:08 PM Weather Condition: Water Appearance: Clear Other Observation: Carabao Close to Sampling area. Temperature, ·c: 28.69
pH: 8.39 ORP, mv: 187 Conductivity, mS/cm: 0.271 Turbidity, NTU: 1.8 DO, mg/L: 6.56
TDS, g/L: 1.76 Salinity, ppt: 0.1 SW specific gravity, ot: 0.0
Station # 6: Maribong Spillway
10/25/2019
8
PULOT NICKEL MINING PROJECT WATER SAMPLING
Observations Coordinates: a·ss'46" N, us·o'40"E Time: 1:11 PM
Weather Condition: Water Appearance: Clear Other Observation: Presence of livestock was observed (carabao) Temperature, ·c: 30.2
pH: 8.68 ORP, mv: 1.77 Conductivity, mS/cm: 0.376 Turbidity, NTU: 0.0 DO, mg/L: 5.16 TDS, g/L: 0.245 Salinity, ppt: 0.2
SW specific gravity, ot: 0.0
PULOT NICKEL MINING PROJECT WATER SAMPLING
Observations
coordinates: s ·ss'46" N,us·o'40"E
Time: 1:56 PM Weather Condition: Water Appearance: Clear Temperature, ·c: 30.13 pH: 8.57 ORP, mv: 160 Conductivity, mS/cm: 0.315 Turbidity, NTU: 0.0
DO, mg/L: 5.06 TDS, g/L: 0.205 Salinity, ppt: 0.1 SW specific gravity, ot: 0.0
Station # 8: Confluence of 6&7
10/25/2019
9
Observations
PULOT NICKEL MINING PROJECT WATER SAMPLING
Coordinates: s·ss'46H N,us·o'40''E
Time: 12:50 PM Weather Condition : Water Appearance: Temperature, ·c: 30.8 pH: 8.71 ORP, mv: 151 Conductivity, mS/cm: 0.408 Turbidity, NTU: 0.3 DO, mg/L: 6.34 TDS, g/L: 0.265 Salinity, ppt: 0.2 SW specific gravity, ot: 0.0
PULOT NICKEL MINING PROJECT WATER SAMPLING
No discharge
10/25/2019
10
PULOT NICKEL MINING PROJECT WATER SAMPLING
Effluent: Siltation Pond # 1
No Discharge
No Discharge
PULOT NICKEL MINING PROJECT WATER SAMPLING
Effluent : Siltation Pond # 3
10/25/2019
11
PULOT NICKEL MINING PROJECT WATER SAMPLING
Effluent: Thgusao Siltation Pond
No Discharge
Recommendation ~ Please Provide a larger
boat during MMTwater sampling.
~ Maintain the Quality of sampling protocol.
10/25/2019
12
PALAWAN COUNCIL FOR SUSTAINABLE DEVELOPMENT STAFF Puerto Princesa City
SEP Clearance Compliance Monitoring Report 4th Quarter of 2019 October 21-25,2019
1.0 Project Information
Name ofProject : Palawan Nickel Mining Project Type of Project Mining/Mineral Development Name of Proponent/ Olympic Mines and Development Authorized Representative Corporation represented by Ms. Caroline
Tanchay, President, CITINICKEL Mines and Development Corporation
Mailing Address, Contact Suite 202, State Condominium IV, Number Ortigas Avenue, San Juan, Metro Manila Project Location/Area of Operation
,. Municipality, Barangay, Barangay San Isidro, Narra, Palawan Sitio
~ Geographic coordinates (Lat/long)
Project Area (hectares/sq.km.) 367.30 hectares SEP Clearance or Certificate of PCSD Accreditation:
:r Clearance/ Accreditation MEP-032406-008 No
}1- Date Issued February 26,2010 }1- Validity (if applicable)
2.0 Results of Monitoring
2.1 Monitoring on Compliance to the Strategic Environmental Plan
SEP Clearance Status of Remarks Terms & Conditions Compliance/
Accomplish ments
I
1. Submit the required FPIC FPIC documents submitted prior to release Certificate from the NCIP Complied of SEP Clearance prior to the release of this Clearance.
2. Ensure that regulated - Existing land use mining activities shall be (Attached Below) confined within the approved area of 367.30 hectares. 3. Conduct ground Complied Comers of boundaries were determined and delineation and properly mark mark the allowed area. 4. Strictly comply with the EPEP Accomplishment report
stipulated mitigating Mines safety accomplishment report
measures as stipulated in the CMVR (ECC compliance)
Environmental Impact SDMP report
Statement (EIS). 5. Ensure that the best Complied Mitigating measures were established and available appropriate anti- rehabilitation of mined out areas were pollution technology and observed facilities to protect the (}_7>EP Accomplishment report)
environment and to restore or rehabilitate mined-out areas and affected by mine waste/tailings and other
I forms of pollution. 6. Institute all measures to Complied PPE compliance and warning signs were '
I
ensure the protection and observed safety of the workers as (Mines safety accomplishment report )
well as general public such as installation of warning signs at strategic location in the facility and etc. 7. Give priority to qualified Complied local residents in hiring Manpower Distribution Number %
project statl/personnel. San lsidro/Bato-Bato, Narra, Pafawan 66 34.55%
Cafategas, Narra, Palawan 9 4.71% Princess Urduja, Narra, Palawan 15 7.85%
Aramaywan,Narra,Palawan 10 5.24% Batang-Batang, Narra, Pafawan 8 4.19%
Teresa, Narra, Palawan 15 7.85%
Malinao,Narra, Palawan 3 1.57% - --.
Panacan,Narra,Palawan 1 0.52%
~oblaci()f'l ,Narra, Palawan _ ___10 - _2._24%
Antipuluan, Narra, Palawan 3 1.57%
Elvita,Narra,Palawan 1 0 .52%
Taritien, Narra, Palawan 1 0.52%
Puerto Princesa City 7 3.66%
Quezon, Palawan 3 1.57%
Sofronio, Espanola, Palawan 2 1.05%
Brooke's Point, Palawan 2 1.05%
Bataraza, Palawan 2 1.05%
Roxas, Palawan 1 0.52%
Other Provinces (Managers, Skilled Workers-Auto
32 Electrician, Welders, Mechanics, Fitters etc.) 16.75%
Total 191 100.00%
Narra 142 74.35% I
Palawan 17 8.90% Outside Palawan 32 16.75%
8. Ensure that waste materials during operation shall be properly disposed. Waste segregation being practiced and no No burning of such shall be Complied burning of waste was observed done as this may cause forest and grass t1res on the adjacent areas. 9. Secure permits/clearances Permits and clearances were secure prior to from other concerned Complied mining operation agencies prior to implementation. 10. Subject any expansion Currently the company operates within the of the project to a separate approved SEP clearance SEP Clearance. 11. Should the implementation of the
. project cause adverse • environmental impact and pose nuisance to public health and safety as determined by PCSDS, these factors shall be sufficient ground for the cancellation or suspension of this clearance.
----- --
12. The herein grantee shall The company, currently provides assume fu11 responsibility compensation on alleged loss crop of and liability for damages to Complied farmers ofBrgy. Bato-Bato allegedly private and public affected by mining operation. properties caused by the project.
13. In case there is a need for additional conditions in this clearance after monitoring/inspection, the same shall be imposed by
!
PCSDS. 14. PCSDS PCSD staff representatives are members of officials/personnel shall Complied DENR-MGBIVB led MJviT regularly conduct monitoring/inspection. 15. This Clearance is an amendment of the SEP Clearance issued on November 25, 2006.
3.0 Area Status
DESCRIPTION AREA (hectares)
Total area issued with SEP 367.30 Has. Clearance
Disturbed or opened up 58.83 (16.01 %)
- Active mining area 5.22
- In active 10.02
- Rehabilitated 24.95 (42.41%)
- On-going rehabilitation 1.05
- Mine out (idle) 8.56
- Ancillary service area 9.03
Untouched 308.47 (83.98%)
Note: for rehabilitated includes temporary rehabilitationprogram of(l.05hm,)
Certified as tQ.. correctness of the foregoing report:
PERL~LING PCSDS
Confirmed by MMT Me"'!lrs _
ENGR.MON/CA '*~NGOZA OICTEAMLE~
TE ,j~~. BATUL
~PDOV
OBSERVATIONS & RECOMMENDATIONS
2. Consider the use of biodegradable potting materials in nursery operation that may be regarded as best practice in the revegetation/rehabilitation works of the company.
OBSERVATIONS & RECOMMENDATIONS
3. There is a need to improve the design of the bench terrace structures to prevent the occurrence of gullies where water could flow that would eventually cause slope erosion as the planted trees (stage of early growth) are still unable to hold the soils together (Narra) .
PALAWAN COUNCIL FOR SUSTAINABLE DEVELOPMENT STAFF Puerto Princesa City
SEP Clearance Compliance Monitoring Report Jrd Quarter 2019
21-25 October 2019
1.0 Project Information
Name of Project : Palawan Nickel Mining Project Type ofProject Mining/Mineral Development Name of Proponent/ Olympic Mines and Development Authorized Representative Corporation represented by Ms. Caroline
Tanchay, President, CITINICKEL Mines and Development Corporation
Mailing Address, Contact Suite 202, State Condominium IV, Number Ortigas A venue, San Juan, Metro Manila Project Location/Area of Operation
).- Municipality, Barangay, Barangays Pulot Interior and Punang, Sitio Sofronio Espanola, Palawan
}> Geographic coordinates (Lat/long)
Project Area (hectares/sq.km.) 1,238.88 hectares SEP Clearance or Certificate of PCSD Accreditation:
}> Clearance/ Accreditation MEP-032406-007 No
;.. Date Issued : February 26,2010 ~ Validity (if applicable)
2.0 Results of Monitoring
2.1 Monitoring on Compliance to the Strategic Environmental Plan - ------ -- --- r
SEP Clearance Status of Remarks Terms & Conditions Compliance
I Accomplish
ments 1. Submit the required FPIC Complied FPIC documents submitted prior to Certificate from the NCIP prior release of SEP Clearance to the release of this Clearance. 2. Ensure that regulated mining Complied (Attached below for Land use update)
activities shall be confmed within the approved area of 1,238.88 hectares. 3. Conduct ground delineation Complied Comers of boundaries were and properly mark the allowed determined and marked area. 4. Strictly comply with the Complied EP EP Accomplishment report
stipulated mitigating measures Mines safety accomplishment report
as stipulated in the C"'MVR (ECC compliance)
Environmental Impact SDMP reports
Statement (EIS). 5. Ensure that the best available Complied Mitigating measures were established appropriate anti-pollution and rehabilitation of mined out areas teclmology and facilities to were observed protect the environment and to (EPEP Accomplishment report)
restore or rehabilitate mined-out areas and affected by mine waste/tailings and other forms of pollution. 6. Institute all measures to Complied ensure the protection and safety (Mines safety accomplishment report)
of the workers as well as general public such as installation of warning signs at strategic location in the facility,etc. 7. Give priority to qualified Complied Manpower Distribution Total % local residents in hiring project - Punang, SE 31 36 staff/personnel. - Pulot Interior , SE 16 18.6
- Pulot Center , SE 1.2 13.9 - Pulot Shore 3 3.4
I - Iraray 3 3.4
I
Panitian 1 1.2 -- Is umbo 2 2.3 - Labog, SE 10 11.6 - Narra 1 1.2 - Puerto Princesa City 2 2.3 - Brookes Point 1 1.2 - Outside Palawan 4 4.6
TOTAL 86 100
S Espanola 78(90.7%) Palawan 82(95%)
Outside Palawan 4(3.4%) 8. Ensure that waste materials Complied Waste segregation being practice and during operation shall be no burning policy is being practice properly disposed. No burning of such shall be done as this may cause forest and grass fires on the adjacent areas. 9. Secure permits/clearances Complied Permits and clearances were secure from other concerned agencies prior to mining operation prior to implementation. 10. Subject any expansion of None the project to a separate SEP Clearance. 11. Should the implementation None of the project cause adverse environmental impact and pose nuisance to public health and safety as determined by PCSDS, these factors shall be sufficient ground for the cancellation or suspension of this clearance. 12. The herein grantee shall None assume full responsibility and liability for damages to private and public properties caused by the project. 13. In case there is a need for None additional conditions in this clearance after monitoring/inspection, the same shall be imposed by PCSDS.
! 14. PCSDS officials/personnel Complied PCSD staff is represented in the I
DENRledMMT shall regularly conduct monitoring/inspection. 15. This Clearance is an Noted amendment of the SEP Clearance issued on November 25, 2006.
OBSERVATIONS & RECOMMENDATIONS
1. Secure SEP Clearance for the Special Tree Cutting Permit in Block A (Narra).lf not included in the component of SEP Clearance issued
3.0 Area Status DESCRIPTION AREA (hectares)
Total area issued witll SEP Clearance 1,238.88
• Disturbed or opened up 102.78 (8.30%)
- Active mining area 15.25
-Rehabilitated 16.2 (15. 76%)
- On-going rehabilitation 14.81
- Ancillary service area 27.75
• Untouched 1,136.1(91. 70%) -----
Note: Map should be available
4.0 OBSERVATIONS
1. Regular sprinkling to prevent dust emission
Prepared-by:
PE~ILING Laboratory Analyst
CONCURRED BY MMT Members
ENGR.MON/1 I
.AVENGOZA 0/C-TEAMLE
;z~~uz
'JR.
Monitoring and Evaluation of Industrial Establishment as Mandated by PO 856 I Sanitation Code of the Philippines
{lmplementingRules and Regulation Chapter VII- Industrial Hygiene)
DATE: October 23, 2019
1- Company Profile:
Name of Establishment : Citinickel Mines and Development Corp. Barangay San Isidro, Narra Palawan Address
Owner/Manager Sanitary Permit Date Issued
Engr. Jainal M. Uy, Jr, Resident Mine Manager 1180 April 26, 2019
11-No. ofWorkers (2"dQuarter 2019 as of September 30, 2019)
Area Male Female Shift 1 Shift 2 Shift 3 Production 267 0 267 Non -Production 18 24 42
TOTAL Ill-Sanitation Standards/Requirements a. Duties and Health and Safety Standards/Requirements Compliance Responsibilities YES NO 1.EMPLOYER
A. Provide installs and maintains in good condition all control facilit ies and protective barriers for potential and actual hazards.
1
B. Informs all affected employees regarding the nature of the hazards and the reasons for the control measures and :1. protective equipment as provided under Rule V Section 3
C. Makes periodic Testing for Hearing capacity, visua l acuity, and other health examinations as related to works exposure to potential o r actual hazards in the workplace as enumerated in Rule V section 2
..J
D. Provides control measures to reduce noise, dust, heat and :1. other hazards as enumerat ed to Ru les V Section 2.
Total 267
42 309
Remarks
Regular maintenance and provided control
faci lities like siltation ponds,
grease trap, oil & water separator and conduct ed
monthly inspection of
machine guarding. Informed
employees through safet y orientation and
toolbox talk. Conducted regular
1
employees health I
monitoring (Blood pressure/sugar),
bi-monthly consultation
conducted last July
06, 2019 and monthly
monitoring such as noise and
illumination Regularly
conducted road wat er sprinkling, and issuance of
earp lug/ ear muff for hearing
protection.
E. Provides adequate and appropriate personal protective Procured and equipment free of charge, w hen considered necessary in ::1. issued PPE to accordance to Rule V Section 3. employees.
: Safety Inspector
I conducted regu lar
F. Ensures strict compliance on the regular use and proper working area
::1. inspection,
I maintenance of Personal Protective Equipment (PPE) .
issuance of PPEs and replacement of worn out PPEs.
I The CMDC, Safety
G. Provides his employees occupational health services and and health office
I facilities in accordance with the provision under Rule V Section ::1. established cl inic
4. and 9 first aid kit
station.
I H. Creates and supports the activities/programs of the Submitted 2019
-.} Annual Safety and company's health and safety committee.
Health Program.
I Submitted MGAR including
I. Submit yearly reports required by the Department or Local ::1.
Morbidity, Blood
I Health Authority. ( NCDCS/OH/IH FORM Il l). pressure /Blood sugar monitoring report in M HO.
j 2.EMPLOYEE A. Strict ly observe and practice the use of personal protective Inspectors daily
equipment and other control measures in accordance with the -.}
provision of Ru le V Section 3. inspection
I B. Observe the proper use and maintenance of equipment Issuance of provided to them by their by employers. replacement for
::1. worn out PPEs.
I Daily inspection conducted by
I safety inspector
Reporting of near misses, improvement of
C. Report potential health haza rds present in t he working ::1.
concerns facility
environment to company's health and safety committee. and participation to CSHEC meeting, toolbox talk, and CSHEC inspection.
E. All employees shall undergo the fol lowing health examination.
1. Pre-employment Examination ::1.
2. Annua l Periodic Examination Conducted Annual Physical
-..} Examination last March 14 -16,
2019.
3. Return to Work Medical Examination :}_ As need arises. 4. Transfer Examination i As need arises.
5. Separation Examination ::!. As need arises. 6. Special Medical Examination :}_ As need arises.
3.SAFETY AND A. Plans and develops health maintenance and accident
Submitted 2019 HEALTH ::!. Annual Safety and COMMITIEE
prevention programs for the establishment. Health Program.
B. Implements the health maintenance and accident prevention Submitted 2019 programs in accordance with the set government rules and ::!. Annual Safety and regulat ions. Health Program.
Submitted MGAR
I including the C. Conducts regular safety meetings
::!. minutes of the
meeting such as
I CSHEC and Toolbox meeting.
D. Reviews reports of inspection, accident and illness Bi-monthly
I investigations and implementation of program. ::!.
accompl ishment, MGAR, and CSHEC
meeting
I E.Submit progress report to manager/employer on the quarterly Bi-monthly basis. ..j accomplishment
report
I G. Initiate and supervises health and safety trainings for Submitted 2019 employees. Annual Safety and
Health Program
I ..J and Bi-monthly
accomplishment
I report
H. Develops and maintains a disaster contingency plan and
I organizes such emergency services units as may be necessary to
Submitted 2019 handle disaster situations pursuant to the emergency
::!. Annual Safety and preparedness manual for establishment of the office of Civil
Health Program
I Defense.
I I. Furnishes the Department or the Local Hea lth Authority, copy Submitted MGAR
including of the illness Investigation Reports ::!. Morbidity report
I in MHO
B. Permit and A. Prior to operation, all industrial establishments shall obtain a Secured Sanitary
Licenses sanitary permit from the Local Health Authority or Duly ::!.
I authorized representative. Permit
::!. Renewed Sanitary
I B. The renewal of Sanitary Permit shall be filed and done on or Permit last Apri l before the 20th day of January of the current year 26,2019
I C.SANITATION FACILITY
L.A. Water 1. An adequate potable water supply approved as to source and )upply. An dist ributed by the Department shall be provided in all places ::!. I adequate potable of employment.
water supply 2. Standard drinking water facilities ready accessible to all On-going shall be provided employees and approved type of drinking water facilities shall to all employees. be provided to all employees in the ration of one (1) facility for ::!.
every fifty (50) employees.
3. Where a local or city waterworks system exists, the industrial establishment shall utilize water from the system or from its No local
I own water supply that comp lies with the IRR of Chapter ll(water ::!. waterworks and
Supply) of PD. 856 and the prescribe water quality standards of the legality of the
the Phi lippine National Standard for Drinking Water (PNSDW) water system of
I In-house is on an ongoing process
I B. SEWERAGE SYSTEM. Sewage
1. All establishments covered by the system shall be connected to the sewer inareas where a sewerage system is available ::!.
works and [ treatment plants 2. Completely treated effluent if conforming to the quality
standards prescribed by the Environmental Management shall comply with ..j the following Bureau = Department of Environmental and Natural Resources -
I requirements (EMB -DENR) may be discharged into body of water. I
3. Storm water shall be discharged to a storm sewer;only
I sanitary sewage shall be discharge to a sewerage system; but ..j
this should not prevent the insta llation of a combined system.
4. Properly designed grease traps shall be installed in
I estab lishments where the sewage carries a large amount of ::!. grease as determined and approved by EMB-DENR.
C. SEPTIC Tank- 1. It shall be generally rectangular in shape. When a number of
1 Where a public compartments are used, the first compartment shall have the ::!. sewerage system capacity from one-half (1/2) to two-thirds (2/3) of the total
is not available, volume of the tank and shall be water -tight.
I sewer outfalls 2. It shall be built of concrete, either pre-cast or poured-in-from industrial place. Bricks and concrete blocks may be used provided in ::!. establishments conforms to Rule V, Section 1c (1) of the IRR.
1 shall be discharged into a septic tank to be 3. It shall not be constructed under any building and within 25
::!. I constructed in meters from any source of water supply.
accordance with
D. Disposal of The company has
j Septic Tank The effluent from septic tank shall be discharged into
an approved Effluent
sludge disposal subsurface soil, absorption field where applicable or shall be
management plan
I treated with some type of purification device. The treated ::!. that conforms to
effluent may be discharged into a stream or body of water if it the DENR- EMB in
conforms to the quality standards prescribe by the compliance with
I (EMB_DENR). the discharge
permit conditions.
I 1. All toxic and hazardous wastes including nuclear wastes incident to the operation of the industrial plant shall be
I collected, stored or disposed of in a manner that will prevent ::!. health hazards, nuisance and pollution in accordance with the
i guidelines set by DENR_DAO 29 (RA6969).
2. All industrial establishments discharging toxic wastes shall submit a copy of the method of treatment approved and
:}_ certified by the EMB-DENR to the Department or its duly authorized representatives.
I The air quality within the workplace shall be in accordance with the Threshold Limit Values for Hazards as adopted by the
i Department from the American Conference of Governmental " Industrial Hygienists- Threshold Values {ACGIH-TLVs).
I G. Abatement Program for On-going
Vermin Control 1 A vermin abatement program shall be maintained in places by good housekeeping their owners, operators or administrators. and proper
I The procedure and frequency of vermin abatement program :}_ maintenance, Pest shall be determined and approved by the Municipal Health control treatment Officer/City Health Officer. conducted last July
I 7, 2019
H. Toilet Facilities
I 1. Adequate and suitable toilet and bath facilities for both male and female employees at the following ration a. Where the number of female employees exceeds one
" I hundred {100) , one (1) toilet for every twenty (20) female employees up to the first one hundred(100) and one(1) for every thirty {30) thereafter
L I b. Where the number of male employees exceeds one hundred
(100) one(1) toilet for every twenty five (25) males up to the :}_
I first one hundred (100) and one(1) more for every forty (40) thereafter c. Where the number of males employed exceed five
I hundred(500) , it is sufficient to provide one(1) toilet for every " sixty(s,60) male d. In addition, male workers shall be provided with sufficient
I urinals in the same ratio with toilet bowl in accordance with :}_
Ru le V, Section 1H (1)b and c. 2. Adequate Restrooms and mess halls shall be provided for the
I employees at the following ratio a. Where ten(10) or more workers are employed at any one :}_
time, at least one(1) restroom for each sex for their exclusive
I use shall be provided.
b. Where less than ten (10) workers are employed and a
I restroom is not available, an equivalent space shall be provided Not applicable
which can be properly screened and made suitable for such use.
I 3. Dining facilities/mess halls shall be provided where there are ten(10) or more workers in an establishment. The recommended space requirement for four(4) workers is 10.80 :}_
I sq. m., and for each additional employee, the minimum addition shall be at 0.90 sq. m.
I 4. A separate bathing/washing facility for each sex shall be provided in the ratio of one bathing/washing facility for every
:}_ : twenty five (25) employees up to the first one hundred(1oo) I
I and one more for every forty (40) thereafter.
I
I ENVIRONMENTAL RAW MATERIALS/CHEMICALS USED
I CONTROL and NICKEL ORE 1 Monitoring
j BY PRODUCTS NONE
I PROCESSES/0 PERATION CONTOUR MINING
L (EXCAVATION and HAULING)
! ENGIN EERING CONTROL MEASURES INSTALLED 1. Bottoms and Siltation Ponds
I 2. Oil and Water Separator 3. Liquid Containment in Fuel Depot 4. Machine Guarding OR Cover
L
[ A. PHYSICAL 1 NOISE ;}_ HAZARDS
2. VIBRATION ;}_
I 3. HEAT AND COLD STRESS " 4. ILLUMINATION :J.
l 5. RADIATION ..; 6. GENERAL VENTILLATION ;}_
! 7.LOCAL EXHAUST VENTILLATION j_ 1 B. CHEMICAL l.Materia l Safety Data Sheet (MSDS) shall be provided by
HAZARD manufacturers/distribution/suppliers and shall be made ;}_
I avai lable to agencies/workers upon requ est
2. Isolation /enclose/interposing of a barrier between a hazard
I and those who might be affected by the hazard shall be applied ;}_
3. Proper ventilation and lighting of the hazardous area/s shall
" I be provided.
I c. BIOLOGICAL HAZARD Control measures shall be provided to eliminate or control the
transmission of infectious diseases through processing or ;}_
handling of industrial products or waste I I
D. ERGONOMICS All work procedures shall be in such a manner that it will not
I produce undue stress to the musculo-skeletal system of ;}_
workers.
Provision of A.Personal protective equipment (PPE) shall be used whenever I Complete and engineering and administrative control measures are not
" appropriate PPE feasible or insufficient/inadequate as specified in Rule V, Section 2.
I I B. Personal protective equipment and/or protective barrier shall
be provided whenever necessary by reason of the hazardous
I nature of the process or environment, chemical, or radiological or other mechanical irritants or hazards capable of causing
" injury or impairment in the functions of any part of the body
I through absorption, inhalation or physical contact.
-
C. All personal protective equipment shalf be of the Issued appropriate Department's approved design and construction appropriate for ;!_ PPE for the exposure and the work to be performed. employees.
D. No person shall be subjected for exposed to hazardous
environment condition without protection. :1 I
I E. List of personal protective equipment recommended for use
..J
I and shall be fitted to each exposed worker whenever necessary.
1. EYE and FACE PROTECTION ::!.
2. RESPIRATORY PROTECTION ::!.
I 3. HEAD PROTECTION ::1.
4. HAIR PROTECTION ::!.
5. HAND and ARM PROTECTION ::!.
I 6. HEARING PROTECTION ::!.
7. SAFETY BELTS LIFE LINES and SAFETY NETS ::!. 8. USE OF SAFETY SHOES ::!.
I SECTION 4. EMERGENCY HEALTH SERVICES OCCUPATIONAL 1. MEDICINES and FACILITIES HEALTH SERVICES A. Every employer covered by IRR shall keep in his workplace at Regular
I least the minimum quantity of emergency and essential maintenance of medicines, medical supplies and equipment and medical emergency facilities listed in table 3a on medicines, supplies and facilities, ..J equipment and
I for the use of the workers employed in the procurement of
establishment/undertaking. medicines, and first aid kit.
I I B. The medicines, medical supplies and facil ities prescribed in
table 3a shall be kept inside the treatment room/medical clinic Procured
I required under Rule V Section 4 E(l) and shall be replaced with :1 medicines. the same qualityimmediately after use or consumption.
I MEDICAL AND DENTAL SERVICES (SEE TABLE 3B FOR THE REQUIRED HEALTH PERSONNEL) Health Personnel i
L Physician (s) I Dentist (s)
Nurse (s) ..J
l First Aider (s) :1 I Health Facilities
First Aider /Treatment room ::!.
I Clinic ::1. I Dental Clinic
Ambulance/Transport Facilities ..J
I Hospital
'
I On-going process
3. EMERGENCY HOSPITAL of Memorandum
\ The employer shall enter into contract with the hospital and :1 of Agreement with
/_._ dental clinic for the use of such hospital/clinic in the treatment the Adventist
of workers in case of emergency Hospital of Palawan.
~~- - -------
4. HEALTH PROGRAMS
5. REPORTS SUBMITIED TO LOCAL HEALTH AUTHORITY
Annual Medical Report Form Annual Work Accident/Illness Exposure Data Report
Annual Employees Work Accident/Illness Report Report on Health and Safety Committee
I Employees Medical Profile
I Community Community health Profile {Baseline Prior to Operation, to be Healt h Profile updated every five year)
I Baseline Data (Prior to Operation) To be updated every 5 years
I
I Food Sanitation Conform with the food safety standard as mandated in PO 856 and existing Rule and Regulation
RATING: EXCELLENT
Prepared by WILLIAM SARAGCON
ANNEXES
nta· ::,anitJtlo 1 Ur1t ~ea
rv:Mr IV ... MBE R (Aiternat('
CARLO D. JAVAREZ Mining/Safety Engineer CMDC-TNMP
1. Duties and Responsibilities (Employer)
Submitted 2019 ,j Annual Safety and
Health Program.
,j ,j ,j ,j
:1.
,j
:1.
:1.
A. Provide installs and maintains in good condition all control facilities and protective barriers for potential and actual hazards.
A.l All pit bottoms and siltation ponds are stable.
i
!
B. Informs all affected employees regarding the nature of the hazards and the reasons for the control measures and protective equipment as provided under Rule V Section 3.
B.1 All newly employees shall undergo safety orientation to inform the nature of the hazards, work instructions,the use of protective equipment and mine safety rules and regulations.
SAFETY ORIENTATION
C. Makes periodic Testing for Hearing capacity, visual acuity, and other health examinations as related to works ~xposure to potential or actual hazards in the workplace as enumerated in Rule V section 2.
C.lMonthly Health Monitoring for employees BLOOD PRESSURE MONITORING
81- MONTHLY CONSULTATION
ILLUMINATION MONITORING
"
~
"
D. Provides control measures to reduce noise, dust, heat and other hazards as enumerated to Rules V Section 2.
0 .1 Water sprinkling and Road maintenance
D. 2 Noise Monitoring I !1 I 52
E. Provides adequate and appropriate personal protective equipment free of charge, when considered necessary in accordance to Rule V Section 3.
E.l Procurement of Personal Protective Equipment
F. Ensures strict compliance on the regular use and proper maintenance of Personal Protective Equipment (PPE) F.l Safety Inspector regularly conducted daily inspection in all active areas.
. - -·.~
G. Provides his employees occupational health services and facilities in accordance with the provision under Rule V Section 4.
Gl. Established and maintained company clinic and first aid kit station.
2. Duties and Responsibilities (Employee) A. Strictly observe and practice the use of personal protective equipment and other control measures in accordance with the provision of Rule V Section 3.
A.lall employees observed wearing of PPE on identified areas.
3. HEALTH AND SAFETY COMMITTEE A. Plans and develops health maintenance and accident prevention programs for the establishment.
Safety and Health Program was evaluated and approved by MGB.
A.l Created and submitted and Annual Safety and Health Program and Emergency Response and Preparedness
Program for 2019.
I'RO(;f~Al\1
21119
C. Conducts regular safety meetings.
TOOLBOX MEETING
GENERAL TOOLBOX MEETING
Me..-.. .. .,,......, ........ ._ ..... ...................... ......... ~..., .. Ct" _____ ...., __ ....__.......,...., ..... --... ........................... .., ............ llillllllll:\"""- .. ....., ....... .... .......... ........, .... ~ ... . ~..., ....... ........_.,e-.. ... -.. .... .. ............. £1......._ ............ .... ....... ca..,; .. ..,........._ ................... . .......... ........................ ~---~-.a-... ..-. ...................
,.... ... ~~
- -··----J.!!!IL!.fl IIIII --.-
CENTRAL SAFETY, HEALTH AND ENVIRONMENT COMMITIEE (CSHEC) MEETING
B. Permit and Licenses
Business Permit
D. Disposal of Septic Tank Effluent
tlOrn:Jntlt'll:'lOOOOO
Sanitary Permit
0 0 0 0 0 c c 0
1. All toxic and hazardous wastes including nuclear wastes incident to the operation of the industrial plant shall be
collected, stored or disposed of in a manner that will prevent health hazards, nuisance and pollution in accordance with
the guidelines set by DENR_DAO 29 (RA6969).
CMDC has established Hazwaste Facilities for storage of used oils and filters contaminated with oil. Safety and
Environment personnel daily inspect the facilities to ensure that no oil spillage will occur.
The air quality within the workplace shall be in accordance with the Threshold limit Values for Hazards as adopted by
the Department from the American Conference of Governmental Industrial Hygienists- Threshold Values (ACGIH-TLVs).
The company regularly conducted road watering for dust suppression and conducted Air Quality sampling on
monthly basis to monitor that the quality of air within the workplace is in accordance with the TLV.
G.Abatement Program for Vermin Control 1. Conducted Vermin abatement last July 7, 2019
H. Toilet Facilities and Mess Halls 1. Adequate and suitable toilet and bath facilities for both male and female employees.
2. Mess hall in staff house
B. CHEMICAL HAZARD
SECTION 4. OCCUPATIONAL HEALTH SERVICES Maintenance of Emergency Vehicle was conducted monthly to guarantee the utilization of unit during
emergency.
I
I
I
Monitoring and Evaluation of Industrial Establishment as Mandated by PO 856 I Sanitation Code of the Philippines
(Implementing Rules and Regulation Chapter VII- Industrial Hygiene)
DATE: October 22, 2019
1- Company Profile:
Name of Establishment : Address Owner/Manager Sanitary Permit Date Issued
11-No. of Workers (as of September 30, 2019}
Citinickel Mines and Development Corp. Barangay Punang, Sofronio Espanola Palawan Engr. Jainal Uy, Jr, Resident Mine Manager 19-001
Februarv..L 2019
Area Male Female Shift 1 Shift 2 Shift 3 Total Production 299 0 299 ___122 Non -Production __1L 10 58 ~
TOTAL 357 Ill-Sanitation Standards/Requirements a. Duties and Health and Safety Standards/Requirements Compliance Responsibilities YES NO
Remarks
1.EMPLOYER All siltation
A. Provide installs and maintains in good condition all control ponds are
facilities and protective barriers for potential and actual hazards. ~ stab le. Oil and
- water separator are well
maintained
B. Informs all affected employees regarding the nature of the Informs through
hazards and the reasons for the control measures and protective :}_ Safety
orientation and equipment as provided under Rule V Section 3
toolbox meeting
C. Makes periodic Testing for Hearing capacity, visual acuity, and Conducted
other health examinations as related to works exposure to ~
monthly health
potential or actual hazards in the workplace as enumerated in monitoring to
Rule V section 2 employees
1. Issued Earmuff and/or earplug & dust mask 2. Conducted
D. Provides control measures to reduce noise, dust, heat and ~ regular water
other hazards as enumerated to Rules V Section 2. sprinkling and road maintenance to mitigate excessive dust generation
E. Provides adequate and appropriate personal protective Procured and equipment free of charge, when considered necessary in :}_ issued PPE to
accordance to Rule V Section 3. employees ~
Safety Officer
F. Ensures strict compliance on the regu lar use and proper regularly
~ monitored and maintenance of Personal Protective Equipment (PPE) inspected all
working areas
G. Provides his employees occupational health services and Established First facilities in accordance with the provision under Rule V Section ~ Aid stations and 4. company clinic
H. Creates and supports the activities/programs of the Approved the
~ proposed ASHP company's health and safety committee.
for 2019
Copy furnished the MHO of
I. Submit yearly reports required by the Department or Local :)_
MGAR including Health Aut hority. ( NCDCS/OH/IH FORM Ill) monthly
morbidity report
2.EMPLOYEE All employees A. Strictly observe and practice the use of personal protective wear prescribed equipment and other control measures in accordance with the
I
::!. PPE's while provision of Rule V Section 3. working in
CMDC B. Observe the proper use and maintenance of equipment provided to them by their by employers. :)_
C. Report potent ial health hazards present in the working ~
environment to company's health and safety committee.
E. All employees shall undergo the following health examination.
1. Pre-employment Examination ;}_
2. Annual Periodic Examination ~
March 14-16, 2019
3. Return to Work Medical Examination As need arises
4. Transfer Examination As need arises
5. Separation Examination As need arises
6. Specia l Medical Examination As need arises
3. SAFETY AND Formulated
' HEALTH A. Plans and develops health maintenance and accident
Safety and
I COMMITIEE ~ Health prevention programs for the establishment.
Programs for 2019
I B. Implements the health maintenance and accident prevention programs in accordance with the set government rules and ~ regulations.
l C. Conducts regular safety meetings ~
CSHEC Meeting
D. Reviews reports of inspection, accident and illness ~
Tackled during
I investigations and implementation of program. CSHEC Meeting
E. Submit progress report to manager/employer on the Submitted ~
- quarterly basis. monthly n:~eort
of CSHEC Inspection. Submitted quarterly
accomplishment report
G. Initiate and supervises health and safety trainings for employees. -../
H. Develops and maintains a disaster contingency plan and Formulated organizes such emergency services units as may be necessary to Emergency handle disaster situations pursuant to the emergency j_ Response and preparedness manual for establishment of the office of Civil Preparedness Defense. Program for
2019
Copy furnished I. Furnishes the Department or the Local Health Authority, copy the MHO of of the illness Investigation Reports j_ MGAR which
includes morbidity
report B. Permit and A. Prior to operation, all industrial establishments shall obtain a Licenses sanitary permit from the Local Health Authority or Duly
-../ Secured
authorized representative. sanitary permit
B. The renewal of Sanitary Permit shall be filed and done on or j_ before the 20th day of January of the current year
C.SANITATION FACILITY 1. A. Water 1. An adequate potable water supply approved as to source and I
Supply. An distributed by the Department shall be provided in all places of -../ adequate potable employment. water supply 2. Standard drinking water facilities ready accessible to all shall be provided employees and approved type of drinking water facilities shall to all employees. be provided to all employees in the ration of one (1) facility for -../
every fifty (SO) employees.
3. Where a local or city waterworks system exists, the industrial establishment shall utilize water from the system or from its NO LOCAL
I own water supply that complies with the IRR of Chapter ll(water WATER SYSTEM Supply) of PD. 856 and the prescribe water quality standards of IN THE AREA the Ph ilippine National Standard for Drinking Water (PNSDW)
I B. SEWERAGE 1. All establishments covered by the system shall be connected SYSTEM. Sewage to the sewer in areas where a sewerage system is available works and -../
I treatment plants shall comply with the following 2. Completely treated effluent if conforming to the quality
I requirements standards prescribed by the Environmental Management Bureau y = Department of Environmental and Natural Resources (EMB-
I DEN R) may be discharged into body of water.
- ---
3. Storm water shall be discharged to a storm sewer; only sanitary sewage shall be discharge to a sewerage system; but .J this should not prevent the installation of a combined system.
4. Properly designed grease traps shall be installed in establishments where the sewage carries a large amount of .J grease as determined and approved by EMB-DENR.
C. SEPTIC Tank- 1. It shall be generally rectangular in shape. When a number of Where a public compartments are used, the first compartment shall have the
.J sewerage system capacity from one-half (1/2) to two-thirds (2/3) of the total is not availab le, volume of the tank and shall be water -tight. sewer outfa lls 2. It shall be built of concrete, either pre-cast or poured-in-place. from industrial Bricks and concrete blocks may be used provided in conforms to .J establishments Rule V, Section lc (1) of the IRR. sha ll be discharged into a septic tank to be 3. It shall not be constructed under any building and within 25 j_ constructed in meters from any source of water supply.
accordance with
D. Disposal of The effluent from septic tank sha ll be discharged into subsurface
Septic Tank Effluent
soil, absorption field where applicable or shall be treated with some type of purification device. The treated effluent may be discharged into a stream or body of water if it conforms to the
quality standards prescribe by the (EMB_DENR).
1. All toxic and hazardous wastes including nuclear wastes incident to the operation of the industrial plant shall be collected, stored or disposed of in a manner that will prevent j_ health hazards, nuisance and pollution in accordance with the guidelines set by DENR_DAO 29 (RA6969).
I
2. All industrial establishments discharging toxic wastes shall submit a copy of the method of treatment approved and .J certified by the EMB-DENR to the Department or its duly authorized representatives.
The air quality within the workplace sha ll be in accordance with the Threshold limit Values for Hazards as adopted by the .J Department from the American Conference of Governmental Industrial Hygienists- Threshold Values (ACGIH-TLVs).
G. Abatement A vermin abatement program shall be maintained in places by I Program for
Vermin Control their owners, operators or administrators. The procedure and frequency of vermin abatement program shall be determined .J
I and approved by the Municipal Health Officer/City Health Officer.
H. Toilet Facilities
I 1. Adequate and suitable toilet and bath facilities for both male and female employees at the following ration a. Where the number of female employees exceeds one
I hundred (100) , one (1) toilet for every twenty (20) female .J employees up to the first one hundred(lOO) and one(1) for every -
thirty (30) thereafter
I
b. Where the number of male employees exceeds one hundred (100) one(l) toilet for every twenty five (25) males up to the first j_ one hundred {100) and one(1) more for every forty (40) thereafter c. Where the number of males employed exceed five
' hundred{500) , it is sufficient to provide one{l) toilet for every sixty:ls,60) male d. In addition, male workers shall be provided with sufficient urinals in the same ratio with toilet bowl in accordance with ..J Rule V, Section 1H (1)b and c. 2. Adequate Restrooms and mess halls shall be provided for the employees at the following ratio
a. Where ten (10) or more workers are employed at any one time, at least one (1) restroom for each sex for their exclusive ..J use shall be provided.
b. Where less than ten (10). workers are employed and a restroom is not available, an equivalent space shall be provided Not applicable which can be properly screened and made suitable for such use.
3. Dining facilities/mess halls shall be provided where there are ten(10) or more·workers in·an·establishment. The-recommended space requirement for four (4) workers is 10.80 1 sq. m., and for each additional employee, the minimum addition shall be at 0.90 sq. m.
4. A separate bathing/washing facility for each sex shall be provided in the ratio of one bathing/washing facility for every
..J twenty five (25) employees up to the first one hundred(loo) and one more for every forty (40) thereafter.
ENVIRONMENTAL RAW MATERIALS/CHEMICALS USED CONTROL and NICKEL ORE Monitoring
BY PRODUCTS NONE
PROCESSES/OPERATION CONTOUR MINING i
I
(EXCAVATION and HAULING)
ENG1NITR1NG CONTROl ME-ASURES INSTAtt:I:D 1. Impounding Structures 2. Oil and Water Separator
I 3. Liquid Containment in Fuel Depot 4. Machine Guarding/Cover
I A. PHYSICAL 1 NOISE ..J HAZARDS 2. VIBRATION ..J
I 3. HEAT AND COLD STRESS 1 4. ILLUMINATION ..J
5. RADIATION none I
I 6. GENERAL VENTILLATION ..J
?.LOCAL EXHAUST VENTILLATION j_
B. CHEMICAL l.Material SafetY Data Sl'feet (MSDS) shall be provided by HAZARD manufacturers/distribution/suppliers and shall be made
..J available to agencies/workers upon request
2. Isolation /enclose/interposing of a barrier between a hazard Constructed and those-who might-be a-ff-ected by the hazard shall· be applied·
I "' Chemical" Storage
3. Proper ventilation and lighting of the hazardous area/s shall be provided. ..J
C. BIOLOGICAL HAZARD Control measures sha ll be provided to eliminate or control the
transmission of infectious diseases through processing or ..J handling of industrial products or waste
D. ERGONOMICS All work procedures shall be in such a manner that it will not Posted signage produce undue stress to the musculo-skeletal system of :1_ regarding workers. ergonomics
Provision of A. Personal protective equipment (PPE) shall be used whenever Complete· and engineering and administrative· control· measures-are-not
:1_ appropriate PPE feasible or insufficient/inadequate as specified in Rule V, Section 2.
B. Personal protective equipment and/or protective barrier shall be provided whenever necessary by reason of the hazardous nature· of the-process or environment, chemical, or radiological· or other mechanical irritants or hazards capable of causing injury
:1_ or impairment in the functions of any part of the body through absorption, inhalation or physical contact.
C. All personal protective equipment shall be of the Department's approved design and construction appropriate for ..J the exposure and the work to be performed.
D. No person shall be subjected for exposed to hazardous ' environment condition w ithout protection. ..J i
I E. List of personal protective equipment recomm ended for use
I and shall be fitted to each exposed worker whenever necessary.
1. EYE and FACE PROTECTION ;!, 2. RESPIRATORY PROTECTION _i
I 3. HEAD PROTECTION ;!, 4. HAIR PROTECTION ;!, 5. HAND and ARM PROTECTION _i
I 6. HEARING PROTECTION ;!, 7. SAFETY BELTS, LIFE LINES and SAFETY NETS ;!, 8. USE OF SAFETY SHOES :1.
I SECTION 4. EMERGENCY HEALTH SERVICES 1. MEDICINES and FACILITIES
OCCUPATIONAL A. Every employer covered by IRR shall keep in his workplace at HEALTH SERVICES least the minimum quantity of emergency and essential
medicines, medical supplies and equipment and medical faci liti es listed in table 3a on medicines, supplies and facilities, for the use of the workers employed in the establishment/undertaking.
B. The medicines, medical supplies and facilities prescribed in table 3a shall be kept inside the treatment room/medical clinic required under Rule V Section 4 E(1) and sha ll be replaced with the same quality immediately after use or consumption.
MEDICAL AND DENTAL SERVICES (SEE TABLE 3B FOR THE REQUIRED HEALTH PERSONNEL) Health Personnel
.. - .. ehy~i_c:ian(~_)_ _. - --·-- - --· - ·- --· -- --· ··-- - - - __ , ... Dentist (s) Nurse (s) First Aider (s)
Health Facilities First Aider /Treatment room
Clinic Dental Clinic .
Ambulance/Transport Facilities Hospital
3. EMERGENCY HOSPITAL The employer shall enter into contract with the hospital and dental clinic for the use of such hospital/clinic in the treatment of workers in case of emergency
4. HEALTH PROGRAMS
5. REPORTS SUBMITTED TO LOCAL HEALTH AUTHORITY
I Annual Medical Report Form Annual Work Accident/Illness Exposure Data Report
I Annual Employees Work Accident/Illness Report I Report on Health and Safety Committee
Employees Medical Profile I
I
Community Community health Profile (Baseline Prior to Operation, to be
I Health Profile updafed every five yearr
Baseline Data (Prior to Operation)
I To be updated every 5 years
I Food Sanitation Conform with the food safety standard as mandated in PD 856
and existing Rule and Regulation
RATING: EXCELLENT
,Jrepared by WILLIAM P. SARAGCON,SE,CE ENGINEER Ill-Environmental Sanitation Unit Head MMT- MEMBER (Alternat e)
1
1
------ -- .. __ ._,_ .
:j_ :j_
_i _i
-- - - -j_
Approved last J
January 18, 1
1 2018 and valid I I
until January 2020
1
:j_ :j_ :j_ :j_
-../
1
1 Conducted last
2015
1
NiCK JAPHERS <l. GABINETE Safety Engineer CMDC-PNMP
ANNEXES Engineering Control 1. Maintenance of Impounding structures, oil and water separator, and machine guarding
Safety Meetings and Orientation 1.8. Informs all affected employees regarding the nature of the hazards and the reasons for the control measures and protective equipment as provided under Rule V Section 3.
r'
3. C. Conducts regular safety meetings
a. CSHEC Meetings
b. General Toolbox Meeting
c. Departmental and Contractor's Toolbox Meeting
July
'~l.. ---- \ "'t·
' ' ----- t·,~ .. · : ' ' . ' . s.· . . _ . .,.. ·_ . . : ' \, . .. · ""'11. -I - ......_ ':'9 > t' ~~.. •
X I .J ·"': · ' • . :;
1,~, ·-. :lit- ~<i·_·.~ t . J'' - t . ,- . ,.,, IIh · · --~:; . ~.,:. . Gll\'jl I ~;1:
. ·~ ~ 'f n ~If.~> f'' . • ..... ) .. - . ' .. !!r(_· .
--- • • . I ' . -- .. . ,.
Dust Suppression, Noise and Illumination Monitoring 1. D. Provides control measures to reduce noise, dust, heat and other hazards as enumerated to Rules V Section 2.
a. Noise Monitoring
September -ea::-w-....
b. Illumination Monitoring
July
c. Oust Suppression
Compliance to PPE
September -rrj
1. F. Ensures strict compliance on the regular use and proper maintenance of Personal Protective Equipment (PPE). 2. A. Strictly observe and practice the use of personal protective equipment and other control measures in accordance with the provision of Rule V Section 3. 2. B. Observe the proper use and maintenance of equipment provided to them by their by employers. A. Personal protective equipment (PPE) shall be used whenever engineering and administrative control measures are not feasible or insufficient/inadequate as specified in Rule V, Section 2.
3. Procured PPE
Occupationaf Health Controf and Services G. Provides his employees occupational health services and facilities in accordance with the provision under Rule V Section 4.
a. Health Monitoring of Employees
July
d. Maintenance of Company Clinic and First Aid Kit
July August September
I ~
II ~
Safety and Health Program 3. A. Plans and develops health maintenance and accident prevention programs for the establishment.
rr···~· .. Wri>ri~.~ IRr,- -~~-~ c~
r .... _ ..... ~- ~·
"' Citinickel Mines • I •• f ~ • I t ' ;! • ~ ' ... ~
PULOT NICKEL MINING PROJECT
ANNUAL SAFETY AND HEALTH PROGRAM
"
\PrRO\l.IJ
~ . • I
201t
~ ~--.. .=.......-:..:: ;;..-:::-_ ..,..., .... ..w, rill,,...,......., ............. ,.....,.,......,...._ \( IW\,., C"r Jel1 ........... c--., .... ..,.._...~,_, .. ~ .......... ...,....... ........ ~ ........ ~ ....... ·~-,...,., -~ , ___ _ ......... ,.,...,.-..........., • .... ........,.-IML "" ..... ~.~ ........ .......-. ...... Cfftt ..... ~ ...... .-..til' tlr'\..Oif\~MW,.~ .. *"-'I44 fi._OI'Hll .-..,....,.""" ()reel .., .,., ............ ,.,. .,.... M"4 ......... .,
~Ad-.,. ,._J~~-t'W ··,..,....,.~Mtl lftJ'
~ .... ~JJ · .... -~iOJtr. ......... ~ ......
,,. \. _ .... --. ~ __ .. _._ __ .....,._......,. ____ .._._ ________ .., ____ ...._....,. ... _.....
Emergency Response and Preparedness Program 3. H. Develops and maintains a disaster contingency plan and organizes such emergency services units as may be necessary to handle disaster situations pursuant to the emergency preparedness manual for establishment of the office of Civil Defense.
0 gi~!~is~~.' ~~~~~ PULOT NICKEL MINING PROJECT
Annex 1
EMERGENCY RESPONSE AND PREPAREDNESS
PLAN
2019
. '·---...... -- ............. -·~-..... ...-.-
......, .............. ,.~·-.... --- ... ___ ,..~ .. &-. ·-·- - ..__
~ ... ..........._ ......... .n: I\.._._~ ...... ' ,., .... -.- .. ~-.... -................ ~."'~ ............. ~. _......... ......................... \it. ...... .,. ~ roo•• .. , ........... P -.- .......... --.4~ ...._,......._........._.._,.......,_,_.. rw-.. ..... ·- ............ ._._" - -~ -· --· _, ... , ..
~- ... ,. , ............. ~- -.......... '11 ...... ..... ~--- ~ ...... _, •.-t- ...-- ... ~ ~' .. ,. .,.,..,... . ....,.,.o,:-o; t•t"\ot -.- ........ "Jf" .. r;a....._,..,._,,.,_.....,J>I••~tl!~
Wlit ....... ~I'Oalt ~--.-
- ~~-:::.--::::..."":.--=-~.._ .. l c
Submission ofMonthly General" Accident Report on MHO 1. I. Transmittal of Monthly General Accident Report, Monthly Employees Report on Accident and Illnesses, Monthly Accident General Information, Minutes of meetings and Morbidity Report 3. I. Furnishes the Department or the Local Health Authority, copy of the illness Investigation Reports
July August September
~~
'
.......... _ .............................. ~ --
Permit and Licenses 1. Business and Sanitary Permit
Comfort Rooms and Mess Hall H.1 Adequate and suitable toilet and bath facilities for both male and female employees.
H.2 Mess hall in staff house
Material Safety Data Sheet 1.Material Safety Data Sheet (MSDS) shall be provided by manufacturers/distribution/suppliers and shall be made available to agencies/workers upon request
CMDC 2nd Quarter 2019 (Toronto) Compliance Report to DAO 2015-02 ANNEX B
MMT COMPLIANCE MONITORING AND VALIDATION REPORT (CMVR) FORM FOR MINING INDUSTRIES
TORONTO NICKEL MINING PROJECT
Barangay San Isidro, Narra, Palawan
Citinickel Mines and Development Corporation (CMDC)
Date of Compliance Monitoring and Validation: October 21- 25, 2019 Monitoring Period Covered: July - September, 2019 Quarter/Semester Year: 3rd Quarter 2019
8.2. Compliance to Impact Management Commitments in EIA Report & EPEP (Directions: The MMT shall check compliance of the Proponent to the commitments in the EMP.)
Project Mitigating Measures/Control Strategies Effective Recommendation
Impacts Planned Field Findings and Observations Yes No Mining 1. Siltation Control Projects
Operation .1 Siltation Ponds Desilted 3,366 cu. m at Balitien ./ • Continue regular dredging
Desilting / Siltation Pond, Km 2.5 Siltation of siltation ponds and pit
Maintenance Pond, Stockyard Siltation Pond bottoms;
.2 Silt Collector Sumps • Continue regular
Desilting / monitoring of the stability
Maintenance and structural integrity of
.3 Siltation Ponds siltation control structures
Construction I Maintenance
.4 Mine Drainage System
Maintenance
2. Tree Planting Operation and Maintenance
2.1 Nursery Operation and Total seedlings inventory was ./ Continue the production of
Maintenance 16,656 of various species located in seedlings to be used in
Central Forest Nursery rehabilitation and
Stacks of plastic stored at the reforest ation
Nursery det eriorating into
microplastics
2.2 Organic Fertilizer It was observed that CMDC is ./ Continue production of
Production continuously producing verrnicornpost to be used in
(Verm icornposting) vermicompost. rehabilitation and
Area near vermicompost has been reforestation
turned into a storage area Organize and clean the
storage area near the
i vermicornpost area.
2.3 Existing NGP Sites Ref er to NGP Team Report ./
Maintenance
2.4 Establishment of 2.10 has. planted for Mined-out ./ Intensify rehabilitation
Reforestation Project Area Land Preparation I Progressive activities of mined-out areas
Rehabilitation
2.46 has. planted for Mined-out
Tree Planting, Enrichment, and
Maintenance
2.5 Climax Species/Fruit Refer to NGP Team Report ./
Tree Planting
3. Water Quality Monitoring
Page 1 of25
CMDC 2nd Quarter 2019 (Toronto) Compliance Reportto DAO 2015-02 ANNEX B
Project Mitigating Measures/Control Strategies Effective
Impacts Planned Field Findings and Observations Recommendation
Yes No 3.1 Monthly in-House Refer to MMT Sampling Team ./ Continue the regular water
Water Quality Report quality monitoring
Monitoring
3.2 Third Party Laboratory Refer to MMT Sampling Team ./
Analysis Report
4. Dust Emission Control Projects
4.1 Mine Roads (including CMDC consumed 1,891.8 cu.m of ./ Continue the regular water
haulage road, pier water for its regular road water sparkling of mine roads
stock yard and sprinkling. including haulage road, pier
causeway) Water stock yard and causeway.
Spraying Scrape-off excess fine dusts
4.2 Monthly in-House Air Refer to MMT Sampling Team ./ Continue the regular air
Quality Monitoring Report quality monitoring
4.3 Road Maintenance Rough Haulage Road experienced ./ Conduct regrading, regular
(including haulage along Mine Site maintenance along haulage
road, pier stock yard roads
and causeway)
5. Solid and Hazardous Waste Management and Disposal
5.1 Toxic and Hazardous 13 drums of Used Oil ./
Waste Storage I 2 drums of Oil-contaminated
Disposal Materials
17 pes. Used lead Acid Batteries
13 kgs. Waste electrical and
electronic equipment
5.2 Solid Waste 948.73 kgs. collected ./
Management I Disposal
6. Information, Education and Communication (IE C) and Monitoring
6.1 Multi-partite CMDC has an active MMT ./ Continue regular
Monitoring Team • 2nd Quarter 2019 last participation in t he MMT
(MMT) Expenses August 12-17, 2019 activities
6.2 Mine Rehabilitation CMDC has an active MRFC ./ Continue regular
Fund Committee • 3n1 Quarter MRFC last participation in the MRFC
(MRFC) Expenses September 3, 2019 activities
7. Others
7.1 Horticulture Project With on-going horticulture projects ./
7.2 Adopt-A-River Coastal Cleanup in celebration of ./
Program (River and Earth Day 2019
Coastal Cleanup)
7.3 2019 International Day Planted seedlings for the ./
of the Forests International Day of the Forest s
2019
7.4 Farmland Monitoring Farmer's compensation and TWG ./
Incentives Pay-out L . .
Page 2 of25
•• •
CMDC 2nd Quarter 2019 fforonto) Compliance Report to DAO 2015-02 ANNEX B
Citinickel Mines r A '~ .. A H D D E Y E l 0 P M E N T C 0 J P 0 J A J I 0 N ~ iot~
Page 3 of25
Tor o nto Nic ke l Mi ni ng Proj ec t
2019Annual Environmental Protection
and Enhancement Program
3rd Quarter Accomplishment
CMDC 2nd Quarter 2019 (Toronto) Compliance Report to DAO 2015-02 ANNEX B
.~·,.
' i~
SILTATION CONTROL PROJECT
~
• f" ~>-
SRIIIJIII CINIIII PRIJE€1J ,· .~~~-\ .••
·· .. . - . . -~ . ,_ . ' . .
i·i} ,, '~- :::· ' .v .. -.~ .. ···~...,:·: .. :~" -~ ""' ·.··• ·. .....
·.· .'' -~-- : .· ·.· ...,.. ~ "'· •I ' ..._
. :,.,..·. Y~:·: . : .... : :·. . -:·: ·.·:. ;.· '
Siltation Ponds and Collector Sumps 3,366 400,000.00 I, 125,819.00 Desilting!Maintenance
Siltation Ponds Construction or - 400,000.00 -Maintenance
Mine Drainage System Maintenance and - 500,000.00 356,499.00 Construction
Page4 of25
CMDC 2nd Quarter 2019 fforonto) Compliance Reportto DAO 2015-02 ANNEX B
Siltation Ponds and Collector Sumps Desilting/Maintenance and Monitoring
Mine Drainage System Construction/Maintenance
Page 5 of25
.......
CMDC 2nd Quarter 2019 (Toronto) Compliance Report to DAO 2015-02 ANNEX B
MINE REHABILITATION AND TREE PLANTING
OPERATION AND MAINTENANCE
MtiNE REIHABtiltiTAW~ON & TREE PlANTtiNG OPERA;Jr~ON & MA~NTEINJANCE
Activity Land Prep/Planted Budget, peso Expenses, peso Area, bas.
Mined-out Area Land Preparation/Progressive 2.10 - 6,517,866.00 Rehabilitation
Mined-out Tree Planting, Enrichment and 2.46 - 44,320.00 Maintenance
Temporary Revegetation - 24,000.00
!Nursery Operation 400,000.00 339,040.88
Existing NGP Sites 25,000.00 10,640.00
Maintenance
Page 6 of 25
j
CMDC 2nd Quarter2019 (Toronto) Compliance Reportto DAO 2015-02 ANNEXB
Mined-out Area Land Preparation/Progressive Rehabilitation
Re-contouring and soil matting of Mined-out Rehabilitation Area 8 Block A
~ ~~ ... rn, ~---.~~--. ;~:.
;.4.. _J$!'-..
Planled 4,124 various seedUnts (endemic' lnlll ttees) In mined-our area
Page 7 of25
CMDC 2nd Quarter 2019 [foronto) Compliance Report to DAO 2015-02 ANNEX B
Nursery Operaoon & Malntenanee
Page 9 of25
WATER QUALITY MONITORING
r'
\
r '
,. '
CMDC 2nd Quarter 2019 (Toronto) Compliance Reportto DAO 2015-02 ANNEX B
WATER QUAlmTY MONmTORmNG
Monthly In-house Water Quality Monitoring
DENR-Accredited Laboratory Third Party Water Analysis
15,000.00
90,000.00
Dlst:baqe NODitOI'IIIi Md Rec:oni~Da
Page 10 of 25
5,651.85
74,381.40
CMDC 2nd Quarter2019 (Toronto) Compliance Report to DAO 2015-02 ANNEXB
DUST EMISSION CONTROL PROJECT
IISIJ IIJSSIINI CINIJIIl PIIJil1J
Causeway Road Watering
Spraying Mine Haul Road
Monthly In-house Air !Quality Monitoring
704
1,187.8
Page 11 of25
200,000.00 56,320
500,000.00 95,024
15,000.00 15,100.00
lN311\139\fN\fll\l 315\fM 5nOOH\fZ\fH "'8 315\fM Oil
H X3NN\f ZO-SlOZ 0\f(l OttJodal{ a:>UB!fdWOJ ( OtUOJo.L) 6l0Z Jauen() puz J<IWJ
CMDC 2nd Quarter 2019 [foronto) Compliance Report to DAO 2015-02 ANNEX B
Sll. WISIJI I IIIDJJIIS WISIJI I_INIIII_INIJ
oxic and Hazardous Waste Storage/Disposal
Solid Waste Management/Disposal
10,000.00
15,000.00
Page 13 of25
2,400.00
28,160.00
CMDC 2nd Quarter2019 (Toronto) Compliance Reportto DAO 2015-02 ANNEXB
IEC AND THIRD PARTY MONITORING
~~~I ljllll PIIIIIIIIIJIIUIG
Quarterly MMT Validation, Air and ,Water Sampling Activity including Third-Party Laboratory Analysis
Quarterly MRFC Meeting
Training & Seminar
EMB Monthly Validation
300,000.00
150,000.00
50,000.00
Page 14 of25
301,750.00
156,150.00
8,112.00
8,287.00
CMDC 2nd Quarter 2019 fforonto) Compliance Report to DAO 2015-02 ANNEX B
FARMERS COMPENSATION
lutale to far•ers tt =
sommal'}' ol Dlsttlboted Farm Inputs to Farmers
Items* ·Quantity Amount,Php
Granular Fertilizer (i .e 14-14-14, 16-566 bags 646,530.00
20-0 46-0-0 0-0-60) ' '
Certified Seeds 13 bags 19,500.00
Herbicides 74 bottles/packs 73,013.00
Farm Tools/Equipment 14 units/sets 92,665.00
Equipment Utilization for Clearing of ::::5,000 sq.m. 18,854.84
Area
TOTAL 850,562.84
(93.6o/o Accomplishment) 1 ------- ·- --------------------- ----------------
Page 16 of 25
%T spa[Old fOliUO) UOfi•IIIS
S3SN3dX3 d3d3\l 6 WG0PJ8
%T uafOJd IDJlUD~ UD!S'i1W3 1sna
%17 1uawa8euew ~1seM
~nopJeZeH pue al!.I!'M puos
g X3NNV ZO-SlOZ ova OltJodalf a:me!(dWOJ ( OlUOJO.L) 6lOZ Ja:tJEnb puz JGWJ
CMDC 2nd Quarter 2019 (Toronto) Compliance Report to DAO 2015-02 ANNEX B
Photo Documentation
! 'T .. i.t E .• 'I":""W~
Page 20 of25
CMDC 3rd Quarter 2019 (Pulot) Compliance Report to DAO 2015-02 ANNEX 8
MMT COMPLIANCE MONITORING AND VALIDATION REPORT (CMVR) FORM FOR MINING INDUSTRIES
PULOT NICKEL MINING PROJECT Barangays La bog, Punang and Pulot Interior, Sofronio Espanola, Palawan
Citinickel Mines and Development Corporation (CMDC)
Date of Compliance Monitoring and Validation: ------~O~ct~ob~e:!.r~21~-....!:..:25~20~10,:!9 _____________ _
Monitoring Period Covered: July - September 2019 Quarter/Semester Year: 3'd Quarter 2019 (2nd Semester)
8.2. Compliance to Impact Management Commitments in EIA Report & EPEP
(Directions: The MMT shall check compliance of the Proponent to the commitments in the EMP.)
Project Mitigating Measures/Control Strategies Effective
Impacts Planned Field Findings and Observations Recommendation
Yes No Mining 1. Siltation Control Projects
Operation 1.1 Siltation Ponds Total Volume Desilted: 780m3 .,1' Continue regular dredging of
Desilting I (Block C SP 01 and Pasi SP 01 & 02) SCSs, siltation ponds and pit
Maintenance Total Expense: Php 150,720.00 bottoms; and
1.2 Silt Collector Sumps
Desilting I Maintenance
1.3 Siltation Ponds Well-maintained siltation ponds Conduct monitoring of the
Construction I and mine drainage system .,1' stability and st ructural
Maintenance integrity of siltation and
1.4 Mine Drainage System Construction of additional siltation erosion control structures;
Maintenance pond at Block A Generate a mine drainage
Indistinct water level markings at map for monitoring
Block A Pit Bottom purposes
Water level for repainting
2. Tree Planting Operation and Maintenance
2.1 Nursery Operation and Propagated a total of 70,791 .,1' Continue production of
Maintenance seedlings native t rees seedlings, shrubs
and grasses to be used in
MRP, NGP and TRP
Formulate a standard
operating procedure /
manual for nursery
manageme nt and
rehabilitation operations•
2.2 Organic Fertilizer Harvested twelve (12) sacks of .,1' Continue production of
Production vermicompost vermicompost to be used in
(Ve rmicomposting) rehabilitation and
reforestation programs
2.3 Existing NGP Sites Refer to Mine Forest Program .,1'
Maintenance Validation Team's f ield
findings/observations
2.4 Establishment of Conducted tree* and enrichment .,1' Continue the mainte nance
Reforestation Project grass planting at Block A mined- and protection of the
2.5 Climax Species/Fruit out area (*11.70 hectares) established reforested a nd
Tree Planting rehabilitate d areas
Page 1 of 12
CMDC 3rd Quarter 2019 (Pulot) Compliance Report to DAO 2015-02 ANNEX B
Project Mitigating Measures/Control Strategies Effective Impacts Planned Field Findings and Observations
Recommendation Yes No
3. Water Quality Monitoring
3.1 Monthly in-House Performs regular in-house water ../ Continue regular water
Water Quality sampling quality monitoring
Monitoring
3.2 Third Party Laboratory Refer to Self- Monitoring Report I ../
Analysis Compliance Monitoring Report
4. Dust Emission Control Projects
4.1 Mine Roads (including An estimated water consumption ../ Continue the regular water
haulage road, pier totaling to 10,200 ml was sparkling of mine roads
stock yard and administered for the regular road including haulage road, pier
causeway) Water water sprinkling. stock yard and causeway
Spraying Total Expense: Php 262,000.00
4.2 Monthly in-House Air Refer to EMB-MIMAROPA Monthly ../ Continue the regular air
Quality Monitoring Monitoring Report quality monitoring
4 .3 Road Maintenance Regular maintenance of road ../ Continue the maintenance
(including haulage including haulage road, pier stock of the haulage road, pier
road, pier stock yard yard and causeway were observed stock yard and causeway
and causeway)
5. Solid and Hazardous Waste Management and Disposal
5.1 Toxic and Hazardous Maintenance of hazardous waste ../
Waste Storage I storage facility
Disposal
Refer to Self- Monitoring Report I Compliance Monitoring Report
5.2 Solid Waste Provision of properly labelled trash ../
Management I bins.
Disposal
Refer to Self- Monitoring Report I Compliance Monitoring Report
6. Coastal Management Program
6.1 Mangrove Tree *Conducted mangrove tree planting ../
Planting and Causeway activity in collaboration with the
Maintenance local government units of Brooke's
Point and Abo- Abo fl ufy 2019
Participated the coastal clean - up
in Barangay lrara~ Sofronio
Espanola I September 2019
*as reported by CMDC
Monitoring and maintenance of
mangrove rehabilitated area in Sitio
Caramay
7. Information, Education and Communication (IEC) and Monitoring
7.1 Multi-partite Active MMT participation ../ Continue regular
Monitoring Team participation in the MMT
(MMT) Expenses activities
7.2 Mine Rehabilitation Active MRFC participation ../ Continue regular
Fund Committee participation in the MRFC
(MRFC) Expenses activities
7.3 IEC Expenses *Conducted IEC in Olympic ../ Continue the regular
Elementary School in August 2019 dialogue and collaboration
*as reported by CMDC with the host and
neighboring communities
8. Others
8.1 Horticulture Project Harvested 250 kilograms of ../ Continue Horticultu re
Page 2 of 12
CMDC 3rd Quarter 2019 (Pulot) Compliance Report to DAO 2015-02 ANNEX B
Project Mitigating Measures/Control Strategies Effective
Impacts Planned Field Findings and Observations Recommendation
Yes No ~
vegetables for staff house Projects
consumption
8.2 Duck Raising Project Duck raising was observed during .f Continue the project
J monitoring
Page 3 of 12
CMDC 3rd Quarter 2019 (Pulot) Compliance Report to DAO 2015-02 ANNEX B
Summary of Third (3rd) Quarter 2019 AEPEP Expenses and Accomplishments (as reported by Citinickel Mines and Development Corporation)
ACTIVITY APPROVED BUDGET (P X 1,000)
I SlllatJon Con!IOI Projects
2 Tree PlaOOng Operabon and Mallllenance
3 WaterQualty Monrtonng
4 Dust EmiSsiOn Control Prc,ects
5 Solid and Hazardous Waste Management and Disposal
6 Coastal Management Program
7 tnfonnallon. Education and Commrnicat1on (IEC) and Monrtonng
8 Others
9 Other AciMIJes not Spec1fied tn !he EPEP
A<IMiy
........ _ Pr#fJ""Q1019)
'M .. I.Iprnsn.., ,1# ........ -').IJpotttW ..... -.
TOTAL
71.920.00
110.2
GOO 27504
275 1,858 704
10 33.084
430 632ns
10 1176
[] 7892
90
84 6779
8,375 46 4.650008
9.879.46 7,808.082
Before ... Planted: November 17.2017
Contraclor/P.nnll Holder
-ChlO:~
••ad Oe:veklpcncnl COfDD'"8'..oon
FMRDF Deposition
T•nemont No. Apt1('0Val 0. ..
{R•tentnce Ho.)
f MPSA-229-2007- 1 Af)nS24 2012 12 4M OOOOC) ' 11VB COA No
I (TOfonto Nd.el t01201201
--~"'~ --~SA·229-200Tf~ ~ 2fl12
I ~% r;,, i 101201202
2) 575 000 00 -
I
~928909 511 08P 016-33-012430
4584
6759
330.84
147.15
117.6
1.578 4
These lllCiude the contmuous ma1n1enance of siltabon ponds. sin colector sump and ptt bottom and conllll\JOUS des1n1ng actlvrtles
Continuous NGP mamtenance and adoption of Slope Agrlc1111Kal Land T echnotogy (SAlT) Approach In mined - out areas
These Include the monthly 1n-1>ouse water quality monitonng.
Regular road watenng dunng shipment operation and road ma10tenance activity tn Minesfte to Pleryatd
Fab<lcanon of addrtionat trash bm and m&ntenance of haZardous waste storage facility
Ma~ntenance ol 5.4 hectares 1n Caramay Puot Shore and 0 39 hectare tn Abo-abo Mangrove rehabilltalton.
The expendrtures were reftected on SOMP 3•• Quarter 2019 accomplishments
8070 InclUdes !he nee pl8nnng asslstance.tralninglsenvnars and Horbculture prc,ects
5551 Matntenance and conltnuous of plannng actlvtnes
79.01 % ACCOMPLISHMENT
1&1 lmli). ----· ... --
. ' ~
( f t.l lt If ' l lf"
I .- •III'UI U t \M'H.t. W\H • • vt."l , . l'l .... fiO.\ ••IMUtona .. n'lll .,..,,h-•·' ,.., ,. ,.. • ,....,..,...-a .. J \1
.·:~ _~"' :"!; ~.-·~ ....... -~ ....... "r ... ·::: ....... ... . ::· ~~-=-:~~.~ .. <,~~~~:::.::;, ~.~.·~:~:." .... , ~~·:.r;:.:t~::. ~::::-.: ~·:"
. , ,,,, . , - y-.. 1.., .. ........ .
;.,..,~·::,· n,• .., ..... ;n ~n "~' ;:.._,. ... :. ,';, ,.'~;'::.~~~;: lit•• ·- ·-·"'" 'ii'U.' ...... -~ ...
~·~· .... . · -~~,., ..... - .... """'
...... ......... ., . ..
-L'l~.!~ ...!.;!.. ' . ..
~ .. ,.,...~ -... .. p_~ ........ _ .... -...... .. ~ --· ~ \r· · .. • ·• ··-"- '""""' .,.~ .. . . .. -..,..,._..,,_ . .. r.
" - • .. Asol
c-oo<YYJ
r~ .. ~ ,. . .. .. <> •
C rH l lfi( ' ATIO~
It• ., r • n rt'l.lii'U t \lr.r .. ,. tW \tlhi"''D.' I IOftrnJ , l to•' l "flltl'l ! II ""J .. I It <o'\ 11 r11 fll rtlfiMt h i It V • • ' \ · -· \(. ...... . .... ....... -. .... u. .. . ,. .. .... ... • • ...., ... ·· --4 ••• ... ........ "' ,.. ·· ~ . .. .. .._ (t ll .. ll'l. l l ' " "'' .. .oil ltl\ 1 l t lkl' I\IJU)I 11 1"'"-t .. l ft \ .. U f'11UI MIIHHII ' L '"' ,. , ,.,,__...., J_ 1 ·' 'I
~· · ' 'W1'io' ...... . ·;. "'" . ...... ..... -~ .. ··- · .. .. . ~ '" ' .j f>t\ol"" •••It '' .. , .... \lll.tl~" •t~.lll Ill ' IUU I:I l lll tl lll'~~ 111111 <o\\11 H\1 111 ,,,,.., .. .,1\1\ ttM • •" ,. ,."' IH"t-•u_.._..,,
l - . . .... . lito ~ ..... ,._ ... _,.., .. .....,._... .... ~h...._.,..,r..;·•••'!IV o
•.•l.t~ .... ::o l 'll _ otlo!o...4< 1 il l ~ .. ,_ •
(-;.k~.::: ,, ... \ .. , ..... ~..
_]
Page 4 of 12 " Q · 0 - ·· ~
I .
CMDC 3rd Quarter2019 (Pulot) Complian ce Report to DAO 2015-02 ANNEX B
AEPEP 2019 JrdQUARTER PHOTO DOCUMENTATION
BNVUI.ONMENTAL MANAGEME!Io'T SYSTEM POUCVSTATEMHNT
cnr.-I!OQ-'(. ,\II, I-, \ ,I'\"() flHI T~! IW\11-. .'VI"fnRPOR.~rl~
{CTI1N1CXFJ,j, u ,..-,.I{ gl>J"" ~· .W ,..._, AI _""...,"'"'_,..._..Jf-o-•• _..,_.;,.,_~.,.......l,.,"""f-.~· ._ .. .,..,.,..,..., c -... •. --.._,....,...-....-. ..... -
• .....,..,..~.r.,"Wft'9PP',.. • ......., ~"" ,...,... ·-~- ....,._ ...............
() ,.....,... CQIDIU~ trl ~Z~•iiH•rnau . ., ~ -.. ..... ......,_.,..,_, __ ....,. ~-- ...... ......-......,....... ... _.J~y .. ~·--- u....;.. .. -•'7 ..m.tzarift. t""""'.Hnt; !lltiWl
() ...,.._ -- - - -' +cr- .... uU.,..~en ca ALCEZ16C401111 -------"""'--· ,....... =·· I,...,...._,. ., --.. ,....._~-.......----,__ ....... .,_.,..,.__
{ I
I
l
..
Figures 1 and 2. Environmental Management System Policy signages (both in
English and local languages) posted at various areas within the mine site
Figure 3. Portion of the waste dump area desilted for the quarter
Page 5 of 12
Pasi Siltation Pond #1
Pasi Siltation Pond #2
Pasi Siltation Pond #3
Block A Siltation Pond #1
Pasi Siltation Pond #4
.
CMDC 3rd Quarter 2019 (Pulot) Compliance Report to DAO 2015-0Z ANNEX B
..
NOTE: • No discharge a t Pasi Siltation Ponds
01 and 03 • Ongoing mine operations at Block C
production area
titS 1 I Block C Pit • • BoHom 1
Block C Pit BoHom 2
Map showing the location of the major si ltation control structures relative to the
mine pit's production b locks (provided by CMDC)
BLOCK-A ~, I Block A Pit ' , . , BoHom 1
i-Tagusao Siltation
. 1 - Pond
1<1 " ~
~
Page 6 of 12
• Clear minimal discharge at Tagusao Siltation Pond
• Block A Pit's water level markings are no longer visible [ For repainting]
CMDC 3rd Quarter 2019 (Pulot) Compliance Report to DAO 2015-02 ANNEX B
• Accomplished hectarage for TRP as of the quarter is at 4.28 hectares out of the 9.0 hectares target for the year; TRP subject areas at Blocks B and C ( C -1 to C - 4)
• Naturally grown cover crops observed at Block A rehabilitated area
Page 7 of 12
~ ·
1
CMDC 3rd Quarter 2019 (Pulot) Compliance Report to DAO 2015-02 ANNEX B
NOTE: • PNMP' s 2019 target for Block A is seventy
percent (70%) rehabilitated area • Three {3) silt pond compartments are being
constructed as additional mitigating measure for Block A
RECOMMENDATION: • Portion of the pier site safety berm
recommended for closure
Figures 26 and 27. Drainage channel at pier site; No loading activities
Page 8 of 12
CMDC 3rd Quarter2019 (Pulot) Compliance Report to DAO 2015-02 ANNEX B
Page 9 of 12
NOTE:
• Provision of additional oil- water separator at the powerhouse
RECOMMENDATION:
• Provide oil - water separator diagram
CMDC 3rd Quarter 2019 (Pulot) Compliance Report to DAO 2015-02 ANNEX B
Figures 37 to 46. Solid waste management at
various areas within the mine site - at the
Motorpool, sample preparation facility,
administrative building, and at cont ractor's
designated area (CERI)
NOTE: • Adequate properly - labelled
waste/trash bins within the mine site, however proper solid waste disposal is not entirely observed
RECOMMENDATION: • Replace worn - out solid waste
disposal signages • Proper stocking of used/opened
paint containers at the stockroom Figures 47 and 48. Unreadable waste management post; Paint containers at the stockroom
Page 10 of 12
CMDC 3rd Quarter 2019 (Pulot) Compliance Report to DAO 2015·02 ANNEX B
'~
~ ' r ~
r ,
J iii Figures 49 to 51. Contractor's pile of used tires; Fuel container and newly- constructed fuel containment dike
RECOMMENDATION:
• Cover the pile of used tires to avoid being nesting sites for mosquitoes ' ' • Remove and desist from using the fuel containment structure as storage
Page 11 of 12 -.
CMDC 3rd Quarter 2019 (Pulot) Compliance Report to DAO 2015-02 ANNEX B
~."~~~~
PPilfJep
Summary of field findings and recommendations:
• Minor inconsistencies in data reporting • Zilch to minimal water discharge at Pasi and Tagusao
Siltation Ponds • Ongoing mine operations at Block C production area • Established temporary revegetation program (TRP) areas at
Blocks B and C • Ongoing land preparation and mine rehabilitation at Block A
mined- out areas • Ongoing construction of additional siltation pond at Block A • No loading activity at pier site • (Generally) Observe proper solid waste management
through the provision of properly labelled trash bins and waste segregation
• Continuous implementation of horticulture projects • Prompted Envi Primer • Completed lodging of the required FMRDF based on MGB
MIMAROPA's status matrix • Conducted target activities for the quarter per the
approved Environmental Protection and Enhancement Program
• Portion of the pier site safety berm for closure • Provision of buffer zone signage per STCP area coverage
(Ang karatulang ito ay X metro mula sa buffer zone {N/5/E/W) at Y metro mula sa saklaw ng MPSA ng CMDC}
• Ensure proper documentation and database management for efficient data retrieving and reviewing/monitoring purposes
• Formulate a standard operating procedure I manual for nursery management and rehabilitation operations*
• Continue implementation of the remaining and regular environmental management activities/programs
• Include in the quarterly reporting the updated Final Mine Rehabilitation and Decommissioning Fund (FMRDF) lodging; Attach bank certificate in the submission to MGB MIMAROPA Regional Office
Submission of AEPEP 2020 on or before 30 November 2019
Page 12 of 12
PARTICULARS
Monitoring Team
Contractor /Permittee/Permit Holder Representative/s
Date of Monitoring:
Coverage of Monitoring
Safe ty and Health (Exploration. Development/ Opera ting) Monitoring C hec klist - Annex 1 C
Republic of the Philippines Department of Environment and Na tural Resources
Mines and Geosciences Bureau Regional Office MIMAROPA
SAFETY AND HEALTH MONITORING CHECKLIST
0 EXPLORATION 0 DEVELOPMENT/OPERATING
NAME COMPANY /DESIGNATION I SIGNATURE 1 I
Monica Mae B. Avengoza MGB MIMAROPA
Ferdinand P. Olivares MGB MIMAROPA
VenusV.Jesoro I MGBMIMAROPA I V~Q~
Roel Anthony S. Luz I MGB MIMAROPA I ----~ TeofiloTredez I PANLIPI-NGO I\ 7~ William Saragcon 1 PHO I ~ [.(j_ David Bundac I A VPP 1
41~
Carlo Javarez Saf~ty En~in.eer, To.ronto I !fM ~ Nickel M1n1ng ProJect \
Nick Japhers Gabinete Safety Engineer, Pulot Nickel l ;:;ij}Jjjjp Mining Project ~
( I J ·rr7r''' October 21-25, 2019
'-" '-" I 3rd Quarter 20 19 J
Safety and Health (Exploration. Development/Operating) Monitoring Checklist- 302019 Contractor/ Permittee/Permit Holder: Citinickel Mines and Development Corporation
Mines and Geosciences Bureau Regional Office MIMAROPA Pa ge 1 of 16 pages
Safety and Health (Exploration, Development/ Operating) Monitoring Checklist- Annex 1 C
BASIC INFORMATION
Tenement (EP/MPSA/FTAA) No. MPSA-229-2007 -I VB
Date Approved January 03, 2007
Contractor/Permittee/Permit Holder Cltlnlckel Mines and Development Corporation
Authorized Operator, If any NA President of the Contractor /Permittee/Permit Holder and
Ferdinand M. Pallera Operator, If any Contract/Permit Area (hectares) 2,176.00
Location of the Contract/Permit Area Brgy. San Isidro, Narra and Brgy. Punang, Sofronlo Espanola, Palawan
Commodity Nickel
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- 3Q2019 Contractor/Permittee/Permit Holder: Citinickel Mines and Development Corporation
Mines and Geosciences Bureau Regional Office MIMAROPA Page 2 of 16 pages
Safety and HeaHn (Exploration, Development/ Operating) Monitoring Cneckllsl- Annex 1 C
MANDATORY SAFETY AND HEALTH COMPLIANCE REQUIREMENTS
!
PARAMETERS LEGAL BASIS
COMPLIANCE INDICATOR
1. Annual Safety and Section 144 of Certificate of Approval of ASHP or Health Program (ASHP) DAO No. 2010- Transmittal received by MGB RO of Mining Contractors/ 21 Permit Holders with
ASHP of Service Section 144(b) Copies of ASHP of Subcontractors Contractor ofDAO No. submitted to the Mining
2010-21 Contractor /Permit Holders
2. With at least 1 licensed Section 164 of licensed mining engineer for > 50 Mining Engineer with at DAO No. 2010- workers with at least five years' least five ( 5) years of 21 experience In mining operation
experience In mining operations to Supervise Mining and Quarrying Operations (If applicable)
3. With Safety and Health Section 3, Rule Established SHO, Table of Office (SHO) 12 of DAO No. Organization under direct
2000-98 supervision of the Manager
4. With Safety Engineer I Section 2, Rule Registered Safety Engineer 1 Safety Inspector 8-11 of DAO No. Inspector
2000-98
5. With Central Safety and Section 5, Rule Central Safety and Health Health Committee 21.2 or Rule 27 Committee established, verified (CSHC) of DAO No. through minutes of meetings /
2000-98 attendance /logbook/photo documentation
Safety and HeaHh (Exploration, Development/Operating) Monitoring Checklist- 3Q2019 Contractor/Permittee/ Permit Holder: Citlnickel Mines and Development Corporation
COMPLIANT YES NO ./
./
./
./
./
RECOMMENDATIONS PENALTIES
If None - Penalty of Suspension/ Cancellation of Permit per Section 95 of RA No. 7942 If None - Penalty of PhP 5000 per Section 110 of RA No. 7942
If None - Penalty of PhP 5000 per Section 110 of RA No. 7942
If not complied -Penalty of PhP 1000 per Rule 1209 (6) o f DAO No. 2000-98 If not complied -Penalty of PhP 1000 per Rule 1209 ( 6 of DAO No. 2000-98 If not compiled -Penalty of PhP 1000 per Rule 1209 (6) of DAO No. 2000-98
Mines and Geosciences Bureau Regional Office MIMAROPA Page 3 of 16 pages
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- Annex 1 C
6. Strict Implementation of Section 163 of No person under 18 years old are Mine Labor Age Limit (18 DAO No. 2010- employed In any phase of mining y/o for Surface and 21 operations (surface/ underground) Underground)
7. Submission of Fatal to RO Rule 1209 of Investigation Report concerned within 15 DAO No. 2000-days after the date of 98 accident (if applicable)
8. Failure to g ive notice to Rule 1209 of Any means of communication the concerned Regional DAO No. 2000-Director within 24 hours 98 of any fatal accident (If applicable)
Safety and HeaHh (Exploration, Development/Operating) Monitoring Checklist - 3Q2019 Contractor/Permittee/Permit Holder: Citinickel Mines and Development Corporation
~ If None- Penalty of PhP 5000 per Section 110 of RA No. 7942 and RA No. 9231
NA. No Fatal If none - Penalty of PhP accident 10,000 per Rule 1209 of
DAO No. 2000-98
NA If none - Penalty of PhP 5000 per Rule 1209 of DAO No. 2000-98
Mines and Geosciences Bureau Regional Office MIMAROPA Page 4 of 16 pages
Safety and Health (Exploration, Development/ Operating) Monitoring Checklist- Annex 1 C
SAFETY AND HEALTH PERFORMANCE CRITERIA
1. Implementation of Safety and Health Program
PARAMETERS LEGAL BASIS COMPLIANCE INDICATOR
: A. Leadership and Administration 1. Safety and Health Policy Rule 21.2 of Safety & Health Polley Satement
DAO No. 2000· signed by highest official on 98 Site/President & strategically
located on all work areas 2. No. of Safety Section 2 of With: one full time Safety
Engineer /Inspector In Rule 8-11 of Engineer and one full time Safety accordance with Mine DAO No. 2000- Inspector for Class A and B; at Classification 98 least one part-time Safety
Engineer and one full time safety Inspector for Class C and D
3. Conduct or monthly Rule 30.4 of CSHC monthly minutes of CSHC Meetings DAO No. 2000- meetings
98 4. Conduct of Rule 21.22 of Departmental meetings on
Departmental Safety DAO No. 2000- Safety and Health conducted and Health Meetings 98 regularly (monthly/ quarterly as
per SHP)
5. Conduct of Pep talk or Rule 21.22 of Pep talk or Toolbox Meetings Toolbox Meetings DAO No. 2000· conducted Regularly (per
98 shift/dally as per SHP)
B. Organizational Rules and Policy 1. Presence of Safety and Section 5, Rule Safety and Health Rules and
Health Rules and 21.6 of DAO Regulations manual/handbook, Regulations that includes No. 2000-98 preferably with translation In Standard Operating local dialect and distributed Procedures and every employee Protocols
--
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- 3Q2019 Contractor/Permittee/ Permit Holder: Citlnickel Mines and Development Corporation
COMPLIANT RECOMMENDATIONS YES NO
PENALTIES
./
./
./
./
./
./
L_ - -
If not complied - Penalty of PhP 1000, Rule 1209(6), DAO No. 2000-98
If not complied - Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000-98
If not complied - Penalty of PhP 1000, Rule 1209(6), DAO No. 2000-98 If not complied - Penalty of PhP 1000, Rule 1209 : (6), DAO No. 2000-98
If not complied • Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000·98
If not complied - Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000·98
Mines and Geosciences Bureau Regional Office MIMAROPA Page 5 of 16 pages
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- Annex 1 C
C. Management and Employees Training 1. Training on Safety and Section 9, Rule Safety and Health training for
Health for all Levels of 31 of DAO No. employees on all levels of Management 2000-98 management conducted with
annual refresher training (based on SHP)
2. Issuance of Certificate of Rule 32 of DAO Certificates of Training Issued by Training No. 2000-98 the employer to employees
3. Conduct of Safety and Section 5, Rule Safety and Health Induction/ Health Induction/ 21.4 of DAO Orientation conducted to new Orientation for New No. 2000-98 employee Employee
4. Conduct of Safety and Rule 21 .25 of Safety and Health Induction/ Health Induction/ DAO No. 2000· Orientation conducted to Orientation for 98 contractor and visitors Contractors/ Visitors
D. Proper Housekeeping 1. Proper Housekeeping In Section 60, Proper housekeeping on
the Workplace Rule 792 of workplaces and support facilities DAO No. 2000-
98 - - ------ - - - - - - -- -- -- -
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- 3Q2019 Contractor/ Permittee/Permit Holder: Citinickel Mines and Development Corporation
./
../
./
./
../
If not complied - Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000-98
If not complied - Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000-98
If not compiled - Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000·98
If not complied - Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000·98
If not complied - Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000-98
Mines and Geosciences Bureau Regional Office MIMAROPA Page 6 of 16 pages
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- Annex 1 C
E. Health Control and Services 1. Provision of Emergency Section 64, Rule Medical and Dental services
Medical and Dental 860, Rule 864·866 and facilities provided. Services of DAO No. Note:
2000-98 Class A Mine, at least 1-First Aid Team/shift, I Full time Nurse, 250/shift, I full time Doctor, Dentist/ shift, w I Emergency Hospital
Class 8 Mine, at least 1 first aid team/shift, 1 full time nurse, 1 full time Doc, 1 part time Dentist, w I Emergency Clinic
Class C, at least 1 First Alder/shift, 1 Full time Nurse, 1 Part time Doctor & Dentist, w I Emergency Clinic
Class D, 1 full time First Alder/shift, 1 Part time Nurse, Doc, Dentist, w Emergency Treatment Room
2. Provision for Medical Section 5, Rule Pre-employment, annual, Examination 21.15 of DAO return-to-work and separation/
No. 2000-98 exit medical examinations to all employees provided
F. Provision for Personal Protective EQuipment (PPE) 1. Provision of PPE Section 63, Rule Adequate PPE provided to all
849 of DAO No. employee 2000-98
2. Replacement of PPE and Rule 21.3 of DAO PPE available for needed Management of No. 2000-98 replacement Inventory
- - - - - - - --L_____ - -~--
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- 3Q2019 Contractor/ Permittee/ Permit Holder: Citinickel Mines and Development Corporation
./
./
./
./
If not complied - Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000-98
Conducted on If not complied - Penalty March 2019 of PhP 1000, Rule 1209
(6), DAO No. 2000-98
If not complied - Penalty o f PhP 1000, Rule 1209 (6), DAO No. 2000-98
If not complied - Penalty of PhP 1 000, Rule 1209 (6), DAO No. 2000·98
Mines and Geosciences Bureau Regional Office MIMAROPA Page 7 of 16 pages
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- Annex 1 C
3. Strict Implementation of Section 63, Rule Strict Implementation of ../
wearing PPE 850·856 & 858· wearing of PPE for workers. All 859 of DAO No. workers are wearing proper PPE
2000-98
G. Monitoring 1. System of Accident Section 5, Rule Protocol/Guidelines ../
Report 21.20 of DAO No. 2000-98
2. Conduct of Section 5 Rule Accident/Incident Investigation ../
Accident/Incident 21.21 of DAO conducted/report (Internal with Investigation No. 2000-98 the company)
3. Conduct of Health and Section 64, Rule Health and Sanitary Inspection ../
Sanitary Inspection 862 of DAO No. conducted by medical 2000-98 practitioner or safety engineer
in all workplace on regular basis
11. Environmental Risk Management Including Emergency Response and Preparedness Program
PARAMETERS LEGAL BASIS COMPLIANCE INDICATOR
1. Preparation/ Presence of Section 49, Rule Emergency Response and Emergency Response and 637 of DAO No. Preparedness Program Preparedness Program 2000-98
2. Emergency Response Team Section 49, Rule Emergency Response Team (ERT) 637(c.l.) of DAO
No. 2000-98
3. Conduct of Quarterly Section 49, Rule Quarterly Emergency Drills Emergency Drills 638 of DAO No. conducted, Quarterly
2000-98 Emergency Drill Reports
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- 3Q2019 Contractor/Permittee/ Permit Holder: Citinickel Mines and Development Corporation
COMPLIANT YES NO ../
../
../
If not complied • Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000-98
If not complied • Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000·98
If not complied • Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000·98
If not complied • Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000·98
RECOMMENDATIONS PENALTIES
If not compiled • Penalty . of PhP 1000, Rule 1209 I
(6), DAO No. 2000-98 I
If not compiled -Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000-98
If not complied • Penalty ' of PhP 1000, Rule 1209 (6), DAO No. 2000-98
Mines and Geosciences Bureau Regional Office MIMAROPA Page 8 of 16 pages
Safety and Health (Exploration, Development/Operating) Monitoring Checklist - Annex 1 C
IV. Reportorial Requirements and Permit Compliances
PARAMETERS LEGAL BASIS COMPLIANCE INDICATOR
1. On- Time Submission of SHP Section 144, SHP submitted w/ln 15 DAO No. 2010- working days before the start
21 or Rule 21.11, of every calendar year DAO No. 2000-
98 2. On- Time Submission of Section 155(b.2.) MGAR submitted w/ln 15
Monthly General Accident or 270(k) of DAO working days after each Report (copy furnished No. 2010-21 or month BWC·DOLE) Rule 5 and 6,
DAO No. 2000-98
3. On - Time Submission of Section 155(b.1) Monthly Accident and Monthly Accident and of DAO No. Sicknesses Report on MGB Sicknesses Report (copy 2010·21 Form 15-5 furnished BWC-DOLE)
4. On- Time Submission of Section 162 of Monthly ETR, submitted w /In Dally Explosives Transaction DAO No. 2010· 15 days after every calendar Report (if applicable) 21 month on MGB Form 15-7
5. On- Time Submission of Section 162 and Monthly EC R, submitted w /in Explosives/ Section 270(1)of 15 days after every calendar Accessories DAO No. 2010- month on MGB Form 15-8 Consumption Report (if 21 applicable)
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- 3Q2019 Contractor/Permittee/Permit Holder: Citinickel Mines and Development Corporation
COMPLIANT YES NO ./
./
./
N/A
N/A
RECOMMENDATIONS PENALTIES
If not complied - Penalty of PhP 5000, Sec.110, RA 7942 or Penalty per Rule 1209 (4), DAO No. 2000-98 If late or non -submission • Penalty of PhP 1000, Section 271 , DAO No. 2010-21; If submitted after 1 month. Penalty of P1 000, 1
Rule 1209 (5), DAO No. I 2000·98 If late or non -submission : - Penalty of PhP 1000, Section 271 , DAO No. 2010-21; If submitted after 1 month· Penalty of P1000, Rule 1209 (5), DAO No. 2000·98 If not complied • Penalty of PhP 5000 per Section 110, RA No. 7942
If not complied - Penalty of P5000, Sec.110 per RA No. 7942 or PhP 1000, Section 271 per DAO No. 2010·21
Mines and Geosciences Bureau Regional Office MIMAROPA Page 9 of 16 pages
Safety and Health (Exploration, Development/ Operating) Monitoring Checklist- Annex 1 C
6. On -Time Submission of Sec.l55-b.3, CSHC Minutes of Meetings CSHC Minutes of Meetings DAO No. 2010- submitted
21
7. Submission of Emergency Rule 639, DAO Quarterly Emergency Drill Drill Report No. 2000-98 Report submitted to MGB RO
8. Authority to Install Section 151 (d) Certificate of Authority to Electrical/Mechanical of DAO No. Install Installations 2010-21
9. Electrical/Mechanical Section 150 of Electrical/Mechanical Installation Permit Including DAO No. 2010- Installation Permit Boilers and Pressure Vessels 21 and Section
1071 of DAO No. 2000-98
10. Purchaser's license, License Section 157 of Purchaser's License, License to Purchase /Transfer DAO 2010-21, to Purchase /Trans fer Explosives and Blaster Rule 641 and 733 Explosives and Blaster Foreman's License (if of DAO No. Foreman's License applicable) 2000-98
11 . Safety Engineer /Safety Section 146 of Safety Engineer /Inspectors Inspector's Permit DAO No. 2010- permit from MGB RO valid for
21 or Rule 15 of 3 years DAO No. 2000-
98
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- 3Q2019 Contractor/Permittee/Permit Holder: Citlnickel Mines and Development Corporation
V'
V'
V'
V'
NA
V'
If late or non -submission - Penalty of PhP 1000, Section 271, DAO No. 2010-21; If submitted after 1 month - Penalty of P 1000, Rule 1209 (5), DAO No. 2000-98 If not complied - Penalty of PhP 1000, Rule 1209 (6), DAO No. 2000-98
If not complied - Penalty of PhP 5000, Sec.11 0, RA No. 7942
If not complied - Penalty of PhP 5000, Sec.110, RA No. 7942
If not complied - Penalty of PhP 5000, Sec.110, RA No. 7942
If not complied - Penalty of PhP 5000, Sec.110, RA No. 7942
Mines and Geosciences Bureau Regional Office MIMAROPA Page 10 of 16 pages
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- Annex 1 C
OTHER FINDINGS/OBSERVATIONS AND RECOMMENDATIONS:
FINDINGS RECOMMENDATIONS PENALTIES
Complied with the implementation of Safety & Health Continue complying with the mandatory/regulatory None program as well as the mandatory reportorial requirements requirements (on-time submission)
Other Concerns and Recommendations:
1. Conduct road regrading and regular road maintenance along mine access roads at TNMP
2. Conduct dust suppression measures (I.e. regular water sprinkling; and road scraping/ grading) at stockyard area (access road) going to the causeway to prevent dust emanation.
Safety and HeaHh (Exploration, Development/Operating) Monitoring Checklist - 3Q2019 Contractor/Permittee/Permit Holder: Citinickel Mines and Development Corporation
Mines and Geosciences Bureau Regional Office MIMAROPA Page 11 of 16 pages
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- Annex 1 C PULOT NICKEL MINING PROJECT
..
~Dtinickelltl&as~ .,...~· MD DfVflOPMEifT CORPOilmON '¥J
Ptl.OT NICKB.. r.w.G PRO£T SAFETY STATISTICS BOARD
fiOft-1..~ 1Wt ACCIJffT (a TAl lMT 7W ACClOfffT (fml.) lMT 7W MJI)fNT ttfON OO'N.) TOTAL ACCIDENT lfCI>f.NC£ RATE fREOUfi/CY IM1l .. r .. .-n~ RATE
dTHrA
~··· ·~
'1 ~0 tO
With updated monthly statistics board
Observes good housekeeping at motorpool area of CERI
Safety and Health (Exploration. Development/Operating) Monitoring Checklist- 3Q2019 Contractor/Permittee/Permit Holder: Citlnickel Mines and Development Corporation
Mines and Geosciences Bureau Regional Office MIMAROPA Page 12 of 16 pages
Safety and HeaHh (Exploration, Development/Operating) Monitoring Checklist- 3Q2019 Contractor/Permittee/Permit Holder: Citlnickel Mines and Development Corporation
Safety and Health (Exploration, Development/ Operating) Monitoring Checklist- Annex 1 C
For improvement (CERI)
Observed with adequate safety signs in workplaces
Mines and Geosciences Bureau Regional Office MIMAROPA Page 13 of 16 pages
Safety and Health (Exploration, Development/Operating) Monitoring CheckUst- Annex 1 C
Reminder to MMT members and company staff ... DO NOT LITTER
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- 3Q2019 Contractor/Permittee/Permit Holder: Citlnickel Mines and Development Corporation
Mines and Geosciences Bureau Regional Office MJMAROPA Page 14 of 16 pages
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- Annex 1 C
TORONTO NICKEL MINING PROJECT
(Observation from previous MMT
With functional emergency eyewash and shower
I ~
Reconstruct floor to desired slope so that water will flow through the drain
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- 3Q2019 Contractor/Permittee/Permit Holder: Citinickel Mines and Development Corporation
Complied ./
Newly reconstruct ed floor
Mines and Geosciences Bureau Regional Office MIMAROPA Page 15 of 16 pages
Cover, tape or secure cords to prevent tripping.
Safety and Health (Exploration, Development/ Operating) Monitoring Checklist- 3Q2019 Contractor/Permittee/ Permit Holder: Citinickel Mines and Development Corporation
Safety and Health (Exploration, Development/ Operating) Monitoring Checklist- Annex 1 C
Improve housekeeping (@vermi compost/nursery)
An initiative observed: improved chemical storage rack (containment of chemical spill)
Mines and Geosciences Bureau Regional Office MIMAROPA Page 16 of 16 pages
Safety and HeaHh (Exploration. Development/Operating) Monitoring Checklist- 3Q2019 Contractor/Permittee/Permit Holder: Citinickel Mines and Development Corporation
Safety and Health (Exploration, Development/Operating) Monitoring Checklist- Annex 1 C
Mines and Geosciences Bureau Regional Office MIMAROPA Page 17 of 16 pages
Social Development (Development/Operating) Monitoring Checklist - Annex 1 E-2
Republic of the Philippines Department of Environment and Natural Resources Mines and Geosciences Bureau MIMAROPA Region
SOCIAL DEVELOPMENT (DEVELOPMENT/OPERATING) MONITORING CHECKLIST
PARTICULARS
Monitoring Team
Contractor/Permit Holder Representative Is
Date of Monitoring:
Coverage of Monitoring
Tenement (MPSA/FTAA) No.
Date Approved
Con tractor /Permit Holder
Authorized Operator, if any
NAME
MONICA MAE B. A VENGOZA
VENUS V. JESORO
M EDULINE CAMINONG
RODEL M. VICENTE
DAVID 6\.U~Di\C
ARMANDO A. TULING
ARLYN A. BAGNA TE
JEALYN B. BACTOL
COMPANY /DESIGNATION
MGB - MIMAROPA I ENGINEER II
MGB- MIMAROPA I SRS II
MENRO - NARRA
IP REPRESENTATIVE - NARRA
AVPP REPRESENTATIVE
Community Relations Officer
Community Relations Officer
Community Relations Officer
ENGR. KIMELODY GIMOTEA Civil Engineer
OCTOBER 21 - 25, 2019
3•d Quarter 2019
BASIC INFORMATION MPSA No. 229 - 2007 - IVB
03 Ja nuary 2007
Ci·inickel Mines and Development Corporation
N/ A
President of the Contractor/ Permit Holder and Operator, if any Mr. Ferdinand M. Pallera
Contract/Permit Area (hectares) 2,1 76 (Toronto and Pulot Nickel Mining Project)
SIGNATURE
JA-4-y~
~s '-t~\r !1
k Tl)T
fi1j ~.
11 '~r --f.Jq.-fflf-'-" '--'1'
Location of the Contract/Permit Area Brgy. San Isidro, Narra and Brgy. Pulot Interior, Sofronio Espanola, Palawan
Commodity Nickel
Social Development (Development/Operating) Monitoring Chedlist - J•d Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citinickel Mines and Development Corporation - Toronto Nickel Mining Project
Social Development (Development/ Operating) Monitoring Checklist- Annex 1 E-2
MANDATORY SOCIAL DEVELOPMENT (DEVELOPMENT/OPERATING) COMPLIANCE REQUIREMENTS
PARAMETERS LEGAL BASIS I COMPLIANT REMARKS/ RECOMMENDATIONS PENALTY I YES NO FINDINGS
(Documents) Social Development and Management Program
1. 5 - Year SDMP Section 134and 136-A Revised Phase II -of DAO No. 2010-21 Five (5) - Year SDMP
./ approved on 20 December 2017 (Toronto & Pulot)
2. Annual SDMP Section 136-A of DAO ./ Approved on 26 No. 2010-21 March 2019
3. Submission of Notarized Section 134 of DAO Submitted final Sworn Statement of 1 .5% No. 2010-21 ./ OPEX on May 28, If not complied - fine not Operating Cost to MGB 2019 exceeding Php 5000 per Section RO 110 of RA No. 7942
4. Memorandum of Section 136-B of DAO Signed 30 June Agreement with the host No. 2010-21
./ 2018 (Pulot); July If not complied - fine not and neighboring 30, 20 18 (San exceeding Php 5000 per Section communities upon the Isidro) 110 of RA No. 7942 approval of 5-Year SDMP
Management and Relationship with Stakeholders
1. Establishment of Section 136-C of DAO ./ Community Relations No. 2010-21
Office If not complied - fine not exceeding Php 5000 per Section
2. With a Community Section 1 36-C of DAO ./ Armando A. Tuling 110 of RA No. 7942 Relations Officer No. 2010-21 Arlyn A. Bagnat e
_ ~alyn Bactol
Social Development (Development/Operating) Monitoring Checklist - 3•d Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citinickel Mines and Development Corporation - Toronto Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E-2
SOCIAL DEVELOPMENT (DEVELOPMENT/OPERATING) PERFORMANCE CRITERIA
5-Yr SDMP CoA No. (Phase) SDMP II MGB MIMAROPA- 2017-01 A&B ASDMP CoA No. ASDMP MGB MIMAROPA - ~SDMP MGB MIMAROPA -12019 OlA i2o19 ·OlB
Date of Approval 20 December 201 7 Date o f Approval 26 March 20 19 126 March 2019
Period of Coverage 2017 - 2021 Period of Coverage CY 2019 CY2019
Term 0 1•1 )2nd 0 3rd 0 4th 0 5th Operating Cost Php 120, 240, 788.00
Total Commitment Php 20,923,322.21 Total Commitment for the Year Php 1,202.663.89 Php 890,859.37
DHNC Commitment Php 15,384,804.73 DHNC Commitment Php 1.226,677.24 Php 668, 143.82
IEC Commitment Php 3,322,982.845 IEC Commitment Php 240,532.79 Php 133,629 .33
DMTG Commitment Php 2,215,534.635 DMTG Commitment Php 160.355.18 Php 89,086.22
Balance of Commitment Php 17.404,949.455 Total Unspent from previous
Php 250,000.00 Php244,853.51 ASDMP (if any)
DHNC Commitment Php 12.472,540.59 DHNC Commitment Php 250,000.00 Php244,853.51
IEC Commitment Php 2,959,317.64 IEC Commitment Php 0.00 Php 0.00
DMTG Commitment Php 1,973.091.225 DMTG Commitment Php 0.00 Php 0.00 !
Impact Communities
Host Barangays San Isidro Narra Pa lawan
(Name of Barangay). [City I Pulot Interior Sofronio Espanola Palawan Municipality), [Province] Punang Sofronio Espanola Palawan
La bog Sofror,io Espanola Palawan
Neighboring Barangays Pulot Shore Sofrorio Espanola Palawan
(Name of Barangay]. [City/ Pulot Center Sofronio Espanola Pa lawan Municipality), [Province]
ICC/IPs (If applicable) Pala 'wan ··-- - ----
Social Development (Development/Operating) Monitoring Checklist - 3•d Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citinickel Mines and Development Corporation- Toronto Nickel Mining Project
Social Development (Development/Operating) Monito ring Checklist - Annex 1 E-2
I. Development of ASDMP
PARAMETERS LEGAL BASIS COMPLIANCE INDICATOR COMPLIANT
RECOMMENDATIONS PENALTIES I YES NO
Consultation with the host Section 136-A D Minutes of meeting ./ and neighboring of DAO No.
D Attendance Sheets ./ communities 2010-21
./ 0 Photos
II. Monitoring of the ASDMP
PARAMETERS LEGAL BASIS COMPLIANCE INDICATOR COMPLIANT
RECOMMENDATIONS PENALTIES YES NO
1. Conduct of Monthly Internal Section 136-D Monthly internal Jan ./ Monitoring of the ASDMP and ofDAO No. monitoring
Feb ./ the representative of the host 2010-21 conducted as shown and neighboring communities in the reports Mar ./
Apr ./
May ./ Jun ./
Jul ./ Aug ./ Sep ./ Oct
Nov ·,
Dec ! --- --- --- ---- - -- --- --
Social Development (Development/Operating) Monitoring Checklist - 3rd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citinickel Mines and Development Corporation - Toronto Nickel M'ning Project
Social Development (Development/Operating) Monitoring Checklist - Annex 1 E-2
Ill. Implementation of Annual Social Development and Management Program
A. Summary- Toronto Nickel Mining Project (for Jrd Quarter 2019)
PHYSICAL I FINANCIAL AVERAGE COMPONENT
ACCOMP % EXPENDITURES BALANCE % % TARGET ALLOTMENT
Development of the Host and 19 17 89.5% Php 753,669.31 Php 487,669.31 Php 266,000.00* 64.7% 77.10%
Neighboring Communities
Information. Education and 40 19 26.7% Php 467,961.25 Php 118,1 75.00 Php 349.786.25 25.3% 26.00% Communication
Development of Mining Technology 5 1 20.0% Php 325,710.75 Php 165,335.57 Php 160,37 5.18 50.8% 35.35% and Geosciences
GRAND TOTAL 64 38 45.4% Php 1,547,341.31 Php 408,510.57 Php 998,830.74 46.9% 46.2%
NOTE: • Compensated by the early provision of five (5) computer units I Remaining project to be implemented is the construction of school canteen (target for 3Q) with Php 115,000 budget cost; Bulk of the financial budget to be used in the 4Q PPA implementations
Unapproved proposed PPAs' budget is not included in this matrix
Social Development (Development/Operating) Monitoring Checklist-3•d Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citinickel Mines and Development Corporation - Toronto Nickel Mining Project
I
No.
2
3
4
2
Social Development {Development/Operating) Monitoring Checklist - Annex 1 E-2 B. Physical Accomplishments - Toronto Nickel Mining Project
PROJECT / PROGRAM/ ACTIVITY (PPA)
Scholarship Program
I Provision of School Cantee n
Provision of I photocopying
machine
1 Provision of computer units
Nutrition Month - .. ..
Barangay Foundation
UNIT OF WORK
MEASURE
Semester
School Facility
School '
l School equipment
Activitv
Event
lQ
2
5 • 2
5
Social Development (Development/Operating) Monitoring Checklist - 3'd Quarter 2019
0 -
For 4Q -
2 I - I
- 5 I - I ;--1.1
• Contractor/Permit Holder: Citinickel Mines and Development Corporation - Toronto Nickel Mining Project
0
0
2
5
7
1
0
I
I I
PPA
%TO DATE (Indicate# of Beneficiaries)
College students provided
0% with financia l allowance support throughout the school ro rar 1 e lementa ry ~ _ ,._\Ji.....J..I::lt......l \.l.lif.""''
0%
100%
,ils/teachers 1 school provided with
100% I additional facili ty /equipment for the benefit
50% 1
0%
100%
0%
of the pupils/teachers
Additional fund to the barangay I community
Financial Support to the Barangay participated
Mines and Geosciences Bureau MIMAROPA Region
2
3
4
2
3
No.
2
I - So.atelopment (Development ng) Monitoriflg Checklist- Annex 1 E-2 Financial Support to the
1 San Isidro Labrador Fiesta
Event
1 Development of Purok No. of
Centers fn c:ilitio=>s
I Renovation o f SK facilities Building
renovated
Sub-Total
Provision of ten ( 1 0) I Sewing unit sewing machines Machines
Purchase of one ( 1) I Farm I unit Farm Tractor to Tractor
CFMCI Compensation for
I agreeing and a llowing 1 L f ocaton the use of 1500 sq.m
ofCSC ___ !
Total for Development of Host and Neighboring
ommunitles
PROJECT /PROGRAM/ ACTIVITY (PPA)
I
UNIT OF WORK
MEASURE
I 2 I 2
lQ
100% I Barangay participated during the event
1 I 1 - I 0 0%
-
1 1 - 0 0%
- --3 4 - 1 25%
I
Add itiona l equipment to be 100% used for the livelihood of
women's association
100% Provided to CFMCI
100% Provid ed to CFMCI
I 19 I 5 I 29 I 2 I 2 I 18 22 56.25%
ANNUAL I lQ '7o TO DATE (Indicate I of Beneficiaries)
INFORMATION, EDUCATION AND COMMUNICATION CAMPAIGN-PROMOTION OF PUBLIC AWARENESS AND EDUCATION ON MINING TECHNOLOGIES AND GEOSCIENCES
Public Relations (PR) Media
PMSEA/ANMSEC Activities
activity /ies
Event
4
1
Social Development (Development/Operating) Monitoring Checklist- 3•d Quarter 2019 Contractor/Permit Holder: Citinickel Mines and Development Corporation- Toronto Nickel Mining Project
0
25%
0%
PF for news clippings and reoorts
Training materials/accommodation
Mines and Geosciences Bureau MIMAROPA Region
Social Development (Develop me 3 National Unified IEC Event 0
4 Trimedia Advocacy
activitiy /ies 0 0% Radio p lugs cam ai n
5 I Local Festivities & Mall activity /ies 1 2 - 0 0%
Exhibit
6 I Com Rei Activities activity /ies 1 1 2 100%
7 1 LGU sessions & other
meetings 6 24 10 A '>at Discuss community meetin--
8 I Fiesta, , ~~··V\,..u~ 01.
Foundation days I activtiy /ies 1 I 1 I 0
School Journalism/
9 I other academic
institution Related I activity / ies 1 I 1 I 0
10 activity /ies 4 4 6
PROJECT/PROGRAM/ I UNIT OF I TARGET
I ACCOMPLISHMENT I PPA STATUS/REMARKS No. I ACTIVITY (PPA) WORK
MEASURE I lQ I 2Q I 3Q TOTAL TO DATE %TO DATE (Indicate # of Beneficiaries)
DEVELOPMENT OF MINING TECHNOLOGIES AND GEOSCIENCES (OMTG)
Scho la rship for Mining
I I Schola rship assistance to Industry re lated 0 0% Courses
college students
Research related to soil, farm produce and
I I I I Third party study on soil
2 I implements for the I analysis 1 1 0 0% analysis benefit o f impact
Contractor/Permit Holder: Citinickel Mines and Development Corporation-Toronto Nickel Mining Project
(Development/c;:>perating) Monitorina Checklist - Annex 1 E-2 Trainings & Seminars related to Mining Industry for Brgy.
3 I Council members. I train.ings/ 1 - 1 - 0 I I 0 I 0% I
Mining Engineers schoolteachers. semmars Convention company employees and other project stakeholders Company visits/Educational
I activity I I I I Capability Building for
4 I Travel of University 1 1 0 0% students, NGOs and
MMT /MRFC Members
lket Assistance to I No. of
5 I Livelihood assistance 1 1 1 I I 1 I 100% I Assistance to 47 farmers
improvement for farmers
T-&-1 •-· nuTr I I I I I I I I I 1 I 0 I 1 I 20%
Social Development (Development/Operating) Monitoring Checklist - Jtd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citinickel Mines and Development Corporation - Toronto Nickel Mining Project
No.
2
3
4
Social Development (Development/Operating) Monito ring Checklist- Annex 1 E-2 C. Financial Accomplishment- Toronto Nickel Mining Project
PROJECT/ PROGRAM/ ACTIVITY (PPA)
Scholarship Program
I Construction of School Canteen
Provision of I photocopying
machine
I Provision of computers units
Maintenance of Solid Waste Mgt Program
lQ
ALLOTMENT/BUDGET
'lnn nnn nn 200,000.00
115,000.00 129, 003.38
95,000.00 I -
100,000.00
70,000.00
I 4oo.ooo.oo
244,003.38
195,000.00
1100,000.00
70,000.00
Social Development (Development/Operating) Monitoring Checklist - 3•d Quarter 2019
-~vv,vvv.v
Contractor/Permit Holder: Citinickel Mines and Development Corporation - Toronto Nickel Mining Project
- 1 2oo.ooo.oo 1
0 -
95,000.00 I I 95,ooo.oo I
100.000 .00 1 1 1 oo.ooo.oo 1
70,000.00 70,000.00
50%
0%
100%
100%
100%
PPA STATUS/REMAR
KS
College students provided with financia l
1 a llowance support throughout the school
San Isidro Elementary School
I Bible Missionary Christian School
A llotted for the service vehicle repair and maintenance of MRF
Mines and Geosciences Bureau MIMAROPA Region
-Annex 1E-2
2 116,000.00
3
50,000.00 50,000.00 0 0% Financial support fiUIIUI1
2 I San Isidro Labrador
Fiesta 50,000.00 50,000.00 50,000.00 100% Financial support
3 I Development of Purok Centers
35o,ooo.oo I 35o,ooo.oo I 0 I 0%
4 1 Renovation of SK Building
371.000 .oo I 371.000 .oo I 0 I 0%
12o.ooo.oo I - I 12o,ooo.oo I 100'7.. I equipment to be used for the livelihood
2 Purchase of 1 unit 52.669.31 52,669.31 52,669 .31 52,669.31 210,677.24 52,669.31 52,669.31 52,669.31 158.007.93 r 75% 1 Provided to CFMCI Farm Tractor to CFMCI Compensation for
3 agreeing and allowing
4,000.00 4,000.00 4,000.00 4,000.00 16,000.00 4,000.00 4,000.00 4,000.00 12,000.00 I 75% I Provided to CFMCI ..
Social Development 1 Development/Operating) Monitoring Checklist- 3'd Quarter 201 9 Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citinickel Mines and Development Corporation- Toronto Nickel Mining Project
Unspent Allotment Previous Year'
Total for Development of Host and Neighboring
CommunHies
Current Alotment -~-----------
Unspent Alotment (Previous Year's)
5
6
7
8
9
ComRel Activities
LGU sessions & other
Fiesta, restiV<""' Foundation
School Journalism/ other academic institution Related Activity
Tarpaulins, p laques. l 0 I leaflets. Hyers &
newsletters, sig nages
56,669.31 426.669.31
54,669.31 42U69.31 --~ --~- - - - - ____ ..,_ ---
. .
266,669.31 476,669.31 1,226.677.24
U.,669.31 476,669.31 1.226,6n.24 ------ -- - ·------- - ----------·------
. . 901.805.00
53,738.97
18,521 .02 18,521 .02
22.570.37 22,570.37
12,213.40 24,426.80
9,770.72 9,770.72
12,213.40 24.426.80
29,312.17 29,312.17
Social Development (Develop ment/Opera ting) Monitoring Checklist- 3•d Quarter 2019
Social Develooment !Develooment/Ooera tinal Monitorina C hecklist- Annex 1 E-2
56,669.31 56,669.31 -
5U69.31 56,669.31 . ---------- -·---- -··-1-
651.805.00 250,000.00 .
3,000.00
3,000.00 3,000.00 6,000 .00
3,000.00 3,000.00 500.00
163,338.62 I -
163,338.62 --- -----·
. 901 ,805.00
93,675.00
6,000 .00
12,000.00
6,500.00
13~
13% ---- _ ... ....... ... ____ _ ---100%
47 .9%
0%
0%
Expenses during PCAPI Convention Training materials/ accomm oda tion food fare etc
gs seminars 26.6% I by MGB and o ther
related Discuss
49. 1% I community conce rns
0%
0%
sponsorship namebran printing of mate rials,
ns company promotion a nd d issemination rega rding m ini ng a ctivities
Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citinickel Mines and Development Corporation - Toronto Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist - Annex 1 E-2 99.675.oo I - I - I 118.175.oo I 2s.3 -ro 59,085.20 467,961.25 59,085.20 I 83,512.00
Scholarship for Mining - 17.639.07 - I I I I I Scho larship Industry related 17.639.07 35,278.14 0 - 0% assistance to Courses Research related to soil. farm produce and
I I I I Research/study
2 I implements for the 51.313.66 51,313.66 - 0% conducted
benefit of impact communities Trainings & Seminars related to Mining Industry for Brgy.
3 I Council members. I 8,819.54 I 8,819.54 I 8,819.54 I 8,819.54 I 35,278.14 I 0 I 0 I 0 I I - I 0% I Trainings schoolteachers, conducted company employees and other project stakeholders Company visits/Educational
I I I I 1 38.485.24 I I I I I I I Company visits 4 I Travel of University 9,621.31 9,621.31 9,621.31 9,621.31 0 0 0 - 0% students. NGOs and conducted
other sta Assistanc
5 Livelihoo_
I I I I 165,335.57 I 165,335.57 165,335.57 I I I 100% ..
Social Development (Development/Operating) Monitoring Checklist- 3rd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citinickel Mines and Development Corporation- Toronto Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist - Annex 1 E-2
• .. • • .. _..,. __ ·-· ·-· ... -'"4'-•• -·. ·-· ··-
PARAMETERS LEGAL BASIS COMPLIANCE COMPLIANT REMARKS/
INDICATOR YES NO DATE OF SUBMISSION RECOMMENDATIONS
1. Annual Report on SDMP (Programs on DHNC, IEC, Section 136
Submitted report
and DMTG) submitted to - D of DAO stamped
Annual MGB RO, copy furnished 2010-21
received by MGB
MGBCO RO
2. Quarterly 1Q Accomplishment Reports Section 136
Submitted reports Apr. 16, 2019
(Programs on DHNS, IEC, -D of DAO stamped ./ 2Q July11,2019
and DMTG) submitted to 2010-21 received by MGB 3Q October 15,2019
MGBRO RO
- -----~ - ----~~-4Q
------ - --
~
Ill. Implementation of Annual Social Development and Management Program
A. Summary - Toronto Nickel Mining Project (for Jld Quarter 201 '1)
PHYSICAL FINANCIAL AVERAGE COMPONENT
ACCOMP % EXPENDITURES BALANCE % % TARGET ALLOTMENT
Development of the Host and 19 17 89.5% Php 753,669.31 Php 487,669.31 Php 266.000.00* 64.7% 77.10% Neiqhborinq Communities
Information, Education and 40 19 26.7% Php 467.961.25 Php 118.1 75.00 Php 349.786.25 25.3% 26.00% Communication
Development of l"~ning Technology 5 1 20.0% Php 325.710.75 Php 165.335.57 Php 160.375.1 8 50.8% 35.35% and Geosciences
GRAND TOTAL 64 38 45.4% Php 1.547.341.31 Php 408.510.57 Php 998.830.74 46.'1% 46.2% - ..____ ____ ._
NOTE: • Compensat~d by tn~ early prov sion of fiv~ (5) compllter unit s f R~'llam ing prot~ct t o be imolemented rs the construction of school canteen (tareet for 3Q) with Php 115,000 budget cost; Bulk of the financial budeet to be used in t~e 4Q PPA rMpl~mentat ior.s
Unapproved proposed PPAs' budget •s not included '"this matnx
PENALTIES
If not complied, fine not exceeding Php 5,000 per Section 110 of RA 7942
Social Development (Development/Operating) Monitoring Checldist- 3 <d Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citinickel Mines and Development Corporation- Toronto Nickel Mining Project
Social Development !Development/Operating) Monitoring Checklist - Annex 1 E-2
OTHER FINDINGS/OBSERVATIONS AND RECOMMENDATIONS· --=· . . --FINDINGS RECOMMENDATIONS PENALTIES
1. Accomplished 45.4% of the quarter's physical Close monitoring of the remaining PPAs to be target with corresponding 46.9% financial implemented for the last quarter accomplishment.
Target accomplishment: at least 85% NONE The Development of Host and Neighboring
Communities covered the bulk of the physical and financial accomplishments at 89.5% and 64.7%, respectively.
2. Low physical and financial accomplishments for IEC Consider publication of IEC materials and DMTG PPAs (pamphlets/brochures) showcasing the companies'
social and environmental commitments and NONE
accomplishments
3. Complied with the mandatory legal requirements Continue compliance with the existing laws, rules, and
other pertinent regulations NONE -- - -·--- --- - - ---
Other Recommendations: • Take advantage of the social events in the community in conducting IECs; Ensure proper documentation • Strictly comply with the construction p lan/program of works for infrastructure projects being implemented • Post a list of the implemented and for implementation projects at conspicuous location in each beneficiary barangay for transparency p urposes • Follow up with regard to the corresponding implemented PPA reports with the LGU.
Social Development !Development/Operating) Monitoring Checklist- 3•d Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citinickel Mines and Development Corporation- Toronto Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist - Annex 1 E-2
PHOTO DOCUMENTATION
Provision of five (5) computer units Bible Missionary Christian School
Total Project Cost I Budget : Php 100.000
Project implementation dura tion: Forty - five (45) calendar days
. ,J. .... ·='··· -:&1 == ...- &E!!!!::....::.. ~~
Social Development (Development/Operating) Monitoring Checklist - Jrd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citinickel Mines and Development Corporation - Toronto Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E-2
Social Development (Development/Operating) Monitoring Checklist- 3'd Quarter 2019 Contractor/Permit Holder: Citinickel Mines and Development Corporation - Toronto Nickel Mining Project
X
I !•M iit .Ge - ·
"""'' ,,...
N.~•l" .Jr..,
y
f.I,OORP~
Mines and Geosciences Bureau MIMAROPA Region
Social Development (Development/Operating! Monitoring Checklist - Annex 1 E-2
Provision of ten (101 units sewing machine Total Project Cost I Budget: Php 120,000.00 Beneficiaries: RIC, Barangay Volunteers, and Women's Association
Social Development (Development/Operating! Monitoring Checklist- 3rd Quarter 2019 Contractor/Permit Holder: Citinickel Mines and Development Corporation- Toronto Nickel Mining Project
Total Project Cost I Budget*: Php 210,677.24
Mines and Geosciences Bureau MIMAROPA Region
Social Development (Development/Operating) Monitoring Checklist - Annex 1 E-2
Social Development (Development/Operating) Monitoring Checklist - Jrd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citinickel Mines and Development Corporation- Toro nto Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E-2
Republic of the Philippines Department of Environment and Natural Resources Mines and Geosciences Bureau MIMAROPA Region
SOCIAL DEVELOPMENT (DEVELOPMENT/OPERATING) MONITORING CHECKLIST
PARTICULARS NAME COMPANY /DESIGNATION SIGNATURE
Monitoring Team ROEL ANTHONY S. LUZ MGB-MIMAROPA I SRS II h/rff/ir_ -Hon. HAMRIN ALIP Brgy. Punang/ Chairman ( } Hon. ANTONIO E. FRANCISCO Brgy. Labog I Chairman VTI~-:k 7 Hon. JESSIE G. GALANG Brgy. Pulot Interior I Chairman K7lJIIJJJJJtl1 / JONATHAN J. ONG IP Representative-S. Espanola I IPMR\1 ~II[/( ARMANDO A. lULING Community Relations Officer f--.-/ V/1_ - [ J[r.J Contractor /Permit Holder
Representative Is ARL YN A. BAG NATE
JEALYN B. BACTOL
Community Relations Officer
Community Relations Officer ~\JJ 2 1 VV Nn IENGR. KIMELODY GIMOTEA Civil Engineer
\7Tf)l \./
Date of Monitoring: October 21 • 25, 2019
Coverage of Monitoring J•d Quarter 2019
BASIC INFORMATION Tenement(MPSA/FTAA) No. MPSA No. 229- 2007 -IVB
Date Approved 03 January 2007
Contractor / Permit Holder Cltlnlck.el Mines and Development Corporation
Authorized Operator, if any N/A
President of the Contractor I Permit Holder and Operator, if any Mr. Ferdinand M. Pallera
Contract/ Permit Area (hectares) 2,176 (Toronto and Pulot Nickel Mining Project)
Location of the Contract/Permit Area Brgy. San Isidro, Narra and Brgy. Pulot Interior, Sofronio Espanola, Palawan
Commodity Nickel I
Social Development (Development/ Operating) Monitoring Checklist- 2nd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/ Permit Holder: Citinickel Mines and Development Corporation - Toronto & Pulot Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E-2
MANDATORY SOCIAL DEVELOPMENT (DEVELOPMENT/OPERATING) COMPLIANCE REQUIREMENTS
PARAMETERS LEGAL BASIS COMPLIANT REMARKS/
RECOMMENDATIONS PENALTY YES NO FINDINGS
(Documents) Social Development and Management Program
1. 5- Year SDMP Section 134 and 136·A Revised Phase II -of DAO No. 2010·21 Five (5)- Year SDMP
./ approved on 20 December 2017
I (Toronto & Pulot)
2. Annual S DMP Section 136-A of DAO ./ Approved on 26
•
No. 2010-21 March 2019
3. Submission of Notarized Section 134 of DAO Submitted final Sworn Statement of 1.5% No. 2010-21 ./ OPEX on May 28, If not complied - fine not Operating Cost to MGB 2019 exceeding Php 5000 per Section RO 110 of RA No. 7942
4. Memorandum of Section 136-B of DAO Signed 30 June Agreement with the host No. 2010-21
./ 2018 (Pulot); July If not complied - fine not and neighboring 30,2018(San exceeding Php 5000 per Section communities upon the Isidro) 110 of RA No. 7942 approval of 5-Year SDMP
Management and Relationship with Stakeholders
1. Establishment of Section 136-C of DAO ./ Community Relations No. 2010-21
Office If not complied - fine not exceeding Php 5000 per Section
2. With a Community Section 136-C of DAO ./ fA.rmando A. Tuling 110 of RA No. 7942 Relations Officer No. 2010-21 ~rlyn A. Bag nate
ealy_n Bactol
Social Development (Development/ Operating) Monitoring Checklist - 2nd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/ Permit Holder: Citinickel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
Social Development (Develop ment/Operatlng) Monitoring Checklist- Annex 1 E-2
SOCIAL DEVELOPMENT (DEVELOPMENT/OPERATING) PERFORMANCE CRITERIA
5·Yr SDMP CoA No. (Phase) SDMP II MGB MIMAROPA- 2017-01 A&B ASDMP CoA No. ASDMP MG8 MIMAROPA - 2017-018
Date of Approval 20 December 2017 Date of Approval 26 March 2019
Period of Coverage 2017. 2021 Period of Coverage CY 2019
Term 0 1" I 2nd 0 3rd 0 41h 0 5th Operating Cost Php 120, 240, 788.00
Total Commitment Php 20,923,322.21 Total Commitment for the Year
DHNC Commitment Php 15,384,804.73 DHNC Commitment Php 1 ,628,453. 98
IEC Commitment Php 3,322,982.845 IEC Commitment Php 325,690.74
DMTG Commitment Php 2,215,534.635 DMTG Commitment Php 217,127.1 7
Balance of Commitment Php 17.404,949.455 Total Unspent from previous ASDMP (If any)
DHNC Commitment Php 12.472,540.59 DHNC Commitment
IEC Commitment Php 2,959,317.64 IEC Commitment
DMTG Commitment Php 1,973,091.225 DMTG Commitment
Impact Communities
Host Barangays San Isidro Narra Palawan
[Name of Barangay], [City I Pulot Interior Sotronio Espanola Palawan Municipality], [Province] Punang Sofronio Espanola Palawan
La bog Sofronio Espanola Palawan
Neighboring Barangays Pulot Shore Sofronio Espanola Palawan
[Name of Barangay), [City/ P ulot Center Sofronio Espanola Palawan Municipality], [Province]
ICC/IPs (If applicable) Pala'wan
Social Development (Development/ Operating) Monitoring Checklist- 2nd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/ Permit Holder: Citinickel Mines and Development Corporation- Toronto & Pulot lllickel Mining Project
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E-2
1. Development of ASDMP
PARAMETERS LEGAL BASIS COMPLIANCE INDICATOR COMPLIANT
RECOMMENDATIONS PENALTIES YES NO
Consultation with the host Section 136-A 0 Minutes of meeting ./ and neighboring ofDAO No. D AHendanceSheeb ./ communities 2010-21
./ 0 Photos
II. Monitoring of the ASDMP
PARAMETERS LEGAL BASIS COMPLIANCE INDICATOR COMPLIANT
RECOMMENDATIONS PENALTIES YES NO
1. Conduct of Monthly Internal Section 136·0 Monthly internal Jan ./ Monitoring of the ASDMP and of DAO No. monitoring
Feb ./ the representative of the host 2010-21 conducted as shown and neighboring communities in the reports Mar ./
Apr ./ May ./
Jun ./
Jul ./ Aug ./ Sep ./ Oct
Nov
Dec
Social Development (Development/ Operating) Monitoring Checklist- 2nd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/ Permit Holder: Citinickel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E·2
Ill. Implementation of Annual Social Development and Management Program
Summary - Pulot Nickel Mining Project
PHYSICAL FINANCIAL AVERAGE COMPONENT
'7o TARGET ACCOMP '7o ALLOTMENT EXPENDITURES BALANCE '7o
Development of the Host and 53 8 15'7o 1 0'7o 13'7o Neighboring Communities 1,628,453. 98 167,576.96 1.460,877.02
Information, Education and 40 23 58'7o 37'7o 47'7o Communication 325,690.74 119,875.00 205,815.74
Development of Mining Technology 4 1 25'7o 55'7o 40'7o and Geosciences 217,127.17 120,000.00 97,127.17
GRAND TOTAL 97 32 33'7o 2,171,271.89 407,451.96 1,763,819.93
34'7o 33'7o
Social Development (Development/Operating) Monitoring Checklist- 2nd Quarter 2019 Contractor/Permit Holder: Citlnickel Mines and Development Corporation-Toronto & Pulot Nickel Mining Project
Mines and Geosciences Bureau MIMAROPA Region
Social Development (Develop ment/Opercrtlng) Monitoring Checklist- Annex 1 E·2
Physical Accomplishments- Pulot Nickel Mining Project
PROJECT/PROGRAM/ UNIT OF TARGET ACCOMPLISHMENT PPA STATUS/REMARKS
No. WORK TOTAL TO %TO (Indicate# of ACTIVITY (PPA) MEASURE 1Q 2Q 3Q 4Q ANNUAL 1Q 2Q 3Q 4Q
DATE DATE Beneficiaries}
DEVELOPMENT OF THE HOST AND NEIGHBORING COMMUNITIES PULOT INTERIOR r
a . Access to Education and Educational Support Pro ~ram
Support for Para-1 Para-Teacher
1 Person 1 1 1 1 100% provided with financial Teacher assistance
b. Others/Social Services Foundations and Approx. 500+
1 Cultural activities Units 1 1 1 1 100% support
residents/ IPs I
Support to members of I community to have a
2 Community Service
1 0 0% safe convenient and
Vehicle easy access to transportation during socio-cultural actvlties
Sub-Total 0 0 1 1 2 0 0 2 0 2 67% Total for Pulot Interior 0 0 1 1 2 0 0 2 0 2 67% c
LABOG a. Access to Education and Educational Support Pro~ram
1 Naltep Day Care
School/ Bldg 1 1 0 0% 30 day care pupils/
Center parents
As requested by Labog 2 1 unit Aircon Unit 1 1 0% Elementary School for
their Computer Center.
b. Others/Social Services ---- ~ - ---------- - - ----- ---- -- ------ -- ----------- --------------
Social Development (Development/ Operating) Monitoring Checklist -2nd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Conf!actor/Permlt Holder: Cltlnlckel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
Social Develooment Development/Op_eratinal Monltorlna Checklist - Annex 1 E·2
1 Tanod Outpost Jail Unit 1 1 0 0% Approx. 500+ residents/IPs
c. Health and Sanitation
Approx. 500 residents/ 1 Medicines Set/s 30 30 0 0% Ips provided with
I medicines
Nutrition Month Support to members of
2 Celebration
Event 1 1 1 1 100% community during socio-cultural actvitles
Sub-Total 0 0 3 31 34 0 0 1 0 1 3%
Total for Labog 0 0 3 31 34 0 0 1 0 1 3%
PUNANG a. Access to Education and Educational Support Pro ;:,ram
Support for Para· 2 Para-Teachers
1 Person/s 3 3 3 3 100% provided with financial Teacher assistance
Additional facility/equipment for
2 Makeshift Ubrary Unit 1 1 the benefit of the pupils and teachers and the community
b. Others/Social Services Foundations and
Approx. 500+ 1 Cultural activities Activity /les 1 1 0 0
support residents/IPs
- c. HeaRh and SanHatlo~
I \ I I I l 1 J I I I 1 Medicines and other S t/ 2 2 1 1 50% I Barangay wide Dengue medical apparatus e s Spray Activity
d. Human Resource
1 leadership and
training/s 1 1 1 1 100% 10 Brgy. Officials/
Procurement Seminar Volunteers e.Uvellhood
Social Development (Development/Operating) Monitoring Checklist- 2nd Quarter 2019 Mines and Geoscienc es Bureau MIMAROPA Region Contractor/Permit Holder: Citlnickel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
Social Develooment Development/Operating) Monitorina Checklist - Annex 1 E-2
1 Goat Raising tralning/s 1 1 0 0% 1 0 Brgy. Officials/ Volunteers Approx. 100 residents/ IPs provided with
i 2 Solar Dryer Unit 1 1 0 0% Additional
facility /equipment to be used of farmers
Sub-Total 0 0 0 10 10 0 1 4 0 5 50% Total for Punang 0 0 0 _10 _ 10 0 1 4 0 5 50%
---~ ------------- ~
PULOT CENTER a. Other Social Services
1 unit Desktop Additional fund to
1 Set/s 1 1 0 0% support the computer with printer Barangay/Communlty
2 Office Supplies Set/s 5 5 0 0% 1--·
Sub-Total 0 0 0 6 6 0 0 0 0 0 0% Total_for Pulot Center _ 0 0 _ o - 6 6 0 0 0 _..__ 0 .,... 0 0%
----~- - - -- - -- . PULOT SHORE
a. Others/Social Services
1 Renovation of waiting
unit 1 1 0 0% Approx. 1 00+
r--- shed residents/IPs Sub-Total 0 0 1 0 1 0 0 0 0 0 0
~ Total for Pulot Shore 0 0 1 0 1 0 0 0 0 0 0% ._,~ · - · ·.r;- -- -- 1- -- ·-- ·- ---· Uo •IIi •!11t :ri • •
~~ (!) [!] ~ 1m3 m (!) tl f} (!) Q m :A ~· • •HIJ ~ . m:n
Social Development (Development/Ope rating) Monitoring Checklist- 2nd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Conlrador/Permlt Holder: Citlnickel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
,---- social oevetoe_ment (Devetopment/Operannal Monnonng cnecKIIST- Annex 1 t•Z
UNIT OF TARGET ACCOMPLISHMENT PPA STATUS/REMARKS No.
PROJECT/PROGRAM/ WORK TOTAL TO (Indicate # of ACTIVITY (PPA)
MEASURE 1Q 2Q 3Q 4Q ANNUAL 1Q 2Q 3Q 4Q DATE
%TO DATE Beneficiaries)
INFORMATION, EDUCATION AND COMMUNICATION CAMPAIGN-PROMOTION OF PUBUC AWARENESS AND EDUCATION ON MINING TECHNOLOGIES AND GEOSCIENCES
1 Public Realations (PR)
activity /les 1 1 1 1 4 1 1 25% PF for news clippings and Media reports
PMSEA/ANMSEC Training
2 Activities
Event 1 1 0 0% materials/accommodation food fare etc
3 National Unified IEC Event 1 1 0 0% National IEC
4 Trimedia Advocacy
activitiy /les 1 1 0 0% campaign Radio _j)lugs
5 Local Festivities & Mall
activity /les 1 1 2 0 0% Put up booths/tents during
exhibit event trainings seminars by MGB
6 Com Rei Activities activity /ies 1 1 1 3 4 400% and other related agencies
7 LGU sessions & other
meetings 6 6 6 6 24 4 4 6 14 58% Discuss community meetings concerns
8 Fiesta, Festivals &
activtiy /ies 1 1 3 3 300% sponsorship Foundation days name branding School Journalism/
9 other academic
activity /ies 1 1 0 0% printing of materials,
Institution Related competitions Activity Tarpaulins, plaques, company promotion and
10 leaflets, flyers & news activity /les 1 1 1 1 4 1 1 25% desslmlnatlon regarding leHers. signages - f-· - minlg activities
Total for IEC Campaign ---- ------------
1 _ L_ 2 --
6 - --
40 5 6 3 0 23 58%
Social Development (Development/OperaHng) Monitoring Checklist- 2nc1 Quarter 2019 Mines and Geosciences ilureau MIMAROPA Region Contractor/Permit Holder: Citinlckel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
... --·-· -- ·-· ..... f"_···-··· --·-·-.... ···-· .. - -·-· ... ···-· .. ·-···· -··-- ........ -- ...- ..... ·--TARGET ACCOMPLISHMENT PPA STATUS/REMARKS
PROJECT/PROGRAM/ UNIT OF
No. WORK TOTAL TO ACTIVITY (PPA) MEASURE 1Q 2Q 3Q 4Q ANNUAL 1Q 2Q 3Q 4Q
DATE '7o TO DATE (Indicate# of Beneficiaries}
DEVELOPMENT OF MINING TECHNOLOGIES AND GEOSCIENCES (DMTG} I Scholarship for Mining
1 Industry related 1 1 0 0% Courses Research related to soil, farm produce and implements for the
Turnover of seedlings to PQMI Rehabilitation 2 benefit of Impact 1 1 1 1 100% Project
communities; Support to PQMI Rehabilitation Project Trainings & Seminars related to Mining Industry for Brgy.
3 Council members.
1 1 0 0% school teachers, company employees and other project stakeholders Company visits/ Educational Travel
4 of University students, 1 1 0 0% NGOs and other stakeholders
Total for DMTG 25% I
--- ------~all'l_paign
------- - ---0 0 0 4 4 0 0 1 0 1
Social Development (Development/ Operating) Monitoring Checklist- 2nc1 Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/ Permit Holder: Citinlckal Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
Social Development (Develop ment/ Operaflng) Monitoring Checklist- Annex 1 E-2
Financial Accomplishment- Pulot Nickel Mining Project
PPA
PROJECT/PROGRA ALLOTMENT/BUDGET STATUS/REMARK
No. ACTUAL EXPENDITURES s M/ ACTIVITY (PP A) TOTAL TO %TO (Indicate * of
1Q 2Q 3Q 4Q ANNUAL 1Q 2Q 3Q 4Q DATE DATE Beneficiaries}
DEVELOPMENT OF THE HOST AND NEIGHBORING COMMUNITIES
PULOT INTERIOR i
a. Access to Education and Educational Support Program 1 Para-Teacher
Support for Para-12,000.00 100%
provided with Teachers 12,000.00 12,000.00 12,000.00 financial
1 assistance
Sub-Total . . 12 000.00 . 12 000.00 . . 12000.00 . 12000.00 100%
Current Allotment . . 12 000.00 . 12 000.00 . . 12 000.00 . 12 000.00 100% !
Unspent Allotment . . . (Previous Year's}
. . . . . . .
b . Assistance to Infrastructure Development and Support Services
Foundations and Approx. 100+
Cultural activities 50,000.00 100% support 30,000.00 80,000.00 80,000.00 80,000.00 residents/ IPs
1 Support to members of community to
Community have a safe 2 0% convenient and
Service Vehicle 423,677.26 423,677.26 . easy access to transportation during soclo-cultural actvities
Social Development (Development/ Operating) Monitoring Checklist- 2nd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Cltinic:kel Mines and Development Corporation-Toronto & Pulot Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E·2
Sub-Total . . 50,000.00 453 677.26 503,677.26 . . 80000.00 . 80000.00 16%
current Allotment . . 50 000.00 453 677.26 503 677.26 . . 80 000.00 . 80 000.00 16%
Unspent Allotment (Previous Year's)
Total for Pulot Interior . 62,000.00 453,677.26 515,677.26 .
92,000.00 92,000.00 18% .. . . :
Current AUotment . 62,000.00 453,677.26_ ,515.~77.26 -
. 9_2,_000.00 92)X~,oo
18% . . . - - - - ---- ,__ -. ·- -
Unspent Allotment (Previous Remaining fund
. . 120,785.94 100% of ASDMP 2018: Year's) . . 142,785.94 22,000.00 142,785.94
solar street lights
LA BOG I. t: .. t:
a. Access to Education and Educational Support Program
Naltep Day Care 0%
30 day care Center 350,000.00 350,000.00 . pupils/ parents
1 As requested by Labog
1 unit Aircon 0% Elementary
30,000.00 30,000.00 School tor their Computer
2 Center.
Sub-Total . . . 380 000.00 380,000.00 . . . . . 0%
Current Allotment . . . 380 000.00 380,000.00 . . . . . 0%
Unspent Allotment . . . (Previous Year's)
. . . . . . .
b. Others/Social Services ---- - ---------- - - -
Social Development (Development/ Operating) Monitoring Checklist- 2nd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Conltactor/ Permlt Holder: Cltinickel Mines and Development Corporation- Toronto & Pvlot Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E-2
1 Tanod Outpost 0%
Approx. 100+ with Jail 75,677.02 75,677.02 . residents/ IPs
Sub-Total . . . 75,677.02 75,677.02 . - . - - 0%
current Allotment . - - 75 677.02 75 677.02 . - - . . 0%
Unspent Allotment . - - - -(Previous Year's} - - . . c. Health and Sanitation
Approx. 500
Medicines 0% residents/ Ips
30,000.00 30,000.00 - provided with 1 medicines
Supporl to
Nutrition Month members of
Celebration 30,000.00 30,000.00 30,000.00 30,000.00 100% community
during soclo· 2 ·- cultural actvitles -
_Sub-Total - - . 60 000.00 60 000.00 . - 30,000.00 . 30 000.00 50%
Current Allotment . - . 60 000.00 60,000.00 . . 30,000.00 . 30 000.00 50%
Unspent Allotment - - . - - I (Previous Year's) . . . - .
,,
Total for Labog . . 515,677.02 515,677.02
. 30,000.00 30,000.00
6% . . --- -- - _.... ------- --· -- .--r:-- -- -- -- ---- ~ ·- ---· - · ~ -Current AUotment . .
515 677.02 515 677.02 - 30000.00 30 000.00 6% - . .
Remaining fund of Unspent Allotment (Previous
0% ASDMP 2018: Year's)
. . - 50,000.00 .
Spring - - -Development
- - - ,. -- ---~-- - - - ·- . - - --~ ...-: ~ _..__ . .,..-- - ··--- - -PUNANG I
Social Development (Development/Operating) Monitoring Checklist- 2.,.. Quarler 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/ Permit Holder: Citlnickel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
OJI,.n .. tUI LIIID'YC:IW III'Cl'lll LI~YIID"IW I IIV 11tf -to'"""l""llll IWHo#IIUWIIII -11"""'-""-11•1- I""VllllliOA ... -.
a. Access to Education and Educational Support Program 2 Para-Teachers
Support tor Para 20,000.00 20,000.00 20% provided with
Teacher 20,000.00 60,000.00 120,000.00 24,000.00 24,000.00 financial 1 assistance
Additional facility /equipment
Makeshift Library 0% for the benefit of
170,000.00 170,000.00 the pupils and teachers and
2 the community ---··
' Sub-Total 20000.00 20,000.00 20 000.00 230 000.00 290 000.00 - - 24000.00 - 24000.00 8%
Current Allotment 20000.00 20000.00 20 000.00 230 000.00 290 000.00 . - 24 000.00 - 24000.00 8%
Unspent Allotment - - -(Previous Year's) - - - - - -b. Others/Social Services Foundations and
Approx. 100+ 1 Cultural activities 0%
support 50,000.00 50,000.00 - residents/ IPs
Sub-Total - - - 50 000.00 50 000.00 - - - - - 0%
Current Allotment - - - 50 000.00 50 000.00 - - . . . 0%
Unspent Allotment . . . (Previous Year's)
. . - . . . c. Health and Sanitation
Medicines and Approx. 100
other medical 20,000.00 0% residents/ Ips
apparatus 20,000.00 - provided with
1 medicines
Sub-Total - . 20 000.00 . 20 000.00 - . - - . 0%
Current Allotment - . 20 000.00 - 20,000.00 - . . . - 0%
Unspent Allotment - . . {Previous Year's} - . . . . .
:ooc1a1 ueve1opmenr (l.levelopmenTt ' peranngJ Monnormg c;necKJist- 2"" Yuaner 20 1'1 M nes and Geosc ences Bureau IIMAROPA R eaton Contractor/Permit Holder: Ciflnickel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E-2
- 50,000.00
Sub-Total - - - . - . - . d . Human Resource leadership and 10 Brgy Officials procurement
50,677.02 50,677.02 21 ,576.96 21 ,576.96 43% I volunteers
1 seminars
Sub-Total . - . 50,677.02 50 677.02 . 21 ,576.96 . . 21 ,576.96 43% I
Current AUotment . . . 50 677.02 50 677.02 . . - .
Unspent Allotment [Previous Yea r's) e. Livelihood
Goat Raising 0% 10 Brgy Officials
1 25,000.00 25,000.00 . I volunteers
Approx. 100 residents/ Ips provided with
2 Solar Dryer 80,000.00 80,000.00
0% Additional . facility /equlpme nt to be used of farmers
Sub-Total . . - 105,000.00 105 000.00 . . . . . 0%
0% Current Allotm ent . . . 105 000.00 105,000.00 . - . .
Unspent Allotme nt [Previous Year's)
Total for Punang 20,000.00 20,000.00 40,000.00
330,677.02 515,677.02 21 ,576.96
24,000.00 45,576.96 9'7;. .
Current Allotment 20000.00
20,000.00 40,000.00 330,677.02 515,677.02
21,576.96 24,000.00 45,576.96
9'7;. . . Social Development (Development/Operating) Monitoring Checklist- 2nd Quarter 2019 Mines and Geoscienc es Bureau MIMAROPA Re gion Contractor/ Permit Holder: Ciflnickel Mines and Development Corporation - Toronto & Pulot Nickel Mining Project
Unspent Allotment (Previous Year's)
PULOT CENTER .I~ -I
Social Development (Develop ment/OperatingJ Monitoring Checkllst- Annex 1 E·2
_]= ] ,~,,m,. l'"·'Md2•.ooo••_L_J~~ ~j,.,,, ..... _l_'""" 1 1 a. Others/Social Ser,vices ,
1 1 1 1 1 1 1
2
1 unit Desktop computer with orinter
Office Supplies
Sub-Total ' •
1 1 Current AUotment
Unspent Allotment fPrevlous Year'sl
Total for Pulot Center
Current AHotment
Unspent Allotment (Previous Year's) • •
PULOT SHORE
27,500.00
13.211.34
40.711 .34
40.711 .34
40,711 .34
40.711.34
27,500.00 0%
0% 13,211.34
40.711 .34
40,711 .34
40,711 .34 0%
40.711 .34 0%
11 .272.57 11 ,272.57 11 ,272.57 100%
1 1 ~· Oth~~/Soc11al Ser1vlces
1 1 1 1 1 1 1 1 1 1 _ _
enov on o waiting shed at So. luntab
Sub-Total • •
Current Allotment
16.703.67 24,007.67
16.703.67 I 24.007.67
16,703.67 24,007.67
40,711.34 0%
40,711 .34
40,711 .34
Remaining fund ASDMP 2018: Support for ParaTeacher
Barangay Office/ Officials and workers Baran gay Office I Offic ials and workers
ASDMP 2018: Maintenance and other operating exPenses
Approx. 100+ residents/ IPs
Social Development (Development/Operating) Monitoring Checklist- 2na Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/ Permit Holder: Citlnickel Mines and Development Corporation-Toronto & Pulot Nickel Mining Project
Total lor Pulot Shore
Current Alotment
Unspent Allotment (Previous Year's)
IEC WITHIN THE IMPACT COMMUNinES
2
3
4
5
Public Realatlons (PR) Media
Activities National Unified IEC Trimedla Advocacy
lPOign
1 Local Festivities & Mall exhibit
16,703.67
16,703.67
32,569.08 32,569.08 32,569.08 32,569.08
35,825.98
32,569.08
7,075.63 7,075.63 7,075.63 7,075.63
25,045.62
Social Development (Development/Operating) Monitoring Checklist- 2nd Quarter2019
Social Development (Development/Operating) Monitoring Checklist- Annex 1
~
~
Expenses during 130,276.30
93,675.00 I 72% I PCAPI convention
93,675.00
Training
0% materlals/ acco mmodatlon food
35 825.98 fare etc
32,569.08 0% Nationai i EC
28,302.53 0% Radio Put up
I 25,045.62 0% I booths/tents
Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citinlckel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E-2 trainings seminars by
6 Com Rei Activities 15,04&.91 15,046.91 4,000.00 3,200.00 5,000.00 0% MGB and other related
12.200.00 agencies
LGU sessions & Discuss
7 other meetings 16,284.54
16,284.54 3,000.00 3,000.00 37% community 6,000.00 concerns
8 Fiesta, Festivals & 6,513.82 7,500.00 115% sponsorship Foundation days 6,513.82
7,500.00 namebranding School Journalism/ other printing of
9 academic 16,284.54 16.284.54 0% materials, . institvllon Related competitions Activity I
Tarpaulins, company
plaques, leaflets, promotion and 10
Hyers & news 19.541.45 19,541.45 500.00 500.00 3% dessimlnation regarding minig letters, slgnages activities
Sub-Total 39 644.71 39 644.71 39 644.71 206 756.62 325 690.74 4 500.00 99 875.00 15 500.00 119 875.00 37% .
Current Alotment 39 644.71 39 644.71 39 644.71 206 756.62 325 690.74 4 500.00 99 875.00 15 500.00 119 875.00
37% . ---· ... .
Unspent Allotment (Previous Year's)
DEVELOPMENT OF MINING TECHNOLOGIES AND GEOSCIENCES (DMTG) Scholarship for Scholarship
1 Mining Industry 23,883.99 23,883.99 47,767.98
0% assistance to related Courses
. college students
Research related to soil, farm produce and
Research/study 2 Implements for 120,000.00 173% the benefit of 69,263.57 69,263.57 120,000.00 conducted
impact communities
~-~--
Social Development (Development/OperaHng) Monitoring Checklist- 2 nd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/Permit Holder: Citlnickel Mines and Development CorporaHon-Toronto & Pulot Nickel Mining Project
Social Development (Development/ Operating) Monitoring Checklist- Annex 1 E-2 Trainings & Seminars related to Mining Industry for Brgy. Council
3 members, school
11 ,941.99 11,941.99 0'7. Trainings
teachers, 11 ,941 .99 11,941.99 47,767.98 - conducted company employees and
I other project stakeholders Company visits/ Educational
4 Travel of University 13,081.91 13,081 .91 0'7. company visits
students, NGOs 13,081 .91 13,081 .91 52,327.65 - conducted and other stakeholders
Sub-Total 25 023.90 48 907.89 25 023.90 118 171.46 217127.17 - - 120 000.00 - 120 000.00 55'7.
Current Allotment 25,023.90 48,907.89 25,023.90 118171.46 21 7,1 27.17 120,000.00 120,000.00 55'7. - - -
Unspent Allotment (Previous Year's)
- ----- --- --~----- ~-
Social Development (Development/OperaHng) Monitoring Checklist - 2nd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/ Permit Holder: Citlnickel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist - Annex 1 E·2
IV. Reportorial Requirements
PARAMETERS LEGAL BASIS COMPLIANCE COMPLIANT REMARKS/
INDICATOR YES NO DATE OF SUBMISSION
RECOMMENDATIONS PENALTIES
1. Annual Report on SDMP (Programs on DHNC, IEC. Section 136
Submitted report
and DMTG) submitted to - D ofDAO stamped
Annual MGB RO, copy furnished 2010 - 21
received by MGB If not complied,
MGBCO RO
fine not exceeding Php
2. Quarterly 1Q Apr. 16, 2019 Accomplishment Reports Section 136
Submitted reports 5,000 per
(Programs on DHNS, IEC, -D ofDAO stamped ./
2Q July 11, 2019 Section 11 0 of
and DMTG) submitted to 2010.21 received by MGB 3Q Oct. 15, 2019
RA 7942
MGBRO RO 4Q
Social Development (Development/Operating) Monitoring Checklist- 2!\d Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/ Permit Holder: Citlnickel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E-2
OTHER FINDINGS/OBSERVATIONS AND RECOMMENDATIONS:
FINDINGS RECOMMENDATIONS PENALTIES
1. Low physical and financial accomplishment Fast Track. implementation of projects
(Physical- 33%, Financial- 34%} -none-
2. Complied with all the mandatory and reportorial requirements In the development and monitoring of Continue complying with the legal requirements. -none-ASDMP.
3. Tribal Hall construction behind schedule Fast track. the construction of the tribal halls before end of the year
-none-
4. Unimplemented projects. Close coordination with the contractors to fast track. the Implementation of the projects.
-none-
- --- ------ --- - - - ----------- - -- ------------- - - -----~ ------ - - ---- - - -------- - - --------------~- --- --- -~--- - ----- - -- - -------~-
Social Development (Development/Operating) Monitoring Checklist- 2nd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/ Permit Holder: Citinickel Mines and Development Corporation - Toronto & Pulot Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E-2
PNMP SDMP Team
Social Development (Development/Operating) Monitoring Checklist- 2nd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/ Permit Holder: Cltinlckel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E-2
,,~ ·~~ ·-·-" --.-l!fllal.
- ..... _,
Support for Para Teachers of Punang National High School Proposed area for the Makeshift library of Punang National High School
Social Development (Development/Operating) Monitoring Checklist- 2nd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/ Permit Holder: Citinickel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
Program/ Activities
Renovation of waiting shed located at Sltlo Luntab, Bgy. Pulot Shore
Beneficiaries
Community/ households
Project Cost
Php 16,703.67
Social Development (Development/Operating) Monitoring Checklist- 2"d Quarter 2019
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E-2
Additional SDMP Fund/Project Php24,007.00
Expected Output/Remarks
Additional support to the Barangay for the renovation of waiting shed
Conducted site visit
I Condition last 2Q 2019 -MM-T~~J
Mines and Geosciences Bureau MIMAROPA Region Contractor/ Permit Holder: Citinickel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project
-.
Social Development (Development/Operating) Monitoring Checklist- Annex 1 E-2
Current state ofthe Tribal Hall at Brgy. Punang Current state of the Tribal Hall at Brgy. La bog
Social Development (Development/ Operating) Monitoring Checklist- 2nd Quarter 2019 Mines and Geosciences Bureau MIMAROPA Region Contractor/ Permit Holder: Citinickel Mines and Development Corporation- Toronto & Pulot Nickel Mining Project